KR20010095915A - Guide frame for anchoring bar - Google Patents
Guide frame for anchoring bar Download PDFInfo
- Publication number
- KR20010095915A KR20010095915A KR1020000019387A KR20000019387A KR20010095915A KR 20010095915 A KR20010095915 A KR 20010095915A KR 1020000019387 A KR1020000019387 A KR 1020000019387A KR 20000019387 A KR20000019387 A KR 20000019387A KR 20010095915 A KR20010095915 A KR 20010095915A
- Authority
- KR
- South Korea
- Prior art keywords
- anchor
- plate
- vertical
- fixed
- male screw
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2253—Mounting poles or posts to the holder
- E04H12/2261—Mounting poles or posts to the holder on a flat base
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Foundations (AREA)
Abstract
Description
본 발명은 앵커 설치용 프레임에 관한 것이다. 보다 구체적으로, PC기둥 또는 철골기둥을 설치하기 위한 앵커를 기초 콘크리트에 설치할 경우에 앵커를 보다 정교하게 설치할 수 있는 앵커 설치용 프레임에 관한 것이다.The present invention relates to an anchor installation frame. More specifically, the present invention relates to an anchor installation frame capable of installing the anchor more precisely when installing an anchor for installing a PC pillar or a steel pillar.
종래에는 기초 콘크리트 타설 전에 앵커를 설치하기 위하여 앵커를 기초철근에 고정하거나, 앵커를 설치하기 위한 프레임을 철근 위에 또는 바닥에 설치하고 앵커를 고정한 다음 콘크리트를 타설하였다. 그러나, 이러한 방법은 앵커의 위치를 정확하게 설치하기가 어렵고, 앵커의 위치가 콘크리트 타설과정에서 유동할 수 있다는 문제점이 있다. 앵커의 위치가 맞지 않을 경우에는 PC나 철골기둥을 설치할 수 없게되고, 콘크리트 기초를 파쇄한 다음 다시 앵커를 설치해야만 한다. 이러한 재시공은 공기의 지연과 비용의 증가는 물론, 양호한 품질을 확보할 수 없는 문제가 있다.Conventionally, in order to install the anchor before installing the concrete, anchors are fixed to the foundation reinforcement, or frames for installing the anchors are installed on the reinforcing bars or on the floor, the anchors are fixed, and then concrete is poured. However, this method is difficult to accurately install the position of the anchor, there is a problem that the position of the anchor can flow during the concrete placing process. If the anchors are not in the correct position, you will not be able to install PC or steel columns, and you will have to crush the concrete foundation and install the anchors again. This reconstruction, as well as the increase in air delay and cost, there is a problem that can not secure good quality.
본 발명의 목적은 정확한 위치에 앵커가 시공될 수 있고, 공사중 앵커의 유동을 방지함으로써 앵커의 위치나 레벨의 불량에 의한 재시공을 방지하여 공사기간과 공사비용의 손실을 줄일 수 있는 앵커 설치용 프레임을 제공하는 것이다.An object of the present invention can be anchored in the correct position, prevent the flow of the anchor during construction by preventing the re-construction by the anchor position or level failure to reduce the construction period and construction cost loss anchor frame To provide.
제1도는 본 발명의 앵커 설치용 프레임의 사시도이다.1 is a perspective view of the anchor mounting frame of the present invention.
제2도는 제1도의 종단면도이다.2 is a longitudinal cross-sectional view of FIG.
<도면의 부호에 대한 간단한 설명><Short description of the symbols in the drawings>
1: 수직재 2: 수평재1: vertical material 2: horizontal material
3: 레벨조정재 4: 앵커3: leveling material 4: anchor
5: 구멍 6: 수나사5: hole 6: male thread
7: 플레이트 8: 너트7: plate 8: nuts
10: 고정판10: fixed plate
본 발명의 앵커 설치용 프레임은 수직재(1), 수평재(2) 및 레벨조정재(3)로 구성된다.The anchor mounting frame of the present invention is composed of a vertical member (1), a horizontal member (2) and a level adjusting member (3).
수직재(1)는 앵커 설치용 프레임의 기둥 역할을 하는 것으로, 수직으로 다수개가 배열된다. 사각기둥의 경우 사각의 각 모서리에 하나씩 배열되는 것이 바람직하며, 원형기둥의 경우 네 개 또는 6개가 설치될 수 있다. 수직재(1)로서는 앵글이나 채널 또는 각파이프를 사용할 수 있다. 상기 수직재(1)의 하단부에는 중앙에 볼트구멍이 형성된 고정판(10)이 부착된다.The vertical member 1 serves as a pillar of the frame for anchor installation, and a plurality of vertical members are arranged vertically. In the case of a square pillar, it is preferable that one is arranged at each corner of the square. In the case of a circular pillar, four or six can be installed. As the vertical material 1, an angle, a channel, or an angle pipe can be used. A fixing plate 10 having a bolt hole in the center is attached to the lower end of the vertical member 1.
수평재(2)는 앵커(4)를 고정하기 위한 것으로서, 상기 수직재(1) 사이사이로 2단 이상 다수 단 설치되며, 상기 수평재(2)의 중간에는 일정간격으로 수직방향으로 다수개의 구멍(5)이 형성된다. 상기 구멍(5)은 앵커(4)가 설치될 위치에 위아래 단에 동일위치에 연직으로 형성되며, 상기 구멍(5)의 직경은 앵커(4)의 직경보다 약간 큰 크기로 형성되어 상기 구멍(5)에 앵커(4)를 삽입하고 앵커(4)를 수평재(2)에 점용접하여 고정한다.The horizontal member (2) is for fixing the anchor (4), two or more stages are provided between the vertical member (1), a plurality of holes (5) in the vertical direction at regular intervals in the middle of the horizontal member (2) Is formed. The hole 5 is vertically formed at the same position at the upper and lower ends at the position where the anchor 4 is to be installed, and the diameter of the hole 5 is formed to be slightly larger than the diameter of the anchor 4 so that the hole ( 5) Insert the anchor (4) and fix the anchor (4) by spot welding the horizontal member (2).
레벨조정재(3)는 상기 수직재(1)를 기초에 고정함과 동시에 레벨을 조절하기 위한 것으로, 판상의 플레이트(7)와 상기 플레이트(7)의 상부에 수직으로 고정되는 수나사(6) 및 상기 수나사(6)와 체결되는 너트(8)로 구성된다.The level adjusting member 3 is for fixing the vertical member 1 to the foundation and simultaneously adjusting the level, and the plate-shaped plate 7 and the male screw 6 fixed vertically to the upper portion of the plate 7 and the It consists of a nut 8 which is fastened to the male screw 6.
플레이트(7)에는 다수 개의 구멍이 형성되며, 세트 앵커나 케미컬 앙카를 바닥에 설치하고 상기 플레이트(7)의 구멍에 끼워 너트(8)로 고정한다. 플레이트(7)에 부착된 수나사(6)는 상기 수직재(1)의 하단에 설치된 고정판(10)의 볼트구멍에 삽입된다. 상기 수나사(6)에는 두 개의 너트(8)가 체결되며, 수나사(6)에 끼워진 수직재(1)의 고정판(10)을 고정판(10)의 위아래에서 고정한다.A plurality of holes are formed in the plate 7, and a set anchor or a chemical anchor is installed on the bottom and inserted into the hole of the plate 7 to be fixed with a nut 8. The male screw 6 attached to the plate 7 is inserted into the bolt hole of the fixing plate 10 provided at the lower end of the vertical member 1. Two nuts 8 are fastened to the male screw 6, and fix the fixing plate 10 of the vertical member 1 fitted to the male screw 6 from above and below the fixing plate 10.
본 발명의 앵커 설치용 프레임의 설치 순서를 설명한다. 먼저 버림콘크리트를 타설한 후 그 위로 먹메김을 실시한다. 먹메김시 앵커(4)가 설치될 위치를 정확하게 표시하며, 보다 구체적으로는 레벨고정재의 플레이트(7)를 고정하기 위한 앵커(4)의 설치 위치를 표시한다. 레벨고정재의 위치는 앵커(4)의 위치를 결정하는 것이므로 사전에 상세도를 작성하여 정확하게 계산한 후 먹메김한다. 먹메김된 위치에 세트앵커 또는 케미컬 앵커를 설치하고, 상기 앵커에 레벨고정재를 설치하여 고정한다. 레벨고정재의 설치와 더불어 수직재(1)와 수평재(2)를 조립하여 틀로 제작한다. 수직재(1)와 수평재(2)의 길이 및 수평재(2)에 형성된 구멍(5)의 위치 또한 상세도를 작성하여 정교하게 제작한다. 수직재(1)와 수평재(2)의 조립이 완료되면, 레벨고정재의 수나사(6)에 너트(8)를 하나 먼저 체결한 다음 수직재(1)의 하단에 설치된 고정판(10)의 볼트구멍에 수나사(6)를 끼우고 다시 위에서 너트(8)를 체결하여 수직재(1)를 일단 가고정한다. 수직재(1)의 레벨을 정확하게 조정한 다음 다시 상기 너트(8)를 완전히 조여 수직재(1)를 레벨조정재(3)에 고정한다. 앵커 설치용 프레임의 설치가 완료되면, 수평재(2)의 구멍(5)에 앵커(4)를 끼운 다음 점용접하여 고정한다.The installation procedure of the anchor installation frame of this invention is demonstrated. First cast the discarded concrete and fill it up. The position at which the anchor 4 is to be installed at the time of ingestion is accurately displayed, and more specifically, the installation position of the anchor 4 for fixing the plate 7 of the leveling material is displayed. Since the position of the level fixing material is to determine the position of the anchor 4, the detailed drawing is made in advance, and after accurate calculation, it is filled. A set anchor or a chemical anchor is installed at the fill position, and a level fixing material is installed and fixed to the anchor. In addition to the installation of the level fixing material, the vertical material (1) and the horizontal material (2) are assembled into a frame. The length of the vertical member 1 and the horizontal member 2 and the position of the hole 5 formed in the horizontal member 2 are also produced in detail by making a detailed view. When the assembly of the vertical member 1 and the horizontal member 2 is completed, the nut 8 is first fastened to the male screw 6 of the level fixing member, and then the male screw is inserted into the bolt hole of the fixing plate 10 installed at the bottom of the vertical member 1. Insert (6) and tighten the nut (8) from the top again to temporarily fix the vertical member (1). The level of the vertical member 1 is accurately adjusted and then the nut 8 is completely tightened to fix the vertical member 1 to the level adjusting member 3. When the installation of the anchor installation frame is completed, the anchor 4 is inserted into the hole 5 of the horizontal member 2 and then fixed by spot welding.
본 발명은 바닥에 먹메김을 하고 앵커 설치용 프레임을 견고하게 고정한 다음 프레임에 앵커를 고정하므로, 앵커를 정확한 위치에 시공할 수 있으며, 레벨의 조정이 용이하고, 시공중에 앵커가 유동하지 않음으로써, 앵커위치의 불량에 의한 재시공을 피할 수 있다.According to the present invention, the anchor is fixed to the frame and the anchor installation frame is firmly fixed, and then the anchor is fixed to the frame, so that the anchor can be installed in the correct position, the level can be easily adjusted, and the anchor does not flow during construction. It is possible to avoid rework due to poor anchoring position.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020000019387A KR20010095915A (en) | 2000-04-12 | 2000-04-12 | Guide frame for anchoring bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020000019387A KR20010095915A (en) | 2000-04-12 | 2000-04-12 | Guide frame for anchoring bar |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20010095915A true KR20010095915A (en) | 2001-11-07 |
Family
ID=19663996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020000019387A KR20010095915A (en) | 2000-04-12 | 2000-04-12 | Guide frame for anchoring bar |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20010095915A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100441285B1 (en) * | 2001-09-04 | 2004-07-22 | 삼성물산 주식회사 | Constructing method for extension of underground parking lot in apartment by using of precast concrete |
KR101253438B1 (en) * | 2011-10-17 | 2013-04-11 | 최진욱 | Concrete filling reinforced frame steel post |
KR20210016812A (en) * | 2019-08-05 | 2021-02-17 | 주식회사 지음피씨이 | Reinforcing rod fixing system for pricast concrete column |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS646428A (en) * | 1987-06-25 | 1989-01-11 | Tokyu Kensetsu Kk | Method for fixing iron base column |
JPS6410837A (en) * | 1987-07-02 | 1989-01-13 | Tokyu Kensetsu Kk | Box pulling basket retaining mold of iron pillar fixing part in s building |
JPS6410838A (en) * | 1987-07-02 | 1989-01-13 | Tokyu Kensetsu Kk | Box pulling basket retaining mold of iron pillar fixing part in src building |
JPH05280202A (en) * | 1992-03-30 | 1993-10-26 | Daiwa House Ind Co Ltd | Anchor frame locating tool |
-
2000
- 2000-04-12 KR KR1020000019387A patent/KR20010095915A/en not_active Application Discontinuation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS646428A (en) * | 1987-06-25 | 1989-01-11 | Tokyu Kensetsu Kk | Method for fixing iron base column |
JPS6410837A (en) * | 1987-07-02 | 1989-01-13 | Tokyu Kensetsu Kk | Box pulling basket retaining mold of iron pillar fixing part in s building |
JPS6410838A (en) * | 1987-07-02 | 1989-01-13 | Tokyu Kensetsu Kk | Box pulling basket retaining mold of iron pillar fixing part in src building |
JPH05280202A (en) * | 1992-03-30 | 1993-10-26 | Daiwa House Ind Co Ltd | Anchor frame locating tool |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100441285B1 (en) * | 2001-09-04 | 2004-07-22 | 삼성물산 주식회사 | Constructing method for extension of underground parking lot in apartment by using of precast concrete |
KR101253438B1 (en) * | 2011-10-17 | 2013-04-11 | 최진욱 | Concrete filling reinforced frame steel post |
KR20210016812A (en) * | 2019-08-05 | 2021-02-17 | 주식회사 지음피씨이 | Reinforcing rod fixing system for pricast concrete column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4738886B2 (en) | Equipment foundation | |
JPH08170340A (en) | Pedestal structure and method of pedestal construction | |
US20070266659A1 (en) | Perimeter foundation panel, and method of use | |
KR101777746B1 (en) | A support | |
JP2008081980A (en) | Positioning tool for anchor bolt | |
KR20010095915A (en) | Guide frame for anchoring bar | |
JP4416141B2 (en) | How to install seismic isolation devices | |
JP2007177559A (en) | Method for mounting handrail and its mounting structure | |
JP5028323B2 (en) | Ground anchor method | |
JP2001279681A (en) | Anchor bolt fixing device | |
JPH08145240A (en) | Piping support fitment for fixing base plate alone | |
JP2630623B2 (en) | Anchor bolt installation method and anchor bolt support device used for it | |
JP2007126956A (en) | Anchor pack for wooden building, and wooden building structure using the same | |
JP7192153B1 (en) | Anchor bolt construction method and level adjustment member | |
CN217580582U (en) | Building shock insulation support mounting structure | |
JP4774268B2 (en) | Column base hardware | |
KR200143185Y1 (en) | Support for wall forms | |
KR200143184Y1 (en) | Support for wall forms | |
JP2008214986A (en) | Base isolator mounting structure at pile head, and its mounting method | |
KR200232750Y1 (en) | Construction for preventing from upset of prestressed concrete beam | |
JPH1046706A (en) | Panel anchoring structure and anchoring method therefor regarding building structure made of concrete wall panel | |
JPH09310354A (en) | Embedment type column base and its construction | |
JPH09264030A (en) | Method of construction of fixing pedestal of exposed type and members and washers for level adjustment used therefor | |
JP4282540B2 (en) | Rebar support stand spacer | |
KR200274922Y1 (en) | Apparatus for anchoring reinforcing steel material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |