KR102625648B1 - falling rock prevention pence using wire ring - Google Patents

falling rock prevention pence using wire ring Download PDF

Info

Publication number
KR102625648B1
KR102625648B1 KR1020210186301A KR20210186301A KR102625648B1 KR 102625648 B1 KR102625648 B1 KR 102625648B1 KR 1020210186301 A KR1020210186301 A KR 1020210186301A KR 20210186301 A KR20210186301 A KR 20210186301A KR 102625648 B1 KR102625648 B1 KR 102625648B1
Authority
KR
South Korea
Prior art keywords
wiring
net
rope
beams
semicircle
Prior art date
Application number
KR1020210186301A
Other languages
Korean (ko)
Other versions
KR20230096628A (en
Inventor
나재술
Original Assignee
나재술
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 나재술 filed Critical 나재술
Priority to KR1020210186301A priority Critical patent/KR102625648B1/en
Publication of KR20230096628A publication Critical patent/KR20230096628A/en
Application granted granted Critical
Publication of KR102625648B1 publication Critical patent/KR102625648B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/04Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
    • E01F7/045Devices specially adapted for protecting against falling rocks, e.g. galleries, nets, rock traps
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16GBELTS, CABLES, OR ROPES, PREDOMINANTLY USED FOR DRIVING PURPOSES; CHAINS; FITTINGS PREDOMINANTLY USED THEREFOR
    • F16G11/00Means for fastening cables or ropes to one another or to other objects; Caps or sleeves for fixing on cables or ropes
    • F16G11/03Means for fastening cables or ropes to one another or to other objects; Caps or sleeves for fixing on cables or ropes incorporating resiliently-mounted members for attachment of the cable end
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

본 발명은 와이어링을 이용한 낙석방지책에 관한 것으로, H 빔 사이에 와이어링로프로 다수개의 와이어링을 순차적으로 형성하되 상하를 결합고리로 형성하는 와이어링넷과, H빔 사이에 횡으로 다수 가닥 설치하는 차단와이어로프, 및 와이어링넷의 와이어링을 좌우로 연결하는 체결클립으로 구성하되, 상기 와이어링넷은 와이어링로프를 파형으로 형성하여 상부와 하부를 반원형으로 형성하되 제1열 와이어링로프의 하부 반원 중심과 제2열 상부 반원 중심의 결합고리로 연결하도록 하고 좌우 교차부분을 체결클립으로 체결하여 다수개의 와이어링을 순차적으로 일정하게 형성하도록 구성하므로, 다수개의 와이어링으로 인하여 수축 및 팽창이 용이하여 낙석으로 인한 충격에너지를 효율적으로 흡수하여 낙석의 도로침입을 억제할 뿐만 아니라 시설을 보호함과 동시에 수명을 연장할 수 있으며 각각의 와이어링넷를 교체할 수 있어 훼손부위를 신속하게 교체할 수 있도록 함과 동시에 와이어링넷의 조립이 용이하고 견고한 결합상태를 유지하므로 비용을 최소화하면서도 고품위의 낙석방지책을 제공하여 낙서방지효율을 극대화하는 것이다.The present invention relates to a rockfall prevention measure using wiring. A plurality of wirings are sequentially formed with wiring ropes between H beams, and a wiring net is formed at the top and bottom with connecting rings, and multiple strands are installed horizontally between the H beams. It consists of a blocking wire rope that connects the wiring of the wiring net to the left and right, and the wiring net is formed by forming the wiring rope into a wave shape so that the upper and lower parts are semicircular, and the lower part of the first row of wiring ropes The center of the semicircle is connected to the center of the semicircle at the top of the second row with a connecting ring, and the left and right intersection parts are fastened with fastening clips to form multiple wirings sequentially and consistently. Therefore, contraction and expansion are easy due to the multiple wirings. By efficiently absorbing the impact energy caused by falling rocks, it not only prevents falling rocks from intruding into the road, but also protects the facility and extends its lifespan. Each wiring net can be replaced so damaged parts can be replaced quickly. At the same time, the wiring net is easy to assemble and maintains a solid connection, thereby minimizing costs and providing high-quality rockfall prevention measures to maximize graffiti prevention efficiency.

