KR200211328Y1 - A concrete pipe having a anchor - Google Patents

A concrete pipe having a anchor Download PDF

Info

Publication number
KR200211328Y1
KR200211328Y1 KR2020000024989U KR20000024989U KR200211328Y1 KR 200211328 Y1 KR200211328 Y1 KR 200211328Y1 KR 2020000024989 U KR2020000024989 U KR 2020000024989U KR 20000024989 U KR20000024989 U KR 20000024989U KR 200211328 Y1 KR200211328 Y1 KR 200211328Y1
Authority
KR
South Korea
Prior art keywords
concrete pipe
anchor
concrete
present
pipe
Prior art date
Application number
KR2020000024989U
Other languages
Korean (ko)
Inventor
이교성
이근호
이명규
Original Assignee
주식회사신흥콘크리트
유한회사 신흥건재산업
이명규
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사신흥콘크리트, 유한회사 신흥건재산업, 이명규 filed Critical 주식회사신흥콘크리트
Priority to KR2020000024989U priority Critical patent/KR200211328Y1/en
Application granted granted Critical
Publication of KR200211328Y1 publication Critical patent/KR200211328Y1/en

Links

Landscapes

  • Sewage (AREA)

Abstract

본 고안은 하수관 등에 사용되는 콘크리트관에 관한 것으로, 더욱 상세하게는 종래의 진동 및 전압 콘크리트관에 앵커를 설치하여 콘크리트관의 시공을 용이하게 하기 위한 앵커가 구비된 콘크리트관에 관한 것이다.The present invention relates to a concrete pipe used for sewage pipes, and more particularly, to a concrete pipe provided with an anchor for facilitating the construction of the concrete pipe by installing the anchor to the conventional vibration and voltage concrete pipe.

본 발명의 앵커가 구비된 콘크리트관은 동일 축방향의 전, 후로 콘크리트관(2)의 외부 벽면에서 콘크리트에 견고하게 매설된 2개의 앵커(1)가 장착되고, 상기 앵커는 운반 및 취급이 용이하도록 콘크리트관의 외부 벽면에 오목하게 형성된 앵커홈 내에 구비되며, 상기 앵커는 콘크리트관의 외부 벽면 위에 원주방향으로 소정각도를 이루며 2개가 더 구비될 수 있는 것을 특징으로 한다.Concrete pipe equipped with an anchor of the present invention is equipped with two anchors (1) firmly embedded in concrete on the outer wall surface of the concrete pipe (2) before and after the same axial direction, the anchor is easy to transport and handle It is provided in the anchor groove formed concave in the outer wall surface of the concrete pipe, the anchor is characterized in that it can be provided with two more at a predetermined angle in the circumferential direction on the outer wall surface of the concrete pipe.

본 발명에 따르면, 앵커가 구비된 콘크리트관은 상기 앵커에 맞는 전용후크가 설치된 와이어 로프에 의해 쉽고 안전하게 들어올려 운반될 수 있 수 있을 뿐만 아니라 시공위치에 따라 콘크리트관의 위치를 수정하기가 용이하게 되어 결국, 콘크리트관의 시공시에 작업능률이 향상되어 작업인원의 수를 줄일 수 있게 된다.According to the present invention, the concrete pipe provided with an anchor can be easily and safely lifted and transported by a wire rope provided with a dedicated hook for the anchor, and it is easy to modify the position of the concrete pipe according to the construction position. As a result, the work efficiency is improved at the time of construction of the concrete pipe, thereby reducing the number of workers.

Description

앵커가 구비된 콘크리트관{A CONCRETE PIPE HAVING A ANCHOR}Concrete pipe with anchor {A CONCRETE PIPE HAVING A ANCHOR}

본 고안은 하수관 등에 사용되는 콘크리트관에 관한 것으로, 더욱 상세하게는 종래의 진동 및 전압 콘크리트관에 앵커를 설치하여 콘크리트관의 시공을 용이하게 하기 위한 앵커가 구비된 콘크리트관에 관한 것이다.The present invention relates to a concrete pipe used for sewage pipes, and more particularly, to a concrete pipe provided with an anchor for facilitating the construction of the concrete pipe by installing the anchor to the conventional vibration and voltage concrete pipe.

하수관 등에 사용되는 콘크리트관을 지하에 매설하기 위하여 콘크리트관을 운반하고 시공하는데 지게차, 포크레인 등이 주로 이용된다. 종래의 콘크리트관의 시공과정에서는 설치하고자 하는 위치에 콘크리트관을 위치시키기 위하여 콘크리트관 전체를 강선 케이블이나 와이어 로프로 묶어서 지게차 등으로 들어올려 설치하여 왔다. 이러한 종래의 콘크리트관을 사용한 시공방법에서는 콘크리트관 전체를 묶기 위하여 작업 능률이 저하되고, 안전성에 있어서도 문제가 있었다. 또한, 상기 콘크리트관을 시공 위치에 정확하게 위치시키기 위해 관의 방향 및 위치를 반복하여 수정하는 것이 용이하지 아니한 문제도 있었다.Forklifts, forklifts, etc. are mainly used to transport and construct concrete pipes for undergrounding concrete pipes used for sewage pipes. In the conventional construction process of the concrete pipe, the entire concrete pipe has been installed by lifting it with a forklift, etc. by tying steel wire cables or wire ropes in order to position the concrete pipe at a position to be installed. In such a construction method using a conventional concrete pipe, work efficiency is lowered to bind the whole concrete pipe, and there is a problem in safety. In addition, there was also a problem that it is not easy to repeatedly modify the direction and position of the pipe in order to accurately position the concrete pipe in the construction position.

본 고안은 상기와 같은 종래 기술의 문제점을 해결하기 위하여 고안된 것으로, 진동 및 전압 콘크리트관의 생산과정에서 콘크리트관의 동일 축방향의 전, 후로 콘크리트관(2)의 외부 벽면에서 콘크리트에 견고하게 매설된 앵커를 설치함으로써 콘크리트관의 운반 및 시공을 용이하게 하여 작업능률의 향상, 안전성 확보 및 시공성을 증진시키는 앵커가 구비된 콘크리트관을 제공하는 것이다.The present invention is designed to solve the problems of the prior art as described above, in the production process of the vibration and voltage concrete pipe, firmly embedded in concrete at the outer wall surface of the concrete pipe (2) before and after the same axial direction of the concrete pipe It is to provide a concrete pipe with an anchor to facilitate the transport and construction of the concrete pipe by installing the anchor to improve the work efficiency, secure safety and improve the workability.

도 1은 콘크리트관의 전, 후에 2개의 앵커가 장착되어 있는 본 고안 앵커가 구비된 콘크리트관을 나타내는 사시도이다.1 is a perspective view showing a concrete pipe with an anchor of the present invention, which is equipped with two anchors before and after the concrete pipe.

도 2는 도 1에 도시된 본 고안의 앵커가 구비된 콘크리트관을 상세하게 나타내는 부분 단면도이다.Figure 2 is a partial cross-sectional view showing in detail the concrete pipe with an anchor of the present invention shown in FIG.

도 3은 본 고안 앵커가 구비된 콘크리트관의 실시예를 나타낸 것이다.Figure 3 shows an embodiment of a concrete pipe provided with an anchor of the present invention.

도 4는 본 고안 앵커가 구비된 콘크리트관의 또다른 실시예를 나타낸 것이다.Figure 4 shows another embodiment of the concrete pipe provided with an anchor of the present invention.

<도면의 주요 부분에 대한 부호 설명><Description of Signs for Main Parts of Drawings>

1 : 앵커 2 : 콘크리트관1 anchor 2 concrete pipe

3 : 앵커홈3: Anchor groove

상기의 목적을 달성하기 위한 본 고안의 앵커가 구비된 콘크리트관은, 콘크리트관의 동일 축방향의 전, 후로 콘크리트관(2)의 외부 벽면에서 콘크리트에 견고하게 매설된 2개의 앵커가 장착되고, 상기 앵커는 운반 및 취급이 용이하도록 콘크리트관의 외부 벽면에 오목하게 형성된 앵커홈 내에 구비되며, 상기 앵커는 콘크리트관의 외부 벽면 위에 원주방향으로 소정각도를 이루며 2개가 더 구비될 수 있는 것을 특징으로 한다.Concrete pipe equipped with an anchor of the present invention for achieving the above object is equipped with two anchors firmly embedded in concrete on the outer wall surface of the concrete pipe (2) before and after the same axial direction of the concrete pipe, The anchor is provided in the anchor groove formed concave in the outer wall of the concrete pipe for easy transportation and handling, the anchor is formed at a predetermined angle in the circumferential direction on the outer wall of the concrete pipe, characterized in that two more can be provided do.

본 고안의 앵커가 구비된 콘크리트관의 구성을 첨부도면을 참조하여 상세히 설명한다.With reference to the accompanying drawings, the configuration of the concrete tube with an anchor of the present invention will be described in detail.

상기 앵커(1)는 도 1에 도시된 바와 같이 콘크리트관(2)의 동일 축방향의 전, 후에 각가 하나씩 2개가 구비된다. 도 3에 도시된 실시예에서와 같이, 콘크리트관을 안정하게 들어올리기 위하여 콘크리트관의 전, 후에 각각 앵커가 구비되는 것이다. 상기 앵커의 위치 및 개수는 작업용이성 및 능률을 고려하여 적당한 위치 및 개수를 정한다.As shown in FIG. 1, two anchors 1 are provided, one before and after the same axial direction of the concrete pipe 2. As in the embodiment shown in Figure 3, the anchor is provided before and after the concrete pipe in order to lift the concrete pipe stably. The position and number of the anchor is determined appropriate position and number in consideration of ease of operation and efficiency.

또한, 상기 앵커(1)는 필요한 경우에 콘크리트관의 외부 벽면 위에서 원주방향으로 초기 구비된 앵커들이 이루는 축방향과 소정 각도를 형성하면서 2개 이상이 반복적으로 구비될 수 있다. 예를 들어, 두 대의 지게차가 동시에 하나의 콘크리트관을 들어올리는데 콘크리트관을 안정하게 들어올리고, 위치를 조정하는데 유용하게 하기 위함이다.In addition, two or more anchors 1 may be repeatedly provided, if necessary, while forming a predetermined angle with an axial direction formed by the anchors initially provided in the circumferential direction on the outer wall of the concrete pipe. For example, two forklifts lift one concrete pipe at the same time, so that it can be useful to stably lift and adjust the position of the concrete pipe.

도 2는 본 고안 앵커가 구비된 콘크리트관에서 앵커홈에 앵커가 구비되어 있는 것을 상세하게 나타낸 부분 단면도이다. 상기 도 2에 도시된 바와 같이, 본 고안에 사용된 앵커(1)는 콘크리트관(2)의 외부 벽면에 형성된 앵커홈(3) 내에 앵커의 한쪽 끝이 돌출되어 있고, 다른 쪽 끝은 콘크리트관 내에 매설되어 있다.Figure 2 is a partial cross-sectional view showing in detail that the anchor is provided in the anchor groove in the concrete pipe provided with the subject innovation. As shown in FIG. 2, the anchor 1 used in the present invention has one end of the anchor protruding from the anchor groove 3 formed in the outer wall of the concrete pipe 2, and the other end of the anchor It is buried inside.

도 2에 도시된 바와 같이, 상기 앵커(1)는 콘크리트관 내에 삽입되어 콘크리트관의 무게를 지지할 수 있을 정도로 견고하게 고정되어야 하므로 앵커의 단부가 알파벳 'T'형으로 형성되어 있다. 여기에서, 상기 앵커의 단부는 알파벳 'T'형에 한정되는 것은 아니다. 상기 콘크리트관의 무게를 지지할 수 있도록 앵커가 콘크리트관에 견고하게 매설될 수 있으면, 상기 앵커의 단부는 어떠한 형성을 갖더라도 무방하다. 따라서, 콘크리트관(2)과 앵커(1)가 별개로 각각 생산된 후에 콘크리트관(2)에 앵커(1)를 설치하는 것은 용이하지 않으며, 앵커(1)와 콘크리트관(2)의 결합력이 저하되므로 바람직하지도 않다.As shown in Figure 2, the anchor (1) is inserted into the concrete tube to be firmly fixed to support the weight of the concrete tube, so that the end of the anchor is formed in the letter 'T' shape. Here, the end of the anchor is not limited to the letter 'T' type. If the anchor can be firmly embedded in the concrete pipe so as to support the weight of the concrete pipe, the end of the anchor may have any formation. Therefore, it is not easy to install the anchor 1 on the concrete pipe 2 after the concrete pipe 2 and the anchor 1 are produced separately, and the coupling force between the anchor 1 and the concrete pipe 2 is reduced. It is not preferable because it is lowered.

이러한 결점을 해소하기 위하여 본 고안의 고안자는 콘크리트관(2)의 제작과정에서 앵커(1)를 콘크리트관의 외벽에 설치하는 제조방법을 개발하였다. 다음에서는 본 고안에 따른 앵커가 구비된 콘크리트관의 제조과정에 대하여 상세하게 설명한다.In order to solve this drawback, the inventors of the present invention have developed a manufacturing method for installing the anchor (1) on the outer wall of the concrete pipe in the manufacturing process of the concrete pipe (2). Next, the manufacturing process of the concrete pipe with an anchor according to the present invention will be described in detail.

진동 및 전압 철근 콘크리트관의 생산은 먼저 철선을 가공하여 조립하고, 운반용 파레트에 철선을 설치하여 성형기에 투입한다. 성형기는 내부 및 외부 거푸집, 진동장치 등으로 구성되어 있다. 철선이 성형기에 투입되면, 외부 거푸집을 조립하고 내부 거푸집과 결합한다. 이 때, 외부 거푸집의 내부면에는 미리 도 2에 도시된 형상의 반원형의 앵커홈(3) 거푸집과 그 반원형의 거푸집을 관통하여 설치되어 있는 앵커(1)가 설치되도록 한다.In the production of vibration and voltage reinforced concrete pipes, the steel wires are first processed and assembled, and the steel wires are installed on the transport pallet and put into the molding machine. The molding machine is composed of internal and external formwork, vibration device, and the like. When the wire is put into the molding machine, the outer formwork is assembled and combined with the inner formwork. At this time, the inner surface of the outer formwork is to be installed in advance the semicircular anchor groove (3) form of the shape shown in Figure 2 and the anchor (1) installed through the semi-circular formwork.

앵커(1) 및 앵커홈(3) 거푸집이 외부 거푸집의 내부면에 설치되면, 미리 배합된 콘크리트를 투입하면서 성형기를 진동시켜 관의 모양을 형성하게 된다. 상기 성형기 내에서 콘크리트관의 진동 성형이 완료되면 거푸집을 제거하는 탈형과정을 거쳐서 운반, 양생시켜 제품을 완성하게 된다.When the anchor 1 and the anchor groove 3 formwork are installed on the inner surface of the outer formwork, the molding machine is vibrated while the premixed concrete is added to form the shape of the tube. When the vibration molding of the concrete tube in the molding machine is completed, the product is transported and cured through a demoulding process to remove formwork.

이와 같이, 본 고안이 앵커가 구비된 콘크리트관은 종래의 콘크리트관 생산 과정 중에 거푸집의 설치와 동시에 앵커 및 앵커홈 거부집을 설치하여 제작하게 되므로, 앵커가 콘크리트관에 견고하게 일체로 부착되고, 아울러 운반 및 취급에 용이하도록 앵커홈이 일체로 형성되며, 앵커가 구비된 콘크리트관을 대량생산할 수 있게 된다.As such, the concrete pipe provided with the anchor of the present invention produces a conventional concrete pipe At the same time as the installation of the formwork and anchor and anchor groove rejection will be installed and manufactured, the anchor is firmly attached to the concrete pipe, and the anchor groove is integrally formed to facilitate transport and handling, and the anchor is provided The mass production of concrete pipes is possible.

상기 앵커홈(3)은, 도 3 및 도4에 도시된 바와 같이, 본 고안의 앵커가 구비된 콘크리트관을 시공할 때, 상기 앵커(1)에 맞는 후크를 결합시키기 용이하도록 하면서 동시에 콘크리트관의 취급 및 운반시에 불편하지 않도록 콘크리트관의 외부 벽면에서 관 안쪽으로 오목한 홈을 형성한 것이다. 상기 콘크리트관의 생산과정에서 사용된 반원형 거푸집을 이용함으로써 도 2에 도시된 바와 같은 앵커홈(3)이 형성된다. 상기 앵커홈(3)은 필요한 경우 사용되는 거푸집의 모양에 따라 다양하게 선택될 수 있다.The anchor groove 3, as shown in Figures 3 and 4, when constructing a concrete pipe with an anchor of the present invention, at the same time to facilitate the hook to fit the anchor (1) while the concrete pipe In order not to be inconvenient during handling and transport of the concave grooves are formed in the inner wall of the concrete pipe. By using the semi-circular formwork used in the production process of the concrete pipe anchor groove 3 as shown in FIG. The anchor groove 3 may be variously selected depending on the shape of the formwork to be used if necessary.

이하에서는 상기와 같이 구성된 본 고안의 작동상태에 대하여 첨부도면을 참조하여 상세히 설명한다.Hereinafter will be described in detail with reference to the accompanying drawings for the operating state of the subject innovation configured as described above.

도 3에는 본 고안 앵커에 맞는 후크가 구비된 와이어 로프로 앵커가 구비된 콘크리트관을 들어올리는 실시예가 도시되어 있다. 상기 도 3에서 보듯이, 지게차 등이 콘크리트관을 들어올릴 때, 콘크리트관의 균형을 유지하면서 용이하게 들어올리도록 콘크리트관 위의 적당한 위치에 앵커홈(3) 및 앵커(1)가 구비되어 있다. 상기 앵커(1)와 그에 맞는 후크와의 결합 및 분리가 용이하므로 작업능률의 향상에도 기여하게 된다.Figure 3 shows an embodiment of lifting the concrete pipe provided with an anchor with a wire rope provided with a hook for the subject innovation. As shown in FIG. 3, when the forklift lifts the concrete pipe, the anchor groove 3 and the anchor 1 are provided at a proper position on the concrete pipe so as to easily lift the concrete pipe while maintaining the balance. Since the anchor (1) is easily coupled and separated from the hook according to it contributes to the improvement of the work efficiency.

도 4는 여러 개의 콘크리트관을 연결하여 시공할 때, 본 고안 앵커가 구비된 콘크리트관을 이용하는 실시예를 나타내고 있다. 여러 개의 콘크리트관을 연결하여 시공하는 경우에, 종래에는 콘크리트관을 들어올려 위치를 고정하기 위하여 최소한 두 대 이상의 지게차가 필요하였다. 지게차가 없는 경우에는 사람이 하나의 콘크리트관을 지렛대를 이용하여 지지하고 있어야 했다. 그러나, 본 고안의 앵커가 구비된 콘크리트관을 사용하면, 도 4에 도시된 방식으로 하나의 지게차를 이용하여 용이하게 두 개의 콘크리트관을 연결할 수가 있다.Figure 4 shows an embodiment using a concrete pipe provided with an anchor of the present invention when connecting a plurality of concrete pipe construction. In the case of connecting a plurality of concrete pipes, at least two forklifts were required to lift the concrete pipe and fix its position. In the absence of a forklift, a person had to support a concrete pipe with a lever. However, by using the concrete pipe provided with the anchor of the present invention, it is possible to easily connect two concrete pipes using one forklift in the manner shown in FIG.

이상에서 상세히 설명한 바와 같이, 본 고안의 앵커가 구비된 콘크리트관은 상기 앵커에 맞는 전용후크가 설치된 와이어 로프를 이용하여 쉽고 안전하게 들어올려 운반될 수 있다. 상기 앵커가 구비된 콘크리트관은 들어 올리기가 수월하므로 시공위치에 따라 콘크리트관의 위치를 수정하기가 용이하게 된다. 결국, 콘크리트관의 시공시에 작업능률이 향상되어 작업인원의 수를 줄일 수 있게 된다.As described in detail above, the concrete pipe provided with an anchor of the present invention can be easily lifted up and transported using a wire rope provided with a dedicated hook for the anchor. Since the concrete pipe provided with the anchor is easy to lift, it is easy to modify the position of the concrete pipe according to the construction position. As a result, the work efficiency is improved at the time of construction of the concrete pipe, thereby reducing the number of workers.

이상에서는 본 고안에 따른 일 실시예를 중심으로 본 고안의 구성 및 작용효과에 대하여 살펴보았으나, 본 고안은 이상에서 기술된 실시예에 한정되는 것은 아니며. 본 고안의 기술적 사상에 기초하여 자유로운 변형이 가능하다.In the above, the configuration and working effects of the present invention have been described with reference to an embodiment of the present invention, but the present invention is not limited to the embodiments described above. Free modification is possible based on the technical idea of the present invention.

Claims (3)

콘크리트관(2)의 동일 축방향의 전, 후로 콘크리트관(2)의 외부 벽면에서 콘크리트에 견고하게 매설된 2개의 앵커(1)가 장착되어 있는 것을 특징으로 하는 앵커가 구비된 콘크리트관.A concrete pipe with an anchor, characterized in that two anchors (1) are firmly embedded in concrete on the outer wall of the concrete pipe (2) before and after in the same axial direction of the concrete pipe (2). 제 1 항에 있어서,The method of claim 1, 상기 앵커(1)는 운반 및 취급이 용이하도록 콘크리트관(2)의 외부 벽면에 오목하게 형성된 앵커홈(3) 내에 구비되는 것을 특징으로 하는 앵커가 구비된 콘크리트관.The anchor (1) is a concrete pipe with an anchor, characterized in that provided in the anchor groove (3) formed concave on the outer wall surface of the concrete pipe (2) for easy transport and handling. 제 1 항 또는 제2항에 있어서,The method according to claim 1 or 2, 상기 앵커(1)는 콘크리트관(2)의 외부 벽면 위에서 원주방향으로 상기 앵커가 이루는 축방향과 소정각도를 이루며 2개가 더 구비되어 있는 것을 특징으로 하는 앵커가 구비된 콘크리트관.The anchor (1) is a concrete pipe with an anchor, characterized in that the axial direction formed by the anchor in the circumferential direction on the outer wall surface of the concrete pipe (2) two more are provided.
KR2020000024989U 2000-09-02 2000-09-02 A concrete pipe having a anchor KR200211328Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000024989U KR200211328Y1 (en) 2000-09-02 2000-09-02 A concrete pipe having a anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000024989U KR200211328Y1 (en) 2000-09-02 2000-09-02 A concrete pipe having a anchor

Publications (1)

Publication Number Publication Date
KR200211328Y1 true KR200211328Y1 (en) 2001-01-15

Family

ID=73088300

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000024989U KR200211328Y1 (en) 2000-09-02 2000-09-02 A concrete pipe having a anchor

Country Status (1)

Country Link
KR (1) KR200211328Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101241240B1 (en) * 2010-07-08 2013-03-14 한국해양과학기술원 Tetrapod

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5673791U (en) * 1979-11-06 1981-06-17

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5673791U (en) * 1979-11-06 1981-06-17

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101241240B1 (en) * 2010-07-08 2013-03-14 한국해양과학기술원 Tetrapod

Similar Documents

Publication Publication Date Title
US6023891A (en) Lifting apparatus for concrete structures
JP4488745B2 (en) Wind turbine
KR100864953B1 (en) Frp-concrete composite structure using precast fiber reinforced polymer pipe of double(inner and outer) hollow type and the construction method using the same
KR100954967B1 (en) Prefab apparatus for reinforcing head of pile
KR101082519B1 (en) Concrete pile
CN210103276U (en) Lifting hook and concrete precast pile
KR200211328Y1 (en) A concrete pipe having a anchor
KR200191011Y1 (en) Insert anchor for pulling up concrete mass
CN217871016U (en) Hoisting tool for concrete supporting beam
KR102155651B1 (en) Pile lifting device and construction method using the same
KR101171746B1 (en) Method execution silo
KR20110026206A (en) Joint for concrete pile
JP2015045202A (en) Arch culvert and manufacturing method thereof
US5201161A (en) Nuclear power plant construction method
CN100586688C (en) Steel bar concrete construction pre-stress stretching method
KR100973503B1 (en) Vertical RC structure construction method using prefabricated steel bar multi story unit
CN219732525U (en) Anchoring type hoisting grouting embedded part for concrete prefabricated part
JP2009161922A (en) Prefabricated concrete pile and method of manufacturing the same
CN110552422A (en) Assembly type underground structure accessory
KR200344724Y1 (en) Concrete Manhole having Anchor for Transporting
KR100640242B1 (en) Constructing method and collapsible mold for manufacture of a manhole
JP4524581B2 (en) Concrete structure
CN215717240U (en) Construction pouring component preformed hole supporting dismounting-free formwork
CN219569332U (en) Hollow slab lifting point embedded part capable of being recycled and prefabricated hollow slab
CN219469462U (en) Anchoring type rotary lifting embedded part for concrete prefabricated part

Legal Events

Date Code Title Description
REGI Registration of establishment
T701 Written decision to grant on technology evaluation
G701 Re-publication after modification of scope of protection [utility model]
G701 Re-publication after modification of scope of protection [utility model]
FPAY Annual fee payment

Payment date: 20091112

Year of fee payment: 10

EXPY Expiration of term