KR20000073541A - Tree planting wall - Google Patents

Tree planting wall Download PDF

Info

Publication number
KR20000073541A
KR20000073541A KR1019990016886A KR19990016886A KR20000073541A KR 20000073541 A KR20000073541 A KR 20000073541A KR 1019990016886 A KR1019990016886 A KR 1019990016886A KR 19990016886 A KR19990016886 A KR 19990016886A KR 20000073541 A KR20000073541 A KR 20000073541A
Authority
KR
South Korea
Prior art keywords
retaining wall
anchor
block
ground
wall block
Prior art date
Application number
KR1019990016886A
Other languages
Korean (ko)
Other versions
KR100359126B1 (en
Inventor
김상수
Original Assignee
김상수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김상수 filed Critical 김상수
Priority to KR1019990016886A priority Critical patent/KR100359126B1/en
Publication of KR20000073541A publication Critical patent/KR20000073541A/en
Application granted granted Critical
Publication of KR100359126B1 publication Critical patent/KR100359126B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

PURPOSE: A tree-planting retaining wall is provided to be partly planted on exposed portions to be harmonized with nature. CONSTITUTION: A tree-planting retaining wall(30) forms a composition ground(50) on a mountain or slant ground and installs anchor girders at regular intervals on the composition ground. The anchor girder installs an inserting groove(38) and a concrete rack(40) is inserted into the groove. The anchor girder installs an anchor groove near the inserting groove and a ground anchor or a lock bolt is inserted into the groove as a fixer. Thus, the anchor girder is fixed to the mountain or the slant ground.

Description

녹화 옹벽{Tree planting wall}Tree planting wall

본 발명은 도로공사 또는 토목공사를 시행하는 경우에 있어 급경사면의 붕괴방지, 지반사태방지 및 기타공사에 녹화옹벽에 관한 것으로서, 더욱 상세하게는 녹화옹벽의 앵커보에 다수의 홈을 내고 상기 홈에 콘크리트 선반을 경사지도록 삽입하며, 상기 콘크리트 선반에 흙을 다져 그 상부에 잔디 또는 기타의 나무를 심어 주위의 경관과 일치시킬 수 있도록 개발한 환경친화적인 녹화옹벽에 관한 것이다.The present invention relates to the greening retaining wall in the prevention of collapse of the steep slope, the ground accident and other construction in the case of road construction or civil engineering work, and more specifically, the grooves of the greening retaining wall, It is inserted into the concrete shelf to be inclined, and the earth to the environmentally friendly green retaining wall was developed to match the surrounding landscape by planting grass or other trees on top of the soil.

일반적으로 문명이 발달하고 생활이 풍부해지면서 사람들은 자연에 대한 관심과 인식을 새롭게 가지게 되었고, 현재의 대규모 공사를 하게되는 경우 계획단계에서부터 환경에 대한 검토가 필수적으로 이루어지고 있는 실정으로 점차 소규모의 공사를 계획하는 경우에도 환경친화적인 계획을 요구하는 추세라 말할 수 있다.In general, as civilization develops and life becomes more abundant, people have a renewed interest in and awareness of nature, and in the case of current large-scale construction, it is necessary to examine the environment from the planning stage. Even when planning construction, it can be said that it is a trend that requires environmentally friendly planning.

그러나, 산업이 발전하면서 인구의 도시 밀집화가 이루어지고 새로운 시가지의 형성과 도시간의 원활한 연결을 위해 도로 및 철도 등의 시설공사가 빈번하게 요구되고 있어, 이때 지형적으로 절취 또는 성토사면이 많은 장소에서는 주위의 경관과 조화를 이루지 못하는 문제가 발생하게 되는데, 그러한 문제들은 한정된 부지의 효율적인 사용을 위하여 경사면에 대한 절토부와 성토부에 콘크리트 옹벽을 설치함으로 주위환경과 제대로 조화를 이루지 못하게 되는 것이다.However, as the industry develops, the urban density of the population is increased, and the construction of roads and railways is frequently required for the formation of new urban areas and the seamless connection between cities. There is a problem that can not be harmonized with the landscape, the problem is that it is not harmonized with the surrounding environment by installing concrete retaining wall on the cut and fill on the slope for the efficient use of the limited site.

또한, 도로공사 또는 대형의 토목 공사시에 형성되는 높이가 높은 옹벽의 경우는 그 주위를 지나는 사람들에게 위압감마저 들게되고, 상기와 같은 단점을 보완하기 위하여 옹벽 벽체에 무늬를 넣거나, 착색을 하거나, 블록식 또는 패널식으로 변화시켜 왔지만 인공적인 콘크리트 벽체의 한계를 벗어나지 못하고 있는 실정이라 말할 수 있다.In addition, in the case of a high retaining wall formed during road construction or large-scale civil engineering work, even a high pressure is felt by people passing through the surrounding wall, and in order to compensate for the above disadvantages, the retaining wall is colored, colored, or Although it has been changed to block or panel type, it can be said that it does not escape the limits of artificial concrete walls.

도 1은 일반적인 토목공사에서 급경사면에 설치하는 옹벽을 나타내는 도면으로서, 일반적으로 도로(8) 등의 토목공사를 하는 경우에는 경사면의 지반붕괴를 방지하기 위해 조성지반에 기초옹벽(10)을 설치하고 상기 기초옹벽(10)의 상면에 콘크리트 벽체 또는 콘크리트 블록을 설치하여 옹벽체를 구성하며, 콘크리트 벽체 또는 여러 가지 형태로 콘크리트 블록(16)을 설치하여 경사면(18)의 지반붕괴를 방지한다. 상기 콘크리트 벽체는 역 T자를 도시하고 있는데, L자 등의 다양한 타입으로 설치할 수도 있다.FIG. 1 is a view showing retaining walls installed on steep slopes in general civil engineering. In general, in the case of civil works such as road 8, foundation retaining walls 10 are installed on the composition ground to prevent ground collapse of slopes. And the retaining wall is formed by installing a concrete wall or concrete block on the upper surface of the foundation retaining wall 10, and by installing the concrete block 16 in a concrete wall or various forms to prevent the ground collapse of the inclined surface (18). The concrete wall shows an inverted T, but may be installed in various types such as L.

또한, 상기 도로 등의 토목공사에서는 하부에 기초옹벽(10)을 설치하고 그 기초옹벽(10)의 측면에 앵커보(12)(14)를 설치한 후 상기 앵커보(12)(14)의 사이에 뿜칠 콘크리트를 사용하여 경사면에 설치하므로서 지반붕괴를 방지하는 경우도 있다. 특히, 도 1 에서는 앵커보(12)(14)를 도시하는데 있어서, 두 개의 번호를 동시에 기입하고 있는데, 이중 반대편으로 형성되는 앵커보(14)를 나타내기 위하여 이중으로 번호를 기입하고 있는 것이다.In addition, in civil engineering works such as roads, the foundation retaining wall 10 is installed at a lower portion thereof, and the anchor beams 12 and 14 are installed on the side surfaces of the foundation retaining wall 10. In some cases, it is possible to prevent ground collapse by using concrete to be sprayed in between. Particularly, in Fig. 1, the anchor beams 12 and 14 are written at the same time, and two numbers are written at the same time. In order to show the anchor beams 14 formed on opposite sides of the anchor beams 12 and 14, the numbers are doubled.

전술한 구조에 의해 도로 등의 토목공사를 시행하는 경우, 콘크리트 벽체 또는 콘크리트 블록 또는 뿜침 콘크리트에 의해서 전면이 완전히 폐쇄되는 구조로 형성됨으로 주위의 환경과 친화적이지 않게 된다.In the case of carrying out civil engineering works such as roads by the above-described structure, the front surface is completely closed by concrete walls or concrete blocks or sprayed concrete, thereby making it unfriendly to the surrounding environment.

본 발명은 전술한 문제점을 해결하기위하여 안출된 것으로서, 본 발명의 목적은, 전면이 폐쇄되는 기존의 옹벽벽체 대신에 공장제작 또는 현장타설에 의해 형성되는 옹벽의 벽체를 부분적으로 옹벽배면의 흙을 노출시키고 노출된 부분을 녹화함으로서, 자연과 친화적인 구조물을 설치하고 작업능률을 향상시킬 수 있는 녹화옹벽을 제공하고자 하는 것이다.The present invention has been made to solve the above-described problems, the object of the present invention, instead of the existing retaining wall wall is closed front of the retaining wall wall formed by factory manufacturing or in-situ cast part of the retaining wall back soil By exposing and taping the exposed areas, it is intended to provide a greening retaining wall to install a natural and friendly structure and improve work efficiency.

전술한 목적을 달성하기 위하여, 본 발명은, 도로공사 또는 토목공사시 형성되는 경사면에 조성지반을 형성하는 단계; 상기 조성지반의 상면에 콘크리트로 형성된 다수의 옹벽체를 형성하는 단계; 상기 옹벽체를 앵커 정착체를 사용하여 경사면과 정착하는 단계; 상기 옹벽체를 앵커보로 구성하고, 상기 앵커보에는 후방으로 경사지도록 삽입홈을 형성하며, 또한 상기 삽입홈에는 하측으로부터 순서대로 콘크리트 선반을 적층하는 단계; 및 상기 옹벽체를 환경친화적으로 녹화하는 단계로 구성되는 녹화옹벽을 제공한다.In order to achieve the above object, the present invention, the step of forming a composition ground on the slope formed during road construction or civil engineering work; Forming a plurality of retaining walls formed of concrete on an upper surface of the composition ground; Fixing the retaining wall to an inclined surface using an anchor fixing unit; Forming the retaining wall as an anchor beam, forming an insertion groove in the anchor beam so as to be inclined rearward, and stacking concrete shelves in the insertion groove in order from a lower side; And an environmentally friendly recording of the retaining wall.

도 1은 일반적인 토목공사에서 급경사면에 설치하는 옹벽을 나타내는 도면.1 is a view showing a retaining wall installed on a steep slope in a general civil construction.

도 2a는 본 발명의 녹화옹벽의 정면도, 도 2b는 본 발명의 녹화옹벽의 측단면도.Figure 2a is a front view of the green retaining wall of the present invention, Figure 2b is a side cross-sectional view of the green retaining wall of the present invention.

도 3a는 본 발명의 다른 녹화옹벽의 블록을 설치하는 개념을 나타내는 단면도, 도 3b는 본 발명의 다른 녹화옹벽의 성토부 적용형을 나타내는 도면, 도 3c는 본 발명의 다른 녹화옹벽의 다른 성토부 적용형을 나타내는 도면, 도 3d는 본 발명의 다른 녹화옹벽의 시공순서도.Figure 3a is a cross-sectional view showing the concept of installing a block of another greening retaining wall of the present invention, Figure 3b is a view showing a fill portion application type of another greening retaining wall of the present invention, Figure 3c is another filling portion of another greening retaining wall of the present invention Fig. 3D is a view illustrating an application type, and a construction sequence diagram of another green retaining wall of the present invention.

<도면의 주요 부분에 대한 부호의 설명〉<Explanation of symbols for main parts of the drawings>

30 : 녹화 옹벽 34,36: 앵커보30: greening retaining wall 34, 36: anchor anchor

38: 삽입홈 40: 콘크리트 선반38: insert groove 40: concrete shelf

44: 앵커홈 48: 그라운드 앵커44: anchor groove 48: ground anchor

50: 조성지반 54: 옹벽 블록50: foundation 54: retaining wall block

56: 원지반 60: 하측부56: base 60: lower side

62: 양측부 64: 타이앵커62: both sides 64: tie anchor

68: 앵커블록 70: 지반 보강재(또는 지오그리드)68: anchor block 70: ground reinforcement (or geogrid)

74: 연결부74: connection

이하, 첨부도면을 참조하여 본 발명의 바람직한 일실시예에 의한 구성 및 작용을 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings illustrating a configuration and operation according to a preferred embodiment of the present invention.

도 2a는 본 발명의 녹화옹벽의 정면도이고, 도 2b는 본 발명의 녹화옹벽의 측단면도이다.2A is a front view of the green retaining wall of the present invention, and FIG. 2B is a side cross-sectional view of the green retaining wall of the present invention.

녹화 옹벽을 형성하는 단계를 살펴보면 크게, 도로공사 또는 토목공사시 형성되는 경사면에 조성지반을 형성하는 단계; 상기 조성지반의 상면에 콘크리트로 형성된 다수의 옹벽체를 형성하는 단계; 상기 옹벽체를 앵커 정착체를 사용하여 경사면과 정착하는 단계; 상기 옹벽체를 앵커보로 구성하고, 상기 앵커보에는 후방으로 경사지도록 삽입홈을 형성하며, 또한 상기 삽입홈에는 하측으로부터 순서대로 콘크리트 선반을 적층하는 단계; 및 상기 옹벽체를 환경친화적으로 녹화하는 단계로 구성된다.Looking at the step of forming a green retaining wall largely, forming a composition ground on the slope formed during road construction or civil engineering work; Forming a plurality of retaining walls formed of concrete on an upper surface of the composition ground; Fixing the retaining wall to an inclined surface using an anchor fixing unit; Forming the retaining wall as an anchor beam, forming an insertion groove to be inclined to the rear in the anchor beam, and stacking a concrete shelf in the insertion groove in order from a lower side; And recording the retaining wall in an environmentally friendly manner.

즉, 상기 녹화 옹벽(30)은 도로공사 또는 토목공사 등을 시행하는 경우에 형성되는 경사면에 조성지반(50)을 형성하고 상기 조성지반(50)에 일정한 거리를 두고 옹벽체로서 앵커보(34)(36)를 설치한다. 상기 옹벽체로 사용되는 앵커보(34) (36)에는 일측에 삽입홈(38)을 설치하고 상기 삽입홈(38)에는 콘크리트 선반(40)을 삽입하여 결합하는 구조이다. 상기 앵커보(34)(36)에 형성된 삽입홈(38)은 후방이 아래로 향하도록 경사지게 형성되는데, 그로인해 콘크리트 선반(40)을 그 삽입홈(38)에 삽입하면 콘크리트 선반(40)의 전방이 높고 후방이 경사지게 형성되어 그 상부에 토사를 적재할 수 있는 비스듬한 형상으로 형성된다.That is, the greening retaining wall 30 forms the composition ground 50 on the inclined surface formed when the road work or civil engineering work is carried out, and the anchor beam 34 as a retaining wall at a predetermined distance from the composition ground 50. 36). The anchor beams 34 and 36 used as the retaining wall are provided with insertion grooves 38 on one side, and the concrete grooves 40 are inserted into the insertion grooves 38 to be coupled to each other. Insertion grooves (38) formed in the anchor beams (34) and (36) are formed to be inclined so that the rear side is downward, thereby inserting the concrete shelf (40) into the insertion groove (38) of the concrete shelf (40) The front is formed high and the rear is inclined so as to be formed in an oblique shape to load the soil on the top.

또한, 상기 앵커보(34)(36)에는 삽입홈(38)을 설치한 곳에 인접하여 앵커홈(44)을 설치하고 상기 앵커홈(44)에는 정착체로서 그라운드 앵커(48)를 설치하거나 잠김 볼트(Rock Bolt)를 설치하는 구조로 형성하여 앵커보(34)(36)가 산 또는 기타의 경사면과 정착되는 구조를 이루도록 한다.In addition, the anchor beams (34) and (36) install an anchor groove (44) adjacent to the place where the insertion groove (38) is installed, and the anchor groove (44) installs or locks the ground anchor (48) as a fixture. By forming a bolt (Rock Bolt) to form a structure so that the anchor beams 34, 36 is fixed to the mountain or other inclined surface.

특히, 상기 앵커보(34)(36)의 삽입홈(38)과 그 삽입홈의 상부 또는 하부로 형성된 삽입홈의 사이는 토사 또는 기타 재질의 낙석을 방지할 수 있는 재질로 형성된 것을 사용할 수도 있다. 상기 앵커보(34)(36)는 도면상 두 개를 사용하는 타입으로 나타내고 있는데, 앵커보를 설치하는 경우 다수개를 적정한 간격으로 설치할 수도 있어 그로인해 앵커보(34)(36)의 삽입홈(38)에 삽입되는 콘크리트 선반(40)의 크기(또는 길이)를 임의대로 조정할 수 있음은 당연하다 말할 수 있다.In particular, between the insertion groove 38 of the anchor beam 34, 36 and the insertion groove formed in the upper or lower portion of the insertion groove may be formed of a material that can prevent the falling of earth and sand or other materials. . The anchor beams (34) and (36) are shown in the figure using a type of two, in the case of installing the anchor beam may be installed in a plurality of appropriate intervals, thereby inserting grooves (34) of the anchor beams (34) ( It can be obvious that the size (or length) of the concrete shelf 40 inserted in 38 can be arbitrarily adjusted.

도 3a는 본 발명의 다른 녹화옹벽의 블록을 설치하는 개념을 나타내는 단면도이고, 도 3b는 본 발명의 다른 녹화옹벽의 성토부 적용형을 나타내는 도면이며, 도 3c는 본 발명의 다른 녹화옹벽의 다른 성토부 적용형을 나타내는 도면이고, 도 3d는 본 발명의 다른 녹화옹벽의 시공순서도이다.Figure 3a is a cross-sectional view showing the concept of installing a block of the other greening retaining wall of the present invention, Figure 3b is a view showing a fill portion application type of another greening retaining wall of the present invention, Figure 3c is another view of another greening retaining wall of the present invention Fig. 3D is a view showing a fill section application type, and Fig. 3D is a construction flowchart of another green retaining wall of the present invention.

도 3a에서 알 수 있듯이, 옹벽체로 사용되는 옹벽 블록(54)은 상부 및 후부가 오픈된 상태로 형성되고 양측부가 일체화된 형상으로 형성된다. 즉, 상기 옹벽 블록(54)은 전체적인 형상이 ㄴ자 형상으로 상부와 후부가 오픈(Open; 또는 열려진 상태)되고 양측부가 일체화된 형상이다.As can be seen in Figure 3a, the retaining wall block 54, which is used as the retaining wall, is formed in a state in which the upper and rear parts are open and formed in an integrated shape on both sides. That is, the retaining wall block 54 has an overall shape of the letter B shape, the top and rear parts of the retaining wall block 54 are open (or open) and both sides are integrated.

상기 옹벽 블록(54)은 양측부에 정착체로서 그라운드 앵커(58)가 설치되어 후방의 토사에 밀착되는 한편, 상기 옹벽 블록(54)의 하측부(60)에는 토사가 쌓이게 되어 옹벽 블록(54)의 후측으로 토압이 작용하게 된다.The retaining wall block 54 is provided with a ground anchor 58 as a fixture on both sides thereof to be in close contact with the earth and sand on the rear side, while soil retains on the lower portion 60 of the retaining wall block 54 to retain the retaining wall block 54. Earth pressure is applied to the rear side of).

또한, 상기 옹벽 블록(54)은 토사의 경사면에 형성된 원지반(56)을 깎아내고 조성지반(50)을 형성한 후 그 조성지반(50)의 하측면에도 조성지반과 마찬가지로 옹벽 블록(54)을 설치하는데, 이는 조성지반(50)이 토압 또는 자연재해(폭우 따위)에 의하여 하부로 침하하지 않도록 설치하는 것이 바람직하다.In addition, the retaining wall block 54 cuts the base ground 56 formed on the inclined surface of the earth and sand to form the composition ground 50, and then the retaining wall block 54 is formed on the lower surface of the composition ground 50 similarly to the composition ground. It is installed, which is preferably installed so that the composition ground 50 does not settle down by earth pressure or natural disasters (such as heavy rain).

도 3a에서 알 수 있듯이, 도 3b는 성토부 적용예를 나타내는 것으로서, 상기 옹벽 블록(54)은 양측부(62)에 앵커 정착체로서 타이 앵커(64)를 설치하고 상기 타이 앵커(64)를 설치한 후방에는 앵커 블록(68)을 설치하여 타이 앵커(64)를 고정한다.As can be seen in Figure 3a, Figure 3b shows the application of the fill portion, the retaining wall block 54 is provided with a tie anchor 64 as an anchor fixture on both sides 62 and the tie anchor 64 An anchor block 68 is installed at the rear of the mount to fix the tie anchors 64.

도 3c는 또 다른 성토부 적용예를 나타내는 것으로서, 상기 옹벽 블록(54)에 지반 보강재(또는 지오그리드)(70)를 필요길이 또는 최소연결 길이를 매립하여 제작하고 현장 시공시 필요한 지반 보강재(70)를 연결할 수 있도록 연결부(74)를 형성하거나 펼쳐서 지반에 정착고정한다. 상기 지반 보강재(70)는 일부가 옹벽 블록(54)내에 미리 매립되어 있어 연결부(74)를 사용하여 간단하게 후방으로 지반 보강재(70)를 연결할 수 있는 것이다.FIG. 3c shows another application example of the soil cover. The ground reinforcement material (or geogrid) 70 is embedded in the retaining wall block 54 by embedding the required length or the minimum connection length, and the ground reinforcement material 70 required for the site construction. Forming or unfolding the connection portion 74 to connect the fixed to the ground fixed. The ground reinforcement 70 is partially embedded in the retaining wall block 54 so that the ground reinforcement 70 can be simply connected to the rear by using the connection portion 74.

도 3d에서 알 수 있듯이, 옹벽 블록의 시공순서는 다음과 같다.As can be seen in Figure 3d, the construction sequence of the retaining wall block is as follows.

먼저, 조성지반(50)에 기초 터파기를 시행한 후 정치필요시 잡석 다짐(66)을 시행한다. 상기 잡석 다짐(66)의 작업이 끝나면 1단의 앵커 블록(68)을 후측으로 설치하고 상기 앵커 블록(68)의 설치작업이 완료되면 뒷채움 성토 및 다짐 작업을 시행한다. 상기 다짐작업이 끝나면 1단의 옹벽 블록(54)을 앵커 블록(68)의 전방에 설치하고 상기 1단의 옹벽 블록(54)과 앵커 블록(68)을 앵커 정착체인 타이앵커(64)로 결속하는 작업을 시행한다. 상기 타이앵커(64)를 설치하는 경우는 옹벽 블록(54)의 전방에서 타이 앵커(64)에 대한 조임작업을 시행하여 앵커 블록(68)과 견고하게 결속되도록 한다. 상기 앵커 정착체의 작업이 끝난 후 옹벽 블록(54)의 후방에는 뒷채움 작업 및 다짐을 시행하고 상기 다짐작업이 완료되면 상기와 같은 방식으로 2단의 앵커 블록(70), 옹벽 블록(72)에 대한 설치작업을 시행한다. 상기 앵커 블록과 옹벽 블록을 다단으로 설치하는 경우 도로의 측면에 형성된 경사면을 지지할 수 있을정도의 높이까지 작업을 시행하는 것은 상기와 같은 방법에 의하여 순차적으로 시행하게 되므로 자세한 설명은 생략한다.First, after the foundation burrows on the composition ground (50), the rubble compaction (66) is implemented if necessary. After the work of the rubble compaction 66 is completed, the first stage anchor block 68 is installed to the rear side, and when the installation work of the anchor block 68 is completed, backfill fill and compaction work is performed. After the compaction operation is completed, the first retaining wall block 54 is installed in front of the anchor block 68, and the first retaining wall block 54 and the anchor block 68 are tied to the tie anchor 64, which is an anchor fixture. To do the work. When the tie anchor 64 is installed, the tie anchor 64 is tightened in front of the retaining wall block 54 so as to be firmly bound to the anchor block 68. After the anchor fixing unit is finished, the rear wall of the retaining wall block 54 is backfilled and compacted. When the compacting is completed, the two-stage anchor block 70 and the retaining wall block 72 are operated as described above. Carry out the installation work. In the case of installing the anchor block and the retaining wall block in multiple stages, the operation is performed to a level high enough to support the inclined surface formed on the side of the road, so that the detailed description thereof will be omitted.

전술한 구성과 작용에 의해 나타나는 본 발명의 효과를 상세히 설명하면 다음과 같다.Referring to the effects of the present invention by the above-described configuration and operation in detail as follows.

도로공사 또는 토목공사시 그 경사면에 녹화 옹벽을 설치하여 주위의 자연환경과 친화적인 녹화 옹벽에 대한 조성을 할 수 있게 되어 그 도로를 운전하는 운전자에게 안락감을 선사함과 동시에 기능면에서도 앵커보의 사이에 콘크리트 선반만을 삽입하거나, 미리 제작된 옹벽블록을 단순히 쌓으면서 모든 작업을 완성할 수 있어 공정축소 및 재료 절감의 효과를 얻을 수 있다.Green road retaining wall can be installed on the slope during road construction or civil engineering to create a green retaining wall that is friendly to the surrounding natural environment, providing comfort to the driver driving the road, All work can be completed by simply inserting a concrete shelf or simply stacking pre-fabricated retaining wall blocks, resulting in process reduction and material savings.

Claims (3)

도로공사 또는 토목공사시 형성되는 경사면에 조성지반을 형성하는 단계; 상기 조성지반의 상면에 콘크리트로 형성된 다수의 옹벽체를 형성하는 단계; 상기 옹벽체를 앵커 정착체를 사용하여 경사면과 정착하는 단계; 상기 옹벽체를 앵커보로 구성하고, 상기 앵커보에는 후방으로 경사지도록 삽입홈을 형성하며, 또한 상기 삽입홈에는 하측으로부터 순서대로 콘크리트 선반을 적층하는 단계; 및 상기 옹벽체를 환경친화적으로 녹화하는 단계로 구성되는 녹화옹벽.Forming a composition ground on an inclined surface formed during road work or civil engineering work; Forming a plurality of retaining walls formed of concrete on an upper surface of the composition ground; Fixing the retaining wall to an inclined surface using an anchor fixing unit; Forming the retaining wall as an anchor beam, forming an insertion groove in the anchor beam so as to be inclined rearward, and stacking concrete shelves in the insertion groove in order from a lower side; And recording the retaining wall in an environmentally friendly manner. 도로공사 또는 토목공사시 형성되는 경사면에 조성지반(50)을 형성하고 그 조성지반에 잡석다짐을 하는 단계; 상기 잡석다짐(66)을 시행하고 그 후측에 1단의 앵커 블록을 설치하는 단계; 상기 앵커 블록(68)을 설치하고 그 앵커 블록의 전방 및 후측에 뒷채움 성토 및 다짐을 하는 단계; 상기 뒷채움 성토 및 다짐을 앵커 정착체의 설치높이까지 시행하고 그 전방에 1단의 옹벽 블록을 설치하는 단계; 상기 옹벽 블록(54)과 앵커 블록(68)의 사이를 앵커 정착체로 결속하는 단계; 상기 앵커 정착체로 옹벽 블록(54)과 앵커 블록(68)을 결속하고 옹벽 블록의 후방에 토사를 뒷채움 및 다짐하는 단계; 상기 옹벽 블록의 후방에 뒷채움 및 다짐을 시행한 뒤, 2단의 앵커 블록(70)을 설치하고 그 전방으로 형성되는 옹벽 블록(72)의 후방에 대한 뒷채움 및 다짐을 반복적으로 시행하여 경사면의 높이까지 적층하는 단계; 및 상기 경사면의 높이까지 옹벽 블록을 적층한 후 옹벽 블록의 전방에 녹화를 시행하는 단계로 구성하는 것을 특징으로 하는 녹화 옹벽.Forming a composition ground (50) on the inclined surface formed during road work or civil engineering work and performing rubble compaction on the composition ground; Performing the rubble compaction 66 and installing one anchor block at a rear side thereof; Installing the anchor block (68) and backfilling and compacting the front and rear sides of the anchor block (68); Performing the backfill fill and compaction to the installation height of the anchor fixture and installing a retaining wall block of one stage in front of the anchor fill fixture; Binding an anchor fixture between the retaining wall block and the anchor block; Binding retaining wall block (54) and anchor block (68) with said anchor fixture and backfilling and compacting earth and sand behind the retaining wall block; After backfilling and compacting the rear of the retaining wall block, the second step of anchor block 70 is installed and the backfilling and compaction of the rear of the retaining wall block 72 formed in front of it is repeatedly performed to increase the height of the inclined surface. Laminating to; And stacking the retaining wall blocks up to the height of the inclined surface, and greening in front of the retaining wall blocks. 제 2 항에 있어서, 상기 옹벽 블록(54)은, 상부 및 후부가 오픈된 상태로서 전체적인 형상이 ㄴ자 형상이고 그 ㄴ자 형상의 측면에는 양측부(62)가 형성되며, 상기 옹벽 블록(54)의 양측부(62)에는 그라운드 앵커(58)가 설치되어 후방의 토사에 밀착되는 한편, 상기 옹벽 블록(54)의 하측부(60)와 양측부(62)에는 토사가 적층되어 옹벽 블록(54)의 후방으로 토압이 작용하여 견고하게 고정하도록 형성된 것을 특징으로 하는 녹화옹벽.3. The retaining wall block 54 has an upper and a rear portion open, the overall shape of the retaining wall block 54 is N-shaped, and both sides 62 are formed on the side surface of the retaining wall block 54. Ground anchors 58 are installed on both side portions 62 so as to be in close contact with the earth and sand of the rear side, while soils are stacked on the lower portion 60 and both side portions 62 of the retaining wall block 54 to retain the wall. Retaining wall is characterized in that the earth pressure is applied to the rear of the formed to be firmly fixed.
KR1019990016886A 1999-05-12 1999-05-12 Making method of tree planting wall KR100359126B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019990016886A KR100359126B1 (en) 1999-05-12 1999-05-12 Making method of tree planting wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990016886A KR100359126B1 (en) 1999-05-12 1999-05-12 Making method of tree planting wall

Publications (2)

Publication Number Publication Date
KR20000073541A true KR20000073541A (en) 2000-12-05
KR100359126B1 KR100359126B1 (en) 2002-11-04

Family

ID=19584918

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019990016886A KR100359126B1 (en) 1999-05-12 1999-05-12 Making method of tree planting wall

Country Status (1)

Country Link
KR (1) KR100359126B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100393515B1 (en) * 2001-03-29 2003-08-14 김상수 Afforestation Retaining-Wall laying Concrete-block

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100393515B1 (en) * 2001-03-29 2003-08-14 김상수 Afforestation Retaining-Wall laying Concrete-block

Also Published As

Publication number Publication date
KR100359126B1 (en) 2002-11-04

Similar Documents

Publication Publication Date Title
KR101792844B1 (en) Under ground structure construction method using underground column wall and under ground structure therewith
KR101902791B1 (en) Under ground structure construction method using composite steel pile and under ground structure therewith
KR100322844B1 (en) tubular roof tunnel construction method
KR100359126B1 (en) Making method of tree planting wall
KR100742335B1 (en) Landscape architecture for cutting ground using natural stone and construction method thereof
KR100376590B1 (en) Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts
KR100447331B1 (en) execution method of landscape architecture for cutting ground using blasting stone and landscape architecture apparatus using the same
KR102259659B1 (en) Ornamental stone retaining wall structure and construction method using L type anker and strip bar
KR101544756B1 (en) Retaining wall block construction method using stone
KR20010073245A (en) Grid Type Retaining Wall for using Sleepers and It&#39;s Construction Method
KR20000065283A (en) tubular roof tunnel construction method
KR20060129146A (en) Pc structure for reinforcing wall
KR200223114Y1 (en) A structure reinforcing for retaining wall for inclined plane which to cut off a rock wall
JP2848475B2 (en) Earth retaining method
JP2802909B2 (en) Roadway widening block and roadway widening method
JP3101371B2 (en) Temporary backfill method
KR100479500B1 (en) The slope tree-planting structure using socket type steel pipe, and his construction method
JPH08226126A (en) Construction method for earth retaining wall and construction material therefor
JP2860751B2 (en) Construction method of underpass introduction section
JPH09209377A (en) Constructing method for l-shaped retaining wall
JP2769778B2 (en) Road construction method in mountains and hills
JP2587309B2 (en) Protective structure of concrete underground structure and its construction method
JP2918421B2 (en) Wall used for earth retaining method
JPH11256604A (en) Burying method
KR20210153311A (en) Construction method for retaining wall

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application
AMND Amendment
J201 Request for trial against refusal decision
AMND Amendment
E902 Notification of reason for refusal
E902 Notification of reason for refusal
B701 Decision to grant
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee
R401 Registration of restoration
FPAY Annual fee payment

Payment date: 20100930

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20111005

Year of fee payment: 10