KR200223684Y1 KR2020000033665U KR20000033665U KR200223684Y1 KR 200223684 Y1 KR200223684 Y1 KR 200223684Y1 KR 2020000033665 U KR2020000033665 U KR 2020000033665U KR 20000033665 U KR20000033665 U KR 20000033665U KR 200223684 Y1 KR200223684 Y1 KR 200223684Y1
Authority
KR
South Korea
Prior art keywords
tube
opening
socket
hammer drill
open air
Prior art date
Application number
KR2020000033665U
Other languages
Korean (ko)
Inventor
장순찬
최금진
김태선
Original Assignee
포항종합제철주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 포항종합제철주식회사 filed Critical 포항종합제철주식회사
Priority to KR2020000033665U priority Critical patent/KR200223684Y1/en
Application granted granted Critical
Publication of KR200223684Y1 publication Critical patent/KR200223684Y1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

본 고안은 절손이 방지된 개공기 함마드릴의 방수분사튜브에 관한 것으로 그 목적은, 개공작업시 고로 출선구를 막은 머드의 타격을 위한 함마드릴에 설치되어 냉각수와 질소가스를 분사시키는 방수분사튜브를 용접으로 연결시키지 않고 일체형으로 형성시키면서 외곽으로는 오일리스 베어링을 설치하여 함마드릴의 타격 및 튜브에 의한 냉각작용이 보다 원활하게 이루어 지도록 하는 데에 그 목적이 있다.The present invention relates to a waterproof spray tube of the open air hammer drill to prevent damage, the purpose of which is installed in the hammer drill for the blow of the mud blocked the blast furnace opening during the opening work waterproof spray tube for spraying coolant and nitrogen gas The purpose is to install the oilless bearing on the outside while forming a one-piece without connecting by welding, so that the impact of the hammer drill and cooling by the tube can be made more smoothly.

따라서, 상기와 같은 목적을 달성하기 위하여 본 고안은, 냉각수와 고압가스를 공급토록 관(10) 연결되고 개공기 드림함머의 연결캡(20)에 고정되는 소켓(30)의 내측에 설치되고, 전방으로 고로 출선구의 개공을 위한 개공파이프가 연결되는 스크류로드(40)가 연결되어 냉각수 및 고압가스를 분사시키는 개공기의 함머드릴 분사튜브(50)에서, 상기 소켓(30)의 내부에는 2단의 튜브 삽입홈(32)이 일체로 관통 형성되고, 상기 튜브(1)의 전방에는 상기 스크류로드(40)에 삽입되는 연결튜브 (52)가 스크류 연결되며, 상기 소켓(30)과 튜브(50)는 방수토록 조립되는 절손이 방지된 개공기 함마드릴의 방수분사튜브를 제공한다.Therefore, in order to achieve the above object, the present invention is installed inside the socket 30 connected to the pipe 10 to supply the cooling water and the high pressure gas and fixed to the connection cap 20 of the open air dreamhammer, The screw rod 40 is connected to the opening pipe for the opening of the blast furnace outlet to the front in the hammer drill injection tube 50 of the open air to inject cooling water and high pressure gas, the inside of the socket 30 End tube insertion groove 32 is integrally formed through, and the connection tube 52 inserted into the screw rod 40 is screw-connected in front of the tube 1, the socket 30 and the tube ( 50) provides a waterproof spray tube of break-proof opening machine hammer drill to be assembled waterproof.

Description

절손이 방지된 개공기 함마드릴의 방수분사튜브{A TUBE OF HAMMER DRILL}Water-proof spray tube for break-proof opening machine hammer drill {A TUBE OF HAMMER DRILL}

본 고안은 고로에 있어서, 철광석과 코크(coke) 및 기타 원료의 산화 , 환원반응으로 생성된 용융물 즉, 쉿물을 고로 외부에 배출시키는 출선구의 개공작업시 사용되는 개공기에 관한 것으로 보다 상세히는, 개공작업시 고로 출선구를 막은 머드의 타격을 위한 함마드릴에 설치되어 냉각수와 질소가스를 분사시키는 방수분사튜브를 용접으로 연결시키지 않고 일체형으로 형성시키면서 외곽으로는 오일리스 베어링을 설치하여 함마드릴의 타격 및 튜브에 의한 냉각작용이 보다 원활하게 이루어 지도록 한 절손이 방지된 개공기 함마드릴의 방수분사튜브에 관한 것이다.The present invention relates to a perforator used in the opening work of the exit hole in the blast furnace, the melt produced by the oxidation and reduction of iron ore, coke and other raw materials, that is, the discharge of the sediment to the outside of the blast furnace. Is installed in the hammer drill for hitting the mud that blocked the blast furnace outlet during the opening work, and the oilless bearing is installed on the outside while forming integrally without connecting the waterproof spray tube that injects the coolant and nitrogen gas by welding. The present invention relates to a waterproof spray tube of an open hole hammer drill, in which breakage is prevented so that the blow and cooling of the tube is performed more smoothly.

일반적으로 고로에 있어서는, 산화 및 환원작용에 의하여 용융된 쉿물을 배출시키는 출선구가 대략 하나의 고로에 2-4개가 형성되는데, 도 1에서 도시한 바와같이, 고로내의 쉿물을 배출하는 출선구는 머드건(mud gun)으로서 메워지고 개공되면서 순차적으로 고로의 쉿물 배출작업을 수행하는데, 이와 같인 출선구의 머드를 개공시키어 고로내의 쉿물을 배출시키도록 하는 장치를 개공기라 한다.In general, in the blast furnace, about 2-4 outlets for discharging molten hex by oxidation and reduction are formed in one blast furnace. As shown in FIG. 1, the outlet for discharging the sewage in the blast furnace is mud. As the mud gun is filled and opened, the smelt discharge operation of the blast furnace is sequentially performed. The apparatus for discharging the mud at the exit port to discharge the mud in the blast furnace is called an opener.

도 1에서는 상기와 같은 일반적인 개공기를 도시하고 있다.1 illustrates a general opening machine as described above.

죽, 도 1에서 도시한 바와 같이, 고로(100)에 선단고정장치(110)와 선단걸고리(112)로서 개공기 프레임(120)이 장착되고, 상기 프레임(120)의 상측에는 에어호이스트(132)가 설치된 권상지지대(130)가 고정되고, 상기 지지대(130)의 하측으로 프레임(120)에는 실질적으로 개공작업을 수행하는 개공비트(142)가 선단에 고정되는 개공파이프(144)가 장착된 함마드릴(140)이 상기 프레임(120)을 따라 전진모터 (152)로서 이동하는 이동블록(150)의 하측에 장착되는 것이다.1, the open air frame 120 is mounted on the blast furnace 100 as the tip fixing device 110 and the end hook 112, and an air hoist 132 is disposed above the frame 120. ) Is installed, the hoisting support 130 is fixed, the lower side of the support 130, the opening 120 is installed in the frame 120, the opening pipe 144 is fixed to the front end of the opening bit 142 for performing the opening operation. The hammer drill 140 is mounted to the lower side of the moving block 150 moving as the forward motor 152 along the frame 120.

따라서, 전진 이동하는 함마드릴(140)에 의하여 회전되는 개공파이프(144) 선단의 개공비트(142)가 고로 출선구(102)의 머드부분(104)을 개공하는 것이다.Therefore, the opening bit 142 of the tip of the opening pipe 144 rotated by the hammer drill 140 moving forward opens the mud portion 104 of the blast furnace outlet 102.

한편, 도 2에서는 상기 함마드릴(140)을 도시하고 있고, 이와 같은 개공기의 함마드릴(140)부분은 크게 냉각수 및 질소가스를 분사하기 위한 분산튜브(200)와 그 전방에 고정되는 스크류로드(210) 및, 상기 튜브(200) 외측에 설치되어 스크류로드(210)를 회전시키는 회전쳐크(146) 및, 에어모터 기어의 구동력을 전달하는 각각의 전달기어(148a)(148b)등으로 이루어 지고, 상기 분사튜브(200)는 도 3에서 상세하게 도시하고 있다.On the other hand, Figure 2 shows the hammer drill 140, the hammer drill 140 of the opening is a screw tube which is fixed in front of the dispersion tube 200 for largely spraying the coolant and nitrogen gas And a rotation chuck 146 installed outside the tube 200 to rotate the screw rod 210 and respective transmission gears 148a and 148b for transmitting a driving force of the air motor gear. The injection tube 200 is shown in detail in FIG.

즉, 도 3에서 도시한 바와 같이, 상기 분사튜브(200)는 냉각수 및 질소가스 공급관(211)이 후방에 연결되는 연결소켓(212)이 튜브 연결캡(213)에 고정되고, 상기 캡(213)에 장착된 함마피스톤(214)의 전방으로 상기 회전쳐크(146)가 위치되며, 상기 각각의 부품 내부에는 분사튜브(200)의 중앙부(201)가 장착되고, 상기 중앙부(201)의 선,후단부에는 상기 소켓(212)과 연결튜브(202)가 각각 용접으로 고정되며, 상기 연결튜브(202)의 전방으로 스크류로드(210)가 연결되는 것이다.That is, as shown in Figure 3, the injection tube 200 is a connection socket 212 is connected to the cooling water and nitrogen gas supply pipe 211 is fixed to the tube connection cap 213, the cap 213 The rotating chuck 146 is located in front of the hammer piston 214 mounted on the), and the center portion 201 of the injection tube 200 is mounted inside the respective parts, and the line of the center portion 201, The socket 212 and the connection tube 202 are fixed to the rear end by welding, and the screw rod 210 is connected to the front of the connection tube 202.

따라서, 상기 공급관(211)을 통하여 공급된 냉각수 및 불황성가스인 질소가스는 소켓(212)과 튜브 중앙부(201) 및 연결튜브(202)를 통하여 스크류로드(210)를 통하여 분사되면서 전체적인 개공기 함마작업시 고로의 열에 의한 고온에 개공기가 잘견디게 하는 냉각작용을 하게 되는 것이다.Accordingly, the nitrogen gas, which is the coolant and the inert gas, supplied through the supply pipe 211 is injected through the screw rod 210 through the socket 212, the tube center portion 201, and the connection tube 202, and the overall open air. During the hammer operation, the cooling effect is to keep the openings well with the high temperature caused by the heat of the blast furnace.

즉, 고로 출선구(102)의 내부로 들어갈수롤 고온 및 강점결성이므로 개공비트(104)의 끝부분을 손쉽게 마모열화시키므로, 급속냉각 및 드릴절삭된 내화재부분을 비트홀에서 부터 불러내기 위하여 분사튜브(200)로서 분사된 고압의 질소가스와 냉각수를 통하여 개공비트(104)의 냉각을 행하는데, 고로 출선구(102)가 중간정도 개공되면 초기와 같이 개공비트(104)의 회전력만으로는 원활한 개공작업이 이루어 지지 않기 때문에, 도 3에서 개략적으로 도시한 타격용 실린더를 작동시키어 스크류로드(210)의 전진 타격을 동시에 수행하게 된다.That is, since the high temperature and strong binding properties of the roll into the blast furnace outlet 102, the end of the opening bit 104 is easily deteriorated in wear, so that the rapid cooling and drilled refractory material is called out from the bit hole by the injection tube. Cooling of the opening bit 104 through the high-pressure nitrogen gas and cooling water injected as 200, if the blast furnace opening 102 is about halfway, smooth opening work only by the rotational force of the opening bit 104 as early Since this is not done, the blow cylinder shown in FIG. 3 is operated to simultaneously perform the forward blow of the screw rod 210.

그러나, 상기와 같은 종래의 개공기 분사튜브(200)에 있어서는, 도 4에서 도시한 바와 같이, 튜브 중앙부(201)와 그 양측의 소켓(212) 및 연결튜브(202)가 용접으로 고정되어 있는데, 이때 도 5에서 도시한 바와 같이 소켓(212)과 튜브 중앙부(201) 및 연결튜브(202)간의 용접시 그 센터링작업이 정확하게 이루어 지지 않으면서 실제 드릴의 출선구 타격시 상기 튜브(200)자체가 절손되는 문제가 발생하는 것이다.However, in the conventional open air injection tube 200 as described above, as shown in FIG. 4, the center portion 201 of the tube, the sockets 212 and the connection tube 202 on both sides thereof are fixed by welding. In this case, as shown in FIG. 5, when the socket 212, the tube center portion 201, and the connection tube 202 are welded, the center of the drill 200 itself when hitting the outlet of the drill itself is not accurately made. The problem is that the loss.

또한, 스크류로드(210)의 회전시에도 센터링이 정확하지 않은 튜브(200)의 비틀림 발생으로 절손 특히 상기 소켓(212)과 튜브 중앙부(201) 및 연결튜브(202)사이의 용접부위에서 그 절손현상이 집중적으로 발생하고, 이경우에는 냉각수가 누수되어 개공기의 오일과 혼합되면서 개공기 작동을 정밀하게 수행되지 못하게 한다.In addition, even when the screw rod 210 is rotated, the centering is not accurate due to the twisting of the tube 200. In particular, the breakage occurs at the weld between the socket 212, the tube center 201, and the connection tube 202. This occurs intensively, in which case the coolant leaks and mixes with the oil in the openings, preventing the openings from performing precisely.

따라서, 원활한 냉각수 및 질소가스의 분사가 이루어 지지 않으면 함마드릴(140) 및 스크류로드(210)의 냉각작용이 불가능하여 설비수명을 극히 단축시키는 한편, 스크류로드(210)의 회전구동도 불가능하여 결국 개공기에 의한 고로 출선구 개공작업도 지연되는 것이다.Therefore, the cooling of the hammer drill 140 and the screw rod 210 is impossible without the smooth injection of coolant and nitrogen gas, thereby dramatically shortening the service life of the hammer drill, and the rotation of the screw rod 210 is impossible. The opening work of the blast furnace exit by the opening machine is also delayed.

이는 고로의 원활한 출선작업을 어렵게 하여 고로의 조업성을 저하시키는 동시에, 개공기의 잦은 부품교체 및 보수작업으로 비용증가는 물론, 생산성을 떨어드리게 되는 등의 여러 문제점들이 있었다.This makes it difficult to smoothly carry out the blast furnace work, and at the same time, there are various problems such as increase in cost as well as a decrease in productivity due to frequent replacement and maintenance of the blast furnace.

본 고안은 상기와 같은 종래의 여러 문제점들을 개선시키기 위하여 안출된 것으로서 그 목적은, 고로 출선구의 개공작업을 수행하는 개공기 함마드릴의 내부에 설치되는 분사튜브의 절손 및 추가적으로 절손시의 냉각수누수룰 완전하게 방지함으로서, 개공기 드릴부의 냉각불량으로 인한 장치의 수명단축을 방지하도록 한 절손이 방지된 개공기 함마드릴의 방수분사튜브를 제공하는 데에 있다.The present invention has been made in order to improve the various problems as described above, the purpose of which is, the cooling water leakage during the breakage of the injection tube installed in the opening of the blast furnace drill to perform the opening work of the blast furnace opening and additionally In order to prevent the rule completely, to provide a waterproof spray tube of the open air hammer drill to prevent breakage to prevent shortening the life of the device due to poor cooling of the open air drill.

또한, 본 고안의 다른 목적은, 개공기 함머드릴부의 냉각불량으로 인한 고열에 의한 파손 및 튜브의 절손을 방지함으로서 개공기의 드릴부와 튜브의 잦은 교체작업이 필요없어 보수 및 유지를 위한 비용이 절감되는 한편, 내열성 및 기밀성이향상된 분사튜브로 인하여 개공기 자체의 가동성이 향상되는 절손이 방지된 개공기 함마드릴의 방수분사튜브를 제공하는 데에 있다.In addition, another object of the present invention is to prevent damage due to high temperature and tube breakage due to poor cooling of the opening machine hammer drill portion, so that the cost of maintenance and maintenance is not necessary because the frequent replacement of the drill portion and the tube of the opening machine is unnecessary. On the other hand, it is to provide a waterproof spray tube of the breaker-opening hammer drill to prevent the breakage that improves the operability of the hole opening itself due to the injection tube with improved heat resistance and airtightness.

도 1은 일반적인 개공기의 전체 구성을 도시한 개략도1 is a schematic diagram showing the overall configuration of a general opening machine

도 2는 종래 개공기의 함마드릴 구동부를 도시한 개략 구조도2 is a schematic structural diagram showing a hammer drill driving unit of a conventional opening machine

도 3은 종래의 개공기의 함마드릴 방수분사튜브를 도시한 전체 구성도Figure 3 is an overall configuration showing a hammer drill waterproof spray tube of a conventional opening machine

도 4는 종래 함마드릴의 용접 일체형 방수분사튜브를 도시한 요부도Figure 4 is a main view showing a welded integral waterproof spray tube of a conventional hammer drill

도 5의 (a)-(b)는 도 4의 'A' 및 'B'의 상세도 및 스크류로드를 도시한 요부도(A)-(b) of FIG. 5 is a detailed view of the 'A' and 'B' of FIG.

도 6은 본 고안에 따른 절손이 방지된 개공기 함마드릴의 방수분사튜브를 도시한 전체 구성도6 is an overall configuration diagram showing a waterproof spray tube of the hammer hole drill prevented breakage according to the present invention

도 7은 본 고안인 절손이 방지된 개공기 함마드릴의 방수분사튜브를 도시한 분해사시도Figure 7 is an exploded perspective view showing a waterproof spray tube of the hammer hole drill to prevent breakage of the present invention

도 8은 본 고안인 절손이 방지된 개공기 함마드릴의 방수분사튜브를 도시한 조립도Figure 8 is an assembly view showing a waterproof spray tube of the hammer hole drill to prevent breakage of the present invention

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1.... 방수분사튜브 10.... 공급관1 .... waterproof spray tube 10 .... supply pipe

20.... 연결캡 30.... 소켓20 .. Connection cap 30 .... Socket

32.... 튜브 삽입홈 40.... 스크류로드32 .... Tube insert groove 40 .... Screw rod

50.... 분사튜브 60.... 오일리스 베어링50 .... Injection tube 60 .... Oilless bearing

62.... 고무패킹 64.... 가스켓62 ... rubber packing 64 ... gasket

70.... 고정링70 .... retaining ring

상기와 같은 목적을 달성하기 위한 기술적인 구성으로서 본 고안은, 냉각수와 고압가스를 공급토록 관 연결되고 개공기 드림함머의 연결캡에 고정되는 소켓의 내측에 설치되고, 전방으로 고로 출선구의 개공을 위한 개공파이프가 연결되는 스크류로드가 연결되어 냉각수 및 고압가스를 분사키니는 개공기의 함머드릴 분사튜브에 있어서,As a technical configuration for achieving the above object, the present invention is connected to the cooling water and the high-pressure gas supply pipe is installed inside the socket fixed to the connection cap of the open air Dreamhammer, the opening of the blast furnace outlet forward In the hammer drill injection tube of the open air to the screw rod is connected to the opening pipe for injecting coolant and high pressure gas,

상기 소켓의 내부에는 2단의 튜브 삽입홈이 일체로 관통 형성되고, 상기 튜브의 전방에는 상기 스크류로드에 삽입되는 연결튜브가 스크류 연결되며, 상기 소켓과 튜브는 방수토록 조립되는 절손이 방지된 개공기 함마드릴의 방수분사튜브를 제공하는 데에 있다.The inner end of the socket is formed through two tube insertion grooves integrally, the connection tube is inserted into the screw rod in the front of the tube is screw-connected, the socket and the tube is prevented from being broken to be assembled to waterproof To provide a waterproof spray tube of air hammer drill.

이하, 첨부된 도면에 의거하여 본 고안의 바람직한 실시예를 보다 상세하게 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 6은 본 고안에 따른 절손이 방지된 개공기 함마드릴의 방수분사튜브를 도시한 전체 구성도이고, 도 7은 본 고안인 절손이 방지된 개공기 함마드릴의 방수분사튜브를 도시한 분해사시도이며, 도 8은 본 고안인 절손이 방지된 개공기 함마드릴의 방수분사튜브를 도시한 조립도이다.6 is an overall configuration diagram showing a waterproof spray tube of the break-resistant opening machine hammer drill according to the present invention, Figure 7 is an exploded perspective view showing a waterproof spray tube of the break-proof opening machine hammer drill according to the present invention. 8 is an assembly view showing a waterproof spray tube of the hammer hole drill to prevent breakage of the present invention.

도 6 에서는 본 고안인 절손이 방지된 개공기 함마드릴의 방수분사튜브(1)를 도시하고 있는 데. 먼저 분사튜브(50)는 냉각수와 고압가스를 공급토록 관(10) 연결되고 개공기 드림함머의 연결캡(20)에 고정되는 소켓(30)의 내측에 설치되고, 전방으로 고로 출선구의 개공을 위한 개공파이프가 연결되는 스크류로드(40)가 연결되어 냉각수 및 고압가스를 분사시키게 된다.Figure 6 shows the waterproof spray tube (1) of the hammer hole drill to prevent breakage of the present invention. First, the injection tube 50 is installed inside the socket 30 connected to the pipe 10 to supply the coolant and the high pressure gas and fixed to the connection cap 20 of the open air dream hammer, and the opening of the blast furnace outlet in the forward direction. Screw rod 40 is connected to the opening pipe for the injection is to spray the coolant and high pressure gas.

그리고, 상기 소켓(30)의 내부에는 2단의 튜브 삽입홈(32)이 일체로 관통 형성되고, 상기 튜브(1)의 전방에는 상기 스크류로드(40)에 삽입되는 연결튜브(52)가 스크류 연결되며, 상기 소켓(30)과 튜브(50)는 방수토록 조립된다.In addition, a two-stage tube insertion groove 32 is integrally formed in the socket 30, and a connection tube 52 inserted into the screw rod 40 is screwed in front of the tube 1. The socket 30 and the tube 50 are assembled to be waterproof.

한편, 상기 소켓(30)의 튜브 삽입홈(32)에 안착 고정되는 튜브(50)의 외곽에는 튜브(50)의 회전을 위한 오일리스 베어링(60a)(60b)이 장착되고, 상기 베어링(60)의 일측에는 튜브(50)의 방수를 위한 고무패킹(62)과 가스켓(64)이 각각 고정된다.Meanwhile, oilless bearings 60a and 60b for rotation of the tube 50 are mounted on the outside of the tube 50 seated and fixed to the tube insertion groove 32 of the socket 30, and the bearing 60. One side of the) is fixed to the rubber packing 62 and the gasket 64 for waterproofing the tube 50, respectively.

또한, 상기 베어링(60)들은 상기 튜브(50)의 고정홈(50a) 및 삽입홈(32)의 고정턱(32a) 부분에 끼워져 고정되는 고정링(70a)(70b)으로서 이탈이 방지토록 고정되는 구성으로 이루어 진다.In addition, the bearings 60 are fixed to the fixing grooves (50a) and the fixing grooves (32a) of the fixing grooves (32a) of the insertion grooves 32 of the tube 50 is fixed to prevent the separation. It consists of the configuration.

상기와 같은 구성으로 이루어 진 본 고안의 작용 및 효과를 보다 상세하게 설명하면 다음과 같다.Referring to the operation and effects of the present invention made in the above configuration in more detail as follows.

도 6 내지 도 8 에서 도시한 바와 같이, 개공기의 개공작업시 냉각수 및 질소가스를 분사하도록 하여 고열에 의한 개공기 비트부분의 손상을 방지하도록 하는 분사튜브(50)을 종래의 다단으로 용접 연결하지 않아 개공파이프의 회전 및 타격시 발생되는 용접부위의 절손을 최소한으로 줄이면서, 특히 소켓(30)과 튜브(50)의 밀착부분을 방수처리함으로서 튜브(50)에서 냉각수가 누수되어도 이를 효과적으로 차단할 수 있도록 한 본 고안인 절손이 방지된 개공기 함마드릴의 방수분사튜브(1)는 다음과 같다.6 to 8, a conventional multi-stage welding connection of the injection tube 50 to spray the cooling water and nitrogen gas during the opening operation of the open air to prevent damage to the open air bit portion due to high heat It is possible to effectively block the leakage of cooling water from the tube 50 by waterproofing the contact portion of the socket 30 and the tube 50 while minimizing the loss of the welding part generated during the rotation and the impact of the opening pipe. The waterproof spray tube (1) of the break-resistant opening machine hammer drill is designed to be as follows.

먼저, 도 8에서 도시한 바와 같이 분사튜브(50)를 간략하게 살펴보면, 냉각수와 고압가스를 공급하는 연결관(10)이 소켓(30)의 후방에 연결되고, 상기 소켓(30)은 개공기 드릴함머에 고정되는 연결캡(20)에 연결된다.First, as shown in Figure 8 briefly look at the injection tube 50, the connection pipe 10 for supplying the cooling water and the high-pressure gas is connected to the rear of the socket 30, the socket 30 is an open air It is connected to the connection cap 20 is fixed to the drill hammer.

그리고, 상기 소켓(30)의 내측에 상기 분사튜브(50)가 장착되는 한편, 상기 분사튜브(50)의 전방에는 외곽으로 장착된 회전쳐크(42)에 의하여 회전하고 후방으로 연결캡(20)에 설치된 피스톤(44)으로서 회전 및 타격되는 스크류로드(40)가 연결되어 실제 고로 출선구의 개공작업을 수행한다.Then, the injection tube 50 is mounted on the inside of the socket 30, while the front of the injection tube 50 is rotated by the rotary chuck 42 mounted to the outside and connected to the rear cap 20 Screw rod 40 is rotated and hit as a piston 44 installed in the connection is performed to actually open the opening of the blast furnace outlet.

한편, 도 6에서 도시한 바와 같이, 상기 소켓(30)의 내부에는 2단의 튜브 삽입홈(32)이 일체로 관통 형성되어 있어서 상기 삽입홈(32)에 분사튜브(50)의 후단부가 일정부분 삽입되어 상기 소켓(30)에 형성된 통로(30a)를 통하여 공급된 냉각수와 질소가스가 상기 분사튜브(50)를 통하여 흐르게 된다.On the other hand, as shown in Figure 6, the two ends of the tube insertion groove 32 is integrally formed through the inside of the socket 30, the rear end of the injection tube 50 in the insertion groove 32 is constant Cooling water and nitrogen gas, which are partially inserted and supplied through the passage 30a formed in the socket 30, flow through the injection tube 50.

또한, 상기 분사튜브(50)의 전방에는 나사조립방식으로 연결튜브(52)가 연결 고정되는데, 이와 같은 연결튜브(52)를 분해 가능하게 연결하는 것은 스크류로드 (40)의 조립시 튜브(50)(52)의 연결을 용이하게 하기 위해서 이다.In addition, the front of the injection tube 50 is connected to the connection tube 52 is fixed by the screw assembly method, such that connecting the connection tube 52 so as to be decomposable when the assembly of the screw rod 40 tube 50 This is to facilitate the connection of the 52.

한편, 상기 소켓(30)의 내측으로 형성된 튜브 삽입홈(32)에 안착 고정된 브(50)의 외곽에는 2개의 오일리스 베어링(60a)(60b)이 장착되어 상기 튜브(50)의 회전을 별도의 오일투입없이 수행하도록 한다.On the other hand, two oilless bearings (60a, 60b) is mounted on the outer periphery of the bar (50) seated in the tube insertion groove (32) formed inside the socket (30) to rotate the tube (50). Do not add oil.

그리고, 상기 2개의 베어링(60a)(60b) 일측에는 고무패킹(62)과 가스켓(64)이 각각 고정됨으로서, 만약 튜브(50)와 소켓(30)의 연결부위에서 누수가 발생되면 상기 고무패킹(62)과 가스켓(64)에 의하여 흐르는 것이 차단되면서 방수효과를 갖는 것이다.And, the rubber packing 62 and the gasket 64 is fixed to one side of the two bearings (60a, 60b), if the leakage occurs in the connection between the tube 50 and the socket 30, the rubber packing ( 62) and the gasket (64) to block the flow is to have a waterproof effect.

동시에, 상기 베어링(60)들은 상기 튜브(50)의 고정홈(50a) 및 소켓 삽입홈(32)의 고정턱(32a) 부분에 끼워져 고정되는 고정링(70a)(70b)에 의하여 그 이탈이 방지된다.At the same time, the bearings 60 are separated by fixing rings 70a and 70b which are fitted into and fixed to the fixing grooves 50a of the tube 50 and the fixing jaw 32a of the socket insertion groove 32. Is prevented.

이에 따라서, 종래 용접으로서 다단으로 연결된 튜브를 본 고안에서는 튜브(50)와 연결튜브(52)의 2단으로 간소화하면서 용접이 필요없이 일체형으로 하고, 동시에 누수가 손쉽게 발생하는 소켓(30)과 튜브(50) 연결부위를 방수처리함으로서, 냉각수 누수에 따른 개공기의 설비손상을 방지하면서도, 원활한 냉각작용으로 개공기의 작동성을 향상시키는 것이다.Accordingly, in the present invention, a tube connected in multiple stages as a conventional welding is simplified into two stages of the tube 50 and the connecting tube 52, and is integrated without welding, and at the same time, the socket 30 and the tube easily leak. (50) By waterproofing the connecting portion, it is possible to prevent damage to the opening of the opening due to the leakage of cooling water, while improving the operability of the opening by a smooth cooling action.

이와 같이 본 고안인 절손이 방지된 개공기 함마드릴의 방수분사튜브에 의하면, 로 출선구의 개공작업을 수행하는 개공기 함마드릴의 내부에 설치되는 분사튜브의 절손을 완전하게 방지함으로서, 개공기 드릴부의 냉각불량으로 인한 장치의 수명단축을 방지시키는 잇점이 있다.As described above, according to the waterproof spray tube of the breaker-proof hammer drill drill of the present invention, by completely preventing the breakage of the injection tube installed inside the hole drill hammer for opening the furnace exit opening, This has the advantage of preventing shortening of the life of the device due to poor cooling of the drill part.

그리고, 개공기 함머드릴부의 냉각불량으로 인한 고열에 의한 파손 및 튜브의 절손을 방지함으로서 개공기의 드릴부와 튜브의 잦은 교체작업이 필요없어 보수 및 유지를 위한 비용이 절감되는 한편, 내열성 및 기밀성이향상된 분사튜브로 인하여 개공기 자체의 가동성이 향상되는 우수한 효과가 있는 것이다.In addition, by preventing the breakage of the tube due to the high temperature due to the poor cooling of the opening of the drill hole drill and tube breakage, it is not necessary to frequently replace the drill portion and the tube of the opening machine to reduce the cost for repair and maintenance, while maintaining heat resistance and airtightness This improved injection tube has an excellent effect of improving the operation of the opening machine itself.

본 고안은 특정한 실시예에 관련하여 도시하고 설명하였지만, 이하의 청구범위에 의해 마련되는 본 고안의 정신이나 분야를 벗어나지 않는 한도내에서 본 고안이 다양하게 개조 및 변화될수 있다는 것을 당업계에서 통상의 지식을 가진자는 용이하게 알수 있음을 밝혀두고자 한다.While the subject innovation has been shown and described with respect to specific embodiments, it will be apparent to those skilled in the art that various modifications and variations can be made without departing from the spirit or scope of the subject innovation as provided by the following claims. I would like to clarify that knowledge is easy to know.

Claims (2)

냉각수와 고압가스를 공급토록 관(10) 연결되고 개공기 드림함머의 연결캡 (20)에 고정되는 소켓(30)의 내측에 설치되고, 전방으로 고로 출선구의 개공을 위한 개공파이프가 연결되는 스크류로드(40)가 연결되어 냉각수 및 고압가스를 분사키니는 개공기의 함머드릴 분사튜브(50)에 있어서,The pipe 10 is connected to supply the cooling water and the high pressure gas, and is installed inside the socket 30 fixed to the connection cap 20 of the open air dreamhammer, and the opening pipe for opening the blast furnace outlet is connected to the front. In the hammer drill injection tube 50 of the open air to the screw rod 40 is connected to inject coolant and high pressure gas, 상기 소켓(30)의 내부에는 2단의 튜브 삽입홈(32)이 일체로 관통 형성되고, 상기 튜브(50)의 전방에는 상기 스크류로드(40)에 삽입되는 연결튜브(52)가 스크류 연결되며, 상기 소켓(30)과 튜브(50)는 방수토록 조립되는 것을 특징으로 하는 절손이 방지된 개공기 함마드릴의 방수분사튜브Inside the socket 30, two-stage tube insertion grooves 32 are integrally formed, and in front of the tube 50, a connection tube 52 inserted into the screw rod 40 is screwed. , The socket 30 and the tube 50 is waterproof spray tube of the hammer hole drill to prevent breakage, characterized in that assembled to waterproof 제 1항에 있어서, 상기 소켓(30)의 튜브 삽입홈(32)에 안착 고정되는 튜브(50)의 외곽에는 튜브(50)의 회전을 위한 오일리스 베어링(60a)(60b)이 장착되고, 상기 베어링(60)의 일측에는 튜브(50)의 방수를 위한 고무패킹(62)과 가스켓(64)이 각각 고정되고, 상기 베어링(60)들은 상기 튜브(50)의 고정홈(50a)및 삽입홈(32)의 고정턱(322a)부분에 끼워져 고정되는 고정링(70a)(70b)으로서 고정되는 것을 특징으로 하는 절손이 방지된 개공기 함마드릴의 방수분사튜브According to claim 1, Oilless bearings (60a) (60b) for the rotation of the tube 50 is mounted on the outer periphery of the tube 50 seated in the tube insertion groove 32 of the socket 30, One side of the bearing 60 is fixed to the rubber packing 62 and the gasket 64 for the waterproofing of the tube 50, the bearings 60 are inserted into the fixing groove (50a) and insertion of the tube (50) Waterproof spray tube of break-proof opening machine hammer drill, characterized in that it is fixed as a fixing ring (70a, 70b) is fitted into the fixing jaw (322a) of the groove 32
KR2020000033665U 2000-12-01 2000-12-01 A tube of hammer drill KR200223684Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000033665U KR200223684Y1 (en) 2000-12-01 2000-12-01 A tube of hammer drill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000033665U KR200223684Y1 (en) 2000-12-01 2000-12-01 A tube of hammer drill

Publications (1)

Publication Number Publication Date
KR200223684Y1 true KR200223684Y1 (en) 2001-05-15

Family

ID=73092471

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000033665U KR200223684Y1 (en) 2000-12-01 2000-12-01 A tube of hammer drill

Country Status (1)

Country Link
KR (1) KR200223684Y1 (en)

Similar Documents

Publication Publication Date Title
KR200223684Y1 (en) A tube of hammer drill
CN101166944B (en) Drill rod
KR200193057Y1 (en) Hammer dril of tap hole
KR200272216Y1 (en) Melting backflow prevention structure of opening machine
KR200268936Y1 (en) A tapping socket for preventing leakage in a boring machine
KR101167122B1 (en) Control device for center of furnace hole
KR100931657B1 (en) Tapping socket of opening machine
KR200173985Y1 (en) Centering machine for excavating tapping hole in blast furnace
KR200193059Y1 (en) Tap hole fixing socket
KR19990012098U (en) Tapping socket of furnace opening
KR100338647B1 (en) Double bite to drill the tap hole at bleast furnace
KR200151310Y1 (en) Slag stopper cooling device of converter
KR100419770B1 (en) A drill bit for using in puncturing the tap hole of the blast furnace
KR970002050Y1 (en) Tuyere of blast furnace
KR101287882B1 (en) Nozzle tip of mud gun using eccentric ring
KR20040026013A (en) Tapping bar adaptor structure for preventing reflow of hot metal from blast furnace into tap hole opener
KR19990026280U (en) Outlet Excavation System of Furnace
CN205329088U (en) A sectional rod for metallurgical stove
CN205473855U (en) Metallurgical combination tool joint
KR200415893Y1 (en) Drilling bit for tap hole of the blast furnace
KR20010019379A (en) An apparatus for drilling a tap holl of furnace
KR100402025B1 (en) Apparatus for adjusting center of tapping hole
KR100829967B1 (en) Device for scattering lime of roof of electric furnace
KR100851874B1 (en) Pressing-in appratus of tap hole of blast furnace
KR980008157U (en) Foreign material removal device at the end of the furnace air lance

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20020228

Year of fee payment: 3