KR200175294Y1 - structure for finish panel in wall - Google Patents

structure for finish panel in wall Download PDF

Info

Publication number
KR200175294Y1
KR200175294Y1 KR2019990022344U KR19990022344U KR200175294Y1 KR 200175294 Y1 KR200175294 Y1 KR 200175294Y1 KR 2019990022344 U KR2019990022344 U KR 2019990022344U KR 19990022344 U KR19990022344 U KR 19990022344U KR 200175294 Y1 KR200175294 Y1 KR 200175294Y1
Authority
KR
South Korea
Prior art keywords
panel
retaining wall
front panel
finishing
sides
Prior art date
Application number
KR2019990022344U
Other languages
Korean (ko)
Inventor
송현수
Original Assignee
송현수
손상원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR2019980027455U external-priority patent/KR19990011984U/en
Application filed by 송현수, 손상원 filed Critical 송현수
Priority to KR2019990022344U priority Critical patent/KR200175294Y1/en
Application granted granted Critical
Publication of KR200175294Y1 publication Critical patent/KR200175294Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/085End form panels for walls

Abstract

본 고안은 패널의 양단을 소정 높이가 유지되도록 수평으로 절곡한 설치대를 일체로 구성하고, 전면패널의 상부에 지지목을 안정감있게 안착시켜 용이하게 고정시킬 수 있도록 고정공과 걸림턱을 구성함으로서, 조립공정을 간소화하여 대량 생산을 가능하게 함과 아울러 제조원가를 절감할 수 있고, 전면패널과 프로파일 설치대를 일체로 성형함으로서 외부에서 가해지는 하중에 의한 변형을 방지할 수 있으며, 천장으로부터 연장된 하부옹벽을 지지하는 하부지지목을 견고하고 용이하게 고정시킬 수 있는 옹벽 마감용 패널에 관한 것이다.The present invention is configured by integrally configuring the mounting bracket bent horizontally so that both ends of the panel to maintain a predetermined height, and by mounting a fixing hole and a locking jaw so that it can be easily fixed by seating the support neck on the upper part of the front panel, Simplify the process to enable mass production and reduce manufacturing costs. By integrally molding the front panel and profile mount, it is possible to prevent deformation due to external loads and to lower the retaining wall extending from the ceiling. It relates to a retaining wall finishing panel that can firmly and easily fix a supporting lower support.

Description

옹벽 마감용 패널구조{structure for finish panel in wall}Structure for finish panel in wall}

본 고안은 거푸집 시스템에 있어, 전`후면 거푸집의 개방된 측단부에 고정 설치되는 옹벽 마감용 패널에 관한 것이다.The present invention relates to a retaining wall finishing panel fixedly installed in the open side end of the front and rear formwork in the formwork system.

주지된 바와 같이 거푸집 시스템은, 주택, 아파트, 빌딩, 댐, 교각, 터널, 상하수도, 지하철공사 등 각종 건축 및 토목현장에 이용되고 있는 것으로, 이러한 거푸집은 금속으로 이루어진 한 종류의 패널, 즉 간편한 구조와 다양한 기능을 발휘하도록 스틸 폼(steel from)으로 구성됨으로서, 반복 사용회수를 증가시켜 자재비를 절감할 수 있고, 조립성이 양호하여 공사기간을 단축시킬 수 있으므로 인건비와 경비의 절감을 기대할 수 있으며, 제품이 표준화 및 규격화된 패널과 부속으로 구분되어 자재 관리가 간편한 이점이 있어 현재 가장 널리 사용되고 있다.As is well known, the formwork system is used in various constructions and civil works such as houses, apartments, buildings, dams, bridges, tunnels, water and sewage systems, subway works, and the formwork is a kind of panel made of metal, that is, a simple structure. And it is composed of steel form (steel from) to exhibit a variety of functions, it can be reduced the material cost by increasing the number of times of repeated use, and can be expected to reduce labor costs and expenses because the assembly time can be shortened due to good assembly. As a result, the product is divided into standardized and standardized panels and accessories, which is easy to manage materials.

그리고 상기와 같은 거푸집 시스템에 있어 현관의 문틀 등이 결합되도록 옹벽에 공간부를 형성시키기 위해서 사용되는 종래의 마감 패널(20)은 도 1과 도 2에 도시된 바와 같이 옹벽(W)의 전후면을 형성하는 거푸집(10)의 측방으로부터 소정 깊이 이격된 위치에 얇은 합판으로 된 전면패널(21)을 수직으로 끼워 넣은 후 그 바깥면의 외곽 둘레에 지지목(22)을 삽입하여 고정못(23)으로 전면패널(21)에 고정시키며, 고정된 지지목(22)의 외측에 각목으로 된 스페이서(24)를 끼워 형합시킨다. 상기와 같이 전면패널(21)의 외측공간에 지지목(22)과 스페이서(24)가 형합되면 그 측면에 상`하 일정 간격 이격되도록 플렛타이(25)를 배치하여 체결핀(26)으로 고정시킴으로서 마감 패널의 시공을 완료한다.In the formwork system as described above, the conventional finishing panel 20 used to form the space portion in the retaining wall so that the door frame and the like of the entrance is coupled to the front and rear surfaces of the retaining wall W as shown in FIGS. 1 and 2. The front panel 21 made of thin plywood is vertically inserted at a position spaced a predetermined depth from the side of the formwork 10 to be formed, and then the support nail 22 is inserted around the outer periphery of the fixing nail 23. The front panel 21 is fixed to the front panel 21, and the spacers 24 made of lumber are fitted to the outside of the fixed support neck 22. When the support neck 22 and the spacer 24 are combined in the outer space of the front panel 21 as described above, the flat tie 25 is disposed on the side to be spaced apart from each other by a fastening pin 26. This completes the construction of the finish panel.

그런데 상기와 같이 구성된 종래의 마감 패널의 구조는 얇은 합판으로 된 전면패널(21)이 지지목(22)과 스페이서(23)에 의해 지지되어 전면패널(21)의 중앙부가 지지되지 못함으로서, 콘크리트를 타설할 때 측방으로 발생하는 압력을 지탱하지 못하여 전면패널(21)의 중앙이 외향으로 변형되어 지지목(22)을 고정시킨 고정못(23)이 이탈함에 따라 콘크리트가 양생된 후 옹벽의 모서리부가 고르지 못하여 창문 및 창틀의 시공을 원할하게 수행할 수 없는 문제점이 있다.However, the structure of the conventional finishing panel configured as described above is because the front panel 21 made of thin plywood is supported by the support wood 22 and the spacer 23, so that the center portion of the front panel 21 is not supported, When pouring concrete, the center of the front panel 21 is deformed outward because it cannot support the pressure generated laterally, and the fixing nail 23 fixing the support tree 22 is released, so that the concrete is cured and the edge of the retaining wall There is a problem that it is not possible to smoothly perform the construction of the windows and window frames because the parts are uneven.

또한 지지목(22)과 스페이서(24)가 목재로 구성되어 있어 중량이 가벼워 운반이 용이하고 제조원가가 저렴한 이점을 있으나 수명이 짧고 조립공정이 난이하며 정밀시공이 불가능한 문제점이 있다.In addition, since the support wood 22 and the spacer 24 is made of wood, it is light in weight, easy to transport, and low in manufacturing cost, but has a short life, a difficult assembly process, and precision construction.

이러한 종래의 문제점을 해결하기 위하여 근래에 와서 여러가지 형태의 옹벽 마감용 패널이 제안되어 사용되고 있는데, 그 일례로서 실용신안등록출원 95-009759호를 들수 있다.In order to solve such a conventional problem, in recent years, various types of retaining wall finishing panels have been proposed and used. As an example, Utility Model Registration Application No. 95-009759 may be cited.

이 선출원 고안의 마감용 패널(30)은, 도 3과 도4에 도시된 바와 같이 전면패널(31)의 외측면 양측과 중앙에 금속재의 세로부재(32)가 용접으로 결합되며, 세로부재(32)의 상부와 하부는 금속재의 보강부재(33)가 용접으로 결합되고, 전면패널(31)과 대향하는 세로부재(32)의 외측에 가로 방향으로 다수개의 가로부재(34)가 용접된다.The finishing panel 30 of the design of the prior application, as shown in Figures 3 and 4, the vertical member 32 of the metal on both sides and the center of the outer surface of the front panel 31 is joined by welding, the vertical member ( The upper and lower portions of the 32 are welded to the reinforcing member 33 of the metal material, and a plurality of horizontal members 34 are welded in the horizontal direction to the outside of the vertical member 32 facing the front panel 31.

이러한 선출원 고안은 목재를 이용한 종래의 마감용 패널구조보다 수명을 연장할 수 있는 이점은 있으나 전면패널에 다수의 세로부재와 보강부재를 용접으로 결합시킴으로서 조립 공정이 복잡하여 대량 생산이 불가능하며, 외부에서 작용하는 하중을 견디지 못하여 용접된 부위가 떨어지는 단점이 있고, 각 세로부재의 수평도 유지하기 난이하여 세로부재에 상`하 일정간격으로 배치되어야 하는 가로부재의 정밀한 조립이 어렵고 제조원가가 상승하는 문제점이 있다.The design of such an earlier application has the advantage of extending the service life than the conventional finishing panel structure using wood, but by combining a plurality of longitudinal members and reinforcing members on the front panel by welding, the assembly process is complicated and mass production is impossible. The welded part cannot fall because it cannot endure the load acting on it, and it is difficult to maintain the horizontality of each vertical member, so it is difficult to precisely assemble the horizontal member that should be arranged at regular intervals up and down on the vertical member and the manufacturing cost rises. There is this.

또한 선출원 고안은 도 5와 도 6에 도시된 바와 같이 문틀이 끼워지는 공간을 형성할 수 있도록 천장(H)으로부터 하향으로 연장된 문틀옹벽(D)을 시공하기 위해서는 마감용 패널(30)을 내측에 수용한 거푸집(10)의 상단 양측에 상부지지판(12)을 길이 방향으로 설치하고, 이 상부지지판(12)의 하부 모서리에는 상부지지목(13)을 끼워 천장(H)에 고정시킨다. 그리고 마감용 패널(30)의 상단, 즉 문틀옹벽(D)의 하부를 지지하기 위는 하부지지판(14)을 설치하기 위해서는 마감용 패널(30)의 상단 전면에 하부지지목(15)을 고정시키고 그 상부에 하부지지판(14)을 안착하여 고정시킨다.In addition, the design of the prior application, as shown in Figures 5 and 6 in order to construct a door frame retaining wall (D) extending downward from the ceiling (H) to form a space for the door frame is fitted inside the finishing panel 30 The upper support plate 12 is installed on both sides of the upper end of the mold 10 accommodated in the longitudinal direction, the upper support plate 13 is fitted to the lower edge of the upper support plate 12 to be fixed to the ceiling (H). And to support the upper end of the finishing panel 30, that is, the lower portion of the door frame retaining wall (D) in order to install the lower support plate 14 to fix the lower support wood 15 to the upper front of the finishing panel 30 The lower support plate 14 is seated and fixed on the upper portion thereof.

그런데 선출원된 고안의 마감용 패널(30)은 상단의 보강부재(33)와 세로부재(32)의 전면에 하부지지목(15)의 배면을 밀착한 후 못으로 박아 전면패널(31)에 고정시키게 됨으로서, 거푸집의 공간에 콘크리트를 타설하여 하부옹벽(W-1)을 형성시킬 때 마감용패널(30)의 전면에 고정된 하부지지목(15)이 하중을 이기지 못하여 변형되는 문제점이 있다. 또한 하부지지목(15)을 고정할 때 전면패널(31)에 구멍이 없이 제작됨으로서, 시공시 별도로 천공작업을 수행하여야 하는 문제점이 있다.By the way, the finish panel 30 of the proposed design is in close contact with the back surface of the lower support wood 15 on the front of the reinforcing member 33 and the vertical member 32 of the upper end and nailed to fix the front panel 31. As a result, when the concrete is poured into the space of the formwork to form the lower retaining wall (W-1), there is a problem in that the lower support wood 15 fixed to the front of the finishing panel 30 cannot deform the load. In addition, when fixing the lower support wood 15 is produced without a hole in the front panel 31, there is a problem that you need to perform a separate drilling operation during construction.

이에 본 고안은 상술한 바와 같은 종래의 제반 결함을 감안하여 이루어진 것으로, 그 목적은 조립공정을 간소화하여 대량 생산을 가능하게 함과 아울러 제조원가를 절감할 수 있고, 전면패널과 세로부재를 일체로 성형함으로서 외부에서 가해지는 하중에 의한 변형을 방지하며, 천장으로부터 연장된 하부옹벽을 지지하는 하부지지목을 견고하고 용이하게 고정시킬 수 있는 옹벽 마감용 패널을 제공함에 있다.Accordingly, the present invention has been made in view of the above-mentioned conventional defects, and its object is to simplify the assembly process, enable mass production, reduce manufacturing costs, and form the front panel and the vertical member integrally. By preventing the deformation caused by the load applied from the outside, and to provide a retaining wall finishing panel that can firmly and easily fix the lower support for supporting the lower retaining wall extending from the ceiling.

이러한 목적을 달성하기 위한 본 고안 마감용 패널은, 전면패널의 양측단을 소정 높이가 유지되도록 수평으로 절곡한 설치대를 일체로 구비하고, 전면패널의 상단 전면에 지지목이 밀착되어 고정되도록 중앙에 고정공을 통공시키고 설치대의 양측을 절취하여 걸림턱을 구비한 것을 특징으로 하는 것이다.The panel for finishing the present invention for achieving the above object is integrally provided with a mounting table that is bent horizontally so that both sides of the front panel to maintain a predetermined height, and fixed to the center so that the support neck is in close contact with the top front of the front panel It is characterized in that the through hole and the both sides of the mounting base having a locking step.

도 1은 종래 마감용 패널의 결합 상태를 보인 사시도1 is a perspective view showing a combined state of a conventional finishing panel

도 2는 종래 마감용 패널의 결합 상태를 보인 평단면도Figure 2 is a plan sectional view showing a combined state of the conventional finishing panel

도 3은 선출원 마감용 패널의 결합 상태를 사시도Figure 3 is a perspective view of the bonding state of the panel for finishing applications

도 4는 선출원 마감용 패널의 결합 상태를 보인 평단면도Figure 4 is a cross-sectional view showing a coupling state of the panel for finishing application

도 5는 선출원 마감용 패널의 상부옹벽 시공 상태를 보인 정면도5 is a front view showing the construction of the upper retaining wall of the panel for finishing application

도 6은 본 고안 도 5의 측단면도Figure 6 is a side cross-sectional view of the present invention Figure 5

도 7은 본 고안 마감용 패널의 사시도7 is a perspective view of the panel for finishing the subject innovation

도 8은 본 고안의 결합 상태를 보인 사시도8 is a perspective view showing a combined state of the present invention

도 9는 본 고안의 결합 상태를 보인 평단면도Figure 9 is a plan sectional view showing a combined state of the present invention

도 10은 본 고안의 상부옹벽 시공 상태를 보인 정면도10 is a front view showing a state of the upper retaining wall construction of the present invention

도 11은 본 고안 도 10의 측단면도Figure 11 is a side cross-sectional view of the present invention Figure 10

<도면의 주요 부분에 대한 부호의 설명><Description of the code | symbol about the principal part of drawing>

W : 옹벽 10 : 거푸집W: retaining wall 10: formwork

40 : 마감용 패널 41 : 전면패널40: finishing panel 41: front panel

42 : 설치대 43 : 고정공42: mounting base 43: fixing hole

44 : 걸림턱 45 : 프로파일44: jam jaw 45: profile

이하 첨부된 도면에 의거하여 본 고안 일 실시예의 구성을 상세히 설명한다.Hereinafter, the configuration of an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 7은 본 고안 마감용 패널의 사시도이고, 도 8은 본 고안의 결합 상태를 보인 사시도이다.7 is a perspective view of the finish panel of the present invention, Figure 8 is a perspective view showing a combined state of the present invention.

본 고안이 적용되는 마감용 패널은 통상에서와 같이 옹벽(W)에 공간부를 형성하여 문틀 등을 결합시킬 수 있도록 옹벽(W)의 전후면을 형성하는 전`후면 거푸집(10)의 개방된 측단부에 고정 설치된다. 이러한 마감용 패널은 전면패널(41)의 양단을 소정 높이가 유지되도록 수평으로 절곡한 설치대(42)를 일체로 구비하고, 전면패널(41)의 상단 전면에 지지목이 밀착되어 고정되도록 고정공(43)을 통공시키고 설치대(42)의 양측을 절취한 걸림턱(44)을 구비하여 이루어지는 것으로, 이를 좀더 구체적으로 설명하면 다음과 같다.Finishing panel to which the present invention is applied is an open side of the front and rear formwork 10 to form the front and rear surfaces of the retaining wall (W) to form a space portion in the retaining wall (W) as shown in the ordinary, so as to couple the door frame, etc. It is fixedly installed at the end. The finishing panel is provided with a mounting table 42 integrally bent horizontally so that both ends of the front panel 41 to maintain a predetermined height, and the fixing hole so that the support wood is in close contact and fixed to the upper front of the front panel 41 ( 43) is provided with a locking jaw 44 through the two sides of the mounting table 42 through the hole, which will be described in more detail as follows.

상기 마감용 패널(40)은, 옹벽의 측단면과 동일한 폭으로 전면패널(41)이 형성되도록 양측을 직각으로 1차 절곡하고, 1차 절곡된 철판의 양측단을 동일한 높이가 유지되도록 내측을 향해 직각으로 2차 절곡하여 전면패널(41)과 수평을 이루는 설치대(42)를 일체로 구성한다.The finishing panel 40 is first bent at both sides at right angles so that the front panel 41 is formed at the same width as the side end surface of the retaining wall, and the inner side is maintained at both sides of the first bent iron plate to maintain the same height. Secondary bending at right angles toward the body to form a mounting table 42 parallel to the front panel 41.

또한 전면패널(41)의 상단 전면에 하부지지목(14)이 밀착되어 고정되도록 전면패널의 중앙 양측에 못을 통과시키는 고정공(43)을 형성하고, 상기 설치대(42)의 양측을 하부지지목(15)을 수용할 수 있는 높이로 절취된 걸림턱(44)을 구비한다.In addition, the lower support wood 14 is formed on the upper front of the front panel 41 to form a fixing hole (43) for passing the nail to both sides of the center of the front panel so as to be fixed in close contact, both sides of the mounting table (42) And a latching jaw 44 cut to a height that can accommodate 15).

그리고 상기와 같이 전면패널(41)과 소정 높이가 유지도록 일체로 구성된 양측 설치대(42)에는 양단의 중앙에 체결홀(451)이 통공된 프로파일(45)을 상부에서 하부까지 일정 간격 이격된 위치에 용접으로 결합한다.In addition, the front panel 41 and the two mounting brackets 42 integrally configured to maintain a predetermined height are spaced apart at regular intervals from the top to the bottom of the profile 45 through which the fastening holes 451 are perforated in the center of both ends. Join by welding on.

상기와 같이 구성된 마감용 패널(40)을 시공하는 과정을 설명하면 다음과 같다.Referring to the process of constructing the finishing panel 40 configured as described above are as follows.

먼저 옹벽(W)의 전후면을 형성하는 거푸집(10)의 측방으로부터 소정 깊이 이격된 위치에서 전면패널(41)이 거푸집(10)과 직각을 이루고, 설치대(42)의 배면이 거푸집(10)의 측벽(11)과 면접촉으로 밀착하도록 마감용 패널(40)을 삽입한다.First, the front panel 41 forms a right angle with the formwork 10 at a position spaced a predetermined depth from the side of the formwork 10 forming the front and rear surfaces of the retaining wall W, and the rear surface of the mounting table 42 is formwork 10. Insert the finishing panel 40 so as to be in close contact with the side wall 11 of the.

이렇게 마감용 패널(40)이 거푸집(10)의 측방에 삽입되면 설치대(42)의 체결홀(431)과 거푸집 측벽(11)의 체결홀을 관통하도록 설치대(42)의 외측에서 체결핀(44)를 삽입하여 마감용 패널(40)을 거푸집(10)의 측방에 고정시킨다.When the finishing panel 40 is inserted into the side of the formwork 10, the fastening pins 44 on the outside of the mounting table 42 pass through the fastening hole 431 of the mounting table 42 and the fastening hole of the side wall 11 of the mounting table 42. ) To fix the finishing panel 40 to the side of the formwork (10).

한편 본 고안 마감용 패널(40)을 이용하여 문틀이 끼워지는 공간을 형성할 수 있도록 천장(H)으로부터 하향으로 연장된 문틀옹벽(D)을 시공하기 위해서는 도 10과 도 11에 도시된 바와 같이 마감용 패널(40)을 내측에 수용한 거푸집(10)의 상단 양측에 상부지지판(12)을 길이 방향으로 설치하고, 이 상부지지판(12)의 하부 모서리에는 상부지지목(13)을 끼워 천장(H)에 고정시킨다. 그리고 본 고안 마감용 패널(40)의 상단, 즉 문틀옹벽(D)의 하부를 지지하는 하부지지판(14)을 설치하기 위해서는 마감용 패널(40)의 상단 양측에 형성된 걸림턱(44)에 하부지지각목(15)의 양단을 탑재하여 그 배면을 마감용 패널(40)의 전면에 밀착시키고, 그 전방에서 못을 박아 고정공(43)을 통해 고정시키며, 마감용 패널(40)의 상부에 길이 방향으로 하부지지판(14)을 안착하여 고정시킨다.Meanwhile, in order to construct a door frame retaining wall (D) extending downward from the ceiling (H) to form a space in which the door frame is fitted by using the finishing panel 40 of the present invention, as shown in FIGS. 10 and 11. The upper support plate 12 is installed on both sides of the upper end of the formwork 10 in which the finishing panel 40 is accommodated in the longitudinal direction, and the upper support wood 13 is fitted to the lower edge of the upper support plate 12. Fix to (H). In order to install the lower support plate 14 supporting the upper end of the panel 40 for finishing the present invention, that is, the lower portion of the door frame retaining wall D, the lower end of the locking jaw 44 formed on both sides of the upper end of the panel 40 is closed. Mounting both ends of the support angle wood 15, the back is in close contact with the front of the panel 40 for finishing, nailed in front of it fixed through the fixing hole 43, the upper part of the finishing panel 40 The lower support plate 14 is seated and fixed in the longitudinal direction.

이렇게 마감용 패널(40)의 상부에 고정된 하부지지목(15)은 전면패널(41)의 전면에 밀착된 상태에서 걸림턱(44)에 안정감있게 안착됨으로서 못을 이용한 고정 작업이 용이할 뿐만 아니라 옹벽을 시공할 때 콘크리트의 하중을 충분히 견딜 수 있다.Thus, the lower support wood 15 fixed to the upper portion of the finishing panel 40 is securely seated on the locking jaw 44 in a state of being in close contact with the front of the front panel 41, and thus it is easy to fix the nail using the nail. When constructing the retaining wall, it can withstand the load of concrete.

이상에서와 같이 본 고안 마감용 패널은 전면패널의 양단을 소정 높이가 유지되도록 수평으로 절곡한 설치대를 일체로 구성하고, 전면패널의 상부에 지지목을 안정감있게 안착시켜 용이하게 고정시킬 수 있도록 고정공과 걸림턱을 구성함으로서, 조립공정을 간소화하여 대량 생산을 가능하게 함과 아울러 제조원가를 절감할 수 있고, 전면패널과 프로파일 설치대를 일체로 성형함으로서 외부에서 가해지는 하중에 의한 변형을 방지하며, 천장으로부터 연장된 하부옹벽을 지지하는 하부지지목을 견고하고 용이하게 고정시킬 수 있는 이점이 있다.As described above, the finishing panel of the present invention is integrally configured with a mounting table bent horizontally so that both ends of the front panel are kept at a predetermined height, and fixed to the upper part of the front panel so that it can be fixed easily and securely fixed. By constructing the ball and the locking jaw, the assembly process can be simplified and mass production is possible, and the manufacturing cost can be reduced, and the front panel and the profile mounting stand are integrally formed to prevent deformation due to external loads and the ceiling There is an advantage that can be fixed firmly and easily the lower support for supporting the lower retaining wall extending from.

Claims (1)

장방형 패널의 전방에 일정 간격으로 이격된 프로파일이 부착되어 전`후면 거푸집(10)의 개방된 측단부에 고정 설치되는 옹벽 마감용 패널에 있어서,In the retaining wall finishing panel is fixed to the open side end of the front and rear formwork 10 is attached to the front of the rectangular panel at regular intervals, 옹벽(W)의 측단면과 동일한 폭으로 전면패널(41)이 형성되도록 양측을 직각으로 1차 절곡하고, 1차 절곡된 철판의 양측단을 동일한 높이가 유지되도록 내측을 향해 직각으로 2차 절곡하여 상기 전면패널(41)과 수평을 이루는 설치대(42)를 일체로 구성하고, 상기 전면패널(41)의 상단 전면에 하부지지목(15)이 밀착되어 고정되도록 전면패널(41)의 중앙 양측에 못을 통과시키는 고정공(43)을 형성하고, 상기 설치대(42)의 양측을 하부지지목(15)을 수용할 수 있는 높이로 절취된 걸림턱(44)을 구비한 것을 특징으로 하는 옹벽 마감용 패널.Both surfaces are first bent at right angles so that the front panel 41 is formed at the same width as the side end surface of the retaining wall W, and the second bends are perpendicularly inwardly at both sides of the first bent iron plate to maintain the same height. And integrally constitute the mounting table 42 which is horizontal with the front panel 41, and the lower support wood 15 is in close contact with the upper front surface of the front panel 41 so as to be fixed in close contact with the center both sides of the front panel 41. Forming a fixing hole 43 for passing the nail, and retaining wall finishing, characterized in that it has a locking jaw 44 cut to a height that can accommodate the lower support wood 15 on both sides of the mounting table 42 panel.
KR2019990022344U 1998-12-30 1999-10-18 structure for finish panel in wall KR200175294Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019990022344U KR200175294Y1 (en) 1998-12-30 1999-10-18 structure for finish panel in wall

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR2019980027455 1998-12-30
KR2019980027455U KR19990011984U (en) 1998-12-30 1998-12-30 Retaining wall finishing panel structure
KR2019990010654U KR19990037033U (en) 1998-12-30 1999-06-15 structure for finish panel in wall
KR2019990022344U KR200175294Y1 (en) 1998-12-30 1999-10-18 structure for finish panel in wall

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR2019990010654U Division KR19990037033U (en) 1998-12-30 1999-06-15 structure for finish panel in wall

Publications (1)

Publication Number Publication Date
KR200175294Y1 true KR200175294Y1 (en) 2000-03-15

Family

ID=26633887

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019990022344U KR200175294Y1 (en) 1998-12-30 1999-10-18 structure for finish panel in wall

Country Status (1)

Country Link
KR (1) KR200175294Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100981361B1 (en) * 2008-03-18 2010-09-10 박상도 Forming edge panels using wood and metal
CN111823364A (en) * 2020-07-10 2020-10-27 三能集成房屋股份有限公司 General assembling die

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100981361B1 (en) * 2008-03-18 2010-09-10 박상도 Forming edge panels using wood and metal
CN111823364A (en) * 2020-07-10 2020-10-27 三能集成房屋股份有限公司 General assembling die

Similar Documents

Publication Publication Date Title
RU2100538C1 (en) Coupling device and attachment joint of roof panels
KR101106699B1 (en) Structure of reinforced deck plate for roof
KR200175294Y1 (en) structure for finish panel in wall
KR19990037033U (en) structure for finish panel in wall
KR101901240B1 (en) A mold panel of assembly for building
KR100435045B1 (en) Prefabricated Construction Wall
KR102477121B1 (en) Deck panel for Euroform
KR102344554B1 (en) Frame assembly structure
KR200414945Y1 (en) A slab panel for euro form of deck panel construct
KR200405361Y1 (en) Sliding End Panel for forms
JP4248685B2 (en) Mounting brackets for exterior materials, vertical edges and mounting methods
KR20080057278A (en) A support member assembly
KR102429151B1 (en) Precast Concrete Modular Structure
KR200277906Y1 (en) A form for carrying out a corner of construction
KR101613694B1 (en) Prefabricated wall panels
JPH0320412Y2 (en)
KR200326554Y1 (en) a support of panel
JP2997462B1 (en) Beam and lower entrance frame using the same
JP3617855B2 (en) Drainer structure
JPH0752246Y2 (en) Prefabricated sidewall structure
US20030106271A1 (en) Lintel block and method
KR20230150598A (en) System for tableform with capable of installation and dismantlement
JP3043851B2 (en) Ceiling construction method
JPH10231569A (en) Wall material assembling construction method
KR200164231Y1 (en) bracket equipped long bar for construction work of ceiling part of concrete structure

Legal Events

Date Code Title Description
T201 Request for technology evaluation of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
O032 Opposition [utility model]: request for opposition
O131 Decision on opposition [utility model]
O072 Maintenance of registration after opposition [utility model]: final registration of opposition
FPAY Annual fee payment

Payment date: 20071205

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee