KR102374363B1 - Temporary double wall sheet pile and the foundation improvement method of construction using the same - Google Patents

Temporary double wall sheet pile and the foundation improvement method of construction using the same Download PDF

Info

Publication number
KR102374363B1
KR102374363B1 KR1020200170464A KR20200170464A KR102374363B1 KR 102374363 B1 KR102374363 B1 KR 102374363B1 KR 1020200170464 A KR1020200170464 A KR 1020200170464A KR 20200170464 A KR20200170464 A KR 20200170464A KR 102374363 B1 KR102374363 B1 KR 102374363B1
Authority
KR
South Korea
Prior art keywords
ground
body part
holes
wall pile
temporary
Prior art date
Application number
KR1020200170464A
Other languages
Korean (ko)
Inventor
홍성관
Original Assignee
한국경량혼합토 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국경량혼합토 주식회사 filed Critical 한국경량혼합토 주식회사
Priority to KR1020200170464A priority Critical patent/KR102374363B1/en
Application granted granted Critical
Publication of KR102374363B1 publication Critical patent/KR102374363B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/28Stressing the soil or the foundation structure while forming foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0051Including fibers
    • E02D2300/0054Including fibers made from plastic
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0051Including fibers
    • E02D2300/0064Including fibers made from metal
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0071Wood
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Abstract

The present invention relates to a temporary wall pile for vertical bed excavation on ultraweak ground and a ground improvement construction method using the same. In accordance with a purpose of the present invention, the temporary wall pile is suggested to solve an issue: since forming a natural inclination angle on weak or ultraweak ground is substantially not possible although a natural inclination angle required for bed excavation is necessary for a ground improvement, there is considerable difficulty in achieving the ground improvement. In order to achieve the purpose, an area to be done with a ground improvement is set within a weak or ultraweak ground area, and then, the temporary wall pile for vertical bed excavation in accordance with the present invention is pushed vertically downward along the circumference of the area to form an artificial wall, and, then, the area is artificially separated into an inner area and an outer area from the wall, and, accordingly, vertical bed excavation is performed in the inner area and an improvement to lightweight mixture soil is made, and the improved lightweight mixture of soil is used to be placed up to a planned ground height, and, therefore, the weak or ultraweak ground can be effectively improved.

Description

초연약지반 수직터파기용 가시설 월파일 및 이를 이용한 지반개량공법{Temporary double wall sheet pile and the foundation improvement method of construction using the same}Temporary double wall sheet pile and the foundation improvement method of construction using the same}

본 발명은 도로, 제방, 건축물 등 각종 상부구조물의 하중을 충분히 지지할 수 없는 초연약지반의 지반개량에 사용되는 초연약지반 수직터파기용 가시설 월파일 및 이를 이용한 지반개량공법에 관한 것으로서,The present invention relates to a temporary facility wall pile for vertical excavation of a super soft ground used for ground improvement of a super soft ground that cannot sufficiently support the load of various superstructures such as roads, embankments, and buildings, and a ground improvement method using the same,

더욱 상세하게는, 본 발명은 지반개량을 위해서는 터파기시에 요구되는 자연경사각이 필요하나 연약지반 또는 초연약지반에서는 자연경사각을 이루기가 실질적으로 불가능하기 때문에 지반개량을 이루기가 상당히 어렵다는 문제를 해결하기 위해 제시되는 것으로서, 연약지반 또는 초연약지반 영역 내에서 지반개량을 하고자 하는 영역을 설정한 후, 상기 영역의 테두리를 따라 본 발명에 따른 수직터파기용 가시설 월파일을 수직하방으로 밀어넣어 인위적인 벽(wall)을 형성함으로써 상기 벽(wall)을 기준으로 안쪽 영역과 바깥쪽 영역을 인위적으로 분리함으로써, 상기 안쪽 영역에 대한 수직터파기, 경량혼합토로 개량 및 개량한 상기 경량혼합토를 사용하여 지반계획고 높이까지 타설함으로써, 연약지반 또는 초연약지반을 효과적으로 개량할 수 있도록 하는 초연약지반 수직터파기용 가시설 월파일 및 이를 이용한 지반개량공법에 관한 것이다.More specifically, the present invention requires a natural inclination angle required at the time of excavation for ground improvement, but since it is practically impossible to achieve a natural inclination angle in soft or very soft ground, it is very difficult to achieve the ground improvement. After setting the area to be improved in the soft ground or super soft ground area, the temporary wall pile for vertical excavation according to the present invention is pushed along the edge of the area vertically downward to create an artificial wall ( By artificially separating the inner area and the outer area based on the wall by forming a wall), vertical excavation for the inner area, using the lightweight mixed soil improved and improved into a lightweight mixed soil It relates to a temporary facility wall pile for vertical excavation of a super soft ground that can effectively improve soft or super soft ground by pouring it to a height, and a ground improvement method using the same.

일반적으로 연약지반은 단순히 지반조건 뿐만 아니라 성토나 구조물의 종류, 규모, 지반조건들을 종합적으로 고려하여 상대적인 관점에서 판단해야 한다.In general, soft ground should be judged from a relative point of view, comprehensively considering not only ground conditions, but also the type, size, and ground conditions of the embankment or structure.

주로 초연약지반은 고함수비의 점토나 실트와 같은 미세한 입자의 흙이나 간극이 큰 유기질토, 이탄, 느슨한 모래 등으로 이루어진 토층으로 구성되어 있으며, 지하수위가 높거나 성토체나 구조물의 안정과 침하의 문제가 발생하는 지반을 의미한다.The super-soft ground is mainly composed of fine-grained soil such as high water content clay or silt, or a soil layer composed of organic soil with large gaps, peat, and loose sand. It means the ground where the problem occurs.

이와 같은 연약지반 상에서 토목, 건축공사가 원지반에서 그대로 이루어지게 될 경우에는 구조물의 안전에 큰 문제가 발생하게 되고, 작업을 위하여 시공장비의 주행은 물론이고 사람 조차 보행이 불가능한 경우가 많다. 따라서 지반 안정성을 증대시키기 위해 지반개량이 필요하다. 상기 지반개량은 지반의 강도특성을 개선하고, 지반의 변형특성을 개선하는 것을 목적으로 한다.When civil engineering and building works are carried out in the original ground on such a soft ground, a big problem arises in the safety of the structure, and in many cases, it is impossible not only to run the construction equipment but also to walk for the work. Therefore, it is necessary to improve the ground to increase the stability of the ground. The purpose of the ground improvement is to improve the strength characteristics of the ground and improve the deformation characteristics of the ground.

이와 같은 연약지반 또는 초연약지반을 개량하기 위해서는 원지반의 비탈면이 안정적으로 유지되어야 하나, 종래에는 연약지반 또는 초연약지반의 개량을 위한 원지반의 비탈면을 제어할 수 있는 기술이 개시되어 있지 않아 지반개량이 용이하지 않은 문제가 있었다.In order to improve such soft or very soft ground, the slope of the original ground must be maintained stably. This was not an easy problem.

대한민국 등록특허 10-0243394(등록일자 1999.11.16)Republic of Korea Patent Registration 10-0243394 (Registration Date 1999.11.16) 대한민국 등록특허 10-0457834(등록일자 2004.11.10)Republic of Korea Patent Registration 10-0457834 (Registration Date 2004.11.10) 대한민국 등록특허 10-1372163(등록일자 2014.02.28)Republic of Korea Patent Registration 10-1372163 (Registration Date 2014.02.28) 대한민국 등록특허 10-1545307(등록일자 2015.08.11)Republic of Korea Patent Registration 10-1545307 (Registration Date 2015.08.11)

본 발명은 지반개량을 위해서는 터파기시에 요구되는 자연경사각이 필요하나 연약지반 또는 초연약지반에서는 자연경사각을 이루기가 실질적으로 불가능하기 때문에 지반개량을 이루기가 상당히 어렵다는 문제를 해결하기 위해 제시되는 것으로서, 연약지반 또는 초연약지반 영역 내에서 지반개량을 하고자 하는 영역을 설정한 후, 상기 영역의 테두리를 따라 본 발명에 따른 수직터파기용 가시설 월파일을 수직하방으로 밀어넣어 인위적인 벽(wall)을 형성함으로써 상기 벽(wall)을 기준으로 안쪽 영역과 바깥쪽 영역을 인위적으로 분리함으로써, 상기 안쪽 영역에 대한 수직터파기, 경량혼합토로 개량 및 개량한 상기 경량혼합토를 사용하여 지반계획고 높이까지 타설함으로써, 연약지반 또는 초연약지반을 효과적으로 개량할 수 있도록 하는 초연약지반 수직터파기용 가시설 월파일 및 이를 이용한 지반개량공법을 제공하고자 하는 것을 발명의 목적으로 한다.The present invention requires a natural inclination angle required at the time of excavation for ground improvement, but since it is practically impossible to achieve a natural inclination angle in soft or super soft ground, it is proposed to solve the problem that it is quite difficult to achieve ground improvement, After setting the area to be improved in the soft ground or super soft ground area, the temporary wall pile for vertical excavation according to the present invention is pushed vertically downward along the edge of the area to form an artificial wall. By artificially separating the inner region and the outer region based on the wall, vertical excavation for the inner region, and using the lightweight mixed soil improved and improved to a lightweight mixed soil, by pouring to the height of the ground plan, It is an object of the invention to provide a temporary facility wall pile for vertical excavation of super soft ground that can effectively improve soft ground or super soft ground, and a ground improvement method using the same.

상기 목적을 달성하기 위하여,In order to achieve the above object,

본 발명은 제1실시형태의,The present invention of the first embodiment,

세개의 면이 상호 절곡된 상태에서 일체를 이루어 종단면이 '┏┓'구조를 이루는 입체형의 바디부와,A three-dimensional body part that forms a '┏┓' structure in which the three surfaces are integrally bent to each other,

상기 바디부의 상면에 형성되는 다수의 통공을 포함하여 상기 바디부의 운반을 용이하게 하는 운반체결부와,A transport fastening portion including a plurality of through-holes formed in the upper surface of the body portion to facilitate transportation of the body portion;

상기 바디부의 전·후면의 양측단부에 다수의 연결공이 형성되어, 부력재의 결합 및 위치를 조절하는 결합체결부를 포함하는 것을 특징으로 하는 초연약지반 수직터파기용 가시설 월파일을 제공한다.A plurality of connection holes are formed in both ends of the front and rear surfaces of the body portion to provide a temporary wall pile for vertical excavation of super soft ground, characterized in that it includes a coupling fastening part for controlling the coupling and position of the buoyancy material.

본 발명은 제2실시형태의,The present invention of the second embodiment,

세개의 면이 상호 절곡된 상태에서 일체를 이루어 종단면이 '┏┓'구조를 이루는 입체형의 바디부와,A three-dimensional body part that forms a '┏┓' structure in which the three surfaces are integrally bent to each other,

상기 바디부의 상면에 형성되는 다수의 통공; 전·후면의 상단부에 형성되는 다수의 체결공;을 포함하여 상기 바디부의 운반을 용이하게 하는 운반체결부와,a plurality of through holes formed in the upper surface of the body part; A plurality of fastening holes formed on the upper ends of the front and rear surfaces; and a transport fastening part for facilitating transport of the body part, including;

상기 바디부의 전·후면에 형성되되, 상기 체결공으로부터 소정의 폭으로 이격된 양측단부에 다수의 연결공이 형성되어, 부력재의 결합 및 위치를 조절하는 결합체결부를 포함하는 것을 특징으로 하는 초연약지반 수직터파기용 가시설 월파일을 제공한다.Doedoe formed on the front and rear surfaces of the body part, a plurality of connection holes are formed at both ends spaced apart from the fastening hole by a predetermined width, the super soft ground, characterized in that it comprises a coupling fastening part for adjusting the coupling and position of the buoyancy material Temporary facility wall piles for vertical excavation are provided.

그리고 상기 제1실형태 또는 제2실시형태 중 어느 하나의 월파일을 선택하여 연약지반 또는 초연약지반에 수직하방으로 밀어넣되, 1개 단독 또는 2개 이상의 다수를 연결하여 지반개량 영역을 원지반으로부터 분리하는 단계(S10)와,And select the wall pile of any one of the first and second embodiments and push it vertically downward to the soft or super soft ground, and connect one alone or two or more to remove the ground improvement area from the original ground. Separating the step (S10) and,

상기 지반개량 영역 내의 토사를 수직터파기한 후 토사를 경량혼합토로 개량하는 단계(S20)와,After vertical excavation of the soil in the ground improvement area, improving the soil into lightweight mixed soil (S20);

상기 개량한 경량혼합토를 상기 지반개량 영역 내에 계획고에 맞춰 타설하는 단계(S30)와,The step of pouring the improved lightweight mixed soil according to the planned height in the ground improvement area (S30);

상기 S10단계에서 설치한 월파일을 빼내어 다시 새롭게 설정된 지반개량 영역에 맞춰 테두리를 따라 다시 상기 월파일을 수직하방으로 밀어넣은 후 상기 S20단계와 상기 S30단계를 반복수행하는 단계(S40)를 포함하는 초연약지반 수직터파기용 가시설 월파일을 이용한 지반개량공법을 제공한다.Taking out the wall pile installed in step S10, pushing the wall pile vertically downward again along the edge in line with the newly set ground improvement area, and then repeating steps S20 and S30 repeatedly (S40) including a step (S40) Provides a ground improvement method using a temporary facility wall pile for vertical excavation of super soft ground.

본 발명에 따른 초연약지반 수직터파기용 가시설 월파일 및 이를 이용한 지반개량공법은 연약지반 또는 초연약지반의 지반개량에 있어서 가시설 월파일을 이용하여 원지반과 지반개량하고자 하는 영역을 분리한 후, 상기 지반개량하고자 하는 영역만을 수직터파기 한 후, 토사를 경량혼합토로 개량하여 타설이 가능하기 때문에 원지반의 토사의 흘러내림을 효과적으로 차단한 상태에서 원활하게 단시간 내에 지반개량 시공이 가능하다는 장점을 갖는다.The temporary facility wall pile for vertical excavation of the super soft ground according to the present invention and the ground improvement method using the same are the original ground and the area to be improved by using the temporary wall pile in the ground improvement of the soft ground or the super soft ground, after separating the area to be improved, the Since only the area to be improved is vertically excavated and then the soil is improved to a lightweight mixed soil and poured, it has the advantage of being able to smoothly construct the ground within a short time while effectively blocking the flow of soil from the original ground.

도 1은 본 발명의 제1실시형태에 따른 월파일의 사시도.
도 2는 상기 도 1의 측면도.
도 3은 상기 도 1의 정면도.
도 4는 상기 도 1에 도시된 월파일이 다수로 결합된 상태를 도시한 사시도.
도 5는 상기 도 1에 도시된 월파일에 부력부재가 설치된 상태를 도시한 사시도.
도 6은 상기 도 5의 측면도.
도 7은 상기 도 5에 도시된 월파일이 다수로 결합된 상태를 도시한 사시도.
도 8은 본 발명의 제2실시형태에 따른 월파일의 사시도.
도 9는 상기 도 8의 측면도.
도 10은 상기 도 8의 정면도.
도 11은 상기 도 8에 도시된 월파일의 폭이 확장된 형태를 도시한 사시도.
도 12는 도 11에 도시된 월파일이 운송장비에 의해 이송되는 상태를 도시한 사시도.
도 13은 본 발명에 따른 지반개량공법의 S10 단계로서, 월파일이 운송장비에 의해 이동하는 상태를 도시한 도면.
도 14는 본 발명에 따른 지반개량공법의 S10 단계로서, 월파일이 초연약지반에 설치된 상태를 도시한 도면.
도 15는 본 발명에 따른 지반개량공법의 S20 단계로서, 월파일에 의해 지반개량영역을 굴착한 상태를 도시한 도면.
도 16은 본 발명에 따른 지반개량공법의 S30 단계로서, 지반개량영역에 경량혼합토를 타설한 상태를 도시한 도면.
도 17 내지 도 20은 본 발명에 따른 지반개량공법의 S40 단계로서, 상기 S10단계에서 S30단계가 반복수행되는 상태를 도시한 도면.
도 21은 본 발명에 따른 지반개량공법에 의해 초연약지반이 지반개량된 상태를 도시한 도면.
1 is a perspective view of a wall pile according to a first embodiment of the present invention;
Fig. 2 is a side view of Fig. 1;
Fig. 3 is a front view of Fig. 1;
4 is a perspective view illustrating a state in which a plurality of wall piles shown in FIG. 1 are combined.
Figure 5 is a perspective view showing a state in which the buoyancy member is installed in the wall pile shown in Figure 1;
Fig. 6 is a side view of Fig. 5;
7 is a perspective view illustrating a state in which a plurality of wall piles shown in FIG. 5 are combined.
8 is a perspective view of a wall pile according to a second embodiment of the present invention;
Fig. 9 is a side view of Fig. 8;
Fig. 10 is a front view of Fig. 8;
11 is a perspective view illustrating an expanded form of the wall pile shown in FIG. 8;
12 is a perspective view showing a state in which the wall pile shown in FIG. 11 is transported by transport equipment.
13 is a step S10 of the ground improvement method according to the present invention, showing a state in which the wall pile is moved by the transportation equipment.
14 is a view showing a state in which the wall pile is installed in the super soft ground as a step S10 of the ground improvement method according to the present invention.
15 is a view showing a state in which the ground improvement area is excavated by a wall pile as step S20 of the ground improvement method according to the present invention.
16 is a view showing a state in which lightweight mixed soil is poured in the ground improvement area as step S30 of the ground improvement method according to the present invention.
17 to 20 are views showing a state in which steps S40 of the ground improvement method according to the present invention are repeated, in which steps S10 to S30 are repeatedly performed.
21 is a view showing a state in which the super soft ground is improved by the ground improvement method according to the present invention.

이하, 본 발명의 초연약지반 수직터파기용 가시설 월파일 및 이를 이용한 지반개량공법에 따른 구체적인 기술 내용을 도면과 함께 살펴보도록 한다.Hereinafter, the temporary facility wall pile for vertical excavation of the super soft ground of the present invention and specific technical contents according to the ground improvement method using the same will be looked at together with the drawings.

도 1 내지 도 7은 본 발명에 따른 제1실시형태의 초연약지반 수직터파기용 가시설 월파일을 도시한 것으로서,1 to 7 show the temporary facility wall pile for excavating the super soft ground vertical trench of the first embodiment according to the present invention,

세개의 면이 상호 절곡된 상태에서 일체를 이루어 종단면이 '┏┓'구조를 이루는 입체형의 바디부(10)와,The three-dimensional body part 10, which forms a '┏┓' structure, in which the three surfaces are integrally bent with each other,

상기 바디부(10)의 상면에 형성되는 다수의 통공(201, 202)을 포함하여 상기 바디부(10)의 운반을 용이하게 하는 운반체결부(20)와,A transport fastening part 20 including a plurality of through-holes 201 and 202 formed in the upper surface of the body part 10 to facilitate transport of the body part 10;

상기 바디부(10)의 전·후면의 양측단부에 다수의 연결공(301)이 형성되어, 2개 이상의 서로 다른 바디부(10)가 체결수단에 의해 상호 결합을 이루도록 하는 결합체결부(30)를 포함하는 것을 특징으로 한다.A plurality of connection holes 301 are formed at both ends of the front and rear surfaces of the body portion 10, so that two or more different body portions 10 are coupled to each other by means of a fastening means. It is characterized in that it includes.

그리고 도 8 내지 도 12는 본 발명에 따른 제2실시형태의 초연약지반 수직터파기용 가시설 월파일을 도시한 것으로서,And Figures 8 to 12 show the temporary facility wall pile for excavating the super soft ground vertical trench of the second embodiment according to the present invention,

세개의 면이 상호 절곡된 상태에서 일체를 이루어 종단면이 '┏┓'구조를 이루는 입체형의 바디부(10)와,The three-dimensional body part 10, which forms a '┏┓' structure, in which the three surfaces are integrally bent with each other,

상기 바디부(10)의 상면에 형성되는 다수의 통공(201); 전·후면의 상단부에 형성되는 다수의 체결공(202);을 포함하여 상기 바디부(10)의 운반을 용이하게 하는 운반체결부(20)와,A plurality of through-holes 201 formed in the upper surface of the body portion (10); A plurality of fastening holes 202 formed at the upper ends of the front and rear surfaces; and a transport fastening part 20 for facilitating transport of the body part 10, including;

상기 바디부(10)의 전·후면에 형성되되, 상기 체결공(202)으로부터 소정의 폭으로 이격된 양측단부에 다수의 연결공(301)이 형성되어, 부력재의 결합 및 위치를 조절하는 결합체결부(30)를 포함하는 것을 특징으로 한다.Doedoe formed on the front and rear surfaces of the body portion 10, a plurality of connection holes 301 are formed at both ends spaced apart from the fastening hole 202 by a predetermined width, the combination body for controlling the coupling and position of the buoyancy material It is characterized in that it includes a connection (30).

본 발명에 따른 초연약지반 수직터파기용 가시설 월파일은 연약지반 또는 초연약지반의 개량에 있어, 일정 영역을 설정하여 벽(wall)을 형성함으로써, 원지반에 대한 자연경사각을 형성하지 않더라도 연약지반 또는 초연약지반에 대한 지반개량이 용이하게 이루어질 수 있도록 한다.Temporary wall pile for vertical excavation of super soft ground according to the present invention, in the improvement of soft ground or super soft ground, by setting a certain area and forming a wall, even if it does not form a natural inclination angle with respect to the original ground, soft ground or Make it easy to improve the ground for super soft ground.

상기 가시설 월파일(1)은 일정 크기를 갖는 독립구조체를 형성하고, 이와 같이 형성된 독립구조체를 결합부재를 사용하여 다수로 연결사용할 수 있다.The temporary wall pile 1 forms an independent structure having a certain size, and the independent structure formed in this way can be connected and used in plurality by using a coupling member.

이와 관련하여, 도 1 내지 도 3, 도 5, 도 6, 도 8 내지 도 12 는 독립구조체로서의 가시설 월파일(1)을 도시하고 있으며, 도 4, 도 7 및 도 11에는 상기 독립구조체를 이루는 가시설 월파일(1) 다수를 연결하여 일체로 형성하는 구조를 도시하고 있다.In this regard, FIGS. 1 to 3, 5, 6, and 8 to 12 show the temporary wall pile 1 as an independent structure, and FIGS. 4, 7 and 11 show the independent structure. It shows a structure formed integrally by connecting a plurality of temporary wall piles (1).

연약지반 또는 초연약지반은 지지력이 약하기 때문에 본 발명에 따른 가시설 월파일을 설치할 경우, 상기 가시설 월파일의 자체 하중에 의해 필요 이상의 깊이로 내려앉아 매몰될 수도 있기 때문에, 지반 상태에 따라 가시설 월파일이 필요이상으로 내려앉는 것을 방지하기 위하여 부력부재를 사용할 수도 있다.Since the soft or super soft ground has weak bearing capacity, when installing the temporary wall pile according to the present invention, it may sink to a depth greater than necessary and be buried by the self-load of the temporary wall pile, depending on the ground condition. A buoyancy member may be used to prevent it from sinking more than necessary.

도 5 내지 도 7에 도시된 가시설 월파일(1)은 바디부(10)의 내측상면에 부력부재(110)가 부착형성된 상태를 보이고 있다.The temporary wall pile 1 shown in FIGS. 5 to 7 shows a state in which the buoyancy member 110 is attached to the inner upper surface of the body part 10 .

상기 부력부재(110)는 바디부(10)에 형성되는 다수의 연결공(301)에 체결되어 고정되고, 필요에 따라서는 높이조절이 가능하다. 이때 체결수단은 다양하게 적용할 수 있으나, 도면에 도시된 바와 같이 일례로 볼트체결방식을 적용할 수 있다.The buoyancy member 110 is fastened to a plurality of connection holes 301 formed in the body portion 10 and is fixed, and the height can be adjusted if necessary. At this time, the fastening means can be applied in various ways, but as shown in the drawings, a bolt fastening method can be applied as an example.

상기 바디부(10)는 필요에 따라 다양한 재질을 사용하여 제작할 수 있으며, 예를 들어 금속재, 합성수지 또는 목재 중 선택되는 어느 1의 재질을 사용하여 제작할 수 있다.The body part 10 may be manufactured using various materials as needed, for example, it may be manufactured using any one material selected from among metal materials, synthetic resins, and wood.

상기 바디부(10)는 상면에 길이방향으로 다수의 통공이 형성되어 이송장비를 통한 가시설 월파일(1)의 이송이 용이하도록 한다.The body portion 10 has a number of through holes formed in the longitudinal direction on the upper surface to facilitate the transfer of the temporary wall pile (1) through the transfer equipment.

상기 통공은 바디부(10)의 상면에 길이방향으로 다수로 형성되되, 중앙부에 1개의 중심 통공(201)이 형성되고, 상기 중심 통공(201)의 주변에 다수의 주변 통공(202) 형성된다.The through-holes are formed in a plurality in the longitudinal direction on the upper surface of the body portion 10, one central through-hole 201 is formed in the central portion, and a plurality of peripheral through-holes 202 are formed around the central through-hole 201. .

이때 중앙부에 형성되는 중심 통공(201)과 중심 통공(201)의 주변에 형성되는 주변 통공(202)의 직경은 가시설 월파일(1)의 재질에 따라 다양하게 정할 수 있다. 일례로서, 상기 중심 통공(201)의 직경은 8~12 cm이고, 상기 주변 통공(202)의 직경은 4~6 cm로 정할 수 있다.At this time, the diameter of the central through-hole 201 formed in the central part and the peripheral through-hole 202 formed around the central through-hole 201 may be variously determined according to the material of the temporary wall pile 1 . As an example, the diameter of the central through hole 201 may be 8 to 12 cm, and the diameter of the peripheral through hole 202 may be set to 4 to 6 cm.

또한 상기 바디부(10)는 도 1, 도 3 내지 도 5, 도 7에 도시된 바와 같이, 양측면에 연결공(301)이 형성되며, 이때 상기 연결공(301)의 직경은 가시설 월파일(1)의 재질에 따라 다양하게 정할 수 있다. 일례로서, 상기 연결공(301)의 직경은 3~7 cm인 원형인 것으로 정할 수 있다.In addition, as shown in FIGS. 1, 3 to 5, and 7, the body portion 10 has connection holes 301 formed on both sides, and the diameter of the connection hole 301 is a temporary wall pile ( It can be set in various ways depending on the material of 1). As an example, the diameter of the connection hole 301 may be determined to be a circle of 3-7 cm.

그리고 상기 바디부(10)는 다른 실시형태로서, 도 8, 도 10 내지 도 12에 도시된 바와 같이, 양측면에 체결공(202)과 연결공(301)이 형성되며, 이때 상기 체결공(202)의 크기 및 상기 연결공(301)의 직경은 가시설 월파일(1)의 재질에 따라 다양하게 정할 수 있다. 일례로서, 상기 체결공(202)의 크기는 가로 29~31 cm이고, 세로 14~16 cm의 크기를 갖는 사각형태로 정할 수 있고, 상기 연결공(301)은 직경이 4~6 cm인 원형인 것으로 정할 수 있다.And the body part 10 is another embodiment, and as shown in FIGS. 8 and 10 to 12 , a fastening hole 202 and a connecting hole 301 are formed on both sides of the fastening hole 202, in this case, the fastening hole 202 ) and the diameter of the connection hole 301 can be variously determined according to the material of the temporary wall pile (1). As an example, the size of the fastening hole 202 is 29 to 31 cm in width and can be determined in a rectangular shape having a size of 14 to 16 cm in length, and the connection hole 301 is a circle having a diameter of 4 to 6 cm. can be determined to be

상기 제1실시형태 또는 제2실시형태의 가시설 월파일(1)은 2개 이상을 상호 연결하여 사용할 수 있으며, 이때 상호 연결은 다양한 형태의 체결방식을 적용할 수 있다. 일례로 도 4 및 도 7에 도시된 바와 같이, 결합부재인 연결용 판을 사용하여 볼트, 너트결합방식을 적용할 수 있다.Two or more temporary wall piles 1 of the first embodiment or the second embodiment may be interconnected and used, and in this case, various types of fastening methods may be applied for interconnection. As an example, as shown in FIGS. 4 and 7 , a bolt and nut coupling method can be applied using a connecting plate that is a coupling member.

다음으로 이와 같이 제시된 가시설 월파일(1)을 이용한 지반개량공법에 대해 살펴보도록 한다.Next, let's take a look at the ground improvement method using the temporary facility wall pile (1) presented as above.

본 발명에 따른 지반개량공법은 도 13 내지 도 21에 도시된 바와 같이,The ground improvement method according to the present invention is as shown in FIGS. 13 to 21,

세개의 면이 상호 절곡된 상태에서 일체를 이루어 종단면이 '┏┓'구조를 이루는 입체형의 바디부(10)와, 상기 바디부(10)의 상면에 형성되는 다수의 통공(201, 202)을 포함하여 상기 바디부(10)의 운반을 용이하게 하는 운반체결부(20)와, 상기 바디부(10)의 전·후면의 양측단부에 다수의 연결공(301)이 형성되어, 부력재의 결합 및 위치를 조절하는 결합체결부(30)를 포함하는 초연약지반 수직터파기용 가시설 월파일;Three-dimensional body part 10 forming a '┏┓' structure by forming an integral body in a state in which three surfaces are bent, and a plurality of through-holes 201 and 202 formed in the upper surface of the body part 10 A plurality of connection holes 301 are formed in both ends of the transport fastening part 20 and the front and rear surfaces of the body part 10 to facilitate the transport of the body part 10, including the combination of the buoyancy material and the Temporary wall pile for vertical excavation of super soft ground including a coupling part 30 for adjusting the position;

또는 or

세개의 면이 상호 절곡된 상태에서 일체를 이루어 종단면이 '┏┓'구조를 이루는 입체형의 바디부(10)와, 상기 바디부(10)의 상면에 형성되는 다수의 통공(201); 전·후면의 상단부에 형성되는 다수의 체결공(202);을 포함하여 상기 바디부(10)의 운반을 용이하게 하는 운반체결부(20)와, 상기 바디부(10)의 전·후면에 형성되되, 상기 체결공(202)으로부터 소정의 폭으로 이격된 양측단부에 다수의 연결공(301)이 형성되어, 부력재의 결합 및 위치를 조절하는 결합체결부(30)를 포함하는 초연약지반 수직터파기용 가시설 월파일; 중 선택되는 어느 하나의 월파일을 연약지반 또는 초연약지반에 수직하방으로 밀어넣되, 1개 단독 또는 2개 이상의 다수를 연결하여 지반개량 영역을 원지반으로부터 분리하는 단계(S10)와,A three-dimensional body part 10 forming a '┏┓' structure in which the three surfaces are integrally bent to each other, and a plurality of through holes 201 formed in the upper surface of the body part 10; A plurality of fastening holes 202 formed at the upper ends of the front and rear surfaces; and a transport fastening part 20 for facilitating transport of the body part 10, including; and formed on the front and rear surfaces of the body part 10 However, a plurality of connecting holes 301 are formed at both ends spaced apart from the fastening hole 202 by a predetermined width, and the super soft ground vertical turf wave including a coupling fastening part 30 for controlling the coupling and position of the buoyancy material temporary facility monthly file; Pushing any one of the wall piles selected from among the soft ground or super soft ground vertically downward, and separating the ground improvement area from the original ground by connecting one single or two or more multiples (S10);

상기 지반개량 영역 내의 토사를 수직터파기한 후 토사를 경량혼합토로 개량하는 단계(S20)와,After vertical excavation of the soil in the ground improvement area, improving the soil into lightweight mixed soil (S20);

상기 개량한 경량혼합토를 상기 지반개량 영역 내에 계획고에 맞춰 타설하는 단계(S30)와,The step of pouring the improved lightweight mixed soil according to the planned height in the ground improvement area (S30);

상기 S10단계에서 설치한 월파일을 빼내어 다시 새롭게 설정된 지반개량 영역에 맞춰 테두리를 따라 다시 상기 월파일을 수직하방으로 밀어넣은 후 상기 S20단계와 상기 S30단계를 반복수행하는 단계(S40)를 포함한다.After taking out the wall pile installed in step S10 and pushing the wall pile vertically downward again along the edge according to the newly set ground improvement area, repeating steps S20 and S30 includes (S40) .

본 발명에 따른 지반개량공법은 본 발명에서 제시하고 있는 제1실시형태 또는 제2실시형태의 가시설 월파일(1)을 이용하는 것으로서, 지반개량하고자 하는 일정 구간을 설정한 후 설정된 구간 영역의 테두리를 따라 장비를 이용하여 상기 가시설 월파일(1)을 설치한다.The ground improvement method according to the present invention uses the temporary facility wall pile 1 of the first or second embodiment presented in the present invention, and after setting a certain section for ground improvement, the edge of the set section area Accordingly, the temporary facility wall pile 1 is installed using the equipment.

이와 같이 설치된 가시설 월파일(1)은 원지반과 지반개량하고자 하는 영역을 구분하는 벽(wall)을 형성함으로써, 상기 원지반의 토사가 흘러내려오는 것을 차단한 상태에서 작업이 이루어질 수 있다.The temporary facility wall pile 1 installed in this way forms a wall that separates the original ground and the area to be improved, so that work can be performed in a state in which the soil of the original ground is blocked from flowing down.

상기 가시설 월파일(1)을 설치한 후에는 지반개량하고자 하는 영역 내의 토사에 대한 수직터파기를 한 후, 터파기한 토사를 경량혼합토 제조장치로 이송하여 경량혼합토로 개량하고, 이와 같이 개량한 경량혼합토를 상기 지반개량 영역 내에 계획고에 맞춰 타설하게 된다.After installing the temporary wall pile (1), vertical excavation of the soil in the area to be improved is performed, and then the excavated soil is transferred to a lightweight mixed soil manufacturing device to improve it into a lightweight mixed soil, and the lightweight mixed soil thus improved is poured according to the planned height in the ground improvement area.

이와 같이 타설된 지반에 이어 상기 일련의 과정을 반복적으로 수행함으로써 도 21에 도시된 바와 같이, 최종적으로 연약지반 또는 초연약지반을 전체적으로 개량이 완성된다.As shown in FIG. 21 by repeatedly performing the above series of processes following the poured ground, the overall improvement of the soft or super soft ground is finally completed.

본 발명에 따른 초연약지반 수직터파기용 가시설 월파일 및 이를 이용한 지반개량공법은 연약지반 또는 초연약지반의 지반개량에 있어서 가시설 월파일을 이용하여 원지반과 지반개량하고자 하는 영역을 분리한 후, 상기 지반개량하고자 하는 영역만을 수직터파기 한 후, 토사를 경량혼합토로 개량하여 타설이 가능하기 때문에 원지반의 토사의 흘러내림을 효과적으로 차단한 상태에서 원활하게 단시간 내에 지반개량 시공이 가능하다는 장점을 갖고 있어 산업상 이용가능성이 크다.The temporary facility wall pile for vertical excavation of the super soft ground according to the present invention and the ground improvement method using the same are the original ground and the area to be improved by using the temporary wall pile in the ground improvement of the soft ground or the super soft ground, after separating the area to be improved, the After excavating only the area to be improved by vertical excavation, it is possible to improve the soil into lightweight mixed soil and pour it. It has great industrial applicability.

1 : 가시설 월파일
10 : 바디부
20 : 운반체결부
30 : 결합체결부
201: 통공
301: 연결공
1: temporary facility wall file
10: body part
20: transport fastening part
30: coupling part
201: through hole
301: connector

Claims (6)

세개의 면이 상호 절곡된 상태에서 일체를 이루어 종단면이 '┏┓'구조를 이루는 입체형의 바디부(10)와,
상기 바디부(10)의 상면에 형성되는 다수의 통공(201, 202)을 포함하여 상기 바디부(10)의 운반을 용이하게 하는 운반체결부(20)와,
상기 바디부(10)의 전·후면의 양측단부에 다수의 연결공(301)이 형성되어, 부력재의 결합 및 위치를 조절하는 결합체결부(30)를 포함하는 것을 특징으로 하는 초연약지반 수직터파기용 가시설 월파일.
A three-dimensional body portion 10 in which the three surfaces are integrally bent to form a '┏┓' structure in the longitudinal section,
A transport fastening part 20 including a plurality of through-holes 201 and 202 formed in the upper surface of the body part 10 to facilitate transport of the body part 10;
A plurality of connection holes 301 are formed at both ends of the front and rear surfaces of the body portion 10, and it is characterized in that it includes a coupling and fastening portion 30 for controlling the coupling and position of the buoyancy material. Temporary facility wall file for appointment.
세개의 면이 상호 절곡된 상태에서 일체를 이루어 종단면이 '┏┓'구조를 이루는 입체형의 바디부(10)와,
상기 바디부(10)의 상면에 형성되는 다수의 통공(201); 전·후면의 상단부에 형성되는 다수의 체결공(202);을 포함하여 상기 바디부(10)의 운반을 용이하게 하는 운반체결부(20)와,
상기 바디부(10)의 전·후면에 형성되되, 상기 체결공(202)으로부터 소정의 폭으로 이격된 양측단부에 다수의 연결공(301)이 형성되어, 부력재의 결합 및 위치를 조절하는 결합체결부(30)를 포함하는 것을 특징으로 하는 초연약지반 수직터파기용 가시설 월파일.
A three-dimensional body portion 10 in which the three surfaces are integrally bent to form a '┏┓' structure in the longitudinal section,
A plurality of through-holes 201 formed in the upper surface of the body portion (10); A plurality of fastening holes 202 formed on the upper ends of the front and rear surfaces; and a transport fastening part 20 for facilitating transport of the body part 10, including;
Doedoe formed on the front and rear surfaces of the body portion 10, a plurality of connection holes 301 are formed at both ends spaced apart from the fastening hole 202 by a predetermined width, the combination body for controlling the coupling and position of the buoyancy material Temporary facility wall pile for vertical excavation of super soft ground, characterized in that it comprises a connection (30).
청구항 1 또는 청구항 2에 있어서,
바디부(10)는 내측상면에 부력부재(110)가 부착형성되는 것을 특징으로 하는 초연약지반 수직터파기용 가시설 월파일.
The method according to claim 1 or 2,
The body portion 10 is a temporary wall pile for vertical excavation of super soft ground, characterized in that the buoyancy member 110 is attached to the inner upper surface.
청구항 1 또는 청구항 2에 있어서,
바디부(10)는 금속재, 합성수지 또는 목재 중 선택되는 어느 1의 재질로 이루어지는 것을 특징으로 하는 초연약지반 수직터파기용 가시설 월파일.
The method according to claim 1 or 2,
The body part 10 is a temporary wall pile for vertical excavation of super soft ground, characterized in that it is made of any one material selected from metal material, synthetic resin, or wood.
청구항 1 또는 청구항 2에 있어서,
통공은 바디부(10)의 상면에 길이방향으로 다수로 형성되되,
중앙부에 1개의 중심 통공(201)이 형성되고,
상기 중심 통공(201)의 주변에 다수의 주변 통공(202) 형성되는 것을 특징으로 하는 초연약지반 수직터파기용 가시설 월파일.
The method according to claim 1 or 2,
A plurality of through holes are formed on the upper surface of the body part 10 in the longitudinal direction,
One central through hole 201 is formed in the central part,
Temporary wall pile for vertical excavation of super soft ground, characterized in that a plurality of peripheral through-holes 202 are formed around the central through-hole 201.
세개의 면이 상호 절곡된 상태에서 일체를 이루어 종단면이 '┏┓'구조를 이루는 입체형의 바디부(10)와, 상기 바디부(10)의 상면에 형성되는 다수의 통공(201, 202)을 포함하여 상기 바디부(10)의 운반을 용이하게 하는 운반체결부(20)와, 상기 바디부(10)의 전·후면의 양측단부에 다수의 연결공(301)이 형성되어, 부력재의 결합 및 위치를 조절하는 결합체결부(30)를 포함하는 초연약지반 수직터파기용 가시설 월파일;
또는
세개의 면이 상호 절곡된 상태에서 일체를 이루어 종단면이 '┏┓'구조를 이루는 입체형의 바디부(10)와, 상기 바디부(10)의 상면에 형성되는 다수의 통공(201); 전·후면의 상단부에 형성되는 다수의 체결공(202);을 포함하여 상기 바디부(10)의 운반을 용이하게 하는 운반체결부(20)와, 상기 바디부(10)의 전·후면에 형성되되, 상기 체결공(202)으로부터 소정의 폭으로 이격된 양측단부에 다수의 연결공(301)이 형성되어, 부력재의 결합 및 위치를 조절하는 결합체결부(30)를 포함하는 초연약지반 수직터파기용 가시설 월파일; 중 선택되는 어느 하나의 월파일을 연약지반 또는 초연약지반에 수직하방으로 밀어넣되, 1개 단독 또는 2개 이상의 다수를 연결하여 지반개량 영역을 원지반으로부터 분리하는 단계(S10)와,
상기 지반개량 영역 내의 토사를 수직터파기한 후 토사를 경량혼합토로 개량하는 단계(S20)와,
상기 개량한 경량혼합토를 상기 지반개량 영역 내에 계획고에 맞춰 타설하는 단계(S30)와,
상기 S10단계에서 설치한 월파일을 빼내어 다시 새롭게 설정된 지반개량 영역에 맞춰 테두리를 따라 다시 상기 월파일을 수직하방으로 밀어넣은 후 상기 S20단계와 상기 S30단계를 반복수행하는 단계(S40)를 포함하는 것을 특징으로 하는 초연약지반 수직터파기용 가시설 월파일을 이용한 지반개량공법.










Three-dimensional body part 10 forming a '┏┓' structure by forming an integral body in a state in which three surfaces are bent, and a plurality of through-holes 201 and 202 formed in the upper surface of the body part 10 A plurality of connection holes 301 are formed at both ends of the transport fastening part 20 and the front and rear surfaces of the body part 10 to facilitate the transport of the body part 10, including the combination of the buoyancy material and the Temporary wall pile for vertical excavation of super soft ground including a coupling part 30 for adjusting the position;
or
A three-dimensional body part 10 forming a '┏┓' structure in which the three surfaces are integrally bent to each other, and a plurality of through holes 201 formed in the upper surface of the body part 10; A plurality of fastening holes 202 formed at the upper ends of the front and rear surfaces; and a transport fastening part 20 for facilitating transport of the body part 10, including; and formed on the front and rear surfaces of the body part 10 However, a plurality of connecting holes 301 are formed at both ends spaced apart from the fastening hole 202 by a predetermined width, and the super soft ground vertical turf wave including a coupling fastening part 30 for controlling the coupling and position of the buoyancy material temporary facility monthly file; Pushing any one of the wall piles selected from among the soft ground or super soft ground vertically downward, and separating the ground improvement area from the original ground by connecting one single or two or more multiples (S10);
After vertical excavation of the soil in the ground improvement area, improving the soil into lightweight mixed soil (S20);
The step of pouring the improved lightweight mixed soil according to the planned height in the ground improvement area (S30);
Taking out the wall pile installed in step S10, pushing the wall pile vertically downward again along the edge in line with the newly set ground improvement area, and then repeating steps S20 and S30 (S40) Ground improvement method using temporary facility wall pile for vertical excavation of super soft ground, characterized in that.










KR1020200170464A 2020-12-08 2020-12-08 Temporary double wall sheet pile and the foundation improvement method of construction using the same KR102374363B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200170464A KR102374363B1 (en) 2020-12-08 2020-12-08 Temporary double wall sheet pile and the foundation improvement method of construction using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200170464A KR102374363B1 (en) 2020-12-08 2020-12-08 Temporary double wall sheet pile and the foundation improvement method of construction using the same

Publications (1)

Publication Number Publication Date
KR102374363B1 true KR102374363B1 (en) 2022-03-15

Family

ID=80816639

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200170464A KR102374363B1 (en) 2020-12-08 2020-12-08 Temporary double wall sheet pile and the foundation improvement method of construction using the same

Country Status (1)

Country Link
KR (1) KR102374363B1 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100243394B1 (en) 1997-03-24 2000-03-15 김종천 A solidity structure of soft foundation for using cell frame-work
KR100457834B1 (en) 2002-02-20 2004-11-18 삼정건설 주식회사 Soft ground stabilization method make use of squeezing out-formed light weight concrete panel
KR200378186Y1 (en) * 2004-12-08 2005-03-21 주식회사 강원프라코 Manhole that high and low control is easy
KR20110037778A (en) * 2009-10-07 2011-04-13 토광건설주식회사 Built-up type temporary cofferdam
KR101119017B1 (en) * 2011-06-27 2012-03-12 (주) 태평양지질 Retaining wall structure of block integrative and it's construction method
KR20130078051A (en) * 2011-12-30 2013-07-10 현대중공업 주식회사 Structure for protecting spool on seabed
KR101372163B1 (en) 2013-02-06 2014-03-12 엔지니어스 주식회사 Structure on soft ground using a compensated foundation and improved surface layer and construction method for the compensated foundation
KR101545307B1 (en) 2014-10-14 2015-08-19 유한회사 강남이앤씨 Construction method of complex temporary facility with bottom grouting for weak ground

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100243394B1 (en) 1997-03-24 2000-03-15 김종천 A solidity structure of soft foundation for using cell frame-work
KR100457834B1 (en) 2002-02-20 2004-11-18 삼정건설 주식회사 Soft ground stabilization method make use of squeezing out-formed light weight concrete panel
KR200378186Y1 (en) * 2004-12-08 2005-03-21 주식회사 강원프라코 Manhole that high and low control is easy
KR20110037778A (en) * 2009-10-07 2011-04-13 토광건설주식회사 Built-up type temporary cofferdam
KR101119017B1 (en) * 2011-06-27 2012-03-12 (주) 태평양지질 Retaining wall structure of block integrative and it's construction method
KR20130078051A (en) * 2011-12-30 2013-07-10 현대중공업 주식회사 Structure for protecting spool on seabed
KR101372163B1 (en) 2013-02-06 2014-03-12 엔지니어스 주식회사 Structure on soft ground using a compensated foundation and improved surface layer and construction method for the compensated foundation
KR101545307B1 (en) 2014-10-14 2015-08-19 유한회사 강남이앤씨 Construction method of complex temporary facility with bottom grouting for weak ground

Similar Documents

Publication Publication Date Title
KR101652163B1 (en) Concrerte pannel for retaining wall and method for constructing retaining wall using the same
US20180119382A1 (en) Retaining wall system, method of supporting same, and kit for use in constructing same
CN106088133B (en) Power transmission line composite foundation for desert area
KR102374363B1 (en) Temporary double wall sheet pile and the foundation improvement method of construction using the same
CN101748735A (en) Foundation ditch excavation method for reducing pile deflection in soft soil area
JP5067307B2 (en) Road deformation prevention structure and road deformation prevention method
KR102116085B1 (en) A Eco-friendly retain wall structure
KR100808977B1 (en) Connecting structure of corner supporting beam for temporary soil sheathing work
JP2000008623A (en) Restoration method of structure
KR102263958B1 (en) the Method of Construction of Prefabricated Block for Retaining Wall Bulwark
KR102150531B1 (en) Retaining wall structure using vertical underground insert and its construction method
JP6240625B2 (en) Retaining wall, creation site and creation method of creation site
JP4968695B2 (en) Ground improvement structure
JP2009275358A (en) Improvement structure of building bearing ground, and construction method
JPS63535A (en) Earthquake-proof fortifying work for existing structure
KR100457834B1 (en) Soft ground stabilization method make use of squeezing out-formed light weight concrete panel
KR102404625B1 (en) Concrete block structure and constructing method therefor
JP7384755B2 (en) Core material and upper core material removal method
JP6718767B2 (en) Composite of soil structure and concrete structure and its construction method
JP2017137687A (en) Irrigation/drainage channel and construction method for the same
CN214497366U (en) Assembled shore protection
JP2019108677A (en) Drain pile and liquefaction countermeasures method
KR102285192B1 (en) A Eco-friendly retain wall structure
KR102511386B1 (en) Connecting structure of reinforced wall using reinforced block and constructing method thereof
JP7014629B2 (en) Building installation structure and installation method

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant