KR102611639B1 - the improved Lock bolts structure and the construction method thereof - Google Patents

the improved Lock bolts structure and the construction method thereof Download PDF

Info

Publication number
KR102611639B1
KR102611639B1 KR1020220090900A KR20220090900A KR102611639B1 KR 102611639 B1 KR102611639 B1 KR 102611639B1 KR 1020220090900 A KR1020220090900 A KR 1020220090900A KR 20220090900 A KR20220090900 A KR 20220090900A KR 102611639 B1 KR102611639 B1 KR 102611639B1
Authority
KR
South Korea
Prior art keywords
rock bolt
hole
fixing
fixture
drilling
Prior art date
Application number
KR1020220090900A
Other languages
Korean (ko)
Inventor
박재만
노영곤
Original Assignee
주식회사 정성이엔씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 정성이엔씨 filed Critical 주식회사 정성이엔씨
Priority to KR1020220090900A priority Critical patent/KR102611639B1/en
Priority to PCT/KR2023/009938 priority patent/WO2024019409A1/en
Application granted granted Critical
Publication of KR102611639B1 publication Critical patent/KR102611639B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/008Anchoring or tensioning means

Abstract

본 발명은 굴착면의 천공홀(H)에 설치하여 보강하기 위한 것으로,
상기 천공홀(H)에 삽입 설치되는 락볼트(100);
상기 락볼트(100)의 선단에 결합되는 고정구(200);
상기 락볼트(100)의 두부에 결합되는 지압고정부(400);
를 포함하여 구성되되,
상기 락볼트(100)와 상기 고정구(200)의 결합체가 상기 천공홀(H)에 삽입될 때 상기 고정구(200)가 확개되어 상기 천공홀(H)에 밀착되고,
상기 천공홀(H)의 입구에 일부 노출된 상기 락볼트(100)의 두부에 상기 지압고정부(400)가 결합되는 것을 특징으로 하는 개량형 락볼트 구조를 제공한다.
더불어, 상기 개량형 락볼트 구조를 시공하기 위한 것으로,
(1) 굴착면을 천공하여 천공홀(H)을 형성하는 천공단계;
(2) 상기 천공홀(H)에 상기 락볼트(100)와 상기 고정구(200)의 결합체를 삽입하는 락볼트삽입단계;
(3) 상기 고정구(200)가 확개되어 상기 천공홀(H)에 밀착되는 선단확개단계;
(4) 외부로부터 상기 천공홀(H)의 내면과 상기 락볼트(100)의 외면 사이에 정착재료(F)를 충진하는 충진단계;
(5) 상기 락볼트(100)의 두부를 상기 지압고정부(400)로 고정하는 고정단계;
를 포함하는 것을 특징으로 하는 개량형 락볼트 구조의 시공방법을 제공한다.
The present invention is intended to be installed and reinforced in the drilled hole (H) of the excavation surface,
A rock bolt (100) inserted into the drilling hole (H);
A fixture 200 coupled to the tip of the rock bolt 100;
An acupressure fixing part (400) coupled to the head of the rock bolt (100);
It is composed including,
When the combination of the rock bolt 100 and the fixture 200 is inserted into the drilling hole (H), the fixture 200 expands and comes into close contact with the drilling hole (H),
An improved rock bolt structure is provided, wherein the acupressure fixing part 400 is coupled to the head of the rock bolt 100 partially exposed at the entrance of the drilling hole (H).
In addition, for constructing the improved rock bolt structure,
(1) A drilling step of drilling the excavation surface to form a drilling hole (H);
(2) a rock bolt insertion step of inserting the combination of the rock bolt 100 and the fixture 200 into the drilled hole (H);
(3) a tip expansion step in which the fixture 200 is expanded and comes into close contact with the drilling hole (H);
(4) a filling step of filling a fixing material (F) between the inner surface of the drill hole (H) and the outer surface of the rock bolt (100) from the outside;
(5) a fixing step of fixing the head of the rock bolt (100) with the acupressure fixing part (400);
It provides a construction method of an improved rock bolt structure comprising a.

Description

개량형 락볼트 구조 및 이의 시공방법{the improved Lock bolts structure and the construction method thereof}{the improved Lock bolts structure and the construction method thereof}

본 발명은 터널공사에서 적용하는 락볼트에 관한 것으로, 락볼트의 경량화를 시도하고 정착재료의 주입작업성을 개선하며 작업중 락볼트의 낙하의 위험을 방지하여 경제적이며 공사의 완성도를 높이는 것이 가능한 개량형 락볼트 구조 및 이의 시공방법에 관한 것이다.The present invention relates to a rock bolt applied in tunnel construction, and is an improved type that is economical and can improve the completeness of construction by attempting to reduce the weight of the rock bolt, improve the workability of injection of fixing material, and prevent the risk of the rock bolt falling during work. It relates to rock bolt structure and its construction method.

터널공사에 있어서 굴착시 발파 등으로 인하여 암반은 연약해지기 쉽다. During tunnel construction, the bedrock tends to become soft due to blasting during excavation, etc.

이때 암반을 견고하고 안정되게 보강시켜 낙석 및 붕락을 방지하기 위한 수단으로 터널을 방사형으로 보강하는 락볼트 공법은 터널의 안전에 매우 중요한 공정이다.At this time, the rock bolt method, which radially reinforces the tunnel as a means of strengthening the rock solidly and stably to prevent rockfall and collapse, is a very important process for the safety of the tunnel.

락볼트 공사는 굴착면에 구멍을 뚫고 그 속에 락볼트를 끼우고 지압판을 너트로 고정시켜 가압하는 것으로, 이때 락볼트의 구조적인 기능을 수행하기 위해서는 굴착 구멍과 락볼트 사이에 정착재료를 충진하여야 하는데 정착재료의 충진방법에 따라 선주입방식과 후주입방식으로 구분된다.Rock bolt construction involves drilling a hole in the excavation surface, inserting a rock bolt into it, and fixing the pressure plate with a nut to pressurize it. At this time, in order to perform the structural function of the rock bolt, fixing material must be filled between the excavation hole and the rock bolt. Depending on the filling method of fixative material, it is divided into pre-injection method and post-injection method.

'선주입방식'은 구멍에 정착재료를 주입한 후에 락볼트를 설치하는 방식으로, 정착재료의 주입작업이 쉬워 널리 선호되고 있었으나, 대다수의 락볼트는 상향으로 설치되기 때문에 주입 시 중력의 영향으로 충진된 정착재료가 하방으로 흘러내려 충진상태의 확인이 곤란하고, 락볼트 설치 시공성 불량, 작업자 숙련도에 따라 품질변동이 큰 점 등이 지적되어 구조적인 안전성으로 적용이 배제되는 경향이 있다.The 'pre-injection method' is a method of installing the rock bolt after injecting the fixing material into the hole. It was widely preferred because it was easy to inject the fixing material. However, since the majority of rock bolts are installed upward, the rock bolt is damaged during injection due to the influence of gravity. It is difficult to check the filling condition because the filled fixing material flows downward, poor rock bolt installation workability, and large quality fluctuations depending on the worker's skill level have been pointed out, so its application tends to be excluded due to structural safety.

'후주입방식'은 락볼트를 삽입한 후에 구멍과 락볼트 간의 간극에 정착재료를 충진하는 방식으로, 공기배출호스를 락볼트와 병행하여 설치하고 입구 쪽에 주입호스를 설치하여, 입구쪽부터 충진되어 상부의 락볼트 선단부로 상향 충진하고, 이때 갇혀있는 공기를 락볼트 선단부에서 공기배출호스로 배출하고 공기가 모두 배출된 후 공기배출호스로 정착재료가 배출되면 정착재료의 충진이 완료된 것으로 확인되기 때문에 충진 상태 확인이 양호한 장점이 있으나, The 'post-injection method' is a method of filling the gap between the hole and the rock bolt with fixing material after inserting the rock bolt. An air discharge hose is installed in parallel with the rock bolt and an injection hose is installed at the entrance, filling from the entrance. It is filled upward to the tip of the rock bolt at the top, and at this time, the trapped air is discharged from the tip of the rock bolt through the air discharge hose. When the fixing material is discharged through the air discharge hose after all the air is discharged, it is confirmed that the filling of the fixing material is complete. Therefore, it has the advantage of being able to check the filling condition, but

터널 발파를 위한 폭약설치에 사용하는 기구를 사용하여 구멍을 천공하기 때문에 구멍의 직경이 매우 작아 락볼트외에 추가적으로 공기배출호스를 같이 설치하는데 어려움이 있는 등 시공의 개선이 필요하다.Since the hole is drilled using a device used to install explosives for tunnel blasting, the diameter of the hole is very small, making it difficult to install an air discharge hose in addition to the rock bolt, which requires improvement in construction.

[문헌 1] 대한민국 등록특허 제1039201호 '선단 확장형 락볼트 및 이의 시공방법', 2011. 05. 30.[Document 1] Republic of Korea Patent No. 1039201 ‘Tip extension type rock bolt and construction method thereof’, May 30, 2011. [문헌 2] 대한민국 등록특허 제0998589호 '지보재용 보호캡', 2021. 01. 11.[Document 2] Republic of Korea Patent No. 0998589 ‘Protective Cap for Jibojae’, 2021. 01. 11.

본 발명은 상기한 바와 같은 종래의 제반 문제점을 해소하기 위해서 제시되는 것이다. 그 목적은 터널의 특성상 상향으로 설치되는 락볼트에 대하여, 락볼트를 경량화하고 정착재료 주입을 위한 공기배출을 별도 설치없이 가능하게 하여 작업성을 개선하며, 또한 작업과정중에 락볼트의 낙하를 방지하여, 경제적이며 공사의 완성도를 높이는 것이 가능한 개량형 락볼트 구조 및 이의 시공방법을 제공하고자 한다.The present invention is proposed to solve various problems of the prior art as described above. The purpose is to improve workability by reducing the weight of rock bolts, which are installed upward due to the nature of the tunnel, and enabling air discharge for fixing material injection without separate installation, and also to prevent rock bolts from falling during the work process. Therefore, we aim to provide an improved rock bolt structure and construction method that is economical and can improve the completeness of construction.

상기한 기술적 과제를 해결하기 위해 본 발명은 굴착면의 천공홀(H)에 설치하여 보강하기 위한 것으로,In order to solve the above-described technical problem, the present invention is intended to be installed and reinforced in the drilled hole (H) of the excavation surface,

상기 천공홀(H)에 삽입 설치되는 락볼트(100);A rock bolt (100) inserted into the drilling hole (H);

상기 락볼트(100)의 선단에 결합되는 고정구(200);A fixture 200 coupled to the tip of the rock bolt 100;

상기 락볼트(100)의 두부에 결합되는 지압고정부(400);An acupressure fixing part (400) coupled to the head of the rock bolt (100);

를 포함하여 구성되되,It is composed including,

상기 락볼트(100)와 상기 고정구(200)의 결합체가 상기 천공홀(H)에 삽입될 때 상기 고정구(200)가 확개되어 상기 천공홀(H)에 밀착되고,When the combination of the rock bolt 100 and the fixture 200 is inserted into the drilling hole (H), the fixture 200 expands and comes into close contact with the drilling hole (H),

상기 천공홀(H)의 입구에 일부 노출된 상기 락볼트(100)의 두부에 상기 지압고정부(400)가 결합되는 것을 특징으로 하는 개량형 락볼트 구조를 제공한다.An improved rock bolt structure is provided, wherein the acupressure fixing part 400 is coupled to the head of the rock bolt 100 partially exposed at the entrance of the drilling hole (H).

더불어, 상기 개량형 락볼트 구조를 시공하기 위한 것으로,In addition, for constructing the improved rock bolt structure,

(1) 굴착면을 천공하여 천공홀(H)을 형성하는 천공단계;(1) A drilling step of drilling the excavation surface to form a drilling hole (H);

(2) 상기 천공홀(H)에 상기 락볼트(100)와 상기 고정구(200)의 결합체를 삽입하는 락볼트삽입단계;(2) a rock bolt insertion step of inserting the combination of the rock bolt 100 and the fixture 200 into the drilled hole (H);

(3) 상기 고정구(200)가 확개되어 상기 천공홀(H)에 밀착되는 선단확개단계;(3) a tip expansion step in which the fixture 200 is expanded and comes into close contact with the drilling hole (H);

(4) 외부로부터 상기 천공홀(H)의 내면과 상기 락볼트(100)의 외면 사이에 정착재료(F)를 충진하는 충진단계;(4) a filling step of filling a fixing material (F) between the inner surface of the drill hole (H) and the outer surface of the rock bolt (100) from the outside;

(5) 상기 락볼트(100)의 두부를 상기 지압고정부(400)로 고정하는 고정단계;(5) a fixing step of fixing the head of the rock bolt (100) with the acupressure fixing part (400);

를 포함하는 것을 특징으로 하는 개량형 락볼트 구조의 시공방법을 제공한다.It provides a construction method of an improved rock bolt structure comprising a.

본 발명에 따르면 다음과 같은 효과가 기대된다.According to the present invention, the following effects are expected.

첫째, 락볼트를 경량화로 시공성 향상이 가능한 개량형 락볼트 구조 및 이의 시공방법을 제공한다.First, we provide an improved rock bolt structure and construction method that can improve constructability by lightening the rock bolt.

둘째, 정착재료 주입을 위한 공기배출을 별도 설치없이 가능하게 하여 작업성 개선이 가능한 개량형 락볼트 구조 및 이의 시공방법을 제공한다.Second, an improved rock bolt structure and construction method are provided that enable air discharge for fixing material injection without separate installation, thereby improving workability.

셋째, 작업과정중에 락볼트의 낙하를 방지하여, 경제적이며 공사의 완성도를 높이는 것이 가능한 개량형 락볼트 구조 및 이의 시공방법을 제공한다.Third, it provides an improved rock bolt structure and construction method that prevents rock bolts from falling during the work process, is economical, and improves the completeness of construction.

도 1은 본 발명의 개량형 락볼트 구조의 결합사시도이다.
도 2는 도 1의 분해사시도이다.
도 3은 본 발명의 개량형 락볼트 구조에서 정착재료 충진과정을 도시한 것이다.
도 4는 본 발명의 개량형 락볼트 구조에서 고정구를 도시한 것이다.
도 5는 도 4의 분해사시도이다.
도 6은 본 발명의 개량형 락볼트 구조에서 고정구의 확개과정을 순서대로 도시한 것이다.
Figure 1 is a combined perspective view of the improved rock bolt structure of the present invention.
Figure 2 is an exploded perspective view of Figure 1.
Figure 3 shows the process of filling the fixing material in the improved rock bolt structure of the present invention.
Figure 4 shows a fixture in the improved rock bolt structure of the present invention.
Figure 5 is an exploded perspective view of Figure 4.
Figure 6 sequentially shows the expansion process of the fixture in the improved rock bolt structure of the present invention.

이하 첨부한 도면과 함께 상기와 같은 본 발명의 개념이 바람직하게 구현된 실시예를 통하여 본 발명을 더욱 상세하게 설명한다. Hereinafter, the present invention will be described in more detail through embodiments in which the above-described concept of the present invention is preferably implemented along with the accompanying drawings.

도 1은 본 발명의 개량형 락볼트 구조의 결합사시도이고,Figure 1 is a combined perspective view of the improved rock bolt structure of the present invention,

도 2는 도 1의 분해사시도이며,Figure 2 is an exploded perspective view of Figure 1;

도 3은 본 발명의 개량형 락볼트 구조에서 정착재료 충진과정을 도시한 것이다.Figure 3 shows the process of filling the fixing material in the improved rock bolt structure of the present invention.

본 발명의 개량형 락볼트 구조는,The improved rock bolt structure of the present invention is,

터널공사에 있어서 굴착시 발파 등으로 인하여 연약해진 암반을 견고하고 안정되게 고정시켜 낙석 및 붕락의 방지를 목적으로 굴착면의 천공홀(H)에 설치하여 보강하기 위한 것으로,In tunnel construction, it is installed in the drilled hole (H) on the excavation surface for the purpose of firmly and stably fixing the rock that has become soft due to blasting during excavation and preventing rockfall and collapse.

상기 천공홀(H)에 삽입 설치되는 락볼트(100);A rock bolt (100) inserted into the drilling hole (H);

상기 락볼트(100)의 선단에 결합되는 고정구(200);A fixture 200 coupled to the tip of the rock bolt 100;

상기 락볼트(100)의 두부에 결합되는 지압고정부(400);An acupressure fixing part (400) coupled to the head of the rock bolt (100);

를 포함하여 구성되되,It is composed including,

상기 락볼트(100)와 상기 고정구(200)의 결합체가 상기 천공홀(H)에 삽입될 때 상기 고정구(200)가 확개되어 상기 천공홀(H)에 밀착되고,When the combination of the rock bolt 100 and the fixture 200 is inserted into the drilling hole (H), the fixture 200 expands and comes into close contact with the drilling hole (H),

상기 천공홀(H)의 입구에 일부 노출된 상기 락볼트(100)의 두부에 상기 지압고정부(400)가 결합되는 것을 특징으로 한다.The acupressure fixing part 400 is coupled to the head of the rock bolt 100 that is partially exposed at the entrance of the drilling hole (H).

상기 락볼트(100)는 고강도 제작하여 동등의 내력에서 기성의 철근보다 경량으로 작업이 쉽고 외주면은 설치후 마찰력과 인발력의 극대화를 위하여 요철 등의 형상으로 하는 것이 바람직하다.The rock bolt 100 is manufactured with high strength, so it is lighter and easier to work with than a ready-made rebar with the same bearing capacity, and the outer circumferential surface is preferably shaped like an uneven shape to maximize friction and pulling force after installation.

그리고 상기 천공홀(H)의 내면과 상기 락볼트(100)의 외면 사이에는 정착재료(F)가 충진되는 것을 특징으로 한다.And a fixing material (F) is filled between the inner surface of the drill hole (H) and the outer surface of the rock bolt (100).

또한 상기 락볼트(100) 내부는 빈공간인 관통구(110)가 형성되어,In addition, a through hole 110, which is an empty space, is formed inside the rock bolt 100,

상기 정착재료(F) 충진시 상기 천공홀(H)의 공기가 상기 관통구(110)를 통하여 외부로 배출되는 것을 특징으로 한다.When filling the fixing material (F), the air in the perforation hole (H) is discharged to the outside through the through hole (110).

도 4는 본 발명의 개량형 락볼트 구조에서 고정구를 도시한 것이고, 도 5는 도 4의 분해사시도이다.Figure 4 shows a fixture in the improved rock bolt structure of the present invention, and Figure 5 is an exploded perspective view of Figure 4.

그리고 도 6은 본 발명의 개량형 락볼트 구조에서 고정구의 확개과정을 순서대로 도시한 것이다.And Figure 6 sequentially shows the expansion process of the fixture in the improved rock bolt structure of the present invention.

도 4 및 5에 도시된 바와 같이,As shown in Figures 4 and 5,

상기 락볼트(100)의 선단 외주면에는 수나사산이 형성되며,A male thread is formed on the outer peripheral surface of the tip of the rock bolt (100),

상기 고정구(200)는 본체(210)와 고정핀(220)으로 구성된다.The fixture 200 consists of a main body 210 and a fixing pin 220.

상기 고정핀(220)은 선단인 상부는 하부로 갈수록 직경이 증가하는 원뿔형의 테이퍼(taper) 형상이며 소정의 위치부터는 하부로 갈수록 직경이 감소하는 역테이퍼 형상이다. The upper end of the fixing pin 220 has a conical taper shape whose diameter increases toward the bottom, and an inverse taper shape whose diameter decreases toward the bottom from a predetermined position.

그리고 외주면에는 방사상으로 다수개의 유도핀(221)이 형성되며. 하단 외주면에는 돌기(222)가 형성된다.And a plurality of guide pins 221 are formed radially on the outer peripheral surface. A protrusion 222 is formed on the lower outer peripheral surface.

상기 본체(210)는 내부에 상하로 관통되는 빈 공간이 형성되며 하부의 결속부(211)와 상부의 확개부(212)로 구성된다.The main body 210 has an empty space penetrating upward and downward and is composed of a lower binding portion 211 and an upper expansion portion 212.

상기 결속부(211)는 내부에 암나사산이 형성되어 상기 락볼트(100)의 선단이 체결된다.The binding portion 211 has a female thread formed therein and the tip of the rock bolt 100 is fastened thereto.

상기 확개부(212)는 전체적으로 상부로 갈수록 직경이 감소하는 원뿔형의 테이퍼(taper) 형상이며 수직으로 다수개의 슬릿(212a)이 형성된다. The expanded portion 212 has a conical, tapered shape whose diameter decreases toward the top, and has a plurality of slits 212a formed vertically.

상기 슬릿(212a)에는 상기 유도핀(221)이 상부에서 삽입된다.The guide pin 221 is inserted into the slit 212a from the top.

상기 확개부(212)의 상부 내주면에는 홈(212c)이 형성되어 상기 돌기(222)가 결합하며,A groove 212c is formed on the upper inner peripheral surface of the expanded portion 212 to engage the protrusion 222,

상기 확개부(212)의 상부 외주면에는 밀착용단턱(212b)이 형성된다.A step 212b for close contact is formed on the upper outer peripheral surface of the expanded portion 212.

따라서 도 6에 도시된 바와 같이,Therefore, as shown in Figure 6,

상기 홈(212c)에 상기 돌기(222)가 결합한 상태로 상기 본체(210)와 상기 고정핀(220)의 결합체가 상기 천공홀(H)에 삽입되어,The combination of the main body 210 and the fixing pin 220 is inserted into the drill hole (H) with the protrusion 222 coupled to the groove 212c,

상기 천공홀(H)의 끝단에 상기 고정핀(220)의 상단이 접촉하여 압력을 받으면 상기 돌기(222)가 상기 홈(212c)에서 이탈하며 상기 고정핀(220)이 상기 본체(210) 내부로 삽입되게 되는 데, 이때 상기 유도핀(221)이 상기 슬릿(212a)의 가이드를 받아 하강한다.When the upper end of the fixing pin 220 contacts the end of the perforated hole (H) and receives pressure, the protrusion 222 leaves the groove 212c and the fixing pin 220 is inserted into the main body 210. is inserted, and at this time, the guide pin 221 descends under the guidance of the slit 212a.

이와 동시에 상기 확개부(212)는 확개되어 상기 밀착용단턱(212b)이 상기 천공홀(H) 내벽을 압박하여 고정된다.At the same time, the expansion portion 212 is expanded and the close contact step 212b is fixed by pressing the inner wall of the drilling hole (H).

따라서 보통 상향으로 설치되는 상기 락볼트(100)의 낙하를 방지할 수 있으며, 동시에 상기 락볼트(100)가 상기 천공홀(H)의 중심에 위치하게 하여 시공 정밀도를 증대시키는 역할을 한다.Therefore, it is possible to prevent the rock bolt 100, which is usually installed upward, from falling, and at the same time, it serves to increase construction precision by positioning the rock bolt 100 at the center of the drill hole (H).

이어서 도 3에 도시된 바와 같이,Then, as shown in Figure 3,

상기 락볼트(100)의 두부 즉 하부에는 역류방지마개(310)와 주입관(320)으로 구성된 주입기구(300)를 설치하고 상기 주입관(320)으로 상기 정착재료(F)를 주입하여 상기 천공홀(H)의 내면과 상기 락볼트(100)의 외면 사이에 상기 정착재료(F)를 충진한다.An injection device 300 consisting of a backflow prevention stopper 310 and an injection pipe 320 is installed at the head or bottom of the rock bolt 100, and the fixing material (F) is injected into the injection pipe 320. The fixing material (F) is filled between the inner surface of the drilled hole (H) and the outer surface of the rock bolt (100).

상기 정착재료(F)가 충진되는 과정에서 상기 천공홀(H) 내부의 공기는 빨간점선과 같이 상기 락볼트(100) 내부의 빈공간인 상기 관통구(110)를 통하여 외부로 자동적으로 배출된다.In the process of filling the fixing material (F), the air inside the drill hole (H) is automatically discharged to the outside through the through hole (110), which is an empty space inside the rock bolt (100), as shown in the red dotted line. .

구체적으로 상기 정착재료(F)는 상기 락볼트(100)의 하단부부터 충진되며, 충진이 상방으로 진행하면서 내부 공기가 압축되어 상기 고정구(200)의 틈새를 통해 상기 락볼트(100)의 관통구(110)를 관통하여 밖으로 배출되고, Specifically, the fixing material (F) is filled from the lower end of the rock bolt 100, and as the filling progresses upward, the internal air is compressed and flows into the through hole of the rock bolt 100 through the gap of the fixture 200. It passes through (110) and is discharged out,

상기 천공홀(H) 내부의 충진이 완료되어 공기가 없어지면 최종적으로 상기 정착재료(F)가 상기 관통구(120)를 통하여 배출될 수 있어, 상기 정착재료(F)가 상기 락볼트(100)의 선단까지 밀실하게 충진되었는 지를 육안으로 확인할 수 있다.When the filling of the inside of the perforation hole (H) is completed and the air disappears, the fixing material (F) can be finally discharged through the through hole (120), so that the fixing material (F) is connected to the rock bolt (100). You can visually check whether it has been tightly filled up to the tip.

그리고 어느 정도 상기 정착재료(F)가 양생되었을 때 상기 주입기구(300)를 제거하고 그 자리에 가압판(410)과 가압볼트(420)로 구성된 지압고정부(400)를 설치한다.And when the fixing material (F) has cured to some extent, the injection device (300) is removed and an acupressure fixing part (400) consisting of a pressure plate (410) and a pressure bolt (420) is installed in its place.

본 발명의 개량형 락볼트 구조의 시공방법은 상기 개량형 락볼트 구조를 시공하기 위한 것으로,The construction method of the improved rock bolt structure of the present invention is for constructing the improved rock bolt structure,

(1) 굴착면을 천공하여 천공홀(H)을 형성하는 천공단계;(1) A drilling step of drilling the excavation surface to form a drilling hole (H);

(2) 상기 천공홀(H)에 상기 락볼트(100)와 상기 고정구(200)의 결합체를 삽입하는 락볼트삽입단계;(2) a rock bolt insertion step of inserting the combination of the rock bolt 100 and the fixture 200 into the drilled hole (H);

(3) 상기 고정구(200)가 확개되어 상기 천공홀(H)에 밀착되는 선단확개단계;(3) a tip expansion step in which the fixture 200 is expanded and comes into close contact with the drilling hole (H);

(4) 외부로부터 상기 천공홀(H)의 내면과 상기 락볼트(100)의 외면 사이에 정착재료(F)를 충진하는 충진단계;(4) a filling step of filling a fixing material (F) between the inner surface of the drill hole (H) and the outer surface of the rock bolt (100) from the outside;

(5) 상기 락볼트(100)의 두부를 상기 지압고정부(400)로 고정하는 고정단계;(5) a fixing step of fixing the head of the rock bolt (100) with the acupressure fixing part (400);

를 포함하는 것을 특징으로 한다.It is characterized by including.

본 발명은 상기에서 언급한 바와 같이 바람직한 실시예와 관련하여 설명되었으나, 본 발명의 요지를 벗어남이 없는 범위 내에서 다양한 수정 및 변형이 가능하며, 다양한 분야에서 사용 가능하다. Although the present invention has been described in relation to the preferred embodiment as mentioned above, various modifications and variations are possible without departing from the gist of the present invention and can be used in various fields.

따라서 본 발명의 청구범위는 이건 발명의 진정한 범위 내에 속하는 수정 및 변형을 포함한다.Accordingly, the scope of the claims includes modifications and variations falling within the true scope of the invention.

H: 천공홀
F: 정착재료
100: 락볼트
110: 관통구
200: 고정구
210: 본체
211: 결속부
212: 확개부
212a: 슬릿
212b: 밀착용단턱
212c: 홈
220: 고정핀
221: 유도핀
222: 돌기
300: 주입기구
310: 역류방지마개
320: 주입관
400: 지압고정부
410: 가압판
420: 가압볼트
H: drilled hole
F: Fixing material
100: rock bolt
110: Through hole
200: fixture
210: body
211: Binding part
212: Expansion part
212a: slit
212b: Step for close fitting
212c: Home
220: fixing pin
221: Guiding pin
222: protrusion
300: injection device
310: Backflow prevention stopper
320: Injection tube
400: Acupressure fixing unit
410: pressure plate
420: Pressurizing bolt

Claims (4)

굴착면의 천공홀(H)에 설치하여 보강하기 위한 것으로,
상기 천공홀(H)에 삽입 설치되는 락볼트(100);
상기 락볼트(100)의 선단에 결합되는 고정구(200);
상기 락볼트(100)의 두부에 결합되는 지압고정부(400);
를 포함하여 구성되되,
상기 락볼트(100)와 상기 고정구(200)의 결합체가 상기 천공홀(H)에 삽입될 때 상기 고정구(200)가 확개되어 상기 천공홀(H)에 밀착되고,
상기 천공홀(H)의 입구에 일부 노출된 상기 락볼트(100)의 두부에 상기 지압고정부(400)가 결합되는 것을 특징으로 하며,
상기 고정구(200)는 본체(210)와 고정핀(220)으로 구성되고,
상기 고정핀(220)은 선단인 상부는 하부로 갈수록 직경이 증가하는 원뿔형의 테이퍼(taper) 형상이며 소정의 위치부터는 하부로 갈수록 직경이 감소하는 역테이퍼 형상이고, 외주면에는 방사상으로 다수개의 유도핀(221)이 형성되며, 하단 외주면에는 돌기(222)가 형성되고,
상기 본체(210)는 내부에 상하로 관통되는 빈 공간이 형성되며 하부의 결속부(211)와 상부의 확개부(212)로 구성되고,
상기 결속부(211)는 내부에 암나사산이 형성되어 상기 락볼트(100)의 선단의 수나사산에 체결되고,
상기 확개부(212)는 상부로 갈수록 직경이 감소하는 원뿔형의 테이퍼(taper) 형상이며 수직으로 다수개의 슬릿(212a)이 형성되며,
상기 슬릿(212a)에는 상기 유도핀(221)이 상부에서 삽입되고, 상기 확개부(212)의 상부 내주면에는 홈(212c)이 형성되어 상기 돌기(222)가 결합하며, 상기 확개부(212)의 상부 외주면에는 밀착용단턱(212b)이 형성되므로,
상기 홈(212c)에 상기 돌기(222)가 결합한 상태로 상기 본체(210)와 상기 고정핀(220)의 결합체가 상기 천공홀(H)에 삽입되어, 상기 천공홀(H)의 끝단에서 상기 고정핀(220)의 상단이 접촉하여 압력을 받으면 상기 돌기(222)가 상기 홈(212c)에서 이탈하며 상기 고정핀(220)이 상기 본체(210) 내부로 삽입되게 되며 상기 유도핀(221)이 상기 슬릿(212a)의 가이드를 받아 하강하고,
상기 확개부(212)는 확개되어 상기 밀착용단턱(212b)이 상기 천공홀(H) 내벽을 압박하여 고정되는 것을 특징으로 하는 개량형 락볼트 구조.
It is installed in the drilled hole (H) on the excavation surface to reinforce it.
A rock bolt (100) inserted into the drilling hole (H);
A fixture 200 coupled to the tip of the rock bolt 100;
An acupressure fixing part (400) coupled to the head of the rock bolt (100);
It is composed including,
When the combination of the rock bolt 100 and the fixture 200 is inserted into the drilling hole (H), the fixture 200 expands and comes into close contact with the drilling hole (H),
Characterized in that the acupressure fixing part (400) is coupled to the head of the rock bolt (100) partially exposed at the entrance of the drilling hole (H),
The fixture 200 consists of a main body 210 and a fixing pin 220,
The fixing pin 220 has a cone-shaped taper shape whose diameter increases toward the bottom at the top, which is the tip, and an inverse taper shape where the diameter decreases toward the bottom from a predetermined position, and has a plurality of radially guiding pins on the outer peripheral surface. (221) is formed, and a protrusion 222 is formed on the lower outer peripheral surface,
The main body 210 has an empty space penetrating up and down inside and is composed of a lower binding part 211 and an upper expansion part 212,
The binding portion 211 has a female thread formed therein and is fastened to the male thread at the tip of the rock bolt 100,
The expansion portion 212 has a conical taper shape whose diameter decreases toward the top, and a plurality of slits 212a are formed vertically,
The guide pin 221 is inserted into the slit 212a from the top, and a groove 212c is formed on the upper inner peripheral surface of the expanded portion 212 to engage the protrusion 222, and the expanded portion 212 Since a close contact step (212b) is formed on the upper outer peripheral surface of
With the protrusion 222 coupled to the groove 212c, the combination of the main body 210 and the fixing pin 220 is inserted into the drilling hole (H), and the When the upper end of the fixing pin 220 is contacted and pressured, the protrusion 222 leaves the groove 212c, the fixing pin 220 is inserted into the main body 210, and the guide pin 221 Descends under the guidance of the slit 212a,
An improved rock bolt structure, characterized in that the expansion portion 212 is expanded and the close contact step 212b is fixed by pressing the inner wall of the drilling hole (H).
제1항에서,
상기 천공홀(H)의 내면과 상기 락볼트(100)의 외면 사이에는 정착재료(F)가 충진되는 것을 특징으로 하는 개량형 락볼트 구조.
In paragraph 1:
An improved rock bolt structure, characterized in that a fixing material (F) is filled between the inner surface of the drilled hole (H) and the outer surface of the rock bolt (100).
제2항에서,
상기 락볼트(100) 내부는 빈공간인 관통구(110)가 형성되어,
상기 정착재료(F) 충진시 상기 천공홀(H)의 공기가 상기 관통구(110)를 통하여 외부로 배출되는 것을 특징으로 하는 개량형 락볼트 구조.
In paragraph 2,
Inside the rock bolt 100, a through hole 110, which is an empty space, is formed,
An improved rock bolt structure, characterized in that when filling the fixing material (F), the air in the perforated hole (H) is discharged to the outside through the through hole (110).
제3항의 개량형 락볼트 구조를 시공하기 위한 것으로,
(1) 굴착면을 천공하여 천공홀(H)을 형성하는 천공단계;
(2) 상기 천공홀(H)에 상기 락볼트(100)와 상기 고정구(200)의 결합체를 삽입하는 락볼트삽입단계;
(3) 상기 고정구(200)가 확개되어 상기 천공홀(H)에 밀착되는 선단확개단계;
(4) 외부로부터 상기 천공홀(H)의 내면과 상기 락볼트(100)의 외면 사이에 정착재료(F)를 충진하는 충진단계;
(5) 상기 락볼트(100)의 두부를 상기 지압고정부(400)로 고정하는 고정단계;
를 포함하는 것을 특징으로 하는 개량형 락볼트 구조의 시공방법.
To construct the improved rock bolt structure of Paragraph 3,
(1) A drilling step of drilling the excavation surface to form a drilling hole (H);
(2) a rock bolt insertion step of inserting the combination of the rock bolt 100 and the fixture 200 into the drilled hole (H);
(3) a tip expansion step in which the fixture 200 is expanded and comes into close contact with the drilling hole (H);
(4) a filling step of filling a fixing material (F) between the inner surface of the drill hole (H) and the outer surface of the rock bolt (100) from the outside;
(5) a fixing step of fixing the head of the rock bolt (100) with the acupressure fixing part (400);
A construction method of an improved rock bolt structure comprising:
KR1020220090900A 2022-07-22 2022-07-22 the improved Lock bolts structure and the construction method thereof KR102611639B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020220090900A KR102611639B1 (en) 2022-07-22 2022-07-22 the improved Lock bolts structure and the construction method thereof
PCT/KR2023/009938 WO2024019409A1 (en) 2022-07-22 2023-07-12 Improved rock bolt structure and construction method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220090900A KR102611639B1 (en) 2022-07-22 2022-07-22 the improved Lock bolts structure and the construction method thereof

Publications (1)

Publication Number Publication Date
KR102611639B1 true KR102611639B1 (en) 2023-12-11

Family

ID=89162855

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220090900A KR102611639B1 (en) 2022-07-22 2022-07-22 the improved Lock bolts structure and the construction method thereof

Country Status (2)

Country Link
KR (1) KR102611639B1 (en)
WO (1) WO2024019409A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100797818B1 (en) * 2007-07-09 2008-02-01 (주)서림건설 Fixing device of removal rock-bolt
KR20090099700A (en) * 2008-03-18 2009-09-23 장인희 Rock-bolt assembly for reinforcing rock bed of tunnel
KR100998589B1 (en) 2008-04-28 2010-12-07 (주)서림건설 Multipurpose Fixing Device of Rock-Bolt
KR101039201B1 (en) 2010-07-12 2011-06-03 윤정배 Edge extension type rock bolt and construction method of the same

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100402890B1 (en) * 2001-04-02 2003-10-22 심석래 Method and apparatus for mounting rock bolt
KR101192605B1 (en) * 2011-11-21 2012-10-18 (주)지인스틸 Fleet fix-rock bolt fix device and construction method
CA3174127A1 (en) * 2020-04-03 2021-10-07 James David Frost Ground anchoring apparatus and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100797818B1 (en) * 2007-07-09 2008-02-01 (주)서림건설 Fixing device of removal rock-bolt
KR20090099700A (en) * 2008-03-18 2009-09-23 장인희 Rock-bolt assembly for reinforcing rock bed of tunnel
KR100998589B1 (en) 2008-04-28 2010-12-07 (주)서림건설 Multipurpose Fixing Device of Rock-Bolt
KR101039201B1 (en) 2010-07-12 2011-06-03 윤정배 Edge extension type rock bolt and construction method of the same

Also Published As

Publication number Publication date
WO2024019409A1 (en) 2024-01-25

Similar Documents

Publication Publication Date Title
EP3314091B1 (en) Grout delivery system
EP3135821B1 (en) Structure of permanent anchor
KR100861938B1 (en) The earth anchor and construction method for use of that
KR100772684B1 (en) The ground reinforcement apparatus and ground reinforcement method grouting type using steel pipe
US6588986B1 (en) Device for drilling and anchoring and process for placing grout anchors
KR102611639B1 (en) the improved Lock bolts structure and the construction method thereof
KR101236765B1 (en) Method for placing adhesive filling into the expanded drill hole to increase bearing capacity of piles and tention members and apparatus therefor
KR100797800B1 (en) Fixing device of permanent anchor
KR100666678B1 (en) Micro-pile having a end supporting round-plate
AU2014262370A1 (en) Apparatus and methods for stabilising rock
KR102067334B1 (en) Grouting pipe manufacture method and pipe structure, using grouting construction method
KR102522769B1 (en) Fixing construction method of high-strength GFRP hollow bar for tunnel and ground reinforcement and its construction device
KR101035943B1 (en) Spacer with Jet Nozzle
JPH10184297A (en) Execution method of lock bolt
KR20190029020A (en) High strength steel pipe lock bolt construction method using underwater non-separation grout material
AU2013205498A1 (en) Apparatus and methods for stabilising rock
US20030194278A1 (en) Device for drilling and anchoring and process for placing grout anchors
KR101192605B1 (en) Fleet fix-rock bolt fix device and construction method
JP4336169B2 (en) How to install rock bolts
KR102562735B1 (en) Rock bolt
KR100441627B1 (en) Apparatus for Injecting Grouting Liquid Through Pile Hole
AU2016100302A4 (en) Apparatus and methods for stabilising rock
JP4221674B2 (en) Regeneration repair method in the ground anchor method
KR102138971B1 (en) Pre-support Structure for Reinforing Upper part of Tunnel
JP2019206868A (en) Micro pile construction method and insertion member for filling grout material used in micro pile construction method

Legal Events

Date Code Title Description
GRNT Written decision to grant