KR200240371Y1 - Suspension type concrete form supporting unit - Google Patents

Suspension type concrete form supporting unit Download PDF

Info

Publication number
KR200240371Y1
KR200240371Y1 KR2020010010693U KR20010010693U KR200240371Y1 KR 200240371 Y1 KR200240371 Y1 KR 200240371Y1 KR 2020010010693 U KR2020010010693 U KR 2020010010693U KR 20010010693 U KR20010010693 U KR 20010010693U KR 200240371 Y1 KR200240371 Y1 KR 200240371Y1
Authority
KR
South Korea
Prior art keywords
formwork
bolt
flange
hole
support member
Prior art date
Application number
KR2020010010693U
Other languages
Korean (ko)
Inventor
방헌규
Original Assignee
(주)종합건축사사무소동우건축
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)종합건축사사무소동우건축 filed Critical (주)종합건축사사무소동우건축
Priority to KR2020010010693U priority Critical patent/KR200240371Y1/en
Application granted granted Critical
Publication of KR200240371Y1 publication Critical patent/KR200240371Y1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

1. 청구범위에 기재된 고안이 속한 기술분야1. TECHNICAL FIELD OF THE INVENTION

본 고안은 교량의 상판 시공을 위해 설치되는 거푸집의 지지를 위한 장치에 관한 것이다.The present invention relates to a device for supporting the formwork is installed for the top plate construction of the bridge.

2. 고안이 해결하려고 하는 기술적 과제2. The technical problem the invention is trying to solve

비계를 사용하지 않고, 거푸집의 설치가 용이하도록 한다.Easy to install formwork without using scaffolding.

3. 고안의 해결방법의 요지3. Summary of solution of design

본 고안은, 거푸집(300)의 지지가 아이형피시빔에 고정된 현수부재(100)에 의해 지지부재(200)를 고정하여 이루어지기 때문에 동바리나 비계를 설치할 필요가 없다.According to the present invention, since the support of the formwork 300 is made by fixing the support member 200 by the suspension member 100 fixed to the eye-shaped fish beam, there is no need to install a clubbage or a scaffold.

4. 고안의 중요한 용도4. Important uses of the devise

교량의 상판 시공에 이용된다.Used for the construction of bridge decks.

Description

현수식 교량상판 거푸집 지지장치{SUSPENSION TYPE CONCRETE FORM SUPPORTING UNIT}Suspension Bridge Top Formwork Supporting Device {SUSPENSION TYPE CONCRETE FORM SUPPORTING UNIT}

본 고안은 교량의 상판용 콘크리트 타설을 위해 설치되는 거푸집을 지지하기위한 것으로, 특히, 비계나 동바리를 설치하지 않고도 거푸집을 지지할 수 있는 거푸집 지지장치에 관한 것이다.The present invention is to support the formwork to be installed for the concrete slab for bridge deck, and more particularly, to a formwork supporting device that can support the formwork without installing scaffolding or clubbing.

일반적으로, 교량이나 고가도로를 건설하기 위해서는 일정간격으로 교각을 설치하고, 교각과 교각 사이에 아이형 PC빔(I TYPE PRECAST CONCRETE BEAM : 이하 '아이형피시빔'이라 함)을 소정간격으로 다수개 거치시킨다. 그리고, PC 빔 사이에 교량상판용 거푸집을 설치하되, 지상이나 교각 상부에 비계나 동바리를 세워 거푸집을 지지하도록 하고있다.In general, in order to construct bridges or overpasses, bridges are installed at regular intervals, and a plurality of I-type PC beams (hereinafter referred to as 'I-type fish beams') are designated at predetermined intervals. Mount it. In addition, formwork for bridge decks is installed between the PC beams, but scaffolding or clubs are placed on the ground or on the top of the pier to support the formwork.

그런데, 이러한 비계나 동바리의 설치는 거푸집의 설치되는 위치가 고소이기 때문에 비계의 설치가 어렵고, 설치되는 비계나 동바리의 양이 많아 자재비가 증가하고, 설치 시간이 오래 걸리는 문제점이 있다.However, the installation of such scaffolding and clubbing is problematic because the location of the formwork is high, the installation of the scaffolding is difficult, the amount of scaffolding and clubbing is large, the material cost increases, and the installation time takes a long time.

또한, 비계가 지상으로부터 설치되면 지상의 작업 공간이 협소하게되어 작업에 에로가 따르는 문제점이 있다.In addition, when the scaffold is installed from the ground, the work space on the ground becomes narrow and there is a problem that the work is accompanied by an error.

그리고, 계곡 등과 같이 교량이 높을 경우에는 현실적으로 비계를 설치하는 것이 불가능한 문제점이 있다.And, if the bridge is high, such as a valley, there is a problem that it is impossible to realistically install the scaffold.

상술한 문제점을 해결하기 위하여 본 고안의 목적은 비계나 동바리를 사용하지 않고도 거푸집을 지지할 수 있는 장치를 제공함에 있다.In order to solve the above problems, an object of the present invention is to provide a device that can support the formwork without using a scaffold or a grouping.

도 1은 본 고안의 실시예에 따른 교량상판 거푸집 지지장치의 분해 사시도이다.1 is an exploded perspective view of a bridge deck formwork supporting apparatus according to an embodiment of the present invention.

도 2는 본 고안의 실시예에 따른 교량 상판 거푸집 지지장치의 설치 사시도이다.Figure 2 is a perspective view of the bridge deck formwork supporting apparatus according to an embodiment of the present invention.

도 3은 도2의 A-A' 단면도이다.3 is a cross-sectional view taken along line AA ′ of FIG. 2.

* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings

100 : 현수부재 110, 120 : 제1 및 제2 볼트100: suspension member 110, 120: first and second bolt

130 : 연결너트 200 : 지지부재130: connection nut 200: support member

상기 목적을 달성하기 위한 본 고안은 교량의 상판 시공을 위한 거푸집(300)의 지지장치에 있어서, 직사각형 관체로 양측 종단에는 아이형피시빔에 일부가 기 매립되어 설치된 디귿자형 철근(10)의 일측이 끼워지도록 걸림홈(101)이 수직으로 형성되어 있고, 중간부위에는 수직으로 관통된 제1홀(102)이 다수개 형성되어 있으며, 양측 하단에는 길이 방향에 수직하여 플랜지(103)가 형성되어 있고, 상기 플랜지(103)에는 고정홀(104)이 형성되어 있는 현수부재(100) ; 직사각형 관체로 밑면에는 거푸집(300)이 올려질 수 있도록 수납공간을 제공하는 걸림판(201)이 연장 형성되어 있고, 상기 제1홀(102)에 대응하여 다수의 제2 홀(202)이 형성되어 있는 지지부재(200) ; 상기 제1 홀(102)에 내삽되어 설치되는 제1 볼트(110)와 상기 제2 홀(202)에 내삽되어 설치되는 제2 볼트(120) : 및, 원형 관체로 내주면에는 나사선이 형성되어 있고, 하단에는 콘크리트가 내부로 유입되는 것을 방지하기 위한 상기 지지부재(200)의 두께에 따른 직경을 가지는 원형 플랜지(131)가 회동되도록 고정되어 있으며, 상기 원형 플랜지(131)의 최외측에는 상기 거푸집(300)을 상면에서 고정시키기 위해 상기 플랜지(131)에 연장되어 돌출된 걸림돌기(132)가 형성되어 있고, 상기 현수부재(100)와 지지부재(200) 사이에 위치하여 설치되고 상단으로는 상기 제1 볼트(102)가 내삽되며, 하단으로는 상기 제2 볼트(202)가 내삽되어 설치되는 연결너트(130)를 구비함을 특징으로 한다.The present invention for achieving the above object is in the support device of the formwork 300 for the construction of the upper plate of the bridge, one side of the deformed reinforcing bar (10), which is partially embedded in the i-shaped fish beam at both ends of the rectangular tube The locking groove 101 is vertically formed so as to be fitted therein, and a plurality of first holes 102 vertically penetrated in the middle portion thereof are formed, and flanges 103 are formed at both lower ends thereof perpendicular to the longitudinal direction. The flange 103, the suspension member 100 is formed with a fixing hole 104; A rectangular tube is formed on the bottom thereof with a locking plate 201 extending from the bottom thereof to provide a storage space, and a plurality of second holes 202 are formed corresponding to the first hole 102. A supporting member 200; The first bolt 110 is inserted into the first hole 102 and the second bolt 120 is inserted into the second hole 202. And, the inner circumferential surface with a circular tube has a thread formed therein. At the bottom, a circular flange 131 having a diameter according to the thickness of the support member 200 to prevent concrete from flowing into the bottom is fixed to rotate, and the formwork is disposed at the outermost side of the circular flange 131. In order to fix 300 on the upper surface, a locking protrusion 132 is formed which extends and protrudes from the flange 131, and is disposed between the suspension member 100 and the support member 200, and the upper side is disposed at the upper end. The first bolt 102 is interpolated, and a lower end of the first bolt 102 is provided with a connection nut 130 interposed therebetween.

이하, 첨부된 도면을 참조하여 본 고안의 바람직한 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 고안의 실시예에 따른 교량상판 거푸집(300) 지지장치의 분해 사시도이고, 도 2는 본 고안의 실시예에 따른 교량 상판 거푸집(300) 지지장치의 설치 사시도이며, 도 3은 도2의 A-A' 단면도이다.1 is an exploded perspective view of a bridge deck formwork 300 supporting apparatus according to an embodiment of the present invention, Figure 2 is a perspective view of the installation of the bridge deck formwork 300 supporting apparatus according to an embodiment of the present invention, Figure 3 2, AA 'section.

본 고안에 따른 거푸집(300) 지지장치는 아이형피시빔에 일부가 기 매립되어 설치된 디귿자형 철근(10)의 일측에 끼워져 설치되는 현수부재(100)와, 제1 및 제2 볼트(110, 120)와 연결너트(130)에 의해 현수부재(100)에 매달려 설치되는 지지부재(200)로 구성되며, 이를 설명하면 다음과 같다.Formwork 300 support device according to the present invention is a suspension member 100 is fitted to one side of the recessed reinforcing bar 10 is partially embedded in the eye-shaped fish beam, and the first and second bolts 110, Consists of the support member 200 is suspended by the hanging member 100 by the 120 and the connection nut 130, which will be described as follows.

현수부재(100)는 지지부재(200)를 설치하기 위한 것으로 도1에 도시된 바와 같이 직사각형 관체 모양을 가지며, 양측 종단에는 아이형피시빔에 일부가 기 매립되어 설치된 디귿자형 철근(10)의 일측이 끼워지도록 걸림홈(101)이 수직으로 형성되어 있다. 관체의 중간부위에는 수직으로 관통된 제1홀(102)이 다수개 형성되어 있다. 관체의 양측 하단에는 현수부재(100)가 넘어지는 것을 방지하고, 현수부재(100)를 아이형피시빔에 고정시키기 위해 관체의 길이 방향에 수직하여 플랜지(103)가 형성되어 있고, 플랜지(103)에는 고정홀(104)이 형성되어 있다.Suspension member 100 is for installing the support member 200 has a rectangular tubular shape, as shown in Figure 1, the both ends of the recessed reinforcing bar (10) of which is partially embedded in the eye-shaped fish beam The locking groove 101 is vertically formed so that one side is fitted. A plurality of first holes 102 vertically penetrated are formed in the middle portion of the tube. Flange 103 is formed perpendicular to the longitudinal direction of the tubular body in order to prevent the suspension member 100 from falling, and to fix the suspension member 100 to the eye-shaped fish beam at both lower ends of the tubular body, the flange 103 ), A fixing hole 104 is formed.

지지부재(200)는 거푸집(300)을 지지하기 위한 것으로 직사각형 관체 모양을 가지며, 밑면에는 거푸집(300)이 올려질 수 있도록 수납공간을 제공하는 걸림판(201)이 연장 형성되어 있다(도2 및 도3 참조). 그리고, 제1홀(102)에 대응하여 다수의 제2 홀(202)이 형성되어 있다.The support member 200 is for supporting the formwork 300 and has a rectangular tubular shape, and a locking plate 201 is provided on the bottom thereof to provide a storage space so that the formwork 300 can be raised (FIG. 2). And FIG. 3). A plurality of second holes 202 is formed corresponding to the first holes 102.

연결너트(130)는 콘크리트 타설 시에 매립 설치되는 것으로, 원형 관체 모양을 가지며, 내주면에는 나사선이 형성되어 있고, 하단에는 콘크리트가 내부로 유입되는 것을 방지하기 위해 지지부재(200)의 두께에 따른 직경을 가지는 원형플랜지(131)가 회동되도록 고정되어 있다. 그리고, 원형 플랜지(131)의 외측에는 거푸집(300)을 상면에서 고정시키기 위한 걸림돌기(132)가 연장형성되어 있다. 연결너트(130)는 현수부재(100)와 지지부재(200) 사이에 위치하여 설치되고, 상단으로는 제1 볼트(102)가 내삽되고, 하단으로는 제2 볼트(202)가 내삽되어 설치된다(도2 및 도3 참조).The connection nut 130 is installed at the time of the concrete pouring, has a circular tubular shape, a screw thread is formed on the inner circumferential surface thereof, and a lower portion of the connecting nut 130 according to the thickness of the support member 200 to prevent the concrete from flowing into the interior. The circular flange 131 having a diameter is fixed to rotate. And, the outer side of the circular flange 131, the locking projection 132 for fixing the formwork 300 from the upper surface is formed extending. The connection nut 130 is installed between the suspension member 100 and the support member 200, and the first bolt 102 is inserted into the upper end and the second bolt 202 is inserted into the lower end. (See Figs. 2 and 3).

이하, 본 고안에 따른 거푸집(300) 지지장치의 설치 및 해체 동작을 설명한다.Hereinafter, the installation and dismantling operation of the formwork 300 supporting apparatus according to the present invention.

도2에 도시된 바와 같이 먼저, 제1 볼트(110)를 제1 와셔(111)와 제1홀(102)에 내삽시켜 연결너트(130)와 결합시킨다. 이후, 아이형피시빔 사이에 현수부재(100)를 설치한다. 필요에 따라서는 고정홀(104)에 못 등을 박아 현수부재(100)가 아이형피시빔에 고정되도록 한다. 다음으로, 제2 너트(120)를 제2 와셔(121)와 지지부재(200)의 제2홀(202)에 내삽시켜 연결너트(130)와 연결하여 지지부재(200)를 현수부재(100)에 고정시킨다. 그리고, 지지부재(200)의 걸림판(201)에 거푸집(300)을 올려놓는다. 거푸집(300)을 걸림판(201)에 올려놓은 다음 원형 플랜지(131)를 돌려 걸림돌기(132)가 거푸집(300)의 상면과 접하도록 한다.As shown in FIG. 2, first, the first bolt 110 is inserted into the first washer 111 and the first hole 102 to be coupled to the connection nut 130. Thereafter, the hanging member 100 is installed between the eye-shaped fish beams. If necessary, nails and the like are fixed in the fixing hole 104 so that the suspension member 100 is fixed to the eye-shaped fish beam. Next, the second nut 120 is inserted into the second washer 121 and the second hole 202 of the support member 200 and connected to the connection nut 130 to connect the support member 200 to the suspension member 100. ). Then, the formwork 300 is placed on the locking plate 201 of the support member 200. Place the formwork 300 on the locking plate 201 and then turn the circular flange 131 so that the engaging projection 132 is in contact with the upper surface of the formwork (300).

거푸집(300) 설치가 완료되면 콘크리트를 타설한다. 콘크리트의 양생이 완료되면 제2 볼트(120)를 제거하여 지지부재(200)를 분리시키고, 거푸집(300)을 탈형 한다.When the formwork 300 is installed, the concrete is poured. When curing of the concrete is completed, the second bolt 120 is removed to separate the support member 200, and the mold 300 is demolded.

탈형 시에는 제2 볼트(120)와 제2 와셔(121), 지지부재(200) 및 거푸집(300)만 분리되고, 나머지, 현수부재(100)와 제1볼트(110), 제1 와셔(111) 및연결너트(130)는 콘크리트에 매설된다.When demolding, only the second bolt 120, the second washer 121, the support member 200, and the formwork 300 are separated, and the remaining suspension member 100, the first bolt 110, and the first washer ( 111) and the connection nut 130 is embedded in the concrete.

이상에서 살펴본 바와 같이 본 고안에 따른 거푸집(300)지지 장치는 거푸집(300)의 지지가 아이형피시빔에 고정된 현수부재(100)에 의해 매달린 지지부재(200)에 의해 이루어지기 때문에 별도의 동바리나 비계를 설치할 필요가 없다. 따라서, 고소 교량의 상판 거푸집(300) 설치가 용이하고, 공기가 단축된다.As described above, the formwork 300 supporting device according to the present invention is separate because the support of the formwork 300 is made by the support member 200 suspended by the suspension member 100 fixed to the child-type fish beam. No need to install clubs or scaffolding. Therefore, installation of the top formwork 300 of the aerial bridge is easy, and the air is shortened.

상기와 같이 본 고안은 거푸집(300)의 지지가 아이형피시빔에 고정된 현수부재(100)에 의해 지지부재(200)를 고정하여 이루어지기 때문에 동바리나 비계를 설치할 필요가 없다.As described above, since the support of the formwork 300 is made by fixing the support member 200 by the suspension member 100 fixed to the eye-shaped fish beam, there is no need to install a copper bar or a scaffold.

Claims (1)

교량의 상판 시공을 위한 거푸집(300)의 지지장치에 있어서,In the supporting device of the formwork 300 for the top plate construction of the bridge, 직사각형 관체로 양측 종단에는 아이형피시빔에 일부가 기 매립되어 설치된 디귿자형 철근(10)의 일측이 끼워지도록 걸림홈(101)이 수직으로 형성되어 있고, 중간부위에는 수직으로 관통된 제1홀(102)이 다수개 형성되어 있으며, 양측 하단에는 길이 방향에 수직하여 플랜지(103)가 형성되어 있고, 상기 플랜지(103)에는 고정홀(104)이 형성되어 있는 현수부재(100) ;Retaining grooves 101 are vertically formed so that one side of the recessed reinforcing bar 10 is partially embedded in the i-type fish beam at both ends of the rectangular tube, and the first hole vertically penetrates in the middle portion. A plurality of (102) is formed, both sides of the lower end perpendicular to the longitudinal direction in the flange 103 is formed, the flange 103, the suspension member 100 is formed with a fixing hole 104; 직사각형 관체로 밑면에는 거푸집(300)이 올려질 수 있도록 수납공간을 제공하는 걸림판(201)이 연장 형성되어 있고, 상기 제1홀(102)에 대응하여 다수의 제2 홀(202)이 형성되어 있는 지지부재(200) ;A rectangular tube is formed on the bottom thereof with a locking plate 201 extending from the bottom thereof to provide a storage space, and a plurality of second holes 202 are formed corresponding to the first hole 102. A supporting member 200; 상기 제1 홀(102)에 내삽되어 설치되는 제1 볼트(110)와 상기 제2 홀(202)에 내삽되어 설치되는 제2 볼트(120) : 및, 원형 관체로 내주면에는 나사선이 형성되어 있고, 하단에는 콘크리트가 내부로 유입되는 것을 방지하기 위한 상기 지지부재(200)의 두께에 따른 직경을 가지는 원형 플랜지(131)가 회동되도록 고정되어 있으며, 상기 원형 플랜지(131)의 최외측에는 상기 거푸집(300)을 상면에서 고정시키기 위해 상기 플랜지(131)에 연장되어 돌출된 걸림돌기(132)가 형성되어 있고, 상기 현수부재(100)와 지지부재(200) 사이에 위치하여 설치되고 상단으로는 상기 제1 볼트(102)가 내삽되며, 하단으로는 상기 제2 볼트(202)가 내삽되어 설치되는 연결너트(130)를 구비함을 특징으로 하는 현수식 교량상판 거푸집 지지장치.The first bolt 110 is inserted into the first hole 102 and the second bolt 120 is inserted into the second hole 202. And, the inner circumferential surface with a circular tube has a thread formed therein. At the bottom, a circular flange 131 having a diameter according to the thickness of the support member 200 to prevent concrete from flowing into the bottom is fixed to rotate, and the formwork is disposed at the outermost side of the circular flange 131. In order to fix 300 on the upper surface, a locking protrusion 132 is formed which extends and protrudes from the flange 131, and is disposed between the suspension member 100 and the support member 200, and the upper side is disposed at the upper end. Suspension bridge deck formwork supporting device, characterized in that the first bolt 102 is interpolated, the lower end has a connecting nut 130 is installed by inserting the second bolt (202).
KR2020010010693U 2001-04-16 2001-04-16 Suspension type concrete form supporting unit KR200240371Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010010693U KR200240371Y1 (en) 2001-04-16 2001-04-16 Suspension type concrete form supporting unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010010693U KR200240371Y1 (en) 2001-04-16 2001-04-16 Suspension type concrete form supporting unit

Publications (1)

Publication Number Publication Date
KR200240371Y1 true KR200240371Y1 (en) 2001-10-11

Family

ID=73064863

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010010693U KR200240371Y1 (en) 2001-04-16 2001-04-16 Suspension type concrete form supporting unit

Country Status (1)

Country Link
KR (1) KR200240371Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100840279B1 (en) * 2007-06-27 2008-06-20 김희완 Suspension hanger for slab form

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100840279B1 (en) * 2007-06-27 2008-06-20 김희완 Suspension hanger for slab form

Similar Documents

Publication Publication Date Title
KR200240371Y1 (en) Suspension type concrete form supporting unit
JP2017082404A (en) Superstructure of t-girder bridge
JPH1171897A (en) Scaffold support device for placing concrete
KR100574064B1 (en) Assembly anchor structure for apartment house
KR100878465B1 (en) Girder, bridge and construction process thereof
JP2005350904A (en) Cofferdam structure and cofferdam construction method
KR102433658B1 (en) Hinge-type Point Connector and Construction method of Composite Frame Bridge
KR102140407B1 (en) Mamanufacturing method of PSC girder using end form steel plate
KR100428942B1 (en) Column Structure Reinforcement Method
KR101208411B1 (en) A joint device for concrete slab
KR101500591B1 (en) Structure for fixing connection of the bridge and fixing methods using former structure
KR200391765Y1 (en) A anchor bolt and assembly thereof
KR102019736B1 (en) Hollow steel pipe unit and concrete structure having the same
KR100926137B1 (en) Composite girder form-system with cross support beam and composite girder construction method using the same
KR100840279B1 (en) Suspension hanger for slab form
KR200241690Y1 (en) inner corner frame for a flash board
KR200195887Y1 (en) Bridge support clamp
KR102543584B1 (en) Waffle form system capable of removing with supporting
CN215629313U (en) Tie beam bracket
KR101366606B1 (en) Structure by precast consturuction method
KR100523145B1 (en) Form unit for kicker and formwork using the same
KR200234940Y1 (en) Level bar for apartment's ceiling slab construction
KR200376947Y1 (en) Euroform support structure
KR200252600Y1 (en) apparatus to reinforce column structure and the method using the same
KR200238510Y1 (en) Spacer supporting steel in steel concrete used in construction

Legal Events

Date Code Title Description
REGI Registration of establishment
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20080605

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee