KR200175311Y1 - Scaffold for high load - Google Patents

Scaffold for high load Download PDF

Info

Publication number
KR200175311Y1
KR200175311Y1 KR2019990022499U KR19990022499U KR200175311Y1 KR 200175311 Y1 KR200175311 Y1 KR 200175311Y1 KR 2019990022499 U KR2019990022499 U KR 2019990022499U KR 19990022499 U KR19990022499 U KR 19990022499U KR 200175311 Y1 KR200175311 Y1 KR 200175311Y1
Authority
KR
South Korea
Prior art keywords
fastening
vertical
hole
diagonal
horizontal
Prior art date
Application number
KR2019990022499U
Other languages
Korean (ko)
Inventor
강근배
Original Assignee
주식회사대산정공
주식회사바우컨설탄트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사대산정공, 주식회사바우컨설탄트 filed Critical 주식회사대산정공
Application granted granted Critical
Publication of KR200175311Y1 publication Critical patent/KR200175311Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/02Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
    • E04G1/04Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • E04G7/22Stiff scaffolding clamps for connecting scaffold members of common shape for scaffold members in end-to-side relation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

본 고안은 토목,건축,교량 등의 공사시 사용되는 트러스구조의 비계에 관한 것으로, 특히 고하중에도 안전성을 유지하며 수직재, 수평재, 대각재의 설치가 용이한 고하중용 비계에 관한 것이다.The present invention relates to the scaffolding of truss structure used in the construction of civil engineering, architecture, bridges, etc. In particular, it relates to a high load scaffolding to maintain safety even under high loads and easy installation of vertical, horizontal and diagonal materials.

본 고안의 고하중용 비계는 중앙에 통공(31)이 형성되며, 그 주연부에 다수의 볼트공(32)과 체결공(33)이 순차적으로 형성된 지지판(30)이 양단에 용접 부착된 수직재(20)와; 양단이 외향 절곡된 양 판금가공재(43)가 보강편(44)을 통해 대향적으로 연결되고, 그 양단에 결합홈(45)과 결합홈의 수직방향으로 체결핀구멍(46)이 형성된 체결편(47)이 부착되어 상기 수직재의 지지판(30)을 통해 체결핀(60)으로 설치되는 수평재(40)와; 양단에 체결핀 구멍(51)이 형성되어 상기 수평재(40)의 대각재 설치공(42)을 통해 체결핀(70)으로 설치되는 대각재(50);를 포함한 구성을 특징으로 한다.The high load scaffold of the present invention has a through hole 31 formed at the center thereof, and a vertical plate 20 in which a plurality of bolt holes 32 and fastening holes 33 are sequentially formed on the periphery of the support plate 30 welded to both ends thereof. )Wow; Fastening piece having both ends of the sheet metal processing material 43 bent outwardly is connected through the reinforcing piece 44, the coupling pin 45 and the coupling pin hole 46 in the vertical direction of the coupling groove at both ends thereof. A horizontal member 40 attached thereto and installed as a fastening pin 60 through the support plate 30 of the vertical member; The fastening pin hole 51 is formed at both ends, and the diagonal member 50 is installed as the fastening pin 70 through the diagonal member installation hole 42 of the horizontal member 40.

Description

고하중용 비계{SCAFFOLD FOR HIGH LOAD}High Load Scaffolding {SCAFFOLD FOR HIGH LOAD}

본 고안은 토목,건축,교량 등의 공사시 사용되는 트러스구조의 비계에 관한 것으로, 특히 고하중에도 안전성을 유지하며 수직재, 수평재, 대각재의 설치가 용이한 고하중용 비계에 관한 것이다.The present invention relates to the scaffolding of truss structure used in the construction of civil engineering, architecture, bridges, etc. In particular, it relates to a high load scaffolding to maintain safety even under high loads and easy installation of vertical, horizontal and diagonal materials.

일반적으로 고층의 건물이나 교량 등의 공사시에는 작업자가 높은 곳에서 작업하는 것이 가능토록 하거나 거푸집 등의 설치를 위해 지상으로 부터 비계(scaffold)가 가설된다.In general, in the construction of high-rise buildings or bridges, scaffolds are installed from the ground to allow workers to work in high places or to install formwork.

그러한 비계는 일반적으로 주기둥인 수직재, 상기 다수의 수직재를 서로 연결시키는 수평재 및 대각재, 상기 수직재와 수평재를 연결시키기 위한 클램프, 수직재의 상,하단에 설치될 수 있는 스크류잭, 및 수직재의 하단에 설치될 수 있는 캐스터 등을 포함한 트러스(truss)구조이다.Such scaffoldings are generally vertical pillars, horizontal and diagonal members connecting the plurality of vertical members to one another, clamps for connecting the vertical members and horizontal members, screw jacks that can be installed on top and bottom of the vertical members, and the bottom of the vertical members. It is a truss (truss) structure including casters that can be installed in.

종래의 가장 일반적인 비계의 구성은 도 1에 도시된 바와 같이 수직재(1)와 수평재(2)의 체결이 클램프(3)에 의해 체결되는 구조이다.The structure of the conventional most common scaffold is a structure in which the fastening of the vertical member 1 and the horizontal member 2 is fastened by the clamp 3, as shown in FIG.

그런데 이러한 비계는 두 부재를 체결시키거나 체결된 두 부재를 해체할 경우 클램프를 구성하는 조임너트를 조이거나 풀어야 하는 불편이 있고, 그에 따라 체결 및 해체시간이 증대되어 작업시간을 지연시키게 되며, 계속적인 사용중에 볼트나 너트 등의 마모에 의해 체결력이 둔화되며, 과다한 하중이 집중될 경우 파손 및 파손에 따른 안전사고의 유발을 초래하게 되는 문제점을 안게 된다.However, such a scaffolding is inconvenient to tighten or loosen the tightening nut constituting the clamp when the two members are fastened or the two fastened members are disassembled, thereby increasing the fastening and dismantling time and delaying the work time. During normal use, the tightening force is slowed down by wear of bolts and nuts, and when excessive loads are concentrated, it causes a problem that causes safety accidents due to breakage and damage.

특히 하나의 수직재에 다수의 수평재를 방향 및 각도를 달리하여 동시에 체결시킬 경우에는 그에 따른 각각의 클램프 작업이 요구되고, 각각의 클램프는 일직선상에 설치되지 못하고 서로 엇갈려 설치되는 폐단이 있다.Particularly, when a plurality of horizontal members are simultaneously fastened in different directions and angles to one vertical member, each clamp operation is required accordingly, and each clamp is not installed in a straight line but has a closed end that is alternately installed.

이러한 문제점을 감안하여 최근에는 도 2에 도시되어 있는 바와 같이, 구조를 간단히 하면서도 수직재와 수평재를 신뢰성있게 연결시킬 수 있으며, 비계가 받는 하중이 연결부위에 균일하게 분포되도록 하여 비계의 안정감을 향상시킬 수 있는 비계의 수평재 연결장치의 기술이 제안되어 있다.In consideration of these problems, as shown in FIG. 2, the vertical and horizontal members can be reliably connected while simplifying the structure, and the load of the scaffold is distributed evenly at the connection part to improve the stability of the scaffold. A technique for scaffolding horizontal material connecting devices has been proposed.

도 2를 통해 보다 더 설명하면, 소정의 길이를 지닌 수직재(10)와, 상기 수직재가 관통될 수 있는 홀이 중앙에 형성되며 그 주연부에 4개의 홀(11)이 일정간격으로 형성된 환형의 지지편(12)과, 상기 수직재와 직교되도록 지지편에 고정되어 인접한 두 수직재를 연결시키는 수평재(13)와, 상기 수평재의 양단에 형성되며 상기 지지편과 결합되는 체결부(14)와, 상기 체결부의 상측에 걸려있으며 결합된 지지편과 체결부에 체결력을 제공하는 체결핀(15)을 포함하고 있다.2, a vertical member 10 having a predetermined length and a hole through which the vertical member can penetrate are formed in the center thereof, and an annular support having four holes 11 formed at regular intervals at a periphery thereof. A piece 12, a horizontal member 13 fixed to a support piece to be orthogonal to the vertical member and connecting two adjacent vertical members, a fastening portion 14 formed at both ends of the horizontal member and coupled to the support piece, and the fastening member Hanging on the upper side and includes a fastening pin 15 for providing a fastening force coupled to the support piece and the fastening portion.

또한 체결부(14)에는 수직방향의 관통홀(16)이 형성되고, 그 전단부에 지지편(12)을 인입시키기 위한 홈부(17)가 형성된다.In addition, the fastening portion 14 is formed with a through hole 16 in the vertical direction, and a groove portion 17 for introducing the support piece 12 into the front end portion thereof is formed.

이러한 구성으로 수직재(10)의 소정 지점에 용접되어 있는 지지편(12)의 주연부 홀(11)이 체결부(14)의 홈부(17)에 인입되면, 체결핀(15)을 회동시켜 꽂아 넣게 되고, 그러면 수직대(10)와 수평재(13)가 체결된다.In this configuration, when the periphery hole 11 of the support piece 12 welded to a predetermined point of the vertical member 10 enters the groove 17 of the fastening portion 14, the fastening pin 15 is rotated and inserted. Then, the vertical stand 10 and the horizontal member 13 is fastened.

그런데 이러한 구성은 지지편(12)을 수직재(10)에 관통시켜 소정 위치에서 용접방식으로 고정시켜야 하는 불편함이 있게 되고, 사용중 용접점 탈락이 있게 될 경우 안전사고을 유발할 염려를 안게 되며, 수평재(13)의 양단에 구성되는 체결부(14) 및 체결핀(15)의 구성이 복잡한 구조를 이루게 되는 등의 또 다른 문제점이 대두되었다.However, such a configuration has the inconvenience of fixing the welding piece 12 through the vertical member 10 in a predetermined position by welding, and there is a fear of causing a safety accident when the welding point is dropped during use, and the horizontal member ( Another problem arises such that the configuration of the fastening portion 14 and the fastening pins 15 formed at both ends of 13) forms a complicated structure.

또한 상기 수직재(10) 및 수평재(13)는 비교적 소직경을 지닌 파이프관으로 되어 있어 큰하중에의 적용이 적합하지 못하게 되고, 특히 상기 수직재(10)와 수직재의 연결을 위해 그 수직재의 끝단에 결합구조를 형성해야 하는 등의 폐단이 있었다.In addition, the vertical member 10 and the horizontal member 13 is made of a pipe pipe having a relatively small diameter, so that it is not suitable for large loads, and particularly at the end of the vertical member for connecting the vertical member 10 and the vertical member. There was a disadvantage such as the need to form a bonding structure.

또한 수평재의 연결은 비교적 용이한 반면에 대각재의 설치를 위해서는 또 다시 상기 대각재의 양단에도 수평재의 양단에 구성된 것과 같은 체결부를 그 대각 방향으로 형성하여야 하는 복잡한 문제가 제기된다.In addition, the connection of the horizontal member is relatively easy, while the installation of the diagonal member poses a complicated problem of forming the same fastening part formed at both ends of the horizontal member in the diagonal direction again at both ends of the diagonal member.

본 고안은 상술한 종래의 문제점을 해결하기 위하여 안출된 것으로서, 본 고안의 목적은 특히 고하중에도 안전성을 유지하며 수직재, 수평재, 대각재의 설치가 용이하며, 체결구조가 간단하여 용이한 작업이 이루어지도록 한 고하중용 비계를 제공하는 데 있다.The present invention is devised to solve the above-described problems, the object of the present invention is to maintain the safety, especially under high loads, easy installation of vertical members, horizontal members, diagonal members, simple fastening structure made easy work is made To provide a heavy duty scaffold to be built.

상기 목적을 달성하기 위한 본 고안의 고하중용 비계는, 소정의 길이를 지닌 비교적 큰 직경의 수직재와; 상기 수직재의 양단에 용접 부착되도록 상기 수직재의 직경보다 큰 외경을 지니고, 중앙에 수직재의 내경보다 작은 통공이 형성되며, 그 주연부에 4개의 볼트공과 4개의 체결공이 순차적으로 형성된 지지편과; 상기 지지편을 통해 체결되도록 길이상의 소정간격으로 다수의 대각재 설치공이 형성되고 양단이 외향 절곡된 양 부재가 보강편으로 대향적으로 연결되고, 그 양단에 결합홈과 결합홈의 수직방향으로 체결핀 구멍이 형성된 체결편이 부착된 수평재와; 상기 수평재에 형성된 대각재설치공을 통해 설치되도록 양단에 체결핀 구멍이 형성된 대각재; 및 상기 수평재의 체결편에 형성된 체결핀 구멍과 지지편에 형성된 체결공을 통해 수평재를 수직재에 체결시키는 체결핀;을 포함한 구성을 특징으로 한다.The high load scaffold of the present invention for achieving the above object comprises: a relatively large diameter vertical member having a predetermined length; A support piece having an outer diameter larger than the diameter of the vertical member so as to be welded to both ends of the vertical member, and having a through hole smaller than the inner diameter of the vertical member at the center thereof, and having four bolt holes and four fastening holes sequentially formed at the periphery thereof; A plurality of diagonal material installation holes are formed at predetermined intervals in the length so as to be fastened through the support piece, and both members having both ends bent outwardly are connected to each other by a reinforcing piece and fastened in the vertical direction of the coupling groove and the coupling groove at both ends thereof. A horizontal member having a fastening piece having a pin hole formed thereon; Diagonal material formed with fastening pin holes at both ends to be installed through the diagonal material installation hole formed in the horizontal member; And a fastening pin for fastening the horizontal member to the vertical member through the fastening pin hole formed in the fastening member of the horizontal member and the fastening hole formed in the support member.

도 1은 종래의 비계구조를 설명하기 위한 요부도,1 is a main view for explaining a conventional scaffolding structure,

도 2는 종래의 비계구조를 설명하기 위한 요부의 분해 사시도,2 is an exploded perspective view of a main portion for explaining a conventional scaffolding structure;

도 3은 본 고안에 따른 비계의 전체적인 설치상태 정면도,3 is a front view of the overall installation state of the scaffold according to the present invention,

도 4는 도 3의 선A-A 평 단면도,4 is a cross-sectional view taken along the line A-A of FIG.

도 5는 도 3의 A부 확대도,5 is an enlarged view of a portion A of FIG. 3;

도 6은 본 고안에 따른 수직재의 정면도,6 is a front view of a vertical member according to the present invention,

도 7은 본 고안에 따른 지지편의 평면도,7 is a plan view of the support piece according to the present invention,

도 8은 본 고안에 따른 수평재의 정면도,8 is a front view of a horizontal member according to the present invention,

도 9는 도 8의 선B-B 측 단면도이다.FIG. 9 is a cross-sectional view taken along the line B-B of FIG. 8.

<도면의 주요 부분에 대한 부호의 설명><Description of the code | symbol about the principal part of drawing>

20,20': 수직재 30: 지지편20,20 ': vertical material 30: support piece

21: 볼트 22: 너트21: Bolt 22: Nut

31,41: 통공 32: 볼트공31, 41: through hole 32: bolt hole

33: 체결공 40: 수평재33: fastener 40: horizontal material

42: 대각재설치공 43: 판금가공재42: diagonal reinstaller 43: sheet metal working material

44: 보강편 45: 결합홈44: reinforcing piece 45: coupling groove

46,51: 체결핀구멍 47: 체결편46, 51: fastening pin hole 47: fastening piece

50: 대각재 60,70: 체결핀50: diagonal 60, 70: fastening pin

80: 스크류잭 90: H빔80: screw jack 90: H beam

이하 첨부된 도면을 참고하여 본 고안의 실시예를 상세히 설명하면 다음과 같다.Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 3은 본 고안에 따른 비계의 전체적인 설치상태 정면도, 도 4는 도 3의 선A-A 평 단면도, 도 5는 도 3의 A부 확대도, 도 6은 본 고안에 따른 수직재의 정면도, 도 7은 본 고안에 따른 지지편의 평면도, 도 8은 본 고안에 따른 수평재의 정면도, 도 9는 도 8의 선B-B 측 단면도이다.Figure 3 is a front view of the overall installation state of the scaffold according to the present invention, Figure 4 is a cross-sectional view AA line of Figure 3, Figure 5 is an enlarged view of portion A of Figure 3, Figure 6 is a front view of the vertical member according to the present invention, Figure 7 is a plan view of the support piece according to the present invention, Figure 8 is a front view of a horizontal member according to the present invention, Figure 9 is a cross-sectional view of the line BB side of Figure 8.

도시된 바와 같이 본 고안의 고하중용 비계는, 양단에 지지편(30)이 용접 부착된 수직재(20)와, 상기 지지편(30)을 통해 연결되는 수평재(40)와, 상기 수평재(40)를 통해 연결되는 대각재(50), 상기 수평재(40)를 연결시키기 위한 체결핀(60) 및 상기 대각재(50)를 연결시키기 위한 체결핀(70)으로 대별된다.As shown in the high load scaffolding of the present invention, the vertical member 20 welded to both ends of the support piece 30, the horizontal member 40 connected through the support piece 30, and the horizontal member 40 Diagonal material 50 is connected through, fastening pin 60 for connecting the horizontal member 40 and fastening pin 70 for connecting the diagonal member 50 is roughly divided.

상기 수직재(20)는 소정의 길이를 지닌 비교적 큰 직경(약 φ165)의 강관 파이프이다.The vertical member 20 is a relatively large diameter (about 165) steel pipe pipe having a predetermined length.

상기 지지편(30)는 상기 수직재의 직경보다 큰 외경(약 φ270)을 지니고, 중앙에 수직재의 내경보다 작은 통공(31)이 형성되며, 그 주연부에 4개의 볼트공(32)과 4개의 체결공(33)이 순차적으로 형성된다.The support piece 30 has an outer diameter (about φ270) larger than the diameter of the vertical member, and a through hole 31 smaller than the inner diameter of the vertical member is formed at the center thereof, and four bolt holes 32 and four fastenings are formed at the periphery thereof. The balls 33 are formed sequentially.

수평재(40)는 다수의 통공(41) 및 대각재 설치공(42)이 길이 방향으로 형성되고, 양단이 외향 절곡된 양 판금가공재(43)가 보강편(44)을 통해 대향적으로 연결되고, 그 양단에 결합홈(45)과 결합홈의 수직방향으로 체결핀구멍(46)이 형성된 체결편(47)이 부착된다.Horizontal member 40 has a plurality of through-hole 41 and the diagonal member installation hole 42 is formed in the longitudinal direction, both ends of the sheet metal processing material 43 is bent outwardly connected to the reinforcing piece 44 At both ends thereof, a coupling piece 47 having a coupling pin hole 46 formed in the vertical direction of the coupling groove 45 and the coupling groove is attached.

상기 대각재(50)는 양단에 체결핀 구멍(51)이 형성된 약 φ22의 환봉이다.The diagonal 50 is a round bar of about φ 22 having fastening pin holes 51 at both ends.

미설명 부호 80는 스크류잭이고, 90은 H빔이다.Reference numeral 80 denotes a screw jack, and 90 denotes an H beam.

상기 구성으로 된 본 고안의 작용효과를 설명한다.It demonstrates the effect of the present invention made of the above configuration.

먼저 수직재(20)가 조립된다.First, the vertical material 20 is assembled.

즉, 2개의 수직재(20)를 맞대게 되면 그 양단에 설치된 지지편(30)끼리 맞닿게 되고, 이러한 상태가 되면 양 지지편(30)의 주연부에 형성된 4개의 볼트공(32)과 4개의 체결공(33)이 일치된다.That is, when the two vertical members 20 abut each other, the support pieces 30 installed on both ends of the two pieces contact each other, and in this state, four bolt holes 32 and four formed on the periphery of both support pieces 30 are provided. The fastening hole 33 is matched.

따라서 상기 일치된 볼트공(32)으로 볼트(21)를 끼워 너트(22)로 조이는 방식으로 각각의 수직재(20)는 순차적으로 연결되어진다.Therefore, the vertical members 20 are sequentially connected in such a manner that the bolts 21 are fitted into the matched bolt holes 32 and tightened with the nuts 22.

다음으로 상기 조립된 수직재(20)와 수직재(20)를 연결시키기 위해 수평재(40)의 설치가 이루어진다.Next, the horizontal member 40 is installed to connect the assembled vertical member 20 and the vertical member 20.

즉, 수평재(40)의 양단에 부착된 체결편(47)에 형성된 결합홈(45)이 지지편(30)에 형성된 체결공(33)의 방향으로 삽입되도록 하면, 상기 지지편(30)에 형성된 체결공(33)과 수평재의 체결편(47)에 형성된 체결핀구멍(46)이 일치된 상태를 이루게 됨에 따라 상기 일치된 양 체결공(33) 및 체결핀구멍(46)을 통해 체결핀(60)을 끼우게 된다.That is, when the coupling groove 45 formed in the fastening piece 47 attached to both ends of the horizontal member 40 is inserted in the direction of the fastening hole 33 formed in the support piece 30, the support piece 30 As the fastening hole 33 and the fastening pin hole 46 formed in the fastening piece 47 of the horizontal member are formed in a matching state, the fastening pins through the matched fastening holes 33 and the fastening pin hole 46 are matched. (60) will be inserted.

이러한 수평재(40)의 설치는 지지편(30)의 사방에서 이루어진다.Installation of such a horizontal member 40 is made in all directions of the support piece 30.

다음으로 대각재(50)가 설치된다.Next, the diagonal 50 is installed.

즉, 대각재(50)의 양단에 형성된 체결핀구멍(51)과 수평재(40)의 판금가공재(43)에 형성된 체결핀구멍(46)을 일치시킨 상태에서 체결핀(70)을 사용하여 서로를 체결시키게 된다.That is, the fastening pin holes 51 formed at both ends of the diagonal member 50 and the fastening pin holes 46 formed in the sheet metal working material 43 of the horizontal member 40 are aligned with each other using the fastening pins 70. Will be fastened.

한편, 조립된 수직재(20)의 양단에서는 보다 작은 수직재(20')를 연결시킬 수 있고, 상기 수직재(20)의 지지편(30)에 또 다시 수평조절용 스크류잭(80)을 설치할 수 있다.On the other hand, at both ends of the assembled vertical member 20 it is possible to connect a smaller vertical member 20 ', it is possible to install the horizontal adjustment screw jack 80 on the support piece 30 of the vertical member 20 again.

이상에서 설명한 바와 같이 본 고안의 고하중용 비계는, 양단에 지지편이 용접 부착된 수직재와, 상기 지지편을 통해 연결되는 판금가공된 수평재, 및 상기 수평재를 통해 연결되는 대각재의 구성에 의해, 상기 지지체의 변형이나 이탈됨이 방지되어 큰 하중을 안정적으로 견디게 되고, 구조물구조로된 수평재에 의해 하중의 분산을 균일하고 안정적으로 하게 되며, 대각재의 설치가 용이하게 되는 등의 효과를 발휘한다.As described above, the high load scaffold according to the present invention includes a vertical member welded to both ends by a support member, a sheet metal machined horizontal member connected through the support member, and a diagonal member connected through the horizontal member. Deformation or separation of the support is prevented to stably withstand large loads, and the horizontal members of the structural structure make the distribution of loads uniform and stable, and easy to install diagonal materials.

본 고안은 기재된 구체예에 대해서만 상세히 설명되었지만 본 고안의 사상과 범위내에서 변형이나 변경할 수 있음은 본 고안이 속하는 분야의 당업자에게는 명백한 것이며, 그러한 변형이나 변경은 첨부한 실용신안등록청구범위에 속한다 할 것이다.Although the present invention has been described in detail only with respect to the embodiments described, it will be apparent to those skilled in the art that the present invention may be modified or changed within the spirit and scope of the present invention. something to do.

Claims (4)

비계에 있어서,In scaffolding, 중앙에 통공(31)이 형성되며, 그 주연부에 다수의 볼트공(32)과 체결공(33)이 순차적으로 형성된 지지판(30)이 양단에 용접 부착된 수직재(20)와;The vertical hole 20 is formed in the center, the support plate 30 is formed in the circumference of the plurality of bolt holes 32 and the fastening hole 33 sequentially welded to both ends; 양단이 외향 절곡된 양 판금가공재(43)가 보강편(44)을 통해 대향적으로 연결되고, 그 양단에 결합홈(45)과 결합홈의 수직방향으로 체결핀구멍(46)이 형성된 체결편(47)이 부착되어 상기 수직재의 지지판(30)을 통해 설치되는 수평재(40)와;Fastening piece having both ends of the sheet metal processing material 43 bent outwardly is connected through the reinforcing piece 44, the coupling pin 45 and the coupling pin hole 46 in the vertical direction of the coupling groove at both ends thereof. A horizontal member (40) attached to and installed through the support plate (30) of the vertical member; 양단에 체결핀 구멍(51)이 형성되어 상기 수평재(40)의 대각재 설치공(42)을 통해 설치되는 대각재(50);를 포함한 구성을 특징으로 하는 고하중용 비계.Fastening pin holes 51 are formed at both ends of the diagonal material 50 is installed through the diagonal material installation hole 42 of the horizontal member 40; high-load scaffolding comprising a configuration. 제 1항에 있어서,The method of claim 1, 상기 지지편(30)는 상기 수직재의 직경보다 큰 외경을 지니고, 중앙에 수직재의 내경보다 작은 통공(31)이 형성되며, 그 주연부에 4개의 볼트공(32)과 4개의 체결공(33)이 순차적으로 형성된 것을 특징으로 하는 고하중용 비계.The support piece 30 has an outer diameter larger than the diameter of the vertical member, and a through hole 31 smaller than the inner diameter of the vertical member is formed at the center thereof, and four bolt holes 32 and four fastening holes 33 at the periphery thereof. High load scaffold, characterized in that formed sequentially. 제 1항에 있어서,The method of claim 1, 상기 수평재(40)는 다수의 통공(41) 및 대각재 설치공(42)이 길이 방향으로 형성되고, 양단이 외향 절곡된 양 판금가공재(43)가 보강편(44)을 통해 대향적으로 연결되고, 그 양단에 결합홈(45)과 결합홈의 수직방향으로 체결핀구멍(46)이 형성된 체결편(47)이 부착되며, 상기 대각재 설치공(42)은 길이 방향의 상하에 형성되는 것을 특징으로 하는 고하중용 비계.The horizontal member 40 has a plurality of through-hole 41 and the diagonal member installation hole 42 is formed in the longitudinal direction, both ends of the sheet metal processing material 43 is bent outwardly connected through the reinforcing piece 44 The fastening piece 47 having the fastening pin hole 46 formed in the vertical direction of the coupling groove 45 and the coupling groove is attached to both ends thereof, and the diagonal material installation hole 42 is formed above and below the longitudinal direction. High load scaffolding, characterized in that. 제 1항에 있어서,The method of claim 1, 상기 조립된 수직재(20)의 양단에 보다 작은 수직재(20')를 연결시킬 수 있고, 상기 수직재(20)의 지지편(30)에 또 다시 수평조절용 스크류잭(80)을 설치할 수 있는 것을 특징으로 하는 고하중용 비계.A smaller vertical member 20 'can be connected to both ends of the assembled vertical member 20, and the screw jack 80 for horizontal adjustment can be installed again on the support piece 30 of the vertical member 20. Load scaffolding
KR2019990022499U 1999-10-19 1999-10-19 Scaffold for high load KR200175311Y1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990045278A KR20010037634A (en) 1999-10-19 1999-10-19 Scaffold for high load

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1019990045278A Division KR20010037634A (en) 1999-10-19 1999-10-19 Scaffold for high load

Publications (1)

Publication Number Publication Date
KR200175311Y1 true KR200175311Y1 (en) 2000-03-15

Family

ID=19615892

Family Applications (2)

Application Number Title Priority Date Filing Date
KR2019990022499U KR200175311Y1 (en) 1999-10-19 1999-10-19 Scaffold for high load
KR1019990045278A KR20010037634A (en) 1999-10-19 1999-10-19 Scaffold for high load

Family Applications After (1)

Application Number Title Priority Date Filing Date
KR1019990045278A KR20010037634A (en) 1999-10-19 1999-10-19 Scaffold for high load

Country Status (1)

Country Link
KR (2) KR200175311Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200217090A1 (en) * 2017-09-14 2020-07-09 Peri Gmbh Scaffolding crossbar, scaffolding and method for constructing scaffolding

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101699217B1 (en) * 2011-10-19 2017-01-23 쇼와 덴코 가부시키가이샤 Perfluoride decomposition treatment method and treatment device
CN104372918A (en) * 2014-10-30 2015-02-25 无锡市安捷脚手架有限公司 Banana type scaffold
KR102330479B1 (en) * 2020-05-29 2021-11-23 삼성물산(주) Moving method of mega modular structure using coupling frame and Column base structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200217090A1 (en) * 2017-09-14 2020-07-09 Peri Gmbh Scaffolding crossbar, scaffolding and method for constructing scaffolding

Also Published As

Publication number Publication date
KR20010037634A (en) 2001-05-15

Similar Documents

Publication Publication Date Title
AU2011209619B2 (en) Scaffold system and method
US9861190B2 (en) Wood gang form and method for constructing concrete building using same
KR101581540B1 (en) Connector for steel pipe scaffold
US5918843A (en) Scaffold bracket
KR101510158B1 (en) Scaffolding system with a curve type extended length structure
KR200175311Y1 (en) Scaffold for high load
KR0140904B1 (en) Scaffolding for an elevator pit
JPH08284439A (en) Heavy load type form timbering and member thereof
JPH08312164A (en) Clamp for post and reinforcing material with the clamp
CN210482949U (en) Novel plug-in type scaffold
KR100960943B1 (en) A steel pipe scaffold for construction work
KR200397583Y1 (en) Circular support for construction work
KR200175312Y1 (en) Assembling device of scaffold
KR20100037242A (en) A rail connector for steel pipe scaffold
KR200164131Y1 (en) Multipurpose clamp for scaffold
CN217518123U (en) Scaffold frame is wall spare even
JPH10121467A (en) Joint structure of pile
JPH0423156Y2 (en)
JP5812554B1 (en) Mounting bracket and mounting structure for strut mooring
CN220909248U (en) Temporary supporting structure and steel truss system
JPH0449340A (en) Lay-in joint structure for column and beam
KR100547010B1 (en) Join and disjoin method of beam structure using clip
JPH05287897A (en) Fabricating method of frame scaffolding and guide fitting for fabrication of frame scaffolding
JP2598154Y2 (en) Temporary support
JPH01187257A (en) Scaffolding plate for construction work and bearing member thereof

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20030106

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee