KR100392031B1 KR10-2000-0078653A KR20000078653A KR100392031B1 KR 100392031 B1 KR100392031 B1 KR 100392031B1 KR 20000078653 A KR20000078653 A KR 20000078653A KR 100392031 B1 KR100392031 B1 KR 100392031B1
Authority
KR
South Korea
Prior art keywords
steel frame
horizontal member
bracket
construction
slab
Prior art date
Application number
KR10-2000-0078653A
Other languages
Korean (ko)
Other versions
KR20020049477A (en
Inventor
소광민
Original Assignee
주식회사 드림종합건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 드림종합건축사사무소 filed Critical 주식회사 드림종합건축사사무소
Priority to KR10-2000-0078653A priority Critical patent/KR100392031B1/en
Publication of KR20020049477A publication Critical patent/KR20020049477A/en
Application granted granted Critical
Publication of KR100392031B1 publication Critical patent/KR100392031B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/50Girders, beams, or the like as supporting members for forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/07Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 발명은 건물 시공용 철골조와 이를 이용한 건물 시공방법에 관한 것으로써, 종래에는 콘크리트 건물 시공때마다 거푸집을 설치 및 해체하여야 하고 내/외장재를 별도 공정으로 시공하며, 벽체와 슬라브를 별도 시공함으로 인해 시간과 많은 인력소모가 소요되어 공사비가 상승되는 요인이 많았다.The present invention relates to a steel frame for building construction and a building construction method using the same, and in the prior art, each time a concrete building construction, the formwork should be installed and dismantled, the interior / exterior materials in a separate process, due to the separate construction of walls and slabs The cost of construction was increased due to the time and labor consumption.

따라서, 본 발명은 "ㄷ"형 세로부재(110a) 및 가로부재(110b)와; 상기 세로부재(110a) 한쌍을 소정 간격으로 벌려 놓은 상태에서 그 간격을 유지시켜 주는 간격유지구(120)와; 상기 간격유지구 (120) 중앙에 결합되어 단열재(133)를 고정시켜 주는 단열재 고정구(130)와; 상기 세로부재(110a)에 가로부재(110b)를 연결시켜 주는 연결구(140)와; 상기 가로부재 (110b)에 결합되어 내/외장재 및 거푸집용 판재(200a)(200b)가 체결되는 브라켓(150) 및 보조브라켓 (160)과; 슬라브 및 내벽용 골격부재(170)로 구성된 것으로서, 이러한 본 발명은 철골조의 조립시공이 간편하고, 콘크리트를 타설하면 내/외장재 및 거푸집용 판재 시공이 동시에 되고, 아울러 벽체와 슬라브가 동시에 시공되므로 많은 시간과 인력을 줄일 수 있어 공사비를 상당히 절감할 수 있는 매우 유용한 발명이다.Therefore, the present invention is the "?" Type vertical member (110a) and the horizontal member (110b); A spacing holder (120) for maintaining the spacing in a state in which a pair of the vertical members (110a) are opened at a predetermined spacing; A heat insulating material fixture 130 coupled to the center of the gap retaining hole 120 to fix the heat insulating material 133; A connector 140 for connecting the horizontal member 110b to the vertical member 110a; A bracket 150 and an auxiliary bracket 160 coupled to the horizontal member 110b to which internal / exterior materials and formwork plates 200a and 200b are fastened; As the slab and the inner wall skeletal member 170, the present invention is easy to assemble the construction of the steel frame, when the concrete is placed, the interior / exterior materials and formwork plate construction at the same time, and the wall and the slab is installed at the same time many It is a very useful invention that can significantly reduce construction costs by saving time and manpower.

Description

건물 시공용 철골조와 이를 이용한 건물 시공방법{Steel frame for structure operation and method for structure operation by using a steel frame}Steel frame for building construction and construction method using the same {Steel frame for structure operation and method for structure operation by using a steel frame}

본 발명은 콘크리트 건물의 뼈대로 설치되는 철골조와 이를 이용한 건물 시공방법에 관한 것으로써, 더욱 상세히는 "ㄷ"형의 형강을 가로와 세로의 격자형으로 쉽게 조립하여 건물의 골격으로 설치되는 철골조와 상기 철골조의 내/외측에 내/외장재 및 거푸집용 판재를 손쉽게 탈부착할 수 있도록 하므로서 공기단축과 공사비 절감의 효과를 볼 수 있는 건물시공용 철골조와 이를 이용한 건물 시공방법을 제공하기 위한 것이다.The present invention relates to a steel frame that is installed as a skeleton of a concrete building and a building construction method using the same, more specifically, the "c" section of the steel frame to be installed as a skeleton of the building by easily assembling the horizontal and vertical lattice type It is to provide a building construction steel frame and a building construction method using the same, so that the internal / exterior materials and formwork plate material can be easily attached and detached on the inside / outside of the steel frame.

일반적으로 건물시공 때 충진되는 콘크리트는 큰 압축강도를 가지고 있으나, 그 자체만으로는 인장 및 전단하중에 취약한 단점이 있으므로 이를 보완하는 골격으로 철골조(STEEL HOUSE)를 설치하고 있으며, 상기 철골조는 지진이나 외부에서 발생되는 진동 등으로 부터 건물을 안전하게 보호하여 주는 중요한 역할을 한다.In general, the concrete filled during building construction has a large compressive strength, but in itself, there is a weak point to the tensile and shear loads, so the steel frame (STEEL HOUSE) is installed as a supplement to the skeleton, the steel frame is earthquake or outside It plays an important role in safeguarding the building from vibrations.

그리고, 콘크리트 건물을 시공하기 위한 상기 철골조 공사를 할 때에는 먼저 외벽과 내벽이 설치될 부위에 철근이나 형강, 빔 등을 종횡으로 배열하여 배근공사를 하였고, 그후 설치된 배근의 양측으로 내,외 거푸집을 설치하여 생콘크리트를 타설한 다음 타설된 생콘크리트가 양생 완료되면 다시 그 상측에 슬라브용 철근을 배근하고 거푸집을 설치한 다음 생콘크리트를 타설하여 슬라브를 형성하였으며, 상기와 같이 내,외벽과 슬라브의 시공이 완료되면 거푸집의 철거작업과 단열시공 및 내,외장재의 시공작업을 차례로 행하였다.In addition, when the steel frame construction for the construction of concrete buildings, the reinforcement work is arranged by vertically and horizontally arranging reinforcing bars, section steel, beams, etc. on the site where the outer wall and the inner wall are to be installed, and then the internal and external formwork is installed on both sides of the installed reinforcement bars. After the installation of the raw concrete is poured, after the completion of the curing of the poured concrete, the slab reinforcing bar is placed on the upper side again, the formwork is installed, and the concrete is poured to form the slab. When the construction was completed, the formwork was demolished, the insulation construction and the interior and exterior materials were in order.

상기한 종래의 시공과정을 보다 상세히 설명하면 건물시공시 바닥을 기초한 후 소정부위에 필요한 철근이나 형강,빔 등을 종횡으로 배열하여 서로 결착한 다음그 내,외측으로 목제 거푸집을 주로 설치하는데, 이때 상기 내,외 거푸집은 각각 바깥면으로 버팀목을 세워서 지탱시켜 주거나 또는 간격 유지구를 사용하여 거푸집이 설치된 상태를 유지할 수 있도록 하였다.When the above-described conventional construction process is described in more detail, after reinforcing the floor, the reinforcing bars, beams, beams, etc. necessary for a predetermined part are arranged vertically and horizontally, and then the wooden formwork is mainly installed inside and outside. The internal and external formwork was to be supported by standing up on each other to the outside surface or to maintain the formwork is installed by using a gap holder.

그런데 거푸집의 설치상태를 유지하기 위해 버팀목을 사용할 경우에는 일일이 대못으로 박아야 하는 번거로움과 해체작업이 어려운 문제점이 발생하고, 간격유지구를 사용할 경우에는 주로 내,외 거푸집을 간격유지구로 관통시켜 체결하였는바 이 역시 체결작업이 번거롭고 시간이 오래걸려서 거푸집을 설치하는데 만도 상당한 시간이 소요되었다.However, when using the shoring to maintain the installation of the formwork, the hassle and difficulty of dismantling work need to be nailed one by one, and when using the spacing area, the inside and outside formwork is mainly penetrated by the spacing area. The fastening work was cumbersome and took a long time, so it took a long time to install the formwork.

그리고 입벽과 슬라브가 콘크리트체로 양생 완료된 후에는 상기와 같이 기히 설치한 내,외 거푸집을 해체하여야 하는데 이때에도 상기의 버팀목이나 간격유지구를 먼저 제거한 후 거푸집을 해체하여야 하므로 이로인해 소요되는 공사기일과 인건비 지출이 상당하며, 특히 상기와 같은 거푸집과 버팀목, 간격유지구 등으로 인해 소요되는 부자재비는 공사비의 상당부분을 차지하여 이로 인한 공사비의 상승부담도 무시할 수가 없는 상태이다.In addition, after the entrance wall and slab are completely cured with concrete, the interior and exterior formwork installed as above should be dismantled.In this case, the formwork and spacing area must be removed first, and then the formwork must be dismantled. Labor costs are considerable, and the subsidiary materials costs due to the formwork, shoring, spacing, etc. above account for a large part of the construction costs, and the rising cost of construction costs cannot be ignored.

또한 종래에는 상기와 같이 내외벽과 슬라브의 시공작업을 행한 후에는 외벽의 내측으로 단열판을 설치하고 벽돌을 쌓는 단열시공과 내,외장재의 시공작업을 각각 별도로 행하였는바, 이와같이 내외벽과 슬라브의 시공작업 및 단열시공과 내,외장재의 시공작업을 함께 행하지 못하고 따로따로 시공할 경우에는 공사기일이 상당히 길게 소요되고 인건비의 지출이 많이 소요됨으로 인해 공사비가 상승되는 문제점이 있다.In addition, in the related art, after the inner and outer walls and the slab construction work as described above, the insulation work is installed separately from the inner wall of the outer wall, and the inner and outer materials are stacked. Thus, the inner and outer walls and the slab are constructed. If the work and insulation construction and the internal and external construction work cannot be performed together, and the construction is performed separately, there is a problem in that the construction cost is increased due to the considerably long construction period and the high labor cost.

본 발명은 상기와 같은 종래의 문제점을 해결하기 위해 개발된 것으로서, 본 발명의 목적은 시공작업이 간편하면서도 보다 견고하게 조립 설치되는 철골조를 제공하는데 있다.The present invention has been developed in order to solve the conventional problems as described above, the object of the present invention is to provide a steel frame that is easy to install and yet firmly installed construction.

본 발명의 다른 목적은 철골조의 내/외측에 내/외장재 및 거푸집용 판재를 부착한 상태에서 슬라브와 벽체의 콘크리트 타설공정을 동시에 행할 수 있도록 하므로서 공정의 신속 간편으로 공기단축과 공사비 절감의 효과를 이룰 수 있는 건물시공용 철골조를 이용한 건물 시공방법을 제공하는데 있다.Another object of the present invention is to perform the concrete placing process of the slab and the wall at the same time attached to the interior / exterior materials and formwork plate attached to the inside / outside of the steel frame, so that the effect of shortening the air and reducing the construction cost in a simple process It is to provide a building construction method using the steel frame for building construction can be achieved.

도 1 은 본 발명의 철골조가 조립된 상태를 일 실시예로 예시한 사시도1 is a perspective view illustrating an embodiment in which the steel frame of the present invention is assembled

도 2 는 도 1 의 철골조가 조립된 상태를 예시한 측면도Figure 2 is a side view illustrating a state in which the steel frame of Figure 1 assembled

도 3 은 본 발명에 의해 외벽체용 철골조로 조립된 상태를 보인 평면도Figure 3 is a plan view showing a state assembled in the steel frame for the outer wall body according to the present invention

도 4 는 도 3 상태에서 콘크리트를 타설하여 충진시킨 상태의 평면도FIG. 4 is a plan view of the state in which the concrete is poured in the state shown in FIG.

도 5 는 본 발명에서 세로부재와 가로부재가 연결구에 의해 연속 체결되는 상태를 보인 사시도Figure 5 is a perspective view showing a state in which the vertical member and the horizontal member is continuously fastened by the connector in the present invention

도 6 은 본 발명의 가로부재와 보조 브라켓을 보인 분해 사시도Figure 6 is an exploded perspective view showing a horizontal member and the auxiliary bracket of the present invention

도 7 은 본 발명에서 가로부재에 보조 브라켓을 체결한 상태의 측면도Figure 7 is a side view of a state in which the auxiliary bracket is fastened to the horizontal member in the present invention

도 8 은 본 발명의 간격유지구와 단열재 고정구, 세로부재, 연결구, 가로부재, 내/외장재 및 거푸집용 판재의 브라켓 조립 구조를 보인 분해 사시도Figure 8 is an exploded perspective view showing the bracket assembly structure of the spacer and the insulating member fixture, vertical member, connector, horizontal member, interior / exterior materials and formwork sheet material of the present invention

도 9 는 본 발명의 철골조로 외벽체와 슬라브용으로 조립 시공한 상태를 보인 일부 횡단면도9 is a partial cross-sectional view showing a state assembled for the outer wall and slab steel frame of the present invention

도 10 은 본 발명에서 세로부재를 반대로 돌려서 간격유지구를 체결할 때 유동방지구를 사용하는 상태를 보인 분해 사시도Figure 10 is an exploded perspective view showing a state in which the flow preventing device is used to fasten the interval maintaining by turning the vertical member in the present invention

도 11 은 본 발명에서 유동방지구를 사용하여 조립된 철골조에 내/외장재 및 거푸집용 판재를 체결한 상태를 보인 일부 평면도Figure 11 is a partial plan view showing a state in which the interior / exterior material and the formwork for fastening the steel frame assembled using the flow prevention device in the present invention

도 12 는 본 발명에서 세로부재와 가로부재를 부착하여 내벽용 및 슬라브용으로 사용하는 골격부재를 보인 사시도Figure 12 is a perspective view showing a skeletal member used for the inner wall and the slab attached to the vertical member and the horizontal member in the present invention

도 13 은 본 발명에서 내벽용으로 조립된 철골조와 슬라브용 철골조를 일체로 체결하여 시공한 상태를 보인 일부 횡단면도Figure 13 is a partial cross-sectional view showing a state in which the construction by fastening the steel frame and the slab steel frame assembled for the inner wall integrally in the present invention

도면의 주요 부분에 대한 부호의 설명Explanation of symbols for the main parts of the drawings

110a : 세로부재 110b : 가로부재110a: vertical member 110b: horizontal member

111 : 체결공 120 : 간격유지구111: fastener 120: spacing

122 : 구멍 123 : 핀공122: hole 123: pin ball

130 : 단열재 고정구 132 : 날개편130: insulation fixture 132: wing

133 : 단열재 140 : 연결구133: insulation 140: connector

150 : 브라켓 153 : 체결구멍150: bracket 153: fastening hole

160 : 보조 브라켓 170 : 골격부재160: auxiliary bracket 170: skeletal member

190 : 유동방지구190: flow prevention

이하 본 발명의 목적을 효과적으로 달성할 수 있는 기술구성 및 작용을 바람직한 실시 예로 첨부한 별첨의 도면에 의해 상세히 설명하면 다음과 같다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT Hereinafter, the technical configuration and operation capable of effectively achieving the object of the present invention will be described in detail with reference to the accompanying drawings as preferred embodiments.

도 1 은 본 발명의 철골조가 조립된 상태를 일 실시예로 나타낸 사시도로서, 이에 도시된 바와 같이 본 발명의 철골조는 "ㄷ"자형 형강으로서 주 골격을 이루는 세로부재(110a) 및 가로부재(110b)와; 상기 세로부재(110a) 한쌍을 소정 간격으로 벌려 놓은 상태에서 그 간격을 유지시켜 주는 간격유지구(120)와; 상기 간격유지구 (120) 중앙에 결합되어 단열재(133)를 고정시켜 주는 단열재 고정구(130)와; 상기 세로부재(110a)에 가로부재(110b)를 연결시켜 주는 연결구(140)와; 상기 가로부재 (110b)에 결합되어 내/외장재 및 거푸집용 판재(200a)(200b)가 체결되는 브라켓 (150) 및 보조브라켓 (160)과; 슬라브 및 내벽용 골격부재(170)로 구성함을 특징으로 한다.Figure 1 is a perspective view showing an assembled state of the steel frame of the present invention as an embodiment, as shown in the steel frame of the present invention is a vertical member (110a) and horizontal member (110b) forming a main skeleton as a "c" shaped steel )Wow; A spacing holder (120) for maintaining the spacing in a state in which a pair of the vertical members (110a) are opened at a predetermined spacing; A heat insulating material fixture 130 coupled to the center of the gap retaining hole 120 to fix the heat insulating material 133; A connector 140 for connecting the horizontal member 110b to the vertical member 110a; A bracket 150 and an auxiliary bracket 160 coupled to the horizontal member 110b to which internal / exterior materials and formwork plates 200a and 200b are fastened; It is characterized by consisting of the slab and the inner wall skeletal member (170).

여기서 상기 세로부재(110a) 및 가로부재(110b)는 양쪽면에 다수의 체결공 (111)이 형성되고, 일측면에 길다란 삽입공(112)과 나사공(113)이 일정 간격으로 형성되어 있으며, 상기 간격유지구(120)의 양쪽 끝단은 단턱진 상태에서 구멍(122)이 뚫려있는 삽입부(121)로 형성되어 상기 세로부재(110a)의 길다란 삽입공(112)에 삽입부(121)를 끼우면 상기 구멍(122)이 양쪽 체결공(111)과 일치하도록 구성되어 있으며, 중앙에는 다수의 핀공(123)이 형성되어 있다.Here, the vertical member 110a and the horizontal member 110b are formed with a plurality of fastening holes 111 on both sides, and long insertion holes 112 and screw holes 113 are formed at regular intervals on one side thereof. Both ends of the spacing holder 120 are formed of an insertion part 121 in which a hole 122 is drilled in a stepped state, and thus the insertion part 121 is inserted into the elongated insertion hole 112 of the vertical member 110a. Inserting the hole 122 is configured to coincide with both fastening holes 111, a plurality of pin holes 123 are formed in the center.

그리고, 상기 단열재 고정구(130)는 몸체가 "∩"형으로 절곡되어 간격유지구 (120)에 위에서 아래로 끼울 수가 있으며, 그 몸체에 간격유지구(120)의 핀공(123)과 일치되는 구멍(131)이 형성되어 있어 나사못이나 핀 등의 체결부재(180)로 고정시킬 수 있고, 일측에는 날개편(132)이 직각으로 절곡되어 있어서 한쌍을 서로 대향되게 간격유지구(120)에 조립하면 그 사이로 단열재(133)를 끼울 수가 있다.In addition, the heat insulating material fixture 130 may be bent into the body to be bent in the "∩" type from top to bottom in the spacing hole 120, the hole corresponding to the pin hole 123 of the spacing hole 120 in the body 131 is formed and can be fixed by fastening members 180 such as screws or pins, and one side of the wing piece 132 is bent at a right angle so that when the pair is assembled to the spacing holder 120 to face each other, In the meantime, the heat insulating material 133 can be fitted.

상기 연결구(140)의 일측에는 세로부재(110a)의 바깥면에서 양면에 걸쳐 끼울 수 있도록 복수의 핀공(142)이 있는 돌출부(141)가 돌출되어 있고, 전면에는 가로부재(110b)를 끼울 수 있는 삽입홈(143)과 브라켓 삽입홈(144)이 2단으로 단턱진 상태에서 그 상하면에 핀공(145)이 형성되어 있다.On one side of the connector 140, a protrusion 141 having a plurality of pin holes 142 is protruded from the outer surface of the vertical member 110a, and the horizontal member 110b can be fitted to the front surface. Pin hole 145 is formed on the upper and lower surfaces of the insertion groove 143 and the bracket insertion groove 144 stepped in two stages.

그리고, 상기 가로부재(110b)에 조립되는 브라켓(150)의 일측에는 가로부재 (110b) 외측에서 상기 연결구(140)의 브라켓 삽입홈(144)에 끼워지는 파지부(151)와 핀공(152)이 구비되어 있고, 전면에는 내/외장재 및 거푸집 판재용 체결구멍 (153) 다수개가 격자형으로 뚫려 있다.In addition, one side of the bracket 150 assembled to the horizontal member 110b, the gripping portion 151 and the pin hole 152 fitted into the bracket insertion groove 144 of the connector 140 from the outside of the horizontal member 110b. Is provided, and a plurality of fastening holes 153 for internal / exterior materials and formwork sheets are drilled in a lattice form on the front surface thereof.

또한, 상기 보조브라켓(160)은 가로부재(110b)의 외측에 끼울 수 있는 파지홈(162)이 형성된 끼움부(161)와; 일단에 핀공(164)이 형성되고 전면에는 내/외장재 및 거푸집 판재용 체결구멍(165) 다수개가 격자형으로 뚫려있는 지지판(163)을 서로 끼워맞춰 조립하는 구조로 형성되어 있다.In addition, the auxiliary bracket 160 has a fitting portion 161 is formed with a gripping groove 162 that can be fitted to the outside of the horizontal member (110b); A pin hole 164 is formed at one end, and a plurality of fastening holes 165 for internal / exterior materials and formwork plates are fitted to each other to assemble the support plates 163 which are drilled in a lattice shape.

그리고, 상기 슬라브 및 내벽용 골격부재(170)는 도 12 에서와 같이 세로부재(110a)와 가로부재(110b)를 서로 접면시킨 상태로 용접하여 직사각의 통체 형태로 구성한 것이다.The slab and the inner wall skeletal member 170 are formed in a rectangular cylindrical shape by welding the vertical member 110a and the horizontal member 110b in contact with each other as shown in FIG. 12.

한편, 도 10 과 같이 상기 세로부재(110a)를 반대로 마주보게 돌려 놓은 상태에서 간격유지구(120)로 소정 간격 유지되게 조립할 수도 있다. 이 때는 간격유지구(120)의 양측 삽입부(121)가 끼워져 걸리도록 장공(191)과 상하 요입홈(192)이 구비되어 있으면서 세로부재(110a) 내면에 밀착되는 유동방지구(190)를 간격유지구 (120)의 양단에 끼운 상태로 조립하는 것으로서, 도면중 미설명 부호 (300)은 벽체용 철골조와 슬라브용 철골조를 서로 체결시켜주는 덫장이다.Meanwhile, as shown in FIG. 10, the vertical member 110a may be assembled such that the vertical member 110a is maintained at a predetermined interval by the interval holding member 120 while being turned to face oppositely. At this time, the long hole 191 and the upper and lower recessed grooves 192 are provided so that both insertion portions 121 of the spacer 120 are inserted therein, and the flow preventing holes 190 are in close contact with the inner surface of the vertical member 110a. Assembling in the state sandwiched between both ends of the retaining region 120, the reference numeral 300 in the drawing is a trap for fastening the steel frame for the wall and the steel frame for the slab to each other.

이와 같이 형성된 본 발명의 철골조를 이용하여 단열재가 사용되는 건물 외벽을 시공하는 과정을 일 실시예로 하여 공정별로 상세히 설명하면 다음과 같다.Using the steel frame of the present invention formed as described above, the process of constructing the outer wall of the building using the heat insulating material as an embodiment will be described in detail for each process as follows.

제1공정 (철골조의 조립시공 공정)1st process (assembly construction process of steel frame)

먼저 도 1 에서와 같이 한쌍의 세로부재(110a)를 서로 마주 보게 하고, 그 양쪽 삽입공(112)에 간격유지구(120)의 양단 삽입부(121)를 끼운 다음 연결구(140)의 돌출부(141)를 세로부재(110a)의 바깥쪽에서 끼우면 연결구(140)의 핀공(142)과 세로부재(110a)의 체결공(111) 및 간격유지구(120)의 구멍(122)이 일치되므로 이때핀 등의 체결부재(180)를 끼우면 세로부재(110a)와 간격유지구(120) 및 연결구 (140)는 일체로 체결된 상태를 유지하게 된다.First, as shown in FIG. 1, a pair of vertical members 110a face each other, and both insertion portions 121 of the gap retaining holes 120 are inserted into both insertion holes 112, and then protrusions of the connector 140 are formed. When the 141 is inserted from the outside of the vertical member 110a, the pin hole 142 of the connector 140 and the fastening hole 111 of the vertical member 110a and the hole 122 of the spacing holder 120 coincide with each other. Inserting the fastening member 180, such as the vertical member 110a and the interval maintaining the 120 and the connector 140 is maintained in a state of being integrally fastened.

그리고, 상기 간격유지구(120)의 중앙에는 한쌍의 단열재 고정구(130)를 서로 대향되게 끼워 각자의 구멍(131)과 핀공(123)에 일치시킨 후 핀 등의 체결부재 (180)를 끼우면 단열재 고정구(130)에 절곡되어 있는 양쪽 날개편(132)들이 소정 간격을 유지하므로 단열재(133)를 신속 견고하게 끼울 수 있다.In the center of the spacer 120, a pair of heat insulating material fixing members 130 are opposed to each other to coincide with the respective holes 131 and the pin holes 123, and then a fastening member 180 such as a pin is inserted into the heat insulating material. Since both wing pieces 132 that are bent in the fixture 130 maintain a predetermined distance, the heat insulating material 133 may be quickly and firmly fitted.

이러한 상태에서 양쪽 세로부재(110a)에 체결된 연결구(140)의 삽입홈(143)에 가로부재(110b)를 끼우고, 2단으로 단턱진 브라켓 삽입홈(144)에 브라켓(150)의 파지부(151)를 끼우면 그 핀공(152)과 연결구(140)의 핀공(142) 및 가로부재(110b)의 체결공(111)이 일치된다.In this state, the horizontal member 110b is inserted into the insertion groove 143 of the connector 140 fastened to both vertical members 110a, and the wave of the bracket 150 is inserted into the bracket insertion groove 144 stepped into two stages. When the branch 151 is fitted, the pin hole 152 and the pin hole 142 of the connector 140 and the fastening hole 111 of the horizontal member 110b coincide with each other.

따라서, 핀 등의 체결부재(180)를 끼우면 세로부재 (110a)의 간격을 유지시키는 간격유지구(120)와 가로부재(110b)를 연결시키는 연결구(140) 및 가로부재 (110b) 외측에 체결되는 브라켓(150)이 일직선으로 조립된 상태를 유지하면서 외벽용 철골조의 조립시공이 완료된다.Accordingly, when the fastening member 180 such as a pin is inserted, the coupling 140 and the horizontal member 110b are connected to the outside of the connector 140 and the horizontal member 110b to maintain the gap between the vertical member 110a and the horizontal member 110b. Assembling construction of the outer wall steel frame is completed while maintaining the bracket 150 is assembled in a straight line.

그리고, 상기 조립된 외벽용 철골조의 안쪽 소정 높이에는 도 9 에서와 같이 슬라브용 골격부재(170)를 체결용 덫장(300)에 의해 세로부재(110a)에 결착한 다음 그 표면과 저면에 각각 가로부재(110b)를 연결구(140)에 의해 체결한다. 그리고, 저면의 가로부재(110b) 밑에 브라켓(150)을 조립하면 슬라브용 철골조의 조립시공이 완료된다.Then, at the predetermined height inside the assembled outer wall steel frame, as shown in FIG. 9, the slab skeletal member 170 is fastened to the vertical member 110a by the trapping trap 300, and then transversely on the surface and the bottom thereof, respectively. The member 110b is fastened by the connector 140. Then, when the bracket 150 is assembled under the horizontal member 110b of the bottom surface, the assembly construction of the steel frame for slabs is completed.

이때, 상기 슬라브용 철골조의 경우 가로부재(110b)에 브라켓(150)을 조립하지 않고 직접 내/외장재 및 거푸집용 판재(200a)(200b)를 가로부재(110b)에 체결하는 구조로 조립 시공할 수도 있다.At this time, in the case of the steel slab for the slab to be assembled and assembled without the bracket 150 to the horizontal member (110b) directly to the interior / exterior and formwork plate (200a, 200b) to the horizontal member (110b) structure. It may be.

제2공정 (단열재 시공공정)2nd process (insulation material construction process)

상기 공정의 외벽용으로 조립된 철골조에서 간격유지구(120)에 체결되어 있는 단열재 고정구(130)의 날개편(132)과 날개편(132) 사이를 이용하여 단열재(133)를 끼워 넣으면 단열재(133) 시공이 완료된다.In the steel frame assembled for the outer wall of the process by inserting the heat insulating material 133 between the wing piece 132 and the wing piece 132 of the heat insulating material fixture 130 is fastened to the spacing holder 120, the heat insulating material ( 133) Construction is completed.

제3공정 (내/외장재 및 거푸집용 판재 시공공정)3rd process (internal / exterior materials and form plate construction process)

상기와 같이 단열시공이 완료되면 내/외측 가로부재(110b)에 체결되어 있는 각 브라켓(150)의 격자형으로 뚫려있는 체결구멍(153)을 이용하여 내/외장재 및 거푸집용 판재(200a) (200b)를 도 9 에서와 같이 조립하며, 슬라브용 골격부재(170)의 가로부재(110b) 저면에 체결된 브라켓(150)에도 내장재 및 거푸집용 판재(200a)를 조립하면 내/외장재 및 거푸집용 판재(200a)(200b)의 조립 시공이 완료된다.When the insulation construction is completed as described above using the fastening hole 153 of the grid 150 of each bracket 150 is fastened to the inner / outer horizontal member (110b) using the inner / outer material and formwork plate (200a) ( 9 and assembling as shown in Figure 9, if the assembly 150 and the inner plate and the formwork plate (200a) also assembled to the bracket 150 fastened to the bottom surface of the horizontal member (110b) of the slab skeletal member 170 for interior / exterior materials and formwork The assembling construction of the board members 200a and 200b is completed.

이때, 내/외장재 및 거푸집용 판재(200a)(200b)의 체결력을 더 높게 유지시켜야 하는 부위에는 가로부재(110b)의 소정부위에 보조 브라켓(160)을 체결한 다음 그 보조 브라켓 (160)을 이용하여 내/외장재 및 거푸집용 판재(200a)(200b)를 체결하면 된다.At this time, in the part where the fastening force of the internal / exterior member and the formwork plate (200a) (200b) should be maintained higher, the auxiliary bracket 160 is fastened to a predetermined portion of the horizontal member 110b, and then the auxiliary bracket 160 is fastened. What is necessary is to fasten internal / exterior materials and formwork boards 200a and 200b.

제4공정 (콘크리트 타설 및 양생공정)4th process (concrete casting and curing process)

상기 3공정이 완료된 상태에서 콘크리트 타설작업을 행하면 외벽용 철골조와 슬라브용 철골조들은 모두 충진되는 콘크리트 속에 묻히게 되며, 이러한 상태에서 충진된 콘크리트를 양생시키면 외벽용 철골조의 내/외장재 및 거푸집용판재(200a)(200b) 사이로 채워진 콘크리트는 외벽으로 양생되는 것이고, 슬라브용 철골조의 내장재 및 거푸집용 판재(200b) 위로 채워지는 콘크리트는 슬라브로 양생되는 것이며, 내/외장재 및 거푸집용 판재(200a)(200b)가 양생되는 외벽 및 슬라브에 견고하게 부착된 상태를 유지하므로 작업이 신속 간편하다.When the concrete is placed in the state in which the three processes are completed, the steel frame for the outer wall and the steel frame for the slab are all buried in the filled concrete. When curing the filled concrete in such a state, the interior / exterior materials and the formwork for the outer wall steel frame (200a) Concrete filled between the (200b) is to be cured by the outer wall, concrete filled over the interior and formwork of the slab steel frame (200b) is to be cured into slabs, interior / exterior and formwork (200a) (200b) Work is fast and easy because it keeps firmly attached to the cured outer wall and slab.

이러한 본 발명에서 단열재를 설치할 필요가 없는 내벽과 슬라브를 함께 시공하는 경우를 다른 실시예로 들어 설명하면 다음과 같다.When the inner wall and the slab do not need to install the heat insulating material in the present invention described in another embodiment as follows.

제1공정 (철골조의 조립시공 공정)1st process (assembly construction process of steel frame)

먼저 도 13 에서와 같이 내벽용 철골조의 골격은 두께가 적고 단열재를 사용하지 않으므로 간격유지구(120)를 사용할 필요가 없다. 즉, 세로부재(110a)와 가로부재(110b)를 용접하여 된 내벽용 골격부재(170)와 슬라브용 골격부재(170)를 체결용 덫장(300)에 의해 서로 체결된 상태로 만들되 내벽용 골격부재(170)의 내/외측에는 상술한 바와 같이 연결구(140)에 의해 가로부재(110b)와 브라켓(150) 및 보조 브라켓(160)을 각각 체결하여 내벽용 철골조로 형성하고, 슬라브용 골격부재(170)의 표면과 저면에는 위 일실시예와 같이 가로부재(110b) 및 브라켓(150)을 조립하여 슬라브용 철골조를 시공한다.First, as shown in Figure 13, the skeleton of the steel frame for the inner wall has a small thickness and does not use a heat insulating material, it is not necessary to use the interval maintaining region 120. That is, the inner wall skeletal member 170 and the slab skeletal member 170 made by welding the vertical member 110a and the horizontal member 110b are fastened to each other by the fastening trap 300, but the inner wall skeleton As described above, the inner and outer sides of the member 170 are fastened to the horizontal member 110b, the bracket 150, and the auxiliary bracket 160 by the connector 140, respectively, to form an inner wall steel frame, and a slab skeletal member. On the surface and bottom of the 170, as shown in the above embodiment, the horizontal member 110b and the bracket 150 are assembled to build a steel frame for slabs.

제2공정 (내/외장재 및 거푸집용 판재 시공공정)2nd process (internal / exterior materials and form plate construction process)

상기와 같이 내/외측 가로부재(110b)에 체결되어 있는 각 브라켓(150)의 격자형으로 뚫려있는 체결구멍(153)을 이용하여 내/외장재 및 거푸집용 판재(200a) (200b)를 도 9 에서와 같이 조립하며, 슬라브용 골격부재(170)의 가로부재(110b) 저면에 체결된 브라켓(150)에 내장재 및 거푸집용 판재(200a)를 조립하면 내/외장재 및 거푸집용 판재(200a)(200b)의 조립 시공이 완료되는데, 이때, 역시 내/외장재 및 거푸집용 판재(200a)(200b)의 체결력을 더 높게 유지시켜야 하는 부위에는 가로부재(110b)의 소정부위에 보조 브라켓(160)을 체결하여 내/외장재 및 거푸집용 판재(200a)(200b)의 체결력을 높힌다.As shown in FIG. 9, the inner / outer and die plate 200a and 200b are formed by using the fastening holes 153 that are drilled in the lattice of each bracket 150 fastened to the inner / outer horizontal member 110b. Assembling as in, when the interior material and formwork plate 200a assembled to the bracket 150 fastened to the bottom surface of the horizontal member (110b) of the slab skeletal member (170) (200a) ( Assembly of the 200b is completed, and in this case, the auxiliary bracket 160 is disposed at a predetermined portion of the horizontal member 110b at a portion where the fastening force of the internal / exterior and formwork plates 200a and 200b should be maintained higher. By tightening to increase the fastening force of the interior / exterior materials and formwork plate (200a) (200b).

제3공정 (콘크리트 타설 및 양생공정)3rd process (concrete casting and curing process)

상기 공정 완료 후 콘크리트 타설공정작업을 행하면 내벽용 철골조와 슬라브용 철골조들은 모두 충진되는 콘크리트 속에 묻히게 된다. 그 후 충진된 콘크리트를 양생시키면 내벽용 철골조의 내/외장재 및 거푸집용 판재(200a)(200b) 사이로 채워진 콘크리트는 내벽으로 양생되고, 슬라브용 철골조의 내장재 및 거푸집용 판재 위로 채워진 콘크리트는 슬라브로 양생되는 것인데, 이 공정 역시 내/외장재 및 거푸집용 판재(200a)(200b)가 양생되는 외벽 및 슬라브에 견고하게 부착된 상태를 유지하므로 작업이 신속 간편하다.When the concrete pouring process is completed after the process is completed, the steel frame for the inner wall and the steel frame for the slab are all buried in the filled concrete. Then, when the filled concrete is cured, the concrete filled between the interior / exterior materials of the inner wall steel frame and the formwork sheet (200a) (200b) is cured into the inner wall, and the concrete filled over the interior material and formwork of the slab steel frame is cured into slabs. This process is also easy to work quickly because the interior / exterior materials and formwork boards (200a, 200b) remains firmly attached to the cured outer wall and slab.

이와 같이 본 발명을 시공할 때 세로부재(110a)와 가로부재(110b)를 연결구 (140)로 결착한 상태에서 골격을 더 강하게 설치하고자 할 때는 가로부재(110b) 외측에 연결구(140)를 옆으로 눕혀 조립하면 다른 세로부재(110a)를 덧대어 조립할 수 있는 것으로서, 이를 반복할 경우 여러겹으로 세로부재(110a)와 가로부재(110b)를 체결할 수 있어 매우 강한 골격을 설치할 수 있다.As described above, when the vertical member 110a and the horizontal member 110b are bound by the connector 140 in the construction of the present invention, the connector 140 is placed on the outer side of the horizontal member 110b. If it is assembled by laying down the other vertical member (110a) can be assembled by padding, when repeating this can be coupled to the vertical member (110a) and horizontal member (110b) in multiple layers can be installed a very strong skeleton.

그리고, 상기 세로부재(110a)를 도 10 과 같이 반대로 돌려 놓은 상태에서 간격유지구(120)로 조립하여 사용할 수도 있다, 이 때 간격유지구(120)의 양측 삽입부(121)에는 유동방지구(190)가 견고하게 끼워진 상태에서 세로부재(110a)의 내면에 밀착되므로 간격유지구(120)의 체결력이 양호하게 유지된다.In addition, in the state in which the vertical member 110a is reversely turned as shown in FIG. 10, the vertical member 110a may be assembled and used as the spacing retainer 120. Since the 190 is firmly fitted to the inner surface of the vertical member 110a, the fastening force of the spacer 120 is maintained well.

이상에서 상술한 바와 같이 본 발명의 철골조는 세로부재와 가로부재를 연결부속에 의해 신속하면서도 견고하게 조립할 수 있어 시공작업이 간편하며, 특히 철골조의 내/외측에 거푸집 겸용의 내/외장재 및 거푸집용 판재를 부착한 상태에서 내/외벽과 슬라브를 동시에 형성할 수 있으므로 공정의 신속 간편으로 공기단축과 공사비 절감의 효과를 상당히 이룰 수 있는 효과가 있다.As described above, the steel frame of the present invention can be quickly and firmly assembled by the vertical member and the horizontal member by the connecting part, so the construction work is easy, and especially for the interior / exterior materials and formwork of the formwork on the inside / outside of the steel frame Since the inner and outer walls and the slab can be formed at the same time when the plate is attached, there is an effect that the effect of shortening the air and reducing the construction cost can be achieved by the quick and simple process.

Claims (5)

양쪽면에 다수의 체결공(111)이 형성되고 일측면에 길다란 삽입공(112)이 일정 간격으로 형성된 세로부재(110a) 및 가로부재(110b)와;A plurality of fastening holes 111 are formed on both sides and the longitudinal member 110a and the horizontal member 110b having elongated insertion holes 112 at regular intervals; 상기 세로부재(110a)의 길다란 삽입공(112)에 끼워져 걸리도록 양쪽 끝단에는 단턱진 삽입부(121)가 형성되고 중앙에는 다수의 핀공(123)이 구비된 간격유지구(120)와;A gap retaining hole 120 having a stepped insertion portion 121 formed at both ends and a plurality of pin holes 123 formed at both ends thereof so as to be fitted into the elongated insertion hole 112 of the vertical member 110a; 상기 간격유지구(120) 중앙에 끼워져 걸쳐지면서 상기 핀공(123)과 일치되는 구멍(131)이 구비되고, 양쪽으로는 단열재(133) 지지용 날개편(132)이 절곡되어 돌출된 단열재 고정구(130)와;A hole 131 which is fitted in the center of the gap holding hole 120 and is matched with the pin hole 123 is provided, and both sides of the insulating member 132 are bent and protruded to support the insulating member 133. 130); 상기 세로부재(110a) 표면에 걸쳐져 끼워지면서 복수의 핀공(142)이 있는 돌출부(141)가 일측에 돌출되고, 전면에는 가로부재 삽입홈(143)이 형성된 연결구 (140)와;A connector 140 formed to span the surface of the vertical member 110a and having a plurality of pin holes 142 having a protrusion 141 protruding at one side thereof, and having a horizontal member insertion groove 143 formed at a front surface thereof; 일측에는 가로부재(110b) 외측에서 상기 연결구(140)의 브라켓 삽입홈(144)에 끼워지는 파지부(151)와 핀공(152)이 구비되고, 전면에는 내/외장재 및 거푸집 판재용 체결구멍(153) 다수개가 격자형으로 뚫려 있는 브라켓(150)과;One side is provided with a gripping portion 151 and a pin hole 152 fitted into the bracket insertion groove 144 of the connector 140 from the outside of the horizontal member (110b), the fastening hole for the interior / exterior material and the form plate (front) 153) a bracket 150 having a plurality of lattice holes; 세로부재(110a)와 가로부재(110b)를 서로 접면시킨 상태로 용접하여 직사각의 통체 형태로 구성한 슬라브 및 내벽용 골격부재(170) 로 이루어진 것을 특징으로 하는 건물 시공용 철골조.Steel frame for building construction, characterized in that the vertical member (110a) and the horizontal member (110b) welded in contact with each other in contact with each other made of a slab and an inner wall skeletal member (170) configured in a rectangular cylindrical shape. 제1항에 있어서, 연결구(140)의 삽입홈(143)에 2단으로 단턱진 브라켓 삽입홈(144)을 일체로 형성하여 가로부재(110b)와 브라켓(150)을 일체로 연결구(140)에 체결토록 한 것을 특징으로 하는 건물 시공용 철골조.The method of claim 1, wherein the insertion groove 143 of the connector 140 is integrally formed with the bracket insertion groove 144 stepped in two stages integrally connecting the horizontal member 110b and the bracket 150 to the connector 140 Steel frame for building construction, characterized in that the fastening to. 제1항에 있어서, 상기 브라켓(150)과 브라켓(150) 사이에 일측에는 가로부재 (110b)의 외측에 끼울 수 있는 파지홈(162)과 핀공(164)이 형성되고, 전면에는 내/외장재 및 거푸집 판재용 체결구멍(165) 다수개가 격자형으로 뚫려있는 보조 브라켓(160)을 설치하여 내/외장재 및 거푸집용 판재 체결력을 보강토록 한 것을 특징으로 하는 건물 시공용 철골조.According to claim 1, wherein the gripping groove 162 and the pin hole 164 that can be fitted to the outside of the horizontal member (110b) is formed on one side between the bracket 150 and the bracket 150, the front / interior material And steel plate for building construction, characterized in that to strengthen the fastening force for the interior / exterior materials and the formwork plate by installing the auxiliary bracket 160, the plurality of formwork fastening holes 165 for lattice. 한쌍의 세로부재(110a) 사이에 간격유지구(120)의 양단 삽입부(121)를 끼운 다음 세로부재(110a) 외측에서 연결구(140)를 끼워 일치되는 각자의 핀공(142)과 체결공(111) 및 구멍(122)으로 체결부재(180)를 끼워 일체로 조립하고, 상기 간격유지구(120) 중앙에 단열재 고정구(130) 한쌍을 대향되게 설치하며, 양쪽 세로부재 (110a)에 체결된 연결구(140)의 삽입홈(143)에 가로부재(110b)를 끼워 조립한 후 가로부재(110b)에 다수의 내/외장재 및 거푸집 판재 고정용 브라켓 (150)을 조립하여 벽체용 철골조를 시공하고, 그 일정 높이에는 가로부재(110b)가 표 이면에 부착된 슬라브용 골격부재(170)를 일체로 설치하는 제1공정의 철골조 조립공정과;Between the pair of vertical members (110a) between the insertion end 121 of the gap retaining hole 120, and then fitted with a connector 140, the pin hole 142 and the fastening hole (fitting the connector 140 from the outside of the vertical member (110a) 111) and the fastening member 180 are assembled together by the holes 122, and a pair of heat insulating material fixing members 130 are installed in the center of the gap holding hole 120 so as to face each other, and fastened to both vertical members 110a. After fitting the horizontal member 110b into the insertion groove 143 of the connector 140 and assembling a plurality of internal / exterior materials and form plate fixing brackets 150 to the horizontal member 110b to construct the steel frame for the wall. The steel frame assembly step of the first step of integrally installing the slab skeletal member 170 attached to the back surface of the horizontal member (110b) at a predetermined height; 상기 공정의 외벽용으로 조립된 철골조의 간격유지구(120)에 체결되어 있는 고정구(130)와 고정구(130) 사이에 단열재(133)를 끼워 설치하는 제2공정의 단열재 시공공정과;A heat insulating material construction process of a second step of installing a heat insulating material 133 between the fasteners 130 and the fasteners 130 fastened to the spacing holder 120 of the steel frame assembled for the outer wall of the process; 내/외벽용 철골조의 외측 가로부재(110b)에 체결되어 있는 각 브라켓(150)에 내/외장재 및 거푸집용 판재(200a)(200b)를 조립 시공하고, 슬라브용 철골조의 저면에 설치된 브라켓(150)에 내장재 및 거푸집용 판재(200a)를 조립 시공하는 제3공정의 내/외장재 시공공정과;Brackets 150 installed on the bottom surface of the slab steel frame by assembling and constructing the inner / exterior material and the form plate 200a and 200b on each bracket 150 fastened to the outer horizontal member 110b of the inner / outer wall steel frame 110b. Internal / exterior materials construction process of the third step of assembling and constructing the interior and formwork plate (200a) in the; 상기 공정 완료후 외벽용 철골조와 슬라브용 철골조에 함께 콘크리트를 타설한 후 양생시키는 제4공정(콘크리트 타설 및 양생공정) 으로 이루어진 것을 특징으로 하는 건물 시공용 철골조를 이용한 건물 시공방법.Building construction method using a steel frame for building construction, characterized in that the fourth step (concrete placing and curing process) to cure after pouring concrete together in the steel frame for the outer wall and the slab steel frame after completion of the process. 제 4 항에 있어서, 제 1 공정의 벽체용 철골조로는 세로부재(110a)와 가로부재(110b)를 용접하여 된 내벽용 골격부재(170)와 슬라브용 골격부재(170)를 서로 체결시킨 후 연결구(140)에 의해 가로부재(110b)와 브라켓(150)을 체결하는 내벽용 철골조와; 슬라브용 골격부재(170)에 가로부재(110b) 및 브라켓(150)을 조립하는 슬라브용 철골조로 시공하여 단열재 설치 공정 없이 곧바로 내/외장재 및 거푸집용 판재 설치공정을 행하도록 한 것을 특징으로 하는 건물 시공용 철골조를 이용한 건물 시공방법.The method of claim 4, wherein the steel frame for the wall of the first step is fastened to each other after the inner wall skeleton member 170 and the slab skeleton member 170 by welding the vertical member (110a) and the horizontal member (110b) An inner wall steel frame for fastening the horizontal member 110b and the bracket 150 by the connector 140; Buildings made of slab steel frame for assembling the horizontal member 110b and the bracket 150 to the slab skeletal member 170 to immediately perform the interior / exterior and formwork plate installation process without the insulation material installation process. Building construction method using steel frame for construction.
KR10-2000-0078653A 2000-12-19 2000-12-19 Steel frame for structure operation and method for structure operation by using a steel frame KR100392031B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0078653A KR100392031B1 (en) 2000-12-19 2000-12-19 Steel frame for structure operation and method for structure operation by using a steel frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0078653A KR100392031B1 (en) 2000-12-19 2000-12-19 Steel frame for structure operation and method for structure operation by using a steel frame

Publications (2)

Publication Number Publication Date
KR20020049477A KR20020049477A (en) 2002-06-26
KR100392031B1 true KR100392031B1 (en) 2003-07-22

Family

ID=27683439

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0078653A KR100392031B1 (en) 2000-12-19 2000-12-19 Steel frame for structure operation and method for structure operation by using a steel frame

Country Status (1)

Country Link
KR (1) KR100392031B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100371747B1 (en) * 2000-12-30 2003-02-12 소광민 Steel frame for structure operation and method for structure operation by using a steel frame

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4545163A (en) * 1983-11-15 1985-10-08 Ovila Asselin Heat insulated tie rod for concrete wall members
JPH08158632A (en) * 1994-12-01 1996-06-18 Junichi Sugisaka Formwork device of concrete
KR20000025510A (en) * 1998-10-12 2000-05-06 윤종용 Method for testing dynamic feedback of frame relay call using asynchronous transfer mode path and device thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4545163A (en) * 1983-11-15 1985-10-08 Ovila Asselin Heat insulated tie rod for concrete wall members
JPH08158632A (en) * 1994-12-01 1996-06-18 Junichi Sugisaka Formwork device of concrete
KR20000025510A (en) * 1998-10-12 2000-05-06 윤종용 Method for testing dynamic feedback of frame relay call using asynchronous transfer mode path and device thereof

Also Published As

Publication number Publication date
KR20020049477A (en) 2002-06-26

Similar Documents

Publication Publication Date Title
US6164035A (en) Reinforced foam block wall
KR100412160B1 (en) Structure of steel aggregate for concrete building
US7837174B2 (en) Modular formwork wall with dovetail joint connectors
KR102259453B1 (en) Foam assembly integrated with wall for architecture
KR102252141B1 (en) Building wall panel concurrently used as mold form
KR20070027432A (en) A fastener for fixing a reinforcing bar assembly, a mold panel, and a ceiling panel by fixing pin
KR100392031B1 (en) Steel frame for structure operation and method for structure operation by using a steel frame
KR20180025641A (en) Mold steel supporter
US20060185283A1 (en) Interlocking construction panel showing fabrication thereof and the building system
KR20180012535A (en) Angle adjustment tie
KR100397580B1 (en) A method of executing a building using an iron reinforcing rod
KR100371747B1 (en) Steel frame for structure operation and method for structure operation by using a steel frame
KR102361122B1 (en) Bonding Spacing Material, Reinforcement Spacing Structures and Construction Methods Using it
KR100322412B1 (en) Construction method using prefabricated steel frame wire
KR100799176B1 (en) Form panels using intersection of breast wall including insulation
JP2005320682A (en) Composite board, and concrete wall construction method
KR200317486Y1 (en) The connecting structure of standard forms
JP3848873B2 (en) Construction method of concrete wall of building and concrete formwork
KR0145358B1 (en) Method of building slabs
JP3653069B2 (en) Assembling type
JP2567805B2 (en) Method for constructing multi-lattice slab, forming form for multi-lattice beam used in the constructing method, fixing jig for parallel flap square timber, reinforcing bar frame arrangement method, break-away forming form for multi-lattice beam, and multi-lattice beam Fixing jig for removing mold
JP2002146954A (en) Built-up form apparatus for use in forming skeleton
KR200306769Y1 (en) a mold fixable structure for building
KR200306741Y1 (en) The mold prefabricated concrete
KR0114180Y1 (en) Tying device for forms

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20060707

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee