KR200167842Y1 - Pile extracting supporter - Google Patents

Pile extracting supporter Download PDF

Info

Publication number
KR200167842Y1
KR200167842Y1 KR2019990018418U KR19990018418U KR200167842Y1 KR 200167842 Y1 KR200167842 Y1 KR 200167842Y1 KR 2019990018418 U KR2019990018418 U KR 2019990018418U KR 19990018418 U KR19990018418 U KR 19990018418U KR 200167842 Y1 KR200167842 Y1 KR 200167842Y1
Authority
KR
South Korea
Prior art keywords
pile
piles
ground
construction
soil
Prior art date
Application number
KR2019990018418U
Other languages
Korean (ko)
Inventor
김일근
Original Assignee
김일근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김일근 filed Critical 김일근
Priority to KR2019990018418U priority Critical patent/KR200167842Y1/en
Application granted granted Critical
Publication of KR200167842Y1 publication Critical patent/KR200167842Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

파일(6)의 형태와 유사하게 양쪽이 앞쪽으로 절곡되어 있으며, 아래쪽은 경사각도를 이루면서 연장부(73)가 형성되어 있고, 윗쪽과 아랫쪽에 삼각앵글(71, 72)이 수평방향으로 각각 용접부착되며, 아랫쪽 삼각앵글(72)의 주변에 쐐기(72)가 돌출형성되어 있는 구조로 이루어지며,Similar to the shape of the pile (6), both sides are bent forward, the bottom is formed an extension portion 73 to form an inclination angle, the triangles 71, 72 are welded in the horizontal direction on the top and bottom, respectively It is attached, and made of a structure in which the wedge 72 protrudes around the lower triangle 72,

지반에 타설되어 있는 파일을 인발하는 경우에 파일의 앞면에 부착되는 토사를 분리하여 파일만 인발될 수 있도록 함으로써 토사 유출로 인한 지반침하의 발생을 제거할 수 있는, 공사용 파일의 인발 보조장치를 제공한다.When drawing piles placed on the ground, it is possible to remove soils attached to the front of piles so that only piles can be pulled out, thereby providing a drawing pile auxiliary device for construction piles that can eliminate ground subsidence due to soil leakage. do.

Description

공사용 파일의 인발 보조장치{PILE EXTRACTING SUPPORTER}Drawing auxiliary device for construction file {PILE EXTRACTING SUPPORTER}

이 고안은 공사용 파일의 인발 보조장치에 관한 것으로서, 더욱 상세하게 말하자면 지반에 타설되어 있는 파일을 인발하는 경우에 파일의 앞면에 부착되는 토사를 분리하여 파일만 인발될 수 있도록 함으로써 토사 유출로 인한 지반침하의 발생을 제거할 수 있는, 공사용 파일의 인발 보조장치에 관한 것이다.The present invention relates to a drawing aid for construction piles. More specifically, when drawing piles placed on the ground, the soil is attached to the front of the pile so that only the pile can be pulled out. It relates to a drawing aid for construction piles, which can eliminate the occurrence of settlement.

일반적으로 토목공사현장에서는 차수벽, 토류벽, 가호안, 가물막이, 가축도 등의 가설공사용으로서 파일이 사용되고 있으며, 또한 안벽, 물양장, 호안, 도류제, 도크, 돌핀, 방파제, 옹벽, 교대, 교각, 지수벽, 쓰레기 매립장, 연직 치수재 등의 영구 구조물용으로서 파일이 사용되고 있다. 그리고, 건축공사현장에서도 지하구조물의 터파기를 할때 토사나 지하수의 유입을 방지하기 위하여 외곽지반에 파일이 매설된다.Generally, piles are used for construction work such as order walls, earth walls, guardian houses, barriers, and livestock roads in civil engineering sites. The pile is used for permanent structures, such as a wall, a landfill, and a vertical dimension material. In addition, piles are buried in the outer ground to prevent the inflow of soil and groundwater when the underground structures are destroyed in construction sites.

도 1은 일반적인 파일 타설 및 인발 장치를 나타내는 도면으로서 도1에 도시되어 있는 바와 같이, 파일(6)을 지반에 매설하기 위해서는 크레인(1)에 장착되어 있는 바이브로 햄머(2)를 이용하게 되는데, 상기한 바이브로 햄머(2)는 유압펌프(4)로부터 발생되어 호스를 타고 전달되는 유압에 의해서 동작되는 유압처크(21)를 이용하여 파일(6)의 상단을 고정시킨 뒤에, 전원공급장치(3)로부터 인가되는 전력에 의해 동작되는 바이브레이터(22)를 이용하여 햄머의 무게가 파일(6)로 인가되도록 타격함으로써 파일(6)이 지반으로 매설되도록 한다. 그 후에, 공사가 완료되고 나면, 상기한 바와 같이 지반에 타설되어 있는 파일(6)을 인발하여 재사용하게 된다. 상기한 바이브로 햄머(2)의 작동은 작업자가 제어패널(5)울 이용하여 제어하게 된다.1 is a view showing a general pile placing and drawing device, as shown in FIG. 1, in order to embed the pile 6 in the ground, a vibro hammer 2 mounted to the crane 1 is used. After fixing the upper end of the pile (6) by using the hydraulic chuck (21) operated by the hydraulic pressure generated from the hydraulic pump (4) is transmitted from the hydraulic pump (4), the power supply device Using the vibrator 22 operated by the electric power applied from (3), the hammer 6 is applied to the pile 6 so that the pile 6 is embedded in the ground. Thereafter, after the construction is completed, the pile 6 placed on the ground is drawn out and reused as described above. The operation of the vibro hammer (2) is controlled by the operator using the control panel (5).

그러나, 종래에는 시공되어 있는 파일을 지반으로부터 인발하는 과정에서, 파일의 뒷면은 부착성이 없으나 앞면의 오목한 부위에는 마찰력으로 토사가 많이 부착되어 있어서 파일과 함께 토사가 밖으로 유출되는 문제점이 있다. 이에따라, 토사가 유출된 만큼 지반에 공간이 생기게 되어 주위 지반이 침하하게 되는 단점이 있다. 물론, 주위지반이 침하되면 되메우기 및 터고르기를 통해 어느정도 회복이 가능하지만, 지반 깊은 곳에서 토사가 유출된 경우에는 정상복귀가 불가능하게 된다. 지하 깊은 곳에서 토사가 유출되면 시간이 지나게 된 후 주위지반이 여파로 인해 금이가게 됨으로써 구조물에 영향을 미치게 되는 문제점이 있다.However, conventionally, in the process of drawing the pile from the ground, the back side of the pile is not adhered, but the soil is attached to the concave portion of the front with a lot of friction because of the problem that the soil outflow with the pile. Accordingly, there is a disadvantage that the soil is settled as the soil is leaked, so that the surrounding ground is settled. Of course, if the surrounding ground is settled to some extent can be recovered through backfilling and picking, but if the soil is spilled deep in the ground it is impossible to return to normal. If the soil is leaked from the deep underground, after a time passes, the surrounding ground is cracked due to the aftermath, which affects the structure.

이 고안의 목적은 이와 같은 종래의 문제점을 해결하기 위한 것으로서, 지반에 타설되어 있는 파일을 인발하는 경우에 파일의 앞면에 부착되는 토사를 분리하여 파일만 인발될 수 있도록 함으로써 토사 유출로 인한 지반침하의 발생을 제거할 수 있는, 공사용 파일의 인발 보조장치를 제공하는 데 있다.The purpose of the present invention is to solve such a conventional problem. When drawing a pile placed on the ground, the ground subsidence due to the soil leakage by separating the soil attached to the front of the pile so that only the pile can be drawn out It is to provide a drawing aid for construction piles, which can eliminate the occurrence of.

도 1은 일반적인 파일 타설 및 인발 장치를 나타내는 도면이다.1 is a view showing a general pile placing and drawing device.

도 2는 이 고안의 실시예에 따른 공사용 파일의 인발 보조장치의 사용 상태도이다.2 is a state diagram used in the drawing auxiliary device for a construction pile according to an embodiment of the present invention.

도 3은 이 고안의 실시예에 따른 공사용 파일의 인발 보조장치의 구조도이다.3 is a structural diagram of a drawing auxiliary device for a construction pile according to an embodiment of the present invention.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 : 크레인 2 : 바이브로 햄머1: crane 2: vibro hammer

3 : 전원 공급장치 4 : 유압 펌프3: power supply 4: hydraulic pump

5 : 제어패널 6 : 파일5: control panel 6: file

7 : 인발 보조장치 71, 72 : 삼각앵글7: drawing aid 71, 72: triangle

73 : 쐐기 74 : 경사부73: wedge 74: inclined portion

이하, 이 고안이 속하는 기술분야에서 통상의 지식을 가진 자가 이 고안을 용이하게 실시할 수 있을 정도로 상세히 설명하기 위하여, 이 고안의 가장 바람직한 실시예를 첨부된 도면을 참조로 하여 설명하기로 한다.Hereinafter, the most preferred embodiments of the present invention will be described with reference to the accompanying drawings in order to be described in detail that can be easily carried out by those of ordinary skill in the art.

도 2 및 도 3에 도시되어 있는 바와 같이, 이 고안의 실시예에 따른 공사용 파일의 인발 보조장치(7)의 구성은, 파일(6)의 형태와 유사하게 양쪽이 앞쪽으로 절곡되어 있으며, 아래쪽은 경사각도를 이루면서 연장부(73)가 형성되어 있고, 윗쪽과 아랫쪽에 삼각앵글(71, 72)이 수평방향으로 각각 용접부착되며, 아랫쪽 삼각앵글(72)의 주변에 쐐기(72)가 돌출형성되어 있는 구조로 이루어진다.As shown in Figs. 2 and 3, the construction of the drawing assistance device 7 for the construction pile according to the embodiment of the present invention, similar to the shape of the pile 6, both sides are bent forward, The extension portion 73 is formed while forming an inclination angle, and the upper and lower triangles 71 and 72 are welded to the horizontal direction, respectively, and the wedges 72 protrude around the lower triangle 72. It consists of a structure which is formed.

상기한 구성에 의한, 이 고안의 실시예에 따른 공사용 파일의 인발 보조장치의 작용은 다음과 같다.By the above-described configuration, the operation of the drawing auxiliary device for a construction pile according to the embodiment of the present invention is as follows.

타설되어 있는 파일(6)을 인발하기 전에, 파일(6)을 타설하는 방법과 마찬가지로 바이브로 햄머(2)를 이용하여 파일(6)의 앞면에 인발 보조장치(7)를 타설한다. 다음에, 유압펌프(4)로부터 발생되어 호스를 타고 전달되는 유압에 의해서 동작되는 유압처크(21)를 이용하여 파일(6)의 상단을 고정시켜서 파일(6)을 지반으로부터 뽑아내게 된다. 이때, 인발 보조장치(7)가 파일(6)의 앞쪽에 부착되어 있는 토사를 긁어줌으로써 파일(6)을 따라 토사가 유출되지 않도록 한다. 파일(6)을 인발하고 나면, 파일(6)을 인발하는 방법과 마찬가지로 바이브로 햄머(2)를 이용하여 인발 보조장치(7)를 뽑아낸다. 이 겨웅에 인발 보조장치(7)의 앞쪽에 형성되어 있는 삼각앵글(71, 72) 및 쐐기(73)는 인발 보조장치(7)를 따라 토사가 밖으로 유출되지 않도록 하는 기능을 갖는다.Before drawing out the pile 6, the drawing assistance apparatus 7 is poured into the front surface of the pile 6 using the Vibro hammer 2 in the same manner as the pile 6 is poured. Next, the upper end of the pile 6 is fixed by using the hydraulic chuck 21 generated by the hydraulic pressure generated from the hydraulic pump 4 and delivered through the hose, and the pile 6 is extracted from the ground. At this time, the drawing aid 7 to scratch the soil attached to the front of the pile 6 so that the soil is not leaked along the pile (6). After the pile 6 is drawn out, the drawing aid 7 is pulled out using the Vibro hammer 2 in the same way as the pile 6 is drawn. The triangles 71 and 72 and the wedges 73 formed on the front side of the drawing aid 7 at this time have a function to prevent the soil from flowing out along the drawing aid 7.

인발 보조장치(7)를 뽑아내고 나면, 다른 파일의 앞면에 인발 보조장치(7)를 타설하여 상기한 과정을 반복 수행하면서 지반에 매설되어 있는 파일을 모두 뽑아내게 된다.After pulling out the drawing aid (7), by placing the drawing aid (7) on the front of the other file to repeat the above process to extract all the files buried in the ground.

이상의 설명에서와 같이 이 고안의 실시예에서, 지반에 타설되어 있는 파일을 인발하는 경우에 파일의 앞면에 부착되는 토사를 분리하여 파일만 인발될 수 있도록 함으로써 토사 유출로 인한 지반침하의 발생을 제거할 수 있는, 효과를 가진 공사용 파일의 인발 보조장치를 제공할 수가 있다. 이 고안의 이와 같은 효과는 토목공사 또는 건축공사 분야에서 이 고안의 기술적 범위를 벗어나지 않는 범위내에서 다양하게 변형되어 이용될 수가 있다.As described above, in the embodiment of the present invention, in the case of drawing a pile placed on the ground, the sediment attached to the front of the pile is separated so that only the pile can be removed, thereby eliminating the occurrence of ground subsidence due to the soil leakage. An effective drawing aid for construction piles can be provided. This effect of the present invention can be used in various modifications within the scope of the technical scope of the present invention in civil engineering or building construction.

Claims (1)

파일(6)의 형태와 유사하게 양쪽이 앞쪽으로 절곡되어 있으며, 아래쪽은 경사각도를 이루면서 연장부(73)가 형성되어 있고, 윗쪽과 아랫쪽에 삼각앵글(71, 72)이 수평방향으로 각각 용접부착되며, 아랫쪽 삼각앵글(72)의 주변에 쐐기(72)가 돌출형성되어 있는 구조로 이루어지는 것을 특징으로 하는 공사용 파일의 인발 보조장치.Similar to the shape of the pile (6), both sides are bent forward, the bottom is formed an extension portion 73 to form an inclination angle, the triangles 71, 72 are welded in the horizontal direction on the top and bottom, respectively Attached, the drawing aids for construction piles, characterized in that consisting of a structure in which the wedge (72) protrudes around the lower triangle (72).
KR2019990018418U 1999-09-01 1999-09-01 Pile extracting supporter KR200167842Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019990018418U KR200167842Y1 (en) 1999-09-01 1999-09-01 Pile extracting supporter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019990018418U KR200167842Y1 (en) 1999-09-01 1999-09-01 Pile extracting supporter

Publications (1)

Publication Number Publication Date
KR200167842Y1 true KR200167842Y1 (en) 2000-02-15

Family

ID=19587009

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019990018418U KR200167842Y1 (en) 1999-09-01 1999-09-01 Pile extracting supporter

Country Status (1)

Country Link
KR (1) KR200167842Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101824926B1 (en) * 2017-05-18 2018-02-02 김사문 Construction incasing for concrete piles

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101824926B1 (en) * 2017-05-18 2018-02-02 김사문 Construction incasing for concrete piles
WO2018212449A1 (en) * 2017-05-18 2018-11-22 김사문 Incasing structure for constructing concrete soil retaining wall

Similar Documents

Publication Publication Date Title
CN109056798A (en) Under a kind of urban road in deep basal pit contrary sequence method top plate bevelling construction method
CN109944264A (en) Earth source heat pump horizontal coiled pipe system is embedded in the construction method of basic internal
KR100877974B1 (en) Reverse removing method of underground retaining wall using bottom-up cut and gradual land infilling with struts
JP5351125B2 (en) Open shield machine start method of open shield method
KR200167842Y1 (en) Pile extracting supporter
JP4981551B2 (en) Wall structure and construction method thereof
KR100401330B1 (en) A method of construction for earth-protection walls of building
KR200224758Y1 (en) Structure of caisson soil protection four concret caisson
JPH08120671A (en) Remover of underground pile
JPH07150564A (en) Removing engineering method for underground structure and obstacle in 1000mm proximity to boundary
KR20060093865A (en) Land-side protection wall method using sheet pile
CN109577458A (en) The method for embedding of pipeline aerial crossing sandy soils stream section
JP2000352053A (en) Existing pile dismantling construction method
JPH01142121A (en) Concrete retaining wall-forming sheet pile and forming of concrete retaining wall thereof
KR102087978B1 (en) A method of pressurizing steel pipe and a method of constructing an underground structure in a lower toe pipe section
CN1260424A (en) Vibratory pipe sinking dug-hole pile
JP2985063B2 (en) Caisson prefabricated manhole and its construction method
JPH06240670A (en) Method and device for pulling pile
JP3105706B2 (en) Construction method of piled raft foundation using existing foundation
JP2810957B2 (en) Pile foundation method
JP2007218061A (en) Earth-retaining open-cut method without width allowance for precast box culvert
JPS5915115A (en) Solidification of soft and underwater ground
JP2006183779A (en) Baseless construction method for buried pipe
JPH02300584A (en) Extinction method of useless buried pipe line
JPH11140881A (en) Penetration method for caisson foundation

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model