KR102412416B1 - Quality check and reinforcing method of cast-in-placed-pile - Google Patents

Quality check and reinforcing method of cast-in-placed-pile Download PDF

Info

Publication number
KR102412416B1
KR102412416B1 KR1020210050387A KR20210050387A KR102412416B1 KR 102412416 B1 KR102412416 B1 KR 102412416B1 KR 1020210050387 A KR1020210050387 A KR 1020210050387A KR 20210050387 A KR20210050387 A KR 20210050387A KR 102412416 B1 KR102412416 B1 KR 102412416B1
Authority
KR
South Korea
Prior art keywords
quality inspection
pile
air inlet
inlet pipe
quality
Prior art date
Application number
KR1020210050387A
Other languages
Korean (ko)
Inventor
박이근
Original Assignee
(주)지오알앤디
박이근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)지오알앤디, 박이근 filed Critical (주)지오알앤디
Priority to KR1020210050387A priority Critical patent/KR102412416B1/en
Application granted granted Critical
Publication of KR102412416B1 publication Critical patent/KR102412416B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/28Stressing the soil or the foundation structure while forming foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 현장타설말뚝을 시공한 후 구체가 경화된 후에 품질을 확인하고 불량구간에 대해 보강할 수 있는 보강방법에 관한 것으로 구체적으로는 현장타설말뚝 공사 후 타설한 콘크리트 구체가 경화된 다음 구체 내에 빈 공간 등이 형성되거나 균열이 발생하여 구체의 기능이 상실 또는 저하된 경우를 확인할 수 있고 구체 불량구간과 주변지반의 공극을 채움할 수 있는 현장타설말뚝 품질확인 및 그 보강방법에 관한 것이다.
본 발명은 말뚝시공이 끝난 후 품질검사용부재를 통하여 공기나 보강 주입재를 주입시킴으로서 콘크리트 구체 내와 그 주변지반의 빈공간을 확인하고, 확인된 빈공간에 보강 주입재를 채워넣음으로서 구체의 불량구간과 그 주변지반의 빈공간을 채움 보강함으로서 종래의 확인불가 사항을 대응할 수 있고, 종래에는 굳이 불량구간을 확인하기 위해서는 경화된 구체 내에 별도의 천공을 실시하여 구체를 약화시키게 되는 불리함을 안고 그라우트를 주입하여야 하는 등의 시간과 비용을 사용하지 않아도 되는 등의 작업효율을 크게 향상시키는 효과가 있다.
품질검사용부재를 다수개 설치하여 1차, 2차 등 여러 차례에 걸쳐 현장타설말뚝의 품질확인 및 불량구간 보강, 보강한 현장타설말뚝의 보강된 사항을 재확인하고 필요시 추가 보강할 수도 있어 현장타설말뚝의 완벽한 품질을 확보할 수 있는 장점이 많은 기술이다.
The present invention relates to a reinforcement method that can check the quality and reinforce the defective section after the sphere is hardened after construction of the cast-in-place pile. Specifically, the concrete sphere cast after construction of the cast-in-place pile is hardened, It relates to the quality confirmation and reinforcement method of cast-in-place piles that can confirm the loss or deterioration of the function of the sphere due to the formation of empty spaces or cracks, and fill the voids in the sphere defective section and the surrounding ground.
The present invention confirms the empty space in the concrete sphere and the surrounding ground by injecting air or reinforcing injection material through the quality inspection member after the pile construction is finished, and filling the confirmed empty space with the reinforcement injection material. By filling in and reinforcing the empty space of the sphere and its surrounding ground, it is possible to cope with the problems that cannot be confirmed in the past. There is an effect of greatly improving the work efficiency, such as not having to use time and money to inject.
By installing multiple quality inspection members, the quality of cast-in-place piles, reinforcement of defective sections, and reinforcement of cast-in-place piles can be reconfirmed and additional reinforcement can be made if necessary. It is a technology with many advantages that can secure the perfect quality of the poured pile.

Description

품질검사용부재를 이용한 현장타설말뚝 품질확인 및 보강방법{Quality check and reinforcing method of cast-in-placed-pile}{Quality check and reinforcing method of cast-in-placed-pile}

본 발명은 현장타설말뚝을 시공한 후 구체가 경화된 후에 품질을 확인하고 불량구간에 대해 보강할 수 있는 보강방법에 관한 것으로 구체적으로는 현장타설말뚝 공사 후 타설한 콘크리트 구체가 경화된 다음 구체 내에 빈 공간 등이 형성되거나 균열이 발생하여 구체의 기능이 상실 또는 저하된 경우를 확인할 수 있고 구체 불량구간과 주변지반의 공극을 채움할 수 있는 현장타설말뚝 품질확인 및 그 보강방법에 관한 것이다.The present invention relates to a reinforcement method capable of confirming the quality and reinforcing the defective section after the sphere is hardened after construction of the cast-in-place pile. It relates to the quality confirmation and reinforcement method of cast-in-place piles that can confirm the loss or deterioration of the function of the sphere due to the formation of empty spaces or cracks, and fill the voids of the sphere defective section and the surrounding ground.

CIP(Cast In Placed Pile) 공법은 현장에서 구조물의 말뚝기초를 시공하는 방법으로 말뚝기초 시공을 위한 천공경 내에 말뚝기초의 부재를 삽입하고 레미콘을 타설한 후 경화시간을 기다려 말뚝기초를 현장에서 시공하는 방법이다. 이 방법은 주열식으로 시공함으로써 지하구조물의 구축을 위한 굴착공사시 굴착으로 인한 주변의 지반붕괴를 방지하기 위한 흙막이 벽체를 구축하는 공법으로도 사용되고 있으며, 지반굴착 이전에 어스오거 등의 대구경 천공기로 필요한 깊이까지 천공한 후, 천공한 공 내에 현장콘크리트 말뚝을 연속하여 지중에 설치하여 주열식으로 흙막이 벽체를 형성하는 공법이다.The CIP (Cast In Placed Pile) method is a method of constructing the pile foundation of the structure on site. After inserting the member of the pile foundation into the borehole for pile foundation construction, pouring ready-mixed concrete, and waiting for curing time, the pile foundation is constructed on site. way to do it This method is also used as a construction method to build a retaining wall to prevent the collapse of the surrounding ground due to excavation during excavation for underground structures by constructing it as a main heat type. After drilling to the required depth, it is a construction method in which on-site concrete piles are continuously installed underground in the drilled hole to form a retaining wall in a columnar type.

이러한 CIP공법은 지반조건에 구애받지 않고 거의 모든 지반에 적용이 가능하며, 굴착이 완료되어 지하구조물을 구축할 때 지하 외부옹벽과의 합벽이 가능하고, 지하구조물을 근접하여 시공할 수 있어 터파기를 최소화시킬 수 있을 뿐 아니라 대지 내 지하구조물의 구축공간을 최대화할 수 있어 토지이용률을 극대화시킬 수 있는 장점이 있다.This CIP method can be applied to almost any ground regardless of ground conditions, and when excavation is completed, it can be combined with the underground external retaining wall when constructing an underground structure, and it is possible to construct the underground structure in close proximity. Not only can it be minimized, but it also has the advantage of maximizing the land use rate by maximizing the construction space of underground structures on the site.

한편, 지반의 조건으로 지중에서 물이 유동하거나 자갈, 전석 등의 암석, 암괴가 있는 경우에는 현장에서 타설한 레미콘이 천공경 내에 머무르지 않고 주변지반으로 흘러들어 요구되던 콘크리트 구체가 형성되지 않고 공극이 함께 형성되어 말뚝기초 또는 흙막이벽체로서의 기능을 기대할 수 없게 됨으로써 말뚝기초의 지지력이 확보되지 않거나 굴착시 누수, 유출수로 인해 큰 피해를 일으켜 이를 보강하는 공사를 별도로 수행하여야 하는 문제점이 발생하고 그 비용은 막대하다.On the other hand, if water flows underground as a condition of the ground, or there are rocks such as gravel or boulder, the ready-mixed concrete poured at the site does not stay within the borehole but flows into the surrounding ground, and the required concrete spheres are not formed and voids are formed. Due to these formations, the function as a pile foundation or retaining wall cannot be expected, so the bearing capacity of the pile foundation is not secured, or when excavation, leakage or runoff causes great damage, so that the construction to reinforce it must be performed separately, and the cost is huge

이러한 현실을 극복하기 위해 현장타설말뚝 시공시 검측공을 별도 설치하여 타설하고 경화 후에는 그 품질을 확인하기 위해 건전도시험을 수행하는 기법이 사용되고 있으나 이는 시험후 불량구간에 대해 보강을 하기 위해서는 별도의 천공, 그라우팅을 실시하여야 하는 기법으로 시험, 천공, 그라우팅을 실시하여야 하는 함으로써 많은 시간과 큰 비용이 발생하게 되어 개선이 요구된다.In order to overcome this reality, the technique of performing a soundness test to check the quality after installing and pouring a separate inspection hole during the construction of cast-in-place piles is used. It is a technique that requires drilling and grouting, and as a result, a lot of time and large costs are incurred by testing, drilling, and grouting, and improvement is required.

한국등록특허공보 제10-1977604호 (2019.05.07)Korean Patent Publication No. 10-1977604 (2019.05.07) 한국등록특허공보 제10-1812718호 (2017.12.20)Korean Patent Publication No. 10-1812718 (2017.12.20)

본 발명은 현장타설말뚝 시공이 완료된 후 기설치된 품질검사용부재를 통하여 공기나 물 또는 그라우트를 타설시킴으로서 현장타설말뚝 내의 빈 공간을 확인하고, 확인된 빈 공간 내로 그라우트 등의 보강주입재를 주입함으로써 말뚝 구체와 주변지반의 빈 공간까지 채워 넣음으로써 구체와 주변지반을 보강하기 위한 목적이다.The present invention confirms the empty space in the cast-in-place pile by pouring air, water, or grout through the previously installed quality inspection member after the construction of the cast-in-place pile is completed, and injects a reinforcement injection material such as grout into the confirmed empty space. The purpose is to reinforce the sphere and the surrounding ground by filling in the empty space of the sphere and the surrounding ground.

상기와 같은 문제를 해결하기 위해 본 발명은 현장말뚝부재에 품질검사용용부재(500)를 설치하여 품질검사용말뚝부재를 제조하는 품질검사용말뚝부재설치단계(S1); 상기 품질검사용말뚝부재설치단계(S1) 이후, 지반에 천공된 천공홀(10)에 품질검사용말뚝부재를 시공하는 품질검사용말뚝부재시공단계(S2); 상기 품질검사용말뚝부재시공단계(S2) 이후, 품질검사용말뚝부재의 품질검사용부재(500)에 공기를 주입시키어 불량구간을 확인하는 품질검사단계(S3); 상기 품질검사단계(S3)를 통해 품질검사용부재(500)에 공기를 주입시키어 불량구간을 확인한 후, 품질검사용말뚝부재의 품질검사용부재(500)에 보강주입재를 주입시키어 불량구간을 보강하는 불량구간보강단계(S4);를 포함하고, 상기 품질검사용말뚝부재설치단계(S1)의 품질검사용말뚝부재는 현장타설말뚝과, 상기 현장타설말뚝의 일측에 위치하되 현장타설말뚝의 길이방향을 따라 형성되되 긴 관형태로 형성되는 품질검사용부재(500)로 구성되되, 상기 품질검사용부재(500)는 외부로부터 공기 또는 보강주입재가 유입되기 위한 관으로서 현장타설말뚝의 길이방향을 따라 형성되되 긴 관형태로 형성되는 공기유입관(510)과, 상기 공기유입관(510)의 상단에 체결되도록 하부 일측이 공기유입관(510)의 상단과 대응되는 크기로 형성되되 공기유입관(510)의 상단을 밀봉시키기 위한 마개부(520)와, 상기 공기유입관(510)의 공기배출홀(511)에 부착되기 위해 소정 크기로 형성되는 공기배출홀테이핑부(530)를 포함하되, 상기 공기유입관(510)은 길이방향을 따라 소정 간격을 가지고 다수 개의 공기배출홀(511)이 형성되는 것을 특징으로 하는 품질검사용부재를 이용한 현장타설말뚝 품질확인 및 불량구간 보강방법을 제공한다.In order to solve the above problems, the present invention provides a quality inspection pile member installation step (S1) of installing a quality inspection member 500 on a field pile member to manufacture a quality inspection pile member; After the quality inspection pile member installation step (S1), the quality inspection pile member construction step (S2) of constructing the quality inspection pile member in the perforated hole 10 drilled in the ground; After the quality inspection pile member construction step (S2), a quality inspection step (S3) of checking a defective section by injecting air into the quality inspection member 500 of the quality inspection pile member; After checking the defective section by injecting air into the quality inspection member 500 through the quality inspection step (S3), a reinforcing injection material is injected into the quality inspection member 500 of the quality inspection pile member to reinforce the defective section Including, the quality inspection pile member of the quality inspection pile member installation step (S1) is located at one side of the cast-in-place pile and the cast-in-place pile, but the length of the cast-in-place pile It is formed along the direction and is composed of a quality inspection member 500 formed in a long tube shape, wherein the quality inspection member 500 is a pipe for introducing air or reinforcing injection material from the outside in the longitudinal direction of the cast-in-place pile. The air inlet pipe 510 formed in the form of a long tube is formed along the line, and the lower one side is formed to have a size corresponding to the upper end of the air inlet pipe 510 so as to be fastened to the upper end of the air inlet pipe 510. It includes a stopper 520 for sealing the upper end of the 510, and an air outlet hole taping part 530 formed in a predetermined size to be attached to the air outlet hole 511 of the air inlet pipe 510. , The air inlet pipe 510 has a predetermined interval along the longitudinal direction and a plurality of air outlet holes 511 are formed. do.

본 발명은 말뚝시공이 끝난 후 품질검사용부재를 통하여 공기나 보강 주입재를 주입시킴으로서 콘크리트 구체 내와 그 주변지반의 빈공간을 확인하고, 확인된 빈공간에 보강 주입재를 채워넣음으로서 구체의 불량구간과 그 주변지반의 빈공간을 채움 보강함으로서 종래의 확인불가 사항을 대응할 수 있고, 종래에는 굳이 불량구간을 확인하기 위해서는 경화된 구체 내에 별도의 천공을 실시하여 구체를 약화시키게 되는 불리함을 안고 그라우트를 주입하여야 하는 등의 시간과 비용을 사용하지 않아도 되는 등의 작업효율을 크게 향상시키는 효과가 있다.The present invention confirms the empty space in the concrete sphere and the surrounding ground by injecting air or reinforcing injection material through the quality inspection member after the pile construction is finished, and filling the confirmed empty space with the reinforcement injection material, thereby forming a defective section of the sphere By filling in and reinforcing the empty space of the sphere and its surrounding ground, it is possible to cope with the problems that cannot be confirmed in the past. There is an effect of greatly improving the work efficiency, such as not having to use time and money to inject.

도 1은 본 발명의 현장타설말뚝 품질보강방법의 순서를 나타낸 도면이다.
도 2는 본 발명의 현장타설말뚝이 설치된 모습을 나타낸 도면이다.
도 3는 본 발명의 품질검사용말뚝부재의 품질검사용부재(500)에 관한 도면이다.
도 4은 본 발명에서 사용되는 품질검사용H빔말뚝부(100)의 상단 일부를 확대하여 도시한 도면이다.
도 5는 본 발명에서 사용되는 품질검사용철근말뚝부(200)의 상단 일부를 확대하여 도시한 도면이다.
도 6은 본 발명의 현장타설말뚝 품질보강방법 중 품질검사단계(S3)와 불량구간보강단계(S4)를 도시한 도면이다.
도 7은 현장타설말뚝이 설치된 모습을 일부 확대한 도면이다.
도 8은 본 발명의 현장타설말뚝 품질보강방법 중 품질검사단계(S3)를 나타낸 도면이다.
도 9는 본 발명의 현장타설말뚝 품질보강방법 중 불량구간보강단계(S4)를 나타낸 도면이다.
도 10은 본 발명의 또 다른 실시예에 따른 제2품질검사용부재(600)에 관한 도면이다.
도 11 내지 도 14는 품질검사단계(S3)의 다양한 예시를 나타낸 도면이다.
도 15는 본 발명의 또 다른 실시예에 따른 제3품질검사용부재(700)에 관한 도면이다.
도 16, 17은 불량이 발생된 구근에 관한 실제 시공현장 사진이다.
1 is a view showing the sequence of the cast-in-place pile quality reinforcement method of the present invention.
Figure 2 is a view showing the state that the cast-in-place pile of the present invention is installed.
3 is a view related to the quality inspection member 500 of the quality inspection pile member of the present invention.
4 is a view showing an enlarged part of the upper end of the H-beam pile part 100 for quality inspection used in the present invention.
5 is an enlarged view showing a part of the upper end of the reinforcement pile part 200 for quality inspection used in the present invention.
6 is a view showing the quality inspection step (S3) and the defective section reinforcement step (S4) of the cast-in-place pile quality reinforcement method of the present invention.
7 is a partially enlarged view of the cast-in-place pile installed.
8 is a view showing the quality inspection step (S3) of the cast-in-place pile quality reinforcement method of the present invention.
9 is a view showing the defective section reinforcement step (S4) of the cast-in-place pile quality reinforcement method of the present invention.
10 is a view of a second quality inspection member 600 according to another embodiment of the present invention.
11 to 14 are views showing various examples of the quality inspection step (S3).
15 is a view of a third quality inspection member 700 according to another embodiment of the present invention.
16 and 17 are pictures of actual construction sites for bulbs in which defects have occurred.

본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms or words used in the present specification and claims should not be construed as being limited to conventional or dictionary meanings, and the inventor can properly define the concept of the term to best describe his invention. Based on the principle, it should be interpreted as meaning and concept consistent with the technical idea of the present invention.

이하 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명은 현장타설말뚝 품질보강방법에 관한 것으로 구체적으로는 현장타설말뚝 공사 후 지반 내의 빈 공간을 확인하여 메우기 위한 현장타설말뚝 품질확인 및 불량구간 보강방법에 관한 것이다.The present invention relates to a method for reinforcing the quality of cast-in-place piles, and more particularly, to a method for confirming the quality of cast-in-place piles and reinforcing defective sections for checking and filling empty spaces in the ground after cast-in-place pile construction.

도 1은 본 발명의 현장타설말뚝 품질확인 및 불량구간 보강방법의 순서를 나타낸 도면으로서 본 발명은 품질검사용말뚝부재설치단계(S1), 품질검사용말뚝부재시공단계(S2), 품질검사단계(S3), 불량구간보강단계(S4)를 포함하여 진행된다.1 is a view showing the sequence of the method of confirming the quality of cast-in-place piles and reinforcing the defective section of the present invention. The present invention is a quality inspection pile member installation step (S1), a quality inspection pile member construction step (S2), a quality inspection step (S3), it proceeds including the step of reinforcing the defective section (S4).

각 단계를 구체적을 설명하면 다음과 같다.Each step is described in detail as follows.

S1) 품질검사용말뚝부재설치단계S1) Pile member installation step for quality inspection

품질검사용말뚝부재설치단계(S1)는 현장말뚝부재에 품질검사용용부재(500)를 설치하여 품질검사용말뚝부재를 제조하는 단계이다.The quality inspection pile member installation step (S1) is a step of manufacturing the quality inspection pile member by installing the quality inspection member 500 on the on-site pile member.

상기 현장타설말뚝은 H빔말뚝, 철근말뚝 등 시공현장에서 사용되는 다양한 말뚝을 의미하는 것이다.The cast-in-place pile means various piles used in construction sites, such as H-beam piles and rebar piles.

상기 품질검사용부재(500)는 도 3을 참고하여 설명한다.The quality inspection member 500 will be described with reference to FIG. 3 .

도 3(a)은 품질검사용부재(500)만 단독으로 도시된 것이며, 도 3(b),(c)는 제1품질검사용부재(130)의 상단 일부를 확대 도시한 도면이다.3 (a) is a view showing only the quality inspection member 500 alone, FIGS. 3 (b), (c) is an enlarged view of a portion of the upper end of the first quality inspection member (130).

상기 품질검사용부재(500)는 외부로부터 공기 또는 보강주입재가 유입되기 위한 관으로서 현장타설말뚝의 일측에 위치하되 현장타설말뚝의 길이방향을 따라 형성되되 긴 관형태로 형성된다. 상기 품질검사용부재(500)는 1개만 설치될 수도 있고 다수개가 현장타설말뚝의 일측에 소정 간격을 가지고 설치될 수도 있다.The quality inspection member 500 is a pipe for introducing air or reinforcing injection material from the outside, and is located on one side of the cast-in-place pile, but is formed along the longitudinal direction of the cast-in-place pile and is formed in a long tube shape. Only one member 500 for quality inspection may be installed, or a plurality of members may be installed at a predetermined interval on one side of the cast-in-place pile.

상기 품질검사용부재(500)는 공기유입관(510), 마개부(520), 공기배출홀테이핑부(530)를 포함하여 구성된다.The quality inspection member 500 is configured to include an air inlet pipe 510 , a stopper 520 , and an air outlet hole taping unit 530 .

공기유입관(510)은 현장타설말뚝의 길이방향을 따라 형성되되 긴 관형태로 형성되는 것이다. 상기 공기유입관(510)의 하단은 밀폐되어 형성되고 상단은 개방되어 형성되되 상단 내측(512)은 나사산으로 형성되어 마개부(520)가 체결되도록 한다.The air inlet pipe 510 is formed in a long pipe shape along the longitudinal direction of the cast-in-place pile. The lower end of the air inlet pipe 510 is sealed and the upper end is open, and the upper inner side 512 is formed with a screw thread so that the stopper 520 is fastened.

상기 공기유입관(510)은 외부로부터 공기 또는 보강주입재가 유입되기 위한 관으로서 길이방향을 따라 소정 간격을 가지고 다수 개의 공기배출홀(511)이 형성된다.The air inlet pipe 510 is a pipe for introducing air or reinforcing injection material from the outside, and a plurality of air outlet holes 511 are formed at predetermined intervals along the longitudinal direction.

상기 공기배출홀(511)은 공기유입관(510)의 상단으로부터 유입되는 공기가 외부로 배출되기 위한 홀이다.The air outlet hole 511 is a hole for air introduced from the upper end of the air inlet pipe 510 to be discharged to the outside.

마개부(520)는 하부 일측이 나사산으로 형성되어 공기유입관(510)의 상단에 체결되도록 하부 일측이 공기유입관(510)의 상단과 대응되는 크기로 형성되는 임시체결부(521)를 포함하되 공기유입관(510)의 상단을 밀봉시키기 위한 것이다.The stopper 520 includes a temporary fastening part 521 whose lower one side is formed with a screw thread and is formed with a size corresponding to the upper end of the air inlet pipe 510 so that the lower one side is fastened to the upper end of the air inlet pipe 510 . However, it is for sealing the upper end of the air inlet pipe (510).

공기배출홀테이핑부(530)는 현장타설말뚝에 형성된 공기유입관(510)의 공기배출홀(511)에 부착되는 것으로 공기배출홀(511)의 홀 부분을 막도록 하기 위해 소정 크기로 형성되는 것이다. The air outlet hole taping part 530 is attached to the air outlet hole 511 of the air inlet pipe 510 formed on the cast-in-place pile, and is formed in a predetermined size to block the hole portion of the air outlet hole 511. will be.

상기 공기배출홀테이핑부(530)는 레미콘이 타설되는 동안 품질검사용부재 내로 레미콘이 유입되지 않도록 배출구를 임시 막음하기 위한 것이다.The air discharge hole taping unit 530 is for temporarily blocking the outlet so that the ready-mixed concrete does not flow into the quality inspection member while the ready-mixed concrete is being poured.

도 3(b)는 공기배출홀테이핑부(530)가 공기유입관(510)의 공기배출홀(511)에 부착되지 않은 모습을 나타낸 도면이며, 도 3(b)는 공기유입관(510)의 공기배출홀(511)에 공기배출홀테이핑부(530)가 부착된 모습을 나타낸 도면이다.3 (b) is a view showing a state in which the air outlet hole taping part 530 is not attached to the air outlet hole 511 of the air inlet pipe 510, and FIG. 3 (b) is the air inlet pipe 510. It is a view showing a state that the air exhaust hole taping unit 530 is attached to the air exhaust hole 511 of the.

천공경 내에 타설된 레미콘이 경화된 후 밀봉한 마개부(520)를 풀고 품질검사용부재(500) 내로 공기를 주입하여 누기가 발생하는 경우에는 타설된 레미콘이 유실되거나 밀실하게 채워지지 않은 빈 공간이 존재하는 상태로 구체가 경화된 것이 확인되는 것이므로 시멘트그라우트와 같은 보강재를 주입함으로써 빈 공간을 채움하도록 한다.After the ready-mixed concrete poured into the perforator is cured, the sealed stopper 520 is loosened and air is injected into the quality inspection member 500 to cause leakage. It is confirmed that the sphere has been hardened in this state, so fill the empty space by injecting a reinforcing material such as cement grout.

즉 도 16, 17과 같이 발생된 콘크리트 구체의 불량구간을 채움하는 과정에서 빈 공간 주변지반의 공극도 동시 채움됨으로써 구체와 그 주변지반도 채움되는 효과를 기대할 수 있게 된다.That is, in the process of filling the defective section of the generated concrete sphere as shown in FIGS. 16 and 17, the voids in the ground around the empty space are also filled at the same time, so that the sphere and the surrounding ground can be expected to be filled as well.

품질검사를 함에 있어서 공기로 누기를 확인하는 과정은 생략하고 바로 그라우트와 같은 보강재를 주입하여 품질검사용부재 내부와 구체의 불량구간, 주변지반을 밀실채움하는 것도 가능하다.In the quality inspection, it is also possible to omit the process of checking for leaks with air and to fill the inside of the quality inspection member, the defective section of the sphere, and the surrounding ground by directly injecting reinforcing materials such as grout.

도 3, 4는 본 발명에서는 H빔말뚝에 품질검사용부재가 설치되어 형성되는 품질검사용H빔말뚝부(100)와 철근말뚝에 품질검사용부재가 설치되어 형성되는 품질검사용철근말뚝부(200)를 도시한 도면으로 이를 대표예로 설명한다.3 and 4 show the quality inspection H-beam pile part 100 formed by installing the quality inspection member on the H-beam pile in the present invention, and the quality inspection reinforcing bar pile part formed by installing the quality inspection member on the reinforcing bar pile. (200) will be described as a representative example with a drawing showing.

상기 품질검사용부재(500)는 공사현장에 따라 품질검사용H빔말뚝부(100)와 품질검사용철근말뚝부(200)의 모든 말뚝에 설치하여 모든 말뚝의 품질을 확인하고 불량구간을 보강할 수 있으며, 천공시 확인되는 불량구간에 시공되는 말뚝에 한해서 설치될 수도 있다.The quality inspection member 500 is installed on all piles of the H-beam pile part 100 for quality inspection and the reinforcing bar pile part 200 for quality inspection depending on the construction site to check the quality of all piles and reinforce the defective section It can be installed, and it can be installed only on piles constructed in the defective section that is confirmed during drilling.

지반에 천공된 홀(10)에 품질검사용H빔말뚝부(100)와 품질검사용철근말뚝부(200)를 삽입하는 것은 일반적인 공사현장의 시공방법에 따른다.Inserting the quality inspection H-beam pile part 100 and the quality inspection reinforcing bar pile part 200 into the hole 10 perforated in the ground follows the general construction method of the construction site.

도 3은 본 발명에서 사용되는 품질검사용H빔말뚝부(100)의 상단 일부를 확대하여 도시한 도면이다.3 is a view showing an enlarged part of the upper end of the H-beam pile part 100 for quality inspection used in the present invention.

본 발명에서 사용되는 품질검사용H빔말뚝부(100)는 지반에 천공된 천공홀(10)에 삽입되기 위한 것으로, H빔몸체부(110), 품질검사용부재(500)를 포함하여 구성된다.The H-beam pile part 100 for quality inspection used in the present invention is to be inserted into the perforated hole 10 perforated in the ground, and includes an H-beam body part 110 and a quality inspection member 500 . do.

H빔몸체부(110)는 두개의 플랜지 사이에 웨브가 형성된 H형상의 말뚝이다.The H-beam body 110 is an H-shaped pile in which a web is formed between two flanges.

도 4는 본 발명의 품질검사용H빔말뚝부(100)의 품질검사용부재(500)의 상단 일부를 확대한 도면이다.4 is an enlarged view of a portion of the upper end of the quality inspection member 500 of the H-beam pile part 100 for quality inspection of the present invention.

품질검사용부재(500)는 상기 H빔몸체부(110)의 웨브 일측과 타측에 각각 위치하되 H빔몸체부(100)의 길이방향을 따라 형성된다.The quality inspection member 500 is located on one side and the other side of the web of the H-beam body 110 , respectively, but is formed along the longitudinal direction of the H-beam body 100 .

도 5는 본 발명에서 사용되는 품질검사용철근말뚝부(200)의 상단 일부를 확대하여 도시한 도면이다.5 is an enlarged view showing a part of the upper end of the reinforcement pile part 200 for quality inspection used in the present invention.

품질검사용철근말뚝부(200)는 지반에 천공된 천공홀(10)에 삽입되기 위한 것으로 소정 간격을 가지고 소정 개수의 철근몸체부(210)가 원형 형상으로 배치되되, 상기 철근몸체부(210)를 고정하기 위해 철근몸체부(210)의 외주면을 둘러싸도록 형성되는 철근고정부재(220)를 포함하여 구성된다.The reinforcing bar pile part 200 for quality inspection is to be inserted into the perforated hole 10 perforated in the ground, and a predetermined number of rebar body parts 210 are arranged in a circular shape with a predetermined interval, the reinforcing bar body part 210 ) is configured to include a reinforcing bar fixing member 220 that is formed to surround the outer circumferential surface of the reinforcing bar body 210 to fix it.

상기 철근고정부재(220)는 철끈 등의 끈형상으로 형성되어 철근몸체부(210)의 길이 방향을 따라 소정 간격을 가지고 소정 갯수가 형성되는 것이 바람직하다.It is preferable that the reinforcing bar fixing member 220 is formed in a string shape such as an iron string, and a predetermined number is formed at a predetermined interval along the longitudinal direction of the reinforcing bar body 210 .

상기 품질검사용철근말뚝부(200)는 품질검사용부재(500)를 더 포함하며, 상기 품질검사용H빔말뚝부(100)의 품질검사용부재(500)와 동일한 형태로 형성되므로 상기 도 4의 도면을 참고할 수 있다.The quality inspection reinforcing bar pile part 200 further includes a quality inspection member 500, and is formed in the same shape as the quality inspection member 500 of the quality inspection H-beam pile part 100. 4 may be referred to.

상기 품질검사용부재(500)는 서로 이웃하는 철근몸체부(210)의 사이 사이에 위치하되, 철근몸체부(210)의 길이방향을 따라 형성되며 긴 관형태로 형성된다.The quality inspection member 500 is located between the adjacent reinforcing bar body parts 210, but is formed along the longitudinal direction of the reinforcing bar body part 210 and is formed in a long tube shape.

도 10은 본 발명의 또 다른 실시예에 따른 제2품질검사용부재(600)에 관한 도면이다.10 is a view of a second quality inspection member 600 according to another embodiment of the present invention.

상기 제2품질검사용부재(600)는 외부로부터 공기 또는 보강주입재가 유입되기 위한 관으로서 현장타설말뚝의 일측에 위치하되 현장타설말뚝의 길이방향을 따라 형성되되 긴 관형태로 형성된다. 상기 제2품질검사용부재(600)는 1개만 설치될 수도 있고 다수개가 현장타설말뚝의 일측에 소정 간격을 가지고 설치될 수도 있다.The second quality inspection member 600 is a pipe for introducing air or reinforcing injection material from the outside, and is located on one side of the cast-in-place pile but is formed along the longitudinal direction of the cast-in-place pile and is formed in a long tube shape. Only one member 600 for the second quality inspection may be installed, or a plurality of members may be installed at a predetermined interval on one side of the cast-in-place pile.

상기 제2품질검사용부재(600)는 제2공기유입관(610), 제2마개부(620), 제2공기배출슬릿테이핑부(630)를 포함하여 구성된다.The second quality inspection member 600 is configured to include a second air inlet pipe 610 , a second stopper 620 , and a second air exhaust slit taping unit 630 .

제2공기유입관(610)은 외부로부터 공기 또는 보강주입재가 유입되기 위한 관으로서 현장타설말뚝의 길이방향을 따라 형성되되 긴 관형태로 형성되는 것이다. 상기 제2공기유입관(610)의 하단은 밀폐되어 형성되고 상단은 개방되어 형성되되 상단의 내측인 제2내측(611)은 나사산으로 형성되어 제2마개부(620)가 체결되도록 한다.The second air inlet pipe 610 is a pipe for introducing air or reinforcing injection material from the outside, and is formed along the longitudinal direction of the cast-in-place pile and is formed in a long pipe shape. The lower end of the second air inlet pipe 610 is sealed and the upper end is open, and the second inner side 611, which is the inner side of the upper end, is formed with a screw thread so that the second stopper 620 is fastened.

상기 제2공기유입관(610)은 길이방향을 따라 소정 간격을 가지고 다수 개의 제2공기배출슬릿(612)이 형성된다.The second air inlet pipe 610 is provided with a plurality of second air outlet slits 612 at predetermined intervals along the longitudinal direction.

상기 제2공기배출슬릿(612)은 제2공기유입관(610)의 상단으로부터 유입되는 공기가 외부로 배출되기 위한 것으로 소정 크기를 가진 슬릿으로 소정 갯수가 형성된다.The second air exhaust slit 612 is for discharging the air flowing in from the upper end of the second air inlet pipe 610 to the outside, and a predetermined number of slits having a predetermined size are formed.

제2마개부(620)는 하부 일측이 나사산으로 형성되어 제2공기유입관(610)의 상단에 체결되도록 하부 일측이 제2공기유입관(610)의 상단과 대응되는 크기로 형성되는 제2임시체결부(621)를 포함하되 제2공기유입관(610)의 상단을 밀봉시키기 위한 것이다.The second stopper 620 has a second lower end having a size corresponding to the upper end of the second air inlet pipe 610 so that the lower one side is formed with a screw thread and is fastened to the upper end of the second air inlet pipe 610 . It includes a temporary fastening part 621 but is for sealing the upper end of the second air inlet pipe 610 .

제2공기배출슬릿테이핑부(630)는 현장타설말뚝에 형성된 제2공기유입관(610)의 제2공기배출슬릿(612)에 부착되는 것으로 제2공기배출슬릿(612)의 홀 부분을 막도록 하기 위해 소정 크기로 형성되는 것이다. The second air exhaust slit taping part 630 is attached to the second air exhaust slit 612 of the second air inlet pipe 610 formed in the cast-in-place pile, and blocks the hole portion of the second air exhaust slit 612. It is formed to a predetermined size in order to

상기 제2공기배출슬릿테이핑부(630)는 레미콘이 타설되는 동안 품질검사용부재 내로 레미콘이 유입되지 않도록 배출구를 임시 막음하기 위한 것이다.The second air exhaust slit taping part 630 is for temporarily blocking the outlet so that the ready-mixed concrete does not flow into the quality inspection member while the ready-mixed concrete is being poured.

천공경 내에 타설된 레미콘이 경화된 후 밀봉한 제2마개부(620)를 풀고 제2품질검사용부재(600) 내로 공기를 주입하여 누기가 발생하는 경우에는 타설된 레미콘이 유실되거나 밀실하게 채워지지 않은 빈 공간이 존재하는 상태로 구체가 경화된 것이 확인되는 것이므로 시멘트그라우트와 같은 보강재를 주입함으로써 빈 공간을 채움하도록 한다.After the ready-mixed concrete poured into the perforator is cured, the sealed second stopper 620 is loosened and air is injected into the second quality inspection member 600 to cause leakage. Since it is confirmed that the sphere has hardened in a state where there is an unsupported empty space, it is necessary to fill the empty space by injecting a reinforcing material such as cement grout.

즉 도 16, 17와 같이 콘크리트 구체의 불량구간을 채움하는 과정에서 빈 공간 주변지반의 공극도 동시 채움됨으로써 구체와 그 주변지반도 채움되는 효과를 기대할 수 있게 된다.That is, as shown in FIGS. 16 and 17 , in the process of filling the defective section of the concrete sphere, the voids in the ground around the empty space are also filled at the same time, so that the sphere and the surrounding ground are also filled.

품질검사를 함에 있어서 공기로 누기를 확인하는 과정은 생략하고 바로 그라우트와 같은 보강재를 주입하여 품질검사용부재 내부와 구체의 불량구간, 주변지반을 밀실채움하는 것도 가능하다.In the quality inspection, it is also possible to omit the process of checking for leaks with air and to fill the inside of the quality inspection member, the defective section of the sphere, and the surrounding ground by directly injecting reinforcing materials such as grout.

본 발명에서는 상기 품질검사용부재(500)를 대표예로 설명하였으나 도 14의 제2품질검사용부재(600)를 적용하여 시공작업을 수행한 모습을 나타낸 도면과 같이 상기 제2품질검사용부재(600)를 사용할 수도 있음은 물론이다.In the present invention, the quality inspection member 500 has been described as a representative example, but as shown in the drawing showing the state in which the construction work was performed by applying the second quality inspection member 600 of FIG. 14 , the second quality inspection member Of course, (600) can also be used.

도 15는 본 발명의 또 다른 실시예에 따른 제3품질검사용부재(700)에 관한 도면이다. 도 15(a)는 제3품질검사용부재(700)의 분해된 모습을 나타낸 도면이며 도 15(b)는 제3품질검사용부재(700)를 결합한 모습을 나타낸 도면이다.15 is a view of a third quality inspection member 700 according to another embodiment of the present invention. Fig. 15 (a) is a view showing an exploded state of the third quality inspection member 700, and Fig. 15 (b) is a view showing a state in which the third quality inspection member 700 is combined.

상기 제3품질검사용부재(700)는 외부로부터 공기 또는 보강주입재가 유입되기 위한 관으로서 현장타설말뚝의 일측에 위치하되 현장타설말뚝의 길이방향을 따라 형성되되 긴 관형태로 형성된다. 상기 제3품질검사용부재(700)는 1개만 설치될 수도 있고 다수개가 현장타설말뚝의 일측에 소정 간격을 가지고 설치될 수도 있다.The third quality inspection member 700 is a pipe for introducing air or reinforcing injection material from the outside, and is located on one side of the cast-in-place pile but is formed along the longitudinal direction of the cast-in-place pile and is formed in a long tube shape. Only one member 700 for the third quality inspection may be installed, or a plurality of members may be installed at a predetermined interval on one side of the cast-in-place pile.

상기 제3품질검사용부재(700)는 제3공기유입관지지부(710),제3밀폐부(720), 제3공기유입관(730), 제4공기유입관(740), 제3품질확인공간테이핑부(750)를 포함하여 구성된다.The third quality inspection member 700 is a third air inlet pipe support part 710 , a third sealing part 720 , a third air inlet pipe 730 , a fourth air inlet pipe 740 , the third quality It is configured to include a confirmation space taping unit (750).

제3공기유입관지지부(710)는 제3공기유입관(730), 제4공기유입관(740)을 지지하기 위한 관으로서 현장타설말뚝의 길이방향을 따라 형성되되 소정 간격 이격되어 다수개가 일자 형상으로 형성되는 것이다. The third air inlet pipe support part 710 is a pipe for supporting the third air inlet pipe 730 and the fourth air inlet pipe 740, and is formed along the longitudinal direction of the cast-in-place pile, and a plurality of them are spaced apart by a predetermined interval. is formed into a shape.

제3밀폐부(720)는 상기 제3공기유입관지지부(710)의 하단에 소정 간격 이격되어 위치하되 상/하단이 막힌 관 형태로 형성된다.The third sealing part 720 is positioned at the lower end of the third air inlet pipe support part 710 at a predetermined interval, but is formed in a tube shape with upper and lower ends blocked.

제3마개부(760)는 상기 제3공기유입관지지부(710)의 상단을 임시로 밀폐시키도록 하단이 제3공기유입관지지부(710)의 상단과 대응되는 형태로 형성되어 제3공기유입관(710)의 상단에 체결되어 상단을 밀봉시킬 수 있다.The third stopper 760 has a lower end formed in a shape corresponding to the upper end of the third air inlet pipe support 710 to temporarily seal the upper end of the third air inlet pipe support 710, so that the third air inlet It may be fastened to the upper end of the tube 710 to seal the upper end.

제3공기유입관(730)과 제4공기유입관(740)은 외부로부터 공기 또는 보강주입재가 유입되기 위한 관으로서, 제3공기유입관(730)은 상기 제3공기유입관지지부(710)와 제3밀폐부(720)의 일측을 둘러싸도록 형성되는 것이며, 제4공기유입관(740)은 상기 제3공기유입관지지부(710)와 제3밀폐부(720)의 타측을 둘러싸도록 형성되는 것이다.The third air inlet pipe 730 and the fourth air inlet pipe 740 are pipes for introducing air or reinforcing injection material from the outside, and the third air inlet pipe 730 is the third air inlet pipe support part 710 . And is formed to surround one side of the third sealing part 720, the fourth air inlet pipe 740 is formed to surround the other side of the third air inlet pipe support part 710 and the third sealing part 720 will become

상기 제3공기유입관(730)과 제4공기유입관(740)는 소정 간격 이격되여 형성됨으로서 도 15(b)의 일부 확대 도면과 같이 품질확인공간(m)이 형성되며 품질확인공간(m)을 통해 공기 또는 보강주입재를 배출시킬 수 있다.The third air inlet pipe 730 and the fourth air inlet pipe 740 are formed to be spaced apart from each other by a predetermined distance, so that a quality check space m is formed as shown in a partially enlarged view of FIG. 15(b), and a quality check space m ) through which air or reinforcing injection material can be discharged.

제3품질확인공간테이핑부(750)는 상기 제3공기유입관지지부(710)가 소정 간격 이격되어 형성되고 제3공기유입관(730)과 제4공기유입관(740)은 소정 간격 이격됨으로서 형성된 품질확인공간(m)에 부착되는 것으로 빈 공간을 막기 위해 소정 크기로 형성되는 것이다(도면 미도시됨). In the third quality confirmation space taping part 750, the third air inlet pipe support part 710 is formed to be spaced apart by a predetermined distance, and the third air inlet pipe 730 and the fourth air inlet pipe 740 are spaced apart by a predetermined distance. It is attached to the formed quality check space (m) and is formed to a predetermined size in order to close an empty space (not shown).

상기 제3품질확인공간테이핑부(750)는 레미콘이 타설되는 동안 품질검사용부재 내로 레미콘이 유입되지 않도록 배출구를 임시 막음하기 위한 것이다.The third quality confirmation space taping unit 750 is to temporarily block the outlet so that the ready-mixed concrete does not flow into the quality inspection member while the ready-mixed concrete is being poured.

천공경 내에 타설된 레미콘이 경화된 후 밀봉한 제3마개부(760)를 풀고 제3공기유입관(730) 및 제4공기유입관(740) 내로 공기를 주입하여 누기가 발생하는 경우에는 타설된 레미콘이 유실되거나 밀실하게 채워지지 않은 빈 공간이 존재하는 상태로 구체가 경화된 것이 확인되는 것이므로 시멘트그라우트와 같은 보강재를 주입함으로써 빈 공간을 채움하도록 한다.After the ready-mixed concrete poured into the perforation diameter is cured, the sealed third stopper 760 is loosened and air is injected into the third air inlet pipe 730 and the fourth air inlet pipe 740 to cause leakage. It is confirmed that the sphere has been hardened in the state that the used ready-mixed concrete is lost or there is an empty space that is not tightly filled, so fill the empty space by injecting a reinforcing material such as cement grout.

S2) 품질검사용말뚝부재시공단계S2) Pile member construction stage for quality inspection

품질검사용말뚝부재시공단계(S2)는 상기 품질검사용말뚝부재설치단계(S1) 이후, 지반에 천공된 천공홀(10)에 품질검사용말뚝부재를 시공하는 단계이다.The quality inspection pile member construction step (S2) is a step of constructing the quality inspection pile member in the perforated hole 10 drilled in the ground after the quality inspection pile member installation step (S1).

상기 품질검사용말뚝부재시공단계(S2)는 품질검사용말뚝부재를 시공하는 단계로서, 지반을 천공하고 품질검사용말뚝부재를 천공된 지반에 근입시킨 후 레미콘을 주입시켜 경화시키는 단계이다.The quality inspection pile member construction step (S2) is a step of constructing the quality inspection pile member, drilling the ground, inserting the quality inspection pile member into the perforated ground, and then injecting ready-mixed concrete to harden it.

상기 레미콘은 콘크리트 등 지반을 메우기 위한 부재로서 액상으로 투입하여 소정 시간을 가지고 경화시키는 것이 바람직하다.The ready-mixed concrete is a member for filling the ground, such as concrete, and is preferably put in a liquid phase and hardened with a predetermined time.

상기 품질검사용말뚝부재시공단계(S2)는 일반적인 현장타설말뚝의 시공방법에 따른 것으로 시공에 사용되는 부재가 품질검사용부재(500)를 포함하는 품질검사용말뚝부재를 사용하는 것이다.The quality inspection pile member construction step (S2) is according to a general construction method of cast-in-place piles, and a member used for construction uses a quality inspection pile member including a quality inspection member 500 .

S3) 품질검사단계S3) Quality inspection step

품질검사단계(S3)는 상기 품질검사용말뚝부재시공단계(S2) 이후, 품질검사용말뚝부재의 품질검사용부재(500)에 공기를 주입시키어 불량구간을 확인하는 단계이다.The quality inspection step (S3) is a step of checking a defective section by injecting air into the quality inspection member 500 of the quality inspection pile member after the quality inspection pile member construction step (S2).

상기 품질검사단계(S3)는 품질검사용부재(500)에 공기를 주입하여 누기 여부를 확인하여 콘크리트 구체 내의 불량구간을 확인하는 단계이다.The quality inspection step (S3) is a step of checking the defective section in the concrete sphere by injecting air into the quality inspection member 500 to check for leaks.

도 7 내지 도 9는 품질검사용H빔말뚝부(100)의 품질검사용부재(500)의 공기유입관(510)에 부착된 공기배출홀테이핑부(530)가 떨어져나가는 모습을 순서대로 도식화한 도면으로 이를 참고하면,7 to 9 are diagrams sequentially showing the state in which the air outlet hole taping unit 530 attached to the air inlet pipe 510 of the quality inspection member 500 of the H-beam pile unit 100 for quality inspection falls off. Referring to this as a drawing,

상기 품질검사단계(S3)에서 각 품질검사용부재에 도 7의 k2방향으로 공기를 주입시키면 지반의 불량구간(11)이 위치하는 부분은 품질검사용부재(500)의 공기유입관(510)에 부착된 공기배출홀테이핑부(530)가 도 8의 k3방향으로 떨어져 나가게 되어 도 9와 같이 공기배출홀테이핑부가 제거되고 공기가 k5방향으로 배출된다.When air is injected into each quality inspection member in the direction k2 of FIG. 7 in the quality inspection step (S3), the part where the defective section 11 of the ground is located is the air inlet pipe 510 of the quality inspection member 500 The air exhaust hole taping part 530 attached to the hood is separated in the k3 direction of FIG. 8 , and as shown in FIG. 9 , the air exhaust hole taping part is removed and air is discharged in the k5 direction.

도 7 내지 도 9에는 품질검사용부재(500)에 대해 도시되지 않았지만 이도 마찬가지임은 물론이다.Although not shown for the quality inspection member 500 in FIGS. 7 to 9 , it is of course also the same.

