KR200223685Y1 - Horizon equipment of slab concreate - Google Patents

Horizon equipment of slab concreate Download PDF

Info

Publication number
KR200223685Y1
KR200223685Y1 KR2020000033669U KR20000033669U KR200223685Y1 KR 200223685 Y1 KR200223685 Y1 KR 200223685Y1 KR 2020000033669 U KR2020000033669 U KR 2020000033669U KR 20000033669 U KR20000033669 U KR 20000033669U KR 200223685 Y1 KR200223685 Y1 KR 200223685Y1
Authority
KR
South Korea
Prior art keywords
horizontal
concrete
support
long hole
level
Prior art date
Application number
KR2020000033669U
Other languages
Korean (ko)
Inventor
안종식
Original Assignee
안종식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 안종식 filed Critical 안종식
Priority to KR2020000033669U priority Critical patent/KR200223685Y1/en
Application granted granted Critical
Publication of KR200223685Y1 publication Critical patent/KR200223685Y1/en

Links

Abstract

본 고안은 바닥 콘크리트 타설전에 옹벽 콘크리트용 철근에 설치하고, 바닥 콘크리트 타설 후, 콘크리트의 바닥수평을 맞추도록 하는 수평장치(10)에 관한 것으로,The present invention relates to a horizontal device (10) to be installed in the retaining wall concrete reinforcement before placing the floor concrete, and to level the floor of the concrete after the floor concrete,

상기 수평장치(10)는 'ㄱ'자형으로 형성된 일측 상단에 장공(110)이 형성되고, 타측은 타설된 콘크리트의 수평을 맞추도록 평면을 구비한 수평대(100)와; 상기 수평대(100)의 장공(110)이 형성된 일측에 삽입이 되도록 U(유)자형으로 절곡되고, 일측은 상기 장공(110)의 내부에 삽입되데, 자유롭게 좌, 우 이동이 되도록 형성된 돌출턱(210)과, 상기 돌출턱(210)의 양측 또는 중앙에 형성되어 상기 수평대(100)를 관통으로 삽입된 볼트를 통상의 너트(N)로 조임으로써 좌, 우 유동을 방지하도록 하는 조임홀(220)과, 상기 조임홀(220)의 상부에 형성된 지지홀(230)을 관통하도록 구비되어 배면에 구비되는 철근에 지지부(241)가 지지되고, 전면에 구비된 체결부(242)에는 통상의 너트(N)를 체결하는 지지볼트(240)에 의해 수평을 유지하도록 적어도 하나 이상 구비된 지지브라켓(200)으로 구성된다.The horizontal device 10 has a long hole 110 is formed on the top of one side formed in a 'b' shape, the other side is provided with a horizontal plane having a plane to level the level of concrete; The long hole 110 of the horizontal stage 100 is bent in a U (U) shape to be inserted into one side formed, one side is inserted into the inside of the long hole 110, protruding jaw formed so as to be free to move left, right 210 and fastening holes which are formed at both sides or the center of the protruding jaw 210 to prevent left and right flow by tightening bolts inserted through the horizontal bar 100 with normal nuts N. FIG. The support part 241 is supported by the reinforcing bar provided on the rear side of the support hole 230 provided in the upper portion of the tightening hole 220 and 220, and the fastening part 242 provided on the front surface is usually provided. Consists of at least one support bracket 200 provided to maintain the horizontal by the support bolt 240 to fasten the nut (N) of the.

본 고안에 의하면, 좌, 우로 자유롭게 이동이 가능한 지지브라켓에 의해 옹벽철근의 간격에 관계없이 모든 현장에 사용이 가능한 다용도의 장치를 공급한 효과가 있다.According to the present invention, there is an effect of supplying a versatile device that can be used in any site regardless of the distance of the retaining wall by the support bracket which is free to move left and right.

Description

바닥콘크리트의 수평장치{HORIZON EQUIPMENT OF SLAB CONCREATE}Horizontal device for floor concrete {HORIZON EQUIPMENT OF SLAB CONCREATE}

본 고안은 바닥 콘크리트의 수평을 맞추는 수평장치에 관한 것으로, 더욱 더 상세하게는 수평대의 일측에 형성된 장공에 지지브라켓의 돌출턱을 삽입하고, 적어도 하나 이상이 구비된 상기 지지브라켓을 옹벽 철근의 간격에 따라 자유롭게 좌, 우로 이동한 것이 가능하고, 또한, 바닥 콘크리트의 두께가 형성될 위치에 상기 수평대의 하단을 구비하여 바닥 콘크리트 타설이 완료되면, 상기 수평대의 하단을 기준으로 수평을 맞추도록 하는 바닥 콘크리트의 수평장치에 관한 것이다.The present invention relates to a horizontal device for leveling the floor concrete, and more particularly, inserting the protruding jaw of the support bracket into the long hole formed on one side of the horizontal stand, and at least one support bracket provided with at least one gap between the retaining wall reinforcement It is possible to move freely to the left and right, and also, having a bottom of the horizontal stand in the position where the thickness of the floor concrete is to be formed when the floor concrete is completed, the floor to be leveled relative to the bottom of the horizontal stand It relates to the leveling device of concrete.

일반적으로, 바닥 콘크리트의 수평을 맞추도록 하는 수평장치에 대해서는 여러가지 개시되었다.In general, various disclosures have been made of a leveling device to level floor concrete.

예를 들면, 출원번호 실용 1998 - 017019호로 시멘트 콘크리트 건축물의 벽거푸집 수평받침구'가 개시된 바가 있는데, 그 내용은 다음과 같다.For example, the application number Utility 1998-017019 discloses the horizontal formwork of the wall formwork of cement concrete building, the contents are as follows.

도 1에 도시한 바에 의하면, 평판형 하판과 기복판을 가진 상판을 결합시켜 받침하판을 형성시키고, 기복판 상면에 삽입공(2)(2')을 양측에 형성하여 하부 너트(3)(3')로 높이조정나사축(5)(5')하부를 고정시키고, 그 높이조정나사축(5)(5') 상부를 거푸집 받침판(6) 저면에 고정볼트로 고정시킨 고정관체(8)(8')의 하측암나사(7')에 나사식 체결하고, 그 고정판체(8)(8') 하단부인 높이조정나사축(5)(5')에 상부너트(3a)를 체결하여 구성되는 수평받침구(H)는 상, 하부의 너트와 높이조정나사축(5)(5')의 회동조작으로 높이 조절이 가능한 것이다.As shown in Fig. 1, the flat bottom plate and the upper plate having the undulating plate are combined to form a supporting lower plate, and the insertion holes 2 and 2 'are formed on both sides of the lower plate to form the lower nut 3 ( 3 '), the lower part of the height adjusting screw shaft (5) (5'), and the fixed pipe body (8) fixing the upper part of the height adjusting screw shaft (5) (5 ') to the bottom of the formwork plate (6) with fixing bolts (8). (8 ') is screwed into the lower female screw (7'), and the upper nut (3a) is fastened to the height adjusting screw shaft (5) (5 ') which is the lower end of the fixing plate (8) (8'). The horizontal support hole (H) is configured, the height can be adjusted by the rotation operation of the upper and lower nuts and the height adjustment screw shaft (5) (5 ').

또한, 상부에는 제 1목재(W)가 길게 구비되어 도시한 수평레벨(G.L)에 맞춰서 바닥 콘크리트의 평면이 형성되는 것이고, 상기 제 1목재(W)의 유동은 제 2목재(Wa)에 의해 방지되는 것이다.In addition, the first wood (W) is provided in the upper portion is a plane of the floor concrete is formed in accordance with the horizontal level (GL) shown, the flow of the first wood (W) by the second wood (Wa) To be prevented.

그러나, 상술한 바와 같은 장치는 콘크리트 타설이 완료되면 콘크리트 속에 묻힘으로써, 제작가격에 비해 그 사용용도가 한정적이어서 과다한 원가의 손실을 초래하고 있다.However, the device as described above is buried in the concrete when the concrete is completed, its use is limited compared to the production price, causing excessive cost loss.

또한, 바닥 목재면 상부에 통상의 못으로 고정된 상태에서 수평을 맞추기 위해 2열로 구비된 나사를 회동하여 높이를 맞추는 것이 불편하고, 또한, 구부리고 나사를 회동하는 작업중 허리가 다치는 안전사고의 위험성을 내포하는 문제가 있었다.In addition, it is inconvenient to adjust the height by rotating the screws provided in two rows in order to level the upper wooden floor surface fixed with a conventional nail, and also the risk of safety accidents injuring the waist during bending and rotating the screw. There was a problem involved.

또한, 목재의 상부에 일정간격으로 철근배근이 완료되어 바닥 목재에 못으로 고정하는 수평받침대는 그 설치위치를 잡기 어려워 정렬되지 않아 작업성이 떨어지는 문제가 있었다.In addition, the reinforcement is completed at a predetermined interval on the upper part of the timber horizontal pedestal to fix the nail to the floor timber is difficult to grasp the installation position there was a problem that the workability is poor.

본 고안은 종래의 이러한 문제점을 해결하기 위해 안출된 것으로써, 본 고안의 목적은 레벨조절을 용이하게 하도록 하되, 타설이 완료된 후, 어느정도 콘크리트가 경화되면 다른 현장에서 사용이 가능하여 원가를 절감하고 큰 효율을 얻도록 하는데 있다.The present invention has been devised to solve these problems of the prior art, the purpose of the present invention is to facilitate the level control, after the completion of the casting, if the concrete is hardened to some extent can be used in other sites to reduce the cost To achieve great efficiency.

또한, 수직으로 구비된 옹벽철근에 지지볼트를 지지함으로써, 바닥에 배근된 철근의 간격과 관계없이 설치는 용이하되 정확하게 수평을 맞추도록 하는데 있다.In addition, by supporting the support bolts in the retaining wall rebar provided vertically, regardless of the spacing of the reinforcing bars arranged on the floor is easy to install, but to accurately level.

또한, 슬라이딩식으로 좌, 우 이동이 가능한 브라켓으로 옹벽 철근의 간격, 즉, 피치에 관계없이 조절이 가능하여 한가지의 구성으로도 여러 현장에서 사용이 가능하여 원가는 절감하되, 작업성은 향상시키도록 하는데 있다.In addition, it is a bracket that can be moved left and right by sliding type, so it can be adjusted regardless of the gap of the retaining wall, that is, pitch, so that it can be used in various sites even with one configuration to reduce the cost but improve workability. It is.

도 1은 종래 수평장치를 도시한 정투상도이고,1 is a perspective view showing a conventional horizontal apparatus,

도 2는 본 고안 수평장치의 구성에 대해서 상세히 설명하기 위해 도시한 정투상도이고,Figure 2 is an orthographic view shown to explain in detail the configuration of the subject innovation horizontal device,

도 3은 본 고안 수평장치의 사용상태도로써, 작업방법에 대해서 설명하기 위해 도시한 정투상도이다.3 is a state diagram of the use of the horizontal device of the present invention, it is a perspective view shown for explaining the working method.

*도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings

10;수평장치 100;수평대10; Horizontal device 100; Horizontal

101;하부평면 110;장공101; bottom plane 110; long hole

200;지지브라켓 210;돌출턱200; support bracket 210; protruding jaw

220;조임홀 230;지지홀220; tightening hole 230; support hole

240;지지볼트 241;지지부240; support bolt 241; support

242;체결부 N;너트242; fastening part N; nut

본 고안은 바닥 콘크리트 타설전에 옹벽 콘크리트용 철근에 설치하고, 바닥 콘크리트 타설 후, 콘크리트의 바닥수평을 맞추도록 하는 수평장치에 관한 것으로,The present invention relates to a horizontal device that is installed in the retaining wall concrete reinforcement before placing the floor concrete, and leveling the floor level of the concrete after the floor concrete,

상기 수평장치는 'ㄱ'자형으로 형성된 일측 상단에 장공이 형성되고, 타측은 타설된 콘크리트의 수평을 맞추도록 평면을 구비한 수평대와;The horizontal device is a long hole is formed on the top of one side formed in a 'b' shape, the other side is provided with a horizontal plane having a plane to level the poured concrete;

상기 수평대의 장공이 형성된 일측에 삽입이 되도록 U(유)자형으로 절곡되고, 일측은 상기 장공의 내부에 삽입되데, 자유롭게 좌, 우 이동이 되도록 형성된 돌출턱과, 상기 돌출턱의 양측 또는 중앙에 형성되어 상기 수평대를 관통으로 삽입된 볼트를 통상의 너트로 조임으로써 좌, 우 유동을 방지하도록 하는 조임홀과, 상기 조임홀의 상부에 형성된 지지홀을 관통하도록 구비되어 배면에 구비되는 철근에 지지부가 지지되고, 전면에 구비된 체결부에는 통상의 너트를 체결하는 지지볼트에 의해 수평을 유지하도록 적어도 하나 이상 구비된 지지브라켓으로 구성된다.이하, 첨부된 예시도를 참조하여 본 고안의 바람직한 실시예에 대해 상세히 설명한다.The horizontal long hole is bent into a U (U) shape to be inserted into one side formed, one side is inserted into the inside of the long hole, freely formed left and right to move the projection jaw, both sides or the center of the projection jaw It is formed to support the reinforcing bar provided on the rear side is provided to penetrate through the support hole formed in the upper portion of the tightening hole to prevent the left and right flow by tightening the bolt inserted through the horizontal bar with a normal nut At least one support portion is provided, and the fastening portion provided on the front side is composed of at least one support bracket provided to be horizontally maintained by a support bolt for fastening a nut. Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings. An example is explained in full detail.

도 2는 본 고안 수평장치의 구성에 대해서 상세히 설명하기 위해 도시한 정투상도이고, 도 3은 본 고안 수평장치의 사용상태도로써, 작업방법에 대해서 설명하기 위해 도시한 정투상도이다.FIG. 2 is an orthogonal view shown to explain in detail the configuration of the inventive device, and FIG. 3 is a state diagram of the use of the inventive device.

도 2에 도시한 바와 같이, 본 고안의 수평장치(10)는 'ㄱ'자형으로 형성된 수평대(100)의 일측에 적어도 하나 이상의 지지브라켓(200)(이하, '브라켓'이라 칭한다.)이 상기 수평대(100)에 형성된 장공(110)을 기준으로 좌, 우 이동이 가능하도록 돌출턱(210)이 삽입된 구성이다.As shown in Figure 2, the horizontal device 10 of the present invention has at least one support bracket 200 (hereinafter referred to as 'bracket') on one side of the horizontal stage 100 formed in the 'b' shape. The protruding jaw 210 is inserted to move left and right with respect to the long hole 110 formed in the horizontal stand 100.

도시한 바에 의하면, 상기 수평대(100)의 장공(110)이 형성된 일측이 후술할 철근(WR)과 결합하여 수직으로 구비되면, 타측은 수평상태를 유지하여 바닥 콘크리트(SC)의 레벨(Level)을 맞추도록 하는 것이다.As shown, when one side formed with the long hole 110 of the horizontal stage 100 is vertically provided in combination with the reinforcing bar (WR) to be described later, the other side is maintained in a horizontal state level (Level) of the floor concrete (SC) ).

또한, 본 고안 수평대(100)의 길이는 통상의 건축재의 길이인 3 ~ 4자(尺) 또는 6 ~ 8자(尺)정도의 길이로 다른 건축재와 규격을 맞추도록 하는 것이다.In addition, the length of the subject innovation horizontal stage 100 is to match the standard with other building materials in a length of about 3 to 4 characters or 6 to 8 characters, which is the length of a normal building material.

한편, 상기 브라켓(200)을 4개가 구비된 것을 도시하였으나, 필요에 따라 3개가 구비될 수도 있다. 그 이유로는 통상적으로 수직방향으로 설치된 옹벽용 철근(WR)(이하, '철근'이라 칭한다.)의 간격에 따라 달라질 수가 있기 때문에 그 수량에 대해서는 한정하지 않도록 한다.Meanwhile, although four brackets 200 are provided, three may be provided as necessary. For this reason, the quantity thereof is not limited because it may vary depending on the spacing of the retaining wall reinforcing bars WR (hereinafter, referred to as "reinforcing bars") installed in the vertical direction.

또한, 상기 수평대(100)에 결합된 브라켓(200)의 전면에는 상, 하로 2개의 관통된 홀이 형성되어 있다.In addition, two front and bottom holes are formed on the front surface of the bracket 200 coupled to the horizontal bar 100.

하부 양측과 중앙에 형성된 조임홀(220)은 3개의 홀 모두 일측이 터진 개구부(221)를 구비하고 있는데, 그 이유는 상측에 형성된 지지홀(230)에 구비되는 지지볼트(240)를 후크볼트(Hook Bolt)로 사용할 경우에는 도시한 바와 같이 통상의 육각볼트(Hex Bolt)의 머리부분이 철근(WR)과의 간섭을 피할 수 있기 때문에 중앙부에 형성된 조임홀(220)에 구비시키는 것이 가능하기 때문이다.Tightening hole 220 formed on both lower sides and the center has an opening 221, one side of all three holes, the reason is the support bolt 240 provided in the support hole 230 formed on the upper side hook bolt When using as a hook bolt, as shown in the figure, since the head of a conventional hex bolt can avoid interference with the reinforcing bars WR, it can be provided in the tightening hole 220 formed in the center portion. Because.

또한, 일측에 도시한 다른 실시예의 예시도에서 처럼 유 볼트(U-Bolt)를 구비할 경우 상기한 철근(WR)의 간섭을 피해 양측으로 형성된 조임홀(220)중 소망하는 위치에 육각볼트를 구비시키는 것이 가능하기 때문이다. 즉, 상기 육각볼트(Hex Bolt)는 탈착식(脫着式)으로 소망하는 위치에 사용이 가능한 것이다.In addition, when provided with a U-bolt as shown in the example of another embodiment shown on one side hex bolts in the desired position of the tightening hole 220 formed on both sides to avoid the interference of the reinforcing bars (WR). It is because it can be provided. That is, the hexagon bolt (Hex Bolt) is removable can be used in the desired position (脫 着 式).

또한, 단면으로 도시한 바에 의하면, 본 고안의 브라켓(200)은 상기 수평대(100)의 두께 정도의 간격을 구비한 'U'자형의 단면을 구비하고, 상기 장공(110)에 반원형의 돌출턱(210)이 삽입된 상태이다.In addition, according to the cross-sectional view, the bracket 200 of the present invention has a 'U' shaped cross section with a thickness of about the thickness of the horizontal stage 100, the semi-circular projection to the long hole 110 The jaw 210 is inserted.

도시한 바에 의하면, 상기 돌출턱(210)이 상기 장공(110)과 동일한 너비로 형성된 것을 도시하였으나, 상기 장공(110)의 너비보다는 다소 좁게 형성하는 것이 바람직하다. 그 이유로는 각 현장마다 다른 철근(WR)의 배근간격에 따라 좌, 우로 이동하는 것이 용이하도록 하기 위한 것이기 때문이다.As shown, although the protrusion jaw 210 is formed to have the same width as the long hole 110, it is preferable to form rather narrow than the width of the long hole (110). The reason for this is that it is easy to move left and right according to the reinforcement spacing of the different rebars WR in each site.

또한, 상기 돌출턱(210)은 상술한 바와 같이, 좌, 우로 이동이 용이하도록 하는 기능 이외에 상기 조임홀(220)에 구비된 볼트를 기준으로 회동(回動), 즉, 뱅글뱅글 도는 것을 방지하도록 하는 것이다. 즉, 상기 장공(110)에 삽입된 돌출턱(210)이 장공(110)에 의해 지지되어 있으므로 회동이 방지되는 것이다.In addition, the protruding jaw 210 as described above, in addition to the function to facilitate the movement to the left, right to prevent the rotation, that is, turning the bangle bangle based on the bolt provided in the tightening hole 220 To do that. That is, since the protruding jaw 210 inserted into the long hole 110 is supported by the long hole 110, rotation is prevented.

도 3에 도시한 것은, 상술한 바와 같은 구성의 수평장치(10)를 이용해서 바닥 콘크리트(SC)의 수평을 맞추는 작업방법에 대해서 설명하기 위해 도시한 것이다.3 is shown for explaining the working method of leveling the floor concrete SC using the horizontal apparatus 10 of the structure mentioned above.

도시한 바에 의하면, 각 부위별로 목재공사가 완료되고, 상기 목재의 상부에 옹벽철근(WR)과 바닥철근(SR)의 배근(配筋)이 완료되면, 바닥(Slab) 콘크리트 타설을 하기 위한 1차적인 작업이 완료된다.As shown, the timber construction for each part is completed, when the reinforcement of the retaining wall reinforcement (WR) and the bottom reinforcement (SR) on the top of the wood is completed, 1 (for slab) concrete pouring The secondary task is completed.

본 고안의 수평장치(10)를 바닥의 두께가 형성될 레벨(Level)(T)에 맞도록 수평대(100)를 구비한다. 즉, 도시한 목재(W)의 표면을 기준으로 하여 바닥 콘크리트(SC)의 두께가 형성되는 것이다.The horizontal apparatus 10 of the present invention is provided with a horizontal stage 100 so as to match the level (T) at which the thickness of the floor is to be formed. That is, the thickness of the floor concrete (SC) is formed on the basis of the surface of the wood (W) shown.

이때, 상술한 수평대(100) 일측의 브라켓(200)에 구비된 지지볼트(240)를 철근(WR)에 걸고 적당한 압축력, 즉, 가조립 한 후, 타측의 지지볼트(240)도 동일한 방법으로 가조립하여 상기한 바닥콘크리트의 두께(T)에 맞도록 높이 조절이 완료되면, 상술한 일측과 타측의 지지볼트(240)와 나머지 지지볼트(240)를 견고하게 조임으로써, 레벨의 조절은 완료되고 다른 부위에 구비된 수평장치(10)도 동일하게 작업하는 것이다.At this time, the support bolt 240 provided on the bracket 200 on one side of the horizontal stage 100 is fastened to the reinforcing bars WR, ie, temporarily assembled, and then the support bolt 240 on the other side is also the same. When the height adjustment is completed so as to fit the thickness (T) of the bottom concrete to be assembled, by tightening the support bolt 240 and the remaining support bolt 240 of one side and the other side firmly, the adjustment of the level is completed The horizontal device 10 provided in the other part is to work the same.

또한, 본 고안의 지지볼트(240)와 조임볼트(221)를 체결하는 너트(N)는 통상의 육각너트(Hex Nut)를 사용해도 무방하나 별도의 작업공구가 없이도 그 견고한 조임상태를 유지할 수 있는 나비너트(KS B 1005 - 85)를 사용하는 것이 바람직하다.In addition, the nut (N) for fastening the support bolt 240 and the tightening bolt 221 of the present invention may use a regular hex nut (Hex Nut), but can maintain its tight tightening state without a separate work tool It is preferable to use a butterfly nut (KS B 1005-85).

상술한 바와 같이 바닥 콘크리트(SC)의 타설이 완료되면, 본 고안의 수평장치(10)에 의해 레벨링(Leveling) 작업을 하는 것이다.As described above, when the casting of the floor concrete (SC) is completed, the leveling (Leveling) work by the horizontal apparatus 10 of the present invention.

즉, 본 고안의 수평대(100)의 하측을 기준으로 점성(粘性)을 구비한 콘크리트의 상부를 긁어 평면을 유지하도록 하고, 상기와 같이 평면형성이 완료되면, 통상 콘크리트의 4주 압축강도, 즉, 28일이 되면 최상의 압축강도를 구비하며 바닥의 작업은 완료되게 된다.That is, the upper surface of the concrete having a viscous (粘性) on the basis of the lower side of the present invention to scrape the upper surface to maintain the plane, and when the plane formation is completed as described above, usually 4 weeks compressive strength of concrete, In other words, at 28 days, it has the best compressive strength and the work on the floor is completed.

상기 4주 이전에 어느정도 표면이 경화가 되면 본 고안의 수평장치(10)는 해체하여 다른 현장의 공사에 대비한다.If the surface is cured to some extent before the above 4 weeks, the horizontal device 10 of the present invention is dismantled to prepare for construction of other sites.

또한, 다른 부위보다 본 고안 수평대(100)의 하부평면(101)이 접촉했던 부위는 전 구역이 레벨링이 이루어진 상태이기 때문에 옹벽에 콘크리트타설을 시행할 때에 별도의 수평장치를 사용하지 않아도 무방하고, 바로 거푸집을 설치해도 수평이 맞은 상태를 유지할 수 있는 것이다.In addition, the area where the lower plane 101 of the present invention horizontal stand 100 is in contact with other parts than the other parts, because the entire area is made of leveling, when the concrete is placed on the retaining wall, a separate horizontal device may be used. Even if the formwork is installed immediately, it can maintain the horizontal level.

본 고안은 상술한 특정 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 고안의 요지를 벗어남이 없이 당해 고안이 속하는 기술분야에서 통상의 지식을 가진자라면 누구든지 용이하게 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구항 기재의 범위내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiment, and can be easily modified by anyone of ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes are intended to fall within the scope of the claims.

상술한 바와 같이, 본 고안에 의하면, 레벨조절을 용이하게 하도록 하되, 타설이 완료된 후, 어느정도 콘크리트가 경화되면 다른 현장에서 사용이 가능하여 원가를 절감하고 큰 효율을 얻도록 한 효과가 있다.As described above, according to the present invention, but easy to adjust the level, after the completion of the casting, if the concrete is cured to some extent it is possible to use in other sites to reduce the cost and obtain a large efficiency.

또한, 수직으로 구비된 옹벽철근에 지지볼트를 지지함으로써, 바닥에 배근된 철근의 간격과 관계없이 설치는 용이하되 정확하게 수평을 맞추도록 한 효과가 있다.In addition, by supporting the support bolt to the retaining wall rebar provided vertically, regardless of the spacing of the reinforcing bars arranged on the floor, it is easy to install, but there is an effect to accurately level.

또한, 슬라이딩식으로 좌, 우 이동이 가능한 브라켓으로 옹벽 철근의 간격, 즉, 피치에 관계없이 조절이 가능하여 한가지의 구성으로도 여러 현장에서 사용이 가능하여 원가는 절감하되, 작업성은 향상시키도록 한 효과가 있다.In addition, it is a bracket that can be moved left and right by sliding type, so it can be adjusted regardless of the gap of the retaining wall, that is, pitch, so that it can be used in various sites even with one configuration to reduce the cost but improve workability. There is one effect.

Claims (4)

바닥 콘크리트 타설전에 옹벽 콘크리트용 철근에 설치하고, 바닥 콘크리트 타설 후, 콘크리트의 바닥수평을 맞추도록 하는 수평장치(10)에 있어서,In the leveling device (10) to be installed in the retaining wall concrete reinforcement before the bottom concrete, and to level the bottom of the concrete after the bottom concrete, 상기 수평장치(10)는 'ㄱ'자형으로 형성된 일측 상단에 장공(110)이 형성되고, 타측은 타설된 콘크리트의 수평을 맞추도록 평면을 구비한 수평대(100)와;The horizontal device 10 has a long hole 110 is formed on the top of one side formed in a 'b' shape, the other side is provided with a horizontal plane having a plane to level the level of concrete; 상기 수평대(100)의 장공(110)이 형성된 일측에 삽입이 되도록 U(유)자형으로 절곡되고, 일측은 상기 장공(110)의 내부에 삽입되데, 자유롭게 좌, 우 이동이 되도록 형성된 돌출턱(210)과, 상기 돌출턱(210)의 양측 또는 중앙에 형성되어 상기 수평대(100)를 관통으로 삽입된 볼트를 통상의 너트(N)로 조임으로써 좌, 우 유동을 방지하도록 하는 조임홀(220)과, 상기 조임홀(220)의 상부에 형성된 지지홀(230)을 관통하도록 구비되어 배면에 구비되는 철근에 지지부(241)가 지지되고, 전면에 구비된 체결부(242)에는 통상의 너트(N)를 체결하는 지지볼트(240)에 의해 수평을 유지하도록 적어도 하나 이상 구비된 지지브라켓(200)으로 구성된 것을 특징으로 하는 바닥콘크리트의 수평장치.The long hole 110 of the horizontal stage 100 is bent in a U (U) shape to be inserted into one side formed, one side is inserted into the inside of the long hole 110, protruding jaw formed so as to be free to move left, right 210 and fastening holes which are formed at both sides or the center of the protruding jaw 210 to prevent left and right flow by tightening bolts inserted through the horizontal bar 100 with normal nuts N. FIG. The support part 241 is supported by the reinforcing bar provided on the rear side of the support hole 230 provided in the upper portion of the tightening hole 220 and 220, and the fastening part 242 provided on the front surface is usually provided. Horizontal device of the floor concrete, characterized in that consisting of at least one support bracket 200 provided to maintain the horizontal by the support bolt 240 to fasten the nut (N) of the. 제 1항에 있어서, 상기 지지브라켓(200)은 상기 장공(110)에 의해 옹벽철근의 간격에 따라 좌, 우 이동이 가능한 것을 특징으로 하는 바닥 콘크리트의 수평장치.According to claim 1, wherein the support bracket 200 is a horizontal device of the floor concrete, characterized in that the left and right by the long hole 110 is movable in accordance with the distance of the retaining wall reinforcement. 제 1항에 있어서, 상기 지지볼트(240)는 유 볼트 또는 후크 볼트중 어느 하나인 것을 것을 특징으로 하는 바닥 콘크리트의 수평장치.According to claim 1, The support bolt 240 is a horizontal device of the floor concrete, characterized in that any one of the bolt or hook bolt. 제 1항에 있어서, 상기 너트(N)는 나비너트인 것을 특징으로 하는 바닥 콘크리트의 수평장치.2. The horizontal apparatus of floor concrete according to claim 1, wherein the nut (N) is a butterfly nut.
KR2020000033669U 2000-12-01 2000-12-01 Horizon equipment of slab concreate KR200223685Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000033669U KR200223685Y1 (en) 2000-12-01 2000-12-01 Horizon equipment of slab concreate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000033669U KR200223685Y1 (en) 2000-12-01 2000-12-01 Horizon equipment of slab concreate

Publications (1)

Publication Number Publication Date
KR200223685Y1 true KR200223685Y1 (en) 2001-05-15

Family

ID=73092392

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000033669U KR200223685Y1 (en) 2000-12-01 2000-12-01 Horizon equipment of slab concreate

Country Status (1)

Country Link
KR (1) KR200223685Y1 (en)

Similar Documents

Publication Publication Date Title
US4993877A (en) Method and apparatus for forming a trench
US7908804B2 (en) Structural lintel assembly and building construction method using the same
JP3269808B2 (en) Method for placing ready-mixed concrete and formwork apparatus used in the method
JPH02269267A (en) Adjustable supporting-structure for metallic keyway form used for concrete slub of upper floor
CA2164625C (en) Supporting element
KR200223685Y1 (en) Horizon equipment of slab concreate
KR200298117Y1 (en) framable set mold for construction
EP1126091A2 (en) Mounting support and process using such a support for mounting a prefabricated element on a building part
KR200198275Y1 (en) Slanted form support
JP3404637B2 (en) Drainage gutter installation method and grating support
KR200249907Y1 (en) Device for adjusting level of a concrete form
US5722176A (en) Brick alignment apparatus
CN219569603U (en) Concrete leveling system for leveling non-bottom floor slab
CN211974358U (en) Device for improving perpendicularity of wall and column formwork
KR100296744B1 (en) Mold installation of cement concrete building using horizontal mold rest and execution method
KR200285374Y1 (en) Horizontal Adjustable Underpinning for Wall Foam Panel
EP1651826B1 (en) Formwork fixing and method
KR20020082966A (en) The construction method and device for slab panel which can instal psc bridge beam
KR200389431Y1 (en) Horizon equipment of slab concreate
JPH11270134A (en) Veranda supporting reinforcement anchor
DE3807764C2 (en)
JPS5938524Y2 (en) Anchor bolt support for concrete foundation
CN114825241A (en) Simple installation device and construction method for side wall embedded part of fair-faced concrete cable trench
JPH0545712Y2 (en)
KR200285860Y1 (en) temporary bracket for construction of precast concrete beam bridge

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20060207

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee