KR20020067306A - Construction method for slab mold - Google Patents

Construction method for slab mold Download PDF

Info

Publication number
KR20020067306A
KR20020067306A KR1020010007823A KR20010007823A KR20020067306A KR 20020067306 A KR20020067306 A KR 20020067306A KR 1020010007823 A KR1020010007823 A KR 1020010007823A KR 20010007823 A KR20010007823 A KR 20010007823A KR 20020067306 A KR20020067306 A KR 20020067306A
Authority
KR
South Korea
Prior art keywords
plywood
concrete
temporary
timbering
joist
Prior art date
Application number
KR1020010007823A
Other languages
Korean (ko)
Inventor
김현모
Original Assignee
삼성물산 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성물산 주식회사 filed Critical 삼성물산 주식회사
Priority to KR1020010007823A priority Critical patent/KR20020067306A/en
Publication of KR20020067306A publication Critical patent/KR20020067306A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs

Abstract

PURPOSE: Provided is to shorten a frame construction period by early disassembly, use the all disassembled materials into the upper floor effectively, and improve working condition. CONSTITUTION: The slab mould construction comprises the following steps as: disassembling the rest plywood non-supported on the timbering, sleeper, joist, and the temporary timbering by installing temporary timbering on the mould plywood directly in curing the concrete; disassemble the rest plywood and temporary timbering by installing residual timbering on the lower part of the casting floor disassembled plywood mould; using all disassembled sleeper, joist, plywood, and timbering except residual timbering into the upper floor; and disassembling the residual timbering after curing concrete until gaining concrete standard strength of design, where slab construction comprises the following installing steps as; the sleeper and the joist; many vertical timbering on the casted floor to support the sleeper and joist, slab mould plywood on the sleeper, and concrete casting layer on the mould plywood.

Description

슬라브용 거푸집 시공방법 {Construction method for slab mold}Construction method for slab {Construction method for slab mold}

본 발명은 슬라브용 거푸집 시공방법에 관한 것으로, 조기강도를 발현하는콘크리트를 사용함으로써 거푸집의 조기해체가 가능하여 골조공기를 대폭 단축시키며, 해체된 자재들을 상부층에 전용할 수 있어 자재의 효율적인 이용과 함께 작업환경을 개선시킬 수 있는 슬라브용 거푸집 시공방법에 관한 것이다.The present invention relates to a method for constructing a slab formwork, by using concrete that expresses the early strength is possible to premature dismantling of the formwork, significantly reducing the frame air, and the dismantled materials can be dedicated to the upper layer and efficient use of materials In addition, the present invention relates to a slab formwork for improving the working environment.

도 1 및 도 2를 참조하여 종래의 통상적인 슬라브 거푸집 시공방법을 설명한다.A conventional slab formwork construction method will be described with reference to FIGS. 1 and 2.

도 1은 개략적인 정면도이고, 도 2는 도 1의 평면 개요도이다.1 is a schematic front view, and FIG. 2 is a plan schematic view of FIG. 1.

도시된 바와 같이 멍에(10) 및 장선(11)을 설치하는 단계, 상기 멍에 및 장선이 지지되도록 기설치된 타설완료층(1) 상에 수직으로 설치되는 다수의 동바리(SUPPORT)(12)를 설치하는 단계, 상기 멍에(10)상에 슬라브 거푸집 합판(13)을 설치하는 단계, 상기 거푸집 합판(13)상에 콘크리트 타설층(2)을 형성하는 단계, 상기 콘크리트 타설층(2) 상에 상부 슬라브 거푸집을 시공하는 단계, 및 상기 타설층(2)의 양생 후 순차적으로 거푸집을 해체하는 단계를 포함한다.Installing the yoke (10) and joist 11 as shown, a plurality of SUPPORT (12) installed vertically installed on the pour finish layer (1) pre-installed to support the yoke and joist And installing a slab formwork plywood 13 on the yoke 10, forming a concrete pour layer 2 on the formwork plywood 13, the upper portion on the concrete pour layer 2 Constructing the slab formwork, and sequentially dismantling the formwork after curing the pour layer 2.

그런데 이러한 종래의 시공방법은 타설층(2)의 규준상 강도인 400㎏/㎠ 이상을 유지시키거나 거푸집 탈형을 위한 1일 강도인 140㎏/㎠ 이상을 유지하기 위해서는 최소한의 동바리(12)를 최소한 28일까지 존치시켜야 하고, 콘크리트 타설 후 거푸집 제거가 3~4일 후에 이루어져야 하는 까닭에 골조공기가 연장되고, 거푸집을 조기 탈형할 수 없어 새로운 거푸집 자재를 이중적으로 사용하게 되는 것에 의해 자재의 효율적인 이용이 저하되며, 거푸집이 해체되기 전까지는 작업공간을 효율적으로 이용할 수 없게 되는 등의 문제점이 있었다.However, in the conventional construction method, at least 400 kg / cm 2, which is the normative strength of the casting layer 2, or to maintain 140 kg / cm 2 or more, which is the daily strength for formwork demoulding, is used. It must be kept for at least 28 days, and the form removal after concrete pouring should be done after 3 ~ 4 days, so that the air is extended and the formwork can not be demolished early so that the new formwork can be used twice. There is a problem that the use is lowered, the work space can not be efficiently used until the formwork is dismantled.

또한 합판의 반복사용을 위해서는 별도의 끼움용 합판과 동바리를 별도로 설치하여야 하는 번거로움이 있는 등 골조공사의 질적향상을 저하시켰으며, 거푸집 및 동바리의 전용횟수가 줄어들어 원가절감이 어렵게 되는 등 반복적이고도 체계적인 작업이 이루어지지 못하였다.In addition, the repetitive use of plywood has reduced the quality improvement of the frame construction, such as the need to install separate fitting plywood and copper bar, and it is difficult to reduce the cost by reducing the number of dedicated dies and copper bar. There was no systematic work.

본 발명은 상술한 종래의 문제점을 해결하기 위하여 안출된 것으로서, 본 발명의 목적은 조기강도를 발현하는 콘크리트를 사용함으로써 거푸집의 조기해체가 가능하여 골조공기를 대폭 단축시키며, 해체된 자재들을 상부층에 전용할 수 있어 자재의 효율적인 이용과 함께 작업환경을 개선시킬 수 있는 슬라브용 거푸집 시공방법을 제공하는 데 있다.The present invention has been made to solve the above-mentioned conventional problems, the object of the present invention is to use the concrete expressing the early strength can be early disassembly of the formwork to significantly shorten the frame air, dismantled material to the upper layer It is to provide a slab formwork construction method that can be converted to improve the working environment with efficient use of materials.

상기 목적을 달성하기 위한 본 발명의 슬라브용 거푸집 시공방법은 멍에 및 장선을 설치하는 단계, 상기 멍에 및 장선이 지지되도록 기설치된 타설완료층 상에 수직으로 설치되는 다수의 동바리(SUPPORT)를 설치하는 단계, 상기 멍에상에 슬라브 거푸집 합판을 설치하는 단계, 및 상기 거푸집 합판상에 콘크리트 타설층을 형성하는 단계를 포함하는 시공방법에 있어서, 상기 콘크리트 타설층의 1일 양생시 임시동바리를 합판 거푸집에 직접 설치하고 동바리, 멍에 및 장선과 상기 임시 동바리에 지지되지 않는 나머지 합판을 해체하는 단계, 합판 거푸집이 해체된 타설층 하단에 잔류동바리를 설치하고 나머지 합판 및 임시동바리를 해체하는 단계, 및 해체된 멍에,장선,합판,동바리를 상부층으로 전용하는 단계가 상부층에서 반복적으로 이루어지는 것을 특징으로 한다.The slab formwork construction method of the present invention for achieving the above object is to install a yoke and joist, to install a plurality of copper (SUPPORT) installed vertically on the pre-installed finishing layer to support the yoke and joist In the construction method comprising the step of installing the slab formwork plywood on the yoke, and forming a concrete pouring layer on the formwork plywood, the temporary copper bar during the day curing of the concrete pouring layer to the plywood formwork Directly installing and dismantling the copper bar, yoke and joist and the remaining plywood not supported by the temporary copper bar, installing residual copper bar at the bottom of the pouring layer where the plywood formwork is dismantled, and dismantling the remaining plywood and temporary copper bar, and dismantled The yoke, joist, plywood, and clubbing of the upper layer are repeated in the upper layer. Gong.

또한 상기 타설층을 형성하는 콘크리트는 고성는 AE감수제의 첨가 및 C/W비가 조절되어 조기강도를 발현할 수 있는 고강도 콘크리트인 것을 특징으로 한다.In addition, the concrete forming the pour layer is characterized in that the high-strength concrete can express the early strength by the addition of the AE reducing agent and the C / W ratio is high.

도 1은 종래의 시공방법을 설명하기 위한 개략적인 정면도,1 is a schematic front view for explaining a conventional construction method,

도 2는 도 1의 평면 개요도,2 is a plan schematic view of FIG. 1;

도 3은 본 발명의 시공 공정도,3 is a construction process diagram of the present invention,

도 4는 본 발명의 시공방법을 설명하기 위한 정면도,4 is a front view for explaining the construction method of the present invention,

도 5 및 도 6은 도 4의 평면 개요도로서,5 and 6 are plan schematic views of FIG. 4.

도 5는 거푸집 제거시 임시동바리 설치상태를 나타내는 평면도,5 is a plan view showing a temporary group installation state when removing the formwork;

도 6은 상부층 작업시 잔류 동바리 설치상태 평면도이다.Figure 6 is a plan view of the residual copper installation state during the upper layer work.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1: 타설완료층 2: 타설층1: pour finish layer 2: pour layer

10,10': 멍에 11,11': 장선10,10 ': Yoke 11,11': Joist

12,12': 동바리 13: 합판12,12 ': East Side 13: Plywood

14: 임시동바리 15: 잔류동바리14: Temporary club 15: Residual club

이하 첨부된 도면을 참고하여 본 발명의 실시예를 상세히 설명하면 다음과 같다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 3은 본 발명의 공정도, 도 4는 본 발명의 개략적인 정면도, 도 5 및 도 6은 도 4의 평면 개요도로서 거푸집 제거시 임시동바리 설치상태를 나타내는 평면도 및 상부층 작업시 잔류 동바리 설치상태 평면도이다.Figure 3 is a process diagram of the present invention, Figure 4 is a schematic front view of the present invention, Figure 5 and Figure 6 is a plan view of Figure 4 is a plan view showing the temporary group installation state when removing the mold and the remaining group installation state during the upper layer work Top view.

도시된 바와 같이 본 발명의 슬라브용 거푸집 시공방법은 도 1 및 도 2에서와 같이 멍에(10) 및 장선(11)을 설치하는 단계, 상기 멍에 및 장선이 지지되도록 기설치된 타설완료층(1) 상에 수직으로 설치되는 다수의 동바리(SUPPORT)(12)를 설치하는 단계, 상기 멍에(10)상에 슬라브 거푸집 합판(13)을 설치하는 단계, 및 상기 거푸집 합판(13)상에 콘크리트 타설층(2)을 형성하는 단계를 포함하되, 상기 콘크리트 타설층(2)의 1일 양생시 임시동바리(14)를 합판(13) 거푸집에 직접 설치하여 지지시킨 상태에서 멍에(10')와 장선(11') 및 동바리(12')를 해체시킨다.As shown in Figure 1, the slab formwork construction method of the present invention to install the yoke 10 and the joist 11, as shown in Figure 1 and 2, the yoke and joist already installed so that the joist complete layer (1) Installing a plurality of SUPPORT (12) vertically installed on the step, Installing a slab formwork plywood (13) on the yoke (10), and Concrete pouring layer on the formwork plywood (13) (2) forming a yoke (10 ') and joist (in the state of supporting the temporary plywood (14) directly installed on the plywood (13) formwork during the day curing of the concrete pour layer (2) 11 ') and the club 12' are dismantled.

이 때 임시동바리(14)의 설치간격은 타설시 설치된 동바리의 2배 간격으로 설치시키는 것이 바람직하고, 따라서 임시동바리(14)의 합판 지지력에 의해 타설층(2)이 임시로 지지된 상태를 유지하게 되는 것과 함께 상기 임시동바리(14)에 지지되지 않는 멍에(10'), 장선(11'), 동바리(12'), 및 합판(13)의 해체가 가능해 진다.At this time, it is preferable to install the temporary spacing 14 at intervals twice as large as the spacings installed at the time of pouring. Therefore, the pouring layer 2 is temporarily supported by the plywood holding force of the temporary spacing 14. In addition, the yoke (10 '), joist (11'), the grouping (12 '), and the plywood 13, which is not supported by the temporary clubs 14 can be dismantled.

해체된 멍에(10'), 장선(11'), 동바리(12'), 및 합판(13)은 상부층 거푸집시공 자재로 전용된다.The dismantled yoke (10 '), joist (11'), club (12 '), and plywood (13) is dedicated to the upper layer formwork material.

다음으로 합판(13)이 해체된 타설층(2) 하단에 잔류동바리(15)를 직접 설치시킨 상태에서 임시동바리(14) 및 나머지 잔류하는 합판(13)을 해체시킨다.Next, the temporary copper bar 14 and the remaining remaining plywood 13 are dismantled in a state in which the residual copper bar 15 is directly installed at the bottom of the poured layer 2 in which the plywood 13 is disassembled.

상기 잔류동바리(15)의 설치간격은 이전 설치된 임시동바리(14)와 동일간격으로 설치시키는 것이 바람직하고, 콘크리트 소요강도 발현시(약28일)까지 존치시킨다.The installation interval of the residual copper barley 15 is preferably installed at the same interval as the temporary copper barley 14 previously installed, and is maintained until the required concrete strength (about 28 days).

이에 따라 타설층(2)의 최종지지는 잔류동바리(15)에 의해 지지된 상태를 유지하고, 상기 잔류동바리를 제외한 나머지 해체된 멍에(10'), 장선(11'), 동바리(12'), 및 합판(13)은 상부층 거푸집시공 자재로 전용된다.Accordingly, the final support of the pouring layer 2 is maintained by the remaining copper group 15, and the remaining yoke (10 '), joist 11', copper bar 12 'except for the residual copper bar , And plywood 13 is dedicated to the upper layer formwork material.

각각의 상부층은 상기 단계의 시공방법이 반복되는 작업으로 시공된다.Each upper layer is constructed by repeating the construction method of the above step.

이상에서 설명한 바와 같이 본 발명의 슬라브용 거푸집 시공방법은 콘크리트 슬라브의 소요강도 확보를 위하여 기설치된 동바리중 1/2개를 해체하여 콘크리트 슬라브에 직접 설치하여 슬라브를 지지하는 공법에 의해, 거푸집의 조기해체가 가능하여 골조공기를 대폭 단축시키며, 해체된 자재들을 상부층에 전용할 수 있어 자재의 효율적인 이용과 함께 작업환경을 개선시킬 수 있는 등의 효과를 발휘한다.As described above, the slab formwork construction method of the present invention by dismantling 1/2 of the pre-installed copper bar to directly install the concrete slab to secure the required strength of the concrete slab, by the method of supporting the slab, It can be dismantled, which greatly reduces the frame air, and the dismantled materials can be dedicated to the upper layer, which makes it possible to use the material efficiently and improve the working environment.

본 발명은 기재된 구체예에 대해서만 상세히 설명되었지만 본 발명의 사상과 범위내에서 변형이나 변경할 수 있음은 본 발명이 속하는 분야의 당업자에게는 명백한 것이며, 그러한 변형이나 변경은 첨부한 특허청구범위에 속한다 할 것이다.Although the invention has been described in detail only with respect to the described embodiments, it will be apparent to those skilled in the art that modifications and variations can be made within the spirit and scope of the invention, and such variations or modifications will belong to the appended claims. .

Claims (5)

멍에 및 장선을 설치하는 단계, 상기 멍에 및 장선이 지지되도록 기설치된 타설완료층 상에 수직으로 설치되는 다수의 동바리(SUPPORT)를 설치하는 단계, 상기 멍에상에 슬라브 거푸집 합판을 설치하는 단계, 및 상기 거푸집 합판상에 콘크리트 타설층을 형성하는 단계를 포함하는 슬라브 시공방법에 있어서,Installing a yoke and a joist, installing a plurality of SUPPORT vertically installed on the pour completion layer pre-installed to support the yoke and the joist, installing a slab formwork plywood on the yoke, and In the slab construction method comprising the step of forming a concrete pouring layer on the formwork plywood, 상기 콘크리트 타설층의 양생시 임시동바리를 합판 거푸집에 직접 설치하여 동바리, 멍에 및 장선과 상기 임시동바리에 지지되지 않는 나머지 합판을 해체하는 단계;Dismantling the remaining plywood that is not supported by the clubb, yoke and joist and the temporary club by installing a temporary club directly on the plywood formwork during curing of the concrete pouring layer; 합판 거푸집이 해체된 타설층 하단에 잔류동바리를 설치하여 나머지 합판 및 임시동바리를 해체하는 단계;Dismantling the remaining plywood and temporary copper bar by installing a residual copper bar at the bottom of the poured layer where the plywood formwork is dismantled; 잔류동바리를 제외한 해체된 멍에,장선,합판,동바리를 상부층으로 전용하는 단계; 및Deconstructing the yoke, Jangsun, plywood, copper bark to the upper layer except for the remaining copper bark; And 콘크리트 소요강도 발현시까지 존치시킨 후 상기 잔류동바리를 해체하는 단계;가 상부층에서 반복적으로 이루어지는 것을 특징으로 하는 슬라브용 거푸집 시공방법.Forming a slab formwork for slabs, characterized in that the step of dismantling the residual copper after maintaining until the required concrete strength. 제 1항에 있어서, 상기 임시동바리를 합판 거푸집에 직접 설치하는 시기는 콘크리트의 타설 후 1일인 것을 특징으로 하는 슬라브용 거푸집 시공방법.The method of claim 1, wherein the installation of the temporary copper bar directly on the plywood formwork is one day after the concrete is placed. 제 1항에 있어서, 상기 타설층을 형성하는 콘크리트는 고성능 AE감수제의 첨가 및 C/W비가 조절되어 조기강도를 발현할 수 있는 고강도 콘크리트인 것을 특징으로 하는 슬라브용 거푸집 시공방법.2. The method of claim 1, wherein the concrete forming the pour layer is a high-strength concrete that can express the early strength by adding a high-performance AE reducing agent and the C / W ratio is controlled. 제 1항에 있어서, 상기 임시동바리의 설치간격은 타설시 설치된 동바리의 2배 간격으로 설치되는 것을 특징으로 하는 슬라브용 거푸집 시공방법.The method according to claim 1, wherein the installation interval of the temporary copper bar is installed at twice the interval of the copper bar installed during pouring. 제 1항에 있어서, 상기 잔류동바리의 설치간격은 이전 설치된 임시동바리와 동일간격으로 설치되는 것을 특징으로 하는 슬라브용 거푸집 시공방법.The method according to claim 1, wherein the installation interval of the residual copper bar is installed at the same interval as the previously installed temporary copper bar.
KR1020010007823A 2001-02-16 2001-02-16 Construction method for slab mold KR20020067306A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020010007823A KR20020067306A (en) 2001-02-16 2001-02-16 Construction method for slab mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020010007823A KR20020067306A (en) 2001-02-16 2001-02-16 Construction method for slab mold

Publications (1)

Publication Number Publication Date
KR20020067306A true KR20020067306A (en) 2002-08-22

Family

ID=27694624

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020010007823A KR20020067306A (en) 2001-02-16 2001-02-16 Construction method for slab mold

Country Status (1)

Country Link
KR (1) KR20020067306A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100462410B1 (en) * 2002-11-07 2004-12-17 페리유한회사 Method of manufactuning siab mold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100462410B1 (en) * 2002-11-07 2004-12-17 페리유한회사 Method of manufactuning siab mold

Similar Documents

Publication Publication Date Title
CN111535579A (en) Construction method for support-free mold hanging tool for horizontal post-pouring belt
CN201666157U (en) Inverted arch integral type moving die carrier
CN105544970A (en) Composite floor slab cast-in-place slab fixing device with bottom mold and construction method
KR20090111590A (en) Method for constructing dome building
CN109797969B (en) Construction method of post-cast strip tool type advanced formwork lifting system
KR101324161B1 (en) 2-day-cycle concrete structure construction method
CN207997396U (en) One kind exempting from formwork constructional column shaper
KR101102824B1 (en) Top base concrete block, and the molding frame, and the forming apparatus and forming method thereof
KR20020067306A (en) Construction method for slab mold
CN217079684U (en) Split type form removal-free concrete hollow structure
CN212001878U (en) Prefabricated floor slab with non-stripping mold
KR100361047B1 (en) Construction mold
CN209244257U (en) A kind of removable superstructure formwork
KR20180102902A (en) slab mold system and slab mold
CN107558734B (en) Building pouring device and pouring method
CN215291442U (en) Support frame system for reinforcing narrow space template
KR20030073280A (en) A system for increase of Heigrt a concrete building.
CN216810952U (en) Concrete arch lintel construction template system
CN219563557U (en) Autoclaved aerated concrete slab casting mold
CN212001877U (en) Mould disassembly-free module for producing prefabricated part and prefabricated part comprising same
KR100697302B1 (en) Method for building and removing mould of bridge and multistage mould
CN112195800B (en) No. 0 block longitudinal support-free construction method for suspension casting bridge
CN213897486U (en) Beam column node pouring structure
KR20010044167A (en) Method of earlier-separating dies for forming the lower part of con&#39;c beam or slab from it
CN106113231B (en) A kind of motar hollow bricks precasting machine

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application