- hole
- fixing member
- lock bolt
- tip cap
- bolt
- Prior art date
Links
- 239000011435 rock Substances 0.000 title claims abstract description 48
- 238000010276 construction Methods 0.000 title claims description 14
- 239000004570 mortar (masonry) Substances 0.000 claims description 34
- 238000005553 drilling Methods 0.000 claims description 30
- 238000000034 method Methods 0.000 claims description 13
- 238000002347 injection Methods 0.000 claims description 12
- 239000007924 injection Substances 0.000 claims description 12
- 238000009434 installation Methods 0.000 claims description 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 4
- 238000004080 punching Methods 0.000 claims description 4
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 230000008878 coupling Effects 0.000 claims description 2
- 238000010168 coupling process Methods 0.000 claims description 2
- 238000005859 coupling reaction Methods 0.000 claims description 2
- 238000010438 heat treatment Methods 0.000 claims description 2
- 229910052742 iron Inorganic materials 0.000 claims description 2
- 238000002360 preparation method Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000011347 resin Substances 0.000 description 2
- 229920005989 resin Polymers 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000011490 mineral wool Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000003313 weakening effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0093—Accessories
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
- E21D20/028—Devices or accesories for injecting a grouting liquid in a bore-hole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0026—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
본 발명은 선단 고정 락볼트 고정장치와 그 시공방법에 관한 것으로, 더욱 상세하게는 터널공사 등에 있어서 사면이나 암면 등의 모든 벽체에 천공구멍을 내어 락볼트를 설치함에 있어서, 천공구멍 내부 선단에 락볼트를 고정하기 위하여 천공구멍 중심축에 위치할 수 있도록 하고 천공구멍 내에서 견고하게 고정되어 있으며, 상향 시공 시에는 자유 낙하 되지 않도록 고정하는 선단 고정 락볼트 고정 장치와 그 시공방법에 관한 것이다.
The present invention relates to a tip fixing rock bolt fixing device and a construction method thereof, and more particularly, in a tunnel construction or the like, drilling holes are formed in all walls such as slopes and rock wool to install rock bolts, In order to fix the bolt to be located in the center hole of the drilling hole and is firmly fixed in the drilling hole, it relates to a front end fixed lock bolt fixing device for fixing so as not to fall freely during upward construction.
터널 시공시 락볼트 시공은 매우 중요한 보조 공법 중 하나이며, 종래 방법으로는 정밀 시공이 불가능하고 몰탈 이나 레진 사용시 몰탈 및 레진이 흘러나오는 것을 방지하기 위해 몰탈 방지구나 시멘트 등으로 락볼트 홀을 사전에 막아주어야 하고, 락볼트 받침판 후면에 쇼크리트(SHOTCRETE : 뿜어붙침 콘크리트)가 충진 되지 않아 정밀시공이 불가능한 결점을 개전하고자 사용하고 있으며, 락볼트의 시공 효과로는 지보 효과, 암괴의 매달림 또는 봉합 효과, 빔 형성 효과, 내압 효과, 원지반 아치 형성 효과, 지반 개량 효과 등이 있으며, 락볼트의 종류에는 장착 방법에 의한 분류와 시공방법에 의한 분류로 나눌 수 있다.Rock bolt construction is one of the most important auxiliary methods for the tunnel construction.In order to prevent the mortar and resin from flowing out when using mortar or resin, it is impossible to precisely install the rock bolt hole in advance. It is used to remedy the defects that cannot be precisely constructed because the shotcrete is not filled in the back of the rockbolt backing plate. , The beam forming effect, the pressure resistance effect, the ground arch forming effect, the ground improving effect, and the like, and the types of rock bolts can be divided into the classification by the mounting method and the classification by the construction method.
예를 들어, 선단 장착형(쐐기형, 확장형, 선단 접합형), 전면 접착형(충전형, 주입형), 혼합형(확대형+그라우팅형, 선단형+르라우팅형), 마찰형(스웰렉스형)이 있으며, 락볼트의 구성은 다웰바, 락볼트 받침판(면판), 와샤, 너트 등으로 이루어져 있다.For example, tip-mounted (wedge, extended, tip-bonded), front-adhesive (filled, infused), mixed (enlarged + grouted, tip + routed), friction (swellex) ), The rock bolt consists of a dowel bar, a rock bolt support plate (face plate), washer, nut, and the like.
종래의 락볼트는 도 1에 도시한 바와 같이, 단순히 벽체(90)에 천공구멍(40)을 성형하여 락볼트(30)를 삽입한 후 벽체(90)의 외부에서 베어링 플레이트(50)를 연결하고, 몰탈 주입관(70)과 공기 배출관(80)을 천공구멍(40)에 연결한 다음 너트(60)로 결합하여 상기 몰탈 주입관(70)으로 몰탈을 공급하는 것에 의해 천공구멍(40)에서 락볼트(30)가 고정되도록 하는 것이었다.In the conventional rock bolt, as shown in FIG. 1, the
그러나 이러한 종래의 락볼트 시공은, 암반 사면에 경사지게 천공된 천공구멍 내부로 락볼트를 삽입하면 천공구멍 내부를 몰탈하여 경화하는데, 이때 사면으로부터 하향 경사지게 천공된 천공구멍 내부에 삽입된 락볼트는 선단부가 자체하중 및 중력에 의해 천공구멍의 충심축 선상 하부로 기울어진 상태로 몰탈(그라우팅)재가 경화되는 과정에서 락볼트와 몰탈재 사이의 정착강도가 현저하게 약해지고, 이러한 정착강도 약화로 인한 암반 사면의 전단 강도 역시 저하되어 락볼트가 큰 저항력을 가지지 못하게 되어 암반의 균열이나 붕괴나 손쉽게 일어나거나 이형철근이 부식되는 등의 문제가 발생하며, 이로 인한 2차 유지보수비용의 증가 및 안전상의 문제점이 발생하게 되었다.However, in the conventional rock bolt construction, when the rock bolt is inserted into the drilled hole inclined to the rock slope, the inside of the drilled hole is mortared and hardened. At this time, the rock bolt inserted into the drilled hole drilled inclined downward from the slope is distal to the tip portion. In the process of hardening the mortar material with the self load and gravity inclined to the lower part of the core line of the hole, the anchoring strength between the rock bolt and the mortar material is significantly weakened, and the rock slope due to the weakening strength Shear strength also decreases, so rock bolts do not have a large resistance, causing problems such as cracking or collapse of rock, easily occurring or corrosion of deformed steel, resulting in increased secondary maintenance costs and safety problems. It happened.
또한, 상기와 같은 천공구멍의 중심축 선상에서 하부면으로 기울어지게 설치한 락볼트에는 내부 암반의 압력 등에 의해 휨 변형이 이루어지기 쉬워 시공불량 등에 의한 안전사고 및 구조적 안전성의 확보가 어려운 결점이 있었다.In addition, the rock bolt installed inclined downward from the line of the central axis of the drilled hole is easy to bend and deform due to the pressure of the internal rock, and has a defect in safety accidents and structural safety due to poor construction. .
상기 락볼트는 단순한 철근형태를 가지는 것이므로 지지력이 약해 큰 저항을 갖도록 하기 위해 락볼트 자체의 길이 또는 락볼트의 설치개수를 증가시켜야 하며, 락볼트의 선단으로 스프링이나 쐐기 원리를 이용한 별도의 고정구조를 제공하였지만, 이러한 구조는 제조가 어렵고, 고비용이며, 락볼트 선단에 규격대로 일체로 설치된 상태에서 락볼트나 천공구멍의 지름에 따라 유연하게 변경하여 사용할 수 없는 상태이므로 많은 문제점이 발생하였다.
Since the rock bolt has a simple reinforcing bar shape, the supporting force is weak and the length of the rock bolt itself or the number of installation of the rock bolt must be increased in order to have a large resistance, and a separate fixing structure using a spring or wedge principle as the tip of the rock bolt. However, this structure is difficult to manufacture, expensive, many problems occurred because it can not be used to flexibly change according to the diameter of the rock bolt or drilling hole in the state of being integrally installed to the end of the rock bolt as standard.
따라서 이러한 종래의 결점을 해소하기 위하여 안출된 본 발명의 해결과제는, 천공구멍 선단부에서 고정부재와 선단 캡이 락볼트의 분리를 방지하도록 견고한 고정상태를 유지하며, 천공구멍의 지름에 유연하게 대처하여 천공구멍의 선단에 안전한 고정상태를 유지할 수 있도록 하는 락볼트 고정장치를 제공함을 목적으로 한다.Therefore, the problem of the present invention devised to solve the conventional drawbacks, the fixing member and the end cap at the end of the drilling hole to maintain a rigid fixed state to prevent the separation of the lock bolt, to flexibly cope with the diameter of the drilling hole It is an object of the present invention to provide a lock bolt fixing device to maintain a secure fixing state at the tip of the drilling hole.
본 발명의 다른 해결과제는, 고정부재와 선단 캡의 결합으로 락볼트를 천공구멍의 중심에 고정시켜 락볼트의 미끄러짐과 낙하현상을 방지할 수 있어서 몰탈 작업을 안전하게 진행할 수 있도록 하며, 몰탈 작업의 종료 후에 락볼트가 천공구멍의 중심에 견고하게 고정된 상태를 제공함을 목적으로 한다.
Another problem of the present invention is to lock the bolt to the center of the perforation hole by the combination of the fixing member and the tip cap to prevent the sliding and falling of the lock bolt to proceed safely mortar work, The purpose of the present invention is to provide a state in which the lock bolt is firmly fixed to the center of the drilling hole after the end.
본 발명은 벽체에 성형한 천공구멍에 락볼트를 삽입하여 몰탈 충진에 의해 고정하는 락볼트 고정장치에 있어서,The present invention provides a rock bolt fixing device for fixing by mortar filling by inserting the rock bolt into the hole formed in the wall,
내경이 중공인 몸체부에 같는 간격으로 큰 홀을 형성하고, 상측으로 머리부를 형성한 선단 캡과;A tip cap forming a large hole at the same interval as the body portion having an inner diameter and forming a head portion at an upper side thereof;
상기 선단 캡의 큰 홀에 결합하여 돌출되는 외측 큰 돌기가 형성되고, 상기 외측 큰 돌기의 사이에 내측으로 돌출되는 내측 돌기를 형성하는 고정부재와;A fixing member which is coupled to the large hole of the tip cap and protrudes an outer large protrusion, and forms an inner protrusion which protrudes inwardly between the outer large protrusions;
상기 고정부재에 끼워 결합하며 나선형 안쪽 돌기가 내측 돌기와 고정되는 락볼트로 이루어지는 것을 특징으로 하는 것이다.
It is characterized in that it is made of a lock bolt fitted to the fixing member and the spiral inner projection is fixed to the inner projection.
본 발명은 락볼트를 준비하여 이를 벽체의 천공구멍에 시공하는 방법에 있어서, The present invention provides a method for preparing a rock bolt and constructing it in the hole of the wall,
상기 시공 대상 벽체에 형성된 천공구멍 내로 시공할 선단 캡과 고정부재를 준비하는 선단 캡 및 고정부재 준비공정(S1)과;A tip cap and fixing member preparing step (S1) of preparing a tip cap and a fixing member to be installed into the drilled hole formed in the wall to be constructed;
선단 캡의 몸체부 내경으로 고정부재를 삽입하여 고정부재의 외측 큰 돌기가 선단 캡의 큰 홀에서 외측으로 돌출되도록 하고, 고정부재의 외측 작은 돌기를 선단 캡의 작은 홀에 결합하는 선단 캡과 고정부재 조립공정(S2)과;Insert the fixing member into the inner diameter of the body of the tip cap so that the outer big protrusion of the fixing member protrudes outward from the large hole of the tip cap, and fix it with the tip cap that couples the outer small protrusion of the fixing member to the small hole of the tip cap. Member assembly step (S2);
상기 선단 캡과 고정부재를 조립한 후 고정부재의 하측에서 락볼트를 결합하여 고정부재의 내측 돌기가 락 볼트의 나선형 안쪽 돌기에 결합, 고정되도록 하는 선단 고정형 락볼트 조립공정(S3)과;A front end fixed type lock bolt assembly step (S3) of assembling the front end cap and the fixing member and then engaging the lock bolt at the lower side of the fixing member so that the inner protrusion of the fixing member is coupled to and fixed to the spiral inner protrusion of the lock bolt;
상기 천공구멍에 선단 캡과 락볼트를 공급하여 천공구멍의 선단에 선단 캡의 머리부가 닿은 상태에서 락볼트가 천공구멍의 중심에 위치하도록 설정하는 선단 고정형 락볼트 삽입공정(S4)과;A tip fixed type lock bolt insertion step (S4) for supplying a tip cap and a lock bolt to the drill hole so that the lock bolt is positioned at the center of the drill hole while the head of the tip cap touches the tip of the drill hole;
상기 천공구멍의 외부에서 마감부재를 삽입한 후 베어링 플레이트를 설치하여 몰탈 주입관과 공기 배출관을 연결하고, 너트를 체결하여 천공구멍을 밀폐하는 부재 설치공정(S5)과;Inserting a finishing member from the outside of the drilling hole and installing a bearing plate to connect the mortar injection pipe and the air discharge pipe, and tighten the nut to seal the drilling hole (S5);
상기 몰탈 주입관으로 천공구멍 내에 몰탈을 주입, 경화하는 몰탈 타설공정(S6)과;A mortar placing step (S6) of injecting and curing mortar into the perforated hole through the mortar injection tube;
상기 천공구멍에서 락볼트를 인장시켜 고정하는 락볼트 인장 및 고정공정(S7);을 순차적으로 수행함으로써, 락볼트가 천공구멍의 중심에서 안정되게 고정하는 것을 특징으로 하는 것이다.
The lock bolt tensioning and fixing step (S7) for tensioning and fixing the lock bolt in the drilling hole; by performing sequentially, it is characterized in that the lock bolt is stably fixed at the center of the drilling hole.
본 발명은 락볼트의 상측 끝 부분이 선단 캡과 고정부재의 내부에서 천공구멍의 선단 끝 부분에서 정 중앙에 위치시킬 수 있도록 설치하고, 상기 고정부재가 선단 캡과 결합된 상태에서 천공구멍의 선단 끝에 고정되어 락볼트의 이탈을 방지할 수 있도록 한 상태에서, 천공구멍의 하측에서 락볼트의 외경에 마감부재로 막아 상기 천공구멍에 몰탈을 채워서 경화될 때까지 락볼트가 미끄러지거나 떨어지지 않아 작업이 매우 용이하며, 특히 상향 시공에 큰 효과를 제공하는 것이다.The present invention is installed so that the upper end portion of the rock bolt can be located at the center of the front end of the drilling hole in the interior of the front end cap and the fixing member, the front end of the drilling hole in the state in which the fixing member is coupled with the front end cap In the state fixed to the end to prevent the release of the lock bolt, the lock bolt on the lower side of the perforated hole to the outer diameter of the lock bolt with a closing member to fill the mortar in the perforated hole until the hardening does not slip or fall until the work is It is very easy to provide, especially for upward construction.
본 발명은 락볼트 고정장치의 고정부재에 형성한 내측돌기에 의해 락볼트를 결합하고, 외측으로 돌출된 외측 큰 돌기를 방사상으로 형성하여 락볼트가 천공구멍의 중앙에 위치할 수 있으므로 천공구멍 내주면에 정박 고정 작용으로 락볼트의 인발 장력 증대와 인발 마찰저항의 증대로 락볼트 시공 본래의 시공목적을 향상시키며, 특히 상향시공 시 락볼트의 낙하를 방지하는 효과를 제공하는 것이다.
According to the present invention, the lock bolt is coupled by an inner protrusion formed on the fixing member of the lock bolt fixing device, and the outer large protrusion protruding outward is formed radially so that the lock bolt can be positioned at the center of the drill hole. The anchoring action on the lock bolt to increase the pull tension and the pull friction resistance to improve the original construction purpose of the rock bolt construction, in particular to provide the effect of preventing the fall of the rock bolt during the up-construction.
도 1은 종래 락볼트에 대한 설치상태 단면도
도 2a 는 본 발명의 선단 캡에 대한 정면도
도 2b 는 본 발명의 선단 캡에 대한 단면도
도 2c 는 본 발명의 선단 캡에 대한 평면도
도 2d 는 본 발명의 선단 캡에 대한 저면도
도 3a 은 본 발명의 고정부재에 대한 정면 단면도
도 3b 는 본 발명의 고정부재에 대한 측면 단면도
도 3c 는 본 발명의 고정부재에 대한 평면도
도 4 는 본 발명의 선단 캡과 고정부재에 대한 조립상태 단면도
도 5 는 본 발명의 선단 캡과 고정부재에 대한 조립상태 측면 단면도
도 6 은 본 발명의 주요 부분에 대한 분리 사시도
도 7 은 본 발명의 주요 부분에 대한 분리상태 단면도
도 8 은 본 발명의 주요 부분에 대한 조립상태 단면도
도 9 는 본 발명의 설치상태 단면도
도 10 은 본 발명의 바람직한 제조방법을 나타낸 블럭도1 is a cross-sectional view of the installation state for a conventional rock bolt
2A is a front view of the tip cap of the present invention.
2B is a cross-sectional view of the tip cap of the present invention.
2C is a plan view of the tip cap of the present invention.
2D is a bottom view of the tip cap of the present invention.
Figure 3a is a front sectional view of the fixing member of the present invention
Figure 3b is a side cross-sectional view of the fixing member of the present invention
Figure 3c is a plan view of the holding member of the present invention
Figure 4 is an assembled state sectional view of the front end cap and the fixing member of the present invention
Figure 5 is an assembled side cross-sectional view of the front end cap and the fixing member of the present invention
6 is an exploded perspective view of the main part of the present invention;
7 is an isolated cross-sectional view of the main part of the present invention.
8 is an assembled cross-sectional view of the main part of the present invention.
9 is a cross-sectional view of the installation state of the present invention
10 is a block diagram showing a preferred manufacturing method of the present invention
이하에서 본 발명의 바람직한 실시예를 첨부시킨 도면에 따라서 상세하게 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 2a 는 본 발명의 선단 캡에 대한 정면도이고, 도 2b 는 본 발명의 선단 캡에 대한 단면도, 도 2c 는 본 발명의 선단 캡에 대한 평면도, 도 2d 는 본 발명의 선단 캡에 대한 저면도를 나타낸 것이다.2A is a front view of the tip cap of the present invention, FIG. 2B is a sectional view of the tip cap of the present invention, FIG. 2C is a top view of the tip cap of the present invention, and FIG. 2D is a bottom view of the tip cap of the present invention. It is shown.
내경이 중공상태인 원통형의 몸체부(12)에 같은 간격으로 사 방향에 상부 홀(14)을 형성하되; 상부 홀(14)을 적어도 2줄로 형성되도록 세로 방향으로 길게 형성하고, 상기 상부 홀(14)의 하측에는 하부 홀(15)을 형성하며, 상기 몸체부(12)의 상측이 원추형으로 머리부(11)가 돌출되는 선단 캡(10)을 형성하는 것이다.
The inner diameter is formed in the
도 3a 은 본 발명의 고정부재에 대한 정면 단면도이고, 도 3b 는 본 발명의 고정부재에 대한 측면 단면도, 도 3c 는 본 발명의 고정부재에 대한 평면도를 나타낸 것이다.Figure 3a is a front cross-sectional view of the fixing member of the present invention, Figure 3b is a side cross-sectional view of the fixing member of the present invention, Figure 3c shows a plan view of the fixing member of the present invention.
선단 캡(10)과 결합하는 고정부재(20)는 철판류나 그와 유사한 강도의 SUS판류로 성형하며, 강도 보강을 위하여 열처리 등의 처리를 하는 것이 바람직하다.Fixing
상기 고정부재(20)는 절개부(25)에서 서로 만나도록 원통(21)으로 형성하며, 같은 간격으로 사 방향에 외측 상부 돌기(22)가 형성되도록 하되; 상기 외측 상부 돌기(22)는 상측 부분이 연결되고 하측 부분이 세 방향에서 절개되어 외측 방향으로 돌출되는 형상을 이루도록 형성하고, 적어도 2줄로 형성하는 것이다.The fixing
상기 외측 상부 돌기(22)의 하측에는 양쪽에 외측 하부 돌기(24)를 형성하여 한번 고정된 후 분리되지 않도록 한다.On the lower side of the outer
상기 원통(21)에는 외측 상부 돌기(22)의 사이에 내측 돌기(23)를 형성하되; 상기 내측 돌기(23)의 하측은 원통(21)에 연결되고 상측 부분이 세 방향에서 절개되어 내측으로 돌출되도록 형성하는 것이다.
An
도 4 는 본 발명의 선단 캡과 고정부재에 대한 조립상태 단면도이고, 도 5 는 본 발명의 선단 캡과 고정부재에 대한 조립상태 측면 단면도, 도 6 은 본 발명의 주요 부분에 대한 분리 사시도, 도 7 은 본 발명의 주요 부분에 대한 분리상태 단면도, 도 8 은 본 발명의 주요 부분에 대한 조립상태 단면도를 나타낸 것이다.Figure 4 is an assembled state cross-sectional view of the front end cap and the fixing member of the present invention, Figure 5 is an assembled state side cross-sectional view of the front end cap and the fixing member of the present invention, Figure 6 is an exploded perspective view of the main part of the present invention, Figure 7 is a separated state cross-sectional view of the main part of the present invention, Figure 8 is an assembled state cross-sectional view of the main part of the present invention.
선단 캡(10)의 하측에서 내경으로 고정부재(20)를 결합하여 외측 상부 돌기(22)가 상부 홀(14)에 위치하게 되면 외측 상부 돌기(22)가 상부 홀(14)에서 외측으로 노출되며, 고정부재(20)의 외측 하부 돌기(24)가 선단 캡(10)의 하부 홀(15)에 고정되어 회전과 상, 하 방향으로 이동되지 않도록 일체형으로 결합하게 된다.When the outer
선단 캡(10)과 고정부재(20)를 결합한 후에는 하측에서 고정부재(20)의 내경에 나선형 돌출부(31)와 나선형 안쪽 돌기(32)로 이루어진 락볼트(30)를 결합한다.After the
상기 내측 돌기(23)는 락볼트(30)의 나선형 안쪽 돌기(32)에 결합되어 상호 고정상태를 유지할 수 있도록 한다.
The
도 9 는 본 발명의 설치상태 단면도를 나타낸 것으로, 벽체(90)에 천공구멍(40)을 형성하고, 락볼트(30)의 선단에 고정부재(20)와 선단 캡(10)을 결합하여 삽입하여 천공구멍(40)의 안쪽 끝 부분에 공급한다.9 is a cross-sectional view showing the installation state of the present invention, and forms a punched
상기 천공구멍(40)의 외측에는 베어링 플레이트(50)를 설치하여 몰탈 주입관(70)과 공기 배출관(80)을 연결하고, 외측에 너트(60)를 결합하며, 상기 베어링 플레이트(50)의 안쪽에는 마감부재(41)를 설치하여 몰탈의 유출을 방지하도록 설치한다.
The bearing
도 10 은 본 발명의 바람직한 제조방법을 나타낸 블럭도를 나타낸 것으로, 락볼트(30)를 준비하여 이를 시공하는 방법에 있어서, 시공 대상 벽체(90)에 형성된 천공구멍(40) 내로 시공할 선단 캡(10)과 고정부재(20)를 준비하는 선단 캡 및 고정부재 준비공정(S1)과;FIG. 10 is a block diagram showing a preferred manufacturing method of the present invention. In the method for preparing the
선단 캡(10)의 몸체부(12) 내경으로 고정부재(20)를 삽입하여 고정부재(20)의 외측 상부 돌기(22)가 선단 캡(10)의 상부 홀(14)에서 외측으로 돌출되도록 하고, 고정부재(20)의 외측 하부 돌기(24)를 선단 캡(10)의 하부 홀(15)에 결합하는 선단 캡과 고정부재 조립공정(S2)과;Inserting the fixing
상기 선단 캡(10)과 고정부재(20)를 조립한 후 고정부재(20)의 하측에서 락볼트(30)를 결합하여 고정부재(20)의 내측 돌기(23)가 락 볼트(30)의 나선형 안쪽 돌기(32)에 결합, 고정되도록 하는 선단 고정형 락볼트 조립공정(S3)과;After assembling the
상기 천공구멍(40)에 선단 캡(10)과 락볼트(30)를 공급하여 천공구멍(40)의 선단에 선단 캡(10)의 머리부(11)가 닿은 상태에서 락볼트(30)가 천공구멍(40)의 중심에 위치하도록 설정하는 선단 고정형 락볼트 삽입공정(S4)과;The
상기 천공구멍(40)의 외부에서 마감부재(41)를 삽입한 후 베어링 플레이트(50)를 설치하여 몰탈 주입관(70)과 공기 배출관(80)을 연결하고, 너트(60)를 체결하여 천공구멍(40)을 밀폐하는 부재 설치공정(S5)과;After inserting the finishing
상기 몰탈 주입관(70)으로 천공구멍(40) 내에 몰탈을 주입, 경화하는 몰탈 타설공정(S6)과;A mortar placing step (S6) of injecting and curing mortar into the
상기 천공구멍(40)에서 락볼트(30)를 인장시켜 고정하는 락볼트 인장 및 고정공정(S7)을 순차적으로 수행함으로써, 락볼트(30)가 천공구멍(40)의 중심에서 안정되게 고정하는 것이다.
The
이러한 구성으로 이루어진 본 발명은 락볼트(30)를 준비하여 벽체(90)에 천공구멍(40)을 성형한 후 이를 시공하는 것으로,The present invention made of such a configuration is to prepare a
시공 대상 벽체(90)에 락볼트(30)를 시공하기 위하여 착암기로 천공구멍(40)을 원하는 장소, 위치에 성형하고, 상기 천공구멍(40)에 시공할 선단 캡(10)과 고정부재(20)를 준비하는 선단 캡 및 고정부재 준비공정(S1)을 수행한다.In order to install the
상기 선단 캡(10)과 고정부재(20)가 준비되면, 선단 캡(10)의 몸체부(12) 내경으로 고정부재(20)를 삽입하여 고정부재(20)의 외측 상부 돌기(22)가 선단 캡(10)의 상부 홀(14)에서 외측으로 돌출되도록 하고, 고정부재(20)의 외측 하부 돌기(24)를 선단 캡(10)의 하부 홀(15)에 결합하는 선단 캡과 고정부재 조립공정(S2)을 수행하여 선단 캡(10)과 고정부재(20)가 일체형이 되도록 조립한다.When the
상기 선단 캡(10)과 고정부재(20)를 조립한 후 고정부재(20)의 하측에서 락볼트(30)를 결합하여 선단 캡(10)의 안쪽 끝 부분에 락볼트(30)의 선단에 위치하도록 밀어 넣으면 고정부재(20)의 내측 돌기(23)가 락 볼트(30)의 나선형 안쪽 돌기(32)에 결합, 고정되도록 하는 선단 고정형 락볼트 조립공정(S3)을 수행하여 락볼트(30)의 선단에서 선단 캡(10)과 고정부재(20)가 일체형으로 조립된 상태를 제공한다.After assembling the
상기 천공구멍(40)에 선단 캡(10)과 락볼트(30)를 공급하여 천공구멍(40)의 선단에 선단 캡(10)의 머리부(11)가 닿은 상태가 되도록 하고, 락볼트(30)가 천공구멍(40)의 중심에 위치하도록 설정하는 선단 고정형 락볼트 삽입공정(S4)을 수행하여 천공구멍(40)에 락볼트(30)를 삽입하여 중심위치에 정확하게 삽입 설치하는 것이다.The
선단 캡(10)과 락볼트(30)를 천공구멍(40)의 선단에 삽입하게 되면, 선단 캡(10)의 상부 홀(14)에서 외부로 돌출된 고정부재(20)의 외측 상부 돌기(22)가 천공구멍(40)에 삽입되면서 외경이 작아지게 삽입되고, 선단에 삽입한 후에는 외측 상부 돌기(22)가 천공구멍(40)의 내벽에서 날개를 펼친 상태를 제공하여 고정되어 외부로 분리되는 것을 방지하여 락볼트(30)의 선단을 고정하게 되며, 락볼트(30)가 천공구멍(40)에서 정확한 중심을 유지한 상태를 유지할 수 있도록 설정할 수 있게 되는 것이다.When the
상기 천공구멍(40)의 외부에서 마감부재(41)를 삽입하여 몰탈이 외부로 배출되지 않도록 마감하여 밀폐한 후 베어링 플레이트(50)를 설치하여 몰탈 주입관(70)과 공기 배출관(80)을 연결 천공구멍(40)의 내부에 위치하고, 너트(60)를 체결하여 천공구멍(40)을 밀폐하는 부재 설치공정(S5)을 통하여 천공구멍(40)의 외부에서 몰탈을 공급할 수 있도록 밀폐하는 것이다.Insert the finishing
상기 몰탈 주입관(70)으로 천공구멍(40) 내에 몰탈을 주입하고, 소정의 시간동안 경화하는 몰탈 타설공정(S6)을 수행하여 주입한 몰탈이 완전히 경화되어 락볼트(30)를 삽입한 위치에서 정확하게 고정상태를 유지할 수 있도록 하는 것이다.Mortar is injected into the
상기 천공구멍(40)에서 락볼트(30)를 인장시켜 고정하는 락볼트 인장 및 고정공정(S7)을 순차적으로 수행함으로써, 락볼트(30)가 천공구멍(40)의 중심에 설정된 상태에서 안정되게 고정하는 작용을 통하여 락볼트(30)의 고정작업을 용이하게 수행할 수있도록 하는 것이다.
By sequentially performing the lock bolt tensioning and fixing process S7 for tensioning and fixing the
본 발명은 선단 캡과 고정부재를 결합한 후 고정부재의 내경에 락볼트를 조립하여 천공구멍으로 삽입하면 락볼트가 중앙에 위치하도록 설정되므로 몰탈을 타설하더라도 락볼트의 설정 위치에 대한 변경이 발생하지 않아 몰탈작업이 용이하며 락볼트가 천공구멍에 안전하고 견고하게 설치되는 것이다.
According to the present invention, when the lock bolt is assembled to the inner diameter of the fixing member after inserting the tip cap and the fixing member and inserted into the drilling hole, the lock bolt is set to be positioned at the center. It is easy to mortar work, and the lock bolt is installed safely and firmly in the drilling hole.
10 : 선단 캡 11 : 머리부
12 : 몸체부 14 : 상부 홀
15 : 하부 홀 20 : 고정부재
21 : 원통 22 : 외측 상부 돌기
23 : 내측 돌기 24 : 외측 하부 돌기
25 : 절개부 30 : 락볼트
31 : 나선형 돌출부 32 : 나선형 안쪽 돌기
40 : 천공구멍 50 : 베어링 플레이트
60 : 너트 70 : 몰탈 주입관
80 : 공기 배출관 90 : 벽체10: tip cap 11: head
12
15: lower hole 20: fixing member
21: cylinder 22: outer upper projection
23: inner projection 24: outer lower projection
25: incision 30: rock bolt
31: spiral protrusion 32: spiral inner projection
40: punched hole 50: bearing plate
60: nut 70: mortar injection tube
80: air discharge pipe 90: wall
Claims (8)
내경이 중공인 몸체부(12)에 같는 간격으로 상부 홀(14)을 형성하고, 상측으로 머리부(11)를 형성한 선단 캡(10)과;
상기 선단 캡(10)의 상부 홀(14)에 결합하여 돌출되는 외측 상부 돌기(22)가 형성되고, 상기 외측 상부 돌기(22)의 사이에 내측으로 돌출되는 내측 돌기(23)를 형성하는 고정부재(20)와;
상기 고정부재(20)에 끼워 결합하며 나선형 안쪽 돌기(32)가 내측 돌기(23)와 고정되는 락볼트(30)로 이루어지며,
상기 선단 캡(10)은 몸체부(12)의 상측으로 머리부(11)가 원추형으로 돌출되도록 형성하고,
상기 고정부재(20)는 사 방향에 같은 간격으로 외측 상부 돌기(22)가 돌출되어 천공구멍(40)에 고정되며, 상기 외측 상부 돌기(22)의 사이에 안쪽 방향으로 돌출되는 내측 돌기(23)를 형성하여 락볼트(30)를 고정하고,
상기 고정부재(20)의 일측이 상,하로 절개된 절개부(25)로 분리되어 원통(21)으로 형성되며 철판과 SUS판으로 제작되어 열처리에 의해 강도를 높이는 것을 특징으로 하는 선단 고정 락볼트 고정장치.
In the lock bolt fixing device for inserting the lock bolt 30 into the punched hole 40 formed in the wall 90 and fixed by mortar filling,
A tip cap 10 having an upper hole 14 formed at equal intervals in the body portion 12 having an inner diameter and a head portion 11 formed at an upper side thereof;
An outer upper protrusion 22 is formed to be coupled to the upper hole 14 of the tip cap 10 and is fixed to form an inner protrusion 23 that protrudes inwardly between the outer upper protrusions 22. The member 20;
Fit into the fixing member 20, the spiral inner projection 32 is made of a lock bolt 30 is fixed to the inner projection 23,
The tip cap 10 is formed so that the head portion 11 protrudes in a conical shape to the upper side of the body portion 12,
The fixing member 20 has an outer upper protrusion 22 protruding at equal intervals in the yarn direction and is fixed to the drilling hole 40, and an inner protrusion 23 protruding inwardly between the outer upper protrusions 22. ) To fix the lock bolt (30),
One side of the fixing member 20 is separated into the incision portion 25 is cut up and down, formed into a cylinder 21, and is made of iron plate and SUS plate is fixed to the front end fixing bolt, characterized in that to increase the strength by heat treatment Fixture.
상기 시공 대상 벽체(90)에 형성된 천공구멍(40) 내로 시공할 선단 캡(10)과 고정부재(20)를 준비하는 선단 캡 및 고정부재 준비공정(S1)과;
선단 캡(10)의 몸체부(12) 내경으로 고정부재(20)를 삽입하여 고정부재(20)의 외측 상부 돌기(22)가 선단 캡(10)의 상부 홀(14)에서 외측으로 돌출되도록 하고, 고정부재(20)의 외측 하부 돌기(24)를 선단 캡(10)의 하부 홀(15)에 결합하는 선단 캡과 고정부재 조립공정(S2)과;
상기 선단 캡(10)과 고정부재(20)를 조립한 후 고정부재(20)의 하측에서 락볼트(30)를 결합하여 고정부재(20)의 내측 돌기(23)가 락 볼트(30)의 나선형 안쪽돌기(32)에 결합, 고정되도록 하는 선단 고정형 락볼트 조립공정(S3)과;
상기 천공구멍(40)에 선단 캡(10)과 락볼트(30)를 공급하여 천공구멍(40)의 선단에 선단 캡(10)의 머리부(11)가 닿은 상태에서 락볼트(30)가 천공구멍(40)의 중심에 위치하도록 설정하는 선단 고정형 락볼트 삽입공정(S4)과;
상기 천공구멍(40)의 외부에서 마감부재(41)를 삽입한 후 베어링 플레이트(50)를 설치하여 몰탈 주입관(70)과 공기 배출관(80)을 연결하고, 너트(60)를 체결하여 천공구멍(40)을 밀폐하는 부재 설치공정(S5)과;
상기 몰탈 주입관(70)으로 천공구멍(40) 내에 몰탈을 주입, 경화하는 몰탈 타설공정(S6)과;
상기 천공구멍(40)에서 락볼트(30)를 인장시켜 고정하는 락볼트 인장 및 고정공정(S7);을 순차적으로 수행함으로써, 락볼트(30)가 천공구멍(40)의 중심에서 안정되게 고정하는 것을 특징으로 하는 선단 고정 락볼트 시공방법.
In the method for preparing the rock bolt 30 and constructing it in the perforation hole 40 of the wall 90,
A tip cap and fixing member preparation process (S1) for preparing the tip cap 10 and the fixing member 20 to be installed into the drilling hole 40 formed in the wall 90 to be constructed;
Inserting the fixing member 20 into the inner diameter of the body portion 12 of the tip cap 10 so that the outer upper protrusion 22 of the fixing member 20 protrudes outward from the upper hole 14 of the tip cap 10. And, the front end cap and the fixing member assembly step (S2) for coupling the outer lower protrusion 24 of the fixing member 20 to the lower hole 15 of the tip cap 10;
After assembling the tip cap 10 and the fixing member 20, the locking bolt 30 is coupled to the lower side of the fixing member 20 so that the inner protrusions 23 of the fixing member 20 are formed of the lock bolt 30. A fixed end lock bolt assembly step (S3) to be coupled to and fixed to the spiral inner protrusion 32;
The cap bolt 10 and the lock bolt 30 are supplied to the punch hole 40 so that the lock bolt 30 is in contact with the head 11 of the tip cap 10 at the tip of the punch hole 40. An end fixed rock bolt insertion step (S4) set to be located at the center of the drilling hole 40;
After inserting the finishing member 41 from the outside of the drilling hole 40, the bearing plate 50 is installed to connect the mortar injection pipe 70 and the air discharge pipe 80, the nut 60 is fastened by drilling A member installation step (S5) for sealing the hole 40;
A mortar placing step (S6) of injecting and curing mortar into the boring hole 40 through the mortar injection tube 70;
By sequentially performing the lock bolt tensioning and fixing process (S7) for tensioning and fixing the lock bolt 30 in the punching hole 40, the lock bolt 30 is stably fixed at the center of the punching hole 40 Tip fixing rock bolt construction method characterized in that.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020110122312 | 2011-11-21 | ||
KR20110122312 | 2011-11-21 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101192605B1 true KR101192605B1 (en) | 2012-10-18 |
Family
ID=47288261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120021858A KR101192605B1 (en) | 2011-11-21 | 2012-03-02 | Fleet fix-rock bolt fix device and construction method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101192605B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102235447B1 (en) | 2020-09-07 | 2021-04-05 | 정희갑 | Fixing cap for rock bolt |
WO2024019409A1 (en) * | 2022-07-22 | 2024-01-25 | 주식회사 정성이엔씨 | Improved rock bolt structure and construction method therefor |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001020281A (en) | 1999-07-12 | 2001-01-23 | Dairin:Kk | Method and apparatus for stabilizing ground surface |
KR100596932B1 (en) * | 2004-05-06 | 2006-07-04 | 로크산업 주식회사 | a fixed device for rock bolt |
-
2012
- 2012-03-02 KR KR1020120021858A patent/KR101192605B1/en not_active IP Right Cessation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001020281A (en) | 1999-07-12 | 2001-01-23 | Dairin:Kk | Method and apparatus for stabilizing ground surface |
KR100596932B1 (en) * | 2004-05-06 | 2006-07-04 | 로크산업 주식회사 | a fixed device for rock bolt |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102235447B1 (en) | 2020-09-07 | 2021-04-05 | 정희갑 | Fixing cap for rock bolt |
WO2024019409A1 (en) * | 2022-07-22 | 2024-01-25 | 주식회사 정성이엔씨 | Improved rock bolt structure and construction method therefor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6746264B1 (en) | Slope stabilization retaining wall and its construction method | |
KR101359488B1 (en) | Micropile including radially extendable head unit for maximization of supporting force and constructing method of micropile using the same | |
KR102214141B1 (en) | Hollow rockbolt | |
KR100956879B1 (en) | Stress dispersion type microfile | |
KR101192605B1 (en) | Fleet fix-rock bolt fix device and construction method | |
KR101600679B1 (en) | Socket shaped anchor | |
KR100666678B1 (en) | Micro-pile having a end supporting round-plate | |
KR101331219B1 (en) | Method for constructing micro pile using reinforcing end bearing capacity | |
KR101549394B1 (en) | Socket shaped anchor | |
KR102393584B1 (en) | Wedge Anchor at Face of Exterior Wall with Reinfoced Support Fixture | |
KR200449724Y1 (en) | Rock bolt for underground hole | |
KR101731535B1 (en) | Pre-loading apparatus for pile and pre-loading method using the same | |
KR101065619B1 (en) | Tiebolt construction method between tunnel section | |
KR20080107731A (en) | Structure strengthening method using the steel pipe with pull-resistance means | |
KR100596932B1 (en) | a fixed device for rock bolt | |
KR101677858B1 (en) | Column section enlargement method using socket shaped anchor | |
KR101424347B1 (en) | Shear anchor for joing new and old concrete and method for joining new and old concrete | |
JP7194850B1 (en) | Auxiliary support device for retaining wall panels | |
KR20080076646A (en) | Coupler for ground reinforcement core member | |
EP3907331B1 (en) | Hybrid anchor | |
JP2014141826A (en) | Junction structure of underground bearing | |
KR102627588B1 (en) | Retaining wall using anchorage construction method | |
KR101314117B1 (en) | Ground reinforcement method having additional grout injection stage in inlet part of drilled-hole | |
KR101985854B1 (en) | Lock bolt safety cap | |
KR200374101Y1 (en) | Micro-pile having a end supporting round-plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
AMND | Amendment | ||
E601 | Decision to refuse application | ||
AMND | Amendment | ||
X701 | Decision to grant (after re-examination) | ||
GRNT | Written decision to grant | ||
LAPS | Lapse due to unpaid annual fee |