KR19990086702A - Recovery construction method of scoured riverbank - Google Patents

Recovery construction method of scoured riverbank Download PDF

Info

Publication number
KR19990086702A
KR19990086702A KR1019980019814A KR19980019814A KR19990086702A KR 19990086702 A KR19990086702 A KR 19990086702A KR 1019980019814 A KR1019980019814 A KR 1019980019814A KR 19980019814 A KR19980019814 A KR 19980019814A KR 19990086702 A KR19990086702 A KR 19990086702A
Authority
KR
South Korea
Prior art keywords
soil
scoured
riverbank
branches
anchors
Prior art date
Application number
KR1019980019814A
Other languages
Korean (ko)
Inventor
김혜주
Original Assignee
김혜주
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김혜주 filed Critical 김혜주
Priority to KR1019980019814A priority Critical patent/KR19990086702A/en
Publication of KR19990086702A publication Critical patent/KR19990086702A/en

Links

Landscapes

  • Revetment (AREA)

Abstract

토사의 입자가 고와서 소량의 강우에도 유실가능성이 높은 하안을 항구적인 복구와 함께 자연녹화가 이뤄지도록 복구하기 위한 것으로서, 세굴된 하안에서 수면 이하의 하상에 생나무가지와 죽은 나무가지로 만든 섶단을 하안의 길이방향으로 늘어놓고 앵커를 고정하며, 섶단 뒤쪽 하안에 그 기울기를 따라 흙마대를 벽돌쌓기식으로 축조하여 줄마다 앵커를 엇갈리게 박아 고정한 후 철사를 섶단과 흙마대 위로 지그재그식으로 지르고 앵커에 단단히 얽어 매 안정시킨 다음 흙마대에다 발근력과 맹아력을 지닌 생나무가지를 심고 흙마대 사이의 공간에 자갈을 채우고 다지는 것이다.This is to restore the river which is likely to be lost even in a small amount of rainfall due to the high concentration of soil, and to make natural greening with permanent recovery. The anchors are lined up in the longitudinal direction of the anchor, and the trowels are constructed in a brick-laying manner along the slope of the lower back at the rear end, and the anchors are staggered in each row. After intertwining and stabilizing, planting green tree branches with rooting and blinding power on the soil yard, and filling and crushing the spaces between the soil yards.

Description

세굴된 하안의 복구시공방법Recovery construction method of scoured riverbank

본 발명은 폭우나 강우로 세굴된 하안을 복구하는 시공방법에 관한 것이며, 특히 수중이나 뭍에서 다같이 강한 생명력을 지닌 버드나무 등의 생나무가지와 섶단 및 흙마대를 활용하여 항구적으로, 자연녹화를 겸해 완벽하게 복구할 수 있게 한 세굴된 하안의 복구시공방법에 관한 것이다.The present invention relates to a construction method for restoring a riverbank scoured by heavy rain or rainfall, and in particular, by using green tree branches such as willow trees and algae and mud rods that have strong vitality in the water or in the soil. In addition, the present invention relates to a method of repairing a scoured riverbank that can be completely recovered.

폭우로 하천수가 급작스레 불어나면 고수부지나 둑의 토사가 유실되어 고랑이 생긴다. 즉, 세굴현상이 일어나는 것이다. 특히 유속이 빠르고 만곡진 하안 부위에서는 토사의 유실현상이 심하다. 하안에서 세굴현상이 발전하면 둑의 붕괴로 까지 이어져 수해를 입을 가능성을 배제할 수 없다. 이러한 불측의 피해를 에방하기 위해서는 하천을 잘 정비하여 하천수의 흐름을 원활히 하고 고수부지와 제방을 튼튼히 보강하는 것이 안전대비책이다.If the river water suddenly blows up due to heavy rain, the coarse ground or dam soil is lost and furrows are formed. In other words, scour occurs. In particular, the flow rate is fast and soil loss is severe in the curved bottom area. The development of scour in river banks leads to the collapse of dams, which cannot be ruled out. In order to prevent such unforeseen damages, it is a safety precaution to maintain the streams smoothly, to smooth the flow of the streams, and to reinforce the site and the banks.

폭우로 하안의 토사가 유실되는 세굴현상이 발생한 지역에 대한 응급조치적 복구방법으로서는 세굴된 부위에 토사포대를 축조하는 방법, 세굴된 곳을 포함한 그 부근에 벤 수목을 늘여뜨려서 토사가 그 이상 유실되지 않도록 보호수 막을 치는 방법, 비닐필름 등을 덮어두는 방법이 있다.As a first aid recovery method for areas where scour is caused by heavy rain, sedimentation is lost. There is a method of covering the protective water film or covering the vinyl film to prevent it.

그러나 문제는 이런 방법들은 비항구적이어서 재손질이 불가피하고, 주변조경과의 조화가 필수적인 유원지나 그 부근 하안, 세굴정도가 심한 곳에 대한 녹화적 복구방법과는 거리가 멀다.However, the problem is that these methods are non-permanent, so retouching is inevitable, and it is far from a greening method for an amusement park, a nearby river, or a scoured area where harmony with the surrounding landscape is essential.

또, 경제성과 내구성이 강점인 통상의 합성수지제 흙포대는 지중에서 장기간 경과할지라도 부패되지 않고 토양을 오염시키는 맹점이 있다.In addition, ordinary synthetic resin earthen bags, which are economic and durable, have blind spots that do not decay and contaminate soil even after long periods in the ground.

본 발명은 입자가 고운 하안을 항구적으로 복구하고 녹화가 절로 이뤄져 자연스레 호안보호수림대를 형성토록 하안을 복구시키기 위한 것으로, 주된 특징은 생물공학적 기법을 이용하여 항구적, 자연녹화적으로 완벽하게 세굴된 하안을 복구하는 것이다.The present invention is for permanently restoring fine river banks permanently and for greening to form a lakeside protection forest naturally, and the main feature is that they are completely scoured permanently and green plants using biotechnological techniques. To recover the bank.

즉, 세굴된 하안에서 수면 이하의 하상에 생나무가지와 죽은 나무가지로 만든 섶단을 하안의 길이방향으로 늘어놓고 앵커를 고정하며, 섶단 뒤쪽 하안에 그 기울기를 따라 흙마대를 벽돌쌓기식으로 축조하여 앵커를 줄마다 엇갈리게 박아 고정한 후, 철사를 흙마대 위에서 지그재그식으로 질러 앵커에 단단히 얽어 매 안정시킨 다음 흙마대에 발근력과 맹아력을 지닌 생나무가지를 심고 흙마대 사이의 공간에 자갈을 채우고 다져서 이후 생나무가지에서 부정근이 지중으로 뻗고 새잎과 새순은 호안을 푸르게 가꾸도록 복구시공하는 것이다.In other words, from the scoured riverbed, the chopped end made of raw and dead tree branches is arranged in the lengthwise direction of the bottom of the riverbed, and anchors are anchored. After fixing anchors alternately in each row, the wires are zigzag on the trowel and entangled tightly to the anchor, and then stabilized. The roots of the roots extend from the tree branches to the ground, and the new leaves and shoots are restored to make the lake green.

도 1은 1단계 시공단면도1 is a first step construction cross section

도 2는 2단계 시공으로 복구된 상태의 단면도Figure 2 is a cross-sectional view of the state restored by the two-stage construction

도 3은 복구된 후의 사시도3 is a perspective view after recovery

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1 : 앵커 2 : 섶단1: Anchor 2: 섶

3 : 흙마대 4 : 철사3: trowel 4: wire

5 : 생나무가지 6 : 자갈5: green tree branch 6: gravel

본 발명에서는 식물재료의 선정이 무엇보다도 중요하다. 하안 부근의 토양에 적합한 수종으로서는 그 지역의 자생 수목이 우선한다. 물가에서 번식가능한 수종중 버드나무류는 발근력이 우수하고 가지가 많으며 꺾꽂이도 가능하다. 버드나무류에는 버드나무(Salix koreensis), 능수버들(Salix pseudo - lasiogyne), 육지꽃버들(Salix viminalis), 키버들(Salix purpurea v. japonica), 갯버들(Salix gracilistyla)등이 있다. 인근에서 생버드나무가지의 조달에 어려움이 있는 경우에는 죽은 침엽수 가지를 섞어서 사용할 수도 있다.In the present invention, the selection of the plant material is most important. As a species suitable for the soil near the riverbank, the native trees in the area have priority. Among the species that can be reproduced by the waterside, the willows have excellent rooting ability, have many branches, and can be folded. Willows include the salix koreensis, the salic pseudo-lasiogyne, the salix viminalis, the saber purpurea v. Japonica, and the salix gracilistyla. If you have difficulty procuring live willow branches nearby, you can mix dead coniferous branches.

복구할 하안의 토양에 적합한 수목을 선정하여 굵은 생가지와 잔가지를 채취한다. 생나무가지의 채취와 시공시기는 수심이 적당한 경우 동절기를 제외한 철이면 언제든 가능하다. 생나무가지의 길이를 특별히 제한할 필요는 없고, 세굴된 부위의 정황을 파악하여 거기에 적합한 것을 골라 채취해 사용하며, 축조한 흙마대에 생나무가지를 꽂거나 흙마대 사이의 틈에 심는다.Choose thick trees and twigs by selecting trees suitable for the soil of the river to be recovered. Harvesting and construction of green tree branches can be done at any time except the winter season, if the depth of water is adequate. There is no need to limit the length of the tree branches, it is necessary to grasp the situation of the scoured area, pick and use the appropriate one, and put the tree branches on the built soil sacks or plant them in the gap between the soil sacks.

시공순서는 다음과 같다. 도 1에서, 세굴된 하안을 정지하고 그 물밑 하상에 섶단(2)을 놓는다. 섶단(2)을 생나무가지로만 만드는 것은 낭비이고, 심부에 있는 것은 고사당할 우려가 크다. 그래서 섶단(2)은 속재와 겉재를 달리한다. 속재는 수중에서 오래가도 부패되지 않는 침엽수 가지, 특히 죽은 침엽수 가지로 하고 겉재는 시공 후 녹화목적에 부합하도록 생나무가지로 한다. 또한 운반과 시공이 주로 인력에 의존하느니만치 나르기 쉬운 크기로 만든다.Construction sequence is as follows. In FIG. 1, the scoured lower eye is stopped and the upper end 2 is placed under the subsurface. It is a waste to make the altar (2) only with the branches of trees, and the ones in the core are likely to be killed. So, Dan (2) is different from inner material. The genus is made of coniferous branches that do not decay long lasting underwater, especially dead coniferous branches, and the surface material is made of live tree branches to meet the purpose of greening after construction. It also makes transporting and construction much easier to carry than largely dependent on manpower.

섶단(2)을 하안의 길이방향을 따라 나란하게 놓는다. 그리고 철근, 나무말뚝 같은 앵커(1)를 박아서 섶단(2)을 고정시시킨다. 이와는 별도로 그 하안에서 채취한 토사나 상류의 기름진 토사를 채운 흙마대(3)를 준비해 둔다. 마대는 재활용품을 활용하면 복구비용을 경감할 수 있다.Lay the ends (2) side by side along the length of the lower eye. And anchoring the end (2) by driving anchors (1), such as reinforcing bars and wooden stakes. Separately, prepare a trowel (3) filled with earth and sand collected from the bottom of it. The harness can reduce the cost of recovery by using recycled materials.

도2, 3에서, 세굴된 부위의 본래 지형의 경사도에 맞게 흙마대(3)를 벽돌쌓듯이 축조한다. 앵커(1)를 흙마대(3)의 높이에 대충 맞게끔 하여 줄마다 엇갈리도록 박고 섶단(2)과 흙마대(3) 위로 철사(4)를 지그재그식으로 지른 다음에 앵커(1)의 상단부마다 단단히 얽어 매고 앵커(1)를 타입하여 철사(4)가 흙마대(3)를 억누르게 한다. 이로써 섶단(2)과 흙마대(3)는 빠른 물살에도 안정을 유지하게 된다.In Figures 2 and 3, the trowel 3 is constructed like a brick to fit the slope of the original terrain of the scoured area. Place the anchor (1) roughly in line with the height of the trowel (3) and stagger the rows, and zigzag the wire (4) over the tip (2) and the trowel (3), then the upper part of the anchor (1) Tie up tightly every time and type an anchor 1 so that the wire 4 restrains the trowel 3. As a result, the ridge (2) and trowel (3) is stable even in the fast current.

미리 채취해 둔 버드나무 등의 생나무가지(5)를 앞 뒤 좌 우 소정의 간격을 두고 흙마대(3) 에 심고, 흙마대(3) 사이의 빈 공간에는 자갈(6)을 채우고 다진다.Planting branches (5), such as willow trees, which have been collected in advance, are planted in a trowel 3 at predetermined intervals in front, rear, left and right, and the gravel 6 is filled and compacted in the empty space between the trowels 3.

시공 후 흙마대(3)에 심어진 생나무가지(4)에서 발근된 부정근은 하안 토사의 인장력을 높여 세굴억제 및 방지에 기여하고, 미관상 보기에 좋지않은 마대는 부패되어 토양을 비옥하게 하는 밑거름이 되며, 앵커(1)는 생나무가지가 자라나서 푸르러진 숲에 가려서 보이지 않으므로 경관에 장애가 되는 일은 없다.The root roots rooted from the green tree branches (4) planted on the soil spigot (3) after construction increase the tensile strength of the bottom soil sediment, thereby contributing to the prevention and prevention of scour, and the unsightly sack is decayed and becomes the foundation to fertilize the soil. , Anchor (1) is not obstructed by the landscape because the branches grow green and hidden in the green forest.

연구결과에 따르면 흙마대(3)가 분해될 무렵이면 섶단(2)과 흙마대(3)에 심긴 생나무가지(4)가 무럭무럭 자랐고 부정근도 아주 발달돼서 웬만한 물줄기에도 토사가 유실되지 않은 점으로 미뤄보아 이후의 세굴방지에 거는 기대가 크다. 본 발명은 특히 토사의 입자가 고와서 상대적으로 유실가능성이 높은 하안이 세굴된 곳을 조기에 복구하고 이후의 호안 및 조경용 녹화에 적합하다.According to the research results, when the soil spigot (3) was dismantled, the tree branches (4) planted on the ridge (2) and the soil spigot (3) grew quickly. In anticipation, there is a great expectation for future scour prevention. The present invention is particularly suitable for the early restoration of areas where the soil of the soil has been washed out, and the riverbank which has a relatively high probability of loss is scoured, and is suitable for subsequent revetment and landscape greening.

이상 설명한 바와 같이 수중과 뭍에서 다같이 강한 생명력을 지닌 버드나무등의 생나무가지와 죽은 가지로 만든 섶단으로 하안과 하사의 경계지점을 보호하고 흙마대로 강력하게 복구한 하안에 생나무가지를 심어 자연녹화시키는 것으로, 시공그 자체만으로도 복구와 동시에 호안효과가 바로 나타나고, 성장하는 생나무가지는 하천수의 유속을 떨어뜨리는 것은 물론 물살에 떼밀려오는 토사를 퇴적시켜 비옥하게 만듦으로써 초본류의 번식과 하상의 복구 및 자연녹화라는 다목적을 성취할 수 있으며, 그 낙엽이 토양의 보비력(비오톱의 증대)을 높여 다음 계절의 자기 성장과 다른 서식생물의 생장용 밑거름이 된다. 게다가 생나무가지의 왕성한 부정근은 하안의 인장강도를 높여 더욱 튼튼히 한다.As described above, by using algae and dead branches, such as willow trees, which have strong vitality both underwater and in the soil, they protect the boundary between the riverbank and the riverbank, and plant the trees in the river, which has been strongly restored with dirt. By planting itself, the construction itself can recover and at the same time have a relieving effect, and the growing tree branches not only reduce the flow rate of the river water, but also deposit and fertilize the soil that is being driven by the water, thereby regenerating herbaceous plants and restoring the riverbed. The versatile purpose of natural greening can be achieved, and the deciduous leaves increase the soil's fertility (increase in biotope), making it the basis for the next season's self-growth and the growth of other habitats. In addition, the vigorous roots of green branches increase the tensile strength of the riverbank, making them stronger.

본 발명은 특히 토사의 입자가 고와서 약한 물줄기에도 유실이 우려되는 하안의 복구 및 호안에 적합하다.The present invention is particularly suitable for the restoration and protection of the riverbank, in which the soil particles are high and there is concern about loss even in weak water streams.

Claims (1)

세굴된 하안에서 수면 이하의 하상에 생나무가지와 죽은 나무가지로 만든 섶단을 하안의 길이방향으로 늘어놓고 앵커를 고정하며, 섶단 뒤쪽 하안에 그 기울기를 따라 흙마대를 벽돌쌓기식으로 축조하여 앵커를 줄마다 엇갈리게 박아 고정한 후, 철사를 섶단과 흙마대 위에서 지그재그식으로 지른 다음에 앵커에 단단히 얽어 매어 안정시키고, 흙마대에는 발근력과 맹아력을 지닌 생나무가지를 심고 흙마대 사이의 공간에 자갈을 채우고 다지는 것 세굴된 하안의 복구시공방법.In the scoured riverbed, the hem of the tree branch and the dead tree branch is lined up in the length direction of the riverbed and anchored at the bottom of the riverbed. After staggering each row, fasten the wires zigzag on the hem and trowel, and then entangle them firmly in the anchor to stabilize them. Crushing method of recovery construction of scoured riverbanks.
KR1019980019814A 1998-05-29 1998-05-29 Recovery construction method of scoured riverbank KR19990086702A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019980019814A KR19990086702A (en) 1998-05-29 1998-05-29 Recovery construction method of scoured riverbank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019980019814A KR19990086702A (en) 1998-05-29 1998-05-29 Recovery construction method of scoured riverbank

Publications (1)

Publication Number Publication Date
KR19990086702A true KR19990086702A (en) 1999-12-15

Family

ID=65899788

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019980019814A KR19990086702A (en) 1998-05-29 1998-05-29 Recovery construction method of scoured riverbank

Country Status (1)

Country Link
KR (1) KR19990086702A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100712199B1 (en) * 2006-02-20 2007-04-27 (주)에코원 A structure for sand capture

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100712199B1 (en) * 2006-02-20 2007-04-27 (주)에코원 A structure for sand capture

Similar Documents

Publication Publication Date Title
Glenn Denudation and erosion in the southern Appalachian region and the Monongahela Basin
Evette et al. History of bioengineering techniques for erosion control in rivers in Western Europe
CN103898870B (en) A kind of gabion net Ecotypic Stone Mesh-box river course slope protection construction method
CN103362135B (en) Fang Beng hilllock, protect water and soil net grass bank protection
CN108289419B (en) Bag, system and method for using same
CN210031857U (en) Ecological embankment side slope structure
KR0147725B1 (en) Revetment method for making the sand bed of natural type watercourse
JPH11323938A (en) Greening construction method
US3412561A (en) Reed-trench terracing
CN214940260U (en) Ecological restoration structure for high and steep rocky slope of surface mine
KR19990086702A (en) Recovery construction method of scoured riverbank
KR100884017B1 (en) Method of Constructing Bank Walls with Recovering Natural Environment
CN210263090U (en) Side slope protection and ecological green covering combined symbiotic universal constraint structure
Schiechtl FAO watershed management field manual: vegetative and soil treatment measures
KR100381254B1 (en) Methode for construction of vegetative streambank of stream using trench
JP4220613B2 (en) Protective greening structure on slopes, walls, shores
KR100279284B1 (en) Planting method of fill slope
Case Coast sand dunes, sand spits and sand wastes
JP2865624B2 (en) Slope protection greening structure
KR19990086701A (en) Recovery construction method of scoured riverbank
CN212835439U (en) High steep rock slope greening structure
KR100279286B1 (en) Greening method of slope
JP2023079214A (en) Ventilation and infiltration water vein planting system, and method for constructing ventilation and infiltration water vein planting system
US722445A (en) Embankment-protector.
Ramser Gullies: How to control and reclaim them

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E601 Decision to refuse application