Figure R1020210186301
Figure R1020210186301

Description

와이어링을 이용한 낙석방지책{falling rock prevention pence using wire ring}Falling rock prevention pence using wire ring}

본 발명은 낙석방지책에 관한 것으로, 상세하게는 낙석으로부터 발생하는 충격에너지를 효율적으로 흡수하여 낙석의 도로 침입을 억제하는 와이어링을 이용한 낙석방지책에 관한 것이다.The present invention relates to a rockfall prevention measure, and more specifically, to a rockfall prevention measure using wiring that efficiently absorbs impact energy generated from falling rocks and suppresses the intrusion of fallen rocks into the road.

일반적으로 낙석이 우려되는 지역에는 낙석방지책을 설치하여 사면에서 발생할 수 있는 낙석으로부터 안전하게 도로를 확보할 수 있도록 하였다.In general, rockfall prevention measures were installed in areas where falling rocks were a concern to ensure roads were safe from falling rocks that could occur on slopes.

이러한 종래의 낙석방지책은 도로의 일측에 콘크리트 기초를 형성하고 여기에 일정간격으로 H-빔을 입설한 다음 H-빔에 피복철선으로된 차단망을 횡으로 길게 설치한 다음 이를 좌우 측에서 잡아당겨 팽팽한 상태에서 각각의 H-빔에 고정시키고 다시 횡으로 와이어로프를 다수층으로 형성하여 낙석을 차단하도록 하였다.This conventional rockfall prevention measure forms a concrete foundation on one side of the road, installs H-beams at regular intervals on this, and then installs a barrier net made of covered wire horizontally on the H-beams and then pulls it from the left and right sides. It was fixed to each H-beam in a taut state, and multiple layers of wire rope were formed laterally to block falling rocks.

그러나 이러한 종래의 낙석방지책은 낙석발생 후 복구할 때 횡으로 형성된 차단망과 와이어로프를 전체를 교체하여야 하므로 신속한 복구가 불가능하고 교체작업 또한 번거로울 뿐만 아니라 최초 시공할 때 시공기간이 장기간 소요될 뿐만 아니라 이로 인하여 코스트가 상승하는 문제점이 있었다.However, these conventional rockfall prevention measures require the entire horizontal barrier net and wire rope to be replaced when recovering after a rockfall, making rapid recovery impossible. Not only is the replacement work cumbersome, but the construction period is long at the time of initial construction. As a result, there was a problem of rising costs.

이로 인하여 본 출원인은 상기한 문제점을 해소하기 위하여 선출원한 특허 등록 제10-643664호(명칭: 네트를 이용한 낙석방지책)가 있으나 H-빔과 H-빔 사이에 개별적으로 설치하여 상기한 문제점을 해소하고 부분적으로 보수 및 설치할 수 있도록 하였으나 낙서에 따른 충격에너지를 흡수하여 도로 침입을 억제하는 데는 한계가 있어 지지력과 충격에너지를 보다 효율적으로 제어할 수 있는 기술의 개발이 지속적으로 요구되어 왔다.Due to this, the present applicant has previously applied for patent registration No. 10-643664 (name: Rockfall prevention measure using net) to solve the above-mentioned problem, but the above-mentioned problem is solved by installing it separately between H-beams and H-beams. However, there is a limit to preventing road intrusion by absorbing the impact energy caused by graffiti, so the development of technology that can control bearing capacity and impact energy more efficiently has been continuously required.

따라서 본 발명의 주목적은 낙석으로 발생하는 충격에너지를 효율적으로 흡수하여 낙석차단 효과를 극대화하므로 안전사고의 발생을 방지할 수 있도록 하는 와이어링을 이용한 낙석방지책을 제공하는 데 있다.Therefore, the main purpose of the present invention is to provide a rockfall prevention measure using wiring that can prevent the occurrence of safety accidents by efficiently absorbing the impact energy generated by falling rocks and maximizing the rockfall blocking effect.

본 발명의 다른 목적은 지주 사이에 와이어로프를 단위개념으로 각각 설치하되 지지력을 극대화할 수 있도록 함과 동시에 간편하게 설치하므로 공사기간을 단축할 수 있도록 하는 와이어링을 이용한 낙석방지책을 제공하는 데 있다.Another object of the present invention is to provide a rockfall prevention measure using wiring, which installs wire ropes as a unit between struts to maximize bearing capacity and at the same time shortens the construction period by making installation simple.

본 발명의 다른 목적은 낙석방지책의 파손이나 훼손시 부분보수가 용이하고 이를 신속하게 보수할 수 있도록 하는 와이어링을 이용한 낙석방지책을 제공하는 데 있다.Another object of the present invention is to provide a rockfall prevention measure using wiring that allows for easy partial repair and rapid repair when the rockfall prevention measure is damaged or damaged.

상기한 목적을 달성하기 위하여 본 발명의 와이어링을 이용한 낙석방지책은 H 빔 사이에 와이어링로프로 다수개의 와이어링을 순차적으로 형성하되 상하를 결합고리로 형성하는 와이어링넷과, H빔 사이에 횡으로 다수 가닥 설치하는 차단와이어로프, 및 와이어링넷의 와이어링을 좌우로 연결하는 체결클립으로 구성하되, 상기 와이어링넷은 와이어링로프를 파형으로 형성하여 상부와 하부를 반원형으로 형성하되 제1열 와이어링로프의 하부 반원 중심과 제2열 상부 반원 중심의 결합고리로 연결하도록 하고 좌우 교차부분을 체결클립으로 체결하여 다수개의 와이어링을 순차적으로 일정하게 형성하도록 구성함을 그 기술적 구성상 기본 특징으로 한다.In order to achieve the above object, the rockfall prevention measure using the wiring of the present invention is to sequentially form a plurality of wirings with wiring ropes between the H beams, and to form a wiring net that forms the upper and lower sides with connecting rings, and a horizontal line between the H beams. It consists of a blocking wire rope installed in multiple strands, and a fastening clip that connects the wiring of the wiring net to the left and right. The wiring net is formed by forming the wiring rope into a wave shape, forming the upper and lower parts into a semicircular shape, and the first row of wires. The basic feature of its technical composition is that it is connected to the center of the lower semicircle of the ring rope with a connecting ring at the center of the upper semicircle of the second row, and the left and right intersection parts are fastened with fastening clips to form multiple wirings sequentially and consistently. do.

따라서 본 발명의 와이어링을 이용한 낙석방지책은 H빔 사이에 설계에 따라 와이어링넷 또는 와이어링넷과 차단와이어로프를 복합적으로 결합하는 것으로, 다수개의 와이어링으로 인하여 수축 및 팽창이 용이하여 낙석으로 인한 충격에너지를 효율적으로 흡수하여 낙석의 도로침입을 억제할 뿐만 아니라 시설을 보호함과 동시에 수명을 연장할 수 있으며 각각의 와이어링넷을 교체할 수 있어 훼손부위를 신속하게 교체할 수 있도록 함과 동시에 와이어링넷의 조립이 용이하고 견고한 결합상태를 유지하므로 비용을 최소화하면서도 고품위의 낙석방지책을 제공하므로 낙서방지효율을 극대화하는 효과가 있는 것이다.Therefore, the rockfall prevention measure using wiring of the present invention is to combine a wiring net or a wiring net and a blocking wire rope in a complex manner according to the design between H beams. Multiple wirings facilitate contraction and expansion, resulting in shock caused by falling rocks. By absorbing energy efficiently, it not only prevents falling rocks from entering the road, but also protects the facility and extends its lifespan. Each wiring net can be replaced, allowing damaged parts to be replaced quickly. It is easy to assemble and maintains a solid connection, minimizing costs and providing high-quality rockfall prevention measures, which has the effect of maximizing graffiti prevention efficiency.

도 1 은 본 발명에 따른 와이어링을 이용한 낙석방지책의 설치상태를 나타낸 사시도.
도 2 는 본 발명에 따른 와이어링을 이용한 낙석방지책의 설치상태를 확대하여 나타낸 정면도.
도 3 은 본 발명에 따른 와이어링을 이용한 낙석방지책의 와이어링넷을 나타낸 정면도.
도 4 는 본 발명에 따른 와이어링을 이용한 낙석방지책의 와이어링넷을 나타낸 확대도.
도 5 는 본 발명에 따른 와이어링을 이용한 낙석방지책의 체결클립 분리상태를 나타낸 사시도.
도 6 은 본 발명에 따른 와이어링을 이용한 낙석방지책의 체결클립 결합상태를 나타낸 사시도.
Figure 1 is a perspective view showing the installation state of a rockfall prevention measure using wiring according to the present invention.
Figure 2 is an enlarged front view showing the installation state of the rockfall prevention measure using wiring according to the present invention.
Figure 3 is a front view showing a wiring net of a rockfall prevention measure using wiring according to the present invention.
Figure 4 is an enlarged view showing the wiring net of the rockfall prevention measure using wiring according to the present invention.
Figure 5 is a perspective view showing the disconnected state of the fastening clip of the rockfall prevention measure using wiring according to the present invention.
Figure 6 is a perspective view showing the combined state of the fastening clips of the rockfall prevention measure using wiring according to the present invention.

이하 첨부한 도면을 참조하면서 본 발명의 실시 예를 상세하게 설명하면 다음과 같다.Hereinafter, an embodiment of the present invention will be described in detail with reference to the attached drawings.

도 1 내지 도 6 에 나타낸 바와 같이, 본 발명의 와이어링을 이용한 낙석방지책(100)은 H빔(111)을 일정간격으로 세워 설치하는 지주부(110)와, 상기 지주부(110)의 H빔(111) 사이에 와이어링로프(121)로 다수개의 와이어링(122)을 순차벅으로 형성하되 상하를 결합고리(123)로 형성하는 와이어링넷(120)과, 상기 지주부(110)의 H빔(111) 사이에 횡으로 다수 가닥 설치하는 차단와이어로프(130), 및 상기 와이어링넷(120)의 와이어링(122)을 좌우를 연결하는 체결클립(140)으로 구성한다.As shown in Figures 1 to 6, the rockfall prevention measure 100 using the wiring of the present invention includes a support part 110 on which H beams 111 are installed at regular intervals, and the H beam of the support part 110. A wiring net 120 in which a plurality of wiring 122 is sequentially formed with a wiring rope 121 between the beams 111 and the top and bottom are formed with coupling rings 123, and the support portion 110 It consists of a blocking wire rope 130 installed laterally between the H beams 111, and a fastening clip 140 connecting the left and right wiring 122 of the wiring net 120.

상기 지주부(110)는 사면의 도로변 등에 설치하는 것으로 H빔(111)의 하측 매설부(112)를 콘크리트기단(114)에 매설하여 일정간격으로 견고하게 세워 다수개 설치하되 H빔(111)의 상측 절곡부(113)를 도로 측으로 기울어지도록 설치함이 이상적이다.The support portion 110 is installed on the side of a road on a slope, etc., and the lower buried portion 112 of the H beam 111 is buried in the concrete base 114 and is firmly erected at regular intervals to install a plurality of H beams 111. It is ideal to install the upper bent portion 113 so that it is inclined toward the road.

상기 와이어링넷(120)은 H빔(111)과 H빔(111) 사이에 결합하여 낙석의 도로 진입 등을 차단하도록 한다.The wiring net 120 is coupled between the H beams 111 and blocks falling rocks from entering the road.

이러한 와이어링넷(120)은 와이어링로프(121)를 파형으로 형성하여 파형의 상측와 하측를 반원형으로 형성하되 이러한 파형을 순차적으로 연속 반복하여 형성하도록 한다.This wiring net 120 forms the wiring rope 121 in a wave shape, forming the upper and lower sides of the wave shape into a semicircle, and forming this wave shape by sequentially repeating it.

여기서 제1열 와이어링로프(121)의 하부 반원 중심과 제2열 상부 반원 중심의 결합고리(123)로 연결하도록 하고 좌우 측을 교차하도록 하여 다수개의 와이어링(122)을 순차적으로 형성하도록 하되, 좌우 측을 교차부분을 체결클립(140)으로 체결하여 와이어링로프(121)에 와이어링(122)을 일정 간격으로 형성함이 바람직하다.Here, the center of the lower semicircle of the first row of wiring ropes 121 is connected to the coupling ring 123 at the center of the upper semicircle of the second row, and a plurality of wirings 122 are sequentially formed by crossing the left and right sides. , It is desirable to form wiring 122 at regular intervals on the wiring rope 121 by fastening the left and right sides at the intersection with fastening clips 140.

나아가, 제1,2열 와이어링로프(121)는 한 가닥으로 형성하여 절단부분을 최소화하도록 한다.Furthermore, the first and second row wiring ropes 121 are formed as a single strand to minimize cut portions.

이러한 체결작업을 제3열에서 임의의 제n열까지 형성하여 원하는 크기로 형성하도록 하거나 일정한 단위면적으로 형성하여 다양한 체결수단으로 연결하여 원하는 크기나 길이로 형성할 수 있도록 한다.This fastening operation can be performed from the 3rd row to an arbitrary nth row to form a desired size, or by forming a certain unit area and connecting it with various fastening means to form a desired size or length.

더욱이, 상기와 같이 와이어링로프(121)로 다수개의 와이어링(122)을 원하는 사이즈로 형성한 다음 테두리에 외각와이어로프(125)를 체결하되 상기와 같이 결합고리(123)로 결합하거나 체결클립(140)으로 결합할 수 있으나 간격유지 등을 위해 체결클립(143)으로 결합함이 바람직하다.Moreover, as described above, a plurality of wiring rings 122 are formed to a desired size using the wiring rope 121, and then the outer wire rope 125 is fastened to the edge, but is combined with a connecting ring 123 or a fastening clip as described above. It can be coupled with (140), but it is preferable to be coupled with a fastening clip (143) to maintain the gap.

아울러 테두리에 형성시킨 외각와이어로프(125)에는 클립 등 통상의 결합수단(124)을 연결하여 H빔(111)에 와이어링넷(120)을 견고하게 결합할 수 있도록 하는 것이다.In addition, a conventional coupling means 124 such as a clip is connected to the outer wire rope 125 formed on the edge, so that the wiring net 120 can be firmly coupled to the H beam 111.

상기 차단와이어로프(130)는 H빔(111)의 상부 측에 횡으로 다수 가닥의 형성하여 통상의 결합수단(131)으로 H빔(111)에 결합하도록 하되 와이어링넷(120)의 상측에 형성하도록 함이 바람직하다.The blocking wire rope 130 is formed in multiple strands horizontally on the upper side of the H-beam 111 to be coupled to the H-beam 111 using a normal coupling means 131, but is formed on the upper side of the wiring net 120. It is desirable to do so.

상기 체결클립(140)은 삽입용 결합홈(141)을 형성하여 사전에 와이어링로프(121)에 일정 간격으로 끼워 형성하되 좌우 한 쌍으로 형성하여 대응 면에 슬라이드돌기(142)와 슬라이드홈(143)을 형성하여 원활하고 견고하게 결합할 수 있도록 함이 이상적이다.The fastening clip 140 is formed by forming a coupling groove 141 for insertion and inserted into the wiring rope 121 at regular intervals in advance, and is formed as a pair on the left and right, and has a slide protrusion 142 and a slide groove ( 143), so that they can be joined smoothly and firmly.

따라서 와이어링로프(121)를 좌우 교차 부분을 체결클립(140)으로 결합하여 견고하게 고정함과 동시에 원형의 와이어링(122)을 순차적으로 정확하게 형성할 수 있도록 하는 것으로 체결클립(140)을 직선상으로 슬라이딩시켜 결합하되 결합 후 원형 상태를 유지하는 와이어링(122)에 의해 분리 우려 없이 견고한 결합 상태를 유지할 수 있도록 하는 것이다.Therefore, the wiring rope 121 is firmly fixed by combining the left and right intersection parts with the fastening clip 140, and at the same time, the circular wiring 122 can be formed sequentially and accurately, so that the fastening clip 140 is straight. It is coupled by sliding upwards, but the wiring 122 maintains its circular state after coupling to maintain a solid coupling state without fear of separation.

한편, 상기 와이어링넷(120) 및 차단와이어로프(130)를 통상의 차단망(150)과 함께 H빔(111)에 설치함이 당연하다.Meanwhile, it is natural to install the wiring net 120 and the blocking wire rope 130 on the H beam 111 together with the normal blocking net 150.

이러한 본 발명의 작용을 설명하면 다음과 같다.The operation of the present invention is explained as follows.

먼저, 도로변 등 설치위치에 콘크리트기단(114)을 형성함과 동시에 H빔(111)을 세워 일정간격으로 다수개 설치하여 견고하게 고정시킨 다음 H빔(111) 사이에 설계에 따라 와이어링넷(120) 또는 와이어링넷(120)과 차단와이어로프(130)를 복합적으로 결합한다.First, a concrete base 114 is formed at an installation location such as a roadside, and at the same time, a plurality of H-beams 111 are erected at regular intervals to be firmly fixed, and then a wiring net 120 is installed between the H-beams 111 according to the design. ) or complexly combine the wiring net 120 and the blocking wire rope 130.

이때 와이어링넷(120) 또는 와이어링넷(120)과 차단와이어로프(130)를 차단망(150)과 함께 설치하는 것으로, 다수개의 와이어링(122)으로 인하여 수축 및 팽창이 용이하여 낙석으로 인한 충격에너지를 효율적으로 흡수하여 낙석의 도로침입을 억제할 뿐만 아니라 시설을 보호함과 동시에 수명을 연장할 수 있으며 각각의 와이어링넷(120)을 교체할 수 있어 파손이나 훼손부위를 신속하게 교체할 수 있도록 하는 것이다.At this time, the wiring net 120 or the wiring net 120 and the blocking wire rope 130 are installed together with the blocking net 150. Due to the multiple wiring 122, it is easy to contract and expand, resulting in shock due to falling rocks. By absorbing energy efficiently, it not only prevents falling rocks from entering the road, but also protects the facility and extends its lifespan. Each wiring net (120) can be replaced so that damaged or broken parts can be quickly replaced. It is done.

더욱이, 와이어링넷(120)의 조립 및 작업성이 용이하고 견고한 결합상태를 유지하므로 비용을 최소화하면서도 최고의 낙서방지효율을 최대로 얻을 수 있는 것이다.Moreover, since the wiring net 120 is easy to assemble and work and maintains a solid connection, the highest anti-graffiti efficiency can be achieved while minimizing costs.

이상의 설명은 본 발명을 예시적으로 설명한 것이고, 명세서에 게시된 실시 예는 본 발명의 기술사상을 한정하기 위한 것이 아니라 설명하기 위한 것이므로 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 본 발명의 기술사상을 벗어나지 않는 범위에서 다양한 수정과 변형 또는 단계의 치환 등이 가능할 것이다. The above description is an illustrative description of the present invention, and the embodiments posted in the specification are not intended to limit the technical idea of the present invention, but are for illustrative purposes, so those skilled in the art will understand the present invention. Various modifications, transformations, or substitution of steps will be possible without departing from the technical idea of .

그러므로 본 발명의 보호범위는 청구범위에 기재된 사항에 의해 해석되고, 그와 균등한 범위 내에 있는 기술적 사항도 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.Therefore, the scope of protection of the present invention should be interpreted based on the matters stated in the claims, and technical matters within the equivalent scope thereof should also be interpreted as being included in the scope of rights of the present invention.

100 : 낙석방지책 110 : 지주부
111 : H빔 112 : 매설부
113 : 절곡부 114 : 기초콘크리트
120 : 와이어링넷 121 : 와이어링로프
122 : 와이어링 123 : 결합고리
124 : 결합수단 125 : 외각와이어로프
130 : 차단와이어로프 131 : 결합수단
140 : 체결클립 141 : 결합홈
142 : 슬라이드돌기 143 : 슬라이드홈
150 : 차단망
100: Rockfall prevention measure 110: Holding part
111: H beam 112: Buried part
113: bent part 114: basic concrete
120: wiring net 121: wiring rope
122: wiring 123: coupling ring
124: Coupling means 125: Outer wire rope
130: Blocking wire rope 131: Coupling means
140: fastening clip 141: coupling groove
142: Slide projection 143: Slide groove
150: Blocking net

Claims (4)

H빔(111)을 일정간격으로 세워 설치하는 지주부(110)와, 상기 지주부(110)의 H빔(111) 사이에 와이어링로프(121)로 다수개의 와이어링(122)을 순차적으로 형성하되 와이어링(122)의 상하를 결합고리(123)로 형성하는 와이어링넷(120)과, 상기 지주부(110)의 H빔(111) 사이에 횡으로 다수 가닥 설치하는 차단와이어로프(130), 및 상기 와이어링넷(120)의 와이어링(122)을 좌우를 연결하는 체결클립(140)으로 구성하되,
상기 와이어링넷(120)은 와이어링로프(121)를 파형으로 형성하여 상부와 하부를 반원형으로 형성하되, 제1열 와이어링로프(121)의 하부 반원 중심과 제2열 상부 반원 중심의 결합고리(122)로 연결하도록 하고 좌우 교차부분을 체결클립(140)으로 체결하여 다수개의 와이어링(122)을 순차적으로 일정하게 형성하도록 하고, 테두리에 외각와이어로프(125)를 형성하고 와이어링로프(121)와 외각와이어로프(125)를 결합고리(123)나 체결클립(140)으로 결합하되, 한 가닥의 와이어링로프(121)로 제1열과 제2열을 형성하도록 하며,
상기 체결클립(140)은 삽입용 결합홈(141)을 구비하여 사전에 와이어링로프(121)에 일정 간격으로 끼워 형성하되 좌우 한 쌍으로 형성하여 대응 면에 슬라이드돌기(142)와 슬라이드홈(143)을 형성하여 구성한 것을 특징으로 하는 와이어링을 이용한 낙석방지책.
A plurality of wirings 122 are sequentially connected with a wiring rope 121 between the supporting portion 110, which installs the H beam 111 at regular intervals, and the H beam 111 of the supporting portion 110. A wiring net 120 is formed on the top and bottom of the wiring 122 with coupling rings 123, and a blocking wire rope 130 is installed laterally between the H beams 111 of the support portion 110. ), and a fastening clip 140 connecting the left and right sides of the wiring 122 of the wiring net 120,
The wiring net 120 is formed by forming the wiring rope 121 in a wave shape to form a semicircle at the top and bottom, and is formed by a connecting ring between the center of the lower semicircle of the first row of wiring ropes 121 and the center of the upper semicircle of the second row. (122), and the left and right intersection parts are fastened with fastening clips 140 to form a plurality of wiring 122 sequentially and consistently, and an outer wire rope 125 is formed on the edge and a wiring rope ( 121) and the outer wire rope 125 are combined with a coupling ring 123 or a fastening clip 140, and the first and second rows are formed with a single strand of wiring rope 121,
The fastening clip 140 is provided with a coupling groove 141 for insertion and is formed in advance by inserting it into the wiring rope 121 at regular intervals. It is formed as a pair on the left and right and has a slide protrusion 142 and a slide groove ( 143) A rockfall prevention measure using wiring, characterized in that it is formed by forming.
삭제delete 삭제delete 삭제delete
KR1020210186301A 2021-12-23 2021-12-23 falling rock prevention pence using wire ring KR102625648B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210186301A KR102625648B1 (en) 2021-12-23 2021-12-23 falling rock prevention pence using wire ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210186301A KR102625648B1 (en) 2021-12-23 2021-12-23 falling rock prevention pence using wire ring

Publications (2)

Publication Number Publication Date
KR20230096628A KR20230096628A (en) 2023-06-30
KR102625648B1 true KR102625648B1 (en) 2024-01-15

Family

ID=86959652

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210186301A KR102625648B1 (en) 2021-12-23 2021-12-23 falling rock prevention pence using wire ring

Country Status (1)

Country Link
KR (1) KR102625648B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101712651B1 (en) * 2016-04-08 2017-03-22 선진기업 주식회사 Falling rock preventing fence using zigzag wire rope and method for constructing this same
JP2020159096A (en) * 2019-03-27 2020-10-01 株式会社テザック Rockfall prevention tool and rockfall prevention method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0124435Y1 (en) * 1992-05-09 1998-12-15 윤종용 Lesin pack motor of lead wire holders
KR20040004884A (en) * 2002-07-05 2004-01-16 나종호 net for preventing a falling rock, using wire rope
KR101691547B1 (en) * 2014-09-18 2016-12-30 주식회사 수아이텍 Wirenet assembly for being adhered on rock and constructing method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101712651B1 (en) * 2016-04-08 2017-03-22 선진기업 주식회사 Falling rock preventing fence using zigzag wire rope and method for constructing this same
JP2020159096A (en) * 2019-03-27 2020-10-01 株式会社テザック Rockfall prevention tool and rockfall prevention method

Also Published As

Publication number Publication date
KR20230096628A (en) 2023-06-30

Similar Documents

Publication Publication Date Title
JP5005659B2 (en) Rock fall protection net structure
AU2020101111A4 (en) Cantilever truss supported resilient flexible protective shed tunnel
JP5779734B1 (en) Shock absorber
CN111236276A (en) Protective structure for dangerous rock falling of high and steep side slope of tunnel and construction method
JP6871681B2 (en) Front and rear two-tiered protective fence
JP5086871B2 (en) Covered slope protection method
JP6114537B2 (en) Rockfall protection device and rockfall protection method
KR102625648B1 (en) falling rock prevention pence using wire ring
JP7235940B2 (en) Earth and sand fall protection work and its construction method
KR102458257B1 (en) Sturcture for preventing falling rock using wire ring
KR100449935B1 (en) Method of installing conduit or the like on mountain surface using steel cable
KR102625646B1 (en) construction method for falling rock prevention fence using wire ring
JP5793633B1 (en) Protective fence
JP4580776B2 (en) Wire rope type rockfall protection fence
KR20160092002A (en) Guard fence
KR101572504B1 (en) Separable fence for protecting from falling rocks
JP2015101948A (en) Avalanche prevention facility
JP4410736B2 (en) Protective fence
CN217460346U (en) Passive protective net
JP2010168833A (en) Protective fence against rockfall or the like
JP6330454B2 (en) Protective net and its construction method, reinforcement structure for existing protective net and its construction method
KR101104124B1 (en) A assembly of the fence for preventing falling stone
AU2017251724B2 (en) Track support system
JP3938777B2 (en) Construction method of crossing underground structure and crossing underground structure
KR102649243B1 (en) falling rock prevention sturcture construction method using wire ring