KR102613234B1 - Collaborative project management platform and method of the same - Google Patents

Collaborative project management platform and method of the same Download PDF

Info

Publication number
KR102613234B1
KR102613234B1 KR1020210092757A KR20210092757A KR102613234B1 KR 102613234 B1 KR102613234 B1 KR 102613234B1 KR 1020210092757 A KR1020210092757 A KR 1020210092757A KR 20210092757 A KR20210092757 A KR 20210092757A KR 102613234 B1 KR102613234 B1 KR 102613234B1
Authority
KR
South Korea
Prior art keywords
task
department
tasks
data
issue
Prior art date
Application number
KR1020210092757A
Other languages
Korean (ko)
Other versions
KR20230012229A (en
Inventor
유장석
Original Assignee
(주)썸잇
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)썸잇 filed Critical (주)썸잇
Priority to KR1020210092757A priority Critical patent/KR102613234B1/en
Publication of KR20230012229A publication Critical patent/KR20230012229A/en
Application granted granted Critical
Publication of KR102613234B1 publication Critical patent/KR102613234B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1093Calendar-based scheduling for persons or groups

Abstract

본 발명은 프로젝트 데이터 및 프로젝트 생성 요청을 사용자 단말로부터 수신하여 상기 프로젝트를 생성하는 프로젝트 관리부, 부서 데이터 및 부서 생성 요청을 상기 사용자 단말로부터 수신하고, 상기 수신된 부서 데이터를 기반으로 상기 부서를 생성하고, 상기 생성된 부서의 인력을 등록하고 상기 등록된 인력의 권한을 설정하는 부서 관리부, 업무 데이터 및 업무 생성 요청을 상기 사용자 단말로부터 수신하고, 수신된 업무 데이터를 기반으로 상기 업무를 생성하고, 상기 생성된 업무를 상기 부서에 할당하고, 상기 생성된 업무의 연관 관계를 설정하는 업무 관리부 및 상기 업무의 연관 관계를 기반으로 다중 업무 연계 진척도를 생성하고 갱신하는 다중 업무 연계 진척도 관리부를 포함하는 협업 프로젝트 관리 플랫폼 및 그 방법을 제공한다.
또한, 상기 업무는 타 부서로부터 결과물 수신하는 인 업무와 타 부서로 결과물을 전달하는 아웃 업무를 포함하고, 상기 다중 업무 연계 진척도는 복수의 부서에 할당된 복수의 업무 중 상기 인 업무와 아웃 업무의 연관 관계를 포함하여 전체 프로젝트의 진척도를 표시하는 협업 프로젝트 관리 플랫폼 및 그 방법을 제공한다.
The present invention includes a project management unit that receives project data and a project creation request from a user terminal to create the project, receives department data and a department creation request from the user terminal, and creates the department based on the received department data. , a department management unit that registers the personnel of the created department and sets the authority of the registered personnel, receives work data and a task creation request from the user terminal, creates the task based on the received work data, and A collaborative project that includes a task management unit that assigns the created tasks to the department and establishes the correlation between the created tasks, and a multi-task linkage progress management unit that creates and updates multi-task linkage progress based on the linkage between the tasks. Provides a management platform and method.
In addition, the work includes an in-task for receiving results from other departments and an out-task for delivering results to other departments, and the multi-task linkage progress is based on the in-task and out-task among the plurality of tasks assigned to a plurality of departments. Provides a collaborative project management platform and method that displays the progress of the entire project, including related relationships.

Description

협업 프로젝트 관리 플랫폼 및 그 방법{COLLABORATIVE PROJECT MANAGEMENT PLATFORM AND METHOD OF THE SAME}Collaborative project management platform and method {COLLABORATIVE PROJECT MANAGEMENT PLATFORM AND METHOD OF THE SAME}

본 발명은 협업 프로젝트 관리 플랫폼에 관한 것으로, 더욱 상세하게는 업무의 연관 관계를 설정하여 연관 관계에 따른 일정을 자동으로 산출하고 조정할 수 있는 협업 프로젝트 관리 플랫폼 및 그 방법에 관한 것이다. The present invention relates to a collaborative project management platform, and more specifically, to a collaborative project management platform and method that can automatically calculate and adjust schedules according to the correlation by establishing the correlation between tasks.

다수의 부서에서 업무를 수행하여 최종 프로젝트 결과물을 도출해내는 업무 관리 시스템 또는 프로젝트 관리 시스템은 다수의 공급 업체에서 제작되어 공급되고 있다. Work management systems or project management systems, which perform work across multiple departments and produce final project results, are produced and supplied by multiple suppliers.

그러나, 이러한 프로젝트의 관리는 각 부서별 업무의 정의하고 To Do, Doing, Done 과 같은 업무의 진척 상황을 제공하고 있을 뿐이다. 이러한 각 부서별의 업무 진척도를 제공하는 종래의 프로젝트 관리 시스템은 특허 등록 제2258163호에 개시되어 있다. However, the management of these projects only defines the work of each department and provides progress status of work such as To Do, Doing, and Done. A conventional project management system that provides work progress for each department is disclosed in Patent Registration No. 2258163.

종래 기술은 프로젝트가 생성되면, 자료 업로드가 가능한 게시판 형태의 프로젝트 공간을 제공하고 그 공간에 게시물과 업로드를 제공하고 프로젝트의 관리의 편의를 일부 제공하고 있다.The prior art provides a project space in the form of a bulletin board where data can be uploaded when a project is created, posts and uploads are provided in the space, and some convenience in project management is provided.

그러나, 최근 다수의 부서의 업무가 서로 유기적으로 연결되기 때문에, 업무의 선후 관계가 반드시 부서 단위와 일치하지 않는다. 또한, 이러한 유기적 연관성에 의해 업무의 개시와 완료 시점이 불분명 해지며, 프로젝트 이슈 발생의 출처와 책임 문제도 불명확해지는 점이 있다.However, because the work of many departments has recently become organically connected to each other, the sequential relationship of work does not necessarily match the departmental level. In addition, due to this organic connection, the start and completion time of work becomes unclear, and the source of project issues and responsibility issues also become unclear.

또한, 프로젝트 관리자 입장에서는 다수의 부서의 업무과 유기적으로 연관되어 있을 때는 진척도를 정확히 관리하기 힘든 점이 있다. Additionally, from the project manager's perspective, it is difficult to accurately manage progress when it is organically related to the work of multiple departments.

또한, 최근 기업 및 연구기관들은 기술이 고도화됨에 따라 업무를 세분화하여 전문성을 가진 외부와 협업하는 것을 선호하고 있다. 또한, 감염병 유행에 의해 재택 근무를 진행하는 기업 및 연구기관들이 증가하게 되면서, 내부적으로도 업무를 세분화하고 담당자에게 할당하여 프로젝트를 수행하고 있다. Additionally, as technology has recently become more advanced, companies and research institutes are preferring to subdivide their work and collaborate with outsiders with expertise. In addition, as the number of companies and research institutes working from home increases due to the infectious disease epidemic, tasks are subdivided internally and assigned to people in charge to carry out projects.

따라서, 기업 및 연구기관들은 프로젝트 관리를 위해 업무 계획, 담당자 선정, 업무 할당, 일정 관리, 외주 관리 및 이슈 관리를 수행해야만 한다. 이에 따라, 기업 및 연구기관들이 내부 업무뿐만 아니라 외부 업무도 자체적으로 관리할 수 있는 프로젝트 관리 솔루션의 필요성이 증가하고 있다.Therefore, companies and research institutes must perform work planning, selection of personnel, task allocation, schedule management, outsourcing management, and issue management for project management. Accordingly, the need for project management solutions that allow companies and research institutes to manage not only internal but also external tasks is increasing.

종래에는, 프로젝트의 업무를 세분화하고, 담당자에게 할당하여 프로젝트를 관리했다. 또한, 외주 업무는 외부에 위탁함으로써 별개로 관리했다. 하지만, 이러한 경우 하나의 프로젝트를 통합적으로 관리하지 못하고 분할하여 관리를 진행해야 한다는 문제점이 있다. 또한, 내부 업무와 외부 업무의 일정관리를 별개로 진행함으로써, 프로젝트의 전체 업무 진척도를 정의하기 어렵다는 문제점이 있다. In the past, projects were managed by subdividing project tasks and assigning them to people in charge. In addition, outsourcing work was managed separately by outsourcing it. However, in this case, there is a problem that one project cannot be managed in an integrated manner and must be managed separately. In addition, there is a problem that it is difficult to define the overall work progress of the project by separately managing schedules for internal work and external work.

본 발명이 이루고자 하는 기술적 과제는 업무의 연관 관계를 설정하여 연관 관계에 따른 일정을 자동으로 산출하고 조정할 수 있는 협업 프로젝트 관리 플랫폼을 제공하는 것이다.The technical task to be achieved by the present invention is to provide a collaborative project management platform that can automatically calculate and adjust schedules according to the relationship by establishing a relationship between tasks.

또한, 다수의 부서의 업무의 연관 관계를 설정하여 연관 관계에 따른 일정을 자동으로 산출하고 조정하는 기술을 제공할 수 있다.In addition, it is possible to provide technology to automatically calculate and adjust schedules according to the relationships by establishing relationships among the work of multiple departments.

또한, 프로젝트의 진척도를 백분율 형태로 정의할 수 있고, 이슈가 생성된 경우 자동으로 다중 업무 진척도를 갱신할 수 있는 기술을 제공한다. In addition, project progress can be defined in percentage form, and technology is provided to automatically update multi-task progress when an issue is created.

또한, 담당자의 승인이 완료되는 경우에만 이슈를 생성함으로써 이슈 생성 이력을 추적 및 관리할 수 있는 솔루션을 제공한다.Additionally, it provides a solution to track and manage issue creation history by creating issues only when the person in charge completes approval.

본 발명이 이루고자 하는 기술적 과제는 이상에서 언급한 기술적 과제로 제한되지 않으며, 언급되지 않은 또 다른 기술적 과제들은 아래의 기재로부터 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 명확하게 이해될 수 있을 것이다.The technical problem to be achieved by the present invention is not limited to the technical problem mentioned above, and other technical problems not mentioned can be clearly understood by those skilled in the art from the description below. There will be.

상기 기술적 과제를 달성하기 위하여, 본 발명의 일 실시예에 따른 업무간 연관 관계를 설정하여 프로젝트를 관리하는 협업 프로젝트 관리 플랫폼은, 프로젝트 데이터 및 프로젝트 생성 요청을 사용자 단말로부터 수신하여 상기 프로젝트를 생성하는 프로젝트 관리부, 부서 데이터 및 부서 생성 요청을 상기 사용자 단말로부터 수신하고, 상기 수신된 부서 데이터를 기반으로 상기 부서를 생성하고, 상기 생성된 부서의 인력을 등록하고 상기 등록된 인력의 권한을 설정하는 부서 관리부, 업무 데이터 및 업무 생성 요청을 상기 사용자 단말로부터 수신하고, 수신된 업무 데이터를 기반으로 상기 업무를 생성하고, 상기 생성된 업무를 상기 부서에 할당하고, 상기 생성된 업무의 연관 관계를 설정하는 업무 관리부 및 상기 업무의 연관 관계를 기반으로 다중 업무 연계 진척도를 생성하고 갱신하는 다중 업무 연계 진척도 관리부를 포함하고, 상기 업무는 타 부서로부터 결과물 수신하는 인 업무와 타 부서로 결과물을 전달하는 아웃 업무를 포함하고, 상기 다중 업무 연계 진척도는 복수의 부서에 할당된 복수의 업무 중 상기 인 업무와 아웃 업무의 연관 관계를 포함하여 전체 프로젝트의 진척도를 표시할 수 있다.In order to achieve the above technical task, a collaborative project management platform that manages projects by establishing relationships between tasks according to an embodiment of the present invention receives project data and project creation requests from a user terminal and creates the project. A project management department, a department that receives department data and department creation requests from the user terminal, creates the department based on the received department data, registers personnel of the created department, and sets authority of the registered personnel. Management unit, receives work data and a task creation request from the user terminal, creates the task based on the received task data, assigns the created task to the department, and establishes a relationship between the created tasks. It includes a task management department and a multi-task linkage progress management department that creates and updates multi-task linkage progress based on the relationship between the tasks, and the work includes an in task that receives results from other departments and an out task that delivers results to other departments. Including, the multi-task linkage progress may display the progress of the entire project, including the relationship between the in-task and out-task among the plurality of tasks assigned to a plurality of departments.

또한, 상기 다중 업무 연계 진척도 관리부는 상기 업무 관리부에서 상기 업무의 생성이 완료되면 상기 업무의 연관 관계, 상기 업무의 비중 및 상기 업무의 일정을 기반으로 상기 다중 업무 연계 진척도를 생성하는 다중 업무 연계 진척도 생성부를 더 포함할 수 있다.In addition, the multi-task linked progress management unit generates the multi-task linked progress chart based on the correlation between the tasks, the proportion of the task, and the schedule of the task when the task management unit completes the creation of the task. It may further include a generating unit.

상기 부서 및 업무에 비중을 부여하여 상기 프로젝트의 진척도를 백분율 형태로 정의하고 관리할 수 있다.By assigning weight to the departments and tasks, the progress of the project can be defined and managed in percentage form.

상기 업무 관리부가 상기 업무의 결과물을 등록하고, 상기 사용자 단말로 업무 승인을 요청하고, 상기 사용자 단말로부터 상기 업무 승인을 수신하는 경우, 상기 다중 업무 연계 진척도를 갱신할 수 있다.When the task management unit registers the results of the task, requests task approval from the user terminal, and receives the task approval from the user terminal, the multi-task linkage progress can be updated.

상기 부서 관리부는 외주 관리를 위한 외부 부서 데이터 및 외부 부서 생성 요청이 수신되는 경우, 상기 수신된 외부 부서 데이터를 기반으로 상기 사용자 단말로 견적을 요청하여 상기 외부 부서의 견적을 수신하고, 상기 수신된 외부 부서의 견적을 기반으로 상기 외부 부서의 인력을 등록하고, 등록된 인력의 권한을 설정할 수 있다.When external department data for outsourcing management and a request for creating an external department are received, the department management unit receives a quote from the external department by requesting a quote from the user terminal based on the received external department data, and receives the quote from the external department. Based on the estimate from the external department, you can register the personnel of the external department and set the authority of the registered personnel.

상기 사용자 단말로부터 이슈 데이터 및 이슈 생성 요청을 수신하고, 수신된 이슈 데이터를 기반으로 이슈를 생성하고 설정하며, 사용자 단말로 이슈 생성 승인 요청을 하는 이슈 관리부를 더 포함할 수 있다.It may further include an issue management unit that receives issue data and an issue creation request from the user terminal, creates and sets an issue based on the received issue data, and requests approval for issue creation to the user terminal.

상기 다중 업무 연계 진척도 관리부는 상기 이슈 관리부에서 생성된 상기 이슈가 상기 업무의 일정 변경을 포함하는 경우, 상기 업무의 연관 관계 및 상기 업무의 일정 변경을 기반으로 상기 다중 업무 연계 진척도를 갱신하는 다중 업무 연계 진척도 갱신부를 더 포함할 수 있다.The multi-task linkage progress management unit updates the multi-task linkage progress based on the correlation between the tasks and the schedule change of the task when the issue created in the issue management unit includes a change in the schedule of the task. A linked progress update section may be further included.

또한, 업무간 연관 관계를 설정하여 프로젝트를 관리하는 협업 프로젝트 관리 방법은, 사용자 단말로부터 프로젝트 데이터 및 프로젝트 생성 요청을 수신하여 상기 프로젝트를 생성하는 단계,상기 사용자 단말로부터 부서 데이터 및 부서 생성 요청을 수신하고, 상기 수신된 부서 데이터를 기반으로 상기 부서를 생성하고, 상기 생성된 부서의 인력을 등록하고 상기 등록된 인력의 권한을 설정하는 단계, 상기 사용자 단말로부터 업무 데이터 및 업무 생성 요청을 수신하고, 수신된 업무 데이터를 기반으로 상기 업무를 생성하고, 상기 생성된 업무를 상기 부서에 할당하고, 상기 생성된 업무의 연관 관계를 설정하는 단계 및 상기 업무의 연관 관계를 기반으로 다중 업무 연계 진척도를 생성하고 갱신하는 단계를 포함할 수 있다.In addition, the collaborative project management method of managing a project by establishing a relationship between tasks includes receiving project data and a project creation request from a user terminal to create the project, receiving department data and a department creation request from the user terminal. Creating the department based on the received department data, registering personnel of the created department and setting authority of the registered personnel, receiving work data and a job creation request from the user terminal, Creating the task based on received task data, assigning the created task to the department, establishing a relationship between the created tasks, and generating a multi-task linkage progress chart based on the relationship between the tasks. and may include updating steps.

상기 업무의 결과물을 등록하는 단계, 상기 사용자 단말로 업무 승인을 요청하고, 상기 사용자 단말로부터 상기 업무 승인을 수신하는 단계 및 상기 수신된 업무 승인을 상기 업무가 완료되었다고 판단하여, 상기 다중 업무 연계 진척도를 갱신하는 단계를 더 포함할 수 있다.Registering the results of the task, requesting task approval from the user terminal, receiving the task approval from the user terminal, and determining that the task has been completed based on the received task approval, and determining the multi-task linkage progress It may further include a step of updating.

외주 관리를 위한 외부 부서 데이터 및 외부 부서 생성 요청을 수신하는 단계, 상기 수신된 외부 부서 데이터를 기반으로 상기 사용자 단말로 견적을 요청하여 상기 외부 부서의 견적을 수신하는 단계 및 상기 수신된 외부 부서의 견적을 기반으로 상기 외부 부서의 인력을 등록하고, 등록된 인력의 권한을 설정하는 단계를 더 포함할 수 있다.Receiving external department data for outsourcing management and a request for creating an external department, requesting a quote from the user terminal based on the received external department data and receiving a quote from the external department, and receiving a quote from the external department It may further include registering personnel from the external department based on the estimate and setting the authority of the registered personnel.

상기 사용자 단말로부터 이슈 데이터 및 이슈 생성 요청을 수신하고, 수신된 이슈 데이터를 기반으로 이슈를 생성하고 설정하며, 사용자 단말로 이슈 생성 승인 요청을 하는 단계를 더 포함할 수 있다.It may further include receiving issue data and an issue creation request from the user terminal, creating and setting an issue based on the received issue data, and requesting approval for issue creation from the user terminal.

여기서, 상기 생성된 이슈가 상기 업무의 일정 변경을 포함하는 경우, 상기 업무의 연관 관계 및 상기 업무의 일정 변경을 기반으로 상기 다중 업무 연계 진척도를 갱신하는 단계를 더 포함할 수 있다.Here, when the generated issue includes a change in the schedule of the task, the step of updating the multi-task linkage progress based on the correlation between the tasks and the change in the schedule of the task may be further included.

본 발명의 실시예에 따르면, 더욱 상세하게는 다수의 부서의 업무의 연관 관계를 설정하여 연관 관계에 따른 일정을 자동으로 산출하고 조정할 수 있기 때문에 프로젝트의 전주기를 관리할 수 있다. According to an embodiment of the present invention, in more detail, the entire cycle of the project can be managed because the relationship between the tasks of multiple departments can be established and the schedule according to the relationship can be automatically calculated and adjusted.

또한, 필요에 따라 외주 업무를 추가하여 협업 프로젝트 관리 플랫폼만으로 내외부 업무를 관리할 수 있다. Additionally, you can manage internal and external work using only the collaborative project management platform by adding outsourced work as needed.

또한, 부서 및 업무에 비중을 부여하여 프로젝트의 진척도를 백분율 형태로 정의하여 관리할 수 있다.In addition, by assigning weight to departments and tasks, the progress of the project can be defined and managed in the form of a percentage.

또한, 업무간 연관 관계를 설정함으로써, 이슈가 생성된 경우 자동으로 다중 업무 진척도를 갱신할 수 있다. Additionally, by establishing relationships between tasks, the progress of multiple tasks can be automatically updated when an issue is created.

또한, 담당자의 승인이 완료되는 경우에만 이슈를 생성함으로써, 무분별한 이슈 생성을 방지하고, 이슈 생성 이력을 추적 및 관리할 수 있다. Additionally, by creating issues only when approval from the person in charge is completed, indiscriminate issue creation can be prevented and issue creation history can be tracked and managed.

본 발명의 효과는 상기한 효과로 한정되는 것은 아니며, 본 발명의 상세한 설명 또는 특허청구범위에 기재된 발명의 구성으로부터 추론 가능한 모든 효과를 포함하는 것으로 이해되어야 한다.The effects of the present invention are not limited to the effects described above, and should be understood to include all effects that can be inferred from the configuration of the invention described in the detailed description or claims of the present invention.

도1은 본 발명의 일 실시예에 따른 협업 프로젝트 관리 플랫폼의 개요를 도시하는 도면이다.
도 2는 본 발명의 일 실시예에 따른 프로젝트를 생성하는 것을 도시하는 도면이다.
도 3은 본 발명의 일 실시예에 따른 협업 프로젝트 관리 플랫폼 화면을 도시하는 도면이다.
도 4는 본 발명의 일 실시예에 따른 업무의 연관 관계를 형성하여 다중 업무 연계 진척도를 생성하는 것을 도시하는 도면이다.
도 5는 본 발명의 일 실시예에 따른 다중 업무 연계 진척도를 도시하는 도면이다.
도6은 본 발명의 일 실시예에 따른 생성된 이슈를 기반으로 다중 업무 연계 진척도를 갱신하는 것을 도시하는 도면이다.
도7은 본 발명의 일 실시예에 따른 협업 프로젝트 관리 플랫폼의 전체 흐름을 도시하는 흐름도이다.
도 8은 본 발명의 일 실시예에 따른 프로젝트를 생성하는 방법을 도시하는 흐름도이다.
도 9는 본 발명의 일 실시예에 따른 업무의 연관 관계를 기반으로 다중 업무 연계 진척도를 생성하는 방법을 도시하는 흐름도이다.
도 10은 본 발명의 일 실시예에 따른 이슈를 생성하고, 다중 업무 연계 진척도를 갱신하는 방법을 도시하는 흐름도이다.
Figure 1 is a diagram showing an overview of a collaborative project management platform according to an embodiment of the present invention.
Figure 2 is a diagram illustrating creating a project according to an embodiment of the present invention.
Figure 3 is a diagram illustrating a collaborative project management platform screen according to an embodiment of the present invention.
Figure 4 is a diagram illustrating the creation of a multi-task linkage progress chart by forming a linkage between tasks according to an embodiment of the present invention.
Figure 5 is a diagram showing the progress of linking multiple tasks according to an embodiment of the present invention.
Figure 6 is a diagram illustrating updating multi-task linkage progress based on issues created according to an embodiment of the present invention.
Figure 7 is a flow chart showing the overall flow of the collaborative project management platform according to an embodiment of the present invention.
Figure 8 is a flowchart showing a method for creating a project according to an embodiment of the present invention.
Figure 9 is a flowchart illustrating a method of generating a multi-task linked progress chart based on the correlation between tasks according to an embodiment of the present invention.
Figure 10 is a flowchart illustrating a method of creating an issue and updating multi-task linkage progress according to an embodiment of the present invention.

이하에서는 첨부한 도면을 참조하여 본 발명을 설명하기로 한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며, 따라서 여기에서 설명하는 실시예로 한정되는 것은 아니다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.Hereinafter, the present invention will be described with reference to the attached drawings. However, the present invention may be implemented in various different forms and, therefore, is not limited to the embodiments described herein. In order to clearly explain the present invention in the drawings, parts that are not related to the description are omitted, and similar parts are given similar reference numerals throughout the specification.

명세서 전체에서, 어떤 부분이 다른 부분과 "연결(접속, 접촉, 결합)"되어 있다고 할 때, 이는 "직접적으로 연결"되어 있는 경우뿐 아니라, 그 중간에 다른 부재를 사이에 두고 "간접적으로 연결"되어 있는 경우도 포함한다. 또한 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 구비할 수 있다는 것을 의미한다.Throughout the specification, when a part is said to be "connected (connected, contacted, combined)" with another part, this means not only "directly connected" but also "indirectly connected" with another member in between. "Includes cases where it is. Additionally, when a part is said to “include” a certain component, this does not mean that other components are excluded, but that other components can be added, unless specifically stated to the contrary.

본 명세서에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 명세서에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terms used herein are only used to describe specific embodiments and are not intended to limit the invention. Singular expressions include plural expressions unless the context clearly dictates otherwise. In this specification, terms such as “comprise” or “have” are intended to indicate the presence of features, numbers, steps, operations, components, parts, or combinations thereof described in the specification, but are not intended to indicate the presence of one or more other features. It should be understood that this does not exclude in advance the possibility of the existence or addition of elements, numbers, steps, operations, components, parts, or combinations thereof.

이하 첨부된 도면을 참고하여 본 발명의 실시예를 상세히 설명하기로 한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the attached drawings.

도1은 본 발명의 일 실시예에 따른 협업 프로젝트 관리 플랫폼의 구성을 도시하는 도면이다. Figure 1 is a diagram showing the configuration of a collaborative project management platform according to an embodiment of the present invention.

도1를 참조하면, 협업 프로젝트 관리 플랫폼(100)은 사용자 등록부(110), 서비스 등록부(120), 프로젝트 관리부(130), 부서 관리부(140), 업무 관리부(150), 다중 업무 연계 진척도 관리부(160) 및 이슈 관리부(170)를 포함할 수 있다.Referring to Figure 1, the collaborative project management platform 100 includes a user register 110, a service register 120, a project management unit 130, a department management unit 140, a task management unit 150, and a multi-task linkage progress management unit ( 160) and an issue management unit 170.

먼저, 사용자 등록부(110)는 사용자 단말로부터 사용자 데이터를 수신하여 사용자를 등록할 수 있다. 사용자 단말은 PC, 스마트폰, 태블릿 및 데스크탑 등을 포함할 수 있다. 또한, 사용자 데이터는 사용자의 이름, 전화번호 및 소속 기업 정보 등을 포함할 수 있다. 협업 프로젝트 관리 플랫폼(100)은 수신된 사용자 데이터를 이용하여 사용자를 인증하고, 인증된 사용자를 등록할 수 있다. First, the user registration unit 110 may receive user data from the user terminal and register the user. User terminals may include PCs, smartphones, tablets, and desktops. Additionally, user data may include the user's name, phone number, and company information. The collaborative project management platform 100 may authenticate users using the received user data and register the authenticated users.

서비스 등록부(120)는 등록된 사용자에게 제공할 서비스를 등록할 수 있다.The service register 120 can register services to be provided to registered users.

서비스 등록부(120)는 등록된 사용자의 서비스 가입 정보를 확인한 후, 가입된 서비스를 제공할 수 있다. 만약, 서비스 가입이 확인되지 않는다면, 서비스 등록부(120)는 사용자 단말로 소속 기업 정보 및 내/외부 구성원 정보 등을 요청할 수 있다. The service registration unit 120 may provide the subscribed service after confirming the service subscription information of the registered user. If service subscription is not confirmed, the service register 120 may request company information and internal/external member information from the user terminal.

프로젝트 관리부(130)는 프로젝트 생성부(131) 및 프로젝트 설정부(132)를 포함할 수 있다. The project management unit 130 may include a project creation unit 131 and a project setting unit 132.

프로젝트 생성부(131)는 사용자 단말로부터 프로젝트 생성 요청을 수신할 수 있다. 또한, 프로젝트 생성부(131)는 사용자 단말로부터 프로젝트 데이터를 수신할 수 있다. 프로젝트 데이터는 프로젝트명 및 프로젝트 설명 등을 포함할 수 있다. The project creation unit 131 may receive a project creation request from the user terminal. Additionally, the project creation unit 131 may receive project data from the user terminal. Project data may include project name and project description.

또한, 프로젝트 생성부(131)는 사용자 단말로 부서 생성을 요청하고 부서 데이터를 수신할 수 있다. 후술하겠지만, 수신된 부서 데이터는 부서 관리부(140)로 전달되어 부서 생성을 진행할 수 있다. Additionally, the project creation unit 131 may request department creation through the user terminal and receive department data. As will be described later, the received department data is transmitted to the department management unit 140 to proceed with department creation.

프로젝트 설정부(132)는 프로젝트의 세부 사항을 설정할 수 있다. 프로젝트 설정부(132)는 프로젝트를 임시 배정하여 사용자 단말에 제공한 후, 프로젝트 변경 여부를 요청할 수 있다. 만약 사용자 단말로부터 프로젝트 변경이 수신된다면, 프로젝트 설정부(132)는 수신된 프로젝트 변경 요청을 기반으로 임시 배정된 프로젝트를 변경할 수 있다. The project setting unit 132 can set the details of the project. The project setting unit 132 may temporarily assign a project, provide it to the user terminal, and then request whether to change the project. If a project change is received from the user terminal, the project setting unit 132 can change the temporarily assigned project based on the received project change request.

또한, 프로젝트 설정부(132)는 임시 배정된 프로젝트의 변경이 완료된다면, 프로젝트 생성부(131)로 프로젝트 생성 완료를 요청할 수 있다. 프로젝트 생성부(131)는 프로젝트 설정부(132)로부터 요청된 프로젝트 생성 완료를 확인하여 프로젝트를 생성할 수 있다.Additionally, if the change to the temporarily assigned project is completed, the project setting unit 132 may request the project creation unit 131 to complete project creation. The project creation unit 131 may create a project by confirming completion of project creation requested from the project setting unit 132.

부서 관리부(140)는 내부 부서 생성부(141), 내부 부서 설정부(142), 외부 부서 생성부(143), 외부 부서 견적 요청부(144) 및 외부 부서 설정부(145)를 포함할 수 있다. The department management unit 140 may include an internal department creation unit 141, an internal department setting unit 142, an external department creation unit 143, an external department quotation request unit 144, and an external department setting unit 145. there is.

내부 부서 생성부(141)는 사용자 단말로부터 내부 부서 데이터를 수신하여 내부 부서를 생성할 수 있다. 내부 부서 데이터는 내부 부서명, 내부 부서 인력 및 내부 부서 인력 권한 등을 포함할 수 있다. The internal department creation unit 141 may receive internal department data from the user terminal and create an internal department. Internal department data may include internal department name, internal department personnel, and internal department personnel authority.

내부 부서 설정부(142)는 내부 부서 생성부(141)로부터 내부 부서 데이터를 수신하여 세부 설정할 수 있다. 내부 부서 설정부(142)는 생성된 내부 부서의 인력을 등록하고, 등록된 내부 부서 인력의 권한을 설정할 수 있다. 이 때, 내부 부서 설정부(142)는 내부 부서의 인력의 권한을 활성 또는 비활성으로 설정할 수 있다. 권한은 일정 승인, 환경 설정 및 문서 편집 등을 포함할 수 있다. 즉, 내부 부서 인력들은 설정된 권한에 맞게 협업 프로젝트 관리 플랫폼(100)을 이용할 수 있다. The internal department setting unit 142 may receive internal department data from the internal department creating unit 141 and make detailed settings. The internal department setting unit 142 can register the personnel of the created internal department and set the authority of the registered internal department personnel. At this time, the internal department setting unit 142 can set the authority of personnel of the internal department to active or inactive. Permissions can include approving schedules, setting preferences, and editing documents. In other words, internal department personnel can use the collaborative project management platform 100 according to the set permissions.

외부 부서 생성부(143)는 사용자 단말로부터 외부 부서 데이터를 수신하여 외부 부서를 생성할 수 있다. 외부 부서 데이터는 외부 부서명 및 외부 부서 인력, 외부 부서 인력 권한 등을 포함할 수 있다.The external department creation unit 143 may receive external department data from the user terminal and create an external department. External department data may include external department name, external department personnel, external department personnel authority, etc.

또한, 외부 부서 생성부(143)는 필요에 따라 외부 부서 데이터를 수신하여 추가 생성할 수 있다. 이로써, 협업 프로젝트 관리 플랫폼(100)은 내부 부서와 외부 부서를 하나의 플랫폼에 생성하여 관리할 수 있다. Additionally, the external department creation unit 143 can receive external department data and create additional data as needed. Accordingly, the collaborative project management platform 100 can create and manage internal departments and external departments on one platform.

외부 부서 견적 요청부(144)는 외부 부서 생성부(143)로부터 외부 부서 데이터를 수신하여, 외부 부서의 사용자 단말로 견적 데이터를 요청할 수 있다. 외부 부서 견적 요청부(144)는 외부 부서명, 외부 부서 인력 및 외부 부서 설명 등을 포함한 견적을 외부 부서의 사용자 단말에 요청할 수 있다.The external department quotation request unit 144 may receive external department data from the external department creation unit 143 and request quotation data from the user terminal of the external department. The external department quotation request unit 144 may request a quotation including the external department name, external department personnel, and external department description from the external department's user terminal.

또한, 외부 부서 견적 요청부(144)는 외부 부서의 사용자 단말로부터 수신된 견적 데이터를 사용자 단말로 전달하여, 견적 데이터 승인 여부를 요청할 수 있다. Additionally, the external department quotation request unit 144 may transmit quotation data received from the external department's user terminal to the user terminal and request approval of the quotation data.

뿐만 아니라, 외부 부서 견적 요청부(144)는 외부 부서의 사용자 단말로부터 수신된 견적 데이터를 외부 부서 설정부(145)로 전달할 수 있다. 즉, 외부 부서 견적 요청부(144)는 사용자 단말로부터 수신된 견적 데이터가 승인되었다고 확인되면, 수신된 견적 데이터를 외부 부서 설정부(145)로 전달할 수 있다.In addition, the external department quotation request unit 144 may transmit quotation data received from the user terminal of the external department to the external department setting unit 145. That is, when the external department quotation request unit 144 confirms that the quotation data received from the user terminal has been approved, it may transfer the received quotation data to the external department setting unit 145.

외부 부서 설정부(145)는 외부 부서 생성부(143)로부터 견적 데이터를 수신하여 세부 설정할 수 있다. 먼저, 외부 부서 설정부(145)는 수신된 견적 데이터를 기반으로, 외부 부서 인력을 등록하고 권한을 설정할 수 있다. 또한, 외부 부서 설정부(145)는 외부 부서의 인력의 권한을 활성 또는 비활성으로 설정할 수 있다. 권한은 일정 승인, 환경 설정 및 문서 편집 등을 포함할 수 있다. 즉, 외부 부서 인력들은 설정된 권한에 맞게 협업 프로젝트 관리 플랫폼(100)을 이용할 수 있다. The external department setting unit 145 may receive quote data from the external department creating unit 143 and set it in detail. First, the external department setting unit 145 can register external department personnel and set permissions based on the received quotation data. Additionally, the external department setting unit 145 can set the authority of personnel of the external department to active or inactive. Permissions can include approving schedules, setting preferences, and editing documents. In other words, external department personnel can use the collaborative project management platform 100 according to the set permissions.

전술한 부서 관리부(140)는 이미 생성된 내부 부서 또는 외부 부서 정보가 있는 경우에는 관리자가 기 생성된 정보를 선택하는 인터페이스를 제고할 수도 있다. If there is already created internal department or external department information, the department management unit 140 described above may provide an interface through which the manager selects the already created information.

업무 관리부(150)는 업무 생성부(151), 부서 선택부(152), 업무 설정부(153), 업무 결과물 등록부(154), 업무 결과물 DB(155) 및 업무 승인 요청부(156)를 포함할 수 있다. The task management unit 150 includes a task creation unit 151, a department selection unit 152, a task setting unit 153, a work result register 154, a work result DB 155, and a work approval request unit 156. can do.

업무 생성부(151)는 사용자 단말로부터 업무 생성 요청을 수신하여 생성할 수 있다. 이 때, 업무 생성부(151)는 사용자 단말로부터 업무 데이터를 수신할 수 있다. 업무 데이터는 업무명, 업무간 연관 관계, 업무 비중, 업무 일정, 부서 및 업무 인력 등을 포함할 수 있다.The task creation unit 151 may receive and create a task creation request from the user terminal. At this time, the task creation unit 151 may receive task data from the user terminal. Work data may include task name, inter-task relationship, task proportion, work schedule, department, and work personnel.

부서 선택부(152)는 업무의 부서를 선택할 수 있다. 즉, 부서 선택부(152)는 내부 부서 생성부(141)에서 생성된 내부 부서와 외부 부서 생성부(143)에서 생성된 외부 부서를 선택할 수 있다. 예를 들어, A 업무를 수행하기 위한 부서 a 및 b를 선택할 수 있다. 이로써, 협업 프로젝트 관리 플랫폼(100)은 세분화된 업무를 내부 부서 및 외부 부서에 할당할 수 있다. The department selection unit 152 can select the department of work. That is, the department selection unit 152 can select an internal department created in the internal department creation unit 141 and an external department created in the external department creation unit 143. For example, you can select departments A and B to perform task A. Accordingly, the collaborative project management platform 100 can assign detailed tasks to internal departments and external departments.

업무 설정부(153)는 업무의 세부 사항을 설정할 수 있다. 업무 설정부(153)는 업무 목록을 생성할 수 있다. 업무 설정부(153)는 업무 목록 각각에 해당하는 업무의 비중, 일수 및 담당 인력을 설정할 수 있다. The task setting unit 153 can set the details of the task. The task setting unit 153 can create a task list. The task setting unit 153 can set the proportion, number of days, and personnel in charge of tasks corresponding to each task list.

또한, 업무 설정부(153)는 업무의 연관 관계를 설정할 수 있다. 업무의 연관 관계는 결과물을 수신하는 인 업무와 결과물을 전달하는 아웃 업무를 기반으로 설정될 수 있다. 예를 들어, A업무는 B 업무의 결과물을 수신해야 하는 경우, B 업무는 A 업무의 인 업무가 될 수 있다. 또한, A 업무의 결과물을 C 업무로 전달해야 하는 경우, C 업무는 A 업무의 아웃 업무가 될 수 있다. Additionally, the task setting unit 153 can set the relationship between tasks. The relationship between tasks can be established based on the in task that receives the results and the out task that delivers the results. For example, if task A needs to receive the results of task B, task B can become a signature task of task A. Additionally, if the results of task A must be delivered to task C, task C may become an out task of task A.

또한, 업무 설정부(153)는 인 업무와 아웃 업무를 설정할 수 있다. 예를 들어, A업무로 인 업무인 B의 어떤 데이터가 수신되어야 하는지 설정할 수 있다. 마찬가지로 A 업무가 아웃 업무인 B로 어떤 데이터가 전달되어야 하는지 설정할 수 있다. 이때, 업무 설정부(153)는 데이터의 형식, 용량 또는 이름 등을 설정할 수 있다.Additionally, the task setting unit 153 can set in tasks and out tasks. For example, task A can set what data from task B should be received. Similarly, task A can set what data should be transmitted to B, which is an out task. At this time, the task setting unit 153 can set the format, capacity, or name of the data.

뿐만 아니라, 업무 설정부(153)는 업무의 결과물을 설정할 수 있다. 일 예로, 업무의 결과물로 등록되어야 할 데이터의 형식, 용량 또는 이름 등을 설정할 수 있다.In addition, the task setting unit 153 can set the results of the task. For example, the format, capacity, or name of data to be registered as a work result can be set.

업무 결과물 등록부(154)는 사용자 단말 및 외부 부서의 사용자 단말로부터 업무 결과물 데이터를 수신할 수 있다. 업무 결과물 등록부(154)는 수신된 업무 결과물 데이터가 업무 설정부(153)에서 설정된 사항에 대응되는지 판단할 수 있다. 설정된 사항에 대응되었다고 판단된 업무 결과물만 업무 결과물 등록부(154)에 등록될 수 있다. The work result register 154 may receive work result data from user terminals and user terminals of external departments. The work result register 154 may determine whether the received work result data corresponds to matters set in the work setting unit 153. Only work results that are determined to correspond to the set items can be registered in the work result register 154.

업무 결과물 DB(155)는 업무 결과물 등록부(154)에 등록된 업무 결과물 데이터를 저장할 수 있다. The work result DB 155 may store work result data registered in the work result register 154.

업무 승인 요청부(156)는 업무의 결과물이 등록되었을 때, 사용자 단말로 업무 승인을 요청할 수 있다. 이 때, 업무 승인 요청부(156)는 프로젝트 담당자 및 업무의 아웃 업무 담당자에게 해당 업무의 승인을 요청할 수 있다. 업무 승인 요청부(156)는 프로젝트 담당자 및 아웃 업무 담당자의 승인이 확인되면, 해당 업무가 완료되었다고 판단할 수 있다. When the work result is registered, the work approval request unit 156 may request work approval from the user terminal. At this time, the task approval request unit 156 may request approval of the task from the project manager and the task out-work manager. When approval from the project manager and the out-work manager is confirmed, the task approval request unit 156 may determine that the task has been completed.

다중 업무 연계 진척도 관리부(160)는 다중 업무 연계 진척도 생성부(161) 및 다중 업무 연계 진척도 갱신부(162)를 포함할 수 있다. The multi-task linked progress management unit 160 may include a multi-task linked progress generation unit 161 and a multi-task linked progress update unit 162.

다중 업무 연계 진척도 생성부(161)는 업무 생성부(151)에서 생성된 업무를 기반으로 다중 업무 연계 진척도를 생성할 수 있다. The multi-task linked progress creation unit 161 may generate a multi-task linked progress chart based on the tasks created in the task creation unit 151.

또한, 다중 업무 연계 진척도 생성부(161)는 업무 설정부(153)에서 설정된 업무의 비중과 업무의 연관 관계를 기반으로 진척도를 자동으로 생성할 수 있다. 이로써, 프로젝트의 내부 업무 뿐만 아니라 외부 업무를 포함한 진척도를 생성할 수 있다. In addition, the multi-task linked progress generation unit 161 may automatically generate progress based on the proportion of tasks set in the task setting unit 153 and the correlation between tasks. This allows you to create a progress chart that includes not only the internal work of the project but also the external work.

다중 업무 연계 진척도 갱신부(162)는 업무의 일정 및 비중 변경에 따라 다중 업무 연계 진척도를 갱신할 수 있다. 업무 설정부(153)에서 설정된 업무의 비중과 업무의 연관 관계를 기반으로 형성된 진척도이기 때문에, 어떤 업무의 일정 및 비중이 변경된다면 자동으로 연계된 업무의 일정이 조정될 수 있다. The multi-task linked progress update unit 162 can update the multi-task linked progress according to changes in the schedule and proportion of tasks. Since it is a progress chart formed based on the proportion of the task set in the task setting unit 153 and the relationship between the tasks, if the schedule and proportion of a task are changed, the schedule of the linked task can be automatically adjusted.

일 예로, A 업무의 인 업무로 연계된 B업무의 완료일이 변경되었다면, A업무의 완료일도 B 업무의 완료일만큼 변경될 수 있다. For example, if the completion date of task B, which is linked to the main task of task A, is changed, the completion date of task A may also be changed by the completion date of task B.

따라서, 협업 프로젝트 관리 플랫폼(100)은 업무의 연관 관계를 설정하고, 설정된 업무의 연관 관계를 기반으로 다중 업무 연계 진척도를 생성함으로써 내부 업무 및 외부 업무의 일정을 효율적으로 관리할 수 있다.Accordingly, the collaborative project management platform 100 can efficiently manage the schedules of internal work and external work by establishing a relationship between tasks and generating a multi-task linkage progress chart based on the relationship between the established tasks.

이슈 관리부(170)는 이슈 생성부(171), 이슈 설정부(172) 및 이슈 승인 요청부(173)를 포함할 수 있다.The issue management unit 170 may include an issue creation unit 171, an issue setting unit 172, and an issue approval request unit 173.

이슈 생성부(171)는 사용자 단말로부터 이슈 생성 요청을 수신할 수 있다. 이 때, 이슈 생성부(171)는 사용자 단말로부터 이슈 데이터를 수신할 수 있다. 이슈 데이터는 이슈가 발생한 부서, 업무, 일정 변경 유무 및 이슈 생성 이유 등을 포함할 수 있다.The issue creation unit 171 may receive an issue creation request from the user terminal. At this time, the issue creation unit 171 may receive issue data from the user terminal. Issue data may include the department where the issue occurred, task, whether there was a schedule change, and the reason for the issue creation.

이슈 설정부(172)는 이슈 생성부(171)로 수신된 이슈 데이터를 기반으로 이슈를 세부 설정할 수 있다. 예를 들어, 이슈 설정부(172)는 이슈가 발생했을 때 영향을 주는 연계 부서 및 업무를 설정할 수 있다. 또한, 이슈가 발생한 업무의 일정의 변경이 요청되는 경우, 이슈 설정부(172)는 요청된 변경일만큼 부서 또는 업무의 일정을 변경할 수 있다. The issue setting unit 172 can set the issue in detail based on issue data received by the issue creating unit 171. For example, the issue setting unit 172 can set related departments and tasks that have influence when an issue occurs. Additionally, when a change in the schedule of a task in which an issue occurs is requested, the issue setting unit 172 can change the schedule of the department or task by the requested change date.

이슈 승인 요청부(173)는 사용자 단말로 이슈 승인을 요청할 수 있다. 이 때, 사용자 단말은 이슈 설정부(172)에서 설정된 연계 부서 담당자 단말, 연계 업무 담당자 단말 및 프로젝트 담당자 단말을 포함할 수 있다. 이슈 설정부(172)에서 업무의 일정이 변경되었다고 판단된다면, 사용자 단말로 이슈 승인을 요청할 수 있다. The issue approval request unit 173 may request issue approval from the user terminal. At this time, the user terminal may include a linked department manager terminal, a linked task manager terminal, and a project manager terminal set in the issue setting unit 172. If the issue setting unit 172 determines that the work schedule has changed, issue approval can be requested through the user terminal.

이슈 승인 요청부(173)는 사용자 단말로부터 이슈 승인이 수신된다면, 이슈 생성부(171)로 이슈 생성 완료를 요청할 수 있다. 즉, 일정을 변경하기 위해서는, 연계 부서 담당자 단말, 연계 업무 담당자 단말 및 프로젝트 담당자 단말로부터 승인된 이슈만 이슈 생성부(171)에서 생성될 수 있다. If issue approval is received from the user terminal, the issue approval request unit 173 may request the issue creation unit 171 to complete issue creation. That is, in order to change the schedule, only issues approved from the linked department manager terminal, linked task manager terminal, and project manager terminal can be created in the issue creation unit 171.

또한, 이슈 승인 요청부(173)는 변경된 업무의 일정을 다중 업무 연계 진척도 갱신부(162)로 송신할 수 있다. 전술한 바와 같이, 다중 업무 연계 진척도 갱신부(162)는 변경된 업무의 일정을 기반으로, 다중 업무 연계 진척도를 갱신할 수 있다. Additionally, the issue approval request unit 173 may transmit the schedule of the changed task to the multi-task linked progress update unit 162. As described above, the multi-task linked progress update unit 162 may update the multi-task linked progress based on the changed schedule of the task.

도 2는 본 발명의 일 실시예에 따른 프로젝트를 생성하는 것을 도시하는 도면이다. Figure 2 is a diagram illustrating creating a project according to an embodiment of the present invention.

도 2를 참조하면, 프로젝트 생성부(131)는 사용자 단말로부터 프로젝트 생성 요청을 수신할 수 있다. 이 때, 프로젝트 생성부(131)는 사용자 단말로 내부 부서 생성 및 외부 부서 생성을 요청할 수 있다. Referring to FIG. 2, the project creation unit 131 may receive a project creation request from the user terminal. At this time, the project creation unit 131 may request the creation of an internal department and an external department through the user terminal.

만약, 프로젝트 생성부(131)는 사용자 단말로부터 내부 부서 생성 및 내부 부서 데이터 수신한다면, 내부 부서 생성부(141)로 내부 부서 데이터를 송신할 수 있다. 마찬가지로, 프로젝트 생성부(131)는 사용자 단말로부터 외부 부서 생성 및 외부 부서 데이터를 수신한다면, 외부 부서 생성부(143)로 외부 부서 데이터를 송신할 수 있다. If the project creation unit 131 receives internal department creation and internal department data from the user terminal, it may transmit the internal department data to the internal department creation unit 141. Likewise, if the project creation unit 131 receives external department creation and external department data from the user terminal, it may transmit the external department data to the external department creation unit 143.

내부 부서 생성부(141)는 수신한 내부 데이터를 기반으로 내부 부서를 생성할 수 있다. 내부 부서 데이터는 내부 부서명, 내부 부서 인력 및 내부 부서 인력 권한 등을 포함할 수 있다. The internal department creation unit 141 may create an internal department based on the received internal data. Internal department data may include internal department name, internal department personnel, and internal department personnel authority.

내부 부서 설정부(142)는 내부 부서 생성부(141)로부터 내부 부서 데이터를 수신하여 설정할 수 있다. 내부 부서 설정부(142)는 생성된 내부 부서 인력 등록 및 권한 설정을 할 수 있다. 내부 부서 설정부(142)는 내부 부서의 인력의 권한을 활성 또는 비활성 형태로 설정할 수 있다. 예를 들어, 내부 부서 설정부(142)는 내부 부서 인력별로 일정 승인, 환경 설정 및 문서 편집 등의 권한을 활성 또는 비활성 형태로 설정할 수 있다. The internal department setting unit 142 may receive and set internal department data from the internal department creation unit 141. The internal department setting unit 142 can register the created internal department personnel and set permissions. The internal department setting unit 142 can set the authority of personnel of the internal department to active or inactive. For example, the internal department setting unit 142 can set permissions such as schedule approval, environment settings, and document editing to be active or inactive for each internal department personnel.

또한, 외부 부서 생성부(143)는 수신한 외부 부서 데이터를 기반으로 외부 부서를 생성할 수 있다. 외부 부서 데이터는 외부 부서명 및 외부 부서 인력, 외부 부서 인력 권한 등을 포함할 수 있다. Additionally, the external department creation unit 143 may create an external department based on the received external department data. External department data may include external department name, external department personnel, external department personnel authority, etc.

이때, 외부 부서 견적 요청부(144)는 외부 부서 설정부(145)로부터 외부 부서에 등록된 인력에 대한 정보를 수신하여, 외부 부서의 사용자 단말로 견적 데이터를 요청할 수 있다. 외부 부서 견적 요청부(144)는 외부 부서명, 외부 부서 인력 및 외부 부서 설명 등을 포함한 견적을 외부 부서의 사용자 단말에 요청할 수 있다.At this time, the external department quotation request unit 144 may receive information about personnel registered in the external department from the external department setting unit 145 and request quotation data from the user terminal of the external department. The external department quotation request unit 144 may request a quotation including the external department name, external department personnel, and external department description from the external department's user terminal.

또한, 외부 부서 견적 요청부(144)는 외부 부서의 사용자 단말로부터 수신된 견적 데이터를 사용자 단말로 전달하여, 견적 데이터 승인 여부를 요청할 수 있다. Additionally, the external department quotation request unit 144 may transmit quotation data received from the external department's user terminal to the user terminal and request approval of the quotation data.

외부 부서 견적 요청부(144)는 외부 부서의 사용자 단말로부터 수신된 견적 데이터를 외부 부서 설정부(145)로 송신할 수 있다. The external department quotation request unit 144 may transmit quotation data received from the external department's user terminal to the external department setting unit 145.

외부 부서 설정부(145)는 외부 부서 견적 요청부(144)로부터 견적 데이터를 수신할 수 있다. 또한, 외부 부서 설정부(145)는 외부 부서의 인력을 등록하고, 등록된 외부 부서의 권한을 활성 또는 비활성 형태로 설정할 수 있다. 예를 들어, 외부 부서 설정부(145)는 외부 부서 인력별로 일정 승인, 환경 설정 및 문서 편집 등의 권한을 활성 또는 비활성 형태로 설정할 수 있다. The external department setting unit 145 may receive quotation data from the external department quotation request unit 144. Additionally, the external department setting unit 145 can register personnel of external departments and set the authority of registered external departments to active or inactive. For example, the external department setting unit 145 can set permissions such as schedule approval, environment settings, and document editing to be active or inactive for each external department personnel.

프로젝트 설정부(132)는 프로젝트의 세부 사항을 설정할 수 있다. 먼저, 프로젝트 설정부(132)는 내부 부서 설정부(142)로부터 세부 사항이 설정 완료된 내부 부서를 수신할 수 있다. 또한, 프로젝트 설정부(132)는 외부 부서 설정부(145)로부터 세부 사항이 설정 완료된 외부 부서를 수신할 수 있다. 이 때, 프로젝트 설정부(132)는 수신된 내부 부서 및 외부 부서의 비중을 설정할 수 있다. 내부 부서와 외부 부서의 비중을 설정함으로써, 내부 부서 및 외부 부서의 전체 진척도를 협업 프로젝트 관리 플랫폼만으로 관리할 수 있다. The project setting unit 132 can set the details of the project. First, the project setting unit 132 may receive an internal department whose details have been set from the internal department setting unit 142. Additionally, the project setting unit 132 may receive an external department whose details have been set from the external department setting unit 145. At this time, the project setting unit 132 can set the received proportions of internal departments and external departments. By setting the proportion of internal and external departments, the overall progress of internal and external departments can be managed using a collaborative project management platform.

또한, 프로젝트 설정부(132)는 프로젝트를 임시 배정하고, 임시 배정된 프로젝트를 사용자 단말에 제공할 수 있다. 또한, 사용자 단말로 제공된 프로젝트의 변경이 사용자 단말로부터 요구된다면, 프로젝트 설정부(132)는 프로젝트 변경 요구를 기반으로 임시 배정된 프로젝트를 변경할 수 있다. 이 때, 프로젝트 설정부(132)는 변경된 프로젝트를 사용자 단말에 제공하고, 변경된 프로젝트의 변경 완료 여부를 사용자 단말로 요청할 수 있다. 만약, 프로젝트 임시 배정된 프로젝트의 변경이 완료된다면, 프로젝트 생성부(131)로 프로젝트 생성을 요청할 수 있다. Additionally, the project setting unit 132 may temporarily assign a project and provide the temporarily assigned project to the user terminal. Additionally, if a change in the project provided to the user terminal is requested from the user terminal, the project setting unit 132 may change the temporarily assigned project based on the project change request. At this time, the project setting unit 132 may provide the changed project to the user terminal and request whether the change of the changed project has been completed from the user terminal. If the change to the temporarily assigned project is completed, the project creation unit 131 can be requested to create the project.

프로젝트 생성부(131)는 프로젝트 설정부(132)로부터 요청된 프로젝트 생성을 기반으로 프로젝트를 생성할 수 있다.The project creation unit 131 may create a project based on the project creation requested from the project setting unit 132.

도 3은 본 발명의 일 실시예에 따른 협업 프로젝트 관리 플랫폼 화면을 도시하는 도면이다. 즉, 도3은 사용자 단말을 이용하여 협업 프로젝트 관리 플랫폼에 접속하는 경우 나타나는 화면을 도시하는 예시도이다. Figure 3 is a diagram illustrating a collaborative project management platform screen according to an embodiment of the present invention. That is, Figure 3 is an example diagram showing a screen that appears when accessing a collaborative project management platform using a user terminal.

협업 프로젝트 관리 플랫폼은 달력 형태로 화면을 표시할 수 있다. 또한, 달력에는 프로젝트, 업무 및 이슈가 표시될 수 있으며, 프로젝트 업무 및 이슈 각각에 색 또는 형태를 부여하여 구분될 수 있다. 또한, 설정에 따라 달력에 사용자가 인력으로 등록된 프로제트, 업무 및 이슈의 진행사항이 표시될 수 있다. 진행 사항은 1차 리뷰, 2차 리뷰, 최종 승인 및 A 부서 a 업무 진행중, B 부서 b 업무 완료 등으로 표시될 수 있다. 또한, 사용자 설정에 따라 진행중, 검토중 완료 등으로 표시될 수도 있다. The collaborative project management platform can display the screen in a calendar format. Additionally, projects, tasks, and issues can be displayed on the calendar, and each project task and issue can be distinguished by giving a color or shape. Additionally, depending on the settings, the progress of projects, tasks, and issues for which the user is registered as a human resource may be displayed on the calendar. Progress can be indicated as 1st review, 2nd review, final approval, Department A task in progress, Department B task completed, etc. Additionally, depending on user settings, it may be displayed as in progress, under review, completed, etc.

또한, 협업 프로젝트 관리 플랫폼은 프로젝트 리스트(Project List), 업무 리스트(Work List) 및 공지/이슈 리스트(Notice/Issue) 등을 표시할 수 있다. 표시된 리스트는 달력에서 선택된 날짜에 대응되는 프로젝트, 업무 및 이슈 등의 리스트를 포함할 수 있다. Additionally, the collaborative project management platform can display Project List, Work List, and Notice/Issue List. The displayed list may include a list of projects, tasks, and issues corresponding to the date selected on the calendar.

또한, 표시된 리스트는 사용자 단말로 협업 프로젝트 관리 플랫폼을 접속한 사용자가 인력으로 포함된 프로젝트 리스트(Project List), 업무 리스트(Work List) 및 공지/이슈 리스트(Notice/Issue)를 표시할 수 있다. 사용자 단말로부터 표시된 프로젝트 리스트(Project List), 업무 리스트(Work List) 및 공지/이슈 리스트(Notice/Issue) 중 특정 항목이 선택되는 경우, 협업 프로젝트 관리 플랫폼은 세부 정보를 표시할 수 있다. 이 때, 사용자는 사용자 단말을 이용하여 사용자가 해당 항목에 설정된 권한에 따라 정보를 입력, 삭제 및 변경할 수 있다. Additionally, the displayed list may display a Project List, Work List, and Notice/Issue list in which users who access the collaborative project management platform through the user terminal are included as personnel. When a specific item is selected among the Project List, Work List, and Notice/Issue displayed from the user terminal, the collaborative project management platform can display detailed information. At this time, the user can use the user terminal to input, delete, and change information according to the permissions set for the corresponding item.

또는, 사용자 단말로부터 선택된 특정 항목의 시작일로 달력 화면이 변경될 수도 있다. Alternatively, the calendar screen may be changed to the start date of a specific item selected from the user terminal.

뿐만 아니라, 사용자는 사용자 단말로 특정 항목을 선택함으로써, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 선택된 날짜에 대응되는 프로젝트 및 업무 등을 생성할 수 있다. In addition, by the user selecting a specific item with the user terminal, the collaborative project management platform can create projects and tasks corresponding to the date selected from the user terminal.

도 4는 본 발명의 일 실시예에 따른 업무의 연관 관계를 형성하여 다중 업무 연계 진척도를 생성하는 것을 도시하는 도면이다.Figure 4 is a diagram illustrating the creation of a multi-task linkage progress chart by forming a linkage between tasks according to an embodiment of the present invention.

먼저, 업무 생성부(151)는 사용자 단말로부터 업무 생성 요청 및 업무 데이터를 수신할 수 있다. 업무 데이터는 업무명, 업무간 연관 관계, 업무 비중, 업무 일정, 부서 및 업무 인력 등을 포함할 수 있다. First, the task creation unit 151 may receive a task creation request and task data from the user terminal. Work data may include task name, inter-task relationship, task proportion, work schedule, department, and work personnel.

부서 선택부(152)는 업무 생성부(151)에 수신된 업무 데이터를 기반으로 업무의 부서를 설정할 수 있다. 즉, 부서 선택부(152)는 내부 부서 및 외부 부서에 업무를 할당할 수 있다. 일 예로, 부서 선택부(152)는 a, b, c 업무를 내부 부서 A에 할당할 수 있다.The department selection unit 152 may set the department of the task based on task data received from the task creation unit 151. That is, the department selection unit 152 can assign tasks to internal departments and external departments. As an example, the department selection unit 152 may assign tasks a, b, and c to internal department A.

업무 설정부(153)는 업무의 세부 사항을 설정할 수 있다. 세부 사항은 업무 목록 생성, 업무간 연관 관계 설정, 업무 일정 설정, 업무 인력 설정 및 업무 비중 설정 등을 포함할 수 있다. The task setting unit 153 can set the details of the task. Details may include creating a task list, establishing relationships between tasks, setting a work schedule, setting work personnel, and setting work proportions.

업무 설정부(153)는 전체 업무 및 부서 선택부(152)에서 선택된 부서의 업무 목록을 생성하고, 업무별로 비중, 일수 및 인력을 설정할 수 있다. The task setting unit 153 can create a list of tasks for all tasks and departments selected in the department selection unit 152, and set the proportion, number of days, and manpower for each task.

또한, 업무 설정부(153)는 인 업무와 아웃 업무를 기반으로 업무의 연관 관계를 설정할 수 있다. 설정하고자 하는 업무가 다른 업무의 결과물을 수신하는 경우, 다른 업무를 인 업무로 정의할 수 있다. 또한, 설정하고자 하는 업무가 다른 업무로 결과물을 송신하는 경우, 다른 업무를 아웃 업무로 정의할 수 있다. 즉, 업무 설정부(153)는 업무의 결과물을 송수신하는 것을 기반으로 업무의 연관 관계를 설정할 수 있다.Additionally, the task setting unit 153 may set a task correlation relationship based on in tasks and out tasks. If the task you want to set receives the results of another task, the other task can be defined as a human task. Additionally, if the task to be set transmits results to another task, the other task can be defined as an out task. In other words, the task setting unit 153 can establish a task relationship based on sending and receiving task results.

일 예로, A 업무가 B 업무의 결과물을 수신해야 하는 경우, B 업무를 A 업무의 인 업무로 정의할 수 있다. 또한, A 업무가 C 업무로 결과물을 송신해야 하는 경우, C 업무를 A 업무의 아웃 업무로 정의할 수 있다. For example, if task A needs to receive the results of task B, task B can be defined as the signature task of task A. Additionally, if task A needs to send a result to task C, task C can be defined as an out task of task A.

또한, 업무 설정부(153)는 인 업무로부터 수신해야 하는 결과물과 아웃 업무로 송신해야 하는 결과물을 설정할 수 있다. 일 예로, A 업무로 인 업무인B 업무의 어떤 결과물이 수신되어야 하는지 설정할 수 있다. 마찬가지로 A 업무가 아웃 업무인 C 업무로 어떤 결과물이 송신되어야 하는지 설정할 수 있다. Additionally, the task setting unit 153 can set the results to be received from the in task and the results to be sent to the out task. As an example, you can set which results of task B, which is task A, should be received. Likewise, task A can set which results should be sent to task C, which is an out task.

또한, 업무 설정부(153)는 업무의 결과물을 설정할 수 있다. 즉, 업무 설정부(153)는 완료되어 등록되어야 할 업무 결과물의 형식, 용량 및 이름 등을 설정할 수 있다. Additionally, the task setting unit 153 can set the results of the task. That is, the task setting unit 153 can set the format, capacity, and name of the task results to be completed and registered.

업무 설정부(153)에서 업무의 설정이 완료되면, 업무 생성부(151)에 업무 설정이 완료되었다고 알릴 수 있다. 이 때, 업무 생성부(151)에서 업무 생성이 완료될 수 있다.When the task setting is completed in the task setting unit 153, the task creation unit 151 can be notified that the task setting has been completed. At this time, task creation may be completed in the task creation unit 151.

또한, 업무 생성부(151)에서 업무 생성이 완료되면, 생성된 업무를 기반으로 다중 업무 연계 진척도 생성부(161)에서 다중 업무 연계 진척도를 생성할 수 있다.In addition, when task creation is completed in the task creation unit 151, a multi-task linked progress chart can be generated in the multi-task linked progress generating unit 161 based on the created task.

즉, 다중 업무 연계 진척도 생성부(161)는 업무 설정부(153)에서 설정된 업무의 연관 관계, 업무의 비중 및 업무 일정 등을 기반으로 생성된 업무의 진척도를 자동으로 생성할 수 있다. 사용자는 생성된 진척도를 이용하여 내부 업무 및 외부 업무의 비중 및 일정을 시각적으로 파악할 수 있다. That is, the multi-task linked progress generation unit 161 can automatically generate the progress of the tasks created based on the task correlation, task proportion, and task schedule set in the task setting unit 153. Users can visually understand the proportion and schedule of internal and external work using the generated progress chart.

또한, 업무 설정부(153)에서 설정된 업무를 기반으로 다중 업무 연계진척도 생성부(161)에서 진척도가 자동으로 생성되기 때문에, 진척도를 생성하기 위한 업무 데이터를 사용자 단말로부터 재입력 받지 않아도 된다. In addition, since progress is automatically generated in the multi-task linked progress generation unit 161 based on the task set in the task setting unit 153, there is no need to re-enter task data for generating the progress from the user terminal.

업무 결과물 등록부(154)는 사용자 단말 및 외부 부서의 사용자 단말로부터 업무 결과물 데이터를 수신할 수 있다. 이때, 업무 결과물 등록부(154)는 수신된 업무 결과물 데이터가 업무 설정부(153)에서 설정된 업무 결과물 조건에 대응되는지 판단할 수 있다. 업무 결과물 등록부(154)는 수신된 업무 결과물 데이터가 설정된 업무 결과물 조건에 대응된다고 판단되는 경우에만, 업무 결과물 데이터를 업무 결과물 등록부(154)에 등록할 수 있다. The work result register 154 may receive work result data from user terminals and user terminals of external departments. At this time, the work result register 154 may determine whether the received work result data corresponds to the work result conditions set in the work setting unit 153. The work result register 154 may register work result data in the work result register 154 only when it is determined that the received work result data corresponds to the set work result conditions.

또한, 업무 결과물 등록부(154)에 등록된 업무 결과물 데이터는 업무 결과물 DB(155)에 저장될 수 있다. Additionally, work result data registered in the work result register 154 may be stored in the work result DB 155.

업무 승인 요청부(156)는 업무 결과물 등록부(154)에 등록된 업무 결과물 데이터를 사용자 단말 또는 외부 부서의 사용자 단말로 승인 요청을 할 수 있다. 즉, 업무 승인 요청부(156)는 프로젝트 담당자 및 아웃 업무 담당자의 승인이 확인되면, 해당 업무가 완료되었다고 판단할 수 있다. The work approval request unit 156 may request approval of work result data registered in the work result register 154 to a user terminal or a user terminal of an external department. In other words, the task approval request unit 156 may determine that the task has been completed when approval from the project manager and the out task manager is confirmed.

이 때, 다중 업무 연계 진척도 갱신부(162)는 업무 승인 요청부(156)의 업무 결과물 승인 여부에 따라 다중 업무 연계 진척도를 갱신할 수 있다. At this time, the multi-task linked progress update unit 162 may update the multi-task linked progress according to whether the task result is approved by the task approval request unit 156.

만약, 다중 업무 연계 진척도 갱신부(162)는 업무 승인 요청부(156)에서 업무의 결과물이 승인되면, 진척도를 달성했다고 판단하여 다중 업무 연계 진척도를 갱신할 수 있다.If the work result is approved by the task approval request unit 156, the multi-task linked progress update unit 162 may determine that progress has been achieved and update the multi-task linked progress.

따라서, 프로젝트 관리 시스템은 설정된 업무의 연관 관계를 기반으로 다중 업무 연계 진척도를 자동으로 생성할 수 있으며, 생성된 다중 업무 진척도를 업무 완료 여부 및 업무의 일정에 따라 자동으로 갱신할 수 있다. 이로써, 사용자는 다중 업무 진척도를 이용하여 내부 업무 및 외부 업무의 일정을 가시적으로 파악하고 관리할 수 있다. Therefore, the project management system can automatically generate a multi-task linked progress chart based on the relationship between the set tasks, and the generated multi-task progress chart can be automatically updated according to task completion and task schedule. As a result, users can visually identify and manage schedules for internal and external tasks using multi-task progress charts.

도 5는 본 발명의 일 실시예에 따른 다중 업무 연계 진척도를 도시하는 도면이다. Figure 5 is a diagram showing the progress of linking multiple tasks according to an embodiment of the present invention.

도 5를 참조하면, 협업 프로젝트 관리 플랫폼은 프로젝트에 포함되는 부서 목록(146) 및 다중 업무 연계 진척도(163)를 도시할 수 있다. 다중 업무 연계 진척도(163)는 업무간 연관 관계를 기반으로 생성되며, 업무간 연관 관계를 화살표 형태로 나타낼 수 있다.Referring to FIG. 5, the collaborative project management platform may display a list of departments included in the project (146) and a multi-task linkage progress chart (163). The multi-task linkage progress chart (163) is created based on the linkage between tasks, and the linkage between tasks can be expressed in the form of an arrow.

또한, 다중 업무 연계 진척도(163)는 사용자가 부서에 대한 업무를 쉽게 파악할 수 있도록, 각 부서에 할당된 업무를 부서별로 구분하여 표시할 수 있다. 예를 들어, 프로젝트를 구성하는 A 부서, B 부서, C 부서 및 D 부서를 표시할 수 있다. 이 때, A 부서, B 부서, C 부서 및 D 부서는 부서 목록(146) 형태로 나열될 수 있다. 또한, 다중 업무 연계 진척도(163)는 층으로 나열된 부서 옆에 각 부서에 할당된 업무들을 표시할 수 있다.In addition, the multi-task linkage progress chart 163 can display the tasks assigned to each department separately by department so that the user can easily understand the tasks for each department. For example, you can display the departments A, B, C, and D that make up the project. At this time, Department A, Department B, Department C, and Department D may be listed in the form of a department list 146. Additionally, the multi-task linked progress chart 163 can display tasks assigned to each department next to the departments listed in layers.

도 5에 도시된 다중 업무 연계 진척도(163)에서 확인할 수 있듯이, 하나의 부서(B)는 타 부서(A)의 업무의 완료에 의존하여 새로운 업무가 개시되는 유기적 연관성을 가지는 것을 확인할 수 있다. 이러한 진척도 관리는 실제로 발생하는 부서간 협업 스케줄 관리를 효율적으로 모니터링 및 관리할 수 있다. 또한, 하나의 부서(C)가 2개 이상의 부서(B, D)에 동시에 아웃 업무가 발생하고 제공하고, 2개 이상의 부서(B,D)로부터 인 업무를 완료되어야 업무 진행이 가능한 상황도 모두 관리하는 것이 가능하다.As can be seen from the multi-task linkage progress chart 163 shown in FIG. 5, it can be seen that one department (B) has an organic relationship in which new tasks are initiated depending on the completion of the tasks of another department (A). This progress management can effectively monitor and manage the collaboration schedule management between departments that actually occurs. In addition, there are situations where one department (C) generates and provides out work to two or more departments (B, D) at the same time, and work can only proceed when in work is completed from two or more departments (B, D). It is possible to manage.

또한, 도 5에 도시된 바와 같이, 사용자 단말에 의해 C 부서가 선택된다면, 다중 업무 연계 진척도(163)는 C 부서에 할당된 업무들에 색상을 부여하여 식별되도록 표시할 수 있다. In addition, as shown in FIG. 5, if department C is selected by the user terminal, the multi-task linkage progress chart 163 can be displayed by assigning a color to tasks assigned to department C to identify them.

다중 업무 연계 진척도(163)는 여기에 한정되지 않고, 선택된 부서에 할당된 업무가 나머지 부서에 할당된 업무와 식별되어 표시되도록, 선택된 부서에 할당된 업무와 나머지 부서에 할당된 업무와 구분되는 형태로 설정될 수 있다. The multi-task linkage progress chart (163) is not limited to this, but is distinguished from the work assigned to the selected department and the work assigned to the remaining departments so that the work assigned to the selected department is displayed and identified with the work assigned to the remaining departments. It can be set to .

또한, 다중 업무 연계 진척도(163)는 구분선(164)으로 현재 시점에서의 업무를 표시할 수 있다. 또한, 다중 업무 연계 진척도(163)는 구분선(164)의 위치를 이동함으로써, 구분선(158)의 위치에 따른 시점 및 업무를 확인할 수 있다. 시점은 연도(YY), 월(MM) 및 일(DD) 형태로 표시될 수 있다.In addition, the multi-task linked progress chart 163 can display the work at the current point in time with a dividing line 164. In addition, the multi-task linked progress chart 163 can be used to check the time point and task according to the position of the dividing line 158 by moving the position of the dividing line 164. The point in time can be displayed in year (YY), month (MM), and day (DD) format.

도6은 본 발명의 일 실시예에 따른 생성된 이슈를 기반으로 다중 업무 연계 진척도를 갱신하는 것을 도시하는 도면이다.Figure 6 is a diagram illustrating updating multi-task linkage progress based on issues created according to an embodiment of the present invention.

이슈 생성부(171)는 사용자 단말로부터 이슈 생성 요청과 이슈 데이터를 수신할 수 있다. 이슈 데이터는 이슈가 발생한 부서, 업무, 일정 변경 유무 및 이슈 생성 이슈 등을 포함할 수 있다. The issue creation unit 171 may receive an issue creation request and issue data from the user terminal. Issue data may include the department where the issue occurred, task, whether there was a schedule change, and the issue that created the issue.

이슈 설정부(172)는 이슈 생성부(171)로 수신된 이슈 데이터를 기반으로 생성될 이슈의 세부사항을 설정할 수 있다. The issue setting unit 172 can set details of an issue to be created based on issue data received by the issue creating unit 171.

일 예로, 이슈 설정부(172)는 이슈를 생성할 업무의 연계 부서 및 업무를 설정할 수 있다. 또한, 이슈 생성부(171)로 이슈를 생성할 업무의 일정 변경이 요청되는 경우, 이슈 설정부(172)는 요청된 변경일만큼 부서 또는 업무의 일정이 변경되도록 이슈를 설정할 수 있다. As an example, the issue setting unit 172 may set a department and task linked to the task to create an issue. Additionally, when a change in the schedule of a task for which an issue is to be created is requested to the issue creation unit 171, the issue setting unit 172 can set the issue so that the schedule of the department or task is changed by the requested change date.

이슈 승인 요청부(173)는 사용자 단말로 이슈의 생성을 요청할 수 있다. 이 때, 사용자 단말은 이슈 설정부(172)에서 설정된 연계 부서 담당자 단말, 연계 업무 담당자 단말 및 프로젝트 담당자 단말을 포함할 수 있다. The issue approval request unit 173 may request creation of an issue through the user terminal. At this time, the user terminal may include a linked department manager terminal, a linked task manager terminal, and a project manager terminal set in the issue setting unit 172.

이슈 승인 요청부(173)는 사용자 단말로부터 이슈 생성 승인을 수신한다면, 이슈 생성부(171)로 이슈 생성을 요청할 수 있다. If the issue approval request unit 173 receives issue creation approval from the user terminal, it may request the issue creation unit 171 to create an issue.

즉, 이슈 생성부(171)는 이슈 승인 요청부(173)로 생성될 이슈의 연계 부서 및 업무의 담당자로부터 승인이 수신된 이슈를 생성할 수 있다. That is, the issue creation unit 171 may create an issue for which approval has been received from the person in charge of the relevant department and task of the issue to be created by the issue approval request unit 173.

따라서, 이슈 생성부(171)는 이슈를 생성하기 위해서 연계 부서 및 프로젝트 담당자의 이슈 생성 승인이 필요하기 때문에 정보의 누락이나 혼란이 발생하지 않는다. 또한, 사용자가 이슈 생성 이력을 수월하게 관리할 수 있다. Therefore, in order to create an issue, the issue creation unit 171 requires approval for issue creation from the linked department and the project manager, so information is not omitted or confused. Additionally, users can easily manage issue creation history.

일 예로, 이슈 생성부(171)는 a업무에 이슈가 발생하여, 일정을 3일 늦춰야 한다는 이슈 데이터를 수신할 수 있다. As an example, the issue creation unit 171 may receive issue data indicating that an issue has occurred in task a and that the schedule must be delayed by 3 days.

이 때, 이슈 설정부(172)는 a 업무의 아웃 부서 및 아웃 업무를 판단하고 연계 부서 및 업무를 설정할 수 있다. 또한, 이슈 설정부는 a 업무와 연계 부서 및 업무의 일정이 3일 증가되도록 이슈를 설정할 수 있다. At this time, the issue setting unit 172 may determine the out-department and out-task of task a and set the linked department and task. Additionally, the issue setting department can set an issue so that the schedule of the department and task associated with task A is increased by 3 days.

이슈 승인 요청부(173)는 연계 부서 및 업무 사용자 단말로 설정된 이슈 생성 승인 요청을 할 수 있다. 또한, 이슈 승인 요청부(173)는 이슈 생성 승인이 수신된다면, 이슈 생성부(171)로 이슈 생성을 요청할 수 있다.The issue approval request unit 173 can request approval for creating issues set to linked departments and business user terminals. Additionally, if issue creation approval is received, the issue approval request unit 173 may request the issue creation unit 171 to create an issue.

이슈 생성부(171)는 이슈 설정부(172)에서 설정된 이슈를 생성할 수 있다. 또한, 이슈 승인 요청부(173)에서 이슈 생성 승인이 수신되는 경우, 업무 설정부(153)는 이슈를 업무에 적용할 수 있다. 이 때, 업무 설정부(153)는 이슈가 생성된 업무뿐만 아니라 연계 업무도 이슈를 적용할 수 있다. The issue creation unit 171 may create an issue set in the issue setting unit 172. Additionally, when issue creation approval is received from the issue approval request unit 173, the task setting unit 153 can apply the issue to the task. At this time, the task setting unit 153 can apply the issue not only to the task for which the issue was created but also to the linked task.

또한, 다중 업무 연계 진척도 갱신부(162)는 업무 설정부(153)에 적용된 이슈를 기반으로 다중 업무 연계 진척도를 갱신할 수 있다. Additionally, the multi-task linked progress update unit 162 may update the multi-task linked progress based on the issues applied to the task setting unit 153.

즉, 다중 업무 연계 진척도 갱신부(162)는 이슈가 생성되었을 때 사용자 단말별로 다른 작업 없이, 이슈가 적용된 다중 업무 연계 진척도를 자동으로 갱신할 수 있다. In other words, when an issue is created, the multi-task linked progress update unit 162 can automatically update the multi-task linked progress to which the issue is applied without any other work for each user terminal.

사용자는 협업 프로젝트 관리 플랫폼의 다중 업무 연계 진척도가 이슈가 적용되도록 자동으로 갱신하는 것을 이용하여, 사용자의 업무뿐만 아니라 연계 업무도 일정 관리를 효율적으로 진행할 수 있다. Users can efficiently manage schedules for not only their own tasks but also linked tasks by automatically updating the collaborative project management platform's multi-task linkage progress to apply issues.

도7은 본 발명의 일 실시예에 따른 협업 프로젝트 관리 플랫폼의 전체 흐름을 도시하는 흐름도이다.Figure 7 is a flow chart showing the overall flow of the collaborative project management platform according to an embodiment of the present invention.

단계(S111)에서, 협업 프로젝트 관리 플랫폼은 사용자를 등록할 수 있다. 먼저, 협업 프로젝트 관리 플랫폼은 사용자 데이터를 수신할 수 있다. 수신된 사용자 데이터는 사용자의 이름, 전화 번호 및 소속 기업 정보 등을 포함할 수 있다. 협업 프로젝트 관리 플랫폼은 수신된 사용자 데이터를 근거로 하여 사용자를 인증하여 등록할 수 있다. In step S111, the collaborative project management platform may register the user. First, the collaborative project management platform can receive user data. The received user data may include the user's name, phone number, and company information. The collaborative project management platform can authenticate and register users based on the received user data.

단계(S112)에서, 협업 프로젝트 관리 플랫폼은 사용자에게 제공할 서비스를 등록할 수 있다. 이 때, 협업 프로젝트 관리 플랫폼은 사용자의 서비스를 등록하기 위해서 소속 기업 정보 및 내/외부 구성원 정보 등의 서비스 가입 데이터를 요청할 수 있다. 협업 프로젝트 관리 플랫폼은 수신된 서비스 가입 데이터를 기반으로 사용자 단말로 서비스 결제를 요청할 수 있다. 만약, 요청된 서비스 결제가 완료되었다고 확인된다면, 협업 프로젝트 관리 플랫폼은 서비스를 등록할 수 있다. In step S112, the collaborative project management platform may register services to be provided to the user. At this time, the collaborative project management platform may request service subscription data such as company information and internal/external member information in order to register the user's service. The collaborative project management platform can request service payment from the user terminal based on the received service subscription data. If it is confirmed that payment for the requested service has been completed, the collaborative project management platform can register the service.

이 때, 협업 프로젝트 관리 플랫폼은 내/외부 구성원에게 아이디와 비밀번호를 부여하거나 사용자 등록을 요청하여, 사용자 단말로 가입된 서비스를 제공할 수 있다. At this time, the collaborative project management platform may provide IDs and passwords to internal/external members or request user registration to provide services subscribed to user terminals.

단계(S113)에서, 협업 프로젝트 관리 플랫폼은 프로젝트 및 부서를 생성할 수 있다. 협업 프로젝트 관리 플랫폼은 프로젝트 생성 요청 및 프로젝트 데이터를 수신할 수 있다. At step S113, the collaborative project management platform may create projects and departments. A collaborative project management platform can receive project creation requests and project data.

프로젝트 데이터는 프로젝트 명 및 프로젝트 설명 등을 포함할 수 있다. Project data may include project name and project description.

또한, 협업 프로젝트 관리 플랫폼은 사용자 단말로 내부 부서 생성 및 외부 부서 생성을 요청할 수 있다. 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 내부 부서 데이터 및 외부 부서 데이터를 수신하여, 내부 부서 및 외부 부서를 생성할 수 있다. 이 때, 외부 부서 데이터는 외부 부서 생성이 필요하는 경우에만 수신될 수 있다. Additionally, the collaborative project management platform can request the creation of internal departments and external departments through the user terminal. The collaborative project management platform can receive internal department data and external department data from the user terminal and create internal departments and external departments. At this time, external department data can be received only when external department creation is necessary.

내부 부서 데이터는 내부 부서명, 내부 부서 인력 및 내부 부서 인력 권한 등을 포함할 수 있다. 협업 프로젝트 관리 플랫폼은 내부 부서의 인력을 등록하고 등록된 내부 인력의 권한을 설정할 수 있다. Internal department data may include internal department name, internal department personnel, and internal department personnel authority. The collaborative project management platform can register personnel from internal departments and set permissions for registered internal personnel.

또한, 외부 부서 데이터는 외부 부서명, 외부 부서 인력 및 외부 부서 인력 권한 등을 포함할 수 있다. 협업 프로젝트 관리 플랫폼은 외부 부서 데이터를 기반으로 외부 부서의 사용자 단말로 견적 데이터를 요청할 수 있다. 협업 프로젝트 관리 플랫폼은 외부 부서의 사용자 단말로부터 견적 데이터를 수신하여, 사용자 단말로 전달할 수 있다. 또한, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 견적 데이터 승인 여부를 수신하여, 승인된 견적 데이터를 기반으로 외부 부서를 세부 설정할 수 있다. Additionally, external department data may include external department name, external department personnel, and external department personnel authority. The collaborative project management platform can request quote data from external department user terminals based on external department data. The collaborative project management platform can receive quote data from user terminals in external departments and transmit it to the user terminal. In addition, the collaborative project management platform can receive whether the quotation data is approved from the user terminal and set external departments in detail based on the approved quotation data.

즉, 견적 데이터에 포함된 외부 부서 인력 및 외부 부서 인력 권한 등을 기반으로 외부 부서를 설정하고 생성할 수 있다.In other words, external departments can be set and created based on external department personnel and external department personnel authority included in the quote data.

또한, 협업 프로젝트 관리 플랫폼은 내부 부서 및 외부 부서의 생성이 완료되면, 생성된 내부 부서 및 외부 부서의 비중을 설정할 수 있다. 후술하겠지만, 부서별로 비중을 설정함으로써, 프로젝트의 진행률을 백분율로 정의하고 관리할 수 있다. Additionally, the collaborative project management platform can set the proportion of the created internal and external departments once the creation of the internal and external departments is completed. As will be explained later, by setting the proportion for each department, the progress of the project can be defined and managed as a percentage.

또한, 협업 프로젝트 관리 플랫폼은 프로젝트를 임시 배정하여 사용자 단말에 제공하고 프로젝트 변경 여부를 요청할 수 있다. 사용자 단말로부터 프로젝트 변경이 수신된다면, 협업 프로젝트 관리 플랫폼은 수신된 프로젝트 변경 요청을 기반으로 입시 배정된 프로젝트를 변경할 수 있다. 프로젝트 변경은 일정 변경, 내부 부서 변경 및 외부 부서 변경 등을 포함할 수 있다.Additionally, the collaborative project management platform can temporarily assign a project, provide it to the user terminal, and request changes to the project. If a project change is received from the user terminal, the collaborative project management platform can change the project assigned to the entrance exam based on the received project change request. Project changes can include schedule changes, internal department changes, and external department changes.

임시 배정된 프로젝트의 변경이 완료되는 경우, 협업 프로젝트 관리 플랫폼은 프로젝트를 생성할 수 있다. When changes to a temporarily assigned project are completed, the collaborative project management platform can create a project.

단계(S114)에서, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 업무 데이터를 수신하여 생성할 수 있다. 업무 데이터는 업무명, 업무간 연관 관계, 업무 비중, 업무 일정, 부서 및 업무 인력 등을 포함할 수 있다.In step S114, the collaborative project management platform may receive and generate work data from the user terminal. Work data may include task name, inter-task relationship, task proportion, work schedule, department, and work personnel.

협업 프로젝트 관리 플랫폼은 업무의 부서를 선택하여, 부서별로 업무를 할당할 수 있다. 이 때, 협업 프로젝트 관리 플랫폼은 내부 부서 및 외부 부서에 업무를 할당할 수 있다. The collaborative project management platform allows you to select the department of work and assign work to each department. At this time, the collaborative project management platform can assign tasks to internal and external departments.

또한, 협업 프로젝트 관리 플랫폼은 업무의 비중, 일수 및 담당 인력을 설정하고, 업무 목록을 생성할 수 있다. Additionally, the collaborative project management platform can set the proportion of work, number of days, and personnel in charge, and create a task list.

또한, 협업 프로젝트 관리 플랫폼은 업무간 연관 관계를 형성할 수 있다. 업무간 연관 관계는 인 업무와 아웃 업무를 기반으로 설정할 수 있다. 업무는 인업무의 결과물을 수신하고, 아웃 업무로 결과물을 전달할 수 있다. Additionally, collaborative project management platforms can form relationships between tasks. The relationship between tasks can be established based on in tasks and out tasks. A task can receive the results of an in-task and deliver the results to an out-task.

단계(S115)에서, 협업 프로젝트 관리 플랫폼은 다중 업무 연계 진척도를 생성할 수 있다. 즉, 단계(S114)에서 업무 생성이 완료되면, 협업 프로젝트 관리 플랫폼은 자동으로 다중 업무 연계 진척도를 생성할 수 있다. 다중 업무 연계 진척도는 업무간 연관 관계, 업무의 비중 및 인력을 기반으로 생성될 수 있다. At step S115, the collaborative project management platform may generate a multi-task linked progress chart. In other words, when task creation is completed in step S114, the collaborative project management platform can automatically create a multi-task linked progress chart. Multi-task linkage progress can be created based on the relationship between tasks, the proportion of tasks, and manpower.

따라서, 사용자는 내부 부서의 업무와 외부 부서의 업무 관리 및 일정 관리를 다중 업무 연계 진척도를 이용하여 수행할 수 있다. 다중 업무 연계 진척도는 업무의 연관 관계를 기반으로 생성되었기 때문에, 부서를 기반으로 생성된 종래의 진척도보다 세부적으로 일정 및 프로젝트 관리가 가능하다. Accordingly, users can perform work management and schedule management of internal departments and external departments using multi-task linked progress charts. Because the multi-task linked progress chart is created based on the relationship between tasks, schedule and project management is possible in more detail than a conventional progress chart created based on department.

단계(S116)에서 협업 프로젝트 관리 플랫폼은 이슈 데이터를 수신하여 이슈를 생성할 수 있다. 이슈 데이터는 이슈가 발생한 부서, 업무, 일정 변경 유무 및 생성 이유 등을 포함할 수 있다. 또한, 협업 프로젝트 관리 플랫폼은 이슈를 생성함으로써 영향이 미칠 수 있는 연계 부서 및 업무를 설정할 수 있다. In step S116, the collaborative project management platform may receive issue data and create an issue. Issue data may include the department where the issue occurred, task, whether there was a schedule change, and the reason for creation. Additionally, collaborative project management platforms can set up linked departments and tasks that can be affected by creating issues.

또한, 협업 프로젝트 관리 플랫폼은 사용자 단말로 이슈 승인 요청을 할 수 있다. 사용자 단말은 연계 부서 담당자 단말, 연계 업무 담당자 단말 및 프로젝트 담당자 등을 포함할 수 있다. 협업 프로젝트 관리 플랫폼은 이슈 승인 요청을 한 모든 사용자 단말로부터 승인을 수신하면, 이슈를 생성할 수 있다. Additionally, the collaborative project management platform can request issue approval through the user terminal. The user terminal may include a linked department manager terminal, a linked task manager terminal, and a project manager. The collaborative project management platform can create an issue when approval is received from all user terminals that have requested issue approval.

단계(S117)에서, 협업 프로젝트 관리 플랫폼은 생성된 이슈를 기반으로 자동으로 다중 업무 연계 진척도를 갱신할 수 있다. 만약, 생성된 이슈가 일정 변경 및 업무 비중 변경 등을 포함했다면, 다중 업무 연계 진척도는 변경된 일정 및 업무 비중을 적용하여 갱신될 수 있다.In step S117, the collaborative project management platform can automatically update multi-task linkage progress based on the generated issues. If the created issue includes a change in schedule or work proportion, the multi-task linkage progress can be updated by applying the changed schedule and work proportion.

다중 업무 연계 진척도는 업무의 연관 관계를 기반으로 생성되었기 때문에, 연관 관계가 있는 업무 및 부서에도 자동으로 생성된 이슈가 적용될 수 있다. Since the multi-task linkage progress chart is created based on the relationship between tasks, automatically created issues can be applied to tasks and departments with a related relationship.

도 8은 본 발명의 일 실시예에 따른 프로젝트를 생성하는 방법을 도시하는 흐름도이다. Figure 8 is a flowchart showing a method for creating a project according to an embodiment of the present invention.

단계(S210)에서, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 프로젝트 데이터를 수신할 수 있다. 프로젝트 데이터는 프로젝트명 및 프로젝트 설명 등을 포함할 수 있다. In step S210, the collaborative project management platform may receive project data from the user terminal. Project data may include project name and project description.

단계(S211)에서, 협업 프로젝트 관리 플랫폼은 사용자 단말로 부서 생성을 요청할 수 있다. 또한, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 부서 생성 청 요청 및 부서 데이터를 수신할 수 있다. 부서 데이터는 내부 부서 데이터 및 외부 부서 데이터를 포함할 수 있다. In step S211, the collaborative project management platform may request the creation of a department through the user terminal. Additionally, the collaborative project management platform can receive department creation request and department data from the user terminal. Department data may include internal department data and external department data.

단계(S212)에서, 협업 프로젝트 관리 플랫폼은 수신된 내부 부서 데이터를 기반으로 내부 부서를 생성할 수 있다. 내부 부서 데이터는 내부 부서명, 내부 부서 인력 및 내부 부서 인력 권한 등을 포함할 수 있다. In step S212, the collaborative project management platform may create an internal department based on the received internal department data. Internal department data may include internal department name, internal department personnel, and internal department personnel authority.

단계(S213)에서, 협업 프로젝트 관리 플랫폼은 생성된 내부 부서의 인력을 등록하고, 등록된 내부 부서 인력의 권한을 활성 또는 비활성 형태로 설정할 수 있다. 권한은 일정 승인, 환경 설정, 문서 편집 및 이슈 생성 등을 포함할 수 있다. 따라서, 내부 부서의 인력을 등록하고, 등록된 인력에게 협업 프로젝트 관리 플랫폼의 권한을 부여할 수 있다. 또한, 내부 부서 인력은 부여된 권한에 맞게 협업 프로젝트 관리 플랫폼을 사용할 수 있기 때문에 불필요한 접근과 변경을 방지할 수 있으며, 추적이 용이할 수 있다. In step S213, the collaborative project management platform may register the personnel of the created internal department and set the authority of the registered internal department personnel to active or inactive. Permissions can include approving schedules, setting preferences, editing documents, and creating issues. Therefore, you can register personnel from internal departments and grant permission to the collaborative project management platform to the registered personnel. Additionally, because internal department personnel can use the collaborative project management platform according to the authority granted, unnecessary access and changes can be prevented and tracking can be facilitated.

단계(S214)에서, 협업 프로젝트 관리 플랫폼은 외부 부서 생성 요청 및 외부 부서 데이터를 수신했는지 확인할 수 있다. In step S214, the collaborative project management platform may confirm whether the external department creation request and external department data have been received.

외부 부서 생성 요청 및 외부 부서 데이터를 수신하는 경우, 단계(S215)에서, 협업 프로젝트 관리 플랫폼은 수신된 외부 부서 데이터를 기반으로 외부 부서를 생성할 수 있다. 즉, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 외부 부서 데이터가 수신되었는지 확인하고, 외부 부서 데이터가 수신되었다면 외부 부서를 생성한다. 외부 부서 데이터는 외부 부서명, 외부 부서 인력 및 외부 부서 인력 권한 등을 포함할 수 있다. When receiving an external department creation request and external department data, in step S215, the collaborative project management platform may create an external department based on the received external department data. In other words, the collaborative project management platform checks whether external department data has been received from the user terminal and, if external department data has been received, creates an external department. External department data may include external department name, external department personnel, and external department personnel authority.

단계(S216)에서, 협업 프로젝트 관리 플랫폼은 생성된 외부 부서를 기반으로 외부 부서의 사용자 단말로 견적 데이터를 요청할 수 있다. 협업 프로젝트 관리 플랫폼은 외부 부서의 사용자로부터 견적 데이터가 수신된다면, 수신된 견적 데이터를 사용자 단말에 전달할 수 있다. 이 때, 사용자 단말은 협업 프로젝트 관리 플랫폼으로 견적 데이터 승인 여부를 전달할 수 있다. In step S216, the collaborative project management platform may request quotation data from the user terminal of the external department based on the created external department. If quote data is received from a user in an external department, the collaborative project management platform can deliver the received quote data to the user terminal. At this time, the user terminal can transmit whether or not the estimate data is approved to the collaborative project management platform.

만약, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 견적 데이터 승인 거절 및 견적 협의 사항이 수신되었다면, 외부 부서의 사용자 단말로 전달할 수 있다. 협업 프로젝트 관리 플랫폼은 외부 부서의 사용자 단말로부터 변경된 견적 데이터를 수신하여 사용자 단말로 전달할 수 있다. 이 때, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 최종 견적 승인 여부가 결정될 때까지, 외부 부서의 사용자 단말과 사용자 단말의 견적 데이터 수신 및 전달을 수행할 수 있다. If the collaborative project management platform receives quotation data approval rejection and quotation discussion matters from a user terminal, it can be transmitted to the user terminal of an external department. The collaborative project management platform can receive changed quote data from the user terminal of an external department and transmit it to the user terminal. At this time, the collaborative project management platform can receive and transmit quotation data from the user terminal to the user terminal of an external department until a decision is made on whether to approve the final quotation from the user terminal.

단계(S217)에서, 협업 프로젝트 관리 플랫폼은 수신된 견적 데이터를 기반으로 외부 부서의 세부사항을 설정할 수 있다. 협업 프로젝트 관리 플랫폼은 외부 부서의 인력을 등록하고, 권한을 설정할 수 있다. 권한은 활성 또는 비활성 상태로 설정될 수 있으며, 일정 설정, 이슈 생성 및 문서 편집 등을 포함할 수 있다. In step S217, the collaborative project management platform may set the details of the external department based on the received quote data. The collaborative project management platform can register personnel from external departments and set permissions. Permissions can be set to active or inactive and can include setting schedules, creating issues, and editing documents.

단계(S218)에서, 협업 프로젝트 관리 플랫폼은 생성된 내부 부서 및 외부 부서의 비중을 설정할 수 있다. 내부 부서 및 외부 부서의 비중을 설정함으로써, 사용자는 프로젝트의 진척도를 백분율로 정의하고 관리할 수 있다. In step S218, the collaborative project management platform can set the proportion of internal departments and external departments created. By setting the proportion of internal and external departments, users can define and manage the project's progress in percentage terms.

만약, 단계(S214)에서, 외부 부서 생성 요청 및 외부 부서 데이터가 수신되지 않았다면, 협업 프로젝트 관리 플랫폼은 단계(S218)에서 외부 부서 비중을 0으로 하고 내부 부서의 비중을 설정할 수 있다. If, in step S214, the external department creation request and external department data are not received, the collaborative project management platform may set the external department proportion to 0 and set the internal department proportion in step S218.

단계(S219)에서, 협업 프로젝트 관리 플랫폼은 프로젝트를 바로 생성하지 않고 임시 생성할 수 있다. In step S219, the collaborative project management platform may temporarily create the project instead of creating it immediately.

단계(S220)에서 임시 생성된 프로젝트를 배정할 수 있다. 프로젝트를 임시 생성하고 배정하는 것은 불필요한 오류를 방지할 수 있다. A temporarily created project can be assigned in step S220. Temporarily creating and assigning projects can prevent unnecessary errors.

단계(S221)에서, 협업 프로젝트 관리 플랫폼은 사용자 단말로 검토 요청을 할 수 있다. 요청된 검토는 내부 부서 및 외부 부서의 설정 사항을 포함할 수 있다. In step S221, the collaborative project management platform may make a review request to the user terminal. Requested reviews may include settings from internal and external departments.

또한, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 검토 결과를 수신할 수 있다. Additionally, the collaborative project management platform may receive review results from the user terminal.

단계(S222)에서, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 프로젝트 일정 변경이 수신되는 경우, 수신된 일정 변경만큼 프로젝트의 일정을 변경할 수 있다. 즉, 협업 프로젝트 관리 플랫폼은 내부 부서의 일정, 외부 부서의 일정 및 프로젝트 전체 일정과 같은 전반적인 일정 변경을 진행할 수 있다. In step S222, when a project schedule change is received from the user terminal, the collaborative project management platform may change the project schedule by the amount of the received schedule change. In other words, a collaborative project management platform can make overall schedule changes such as internal department schedules, external department schedules, and the overall project schedule.

협업 프로젝트 관리 플랫폼은 일정 변경이 완료되면 사용자 단말로 최종 승인을 요청할 수 있다. 협업 프로젝트 관리 플랫폼은 최종 승인이 될 때까지 일정 변경 단계를 진행할 수 있다. The collaborative project management platform can request final approval from the user terminal once the schedule change is completed. Collaborative project management platforms can stage schedule changes until final approval.

단계(S223)에서, 협업 프로젝트 관리 플랫폼은 일정 변경의 최종 승인이 수신되면, 프로젝트를 생성할 수 있다. 협업 프로젝트 관리 플랫폼은 프로젝트 담당자, 내부 부서 담당자 및 외부 부서 담당자의 검토를 진행한 후 프로젝트를 생성할 수 있다. At step S223, the collaborative project management platform may create a project once final approval of the schedule change is received. The collaborative project management platform can create projects after review by project managers, internal department staff, and external department staff.

도 9는 본 발명의 일 실시예에 따른 업무의 연관 관계를 기반으로 다중 업무 연계 진척도를 생성하는 방법을 도시하는 흐름도이다. Figure 9 is a flowchart illustrating a method of generating a multi-task linked progress chart based on the correlation between tasks according to an embodiment of the present invention.

단계(S310)에서, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 업무 생성 요청 및 업무 데이터를 수신할 수 있다. 업무 데이터는 업무명, 업무간 연관 관계, 일정, 부서 및 업무 인력 등을 포함할 수 있다. In step S310, the collaborative project management platform may receive a task creation request and task data from the user terminal. Work data may include task names, relationships between tasks, schedules, departments, and work personnel.

단계(S311)에서, 협업 프로젝트 관리 플랫폼은 수신된 업무 데이터를 기반으로 업무의 부서를 설정할 수 있다. 즉, 협업 프로젝트 관리 플랫폼은 업무를 부서에 할당할 수 있다. In step S311, the collaborative project management platform may set the department of work based on the received work data. In other words, a collaborative project management platform can assign tasks to departments.

단계(S312)에서, 협업 프로젝트 관리 플랫폼은 부서에 할당된 업무의 세부사항을 설정할 수 있다. 세부 사항은 업무간 연관 관계 설정, 업무 일정 설정, 업무 인력 설정, 업무 비중 설정 및 업무 목록 생성 등을 포함할 수 있다. At step S312, the collaborative project management platform may set details of tasks assigned to the department. Details may include establishing relationships between tasks, setting work schedules, setting work personnel, setting work proportions, and creating task lists.

협업 프로젝트 관리 플랫폼은 인 업무와 아웃 업무를 기반으로 업무의 연관 관계를 설정할 수 있다. 설정하고자 하는 업무가 다른 업무의 결과물을 수신하는 경우, 다른 업무를 인 업무로 속성을 정의할 수 있다. 또한, 설정하고자 하는 업무가 다른 업무로 결과물을 송신하는 경우, 다른 업무를 아웃 업무로 속성을 정의할 수 있다. The collaborative project management platform can establish task relationships based on in and out tasks. If the task you want to set receives the results of another task, you can define the attribute as a task that represents the other task. Additionally, if the task to be set transmits results to another task, the attribute of the other task can be defined as an out task.

예를 들어, 설정하고자 하는 A 업무가 B 업무의 결과물을 수신해야 하는 경우, B 업무를 A 업무의 인 업무로 정의할 수 있다. 또한, A 업무가 C 업무로 결과물을 송신해야 하는 경우, C 업무를 A 업무의 아웃 업무로 정의할 수 있다. For example, if task A to be set must receive the results of task B, task B can be defined as the end-user task of task A. Additionally, if task A needs to send a result to task C, task C can be defined as an out task of task A.

단계(S313)에서, 협업 프로젝트 관리 플랫폼은 설정하고자 하는 업무의 인 업무 및 아웃 업무가 존재하는지 판단할 수 있다. In step S313, the collaborative project management platform may determine whether there are in-tasks and out-tasks for the task to be set.

단계(S314)에서, 설정하고자 하는 업무의 인 업무가 존재한다면, 협업 프로젝트 관리 플랫폼은 인 업무의 세부 설정을 할 수 있다. 이 때, 협업 프로젝트 관리 플랫폼은 어떤 인 업무의 결과물이 수신되어야 하는지 설정할 수 있다. 예를 들어, 협업 프로젝트 관리 플랫폼은 인 업무인 A 업무의 결과물 a가 B 업무로 수신할 수 있도록, 결과물 a의 형식, 용량 및 이름 등을 설정할 수 있다. In step S314, if there is a human task for the task to be set, the collaborative project management platform can make detailed settings for the human task. At this time, the collaborative project management platform can set which work results should be received. For example, the collaborative project management platform can set the format, capacity, and name of result a so that result a of task A, which is task A, can be received by task B.

단계(S315)에서, 설정하고자 하는 업무의 아웃 업무가 존재한다면, 협업 프로젝트 관리 플랫폼은 아웃 업무의 세부 설정을 할 수 있다. 마찬가지로, 협업 프로젝트 관리 플랫폼은 아웃 업무로 어떤 견과물이 송신되어야 하는지 설정할 수 있다. 예를 들어, 협업 프로젝트 관리 플랫폼은 아웃 업무인 C 업무로 B 업무의 결과물 b가 송신될 수 있도록, 결과물 b의 형식, 용량 및 이름 등을 설정할 수 있다. In step S315, if there is an out task for the task to be set, the collaborative project management platform can make detailed settings for the out task. Likewise, a collaborative project management platform can set which deliverables should be sent out to work. For example, the collaborative project management platform can set the format, capacity, and name of result b so that result b of task B can be transmitted to task C, which is an out task.

단계(S316)에서, 협업 프로젝트 관리 플랫폼은 업무의 결과물을 설정할 수 있다. 업무의 결과물은 아웃 업무로 전달되어야 하는 데이터이다. 협업 프로젝트 관리 플랫폼은 업무의 결과물 형식, 용량 및 이름 등을 설정할 수 있다. In step S316, the collaborative project management platform may set the work output. The result of the work is data that must be delivered to the outgoing work. The collaborative project management platform can set the format, capacity, and name of the work output.

단계(S317)에서, 협업 프로젝트 관리 플랫폼은 설정이 완료된 업무를 생성할 수 있다. In step S317, the collaborative project management platform may create a task that has been set up.

단계(S318)에서, 협업 프로젝트 관리 플랫폼은 생성된 업무를 기반으로 다중 업무 연계 진척도를 생성할 수 있다. 즉, 협업 프로젝트 관리 플랫폼은 업무의 연관 관계, 업무의 비중 및 업무의 일정을 기반으로 다중 업무 연계 진척도를 생성할 수 있다. 이 때, 다중 업무 연계 진척도는 업무의 생성이 완료되면 자동으로 생성될 수 있다. 따라서, 사용자는 진척도를 생성하기 위한 업무 데이터를 협업 프로젝트 관리 플랫폼으로 별도로 송신하지 않아도 된다. In step S318, the collaborative project management platform may generate a multi-task linked progress chart based on the created tasks. In other words, the collaborative project management platform can create multi-task linkage progress based on the relationship between tasks, the proportion of tasks, and the schedule of tasks. At this time, the multi-task linked progress chart can be automatically generated when the creation of the task is completed. Accordingly, users do not need to separately transmit work data to generate progress reports to the collaborative project management platform.

프로젝트를 내부 부서 및 외부 부서로 세분화하고, 세분화된 내부 부서 및 외부 부서에 업무를 할당함으로써, 사용자는 내부 부서의 업무 및 외부 부서의 업무를 협업 프로젝트 관리 플랫폼만을 이용하여 관리할 수 있다. By subdividing projects into internal and external departments and assigning tasks to the segmented internal and external departments, users can manage the work of internal departments and external departments using only the collaborative project management platform.

또한, 협업 프로젝트 관리 플랫폼은 업무 간의 연관 관계를 설정하고, 업무별로 비중을 부여했기 때문에 진척도를 백분율로 정의하고 관리할 수 있다.In addition, the collaborative project management platform establishes relationships between tasks and assigns weight to each task, so progress can be defined and managed as a percentage.

또한, 협업 프로젝트 관리 플랫폼은 업무 간의 연관 관계 및 업무 진척도를 타임라인 형식으로 표현하기 때문에, 사용자들은 시각적으로 파악하고, 효율적으로 업무를 수행 및 관리할 수 있다. In addition, the collaborative project management platform expresses the relationships between tasks and work progress in a timeline format, allowing users to visually understand and perform and manage tasks efficiently.

도 10은 본 발명의 일 실시예에 따른 이슈를 생성하고, 다중 업무 연계 진척도를 갱신하는 방법을 도시하는 흐름도이다. Figure 10 is a flowchart illustrating a method of creating an issue and updating multi-task linkage progress according to an embodiment of the present invention.

단계(S410)에서, 협업 프로젝트 관리 플랫폼은 사용자 단말로부터 이슈 생성 요청을 수신할 수 있다. 이슈 데이터는 이슈가 발생한 부서, 업무, 일정 변경 유무 및 이슈 생성 이유 등을 포함할 수 있다. In step S410, the collaborative project management platform may receive an issue creation request from the user terminal. Issue data may include the department where the issue occurred, task, whether there was a schedule change, and the reason for the issue creation.

단계(S411)에서, 협업 프로젝트 관리 플랫폼은 이슈를 생성할 업무의 연관 부서가 있는지 확인할 수 있다. 즉, 협업 프로젝트 관리 플랫폼은 이슈를 생성할 업무의 인 업무 또는 아웃 업무 중 적어도 하나를 포함하는지 판단할 수 있다. In step S411, the collaborative project management platform can check whether there is a related department of work that will create an issue. In other words, the collaborative project management platform can determine whether the task to create an issue includes at least one of in-task or out-task.

단계(S412)에서, 인 업무가 포함되는 경우, 협업 프로젝트 관리 플랫폼은 인 업무를 설정할 수 있다. 이 때, 협업 프로젝트 관리 플랫폼은 다수의 인 업무를 선택할 수 있다. In step S412, if personnel tasks are included, the collaborative project management platform may set the personnel tasks. At this time, the collaborative project management platform can select multiple human tasks.

예를 들어, A 업무의 이슈가 B 업무에 영향을 끼칠 수 있는 경우, 협업 프로젝트 관리 플랫폼은 B 업무와 A 업무의 연관 관계를 설정하여 관리할 수 있다 협업 프로젝트 관리 플랫폼은 B 업무를 A 업무의 인 업무로 설정할 수 있다. 이슈가 생성된 후, B 업무는 생성된 A 업무의 이슈를 반영한 결과물을 A 업무로 제공할 수 있다. 즉, 협업 프로젝트 관리 플랫폼은 인 업무를 설정하여, 인 업무로부터 변경된 결과물을 제공받을 수 있다. For example, if an issue in task A can affect task B, the collaborative project management platform can establish and manage the relationship between task B and task A. The collaborative project management platform can connect task B to task A. It can be set as a personal task. After an issue is created, task B can provide task A with results that reflect the issues of task A. In other words, the collaborative project management platform can set up human tasks and receive changed results from human tasks.

단계(S413)에서, 아웃 업무가 포함되는 경우, 협업 프로젝트 관리 플랫폼은 아웃 업무를 설정할 수 있다. 이 때, 협업 프로젝트 관리 플랫폼은 다수의 아웃 업무를 선택할 수 있다. In step S413, if out tasks are included, the collaborative project management platform may set the out tasks. At this time, the collaborative project management platform can select multiple out tasks.

예를 들어, A 업무의 이슈가 C 업무에 영향을 끼칠 수 있는 경우, 협업 프로젝트 관리 플랫폼은 C 업무와 A 업무의 연관 관계를 설정하여 관리할 수 있다 협업 프로젝트 관리 플랫폼은 C 업무를 A 업무의 아웃 업무로 설정할 수 있다. 이슈가 생성된 후, C 업무는 생성된 A 업무의 이슈를 반영한 결과물을 A 업무로부터 제공받을 수 있다. 즉, 협업 프로젝트 관리 플랫폼은 아웃 업무를 설정하여, 아웃 업무로 변경된 결과물을 제공할 수 있다. For example, if an issue in task A can affect task C, the collaborative project management platform can establish and manage the relationship between task C and task A. The collaborative project management platform can connect task C to task A. It can be set as out work. After an issue is created, task C can receive results from task A that reflect the issues of task A. In other words, the collaborative project management platform can set out work and provide results that have been changed to out work.

단계(S414)에서, 협업 프로젝트 관리 플랫폼은 이슈 데이터에서 일정 또는 사양 등의 변경 사항이 있는지 확인할 수 있다. In step S414, the collaborative project management platform can check whether there are any changes to the schedule or specifications in the issue data.

단계(S415)에서, 협업 프로젝트 관리 플랫폼은 일정 변경이 있는 경우, 이슈를 생성할 업무의 변경된 일정을 계산할 수 있다. 또한, 단계(S413)에서 설정한 인 업무 또는 단계(S414)에서 설정한 아웃 업무의 일정을 이슈가 반영되도록 자동으로 변경된 일정을 계산할 수 있다. In step S415, the collaborative project management platform may calculate the changed schedule of the task to create an issue if there is a schedule change. Additionally, a schedule changed automatically can be calculated to reflect the issue in the schedule of the in-task set in step S413 or the out-task set in step S414.

단계(S416)에서, 사양 변경이 있는 경우, 협업 프로젝트 관리 플랫폼은 이슈를 생성할 업무의 사양 변경 데이터를 등록할 수 있다. 예를 들어, 이슈가 생성된 후에, A 업무가 인 업무인 B 업무 결과물의 사양이 변경된 경우, B 업무로 등록된 사양 변경 데이터를 송신할 수 있다. 또한, A 업무가 아웃 업무인 C 업무로 제공해야 할 A 업무 결과물의 사양이 변경된 경우, C 업무로 등록된 사양 변경 데이터를 송신할 수 있다. In step S416, if there is a specification change, the collaborative project management platform may register specification change data of the task to create an issue. For example, after an issue is created, if the specifications of the result of task B, which is task A, are changed, the specification change data registered as task B can be transmitted. In addition, if the specifications of task A results to be provided by task A to task C, which is an out task, are changed, the specification change data registered as task C can be transmitted.

단계(S417)에서, 협업 프로젝트 관리 플랫폼은 이슈를 임시 생성할 수 있다. 이슈를 임시 생성함으로써, 협업 프로젝트 관리 플랫폼은 불필요한 이슈 생성을 방지하고, 정확한 데이터가 반영된 이슈 데이터를 생성할 수 있다. At step S417, the collaborative project management platform may temporarily create an issue. By temporarily creating issues, the collaborative project management platform can prevent unnecessary issue creation and create issue data that reflects accurate data.

단계(S418)에서, 협업 프로젝트 관리 플랫폼은 사용자 단말로 임시 생성된 이슈의 승인을 요청할 수 있다. 이 때, 협업 프로젝트 관리 플랫폼은 인 업무 담당자, 아웃 업무 담당자 및 프로젝트 담당자 등에게 이슈 승인 요청을 송신할 수 있다. In step S418, the collaborative project management platform may request approval of a temporarily created issue from the user terminal. At this time, the collaborative project management platform can send an issue approval request to the in-work manager, out-work manager, and project manager.

단계(S419)에서, 협업 프로젝트 관리 플랫폼은 이슈 생성 승인을 요청한 사용자로부터 승인을 수신하면, 이슈를 생성할 수 있다. In step S419, the collaborative project management platform may create an issue when it receives approval from the user who requested approval for creating the issue.

이슈가 생성되면, 협업 프로젝트 관리 플랫폼은 생성된 이슈가 반영되도록 인 업무 및 아웃 업무를 변경할 수 있다. 예를 들어, 일정 변경이 포함된 이슈가 생성된 경우, 협업 프로젝트 관리 플랫폼은 인 업무의 아웃 업무의 변경된 일정을 산출하고 조정할 수 있다.Once an issue is created, the collaborative project management platform can change the in and out tasks to reflect the created issue. For example, when an issue involving a schedule change is created, the collaborative project management platform can calculate and adjust the changed schedule of the in-work and out-work.

단계(S420)에서, 협업 프로젝트 관리 플랫폼은 이슈가 반영되도록 다중 업무 연계 진척도를 자동으로 갱신할 수 있다. 즉, 협업 프로젝트 관리 플랫폼은 단계(S419)에서, 변경된 인 업무 및 아웃 업무의 일정이 반영된 다중 업무 연계 진척도를 생성할 수 있다. 따라서, 이슈가 생성된 직후, 사용자는 이슈가 반영된 다중 업무 연계 진척도를 실시간으로 확인할 수 있다. In step S420, the collaborative project management platform can automatically update the multi-task linkage progress to reflect issues. In other words, the collaborative project management platform can generate a multi-task linked progress chart reflecting the changed schedules of in-tasks and out-tasks in step S419. Therefore, immediately after an issue is created, users can check the progress of multiple tasks linked with the issue in real time.

사용자는 프로젝트를 세분화하고, 내/외부 부서를 협업 프로젝트 관리 플랫폼만으로 관리할 수 있다. 또한, 사용자는 내/외부 부서의 업무를 할당하고, 할당된 업무의 연관 관계를 설정할 수 있다.Users can segment projects and manage internal and external departments using only a collaborative project management platform. Additionally, users can assign tasks to internal/external departments and establish relationships between assigned tasks.

업무 생성이 완료되면 사용자는 업무의 연관 관계를 기반으로 한 업무 진척도가 자동으로 생성되어 확인할 수 있다. 생성된 업무 진척도는 부서 및 업무의 비중이 반영되어 백분율 형태로 사용자에게 제공될 수 있다. 또한, 업무 진척도는 실시간으로 이슈가 반영되도록, 이슈가 생성된 직후 자동으로 갱신될 수 있다. 업무간 연관 관계가 반영된 진척도를 생성하거나 갱신하기 위해서 사용자는 별도의 작업을 수행하지 않아도 된다. Once task creation is complete, users can automatically create and check task progress based on task relationships. The generated work progress can be provided to the user in the form of a percentage, reflecting the proportion of the department and task. Additionally, work progress can be automatically updated immediately after an issue is created so that the issue is reflected in real time. Users do not need to perform any additional work to create or update a progress chart that reflects the relationships between tasks.

따라서, 사용자는 협업 프로젝트 관리 플랫폼만을 이용하여 프로젝트 계획, 담당자 선정, 업무 할당, 일정 관리, 외주 관리 및 이슈 관리를 수행할 수 있다. Therefore, users can perform project planning, selection of personnel, task assignment, schedule management, outsourcing management, and issue management using only the collaborative project management platform.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.The description of the present invention described above is for illustrative purposes, and those skilled in the art will understand that the present invention can be easily modified into other specific forms without changing the technical idea or essential features of the present invention. will be. Therefore, the embodiments described above should be understood in all respects as illustrative and not restrictive. For example, each component described as unitary may be implemented in a distributed manner, and similarly, components described as distributed may also be implemented in a combined form.

본 발명의 범위는 후술하는 청구범위에 의하여 나타내어지며, 청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is indicated by the claims described below, and all changes or modified forms derived from the meaning and scope of the claims and their equivalent concepts should be construed as being included in the scope of the present invention.

100. 협업 프로젝트 관리 플랫폼
110. 사용자 등록부
120. 서비스 등록부
130. 프로젝트 관리부
140. 부서 관리부
100. Collaborative project management platform
110. User register
120. Service register
130. Project Management Department
140. Department Management

Claims (13)

업무간 연관 관계를 설정하여 프로젝트를 관리하는 협업 프로젝트 관리 플랫폼에 있어서,
프로젝트 데이터 및 프로젝트 생성 요청을 사용자 단말로부터 수신하여 상기 프로젝트를 생성하는 프로젝트 관리부;
부서 데이터 및 부서 생성 요청을 상기 사용자 단말로부터 수신하고, 상기 수신된 부서 데이터를 기반으로 상기 부서를 생성하고, 상기 생성된 부서의 인력을 등록하고 상기 등록된 인력의 권한을 설정하는 부서 관리부;
업무 데이터 및 업무 생성 요청을 상기 사용자 단말로부터 수신하고, 수신된 업무 데이터를 기반으로 상기 업무를 생성하고, 상기 생성된 업무를 상기 부서에 할당하고, 상기 생성된 업무의 연관 관계를 설정하는 업무 관리부; 및
상기 업무의 연관 관계를 기반으로 다중 업무 연계 진척도를 생성하고 갱신하는 다중 업무 연계 진척도 관리부;를 포함하고,
상기 다중 업무 연계 진척도 관리부는
상기 업무 관리부에서 상기 업무의 생성이 완료되면 상기 업무의 연관 관계, 상기 업무의 비중 및 상기 업무의 일정을 기반으로 상기 다중 업무 연계 진척도를 생성하는 다중 업무 연계 진척도 생성부를 포함하며,
상기 업무는 타 부서로부터 결과물을 수신하는 인 업무와 타 부서로 결과물을 전달하는 아웃 업무를 포함하고, 상기 부서 및 업무에 비중을 부여하여 상기 프로젝트의 진척도를 백분율 형태로 정의하고 관리하며,
상기 다중 업무 연계 진척도는, 복수의 부서를 복수의 층의 목록 형태로 나열하고, 상기 층으로 나열된 부서 옆에 각 부서에 할당된 업무들을 표시하며, 선택된 부서에 할당된 업무가 나머지 부서에 할당된 업무와 식별되어 표시되도록, 선택된 부서에 할당된 업무와 나머지 부서에 할당된 업무와 구분되는 형태로 설정되며, 상기 복수의 부서에 할당된 업무 중 하나의 업무의 완료에 의존하여 새로운 업무가 개시되는 유기적 연관성을 포함하여 전체 프로젝트의 진척도를 표시하는 것인 협업 프로젝트 관리 플랫폼.
In a collaborative project management platform that manages projects by establishing relationships between tasks,
a project management unit that receives project data and a project creation request from a user terminal and creates the project;
a department management unit that receives department data and a department creation request from the user terminal, creates the department based on the received department data, registers personnel in the created department, and sets authority of the registered personnel;
A task management unit that receives task data and task creation requests from the user terminal, creates the task based on the received task data, assigns the created task to the department, and establishes a relationship between the created tasks. ; and
It includes a multi-task linked progress management unit that creates and updates multi-task linked progress based on the relationship between the tasks,
The multi-task linkage progress management department
When the creation of the task is completed in the task management unit, it includes a multi-task linked progress generation unit that generates the multi-task linked progress based on the relationship between the tasks, the proportion of the task, and the schedule of the task,
The above tasks include in tasks that receive results from other departments and out tasks that deliver results to other departments, and assign weight to the departments and tasks to define and manage the progress of the project in the form of a percentage,
The multi-task linkage progress chart lists multiple departments in the form of a list of multiple layers, displays tasks assigned to each department next to the departments listed in the layers, and tasks assigned to the selected department are assigned to the remaining departments. It is set in a form that is distinguished from the work assigned to the selected department and the work assigned to the remaining departments so that it is displayed and identified with the work, and a new task is initiated depending on the completion of one task among the tasks assigned to the plurality of departments. A collaborative project management platform that displays the progress of the entire project, including organic relationships.
삭제delete 삭제delete 제 1항에 있어서,
상기 업무 관리부가 상기 업무의 결과물을 등록하고, 상기 사용자 단말로 업무 승인을 요청하고, 상기 사용자 단말로부터 상기 업무 승인을 수신하는 경우, 상기 다중 업무 연계 진척도를 갱신하는 협업 프로젝트 관리 플랫폼.



According to clause 1,
A collaborative project management platform that updates the multi-task linkage progress when the task management unit registers the results of the task, requests task approval from the user terminal, and receives the task approval from the user terminal.



제 1항에 있어서,
상기 부서 관리부는
외주 관리를 위한 외부 부서 데이터 및 외부 부서 생성 요청이 수신되는 경우, 상기 수신된 외부 부서 데이터를 기반으로 상기 사용자 단말로 견적을 요청하여 상기 외부 부서의 견적을 수신하고, 상기 수신된 외부 부서의 견적을 기반으로 상기 외부 부서의 인력을 등록하고, 등록된 인력의 권한을 설정하는 협업 프로젝트 관리 플랫폼.
According to clause 1,
The above department management department
When external department data for outsourcing management and a request for creating an external department are received, a quotation is requested to the user terminal based on the received external department data, a quotation from the external department is received, and the received quotation from the external department is received. A collaborative project management platform that registers personnel from the above external departments and sets the authority of the registered personnel based on the above.
제1항에 있어서,
상기 사용자 단말로부터 이슈 데이터 및 이슈 생성 요청을 수신하고, 수신된 이슈 데이터를 기반으로 이슈를 생성하고 설정하며, 사용자 단말로 이슈 생성 승인 요청을 하는 이슈 관리부를 더 포함하는 협업 프로젝트 관리 플랫폼.
According to paragraph 1,
A collaborative project management platform further comprising an issue management unit that receives issue data and an issue creation request from the user terminal, creates and sets an issue based on the received issue data, and requests approval for issue creation to the user terminal.
제 6항에 있어서,
상기 다중 업무 연계 진척도 관리부는
상기 이슈 관리부에서 생성된 상기 이슈가 상기 업무의 일정 변경을 포함하는 경우, 상기 업무의 연관 관계 및 상기 업무의 일정 변경을 기반으로 상기 다중 업무 연계 진척도를 갱신하는 다중 업무 연계 진척도 갱신부를 더 포함하는 협업 프로젝트 관리 플랫폼.
According to clause 6,
The multi-task linkage progress management department
When the issue created in the issue management unit includes a change in the schedule of the task, it further includes a multi-task linkage progress update unit that updates the multi-task linkage progress based on the relationship between the tasks and the change in the schedule of the task. Collaborative project management platform.
업무간 연관 관계를 설정하여 프로젝트를 관리하는 협업 프로젝트 관리 방법에 있어서,
협업 프로젝트 관리 플랫폼이 사용자 단말로부터 프로젝트 데이터 및 프로젝트 생성 요청을 수신하여 상기 프로젝트를 생성하는 단계;
협업 프로젝트 관리 플랫폼이 상기 사용자 단말로부터 부서 데이터 및 부서 생성 요청을 수신하고, 상기 수신된 부서 데이터를 기반으로 상기 부서를 생성하고, 상기 생성된 부서의 인력을 등록하고 상기 등록된 인력의 권한을 설정하는 단계;
협업 프로젝트 관리 플랫폼이 상기 사용자 단말로부터 업무 데이터 및 업무 생성 요청을 수신하고, 수신된 업무 데이터를 기반으로 상기 업무를 생성하고, 상기 생성된 업무를 상기 부서에 할당하고, 상기 생성된 업무의 연관 관계를 설정하는 단계; 및
협업 프로젝트 관리 플랫폼이 상기 업무의 연관 관계를 기반으로 다중 업무 연계 진척도를 생성하고 갱신하는 단계를 포함하며,
상기 다중 업무 연계 진척도를 생성하는 단계는, 상기 업무의 생성이 완료되면 상기 업무의 연관 관계, 상기 업무의 비중 및 상기 업무의 일정을 기반으로 상기 다중 업무 연계 진척도를 생성하며,
상기 업무는 타 부서로부터 결과물을 수신하는 인 업무와 타 부서로 결과물을 전달하는 아웃 업무를 포함하고, 상기 부서 및 업무에 비중을 부여하여 상기 프로젝트의 진척도를 백분율 형태로 정의하고 관리하며,
상기 다중 업무 연계 진척도는, 복수의 부서를 복수의 층의 목록 형태로 나열하고, 상기 층으로 나열된 부서 옆에 각 부서에 할당된 업무들을 표시하며, 선택된 부서에 할당된 업무가 나머지 부서에 할당된 업무와 식별되어 표시되도록, 선택된 부서에 할당된 업무와 나머지 부서에 할당된 업무와 구분되는 형태로 설정되며,
상기 복수의 부서에 할당된 업무 중 하나의 업무의 완료에 의존하여 새로운 업무가 개시되는 유기적 연관성을 포함하여 전체 프로젝트의 진척도를 표시하는 것인 협업 프로젝트 관리 방법.
In a collaborative project management method that manages projects by establishing relationships between tasks,
A collaborative project management platform receiving project data and a project creation request from a user terminal to create the project;
The collaborative project management platform receives department data and a department creation request from the user terminal, creates the department based on the received department data, registers personnel of the created department, and sets authority of the registered personnel. steps;
The collaborative project management platform receives work data and a task creation request from the user terminal, creates the task based on the received task data, assigns the created task to the department, and relates the created task to the department. Setting up; and
A collaborative project management platform includes a step of creating and updating multi-task linkage progress based on the correlation between the tasks,
In the step of generating the multi-task linked progress chart, when the creation of the task is completed, the multi-task linked progress chart is generated based on the relationship between the tasks, the proportion of the task, and the schedule of the task,
The above tasks include in tasks that receive results from other departments and out tasks that deliver results to other departments, and assign weight to the departments and tasks to define and manage the progress of the project in the form of a percentage,
The multi-task linkage progress chart lists multiple departments in the form of a list of multiple layers, displays tasks assigned to each department next to the departments listed in the layers, and tasks assigned to the selected department are assigned to the remaining departments. In order to be displayed and identified with the work, it is set in a form that distinguishes between the work assigned to the selected department and the work assigned to the remaining departments.
A collaborative project management method that displays the progress of the entire project, including the organic relationship in which a new task is initiated depending on the completion of one task among the tasks assigned to the plurality of departments.
삭제delete 제 8항에 있어서,
협업 프로젝트 관리 플랫폼이 상기 업무의 결과물을 등록하는 단계;
협업 프로젝트 관리 플랫폼이상기 사용자 단말로 업무 승인을 요청하고, 상기 사용자 단말로부터 상기 업무 승인을 수신하는 단계; 및
협업 프로젝트 관리 플랫폼이 상기 수신된 업무 승인을 상기 업무가 완료되었다고 판단하여, 상기 다중 업무 연계 진척도를 갱신하는 단계;를 더 포함하는 협업 프로젝트 관리 방법.
According to clause 8,
A collaborative project management platform registering the results of the work;
Collaborative project management platform: Requesting task approval from the user terminal and receiving the task approval from the user terminal; and
A collaborative project management method further comprising the step of the collaborative project management platform determining that the received task approval has been completed and updating the multi-task linkage progress.
제 8항에 있어서,
협업 프로젝트 관리 플랫폼이 외주 관리를 위한 외부 부서 데이터 및 외부 부서 생성 요청을 수신하는 단계;
협업 프로젝트 관리 플랫폼이 상기 수신된 외부 부서 데이터를 기반으로 상기 사용자 단말로 견적을 요청하여 상기 외부 부서의 견적을 수신하는 단계;및
협업 프로젝트 관리 플랫폼이 상기 수신된 외부 부서의 견적을 기반으로 상기 외부 부서의 인력을 등록하고, 등록된 인력의 권한을 설정하는 단계;를 더 포함하는 협업 프로젝트 관리 방법.
According to clause 8,
A collaborative project management platform receiving external department data and an external department creation request for outsourcing management;
A collaborative project management platform receiving a quote from the external department by requesting a quote from the user terminal based on the received external department data; And
A collaborative project management method further comprising: registering, by the collaborative project management platform, personnel of the external department based on the received quotation of the external department, and setting authority of the registered personnel.
제8항에 있어서,
협업 프로젝트 관리 플랫폼이 상기 사용자 단말로부터 이슈 데이터 및 이슈 생성 요청을 수신하고, 수신된 이슈 데이터를 기반으로 이슈를 생성하고 설정하며, 사용자 단말로 이슈 생성 승인 요청을 하는 단계;를 더 포함하는 협업 프로젝트 관리 방법.
According to clause 8,
A collaborative project further comprising the step of the collaborative project management platform receiving issue data and an issue creation request from the user terminal, creating and setting an issue based on the received issue data, and requesting approval for issue creation to the user terminal. How to manage.
제12항에 있어서,
협업 프로젝트 관리 플랫폼이 상기 생성된 이슈가 상기 업무의 일정 변경을 포함하는 경우, 상기 업무의 연관 관계 및 상기 업무의 일정 변경을 기반으로 상기 다중 업무 연계 진척도를 갱신하는 단계;를 더 포함하는 협업 프로젝트 관리 방법.
According to clause 12,
A collaborative project further comprising the step of the collaborative project management platform updating the multi-task linkage progress based on the correlation between the tasks and the schedule change of the tasks when the generated issue includes a change in the schedule of the tasks. How to manage.
KR1020210092757A 2021-07-15 2021-07-15 Collaborative project management platform and method of the same KR102613234B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210092757A KR102613234B1 (en) 2021-07-15 2021-07-15 Collaborative project management platform and method of the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210092757A KR102613234B1 (en) 2021-07-15 2021-07-15 Collaborative project management platform and method of the same

Publications (2)

Publication Number Publication Date
KR20230012229A KR20230012229A (en) 2023-01-26
KR102613234B1 true KR102613234B1 (en) 2023-12-14

Family

ID=85110854

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210092757A KR102613234B1 (en) 2021-07-15 2021-07-15 Collaborative project management platform and method of the same

Country Status (1)

Country Link
KR (1) KR102613234B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102597643B1 (en) * 2023-02-16 2023-11-02 (주)예신뷰 Erp system for design works
KR102629930B1 (en) * 2023-08-18 2024-01-29 주식회사 마이링크 Method for linking a work between platforms and platform using the same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102258163B1 (en) * 2020-08-31 2021-05-27 주식회사 케이비손해보험 Method, System and Apparatus of Cooperation Service Provision for Hierarchical Organizational Structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200106817A (en) * 2020-01-02 2020-09-15 디지테크정보 주식회사 Project management system and method using template

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102258163B1 (en) * 2020-08-31 2021-05-27 주식회사 케이비손해보험 Method, System and Apparatus of Cooperation Service Provision for Hierarchical Organizational Structure

Also Published As

Publication number Publication date
KR20230012229A (en) 2023-01-26

Similar Documents

Publication Publication Date Title
US20210110347A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
US20210081897A1 (en) Collaboration tool
US5765140A (en) Dynamic project management system
US8285578B2 (en) Managing information technology (IT) infrastructure of an enterprise using a centralized logistics and management (CLAM) tool
CA2332938C (en) Cross application time sheet
US6714915B1 (en) System and method for project designing and developing a procurement and accounts payable system
US20190220796A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
US6684212B1 (en) System and method for data sharing between members of diverse organizations
US6684191B1 (en) System and method for assessing a procurement and accounts payable system
US6687677B1 (en) System and method for deploying a procurement and accounts payable system
US20060122861A1 (en) Corporate introduction system and method
KR102613234B1 (en) Collaborative project management platform and method of the same
US20070300229A1 (en) Configurable application integrating service request and fulfillment process
WO2001026014A1 (en) Method and estimator for providing service control
CN108876281A (en) A kind of project management system and device
US20090106434A1 (en) Community network
KR101581747B1 (en) System, server and method for providing SAMP service
JP7277877B2 (en) Signboard-based business processing device and business processing method
US20190266544A1 (en) Techniques for managing process-flows across an enterprise
KR100976420B1 (en) Software configuration management system and method therefore
JP2021117945A (en) Method and system for customizing work order
US20130036035A1 (en) System And Method For Automation Of Law Firms
US20170132637A1 (en) System and method for managing events
US20240086803A1 (en) Platform for Cross-Enterprise Project Monitoring, Management, and Reporting
Board Nunavut Water Board

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
X091 Application refused [patent]
AMND Amendment
X701 Decision to grant (after re-examination)