KR102595177B1 - Jig for installing guide ring of automatic welding carriage and method of using the same - Google Patents

Jig for installing guide ring of automatic welding carriage and method of using the same Download PDF

Info

Publication number
KR102595177B1
KR102595177B1 KR1020220096747A KR20220096747A KR102595177B1 KR 102595177 B1 KR102595177 B1 KR 102595177B1 KR 1020220096747 A KR1020220096747 A KR 1020220096747A KR 20220096747 A KR20220096747 A KR 20220096747A KR 102595177 B1 KR102595177 B1 KR 102595177B1
Authority
KR
South Korea
Prior art keywords
guide ring
jig
gap
adjustment block
automatic welding
Prior art date
Application number
KR1020220096747A
Other languages
Korean (ko)
Inventor
안천규
권오창
강희재
Original Assignee
삼성엔지니어링 주식회사
주식회사 엔코텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성엔지니어링 주식회사, 주식회사 엔코텍 filed Critical 삼성엔지니어링 주식회사
Priority to KR1020220096747A priority Critical patent/KR102595177B1/en
Application granted granted Critical
Publication of KR102595177B1 publication Critical patent/KR102595177B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/0426Fixtures for other work
    • B23K37/0435Clamps
    • B23K37/0443Jigs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/02Carriages for supporting the welding or cutting element
    • B23K37/0264Carriages for supporting the welding or cutting element magnetically attached to the workpiece
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/02Carriages for supporting the welding or cutting element
    • B23K37/0282Carriages forming part of a welding unit
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

자동 용접 캐리지의 가이드 링 설치용 지그가 개시된다. 개시된 자동 용접 캐리지의 가이드 링 설치용 지그는 지그 본체, 상기 지그 본체에 수평이동 가능하게 결합된 거리조정 블록, 상기 지그 본체에 수평이동 가능하게 결합된 갭조정 블록, 상기 지그 본체에 결합된 센터갭 블록 및 상기 지그 본체에 이동 가능하게 결합된 마그네틱 블록을 포함한다.A jig for installing a guide ring of an automatic welding carriage is disclosed. The disclosed jig for installing a guide ring of an automatic welding carriage includes a jig body, a distance adjustment block horizontally movably coupled to the jig body, a gap adjustment block horizontally movably coupled to the jig body, and a center gap block coupled to the jig body. and a magnetic block movably coupled to the jig body.

Description

자동 용접 캐리지의 가이드 링 설치용 지그 및 그의 사용방법{Jig for installing guide ring of automatic welding carriage and method of using the same}Jig for installing guide ring of automatic welding carriage and method of using the same {Jig for installing guide ring of automatic welding carriage and method of using the same}

자동 용접 캐리지의 가이드 링 설치용 지그 및 그의 사용방법이 개시된다. 보다 상세하게는, 자동 용접 캐리지의 가이드 링 설치 작업을 쉽고 정확하고 빠르게 수행할 수 있도록 구성된 자동 용접 캐리지의 가이드 링 설치용 지그 및 그의 사용방법이 개시된다.A jig for installing a guide ring of an automatic welding carriage and a method of using the same are disclosed. More specifically, a jig for installing a guide ring of an automatic welding carriage configured to easily, accurately, and quickly perform the guide ring installation work of an automatic welding carriage, and a method of using the same are disclosed.

대구경 배관을 이용하여 배관라인을 형성하기 위해서는 다수개의 배관을 맞대기 용접하여 서로 연결해야 하며, 이와 같이 다수개의 배관을 자동용접하여 서로 연결하기 위해서는 통상적으로 자동 용접 캐리지를 사용하게 된다.In order to form a piping line using large-diameter piping, a plurality of piping must be butt-welded and connected to each other. In order to automatically weld and connect a plurality of piping to each other, an automatic welding carriage is typically used.

자동 용접 캐리지를 이용하여 배관라인의 원주 맞대기 용접을 하기 위해서는 배관라인의 외주면에 가이드 링을 설치한 다음, 상기 설치된 가이드 링에 자동 용접 캐리지를 설치하여야 한다.In order to perform circumferential butt welding of a pipe line using an automatic welding carriage, a guide ring must be installed on the outer peripheral surface of the pipe line, and then an automatic welding carriage must be installed on the installed guide ring.

가이드 링에 설치된 자동 용접 캐리지는 배관라인의 외주면에 설치된 가이드 링을 따라 배관라인의 원주 방향으로 회전하면서 용접부에 용접을 수행하게 된다.The automatic welding carriage installed on the guide ring rotates in the circumferential direction of the pipe line along the guide ring installed on the outer circumference of the pipe line and performs welding on the welding area.

기존에는 배관라인의 외주면에 가이드 링을 설치하기 위해서는 배관 상의 체결 위치를 측정하여 식별 가능하도록 마킹하는 단계(S1), 2개 또는 4개의 부품으로 나뉜 가이드 링을 조립하는 단계(S2), 배관 진원도에 따라 가이드 링 부품 간의 간격을 조절하는 단계(S3), 배관 외경과 가이드 링의 내경 간의 간극을 확인하여 고정핀으로 조이는 작업을 반복적으로 수행하는 단계(S4), 고무망치 등을 이용하여 배관상의 체결 위치를 재조정하는 단계(S5)를 포함하고, 최적 설치 위치가 결정될 때까지 상기 단계들(S3, S4)을 수동으로 반복적으로 수행하여야 한다. 따라서, 기존에는 가이드 링 설치시 관경 및 진원도에 따라 15~150분의 많은 시간이 소요되었다. Previously, installing a guide ring on the outer circumference of a pipe line involved measuring the fastening position on the pipe and marking it for identification (S1), assembling a guide ring divided into two or four parts (S2), and measuring the pipe roundness. Step of adjusting the gap between guide ring parts according to the step (S3), step of repeatedly checking the gap between the outer diameter of the pipe and the inner diameter of the guide ring and tightening it with a fixing pin (S4), and tightening the pipe with a rubber mallet, etc. It includes a step (S5) of readjusting the fastening position, and the steps (S3 and S4) must be manually and repeatedly performed until the optimal installation position is determined. Therefore, previously, installing a guide ring took a long time, ranging from 15 to 150 minutes depending on the pipe diameter and roundness.

구체적으로, 기존의 가이드 링 설치 방법은 가이드 링을 용접 위치로부터 210mm만큼 떨어진 위치에 설치하기 위해 배관의 외주면상에 네임펜 등으로 마킹하고, 배관의 진원도에 따라 가이드 링 부품 간의 간격을 줄자 등으로 수동으로 측정하여 조정하고, 배관의 원주방향으로 가이드 링의 높이를 자를 이용하여 수동으로 측정하고, 위치 설정이 변경될 때마다 고정핀의 조임도 반복적으로 수행하게 되는데, 상부 조정후 하부 조정을 수행하면 상부의 위치가 변경되는 등 고정이 불안정하고, 작업자의 측정 오류 등으로 반복 작업의 회수가 증가하며, 개인의 기량에 따라 개인별 설치 시간 편차가 발생하는 문제점이 있었다. Specifically, the existing guide ring installation method involves marking the outer circumference of the pipe with a name pen, etc. in order to install the guide ring at a distance of 210 mm from the welding position, and manually adjusting the gap between guide ring parts according to the roundness of the pipe using a tape measure, etc. The height of the guide ring in the circumferential direction of the pipe is measured manually using a ruler, and the fixing pin is tightened repeatedly whenever the position setting is changed. If the lower adjustment is performed after the upper adjustment, the upper There were problems such as unstable fixation due to changes in position, increased number of repetitive tasks due to operator measurement errors, and individual installation time deviations depending on individual skills.

본 발명의 일 구현예는 자동 용접 캐리지의 가이드 링 설치 작업을 쉽고 정확하고 빠르게 수행할 수 있도록 구성된 자동 용접 캐리지의 가이드 링 설치용 지그를 제공한다.One embodiment of the present invention provides a jig for installing a guide ring of an automatic welding carriage configured to easily, accurately, and quickly perform the guide ring installation work of an automatic welding carriage.

본 발명의 다른 구현예는 상기 자동 용접 캐리지의 가이드 링 설치용 지그의 사용방법을 제공한다.Another embodiment of the present invention provides a method of using a jig for installing a guide ring of the automatic welding carriage.

본 발명의 일 측면은,One aspect of the present invention is,

지그 본체;jig body;

상기 지그 본체에 수평이동 가능하게 결합된 거리조정 블록;A distance adjustment block horizontally movably coupled to the jig body;

상기 지그 본체에 수평이동 가능하게 결합된 갭조정 블록; A gap adjustment block horizontally movably coupled to the jig body;

상기 지그 본체에 결합된 센터갭 블록; 및A center gap block coupled to the jig body; and

상기 지그 본체에 이동 가능하게 결합된 마그네틱 블록을 포함하는 자동 용접 캐리지의 가이드 링 설치용 지그를 제공한다.A jig for installing a guide ring of an automatic welding carriage including a magnetic block movably coupled to the jig body is provided.

상기 지그 본체는 거리조정 블록 고정용 홈, 마그네틱 블록 고정용 홈 및 갭조정 블록 고정용 홈을 포함할 수 있다.The jig body may include a groove for fixing a distance adjustment block, a groove for fixing a magnetic block, and a groove for fixing a gap adjustment block.

상기 거리조정 블록은 거리조정 블록 베이스, 경첩부, 한쌍의 날개부 및 한쌍의 스토퍼를 포함할 수 있다.The distance adjustment block may include a distance adjustment block base, a hinge portion, a pair of wings, and a pair of stoppers.

상기 한쌍의 날개부 및 상기 한쌍의 스토퍼는 상기 경첩부를 매개로 하여 상기 거리조정 블록 베이스를 기준으로 하방으로 회전 가능하도록 구성될 수 있다. The pair of wings and the pair of stoppers may be configured to rotate downward with respect to the distance adjustment block base via the hinge portion.

상기 경첩부는 스프링 장치 부착형 경첩을 포함할 수 있다.The hinge unit may include a spring attached hinge.

상기 갭조정 블록은 갭조정 블록 베이스 및 갭조정 블록 베이스 고정 노브를 포함하고, 상기 갭조정 블록 베이스는 다단 계단식으로 구성된 상면을 포함할 수 있다. The gap adjustment block includes a gap adjustment block base and a gap adjustment block base fixing knob, and the gap adjustment block base may include an upper surface configured in multi-step steps.

상기 자동 용접 캐리지의 가이드 링 설치용 지그는 상기 갭조정 블록 베이스의 상면에 장착되도록 구성된 보조 갭조정 블록을 더 포함할 수 있다.The jig for installing the guide ring of the automatic welding carriage may further include an auxiliary gap adjustment block configured to be mounted on the upper surface of the gap adjustment block base.

상기 보조 갭조정 블록은 하부에 장착된 자석을 포함할 수 있다.The auxiliary gap adjustment block may include a magnet mounted at the bottom.

상기 센터갭 블록은 센터갭 블록 베이스 및 센터갭 블록 베이스 고정 노브를 포함하고, 상기 센터갭 블록 베이스는 서로 반대쪽에 위치하는 쐐기형 단부 및 라운드형 단부를 포함할 수 있다. The center gap block may include a center gap block base and a center gap block base fixing knob, and the center gap block base may include a wedge-shaped end and a round end positioned opposite to each other.

상기 마그네틱 블록은 마그네틱 베이스, 마그네틱 베이스 고정 브라켓, 마그네틱 베이스 작동 노브 및 마그네틱 베이스 고정 노브를 포함할 수 있다. The magnetic block may include a magnetic base, a magnetic base fixing bracket, a magnetic base operation knob, and a magnetic base fixing knob.

상기 마그네틱 베이스는 라운드형 바닥부를 포함할 수 있다.The magnetic base may include a round bottom.

본 발명의 다른 측면은,Another aspect of the present invention is,

상기 자동 용접 캐리지의 가이드 링 설치용 지그의 사용방법으로서,As a method of using the jig for installing the guide ring of the automatic welding carriage,

2개의 배관을 핏업하는 단계(S10);Step of fitting up two pipes (S10);

자동 용접 캐리지의 가이드 링 설치용 지그를 상기 2개의 배관 중 어느 한 배관의 외주면 상에 위치시키는 단계(S20);Positioning the guide ring installation jig of the automatic welding carriage on the outer peripheral surface of one of the two pipes (S20);

센터갭 블록 베이스의 일단부를 상기 2개의 배관 사이의 빈틈에 삽입하는 단계(S30);Inserting one end of the center gap block base into the gap between the two pipes (S30);

센터갭 블록 베이스 고정 노브를 이용하여 상기 센터갭 블록 베이스를 지그 본체에 고정시키는 단계(S40);Fixing the center gap block base to the jig body using a center gap block base fixing knob (S40);

마그네틱 베이스 작동 노브를 이용하여 마그네틱 베이스를 작동시키는 단계(S50);Operating the magnetic base using the magnetic base operation knob (S50);

마그네틱 베이스 고정 노브를 이용하여 상기 마그네틱 베이스를 상기 배관의 외주면 상에 고정시키는 단계(S60); 및Fixing the magnetic base on the outer peripheral surface of the pipe using a magnetic base fixing knob (S60); and

갭조정 블록 베이스의 수평 위치를 조정하여 미리 결정된 갭에 맞춘 후 갭조정 블록 베이스 고정 노브를 이용하여 상기 갭조정 블록 베이스를 지그 본체에 고정시키는 단계(S70)를 포함하는 자동 용접 캐리지의 가이드 링 설치용 지그의 사용방법을 제공한다.For guide ring installation of an automatic welding carriage, including the step of adjusting the horizontal position of the gap adjustment block base to match a predetermined gap and then fixing the gap adjustment block base to the jig body using a gap adjustment block base fixing knob (S70). Provides instructions for using the jig.

상기 단계(S30)에서, 상기 2개의 배관이 용접되지 않은 경우에는, 상기 센터갭 블록 베이스의 쐐기형 단부가 상기 2개의 배관 사이의 빈틈에 삽입되고, 상기 2개의 배관이 가용접된 경우에는, 상기 센터갭 블록 베이스의 라운드형 단부가 상기 2개의 배관 사이의 빈틈에 삽입될 수 있다.In the step (S30), if the two pipes are not welded, the wedge-shaped end of the center gap block base is inserted into the gap between the two pipes, and if the two pipes are tack-welded, The round end of the center gap block base may be inserted into the gap between the two pipes.

상기 단계(S70)는 상기 갭조정 블록 베이스 위에 보조 갭조정 블록을 장착한 상태에서 수행될 수 있다.The step (S70) can be performed with an auxiliary gap adjustment block mounted on the gap adjustment block base.

상기 자동 용접 캐리지의 가이드 링 설치용 지그의 사용방법은, 상기 단계(S70) 이후에, 상기 배관의 외주면 상에 자동 용접 캐리지의 가이드 링을 임시로 고정시키는 단계(S80)를 더 포함할 수 있다.The method of using the jig for installing the guide ring of the automatic welding carriage may further include the step of temporarily fixing the guide ring of the automatic welding carriage on the outer peripheral surface of the pipe (S80) after the step (S70).

상기 자동 용접 캐리지의 가이드 링 설치용 지그의 사용방법은, 상기 단계(S80) 이후에, 상기 배관의 외주면 상에 상기 자동 용접 캐리지의 가이드 링을 정식으로 고정시키는 단계(S90) 및 상기 배관의 외주면으로부터 상기 자동 용접 캐리지의 가이드 링 설치용 지그를 제거하는 단계(S100)를 더 포함할 수 있다.The method of using the jig for installing the guide ring of the automatic welding carriage includes, after the step (S80), formally fixing the guide ring of the automatic welding carriage on the outer peripheral surface of the pipe (S90) and the step (S90) of formally fixing the guide ring of the automatic welding carriage on the outer peripheral surface of the pipe. It may further include removing the jig for installing the guide ring of the automatic welding carriage (S100).

본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그는 자동 용접 캐리지의 가이드 링의 설치 시간을 단축시키는 효과가 있다.The jig for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention has the effect of shortening the installation time of the guide ring of an automatic welding carriage.

도 1은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그를 제1 방향에서 바라본 사시도로서 최초 용접시 가이드 링의 설치 위치 설정방법을 나타낸 도면이다.
도 2는 도 1에서 자동 용접 캐리지의 가이드 링 설치용 지그를 확대하여 도시한 도면이다.
도 3은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그를 제2 방향에서 바라본 사시도로서 최초 용접시 가이드 링의 설치 위치 설정방법을 나타낸 도면이다.
도 4는 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그를 제4 방향에서 바라본 사시도로서 최초 용접시 가이드 링의 설치 위치 설정방법을 나타낸 도면이다.
도 5는 도 4에서 자동 용접 캐리지의 가이드 링 설치용 지그를 확대하여 도시한 도면이다.
도 6은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그를 제5 방향에서 바라본 정면도로서 최초 용접시 가이드 링의 설치 위치 설정방법을 나타낸 도면이다.
도 7은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그를 제6 방향에서 바라본 평면도로서 최초 용접시 가이드 링의 설치 위치 설정방법을 나타낸 도면이다.
도 8은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그를 제7 방향에서 바라본 측면도로서 최초 용접시 가이드 링의 설치 위치 설정방법을 나타낸 도면이다.
도 9는 갭조정 블록 및 이에 대응되는 지그 본체의 구조 및 갭조정 블록의 사용방법을 설명하기 위한 도면이다.
도 10은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그를 제1 방향에서 바라본 사시도로서 가용접후 가이드 링의 설치 위치 설정방법을 나타낸 도면이다.
도 11은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그를 제7 방향에서 바라본 측면도로서 최초 용접시 가이드 링의 설치 위치 설정방법을 나타낸 도면이다.
도 12는 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그를 제7 방향에서 바라본 측면도로서 가용접후 가이드 링의 설치 위치 설정방법을 나타낸 도면이다.
Figure 1 is a perspective view of a jig for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention, viewed from a first direction, and is a diagram showing a method of setting the installation position of the guide ring during initial welding.
FIG. 2 is an enlarged view of the jig for installing the guide ring of the automatic welding carriage in FIG. 1.
Figure 3 is a perspective view of a jig for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention as seen from a second direction, and is a diagram showing a method of setting the installation position of the guide ring during initial welding.
Figure 4 is a perspective view of a jig for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention as seen from a fourth direction, and is a diagram showing a method of setting the installation position of the guide ring during the first welding.
Figure 5 is an enlarged view of the jig for installing the guide ring of the automatic welding carriage in Figure 4.
Figure 6 is a front view of a jig for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention as seen from the fifth direction, and is a diagram showing a method of setting the installation position of the guide ring during the first welding.
Figure 7 is a plan view of a jig for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention as seen from a sixth direction, and is a diagram showing a method of setting the installation position of the guide ring during the first welding.
Figure 8 is a side view of a jig for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention, viewed from a seventh direction, and is a diagram showing a method of setting the installation position of the guide ring during the first welding.
Figure 9 is a diagram for explaining the structure of the gap adjustment block and the corresponding jig body and the method of using the gap adjustment block.
Figure 10 is a perspective view of a jig for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention as seen from a first direction, and is a diagram showing a method of setting the installation position of the guide ring after tack welding.
Figure 11 is a side view of a jig for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention, viewed from a seventh direction, and is a diagram showing a method of setting the installation position of the guide ring during the first welding.
Figure 12 is a side view of a jig for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention, viewed from a seventh direction, and is a diagram showing a method of setting the installation position of the guide ring after tack welding.

이하에서는 도면을 참조하여 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그를 상세히 설명한다.Hereinafter, a jig for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention will be described in detail with reference to the drawings.

본 명세서에서, "거리조정"이란 서로 맞대기 용접되는 2개의 배관의 용접 위치로부터 자동 용접 캐리지의 가이드 링까지의 거리조정을 의미한다.In this specification, “distance adjustment” means adjusting the distance from the welding position of two pipes to be butt-welded to the guide ring of the automatic welding carriage.

또한 본 명세서에서, "갭조정"이란 배관의 외주면과 자동 용접 캐리지의 가이드 링의 하부(또는 내면) 사이의 갭조정을 의미한다.Also, in this specification, “gap adjustment” means gap adjustment between the outer peripheral surface of the pipe and the lower portion (or inner surface) of the guide ring of the automatic welding carriage.

또한 본 명세서에서, "센터갭"이란 서로 맞대기 용접되는 2개의 배관 사이의 갭을 의미한다.Also, in this specification, “center gap” refers to the gap between two pipes that are butt-welded to each other.

또한 본 명세서에서, "상부"란 상대적으로 중력의 역방향에 위치한 부분을 의미하고 "하부"란 상대적으로 중력의 순방향에 위치한 부분을 의미한다.Additionally, in this specification, “upper” refers to a portion located relatively in the reverse direction of gravity, and “lower” refers to a portion relatively located in the forward direction of gravity.

도 1은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)를 제1 방향에서 바라본 사시도로서 최초 용접시 가이드 링(GR)의 설치 위치를 나타낸 도면이고, 도 2는 도 1에서 자동 용접 캐리지의 가이드 링 설치용 지그(100)를 확대하여 도시한 도면이고, 도 3은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)를 제2 방향에서 바라본 사시도로서 최초 용접시 가이드 링(GR)의 설치 위치를 나타낸 도면이고, 도 4는 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)를 제4 방향에서 바라본 사시도로서 최초 용접시 가이드 링(GR)의 설치 위치를 나타낸 도면이고, 도 5는 도 4에서 자동 용접 캐리지의 가이드 링 설치용 지그(100)를 확대하여 도시한 도면이고, 도 6은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)를 제5 방향에서 바라본 정면도로서 최초 용접시 가이드 링(GR)의 설치 위치를 나타낸 도면이고, 도 7은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)를 제6 방향에서 바라본 평면도로서 최초 용접시 가이드 링(GR)의 설치 위치를 나타낸 도면이고, 도 8은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)를 제7 방향에서 바라본 측면도로서 최초 용접시 가이드 링(GR)의 설치 위치를 나타낸 도면이다. 도 1 내지 도 8에서, 제1 방향 내지 제8 방향은 각각 서로 다른 방향일 수 있다. Figure 1 is a perspective view of the jig 100 for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention as seen from a first direction, showing the installation position of the guide ring (GR) during the first welding, and Figure 2 is a diagram showing the installation position of the guide ring (GR) in the first direction. 1 is an enlarged view of the jig 100 for installing a guide ring of an automatic welding carriage, and FIG. 3 is a perspective view of the jig 100 for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention as seen from a second direction. This is a diagram showing the installation position of the guide ring (GR) during the first welding, and Figure 4 is a perspective view of the jig 100 for installing the guide ring of an automatic welding carriage according to an embodiment of the present invention as seen from the fourth direction, during the first welding. It is a diagram showing the installation position of the guide ring (GR), and FIG. 5 is an enlarged view of the jig 100 for installing the guide ring of the automatic welding carriage in FIG. 4, and FIG. 6 is an automatic welding carriage according to an embodiment of the present invention. This is a front view of the jig 100 for installing the guide ring of the welding carriage as seen from the fifth direction, showing the installation position of the guide ring (GR) during the first welding, and Figure 7 is a guide of the automatic welding carriage according to an embodiment of the present invention. It is a plan view of the ring installation jig 100 as seen from the sixth direction, showing the installation position of the guide ring (GR) at the time of initial welding, and Figure 8 is a jig for installing the guide ring of the automatic welding carriage according to an embodiment of the present invention ( This is a side view viewed from the 7th direction (100), showing the installation position of the guide ring (GR) during the first welding. 1 to 8, the first to eighth directions may be different directions.

도 1 내지 도 8을 참조하면, 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)(이하, 간단히 "가이드 링 설치용 지그(100)" 또는 "지그(100)"로 지칭함)는 지그 본체(110), 거리조정 블록(120), 갭조정 블록(130), 센터갭 블록(140) 및 마그네틱 블록(150)을 포함한다. 1 to 8, a jig 100 for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention (hereinafter simply referred to as “jig 100 for installing a guide ring” or “jig 100”) ) includes a jig body 110, a distance adjustment block 120, a gap adjustment block 130, a center gap block 140, and a magnetic block 150.

자동 용접 캐리지(미도시)는 용접 헤드(미도시)를 포함할 수 있다. The automatic welding carriage (not shown) may include a welding head (not shown).

또한, 상기 자동 용접 캐리지는 자동 용접 캐리지의 가이드 링(GR)(이하, 간단히 "가이드 링(GR)"으로 지칭함)에 장착되어 가이드 링(GR)을 따라 이동하면서 2개의 배관을 맞대기 용접함으로써 당해 배관들을 서로 연결해주는 역할을 수행한다.In addition, the automatic welding carriage is mounted on the guide ring (GR) (hereinafter simply referred to as “guide ring (GR)”) of the automatic welding carriage and butt-welds two pipes while moving along the guide ring (GR), thereby welding the pipe. It serves to connect pipes to each other.

가이드 링 설치용 지그(100)는 그 전체 길이가 용접 위치에서부터 가이드 링(GR)의 설치 위치까지의 미리 결정된 거리에 상응하는 길이가 되도록 제작되어, 용접 위치를 설치 시작점으로 하여 가이드 링(GR)을 배관(PP)의 길이방향으로 부착하면 배관(PP)의 외주면 상에서 가이드 링(GR)의 설치 위치가 자동으로 설정될 수 있다.The guide ring installation jig 100 is manufactured so that its total length corresponds to a predetermined distance from the welding position to the installation position of the guide ring (GR), and the guide ring (GR) is installed using the welding position as the installation starting point. When attached in the longitudinal direction of the pipe (PP), the installation position of the guide ring (GR) can be automatically set on the outer peripheral surface of the pipe (PP).

예를 들어, 가이드 링 설치용 지그(100)는 센터갭 베이스(141)로부터 스토퍼(124)까지의 거리가 미리 결정된 길이(예를 들어, 210mm)만큼이 되도록 구성될 수 있다. For example, the guide ring installation jig 100 may be configured such that the distance from the center gap base 141 to the stopper 124 is a predetermined length (eg, 210 mm).

지그 본체(110)는 거리조정 블록 고정용 홈(gr1), 마그네틱 블록 고정용 홈(gr2) 및 갭조정 블록 고정용 홈(gr3)을 포함할 수 있다. The jig body 110 may include a groove (gr1) for fixing the distance adjustment block, a groove (gr2) for fixing the magnetic block, and a groove (gr3) for fixing the gap adjustment block.

도 2 및 도 5를 참조하면, 거리조정 블록 고정용 홈(gr1) 및 마그네틱 블록 고정용 홈(gr2)은 서로 연통될 수 있다. 즉, 1개의 길쭉한 홈이 형성되고, 그 중 일부분은 거리조정 블록 고정용 홈(gr1)으로 사용되고, 나머지 일부는 마그네틱 블록 고정용 홈(gr1)으로 사용될 수 있다. 그러나, 본 발명이 이에 한정되는 것은 아니며, 거리조정 블록 고정용 홈(gr1) 및 마그네틱 블록 고정용 홈(gr2)은 서로 연통되지 않고 별도로 형성될 수도 있다.Referring to Figures 2 and 5, the distance adjustment block fixing groove (gr1) and the magnetic block fixing groove (gr2) may communicate with each other. That is, one elongated groove is formed, part of which can be used as a groove (gr1) for fixing the distance adjustment block, and the remaining part can be used as a groove (gr1) for fixing the magnetic block. However, the present invention is not limited to this, and the distance adjustment block fixing groove (gr1) and the magnetic block fixing groove (gr2) may not be in communication with each other but may be formed separately.

거리조정 블록(120)은 상술한 바와 같이 배관(PP)의 외주면 상에서 가이드 링(GR)의 설치 위치를 자동으로 설정해주는 역할을 수행한다. 즉, 배관(PP)의 외주면 상에 가이드 링 설치용 지그(100)를 설치하여 그 설치 위치를 고정할 경우, 가이드 링 설치용 지그(100)가 배관(PP)의 측면 또는 하부에 설치되더라도 거리조정 블록(120)은 배관(PP)의 관경에 따라 스스로 자신의 곡률 반경을 변화시켜 배관(PP)의 외주면의 곡률 반경에 맞게 배관 밀착부(즉, 스토퍼(124))의 각도와 높이를 조정할 수 있다.As described above, the distance adjustment block 120 serves to automatically set the installation position of the guide ring GR on the outer peripheral surface of the pipe PP. That is, when installing the guide ring installation jig 100 on the outer peripheral surface of the pipe (PP) and fixing the installation position, the distance adjustment block even if the guide ring installation jig 100 is installed on the side or bottom of the pipe (PP) (120) can change its own radius of curvature according to the pipe diameter of the pipe (PP) and adjust the angle and height of the pipe adhesion portion (i.e., stopper 124) to suit the radius of curvature of the outer peripheral surface of the pipe (PP). .

구체적으로, 거리조정 블록(120)은 거리조정 블록 베이스(121), 경첩부(122), 한쌍의 날개부(123) 및 한쌍의 스토퍼(124)를 포함할 수 있다.Specifically, the distance adjustment block 120 may include a distance adjustment block base 121, a hinge portion 122, a pair of wings 123, and a pair of stoppers 124.

도 2 및 도 5를 참조하면, 거리조정 블록 베이스(121)에는 복수개의 나사홈이 형성되어 있어서 상기 각 나사홈 및 거리조정 블록 고정용 홈(gr1)을 차례로 관통하여 나사가 지그 본체(110)에 결합됨으로써 거리조정 블록 베이스(121)가 지그 본체(110)에 나사결합될 수 있다. 또한, 거리조정 블록 베이스(121)는 거리조정 블록 고정용 홈(gr1)을 따라 수평이동이 가능하기 때문에 원하는 지점에 위치 고정될 수 있다. 이와 같이, 거리조정 블록(120)이 거리조정 기능을 갖기 때문에 배관(PP)의 절단면이 일직선으로 절단되지 않아 용접 위치에서부터 가이드 링(GR)의 설치 위치까지의 거리가 미리 결정된 거리(예를 들어, 210mm)를 벗어나는 경우에도 거리조정 블록(120)을 수평이동시킴으로써 가이드 링(GR)을 용접 위치로부터 미리 결정된 거리만큼 이격시켜 설치할 수 있다. Referring to Figures 2 and 5, a plurality of screw grooves are formed in the distance adjustment block base 121, so that the screw sequentially penetrates each of the screw grooves and the distance adjustment block fixing groove (gr1) to the jig body 110. By being coupled to the distance adjustment block base 121 can be screwed to the jig body 110. In addition, since the distance adjustment block base 121 can move horizontally along the distance adjustment block fixing groove (gr1), it can be positioned and fixed at a desired point. In this way, since the distance adjustment block 120 has a distance adjustment function, the cut surface of the pipe PP is not cut in a straight line, so the distance from the welding position to the installation position of the guide ring GR is a predetermined distance (e.g. , 210 mm), the guide ring GR can be installed at a predetermined distance from the welding position by horizontally moving the distance adjustment block 120.

한편, 배관(PP)의 외주면 상에 가이드 링(GR)을 임시로 고정시킨 후에는 가이드 링(GR)의 모든 구간의 높이를 확인하여 적절하다고 생각되는 경우에는 일시에 고정핀(미도시)을 조여줌으로써 가이드 링(GR)을 신속하게 설치하여 가이드 링(GR)의 정확한 설치 위치 및 정확한 이격거리를 확보할 수 있어서 기존 반복 작업을 해소할 수 있다.Meanwhile, after temporarily fixing the guide ring (GR) on the outer peripheral surface of the pipe (PP), check the height of all sections of the guide ring (GR) and, if deemed appropriate, attach a fixing pin (not shown) at the same time. By tightening, the guide ring (GR) can be quickly installed and the exact installation position and accurate separation distance of the guide ring (GR) can be secured, eliminating existing repetitive work.

경첩부(122)는 한쌍의 날개부(123)를 거리조정 블록 베이스(121)에 회동 가능하게 결합하는 역할을 수행한다. 구체적으로, 경첩부(122)는 배관(PP)의 관경에 따라 곡률이 상이한 점을 고려하여 안출된 것으로 배관(PP)의 관경이 변화하더라도 거리조정 블록(120)이 항상 배관(PP)의 외주면에 밀착되게 하는 역할을 수행한다.The hinge portion 122 serves to rotatably couple the pair of wings 123 to the distance adjustment block base 121. Specifically, the hinge portion 122 was designed in consideration of the fact that the curvature varies depending on the pipe diameter of the pipe (PP). Even if the pipe diameter of the pipe (PP) changes, the distance adjustment block 120 is always positioned on the outer surface of the pipe (PP). It plays a role in adhering closely to the

한쌍의 스토퍼(124)는 한쌍의 날개부(123) 각각에 하나씩 결합되어 일 측면은 가이드 링(GR)과 접촉 가능하고 하부는 배관(PP)과 접촉 가능하도록 구성될 수 있다.The pair of stoppers 124 may be configured to be coupled one by one to each of the pair of wings 123 so that one side can be in contact with the guide ring (GR) and the lower part can be in contact with the pipe (PP).

또한, 한쌍의 스토퍼(124)는 각각 가이드 링(GR)의 높이에 맞게 구성될 수 있다.Additionally, the pair of stoppers 124 may each be configured to match the height of the guide ring GR.

또한, 한쌍의 스토퍼(124)는 각각 항상 배관(PP)에 밀착되도록 배관(PP)과 접촉하는 하부면에 자석(미도시)을 장착할 수 있다.Additionally, each of the pair of stoppers 124 may be equipped with a magnet (not shown) on its lower surface in contact with the pipe PP so that it is always in close contact with the pipe PP.

결과적으로, 한쌍의 날개부(123) 및 한쌍의 스토퍼(124)는 경첩부(122)를 매개로 하여 거리조정 블록 베이스(121)를 기준으로 하방(즉, 배관(PP)의 외주면 방향)으로 회전 가능하도록 구성될 수 있다. As a result, the pair of wings 123 and the pair of stoppers 124 move downward (i.e., in the direction of the outer peripheral surface of the pipe PP) with respect to the distance adjustment block base 121 via the hinge portion 122. It may be configured to be rotatable.

또한, 경첩부(122)는 스프링 장치 부착형 경첩을 포함할 수 있다. 이에 따라, 가이드 링 설치용 지그(100)가 배관(PP)의 하부에 위치하더라도 지그(100)의 거리조정 블록(120)(구체적으로, 한쌍의 날개부(123)와 한쌍의 스토퍼(124))이 중력에 의하여 하부로 처지는 것을 방지할 수 있다. Additionally, the hinge portion 122 may include a spring-loaded hinge. Accordingly, even if the guide ring installation jig 100 is located at the lower part of the pipe PP, the distance adjustment block 120 of the jig 100 (specifically, a pair of wings 123 and a pair of stoppers 124) This gravity prevents it from sagging downward.

또한, 경첩부(122)는 적어도 한쌍(예를 들어, 2쌍)의 경첩을 포함할 수 있다.Additionally, the hinge portion 122 may include at least one pair (eg, two pairs) of hinges.

갭조정 블록(130)은 배관(PP)의 외주면과 가이드 링(GR)의 내면 간의 간격(즉, 갭)을 쉽고 빠르게 설정할 수 있게 하는 역할과 함께 가이드 링(GR)을 배관(PP)의 외주면에 임시 고정할 수 있게 하는 역할을 수행한다. The gap adjustment block 130 serves to easily and quickly set the gap (i.e. gap) between the outer peripheral surface of the pipe (PP) and the inner surface of the guide ring (GR) and adjusts the guide ring (GR) to the outer peripheral surface of the pipe (PP). It plays a role in allowing temporary fixation.

구체적으로, 갭조정 블록(130)은 갭조정 블록 베이스(131) 및 갭조정 블록 베이스 고정 노브(132)를 포함할 수 있다. 구체적으로, 갭조정 블록 베이스(131)에는 홀(h1)이 형성되고, 이 홀(h1)의 외부로 돌출되도록 갭조정 블록 베이스 고정 노브(132)가 갭조정 블록 고정용 홈(gr3)을 관통하여 지그 본체(110)에 나사결합될 수 있다. 이에 따라, 갭조정 블록 베이스 고정 노브(132)를 풀어 갭조정 블록 베이스(131)의 수평 위치를 조정하고, 이후 갭조정 블록 베이스 고정 노브(132)를 잠가 갭조정 블록 베이스(131)의 수평 위치를 고정시킬 수 있다.Specifically, the gap adjustment block 130 may include a gap adjustment block base 131 and a gap adjustment block base fixing knob 132. Specifically, a hole h1 is formed in the gap adjustment block base 131, and the gap adjustment block base fixing knob 132 penetrates the gap adjustment block fixing groove gr3 so as to protrude out of the hole h1. Thus, it can be screwed to the jig body 110. Accordingly, the gap adjustment block base fixing knob 132 is loosened to adjust the horizontal position of the gap adjustment block base 131, and then the gap adjustment block base fixing knob 132 is locked to adjust the horizontal position of the gap adjustment block base 131. can be fixed.

도 9는 갭조정 블록(130) 및 이에 대응되는 지그 본체(110)의 구조 및 갭조정 블록(130)의 사용방법을 설명하기 위한 도면이다.FIG. 9 is a diagram for explaining the structure of the gap adjustment block 130 and the corresponding jig body 110 and a method of using the gap adjustment block 130.

도 9를 참조하면, 지그 본체(110)에는 갭조정 블록 베이스 고정 노브(132)가 체결될 수 있는 나사홈이 복수개 형성될 수 있다. 따라서, 갭조정 블록(130)을 좌우로 수평이동시켜 지그 본체(110)에 형성된 복수개의 나사홈 중 어느 하나에 갭조정 블록 베이스 고정 노브(132)를 체결함으로써 갭조정 블록(130)의 수평 위치를 고정시킬 수 있다. Referring to FIG. 9, a plurality of screw grooves into which the gap adjustment block base fixing knob 132 can be fastened may be formed in the jig body 110. Therefore, the gap adjustment block 130 is moved horizontally to the left and right and the gap adjustment block base fixing knob 132 is fastened to one of the plurality of screw grooves formed in the jig body 110 to adjust the horizontal position of the gap adjustment block 130. can be fixed.

갭조정 블록 베이스(131)는 다단 계단식으로 구성된 상면을 포함할 수 있다. 구체적으로, 갭조정 블록 베이스(131)는 배관(PP)의 외주면과 가이드 링(GR)의 내면과의 이격거리(즉, 갭)를 미리 결정된 길이 단위(예를 들어, 1mm 단위)로 조정할 수 있도록 다단 계단식으로 구성된 상면을 포함할 수 있다.The gap adjustment block base 131 may include an upper surface configured in multi-step steps. Specifically, the gap adjustment block base 131 can adjust the separation distance (i.e., gap) between the outer peripheral surface of the pipe (PP) and the inner surface of the guide ring (GR) in predetermined length units (e.g., 1 mm units). It may include an upper surface composed of multi-step steps.

또한 도 8을 참조하면, 가이드 링 설치용 지그(100)는 갭조정 블록 베이스(131)의 상면에 장착 가능하도록 구성된 보조 갭조정 블록(133)을 더 포함할 수 있다.Also, referring to FIG. 8, the guide ring installation jig 100 may further include an auxiliary gap adjustment block 133 configured to be mounted on the upper surface of the gap adjustment block base 131.

보조 갭조정 블록(133)은 갭조정 블록(130)만으로 조정하기 어려운 갭(즉, 배관(PP)의 외주면과 가이드 링(GR)의 내면 사이의 이격거리)을 갭조정 블록(130)과 함께 조정하는 역할을 수행한다. 예를 들어, 갭조정 블록(130)은 300A, 400A 등 100mm 단위로 증가하는 배관(PP)의 갭조정에는 적합하게 사용될 수 있지만, 350A, 450A, 550A 등 50mm 단위로 생산되는 배관(PP)에는 사용하기가 어렵다. 그러나, 갭조정 블록(130)의 상면에 20mm 두께의 보조 갭조정 블록(133)을 배치하게 되면 350A, 450A, 550A 등 50mm 단위로 생산되는 배관(PP)의 갭조정도 가능해진다.The auxiliary gap adjustment block 133 is used together with the gap adjustment block 130 to adjust the gap (i.e., the separation distance between the outer peripheral surface of the pipe (PP) and the inner surface of the guide ring (GR)) that is difficult to adjust with the gap adjustment block 130 alone. Plays a coordinating role. For example, the gap adjustment block 130 can be suitably used to adjust the gap of piping (PP) produced in 100 mm increments such as 300A, 400A, etc., but it can be used for piping (PP) produced in 50 mm increments such as 350A, 450A, and 550A. It's difficult to use. However, if a 20 mm thick auxiliary gap adjustment block 133 is placed on the upper surface of the gap adjustment block 130, gap adjustment of pipes (PP) produced in 50 mm units such as 350A, 450A, and 550A becomes possible.

또한, 보조 갭조정 블록(133)은 하부에 장착된 자석(미도시)을 포함할 수 있다. 따라서, 보조 갭조정 블록(133)은 갭조정 블록(130)의 상면에 쉽게 탈부착될 수 있을 뿐만 아니라, 가이드 링 설치용 지그(100)가 배관(PP)의 측면 또는 하부에 설치되더라도 보조 갭조정 블록(133)이 중력에 의하여 하부로 낙하하는 것을 방지할 수 있다. Additionally, the auxiliary gap adjustment block 133 may include a magnet (not shown) mounted at the bottom. Therefore, the auxiliary gap adjustment block 133 can be easily attached and detached from the upper surface of the gap adjustment block 130, and even if the guide ring installation jig 100 is installed on the side or bottom of the pipe (PP), the auxiliary gap adjustment block 133 can be easily attached and detached from the upper surface of the gap adjustment block 130. (133) can be prevented from falling to the bottom due to gravity.

센터갭 블록(140)은 용접 위치를 기준으로 가이드 링(GR)의 설치 위치를 자동으로 설정함에 있어서 기준 위치를 잡아주는 역할을 수행한다.The center gap block 140 serves to hold the reference position in automatically setting the installation position of the guide ring (GR) based on the welding position.

구체적으로, 센터갭 블록(140)은 센터갭 블록 베이스(141) 및 센터갭 블록 베이스 고정 노브(142)를 포함할 수 있다. 구체적으로, 센터갭 블록 베이스(141)에는 수직방향으로 연장된 홀(h2)이 형성되고, 이 홀(h2)의 외부로 돌출되게 센터갭 블록 베이스 고정 노브(142)가 지그 본체(110)에 나사결합될 수 있다. 이에 따라, 센터갭 블록 베이스 고정 노브(142)를 풀어 용접 위치에서의 갭의 크기(미용접 상태) 또는 홈의 깊이(가용접 상태)에 맞춰 센터갭 블록 베이스(141)의 수직 위치를 조정하고, 이후 센터갭 블록 베이스 고정 노브(142)를 잠가 센터갭 블록 베이스(141)의 수직 위치를 고정시킬 수 있다.Specifically, the center gap block 140 may include a center gap block base 141 and a center gap block base fixing knob 142. Specifically, a vertically extending hole (h2) is formed in the center gap block base 141, and the center gap block base fixing knob 142 is attached to the jig body 110 to protrude out of the hole (h2). Can be screwed together. Accordingly, the center gap block base fixing knob 142 is loosened to adjust the vertical position of the center gap block base 141 according to the size of the gap at the welding position (unwelded state) or the depth of the groove (tack welded state). , Afterwards, the vertical position of the center gap block base 141 can be fixed by locking the center gap block base fixing knob 142.

또한, 센터갭 블록 베이스(141)는 배관과 배관 사이의 빈틈을 통과하지 못하도록 배관과 배관 사이의 빈틈보다 두께가 두껍도록 구성될 수 있다.Additionally, the center gap block base 141 may be configured to be thicker than the gap between the pipes to prevent it from passing through the gap between the pipes.

또한, 센터갭 블록 베이스(141)는 서로 반대쪽에 위치하는 쐐기형 단부(141a) 및 라운드형 단부(141b)를 포함할 수 있다. Additionally, the center gap block base 141 may include a wedge-shaped end 141a and a round end 141b located on opposite sides of each other.

쐐기형 단부(141a)는 서로 맞대기 용접되는 2개의 배관(PP)의 용접 위치가 아직 용접되지 않은 경우, 상기 용접 위치의 정중앙에 위치하여 가이드 링(GR)의 설치 위치를 조정하기 위해 사용될 수 있다. The wedge-shaped end 141a is located at the exact center of the welding position of the two pipes PP butt-welded to each other when the welding position has not yet been welded. It can be used to adjust the installation position of the guide ring GR. .

라운드형 단부(141b)는 서로 맞대기 용접되는 2개의 배관(PP)의 용접 위치가 가용접(즉, 초층용접)된 경우, 상기 용접 위치의 정중앙에 위치하여 가이드 링(GR)의 설치 위치를 조정하기 위해 사용될 수 있다. When the welding positions of two pipes (PP) butt-welded to each other are tack welded (i.e., first layer welded), the round end portion 141b is located at the exact center of the welding positions to adjust the installation position of the guide ring GR. It can be used to:

마그네틱 블록(150)은 마그네틱 베이스(151), 마그네틱 베이스 고정 브라켓(152), 마그네틱 베이스 작동 노브(153) 및 마그네틱 베이스 고정 노브(154)를 포함할 수 있다.The magnetic block 150 may include a magnetic base 151, a magnetic base fixing bracket 152, a magnetic base operation knob 153, and a magnetic base fixing knob 154.

마그네틱 베이스(151)는 자력에 의해 배관(PP)의 외주면에 부착되도록 구성될 수 있다. 따라서, 마그네틱 베이스(151)는 가이드 링 설치용 지그(100)가 배관(PP)의 측면 또는 하부에 설치되더라도 영구자석 및 마그네틱 기능으로 인해 중력에 의하여 하부로 낙하하는 것을 방지할 수 있다. The magnetic base 151 may be configured to be attached to the outer peripheral surface of the pipe PP by magnetic force. Accordingly, the magnetic base 151 can prevent the guide ring installation jig 100 from falling downward due to gravity due to the permanent magnet and magnetic functions even if the guide ring installation jig 100 is installed on the side or bottom of the pipe PP.

마그네틱 베이스 고정 브라켓(152)은 그 일단부가 마그네틱 베이스(151)에 결합되고, 타단부는 마그네틱 블록 고정용 홈(gr2)을 통해 지그 본체(110)에 나사결합되어, 결과적으로 마그네틱 베이스(151)를 지그 본체(110)에 결합하는 역할을 수행한다.One end of the magnetic base fixing bracket 152 is coupled to the magnetic base 151, and the other end is screwed to the jig body 110 through a magnetic block fixing groove (gr2), resulting in the magnetic base 151 It plays the role of coupling to the jig body 110.

마그네틱 베이스 작동 노브(153)는 마그네틱 베이스(151)에 자력을 발생시키거나 자력을 소멸시키는 역할을 수행한다. 예를 들어, 마그네틱 베이스 작동 노브(153)를 시계방향으로 돌리면 마그네틱 베이스(151)에 자력이 발생하여 마그네틱 베이스(151)가 배관(PP)에 부착되고, 마그네틱 베이스 작동 노브(153)를 반시계방향으로 돌리면 마그네틱 베이스(151)에서 자력이 소멸하여 마그네틱 베이스(151)가 배관(PP)으로부터 탈착될 수 있다. The magnetic base operation knob 153 serves to generate magnetic force or annihilate magnetic force in the magnetic base 151. For example, when the magnetic base operation knob 153 is turned clockwise, magnetic force is generated in the magnetic base 151 so that the magnetic base 151 is attached to the pipe (PP), and the magnetic base operation knob 153 is turned counterclockwise. When turned in this direction, the magnetic force in the magnetic base 151 disappears and the magnetic base 151 can be detached from the pipe PP.

도 3을 참조하면, 마그네틱 베이스 고정 브라켓(152)에는 원호형 홀(h3)이 형성되고, 이 홀(h3)의 외부로 돌출되게 마그네틱 베이스 고정 노브(154)가 마그네틱 베이스(151)에 나사결합될 수 있다. 구체적으로, 배관(PP)의 관경에 따라 곡률이 상이하므로 마그네틱 베이스 고정 노브(154)를 풀어 마그네틱 베이스(151)의 높이와 각도를 조정하고, 이후 마그네틱 베이스 고정 노브(154)를 잠가 마그네틱 베이스(151)의 높이와 각도를 고정시킬 수 있다.Referring to FIG. 3, an arc-shaped hole (h3) is formed in the magnetic base fixing bracket 152, and the magnetic base fixing knob 154 is screwed to the magnetic base 151 so as to protrude out of the hole (h3). It can be. Specifically, since the curvature varies depending on the pipe diameter of the pipe (PP), loosen the magnetic base fixing knob 154 to adjust the height and angle of the magnetic base 151, and then lock the magnetic base fixing knob 154 to secure the magnetic base ( 151) height and angle can be fixed.

또한, 마그네틱 베이스 고정 브라켓(152)에는 나사홈이 형성되어 있어서 상기 나사홈 및 마그네틱 블록 고정용 홈(gr2)을 차례로 관통하여 나사가 지그 본체(110)에 결합됨으로써 마그네틱 블록(150)이 지그 본체(110)에 나사결합될 수 있다. 또한, 마그네틱 베이스 고정 브라켓(152)은 마그네틱 블록 고정용 홈(gr2)을 따라 수평이동이 가능하기 때문에 원하는 지점에 위치 고정될 수 있다. 따라서, 마그네틱 베이스(151)의 설치 위치는 그 무게 중심에 맞게 지그 본체(110)의 길이방향을 따라 용이하게 변경될 수 있다.In addition, a screw groove is formed in the magnetic base fixing bracket 152, so that the screw sequentially penetrates the screw groove and the magnetic block fixing groove (gr2) and is coupled to the jig body 110, so that the magnetic block 150 is attached to the jig body. It can be screwed to (110). In addition, since the magnetic base fixing bracket 152 can move horizontally along the magnetic block fixing groove (gr2), it can be positioned and fixed at a desired point. Accordingly, the installation position of the magnetic base 151 can be easily changed along the longitudinal direction of the jig body 110 to suit its center of gravity.

또한, 마그네틱 베이스(151)는 라운드형 바닥부(151a)를 포함할 수 있다. 따라서, 마그네틱 베이스(151)는 일정한 곡률을 갖는 배관(PP)의 외주면에 밀착되게 배치될 수 있다.Additionally, the magnetic base 151 may include a round bottom portion 151a. Accordingly, the magnetic base 151 can be placed in close contact with the outer peripheral surface of the pipe PP having a certain curvature.

도 10은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)를 도 1 및 도 2와 같이 제1 방향에서 바라본 사시도로서 가용접후 가이드 링(GR)의 설치 위치를 나타낸 도면이다.Figure 10 is a perspective view of the jig 100 for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention as seen from the first direction as shown in Figures 1 and 2, and is a view showing the installation position of the guide ring (GR) after tack welding. am.

도 10이 도 2와 다른 점은 센터갭 블록 베이스(141)가 180도 회전하여 라운드형 단부(141b)가 하방으로 향하고 쐐기형 단부(141a)가 상방으로 향한다는 점이다.The difference between FIG. 10 and FIG. 2 is that the center gap block base 141 is rotated 180 degrees so that the round end 141b is directed downward and the wedge-shaped end 141a is directed upward.

상기와 같은 구성을 갖는 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)는 배관(PP)의 외주면에 3~4개 설치되어 용접 위치와 가이드 링(GR) 간의 거리와, 배관(PP)의 외주면과 가이드 링(GR)의 내면 간의 간격을 쉽게 조절할 수 있어서 안정적인 용접을 가능하게 하는 이점이 있다.Three to four jig 100 for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention having the above configuration are installed on the outer peripheral surface of the pipe (PP) to determine the distance between the welding position and the guide ring (GR) , there is an advantage in that stable welding is possible because the gap between the outer peripheral surface of the pipe (PP) and the inner surface of the guide ring (GR) can be easily adjusted.

예를 들어, 자동 용접 캐리지의 가이드 링 설치용 지그(100)는 배관(PP)의 관경에 따라 1200A 이하의 배관에는 3개가 등간격으로 설치되고, 1200A 초과의 배관에는 4개가 등간격으로 설치될 수 있다. 구체적으로, 배관(PP)의 관경에 따라 1200A 이하의 배관에는 3개의 지그(100)를 12시 방향, 4시 방향 및 8시 방향에 하나씩 설치하여 운영할 수 있고, 1200A 초과의 배관에는 4개의 지그(100)를 12시 방향, 3시 방향, 6시 방향 및 9시 방향에 하나씩 설치하여 운영할 수 있다.For example, three jig 100 for installing the guide ring of an automatic welding carriage can be installed at equal intervals in pipes under 1200A, and four pieces can be installed at equal intervals in pipes exceeding 1200A depending on the pipe diameter of the pipe (PP). there is. Specifically, depending on the pipe diameter of the pipe (PP), pipes under 1200A can be operated by installing three jigs (100), one at 12 o'clock, one at 4 o'clock, and one at 8 o'clock, and four jigs 100 can be installed in pipes over 1200A. The jig 100 can be installed and operated one by one at 12 o'clock, 3 o'clock, 6 o'clock, and 9 o'clock.

이하, 도면을 참조하여 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)의 사용방법을 상세히 설명한다.Hereinafter, a method of using the jig 100 for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention will be described in detail with reference to the drawings.

도 11은 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)를 제7 방향에서 바라본 측면도로서 최초 용접시 가이드 링(GR)의 설치 위치를 나타낸 도면이고, 도 12는 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)를 도 11과 같이 제7 방향에서 바라본 측면도로서 가용접후 가이드 링(GR)의 설치 위치를 나타낸 도면이다. 도 12에서, 도면부호 "TW"는 가용접된 부분을 의미한다.Figure 11 is a side view of the jig 100 for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention as seen from the seventh direction, showing the installation position of the guide ring (GR) at the time of initial welding, and Figure 12 is a view showing the installation position of the guide ring (GR) at the time of initial welding. A side view of the jig 100 for installing a guide ring of an automatic welding carriage according to an embodiment of the invention as seen from the seventh direction as shown in FIG. 11 is a diagram showing the installation position of the guide ring (GR) after tack welding. In FIG. 12, reference numeral “TW” refers to a tack-welded portion.

도 1 내지 도 10과 함께 도 11 및 도 12를 참조하면, 본 발명의 일 구현예에 따른 자동 용접 캐리지의 가이드 링 설치용 지그(100)의 사용방법은 하기 단계들을 포함한다:Referring to FIGS. 11 and 12 along with FIGS. 1 to 10, the method of using the jig 100 for installing a guide ring of an automatic welding carriage according to an embodiment of the present invention includes the following steps:

(1) 2개의 배관(PP1, PP2)을 핏업하는 단계(S10),(1) Step of fitting up two pipes (PP1, PP2) (S10),

(2) 가이드 링 설치용 지그(100)를 상기 2개의 배관(PP1, PP2) 중 어느 한 배관(PP2)의 외주면 상에 위치시키는 단계(S20),(2) positioning the guide ring installation jig 100 on the outer peripheral surface of one of the two pipes PP1 and PP2 (PP2) (S20),

(3) 센터갭 블록 베이스(141)의 일단부(141a 또는 141b)를 상기 2개의 배관(PP1, PP2) 사이의 빈틈에 삽입하는 단계(S30),(3) inserting one end (141a or 141b) of the center gap block base 141 into the gap between the two pipes (PP1 and PP2) (S30),

(4) 센터갭 블록 베이스 고정 노브(142)를 이용하여 센터갭 블록 베이스(141)를 지그 본체(110)에 고정시키는 단계(S40),(4) fixing the center gap block base 141 to the jig body 110 using the center gap block base fixing knob 142 (S40),

(5) 마그네틱 베이스 작동 노브(153)를 이용하여 마그네틱 베이스(151)를 작동시키는 단계(S50),(5) operating the magnetic base 151 using the magnetic base operation knob 153 (S50),

(6) 마그네틱 베이스 고정 노브(154)를 이용하여 마그네틱 베이스(151)를 배관(PP2)의 외주면 상에 고정시키는 단계(S60), 및(6) fixing the magnetic base 151 on the outer peripheral surface of the pipe PP2 using the magnetic base fixing knob 154 (S60), and

(7) 갭조정 블록 베이스(131)의 수평 위치를 조정하여 미리 결정된 갭(즉, 배관(PP2)의 외주면과 자동 용접 캐리지의 가이드 링(GR)의 하부 사이의 갭)에 맞춘 후 갭조정 블록 베이스 고정 노브(132)를 이용하여 갭조정 블록 베이스(131)를 지그 본체(110)에 고정시키는 단계(S70).(7) Adjust the horizontal position of the gap adjustment block base 131 to match the predetermined gap (i.e., the gap between the outer peripheral surface of the pipe PP2 and the lower part of the guide ring (GR) of the automatic welding carriage) and then adjust the gap adjustment block. Step of fixing the gap adjustment block base 131 to the jig body 110 using the base fixing knob 132 (S70).

상기 단계(S30)에서, 상기 2개의 배관(PP1, PP2)이 서로 용접되지 않은 경우에는, 센터블록 베이스(141)의 쐐기형 단부(141a)가 상기 2개의 배관(PP1, PP2) 사이의 빈틈에 삽입되고, 상기 2개의 배관(PP1, PP2)이 서로 가용접된 경우에는, 센터블록 베이스(141)의 라운드형 단부(141b)가 상기 2개의 배관(PP1, PP2) 사이의 빈틈에 삽입될 수 있다.In step S30, when the two pipes (PP1, PP2) are not welded to each other, the wedge-shaped end (141a) of the center block base 141 is in the gap between the two pipes (PP1, PP2). When the two pipes (PP1, PP2) are tack-welded to each other, the round end (141b) of the center block base 141 is inserted into the gap between the two pipes (PP1, PP2). You can.

상기 단계(S70)는 갭조정 블록 베이스(131) 위에 보조 갭조정 블록(133)을 장착한 상태에서 수행될 수 있다. 이와 같이, 배관(PP2)과 가이드 링(GR) 사이의 갭은 갭조정 블록(130)만을 이용하거나 갭조정 블록(130)과 함께 보조 갭조정 블록(133)을 이용하여 조정될 수 있다.The step (S70) can be performed with the auxiliary gap adjustment block 133 mounted on the gap adjustment block base 131. In this way, the gap between the pipe PP2 and the guide ring GR can be adjusted using only the gap adjustment block 130 or using the auxiliary gap adjustment block 133 together with the gap adjustment block 130.

또한, 가이드 링 설치용 지그(100)의 사용방법은, 상기 단계(S70) 이후에, 하기 단계들을 더 포함할 수 있다:In addition, the method of using the guide ring installation jig 100 may further include the following steps after the step (S70):

(8) 배관(PP2)의 외주면 상에 가이드 링(GR)을 임시로 고정시키는 단계(S80),(8) temporarily fixing the guide ring (GR) on the outer peripheral surface of the pipe (PP2) (S80),

(9) 배관(PP2)의 외주면 상에 가이드 링(GR)을 정식으로 고정시키는 단계(S90), 및(9) formally fixing the guide ring (GR) on the outer peripheral surface of the pipe (PP2) (S90), and

(10) 배관(PP2)의 외주면으로부터 가이드 링 설치용 지그(100)를 제거하는 단계(S100).(10) Removing the guide ring installation jig 100 from the outer peripheral surface of the pipe PP2 (S100).

상기 단계(S100) 이후에, 자동 용접 캐리지(미도시)를 가이드 링(GR)에 장착하여 용접을 진행하고, 용접이 완료되면 배관(PP2)의 외주면으로부터 가이드 링(GR)을 제거할 수 있다.After the above step (S100), an automatic welding carriage (not shown) is mounted on the guide ring (GR) to proceed with welding, and when welding is completed, the guide ring (GR) can be removed from the outer peripheral surface of the pipe (PP2). .

이하, 배관 규격표와 자동 용접 캐리지의 가이드 링 규격을 기준으로 실제 가이드 링 설치시 갭조정 블록의 사용방법을 상세히 설명한다. Below, we will explain in detail how to use the gap adjustment block when installing the actual guide ring based on the piping standard table and the guide ring standard of the automatic welding carriage.

(1) 1200A 배관의 규격을 기준으로 가이드 링을 체결할 때 1200A 배관의 외경은 1219mm(48”)이다.(1) When fastening the guide ring based on the 1200A piping standard, the outer diameter of the 1200A piping is 1219mm (48”).

(2) 1200A 배관용 가이드 링의 내경은 1232mm(48.5”)이다.(2) The inner diameter of the guide ring for 1200A piping is 1232mm (48.5”).

(3) 배관 원주방향 가이드 링의 내면과 배관 외주면 사이의 이격거리(Gap)는 6.5mm(=(1232-1219)/2)이다.(3) The gap between the inner surface of the pipe circumferential guide ring and the outer surface of the pipe is 6.5mm (=(1232-1219)/2).

(4) 배관이 진원이라고 가정하면 가이드 링 설치용 지그의 갭조정 블록은 6.5mm의 두께를 사용하여야 한다.(4) Assuming that the pipe is a perfect circle, the gap adjustment block of the guide ring installation jig must be used with a thickness of 6.5mm.

(5) 우선, 12시 방향에 설치된 가이드 링 설치용 지그의 갭조정 블록을 6mm에 맞춰놓고 가이드 링을 갭조정 블록 위에 위치시킨다.(5) First, set the gap adjustment block of the guide ring installation jig installed at 12 o'clock to 6mm and place the guide ring on the gap adjustment block.

(6) 8시 방향에 설치된 가이드 링 설치용 지그의 갭조정 블록과 4시 방향에 설치된 가이드 링 설치용 지그의 갭조정 블록도 6mm에 맞춰놓고 가이드 링을 갭조정 블록 위에 위치시킨다.(6) Set the gap adjustment block of the guide ring installation jig installed at the 8 o'clock direction and the gap adjustment block of the guide ring installation jig installed at the 4 o'clock direction to 6 mm, and place the guide ring on the gap adjustment block.

(7) 배관의 상태에 따라 배관의 원주방향으로 가이드 링이 편심되지 않았는지 확인한다.(7) Depending on the condition of the pipe, check whether the guide ring is eccentric in the circumferential direction of the pipe.

(8) 편심된 위치의 가이드 링 설치용 지그의 갭 조정블록을 조정하여 원주방향 갭이 모든 원주방향으로 일치하도록 조정한다.(8) Adjust the gap adjustment block of the guide ring installation jig in an eccentric position so that the circumferential gap is consistent in all circumferential directions.

(9) 8시 방향의 갭이 크다고 생각되면 8시 방향의 가이드 링 설치용 지그의 갭조정 블록을 6mm에서 5mm로 조정하고, 반대편 4시 방향의 가이드 링 설치용 지그의 갭조정 블록을 7mm로 조정하면 원주방향 중심으로 배관이 위치하게 된다.(9) If you think the gap at 8 o'clock is large, adjust the gap adjustment block of the guide ring installation jig at 8 o'clock from 6mm to 5mm, and adjust the gap adjustment block of the guide ring installation jig at 4 o'clock on the opposite side from 7mm. The pipe is located at the center of the circumferential direction.

본 발명은 도면을 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 다른 구현예가 가능하다는 점을 이해할 것이다. 따라서, 본 발명의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의하여 정해져야 할 것이다. The present invention has been described with reference to the drawings, but these are merely illustrative examples, and those skilled in the art will understand that various modifications and equivalent implementations can be made therefrom. Therefore, the true scope of technical protection of the present invention should be determined by the technical spirit of the attached patent claims.

100: 자동 용접 캐리지의 가이드 링 설치용 지그
110: 지그 본체 120: 거리조정 블록
121, 131, 141: 베이스 122: 경첩부
123: 연결부 124: 스토퍼
130: 갭조정 블록 132, 142, 154: 고정 노브
133: 보조 갭조정 블록 140: 센터갭 블록
141a: 쐐기형 단부 141b: 라운드형 단부
150: 마그네틱 블록 151: 마그네틱 베이스
151a: 라운드형 바닥부 152: 마그네틱 베이스 고정 브라켓
153: 마그네틱 베이스 작동 노브 gr1, gr2 gr3: 홈
h1, h2, h3: 홀 PP: 배관
GR: 가이드 링
100: Jig for installing guide ring of automatic welding carriage
110: Jig body 120: Distance adjustment block
121, 131, 141: Base 122: Hinge portion
123: Connection 124: Stopper
130: Gap adjustment block 132, 142, 154: Fixed knob
133: Auxiliary gap adjustment block 140: Center gap block
141a: wedge-shaped end 141b: round end
150: magnetic block 151: magnetic base
151a: Round bottom 152: Magnetic base fixing bracket
153: Magnetic base operation knob gr1, gr2 gr3: home
h1, h2, h3: hole PP: pipe
GR: Guide ring

Claims (16)

자동 용접 캐리지의 가이드 링 설치용 지그로서, 상기 자동 용접 캐리지는 상기 가이드 링에 장착되어 상기 가이드 링을 따라 이동하면서 2개의 배관을 맞대기 용접함으로써 당해 배관들을 서로 연결해주는 역할을 수행하고, 상기 가이드 링 설치용 지그는 전체 길이가 용접 위치에서부터 상기 가이드 링의 설치 위치까지의 미리 결정된 거리에 상응하는 길이가 되도록 제작되어 용접 위치를 설치 시작점으로 하여 상기 가이드 링을 배관의 길이방향으로 부착하면 상기 배관의 외주면 상에서 상기 가이드 링의 설치 위치가 설정되고,
지그 본체;
상기 지그 본체에 수평이동 가능하게 결합된 거리조정 블록;
상기 지그 본체에 수평이동 가능하게 결합된 갭조정 블록;
상기 지그 본체에 결합된 센터갭 블록; 및
상기 지그 본체에 이동 가능하게 결합된 마그네틱 블록을 포함하고,
상기 지그 본체는 거리조정 블록 고정용 홈, 마그네틱 블록 고정용 홈 및 갭조정 블록 고정용 홈을 포함하고,
상기 거리조정 블록은 거리조정 블록 베이스, 경첩부, 한쌍의 날개부 및 한쌍의 스토퍼를 포함하고,
상기 갭조정 블록은 갭조정 블록 베이스 및 갭조정 블록 베이스 고정 노브를 포함하고, 상기 갭조정 블록 베이스는 다단 계단식으로 구성된 상면을 포함하고,
상기 센터갭 블록은 센터갭 블록 베이스 및 센터갭 블록 베이스 고정 노브를 포함하고, 상기 센터갭 블록 베이스는 서로 반대쪽에 위치하는 쐐기형 단부 및 라운드형 단부를 포함하고,
상기 마그네틱 블록은 마그네틱 베이스, 마그네틱 베이스 고정 브라켓, 마그네틱 베이스 작동 노브 및 마그네틱 베이스 고정 노브를 포함하는 자동 용접 캐리지의 가이드 링 설치용 지그.
A jig for installing a guide ring of an automatic welding carriage, wherein the automatic welding carriage is mounted on the guide ring and moves along the guide ring to butt-weld two pipes to connect the pipes to each other. The jig is manufactured so that the total length corresponds to the predetermined distance from the welding position to the installation position of the guide ring. When the guide ring is attached in the longitudinal direction of the pipe using the welding position as the installation starting point, it is installed on the outer peripheral surface of the pipe. The installation position of the guide ring is set,
jig body;
A distance adjustment block horizontally movably coupled to the jig body;
A gap adjustment block horizontally movably coupled to the jig body;
A center gap block coupled to the jig body; and
Includes a magnetic block movably coupled to the jig body,
The jig body includes a groove for fixing a distance adjustment block, a groove for fixing a magnetic block, and a groove for fixing a gap adjustment block,
The distance adjustment block includes a distance adjustment block base, a hinge portion, a pair of wings, and a pair of stoppers,
The gap adjustment block includes a gap adjustment block base and a gap adjustment block base fixing knob, and the gap adjustment block base includes an upper surface configured in multi-step steps,
The center gap block includes a center gap block base and a center gap block base fixing knob, and the center gap block base includes a wedge-shaped end and a round end located opposite to each other,
The magnetic block is a jig for installing a guide ring of an automatic welding carriage, including a magnetic base, a magnetic base fixing bracket, a magnetic base operation knob, and a magnetic base fixing knob.
삭제delete 삭제delete 제1항에 있어서,
상기 한쌍의 날개부 및 상기 한쌍의 스토퍼는 상기 경첩부를 매개로 하여 상기 거리조정 블록 베이스를 기준으로 하방으로 회전 가능하도록 구성된 자동 용접 캐리지의 가이드 링 설치용 지그.
According to paragraph 1,
A jig for installing a guide ring of an automatic welding carriage, wherein the pair of wings and the pair of stoppers are configured to rotate downward with respect to the distance adjustment block base via the hinge portion.
제1항에 있어서,
상기 경첩부는 스프링 장치 부착형 경첩을 포함하는 자동 용접 캐리지의 가이드 링 설치용 지그.
According to paragraph 1,
The hinge part is a jig for installing a guide ring of an automatic welding carriage including a spring device attached hinge.
삭제delete 제1항에 있어서,
상기 갭조정 블록 베이스의 상면에 장착되도록 구성된 보조 갭조정 블록을 더 포함하는 자동 용접 캐리지의 가이드 링 설치용 지그.
According to paragraph 1,
A jig for installing a guide ring of an automatic welding carriage, further comprising an auxiliary gap adjustment block configured to be mounted on the upper surface of the gap adjustment block base.
제7항에 있어서,
상기 보조 갭조정 블록은 하부에 장착된 자석을 포함하는 자동 용접 캐리지의 가이드 링 설치용 지그.
In clause 7,
The auxiliary gap adjustment block is a jig for installing a guide ring of an automatic welding carriage including a magnet mounted at the bottom.
삭제delete 삭제delete 제1항에 있어서,
상기 마그네틱 베이스는 라운드형 바닥부를 포함하는 자동 용접 캐리지의 가이드 링 설치용 지그.
According to paragraph 1,
The magnetic base is a jig for installing a guide ring of an automatic welding carriage including a round bottom.
제1항, 제4항, 제5항, 제7항, 제8항 및 제11항 중 어느 한 항에 따른 자동 용접 캐리지의 가이드 링 설치용 지그의 사용방법으로서,
2개의 배관을 핏업하는 단계(S10);
자동 용접 캐리지의 가이드 링 설치용 지그를 상기 2개의 배관 중 어느 한 배관의 외주면 상에 위치시키는 단계(S20);
센터갭 블록 베이스의 일단부를 상기 2개의 배관 사이의 빈틈에 삽입하는 단계(S30);
센터갭 블록 베이스 고정 노브를 이용하여 상기 센터갭 블록 베이스를 지그 본체에 고정시키는 단계(S40);
마그네틱 베이스 작동 노브를 이용하여 마그네틱 베이스를 작동시키는 단계(S50);
마그네틱 베이스 고정 노브를 이용하여 상기 마그네틱 베이스를 상기 배관의 외주면 상에 고정시키는 단계(S60); 및
갭조정 블록 베이스의 수평 위치를 조정하여 미리 결정된 갭에 맞춘 후 갭조정 블록 베이스 고정 노브를 이용하여 상기 갭조정 블록 베이스를 지그 본체에 고정시키는 단계(S70)를 포함하는 자동 용접 캐리지의 가이드 링 설치용 지그의 사용방법.
A method of using a jig for installing a guide ring of an automatic welding carriage according to any one of claims 1, 4, 5, 7, 8, and 11,
Step of fitting up two pipes (S10);
Positioning the guide ring installation jig of the automatic welding carriage on the outer peripheral surface of one of the two pipes (S20);
Inserting one end of the center gap block base into the gap between the two pipes (S30);
Fixing the center gap block base to the jig body using a center gap block base fixing knob (S40);
Operating the magnetic base using the magnetic base operation knob (S50);
Fixing the magnetic base on the outer peripheral surface of the pipe using a magnetic base fixing knob (S60); and
For guide ring installation of an automatic welding carriage, including the step of adjusting the horizontal position of the gap adjustment block base to match a predetermined gap and then fixing the gap adjustment block base to the jig body using a gap adjustment block base fixing knob (S70). How to use a jig.
제12항에 있어서,
상기 단계(S30)에서, 상기 2개의 배관이 용접되지 않은 경우에는, 상기 센터갭 블록 베이스의 쐐기형 단부가 상기 2개의 배관 사이의 빈틈에 삽입되고, 상기 2개의 배관이 가용접된 경우에는, 상기 센터갭 블록 베이스의 라운드형 단부가 상기 2개의 배관 사이의 빈틈에 삽입되는 자동 용접 캐리지의 가이드 링 설치용 지그의 사용방법.
According to clause 12,
In the step (S30), if the two pipes are not welded, the wedge-shaped end of the center gap block base is inserted into the gap between the two pipes, and if the two pipes are tack-welded, A method of using a jig for installing a guide ring of an automatic welding carriage in which the round end of the center gap block base is inserted into the gap between the two pipes.
제12항에 있어서,
상기 단계(S70)는 상기 갭조정 블록 베이스 위에 보조 갭조정 블록을 장착한 상태에서 수행되는 자동 용접 캐리지의 가이드 링 설치용 지그의 사용방법.
According to clause 12,
The step (S70) is a method of using a jig for installing a guide ring of an automatic welding carriage, which is performed with an auxiliary gap adjustment block mounted on the gap adjustment block base.
제12항에 있어서,
상기 단계(S70) 이후에, 상기 배관의 외주면 상에 자동 용접 캐리지의 가이드 링을 임시로 고정시키는 단계(S80)를 더 포함하는 자동 용접 캐리지의 가이드 링 설치용 지그의 사용방법.
According to clause 12,
After the step (S70), the method of using a jig for installing a guide ring of an automatic welding carriage further includes a step (S80) of temporarily fixing the guide ring of the automatic welding carriage on the outer peripheral surface of the pipe.
제15항에 있어서,
상기 단계(S80) 이후에, 상기 배관의 외주면 상에 상기 자동 용접 캐리지의 가이드 링을 정식으로 고정시키는 단계(S90) 및 상기 배관의 외주면으로부터 상기 자동 용접 캐리지의 가이드 링 설치용 지그를 제거하는 단계(S100)를 더 포함하는 자동 용접 캐리지의 가이드 링 설치용 지그의 사용방법.
According to clause 15,
After the step (S80), formally fixing the guide ring of the automatic welding carriage on the outer peripheral surface of the pipe (S90) and removing the jig for installing the guide ring of the automatic welding carriage from the outer peripheral surface of the pipe ( Method of using a jig for installing a guide ring of an automatic welding carriage further comprising (S100).
KR1020220096747A 2022-08-03 2022-08-03 Jig for installing guide ring of automatic welding carriage and method of using the same KR102595177B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220096747A KR102595177B1 (en) 2022-08-03 2022-08-03 Jig for installing guide ring of automatic welding carriage and method of using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220096747A KR102595177B1 (en) 2022-08-03 2022-08-03 Jig for installing guide ring of automatic welding carriage and method of using the same

Publications (1)

Publication Number Publication Date
KR102595177B1 true KR102595177B1 (en) 2023-10-30

Family

ID=88557879

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220096747A KR102595177B1 (en) 2022-08-03 2022-08-03 Jig for installing guide ring of automatic welding carriage and method of using the same

Country Status (1)

Country Link
KR (1) KR102595177B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102162299B1 (en) * 2020-06-01 2020-10-06 주식회사 금창이엔에스 A piping welding jig and a fire diffusion preventing type piping welding unit including the piping welding jig
KR20200134821A (en) * 2019-05-23 2020-12-02 (주)비더블유티 Carriage clamped to guide ring in automatic welding system
KR20220036893A (en) * 2020-09-16 2022-03-23 주식회사대불용접산업 Orbital railless welding carriage for narrow areas
KR102421367B1 (en) * 2022-01-07 2022-07-15 주식회사 제이앤지텍 Piping jig with pipe alignment function

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200134821A (en) * 2019-05-23 2020-12-02 (주)비더블유티 Carriage clamped to guide ring in automatic welding system
KR102162299B1 (en) * 2020-06-01 2020-10-06 주식회사 금창이엔에스 A piping welding jig and a fire diffusion preventing type piping welding unit including the piping welding jig
KR20220036893A (en) * 2020-09-16 2022-03-23 주식회사대불용접산업 Orbital railless welding carriage for narrow areas
KR102421367B1 (en) * 2022-01-07 2022-07-15 주식회사 제이앤지텍 Piping jig with pipe alignment function

Similar Documents

Publication Publication Date Title
CA2195154C (en) Hole saw guide clamp system
US6145212A (en) Component-support fixtures for component assembly system
KR100675786B1 (en) Multi jointing arm for a pipe welding
KR100823158B1 (en) Tacking jig of pipe and flange, and tacking method there of
US7194812B2 (en) Laser marking device for serial I-joist cutouts
US9370828B2 (en) Adjustable doweling jig
JP2017221949A (en) Pipe welding device
US8651777B2 (en) Adjustable doweling jig
KR102595177B1 (en) Jig for installing guide ring of automatic welding carriage and method of using the same
CN107747934B (en) Pipe jacking axis measuring method
US11906084B2 (en) Flange leveling system for supporting and aligning a flange and related method
KR20140145405A (en) Pipe Alignment Assist Device With A Spirit Level
KR20130071774A (en) Clamp for pipe
KR101218791B1 (en) a fit-up device of pipe welding
CN111055061A (en) Welding jig frame of steel structure
KR101845824B1 (en) Apparatus for measuring cross section of adjusting pipe installation for butt welding
KR102232086B1 (en) Articulated robot for adjustment pipe reproduction
JP2000072385A (en) Construction machine
US2859522A (en) Pipe marker
JPH11153438A (en) Centering jig and measuring device using it
CN113070846B (en) Positioning assembly assembling device
CN214560326U (en) Steel construction installation positioner
CN210849274U (en) Drilling clamp for machining industry
JPH03230896A (en) Positioning apparatus for welding digging claw
KR100775667B1 (en) Apparatus and method for installation of multi beam flow meter

Legal Events

Date Code Title Description
GRNT Written decision to grant