KR200172623Y1 - Fixing device for setting up a mold for constructing architectures - Google Patents
Fixing device for setting up a mold for constructing architectures Download PDFInfo
- Publication number
- KR200172623Y1 KR200172623Y1 KR2019990021621U KR19990021621U KR200172623Y1 KR 200172623 Y1 KR200172623 Y1 KR 200172623Y1 KR 2019990021621 U KR2019990021621 U KR 2019990021621U KR 19990021621 U KR19990021621 U KR 19990021621U KR 200172623 Y1 KR200172623 Y1 KR 200172623Y1
- Authority
- KR
- South Korea
- Prior art keywords
- formwork
- sides
- fixing device
- unit boards
- binding
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/04—Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
본 고안은 시멘트몰탈로 축조되는 건축 구조물의 양생을 위해 설치되는 거푸집의 단위판재들을 고정설시키기 위하여 사용되는 고정장치를 제공함에 의해 달성되게 되는데, 이 고정장치는 시멘트몰탈로 축조되는 건축물의 양생을 위해 설치되는 규격화되지 않은 임시제작된 거푸집의 단위판재들 설치를 위한 고정장치로써, 소폭의 금속대로 하여 축조되는 구조물의 두께에 따라서 적당한 길이를 가지며, 상기 단위판재들의 설치간격을 유지시키고 양측에 삽입공을 갖는 결속대; 및 상기 결속대의 각 삽입공에 끼워맞춤결합되고 상단에 두부와 이 두부 하부에 양측으로 뻣어나면서 이루어진 받침턱, 그리고 이 받침턱 하부로 일정길이 연장되어 이룬 한쌍의 다리를 갖는 고정쇠를 포함하며, 여기서, 상기 임시제작된 거푸집 외측에 상기 결속대를 설치한후, 상기 결속대의 양측에 구비되는 삽입공에 고정쇠를 못박음하여서 규격화되지 않은 거푸집 성형을 위한 단위판재들을 간단히 설치할 수 있게 된다.The present invention is achieved by providing a fixing device used to fix the unit boards of the formwork installed for the curing of the building structure built with cement mortar, the fixing device for curing the building built with cement mortar Fixture for installing unit boards of non-standard temporary formwork, which is installed for the purpose, having a proper length according to the thickness of the structure constructed with a small metal strip, and maintaining the installation interval of the unit boards and inserting them on both sides. Strap with ball; And a fixing jaw fitted to each insertion hole of the binding band and having a head on the top and a support jaw formed on both sides of the head, and a pair of legs extending a predetermined length below the support jaw. Here, after the binding stand is installed on the outside of the temporarily manufactured formwork, it is possible to simply install the unit boards for the non-standard formwork by nailing the fixing bolt to the insertion holes provided on both sides of the binding stand.
Description
본 고안은 시멘트몰탈로 축조되는 건축 구조물의 양생을 위해 설치되는 거푸집의 단위판재들을 고정설시키기 위하여 사용되는 고정장치에 관한 것으로, 특히 규격화되지 않은 거푸집 성형을 위한 단위판재들을 간단히 설치시킬 수 있게한 건축 구조물 축조를 위한 거푸집 설치용 고정장치에 관한 것이다.The present invention relates to a fixing device used to fix the unit boards of the formwork installed for the curing of building structures constructed with cement mortar, and in particular, it is possible to simply install the unit boards for the unformed formwork The present invention relates to a formwork mounting fixture for building structures.
시멘트몰탈로 축조되는 건축 구조물의 양생을 위해 필연적으로 거푸집이 설치되고 있다. 그러한 거푸집은 건축 구조물에 따라 설치되고 있는데, 이러한 거푸집은 통상 규격화 되어 있는 단위판재들을 짜맞추어 성형시키고 있다.Formwork is inevitably installed for the curing of building structures constructed with cement mortar. Such formwork is installed according to the building structure, which is usually formed by uniting standard unit boards.
그런데 이러한 규격화된 단위판재들을 사용하지 못하는 구조물, 예를 들어 건축물의 지하구조 또는 그 이외 다양변화를 가지는 구조물등에는 규격화된 단위판재들을 사용하지 못하고 현장에서 구조물에 맞추어서 직접제작한 임시 단위판재들을 설치하고 있다. 이때 이렇게 임시제작된 단위판재들을 짜맞추어 거푸집을 성형시키기 위해서는 필수적으로 단위판재들을 고정설시키기 위한 고정부재들이 사용되고 있는데, 이러한 고정부재들은 규격화된 단위판재들의 전용으로써, 임시제작되는 단위판재들을 고정시키기에는 그 설치 및 결합작업이 용이하지 못하여 그때마다 현장에서 임시적으로 작업자가 해결하고 있으나, 이는 작업성을 떨어뜨리고 설치상태가 불안정하여 안전사고위험등 따르고 있는 것이다.However, in the structures that do not use the standardized unit boards, for example, the underground structure of the building, or other structures having various variations, the temporary unit boards manufactured by making them in accordance with the structure in the field cannot be installed without using the standardized unit boards. Doing. At this time, in order to form the formwork by uniting the temporarily produced unit boards, fixing members for fixing the unit boards are essentially used. These fixing members are dedicated to the standardized unit boards to fix the unit boards to be temporarily manufactured. The installation and joining work is not easy and the worker is temporarily solved at the site every time. However, this reduces the workability and the installation is unstable, which is accompanied by safety accidents.
따라서, 규격화되지 않은 거푸집 단위판재의 설치위한 고정장치가 시급히 요구되고 있는 실정이다.Therefore, there is an urgent need for a fixing device for installing a non-standard formwork unit plate.
본 고안은 상기와 같은 사정을 고려하여 이루어진 것으로, 그 목적은 규격화되지 않은 거푸집 성형을 위한 임시 단위판재들을 간편하고도 견고히 고정시킬 수 있도록한 건축 구조물 축조를 위한 거푸집설치용 고정장치를 제공하는 것이다.The present invention has been made in view of the above circumstances, and an object thereof is to provide a formwork fixing device for building a structure for building a temporary unit board for forming a non-standard formwork easily and firmly.
이러한 본 고안의 목적은 시멘트몰탈로 축조되는 건축 구조물의 양생을 위해 설치되는 거푸집의 단위판재들을 고정설시키기 위하여 사용되는 고정장치를 제공함에 의해 달성되게 되는데, 이 고정장치는 시멘트몰탈로 축조되는 건축물의 양생을 위해 설치되는 규격화되지 않은 임시제작된 거푸집의 단위판재들 설치를 위한 고정장치로써, 소폭의 금속대로 하여 축조되는 구조물의 두께에 따라서 적당한 길이를 가지며, 상기 단위판재들의 설치간격을 유지시키고 양측에 삽입공을 갖는 결속대; 및 상기 결속대의 각 삽입공에 끼워맞춤결합되고 상단에 두부와 이 두부 하부에 양측으로 뻣어나면서 이루어진 받침턱, 그리고 이 받침턱 하부로 일정길이 연장되어 이룬 한쌍의 다리를 갖는 고정쇠를 포함하며, 여기서, 상기 임시제작된 거푸집 외측에 상기 결속대를 설치한후, 상기 결속대의 양측에 구비되는 삽입공에 고정쇠를 못박음하여서 규격화되지 않은 거푸집 성형을 위한 단위판재들을 간단히 설치할 수 있게 된다.The object of the present invention is achieved by providing a fixing device used to fix the unit boards of the formwork installed for the curing of the building structure built with cement mortar, the fixing device is a building made of cement mortar As a fixing device for the installation of unstandardized formwork unit plates installed for curing, the device has a suitable length according to the thickness of the structure constructed with a small metal and maintains the installation interval of the unit plates. A binding band having insertion holes at both sides; And a fixing jaw fitted to each insertion hole of the binding band and having a head on the top and a support jaw formed on both sides of the head, and a pair of legs extending a predetermined length below the support jaw. Here, after the binding stand is installed on the outside of the temporarily manufactured formwork, it is possible to simply install the unit boards for the non-standard formwork by nailing the fixing bolt to the insertion holes provided on both sides of the binding stand.
도 1은 본 고안 건축 구조물 축조를 위한 거푸집 설치용 고정장치에 적용되는 고정쇠를 보여 주는 사시도,1 is a perspective view showing a fastener applied to the formwork for fixing the building construction of the subject innovation design,
도 2는 본 고안 건축 구조물 축조를 위한 거푸집 설치용 고정장치의 실시예를 보여 주는 단면도.Figure 2 is a cross-sectional view showing an embodiment of the formwork mounting fixture for construction of the present invention construction structure.
* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
10 : 고정쇠 12 : 두부10: clamp 12: tofu
14 : 받침턱 16 : 다리14: base jaw 16: leg
30 : 결속대 32 : 삽입공30: binding band 32: insertion hole
다음 본 고안의 실시예를 도면에 의거하여 구체적으로 설명하겠다. 도 1에는 본 고안에 따른 건축 구조물 축조를 위한 거푸집 설치용 고정장치에 적용되는 고정쇠를 보이고 있다.Next, embodiments of the present invention will be described in detail with reference to the drawings. Figure 1 shows a clamp applied to the formwork for mounting fixture for building construction structure according to the present invention.
고정쇠(10)는 금속판재를 프레스가공에 의해 가공되게 되는데, 이 고정쇠(10)는 상단부에 원추형상의 두부(12)를 구비하고 있고, 이 두부(12) 하부에 양측으로 뻣어내려서 상기 두부(12)의 너비 보다는 다소 더 넓은 폭을 가지는 받침턱(14)을 갖고 있으며, 또 받침턱(14) 하부에 일정길이 연장하여 이룬 한쌍의 다리(16)를 일체로 구비하여 구성된다. 여기서 상기 고정쇠(10)의 두부(12)는 해체시, 즉 못박음된 고정쇠를 빼어낼시 이용될 것이다.The fastener 10 is machined by press working a metal plate, the fastener 10 is provided with a conical head (12) at the upper end, the head 12 is stiffened to both sides below the head (12) It has a base jaw 14 having a width slightly wider than the width of), and is composed of a pair of legs (16) integrally formed by extending a predetermined length below the base jaw (14). Here, the head 12 of the clamp 10 will be used when dismantling, ie pulling out the nailed clamp.
이렇게 구성되는 고정쇠(10)는 이후에 설명할 결속대와 결합될 것이다.The fastener 10 configured in this way will be combined with the binding band to be described later.
도 2에는 본 고안 고정장치의 설치된 모습을 보여 주는 일실시예이다. 본 고안 고정장치는 임시제작된 거푸집의 단위판재들 간격, 즉 축조되는 건축 구조물의 벽 두께에 따른 설치간격으로 유지시키며 목적하는 구조물의 양생을 위한 거푸집을 성형시키게 될 것이다. 다시설명하면 임시제작된 거푸집의 단위판재(20) 외측에 소폭의 금속대로 하여 이루어진 결속대(30)를 설치하고, 이 결속대(30) 양측에 구성시킨 삽입공(32)에 고정쇠(10)를 못박음 한다. 이렇게 못박음된 고정쇠(10)는 그 받침턱(14)이 결속대(30)를 가압하고 한쌍의 다리는 못박음되어 견고한 고정상태를 유지하게 된다.Figure 2 is an embodiment showing a state of installation of the device of the present invention. The fixing device of the present invention will maintain the spacing of the unit boards of the temporarily manufactured formwork, that is, the installation interval according to the wall thickness of the building structure being constructed, and form the formwork for curing the desired structure. In other words, the binding rack 30 made of a narrow metal strip is installed outside the unit plate 20 of the temporarily manufactured formwork, and the fixing bracket 10 is inserted into the insertion hole 32 formed at both sides of the binding board 30. Nail it. The nailing fixture 10 is nailed so that the supporting jaw 14 presses the binding table 30 and the pair of legs are nailed to maintain a firm fixed state.
그러므로써, 본 고안은 건축 구조물에서 규격화된 거푸집을 사용할 수 없는 구조물, 예를 들어 지하구조 또는 그 이외 다양히 변화되는 구조물에 따라서 현장에서 임시제작되어 사용되는 단위판재들을 보다 간편히 설치하여 시공작업성을 향상시키고 해체 작업 또한 간단히 이룰 수 있는 효과가 있다.Therefore, the present invention makes installation work easier by installing unit boards that are temporarily manufactured in the field according to structures that cannot use standard formwork in building structures, for example, underground structures or other variously changed structures. The decontamination work is also easy to achieve.
이상에서같이 본 고안의 일실시예를 도면에 의거하여 설명하였으나, 본 고안은 이에 국한되지 않고 청구범위에 기재된 범위내에서 변경이 가능할 것이다.As described above, an embodiment of the present invention has been described with reference to the drawings, but the present invention is not limited thereto and may be modified within the scope of the claims.
Claims (1)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2019990011838 | 1999-06-29 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2019990011838 Division | 1999-06-29 | 1999-06-29 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200172623Y1 true KR200172623Y1 (en) | 2000-03-15 |
Family
ID=19578783
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2019990021621U KR200172623Y1 (en) | 1999-06-29 | 1999-10-08 | Fixing device for setting up a mold for constructing architectures |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200172623Y1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101596233B1 (en) * | 2016-01-08 | 2016-02-25 | 김동진 | Ballpoint pen with ear swab |
-
1999
- 1999-10-08 KR KR2019990021621U patent/KR200172623Y1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101596233B1 (en) * | 2016-01-08 | 2016-02-25 | 김동진 | Ballpoint pen with ear swab |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20090301030A1 (en) | Wall construction system | |
KR200172623Y1 (en) | Fixing device for setting up a mold for constructing architectures | |
JPH11172820A (en) | Form method and apparatus for constructing foamed synthetic resin plate drive wall | |
KR200205940Y1 (en) | Supporter for form construction | |
US20050016114A1 (en) | Masonry block anchor bolt assembly | |
KR20110108902A (en) | Exterior fixing device of building | |
KR101619772B1 (en) | Aluminum die retaining pin | |
DE50009269D1 (en) | Formwork for the erection of a pillar or a pillar of a structure | |
KR200326563Y1 (en) | Mold combination member | |
KR200241654Y1 (en) | Fastening device for concrete forms | |
KR200201596Y1 (en) | A supporter for form construction | |
KR200375139Y1 (en) | Lower Part Fixing Structure of Gang Form | |
KR200306769Y1 (en) | a mold fixable structure for building | |
JP3059976B2 (en) | Formwork wall structure and formwork connection method | |
KR200193188Y1 (en) | Beam padestal for temporary fixture | |
KR200339870Y1 (en) | support to uphold a slab mold | |
KR200376992Y1 (en) | The insert for construction work | |
KR100422090B1 (en) | Fastening device for concrete forms | |
PL244607B1 (en) | Formwork of the wall tie beam | |
JPH0438039Y2 (en) | ||
KR200304751Y1 (en) | Gypsum Ceiling Tile Profile | |
JPH0218184Y2 (en) | ||
JPS6231553Y2 (en) | ||
KR930005579Y1 (en) | Prefabricated shutterings | |
KR100392031B1 (en) | Steel frame for structure operation and method for structure operation by using a steel frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
T201 | Request for technology evaluation of utility model | ||
REGI | Registration of establishment | ||
T201 | Request for technology evaluation of utility model | ||
T701 | Written decision to grant on technology evaluation | ||
FPAY | Annual fee payment |
Payment date: 20081216 Year of fee payment: 10 |
|
EXPY | Expiration of term |