KR102340049B1 - Change management method and system for managing change elements utilizing drawing information - Google Patents

Change management method and system for managing change elements utilizing drawing information Download PDF

Info

Publication number
KR102340049B1
KR102340049B1 KR1020190107679A KR20190107679A KR102340049B1 KR 102340049 B1 KR102340049 B1 KR 102340049B1 KR 1020190107679 A KR1020190107679 A KR 1020190107679A KR 20190107679 A KR20190107679 A KR 20190107679A KR 102340049 B1 KR102340049 B1 KR 102340049B1
Authority
KR
South Korea
Prior art keywords
change
facility
work
management
element management
Prior art date
Application number
KR1020190107679A
Other languages
Korean (ko)
Other versions
KR20210026633A (en
Inventor
김용하
홍준기
안성조
정희욱
정재원
김우람
김새롬이
신유진
이명주
손원기
정윤남
이화수
Original Assignee
주식회사 이수시스템
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 이수시스템 filed Critical 주식회사 이수시스템
Priority to KR1020190107679A priority Critical patent/KR102340049B1/en
Publication of KR20210026633A publication Critical patent/KR20210026633A/en
Application granted granted Critical
Publication of KR102340049B1 publication Critical patent/KR102340049B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Abstract

본 발명은 변경관리 방법 및 시스템에 관한 것으로서, 보다 구체적으로는 플랜트 현장에서 업무 창구의 일원화를 위해 발생하는 모든 작업을 일반 정비작업 및 변경요소작업으로 분류하는 과정부터 현장과 일치화된 도면 정보를 기초로 설계 변경, 변경 작업 지시, 변경 관리까지 용이하게 수행되도록 할 수 있는 도면 정보를 활용한 변경요소 관리용 변경관리 방법 및 시스템에 관한 것이다.
이를 위해 본 발명은, 공장 설비의 일반/변경요소 관리 대상을 분류하고, 변경요소 관리 대상에 대응하는 설비도면을 매칭시키는 변경요소 분류단계와; 설비도면과 매칭된 변경요소 관리 대상의 변경 작업에 대한 승인을 요청하는 변경승인 요청단계와; 승인된 변경 작업에 따라 설비도면을 수정하는 설비도면 수정단계와; 수정된 설비도면에 기초하여 변경요소 관리 대상의 변경 작업을 계획하는 변경작업 계획단계와; 변경 작업 계획에 따른 작업 및 설비 가동전 점검 완료 후 작업 표준을 개정하는 작업표준 개정단계;를 포함하는 것을 특징으로 한다.
The present invention relates to a change management method and system, and more specifically, from the process of classifying all operations that occur for unification of work windows at a plant site into general maintenance work and change element work, drawing information consistent with the field It relates to a change management method and system for managing change elements using drawing information that can easily perform design change, change work instruction, and change management as a basis.
To this end, the present invention includes: a change element classification step of classifying a general/modified element management target of factory equipment and matching facility drawings corresponding to the change element management object; a change approval request step of requesting approval for a change operation of a change element management target matched with a facility drawing; a facility drawing modification step of revising the facility drawing according to the approved change operation; a change operation planning step of planning a change operation of a change element management target based on the amended facility drawing; It characterized in that it includes; a work standard revision step of revising the work standard after completion of the inspection before operation and facility operation according to the change work plan.

Description

도면 정보를 활용한 변경요소 관리용 변경관리 방법 및 시스템{CHANGE MANAGEMENT METHOD AND SYSTEM FOR MANAGING CHANGE ELEMENTS UTILIZING DRAWING INFORMATION}CHANGE MANAGEMENT METHOD AND SYSTEM FOR MANAGING CHANGE ELEMENTS UTILIZING DRAWING INFORMATION

본 발명은 변경관리 방법 및 시스템에 관한 것으로서, 보다 구체적으로는 플랜트 현장에서 업무 창구의 일원화를 위해 발생하는 모든 작업을 일반 정비작업 및 변경요소작업으로 분류하는 과정부터 현장과 일치화된 도면 정보를 기초로 설계 변경, 변경 작업 지시, 변경 관리까지 용이하게 수행되도록 할 수 있는 도면 정보를 활용한 변경요소 관리용 변경관리 방법 및 시스템에 관한 것이다.The present invention relates to a change management method and system, and more specifically, from the process of classifying all operations that occur for unification of business windows at a plant site into general maintenance work and change element work, drawing information consistent with the field It relates to a change management method and system for managing change elements using drawing information that can easily perform design change, change work instruction, and change management as a basis.

일반적으로 플랜트 산업은 화학 소재, 전력, 가스, 석유, 담수 등 제품을 생산할 수 있는 설비를 공급하거나 공장을 짓는 산업으로, 제품을 제조하기 위한 기계, 장비 등의 하드웨어, 엔지니어링, 소프트웨어, 시공, 유지보수가 모두 포함된 종합 산업이라 볼 수 있으며, 여기서 산업 플랜트는 원료나 에너지를 공급하여 물리적, 화학적 작용을 하게 하는 장치, 공장 시설, 생산 시설 등을 포괄적으로 의미한다.In general, the plant industry is an industry that supplies or builds factories that can produce products such as chemical materials, electric power, gas, oil, and freshwater. Hardware, engineering, software, construction, and maintenance of machinery and equipment to manufacture products It can be seen as a comprehensive industry that includes all maintenance. Here, an industrial plant comprehensively refers to devices, factory facilities, and production facilities that supply raw materials or energy to perform physical and chemical actions.

이러한 산업 플랜트는 그 용도, 규모, 목적에 맞게 수많은 산업 설비, 자재들이 다양하게 조합되어져 구축됨에 따라 주기적으로 해당 설비, 자재 등을 개별적으로 관리해야 하는데, 현재까지의 산업 플랜트 관리는 주로 전문가를 통해 플랜트 현장을 관리하도록 하는 방식에 의해 이루어지게 되고, 규모와 용도에 따라 플랜트 현장에 배치되는 인원수가 많을 수 밖에 없으며, 이로 인해 플랜트 관리를 위한 경제적인 비용 소요 부분도 상당할 수 밖에 없다.As these industrial plants are constructed by combining numerous industrial facilities and materials in various ways according to their use, scale, and purpose, it is necessary to periodically manage the relevant facilities and materials individually. This is done by the method of managing the plant site, and depending on the size and use, the number of people assigned to the plant site is inevitably large.

한편으로, 대규모로 구축되어지는 산업 플랜트 특성상 수년에서 수십년 동안 장기적으로 관리가 이루어져야 하지만, 과거에는 관리자의 기억이나 종이 문서에 의존한 수동적인 관리에 의존하였기 때문에 오랜 시간 경과에 따라 지속적으로 도면, 설비 변경 이력 등의 관리정보를 보존하기 어려웠고, 여러 관리인력의 변동이나 정보 공유를 위한 소통채널의 불확실성으로 인해 전반적으로 산업 플랜트의 체계적인 관리가 어려울 수 밖에 없었다.On the other hand, due to the nature of industrial plants built on a large scale, long-term management must be performed for several to several decades, but in the past, manual management that relied on the manager's memory or paper documents was relied on. It was difficult to preserve management information such as facility change history, and overall, systematic management of industrial plants was difficult due to changes in management personnel and uncertainty in communication channels for information sharing.

따라서, 산업 플랜트와 관련된 도면, 일반/변경요소, 유지보수 이력 등의 정보 관리, 설계 변경이 필요한 현장의 정확한 작업 지시 등을 통해 장기적인 관점에서 산업 플랜트의 최적화된 관리가 가능하도록 하기 위한 방안 마련이 필요한 실정이다.Therefore, it is necessary to prepare a plan to enable the optimized management of the industrial plant from a long-term perspective through information management such as drawings, general/change elements, and maintenance history related to the industrial plant, and accurate work instructions at the site requiring design changes. it is necessary.

대한민국 등록특허공보 제10-1897434호Republic of Korea Patent Publication No. 10-1897434 대한민국 등록특허공보 제10-1490311호Republic of Korea Patent Publication No. 10-1490311

본 발명은 상기한 종래 기술의 문제점을 해결하기 위해 안출된 것으로서, 플랜트 현장의 업무 창구의 일원화를 위해 발생하는 설비 관련 모든 작업을 일반 정비작업 및 변경요소작업으로 분류하고 현장과 일치화된 도면 정보를 기초로 설계 변경, 변경 작업 지시, 변경 관리까지 원활하게 진행되도록 하기 위한 도면 정보를 활용한 변경요소 관리용 변경관리 방법 및 시스템을 제공하는데 그 목적이 있다.The present invention has been devised to solve the problems of the prior art, and classifies all facility-related works that occur for unification of business windows at plant sites into general maintenance work and change element work, and drawing information consistent with the site Its purpose is to provide a change management method and system for managing change elements using drawing information to smoothly proceed from design change, change work order, and change management based on

상기 목적을 달성하기 위하여, 본 발명은, 공장 설비의 일반/변경요소 관리 대상을 분류하고, 변경요소 관리 대상에 대응하는 설비도면을 매칭시키는 변경요소 분류단계와; 설비도면과 매칭된 변경요소 관리 대상의 변경 작업에 대한 승인을 요청하는 변경승인 요청단계와; 승인된 변경 작업에 따라 설비도면을 수정하는 설비도면 수정단계와; 수정된 설비도면에 기초하여 변경요소 관리 대상의 변경 작업을 계획하는 변경작업 계획단계와; 변경 작업 계획에 따른 작업 및 설비 가동전 점검 완료 후 작업 표준을 개정하는 작업표준 개정단계;를 포함하는 것을 특징으로 한다.In order to achieve the above object, the present invention, a change element classification step of classifying the general/modified element management target of factory equipment, and matching facility drawings corresponding to the change element management object; a change approval request step of requesting approval for a change operation of a change element management target matched with a facility drawing; a facility drawing revision step of revising the facility drawing according to the approved change work; a change work planning step of planning a change work of a change element management target based on the revised facility drawing; and a work standard revision step of revising the work standard after completion of the inspection before operation and facility operation according to the change work plan.

또한, 본 발명은 상기 변경요소 분류단계 이전으로 설비도면과 비교하기 위한 공장 설비의 사진, 기존 도면 및 스펙 중 적어도 어느 하나 이상의 설비 데이터를 취합하는 설비 데이터 취합단계를 더 포함하는 것을 특징으로 한다.In addition, the present invention is characterized in that it further comprises a facility data collection step of collecting at least any one or more facility data of a photograph of a factory facility for comparison with the facility drawing before the change element classification step, an existing drawing, and a specification.

추가로, 상기 변경요소 분류단계는 사전에 구비되는 설비관리용 체크리스트를 통해 일반/변경요소 관리 대상 및 등급을 자동으로 분류하며, 분류된 변경요소 관리 대상에 대한 설비명, 기능, 위치 및 설비도면 중 적어도 어느 하나 이상을 시각적으로 나타내는 변경요소 정보 제공단계를 더 포함하는 것을 특징으로 한다.In addition, the change element classification step automatically classifies general/change element management targets and grades through a checklist for facility management provided in advance, and facility names, functions, locations and facility drawings for the classified change element management objects It characterized in that it further comprises the step of providing information on the changing element visually indicating at least any one or more.

또한, 상기 변경승인 요청단계 다음으로 사전에 준비된 공정안전 인허가 자료에 기초하여 변경요소 관리 대상의 변경 작업에 대한 이상 유무를 자동으로 판단하여 변경 작업 승인 여부를 결정하는 변경승인 결정단계를 포함하며, 상기 작업표준 개정단계 다음으로 변경 작업 완료된 준공 도면 및 개정된 작업 표준 정보를 외부 요청 시 제공 가능하도록 갱신하는 변경관리 완료단계를 더 포함하는 것을 특징으로 한다.In addition, following the change approval request step, based on the process safety approval data prepared in advance, the change approval decision step of determining whether to approve the change work by automatically determining whether there is an abnormality in the change work of the change element management target, After the work standard revision step, it characterized in that it further comprises a change management completion step of updating the completed work drawing and the revised work standard information to be provided upon external request.

한편으로, 본 발명은, 공장 설비의 일반/변경요소 관리 대상을 분류하고, 변경요소 관리 대상에 대응하는 설비도면을 매칭시키기 위한 변경요소 분류모듈과; 설비도면과 매칭된 변경요소 관리 대상의 변경 작업에 대한 승인을 요청하기 위한 변경승인 요청모듈과; 승인된 변경 작업에 따라 설비도면을 수정하기 위한 설비도면 수정모듈과; 수정된 설비도면에 기초하여 변경요소 관리 대상의 변경 작업을 계획하기 위한 변경작업 계획모듈과; 변경 작업 계획에 따른 작업 및 설비 가동전 점검 완료 후 작업 표준을 개정하기 위한 작업표준 개정모듈;을 포함하는 것을 특징으로 한다.On the other hand, the present invention, a change element classification module for classifying the general/modified element management target of factory equipment and matching facility drawings corresponding to the change element management object; a change approval request module for requesting approval for a change operation of a change element management target matched with a facility drawing; a facility drawing modification module for revising the facility drawing according to the approved change operation; a change operation planning module for planning a change operation of a change element management target based on the amended facility drawing; and a work standard revision module for revising the work standard after the work according to the change work plan and the inspection before facility operation is completed.

이상과 같은 본 발명에 따른 도면 정보를 활용한 변경요소 관리용 변경관리 방법 및 시스템은 플랜트 현장의 모든 작업을 일반 관리 대상 및 변경요소 관리 대상으로 자동 분류하고 변경 작업 대상 설비와 도면을 매칭시켜 연계되도록 함에 따라 변경 관리 진행에 필요한 빠른 대상 확인, 변경 작업 대상 누락 방지, 전산화에 의한 변경 작업 관리의 신뢰성 확보 등에 일조할 수 있다.As described above, the change management method and system for managing change elements using drawing information according to the present invention automatically classifies all work on the plant site into general management objects and change element management objects, and matches the equipment and drawings for change work and connects them By doing so, it can help to quickly identify the target required for change management, prevent omission of target for change, and secure the reliability of management of change work by computerization.

도 1은 본 발명에 따른 도면 정보를 활용한 변경요소 관리용 변경관리 방법을 도시한 순서도
도 2a, 도 2b, 도 3 및 도 4는 본 발명에 따른 변경관리 방법 프로세스의 일례를 도시한 도면
도 5는 본 발명에 따른 변경관리 시스템 및 기존 레거시 시스템의 연계 구성을 나타낸 도면
도 6은 본 발명에 따른 도면 정보를 활용한 변경요소 관리용 변경관리 시스템을 개략적으로 도시한 도면
1 is a flowchart illustrating a change management method for managing change elements using drawing information according to the present invention;
2A, 2B, 3 and 4 are diagrams showing an example of a change management method process according to the present invention;
5 is a diagram showing the configuration of the change management system and the existing legacy system in accordance with the present invention.
6 is a diagram schematically illustrating a change management system for managing change elements using drawing information according to the present invention;

본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms or words used in the present specification and claims should not be construed as being limited to their ordinary or dictionary meanings, and the inventor may properly define the concept of the term in order to best describe his invention. Based on the principle that there is, it should be interpreted as meaning and concept consistent with the technical idea of the present invention.

따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.Accordingly, the embodiments described in this specification and the configurations shown in the drawings are only the most preferred embodiment of the present invention, and do not represent all of the technical spirit of the present invention, so they can be substituted at the time of the present application It should be understood that various equivalents and modifications may exist.

이하, 도면을 참조로 하여 본 발명에 따른 도면 정보를 활용한 변경요소 관리용 변경관리 방법 및 시스템을 설명하기로 한다.Hereinafter, a change management method and system for managing change elements using drawing information according to the present invention will be described with reference to the drawings.

도 1은 본 발명에 따른 도면 정보를 활용한 변경요소 관리용 변경관리 방법을 도시한 순서도이다.1 is a flowchart illustrating a change management method for managing change elements using drawing information according to the present invention.

본 발명은 기본적으로 변경요소 분류단계, 변경승인 요청단계, 설비도면 수정단계, 변경작업 계획단계, 작업표준 개정단계를 포함하여 구성된다.The present invention is basically configured to include a change element classification step, a change approval request step, a facility drawing revision step, a change work planning step, and a work standard revision step.

보다 구체적으로, 본 발명은 공장 설비의 일반/변경요소 관리 대상을 분류하고, 변경요소 관리 대상에 대응하는 설비도면을 매칭시키는 변경요소 분류단계와, 설비도면과 매칭된 변경요소 관리 대상의 변경 작업에 대한 승인을 요청하는 변경승인 요청단계와, 승인된 변경 작업에 따라 설비도면을 수정하는 설비도면 수정단계와, 수정된 설비도면에 기초하여 변경요소 관리 대상의 변경 작업을 계획하는 변경작업 계획단계와, 변경 작업 계획에 따른 작업 및 설비 가동전 점검 완료 후 작업 표준을 개정하는 작업표준 개정단계를 포함하여 이루어진다.More specifically, the present invention categorizes general/modified element management targets of factory equipment, and a change element classification step of matching facility drawings corresponding to change element management objects, and a change operation of a change element management object matched with facility drawings Change approval request step for requesting approval, facility drawing revision step to revise facility drawings according to the approved change work, and change work planning step to plan the change work of the change element management target based on the revised facility drawing And, it is made including the work standard revision step of revising the work standard after the work according to the change work plan and the inspection before facility operation is completed.

상기 변경요소 분류단계 이전으로 설비도면과 비교하기 위한 공장 설비의 사진, 기존 도면 및 스펙 중 적어도 어느 하나 이상의 설비 데이터를 취합하는 설비 데이터 취합단계를 더 포함하게 된다.It further includes a facility data collection step of collecting at least any one or more facility data of a photograph of a factory facility for comparison with a facility drawing before the change element classification step, an existing drawing, and a specification.

상기 설비 데이터 취합단계는 변경요소 분류단계에서 참고할 설비 데이터의 분류체계를 정의하여 그 기준에 따라 설비 데이터를 분류하게 되는데, 이러한 분류는 수작업에 의해 이루어질 수도 있으나, OCR(Optical Character Reader), 스마트 렌즈 등과 같은 문자, 이미지 인식 방식을 통해 문서 및 도면을 자동 분류할 수 있으며, 이 때에 키워드 추출, 데이터 마이닝, 머신러닝, 딥러닝 등의 다양한 방식이 함께 적용될 수 있다.The facility data collection step defines a classification system of facility data to be referred to in the change factor classification step and classifies facility data according to the standard. This classification may be done manually, but OCR (Optical Character Reader), smart lens Documents and drawings can be automatically classified through text and image recognition methods such as, etc., and at this time, various methods such as keyword extraction, data mining, machine learning, and deep learning can be applied together.

도 2a, 도 2b, 도 3 및 도 4는 본 발명에 따른 변경관리 방법 프로세스의 일례를 도시한 도면이다.2A, 2B, 3 and 4 are diagrams illustrating an example of a change management method process according to the present invention.

상기 변경요소 분류단계는 공장 설비를 관리하는데 있어서 대상을 관리 범주에 따라 분류할 필요가 있으며, 이에 따라 일반/변경요소 관리 대상을 분류할 수 있는데, 다시 말해서 단순히 점검을 통해 관리가 이루어지는 일반 관리 대상과, 부분별로 나누어진 설비의 고장/안전관련 규정의 변동/기타 사유에 의한 비교적 큰 규모로 단위 설비의 일부 또는 전체 변경을 요구하는 변경요소 관리 대상으로 분류하여 각 대상별로 별도의 관리 프로세스가 진행된다.In the change factor classification step, it is necessary to classify the target according to the management category in managing the factory equipment, and accordingly, the general/modifiable factor management target can be classified, that is, the general management target managed through simple inspection. A separate management process is carried out for each subject by classifying them into change factor management targets that require partial or complete change of unit facilities on a relatively large scale due to equipment failure/safety-related regulations change/other reasons do.

상기 변경요소 분류단계는 사전에 구비되는 설비관리용 체크리스트를 통해 일반/변경요소 관리 대상 및 등급을 자동으로 분류하게 되며, 이는 설비의 변경관리 표준 프로세스를 수립하고 관리의 신뢰성 확보를 위해 일정한 절차에 따라 변경요소 관리에 누락이 발생되지 않도록 하기 위함이다.The change factor classification step automatically classifies general/change factor management targets and grades through a checklist for facility management provided in advance, which establishes a standard process for facility change management and is a certain procedure to secure management reliability. This is to prevent omissions from occurring in the management of change factors according to

여기서, 상기 변경요소 분류단계는 분류된 변경요소 관리 대상에 대한 설비명, 기능, 위치, 설비도면 등을 시각적으로 나타내는 변경요소 정보 제공단계를 더 포함하게 되며, 이에 따라 변경요소에 대한 작업 대상 확인, 작업 지시 결정 등의 과정 진행 시 변경관리 진행에 필요한 모델, 도면 등을 통해 대상을 직접 확인할 수 있고, 모든 도면, 기술문서의 연계로 변경요소 관리 대상이 누락되는 상황을 방지할 수 있으며, 변경 관리의 전산화를 통해 신뢰성을 확보할 수 있게 된다.Here, the change element classification step further includes a change element information providing step visually indicating the equipment name, function, location, equipment drawing, etc. for the classified change element management target, and accordingly, confirming the work target for the change element; In the process of determining work orders, it is possible to directly check the target through models and drawings necessary for change management, and it is possible to prevent the omission of change element management targets by linking all drawings and technical documents. Reliability can be secured through computerization of

참고로, 기술된 바와 같은 변경요소 관리 대상 문서는 신규 공장의 도면/기술자료, 증설 공장 및 공정의 도면/기술자료, 운전 중 유실되어 복원된 도면/기술자료, 운전 중 불일치되어 일치화된 도면/기술자료와 같은 것들로 정의될 수 있다.For reference, the document subject to change element management as described is the drawing/technical data of the new plant, the drawing/technical data of the extension plant and process, the restored drawing/technical data lost during operation, and the matching drawing due to inconsistency during operation It can be defined as things like /technical data.

상기 변경승인 요청단계는 분류된 변경요소 관리 대상에 대해 변경 작업 승인을 온라인상에서 요청하게 되며, 변경 작업 승인을 위해 첫째로는 다수의 결재 라인을 거쳐 순차적 또는 일괄적으로 승인 요청을 하면서 변경요소에 대한 변경 관련 자료(예: 설비도면, 기술문서 등)를 공유하는 방식이나, 둘째로는 변경승인 요청단계 다음으로 사전에 준비된 공정안전 인허가 자료에 기초하여 변경요소 관리 대상의 변경 작업에 대한 이상 유무를 자동으로 판단하는 과정을 통해 변경 작업 승인 여부를 결정하는 방식과 같은 변경승인 결정단계가 따를 수 있으며, 이러한 변경승인 결정단계 또한 키워드 추출, 데이터 마이닝, 머신러닝, 딥러닝 등의 다양한 방식을 통해 수행될 수 있을 것이다.In the change approval request step, change work approval is requested online for the classified change factor management target. The method of sharing change-related data (e.g., facility drawings, technical documents, etc.) for Through the process of automatically determining whether to approve a change, a change approval decision step can follow, and this change approval decision step can also be performed through various methods such as keyword extraction, data mining, machine learning, and deep learning. it could be done

상기 설비도면 수정단계는 변경승인 요청단계 이후로 승인된 변경 작업에 따라 기존 설비도면을 수정하는 과정에 따르는데, 도면 담당자에 의한 수작업을 통해 기존 도면의 설계변경이 이루어질 수도 있고, 수정될 부분의 지정 이후 별도 라이브러리 호출, 대체 설비의 지정 등의 방식을 통해서 자동으로 도면 수정이 이루어지도록 할 수도 있다.The facility drawing revision step follows the process of revising the existing facility drawing according to the changed work approved after the change approval request step. After designation, it is also possible to automatically modify the drawing through a method such as calling a separate library or designating an alternative facility.

상기 변경작업 계획단계는 수정된 설비도면에 따라 변경요소 관리 대상의 변경 작업을 계획하는 과정임을 고려할 때, 자재 수급, 인력 배치, 작업 일정 등 변경 작업 계획서를 작성하여 작업 담당자에게 통보하게 되며, 예를 들어 변경 작업 계획서의 경우 수정된 설비도면이 첨부되거나 온라인상에서 자재, 인력, 일정 등과 관련하여 단순 체크하는 방식에 따라 간단히 작성될 수 있다.Considering that the above change work planning stage is the process of planning the change work of the change element management target according to the revised facility drawing, a change work plan such as material supply and demand, manpower arrangement, work schedule, etc. is prepared and notified to the work person in charge, yes For example, in the case of a change work plan, it can be prepared simply by attaching a revised facility drawing or by simply checking the material, manpower, and schedule online.

상기 변경작업 계획단계는 변경작업에 필요한 자재의 명칭, 수량, 규격, 가격 등의 자재정보를 안내하는 자재정보 안내단계를 더 포함함으로써 현장에서 요구되는 자재의 규모, 재고 상황들을 변경작업 지시 내용과 함께 일괄적으로 확인하도록 할 수 있고, 변경작업이 완료된 이후에 공정 운전 데이터, 자재정보를 포함한 설비 이력 데이터를 빅데이터화한 다음 인공지능을 통해 분석함으로써, 공정 운전 데이터 분석을 통해서는 공정 효율의 최적화를 도모할 수 있고, 설비 이력 데이터 분석을 통해서는 설비의 최소 보존주기를 산출하여 설비 점검/유지보수 기간을 예측하는 과정이 포함될 수 있다.The change work planning step further includes a material information guide step of guiding material information such as name, quantity, standard, price, etc. of the material required for the change work, so that the size and inventory status of the material required at the site are displayed with the change work instruction contents and It can be checked together, and after change work is completed, big data of facility history data including process operation data and material information is converted into big data and then analyzed through artificial intelligence to optimize process efficiency through process operation data analysis. In addition, the process of estimating the facility inspection/maintenance period by calculating the minimum retention period of the facility through facility history data analysis may be included.

참고로, 상기 변경작업 계획단계에서는 자재정보에 기초하여 수량별 또는 가격별 우선순위에 따라 호환 가능한 재고 자재가 수정도면에 반영되도록 할 수도 있는데, 이는 변경작업 시 재고 수량이 많은 자재를 먼저 사용하도록 하거나 동일한 기능을 하더라도 가격이 낮은 자재가 우선적으로 사용되도록 하여 자재 관리의 효율성이나 경제적인 측면을 고려한 작업이 이루어지도록 하기 위함이다.For reference, in the above change work planning stage, compatible stock materials may be reflected in the revision level according to the priority by quantity or price based on material information. This is to ensure that materials with lower prices are used preferentially, even if they perform the same function, so that work is performed in consideration of the efficiency or economical aspects of material management.

상기 작업표준 개정단계는 변경된 설비에 따라 작업 표준 또한 개정되는 것이 바람직하므로 변경 작업 계획에 따른 작업 및 설비 가동전 점검 완료 후 작업 표준을 개정하게 되고, 이 때 안전운전 계획, 비상조치 계획, 운전 매뉴얼, 가동전 점검 안전표, 가동전 점검 체크리스트, 펀치 리스트, 변경 작업 교육 등에 대한 문서들이 작업표준 개정 사항에 반영될 수 있다.Since it is desirable that the work standard be revised according to the changed equipment in the above work standard revision step, the work standard is revised after the work according to the changed work plan and the inspection before facility operation is completed. At this time, the safe operation plan, emergency action plan, and operation manual , documents for pre-operation inspection safety table, pre-operation inspection checklist, punch list, change operation training, etc. can be reflected in the revision of the work standard.

상기 작업표준 개정단계 다음으로 변경 작업 완료된 준공 도면 및 개정된 작업 표준 정보를 외부 요청 시 제공 가능하도록 갱신하는 변경관리 완료단계를 더 포함할 수 있고, 상기 변경관리 완료단계에서는 포털 사이트를 통해 설비도면, 수정도면, 변경작업 이력과 같은 설비관리 정보의 검색이 가능하도록 하여 공장 운영 및 유지보수에 필요한 정보를 손쉽게 취득하도록 하며, 포털 사이트에서는 그 밖에 뉴스, 날씨와 같은 정보를 제공하거나 SAP, EDMS, 그룹웨어/HR 등의 기간계 시스템 연계에 의해 업무에 필요한 다양한 정보 또한 제공할 수 있을 것이다.Following the work standard revision step, a change management completion step of updating the completed construction drawings and the revised work standard information on which the changed work has been completed can be provided upon external request, in the change management completion step, facility drawings through a portal site , correction level, facility management information such as change work history can be searched so that information necessary for factory operation and maintenance can be easily obtained. It will also be able to provide various information necessary for work by linking back-to-back systems such as groupware/HR.

부수적으로, 상기 포털 사이트는 설비관리 정보 열람을 위한 다양한 문서 포맷을 지원하여 별도의 소프트웨어 구매 절차를 거치지 않고도 무료로 업무에 필요한 여러 형식의 문서를 확인하도록 지원할 수 있다.Incidentally, the portal site supports various document formats for viewing facility management information, so that it is possible to check various types of documents required for work for free without going through a separate software purchase procedure.

아래에서는 본 발명에 따른 변경요소 관리 표준 프로세스의 일례에 대해 도 2a 및 도 2b를 참조로 하여 살펴보기로 한다.Hereinafter, an example of a change element management standard process according to the present invention will be described with reference to FIGS. 2A and 2B .

1. 설비 관리 작업이 발생하면 체크리스트를 통해 자동으로 일반 또는 변경요소 관리 대상으로 분류하고, 변경요소 관리 대상이 존재하면 변경요소 관리 작업에 대해 발의1. When a facility management operation occurs, it is automatically classified into general or change factor management targets through a checklist, and if a change factor management target exists, the change factor management operation is initiated

2. 변경관리위원회에서 변경요소 관리 작업의 승인여부를 결정하고, 작업이 승인되면 변경요소 관리 대상의 도면을 수정/검토 후 변경 작업을 계획2. The change management committee decides whether to approve the change element management work, and if the work is approved, plan the change work after revising/reviewing the drawing for the change element management target

3. 변경 작업 계획에 따른 공사 완료 후 설비 가동전 점검 및 교육 작업 표준 개정3. Revision of standards for inspection and training before operation of facilities after completion of construction according to the change work plan

4. 안전운전 계획, 비상조치 계획, 운전 매뉴얼, 가동전 안전 점검표, 가동전 점검 Check Sheet, Punch List, 변경 작업 교육 등 관련 문서 공유4. Sharing related documents such as safe operation plan, emergency action plan, operation manual, safety checklist before operation, check sheet before operation, punch list, change operation training, etc.

5. 시운전 진행, 준공 도면 공유 이후로 변경 관리 완료5. Completion of change management after commissioning and sharing of construction drawings

도 5는 본 발명에 따른 변경관리 시스템 및 기존 레거시 시스템의 연계 구성을 나타낸 도면이다.5 is a diagram showing the configuration of the linkage between the change management system and the existing legacy system according to the present invention.

기술된 바와 같이 변경관리 프로세스 진행 중에 다음 단계로 넘어가기 위해 필요한 조건(변경관리위원회 승인여부, 변경대상 등록여부 확인, 작업완료 여부 확인, 안전담당자 승인 여부 등)을 충족하여야만 다음 단계로 진행이 가능할 수 있으며, 이러한 특징은 변경요소관리를 진행하여 도면의 신뢰성을 확보하는 방법이다.As described, it is possible to proceed to the next stage only when the conditions necessary to move to the next stage during the change management process (change management committee approval, change target registration confirmation, work completion confirmation, safety officer approval, etc.) are met. This feature is a method to secure the reliability of drawings by managing the change elements.

도 5를 참조로 하면, 상술된 바와 같은 본 발명에 따른 변경 관리의 주요 특징은 다음과 같다.Referring to FIG. 5 , the main features of change management according to the present invention as described above are as follows.

1. 변경 관리와 관련된 표준문서, 지침, 도면, 기술문서 등을 사전에 문서 관리 시스템에 등록하여 문서의 버전관리가 될 수 있도록 시스템화하고 변경관리 시스템과 연동 가능1. Standard documents, guidelines, drawings, technical documents, etc. related to change management can be registered in the document management system in advance so that the version control can be systemized and linked with the change management system

2. 변경관리의 대상이 되는 설비 관리 시스템의 설비/기능위치 데이터와 연동 가능2. Possible to link with facility/function location data of facility management system subject to change management

3. 변경 관리를 통해 변경되는 설비 및 문서를 사전 맵핑하여 설비, 도면, 기술문서, 표준문서, 각종 지침 등을 누락없이 관리 가능3. By pre-mapping equipment and documents that are changed through change management, facilities, drawings, technical documents, standard documents, and various guidelines can be managed without omission.

4. 기타 결재 시스템, 인사/조직관리 시스템 등 기간계 시스템 간 연계 가능4. Other payment systems, HR/organizational management systems, etc. can be linked between key systems

도 6은 본 발명에 따른 도면 정보를 활용한 변경요소 관리용 변경관리 시스템을 개략적으로 도시한 도면이다.6 is a diagram schematically illustrating a change management system for managing change elements using drawing information according to the present invention.

본 발명에 따른 도면 정보를 활용한 변경요소 관리용 변경관리 시스템은 기본적으로 변경요소 분류모듈, 변경승인 요청모듈, 변경작업 계획모듈 및 작업표준 개정모듈을 포함하여 구성된다.The change management system for change element management using drawing information according to the present invention is basically configured to include a change element classification module, a change approval request module, a change work plan module, and a work standard revision module.

보다 구체적으로, 본 발명은 공장 설비의 일반/변경요소 관리 대상을 분류하고 변경요소 관리 대상에 대응하는 설비도면을 매칭시키기 위한 변경요소 분류모듈과, 설비도면과 매칭된 변경요소 관리 대상의 변경 작업에 대한 승인을 요청하기 위한 변경승인 요청모듈과, 승인된 변경 작업에 따라 설비도면을 수정하기 위한 설비도면 수정모듈과, 수정된 설비도면에 기초하여 변경요소 관리 대상의 변경 작업을 계획하기 위한 변경작업 계획모듈과, 변경 작업 계획에 따른 작업 및 설비 가동전 점검 완료 후 작업 표준을 개정하기 위한 작업표준 개정모듈을 포함하여 이루어진다.More specifically, the present invention provides a change element classification module for classifying general/modified element management targets of factory equipment and matching facility drawings corresponding to change element management objects, and a change operation of a change element management object matched with the facility drawings Change approval request module for requesting approval, facility drawing modification module for revising facility drawings according to the approved change work, and changes for planning change work of the change element management target based on the modified facility drawing It consists of a work plan module, and a work standard revision module for revising work standards after work according to the change work plan and inspection before facility operation is completed.

상기 변경요소 분류모듈은 사전에 마련되는 설비관리용 체크리스트를 통해 설비 중 일반/변경요소 관리 대상을 자동으로 분류하게 되며, 분류된 변경요소 관리 대상에 대한 설비명, 기능, 위치, 설비도면 등을 시각적으로 나타내는 기능을 포함하여 변경요소에 대한 작업 대상 확인, 작업 지시 결정 등의 과정 진행 시 변경관리 진행에 필요한 모델, 도면 등을 통해 대상을 직접 확인하도록 지원하게 된다.The change element classification module automatically classifies general/modified element management targets among facilities through a facility management checklist prepared in advance, and provides facility names, functions, locations, facility drawings, etc. for the classified change element management objects. Including the function of visual indication, when the process of confirming the work target for the change element and determining the work order is carried out, it will be supported to directly check the target through the models and drawings necessary for the change management process.

상기 변경승인 요청모듈은 분류된 변경요소 관리 대상에 대해 변경 작업 승인을 온라인상에서 요청하기 위한 것으로, 변경 작업 승인을 위해 다수의 결재 라인을 거쳐 순차적 또는 일괄적으로 승인 요청을 하면서 변경요소에 대한 변경 관련 자료를 공유하거나, 사전에 준비된 공정안전 인허가 자료에 기초하여 변경요소 관리 대상의 변경 작업에 대한 이상 유무를 자동으로 판단하는 과정을 통해 변경 작업 승인 여부를 결정하도록 지원하며, 키워드 추출, 데이터 마이닝, 머신러닝, 딥러닝 등을 통해 이러한 기능을 수행할 수 있다.The change approval request module is for requesting change work approval for the classified change factor management target online, and requests for approval sequentially or collectively through a plurality of approval lines for change work approval. Sharing related data or supporting decision whether to approve change work through the process of automatically judging whether there is an abnormality in the change work in the subject of change management based on process safety licensing data prepared in advance, keyword extraction, data mining , machine learning, deep learning, etc. can perform these functions.

상기 설비도면 수정모듈은 일례로 승인된 변경 작업에 따라 기존 설비도면을 수정하기 위해 수정될 부분의 지정 이후 별도 라이브러리 호출, 대체 설비의 지정 등의 방식에 따라 자동으로 도면 수정이 이루어지도록 하는 것을 들 수 있다.The facility drawing modification module is, for example, in order to modify the existing facility drawing according to the approved change work, after designating the part to be modified, calling a separate library, specifying an alternative facility, etc. to automatically modify the drawing according to the method can

상기 변경작업 계획모듈은 자재 수급, 인력 배치, 작업 일정 등 변경 작업 계획서를 작성하여 작업 담당자에게 통보하게 되며, 예를 들어 변경 작업 계획서의 경우 수정된 설비도면을 첨부하거나 온라인상에서 자재, 인력, 일정 등과 관련하여 단순 체크하는 방식에 따라 간단히 작성될 수 있음과 아울러, 변경작업에 필요한 자재의 명칭, 수량, 규격, 가격 등의 자재정보를 안내하는 기능을 더 포함하여 현장에서 요구되는 자재의 규모, 재고 상황들을 변경작업 지시 내용과 함께 일괄적으로 확인하도록 할 수 있다.The change work planning module prepares a change work plan such as material supply and demand, manpower allocation, and work schedule and notifies the person in charge of the work. In addition, it can be written simply by a simple check method in relation to the size of the materials required at the site, including the function of guiding material information such as the name, quantity, standard, and price of the material required for the change operation; Inventory status can be checked together with change work orders.

상기 작업표준 개정모듈은 변경 작업 계획에 따른 작업 및 설비 가동전 점검 완료 후 작업 표준을 개정하게 되고, 이 때 안전운전 계획, 비상조치 계획, 운전 매뉴얼, 가동전 점검 안전표, 가동전 점검 체크리스트, 펀치 리스트, 변경 작업 교육 등에 대한 문서들이 작업표준 개정 사항에 반영될 수 있으며, 작업표준 개정은 인공지능에 의한 학습과정을 통해 이루어질 수 있을 것이다.The work standard revision module revises the work standard after the work according to the change work plan and the pre-operation inspection of the facility is completed, and at this time, the safe operation plan, emergency action plan, operation manual, pre-operation safety table, pre-operation inspection checklist Documents on , punch list, change job training, etc. can be reflected in the revision of the job standard, and revision of the job standard can be made through the learning process by artificial intelligence.

이상에서 첨부된 도면을 참조하여 본 발명을 설명함에 있어 특정형상 및 방향을 위주로 설명하였으나, 본 발명은 당업자에 의하여 다양한 변형 및 변경이 가능하고, 이러한 변형 및 변경은 본 발명의 권리범위에 포함되는 것으로 해석되어야 한다.In the above description of the present invention with reference to the accompanying drawings, a specific shape and direction have been mainly described, but the present invention can be variously modified and changed by those skilled in the art, and these modifications and changes are included in the scope of the present invention. should be interpreted as

Claims (7)

공장 설비의 일반/변경요소 관리 대상을 분류하고, 변경요소 관리 대상에 대응하는 설비도면을 매칭시키는 변경요소 분류단계와;
설비도면과 매칭된 변경요소 관리 대상의 변경 작업에 대한 승인을 요청하는 변경승인 요청단계와;
상기 변경승인 요청단계 다음으로 사전에 준비된 공정안전 인허가 자료에 기초하여 변경요소 관리 대상의 변경 작업에 대한 이상 유무를 자동으로 판단하여 변경 작업 승인 여부를 결정하는 변경승인 결정단계와;
승인된 변경 작업에 따라 설비도면을 수정하는 설비도면 수정단계와;
수정된 설비도면에 기초하여 변경요소 관리 대상의 변경 작업을 계획하는 변경작업 계획단계와;
변경작업에 필요한 자재의 명칭, 수량 및 가격의 자재정보를 안내하는 자재정보 안내 단계와;
변경 작업 계획에 따른 작업 및 설비 가동전 점검 완료 후 작업 표준을 개정하는 작업표준 개정단계;를 포함하고,
상기 변경요소 분류단계는,
사전에 구비되는 설비관리용 체크리스트를 통해 단순 점검을 통해 관리가 이루어지는 일반 관리 대상과 단위 설비의 일부 또는 전체 변경을 요구하는 변경요소 관리 대상으로 자동 분류하고,
분류된 변경요소 관리 대상에 대해서 설비명, 기능, 위치 및 설비도면 중 적어도 어느 하나 이상을 시각적으로 나타내는 변경요소 정보 제공단계를 더 포함하고,
상기 변경작업 계획단계는,
자재정보에 기초하여 수량별 및 가격별 우선순위에 따라 호환 가능한 재고 자재가 설비도면의 수정에 반영되도록 하고,
상기 작업표준 개정단계는,
안전운전 계획, 비상조치 계획, 운전 매뉴얼, 가동전 점검 안전표, 가동전 점검 체크리스트, 펀치 리스트 및 변경 작업 교육에 대한 문서들이 작업표준 개정 사항에 반영되는 것을 특징으로 하는 도면 정보를 활용한 변경요소 관리용 변경관리 방법.
a change element classification step of classifying general/modified element management targets of factory equipment and matching facility drawings corresponding to the change element management objects;
a change approval request step of requesting approval for a change operation of a change element management target matched with a facility drawing;
a change approval decision step of determining whether to approve the change work by automatically determining whether there is an abnormality in the change work of the change element management target based on the process safety permit data prepared in advance after the change approval request step;
a facility drawing modification step of revising the facility drawing according to the approved change operation;
a change operation planning step of planning a change operation of a change element management target based on the amended facility drawing;
a material information guide step of guiding material information of the name, quantity, and price of materials required for the change operation;
Including; and a work standard revision step of revising the work standard after completing the inspection before operation and facility operation according to the change work plan;
The change element classification step is,
Through a checklist for facility management provided in advance, it is automatically classified into a general management target, which is managed through simple inspection, and a change factor management target that requires a partial or complete change of unit facilities,
Further comprising the step of providing change element information visually indicating at least any one or more of equipment name, function, location, and equipment drawing for the classified change element management target;
The change work planning stage is,
Based on the material information, compatible stock materials according to the priority by quantity and price are reflected in the revision of the facility drawings;
The work standard revision step is,
Change using drawing information, characterized in that documents for safe operation plan, emergency action plan, operation manual, pre-operation safety table, pre-operation check checklist, punch list, and change work training are reflected in work standard revision Change management method for element management.
청구항 1에 있어서,
상기 변경요소 분류단계 이전으로 설비도면과 비교하기 위한 공장 설비의 사진, 기존 도면 및 스펙 중 적어도 어느 하나 이상의 설비 데이터를 취합하는 설비 데이터 취합단계를 더 포함하는 것을 특징으로 하는 도면 정보를 활용한 변경요소 관리용 변경관리 방법.
The method according to claim 1,
Change using drawing information, characterized in that it further comprises a facility data collection step of collecting at least any one or more facility data of a photograph of a factory facility for comparison with a facility drawing before the change element classification step, an existing drawing, and a specification Change management method for element management.
삭제delete 삭제delete 삭제delete 청구항 1에 있어서,
상기 작업표준 개정단계 다음으로 변경 작업 완료된 준공 도면 및 개정된 작업 표준 정보를 외부 요청 시 제공 가능하도록 갱신하는 변경관리 완료단계를 더 포함하는 것을 특징으로 하는 도면 정보를 활용한 변경요소 관리용 변경관리 방법.
The method according to claim 1,
Change management for change element management using drawing information, characterized in that after the work standard revision step, a change management completion step of updating the completed drawing and the revised work standard information on which the changed work has been completed can be provided upon external request. Way.
청구항 1, 청구항 2 및 청구항 6 중 어느 한 항에 따른 방법을 사용한 변경관리 시스템에 있어서,
공장 설비의 일반/변경요소 관리 대상을 분류하고, 변경요소 관리 대상에 대응하는 설비도면을 매칭시키기 위한 변경요소 분류모듈과;
설비도면과 매칭된 변경요소 관리 대상의 변경 작업에 대한 승인을 요청하기 위한 변경승인 요청모듈과;
승인된 변경 작업에 따라 설비도면을 수정하기 위한 설비도면 수정모듈과;
수정된 설비도면에 기초하여 변경요소 관리 대상의 변경 작업을 계획하기 위한 변경작업 계획모듈과;
변경 작업 계획에 따른 작업 및 설비 가동전 점검 완료 후 작업 표준을 개정하기 위한 작업표준 개정모듈;을 포함하고,
상기 변경요소 분류모듈은,
사전에 구비되는 설비관리용 체크리스트를 통해 단순 점검을 통해 관리가 이루어지는 일반 관리 대상과 단위 설비의 일부 또는 전체 변경을 요구하는 변경요소 관리 대상으로 자동 분류하며, 분류된 변경요소 관리 대상에 대해서 설비명, 기능, 위치 및 설비도면 중 적어도 어나 하나 이상을 시각적으로 나타내며,
상기 변경작업 계획모듈은,
자재정보에 기초하여 수량별 및 가격별 우선순위에 따라 호환 가능한 재고 자재를 설비도면의 수정에 반영하고, 변경작업에 필요한 자재의 명칭, 수량 및 가격의 자재정보를 안내하며,
상기 변경승인 요청모듈은,
사전에 준비된 공정안전 인허가 자료에 기초하여 변경요소 관리 대상의 변경 작업에 대한 이상 유무를 자동으로 판단하여 변경 작업 승인 여부를 결정하며,
상기 작업표준 개정모듈은,
안전운전 계획, 비상조치 계획, 운전 매뉴얼, 가동전 점검 안전표, 가동전 점검 체크리스트, 펀치 리스트 및 변경 작업 교육에 대한 문서들을 작업표준 개정 사항에 반영하는 것을 특징으로 하는 도면 정보를 활용한 변경요소 관리용 변경관리 시스템.

In the change management system using the method according to any one of claims 1, 2 and 6,
a change element classification module for classifying general/modified element management targets of factory equipment and matching facility drawings corresponding to the change element management objects;
a change approval request module for requesting approval for a change operation of a change element management target matched with a facility drawing;
a facility drawing modification module for revising the facility drawing according to the approved change operation;
a change operation planning module for planning a change operation of a change element management target based on the amended facility drawing;
Including; and a work standard revision module for revising the work standard after the work according to the change work plan and the inspection before facility operation is completed;
The change element classification module,
Through a checklist for facility management provided in advance, it is automatically classified into general management, which is managed through simple inspection, and change factor management, which requires partial or complete change of unit facilities. , at least one or more of function, location and facility drawings are visually indicated,
The change work planning module,
Based on the material information, compatible stock materials are reflected in the revision of the facility drawings according to the priority by quantity and price, and the material information of the name, quantity and price of the materials required for the change is provided.
The change approval request module,
Based on the pre-prepared process safety licensing data, it automatically determines whether there is an abnormality in the change operation of the change factor management target and decides whether to approve the change operation,
The work standard revision module,
Change using drawing information, characterized in that documents on safe operation plan, emergency action plan, operation manual, pre-operation inspection safety table, pre-operation inspection checklist, punch list, and change work training are reflected in work standard revision Change management system for element management.

KR1020190107679A 2019-08-30 2019-08-30 Change management method and system for managing change elements utilizing drawing information KR102340049B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190107679A KR102340049B1 (en) 2019-08-30 2019-08-30 Change management method and system for managing change elements utilizing drawing information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190107679A KR102340049B1 (en) 2019-08-30 2019-08-30 Change management method and system for managing change elements utilizing drawing information

Publications (2)

Publication Number Publication Date
KR20210026633A KR20210026633A (en) 2021-03-10
KR102340049B1 true KR102340049B1 (en) 2021-12-17

Family

ID=75148791

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190107679A KR102340049B1 (en) 2019-08-30 2019-08-30 Change management method and system for managing change elements utilizing drawing information

Country Status (1)

Country Link
KR (1) KR102340049B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20240048365A (en) 2022-10-06 2024-04-15 삼성중공업 주식회사 Drawing comparison apparatus and method using text area arrangement shape

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102375880B1 (en) * 2021-08-24 2022-03-17 이지훈 Estimate and blueprint prediction system in manufacturing process based on artificial intelligence model

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009134685A (en) * 2007-09-03 2009-06-18 Tauchi Sekkei:Kk Construction management system of building

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080004060A (en) * 2006-07-04 2008-01-09 Stx조선주식회사 A method of examining technical change for a ship design
KR20080004062A (en) * 2006-07-04 2008-01-09 Stx조선주식회사 A method of managing technical standard for a ship design
KR20080004061A (en) * 2006-07-04 2008-01-09 Stx조선주식회사 A method of managing technical change for a ship design
KR101490311B1 (en) 2012-09-24 2015-02-05 플랜트에셋 주식회사 Method for Inspecting of Quality and Constructability of Plant Structure Using a Laser Scanner
KR101897434B1 (en) 2018-03-05 2018-09-10 조현태 Apparatus and method for checking construction state

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009134685A (en) * 2007-09-03 2009-06-18 Tauchi Sekkei:Kk Construction management system of building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20240048365A (en) 2022-10-06 2024-04-15 삼성중공업 주식회사 Drawing comparison apparatus and method using text area arrangement shape

Also Published As

Publication number Publication date
KR20210026633A (en) 2021-03-10

Similar Documents

Publication Publication Date Title
US20200042915A1 (en) Collaboration system for construction management utilizing shared computing platforms
US10713607B2 (en) Method and system for a construction site management and support system with a marking robot
Garbie Sustainability in manufacturing enterprises: Concepts, analyses and assessments for industry 4.0
CN109559069B (en) Production management method and device based on assembly type building platform and terminal equipment
KR102340049B1 (en) Change management method and system for managing change elements utilizing drawing information
Irajpour et al. A framework to determine the effectiveness of maintenance strategies lean thinking approach
Ćwikła The methodology of development of the Manufacturing Information Acquisition System (MIAS) for production management
Gupta et al. Modeling lean maintenance metric using incidence matrix approach
Heilala et al. Decision support using simulation for customer-driven manufacturing system design and operations planning
KR102085541B1 (en) Method and system for managing plant synthetically utilizing plan information based on laser scan
Lucas et al. Using a case-study approach to explore methods for transferring BIM-based asset data to facility management systems
Sunday et al. ROLE OF RELIABILITY MANAGEMENT TOOLS AND DOCUMENTATIONS-A REVIEW
Kang et al. Discrete event simulation to reduce the effect of uncertainties on project planning
Massaro et al. A case study of process engineering of operations in working sites through data mining and augmented reality
Ali et al. Building Operation and Maintenance: A Framework for Simplified Building Information Modeling (BIM) Digital Mobile Application.
Kowalski et al. Technical aspects of relocation of production and assembly lines in automotive industry
Chelyshkov et al. Development the concept of using XML-schemas and requirements for them for the transfer and storage of information, documents and materials included in the information model of capital construction objects
KR20160131192A (en) Rebar processing integrated management system
Chen et al. The prototype and application of RFID implementation: A case study of automobiles assembly industries.
Borhani et al. Data requirements for BIM-based asset management from owners’ perspective
Shahin et al. Radio frequency identification (RFID): a technology for enhancing computerized maintenance system (CMMS)
Roh et al. Smart-Tracking Systems Development with QR-Code and 4D-BIM for Progress Monitoring of a Steel-Plant Blast-Furnace Revamping Project in Korea
Pati et al. A hybrid approach to minimising manufacturing costs–study in a heating ventilation and air conditioning industry
Mejía et al. Analyzing the requirements to implement a data analysis model for software process improvement
Mohammad Automation in applications for healthcare, private, and public sectors in IT

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
X091 Application refused [patent]
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant