KR102626132B1 - System and Method for inspection to prevent demage of tube caused by high temperature - Google Patents

System and Method for inspection to prevent demage of tube caused by high temperature Download PDF

Info

Publication number
KR102626132B1
KR102626132B1 KR1020230050133A KR20230050133A KR102626132B1 KR 102626132 B1 KR102626132 B1 KR 102626132B1 KR 1020230050133 A KR1020230050133 A KR 1020230050133A KR 20230050133 A KR20230050133 A KR 20230050133A KR 102626132 B1 KR102626132 B1 KR 102626132B1
Authority
KR
South Korea
Prior art keywords
tube
inspection
damage
information
boiler
Prior art date
Application number
KR1020230050133A
Other languages
Korean (ko)
Other versions
KR20230058337A (en
Inventor
김범신
박명수
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR1020230050133A priority Critical patent/KR102626132B1/en
Publication of KR20230058337A publication Critical patent/KR20230058337A/en
Application granted granted Critical
Publication of KR102626132B1 publication Critical patent/KR102626132B1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/42Applications, arrangements, or dispositions of alarm or automatic safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B35/00Control systems for steam boilers
    • F22B35/06Control systems for steam boilers for steam boilers of forced-flow type
    • F22B35/10Control systems for steam boilers for steam boilers of forced-flow type of once-through type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N25/00Investigating or analyzing materials by the use of thermal means

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Thermal Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Analytical Chemistry (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Biochemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

보일러 튜브의 고온 손상을 예방하기 위한 검사를 최적으로 설계할 수 있는 검사 시스템이 개시된다. 상기 검사 시스템은, 튜브를 센싱하여 센싱 정보를 생성하는 센서계, 상기 센싱 정보를 수집하는 데이터 수집기, 및 통신망을 통해 상기 데이터 수집기에 연결되어 획득되는 상기 센싱 정보를 이용하여 금회 검사 결과를 생성하고 상기 금회 검사 결과에 따른 튜브 상태를 평가하여 정비 계획 정보를 생성하는 컴퓨터를 포함하는 것을 특징으로 한다.
튜브의 운전정보를 이용하여 튜브의 손상을 평가하고 고장이력과 전회 검사결과를 이용하여 튜브의 검사 및 교체여부를 점검(Overhaul) 계획수립전 결정하고 이를 Overhaul 계획수립 시 반영하도록 함으로써 정비 책임자가 적절한 교체물량을 확보하고 검사계획을 용이하게 수립할 수 있다.
An inspection system that can optimally design inspections to prevent high-temperature damage to boiler tubes is disclosed. The inspection system generates current inspection results using a sensor system that senses a tube and generates sensing information, a data collector that collects the sensing information, and the sensing information obtained by being connected to the data collector through a communication network. It is characterized in that it includes a computer that generates maintenance plan information by evaluating the tube condition according to the current inspection result.
Using the operation information of the tube, damage to the tube is evaluated, and the failure history and previous inspection results are used to determine whether to inspect and replace the tube before establishing an inspection (overhaul) plan, and to reflect this when establishing an overhaul plan so that the maintenance manager can make an appropriate decision. Replacement quantities can be secured and inspection plans can be easily established.

Description

튜브 고온 손상 예방을 위한 검사 시스템 및 방법{System and Method for inspection to prevent demage of tube caused by high temperature} Inspection system and method for preventing damage to tubes by high temperature {System and Method for inspection to prevent damage of tube caused by high temperature}

본 발명은 튜브 검사 기술에 관한 것으로서, 더 상세하게는 보일러 튜브의 고온 손상을 예방하기 위한 검사를 최적으로 설계하는 시스템 및 방법에 대한 것이다.The present invention relates to tube inspection technology, and more specifically to a system and method for optimally designing inspection to prevent high temperature damage to boiler tubes.

보일러 튜브는 보일러 구성설비 중 가장 빈번하게 고장이 발생하는 설비로 수천 개 이상의 막대한 수량과 튜브 1본 당 30 ~ 50m의 긴 길이로 인해 검사 및 진단에 많은 어려움이 발생하고 있다. Boiler tubes are the equipment that breaks down most frequently among boiler components, and due to the enormous number of thousands of tubes and the long length of 30 to 50 m per tube, many difficulties arise in inspection and diagnosis.

또한, 보일러의 대용량화와 고효율화가 진행되며 고장피해로 인한 경제적 손실과 전력수급 불안정 등의 문제가 발생하고 있으며, 이를 예방하기 위해 다양한 기술과 시스템이 적용되고 있으나 큰 실효를 거두지 못하고 있다. In addition, as boilers become larger in capacity and more efficient, problems such as economic losses due to breakdown damage and unstable power supply and demand are occurring. Various technologies and systems are being applied to prevent these problems, but they are not showing much effectiveness.

부연하면, 보일러 튜브 3D CAD 모델링을 통해 사용자가 직관적으로 튜브위치를 찾아 검사정보를 쉽게 입력/조회를 하는 기술이 제안되다. 그러나, 이 경우, 튜브의 적정 검사시기/위치 및 교체시기/위치 제공이 불가하며, 다양하고 방대한 검사정보관리를 위한 지속적인 노력이 필요하다는 문제점이 있다.To elaborate, a technology was proposed that allows users to intuitively find the tube location and easily input/search inspection information through boiler tube 3D CAD modeling. However, in this case, it is impossible to provide the appropriate inspection time/position and replacement time/position of the tube, and there is a problem that continuous efforts are needed to manage diverse and extensive inspection information.

또한, 보일러 튜브와 관련된 센서(출력, 과잉공기비, 각 튜브출구 온도센서, 증기압력 등)간의 상관도 및 정상 운전패턴을 학습하여 이상패턴발생 시 경보를 제공하는 기술이 제안되었다. 이 경우, 경보에 대한 심각도 및 고장정보(위치/종류)가 미제공되어 예방 정비 대책의 수립이 곤란하고, 점검(Overhaul)실시 후 운전상태 변화시 모델 재학습 필요로 지속적인 관리노력이 필요하다는 문제점이 있다. In addition, a technology was proposed that learns the correlation and normal operation patterns between boiler tubes and related sensors (output, excess air ratio, each tube outlet temperature sensor, steam pressure, etc.) and provides an alarm when abnormal patterns occur. In this case, the severity and fault information (location/type) of the alarm are not provided, making it difficult to establish preventive maintenance measures, and the problem is that continuous management efforts are required due to the need to relearn the model when the operation status changes after inspection (overhaul). there is.

또한, 점검(Overhaul) 기간 중 검사가 수행되기 위해서는 적어도 점검(Overhaul) 6개월 전 교체부위와 검사부위/방법이 결정되어 교체물량의 수급과 검사계약이 체결될 수 있다. 그러나, 모든 종래기술은 노후화 및 환경변화에도 불구하고 항상 동일한 부위에 대해 검사를 수행하며 교체물량은 검사 후 결정되기 때문에 보일러 정비책임자는 물량을 부족하게 준비하거나 과다하게 준비할 수밖에 없는 어려움이 있어 설비의 안정적 운영과 정비예산의 효율적 집행을 저해하고 있다.In addition, in order for inspection to be performed during the overhaul period, the replacement part and inspection part/method must be determined at least 6 months before the overhaul, so that the supply and demand of replacement quantity and inspection contract can be concluded. However, all conventional technologies always inspect the same parts despite aging and environmental changes, and the replacement quantity is determined after the inspection, so the person in charge of boiler maintenance has no choice but to prepare insufficient or excessive quantity. It is hindering the stable operation and efficient execution of the maintenance budget.

일반적으로 보일러의 과열기, 재열기와 같은 고온손상에 노출된 튜브 모듈은 용량에 따라 다르지만 하나의 튜브 모듈당 대략 1,000개 내외의 튜브가 설치되어 있으며, 약 15 ~ 30개의 튜브가 모여 뱅크(Bank 또는 Panel)라는 단위를 이루고, 약 20 ~ 80개의 뱅크가 모여 하나의 과열기와 재열기가 된다.In general, tube modules exposed to high-temperature damage such as boiler superheaters and reheaters vary depending on capacity, but approximately 1,000 tubes are installed per tube module, and about 15 to 30 tubes are gathered together to form a bank (or bank). It forms a unit called a panel, and about 20 to 80 banks are gathered together to form one superheater and reheater.

고온에 노출된 과열기와 재열기에서 발생되는 대표적인 고온손상은 장기 크리프, 단기 크리프, 고온부식 손상이 있으며, 이 손상들은 주로 용접부위, 곡관부위, 두께 변화부위에서 발생하지만 운영 중인 보일러에서 손상을 찾아낼 수 있는 유일한 방법은 정지 중 비파괴 검사를 시행하는 방법외에는 없다.Typical high-temperature damage that occurs in superheaters and reheaters exposed to high temperatures include long-term creep, short-term creep, and high-temperature corrosion damage. These damages mainly occur at welds, bends, and thickness changes, but damage can be found in operating boilers. The only way to do this is to conduct non-destructive testing during shutdown.

한편, 보일러 튜브의 손상을 검사하는 비파괴 검사방법과 그 장단점은 다음과 같다.Meanwhile, the non-destructive testing method for inspecting damage to boiler tubes and its pros and cons are as follows.

튜브의 고온손상은 크리프 기공(장기/단기 크리프 손상) 발생 후 미세균열로 성장하고, 미세균열(㎛단위)이 생성되면 단기간에 파손될 가능성이 매우 높아 보통 크리프 기공이 발생되면 튜브를 교체한다.High-temperature damage to the tube grows into microcracks after the occurrence of creep pores (long-term/short-term creep damage), and when microcracks (in ㎛ units) are created, it is very likely to be damaged in a short period of time, so the tube is usually replaced when creep pores occur.

고온부식의 경우 최초 미세 부식 피트(Pit)(㎛단위) 발생 후 미세균열로 성장하고, 미세균열(㎛단위)이 생성되면 단기간에 파손될 가능성이 매우 높다. 보통 부식 Pit가 mm이상 성장하거나 미세균열이 발생하면 튜브를 교체한다.In the case of high-temperature corrosion, after the first micro-corrosion pit (in ㎛ units) occurs, it grows into a micro-crack, and when a micro-crack (in ㎛ units) is created, there is a very high possibility that it will be damaged in a short period of time. Usually, the tube is replaced when the corrosion pit grows more than mm or microcracks occur.

따라서 침투/초음파/자분탐상은 균열이 충분히 성장하여 튜브가 파손되기 직전에만 검사가 가능하므로 일반적으로 2년 단위의 보일러 점검(Overhaul) 시행 시에만 검사가 가능하므로 튜브파열을 예방하기에는 매우 제한적이다.Therefore, penetration/ultrasonic/magnetic particle inspection can only be done right before the crack grows sufficiently and the tube is broken, so inspection is generally only possible when a boiler inspection (Overhaul) is performed every two years, so it is very limited in preventing tube rupture.

상기 검사방법 중 금속 조직 복제와 경도측정은 튜브의 초기결함 발생 단계부터 탐지 및 진전을 관리할 수 있으나 이 중 경도측정은 단독으로 검사 시 강도저하를 판단하기 어렵기 때문에 금속 조직 복제법과 병행하여 금속 조직 복제 결과를 보완하여 주로 사용한다.Among the above inspection methods, metal structure replication and hardness measurement can detect and manage the progress of defects in the tube from the initial stage of defect occurrence. However, since hardness measurement alone is difficult to determine the strength decrease during inspection, it is used in parallel with metal structure replication method. It is mainly used to complement tissue replication results.

금속 조직 복제법은 다양한 결함과 균열의 탐지가 가능하지만 매우 고가이며 탐지에 장시간이 소요되므로 제한된 Overhaul기간과 예산을 고려하면 보일러 튜브의 가장 취약부를 검사해야 하나 현재는 과거 유사형식의 보일러에서 발생된 사고부위 또는 현장 여건상 검사가 용이한 부위를 설정하여 검사가 이루어져 고장예방에 비효율적이다.The metal structure replication method can detect various defects and cracks, but it is very expensive and takes a long time to detect, so considering the limited overhaul period and budget, the most vulnerable part of the boiler tube must be inspected. The inspection is conducted by setting the accident site or an area that is easy to inspect due to site conditions, which is ineffective in preventing breakdowns.

또한, 점검(Overhaul) 기간 중 검사가 수행되기 위해서는 적어도 점검(Overhaul) 6개월 전 교체부위와 검사부위/방법이 결정되어 교체물량의 수급과 검사계약이 체결될 수 있다. 그러나, 모든 종래기술은 노후화 및 환경변화에도 불구하고 항상 동일한 부위에 대해 검사를 수행하며 교체물량은 검사 후 결정되기 때문에 보일러 정비책임자는 물량을 부족하게 준비하거나 과다하게 준비할 수밖에 없는 어려움이 있어 설비의 안정적 운영과 정비예산의 효율적 집행을 저해하고 있다.In addition, in order for inspection to be performed during the overhaul period, the replacement part and inspection part/method must be determined at least 6 months before the overhaul, so that the supply and demand of replacement quantity and inspection contract can be concluded. However, all conventional technologies always inspect the same parts despite aging and environmental changes, and the replacement quantity is determined after the inspection, so the person in charge of boiler maintenance has no choice but to prepare insufficient or excessive quantity. It is hindering the stable operation and efficient execution of the maintenance budget.

1. 한국공개특허번호 제10-2013-0088557호1. Korean Patent Publication No. 10-2013-0088557

본 발명은 위 배경기술에 따른 문제점을 해소하기 위해 제안된 것으로서, 보일러 튜브의 고온 손상을 예방하기 위한 검사를 최적으로 설계할 수 있는 검사 시스템 및 방법을 제공하는데 그 목적이 있다.The present invention was proposed to solve the problems caused by the above background technology, and its purpose is to provide an inspection system and method that can optimally design inspections to prevent high temperature damage to boiler tubes.

또한, 본 발명은 튜브의 운전정보를 이용하여 튜브의 손상을 평가하고 고장이력과 전회 검사결과를 이용하여 튜브의 검사 및 교체여부를 점검(Overhaul) 계획수립전 결정하고 이를 점검(Overhaul) 계획수립 시 반영하도록 함으로써 정비 책임자가 적절한 교체물량을 확보하고 검사계획을 용이하게 수립할 수 있는 검사 시스템 및 방법을 제공하는데 다른 목적이 있다.In addition, the present invention uses the operation information of the tube to evaluate damage to the tube, uses the failure history and previous inspection results to determine whether to inspect and replace the tube before establishing an overhaul plan, and establishes an overhaul plan. By allowing maintenance managers to secure appropriate replacement quantities and easily establish inspection plans, There is another purpose in providing inspection systems and methods.

또한, 본 발명은 튜브 상태진단의 정확도를 향상시켜 효과적으로 튜브의 예방정비를 수행하고 최적의 검사 및 교체비용을 집행할 수 있도록 하는 검사 시스템 및 방법을 제공하는데 또다른 목적이 있다.In addition, the present invention improves the accuracy of tube condition diagnosis, allowing effective tube preventive maintenance and optimal inspection and replacement costs. Another purpose is to provide inspection systems and methods.

본 발명은 위에서 제시된 과제를 달성하기 위해, 보일러 튜브의 고온 손상을 예방하기 위한 검사를 최적으로 설계할 수 있는 검사 시스템을 제공한다.In order to achieve the problems presented above, the present invention provides an inspection system that can optimally design inspection to prevent high temperature damage to boiler tubes.

상기 검사 시스템은, The inspection system is,

보일러 및 튜브를 센싱하여 센싱 정보를 생성하는 센서계;A sensor system that generates sensing information by sensing boilers and tubes;

상기 센싱 정보를 수집하는 데이터 수집기; 및a data collector that collects the sensing information; and

통신망을 통해 상기 데이터 수집기에 연결되어 획득되는 상기 센싱 정보를 이용하여 금회 검사 결과를 생성하고 상기 금회 검사 결과에 따른 튜브 상태를 평가하여 정비 계획 정보를 생성하는 컴퓨터;를 포함하는 것을 특징으로 한다.A computer that generates current inspection results using the sensing information obtained by being connected to the data collector through a communication network and generates maintenance plan information by evaluating the tube condition according to the current inspection results.

또한, 상기 센싱 정보는 상기 보일러 및 상기 튜브의 운전 정보를 포함하는 것을 특징으로 한다.Additionally, the sensing information may include operation information of the boiler and the tube.

또한, 상기 컴퓨터는, 상기 운전정보를 포함하는 상기 센싱 정보를 획득하는 획득 모듈; 상기 운전정보를 이용하여 상기 튜브의 손상 정도를 평가하는 분석모듈; 상기 금회 검사 결과 및 데이터베이스에 미리 저장되어 있는 고장이력과 전회 검사결과를 이용하여 상기 튜브의 검사 및 교체여부를 점검(Overhaul) 계획수립전 결정하는 계산모듈; 및 상기 결정에 따른 상기 정비 계획 정보를 알림 정보로 생성하는 알림 정보 생성모듈;을 포함하는 것을 특징으로 한다.Additionally, the computer may include an acquisition module that acquires the sensing information including the driving information; An analysis module that evaluates the degree of damage to the tube using the operation information; A calculation module that determines whether to inspect and replace the tube before establishing an overhaul plan using the current inspection result, failure history pre-stored in a database, and previous inspection result; and a notification information generation module that generates the maintenance plan information according to the decision as notification information.

또한, 상기 평가는 검사 생략을 나타내는 제 1 스테이지, 검사 검토를 나타내는 제 2 스테이지, 검사를 나타내는 제 3 스테이지, 검사 및 교체 검토를 나타내는 제 4 스테이지, 및 교체를 나타내는 제 5 스테이지 중 어느 하나인 것을 특징으로 한다.In addition, the evaluation is one of the first stage indicating inspection omission, the second stage indicating inspection review, the third stage indicating inspection, the fourth stage indicating inspection and replacement review, and the fifth stage indicating replacement. It is characterized by

또한, 상기 튜브의 손상 정도의 평가는 크리프 손상도, 조직복제검사 및 경도 측정 정보를 이용하여 이루어지며, 상기 크리프 손상되는 상기 운전정보와 재료의 크리프 파괴실험에서 얻어진 크리프 손상 관계식을 이용하여 평가되는 것을 특징으로 한다.In addition, the evaluation of the degree of damage to the tube is made using creep damage, tissue replication inspection, and hardness measurement information, and is evaluated using the creep damage relationship equation obtained from the creep damage test and the operation information on the creep damage. It is characterized by

또한, 상기 운전정보는 전회 계획예방정비공사 후 금회 계획예방정비공사 설계 전까지의 운전정보인 것을 특징으로 한다.In addition, the operation information is characterized in that it is operation information from the previous planned preventive maintenance work to the design of the current planned preventive maintenance work.

또한, 상기 조직복제검사 및 경도 측정 정보는 상기 전회 검사 결과를 사용하며, 금회 검사에서 크리프 보이드(Creep Void)가 검출되거나 조직열화등급이 E 또는 F이며 경도가 설계 강도 환산치의 30%이상 저하되는 경우는 상기 튜브는 결함으로 판단되는 것을 특징으로 한다.In addition, the tissue replication test and hardness measurement information uses the results of the previous test, and in the current test, creep voids are detected, the tissue deterioration grade is E or F, and the hardness is reduced by more than 30% of the design strength conversion value. In this case, the tube is determined to be defective.

또한, 상기 크리프 손상 관계식은 상기 튜브의 온도 및 상기 튜브의 응력을 이용하여 산출되며, 상기 튜브의 온도의 산출은 상기 튜브에 흐르는 튜브의 유량을 이용하여 이루어지는 것을 특징으로 한다.In addition, the creep damage equation is calculated using the temperature of the tube and the stress of the tube, and the calculation of the temperature of the tube is characterized by using the flow rate of the tube flowing through the tube.

또한, 상기 튜브의 유량은 입구 헤더, 출구 헤더 및 다수의 튜브뱅크로 구성되는 보일러 튜브 모델을 이루는 각 튜브의 유량분포를 계산함으로써 산출되며, 상기 튜브 뱅크는 다수의 튜브로 구성되는 것을 특징으로 한다.In addition, the flow rate of the tube is calculated by calculating the flow rate distribution of each tube forming a boiler tube model consisting of an inlet header, an outlet header, and a plurality of tube banks, and the tube bank is characterized in that it is composed of a plurality of tubes. .

또한, 상기 튜브의 응력은 전체 튜브 모듈의 출구설계증기온도 또는 미리 설정되는 기간의 운전이력에서 계산되는 출구운전증기온도 중앙값과 표준편차를 미리 설정되는 허용온도 계산식을 이용하여 계산되는 상기 튜브의 허용온도에서의 허용응력인 것을 특징으로 한다.In addition, the stress of the tube is calculated using the allowable temperature calculation formula that is preset using the outlet design steam temperature of the entire tube module or the median and standard deviation of the outlet operating steam temperature calculated from the operation history of a preset period. It is characterized by allowable stress at temperature.

또한, 상기 튜브의 검사위치는 상기 크리프 손상 관계식 및 상기 운전이력을 이용하여 선정된 튜브 출구의 곡관부위, 용접부위, 및 두께변화부위 중 어느 하나인 것을 특징으로 한다.In addition, the inspection location of the tube is characterized in that it is any one of a bend portion, a weld portion, and a thickness change portion of the tube outlet selected using the creep damage relationship equation and the operation history.

또한, 상기 튜브의 중간부위에 상기 두께 변화부위 또는 상기 용접부위가 있는 경우, 상기 검사위치로 선정되는 것을 특징으로 한다.In addition, when the thickness change area or the weld area is located in the middle part of the tube, it is selected as the inspection position.

또한, 전회 공사에서 결함원인이 크리프로 판명되어 교체된 부위는 교체 후 최초 계획예방정비공사 시 상기 검사위치로 선정되며 검사결과 및 크리프 손상평가결과가 양호한 경우, 일정기간 동안 검사 대상에서 제외되는 것을 특징으로 한다.In addition, parts that were replaced in the previous construction because the cause of the defect was determined to be creep are selected as the above-mentioned inspection location during the first planned preventive maintenance work after replacement, and if the inspection results and creep damage evaluation results are good, they will be excluded from inspection for a certain period of time. It is characterized by

다른 한편으로, 본 발명의 다른 일실시예는, (a) 센서계가 튜브를 센싱하여 센싱 정보를 생성하는 단계; (b) 데이터 수집기가 상기 센싱 정보를 수집하는 단계; 및 (c) 통신망을 통해 상기 데이터 수집기에 연결되는 컴퓨터가 획득되는 상기 센싱 정보를 이용하여 금회 검사 결과를 생성하고 상기 금회 검사 결과에 따른 튜브 상태를 평가하여 정비 계획 정보를 생성하는 단계;를 포함하는 것을 특징으로 하는 튜브 고온 손상 예방을 위한 검사 방법을 제공한다.On the other hand, another embodiment of the present invention includes the steps of (a) a sensor system sensing a tube to generate sensing information; (b) collecting the sensing information by a data collector; And (c) generating a current inspection result using the sensing information obtained by a computer connected to the data collector through a communication network, and generating maintenance plan information by evaluating the tube condition according to the current inspection result. Provides an inspection method for preventing high temperature damage to tubes, characterized in that:

또 다른 한편으로, 본 발명의 또 다른 일실시예는, (a) 컴퓨터가 실시간 튜브의 운전 상태 정보를 갖는 데이터베이스를 이용하여 튜부별 유량 분포를 계산하는 단계; (b) 상기 컴퓨터가 상기 튜부별 유량 분포를 이용하여 튜브별 온도 응력을 계산하는 단계; (c) 상기 컴퓨터가 상기 튜브별 온도 응력을 이용하여 튜브별 순시 손상값을 계산하는 단계; (d) 상기 컴퓨터가 상기 튜브의 순시 평균 운전값과 튜브 재질에 대한 크리프 파괴 실험 데이터에서 얻어진 응력-온도-수명 관계식을 통해 다수의 순시 손상을 계산하고 다수의 상기 순시 손상값을 누적하여 투브별 누적 손상값을 산출하는 단계; 및 (e) 상기 컴퓨터가 일정기간의 상기 투브별 누적 손상값을 이용하여 전회 정비에서 검사된 검사결과와 정비이력을 이용하여 특정의 상태 평가 지표와 교체대상 튜브를 선정하는 단계;를 포함하는 것을 특징으로 하는 튜브 고온 손상 예방을 위한 검사 방법을 제공한다.On the other hand, another embodiment of the present invention includes the steps of: (a) a computer calculating the flow rate distribution for each tube using a database with real-time tube operation status information; (b) the computer calculating temperature stress for each tube using the flow rate distribution for each tube; (c) the computer calculating an instantaneous damage value for each tube using the temperature stress for each tube; (d) The computer calculates a plurality of instantaneous damages through the stress-temperature-life relationship equation obtained from the instantaneous average operating value of the tube and creep fracture test data for the tube material, and accumulates the plurality of instantaneous damage values for each tube. Calculating a cumulative damage value; and (e) the computer selecting a specific condition evaluation index and a tube to be replaced using the inspection results and maintenance history of the previous maintenance using the cumulative damage value for each tube over a certain period of time. Provides an inspection method to prevent high-temperature damage to the featured tube.

본 발명에 따르면, 튜브의 운전정보를 이용하여 튜브의 손상을 평가하고 고장이력과 전회 검사결과를 이용하여 튜브의 검사 및 교체여부를 점검(Overhaul) 계획수립전 결정하고 이를 Overhaul 계획수립 시 반영하도록 함으로써 정비 책임자가 적절한 교체물량을 확보하고 검사계획을 용이하게 수립할 수 있다.According to the present invention, damage to the tube is evaluated using the operation information of the tube, and the failure history and previous inspection results are used to determine whether to inspect and replace the tube before establishing an inspection (overhaul) plan, and to reflect this when establishing an overhaul plan. By doing so, the maintenance manager can secure an appropriate replacement quantity and easily establish an inspection plan.

또한, 본 발명의 다른 효과로서는 튜브 상태진단의 정확도를 향상시켜 효과적으로 튜브의 예방정비를 수행하고 최적의 검사 및 교체비용을 집행할 수 있다는 점을 들 수 있다.In addition, another effect of the present invention is that it improves the accuracy of tube condition diagnosis, effectively performs preventive maintenance of the tube, and executes optimal inspection and replacement costs.

또한, 본 발명의 다른 효과로서는 현장의 센서와 운전 데이터만 있으면 원격 감시/진단 사업이 가능하다는 점을 들 수 있다.In addition, another effect of the present invention is that remote monitoring/diagnosis business is possible with only on-site sensors and driving data.

도 1은 본 발명의 일실시예에 따른 검사 시스템의 구성 블럭도이다.
도 2는 도 1에 도시된 컴퓨터의 세부 구성 블럭도이다.
도 3은 도 2에 도시된 제어기의 세부 구성 블럭도이다.
도 4는 본 발명의 일실시예에 따른 튜브 고온 손상 예방 정비 과정을 보여주는 흐름도이다.
도 5는 본 발명의 일실시예에 따른 크리프 손상관계 테이블이다.
도 6은 본 발명의 일실시예에 따른 운전조건에 의해 각 튜브뱅크의 유량분포를 계산하는 모델의 예시이다.
도 7은 본 발명의 일실시예에 따른 질량 유량에 대해 실험과 계산의 오차를 비교한 결과 그래프이다.
도 8은 본 발명의 일실시예에 따른 정압(static pressure)에 대해 실험과 계산의 오차를 비교한 결과 그래프이다.
도 9는 일반적인 튜브 운전온도 변동특성 그래프이다.
도 10은 본 발명의 일실시예에 따른 온도 센서를 이용한 검사 개념도이다.
도 11은 일반적인 대상 튜브의 단면을 확대하여 촬영된 화면예이다.
도 12는 본 발명의 다른 일실시예에 따른 튜브 고온 손상 예방 정비 과정을 보여주는 흐름도이다.
1 is a block diagram of the configuration of an inspection system according to an embodiment of the present invention.
FIG. 2 is a detailed block diagram of the computer shown in FIG. 1.
FIG. 3 is a detailed block diagram of the controller shown in FIG. 2.
Figure 4 is a flow chart showing a tube high temperature damage prevention maintenance process according to an embodiment of the present invention.
Figure 5 is a creep damage relationship table according to an embodiment of the present invention.
Figure 6 is an example of a model that calculates the flow rate distribution of each tube bank according to operating conditions according to an embodiment of the present invention.
Figure 7 is a graph showing the results of comparing the errors between experiment and calculation for mass flow rate according to an embodiment of the present invention.
Figure 8 is a graph showing the results of comparing errors between experiments and calculations for static pressure according to an embodiment of the present invention.
Figure 9 is a graph of typical tube operating temperature fluctuation characteristics.
Figure 10 is a conceptual diagram of inspection using a temperature sensor according to an embodiment of the present invention.
Figure 11 is an example of a screen captured by enlarging the cross section of a typical target tube.
Figure 12 is a flow chart showing a tube high temperature damage prevention maintenance process according to another embodiment of the present invention.

본 발명의 이점 및 특징, 그리고 그것들을 달성하는 방법은 첨부되는 도면과 함께 상세하게 후술되어 있는 실시 예들을 참조하면 명확해질 것이다. 그러나 본 발명은 이하에서 개시되는 실시 예들에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 것이며, 단지 본 실시 예들은 본 발명의 개시가 완전하도록 하며, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 발명은 청구항의 범주에 의해 정의될 뿐이다. 도면에서 표시된 구성요소의 크기 및 상대적인 크기는 설명의 명료성을 위해 과장된 것일 수 있다.The advantages and features of the present invention and methods for achieving them will become clear by referring to the embodiments described in detail below along with the accompanying drawings. However, the present invention is not limited to the embodiments disclosed below and will be implemented in various different forms. These embodiments only serve to ensure that the disclosure of the present invention is complete, and those skilled in the art It is provided to fully inform the person of the scope of the invention, and the present invention is only defined by the scope of the claims. The sizes and relative sizes of components shown in the drawings may be exaggerated for clarity of explanation.

명세서 전체에 걸쳐 동일 참조 부호는 동일 구성 요소를 지칭하며, “및/또는”은 언급된 아이템들의 각각 및 하나 이상의 모든 조합을 포함한다.Like reference numerals refer to like elements throughout the specification, and “and/or” includes each and all combinations of one or more of the referenced items.

본 명세서에서 사용된 용어는 실시 예들을 설명하기 위한 것이며 본 발명을 제한하고자 하는 것은 아니다. 본 명세서에서, 단수형은 문구에서 특별히 언급하지 않는 한 복수형도 포함한다. 명세서에서 사용되는 “포함한다” 및/또는 “구성된다”는 언급된 구성요소, 단계, 동작 및/또는 소자는 하나 이상의 다른 구성요소, 단계, 동작 및/또는 소자의 존재 또는 추가를 배제하지 않는다.The terms used in this specification are for describing embodiments and are not intended to limit the invention. As used herein, singular forms also include plural forms, unless specifically stated otherwise in the context. As used in the specification, “comprises” and/or “consisting of” stated components, steps, operations and/or elements do not exclude the presence or addition of one or more other components, steps, operations and/or elements. .

비록 제1, 제2 등의 다양한 구성요소들을 서술하기 위해서 사용되나, 이들 구성요소들은 이들 용어에 대해 제한되지 않음은 물론이다. 이들 용어들은 단지 하나의 구성요소와 구별하기 위하여 사용되는 것이다. 따라서, 이하에서 언급되는 제 1 구성요소는 본 발명의 기술적 사상 내에서 제2 구성요소일 수도 있음은 물론이다.Although it is used to describe various components such as first and second, it goes without saying that these components are not limited to these terms. These terms are used to distinguish between only one component. Therefore, it goes without saying that the first component mentioned below may also be the second component within the technical spirit of the present invention.

다른 정의가 없다면, 본 명세서에서 사용되는 모든 용어(기술 및 과학적 용어를 포함)는 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 공통적으로 이해될 수 있는 의미로 사용될 수 있을 것이다. 또 일반적으로 사용되는 사전에 정의되어 있는 용어들은 명백하게 특별히 정의되어 있지 않은 한 이상적으로 또는 과도하게 해석되지 않는다.Unless otherwise defined, all terms (including technical and scientific terms) used in this specification may be used with meanings that can be commonly understood by those skilled in the art to which the present invention pertains. Additionally, terms defined in commonly used dictionaries are not to be interpreted ideally or excessively unless clearly specifically defined.

이하 첨부된 도면을 참조하여 본 발명의 일실시예에 따른 튜브 고온 손상 예방을 위한 검사 시스템 및 방법을 상세하게 설명하기로 한다.Hereinafter, an inspection system and method for preventing high temperature damage to a tube according to an embodiment of the present invention will be described in detail with reference to the attached drawings.

도 1은 본 발명의 일실시예에 따른 검사 시스템(100)의 구성 블럭도이다. 도 1을 참조하면, 검사 시스템(100)은 보일러 및/또는 튜브를 센싱하여 센싱 정보를 생성하는 센서계(110), 센싱 정보를 수집하는 데이터 수집기(120), 통신망(130), 통신망(130)을 통해 수집된 센싱 정보를 이용하여 검사 결과를 생성하고 검사 결과에 따른 튜브 상태를 평가하여 정비 계획 정보를 생성하는 컴퓨터(140) 등을 포함하여 구성될 수 있다.Figure 1 is a block diagram of the inspection system 100 according to an embodiment of the present invention. Referring to FIG. 1, the inspection system 100 includes a sensor system 110 that generates sensing information by sensing a boiler and/or tube, a data collector 120 that collects sensing information, a communication network 130, and a communication network 130. It may be configured to include a computer 140 that generates inspection results using sensing information collected through ) and generates maintenance plan information by evaluating the tube condition according to the inspection results.

센서계(110)는 제 1 측정기(111), 제 2 측정기(112), 차압계(113), 센서(114) 등을 포함하여 구성될 수 있다. 제 1 측정기(111)는 입구 헤더 유량 측정기이고, 제 2 측정기(112)는 튜브 유로 유량 측정기이고, 차압계(113)는 헤더 및 튜브 뱅크 차압계가 될 수 있다. 센서(114)는 보일러 및/또는 튜브에 설치되는 센서로서 온도 센서 등이 될 수 있다.The sensor system 110 may include a first measuring device 111, a second measuring device 112, a differential pressure gauge 113, a sensor 114, etc. The first meter 111 is an inlet header flow meter, the second meter 112 is a tube flow meter, and the differential pressure gauge 113 can be a header and tube bank differential pressure meter. The sensor 114 is a sensor installed in the boiler and/or tube and may be a temperature sensor or the like.

일반적으로 보일러의 과열기, 재열기와 같은 고온손상에 노출된 튜브 모듈은 용량에 따라 다르지만 하나의 튜브 모듈당 대략 1,000개 내외의 튜브가 설치되어 있으며, 약 15 ~ 30개의 튜브가 모여 뱅크(Bank 또는 Panel)라는 단위를 이루고, 약 20 ~ 80개의 뱅크가 모여 하나의 과열기와 재열기가 된다.In general, tube modules exposed to high-temperature damage such as boiler superheaters and reheaters vary depending on capacity, but approximately 1,000 tubes are installed per tube module, and about 15 to 30 tubes are gathered together to form a bank (or bank). It forms a unit called a panel, and about 20 to 80 banks are gathered together to form one superheater and reheater.

고온에 노출된 과열기와 재열기에서 발생되는 대표적인 고온손상은 장기 크리프, 단기 크리프, 고온부식 손상이 있으며, 이 손상들은 주로 용접부위, 곡관부위, 두께 변화부위에서 발생하지만 운영 중인 보일러에서 손상을 찾아낼 수 있는 유일한 방법은 정지 중 비파괴 검사를 시행하는 방법외에는 없다.Typical high-temperature damage that occurs in superheaters and reheaters exposed to high temperatures include long-term creep, short-term creep, and high-temperature corrosion damage. These damages mainly occur at welds, bends, and thickness changes, but damage can be found in operating boilers. The only way to do this is to conduct non-destructive testing during shutdown.

따라서, 본 발명의 일실시예에서는 튜브의 운전정보를 이용하여 튜브의 손상을 평가하고 고장이력과 전회 검사결과를 이용하여 튜브의 검사 및 교체여부를 Overhaul 계획수립 전 결정하고 이를 Overhaul 계획수립 시 반영하도록 함으로써 보일러 정비책임자가 적절한 교체물량을 확보하고 검사계획을 용이하게 수립하도록 하며 튜브 상태진단의 정확도를 향상시켜 효과적으로 튜브의 예방정비를 수행하고 최적의 검사 및 교체비용을 집행할 수 있도록 한다.Therefore, in one embodiment of the present invention, damage to the tube is evaluated using the operation information of the tube, and the failure history and previous inspection results are used to determine whether to inspect and replace the tube before establishing an overhaul plan, and this is reflected when establishing an overhaul plan. By doing so, the boiler maintenance manager can secure an appropriate replacement quantity, easily establish an inspection plan, improve the accuracy of tube condition diagnosis, effectively perform preventive maintenance of tubes, and execute optimal inspection and replacement costs.

도 1을 계속 참조하면, 데이터 수집기(120)는 센서계(110)로부터 생성되는 센싱 정보를 취합하여 통신망(130)을 통해 컴퓨터(140)에 전송하는 기능을 수행한다. 데이터 수집기(120)는 Data acquisition 장치가 될 수 있다. 데이터 수집기(120)는 통신망(130)과의 연결을 위해 통신 모듈을 포함하여 구성될 수 있다. 또한, 데이터 수집기(120)는 보일러(미도시)를 제어하는 운전 제어기(101)와 연결되어, 보일러 및/또는 튜브의 운전 정보를 획득할 수도 있다. 운전 제어기(101)는 마이크로프로세서, 마이콤, 스위칭 회로 소자 등을 포함하여 구성될 수 있다.Continuing to refer to FIG. 1 , the data collector 120 performs the function of collecting sensing information generated from the sensor system 110 and transmitting it to the computer 140 through the communication network 130. The data collector 120 may be a data acquisition device. The data collector 120 may be configured to include a communication module for connection to the communication network 130. Additionally, the data collector 120 may be connected to the operation controller 101 that controls the boiler (not shown) to obtain operation information of the boiler and/or tube. The operation controller 101 may be configured to include a microprocessor, microcomputer, switching circuit element, etc.

통신망(130)은 복수의 단말 및 서버들과 같은 각각의 노드 상호 간에 정보 교환이 가능한 연결 구조를 의미하는 것으로, 공중교환 전화망(PSTN), 공중교환 데이터망(PSDN), 종합정보통신망(ISDN: Integrated Services Digital Networks), 광대역 종합 정보 통신망(BISDN: Broadband ISDN), 근거리 통신망(LAN: Local Area Network), 대도시 지역망(MAN: Metropolitan Area Network), 광역 통신망(WLAN: Wide LAN) 등이 될 수 있다, 그러나, 본 발명은 이에 한정되지는 않으며, 무선 통신망인 CDMA(Code Division Multiple Access), WCDMA(Wideband Code Division Multiple Access), Wibro(Wireless Broadband), WiFi(Wireless Fidelity), HSDPA(High Speed Downlink Packet Access) 망, 블루투스(bluetooth), NFC(Near Field Communication) 네트워크, 위성 방송 네트워크, 아날로그 방송 네트워크, DMB(Digital Multimedia Broadcasting) 네트워크 등이 될 수 있다. 또는, 이들 유선 통신망 및 무선 통신망의 조합일 수 있다.The communication network 130 refers to a connection structure that allows information exchange between nodes such as a plurality of terminals and servers, such as public switched telephone network (PSTN), public switched data network (PSDN), and integrated information and communication network (ISDN). It can be Integrated Services Digital Networks (BISDN: Broadband ISDN), Local Area Network (LAN), Metropolitan Area Network (MAN), Wide LAN (WLAN), etc. However, the present invention is not limited to this, and is applicable to wireless communication networks such as CDMA (Code Division Multiple Access), WCDMA (Wideband Code Division Multiple Access), Wibro (Wireless Broadband), WiFi (Wireless Fidelity), and HSDPA (High Speed Downlink). Packet Access) network, Bluetooth, NFC (Near Field Communication) network, satellite broadcasting network, analog broadcasting network, DMB (Digital Multimedia Broadcasting) network, etc. Alternatively, it may be a combination of these wired communication networks and wireless communication networks.

컴퓨터(140)는 센싱 정보를 이용하여 검사 결과를 생성하고 검사 결과에 따른 튜브 상태를 평가하여 정비 계획 정보를 생성하는 기능을 수행한다. 부연하면, 컴퓨터(140)는 튜브의 운전정보를 이용하여 튜브의 손상을 평가하고, 고장이력과 전회 검사결과를 이용하여 튜브의 검사 및 교체여부를 점검(Overhaul) 계획수립전 결정하고 이를 점검(Overhaul) 계획수립시 반영하도록 함으로써 보일러 정비책임자가 적절한 교체물량을 확보하고 검사계획을 용이하게 수립하도록 하며 튜브 상태진단의 정확도를 향상시켜 효과적으로 튜브의 예방정비를 수행하고 최적의 검사 및 교체비용을 집행할 수 있도록 한다.The computer 140 performs the function of generating inspection results using sensing information and generating maintenance plan information by evaluating the tube condition according to the inspection results. To elaborate, the computer 140 uses the operation information of the tube to evaluate damage to the tube, and uses the failure history and previous inspection results to determine whether to inspect and replace the tube before establishing an inspection (overhaul) plan and inspect it ( Overhaul) By reflecting this when establishing a plan, the boiler maintenance manager can secure an appropriate replacement quantity and easily establish an inspection plan. By improving the accuracy of tube condition diagnosis, effectively performing preventive maintenance of tubes and executing optimal inspection and replacement costs. make it possible

컴퓨터(140)는 PC(Personal Computer) 또는 서버가 될 수 있다. 컴퓨터(140)에는 데이터베이스(141)가 구축될 수 있다. 데이터베이스(141)에는 센싱정보, 보일러, 튜브 등에 대한 식별 정보등도 저장될 수 있다. The computer 140 may be a personal computer (PC) or a server. A database 141 may be built in the computer 140. The database 141 may also store sensing information, identification information for boilers, tubes, etc.

도 2는 도 1에 도시된 컴퓨터(140)의 세부 구성 블럭도이다. 도 2를 참조하면, 컴퓨터(140)는, 센싱 정보를 이용하여 검사 결과를 생성하고 검사 결과에 따른 튜브 상태를 평가하여 정비 계획 정보를 생성하는 제어기(210), 통신망(130)과 연결되어 센싱 정보를 획득하는 통신부(220), 통신부(220)를 통해 획득되는 센싱 정보를 저장하는 저장부(230), 구성요소들에 전원을 공급하는 전원부(240), 사용자의 명령을 입력하는 입력부(250), 정비 계획 정보를 출력하는 출력부(260) 등을 포함하여 구성될 수 있다.FIG. 2 is a detailed block diagram of the computer 140 shown in FIG. 1. Referring to FIG. 2, the computer 140 is connected to the controller 210, which generates inspection results using sensing information and generates maintenance plan information by evaluating the tube condition according to the inspection results, and the communication network 130 to perform sensing. A communication unit 220 that acquires information, a storage unit 230 that stores sensing information obtained through the communication unit 220, a power unit 240 that supplies power to components, and an input unit 250 that inputs user commands. ), and an output unit 260 that outputs maintenance plan information.

제어기(210)는 센싱 정보를 이용하여 검사 결과를 생성하고 검사 결과에 따른 튜브 상태를 평가하여 정비 계획 정보를 생성하는 기능을 수행한다. 이를 위해, 구성요소들과 신호를 주고 받으며, 제어를 수행한다.The controller 210 performs a function of generating inspection results using sensing information and generating maintenance plan information by evaluating the tube condition according to the inspection results. For this purpose, signals are exchanged with components and control is performed.

통신부(220)는 통신망(130)과 통신 연결을 수행하며, 데이터 수집기(120)와 컴퓨터(140) 간 통신을 연결하는 기능을 수행한다. 이를 위해, 통신부(220)는 유선 또는 무선 모뎀, 랜카드, 마이크로프로서등을 포함하여 구성될 수 있다.The communication unit 220 performs a communication connection with the communication network 130 and performs a function of connecting communication between the data collector 120 and the computer 140. For this purpose, the communication unit 220 may be configured to include a wired or wireless modem, a LAN card, a microprocessor, etc.

저장부(230)는 데이터베이스(141)를 저장하는 기능을 수행한다. 또한, 저장부(230)는 센싱 정보를 이용하여 검사 결과를 생성하고 검사 결과에 따른 튜브 상태를 평가하여 정비 계획 정보를 생성하는 알고리즘을 갖는 프로그램, 소프트웨어, 데이터 등을 저장한다. The storage unit 230 performs the function of storing the database 141. In addition, the storage unit 230 stores programs, software, data, etc. having an algorithm that generates inspection results using sensing information, evaluates the tube condition according to the inspection results, and generates maintenance plan information.

이를 위해 저장부(230)는 플래시 메모리 타입(flash memory type), 하드디스크 타입(hard disk type), 멀티미디어 카드 마이크로 타입(multimedia card micro type), 카드 타입의 메모리(예를 들어 SD(Secure Digital) 또는 XD(eXtreme Digital) 메모리 등), 램(Random Access Memory, RAM), SRAM(Static Random Access Memory), 롬(Read Only Memory, ROM), EEPROM(Electrically Erasable Programmable Read Only Memory), PROM(Programmable Read Only Memory), 자기 메모리, 자기 디스크, 광디스크 중 적어도 하나의 타입의 저장매체를 포함할 수 있다. 또한, 인터넷(internet)상에서 저장 기능을 수행하는 웹 스토리지(web storage), 클라우드 서버와 관련되어 동작할 수도 있다.For this purpose, the storage unit 230 is a flash memory type, a hard disk type, a multimedia card micro type, and a card type memory (for example, SD (Secure Digital) or eXtreme Digital (XD) memory, etc.), Random Access Memory (RAM), Static Random Access Memory (SRAM), Read Only Memory (ROM), Electrically Erasable Programmable Read Only Memory (EEPROM), Programmable Read It may include at least one type of storage medium among (Only Memory), magnetic memory, magnetic disk, and optical disk. Additionally, it may operate in connection with web storage and cloud servers that perform storage functions on the Internet.

전원부(240)는 구성요소들에 전원을 공급하는 기능을 수행한다. 이를 위해, 파워 서플라이, 레귤레이터, AC(Alternating Current)-DC(Direct Current) 컨버터 등을 포함하여 구성될 수 있다.The power unit 240 performs the function of supplying power to components. To this end, it may be configured to include a power supply, regulator, AC (Alternating Current)-DC (Direct Current) converter, etc.

입력부(250)는 사용자의 명령을 입력하는 기능을 수행한다. 따라서, 마우스, 키보드, 마이크 등으로 포함하여 구성될 수 있다.The input unit 250 performs the function of inputting a user's command. Therefore, it may be configured to include a mouse, keyboard, microphone, etc.

출력부(260)는 설정 화면, 처리 정보 화면 등을 출력하는 기능을 수행한다. 이를 위해, 출력부(260)는 LCD(Liquid Crystal Display), LED(Light Emitting Diode) 디스플레이, PDP(Plasma Display Panel), OLED(Organic LED) 디스플레이, 터치 스크린, CRT(Cathode Ray Tube), 플렉시블 디스플레이, 마이크로 LED, 미니 LED 등이 될 수 있다. 터치 스크린의 경우, 입력 수단으로 사용될 수 있다. 또한, 출력부(260)는 사운드 시스템을 포함하여 구성될 수 있다.The output unit 260 performs the function of outputting a settings screen, a processing information screen, etc. For this purpose, the output unit 260 includes a liquid crystal display (LCD), a light emitting diode (LED) display, a plasma display panel (PDP), an organic LED (OLED) display, a touch screen, a cathode ray tube (CRT), and a flexible display. , micro LED, mini LED, etc. In the case of a touch screen, it can be used as an input means. Additionally, the output unit 260 may be configured to include a sound system.

도 3은 도 2에 도시된 제어기(210)의 세부 구성 블럭도이다. 도 3을 참조하면, 제어기(210)는, 튜브의 운전정보를 포함하는 센싱 정보를 획득하는 획득 모듈(310), 운전정보를 이용하여 튜브의 손상 정도를 평가하는 분석모듈(320), 고장이력과 전회 검사결과를 이용하여 튜브의 검사 및 교체여부를 점검(Overhaul) 계획수립전 결정하는 계산모듈(330), 결정에 따른 정비 계획 정보를 알림 정보로 생성하는 알림 정보 생성모듈(340) 등을 포함하여 구성될 수 있다.FIG. 3 is a detailed block diagram of the controller 210 shown in FIG. 2. Referring to FIG. 3, the controller 210 includes an acquisition module 310 that acquires sensing information including operation information of the tube, an analysis module 320 that evaluates the degree of damage to the tube using the operation information, and a failure history. and a calculation module (330) that determines whether to inspect and replace the tube before establishing an inspection (overhaul) plan using the previous inspection results, and a notification information generation module (340) that generates maintenance plan information according to the decision as notification information. It can be configured to include.

분석모듈(320)은 튜브의 운전정보를 이용하여 튜브의 손상을 평가하는 기능을 수행한다.The analysis module 320 performs a function of evaluating damage to the tube using the tube's operation information.

계산모듈(330)은 데이터베이스에 미리 저장되어 있는 고장이력과 전회 검사결과를 이용하여 튜브의 검사 및 교체여부를 점검(Overhaul) 계획수립전 결정하고 이를 점검(Overhaul) 계획수립시 반영하도록 하는 기능을 수행한다.The calculation module 330 uses the failure history and previous inspection results previously stored in the database to determine whether to inspect and replace the tube before establishing an overhaul plan, and has a function to reflect this when establishing an overhaul plan. Perform.

알림 정보 생성 모듈(340)은 보일러 정비 책임자가 적절한 교체물량을 확보하고 검사계획을 용이하게 수립하도록 알림 정보로 생성하는 기능을 수행한다. 따라서, 튜브 상태진단의 정확도를 향상시켜 효과적으로 튜브의 예방정비를 수행하고 최적의 검사 및 교체비용을 집행할 수 있도록 한다.The notification information generation module 340 performs the function of generating notification information so that the boiler maintenance manager can secure an appropriate replacement quantity and easily establish an inspection plan. Therefore, by improving the accuracy of tube condition diagnosis, it is possible to effectively perform preventive maintenance of tubes and execute optimal inspection and replacement costs.

도 3에 도시된 "획득 모듈", "분석 모듈", "계산 모듈", 알림 정보 생성모듈" 등은 적어도 하나의 기능이나 동작을 처리하는 단위를 의미하며, 이는 소프트웨어 및/또는 하드웨어로 구현될 수 있다. 하드웨어 구현에 있어, 상술한 기능을 수행하기 위해 디자인된 ASIC(application specific integrated circuit), DSP(digital signal processing), PLD(programmable logic device), FPGA(field programmable gate array), 프로세서, 마이크로프로세서, 다른 전자 유닛 또는 이들의 조합으로 구현될 수 있다. 소프트웨어 구현에 있어, 소프트웨어 구성 컴포넌트(요소), 객체 지향 소프트웨어 구성 컴포넌트, 클래스 구성 컴포넌트 및 작업 구성 컴포넌트, 프로세스, 기능, 속성, 절차, 서브 루틴, 프로그램 코드의 세그먼트, 드라이버, 펌웨어, 마이크로 코드, 데이터, 데이터베이스, 데이터 구조, 테이블, 배열 및 변수를 포함할 수 있다. 소프트웨어, 데이터 등은 메모리에 저장될 수 있고, 프로세서에 의해 실행된다. 메모리나 프로세서는 당업자에게 잘 알려진 다양한 수단을 채용할 수 있다.“Acquisition module,” “analysis module,” “calculation module,” notification information generation module, etc. shown in FIG. 3 refer to a unit that processes at least one function or operation, which may be implemented in software and/or hardware. In hardware implementation, an application specific integrated circuit (ASIC), digital signal processing (DSP), programmable logic device (PLD), field programmable gate array (FPGA), processor, and microcontroller designed to perform the above-mentioned functions. It may be implemented as a processor, other electronic units, or a combination thereof.In software implementation, software configuration components (elements), object-oriented software configuration components, class configuration components, and task configuration components, processes, functions, properties, procedures, and sub-components. It can include routines, segments of program code, drivers, firmware, microcode, data, databases, data structures, tables, arrays, and variables.Software, data, etc. can be stored in memory and executed by a processor. The memory or processor may employ various means well known to those skilled in the art.

도 4는 본 발명의 일실시예에 따른 튜브 고온 손상 예방 정비 과정을 보여주는 흐름도이다. 도 4를 참조하면, 튜브상태 평가 및 교체물량 예측 단계(S410)에서 운전상태 분석 단계(S481)까지 순환적으로 진행되어 직선적이며 일회적인 종래의 체계와는 차별화된다.Figure 4 is a flow chart showing a tube high temperature damage prevention maintenance process according to an embodiment of the present invention. Referring to FIG. 4, the process progresses cyclically from the tube condition evaluation and replacement quantity prediction stage (S410) to the operation state analysis stage (S481), making it different from the linear and one-time conventional system.

튜브상태 평가 및 교체물량예측 단계(S410)에서는 과거 튜브의 결함 원인 분석(S460)에 따른 결함 원인 분석 정보, 검사결과 및 정비이력(S471)에 따른 검사결과 및 정비 이력 정보, 및 계획예방 정비공사 후 현재까지의 운전이력을 이용한 운전상태분석(S481)에 따른 운전상태분석 정보를 종합하여 튜브의 상태를 1 ~ 5 단계(즉, 스테이지)로 평가하고 이 중 가장 상태가 심각한 5 스테이지에 해당하는 튜브에 대해 교체를 권고하고 4 스테이지에 대해서는 차차기 계획예방정비시기 도래(4년 후) 이전에 5 스테이지에 이르는 경우에 대해 교체를 권고한다. 5 스테이지를 보면 다음과 같다.In the tube condition evaluation and replacement quantity prediction stage (S410), defect cause analysis information according to past tube defect cause analysis (S460), inspection results and maintenance history information according to inspection results and maintenance history (S471), and planned preventive maintenance work. Afterwards, the operation status analysis information according to the operation status analysis (S481) using the operation history up to the present is synthesized to evaluate the condition of the tube in stages 1 to 5 (i.e. stages), of which stage 5 is the most serious. Replacement of the tube is recommended, and replacement of the 4th stage is recommended if it reaches stage 5 before the next planned preventive maintenance period (after 4 years) arrives. The 5 stages are as follows.

스테이지stage 1One 22 33 44 55 조차사항Even matters 검사생략Skip inspection 검사검토Inspection review 검사test 검사 및inspection and
교체검토Consider replacement
교체substitute

위 표에서 1 스테이지는 금회 계획예방정비공사시 검사를 생략해도 무방하며, 2 스테이지는 공사기간 및 예산규모에 따라 검사를 시행하거나 차기 검사로 연기가 가능하다. 3 스테이지 및 4 스테이지는 금회 계획예방정비공사에서 필수적으로 검사를 수행하여야 하며, 4 스테이지인 경우 검사결과에 따라 교체가 필요할 수 있으므로 교체물량을 준비하거나 2년 주기의 계획예방정비공사 사이에 간이정비공사가 예정된 경우 교체를 1년 연기할 수 있다. 5 스테이지에 해당하는 경우, 필수적으로 교체물량을 확보하여야 하며 데이터의 수집이 필요할 경우 검사를 시행할 수 있다.튜브상태평가는 단계 S460,S461,S470,S471,S480,S481에 의해 생성되는 정보를 통합해야만 정확한 결과를 얻을 수 있으나, 과거 단계 S461과 S471을 수행하지 않은 경우, 단계 S481에 의해 생성되는 정보는 확보하여야 평가를 수행할 수 있다. 보통 신규로 보일러 튜브 고온손상 예방정비기법을 적용하거나 시스템을 설치한 경우 단계 S461과 S471에 따른 정보를 얻을 수 없으나 단계 S481에 따른 정보는 대부분의 보일러에 설치된 센서에 의해 취득되므로 튜브상태평가가 불가능한 경우는 찾아보기 어렵다.In the table above, Stage 1 inspection can be omitted during the current planned preventive maintenance construction, and Stage 2 inspection can be performed or postponed to the next inspection depending on the construction period and budget size. Stages 3 and 4 must be inspected during this planned preventive maintenance project. In the case of stage 4, replacement may be necessary depending on the inspection results, so prepare replacement quantities or perform simple maintenance between planned preventive maintenance projects every two years. If construction is scheduled, replacement can be delayed by one year. In the case of stage 5, replacement quantity must be secured, and inspection can be performed if data collection is necessary. Tube condition evaluation uses the information generated by steps S460, S461, S470, S471, S480, and S481. Accurate results can only be obtained by integration, but if steps S461 and S471 have not been performed in the past, the information generated by step S481 must be secured to perform the evaluation. Usually, when a new boiler tube high-temperature damage preventive maintenance technique is applied or a system is installed, information according to steps S461 and S471 cannot be obtained. However, since information according to step S481 is obtained by sensors installed in most boilers, tube condition evaluation is not possible. Cases are difficult to find.

튜브상태평가는 다음의 평가절차에 의해 결정된다. 크리프 손상도는 전회 계획예방정비공사 후 금회 계획예방정비공사 설계 전까지의 운전정보와 Larson-Miller Parameter 등 재료의 크리프 파괴실험에서 얻어진 크리프 손상관계식을 이용하여 평가할 수 있다. 조직복제검사와 경도측정은 일반적으로 전회 검사결과(S400)를 사용하며 금회 검사에서 Creep Void가 검출되거나 조직열화등급이 E 또는 F이며 경도가 설계강도환산치의 30%이상 저하되는 경우는 결함으로 판단하여(SS460), 교체를 권고한다.Tube condition evaluation is determined by the following evaluation procedure. The degree of creep damage can be evaluated using the creep damage relationship equation obtained from the creep failure test of materials such as Larson-Miller Parameter and operation information from the previous planned preventive maintenance work to the design of the current planned preventive maintenance work. Tissue replication tests and hardness measurements generally use the previous test results (S400), and if a creep void is detected in the current test, the tissue deterioration grade is E or F, and the hardness decreases by more than 30% of the design strength conversion value, it is judged to be a defect. Therefore (SS460), replacement is recommended.

단계 S461,S471,S481는 단계 S410을 수행하기 위해 필요한 정보를 제공하는 단계로 단계 S461은 검사위치 선정시 과거 결함위치를 반영하며 단계 S471는 튜브의 상태평가를 위한 검사결과와 튜브 정비이력을 통해 사용시간 및 과거 산화스케일 두께 등 튜브온도계산에 필요한 정보를 제공하고 단계 S481은 튜브의 크리프 손상평가를 위한 핵심적인 운전정보를 제공하는 단계로 보일러 튜브 출구 비가열부에 설치된 온도센서 데이터와 증기유량, 압력 등의 운전정보를 포함할 수 있다.Steps S461, S471, and S481 provide the information necessary to perform step S410. Step S461 reflects past defect locations when selecting an inspection location, and step S471 provides inspection results and tube maintenance history for evaluating the condition of the tube. It provides information necessary for calculating tube temperature, such as usage time and past oxidation scale thickness, and step S481 provides key operation information for evaluating creep damage of the tube, including data from the temperature sensor installed in the unheated part of the boiler tube outlet, steam flow rate, It may include operating information such as pressure.

또한, 단계 S420는 단계 S410의 결과를 현장에 반영하는 단계로 계획예방정비공사 설계서에 검사개소, 위치, 방법과 검사를 위한 비계/발판 설치위치 등 정보를 제공하며 손상발생가능성이 매우 높은 튜브들을 선별하여 교체물량을 산정하고 공사 전 발주하도록 하여 공사수행에 차질이 없도록 하는 단계이다.In addition, step S420 is a step that reflects the results of step S410 on the site, providing information such as inspection location, location, method, and scaffolding/scaffolding installation location for inspection in the planned preventive maintenance work design, and inspecting tubes with a very high possibility of damage. This is the stage to select, calculate the replacement quantity, and place an order before construction to ensure that there are no disruptions in construction performance.

한편, 단계 S410에서 단계 S471의 절차는 일반적으로 단계별 독립적으로 진행되나 전체 단계 또는 일부 단계를 전산시스템으로 처리할 수 있으며 단계와 단계를 자동으로 연계하기 위한 추가적인 작업이 필요하다. 특히 S471 단계에서 처리하는 데이터는 시계열 데이터로서 시간의 흐름에 따라 연속적으로 기록되는 값이기 때문에 이를 관리하기 위해서는 특별한 데이터베이스가 필요하며 일반적인 관계형 데이터베이스를 사용하는 경우 활용에 어려움이 따르게 될 수 있다. Meanwhile, the procedures from steps S410 to S471 are generally carried out step by step independently, but all or part of the steps can be processed by a computer system, and additional work is required to automatically link the steps. In particular, the data processed in step S471 is time series data, which is a value that is continuously recorded over time, so a special database is required to manage it, and if a general relational database is used, utilization may be difficult.

실시간데이터베이스는 시계열 데이터 관리를 위한 특수한 데이터베이스로 상용화된 제품이 있으며 S410 단계의 복잡한 계산을 지원하기 위해 다양한 인터페이스를 지원하고 있다. 그러나 오픈소스 실시간 데이터베이스의 경우 인터페이스 지원이 매우 제한적이기 때문에 사용자가 개발해야 하는 어려움이 있어 거의 사용되고 있지 않다.The real-time database is a special database for time series data management, and there are commercialized products that support various interfaces to support complex calculations at the S410 level. However, in the case of open source real-time databases, interface support is very limited, making it difficult for users to develop them, so they are rarely used.

도 5는 본 발명의 일실시예에 따른 크리프 손상관계 테이블이다. 도 5를 참조하면, 크리프 손상도는 단계 S410 및 S481에 의해 산출되며, 조직복제검사는 단계 S461,S471에 의해 산출되며, 경도측정 정보는 단계 S461,S471에 의해 산출된다. 도 5에 표시된 *는 특이검사결과로 추가검사를 시행하거나 발췌하여 Creep 파괴실험을 수행함을 나타내고, **는 단기과열이 의심되므로 추가검사를 시행하거나 발췌하여 Creep 파괴실험을 수행함을 나타낸다.Figure 5 is a creep damage relationship table according to an embodiment of the present invention. Referring to Figure 5, the creep damage degree is calculated by steps S410 and S481, the tissue replication test is calculated by steps S461 and S471, and the hardness measurement information is calculated by steps S461 and S471. * shown in Figure 5 indicates that an additional test is performed or an excerpt is taken as a special test result and a creep destruction test is performed, and ** indicates that an additional test is performed or an excerpt is performed and a creep destruction test is performed because short-term overheating is suspected.

도 6은 본 발명의 일실시예에 따른 운전조건에 의해 각 튜브뱅크의 유량분포를 계산하는 모델의 예시이다. 일반적으로, 보일러 튜브의 상태평가 요소 중 크리프 손상평가결과는 입력 데이터의 정확도와 평가기법의 적절성에 의해 결정되나 종래의 제시된 입력데이터와 평가기법은 실제 보일러의 운전특성과 부합하지 않거나 임의적으로 선정하는 등 신뢰하기에 어려움이 있으며 이를 해결하기 위한 개선방법은 아래와 같다.Figure 6 is an example of a model that calculates the flow rate distribution of each tube bank according to operating conditions according to an embodiment of the present invention. In general, among the condition evaluation factors of boiler tubes, creep damage evaluation results are determined by the accuracy of input data and the appropriateness of evaluation techniques, but the input data and evaluation techniques presented in the past do not match the operating characteristics of the actual boiler or are arbitrarily selected. There are difficulties in trusting, and the improvement methods to solve this are as follows.

튜브상태평가 방법은 전통적인 크리프 손상평가기법을 따르나 튜브의 온도를 계산하는 단계와 튜브 응력을 계산하는 단계가 종래의 방법과는 크게 다르다. 종래의 튜브의 온도를 계산하는 방법은 각 튜브에 흐르는 유량이 동일하고, 그 값은 평균값으로 가정하여 튜브의 온도를 계산하나 실제 튜브는 입, 출구 헤더의 증기유입, 유출방향과 개수 및 튜브와 헤더의 연결형태에 따라 각 튜브의 유량이 결정된다. 일반적으로 튜브의 최대유량과 최소유량은 10 ~ 20%의 차이를 나타내기 때문에 튜브의 유량을 계산하는 과정은 매우 중요하다.The tube condition evaluation method follows the traditional creep damage evaluation technique, but the steps for calculating the tube temperature and the tube stress are significantly different from the conventional method. The conventional method of calculating the temperature of a tube is to calculate the temperature of the tube by assuming that the flow rate flowing through each tube is the same and that the value is an average value. The flow rate of each tube is determined depending on the connection type of the header. In general, the process of calculating the tube flow rate is very important because there is a difference of 10 to 20% between the maximum and minimum flow rates of the tube.

보일러 튜브와 같이 복잡한 배관망의 유량을 계산하는 이론적인 방법은 유로망 해석방법 또는 이와 유사한 상용 소프트웨어가 될 수 있다. 이러한 튜브의 유량을 계산하는 과정은 다음과 같다.The theoretical method for calculating the flow rate of a complex piping network such as boiler tubes can be a flow network analysis method or similar commercial software. The process for calculating the flow rate of these tubes is as follows.

①. 튜브 1개 유로의 구성요소에 대한 압력손실계수식 또는 선도를 이용하여 가능한 온도, 압력, 유량범위 등의 운전조건에 대해 유로 전체의 압력손실계수식 또는 선도를 계산한다. 배관내 압력손실계수의 일반형은 다음 수학식과 같다.①. Using the pressure loss coefficient equation or diagram for the components of one tube flow path, calculate the pressure loss coefficient formula or diagram for the entire flow path for operating conditions such as possible temperature, pressure, and flow rate range. The general form of the pressure loss coefficient within the pipe is as follows:

여기서, f:마찰계수, L:배관길이, D:배관직경이다. 마찰계수는 다음과 같다.Here, f: friction coefficient, L: pipe length, D: pipe diameter. The friction coefficient is as follows.

즉 난류유동에 대한 Filonenko의 식이다. That is, Filonenko's equation for turbulent flow.

여기서, Re:배관유동의 레이놀즈수이다. Re는 다음 수학식과 같다.Here, Re: Reynolds number of pipe flow. Re is as follows:

여기서, μ:유체의 점성계수, ρ:유체의 밀도, v: 유체의 속도 D:배관직경이다.Here, μ: viscosity coefficient of the fluid, ρ: density of the fluid, v: velocity of the fluid, D: pipe diameter.

②. 유로망 해석 또는 이와 유사한 기능을 수행하는 상용 소프트웨어를 이용하여 다수의 튜브로 구성되는 튜브뱅크(또는 패널, 번들)에 대해 절차 ①에서 계산된 각 유로의 압력손실계수식 또는 선도와 가능한 운전조건에 의해 압력손실계수식 또는 선도와 각 튜브 유로의 유량분포를 계산한다.②. Using commercial software that performs flow network analysis or similar functions, the pressure loss coefficient equation or diagram for each flow path calculated in procedure ① for a tube bank (or panel, bundle) composed of multiple tubes and possible operating conditions are analyzed. Calculate the pressure loss coefficient equation or diagram and the flow rate distribution of each tube passage.

③. 유로망 해석 또는 이와 유사한 기능을 수행하는 상용 소프트웨어를 이용하여 입, 출구 헤더와 다수의 튜브뱅크로 구성되는 보일러 튜브 모델에 대해 절차 ②에서 얻어진 튜브뱅크의 압력손실계수식 또는 선도와 가능한 운전조건에 의해 각 튜브뱅크의 유량분포를 계산한다.③. Using commercial software that performs flow network analysis or similar functions, the pressure loss coefficient equation or diagram of the tube bank obtained in procedure ② for the boiler tube model consisting of the inlet and outlet headers and multiple tube banks and the possible operating conditions are calculated. Calculate the flow distribution of each tube bank.

④. 단계 3의 튜브뱅크별 유량분포와 절차 ②의 뱅크내 각 튜브의 유량분포를 이용하여 보일러 튜브모델을 구성하는 각 튜브의 유량분포를 계산한다. ④. Calculate the flow rate distribution of each tube that makes up the boiler tube model using the flow rate distribution for each tube bank in step 3 and the flow rate distribution of each tube in the bank in procedure ②.

도 6은 상기의 절차 ① 내지 ③의 사례를 제시한 것으로, 절차 ①과 절차 ②는 상용 유로설계 소프트웨어인 Flowmaster를 이용하여 단일 튜브유로와 튜브 뱅크의 압력손실계수를 계산하였으며 절차 ③은 유로망 해석법을 이용하여 계산하였다. 투브 유로 압력 손실 계산 단계(S610), 튜브 뱅크 압력 손실 계산 단계(S620), 및 튜브 모듈 유량 분포 계산 단계(S630)로 구성된다.Figure 6 presents an example of the above procedures ① to ③. In procedures ① and ②, the pressure loss coefficient of a single tube passage and a tube bank was calculated using Flowmaster, a commercial flow path design software, and in procedure ③, the flow network analysis method was used. It was calculated using . It consists of a tube flow path pressure loss calculation step (S610), a tube bank pressure loss calculation step (S620), and a tube module flow distribution calculation step (S630).

도 7은 본 발명의 일실시예에 따른 질량 유량에 대해 실험과 계산의 오차를 비교한 결과 그래프이다. 도 7을 참조하면, 분배 헤더 출구(Divide header outlet)에서 질량 유량(710) 및 결합 헤더 출구(Combine header outlet)에서 질량 유량(720)이 실험과 계산의 경계에 밀집된다. 즉, 실험과 계산의 오차를 비교한 결과로서 양호한 유량 결과를 보여준다.Figure 7 is a graph showing the results of comparing the errors between experiment and calculation for mass flow rate according to an embodiment of the present invention. Referring to FIG. 7, the mass flow rate 710 at the divide header outlet and the mass flow rate 720 at the combine header outlet are crowded at the boundary between experiment and calculation. In other words, it shows good flow rate results as a result of comparing the errors of experiment and calculation.

도 8은 본 발명의 일실시예에 따른 정압(static pressure)에 대해 실험과 계산의 오차를 비교한 결과 그래프이다. 도 8을 참조하면, 분배 헤더 출구에서 정압(810) 및 결합 헤더 출구에서 정압(820)이 실험과 계산의 경계에 밀집된다. 즉, 실험과 계산의 오차를 비교한 결과로서 양호한 정압 결과를 보여준다.Figure 8 is a graph showing the results of comparing errors between experiments and calculations for static pressure according to an embodiment of the present invention. Referring to Figure 8, the static pressure 810 at the distribution header outlet and the static pressure 820 at the combined header outlet are crowded at the boundary between experiment and calculation. In other words, it shows good static pressure results as a result of comparing the errors of experiment and calculation.

도 9는 일반적인 튜브의 운전온도 변동특성 그래프이다. 도 9를 참조하면, 일반적으로 튜브의 크리프 손상을 평가하기 위한 튜브에 작용하는 응력을 계산하는 종래의 방법은 튜브 내부를 흐르는 증기의 압력을 이용한 후프응력을 계산하는 방법과 운전온도를 이용한 허용응력을 계산하는 방법이 제시되어 있다. 전자의 방법은 ASME( American Society of Mechanical Engineers) 및 KEPIC(Korea Electric Power Industry Code, KEPIC) 등 산업계 표준 코드에서 제시되나 계산되는 손상의 값이 너무 작아 튜브간의 변별력이 없어지는 단점이 있으며, 후자의 방법은 도 9에 도시된 바와 같이 튜브의 운전온도(Outlet tube metal temp)의 변동특성이 너무 커 실제 적용하기 어려운 단점이 있다. 또한 이 두 값을 비교하여 큰 값을 선택한다 하더라도 손상을 평가하는 응력이 일관성을 유지하지 못하여 실제 운전현상과 일치하지 못하는 어려움이 있다.Figure 9 is a graph of the operating temperature fluctuation characteristics of a general tube. Referring to FIG. 9, the conventional method of calculating the stress acting on the tube to evaluate creep damage of the tube is generally a method of calculating the hoop stress using the pressure of steam flowing inside the tube and an allowable stress using the operating temperature. A method for calculating is presented. The former method is presented in industry standard codes such as ASME (American Society of Mechanical Engineers) and KEPIC (Korea Electric Power Industry Code, KEPIC), but it has the disadvantage of losing the ability to differentiate between tubes because the calculated damage value is too small. As shown in FIG. 9, the method has the disadvantage that it is difficult to apply in practice because the variation in the operating temperature of the tube (outlet tube metal temp) is too large. In addition, even if you compare these two values and select a larger value, there is a difficulty in not matching the actual driving phenomenon because the stress for evaluating damage is not consistent.

상기와 같은 문제점을 해결하기 위해 국제적인 압력용기 코드인 TRD 300과 IBR(Indian Boiler Regulation)에서 제시하는 허용온도 계산방법에 기반한 다음과 같은 절차를 통해 튜브의 응력을 계산한다.To solve the above problems, the stress of the tube is calculated through the following procedure based on the allowable temperature calculation method presented by TRD 300, the international pressure vessel code, and IBR (Indian Boiler Regulation).

①. 전체 튜브 모듈의 출구설계증기온도 또는 1년 이상의 운전이력(계절변화에 따른 보일러의 운전특성을 고려)에서 출구운전증기온도 중앙값과 표준편차를 계산한다.①. Calculate the median and standard deviation of the outlet operating steam temperature from the outlet design steam temperature of the entire tube module or more than one year of operation history (taking into account the boiler's operation characteristics according to seasonal changes).

②. 출구설계증기온도가 얻어진 경우 TRD300의 허용온도계산식을 이용하여 튜브의 허용온도를 계산하거나 출구운전증기온도 중앙값과 표준편차를 계산한 경우 IBR의 허용온도계산식을 변경한 계산식을 사용하며, 튜브손상의 변별력과 정비의사결정의 안정성을 보장하기 위해 두 개의 허용온도 중 낮은 값을 허용온도로 결정한다.②. When the outlet design steam temperature is obtained, calculate the allowable temperature of the tube using the allowable temperature calculation formula of TRD300, or when the median and standard deviation of the outlet operating steam temperature are calculated, use a calculation formula that changes the allowable temperature calculation formula of IBR, and use the calculation formula that changes the allowable temperature calculation formula of IBR. To ensure discrimination and stability of maintenance decisions, the lower of the two allowable temperatures is determined as the allowable temperature.

출구설계증기온도 및 출구운전증기온도 조건을 보면 다음과 같다.The outlet design steam temperature and outlet operating steam temperature conditions are as follows.

IBR의 원래 식은 이며 Tmx는 예상되는 최대증기온도이다. The original formula for IBR was and and T mx is the expected maximum steam temperature.

위 식에서 Td는 출구설계증기온도, Tm는 출구운전증기온도 중앙값, Tsd는 출구운전 증기온도 표준편차, n은 보일러 형식 및 튜브모듈의 위치에 따라 결정되는 값으로 1, 1.5, 2 중 한 개의 값을 선택한다. 기본값은 1.5이며 복사과열기는 보일러 노 출구에 가까울수록 큰 값을 대류과열기는 멀수록 큰 값을 적용한다.In the above equation, T d is the outlet design steam temperature, T m is the median outlet operation steam temperature, T sd is the outlet operation steam temperature standard deviation, and n is a value determined depending on the boiler type and the position of the tube module, among 1, 1.5, and 2. Select one value. The default value is 1.5, and for radiant superheaters, a larger value is applied the closer it is to the boiler furnace outlet, and for convection superheaters, a larger value is applied the farther away it is.

일반적으로 보일러의 출구설계증기온도는 최종과열기 및 최종재열기에만 주어지며 1차, 2차 과열기와 재열기에는 주어지지 않으므로 출구운전증기온도 조건을 적용해야한다.In general, the boiler's outlet design steam temperature is given only to the final superheater and final reheater, but not to the primary and secondary superheaters and reheaters, so the outlet operation steam temperature condition must be applied.

③. 절차 ②에서 계산된 튜브의 허용온도에서 허용응력을 튜브에 작용하는 응력으로 결정한다. 이 결정방법은 보일러 제작사에서 튜브의 수명을 결정하는 방법과 개념적으로 부합하며 출구설계증기온도를 확보하지 못하더라도 압력용기관련 국제적인 코드와 운전이력 및 통계적 방법을 통해 합리적으로 평가함으로써 다양한 튜브모듈에 대한 손상평가가 가능하다. ③. Determine the allowable stress as the stress acting on the tube at the allowable temperature of the tube calculated in procedure ②. This determination method is conceptually consistent with the method by which boiler manufacturers determine the lifespan of tubes, and even if the outlet design steam temperature cannot be secured, it can be reasonably evaluated through international codes related to pressure vessels, operation history, and statistical methods to determine the lifespan of tubes. Damage assessment is possible.

한편, 종래의 튜브 검사위치 선정방법은 과거 사고사례와 보일러 튜브 정비 가이드라인에 의해 일괄적으로 결정하여 보일러의 운전이력 및 특성을 고려하지 않고 동일한 위치만을 검사토록 하였다. 그러나 실제 보일러 튜브의 사고위치는 일괄적으로 정해진 위치와 일치하지 않는 경우가 다수 발생하여 종래 방법의 문제점이 인지하고 있으나 개선된 방법은 제시된 사례가 없었다.Meanwhile, the conventional tube inspection location selection method was uniformly determined based on past accident cases and boiler tube maintenance guidelines, so that only the same location was inspected without considering the boiler's operation history and characteristics. However, there are many cases where the actual accident location of the boiler tube does not coincide with the uniformly determined location, so although the problems with the conventional method are recognized, no improved method has been proposed.

본 발명의 일실시예에서는 개선된 튜브 검사위치 선정 개념을 제시한다. 새로운 튜브 검사위치 선정방법은 개선된 튜브 크리프 손상기법과 보일러 튜브 정비 가이드라인에서 제시하는 취약부를 고려하여 다음 절차에 따라 선정한다.One embodiment of the present invention presents an improved tube inspection position selection concept. The new tube inspection location selection method is selected according to the following procedure, considering the improved tube creep damage technique and the weak points presented in the boiler tube maintenance guidelines.

①.개선된 튜브 크리프 손상기법과 운전이력을 이용하여 센서가 설치된 튜브의 손상도를 평가하며 튜브상태가 3 스테이지 이상으로 평가되는 경우 검사대상으로 선정한다.①. Using the improved tube creep damage technique and operation history, the degree of damage to the tube on which the sensor is installed is evaluated, and if the tube condition is evaluated to be 3 stages or higher, it is selected as an inspection target.

*②.센서가 설치되지 않은 튜브 중 인근의 튜브상태가 3 스테이지 이상으로 평가되는 경우는 동일한 뱅크 내의 센서가 설치된 튜브가 3 스테이지 이상으로 평가되거나, 이웃하는 뱅크의 동일한 열 위치에 센서가 설치된 튜브가 3 스테이지 이상으로 평가되는 2가지 경우 중 하나이면 모두 검사대상에 포함시킨다.*②. Among tubes without sensors installed, if the condition of a nearby tube is evaluated as 3 stages or higher, a tube with a sensor installed in the same bank is evaluated as 3 stages or higher, or a tube with a sensor installed in the same row of a neighboring bank If it is one of the two cases evaluated as stage 3 or higher, both are included in the inspection target.

③.절차 ②에서 상태평가 스테이지가 3 스테이지 이상인 튜브와 동일한 뱅크에 센서가 설치되지 않은 튜브들이 있는 경우 대상 튜브들 중 가장 유량이 작아 연소가스 온도변화에 민감하므로 고온에 노출될 확률이 가장 큰 튜브를 검사대상으로 선정한다.③. In procedure ②, if there are tubes without sensors installed in the same bank as tubes with 3 or more condition evaluation stages, the tube with the lowest flow rate among the target tubes is sensitive to changes in combustion gas temperature, and is thus most likely to be exposed to high temperatures. is selected as the inspection target.

④.절차 ① ~ 절차 ③에 선정된 튜브 출구의 곡관부위, 용접부위, 두께 변화부위를 검사대상으로 선정하며, 곡관부위는 외호면(extrados), 용접부위는 인근 열영향부 및 모재부를 포함하여 검사위치를 선정한다. 만약 튜브 출구에 직관부위만 존재할 경우는 가장 고온부를 검사부위로 선정하며 고온부를 결정한다. 고온부위를 결정하는 방법은 다음과 같다. ④. The bend area, weld area, and thickness change area of the tube outlet selected in procedures ① ~ procedure ③ are selected as inspection targets. The bend area includes the outer surface (extrados), and the weld area includes the nearby heat-affected zone and base metal area. Select the inspection location. If there is only a straight pipe area at the tube outlet, the area with the highest temperature is selected as the inspection area and the high temperature area is determined. The method for determining the high temperature area is as follows.

도 10은 본 발명의 일실시예에 따른 온도 센서를 이용한 검사 개념도이다. 도 10을 참조하면, 온도센서(1021,1022)가 설치된 증기 인입 헤더(1011) 및 증기 출구 헤더(1012)측 최장열 튜브 출구의 3/4 Run 부위를 중심으로 10cm간격으로 상단 인클로즈(1031)과 하단 인클로즈(1032)사이의 산화스케일을 연소 가스 흐름(1001)에 따라 10개 이상 측정하여 가장 산화스케일 두께가 두꺼운 부위에 대해 검사(조직복제 및 경도측정)위치로 선정하며, 온도센서가 설치되지 않은 대상 튜브도 동일한 위치를 검사위치로 선정한다.Figure 10 is a conceptual diagram of inspection using a temperature sensor according to an embodiment of the present invention. Referring to FIG. 10, the upper enclosure (1031) is spaced at intervals of 10 cm centered on the 3/4 run area of the longest tube outlet on the steam inlet header (1011) and steam outlet header (1012) where the temperature sensors (1021, 1022) are installed. ) and the lower enclosure (1032), the oxidation scale is measured at more than 10 locations according to the combustion gas flow (1001), and the area with the thickest oxidation scale thickness is selected as the location for inspection (tissue replication and hardness measurement), and the temperature sensor Select the same location as the inspection location for the target tube that is not installed.

⑤.절차 ① ~ 절차 ③에 선정된 튜브의 중간부위에 두께 변화부위 또는 용접부위가 있는 경우 검사위치로 선정한다.⑤. If there is a thickness change area or welding area in the middle of the tube selected in procedures ① to procedure ③, select it as the inspection location.

⑥.전회 공사에서 결함원인이 크리프로 판명되어 교체된 부위는 교체 후 최초 계획예방정비공사 시 검사위치로 선정하며 검사결과 및 크리프 손상평가결과가 양호한 경우 4년까지 검사에서 제외된다.⑥. Parts that were replaced because the cause of the defect was determined to be creep in the previous construction are selected as inspection locations during the first planned preventive maintenance work after replacement, and if the inspection results and creep damage evaluation results are good, they are excluded from inspection for up to 4 years.

한편, 절차 1에서 절차 4의 단계에 의해 검사를 수행하며 검사결과 결함이 발견되면 결함부를 중심으로 절차 3과 같은 방법으로 추가적인 검사위치를 선정한다.Meanwhile, the inspection is performed according to the steps from Procedure 1 to Procedure 4, and if a defect is found as a result of the inspection, an additional inspection location is selected in the same manner as Procedure 3, focusing on the defective part.

도 11은 일반적인 대상 튜브의 단면을 확대하여 촬용된 화면예이다. 도 11을 참조하면, 튜브의 상태평가지표는 크리프에 의한 손상뿐만 아니라 고온부식에 의한 손상도 감지가 가능하기 때문에 동일한 방법을 이용하여 예방정비가 가능하다. 튜브의 고온부식은 강종별로 활성화되는 온도가 다르지만 공통적으로 튜브의 온도에 비례하여 부식손상의 범위와 결함발생확률이 증가한다. 다만 부식손상을 확인하기 위해서는 대상튜브를 발췌하여 단면을 확대하여 관찰하여야 한다. 도 11에는 건전부의 단면(1110) 및 손상부의 단면(1120)기 도시된다. 건전부의 단면(1110)은 전처리 표면이 매끈하며, 손상부의 단면(1120)는 전처리 표면에 구멍(Pit)가 존재한다.Figure 11 is an example of a screen captured by enlarging the cross section of a typical target tube. Referring to Figure 11, the condition evaluation index of the tube can detect not only damage due to creep but also damage due to high-temperature corrosion, so preventive maintenance is possible using the same method. High-temperature corrosion of tubes has different activation temperatures for each steel type, but in common, the extent of corrosion damage and the probability of defects increase in proportion to the temperature of the tube. However, in order to check corrosion damage, the target tube must be extracted and the cross-section enlarged to be observed. In Figure 11, a cross section 1110 of the sound part and a cross section 1120 of the damaged part are shown. The cross-section 1110 of the healthy part has a smooth pre-treatment surface, and the cross-section 1120 of the damaged part has a hole (pit) on the pre-treatment surface.

고온부식을 평가하기 위해서는 크리프 손상지표와 발췌튜브 단면의 관찰정보가 필요한 반면 튜브 표면 조직복제 및 경도측정은 불필요한다. 그러나 고온부식과 크리프는 동시에 발생하는 경향이 강하며 상호작용하여 파손에 이르는 시간이 감소되는 특징이 있으므로 튜브상태평가 지표가 4 스테이지에 해당하는 경우 일부 튜브는 발췌하여 표면검사를 시행한 후 구멍(Pit)나 홈(Groove) 등과 같은 결함이 발견되면 당회 계획예방정비공사 또는 적어도 차회 예방정비공사에서는 튜브를 교체하도록 권고할 수 있다.In order to evaluate high-temperature corrosion, creep damage indicators and observation information of the sampled tube cross-section are required, while tube surface tissue replication and hardness measurements are unnecessary. However, high-temperature corrosion and creep have a strong tendency to occur at the same time, and they interact to reduce the time to failure. Therefore, if the tube condition evaluation index corresponds to stage 4, some tubes are extracted, a surface inspection is performed, and holes ( If defects such as pits or grooves are discovered, replacement of the tube may be recommended during the session's planned preventive maintenance work or at least the next preventive maintenance work.

따라서, 고온부식에 의한 손상을 예방하는 경우에도 원래의 지표를 변경할 필요는 없으며 추가적으로 튜브발췌시험을 수행하여 정비여부를 결정할 수 있다. 튜브발췌시험의 결과는 부식손상이 있는 경우 즉시 교체를 권고해야하나 발췌시험기간이 수 일 이상 소요되기 때문에 교체기간이 확보되지 않는 경우는 차기 간이정비 또는 차기 계획예방정비공사에서 교체하도록 권고하여야 한다.Therefore, even when preventing damage due to high-temperature corrosion, there is no need to change the original indicator, and additional tube sampling tests can be performed to determine whether or not to maintain. According to the results of the tube sampling test, if there is corrosion damage, immediate replacement should be recommended. However, since the sampling test period takes several days or more, if the replacement period is not secured, replacement should be recommended during the next simple maintenance or the next scheduled preventive maintenance work. .

검사비용 절감을 위해 국내 IPP(Industry Professional Practice)나 검사기술수준이 낮아 조직복제검사가 원활하지 않은 중동이나 동남아시아 화력발전소의 경우 경도만 측정하거나 조직복제검사와 경도 모두 시행하지 않으며 대신 PT(Liquid Penetration Test)/MT(Magnetic Particle Testing)/UT(Ultrasonic Testing)를 시행하는 경우가 있다. 이러한 경우 튜브의 상태평가는 크리프 손상도에 의해서 결정되기 때문에 검사범위와 검사위치도 크리프 손상도에만 의존하게되는 차이점이 있으나 전체적인 예방정비방법은 기존의 방법과 절차를 따르며 기존의 방법과 다른 점은 다음과 같다.In order to reduce inspection costs, in the case of thermal power plants in the Middle East or Southeast Asia where tissue replication testing is not smooth due to the low level of domestic IPP (Industry Professional Practice) or inspection technology, only hardness is measured or neither tissue replication testing nor hardness is performed. Instead, PT (Liquid Penetration) is used. Test)/MT(Magnetic Particle Testing)/UT(Ultrasonic Testing) are sometimes performed. In this case, since the condition evaluation of the tube is determined by the degree of creep damage, there is a difference in the inspection range and inspection location in that it depends only on the degree of creep damage. However, the overall preventive maintenance method follows existing methods and procedures and is different from the existing method. As follows.

도 12는 본 발명의 다른 일실시예에 따른 튜브 고온 손상 예방 정비 과정을 보여주는 흐름도이다. 도 12를 참조하면, S1210, S1220단계는 앞서 기술한 방법으로 튜브별 유량분포를 계산하는 단계이며, S1230은 TRD 300 및 IBR 코드의 개념에 기반한 새로운 응력 계산법에 의해 튜브 응력을 계산하고 에너지 정산 방법을 이용하여 온도를 계산한다. Figure 12 is a flow chart showing a tube high temperature damage prevention maintenance process according to another embodiment of the present invention. Referring to FIG. 12, steps S1210 and S1220 are steps for calculating the flow distribution for each tube using the method described above, and S1230 calculates tube stress by a new stress calculation method based on the concepts of TRD 300 and IBR code and uses an energy settlement method. Calculate the temperature using .

S1240단계에서는 순시(1시간 ~ 2시간) 평균 운전값과 튜브 재질에 대한 Creep 파괴 실험 데이터에서 얻어진 응력-온도-수명 관계식을 통해 손상을 계산한다. S1250 단계는 튜브들의 순시손상값을 운전시간별로 저장하며 각 튜브별 순시손상값들을 모두 합하여 누적손상값을 얻어 역시 운전 시간별로 저장한다.In step S1240, damage is calculated through the stress-temperature-life relationship equation obtained from the instantaneous (1 hour to 2 hours) average operating value and creep fracture test data for the tube material. In step S1250, the instantaneous damage values of the tubes are stored by operation time, and the instantaneous damage values of each tube are added to obtain a cumulative damage value, which is also stored by operation time.

S1260 단계에서는 정비 6개월 전 튜브별 누적손상(크리프 손상)을 조회한 후 전회 정비에서 검사된 검사결과와 정비이력정보를 이용하여 최신의 상태평가지표와 교체대상 튜브를 선정한다. S1270단계에서는 과거 결함위치 및 원인분석정보와 S1260단계의 튜브 상태평가 지표를 이용하여 튜브의 검사위치를 선정한다. S1260과 S1270단계의 결과물을 종합하여 S1280단계의 비파괴 검사 및 정비계획을 수립한다.In step S1260, the accumulated damage (creep damage) for each tube is checked 6 months before maintenance, and then the latest condition evaluation index and replacement target tube are selected using the inspection results and maintenance history information from the previous maintenance. In step S1270, the tube inspection location is selected using past defect location and cause analysis information and the tube condition evaluation index in step S1260. The results of steps S1260 and S1270 are combined to establish a non-destructive inspection and maintenance plan for step S1280.

한편, S1220에서 S1250까지의 단계로 튜브의 손상을 실시간으로 감시할 수 있는 시스템을 개발할 수 있다. 또한, S1201,S1202, S1210, S1280단계를 시스템으로 구축 시 각 단계별 연계 및 세부기능수행 절차를 나타낸 것으로 S1220 단계에서 실시간 운전 정보를 갖는 DB를 이용하여 관리하게 되면 Java, C, C#, VB등으로 개발된 프로그램과 데이터를 연계할 수 있다.Meanwhile, it is possible to develop a system that can monitor tube damage in real time in steps from S1220 to S1250. In addition, it shows the linkage and detailed function performance procedures for each step when building a system at the S1201, S1202, S1210, and S1280 steps. When managed using a DB with real-time operation information at the S1220 step, it can be managed using Java, C, C#, VB, etc. The developed program and data can be linked.

또한, 여기에 개시된 실시형태들과 관련하여 설명된 방법 또는 알고리즘의 단계들은, 마이크로프로세서, 프로세서, CPU(Central Processing Unit) 등과 같은 다양한 컴퓨터 수단을 통하여 수행될 수 있는 프로그램 명령 형태로 구현되어 컴퓨터 판독 가능 매체에 기록될 수 있다. 상기 컴퓨터 판독 가능 매체는 프로그램 (명령) 코드, 데이터 파일, 데이터 구조 등을 단독으로 또는 조합하여 포함할 수 있다. Additionally, the steps of the method or algorithm described in relation to the embodiments disclosed herein are implemented in the form of program instructions that can be executed through various computer means such as a microprocessor, processor, CPU (Central Processing Unit), etc., and are computer readable. Can be recorded on any available medium. The computer-readable medium may include program (instruction) codes, data files, data structures, etc., singly or in combination.

상기 매체에 기록되는 프로그램 (명령) 코드는 본 발명을 위하여 특별히 설계되고 구성된 것들이거나 컴퓨터 소프트웨어 당업자에게 공지되어 사용 가능한 것일 수도 있다. 컴퓨터 판독 가능 기록 매체의 예에는 하드 디스크, 플로피 디스크 및 자기 테이프 등과 같은 자기 매체(magnetic media), CD-ROM, DVD, 블루레이 등과 같은 광기록 매체(optical media) 및 롬(ROM), 램(RAM), 플래시 메모리 등과 같은 프로그램 (명령) 코드를 저장하고 수행하도록 특별히 구성된 반도체 기억 소자가 포함될 수 있다. The program (instruction) code recorded on the medium may be specially designed and constructed for the present invention, or may be known and usable by those skilled in the art of computer software. Examples of computer-readable recording media include magnetic media such as hard disks, floppy disks, and magnetic tapes, optical media such as CD-ROM, DVD, and Blu-ray, and ROM and RAM. Semiconductor memory elements specially configured to store and execute program (instruction) code, such as RAM, flash memory, etc., may be included.

여기서, 프로그램 (명령) 코드의 예에는 컴파일러에 의해 만들어지는 것과 같은 기계어 코드뿐만 아니라 인터프리터 등을 사용해서 컴퓨터에 의해서 실행될 수 있는 고급 언어 코드를 포함한다. 상기된 하드웨어 장치는 본 발명의 동작을 수행하기 위해 하나 이상의 소프트웨어 모듈로서 작동하도록 구성될 수 있으며, 그 역도 마찬가지이다.Here, examples of program (instruction) code include not only machine language code such as that created by a compiler, but also high-level language code that can be executed by a computer using an interpreter or the like. The hardware devices described above may be configured to operate as one or more software modules to perform the operations of the present invention, and vice versa.


*100: 검사 시스템
110: 센서계 120: 데이터 수집기
130: 통신망 140: 컴퓨터
310: 획득 모듈 320: 분석 모듈
330: 계산 모듈 340: 정보 알림 생성 모듈
1011: 증기 인입 헤더 1012: 증기 출구 헤더
1021,1022: 온도센서
1031: 상단 인클로즈
1032: 하단 인클로즈

*100: Inspection system
110: sensor system 120: data collector
130: communication network 140: computer
310: Acquisition module 320: Analysis module
330: calculation module 340: information notification generation module
1011: Steam inlet header 1012: Steam outlet header
1021,1022: Temperature sensor
1031: Top enclosure
1032: Bottom enclosure

Claims (1)

(a) 센서계(110)가 보일러 및 튜브를 센싱하여 센싱 정보를 생성하는 단계;
(b) 데이터 수집기(120)가 상기 센싱 정보를 수집하는 단계; 및
(c) 통신망(130)을 통해 상기 데이터 수집기(120)에 연결되는 컴퓨터(140)가 획득되는 상기 센싱 정보를 이용하여 금회 검사 결과를 생성하고 상기 금회 검사 결과에 따른 튜브 상태를 평가하여 정비 계획 정보를 생성하는 단계;를 포함하며,
상기 센싱 정보는 상기 보일러 및 상기 튜브의 운전정보를 포함하고,
상기 (c) 단계는,
획득 모듈(310)이 상기 센싱 정보를 획득하는 단계;
분석모듈(320)이 상기 운전정보를 이용하여 상기 튜브의 손상 정도를 평가하는 단계; 및
계산모듈(330)이 상기 금회 검사 결과 및 데이터베이스(141)에 미리 저장되어 있는 고장이력과 전회 검사결과를 이용하여 상기 튜브의 검사 및 교체여부를 점검(Overhaul) 계획수립전 결정하는 단계;를 포함하고,
상기 튜브의 손상 정도의 평가는 조직복제검사 및 경도 측정 정보를 이용하여 이루어지며,
상기 조직복제검사 및 경도 측정 정보는 상기 전회 검사 결과를 사용하며, 금회 검사에서 크리프 보이드(Creep Void)가 검출되거나 조직열화등급이 E 또는 F이며 경도가 설계강도환산치의 30%이상 저하되는 경우는 상기 튜브는 결함으로 판단되고,
상기 튜브의 손상 정도의 평가는 검사 생략을 나타내는 제 1 스테이지, 검사 검토를 나타내는 제 2 스테이지, 검사를 나타내는 제 3 스테이지, 검사 및 교체 검토를 나타내는 제 4 스테이지, 및 교체를 나타내는 제 5 스테이지 중 어느 하나로 평가하는 것을 특징으로 하는 튜브 고온 손상 예방을 위한 검사 방법.
(a) the sensor system 110 sensing the boiler and tube to generate sensing information;
(b) collecting the sensing information by the data collector 120; and
(c) The computer 140 connected to the data collector 120 through the communication network 130 generates the current inspection result using the acquired sensing information and evaluates the tube condition according to the current inspection result to plan maintenance. It includes: generating information;
The sensing information includes operation information of the boiler and the tube,
In step (c),
Acquiring the sensing information by the acquisition module 310;
The analysis module 320 evaluating the degree of damage to the tube using the operation information; and
A step where the calculation module 330 determines before establishing an overhaul plan whether to inspect or replace the tube using the current inspection result, the failure history previously stored in the database 141, and the previous inspection result. do,
Evaluation of the degree of damage to the tube is performed using tissue replication tests and hardness measurement information,
The tissue replication test and hardness measurement information uses the previous test results, and if creep voids are detected in the current test or the tissue deterioration grade is E or F and the hardness decreases by more than 30% of the design strength conversion value. The tube is judged to be defective,
The evaluation of the degree of damage to the tube is any of the following: a first stage indicating inspection omission, a second stage indicating inspection review, a third stage indicating inspection, a fourth stage indicating inspection and replacement review, and a fifth stage indicating replacement. An inspection method for preventing high temperature damage to tubes, characterized by evaluating them as one.
KR1020230050133A 2021-08-20 2023-04-17 System and Method for inspection to prevent demage of tube caused by high temperature KR102626132B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020230050133A KR102626132B1 (en) 2021-08-20 2023-04-17 System and Method for inspection to prevent demage of tube caused by high temperature

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020210110104A KR102524553B1 (en) 2021-08-20 2021-08-20 System and Method for inspection to prevent demage of tube caused by high temperature
KR1020230050133A KR102626132B1 (en) 2021-08-20 2023-04-17 System and Method for inspection to prevent demage of tube caused by high temperature

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020210110104A Division KR102524553B1 (en) 2021-08-20 2021-08-20 System and Method for inspection to prevent demage of tube caused by high temperature

Publications (2)

Publication Number Publication Date
KR20230058337A KR20230058337A (en) 2023-05-03
KR102626132B1 true KR102626132B1 (en) 2024-01-18

Family

ID=85326293

Family Applications (5)

Application Number Title Priority Date Filing Date
KR1020210110104A KR102524553B1 (en) 2021-08-20 2021-08-20 System and Method for inspection to prevent demage of tube caused by high temperature
KR1020230050130A KR102626129B1 (en) 2021-08-20 2023-04-17 System and Method for inspection to prevent demage of tube caused by high temperature
KR1020230050132A KR102626131B1 (en) 2021-08-20 2023-04-17 System and Method for inspection to prevent demage of tube caused by high temperature
KR1020230050131A KR102626130B1 (en) 2021-08-20 2023-04-17 System and Method for inspection to prevent demage of tube caused by high temperature
KR1020230050133A KR102626132B1 (en) 2021-08-20 2023-04-17 System and Method for inspection to prevent demage of tube caused by high temperature

Family Applications Before (4)

Application Number Title Priority Date Filing Date
KR1020210110104A KR102524553B1 (en) 2021-08-20 2021-08-20 System and Method for inspection to prevent demage of tube caused by high temperature
KR1020230050130A KR102626129B1 (en) 2021-08-20 2023-04-17 System and Method for inspection to prevent demage of tube caused by high temperature
KR1020230050132A KR102626131B1 (en) 2021-08-20 2023-04-17 System and Method for inspection to prevent demage of tube caused by high temperature
KR1020230050131A KR102626130B1 (en) 2021-08-20 2023-04-17 System and Method for inspection to prevent demage of tube caused by high temperature

Country Status (1)

Country Link
KR (5) KR102524553B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117724369B (en) * 2023-12-21 2024-06-04 马鞍山华衍水务有限公司 Drainage control system for waterworks

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100380966B1 (en) * 2000-11-29 2003-04-26 두산중공업 주식회사 Apparatus and method for monitoring thermal stress in fossil power plant
KR101073092B1 (en) * 2009-12-29 2011-10-12 한국남동발전 주식회사 Fault maintenance system of equipment and method of the same
KR101435416B1 (en) 2012-01-31 2014-08-29 하나에버텍 주식회사 Boiler tube monitoring system

Also Published As

Publication number Publication date
KR20230058337A (en) 2023-05-03
KR102626130B1 (en) 2024-01-18
KR102626131B1 (en) 2024-01-18
KR102626129B1 (en) 2024-01-18
KR20230058334A (en) 2023-05-03
KR20230027856A (en) 2023-02-28
KR102524553B1 (en) 2023-04-24
KR20230058335A (en) 2023-05-03
KR20230058336A (en) 2023-05-03

Similar Documents

Publication Publication Date Title
RU2617720C2 (en) Device and method for forecasting and optimization of gas turbine service life
CN112597642B (en) High Wen Jixiang state evaluation method based on metal inspection
KR102626132B1 (en) System and Method for inspection to prevent demage of tube caused by high temperature
JPS61240005A (en) Future behavioral installation predicting system
CN109253870B (en) The assessment device and method in biomass fuel boiler heat-exchange tube service life
CN112580202B (en) State evaluation method for high Wen Jixiang adapter tube and tube seat based on metal inspection
JP2003303243A (en) Method and device for life diagnosis and maintenance management of plant equipment
CN114936498A (en) Creep fatigue damage grade determination method and system considering material performance degradation
JP2010191494A (en) System and method for diagnosing remaining life of high temperature plant equipment
KR101656672B1 (en) Evaluating method for degree of risk using creep and wall thinning of heat exchanger steam tube
JP3652418B2 (en) Corrosion fatigue damage diagnosis prediction method for boiler water wall pipe
WO2019163979A1 (en) Maintenance management menu determination method and plant maintenance management method
RU2633728C1 (en) Method of detecting sections of main gas pipelines prone to stress corrosion cracking
JP2005091028A (en) Method for diagnosing corrosion fatigue damage of boiler water wall tube
CN113138129A (en) Method for obtaining power station material mechanical property change rule based on L-M parameter method
Kere et al. Risk management strategies and probabilistic failure pressure model development for pipelines with crack-like defect
Shibli Overview of the HIDA Project
Aronson et al. Development of a procedure for substantiating replacement terms for the condenser tubes of steam turbine installations
Sandhu et al. Digital Condition Monitoring of Nuclear Piping-Equipment Systems using Artificial Intelligence Technology
RU2574578C2 (en) System for continuous multiparameter monitoring of nuclear power plant equipment operational failure rate
Mentl et al. Safe remaining lifetime assessment of power plant steam boilers
CN115238924A (en) Integrity management system and method for furnace tube of heating furnace
CN116757043A (en) Mining pipeline defect analysis method, system, terminal equipment and storage medium
Dyson et al. Impression Creep Testing and Its Role in Power Plant Component Integrity Management
Hamata et al. A Risk Based Maintenance Model for Power Plant Boilers

Legal Events

Date Code Title Description
A107 Divisional application of patent
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right