도 6(a)및 도 7의 상단 확대도는 상기 품질검사단계(S3)를 통해 품질검사용H빔말뚝부(100)의 품질검사용부재(500)와, 품질검사용철근말뚝부(200)의 품질검사용부재(500)에 각각 공기가 k2 방향으로 주입되는 모습을 나타낸 도면이다.6 (a) and the upper enlarged view of Figure 7 is a quality inspection member 500 of the quality inspection H-beam pile part 100 through the quality inspection step (S3), and a quality inspection reinforcing bar pile part 200 ) is a view showing a state in which air is injected into the quality inspection member 500 in the k2 direction, respectively.

상기 품질검사단계(S3)를 통해 각각의 공기유입관에 공기를 주입시키는 이유는 공기유입관에 공기압을 채움으로서 누기 여부에 따라 콘크리트 구체 내의 불량구간을 확인하기 위함이다.The reason for injecting air into each air inlet pipe through the quality inspection step (S3) is to check the defective section in the concrete sphere depending on whether there is a leak by filling the air inlet pipe with air pressure.

즉 상기 품질검사단계(S3)는 상기 레미콘타설단계(S2)를 통해 레미콘이 채워지고 굳고 난 후 지반이 약하여 레미콘이 채워지지 않거나 유실된 부분인 지반의 불량구간(11)이 있는지를 확인하기 위한 것으로 만일 품질검사단계(S3)를 통해 공기유입관에 공기를 채울 시 불량구간(11)이 있는 부분은 공기압으로 인해 각각의 공기배출홀테이핑부가 떨어져 나가서 공기가 바깥으로 배출되는지 여부에 따라 콘크리트 구체의 불량 여부를 확인할 수 있다.That is, in the quality inspection step (S3), the ready-mixed concrete is filled and solidified through the ready-mixed concrete pouring step (S2), and then the ground is weak so that the ready-mixed concrete is not filled or is a lost part. As a result, if the air inlet pipe is filled with air through the quality inspection step (S3), each air outlet hole taping part falls off due to air pressure in the portion with the defective section 11, depending on whether the air is discharged to the outside or not. can be checked for defects.

다시 말해 상기 품질검사단계(S3)는 품질검사용H빔말뚝부(100)의 품질검사용부재(500)의 공기유입관(510)에 체결된 마개부(520)를 제거하고, 품질검사용철근말뚝부(200)의 품질검사용부재(500)에 체결된 마개부(520)가 제거된 상태에서 각각의 관에 하기 불량구간보강단계(S4)를 통해 시멘트밀크와 같은 보강주입재를 주입시키어 불량구간(11)을 보강하기 위한 것이다.In other words, the quality inspection step (S3) is to remove the stopper 520 fastened to the air inlet pipe 510 of the quality inspection member 500 of the H-beam pile part 100 for quality inspection, and for quality inspection In the state in which the stopper 520 fastened to the quality inspection member 500 of the reinforcing bar pile part 200 is removed, a reinforcing injection material such as cement milk is injected into each pipe through the following defective section reinforcement step (S4). This is to reinforce the defective section (11).

도 11 내지 도 14는 품질검사단계(S3)의 다양한 예시를 나타낸 도면이다.11 to 14 are views showing various examples of the quality inspection step (S3).

도 11은 본 발명의 대표예에 관한 도면으로서 CIP공법에 따른 시공방법으로 구근형성 불량으로 철근 및 H빔이 노출되고, 도 11(a)와 같이 공기유입관(510) 내부(k2 방향 참고)으로 공기를 주입시켜 도 11(b)와 같이 노출된 부위에 위치하는 공기배출홀(511)로 공기가 빠져나가는 모습(k5)을 나타낸 도면이다.11 is a view of a representative example of the present invention, in which reinforcing bars and H-beams are exposed due to poor bulb formation in a construction method according to the CIP method, and as shown in FIG. It is a view showing a state (k5) in which air is injected into the air through the air outlet hole 511 located in the exposed part as shown in FIG.

도 12는 SCW공법에 따른 시공방법으로서 구근형성 불량으로 H빔이 노출되고, 도 12(a)와 같이 공기유입관(510) 내부(k2 방향 참고)으로 공기를 주입시켜 도 12(b)와 같이 노출된 부위에 위치하는 공기배출홀(511)로 공기가 빠져나가는 모습(k5)을 나타낸 도면이다.12 is a construction method according to the SCW method, in which the H-beam is exposed due to poor bulb formation, and air is injected into the air inlet pipe 510 (refer to the k2 direction) as shown in FIG. It is a view showing a state (k5) in which air escapes through the air exhaust hole 511 located in the exposed portion.

도 13은 현장타설말뚝공법에 따른 시공방법으로서 구근형성불량으로 철근이 노출되고, 도 13(a)와 같이 공기유입관(510) 내부(k2 방향 참고)으로 공기를 주입시켜 도 13(b)와 같이 노출된 부위에 위치하는 공기배출홀(511)로 공기가 빠져나가는 모습(k5)을 나타낸 도면이다.13 is a construction method according to the cast-in-place pile method, in which the reinforcing bars are exposed due to poor bulb formation, and air is injected into the air inlet pipe 510 (refer to the k2 direction) as shown in FIG. 13(a) in FIG. 13(b) It is a view showing a state (k5) of air exiting through the air exhaust hole 511 located in the exposed portion as shown in FIG.

도 14는 CIP공법에 따른 시공방법으로서 품질검사용부재(500)를 대신하여 제2품질검사용부재(600)가 설치된 품질검사용H빔말뚝부(100)과 품질검사용철근말뚝부(200)를 도시한 도면이다. 상기 제2공기유입관(610) 내부으로 공기를 주입시켜 도 14(a)와 같이 노출된 부위에 위치하는 제2공기배출슬릿(612)으로 공기가 빠져나가는 모습(k7)을 나타낸 도면이다.14 is a construction method according to the CIP method, in which the second quality inspection member 600 is installed instead of the quality inspection member 500. The quality inspection H-beam pile part 100 and the quality inspection reinforcing bar pile part 200 ) is a diagram showing It is a view showing a state (k7) of air being introduced into the second air inlet pipe 610 and escaping through the second air exhaust slit 612 positioned at the exposed portion as shown in FIG. 14(a).

S4) 불량구간보강단계S4) Defective section reinforcement step

불량구간보강단계(S4)는 상기 품질검사단계(S3)를 통해 품질검사용부재(500)에 공기를 주입시키어 불량구간을 확인한 후, 품질검사용말뚝부재의 품질검사용부재(500)에 보강주입재를 주입시키어 불량구간을 보강하는 단계이다.In the defective section reinforcement step (S4), air is injected into the quality check member 500 through the quality check step (S3) to check the defective section, and then reinforce the quality check member 500 of the quality check pile member This is the step of reinforcing the defective section by injecting the injection material.

상기 보강주입재는 시멘트밀크 등 지반을 보강하기 위한 것으로 어떠한 부재도 사용 가능하다.The reinforcing injection material is for reinforcing the ground, such as cement milk, and any member can be used.

도 6(b)는 상기 불량구간보강단계(S4)를 통해 보강주입재를 주입시켜 불량구간(11) 부분에 보강주입재(20)가 채워져 굳어진 모습을 나타낸 도면이다.6(b) is a view showing a state in which the reinforcing injection material 20 is filled and hardened in the defective section 11 by injecting the reinforcing injection material through the step of reinforcing the defective section (S4).

이와 같이 본 발명은 품질검사용부재를 통해 지반의 유실된 부분 등에 레미콘을 타설시켜서 지반을 보강시킴으로서 추가적인 보강작업을 줄일 수 있으며 안전한 시공이 가능하도록 하는 이점이 있다.As such, the present invention has the advantage of reducing additional reinforcement work and enabling safe construction by reinforcing the ground by pouring ready-mixed concrete into the lost part of the ground through the quality inspection member.

또한 본 발명은 품질검사용말뚝부재 내에 품질검사용부재(500)를 다수개 설치하여, 최초 하나의 품질검사용부재(500)에 공기를 주입시키어 1차품질을 확인 및 1차 보강을 실시하며, 지반 보강이 덜 된 경우 이후 또 다른 하나의 품질검사용부재(500)에 공기를 주입시키어 2차 확인 및 재보강할 수 있으며, 이후 추가로 설치된 품질검사용부재(500)의 갯수만큼 품질 확인 및 보강을 실시할 수 있음이 특징이다.In addition, the present invention installs a plurality of quality inspection members 500 in the quality inspection pile member, and injects air into one first quality inspection member 500 to check the primary quality and perform primary reinforcement. , when the ground reinforcement is less, after injecting air into another quality inspection member 500, it can be checked and re-reinforced, and then the quality is checked as much as the number of additionally installed quality inspection members 500 And it is characterized in that reinforcement can be carried out.

이상과 같은 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.The configuration shown in the embodiments and drawings described in the present specification as described above is merely the most preferred embodiment of the present invention and does not represent all of the technical spirit of the present invention, so various equivalents and modifications that can be substituted for them It should be understood that there may be examples.

10 천공홀
11 불량구간
20 보강주입재
100 품질검사용H빔말뚝부
110 H빔몸체부
200 품질검사용철근말뚝부
210 철근몸체부
220 철근고정부재
500 품질검사용부재
510 공기유입관
511 공기배출홀
520 마개부
530 공기배출홀테이핑부
600 제2품질검사용부재
610 제2공기유입관
611 제2공기배출슬릿
620 제2마개부
630 제2공기배출슬릿테이핑부
700 제3품질검사용부재
710 제3공기유입관지지부
720 제3밀폐부
730 제3공기유입관
740 제4공기유입관
750 제3품질확인공간테이핑부
10 drill hole
11 bad section
20 Reinforcing injection material
100 H-beam pile part for quality inspection
110H beam body
200 Reinforcing bar piles for quality inspection
210 Rebar body
220 Rebar fixing member
500 quality inspection member
510 air inlet pipe
511 air exhaust hole
520 stopper
530 Air exhaust hole taping part
600 2nd quality inspection member
610 2nd air inlet pipe
611 2nd air exhaust slit
620 second stopper
630 Second air exhaust slit taping part
700 3rd quality inspection member
710 3rd air inlet pipe support part
720 third seal
730 3rd air inlet pipe
740 4th air inlet pipe
750 3rd quality confirmation space taping part

Claims (6)

제3공기유입관(730), 제4공기유입관(740)을 지지하기 위한 관으로서 현장타설말뚝의 길이방향을 따라 형성되되 소정 간격 이격되어 다수개가 일자 형상으로 형성되는 제3공기유입관지지부(710)와,
상기 제3공기유입관지지부(710)의 하단에 소정 간격 이격되어 위치하되 상/하단이 막힌 관 형태로 형성되는 제3밀폐부(720)와,
상기 제3공기유입관지지부(710)와 제3밀폐부(720)의 일측을 둘러싸도록 형성되는 제3공기유입관(730)과.
상기 제3공기유입관지지부(710)와 제3밀폐부(720)의 타측을 둘러싸도록 형성되는 제4공기유입관(740)과,
상기 제3공기유입관지지부(710)가 소정 간격 이격되어 형성되고 제3공기유입관(730)과 제4공기유입관(740)은 소정 간격 이격됨으로서 형성된 품질확인공간(m)에 부착되는 것으로 빈 공간을 막기 위해 소정 크기로 형성되는 제3품질확인공간테이핑부(750)를 포함하되,
상기 제3공기유입관(730)과 제4공기유입관(740)는 소정 간격 이격되어 형성됨으로서 품질확인공간(m)이 형성되는 것을 특징으로 하는 제3품질검사용부재.
As a pipe for supporting the third air inlet pipe 730 and the fourth air inlet pipe 740, the third air inlet pipe support part is formed along the longitudinal direction of the cast-in-place pile and is spaced apart from each other by a predetermined interval to form a plurality of straight lines. 710, and
A third sealing part 720, which is located at the lower end of the third air inlet pipe support part 710 and spaced apart from each other by a predetermined distance, and is formed in the form of a tube in which the upper and lower ends are blocked,
and a third air inlet pipe 730 formed to surround one side of the third air inlet pipe support part 710 and the third sealing part 720 .
a fourth air inlet pipe 740 formed to surround the other side of the third air inlet pipe support part 710 and the third sealing part 720;
The third air inlet pipe support part 710 is formed to be spaced apart by a predetermined distance, and the third air inlet pipe 730 and the fourth air inlet pipe 740 are attached to the quality check space (m) formed by being spaced apart by a predetermined distance. Including a third quality confirmation space taping unit 750 formed in a predetermined size to close the empty space,
The third air inlet pipe (730) and the fourth air inlet pipe (740) are formed to be spaced apart from each other by a predetermined distance to form a quality checking space (m).
현장말뚝부재에 제3품질검사용부재(700)를 설치하여 품질검사용말뚝부재를 제조하는 품질검사용말뚝부재설치단계(S1);
상기 품질검사용말뚝부재설치단계(S1) 이후, 지반에 천공된 천공홀(10)에 품질검사용말뚝부재를 시공하는 품질검사용말뚝부재시공단계(S2);
상기 품질검사용말뚝부재시공단계(S2) 이후, 품질검사용말뚝부재의 제3품질검사용부재(700)에 공기를 주입시키어 불량구간을 확인하는 품질검사단계(S3);
상기 품질검사단계(S3)를 통해 제3품질검사용부재(700)에 공기를 주입시키어 불량구간을 확인한 후, 품질검사용말뚝부재의 제3품질검사용부재(700)에 보강주입재를 주입시키어 불량구간을 보강하는 불량구간보강단계(S4);를 포함하고,

상기 품질검사용말뚝부재설치단계(S1)의 품질검사용말뚝부재는
현장타설말뚝과,
상기 현장타설말뚝의 일측에 위치하되 현장타설말뚝의 길이방향을 따라 형성되되 긴 관형태로 형성되는 제3품질검사용부재(700)로 구성되되,
제3공기유입관(730), 제4공기유입관(740)을 지지하기 위한 관으로서 현장타설말뚝의 길이방향을 따라 형성되되 소정 간격 이격되어 다수개가 일자 형상으로 형성되는 제3공기유입관지지부(710)와,
상기 제3공기유입관지지부(710)의 하단에 소정 간격 이격되어 위치하되 상/하단이 막힌 관 형태로 형성되는 제3밀폐부(720)와,
상기 제3공기유입관지지부(710)와 제3밀폐부(720)의 일측을 둘러싸도록 형성되는 제3공기유입관(730)과.
상기 제3공기유입관지지부(710)와 제3밀폐부(720)의 타측을 둘러싸도록 형성되는 제4공기유입관(740)과,
상기 제3공기유입관지지부(710)가 소정 간격 이격되어 형성되고, 제3공기유입관(730)과 제4공기유입관(740)은 소정 간격 이격됨으로서 형성된 품질확인공간(m)에 부착되는 것으로 빈 공간을 막기 위해 소정 크기로 형성되는 제3품질확인공간테이핑부(750)를 포함하되,
상기 제3공기유입관(730)과 제4공기유입관(740)는 소정 간격 이격되어 형성됨으로서 품질확인공간(m)이 형성되는 것을 특징으로 하는 품질검사용부재를 이용한 현장타설말뚝 품질확인 및 불량구간 보강방법.
A quality inspection pile member installation step of manufacturing a quality inspection pile member by installing a third quality inspection member 700 on the field pile member (S1);
After the quality inspection pile member installation step (S1), the quality inspection pile member construction step (S2) of constructing the quality inspection pile member in the perforated hole 10 perforated in the ground;
After the quality inspection pile member construction step (S2), a quality inspection step (S3) of checking a defective section by injecting air into the third quality inspection member 700 of the quality inspection pile member;
After checking the defective section by injecting air into the third quality inspection member 700 through the quality inspection step (S3), a reinforcement injection material is injected into the third quality inspection member 700 of the quality inspection pile member. Including; defective section reinforcement step (S4) of reinforcing the defective section;

The quality inspection pile member of the quality inspection pile member installation step (S1) is
cast-in-place piles,
It is located on one side of the cast-in-place pile but is formed along the longitudinal direction of the cast-in-place pile and is composed of a third quality inspection member 700 formed in a long tube shape,
As a pipe for supporting the third air inlet pipe 730 and the fourth air inlet pipe 740, the third air inlet pipe support part is formed along the longitudinal direction of the cast-in-place pile and is spaced apart from each other by a predetermined interval to form a plurality of straight lines. 710, and
A third sealing part 720, which is located at the lower end of the third air inlet pipe support part 710 and spaced apart from each other by a predetermined distance, and is formed in the form of a tube in which the upper and lower ends are blocked,
and a third air inlet pipe 730 formed to surround one side of the third air inlet pipe support part 710 and the third sealing part 720 .
a fourth air inlet pipe 740 formed to surround the other side of the third air inlet pipe support part 710 and the third sealing part 720;
The third air inlet pipe support part 710 is formed to be spaced apart by a predetermined distance, and the third air inlet pipe 730 and the fourth air inlet pipe 740 are attached to the quality check space (m) formed by being spaced apart by a predetermined distance. Including a third quality confirmation space taping unit 750 formed in a predetermined size to block an empty space with
The third air inlet pipe 730 and the fourth air inlet pipe 740 are spaced apart from each other by a predetermined interval to form a quality check space (m). How to reinforce the defective section.
H빔몸체부(110)에 제2품질검사용부재(600)를 설치하여 품질검사용H빔말뚝부(100)를 제조하고 철근몸체부(210)에 제2품질검사용부재(600)를 설치하여 품질검사용철근말뚝부(200)를 제조하는 품질검사용말뚝부재설치단계(S1);
상기 품질검사용말뚝부재설치단계(S1) 이후, 지반에 천공된 천공홀(10)에 품질검사용H빔말뚝부(100)와 품질검사용철근말뚝부(200)를 근입시킨 후 레미콘을 주입시켜 경화시키는 품질검사용말뚝부재시공단계(S2);
상기 품질검사용말뚝부재시공단계(S2) 이후, 품질검사용H빔말뚝부(100)의 제2품질검사용부재(600), 품질검사용철근말뚝부(200)의 제2품질검사용부재(600)에 각각 공기를 주입시키는 품질검사단계(S3);
상기 품질검사단계(S3) 이후, 품질검사용H빔말뚝부(100)의 제2품질검사용부재(600)와 품질검사용철근말뚝부(200)의 제2품질검사용부재(600)에 각각 보강주입재를 주입시키는 불량구간보강단계(S4);를 포함하고,

상기 품질검사용말뚝부재설치단계(S1)의 품질검사용H빔말뚝부(100)는 지반에 천공된 천공홀(10)에 삽입되기 위한 것으로,

상기 품질검사용H빔말뚝부(100)는
두개의 플랜지 사이에 웨브가 형성된 H형상의 H빔몸체부(110)과,
상기 H빔몸체부(100)의 웨브 일측과 타측에 각각 위치하되 H빔몸체부(100)의 길이방향을 따라 형성되되 긴 관형태로 형성되는 제2품질검사용부재(600)를 포함하고,
상기 품질검사용말뚝부재설치단계(S1)의 품질검사용철근말뚝부(200)는 지반에 천공된 천공홀(10)에 삽입되기 위한 것으로,

상기 품질검사용철근말뚝부(200)는
소정 간격을 가지고 소정 개수의 철근몸체부(210)가 원형 형상으로 배치되되, 상기 철근몸체부(210)를 고정하기 위해 철근몸체부(210)의 외주면을 둘러싸도록 형성되는 철근고정부재(220)와,
서로 이웃하는 철근몸체부(210)의 사이 사이에 위치하되, 철근몸체부(210)의 길이방향을 따라 형성되며 긴 관형태로 형성되는 상기 제2품질검사용부재(600)를 포함하되,
상기 품질검사용H빔말뚝부(100)와 품질검사용철근말뚝부(200)에 각각 형성되는 제2품질검사용부재(600)는
외부로부터 공기 또는 보강주입재가 유입되기 위한 관으로서 현장타설말뚝의 길이방향을 따라 형성되되 긴 관형태로 형성되되 소정 크기의 슬릿 형상의 제2공기배출슬릿(612)이 소정 간격을 가지고 소정 갯수가 형성되는 제2공기유입관(610)과,
상기 제2공기유입관(610)의 상단에 체결되어 상단을 밀봉시키기 위해 하부 일측이 제2공기유입관(610)의 상단과 대응되는 크기로 형성되는 제2마개부(620)와,
상기 제2공기유입관(610)의 제2공기배출슬릿(612)에 부착되기 위해 소정 크기로 형성되는 제2공기배출슬릿테이핑부(630)를 포함하는 것을 특징으로 하고,
상기 품질검사단계(S3)를 통해 품질검사용H빔말뚝부(100)의 제2품질검사용부재(600)와 품질검사용철근말뚝부(200)의 제2품질검사용부재(600) 각각에 공기를 주입시키면, 콘크리트 구체 내의 불량구간(11)이 위치하는 부분은 제2품질검사용부재(600)의 제2공기유입관(610)에 부착된 제2공기배출슬릿테이핑부(630)가 제거되며, 이후 상기 불량구간보강단계(S4)를 통해 품질검사용H빔말뚝부(100)의 제2품질검사용부재(600), 품질검사용철근말뚝부(200)의 제2품질검사용부재(600)에 보강주입재를 주입시키어 불량구간(11)을 보강시키는 것을 특징으로 하는 현장타설말뚝 품질 확인 및 불량구간 보강방법.

By installing the second quality inspection member 600 in the H-beam body 110 , the H-beam pile part 100 for quality inspection is manufactured, and the second quality inspection member 600 is installed in the reinforcing bar body 210 . A quality inspection pile member installation step (S1) of installing and manufacturing a quality inspection reinforcing bar pile part 200;
After the quality inspection pile member installation step (S1), after inserting the quality inspection H-beam pile part 100 and the quality inspection reinforcing bar pile part 200 into the perforated hole 10 drilled in the ground, ready-mixed concrete is injected quality inspection pile member construction step (S2);
After the quality inspection pile member construction step (S2), the second quality inspection member 600 of the H-beam pile part 100 for quality inspection, the second quality inspection member of the quality inspection reinforcing bar pile part 200 A quality inspection step (S3) of injecting air into each (600);
After the quality inspection step (S3), the second quality inspection member 600 of the H-beam pile part 100 for quality inspection and the second quality inspection member 600 of the quality inspection reinforcing bar pile part 200 Containing; defective section reinforcement step (S4) of injecting each reinforcing injection material;

The H-beam pile part 100 for quality inspection of the quality inspection pile member installation step (S1) is to be inserted into the perforation hole 10 perforated in the ground,

The H-beam pile part 100 for quality inspection is
An H-shaped H-beam body 110 in which a web is formed between two flanges, and
The H-beam body part 100, which is located on one side and the other side of the web, is formed along the longitudinal direction of the H-beam body part 100 and includes a second quality inspection member 600 formed in a long tubular shape,
The quality inspection reinforcing bar pile part 200 of the quality inspection pile member installation step (S1) is to be inserted into the perforated hole 10 perforated in the ground,

The quality inspection reinforcing bar pile part 200 is
A predetermined number of reinforcing bar body parts 210 are arranged in a circular shape with a predetermined interval, and the reinforcing bar fixing member 220 is formed to surround the outer circumferential surface of the reinforcing bar body 210 in order to fix the reinforcing bar body 210 . Wow,
It is located between the adjacent reinforcing bar body parts 210, but includes the second quality inspection member 600 formed in the longitudinal direction of the reinforcing bar body part 210 and formed in a long tube shape,
The second quality inspection member 600 formed in the quality inspection H-beam pile part 100 and the quality inspection reinforcing bar pile part 200, respectively, is
As a pipe for introducing air or reinforcing injection material from the outside, it is formed along the longitudinal direction of the cast-in-place pile and is formed in a long pipe shape. A second air inlet pipe 610 is formed, and
A second stopper 620, which is fastened to the upper end of the second air inlet pipe 610 and has a lower one side having a size corresponding to the upper end of the second air inlet tube 610 to seal the upper end;
It characterized in that it comprises a second air exhaust slit taping part 630 formed in a predetermined size to be attached to the second air exhaust slit 612 of the second air inlet pipe 610,
Through the quality inspection step (S3), the second quality inspection member 600 of the H-beam pile part 100 for quality inspection and the second quality inspection member 600 of the quality inspection reinforcing bar pile part 200, respectively When air is injected into the concrete sphere, the portion where the defective section 11 is located is the second air exhaust slit taping part 630 attached to the second air inlet pipe 610 of the second quality inspection member 600 . is removed, and then, through the defective section reinforcement step (S4), the second quality inspection member 600 of the H-beam pile part 100 for quality inspection, the second quality inspection of the reinforcing bar pile part 200 for quality inspection Cast-in-place pile quality check and defective section reinforcement method, characterized in that the defective section (11) is reinforced by injecting a reinforcing injection material into the yong member (600).

삭제delete 삭제delete 삭제delete
KR1020210050387A 2021-04-19 2021-04-19 Quality check and reinforcing method of cast-in-placed-pile KR102412416B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210050387A KR102412416B1 (en) 2021-04-19 2021-04-19 Quality check and reinforcing method of cast-in-placed-pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210050387A KR102412416B1 (en) 2021-04-19 2021-04-19 Quality check and reinforcing method of cast-in-placed-pile

Publications (1)

Publication Number Publication Date
KR102412416B1 true KR102412416B1 (en) 2022-06-23

Family

ID=82222167

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210050387A KR102412416B1 (en) 2021-04-19 2021-04-19 Quality check and reinforcing method of cast-in-placed-pile

Country Status (1)

Country Link
KR (1) KR102412416B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20170040602A (en) * 2015-10-05 2017-04-13 김동욱 Grouting device using a reinforced network is equipped with a small steel pipe
KR101812718B1 (en) 2016-08-08 2017-12-27 정용복 Cast-in-place concrete composite measuring instruments
KR101914901B1 (en) * 2018-01-22 2018-11-02 이종우 Reinforcement pile for ground improvement and earthquake-proof and its construction method
KR101977604B1 (en) 2017-04-18 2019-05-13 비티이엔씨 주식회사 Method and apparatus for high speed curing of cast in place pile, and method for early quality test of pile using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20170040602A (en) * 2015-10-05 2017-04-13 김동욱 Grouting device using a reinforced network is equipped with a small steel pipe
KR101812718B1 (en) 2016-08-08 2017-12-27 정용복 Cast-in-place concrete composite measuring instruments
KR101977604B1 (en) 2017-04-18 2019-05-13 비티이엔씨 주식회사 Method and apparatus for high speed curing of cast in place pile, and method for early quality test of pile using the same
KR101914901B1 (en) * 2018-01-22 2018-11-02 이종우 Reinforcement pile for ground improvement and earthquake-proof and its construction method

Similar Documents

Publication Publication Date Title
JP5990214B2 (en) Reinforcement method of hole wall in construction method of cast-in-place concrete pile.
KR101925597B1 (en) Underground continuous wall grouting waterproofing method
US11512812B2 (en) Underground hydrogen storage vessel
KR100927186B1 (en) Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
KR102009077B1 (en) Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type
KR101925598B1 (en) Underground continuous wall grouting waterproofing method
KR102382616B1 (en) Temporary earth retaining structure and construction method thereof
KR20160088059A (en) CFT pile Construction Method and the Shoring Method using the same file
KR100553478B1 (en) The drilled shaft and its construction method with the application of perforated metal tubing as drilled shaft reinforcement
KR20050040079A (en) Multistage grouting system and multistage grouting method
KR101677017B1 (en) construction methods of close-twin tunnel using tube hollow
KR101119829B1 (en) Method for cast-in-place pile construction using punctured couplers
KR100849226B1 (en) C.i.p temporary wall and method for constructing thereof
KR102412416B1 (en) Quality check and reinforcing method of cast-in-placed-pile
KR101078080B1 (en) Earth retaining wall and it's construction method using the precast pile and ground reinforcement
KR102247848B1 (en) Cast-in-place pile using Pressurized grouting and construction method
ES2642145T3 (en) Procedure for the consolidation of soils and / or construction structures in contact with them, and related device
KR102494824B1 (en) CIP retaining wall and water barrier construction method using PHC-pile
KR100991248B1 (en) Foundation construction method of micro pile using pack and pile used in the same
KR102415056B1 (en) Quality check/reinforcement and order method of on-site pile using quality inspection and order prevention materials
KR102156277B1 (en) Basic file construction method of soft ground and thereof foundation file device
KR102480876B1 (en) Structure for reinforcing foundation using steel piles and construction method thereof
CN110410082B (en) Tunnel excavation advance support method
CN114351684A (en) Foundation construction structure for maintaining tunnel and construction method thereof
JP7057726B2 (en) How to form underground space and how to use underground space

Legal Events

Date Code Title Description
GRNT Written decision to grant