KR102477113B1 - Temporary scaffolding assembly for construction site - Google Patents

Temporary scaffolding assembly for construction site Download PDF

Info

Publication number
KR102477113B1
KR102477113B1 KR1020210188396A KR20210188396A KR102477113B1 KR 102477113 B1 KR102477113 B1 KR 102477113B1 KR 1020210188396 A KR1020210188396 A KR 1020210188396A KR 20210188396 A KR20210188396 A KR 20210188396A KR 102477113 B1 KR102477113 B1 KR 102477113B1
Authority
KR
South Korea
Prior art keywords
frame
temporary
vertical
fixing means
frames
Prior art date
Application number
KR1020210188396A
Other languages
Korean (ko)
Inventor
유병문
유도균
Original Assignee
(주)창조종합건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)창조종합건축사사무소 filed Critical (주)창조종합건축사사무소
Priority to KR1020210188396A priority Critical patent/KR102477113B1/en
Application granted granted Critical
Publication of KR102477113B1 publication Critical patent/KR102477113B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/045Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on profiles, e.g. I or H profiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks

Abstract

The present invention relates to a temporary scaffolding assembly for on-site construction, comprising temporary frames temporarily installed on a plurality of vertical beams of a steel structure, which are installed at regular intervals on the ground; a plurality of fixing means for fixing the temporary frames installed on the vertical beams to the vertical beams; a bridge unit installed across the temporary frames to connect the temporary frames to each other; and a foot plate unit placed on top of the bridge unit, wherein the temporary frames have hanging frames so as to be temporarily held on horizontal beams of the steel structure, which are connected across the vertical beams, without tightening the fixing means, thereby facilitating one-site construction by one person.

Description

현장 시공이 용이한 가설 발판 조립체{TEMPORARY SCAFFOLDING ASSEMBLY FOR CONSTRUCTION SITE}Temporary scaffolding assembly that is easy to construct on site {TEMPORARY SCAFFOLDING ASSEMBLY FOR CONSTRUCTION SITE}

본 발명은 철골구조물에 직접적인 체결 없이 손쉽게 설치 및 해체가 가능한 현장 시공 가설발판 조립체에 관한 것으로, 보다 상세하게는 발판부를 설치하기 앞서 가설되는 가설프레임을 1인(人) 현장 시공이 가능하도록 고정수단의 조임 없이 철골구조물 매달린 상태로 임시 걸쳐지도록 한 후, 고정수단을 통해 가설프레임을 설치할 수 있도록 한 현장 시공 가설발판 조립체에 관한 것이다.The present invention relates to a temporary scaffolding assembly for on-site construction that can be easily installed and dismantled without direct fastening to a steel structure, and more particularly, a fixing means for enabling one-person on-site construction of a temporary frame to be constructed prior to installing a scaffolding unit. It relates to an on-site construction temporary scaffolding assembly that allows a temporary frame to be installed through a fixing means after temporarily hanging a steel structure in a suspended state without tightening.

일반적으로 철골구조물의 외벽 공사에서는 수직빔(H빔)에 근접되게 가설 발판을 설치한다. In general, in the exterior wall construction of a steel structure, a temporary scaffold is installed in close proximity to a vertical beam (H beam).

특히 이러한 임시 가설 발판은 수직빔의 손상을 피하기 위해 원형의 파이프를 격자형태로 설치하게 되며, 이러한 파이프에 발판플레이트를 결합시켜 임시 가설 발판을 설치하였다.In particular, these temporary temporary scaffolds are installed in a grid form of circular pipes to avoid damage to vertical beams, and temporary temporary scaffolds are installed by combining scaffolding plates with these pipes.

이와 같은 가설 발판으로, 통상 건축용 비계 조립구조(대한민국 등록실용 제20-0323788호)가 있는데, 이러한 종래 기술은 현장에서 작업자에 의해 용접과 클램프와 같은 방법으로 제작됨에 따라 많은 자재가 필요하고, 인건비와 시공이 길어지는 문제점이 발생된다.As such a temporary scaffolding, there is usually a scaffolding assembly structure for construction (Republic of Korea Registration Office No. 20-0323788). This prior art requires a lot of materials and labor costs as it is produced by methods such as welding and clamping by workers in the field. and the problem of prolonged construction occurs.

또한 종래의 기술은 설치 뿐만 아니라 분해가 어렵고, 공사구간의 높이를 조절할 경우, 일일이 파이프 자재를 덧대어 재조립해야 해야 하는 문제점이 있었다.In addition, the conventional technology has a problem in that it is difficult to disassemble as well as installation, and when adjusting the height of the construction section, it is necessary to reassemble by attaching pipe materials one by one.

대한민국 등록실용 제20-0323788호Republic of Korea Registered Utility No. 20-0323788

본 발명은 상기와 같은 문제점을 감안하여 안출된 것으로, 본 발명의 제1목적은, 걸림프레임을 통해 가설프레임을 철골구조물 중 수직빔을 가로질러 연결되는 수평빔에 임시 걸쳐지도록 1인 현장 시공이 가능한 현장 시공이 용이한 가설 발판 조립체를 제공하는데 있다.The present invention has been devised in view of the above problems, and the first object of the present invention is a one-person on-site construction so that the temporary frame through the hanging frame is temporarily hung over the horizontal beam connected across the vertical beam of the steel structure. It is to provide a temporary scaffolding assembly that is easy to construct on-site as possible.

본 발명의 제2목적은, 지지프레임을 수직빔에 고정하는 고정수단의 결속을 느슨하게 된다 하더라도, 걸림프레임을 통해 가설프레임이 낙하되지 않아 안전사고를 방지할 수 있도록 한 현장 시공이 용이한 가설 발판 조립체를 제공하는데 있다.A second object of the present invention is a temporary scaffold that is easy to construct on site so that even if the binding of the fixing means for fixing the support frame to the vertical beam is loosened, the temporary frame does not fall through the hanging frame to prevent safety accidents. to provide an assembly.

본 발명의 제3목적은, 가설프레임과, 가교부와, 발판부로만 이루어져 있어 구조가 매우 간단하고 시공이 용이한 현장 시공이 용이한 가설 발판 조립체를 제공하는데 있다.A third object of the present invention is to provide a temporary scaffold assembly having a very simple structure and easy on-site construction because it consists of only a temporary frame, a bridge part, and a scaffolding part.

상기한 바와 같은 목적을 달성하기 위한 특징에 따르면, 제1발명은, 현장 시공 가설 발판조립체에 관한 것으로, 이를 위해 철골구조물 중 지면에 일정간격을 두고 설치된 다수의 수직빔에 가설되는 가설프레임;과, 상기 각 수직빔에 가설된 가설프레임을 수직빔에 고정하는 다수의 고정수단;과, 상기 각 가설프레임을 상호 간 연결하기 위해 상기 가설프레임을 가로질러 설치되는 가교부; 및 상기 가교부의 상부에 거치되는 발판부;를 포함하여 이루어지되, 상기 가설프레임은 1인 현장 시공이 용이하도록 고정수단의 조임 없이 철골구조물 중 수직빔을 가로질러 연결되는 수평빔에 임시 걸쳐지도록 걸림프레임을 갖는 것을 특징으로 한다.According to the characteristics for achieving the above object, the first invention relates to a field construction temporary scaffolding assembly, for which a temporary frame is constructed on a plurality of vertical beams installed at regular intervals on the ground among steel structures; and A plurality of fixing means for fixing the temporary frame hypothesized to each vertical beam to the vertical beam; and a bridging unit installed across the temporary frame to connect each of the temporary frames to each other; And a scaffolding portion mounted on the upper portion of the bridge portion, wherein the temporary frame is temporarily caught on a horizontal beam connected across a vertical beam of a steel structure without tightening a fixing means so that one-person on-site construction is easy. It is characterized by having a frame.

제2발명은, 제1발명에서, 상기 가설프레임은 난간 핸드레일이 연결되는 수직프레임과, 상기 수직프레임의 하부에 수평 연결되고 수직빔의 전면에 2점 가설되는 한쌍의 지지프레임으로 이루어지되, 상기 걸림프레임은 상기 수직프레임의 상부에 연결되는 수평프레임을 매개로 분기되어 상기 철골구조물 중 상기 각 수직빔을 가로질러 연결되는 수평빔에 타면에 2점 가설되는 것을 특징으로 한다.In the second invention, in the first invention, the temporary frame is composed of a vertical frame to which a handrail is connected, and a pair of support frames connected horizontally to the lower part of the vertical frame and constructed at two points in front of the vertical beam, The hanging frame is branched via a horizontal frame connected to the upper portion of the vertical frame, characterized in that two points are hypothesized on the other side of the horizontal beam connected across each vertical beam of the steel frame structure.

제3발명은, 제1발명에서, 상기 각 지지프레임은 고정수단을 연결하기 위해 수직방향으로 연결되는 제1프레임플랜지를 더 포함하고, 상기 각 걸림프레임은 고정수단을 연결하기 위해 수직방향으로 연결되는 제2프레임플랜지를 더 포함하는 것을 특징으로 한다.In the third invention, in the first invention, each support frame further comprises a first frame flange connected in the vertical direction to connect the fixing means, and each locking frame is connected in the vertical direction to connect the fixing means. It is characterized in that it further comprises a second frame flange.

제4발명은, 제1발명에서, 상기 고정수단은 연결된 손잡이의 회전방향에 따라 진퇴될 수 있도록 상기 제1,2프레임플랜지에 나선 결합되는 조임볼트(21)와, 상기 조임볼트의 단부에 고정되어 수직빔 또는 수평빔에 가압 고정되는 조임접시로 구성되는 것을 특징으로 한다. In the fourth invention, in the first invention, the fixing means is fixed to the tightening bolt 21 spirally coupled to the first and second frame flanges and to the end of the tightening bolt so that the fixing means can be moved forward and backward according to the rotation direction of the handle connected thereto. It is characterized in that it consists of a tightening plate that is pressed and fixed to a vertical beam or a horizontal beam.

본 발명의 현장 시공이 용이한 가설 발판 조립체에 따르면, 가설프레임과, 가교부와, 발판부로만 이루어져 있어 구조가 매우 간단하고 시공이 용이한 효과가 있다.According to the temporary scaffolding assembly, which is easy to construct on site, of the present invention, the structure is very simple and the construction is easy because it consists of only the temporary frame, the bridge part, and the scaffolding part.

또한 지지프레임을 수직빔에 고정하는 고정수단의 결속을 느슨하게 된다 하더라도, 걸림프레임을 통해 가설프레임이 낙하되지 않아 안전사고를 방지할 수 있는 효과가 있다.In addition, even if the binding of the fixing means for fixing the support frame to the vertical beam is loosened, the temporary frame does not fall through the hanging frame, thereby preventing safety accidents.

또한 걸림프레임을 통해 가설프레임을 철골구조물 중 수직빔을 가로질러 연결되는 수평빔에 임시 걸쳐지도록 1인 현장 시공이 가능한 효과가 있다.In addition, there is an effect that one-person on-site construction is possible so that the temporary frame is temporarily strung on the horizontal beam connected across the vertical beam of the steel frame through the hanging frame.

도 1은 본 발명에 따른 현장 시공이 용이한 가설 발판 조립체의 사시도,
도 2는 도 1에서 발췌된 가설프레임을 나타내는 사시도,
도 3은 수직빔에 가설된 가설프레임의 나타내는 사시도,
도 4는 도 3의 측면도,
도 5는 도 4에서 수평프레임에 걸쳐진 가설프레임을 나타내는 개념도,
도 6은 가설프레임에 가교부의 설치 상태를 나타내는 사시도,
도 7은 도 1에서 발췌된 발판부를 나타내는 사시도,
1 is a perspective view of a temporary scaffolding assembly that is easy to construct on-site according to the present invention;
Figure 2 is a perspective view showing a hypothetical frame extracted from Figure 1;
3 is a perspective view showing a temporary frame hypothesized to a vertical beam;
Figure 4 is a side view of Figure 3;
5 is a conceptual diagram showing a hypothetical frame spanning a horizontal frame in FIG. 4;
6 is a perspective view showing the installation state of the bridge unit on the temporary frame;
Figure 7 is a perspective view showing the scaffolding extracted from Figure 1;

이하의 본 발명의 목적들, 다른 목적들, 특징들 및 이점들은 첨부된 도면과 관련된 이하의 바람직한 실시예들을 통해서 쉽게 이해될 것이다. 그러나 본 발명은 여기서 설명되는 실시예들에 한정되지 않고 다른 형태로 구체화될 수도 있다.Objects, other objects, features and advantages of the present invention below will be easily understood through the following preferred embodiments in conjunction with the accompanying drawings. However, the present invention is not limited to the embodiments described herein and may be embodied in other forms.

오히려, 여기서 소개되는 실시예들은 개시된 내용이 철저하고 완전해질 수 있도록 그리고 당업자에게 본 발명의 사상이 충분히 전달될 수 있도록 하기 위해 제공되는 것이다.Rather, the embodiments introduced herein are provided so that the disclosed content will be thorough and complete and the spirit of the present invention will be sufficiently conveyed to those skilled in the art.

여기에 설명되고 예시되는 실시예들은 그것의 상보적인 실시예들도 포함한다.Embodiments described and illustrated herein also include complementary embodiments thereof.

본 명세서에서, 단수형은 문구에서 특별히 언급하지 않는 한 복수형도 포함한다. 명세서에서 사용되는 '포함한다(comprise)' 및/또는 '포함하는(comprising)'은 언급된 구성요소는 하나 이상의 다른 구성요소의 존재 또는 추가를 배제하지 않는다.In this specification, singular forms also include plural forms unless specifically stated otherwise in a phrase. The terms 'comprise' and/or 'comprising' used in the specification do not exclude the presence or addition of one or more other elements.

이하, 도면을 참조하여 본 발명을 상세히 설명하도록 한다. 아래의 특정 실시예들을 기술하는데 있어서, 여러가지의 특정적인 내용들은 발명을 더 구체적으로 설명하고 이해를 돕기 위해 작성되었다. 하지만 본 발명을 이해할 수 있을 정도로 이 분야의 지식을 갖고 있는 독자는 이러한 여러 가지의 특정적인 내용들이 없어도 사용될수 있다는 것을 인지할 수 있다. 어떤 경우에는, 발명을 기술하는 데 있어서 흔히 알려졌으면서 발명과 크게 관련 없는 부분들은 본 발명을 설명하는 데 있어 혼돈을 막기 위해 기술하지 않음을 미리 언급해 둔다.Hereinafter, the present invention will be described in detail with reference to the drawings. In describing the specific embodiments below, various specific details have been prepared to more specifically describe the invention and aid understanding. However, readers who have knowledge in this field to the extent that they can understand the present invention can recognize that it can be used without these various specific details. In some cases, it is mentioned in advance that parts that are commonly known in describing the invention and are not greatly related to the invention are not described in order to prevent confusion in describing the present invention.

이하에서는 본 발명에 따른 현장 시공이 용이한 가설 발판 조립체에 관하여 첨부되어진 도면과 함께 더불어 상세히 설명하기로 한다.Hereinafter, it will be described in detail in conjunction with the accompanying drawings with respect to the temporary scaffolding assembly, which is easy to construct on-site according to the present invention.

도 1은 본 발명에 따른 현장 시공이 용이한 가설 발판 조립체의 사시도이고, 도 2는 도 1에서 발췌된 가설프레임을 나타내는 사시도이고, 도 3은 수직빔에 가설된 가설프레임의 나타내는 사시도이고, 도 4는 도 3의 측면도이고, 도 5는 도 4에서 수평프레임에 걸쳐진 가설프레임을 나타내는 개념도이고, 도 6은 가설프레임에 가교부의 설치 상태를 나타내는 사시도이고, 도 7은 도 1에서 발췌된 발판부를 나타내는 사시도이다.1 is a perspective view of a temporary scaffolding assembly that is easy to construct on site according to the present invention, FIG. 2 is a perspective view showing a temporary frame extracted from FIG. 1, and FIG. 3 is a perspective view showing a temporary frame constructed on a vertical beam. 4 is a side view of FIG. 3, FIG. 5 is a conceptual diagram showing a temporary frame spanning a horizontal frame in FIG. 4, FIG. 6 is a perspective view showing the installation state of a bridge unit on a temporary frame, and FIG. 7 is a scaffolding portion extracted from FIG. It is a perspective view that represents

도 1 내지 도 7에 도시된 바와 같이, 본 발명은 발판부를 설치하기 앞서 가설되는 가설프레임을 1인(人) 현장 시공이 가능하도록 고정수단의 조임 없이 철골구조물 매달린 상태로 임시 걸쳐지도록 한 후, 고정수단을 통해 가설프레임을 손쉽게 설치할 수 있도록 한 현장 시공 가설발판 조립체(100)에 관한 것이다.As shown in FIGS. 1 to 7, the present invention temporarily hangs the temporary frame in a hanging state without tightening the fixing means so that the temporary frame to be constructed prior to installing the scaffolding portion can be constructed by one person, It relates to a field construction temporary scaffold assembly 100 that allows easy installation of a temporary frame through a fixing means.

이러한 본 발명의 현장 시공이 용이한 가설 발판 조립체(100)는 크게 3부분으로 구성되는데, 이는 가설프레임(10)과, 가교부(30) 및 발판부(40)로 구성된다. The temporary scaffolding assembly 100, which is easy to construct on site, of the present invention is largely composed of three parts, which include a temporary frame 10, a bridge portion 30, and a scaffold portion 40.

상기 가설프레임(10)은 철골구조물 중 지면에 일정간격을 두고 설치된 다수의 수직빔(210)에 가설되는 구조이다.The temporary frame 10 is a structure that is hypothesized to a plurality of vertical beams 210 installed at regular intervals on the ground among steel structures.

이러한 상기 가설프레임(10)은 1인 현장 시공이 용이하도록 고정수단(20)의 조임 없이 철골구조물 중 수직빔(210)을 가로질러 연결되는 수평빔(220)에 임시 걸쳐지도록 걸림프레임(14)을 갖는 구조이다.The temporary frame 10 is a hanging frame 14 so that it is temporarily hung on the horizontal beam 220 connected across the vertical beam 210 of the steel structure without tightening the fixing means 20 so that one-person on-site construction is easy. is a structure with

보다 상세하게는 상기 가설프레임(10)은 난간 핸드레일(11a)이 연결되는 수직프레임과, 상기 수직프레임(11)의 하부에 수평 연결되고 수직빔(210)의 전면에 2점 지지되는 한쌍의 지지프레임(12)으로 이루어진다.More specifically, the temporary frame 10 is a vertical frame to which the handrail handrail 11a is connected, a pair of horizontally connected to the lower part of the vertical frame 11 and supported by two points on the front of the vertical beam 210 It consists of a support frame (12).

여기서 지지프레임(12)은 상하로 이격되게 한쌍이 설치되는 것으로, 상부에 배치되는 지지프레임(12)은 수직프레임(11)의 하부에 연결되어 발판부(40)의 설치 공간을 확보하고, 더불어 수직빔(210)에 1점 지지된다.Here, a pair of support frames 12 are installed spaced apart vertically, and the support frame 12 disposed on the upper portion is connected to the lower portion of the vertical frame 11 to secure an installation space for the scaffolding portion 40, together with One point is supported on the vertical beam 210.

그리고 하부에 배치된 지지프레임(12)은 보강프레임(13)을 매개로 상부에 배치된 지지프레임(12)과 연결되고, 수직빔(210)에 2점 지지되어 보다 안정적으로 가설프레임(10)을 가설할 수 있는 구조를 마련한다.In addition, the support frame 12 disposed at the lower portion is connected to the support frame 12 disposed at the upper portion via the reinforcing frame 13, and is supported at two points by the vertical beam 210 to provide a more stable temporary frame 10 Provide a structure that can hypothesize.

그리고 상기 걸림프레임(14)은 상기 수직프레임(11)의 상부에 연결되는 수평프레임(11b)을 매개로 분기되는 구조이다.In addition, the hanging frame 14 has a structure branching through a horizontal frame 11b connected to an upper portion of the vertical frame 11 .

이러한 상기 걸림프레임(14)은 수직빔(210)의 간섭을 피할 수 있도록 상기 수직빔(210)을 사이에 두고 분기된 구조로, 상기 철골구조물 중 상기 각 수직빔(210)을 가로질러 연결되는 수평빔(220)에 타면에 2점 지지될 수 있도록 기능한다.The hanging frame 14 has a branched structure with the vertical beams 210 interposed therebetween to avoid interference of the vertical beams 210, and is connected across each vertical beam 210 of the steel frame structure. It functions so that two points can be supported on the other side of the horizontal beam 220.

이 때 상기 각 지지프레임(12)은 수직빔(210)에 지지될 수 있도록 고정수단(20)을 연결하기 위해 수직방향으로 연결되는 제1프레임플랜지(121)를 더 포함한다.At this time, each support frame 12 further includes a first frame flange 121 connected in the vertical direction to connect the fixing means 20 so that it can be supported by the vertical beam 210.

또한 상기 각 걸림프레임(14) 역시 수평빔(220)에 지지될 수 있도록 고정수단(20)을 연결하기 위해 수직방향으로 연결되는 제2프레임플랜지(141)를 더 포함하는 구성이다.In addition, each of the hanging frames 14 is also configured to further include a second frame flange 141 connected in the vertical direction to connect the fixing means 20 so that it can be supported by the horizontal beam 220.

아울러 상기 고정수단(20)은 연결된 손잡이(211)의 회전방향에 따라 진퇴될 수 있도록 상기 제1,2프레임플랜지(121,141)에 나선결합되는 조임볼트(21)와, 상기 조임볼트(21)의 단부에 고정되어 수직빔(210) 또는 수평빔(220)에 가압 고정되는 조임접시(22)로 구성된다.In addition, the fixing means 20 includes a tightening bolt 21 spirally coupled to the first and second frame flanges 121 and 141 so that it can move forward and backward according to the rotation direction of the handle 211 connected thereto, and the tightening bolt 21 It is fixed to the end and consists of a tightening plate 22 that is pressed and fixed to the vertical beam 210 or the horizontal beam 220.

상술된 가설프레임(10)은 고정수단(20)을 통해 수직빔(210)과 수평빔(220)에 가설하기 앞서, 도 5와 같이, 상기 걸림프레임(14)의 제2프레임플랜지(141)에 나선 결합된 고정수단(20)이 수평빔(220)의 플랜지에 걸쳐지도록 하여 철골구조물에서 낙하됨이 없이 매달아 임시 설치할 수 있는 구조이다.The above-described temporary frame 10 is installed on the vertical beam 210 and the horizontal beam 220 through the fixing means 20, as shown in FIG. 5, the second frame flange 141 of the hanging frame 14 It is a structure that can be temporarily installed by hanging without falling from the steel structure by allowing the spirally coupled fixing means 20 to span the flange of the horizontal beam 220.

이 후 1인 설치자는 가설프레임(10)의 위치를 정위치 시킨 후, 제2프레임플랜지(141)에 결합된 조임볼트(21)를 수평빔(220)의 타면에 가압하여 고정하고, 연속적으로 제1프레임플랜지(121)의 조임볼트(21)를 수평빔(220)의 전면에 가압하여 설치할 수 있다.Thereafter, the one-person installer positions the temporary frame 10 in the correct position, presses and fixes the tightening bolt 21 coupled to the second frame flange 141 to the other surface of the horizontal beam 220, and continuously The tightening bolt 21 of the first frame flange 121 may be installed by pressing the front of the horizontal beam 220.

상기 가설프레임(10)의 지지프레임(12)에는 발판부(40)를 설치하기 위해 가교부(30)가 설치된다.A bridge part 30 is installed in the support frame 12 of the temporary frame 10 to install the scaffolding part 40.

이러한 상기 가교부(30)는 도 6과 같이, 지지프레임(12) 상부에 고정되는 제1가교파이프(31)와, 상기 각 제1가교파이프(31)을 가로질러 상기 각 제1가교파이프(31)의 양측 상부에 연결되는 제2가교파이프(32)로 구성된다.As shown in FIG. 6, the cross-linking portion 30 crosses the first cross-linking pipe 31 fixed to the upper portion of the support frame 12 and each of the first cross-linking pipes 31 ( 31) is composed of a second cross-linking pipe 32 connected to the top of both sides.

이러한 상기 가교부(30)는 지지력을 확보할 수 있도록 원형의 파이프로 이루어질 수 있으며, 이외에 각형 파이프로도 구성할 수 있다.The bridging part 30 may be made of a circular pipe to secure bearing capacity, or may also be made of a prismatic pipe.

상기 발판부(40)는 도 7과 같이, 가교부(30)의 상부에 거치되는 것으로, 발판플레이트(41)와, 상기 발판플레이트(41)의 양측에 결합되는 걸림후크(H)로 구성된다.As shown in FIG. 7, the scaffolding portion 40 is mounted on the top of the bridge portion 30, and is composed of a scaffolding plate 41 and hooks H coupled to both sides of the scaffolding plate 41. .

이러한 상기 발판부(40)는 별도의 결속 없이 양단에 결합된 걸림후크(H)를 통해 가교부(30)인 제2가교파이프(32)에 거치시켜 손쉽게 분해 조립할 수 있는 구조이다.The scaffolding portion 40 has a structure that can be easily disassembled and assembled by being placed on the second crosslinking pipe 32, which is the bridge portion 30, through the hooks H coupled to both ends without separate binding.

한편 상기 가설프레임(10)의 수직프레임(11)은 도 4에 도시된 바와 같이, 수직빔(210)에 가설된 상태에서 발판부(40)의 높이를 조절할 수 있도록 구성될 수 있다.Meanwhile, as shown in FIG. 4, the vertical frame 11 of the temporary frame 10 may be configured to adjust the height of the scaffolding portion 40 in a hypothesized state on the vertical beam 210.

이를 위해 상기 가설프레임(10)의 수직프레임(11)은 2개로 분리되고, 분리된 2개의 수직프레임(11)은 상호 간 삽입된 상태에서 고정핀(P)을 통해 고정된 상태로 구성될 수 있다.To this end, the vertical frame 11 of the temporary frame 10 is separated into two, and the two separated vertical frames 11 can be configured in a fixed state through a fixing pin (P) in a mutually inserted state. have.

이하에서는 본 발명에 따른 현장 시공이 용이한 가설 발판 조립체의 시공방법에 관하여 간단히 설명하기로 한다.Hereinafter, a simple description will be given of the construction method of the temporary scaffolding assembly, which is easy to construct on site according to the present invention.

먼저 가설프레임(10) 중 걸림프레임(14)을 철골구조물인 수평빔(220)의 플랜지()에 걸쳐지도록 하여 낙하됨이 없이 매달아 임시 설치한다.First, the hanging frame 14 of the temporary frame 10 is temporarily installed by hanging it without falling so as to span the flange ( ) of the horizontal beam 220, which is a steel structure.

이 후 가설프레임(10)의 위치를 수직빔(210)의 전면에 정위치 시킨 후, 제2프레임플랜지(141)에 결합된 조임볼트(21)를 수평빔(220)의 타면에 가압하여 고정한다.After that, after setting the position of the temporary frame 10 to the front of the vertical beam 210, press the tightening bolt 21 coupled to the second frame flange 141 to the other surface of the horizontal beam 220 to fix it do.

그리고 제1프레임플랜지(121)의 조임볼트(21)를 수평빔(220)의 전면에 가압하여 가설프레임(10)의 설치를 완료한다.Then, the installation of the temporary frame 10 is completed by pressing the tightening bolt 21 of the first frame flange 121 to the front of the horizontal beam 220.

그리고 가설프레임(10)의 지지프레임(12) 상부에 가교부(30)를 고정한다.In addition, the bridge part 30 is fixed to the upper part of the support frame 12 of the temporary frame 10.

마지막으로 걸림후크(H)를 통해 가교부(30)에 발판부(40)을 거치시켜 시공을 완성한다.Finally, the construction is completed by placing the scaffolding portion 40 on the bridge portion 30 through the hook H.

본 발명의 현장 시공이 용이한 가설 발판 조립체는 하기와 같은 차별적인 특징을 갖는다.The temporary scaffolding assembly, which is easy to construct on site, of the present invention has the following distinctive features.

첫째: 걸림프레임을 통해 가설프레임을 철골구조물 중 수직빔을 가로질러 연결되는 수평빔에 임시 걸쳐지도록 1인 현장 시공이 가능한 특징이 있다.First: There is a feature that one-person on-site construction is possible so that the temporary frame is temporarily hung on the horizontal beam connected across the vertical beam of the steel structure through the hanging frame.

둘째; 지지프레임을 수직빔에 고정하는 고정수단의 결속을 느슨하게 된다 하더라도, 걸림프레임을 통해 가설프레임이 낙하되지 않아 안전사고를 방지할 수 있는 특징이 있다.second; Even if the binding of the fixing means for fixing the support frame to the vertical beam is loosened, the temporary frame does not fall through the locking frame, so there is a feature that can prevent safety accidents.

셋째: 가설프레임과, 가교부와, 발판부로만 이루어져 있어 구조가 매우 간단한 특징이 있다.Third: It consists of only temporary frames, bridges, and scaffoldings, so it has a very simple structure.

본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.Since the embodiments described in this specification and the configurations shown in the drawings are only one of the most preferred embodiments of the present invention and do not represent all of the technical spirit of the present invention, various equivalents that can replace them at the time of this application It should be understood that there may be variations and examples.

10: 가설프레임 11: 수직프레임 11a: 핸드레일
11b: 수평프레임 12: 지지프레임
121: 제1프레임플랜지 13: 보강프레임
14: 걸림프레임 141: 제2프레임플랜지
20: 고정수단 21: 조임볼트 211: 손잡이
22: 조임접시
30: 가교부 31: 제1가교파이프 32: 제2가교파이프
40: 발판부 41: 발판플레이트 42: 걸림후크
100: 현장 시공이 용이한 가설 발판 조립체
210: 수직빔 220: 수평빔 P: 핀
10: temporary frame 11: vertical frame 11a: handrail
11b: horizontal frame 12: support frame
121: first frame flange 13: reinforcing frame
14: hanging frame 141: second frame flange
20: fixing means 21: tightening bolt 211: handle
22: fastening plate
30: bridge part 31: first bridge pipe 32: second bridge pipe
40: scaffolding part 41: scaffolding plate 42: hanging hook
100: Temporary scaffolding assembly that is easy to construct on site
210: vertical beam 220: horizontal beam P: pin

Claims (4)

철골구조물 중 지면에 일정간격을 두고 설치된 다수의 수직빔(210)에 가설되는 가설프레임(10);
상기 각 수직빔(210)에 가설된 가설프레임(10)을 수직빔(210)에 고정하는 다수의 고정수단(20);
상기 각 가설프레임(10)을 상호 간 연결하기 위해 상기 가설프레임(10)을 가로질러 설치되는 가교부(30); 및
상기 가교부(30)의 상부에 거치되는 발판부(40);를 포함하여 이루어지되,
상기 가설프레임(10)은 1인 현장 시공이 용이하도록 고정수단(20)의 조임 없이 철골구조물 중 수직빔(210)을 가로질러 연결되는 수평빔(220)에 임시 걸쳐지도록 걸림프레임(14)으로 이루어지고,
상기 가설프레임(10)은 난간 핸드레일(11a)이 연결되는 수직프레임(11)과, 상기 수직프레임(11)의 하부에 수평 연결되고 수직빔(210)의 전면에 2점 가설되는 한쌍의 지지프레임(12)으로 이루어지되,
상기 걸림프레임(14)은 상기 수직프레임(11)의 상부에 연결되는 수평프레임(11b)을 매개로 분기되어 상기 철골구조물 중 상기 각 수직빔(210)을 가로질러 연결되는 수평빔(220)에 타면에 2점 가설되고,
상기 각 걸림프레임(14)은 고정수단(20)을 연결하기 위해 수직방향으로 연결되는 제2프레임플랜지(141)를 더 포함하는 것을 특징으로 하는 현장 시공이 용이한 가설 발판조립체.
A temporary frame 10 that is hypothesized to a plurality of vertical beams 210 installed at regular intervals on the ground among steel structures;
A plurality of fixing means 20 for fixing the temporary frame 10 hypothesized to each vertical beam 210 to the vertical beam 210;
A bridging part 30 installed across the temporary frames 10 to connect each of the temporary frames 10 to each other; and
It is made to include; scaffolding portion 40 mounted on the upper portion of the bridge portion 30,
The temporary frame 10 is a hanging frame 14 so that it is temporarily hung on the horizontal beam 220 connected across the vertical beam 210 of the steel structure without tightening the fixing means 20 so that one-person on-site construction is easy. done,
The temporary frame 10 is a vertical frame 11 to which the handrail handrail 11a is connected, and a pair of supports horizontally connected to the lower part of the vertical frame 11 and two points hypothesized to the front of the vertical beam 210. It consists of a frame 12,
The hanging frame 14 is branched through the horizontal frame 11b connected to the upper part of the vertical frame 11 to the horizontal beam 220 connected across each vertical beam 210 of the steel structure. Two points are installed on the batting surface,
Each of the hanging frames 14 further comprises a second frame flange 141 connected in the vertical direction to connect the fixing means 20.
삭제delete 제1항에 있어서,
상기 각 지지프레임(12)은 고정수단(20)을 연결하기 위해 수직방향으로 연결되는 제1프레임플랜지(121)를 더 포함하는 것을 특징으로 하는 현장 시공이 용이한 가설 발판조립체.
According to claim 1,
Each of the support frames 12 further comprises a first frame flange 121 connected in the vertical direction to connect the fixing means 20.
제1항 또는 제3항에 있어서,
상기 고정수단(20)은 연결된 손잡이(211)의 회전방향에 따라 진퇴될 수 있도록 상기 제1,2프레임플랜지(121,141)에 나선 결합되는 조임볼트(21)와, 상기 조임볼트(21)의 단부에 고정되어 수직빔(210) 또는 수평빔(220)에 가압 고정되는 조임접시(22)로 구성되는 것을 특징으로 하는 현장 시공이 용이한 가설 발판조립체.
According to claim 1 or 3,
The fixing means 20 includes a tightening bolt 21 spirally coupled to the first and second frame flanges 121 and 141 so that the handle 211 can move forward and backward according to the rotation direction of the handle 211, and an end of the tightening bolt 21 A temporary scaffolding assembly that is easy to construct on site, characterized in that it consists of a tightening plate 22 fixed to the vertical beam 210 or the horizontal beam 220 by pressing.
KR1020210188396A 2021-12-27 2021-12-27 Temporary scaffolding assembly for construction site KR102477113B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210188396A KR102477113B1 (en) 2021-12-27 2021-12-27 Temporary scaffolding assembly for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210188396A KR102477113B1 (en) 2021-12-27 2021-12-27 Temporary scaffolding assembly for construction site

Publications (1)

Publication Number Publication Date
KR102477113B1 true KR102477113B1 (en) 2022-12-13

Family

ID=84439137

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210188396A KR102477113B1 (en) 2021-12-27 2021-12-27 Temporary scaffolding assembly for construction site

Country Status (1)

Country Link
KR (1) KR102477113B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000012050U (en) * 1998-12-14 2000-07-05 최규두 Builder's workbench
KR200323788Y1 (en) 2003-01-11 2003-08-19 주식회사 신영 Assembly structures of scaffold for construction
KR102180857B1 (en) * 2020-08-07 2020-11-19 이규운 A TEMPORARY GUARDRAIL ASSEMBLY FOR THE POSt

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000012050U (en) * 1998-12-14 2000-07-05 최규두 Builder's workbench
KR200323788Y1 (en) 2003-01-11 2003-08-19 주식회사 신영 Assembly structures of scaffold for construction
KR102180857B1 (en) * 2020-08-07 2020-11-19 이규운 A TEMPORARY GUARDRAIL ASSEMBLY FOR THE POSt

Similar Documents

Publication Publication Date Title
KR102180857B1 (en) A TEMPORARY GUARDRAIL ASSEMBLY FOR THE POSt
JP2603178B2 (en) Formwork equipment
GB2243863A (en) Formwork
KR102477113B1 (en) Temporary scaffolding assembly for construction site
US4462573A (en) Support post for temporary guard-rail chains
US2916245A (en) Adjustable scaffold bracket
KR200467252Y1 (en) cage for exterior works of building
CN111593898A (en) Adjustable turnover discharging platform and installation method
KR20020036198A (en) A temporary bracket for construction of precast concrete beam bridge and the temporary work method using the same
KR200392341Y1 (en) Fixing Device for Aerial Scaffolding
KR101707037B1 (en) A structure for assembled system scaffold and erecting method thereof
KR20020049414A (en) Inspection plate for a pier
KR200213539Y1 (en) Frame of safety workbench
KR101880854B1 (en) Construction method of the mold available again
JP2021075967A (en) Suspended scaffolding
CN212773547U (en) Adjustable turnover platform of unloading
CN214462700U (en) Horizontal steel bar binding platform
JPH0754480A (en) Prefabricated scaffolding and assembling and disassembling method thereof
CN218028577U (en) Prefabricated staircase that adaptation degree is high
KR200495306Y1 (en) Scaffold tread plate tightening device
CN113931354B (en) Cantilever scaffold and curtain wall integrated structure and construction method
KR100260674B1 (en) A net of safety styled for cable stayed bridge
KR102289940B1 (en) A Study on the Hypothesis Tread Plates for Framed Construction
JP3075475U (en) Scaffold for laying bridge pipelines
KR100760332B1 (en) Temporary cantilever resources, construction method of structure using the same and dismantling method for the same

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant