JP2009134685A JP2008122725A JP2008122725A JP2009134685A JP 2009134685 A JP2009134685 A JP 2009134685A JP 2008122725 A JP2008122725 A JP 2008122725A JP 2008122725 A JP2008122725 A JP 2008122725A JP 2009134685 A JP2009134685 A JP 2009134685A
Authority
JP
Japan
Prior art keywords
construction
building
approval
database
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2008122725A
Other languages
Japanese (ja)
Inventor
Takashi Tauchi
隆司 田内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAUCHI SEKKEI KK
Original Assignee
TAUCHI SEKKEI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAUCHI SEKKEI KK filed Critical TAUCHI SEKKEI KK
Priority to JP2008122725A priority Critical patent/JP2009134685A/en
Publication of JP2009134685A publication Critical patent/JP2009134685A/en
Withdrawn legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a general building construction management system including a client, a supervisor, and a contractor. <P>SOLUTION: A construction management system is provided with a client side terminal device, a supervisor side terminal device, and a contractor side terminal device, and a system management serve 10. The system management server 10 is provided with a computer part 12 for processing information and a server part 14 for recording the information. The server part 14 has a recording database 56 for registering information about construction work and an approval recording database 58 for registering approval information on the construction work. At a stage of construction work, when individual approval signals are received from the client side terminal device, the supervisor side terminal device, and the contractor side terminal device, an approval determination means determines that the three parties, the client, the supervisor, and the contractor, have approved and generates an agreed approval signal, and the approved construction work information in the recording database 56 is registered to the approval recording database 58. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、一戸建て住宅、集合住宅、ビルなどの建築物の施工を管理するための施工管理システムに関する。   The present invention relates to a construction management system for managing construction of buildings such as detached houses, apartment houses, and buildings.

建築工事における施工者の施工ミス、手抜きなどを防止する建築管理システムとして、画像データを記録するようにしたシステムが提案されている(例えば、特許文献1参照)。この建築管理システムは、工程の終了時における建築施工現場を撮影した画像情報を送信する送信手段と、画像情報及び工程終了情報を含む工程情報を記録する工程情報記憶手段と、前記画像情報及び工程終了情報を工程情報記憶手段に記録する記録手段とを備えている。この建築管理システムにおいては、工程終了時に工程終了情報に施工状況の画像情報が添付されているときにはその工程が終了し、工程終了情報に施工状況の画像情報が添付されていないときにはその工程が終了せず、また建築管理業者側端末によってその工程終了確認を行い、このように管理することによって、各工程終了時における施工状況を画像情報として確実に残すようになっている。このような建築管理システムでは、施工後に記録された画像情報を後に見ることができ、この画像情報によってその施工のミス、手抜きの有無を容易に確認することができる。   A system that records image data has been proposed as a construction management system that prevents construction errors and omissions of a construction worker in a construction work (see, for example, Patent Document 1). The building management system includes a transmission unit that transmits image information obtained by photographing a building construction site at the end of a process, a process information storage unit that records process information including image information and process end information, and the image information and the process. Recording means for recording the end information in the process information storage means. In this building management system, when image information on the construction status is attached to the process completion information at the end of the process, the process is terminated, and when the image information on the construction status is not attached to the process completion information, the process is terminated. In addition, the completion of the process is confirmed by the terminal of the construction manager and managed in this way so that the construction status at the end of each process is reliably left as image information. In such a building management system, the image information recorded after the construction can be seen later, and it is possible to easily confirm the construction error and the presence or absence of omission by this image information.

特開2005−275982号公報JP 2005-275882 A

しかしながら、上述した建築管理システムでは、施工状況を単に画像情報として残すのみで、設計変更、施工不良などに充分に対応する管理システムとなっていない。また、施工工事の各工程における工事の承認は、建築管理業者のみであり、施主、施工業者を含めた総合的な管理システムとなっていない。   However, in the above-described building management system, the construction status is simply left as image information, and the management system does not sufficiently cope with design changes, construction failures, and the like. In addition, the approval of construction in each process of construction work is only a construction manager, and it is not a comprehensive management system including the owner and the contractor.

本発明の目的は、施主、監理者及び施工業者を含めた総合的な建築物の施工管理システムを提供することである。
本発明の他の目的は、通常の施工工事のみならず設計変更、施工不良にも充分に対応することができる建築物の施工管理システムを提供することである。
An object of the present invention is to provide a comprehensive building construction management system including a client, a supervisor, and a contractor.
Another object of the present invention is to provide a construction management system for buildings that can sufficiently cope with not only normal construction work but also design changes and construction defects.

本発明の請求項1に記載の建築物の施工管理システムは、建築物を依頼する施主側に設けられる施主側端末装置と、建築物を監理する監理者側に設けられる監理側端末装置と、建築物を施工する施工業者側に設けられる施工業者側端末装置と、前記施主側端末装置、前記監理者側端末装置及び前記前記施工業者側端末装置との間で送受信を行うたのシステム管理サーバとを備え、
前記システム管理サーバは、情報を所要の通りに処理するためのコンピュータ部と、情報を記録するためのサーバ部とを備え、前記サーバ部は、施主に関する情報を登録する施主情報データベースと、監理者に関する情報を登録する監理者情報データベースと、施工業者に関する情報を登録する施工業者情報データベースと、建築物の施工工事に関する情報を登録する記録データベースと、前記施工工事の承認に関する承認情報を登録する承認記録データベースとを有し、前記コンピュータ部は、前記サーバ部に情報を登録するためのデータ登録手段と、施主、監理者及び施工業者からの承認を判定するための承認判定手段と、前記承認記録データベースに登録された前記承認情報の修正を禁止するための修正禁止手段とを備え、
建築物を建造する建築施工工程は、建築物を施工する施工業者を決定した後の施工工事段階と、前記施工工事段階の前段階の施工準備段階とに区別され、前記施工工事段階の所定工程終了時において、前記コンピュータ部が前記施主側端末装置、前記監理者側端末装置及び前記施工業者側端末装置からの個別承認信号を受信すると、前記承認判定手段は、施主、監理者及び施工業者の三者が承認したと判定して合意承認信号を生成し、前記前記データ登録手段は、前記合意承認信号に基づいて前記記録データベースに登録された施工工事に関する情報のうち承認された施工工事に関するものを前記承認記録データベースに登録し、前記修正禁止手段は、前記承認記録データベースに登録された施工工事に関する承認情報の修正を禁止することを特徴とする。
The construction management system for a building according to claim 1 of the present invention includes a client-side terminal device provided on a client-side who requests a building, a supervisor-side terminal device provided on a supervisor side who supervises the building, System management server for performing transmission / reception between a contractor-side terminal device provided on a contractor-side that constructs a building, the owner-side terminal device, the supervisor-side terminal device, and the contractor-side terminal device And
The system management server includes a computer unit for processing information as required, and a server unit for recording information. The server unit includes a client information database for registering information about the client, and a supervisor. Approval to register supervisor information database for registering information about, contractor information database for registering information about contractors, record database for registering information related to construction work for buildings, and approval information for approval of construction works A recording database, the computer unit is a data registration unit for registering information in the server unit, an approval determination unit for determining approval from the owner, supervisor and contractor, and the approval record Correction prohibiting means for prohibiting correction of the approval information registered in the database,
The building construction process for building a building is classified into a construction work stage after determining a construction contractor to construct a building and a construction preparation stage before the construction work stage, and a predetermined process in the construction work stage. At the time of termination, when the computer unit receives an individual approval signal from the owner-side terminal device, the supervisor-side terminal device, and the contractor-side terminal device, the approval determination means includes the owner, supervisor, and contractor. It is determined that the three parties have approved and generates an agreement approval signal, and the data registration means relates to the approved construction work among the information on the construction work registered in the record database based on the agreement approval signal. Is registered in the approval record database, and the correction prohibition means prohibits the correction of the approval information related to the construction work registered in the approval record database. And features.

また、本発明の請求項2に記載の建築物の施工監理システムでは、前記記録データベースには、更に、前記施工準備段階の施工準備に関する情報が登録され、前記承認記録データベースには、前記施工準備の承認に関する承認情報が登録され、前記コンピュータ部の前記承認判定手段は、前記施工準備段階においても承認判定するように構成され、前記施工準備段階の所定工程終了時において、前記コンピュータ部が前記施主側端末装置及び前記監理者側端末装置からの前記個別承認信号を受信すると、前記承認判定手段は、施主及び監理者の二者が承認したと判定して合意承認信号を生成し、前記前記データ登録手段は、前記合意承認信号に基づいて前記記録データベースに登録された施工準備に関する情報のうち承認された施工準備に関するものを前記承認記録データベースに登録し、前記修正禁止手段は、前記承認記録データベースに登録された施工準備に関する承認情報の修正を禁止することを特徴とする。   Moreover, in the construction supervision system for a building according to claim 2 of the present invention, information related to construction preparation at the construction preparation stage is further registered in the record database, and the construction preparation is recorded in the approval record database. Approval information related to the approval is registered, and the approval determination means of the computer unit is configured to determine approval also in the construction preparation stage, and at the end of a predetermined process in the construction preparation stage, the computer unit is configured to perform the operation. When receiving the individual approval signal from the side terminal device and the supervisor side terminal device, the approval determination means determines that the two of the owner and the supervisor have approved, generates an agreement approval signal, and generates the data The registration means relates to the approved construction preparation among the information relating to the construction preparation registered in the record database based on the agreement approval signal. Registers shall in the approval record database, the correction inhibiting means, and inhibits the correction of the approval information about construction preparations registered in the authorization record database.

また、本発明の請求項3に記載の建築物の施工監理システムでは、前記コンピュータ部は、更に、修正禁止手段の禁止を解除する禁止解除手段を備え、前記施工準備段階において前記コンピュータ部が前記施主側端末装置及び前記監理者側端末装置からの前記個別承認解除信号を受信する、又は前記施工工事段階において前記コンピュータ部が前記施主側端末装置、前記監理者側端末装置及び前記施工業者側端末装置からの個別承認解除信号を受信すると、前記禁止解除手段は前記承認記録データベースに登録された前記施工準備に関する情報又は前記施工工事に関する情報の修正禁止を解除することを特徴とする。   In the construction management system for a building according to claim 3 of the present invention, the computer unit further includes prohibition release means for canceling the prohibition of the correction prohibition means, and the computer unit in the construction preparation stage The computer unit receives the individual approval release signal from the client-side terminal device and the supervisor-side terminal device, or in the construction work stage, the computer-side terminal device, the supervisor-side terminal device, and the contractor-side terminal When receiving the individual approval cancellation signal from the apparatus, the prohibition canceling unit cancels the prohibition of modification of the information related to the construction preparation or the information related to the construction work registered in the approval record database.

また、本発明の請求項4にに記載の建築物の施工管理システムでは、前記施工工段階の施工工事に関する情報は、施工工事内容をファイル形式で作成される管理ファイルを含んでおり、前記管理ファイルは、設計図面の情報を表示する設計図面表示部と、設計図面の情報に基づいて施工した状態を表示する施工表示部と、設計図面の内容を変更した変更情報を表示する変更設計図面表示部と、変更設計図面の変更情報に基づいて施工した状態を表示する変更施工表示部とを含んでいることを特徴とする。   In the building construction management system according to claim 4 of the present invention, the information related to the construction work at the construction stage includes a management file in which construction work contents are created in a file format. The file includes a design drawing display section for displaying design drawing information, a construction display section for displaying a construction state based on the design drawing information, and a modified design drawing display for displaying change information for changing the contents of the design drawing. And a modified construction display section for displaying a state of construction based on the modification information of the modified design drawing.

また、本発明の請求項5に記載の建築物の施工管理システムでは、前記サーバ部は、更に、施工準備及び/又は施工工事に関連する情報が登録された施工知識データベースと、建材に関する情報が登録された建材情報データベースと、建築物に関連する業者に関する情報が登録された業者一覧データベースとを備え、前記施主側端末装置、前記監理者側端末装置及び前記施工業者側端末装置から前記施工知識データベース、前記建材データベース及び前記業者一覧データベースにアクセス可能であることを特徴とする。   In the building construction management system according to claim 5 of the present invention, the server unit further includes a construction knowledge database in which information related to construction preparation and / or construction work is registered, and information on building materials. It comprises a registered building material information database and a supplier list database in which information related to a supplier related to a building is registered, and the construction knowledge from the client side terminal device, the supervisor side terminal device and the contractor side terminal device The database, the building material database, and the supplier list database are accessible.

また、本発明の請求項6に記載の建築物の施工管理システムでは、前記コンピュータ部は、更に、前記サーバ部に登録された情報を出力するためのデータ出力手段を備え、前記サーバ部は、建築物の完成図書に関する情報を登録する完成図書データベースを含み、建築物の完了検査が承認された時点で、前記承認記録データベースに登録された承認記録情報が、完成図書情報として前記完成図書データベースに登録され、前記完成図書データベースに登録された完成図書情報は、前記データ出力手段により出力されることを特徴とする。   In the construction management system for a building according to claim 6 of the present invention, the computer unit further includes data output means for outputting information registered in the server unit, and the server unit includes: Including a completed book database for registering information relating to the completed book of the building, and when the completion inspection of the building is approved, the approval record information registered in the approval record database is stored in the completed book database as completed book information. The completed book information registered and registered in the completed book database is output by the data output means.

また、本発明の請求項7に記載の建築物の施工管理システムでは、前記コンピュータ部は、データの修正を完全に禁止するための修正完全禁止手段を備え、前記承認記録情報が完全図書情報として前記完成図書データベースに登録されると、前記修正完全禁止手段は、前記記録データベース、前記承認記録データベース及び前記完成図書データベースに登録された情報の修正を完全に禁止することを特徴とする。   Moreover, in the construction management system for a building according to claim 7 of the present invention, the computer unit includes a correction complete prohibition means for completely prohibiting correction of data, and the approval record information is the complete book information. When registered in the completed book database, the modification complete prohibition means completely prohibits modification of the information registered in the record database, the approval record database, and the completed book database.

また、本発明の請求項8に記載の建築物の施工管理システムでは、前記サーバ部は、建材及び/又は材料の判定基準が登録された建材・材料基準データベースを備え、また前記コンピュータ部は、建材及び/又は材料の標準建材及び/又は標準材料を選定する標準品選定手段と、建材及び/又は材料を判定するための建材・材料判定手段を含んでおり、特記仕様の建材及び/又は材料を選定しないときには、前記標準品選定手段は、前記建材・材料基準データベースに登録された標準建材及び/又は標準材料を選定し、また特記仕様の建材及び/又は材料を選定したときには、前記建材・材料判定手段は、前記建材・材料データベースに登録された判定基準に基づいて選定した建材及び/又は材料が前記特記仕様を満足するかを判定することを特徴とする。   In the building construction management system according to claim 8 of the present invention, the server unit includes a building material / material standard database in which building material and / or material judgment criteria are registered, and the computer unit includes: It includes standard building material selection means for selecting standard building materials and / or standard materials for building materials and / or materials, and building material / material determination means for determining building materials and / or materials. The standard product selection means selects the standard building material and / or standard material registered in the building material / material standard database, and when the building material and / or material with special specifications are selected, the building material / material is selected. The material judging means judges whether the building material and / or material selected based on the judgment standard registered in the building material / material database satisfies the special specification. And features.

また、本発明の請求項9に記載の建築物の施工管理システムでは、建築物を施工する施工現場には、建築物を撮影するためのカメラ手段が設置され、前記サーバ部は、前記カメラ手段からの画像情報を登録する画像記録データベースを有し、前記カメラ手段からの画像情報又は前記画像記録データベースに登録された画像情報が、前記施主側端末装置、前記監理者側端末装置及び前記施工業者側端末装置に送信可能であることを特徴とする。   Further, in the construction management system for a building according to claim 9 of the present invention, camera means for photographing the building is installed at a construction site where the building is constructed, and the server unit includes the camera means. The image information from the camera means or the image information registered in the image recording database is the client side terminal device, the supervisor side terminal device, and the contractor. It is possible to transmit to the side terminal device.

更に、本発明の請求項10に記載の建築物の施工管理システムでは、前記建築施工行程の後に、建造した建築物を管理する建築物維持管理工程が行われ、この建築物維持管理工程に関連して、前記サーバ部は、管理のスケジュールに関する情報が登録される管理スケジュールデータベースと、定期報告書に関する情報が登録される定期報告記録データベースを含み、前記コンピュータ部は、維持管理対象項目に基づいて管理報告期日を演算する期日演算手段と、前記期日演算手段により演算された管理報告期日に基づいて報告準備期間を設定する準備期間設定手段とを含み、前記管理報告期日及び前記報告準備期間が前記管理スケジュールデータベースに登録され、前記報告準備期間中に作成された定期報告書が前記定期報告記録データベースに登録されることを特徴とする。   Furthermore, in the construction management system for a building according to claim 10 of the present invention, a building maintenance management process for managing the built building is performed after the building construction process, and the building maintenance management process is related to this building maintenance management process. The server unit includes a management schedule database in which information related to a management schedule is registered, and a periodic report recording database in which information related to a periodic report is registered, and the computer unit is based on maintenance management target items. A date calculation means for calculating a management report date, and a preparation period setting means for setting a report preparation period based on the management report date calculated by the date calculation means, wherein the management report date and the report preparation period are the The periodic report registered in the management schedule database and created during the report preparation period is the periodic report record database. Characterized in that it is registered with.

本発明の請求項1に記載の建築物の施工管理システムによれば、サーバ部は施主情報データベース、監理者情報データベース、施工業者情報データベース、記録データベース及び承認記録データベースを有し、コンピュータ部は、データ登録手段、承認判定手段及び修正禁止手段を備え、施工工事段階の所定工程終了時において、コンピュータ部が施主側端末装置、監理者側端末装置及び施工業者側端末装置からの個別承認信号を受信すると、承認判定手段は、施主、監理者及び施工業者の三者が承認したと判定して合意承認信号を生成するので、この合意承認信号が生成されるということは、施主、監理者及び施工業者の三者がその所定工程の作業内容について満足であるとのことであり、このように施主、監理者及び施工業者の三者の承認を取りながら施工工事段階の各種作業を進めていくことによって、施工工事におけるミス、手抜きなどがなくなり、施主の満足な建築物を完成させることができる。また、施工工事段階において、施主、監理者及び施工業者の三者が承認して合意承認信号が生成されると、データ登録手段は、この合意承認信号に基づいて承認された施工工事に関する施工情報を承認記録データベースに登録し、修正禁止手段は、この承認記録データベースに登録された施工工事に関する承認情報の修正を禁止するので、施主、監理者及び施工業者の承認内容が記録として残り、施工工事後のトラブルもなく、仮にトラブルが生じたとしてもこの承認内容を見ることによって容易に解決を図ることができる。   According to the construction management system for a building according to claim 1 of the present invention, the server unit includes a client information database, a supervisor information database, a contractor information database, a record database, and an approval record database, and the computer unit includes: Data registration means, approval judgment means and correction prohibition means are provided, and at the end of a predetermined process in the construction work stage, the computer unit receives individual approval signals from the client side terminal device, the supervisor side terminal device and the contractor side terminal device Then, the approval determination means determines that the three parties, the owner, the supervisor, and the contractor have approved, and generates an agreement approval signal, so that this agreement approval signal is generated means that the owner, the supervisor, and the construction It is said that the three parties of the contractor are satisfied with the work contents of the predetermined process. The by to proceed with various work of the construction work stage while taking, mistakes in construction work, cut corners and no, it is possible to complete a satisfactory building of the Owner. In addition, when the agreement approval signal is generated by the three parties, the owner, the supervisor, and the construction contractor, at the construction work stage, the data registration means will provide the construction information related to the construction work approved based on the agreement approval signal. Is registered in the approval record database, and the modification prohibition means prohibits the modification of the approval information related to the construction work registered in this approval record database, so the approval contents of the owner, supervisor and contractor remain as records, and the construction work There is no later trouble, and even if a trouble occurs, it can be easily solved by looking at the contents of the approval.

また、本発明の請求項2に記載の建築物の施工管理システムによれば、承認記録データベースには施工準備段階の承認情報も登録されるように構成され、施工準備段階の所定工程終了時において、施主側端末装置及び監理者側端末装置からの個別承認信号を受信すると、承認判定手段は、施主及び監理者の二者が承認したと判定して合意承認信号を生成するので、この合意承認信号が生成されるということは、施主及び監理者の二者が施工準備段階におけるその所定工程の作業内容について満足であるとのことであり、このように施主及び監理者の二者の承認を取りながら施工準備を進めていくことによって、施工準備段階におけるミスなどがなくなる。また、施工準備段階においても、施主及び監理者の二者が承認して合意承認信号が生成されると、データ登録手段は、この合意承認信号に基づいて承認された施工準備に関する施工情報を承認記録データベースに登録し、修正禁止手段は、この承認記録データベースに登録された施工準備に関する承認情報の修正を禁止するので、施主及び監理者の承認内容が記録として残り、施工準備段階のトラブルもなく、仮にトラブルが生じたとしても容易に解決を図ることができる。   Moreover, according to the construction management system for a building according to claim 2 of the present invention, the approval record database is also configured to register the approval information at the construction preparation stage, and at the end of the predetermined process at the construction preparation stage. When the individual approval signal is received from the client side terminal device and the supervisor side terminal device, the approval determination means determines that the two parties, the client and supervisor, have approved, and generates an agreement approval signal. The fact that the signal is generated means that the two owners and supervisors are satisfied with the work content of the predetermined process in the construction preparation stage. By proceeding with the preparation for construction while taking, there will be no mistakes in the construction preparation stage. Also, at the construction preparation stage, when an agreement approval signal is generated by the approval of the owner and supervisor, the data registration means approves construction information related to the construction preparation approved based on the agreement approval signal. The modification prohibition means is registered in the record database and prohibits modification of the approval information related to the construction preparation registered in this approval record database. Therefore, the approval contents of the owner and supervisor remain as records, and there is no trouble at the construction preparation stage. Even if trouble occurs, it can be easily solved.

また、本発明の請求項3に記載の建築物の施工管理システムによれば、コンピュータ部は禁止解除手段を備え、施工準備段階において施主側端末装置及び監理者側端末装置からの個別承認解除信号を受信すると、禁止解除手段は修正禁止を解除するので、施工準備段階では施主及び監理者の二者の合意によって承認記録データベースに登録された施工準備に関する情報を修正することが可能となる。また、施工工事段階において施主側端末装置、監理者側端末装置及び施工業者側端末装置からの個別承認解除信号を受信すると、禁止解除手段は修正禁止を解除するので、施工工事段階では施主、監理者及び施工業者の三者の合意によって承認記録データベースに登録された施工準備に関する情報を修正することが可能となる。   Further, according to the construction management system for a building according to claim 3 of the present invention, the computer unit includes prohibition release means, and an individual approval release signal from the owner side terminal device and the supervisor side terminal device in the construction preparation stage. Since the prohibition canceling means cancels the prohibition of modification, it becomes possible to correct the information related to the construction preparation registered in the approval record database by the agreement between the owner and the supervisor in the construction preparation stage. In addition, when the individual approval release signal is received from the owner side terminal device, the supervisor side terminal device, and the contractor side terminal device at the construction work stage, the prohibition release means cancels the prohibition of modification. It becomes possible to correct the information related to the construction preparation registered in the approval record database by the agreement between the operator and the contractor.

また、本発明の請求項4に記載の建築物の施工管理システムによれば、施工工事に関する情報を管理する管理ファイルは、設計図面の情報を表示する設計図面表示部と、設計図面の情報に基づいて施工した状態を表示する施工表示部と、設計図面の内容を変更した変更情報を表示する変更設計図面表示部と、変更設計図面の変更情報に基づいて施工した状態を表示する変更施工表示部とを含んでいるので、通常の施工工事のみならず、設計変更による施工工事、また施工不良を直す施工工事にも充分に対応して管理することができる。尚、管理を容易にするとともに、設計変更の内容、施工不良の手直しを見やすくするために、管理ファイルの設計図面表示部、施工表示部、変形設計図面表示部及び変更施工表示部を一枚の管理ファイルに表示するようにするのが望ましい。   Further, according to the construction management system for a building according to claim 4 of the present invention, the management file for managing information related to the construction work includes a design drawing display unit for displaying the information of the design drawing, and information on the design drawing. A construction display section that displays the state of construction based on it, a modified design drawing display section that displays change information that changed the contents of the design drawing, and a modified construction display that displays the state of construction based on the change information of the modified design drawing Therefore, it is possible to manage not only normal construction work but also construction work by design change and construction work for correcting construction defects. In addition, in order to facilitate management and make it easier to see the contents of design changes and repairs of construction defects, the design drawing display section, construction display section, deformation design drawing display section, and modified construction display section of the management file are all in one piece. It should be displayed in the management file.

また、本発明の請求項5に記載の建築物の施工管理システムによれば、サーバ部は施工知識データベース、建材情報データベース及び業者一覧データベースを備えているので、施工知識データベースを利用することによって、施工準備及び/又は施工工事に関連する情報を容易に入手することができ、また建材情報データベースを利用することによって、建材に関する情報を容易に入手することができ、更に業者一覧データベースを利用することによって、建築物に関連する業者に関する情報を容易に入手することができる。   Moreover, according to the construction management system for a building according to claim 5 of the present invention, since the server unit includes the construction knowledge database, the building material information database, and the supplier list database, by using the construction knowledge database, Information related to construction preparation and / or construction work can be easily obtained, information on building materials can be easily obtained by using a building material information database, and a supplier list database can be used. By this, it is possible to easily obtain information on the traders related to the building.

また、本発明の請求項6に記載の建築物の施工管理システムによれば、建築物の完了検査が承認された時点で、承認記録データベースに登録された承認記録情報が、完成図書情報として完成図書データベースに登録され、この完成図書データベースに登録された完成図書情報は、データ出力手段により例えば紙書類として、又は例えばCD−R、MO、DVDなどとして出力されるので、施主などは完成図書情報を紙情報として、又はデジタル情報として保管することができる。   Further, according to the construction management system for a building described in claim 6 of the present invention, the approval record information registered in the approval record database is completed as completed book information when the completion inspection of the building is approved. The completed book information registered in the book database and registered in the completed book database is output by the data output means as, for example, a paper document or as, for example, a CD-R, MO, DVD, etc. Can be stored as paper information or as digital information.

また、本発明の請求項7に記載の建築物の施工管理システムによれば、承認記録情報が完全図書情報として完成図書データベースに登録されると、コンピュータ部の修正完全禁止手段は、記録データベース、承認記録データベース及び完成図書データベースに登録された情報の修正を完全に禁止するので、建築物の完成後にこれらに登録された情報を訂正、削除などをすることが一切できなくなり、それ故に、後にその建築物の施工内容などが問題となったときに、記録データベース、承認記録データベース及び完成図書データベースに登録された情報をこの問題の解決に有効利用することができる。   Further, according to the construction management system for a building according to claim 7 of the present invention, when the approval record information is registered in the completed book database as complete book information, the correction complete prohibition means of the computer unit is a record database, Since the modification of the information registered in the approval record database and the completed book database is completely prohibited, the information registered in the building cannot be corrected or deleted after completion of the building. When the construction content of a building becomes a problem, information registered in the record database, the approval record database, and the completed book database can be effectively used to solve this problem.

また、本発明の請求項8に記載の建築物の施工管理システムによれば、特記仕様の建材(及び/又は材料)を選定しないときには、標準品選定手段は、建材・材料基準データベースに登録された標準建材(及び/又は標準材料)を選定するので、建築確認申請書類を作成するに際し、建材(及び/又は材料)を一つ一つ選定する必要がなく、標準建材(及び/又は標準材料)の選定の誤りを防止することができるとともに、その選定を非常に容易に行うことができる。また、特記仕様の建材及び/又は材料を選定したときには、建材・材料判定手段は、建材・材料データベースに登録された判定基準に基づいて選定した建材(及び/又は材料)が特記仕様を満足するかを判定するので、特記仕様の建材(及び/又は材料)がその特記仕様に適合するものであるかを容易に判定することができ、特記仕様においても建材(及び/又は材料)の選定の誤りを防止することができる。   Further, according to the construction management system for a building according to claim 8 of the present invention, when a building material (and / or material) having a special specification is not selected, the standard product selecting means is registered in the building material / material reference database. Standard building materials (and / or standard materials) are selected, so it is not necessary to select building materials (and / or materials) one by one when creating a building confirmation application document. ) Can be prevented from being selected, and the selection can be performed very easily. In addition, when building materials and / or materials with special specifications are selected, the building materials and / or materials judgment means that the building materials (and / or materials) selected based on the judgment criteria registered in the building materials and materials database satisfy the special specifications. Therefore, it can be easily determined whether the building material (and / or material) of the special specification conforms to the special specification, and the selection of the building material (and / or material) is also possible in the special specification. Errors can be prevented.

また、本発明の請求項9に記載の建築物の施工管理システムによれば、施工現場にカメラ手段が設置され、このカメラ手段からの画像情報又はこの画像情報が登録された画像記録データベースからの画像情報が、施主側端末装置、監理者側端末装置及び施工業者側端末装置に送信可能であるので、施主などは施主側端末装置などを用いて施工現場の状況を知ることができる。   Moreover, according to the construction management system for a building according to claim 9 of the present invention, the camera means is installed at the construction site, and the image information from the camera means or the image recording database in which the image information is registered. Since the image information can be transmitted to the owner-side terminal device, the supervisor-side terminal device, and the contractor-side terminal device, the owner can know the status of the construction site using the owner-side terminal device.

更に、本発明の請求項10に記載の建築物の施工管理システムによれば、建築施工行程後の建築物維持管理工程においては、期日演算手段は、維持管理対象項目(例えば、建築物については3年毎、昇降機については1年毎)基づいて管理報告期日を演算し、また準備期間演算手段は、この管理報告期日に基づいて報告準備期間(例えば、管理報告期日の例えば2か月前からその当日までの2か月間)を設定し、これら管理報告期日及び報告準備期間が管理スケジュールデータベースに登録されるので、建築物完成後の維持管理工程における維持管理を容易に且つ確実に管理することができる。また、この報告準備期間中に作成された定期報告書が定期報告記録データベースに登録されるので、各維持管理対象項目について作成された定期報告書を保管し、必要な際に読み出して見ることが可能となる。   Furthermore, according to the construction management system for a building according to claim 10 of the present invention, in the building maintenance management process after the construction construction process, the date calculation means is the maintenance management target item (for example, for the building). The management report date is calculated every 3 years, and every year for elevators, and the preparation period calculation means calculates the report preparation period (for example, from 2 months before the management report date) based on this management report date. (2 months until that day) is set, and these management report dates and report preparation periods are registered in the management schedule database, so the maintenance management in the maintenance process after the building is completed should be managed easily and reliably Can do. In addition, since the periodic reports created during this report preparation period are registered in the periodic report record database, the periodic reports created for each maintenance target item can be stored and read and viewed when necessary. It becomes possible.

以下、添付図面を参照して、本発明に従う建築物の施工管理システムの一実施形態について説明する。図1は、一実施形態の建築物の施工管理システムの全体を示す概略図であり、図2は、図1の施工管理システムにおけるシステム管理サーバを簡略的に示すブロック図であり、図3は、図1の施工管理システムによる施工管理の全体を示す工程図であり、図4は、図3の施工管理における建築物の土地決定までの作業の流れを示すフローチャートであり、図5は、図3の施工管理における権利契約の締結までの作業の流れを示すフローチャートであり、図6は、図4の特記仕様のチェックにおける作業の流れを示すフローチャートであり、図7は、図5の特記仕様のチェックにおける画面内容の一例を示す図であり、図8は、図3の施工管理における工事の着工までの作業の流れを示すフローチャートであり、図9は、図3の施工管理における建築物の完成までの作業の流れを示すフローチャートであり、図10は、図9の基礎工事における配筋工程までの作業の流れを具体的に示すフローチャートであり、図11は、図1の施工管理システムにおける見積納品確認リストの一例を示す図であり、図12は、図11の見積納品確認リストにおけるリスト品の具体的内容の画面の一例を示す図であり、図13は、図9の基礎工事におけるコンクリート打設工程までの作業の流れを具体的に示すフローチャートであり、図14は、図10の基礎工事の地業工程において施工不良が発生した場合における作業の流れを示すフローチャートであり、図15は、図14の施工不良が発生した場合における管理ファイルの表示内容を示す簡略図であり、図16は、図10の基礎工事の地業工程において設計変更が発生した場合における作業の流れを示すフローチャートであり、図17は、図16の設計変更が発生した場合における管理ファイルの表示内容を示す簡略図であり、図18は、図3の施工管理における維持管理工程の作業の流れを示すフローチャートである。   Hereinafter, with reference to an accompanying drawing, one embodiment of a construction management system of a building according to the present invention is described. FIG. 1 is a schematic diagram illustrating an entire construction management system for a building according to an embodiment, FIG. 2 is a block diagram schematically illustrating a system management server in the construction management system of FIG. 1, and FIG. FIG. 4 is a process diagram showing the whole construction management by the construction management system of FIG. 1, FIG. 4 is a flowchart showing the flow of work until the land determination of the building in the construction management of FIG. 3, and FIG. 3 is a flowchart showing the flow of work up to the conclusion of the rights contract in the construction management of FIG. 3, FIG. 6 is a flowchart showing the flow of work in the special specification check of FIG. 4, and FIG. 7 is the special specification of FIG. 8 is a diagram showing an example of the contents of the screen in the check of FIG. 8, FIG. 8 is a flowchart showing the flow of work up to the start of construction in the construction management of FIG. 3, and FIG. FIG. 10 is a flowchart showing the flow of work up to the completion of the building, FIG. 10 is a flowchart specifically showing the flow of work up to the bar arrangement process in the foundation work of FIG. 9, and FIG. 11 is the construction of FIG. FIG. 12 is a diagram illustrating an example of an estimated delivery confirmation list in the management system, FIG. 12 is a diagram illustrating an example of a specific content screen of a list product in the estimated delivery confirmation list of FIG. 11, and FIG. 13 is a diagram of FIG. FIG. 14 is a flowchart specifically showing the flow of work up to the concrete placing process in the foundation work, and FIG. 14 is a flowchart showing the work flow when a construction failure occurs in the ground work process of the foundation work in FIG. 15 is a simplified diagram showing the display contents of the management file when the construction failure of FIG. 14 occurs, and FIG. 16 shows the groundwork process of the basic construction of FIG. FIG. 17 is a flowchart showing the flow of work when a design change occurs, FIG. 17 is a simplified diagram showing the display contents of the management file when the design change of FIG. 16 occurs, and FIG. It is a flowchart which shows the flow of the operation | work of the maintenance management process in construction management.

図1において、図示の建築物の施工管理システムは、建築物を依頼する施主側に設置される施主側端末装置2、建築物を管理する管理者側に設置される管理者側端末装置4及び建築物を施工する施工業者側に設置される施工業者側端末装置6と、これら施主側端末装置2、管理者側端末装置4及び施工業者側端末装置6とインターネット通信網8を介して通信接続されたシステム管理サーバ10とを備え、施主側端末装置2、管理者側端末装置4及び施工業者側端末装置6とシステム管理サーバ10とは、インターネット通信網8を介して各種情報を送受信することができる。施主は、例えば個人、会社などであり、監理者は、例えば設計事務所、工務店などであり、また施工業者は、建築業者、電気工事業者、ガス工事業者、瓦業者、左官業者などである。   In FIG. 1, the construction management system for a building shown in FIG. 1 includes a client-side terminal device 2 installed on a client-side who requests a building, a manager-side terminal device 4 installed on a manager-side managing a building, and Communication connection through the Internet communication network 8 to the contractor side terminal device 6 installed on the side of the contractor that constructs the building, the client side terminal device 2, the manager side terminal device 4, and the contractor side terminal device 6 The system management server 10 is provided, and the client side terminal device 2, the manager side terminal device 4, the contractor side terminal device 6 and the system management server 10 transmit and receive various types of information via the Internet communication network 8. Can do. The owner is, for example, an individual or a company, the supervisor is, for example, a design office or a construction company, and the contractor is a contractor, an electrician, a gas contractor, a tiler, a plasterer, or the like. .

この施工管理システムは、多数の監理者を含めて利用するオープン的なシステムとして適用するができるが、例えば特定の監理者を中心として利用するクローズ的なシステムとしても利用することができる。オープン的なシステムの場合、システム管理サーバ10は、例えばシステム管理会社などに設置され、このシステム管理サーバ10にインターネット通信網8を介して多数の施主側端末装置2、監理者側端末装置4及び施工業者側端末装置6が通信接続される。また、例えば特定の監理者を中心としたクローズ的なシステムの場合、システム管理サーバ10は監理者側に設置され、このシステム管理サーバ10にインターネット通信網8を介して多数の施主側端末装置2及び施工業者側端末装置6が通信接続され、この場合、専用のシステム管理サーバ10を設けることに代えて、例えば監理者側端末装置4をシステム管理サーバ10として機能されるようにしてもよい。   This construction management system can be applied as an open system including a number of supervisors, but can also be used as a closed system mainly used by a specific supervisor. In the case of an open system, the system management server 10 is installed, for example, in a system management company or the like, and a large number of client-side terminal devices 2, supervisor-side terminal devices 4 and The contractor side terminal device 6 is connected for communication. Further, for example, in the case of a closed system centered on a specific supervisor, the system management server 10 is installed on the supervisor side, and a large number of client terminal devices 2 are connected to the system management server 10 via the Internet communication network 8. The contractor-side terminal device 6 is communicatively connected. In this case, for example, the supervisor-side terminal device 4 may function as the system management server 10 instead of providing the dedicated system management server 10.

図2をも参照して、図示のシステム管理サーバ10はコンピュータ部12及びサーバ部14から構成され、コンピュータ部12及びサーバ部14は所要の通りにプログラムされたソフトによりデータ処理される。コンピュータ部12は例えばマイクロプロセッサから構成され、データ読出し手段16、データ登録手段18、承認判定手段20、修正禁止手段22及び修正完全禁止手段23を備えている。データ読出し手段16はサーバ部14に登録された各種情報を読み出し、データ登録手段18は各種情報をサーバ部14に登録し、承認判定手段20は後述するように承認して合意承認信号を生成し、修正禁止手段22は、この合意承認信号に基づいて所定の情報の修正を禁止し、また修正完全禁止手段23は後述するようにしてサーバ部14に登録された情報の修正を完全に禁止する。   Referring also to FIG. 2, the illustrated system management server 10 includes a computer unit 12 and a server unit 14, and the computer unit 12 and the server unit 14 are subjected to data processing by software programmed as required. The computer unit 12 includes, for example, a microprocessor, and includes a data reading unit 16, a data registration unit 18, an approval determination unit 20, a correction prohibition unit 22 and a correction complete prohibition unit 23. The data reading unit 16 reads various information registered in the server unit 14, the data registration unit 18 registers various information in the server unit 14, and the approval determination unit 20 approves and generates an agreement approval signal as described later. The correction prohibition means 22 prohibits the correction of predetermined information based on the agreement approval signal, and the correction complete prohibition means 23 completely prohibits the correction of information registered in the server unit 14 as will be described later. .

このコンピュータ手段12は、合意承認信号に基づいて登録された情報の修正禁止を解除することができるように、修正判定手段24、禁止解除手段26及び修正承認判定手段28を含み、修正判定手段24は後述するように承認して合意解除承認信号を生成し、禁止解除手段26はこの合意解除承認信号に基づいて修正禁止状態を解除し、また修正承認判定手段28は後述するようにして承認して合意修正承認信号を生成する。このように合意修正承認信号が生成されると、この合意修正承認信号に基づいて修正禁止手段22は、再び、修正した所定の情報の修正を禁止する。   The computer unit 12 includes a correction determination unit 24, a prohibition release unit 26, and a correction approval determination unit 28 so that the correction prohibition of the registered information can be canceled based on the agreement approval signal. Approves and generates an agreement cancellation approval signal as will be described later, the prohibition cancellation means 26 cancels the correction prohibition state based on the agreement cancellation approval signal, and the correction approval determination means 28 approves as described later. To generate a consensus amendment approval signal. When the agreement correction approval signal is generated in this way, the correction prohibition unit 22 again prohibits the correction of the corrected predetermined information based on the agreement correction approval signal.

コンピュータ手段12は、更に、施工不良登録手段30、設計変更登録手段32、完成図書作成手段34及びデータ出力手段36を含んでいる。施工不良登録手段30は、施工不良が発生した場合に施工不良に関する情報を後述する如くサーバ部14に登録し、設計変更登録手段32は、設計不良が発生した場合に設計変更に関する情報を後述する如くサーバ部14に登録し、またデータ出力手段36は後述する如くサーバ部14に登録された各種情報を出力する。   The computer means 12 further includes a construction failure registration means 30, a design change registration means 32, a completed book creation means 34, and a data output means 36. The construction failure registration means 30 registers information related to construction failures in the server unit 14 as described later when a construction failure occurs, and the design change registration means 32 describes information related to design changes when a design failure occurs. The data output means 36 outputs various information registered in the server unit 14 as will be described later.

このコンピュータ部12は、更にまた、建材及び又は材料の選定を行うための標準品選定手段35及び建材・材料判定手段37と、建築物を維持管理するための期日及び期間の設定を行うための期日演算手段39及び準備期間設定手段41を含んでいる。標準品選定手段35は、後述する如くして期日(即ち、管理報告期日)を演算し、準備期間設定手段41は、演算された期日に基づいて後述する如く報告準備期間を設定する。   This computer unit 12 is also used for setting a standard product selecting means 35 and a building material / material judging means 37 for selecting building materials and / or materials, and setting a date and a period for maintaining the building. The date calculating means 39 and the preparation period setting means 41 are included. The standard product selection unit 35 calculates a date (that is, a management report date) as described later, and the preparation period setting unit 41 sets a report preparation period as described later based on the calculated date.

このコンピュータ部12には、印刷するためのプリンタ38と、各種情報を表示するための画像表示手段40と、各種情報を記録メディアに記録するための記録装置42とが設けられている。表示手段40は液晶表示装置、CRTなどであり、記録装置42は記録メディアとしてのCD−R、DVD、MOなどに記録するメディア記録装置である。   The computer unit 12 is provided with a printer 38 for printing, an image display means 40 for displaying various information, and a recording device 42 for recording various information on a recording medium. The display means 40 is a liquid crystal display device, a CRT or the like, and the recording device 42 is a media recording device for recording on a CD-R, DVD, MO or the like as a recording medium.

また、サーバ部14は、施工知識データベース44、法律知識データベース43、構造知識データベース45、計画知識データベース47、業者一覧データベース46、施主情報データベース48、管理者情報データベース50、建材情報データベース52、施工業者情報データベース54、建材・材料基準データベース55、記録データベース56、承認記録データベース60及び完成図書データベース60を有している。施工知識データベース44には、建築物を施工するときの基礎的知識、例えば各種契約の形態、施工工事に関する一般的手法や工法、施工工事の手順、建築関係の各種用語などが登録されている。法律知識データベース43には、建築関係の一般的法律、その法律を適用した判例などが登録され、必要に応じてその法律の解説が登録される。また、構造知識データベース45には、建築物の構造に関する基礎的知識などが登録され、計画知識データベース47には、建築物を建造するときの計画に関する基礎知識が登録されている。   The server unit 14 includes a construction knowledge database 44, a legal knowledge database 43, a structural knowledge database 45, a plan knowledge database 47, a supplier list database 46, a client information database 48, an administrator information database 50, a building material information database 52, and a construction supplier. An information database 54, a building material / material reference database 55, a record database 56, an approval record database 60, and a completed book database 60 are provided. In the construction knowledge database 44, basic knowledge when constructing a building, for example, various contract forms, general methods and methods related to construction, construction procedures, various terms related to construction, and the like are registered. In the legal knowledge database 43, general laws related to construction, precedents to which the laws are applied, and the like are registered as necessary. Further, basic knowledge about the structure of the building is registered in the structural knowledge database 45, and basic knowledge about the plan for building the building is registered in the plan knowledge database 47.

更に、業者一覧データベース46には、建築物に関連する業者、例えば設計事務所、工務店、土地家屋調査士、不動産鑑定士、司法書士、弁護士、弁理士などの一覧が登録され、施主情報データベース48には、建築物を依頼する施主に関する情報、例えば住所、氏名、電話番号、管理番号などが登録され、監理者情報データベース50には、建築物を監理する監理者に関する情報、例えば住所、氏名、電話番号、管理番号などが登録され、また施工業者情報データベース54には建築物を施工する施工業者に関連する情報、例えば施工業者名、代表者、住所、電話番号などが登録される。また、建材・材料基準データベース55には、建材及び/又は材料の標準品の情報が登録されているとともに、特記仕様の建材及び/又は材料を選定したときのその特記仕様に対する判定基準が登録され、記録データベース56には、後述するように、例えば各種議事録、図面、設備設計資料、写真台帳、日報・出面情報、予定・工程情報などが記録され、承認記録データベース58には、後述するようにして承認された承認記録情報、後述するようにして修正承認された修正承認記録情報が登録され、また完成図書データベース60には、完成した建築物の完成図書情報が登録される。   Further, in the trader list database 46, a list of traders related to buildings, such as design offices, construction shops, land and house investigators, real estate appraisers, judicial scriveners, lawyers, patent attorneys, etc., is registered. 48, information relating to the client who requests the building, for example, address, name, telephone number, management number, etc., is registered, and the supervisor information database 50 includes information on the supervisor who supervises the building, such as address, name, etc. A telephone number, a management number, and the like are registered, and information related to a contractor who constructs a building, such as a contractor name, a representative, an address, and a telephone number, is registered in the contractor information database 54. In the building material / material standard database 55, information on standard building materials and / or materials is registered, and criteria for the special specifications when a building material and / or material with special specifications are selected are registered. As will be described later, for example, various minutes, drawings, equipment design materials, photo ledgers, daily reports / exit information, schedule / process information, etc. are recorded in the record database 56, and the approval record database 58 is described later. Approval record information approved as described above, and correction approval record information corrected and approved as described later are registered, and completed book information of the completed building is registered in the completed book database 60.

このサーバ部14は、更にまた、使用建材データベース61、定期報告資料データベース63、定期報告記録データベース65及び管理スケジュールデータベース67を含んでいる。使用建材データベース61には、建築物の建造に使用した建材及び材料が登録され、定期報告資料データベース63には、維持管理する建造物の定期報告書を作成する各種資料が登録され、定期報告記録データベース65には、提出した定期報告書の内容が登録され、管理スケジュールデータベース67には、維持管理すべき建築物の管理スケジュール(管理報告期日、報告準備期間など)が登録される。   The server unit 14 further includes a used building material database 61, a regular report material database 63, a regular report record database 65, and a management schedule database 67. Building materials and materials used for building construction are registered in the used building material database 61, and various materials for creating periodic reports on the buildings to be maintained are registered in the periodic report data database 63. Periodic report records The contents of the submitted periodic report are registered in the database 65, and the management schedule (management report date, report preparation period, etc.) of the building to be maintained is registered in the management schedule database 67.

施主側端末装置2、監理者側端末装置4及び施工業者側端末装置6は、例えばパソコンから構成され、このパソコンのパソコン本体には、コンピュータ部12と同様に、プリンタ、画像表示手段及び記録装置が設けられる。各種情報及び信号は、インターネット通信網8を介して施主側端末装置2、監理者側端末装置4及び施工業者側端末装置6とシステム管理サーバ10との間で送受信される。尚、これらの端末装置2,4,6は、携帯端末装置などから構成するようにしてもよい。   The client-side terminal device 2, the supervisor-side terminal device 4, and the contractor-side terminal device 6 are composed of, for example, a personal computer. Like the computer unit 12, the personal computer body of this personal computer has a printer, an image display means, and a recording device. Is provided. Various types of information and signals are transmitted and received between the owner-side terminal device 2, the supervisor-side terminal device 4, the contractor-side terminal device 6, and the system management server 10 via the Internet communication network 8. In addition, you may make it comprise these terminal devices 2, 4, and 6 from a portable terminal device.

この施工管理システムは、更に、建築現場の状況が画像情報としてシステム管理サーバ10のサーバ部14に登録されるとともに、この画像情報が各種端末装置2,4,6に送られるように構成されている。建築物Bを施工する現場には映像カメラの如きカメラ手段64が設置され、このカメラ手段64は地面に設置された例えば三脚の如き支持手段66に取り付けられる。この支持手段66には画像情報を送信するための送信手段68が取り付けられている。また、システム管理サーバ10のサーバ部14は画像記録データベース70を有し、カメラ手段64からの画像情報は、送信手段68からインターネット通信網8を介してシステム管理サーバ10に送給され、そのサーバ部14の画像記録データベース70に記憶される。カメラ手段64からの画像は所定間隔(例えば、2〜10秒)毎の静止画像でもよく、或いは連続的な動画でもよい。尚、動画の場合、サーバ部14の画像記録データベース70を省略し、カメラ手段64から画像情報をサーバ部14で蓄積せずにインターネット通信網8を介して施主側端末装置2、監理者側端末装置4及び施工業者側端末装置6に送るようにしてもよく、このように構成した場合、これら端末装置2,4,6によって、建築物Bの施工現場をリアルタイムで見ることができ、施工現場から離れていても施工工事の進行状況などを用意に確認することができる。   This construction management system is further configured so that the status of the building site is registered in the server unit 14 of the system management server 10 as image information, and this image information is sent to the various terminal devices 2, 4, 6. Yes. Camera means 64 such as a video camera is installed at the site where the building B is constructed, and this camera means 64 is attached to a support means 66 such as a tripod installed on the ground. The support means 66 is attached with a transmission means 68 for transmitting image information. The server unit 14 of the system management server 10 has an image recording database 70. Image information from the camera unit 64 is sent from the transmission unit 68 to the system management server 10 via the Internet communication network 8, and the server It is stored in the image recording database 70 of the unit 14. The image from the camera means 64 may be a still image at a predetermined interval (for example, 2 to 10 seconds) or a continuous moving image. In the case of a moving image, the image recording database 70 of the server unit 14 is omitted, and the client side terminal device 2 and the supervisor side terminal are not stored in the server unit 14 via the Internet communication network 8 without storing image information from the camera unit 64. You may make it send to the apparatus 4 and the contractor side terminal device 6, and when comprised in this way, the construction site of the building B can be seen in real time by these terminal devices 2, 4, and 6, and the construction site Even if you are away from the site, you can check the progress of construction work.

次に、図1及び図2とともに、図3〜図18を参照して、上述した施工管理システムによる作業の流れについて説明する。この施工管理システムによる作業の概略は、図3に示す通りである。ます、建築物の施工の最初の段階としての計画フェイズでは、建築用地を探すこと(段階F1)から始まり、その土地調査の契約(段階F2)及び設計契約の締結(段階F3)と進む。そして、設計契約を締結すると、次の設計フェイズに移り、施主と監理者との間で監理契約が締結され(段階F4)、更に施工業者と施主及び監理者との間で工事契約が締結され(段階F5)、このようにして施工フェイズに移る。この施工フェイズでは、建築物の施工工事の着工が行われ(段階F6)、施工工事の終了後に完了検査が行われ(段階7)、このようにして建築物が完成する(段階F8)。この完成後は、維持管理フェイズに移り、完成した建築物の維持管理が行われ(段階F9)、完了後所定期間が経過すると維持管理が終了し(段階F10)、このようにして建造した建築物の施工工事及び維持管理を含む施工管理が終了する。   Next, referring to FIGS. 3 to 18 together with FIGS. 1 and 2, the flow of work by the construction management system described above will be described. The outline of the work by this construction management system is as shown in FIG. First, in the planning phase as the first stage of construction of a building, it begins with searching for a building site (stage F1), and proceeds with a land investigation contract (stage F2) and a design contract conclusion (stage F3). When the design contract is concluded, the process proceeds to the next design phase, where a supervision contract is concluded between the owner and the supervisor (stage F4), and a construction contract is concluded between the contractor, the owner and the supervisor. (Step F5), thus moving to the construction phase. In this construction phase, the construction work for the building is started (step F6), and the completion inspection is performed after the construction work is finished (step 7), thus completing the building (step F8). After this completion, the operation moves to the maintenance phase, and maintenance of the completed building is performed (step F9). When a predetermined period elapses after completion, the maintenance is completed (step F10). Construction management, including construction work and maintenance management, will end.

次に、この施工管理を具体的に説明すると、次の通りである。主として図2及び図4を参照して、建築物を新たに建築する場合、まず、建築用地を探すこと(段階F1)から始まり、建築物を建築しようとする建築用地を不動産会社などで見付けて仮決定する(ステップS1)。システム管理サーバ10の施工知識データベース44には土地を購入する際の基本的知識(注意点などを含む)が登録され、また、その法律知識データベース43には土地を購入す際の法律知識が登録されており、建築用地を仮決定する際、施主となる建築主は、施主側端末装置2を入力操作してシステム管理サーバ10にアクセスし、そのサーバ部14の施工知識データベース44及び法律知識データベース43から土地購入に関する所望の情報を入手することによって、土地購入の予備知識を持って土地を購入することができる。   Next, this construction management will be specifically described as follows. Mainly referring to FIG. 2 and FIG. 4, when building a new building, firstly, searching for a building site (stage F1), finding a building site where the building is to be built by a real estate company, etc. A provisional decision is made (step S1). Basic knowledge (including precautions) when purchasing land is registered in the construction knowledge database 44 of the system management server 10, and legal knowledge when purchasing land is registered in the legal knowledge database 43. When the land for construction is tentatively determined, the building owner who is the owner inputs the operating terminal device 2 to access the system management server 10, and the construction knowledge database 44 and the legal knowledge database of the server unit 14 are accessed. By obtaining desired information regarding land purchase from 43, it is possible to purchase land with prior knowledge of land purchase.

建築用地を仮決定すると、建築物の設計を行ってもらう設計事務所(工務店の場合もある)を探して決定する(ステップS2)。設計事務所を探す際、施主は施主側端末装置2を入力操作してシステム管理サーバ10にアクセスし、その業者一覧データベース46から設計事務所に関する情報を入手することによって、各設計事務所の特徴などを考慮しながら事務所を選択することができる。   When the construction site is provisionally determined, a design office (which may be a construction shop) that will design the building is searched for and determined (step S2). When searching for a design office, the client inputs and operates the client-side terminal device 2 to access the system management server 10 and obtains information on the design office from the supplier list database 46. It is possible to select an office in consideration of the above.

このようにして設計事務所が決定すると、建築主、即ち施主は建築物の建築をその設計事務所に正式に依頼するようになる(ステップS3)。このように依頼すると、例えば監理者側端末装置4を用いて施主に関する情報(管理番号、住所、氏名など)及び監理者に関する情報(管理番号、住所、氏名など)が入力され、入力された情報はシステム管理サーバ14に送られ、施主に関する情報は施主情報データベース48に登録され、また監理者に関する情報が監理者情報データベース50に登録され、この施工管理システムによる施工管理が開始する。   When the design office is determined in this way, the architect, that is, the owner, officially requests the design office to construct the building (step S3). When requested in this way, for example, information (management number, address, name, etc.) relating to the owner and information (management number, address, name, etc.) relating to the supervisor are input using the supervisor side terminal device 4, and the input information Is sent to the system management server 14, information relating to the owner is registered in the owner information database 48, information relating to the supervisor is registered in the supervisor information database 50, and construction management by this construction management system is started.

このようにして設計事務所に建築の依頼をすると、次に、建築用地の土地調査が必要かが検討され、仮決定の建築用地の土地調査が不要である場合、ステップS4からステップS5に進み、この土地が建築用地として決定される。一方、建築用地の土地調査が必要である場合、ステップS4からステップS6に進み、施主と監理者との間で土地調査契約の締結が行われ(段階F2)、土地調査の種類として行政調査、法務局調査及び現地調査を行うかが決定される。行政調査を行わない場合には、ステップS7からステップS8に進むが、行政調査を行う場合、ステップS7からステップS9に進み、都市計画各種規制調査が行われ、消防法に関する全調査が行われ(ステップS10)、これら行政調査についての調査報告書が作成される(ステップS11)。そして、これら調査報告書についての承認が行われる(ステップS12)。建築物の施工工事を行う前段階、即ち施工準備段階においては、施主と監理者との二者によって作業が進行するので、この実施形態では、この承認は施主及び監理者の二者の承認が必要となり、これら二者が承認することによってステップS12からステップS8に進む。   When construction is requested to the design office in this way, next, it is considered whether the land survey of the building site is necessary. If the land survey of the temporarily determined building site is unnecessary, the process proceeds from step S4 to step S5. This land will be determined as a building site. On the other hand, if a land survey of the building site is required, the process proceeds from step S4 to step S6, and a land survey contract is concluded between the owner and the supervisor (step F2). It is decided whether to conduct a Legal Affairs Bureau survey and a field survey. If an administrative survey is not performed, the process proceeds from step S7 to step S8. However, if an administrative survey is performed, the process proceeds from step S7 to step S9, various city planning regulatory surveys are performed, and all surveys relating to the Fire Service Act are performed ( In step S10), survey reports for these administrative surveys are created (step S11). And approval about these investigation reports is performed (Step S12). In the previous stage of building construction, that is, in the construction preparation stage, work is carried out by two parties, the owner and the supervisor. In this embodiment, this approval is approved by the owner and the supervisor. It becomes necessary, and the process proceeds from step S12 to step S8 when these two parties approve.

この承認は、例えば監理者にあっては監理者側端末装置4を操作して調査報告書の内容を入力した後に承認の操作をすればよく、かくすると、この監理者端末装置4から調査報告データとともに個別承認信号がシステム管理サーバ10に送給され、データ登録手段18はこの調査報告データをサーバ部14の記録データベース56に登録する。また、例えば施主にあっては施主側端末装置2を入力操作して承認すればよく、かくすると、施主側端末装置2からの個別承認信号がシステム管理サーバ10に送給される。このように二者からの個別承認信号が送給されると、システム管理サーバ10の承認判定手段20は、双方の個別承認信号に基づいて両者が承認したとして合意承認信号を生成し、データ登録手段18は、この合意承認信号に基づいて記録データベース56の調査報告データを承認記録データベース58に登録し、修正禁止手段22はこのようにして登録された承認記録データベース58の承認情報の修正を禁止し、このように修正禁止状態にすることによって、施主及び監理者のいずれか一方が承認データを修正するのを防止することができる。   For example, in the case of the supervisor, the supervisor terminal device 4 is operated to input the contents of the investigation report and then the approval operation is performed. An individual approval signal is sent to the system management server 10 together with the data, and the data registration means 18 registers the survey report data in the recording database 56 of the server unit 14. Further, for example, in the case of a client, an approval may be made by performing an input operation on the client-side terminal device 2, so that an individual approval signal from the client-side terminal device 2 is sent to the system management server 10. When the individual approval signals from the two parties are sent in this way, the approval determination means 20 of the system management server 10 generates an agreement approval signal based on both of the individual approval signals and generates an agreement approval signal, and registers the data. The means 18 registers the investigation report data of the record database 56 in the approval record database 58 based on the agreement approval signal, and the correction prohibition means 22 prohibits the correction of the approval information of the approval record database 58 registered in this way. In this way, by making the modification prohibited state, it is possible to prevent either the owner or the supervisor from modifying the approval data.

また、法務局調査を行わない場合には、ステップS13からステップS8に進むが、法務局調査を行う場合、ステップS13からステップS14に進み、法務局での土地の登記簿の調査が行われ、建築用地の測量を行って敷地測量図が作成され(ステップS15)、字図が作成され(ステップS16)、このようにして法務局調査についての調査報告書が作成される(ステップS17)。そして、これら調査報告書についての承認が、行政調査と同様にして行われる(ステップS18)。即ち、例えば監理者にあっては監理者側端末装置4を操作して調査報告書の内容の入力と承認操作が行われ、監理者端末装置4から調査報告データ及び個別承認信号がシステム管理サーバ10に送給され、調査報告データはサーバ部14の記録データベース56に登録される。また、例えば施主にあっては施主側端末装置2の承認操作が行われ、施主側端末装置2からの個別承認信号がシステム管理サーバ10に送給される。そして、システム管理サーバ10の承認判定手段20は、双方の個別承認信号に基づいて合意承認信号を生成し、この合意承認信号に基づいて記録データベース56の調査報告データが承認記録データベース58に登録され、修正禁止手段22は承認記録データベース58の承認情報の修正を禁止する。   If the Legal Affairs Bureau survey is not performed, the process proceeds from Step S13 to Step S8. However, if the Legal Affairs Bureau survey is performed, the process proceeds from Step S13 to Step S14. Surveying is performed to create a site survey map (step S15), a character map is created (step S16), and a survey report for the Legal Affairs Bureau survey is thus created (step S17). And approval about these investigation reports is performed like administrative investigation (Step S18). That is, for example, the supervisor operates the supervisor side terminal device 4 to input and approve the contents of the survey report, and the supervisor report device 4 sends the survey report data and the individual approval signal to the system management server. The survey report data is registered in the recording database 56 of the server unit 14. Further, for example, in the owner, the approval operation of the owner-side terminal device 2 is performed, and an individual approval signal from the owner-side terminal device 2 is sent to the system management server 10. Then, the approval determination means 20 of the system management server 10 generates an agreement approval signal based on both individual approval signals, and the investigation report data of the recording database 56 is registered in the approval recording database 58 based on the agreement approval signal. The modification prohibiting means 22 prohibits modification of the approval information in the approval record database 58.

更に、現地調査を行わない場合には、ステップS19からステップS8に進むが、現地調査を行う場合、ステップS19からステップS20に進み、建築用地の地盤・地耐力調査が行われ、土地汚染調査が行われ(ステップS21)、敷地調査が行われ(ステップS22)、道路状況調査が行われ(ステップS23)、ライフライン調査が行われ(ステップS24)、また公共施設調査が行われ(ステップS25)、このようにして行った現地調査についての調査報告書が作成される(ステップS26)。そして、これら調査報告書についての承認が、行政調査及び法務局調査と同様にして行われる(ステップS27)。   Further, when the field survey is not performed, the process proceeds from step S19 to step S8. However, when the field survey is performed, the process proceeds from step S19 to step S20, the ground / ground strength survey of the construction site is performed, and the land contamination survey is performed. (Step S21), site survey is performed (step S22), road condition survey is performed (step S23), lifeline survey is performed (step S24), and public facility survey is performed (step S25). Then, a survey report on the field survey conducted in this way is created (step S26). And approval about these investigation reports is performed like administrative investigation and Legal Affairs Bureau investigation (Step S27).

この実施形態では、建築用地の地盤・地耐力調査、土地汚染調査、敷地調査、道路状況調査、ライフライン調査及び公共施設調査などの調査を行う調査会社及び調査機関の情報は、システム管理サーバ10の建材情報データベース52に登録されており、従って、この建材情報データベース52にアクセスすることによって、これら調査を行う調査会社、調査機関を容易に探すことができる。尚、現地調査で行う各種調査は、これら全てを行う必要はなく、これらのうち不必要なもののついては省略するようにしてもよい。   In this embodiment, the information of the survey company and the survey organization that conducts surveys such as the ground / ground strength survey, land contamination survey, site survey, road condition survey, lifeline survey, and public facility survey of the building site is stored in the system management server 10. Therefore, by accessing this building material information database 52, it is possible to easily find a survey company and a survey organization that conduct these surveys. In addition, it is not necessary to perform all of the various surveys conducted in the field survey, and unnecessary ones of these may be omitted.

このようにしてステップS8に進むと、必要な土地調査が全て終了したかの再確認のための承認が行われ、施主及び監理者の双方が承認した場合、ステップS5に進み、建築用地が決定され、この建築用地に建築物を建築するようになり、施主と監理者との間で設計契約が締結される(ステップS28)(段階F3)が、土地調査の承認が行われない場合、ステップS29に進み、この建築用地での建築が中止となる(ステップS29)。   When the process proceeds to step S8 in this way, an approval for reconfirming whether all necessary land surveys have been completed is performed. If both the owner and supervisor approve, the process proceeds to step S5, and the construction site is determined. If a building is built on this building site and a design contract is concluded between the owner and the supervisor (step S28) (step F3), if the land survey is not approved, step Proceeding to S29, construction on this construction site is canceled (step S29).

主として図2及び図5を参照して、設計契約に関する契約形態、書式などはシステム管理サーバ10の施工知識データベース44に登録されており、例えば施主は施主側端末装置2を入力操作してシステム管理サーバ10の施工知識データベース44にアクセスして設計契約に関する情報を入手することができ、この情報を利用することによって設計契約の知識を得て内容を理解して契約締結することになる。   Referring mainly to FIG. 2 and FIG. 5, the contract form, format, etc. relating to the design contract are registered in the construction knowledge database 44 of the system management server 10. Information on the design contract can be obtained by accessing the construction knowledge database 44 of the server 10, and by using this information, the knowledge of the design contract is obtained, the contents are understood, and the contract is concluded.

このように設計契約を締結すると、建築用地のチェックが行われ(ステップS30)、その後、どのような建築物を建築するかなどに関するヒアリングが行われ(ステップS31)、このヒアリングに基づいて建築物の概算見積が作成され(ステップS32)、建築物に関する全体的プランが作成される(ステップS33)。システム管理サーバ10の建材情報データベース52には、建築物に用いる各種建材に関する情報が登録されており、例えば施主との打合せの際に、監理者が監理者側端末装置4を入力操作して建材情報データベース52にアクセスすることによって各種建材情報を入手することができ、この建材情報を利用することによって、要望ヒアリング、建築物の概算見積及びプラン作成を入手した資料を施主に見せながら容易に行うことができる。   When the design contract is concluded in this way, the building site is checked (step S30), and then an interview regarding what kind of building is to be constructed (step S31), and the building is based on this hearing. Is prepared (step S32), and an overall plan for the building is created (step S33). In the building material information database 52 of the system management server 10, information on various building materials used for the building is registered. For example, when meeting with the owner, the supervisor inputs the supervisor side terminal device 4 to operate the building material. By accessing the information database 52, various building material information can be obtained. By using this building material information, request interviews, rough estimates of buildings, and materials obtained for plan creation are easily performed while showing the client. be able to.

このようにしてプランを作成すると、概算見積及びプランの承認が行われ(ステップS34)、例えば監理者にあっては監理者側端末装置4を操作して概算見積及びプランの内容の入力と承認操作が行われ、監理者端末装置4から概算見積及びプランのデータ並びに個別承認信号がシステム管理サーバ10に送給され、概算見積及びプランデータはサーバ部14の記録データベース56に登録される。また、例えば施主にあっては施主側端末装置2の承認操作が行われ、施主側端末装置2からの個別承認信号がシステム管理サーバ10に送給される。そして、システム管理サーバ10の承認判定手段20は、双方の個別承認信号に基づいて合意承認信号を生成し、この合意承認信号に基づいて記録データベース56の概算見積及びプランのデータが承認記録データベース58に登録され、修正禁止手段22は承認記録データベース58の承認情報の修正を禁止する。   When the plan is created in this way, the rough estimate and the approval of the plan are performed (step S34). The operation is performed, and the rough estimate and plan data and the individual approval signal are sent from the supervisor terminal device 4 to the system management server 10, and the rough estimate and plan data are registered in the recording database 56 of the server unit 14. Further, for example, in the owner, the approval operation of the owner-side terminal device 2 is performed, and an individual approval signal from the owner-side terminal device 2 is sent to the system management server 10. Then, the approval determination means 20 of the system management server 10 generates an agreement approval signal based on both of the individual approval signals, and based on the agreement approval signal, the rough estimate of the recording database 56 and the plan data are obtained as the approval record database 58. The modification prohibiting means 22 prohibits modification of the approval information in the approval record database 58.

その後、作成プランに沿った建築物の構造計算が行われ(ステップS35)、その建築物の建築・消防設備設計が行われ(ステップS36)、またこの建築物の仕上材設計が行われる(ステップS37)。建築物の構造計算式などの構造知識については、サーバ部14の構造知識データベース43に登録されており、この構造知識データベース43の情報を利用することによって、この構造計算を容易に行うことができ、また建築物の建築・防災設備設計などの法律知識については法律知識データベース43に登録されており、この法律知識データベース43に登録された情報を利用することによって、建築物の建築・防災設備設計を容易に行うことができる。   Thereafter, the structural calculation of the building according to the creation plan is performed (step S35), the building / firefighting equipment design of the building is performed (step S36), and the finishing material design of the building is performed (step S36). S37). The structural knowledge such as the structural formula of the building is registered in the structural knowledge database 43 of the server unit 14, and this structural calculation can be easily performed by using the information in the structural knowledge database 43. In addition, legal knowledge such as building / disaster design of buildings is registered in the legal knowledge database 43. By using information registered in the legal knowledge database 43, building / disaster design of buildings is designed. Can be easily performed.

構造計算、建築・消防設備設計及び仕上材設計については上述したと同様にして施主及び監理者の二者の承認が行われる(ステップS38、ステップS39、ステップS40)。例えば構造計算(又は建築・消防設備設計、仕上材設計)ついては、例えば監理者にあっては監理者側端末装置4を操作して構造計算書(又は建築・消防設備設計書、仕上材設計書)の内容の入力と承認操作が行われ、監理者端末装置4から構造計算(又は建築・消防設備設計、仕上材設計)データ及び個別承認信号がシステム管理サーバ10に送給され、構造計算(又は建築・消防設備設計、仕上材設計)データはサーバ部14の記録データベース56に登録される。また、例えば施主にあっては施主側端末装置2の承認操作が行われ、施主側端末装置2からの個別承認信号がシステム管理サーバ10に送給される。そして、システム管理サーバ10の承認判定手段20は、双方の個別承認信号に基づいて合意承認信号を生成し、この合意承認信号に基づいて記録データベース56の構造計算(又は建築・消防設備設計、仕上材設計)データが承認記録データベース58に登録され、修正禁止手段22は承認記録データベース58の承認情報の修正を禁止する。   The structural calculation, building / firefighting equipment design, and finishing material design are approved by the owner and supervisor in the same manner as described above (steps S38, S39, and S40). For example, for structural calculations (or building / firefighting equipment design, finishing material design), for example, a supervisor operates the supervisor side terminal device 4 to calculate the structural calculation (or building / firefighting equipment design document, finishing material design document). ) Are input and approved, and structural calculation (or construction / firefighting equipment design, finishing material design) data and individual approval signal are sent from the supervisor terminal device 4 to the system management server 10 for structural calculation ( Or, building / firefighting equipment design, finishing material design) data is registered in the recording database 56 of the server unit 14. Further, for example, in the owner, the approval operation of the owner-side terminal device 2 is performed, and an individual approval signal from the owner-side terminal device 2 is sent to the system management server 10. Then, the approval determination means 20 of the system management server 10 generates an agreement approval signal based on both of the individual approval signals, and based on the agreement approval signal, the structural calculation of the recording database 56 (or construction / firefighting equipment design, finishing) Material design) data is registered in the approval record database 58, and the correction prohibiting means 22 prohibits the correction of the approval information in the approval record database 58.

このようにしてステップS41に進むと、建築物の設計事項が全て終了したかの再確認のための承認が行われ、施主及び監理者の双方が承認した場合、ステップS42に進み、建造物の建築図面の作成が行われる。そして、作成した建築図面の承認が行われ(ステップS43)、施主及び管理者の双方が承認した場合、ステップS44に進む。尚、この場合にも、例えば監理者にあっては監理者側端末装置4を操作して建築図面の入力と承認操作が行われ、また例えば施主にあっては施主側端末装置2の承認操作が行われ、このように双方が承認したときには、システム管理サーバ10の承認判定手段20は合意承認信号を生成し、この合意承認信号に基づいて記録データベース56の建築図面データが承認記録データベース58に登録され、修正禁止手段22は承認記録データベース58の承認建築図面の修正を禁止する。   When the process proceeds to step S41 in this way, an approval for reconfirming whether all the design items of the building have been completed is performed. When both the owner and the supervisor approve, the process proceeds to step S42, and the building Architectural drawings are created. And the approval of the created architectural drawing is performed (step S43), and when both the owner and the manager approve, the process proceeds to step S44. Even in this case, for example, the supervisor operates the supervisor side terminal device 4 to input and approve the architectural drawing. For example, in the case of the owner, the approval operation of the owner side terminal device 2 is performed. In this way, when both parties approve, the approval determination means 20 of the system management server 10 generates an agreement approval signal, and the architectural drawing data of the record database 56 is stored in the approval record database 58 based on the agreement approval signal. The registered prohibition means 22 prohibits the correction of the approved architectural drawing in the approval record database 58.

ステップS44に進むと、建築する建築物に規制がかかっているかが検討され、規制がかかっている場合、各法令に基づく許認可・届出が行われ(ステップS45)、その後ステップS46に移り、また規制がかかっていない場合、ステップS44から直接にステップS46に移る。   Proceeding to step S44, it is examined whether or not the building to be regulated is restricted. If the restriction is imposed, approval / reporting is performed based on each law (step S45), and then the process proceeds to step S46. If not, the process moves directly from step S44 to step S46.

ステップS46においては、特記仕様のチェックが行われ、このチェックの後に建築確認申請書類の作成が行われ(ステップS47)、確認審査機関は作成した建築確認申請書類をチェックし(ステップS48)、建築確認申請書類の訂正がないときにはステップS49からステップS50に進む。訂正がある場合、建築確認申請書類における図面の訂正が行われ(ステップS51)、建築確認申請書類がパスするまで訂正が行われる。このようにしてステップS52に進むと、確認審査機関から確認済証が交付され、その後、施主と管理者との間で建築物の監理に関する監理契約が締結される(ステップS52)(段階F4)。   In step S46, a special specification is checked, and after this check, a building confirmation application document is created (step S47), and the confirmation examination organization checks the created building confirmation application document (step S48). When the confirmation application document is not corrected, the process proceeds from step S49 to step S50. When there is a correction, the drawing in the building confirmation application document is corrected (step S51), and the correction is performed until the building confirmation application document passes. When the process proceeds to step S52 in this manner, a confirmation certificate is issued from the confirmation examination organization, and thereafter, a management contract relating to the supervision of the building is concluded between the owner and the manager (step S52) (stage F4). .

ステップS46の特記仕様のチェックは、例えば、図6及び図7に示す通りに行われる。図6及び図7において、建築確認申請書類を作成するに際し、例えば、鉄筋工事項目における鉄筋材料については特記仕様なしと設定すると、コンピュータ部12の標準品選定手段35は、建材・材料基準データベース55に登録された標準建材を自動的に選定し、このように設定することによって、建材の設定を容易に行うことができるとともに、例えば強度の弱い材料を誤選定することを防止することができる。このような標準品の選定は、材料についても行われ、標準品選定手段35は、特記仕様なしと設定すると、その材料につても建材・材料基準データベース55に登録された標準材料を自動的に選定する。   The special specification check in step S46 is performed, for example, as shown in FIGS. 6 and 7, when creating the building confirmation application document, for example, if there is no special specification for the reinforcing bar material in the reinforcing bar construction item, the standard product selection means 35 of the computer unit 12 will set the building material / material standard database 55. By automatically selecting the standard building material registered in the above and setting it in this way, it is possible to easily set the building material and to prevent erroneous selection of, for example, a material having low strength. Such a standard product is also selected for the material. When the standard product selection means 35 is set to have no special specification, the standard material registered in the building material / material reference database 55 is automatically set for the material. Select.

また、例えば、鉄筋工事項目のチェックにおいて、特記仕様として鉄筋材料の一つとして例えば異形鉄筋型番SD295Aを選定する(ステップS46−1)と、コンピュータ部12の建材・材料判定手段37は、選定した鉄筋材料、例えば異形鉄筋型番SD295Aが強度的に適法であるかの判定を行い(ステップS46−2)、適法であると判定した場合には、次のステップS46−3に進むが、適法でないと判定したときにはステップS46−4に移り、図7に示すように、材料選定画面において所定の警告表示が行われ、この警告表示が消えるまで、換言すると選定した鉄筋材料が適法になるまで繰り返し行われる。   In addition, for example, in the check of the reinforcing bar construction item, for example, the deformed reinforcing bar model number SD295A is selected as one of the reinforcing bar materials as the special specification (step S46-1), the building material / material determining means 37 of the computer unit 12 is selected. It is determined whether the reinforcing bar material, for example, the deformed reinforcing bar model number SD295A is legally strong (step S46-2). If it is determined that it is legal, the process proceeds to the next step S46-3. When it is determined, the process proceeds to step S46-4, and as shown in FIG. 7, a predetermined warning is displayed on the material selection screen, and until this warning display disappears, in other words, until the selected reinforcing bar material becomes legal. .

この実施形態では、鉄筋工事項目の全体を通しての警告表示と、各細項目(例えば、材料選択)についての警告表示が行われ、建材・材料判定手段37が細項目の一つについて適法でないと判定したときには、その細項目について警告表示が行われるとともに、その細項目を含む全体項目、例えば鉄筋工事項目について警告表示が行われる。   In this embodiment, a warning display throughout the reinforcing bar construction items and a warning display for each sub-item (for example, material selection) are performed, and the building material / material determination means 37 determines that one of the sub-items is not legal. When this is done, a warning is displayed for the sub-item and a warning is displayed for the entire item including the sub-item, for example, a reinforcing bar work item.

ステップS46−3に進むと、次に、特記仕様の一つとしての継手の選択が行われ、選定した鉄筋材料を接続するための継手、例えばガス圧接継手で直径19mm以上を選定すると、上述したと同様に、建材・材料判定手段37は、選定した継手、例えばガス圧接継手で直径19mm以上が強度的に適法であるかの判定を行い(ステップS46−5)、適法でないと判定した場合には、ステップS46−6に移り、継手選定画面において所定の警告表示が行われ、この警告表示が消えるまで、換言すると選定した継手が適法になるまで繰り返し行われる。   Proceeding to step S46-3, next, a joint is selected as one of the special specifications, and when a diameter of 19 mm or more is selected with a joint for connecting the selected reinforcing steel material, for example, a gas pressure welding joint, Similarly, the building material / material determining means 37 determines whether the selected joint, for example, a gas pressure welded joint, has a diameter of 19 mm or more is legal in strength (step S46-5), and determines that it is not legal. The process proceeds to step S46-6, where a predetermined warning is displayed on the joint selection screen, and is repeated until the warning display disappears, in other words, until the selected joint becomes legal.

選定した継手が適法であると、ステップS46−7に進み、鉄筋工事項目の細項目の全てが適法であるかの判定がなされ、全てが適法であると、鉄筋工事項目が適法であるとの表示がなされ、次の選定項目に進み、このようにして特記仕様についての建材及び/又は材料の選定が行われるとともに、選定した建材及び/又は材料が適法であるか、即ち所定の特記仕様を満足するかの判定が行われ、このようにすることによって、建材及び又は材料の誤選定を防止することができる。   If the selected joint is legal, the process proceeds to step S46-7, where it is determined whether all the fine items of the reinforcing bar work item are legal, and if all of them are legal, the reinforcing bar item is legal. The display is made, and the process proceeds to the next selection item. In this way, the building material and / or material for the special specification is selected, and the selected building material and / or material is legal, that is, the predetermined special specification is selected. It is determined whether or not it is satisfied, and in this way, erroneous selection of building materials and / or materials can be prevented.

主として図2及び図8を参照して、このようにして監理契約が締結される(段階F4)と、建築物の見積書が作成され(ステップS61)、作成された見積書の承認が行われ(ステップS62)、施主及び監理者の二者が承認すると、ステップS63に進み、入札業者の選択が行われる。システム管理サーバ10の業者一覧データベース46には建築物の施工工事を請け負う例えば工務店に関する情報が登録されており、例えば監理者は監理者側端末装置4を入力操作してシステム管理サーバ10の業者一覧データベース46にアクセスして工務店に関する情報を入手することができ、この情報を利用することによって施工依頼する工務店を容易に選択することができる。   Mainly referring to FIG. 2 and FIG. 8, when the supervision contract is concluded in this way (step F4), an estimate of the building is prepared (step S61), and the prepared estimate is approved. (Step S62) If the two of the owner and supervisor approve it, the process proceeds to Step S63, and a bidder is selected. In the supplier list database 46 of the system management server 10, for example, information related to a construction shop that undertakes construction work of a building is registered. By accessing the list database 46, it is possible to obtain information on the construction shop, and by using this information, it is possible to easily select the construction shop to which construction is requested.

工務店が選択されると、建築物の建築現場の説明資料の作成が行われ(ステップS64)、施工業者(工務店)に提供してよいかの承認が行われ(ステップS65)、この承認が行われるまで現場説明資料の訂正が行われる。施主及び監理者の双方が承認すると、システム管理サーバ10の承認判定手段20は合意承認信号を生成し、この合意承認信号に基づいて記録データベース56の現場説明資料データが承認記録データベース58に登録され、修正禁止手段22は承認記録データベース58の承認建現場説明資料の修正を禁止する。   When the construction shop is selected, the explanation material of the building site of the building is created (step S64), and approval is given as to whether it can be provided to the contractor (construction shop) (step S65). Corrections to on-site explanation materials will be made until When both the owner and the supervisor approve, the approval determination means 20 of the system management server 10 generates an agreement approval signal, and the field explanation material data of the record database 56 is registered in the approval record database 58 based on the agreement approval signal. The correction prohibition means 22 prohibits the correction of the approved construction site explanation material in the approval record database 58.

このように承認されると、入札業者(工務店)に現場説明資料が提供され(ステップS66)、現場説明資料の提供を受けた入札業者が建築物の業者見積書を検討し(ステップS67)、業者見積書を作成できる場合にはステップS68に進む。一方、業者見積を作成できない場合、入札業者は質疑回答書(質疑)を作成して監理者に提出し(ステップS69)、監理者は施主と打合せを行って質疑回答書(回答)を作成し(ステップS70)、これを質疑者(入札業者)に回答するかの承認が行われる(ステップS71)。例えば、監理者にあっては監理者側端末装置4を操作して質疑回答書の入力と承認操作が行われ、また例えば施主にあっては施主側端末装置2の承認操作が行われ、このように双方が承認したときには、システム管理サーバ10の承認判定手段20は合意承認信号を生成し、記録データベース56の質疑回答書(回答)データが承認記録データベース58に登録され、修正禁止手段22は承認記録データベース58の承認建築図面の修正を禁止する。このように承認された質疑回答書(回答)は、質疑者(入札業者)に提供され、入札業者はこの質疑回答書(回答)をも参考にして業者見積書を完成するようになる。   If approved in this way, site explanation materials are provided to the bidder (construction shop) (step S66), and the bidder who has received the site explanation materials considers the contractor estimate of the building (step S67). If the supplier quotation can be created, the process proceeds to step S68. On the other hand, if a supplier estimate cannot be made, the bidder creates a question answer (question) and submits it to the supervisor (step S69), and the supervisor meets with the client to create a question answer (answer). (Step S70), approval of whether to answer this to the questioner (bidding company) is performed (Step S71). For example, in the supervisor, the supervisor side terminal device 4 is operated to input a question and answer document and the approval operation is performed. For example, in the case of the owner, the approval operation of the client side terminal device 2 is performed. Thus, when both sides approve, the approval judging means 20 of the system management server 10 generates an agreement approval signal, the question answering document (answer) data of the recording database 56 is registered in the approval recording database 58, and the correction prohibiting means 22 The modification of the approved architectural drawing in the approval record database 58 is prohibited. The question answering document (answer) approved in this way is provided to the questioner (bidding agent), and the bidder completes the supplier quotation with reference to the question answering document (answer).

このようにして入札業者からの業者見積書の提出がある(ステップS68)と、施主及び監理者は各業者の見積書を検討してその内容を評価し(ステップS72)、その評価結果の承認が行われる(ステップS73)。この承認についても、上述したと略同様に、例えば監理者にあっては監理者側端末装置4を操作して見積結果の入力と承認操作が行われ、また例えば施主にあっては施主側端末装置2の承認操作が行われ、このように双方が承認したときには、承認判定手段20は合意承認信号を生成し、記録データベース56の評価結果データが承認記録データベース58に登録され、修正禁止手段22は承認記録データベース58の承認評価結果の修正を禁止する。   In this way, when a supplier estimate is submitted from the bidder (step S68), the owner and supervisor examine each supplier's estimate and evaluate the contents (step S72), and approve the evaluation result. Is performed (step S73). As for the approval, for example, in the case of the supervisor, the supervisor side terminal device 4 is operated to input the estimation result and the approval operation is performed. For example, in the case of the owner, the owner side terminal is also used. When the approval operation of the apparatus 2 is performed and both of them approve as described above, the approval determination unit 20 generates an agreement approval signal, the evaluation result data of the recording database 56 is registered in the approval recording database 58, and the correction prohibiting unit 22 Prohibits modification of the approval evaluation result in the approval record database 58.

そして、この業者見積の評価結果の後に、建築物の施工工事を請け負う工務店、即ち施工業者が決定され(ステップS74)、施工工事を請け負う施工業者と施主及び監理者との間で工事契約の締結が行われる(ステップ75)(段階F5)。このように締結すると、例えば監理者側端末装置4を用いて施工業者に関する情報(管理番号、住所、工務店名、代表者など)が入力され、入力された情報はシステム管理サーバ10に送給され、そのサーバ部14の施工業者上方データベース54に登録される。このように施工業者の登録が行われると、施工準備段階から施工工事段階に移り、この施工工事段階においては、後述するように、施主、管理者及び施工業者の三者の承認により施工工事の各種工程が進むようになる。尚、施工業者との間で決定された見積書の内容(換言すると、建築物に使用する建材及び材料)については、使用建材データベース61に登録され、かく登録された情報は、後の見積納品確認において利用される。   After the evaluation result of the contractor estimate, a contractor that contracts the construction work of the building, that is, the contractor is determined (step S74), and the contractor contracts between the contractor who contracts the construction work and the owner and the supervisor. Fastening is performed (step 75) (step F5). When concluded in this way, for example, information (management number, address, construction shop name, representative, etc.) relating to the contractor is input using the supervisor side terminal device 4, and the input information is sent to the system management server 10. The server unit 14 is registered in the contractor upper database 54. Once the contractor is registered in this way, the process moves from the preparatory stage to the construction stage. In this construction stage, as will be described later, with the approval of the three parties, the owner, manager and contractor, Various processes will proceed. In addition, the contents of the quotations determined with the contractor (in other words, the building materials and materials used for the building) are registered in the used building material database 61, and the information thus registered is the estimated delivery afterwards. Used in confirmation.

施工業者が決定されると、次に、施工工事の各種工程の工事を行う工事業者の決定が行われる。システム管理サーバ10の業者一覧データベース46には施工工事の各種工程の工事を行う工事業者に関する情報が登録されており、例えば施工業者は施工業者側端末装置6を入力操作してシステム管理サーバ10の業者一覧データベース46にアクセスして工事業者に関する情報を入手することができ、この情報を利用することによって依頼する工事業者を容易に選定することができる。   When the contractor is determined, next, the contractor that performs the construction in various steps of the construction work is determined. Information related to a construction contractor that performs various steps of the construction work is registered in the contractor list database 46 of the system management server 10. For example, the construction contractor inputs and operates the terminal device 6 on the contractor side, and stores information on the system management server 10. Information on the construction contractor can be obtained by accessing the contractor list database 46, and the construction contractor to be requested can be easily selected by using this information.

このようにして施工業者の決定が行われると、その承認が行われる(ステップS77)。例えば施工業者にあっては施工業者側端末装置6を操作して施工業者に関する情報の入力と承認操作が行われ、施工業者側端末装置6から施工業者データ及び個別承認信号がシステム管理サーバ10に送給され、施工業者データはサーバ部14の記録データベース56に登録される。また、例えば施主及び監理者にあっては施主側端末装置2及び監理者側端末装置4の承認操作が行われ、施主側端末装置2及び監理者側端末装置4からの個別承認信号がシステム管理サーバ10に送給される。そして、システム管理サーバ10の承認判定手段20は、施工業者側端末装置6、施主側端末装置2及び監理者側端末装置4からの個別承認信号に基づいて合意承認信号を生成し、この合意承認信号に基づいて記録データベース56の工事業者のデータが承認記録データベース58に登録され、修正禁止手段22は承認記録データベース58の承認工事業者情報の修正を禁止する。   When the contractor is thus determined, the approval is made (step S77). For example, in the contractor, the contractor side terminal device 6 is operated to input information about the contractor and the approval operation, and the contractor data and the individual approval signal are sent from the contractor side terminal device 6 to the system management server 10. The contractor data is registered in the recording database 56 of the server unit 14. Further, for example, the owner and the supervisor perform the approval operation of the client-side terminal device 2 and the supervisor-side terminal device 4, and individual approval signals from the client-side terminal device 2 and the supervisor-side terminal device 4 are system-managed. It is sent to the server 10. The approval determination means 20 of the system management server 10 generates an agreement approval signal based on the individual approval signals from the contractor side terminal device 6, the owner side terminal device 2, and the supervisor side terminal device 4, and this agreement approval signal is generated. Based on the signal, the data of the construction contractor in the record database 56 is registered in the approval record database 58, and the correction prohibition means 22 prohibits the modification of the approved contractor information in the approval record database 58.

このように工事業者が決定された後に、施工業者は工事業者と打合せを行って工事関係書類、例えば施工工事の工程表、予定表などを作成し(ステップS78)、作成された工事関係書類の承認が行われ(ステップS79)、施主、監理者及び施工業者の三者による承認の後に、施工工事の着工が行われる(ステップS80)。この承認も工事業者の決定の際の承認と略同様に行われ、例えば施工業者にあっては施工業者側端末装置6を操作して工事関係書類関する情報の入力と承認操作が行われ、工事関係書類データはサーバ部14の記録データベース56に登録される。また、例えば施主及び監理者にあっては施主側端末装置2及び監理者側端末装置4の承認操作が行われる。そして、システム管理サーバ10の承認判定手段20は、施工業者側端末装置6、施主側端末装置2及び監理者側端末装置4からの個別承認信号に基づいて合意承認信号を生成し、記録データベース56の工事関係資料データが記録データベース56から承認記録データベース58に登録され、承認記録データベース58の承認工事関係書類情報の修正を禁止する。   After the construction contractor is determined in this way, the contractor makes a meeting with the contractor to create a construction related document, for example, a construction work schedule, a schedule, etc. (step S78). Approval is performed (step S79), and after the approval by the owner, supervisor, and contractor, construction work starts (step S80). This approval is performed in substantially the same manner as the approval at the time of determination by the contractor. For example, in the contractor, the contractor side terminal device 6 is operated to input information related to the construction document and the approval operation. The related document data is registered in the recording database 56 of the server unit 14. Further, for example, in the owner and supervisor, the approval operation of the owner-side terminal device 2 and the supervisor-side terminal device 4 is performed. Then, the approval determination means 20 of the system management server 10 generates an agreement approval signal based on the individual approval signals from the contractor side terminal device 6, the owner side terminal device 2, and the supervisor side terminal device 4, and the record database 56 Is registered in the approval record database 58 from the record database 56, and the modification of the approval-related document information in the approval record database 58 is prohibited.

主として図2及び図9を参照して、建築物の施工工事が着工される(段階F6)と、まず仮設工事が行われ(ステップS81)、次いで基礎工事(ステップS82)、躯体工事(ステップS83)及び上棟式(ステップS84)が行われ、この上棟式が行われた後に中間検査が行われる(ステップS85)。   Referring mainly to FIG. 2 and FIG. 9, when construction work of a building is started (step F6), temporary work is first performed (step S81), then foundation work (step S82), and frame work (step S83). ) And the upper building type (step S84), and after the upper building type is performed, an intermediate inspection is performed (step S85).

その後、屋根工事(ステップS86)、外壁工事(ステップS87)、造作工事(ステップ88)が行われ、更に内外装仕上げ工事(ステップS89)、電気・ガス・給排水設備工事(ステップS90)が行われて建築物の建築が完了し、この建築物の完了検査が行われる(ステップS91)(段階F7)。この完了検査がパスするということは、建築物が所要の通りに建築されたということであり、この検査後に建築物の施主への引渡しが行われ(ステップS92)、その後、建築物に関する全データの施主への送付が行われ(ステップS93)、このようにして建築物が完成する(ステップS94)(段階F8)。   After that, roof construction (step S86), exterior wall construction (step S87), and construction work (step 88) are performed, and interior / exterior finishing construction (step S89) and electricity / gas / water supply / drainage construction (step S90) are performed. Then, the building of the building is completed, and the completion inspection of the building is performed (step S91) (step F7). If this completion inspection passes, it means that the building has been built as required. After this inspection, the building is handed over to the owner (step S92), and then all the data on the building. Is sent to the owner (step S93), thus completing the building (step S94) (step F8).

建築物の完了検査が終わった段階で、施主、管理者及び施工業者の三者が完了検査の承認を行う(即ち、施主側端末装置2、監理者側端末装置4及び施工業者側端末装置6から個別承認信号が送られる)と、システム管理サーバ10のコンピュータ部12の完成図書作成手段34は、サーバ部14の承認記録データベース58に登録された承認記録情報(後述する修正承認記録情報を含む)をその建築物に関する承認記録情報として一つにまとめて完成図書を作成し、データ登録手段18は作成された完成図書情報を完成図書データベース60に登録する。このように登録された完成図書情報は、記録装置42を利用して記録メディアに記録することができ、例えば監理者が監理者側端末装置4を入力操作して記録メディアを作成し、作成した記録メディアを施主に送付するようになり、このように完成図書情報の全データを施主に渡すことによって、施主が建築物の施工履歴などを保管することになり、施工に関するトラブルが後に発生した場合にこの完成図書データが貴重な資料となる。また、このように完成図書データベース60に登録されると、建築物についての施工は全て終了したことになり、コンピュータ部12の修正完全禁止手段23は、サーバ部14の記録データベース56、承認記録データベース58及び完成図書データベース60に登録された情報の修正を完全に禁止し、建築物完成後の登録した情報の訂正、削除などが一切できなくなり、その後の維持管理を行う際の建築物の情報として有効に利用することができる。   At the stage where the completion inspection of the building is completed, the owner, the manager, and the construction contractor approve the completion inspection (that is, the client terminal device 2, the supervisor terminal device 4, and the contractor terminal device 6). The completed book creation means 34 of the computer unit 12 of the system management server 10 receives the approval record information (including later-described corrected approval record information) registered in the approval record database 58 of the server unit 14. ) Are collected as approval record information relating to the building, and a completed book is created, and the data registration means 18 registers the created completed book information in the completed book database 60. The completed book information registered in this way can be recorded on a recording medium using the recording device 42. For example, the supervisor creates the recording medium by operating the supervisor side terminal device 4 to input it. When the recording media is sent to the client, and all the data of the completed book information is handed over to the client in this way, the client will keep the construction history of the building, etc. This completed book data is a valuable resource. Further, when registered in the completed book database 60 in this way, all construction work has been completed, and the modification complete prohibition means 23 of the computer unit 12 includes the recording database 56 of the server unit 14, the approval recording database. As a building information when performing maintenance management after that, it is completely prohibited to modify the information registered in 58 and the completed book database 60, and the registered information cannot be corrected or deleted after the building is completed. It can be used effectively.

図9では施工工事の概要について説明した、この施工工事における例えば基礎工事の具体的内容は、図10〜図11に示す通りとなる。尚、施工工事における他の工事、例えば仮設工事、躯体工事、上棟式、屋根工事などは、それらの具体的内容を示していないが、それらの内容は、基礎工事の具体的内容と同じ考え方に沿って行われる。   FIG. 9 explains the outline of the construction work. For example, the concrete contents of the foundation work in the construction work are as shown in FIGS. In addition, other constructions such as temporary construction, frame construction, upper building type, roof construction, etc. are not shown in detail, but they are the same as the concrete contents of foundation work. Done along.

図2とともに図10〜図12を参照して基礎工事について説明すると、基礎工事においては、まず、建築物の外枠を紐(又は糸)を用いて張る遣り方工程が行われる(ステップS95)。この遣り方工程の内容については、システム管理サーバ10の施工知識データベース44に登録されており、従って、この施工知識データベース44にアクセスすることによって遣り方工程の一般的知識を知ることができる。この遣り方工程においては、施工業者はその日の工事が終わった時点で日報、出面及び工事写真を作成し、これら日報、出面及び工事写真のデータをシステム管理サーバ10のサーバ部14に登録する。即ち、施工業者は、工事日毎に施工業者側端末装置6を用いて記録すべき日報及び出面を作成するとともに、カメラ手段を用いて現場写真を撮影する。これら日報、出面及び現場写真は一つの業務管理ファイルとなるように作成され、作成された業務管理ファイルはシステム管理サーバ10に送信され、かく送信された業務管理ファイルがサーバ部14の記録データベース56に記録され、このようにして工事状況が業務管理ファイル(日報、出面及び現場写真)として工事日毎に記録データベース56に登録される。   The foundation work will be described with reference to FIGS. 10 to 12 together with FIG. 2. First, in the foundation work, a process of stretching the outer frame of the building using a string (or thread) is performed (step S95). . The contents of this spending process are registered in the construction knowledge database 44 of the system management server 10, and thus general knowledge of the spending process can be known by accessing the construction knowledge database 44. In this dispatching process, the contractor creates daily reports, appearances, and construction photographs at the end of the day's construction, and registers these daily reports, appearances, and construction photographs in the server unit 14 of the system management server 10. That is, the contractor creates a daily report and a face to be recorded using the contractor-side terminal device 6 for each construction day, and takes a photograph of the site using the camera means. The daily report, the screen, and the on-site photograph are created so as to become one business management file, the created business management file is transmitted to the system management server 10, and the transmitted business management file is stored in the recording database 56 of the server unit 14. In this way, the construction status is registered in the record database 56 for each construction date as a business management file (daily report, front page and on-site photo).

このように作成された業務管理ファイルは、工事日毎に承認が行われる(ステップS97)。施工工事段階においては、施主、監理者及び施工業者の三者の承認が必要となり、施主が施主側端末装置2を承認操作すると、この施主側端末装置2からの個別承認信号がシステム管理サーバ10に送給され、また監理者(又は施工業者)が監理者側端末装置4(又は施工業者側端末装置6)を承認操作すると、この監理者側端末装置4(又は施工業者側端末装置6)からの個別承認信号がシステム管理サーバ10に送給される。このようにして施主側端末装置2、監理者側端末装置4及び施工業者側端末装置6から個別承認信号が送られると、システム管理サーバ10の承認判定手段20は施主、監理者及び施工業者の三者からの承認が得られたとして合意承認信号を生成し、この合意承認信号に基づいてデータ登録手段18は記録データベース56の業務管理ファイルを承認記録データベース58に登録し、修正禁止手段22は承認記録データベース58の承認業務管理ファイルの修正を禁止し、このようにして業務管理ファイルが承認記録データベース58に登録される。   The business management file created in this way is approved every construction day (step S97). At the construction stage, approval by the owner, supervisor, and contractor is required. When the owner approves the owner-side terminal device 2, an individual approval signal from the owner-side terminal device 2 is sent to the system management server 10. When the supervisor (or contractor) approves the supervisor-side terminal device 4 (or contractor-side terminal device 6), the supervisor-side terminal device 4 (or the contractor-side terminal device 6) Is sent to the system management server 10. When the individual approval signal is sent from the client side terminal device 2, the supervisor side terminal device 4 and the contractor side terminal device 6 in this way, the approval judgment means 20 of the system management server 10 is used by the owner, supervisor and contractor. An agreement approval signal is generated on the assumption that the approval from the three parties has been obtained. Based on the agreement approval signal, the data registration means 18 registers the business management file of the record database 56 in the approval record database 58, and the correction prohibition means 22 Modification of the approved work management file in the approval record database 58 is prohibited, and the work management file is registered in the approval record database 58 in this way.

そして、遣り方工程が終了すると、この工程が終了したことを施主、監理者及び施工業者が再確認するために、この工程終了の承認が行われる(ステップS98)。この承認は上述したと略同様に行われ、施主側端末装置2、監理者側端末装置4及び施工業者側端末装置6から個別承認信号が送られると、システム管理サーバ10の承認判定手段20は合意承認信号を生成し、この合意承認信号に基づいてデータ登録手段18は承認記録データベース58に登録された遣り方工程の業務管理ファイルを日付順に列べて遣り方工程ファイルとしてまとめて承認記録データベースに登録し、修正禁止手段22は承認記録データベース58の承認遣り方工程ファイルの修正を禁止する。   When the spending process is completed, the end of the process is approved in order for the owner, supervisor and contractor to confirm again that the process has been completed (step S98). This approval is performed in substantially the same manner as described above, and when an individual approval signal is sent from the owner-side terminal device 2, the supervisor-side terminal device 4, and the contractor-side terminal device 6, the approval determination means 20 of the system management server 10 An agreement approval signal is generated, and based on the agreement approval signal, the data registration means 18 collects the operation management files of the usage process registered in the approval record database 58 in order of date and collects them as a usage process file, and the approval record database. The modification prohibiting means 22 prohibits modification of the approval sending process file in the approval record database 58.

遣り方工程が終了すると、次に、基礎をつくるために地面を掘ったり、敷石を置いたりする地業工程が行われる(ステップS99)。この地業工程においても、その作業進行は遣り方工程と同様に行われる。即ち、地業工程の内容については、システム管理サーバ10の施工知識データベース44に登録されており、従って、この施工知識データベース44にアクセスすることによって地業工程の一般的知識を知ることができる。この地業工程においても、施工業者はその日の工事が終わった時点で日報、出面及び工事写真を作成し(ステップS100)、これら日報、出面及び工事写真のデータがシステム管理サーバ10のサーバ部14に上述したと同様にして登録される。即ち、施工業者は、工事日毎に施工業者側端末装置6を用いて日報、出面及び現場写真が一つの業務管理ファイルとなるように作成し、作成された業務管理ファイルはシステム管理サーバ10のサーバ部14の記録データベース56に記録される。そして、業務管理ファイルは、上述したと同様にして工事日毎に承認が行われ(ステップS101)、施主、監理者及び施工業者の三者が承認すると、この業務管理ファイルが記録データベース56の承認記録データベース58に登録され、その修正が禁止される。そして、地業工程が終了すると、この工程が終了したときにも施主、監理者及び施工業者が再確認するために、この工程終了の承認が行われ(ステップS102)、施主、監理者及び施工業者の三者が承認すると、地業工程の業務管理ファイルが地業工程ファイルとして承認記録データベース58に登録され、その修正が禁止される。   When the spending process is completed, a grounding process for digging the ground and setting a paving stone to form a foundation is performed (step S99). In this geotechnical process, the work progress is performed in the same manner as the spending process. That is, the contents of the geotechnical process are registered in the construction knowledge database 44 of the system management server 10, and thus general knowledge of the geotechnical process can be known by accessing the construction knowledge database 44. Also in this geotechnical process, the contractor creates daily reports, appearances, and construction photographs at the end of the day's construction (step S100), and these daily reports, appearances, and construction photographs are stored in the server unit 14 of the system management server 10. Are registered in the same manner as described above. In other words, the contractor uses the contractor-side terminal device 6 for each construction day to create the daily report, the screen, and the site photograph as one business management file, and the created business management file is a server of the system management server 10. It is recorded in the recording database 56 of the unit 14. Then, the business management file is approved for each construction date in the same manner as described above (step S101). When the business owner, supervisor, and contractor approve the business management file, the business management file is recorded in the record database 56. It is registered in the database 58 and its modification is prohibited. Then, when the geotechnical process is completed, when the process is completed, the owner, the supervisor, and the contractor are reconfirmed to confirm the completion of the process (step S102). When the three parties of the trader approve, the business management file of the local business process is registered in the approval record database 58 as the local business process file, and its correction is prohibited.

地業工程の後に、コンクリートの内に埋設される配筋を配設する鉄筋工程が行われ(ステップS103)、この鉄筋工程においても、その作業進行は遣り方工程及び地業工程と同様に行われる。即ち、鉄筋工程の内容については、システム管理サーバ10の施工知識データベース44に登録されており、従って、この施工知識データベース44にアクセスすることにより鉄筋工程の一般的知識を知ることができる。この鉄筋工程においても、施工業者はその日の工事が終わった時点で日報、出面及び工事写真を作成し(ステップS104)、これら日報、出面及び工事写真のデータがシステム管理サーバ10のサーバ部14に上述したと同様にして登録される。即ち、施工業者の作成した工事日毎の業務管理ファイル(日報、出面及び現場写真)はシステム管理サーバ10の記録データベース56に記録され、施主、監理者及び施工業者の三者が承認する(ステップS105)と、この業務管理ファイルが記録データベース56の承認記録データベース58に登録され、その修正が禁止される。   After the geotechnical process, a reinforcing bar process for arranging reinforcements embedded in concrete is performed (step S103). In this reinforcing bar process as well, the work progress is performed in the same manner as the spending process and the geotechnical process. Is called. That is, the contents of the reinforcing bar process are registered in the construction knowledge database 44 of the system management server 10, and therefore, general knowledge of the reinforcing bar process can be known by accessing the construction knowledge database 44. Also in this reinforcing bar process, the contractor creates daily reports, appearances, and construction photographs at the end of the day's construction (step S104), and these daily reports, appearances, and construction photographs are stored in the server unit 14 of the system management server 10. Registration is performed in the same manner as described above. In other words, the business management file (daily report, appearance and field photo) for each construction date created by the contractor is recorded in the record database 56 of the system management server 10 and approved by the three parties of the owner, supervisor and contractor (step S105). ) Is registered in the approval record database 58 of the record database 56, and its modification is prohibited.

また、この鉄筋工程においては、鉄筋引張強度試験が行われ(ステップS106)、その試験報告書が作成され(ステップS107)、作成された試験報告書の承認が行われる(ステップS108)。施工業者が試験報告書を入力すると、そのデータはシステム管理サーバ10に送信され、サーバ部14の記録データベース56に記録される。そして、施主、監理者及び施工業者の三者が承認すると、この試験報告書のデータが記録データベース56から承認記録データベース58に登録され、その修正が禁止される。   In this reinforcing bar process, a reinforcing bar tensile strength test is performed (step S106), a test report is generated (step S107), and the generated test report is approved (step S108). When the contractor inputs the test report, the data is transmitted to the system management server 10 and recorded in the recording database 56 of the server unit 14. When the three parties of the owner, supervisor, and contractor approve, the data of this test report is registered from the record database 56 to the approval record database 58, and its correction is prohibited.

このようにして鉄筋工程が終了すると、この工程が終了したときにも施主、監理者及び施工業者が再確認するために、この工程終了の承認が行われ(ステップS109)、施主、監理者及び施工業者の三者が承認すると、鉄筋工程の業務管理ファイル及び試験報告書が鉄筋工程ファイルとして承認記録データベース58に登録され、その修正が禁止される。   When the reinforcing bar process is completed in this manner, when the process is completed, the owner, the supervisor, and the construction contractor confirm the completion of the process (step S109), and the owner, the supervisor, If the three contractors approve, the business management file and test report of the reinforcing bar process are registered in the approval record database 58 as a reinforcing bar process file, and the correction thereof is prohibited.

この実施形態では、建築物の施工工事において遂行される各工程、例えば図10のフローチャートでは遣り方工程(ステップS95)、地業工程(ステップS100)及び鉄筋工程(ステップS103)において、見積納品の確認が行われる。図11及び図12を参照して、例えば各種工程の一つにおいてグラスウールの納品があると、施工業者は施工業者側端末装置6を用いて納品のチェックを行う。サーバ部14の使用建材データベース61には、各種の使用建材及び使用材料が、例えば図11に示す見積納品確認リストとしてリスト形式で登録されており、この納品のチェックにおいて、施工業者は、施工業者側端末装置6を用いて納品された建材(例えば、グラスウール)に対応する見積納品確認リストを使用建材データベース61から読み出し、読み出した見積納品確認リストを見ながら納品された建材(例えば、グラスウール)が見積り通りの商品、価格などであるかをチェックするとともに、その納品された建材に認定証が添付されているかを確認する。そして、見積り通りであると、見積納品確認リストの納品書欄に例えば「○」を付し、また認定証が添付されていると、見積納品確認リストの認定証欄に例えば「○」を付し、このようにして納品された建材及び材料の一つ一つについて見積納品確認が行われ、このような見積納品確認の結果は、再び使用建材データベース61に登録される。   In this embodiment, in each process performed in the construction work of the building, for example, in the flowchart of FIG. 10, in the delivery process (step S95), the earthwork process (step S100), and the reinforcing bar process (step S103), the estimated delivery Confirmation is performed. Referring to FIGS. 11 and 12, for example, when glass wool is delivered in one of various processes, the contractor checks the delivery using the contractor-side terminal device 6. In the used building material database 61 of the server unit 14, various used building materials and used materials are registered in a list format, for example, as an estimated delivery confirmation list shown in FIG. 11. The estimated delivery confirmation list corresponding to the building material (for example, glass wool) delivered using the side terminal device 6 is read from the used construction material database 61, and the delivered construction material (for example, glass wool) is viewed while viewing the estimated delivery confirmation list that has been read. Check whether the product is exactly as estimated, price, etc., and confirm that the certificate is attached to the delivered building material. For example, “○” is added to the delivery form column of the estimated delivery confirmation list if it is as estimated, and “○” is added to the certification column of the estimated delivery confirmation list if a certificate is attached. Then, the estimated delivery confirmation is performed for each of the building materials and materials delivered in this way, and the result of the estimated delivery confirmation is registered in the used building material database 61 again.

このように建材、例えばグラスウールの納品があると、納品建材に関する情報は、例えば図11に示す見積納品確認リストと関連付けられて図12に示す通りにまとめられて使用建材データベース61に登録される。即ち、納品建材(例えば、グラスウール)についての問合せ先、材質名、品番、シリーズ名などの一般的項目が一般的項目欄に表示されるとともに、この建材についての見積り欄、納品書欄、認定証欄及び納品状況欄がこの一般的項目欄と同一の画面に設けられ、見積もり欄には、見積り数量、価格などが表示され、納品書欄には、登録された納品書に関連付けられたクリック部が表示され、認定証欄には、登録された認定証に関連付けられたクリック部が表示され、また納品状況欄には、デジカメで撮影された納品状況の写真が表示され、このように納品建材の一般的項目と見積り、納品書、認定証及び納品状況とを同一画面に表示することによって、納品建材の確認を容易に且つ簡単に行うことができる。尚、この見積納品確認については、建材の一例としてのグラスウールについて説明したが、建築物の建造に用いる全ての建材及び材料について行われ、このように見積納品確認を行うことによって、建材などを誤って用いることがなく、建築確認申請を行った見積り通りの建築物を建造することができる。   Thus, when there is delivery of building materials such as glass wool, information relating to the delivered building materials is associated with the estimated delivery confirmation list shown in FIG. 11, for example, and collected and registered in the used building material database 61 as shown in FIG. That is, general items such as contact information, material name, product number, and series name for delivery building materials (for example, glass wool) are displayed in the general item column, as well as an estimate column, invoice column, certificate for this building material Column and delivery status column are provided on the same screen as this general item column, the estimated column displays the estimated quantity, price, etc., and the invoice column contains a click section associated with the registered invoice. In the certificate column, the click part associated with the registered certificate is displayed, and in the delivery status column, a picture of the delivery status photographed with a digital camera is displayed. By displaying the general items and estimates, delivery note, certificate and delivery status on the same screen, delivery building materials can be easily and easily confirmed. In addition, although this estimated delivery confirmation explained about glass wool as an example of building materials, it was performed for all building materials and materials used for building construction. It is possible to build a building as estimated by applying for building confirmation.

図10に戻って、その後、配筋検査工程が行われ(ステップS110)、配筋検査報告書が作成され(ステップS111)、作成された配筋検査報告書の承認が行われ(ステップS112)、更に上述したと同様にして配筋検査工程の終了の承認が行われる(ステップS113)。   Referring back to FIG. 10, a bar arrangement inspection process is performed (step S110), a bar arrangement inspection report is created (step S111), and the created bar arrangement inspection report is approved (step S112). Further, the end of the bar arrangement inspection process is approved in the same manner as described above (step S113).

その後、コンクリートを打設するための型枠を設ける型枠工程が行われる(ステップS114)。図13において、この型枠工程においても、その作業進行は遣り方工程及び地業工程と同様に行われ、施工業者はその日の工事が終わった時点で日報、出面及び工事写真を作成して業務管理ファイルを作成し(ステップS115)、工事日毎の業務管理ファイル(日報、出面及び現場写真)がシステム管理サーバ10の記録データベース56に記録され、施主、監理者及び施工業者の三者が承認する(ステップS116)ことによって記録データベース56の承認記録データベース58に登録され、その修正が禁止される。また、型枠工程が終了すると、この工程が終了したときにも施主、監理者及び施工業者が再確認するために、この工程終了の承認が行われ(ステップS117)、施主、監理者及び施工業者の三者が承認すると、型枠工程の業務管理ファイルが型枠工程ファイルとして承認記録データベース58に登録され、その修正が禁止される。   Thereafter, a mold forming process for providing a mold for placing concrete is performed (step S114). In FIG. 13, in this formwork process, the work progress is carried out in the same way as the spending process and the geotechnical process, and the contractor creates daily reports, appearances, and construction photographs at the end of the day's work. A management file is created (step S115), and a business management file (daily report, front page and site photo) for each construction date is recorded in the recording database 56 of the system management server 10, and is approved by the owner, supervisor, and contractor. (Step S116), it is registered in the approval record database 58 of the record database 56, and its correction is prohibited. In addition, when the formwork process is completed, when the process is completed, in order for the owner, supervisor, and contractor to reconfirm, the end of the process is approved (step S117). If the three of the vendors approve, the work process management file for the formwork process is registered in the approval record database 58 as a formwork process file, and its modification is prohibited.

次に、型枠内にコンクリートを流し込んで打設するコンクリート打設工程が行われる(ステップS118)。このコンクリート打設工程においても、その作業進行は遣り方工程(ステップS95)、地業工程(ステップS99)及び型枠工程(ステップS114)と同様に行われる。即ち、コンクリート打設工程の内容については、システム管理サーバ10の施工知識データベース44に登録されており、従って、この施工知識データベース44にアクセスすることによりコンクリート打設工程の一般的知識を知ることができる。このコンクリート打設工程においても、施工業者はその日の工事が終わった時点で日報、出面及び工事写真を作成し(ステップS119)、これら日報、出面及び工事写真を含む工事日毎の業務管理ファイルを作成し、この業務管理ファイル(日報、出面及び現場写真)はシステム管理サーバ10の記録データベース56に記録される。そして、施主、監理者及び施工業者の三者が承認する(ステップS120)と、この業務管理ファイルが記録データベース56の承認記録データベース58に登録され、その修正が禁止される。   Next, a concrete placing process is performed in which concrete is poured into the mold and placed (step S118). Also in this concrete placing process, the work progress is performed in the same manner as the spending process (step S95), the earthwork process (step S99), and the formwork process (step S114). In other words, the contents of the concrete placing process are registered in the construction knowledge database 44 of the system management server 10. Therefore, by accessing this construction knowledge database 44, it is possible to know general knowledge of the concrete placing process. it can. Also in this concrete placing process, the contractor creates daily reports, appearances and construction photographs at the end of the day's construction (step S119), and creates a work management file for each construction day including these daily reports, appearances and construction photographs. The business management file (daily report, front page and field photo) is recorded in the recording database 56 of the system management server 10. Then, when the three parties of the owner, the supervisor, and the contractor approve (step S120), this business management file is registered in the approval record database 58 of the record database 56, and its correction is prohibited.

また、このコンクリート打設工程においては、コンクリート強度試験が行われ(ステップS121)、その試験報告書が作成され(ステップS122)、その承認が行われる(ステップS123)。施工業者が試験報告書を入力すると、そのデータはシステム管理サーバ10に送信され、サーバ部14の記録データベース56に記録され、施主、監理者及び施工業者の三者が承認すると、この試験報告書のデータが記録データベース56から承認記録データベース58に登録され、その修正が禁止される。   In this concrete placing process, a concrete strength test is performed (step S121), a test report is created (step S122), and approval is performed (step S123). When the contractor inputs the test report, the data is transmitted to the system management server 10 and recorded in the record database 56 of the server unit 14, and when the three parties of the owner, supervisor and contractor approve, the test report Is registered from the recording database 56 into the approval recording database 58, and its correction is prohibited.

このようにしてコンクリート打設工程が終了すると、この工程が終了したときにも施主、監理者及び施工業者が再確認するために、この工程終了の承認が行われ(ステップS124)、施主、監理者及び施工業者の三者が承認すると、コンクリート打設工程の業務管理ファイル及び試験報告書がコンクリート打設工程ファイルとして承認記録データベース58に登録され、その修正が禁止される。   When the concrete placing process is completed in this way, the end of the process is approved (step S124) for reconfirmation by the owner, supervisor and contractor even when this process is completed. If the three of the contractor and the contractor approve, the business management file and the test report of the concrete placing process are registered in the approval record database 58 as the concrete placing process file, and the modification thereof is prohibited.

このようにして基礎工事が終了すると、このときにも施主、監理者及び施工業者の三者が再確認するために、その終了確認が行われる(ステップS125)。施主、監理者及び施工業者の三者が承認すると、承認記録データベース58に登録された基礎工事の各種監理ファイル、即ち遣り方工程ファイル、地業工程ファイル、鉄筋工程ファイル、配筋検査工程ファイル、型枠工程ファイル及びコンクリート打設工程ファイルが基礎工事ファイルとしてまとめられて承認記録データベース58に登録され、その修正が禁止される。この実施形態では、上述したように、施工工事の工事日毎の業務管理ファイル、また各種工事の各工程毎の工程ファイル、更には各種工事毎の工事ファイルとして管理され、これらについて施工工事段階においては施主、管理者及び施工業者の三者の承認を得て次のステップに進むので、工事ミス、手抜きなどが発生することが極めて少なく、仮に発生したとしてもその解決が容易となる。   When the foundation work is completed in this manner, the completion confirmation is performed in order for the three parties of the owner, the supervisor, and the construction contractor to confirm again at this time (step S125). When the owner, supervisor, and contractor approve, the various supervision files of the foundation work registered in the approval record database 58, that is, the process method file, the geotechnical process file, the reinforcing bar process file, the reinforcement inspection process file, The formwork process file and the concrete placing process file are collected as a foundation work file and registered in the approval record database 58, and the modification thereof is prohibited. In this embodiment, as described above, it is managed as a business management file for each construction date, a process file for each process of various constructions, and a construction file for each construction. Since the process proceeds to the next step with the approval of the owner, manager, and contractor, construction errors and omissions are very rare, and even if they occur, it is easy to solve them.

例えば、この基礎工事の例えば地業工程(ステップS99)の作業において施工不良が発生すると、その作業の流れは、図14に示す通りとなる。主として図2とともに図14を参照して、地業工程の工事中に施工不良が発生する、例えば地面に掘る溝の深さが所定深さ(地面に示された深さ)よりも浅いと、ステップS100−1からステップS100−2に進み、この施工不良の承認が施主、管理者及び施工業者の三者で行われ、例えば溝の深さが浅いことを三者が合意承認する(例えば、施主側端末装置2、管理者側端末装置4及び施工業者側端末装置6によって承認操作される)と、現在行っている工事が中断される(ステップS100−3)。そして、施工不良に関する打合せが行われ(ステップS100−4)、その打合せの議事録が作成され(ステップS100−5)、その議事録の承認が行われる(ステップS100−6)。この承認については、例えば施工業者が施工業者側端末装置6を用いて議事録を入力すると、その議事録のデータはシステム管理サーバ10に送信され、サーバ部14の記録データベース56に記録される。そして、施主、監理者及び施工業者の三者が承認する(例えば、施主側端末装置2、監理者側端末装置4及び施工業者側端末装置6により承認操作される)と、この議事録のデータが記録データベース56から承認記録データベース58に登録され、その修正が禁止される。   For example, when a construction failure occurs in the work of, for example, the geotechnical process (step S99) of this foundation work, the work flow is as shown in FIG. Mainly referring to FIG. 14 together with FIG. 2, a construction failure occurs during construction of the geotechnical process. For example, if the depth of the groove dug in the ground is shallower than a predetermined depth (depth shown in the ground), Proceeding from step S100-1 to step S100-2, this construction failure is approved by the owner, manager, and contractor, for example, the three parties agree and approve that the depth of the groove is shallow (for example, (Approval operation is performed by the owner-side terminal device 2, the manager-side terminal device 4, and the contractor-side terminal device 6), and the current construction is interrupted (step S100-3). Then, a meeting regarding construction failure is performed (step S100-4), a minutes of the meeting is created (step S100-5), and the minutes are approved (step S100-6). As for this approval, for example, when the contractor inputs the minutes using the contractor-side terminal device 6, the minutes data is transmitted to the system management server 10 and recorded in the recording database 56 of the server unit 14. When the three parties of the owner, the supervisor, and the contractor approve (for example, the approval operation is performed by the owner-side terminal device 2, the supervisor-side terminal device 4, and the contractor-side terminal device 6), the data of the minutes Is registered from the recording database 56 to the approval recording database 58, and its correction is prohibited.

このようにして三者の合意承認が行われると、地業工程の作業に関する工程表の修正が行われ(ステップS100−7)、その承認が上述したと同様にして行われ(ステップS100−8)、このうようにして施主、監理者及び施工業者の三者の合意承認が行われると、ステップS100−9に進み、中断していた工事が再開され、通常工事の場合と同様にして以後の工事が行われる。   When the consensus approval of the three parties is performed in this way, the process chart relating to the work of the geotechnical process is corrected (step S100-7), and the approval is performed in the same manner as described above (step S100-8). ) In this way, when the agreement of the owner, supervisor and contractor is approved, the process proceeds to step S100-9, where the suspended work is resumed. Construction will be carried out.

この施工不良のときには、工事写真などは図15に示す通りに表示されるように管理される。図15を参照して、施工工事に関する情報はファイル形式で作成される管理ファイルで管理され、この管理ファイルKは、設計図面を情報を表示する設計図面表示部102と、この設計図面に基づいて施工工事を行ったときの施工状態を表示する施工表示部104と、設計図面の内容を変更した変更設計図面を表示する変更設計図面表示部106と、変更設計図面の変更情報に基づいて施工をした状態を表示する変更施工表示部108と有しており、設計図面表示部102及び変更設計図面表示部106には図面情報が表示され、施工表示部104及び変更施工表示部108にはカメラ手段により撮影された画像情報(静止画像情報)が表示される。   When the construction is defective, the construction photograph is managed so as to be displayed as shown in FIG. Referring to FIG. 15, information related to construction work is managed by a management file created in a file format. This management file K is based on a design drawing display unit 102 for displaying information on a design drawing and the design drawing. A construction display unit 104 that displays a construction state when the construction work is performed, a modified design drawing display unit 106 that displays a modified design drawing in which the content of the design drawing is changed, and a construction based on change information of the modified design drawing A modified construction display unit 108 for displaying the state, and drawing information is displayed on the design drawing display unit 102 and the modified design drawing display unit 106, and camera means is displayed on the construction display unit 104 and the modified construction display unit 108. The image information (still image information) taken by is displayed.

通常の施工の場合、管理ファイルKの設計図面表示部102に設計図面情報が表示され、また施工表示部104に施工状態を撮影した施工写真情報が表示されるが、変更設計図面がないので変更設計表示部106に表示されることはなく、変更施工状態もないので変更施工表示部108に表示されることもない。   In the case of normal construction, design drawing information is displayed on the design drawing display section 102 of the management file K, and construction photograph information obtained by photographing the construction state is displayed on the construction display section 104, but there is no changed design drawing. It is not displayed on the design display unit 106 and is not displayed on the modified construction display unit 108 because there is no modified construction state.

また、施工不良の場合、図15に示す通り、管理ファイルKの設計図面表示部102に設計図面情報が表示され、また施工表示部104に施工状態(施工不良である状態)を撮影した施工写真情報が表示され、更に施工状態が設計図面の内容と一致するように変更施工されるので変更施工状態(不良を解消した施工状態)の変更施工状態を撮影した変更施工写真情報が変更施工表示部108に表示されるが、変更設計図面がないので変更設計表示部106に表示されることはない。このように管理することによって、施工不良前の状態と施工不良解消後の状態とを記録に残すようになり、その施工工事履歴を画像情報を利用して残すことができる。   In the case of construction failure, as shown in FIG. 15, the design drawing information is displayed on the design drawing display unit 102 of the management file K, and the construction photograph in which the construction state (state of construction failure) is photographed on the construction display unit 104. Information is displayed, and the construction status is changed so that it matches the content of the design drawing. However, since there is no modified design drawing, it is not displayed on the modified design display unit 106. By managing in this way, the state before construction failure and the state after elimination of construction failure are recorded, and the construction history can be left using image information.

このように管理された管理ファイルKも、施主、管理者及び施工業者の承認対象となり(ステップS101)、業務管理ファイルの一部として管理され、例えば、施工不良を解消した時点で、施工業者は管理ファイルKを作成し、この管理ファイルKは、システム管理サーバ10の設計不良登録手段30によってサーバ部14の記録データベース56に記録される。そして、施主、監理者及び施工業者の三者が承認する(ステップS101)と、この管理ファイルKが記録データベース56の承認記録データベース58に登録され、その修正が禁止される。このようにして施工不良のデータが記録として残される。   The management file K managed in this way is also subject to approval by the owner, manager, and contractor (step S101), and is managed as a part of the business management file. A management file K is created, and this management file K is recorded in the recording database 56 of the server unit 14 by the design defect registration means 30 of the system management server 10. Then, when the three of the owner, supervisor, and contractor approve (step S101), this management file K is registered in the approval record database 58 of the record database 56, and its correction is prohibited. In this way, construction failure data remains as a record.

例えば、この基礎工事の例えば地業工程(ステップS99)の作業において設計変更が発生すると、その作業の流れは、図16に示す通りとなる。主として図2とともに図16を参照して、地業工程の工事中に設計変更が発生する、例えば建築物の玄関の場所を変更すると、ステップS100−11からステップS100−12に進み、この設計変更の承認が施主、管理者及び施工業者の三者で行われ、例えば建築物の玄関の位置を変更することについて三者が合意承認する(例えば、施主側端末装置2、管理者側端末装置4及び施工業者側端末装置6によって承認操作される)と、現在行っている工事が中断される(ステップS100−13)。そして、設計変更に関する打合せが行われ(ステップS100−14)、その打合せの議事録が作成され(ステップS100−15)、その議事録の承認が行われる(ステップS100−16)。この承認については、施工不良のときと同様に行われ、例えば施工業者が施工業者側端末装置6を用いて議事録を入力すると、その議事録のデータはサーバ部14の記録データベース56に記録され、施主、監理者及び施工業者の三者が承認すると、この議事録のデータが記録データベース56から承認記録データベース58に登録され、その修正が禁止される。   For example, when a design change occurs in the work of the foundation work, for example, the geotechnical process (step S99), the flow of the work is as shown in FIG. Referring mainly to FIG. 16 together with FIG. 2, when a design change occurs during construction of the geotechnical process, for example, when the location of a building entrance is changed, the process proceeds from step S100-11 to step S100-12, and this design change is made. Is approved by the owner, the manager, and the contractor. For example, the three parties agree and change the position of the entrance of the building (for example, the owner-side terminal device 2 and the administrator-side terminal device 4). If the approval operation is performed by the contractor-side terminal device 6, the current construction is interrupted (step S100-13). Then, a meeting regarding the design change is made (step S100-14), a minutes of the meeting is created (step S100-15), and the minutes are approved (step S100-16). This approval is performed in the same manner as when the construction is defective. For example, when the contractor inputs the minutes using the contractor-side terminal device 6, the minutes data is recorded in the recording database 56 of the server unit 14. When the three parties, the owner, the supervisor, and the contractor approve, the data of the minutes are registered from the record database 56 to the approval record database 58, and the correction thereof is prohibited.

このようにして三者の合意承認が行われると、地業工程の作業に関する工程表の修正が行われ(ステップS100−17)、その承認が上述したと同様に行われ(ステップS100−18)、このうようにして施主、監理者及び施工業者の三者の合意承認が行われると、ステップS100−19に進み、中断していた工事が再開され、通常工事の場合と同様にして以後の工事が行われる。   When the consensus approval of the three parties is performed in this way, the process chart relating to the work of the geotechnical process is corrected (step S100-17), and the approval is performed as described above (step S100-18). In this way, when the agreement of the three parties, the owner, the supervisor, and the contractor is approved, the process proceeds to step S100-19, where the suspended construction is resumed, and the subsequent construction is performed in the same manner as in the normal construction. Construction is carried out.

このときには、工事写真などは図17に示す通りに表示されるように管理される。図17を参照して、施工工事の設計変更には2種類あり、その一つの例は、設計図面に基づいて施工工事を行った後に不備などが生じて設計変更し、変更設計図面に基づいて変更施工する場合である。この場合、図17(a)で示すように表示され、管理ファイルKの設計図面表示部102に設計図面情報が表示され、また施工表示部104に設計図面に基づいて施工工事した施工状態(変更前の施工状態))を撮影した施工写真情報が表示され、また設計変更表示部106に設計変更した変更設計図面が表示され、更に、変更施工表示部108に変更設計図面に基づいて施工された変更施工状態(変更後の施工状態)を撮影した変更施工写真情報が表示される。   At this time, the construction photo is managed so as to be displayed as shown in FIG. Referring to FIG. 17, there are two types of design changes in construction work. One example is that after a construction work is performed based on a design drawing, a design change occurs due to a deficiency or the like. It is a case of changing construction. In this case, as shown in FIG. 17 (a), the design drawing information is displayed on the design drawing display unit 102 of the management file K, and the construction state (change) in which the construction is performed based on the design drawing on the construction display unit 104 The construction photo information obtained by photographing the previous construction state)) is displayed, the modified design drawing changed in design is displayed in the design change display unit 106, and further, the changed construction display unit 108 is constructed based on the changed design drawing. The modified construction photograph information obtained by photographing the modified construction state (construction state after modification) is displayed.

また、設計変更の他の例は、施工工事を行う前に不備などに気付いて設計変更し、変更設計図面に基づいて施工工事を行う場合である。この場合、図17(b)で示すように表示され、管理ファイルKの設計図面表示部102に設計図面情報が表示され、設計変更表示部106に設計変更した変更設計図面が表示され、また変更施工表示部108に変更設計図面に基づいて施工された変更施工状態(設計変更後の施工状態)を撮影した変更施工写真情報が表示されるが、設計図面に基づいて施工工事が行われていないので施工表示部104に表示されることはない。このように管理することによって、設計変更前の状態と設計変更後の状態とを記録に残すようになり、その施工工事履歴を画像情報を利用して残すことができる。   Another example of the design change is a case where a design change is made by noticing a deficiency or the like before construction work is performed, and the construction work is performed based on the changed design drawing. In this case, as shown in FIG. 17B, the design drawing information is displayed on the design drawing display unit 102 of the management file K, the changed design drawing whose design has been changed is displayed on the design change display unit 106, and changed. The construction display unit 108 displays the modified construction photograph information obtained by photographing the modified construction state (construction state after the design change) constructed based on the modified design drawing, but the construction work is not performed based on the design drawing. Therefore, it is not displayed on the construction display unit 104. By managing in this way, the state before the design change and the state after the design change are recorded, and the construction work history can be left using the image information.

このように管理された管理ファイルKも、施主、管理者及び施工業者の承認対象となり(ステップS101)、業務管理ファイルの一部として管理され、例えば、設計変更の施工工事を行った時点で、施工業者は管理ファイルKを作成し、この管理ファイルKは、システム管理サーバ10の設計変更登録手段32によってサーバ部14の記録データベース56に記録される。そして、施主、監理者及び施工業者の三者が承認する(ステップS101)と、この管理ファイルKが記録データベース56の承認記録データベース58に登録され、その修正が禁止され、このようにしてえ設計変更のデータも記録として残される。   The management file K managed in this way is also subject to approval by the owner, administrator, and contractor (step S101), and is managed as part of the business management file. For example, when construction work for design change is performed, The contractor creates a management file K, and this management file K is recorded in the recording database 56 of the server unit 14 by the design change registration means 32 of the system management server 10. Then, when the three of the owner, the supervisor, and the contractor approve (step S101), this management file K is registered in the approval record database 58 of the record database 56, and its modification is prohibited. Change data is also recorded.

このようにして建造された建築物は、その完成後は維持管理の対象物件となり、その維持管理は、図18に示す流れに沿って維持管理される(段階F9)。図2とともに図18を参照して、建築物を維持管理するには、管理者の端末装置(例えば、施工工事の監理者が管理する場合には監理者側端末装置4、また施工業者が管理する場合には施工業者側端末装置6)を用いて維持管理対象項目の選択を行う(ステップS131)。例えば、建築物については3年毎に、昇降機については1年毎に、遊技施設については1年毎にと定期報告期間が法律で定められており、このような維持管理対象項目及びその定期報告期間などは法律知識データベース43に登録されており、この法律知識データベース43から所要の情報を読み出すことによって容易に知ることができる。   The building constructed in this manner becomes a property subject to maintenance after completion, and the maintenance is maintained along the flow shown in FIG. 18 (step F9). Referring to FIG. 18 together with FIG. 2, in order to maintain and manage the building, the terminal device of the manager (for example, when the supervisor of the construction work manages, the supervisor side terminal device 4 or the contractor manages it). When doing so, the maintenance management target item is selected using the contractor side terminal device 6) (step S131). For example, the regular reporting period is stipulated by law every three years for buildings, every year for elevators, and every year for amusement facilities. The period and the like are registered in the legal knowledge database 43, and can be easily known by reading out necessary information from the legal knowledge database 43.

例えば維持管理対象項目として建築物(又は昇降機)を選択した場合、この維持管理対象項目についての維持管理が開始され(ステップS132)、その維持管理の開始日が定期報告資料データベース63に登録され、またコンピュータ部12の期日演算手段39はこの3年毎(又は1年毎)の報告締切期日を演算し(ステップS133)、演算した報告締切期日が管理スケジュールデータベース67に登録される。この維持管理対象項目の選択は、維持管理する建築物に対する全ての項目について行われ、維持管理すべき全対象項目についての維持管理の開始日が登録されるとともに、その維持管理対象項目の提出すべき報告締切期日が管理スケジュールデータベース67に登録される。   For example, when a building (or elevator) is selected as a maintenance management target item, maintenance management for this maintenance management target item is started (step S132), and the start date of the maintenance management is registered in the periodic report data database 63. The due date calculating means 39 of the computer unit 12 calculates the report deadline date every three years (or every year) (step S133), and the calculated report deadline date is registered in the management schedule database 67. This maintenance target item is selected for all items for the building to be maintained, the start date of maintenance for all target items to be maintained is registered, and the maintenance target item is submitted. The deadline for report deadline is registered in the management schedule database 67.

このように維持管理対象項目に対する報告締切期日が演算されると、次に、準備期間設定手段41は、演算して設定された報告締切期日に基づいて報告書作成のための準備期間を演算し、演算した準備期間が維持対象項目に対応させて管理スケジュールデータベース67に登録される(ステップS134)。   When the report deadline for the maintenance target item is calculated in this way, the preparation period setting means 41 calculates the preparation period for preparing the report based on the calculated report deadline. The calculated preparation period is registered in the management schedule database 67 in association with the maintenance target item (step S134).

準備期間として例えば2か月を設定した場合、準備期間設定手段41は、維持管理対象項目に対する報告締切期日の2か月前を準備時間の開始日として演算し、この準備期間開始日から報告締切期日までの間の2か月を報告書を作成するための準備期間として設定し、このような準備期間の設定は、全ての調査対象項目について行われる。尚、この準備期間については管理者側で例えば1か月などと適宜に設定することができるように構成される。   For example, when 2 months is set as the preparation period, the preparation period setting means 41 calculates the start date of preparation time as 2 months before the report deadline date for the maintenance target item, and the report deadline from this preparation period start date. Two months until the due date are set as a preparation period for preparing the report, and such a preparation period is set for all items to be investigated. The preparation period can be set as appropriate, for example, one month on the administrator side.

このようにして維持管理対象項目についての報告締切期日及び準備期間の設定が行われると、管理すべき建築物の維持管理が開始される。そして、維持管理対象項目の少なくとも一つについて報告期間(この実施形態では、報告書作成のための準備期間)が到来すると、ステップS135からステップS136に進み、提出締切期日の近づいた維持管理対象項目についての調査報告書を作成するようになる。尚、報告期間の到来については、管理スケジュールデータベース67で管理するとともに、電子メールなどによって管理担当者の携帯電話、パソコンなどに知らせるようにすることもできる。   When the report deadline and preparation period for the maintenance target items are set in this way, the maintenance management of the building to be managed is started. Then, when a reporting period (in this embodiment, a preparation period for creating a report) has arrived for at least one of the maintenance management target items, the process proceeds from step S135 to step S136, and the maintenance management target item approaching the submission deadline. To come up with a survey report. Note that the arrival of the reporting period can be managed by the management schedule database 67, and can also be notified to the cellular phone or personal computer of the person in charge of management by e-mail or the like.

調査報告書を作成するに際の資料、見積書、申請許可書、図面、写真などは定期報告資料データベース63に登録され、また調査報告書を作成するに際して付近見取図、配置図、各階平面図、建築設備定期調査報告書などが作成され、それらの一部については完成徒手データベース60に登録された情報などが利用され、このようにして所定の調査報告書が作成される。尚、この調査報告書を作成する際に、施工知識データベース44、法律知識データベース43、構造知識データベース45及び計画知識データベース47に登録された情報を利用することによって、管理状況に即した調査報告書を容易に作成することができる。   Documents, quotations, application permits, drawings, photos, etc. when creating a survey report are registered in the periodic report data database 63. Also, when creating a survey report, a nearby sketch, layout, floor plan, A construction facility periodic survey report and the like are created, and information registered in the completed manual database 60 is used for some of them, and a predetermined survey report is created in this way. Incidentally, when creating this investigation report, by utilizing the information registered in the construction knowledge database 44, the legal knowledge database 43, the structural knowledge database 45 and the planning knowledge database 47, the investigation report in accordance with the management situation Can be easily created.

このようにして作成された調査報告書は、所定の官庁などに提出され(ステップS138)、また提出した調査報告書は定期報告記録データベース65に登録され、定期報告記録データベース65の情報を読み出すことによて、後にどのような調査報告書を提出したかを容易に知ることができる。このような調査報告書の作成、提出は建築物件の管理期間が終了するまで行われ、管理期間が終了した時点で建造物の施工管理及び維持管理の全ての管理が終了する。   The survey report created in this way is submitted to a predetermined government office or the like (step S138), and the submitted survey report is registered in the regular report record database 65, and information in the regular report record database 65 is read out. This makes it easy to know what research report was submitted later. Creation and submission of such a survey report is performed until the management period of the building is completed, and all management of construction management and maintenance management of the building is completed when the management period ends.

以上、本発明の施工管理システムの一実施形態について説明したが、本発明はかかる実施形態に限定されるものではなく、本発明の範囲を逸脱することなく種々の変形乃至修正が可能である。   As mentioned above, although one embodiment of the construction management system of the present invention was described, the present invention is not limited to such an embodiment, and various changes and modifications can be made without departing from the scope of the present invention.

例えば、上述した実施形態では、施工工事段階及び施工準備段階にこの施工管理システムを適用しているが、施工ミス、手抜きなどが問題となり易い施工工事段階のみにこの施工管理システムを適用するようにしてもよい。   For example, in the above-described embodiment, this construction management system is applied to the construction work stage and the construction preparation stage. May be.

一実施形態の建築物の施工管理システムの全体を示す概略図。Schematic which shows the whole construction management system of the building of one Embodiment. 図1の施工管理システムにおけるシステム管理サーバを簡略的に示すブロック図。The block diagram which shows simply the system management server in the construction management system of FIG. 図1の施工管理システムによる施工管理の全体を示す工程図。The process figure which shows the whole construction management by the construction management system of FIG. 図3の施工管理における建築物の土地決定までの作業の流れを示すフローチFlow chart showing the flow of work up to the land determination of the building in the construction management of FIG. 図3の施工管理における権利契約の締結までの作業の流れを示すフローチャート。The flowchart which shows the flow of the work until conclusion of the rights contract in the construction management of FIG. 図4の特記仕様のチェックにおける作業の流れを示すフローチャート。The flowchart which shows the flow of the operation | work in the check of the special mention specification of FIG. 図5の特記仕様のチェックにおける画面内容の一例を示す図。The figure which shows an example of the screen content in the check of the special mention specification of FIG. 図3の施工管理における工事着工までの作業の流れを示すフローチャート。The flowchart which shows the flow of the work to the construction start in the construction management of FIG. 図3の施工管理における建築物の完成までの作業の流れを示すフローチャート。The flowchart which shows the flow of the work until completion of the building in the construction management of FIG. 図9の基礎工事における配筋工程までの作業の流れを具体的に示すフローチャート。The flowchart which shows concretely the flow of the work to the bar arrangement process in the foundation construction of FIG. 図1の施工管理システムにおける見積納品確認リストの一例を示す図。The figure which shows an example of the estimated delivery confirmation list in the construction management system of FIG. 図11の見積納品確認リストにおけるリスト品の具体的内容の画面の一例を示す図。The figure which shows an example of the screen of the specific content of the list item in the estimated delivery confirmation list | wrist of FIG. 図9の基礎工事におけるコンクリート打設工程までの作業の流れを具体的に示すフローチャート。The flowchart which shows concretely the flow of the work to the concrete placement process in the foundation construction of FIG. 図10の基礎工事の地業工程において施工不良が発生した場合における作業の流れを示すフローチャート。The flowchart which shows the flow of an operation | work when a construction defect generate | occur | produces in the groundwork process of the foundation construction of FIG. 図14の施工不良が発生した場合における管理ファイルの表示内容を示す簡略図。The simplification figure which shows the display content of the management file when the construction defect of FIG. 14 generate | occur | produces. 図10の基礎工事の地業工程において設計変更が発生した場合における作業の流れを示すフローチャート。The flowchart which shows the flow of an operation | work when a design change generate | occur | produces in the groundwork process of the foundation construction of FIG. 図16の設計変更が発生した場合における管理ファイルの表示内容を示す簡略図。FIG. 17 is a simplified diagram showing display contents of a management file when the design change of FIG. 16 occurs. 図3の施工管理における維持管理工程の作業の流れを示すフローチャート。The flowchart which shows the work flow of the maintenance process in the construction management of FIG.

符号の説明Explanation of symbols

2 施主側端末装置
4 管理者側端末装置
6 施工業者側端末装置
8 インターネット通信網
10 システム管理サーバ
12 コンピュータ部
14 サーバ部
20 承認判定手段
22 修正禁止手段
23 修正完全禁止手段
34 完成図書作成手段
37 建材・材料判定手段
39 期日演算手段
41 期間設定手段
44 施工知識データ部エース
46 業者一覧データベース
52 建材情報データベース
55 建材・材料基準データベース
56 記録データベース
58 承認記録データベース
65 定期報告記録データベース
67 管理スケジュールデータベース
2 Client-side terminal device 4 Manager-side terminal device 6 Contractor-side terminal device 8 Internet communication network 10 System management server 12 Computer unit 14 Server unit 20 Approval determination unit 22 Correction prohibition unit 23 Correction complete prohibition unit 34 Completion book creation unit 37 Construction material / material judgment means 39 Date calculation means 41 Period setting means 44 Construction knowledge data section ACE 46 Contractor list database 52 Construction material information database 55 Construction material / material reference database 56 Recording database 58 Approval record database 65 Periodic report record database 67 Management schedule database

Claims (10)

建築物を依頼する施主側に設けられる施主側端末装置と、建築物を監理する監理者側に設けられる監理側端末装置と、建築物を施工する施工業者側に設けられる施工業者側端末装置と、前記施主側端末装置、前記監理者側端末装置及び前記前記施工業者側端末装置との間で送受信を行うたのシステム管理サーバとを備え、
前記システム管理サーバは、情報を所要の通りに処理するためのコンピュータ部と、情報を記録するためのサーバ部とを備え、前記サーバ部は、施主に関する情報を登録する施主情報データベースと、監理者に関する情報を登録する監理者情報データベースと、施工業者に関する情報を登録する施工業者情報データベースと、建築物の施工工事に関する情報を登録する記録データベースと、前記施工工事の承認に関する承認情報を登録する承認記録データベースとを有し、前記コンピュータ部は、前記サーバ部に情報を登録するためのデータ登録手段と、施主、監理者及び施工業者からの承認を判定するための承認判定手段と、前記承認記録データベースに登録された前記承認情報の修正を禁止するための修正禁止手段とを備え、
建築物を建造する建築施工工程は、建築物を施工する施工業者を決定した後の施工工事段階と、前記施工工事段階の前段階の施工準備段階とに区別され、前記施工工事段階の所定工程終了時において、前記コンピュータ部が前記施主側端末装置、前記監理者側端末装置及び前記施工業者側端末装置からの個別承認信号を受信すると、前記承認判定手段は、施主、監理者及び施工業者の三者が承認したと判定して合意承認信号を生成し、前記前記データ登録手段は、前記合意承認信号に基づいて前記記録データベースに登録された施工工事に関する情報のうち承認された施工工事に関するものを前記承認記録データベースに登録し、前記修正禁止手段は、前記承認記録データベースに登録された施工工事に関する承認情報の修正を禁止することを特徴とする建築物の施工管理システム。
A client-side terminal device provided on the client-side that requests a building, a supervisor-side terminal device provided on the supervisor side that supervises the building, and a contractor-side terminal device provided on the contractor side that constructs the building A system management server for performing transmission / reception between the owner-side terminal device, the supervisor-side terminal device, and the contractor-side terminal device,
The system management server includes a computer unit for processing information as required, and a server unit for recording information. The server unit includes a client information database for registering information about the client, and a supervisor. Approval to register supervisor information database for registering information, contractor information database for registering information about contractors, record database for registering information regarding construction work of buildings, and approval information for approval of construction works A recording database, the computer unit is a data registration unit for registering information in the server unit, an approval determination unit for determining approval from the owner, supervisor and contractor, and the approval record Correction prohibiting means for prohibiting correction of the approval information registered in the database,
The building construction process for building a building is classified into a construction work stage after determining a construction contractor to construct a building and a construction preparation stage before the construction work stage, and a predetermined process in the construction work stage. At the time of termination, when the computer unit receives an individual approval signal from the owner-side terminal device, the supervisor-side terminal device, and the contractor-side terminal device, the approval determination means includes the owner, supervisor, and contractor. It is determined that the three parties have approved, and an agreement approval signal is generated, and the data registration means relates to the approved construction work among the information related to the construction work registered in the record database based on the agreement approval signal. Is registered in the approval record database, and the correction prohibition means prohibits correction of approval information related to construction work registered in the approval record database. Construction management system of the building which is characterized.
前記記録データベースには、更に、前記施工準備段階の施工準備に関する情報が登録され、前記承認記録データベースには、前記施工準備の承認に関する承認情報が登録され、前記コンピュータ部の前記承認判定手段は、前記施工準備段階においても承認判定するように構成され、前記施工準備段階の所定工程終了時において、前記コンピュータ部が前記施主側端末装置及び前記監理者側端末装置からの前記個別承認信号を受信すると、前記承認判定手段は、施主及び監理者の二者が承認したと判定して合意承認信号を生成し、前記前記データ登録手段は、前記合意承認信号に基づいて前記記録データベースに登録された施工準備に関する情報のうち承認された施工準備に関するものを前記承認記録データベースに登録し、前記修正禁止手段は、前記承認記録データベースに登録された施工準備に関する承認情報の修正を禁止することを特徴とする請求項1に記載の建築物の施工管理システム。   In the record database, further information related to the construction preparation in the construction preparation stage is registered, in the approval record database, approval information related to the approval of the construction preparation is registered, and the approval determination means of the computer unit, It is configured to determine approval in the construction preparation stage, and at the end of a predetermined process in the construction preparation stage, the computer unit receives the individual approval signal from the owner side terminal device and the supervisor side terminal device. The approval determination means determines that the two owners and the supervisor have approved, and generates an agreement approval signal, and the data registration means is a construction registered in the recording database based on the agreement approval signal. Of information relating to preparation, information relating to approved construction preparation is registered in the approval record database, and the correction prohibition means , Construction management system of the building according to claim 1, characterized in that prohibiting correction of the approval information regarding the authorized registered construction prepared record database. 前記コンピュータ部は、更に、修正禁止手段の禁止を解除する禁止解除手段を備え、前記施工準備段階において前記コンピュータ部が前記施主側端末装置及び前記監理者側端末装置からの前記個別承認解除信号を受信する、又は前記施工工事段階において前記コンピュータ部が前記施主側端末装置、前記監理者側端末装置及び前記施工業者側端末装置からの個別承認解除信号を受信すると、前記禁止解除手段は前記承認記録データベースに登録された前記施工準備に関する情報又は前記施工工事に関する情報の修正禁止を解除することを特徴とする請求項2に記載の建築物の施工管理システム。   The computer unit further includes a prohibition canceling unit that cancels prohibition of the correction prohibition unit, and the computer unit receives the individual approval cancellation signal from the client side terminal device and the supervisor side terminal device in the construction preparation stage. When receiving the individual approval release signal from the owner-side terminal device, the supervisor-side terminal device, and the contractor-side terminal device in the construction work stage, the prohibition canceling means receives the approval record. The construction management system for buildings according to claim 2, wherein the prohibition of modification of the information relating to the construction preparation registered in the database or the information relating to the construction work is canceled. 前記施工工段階の施工工事に関する情報は、施工工事内容をファイル形式で作成される管理ファイルを含んでおり、前記管理ファイルは、設計図面の情報を表示する設計図面表示部と、設計図面の情報に基づいて施工した状態を表示する施工表示部と、設計図面の内容を変更した変更情報を表示する変更設計図面表示部と、変更設計図面の変更情報に基づいて施工した状態を表示する変更施工表示部とを含んでいることを特徴とする請求項1〜3のいずれかに記載の建築物の施工管理システム。   The information related to the construction work in the construction stage includes a management file in which the construction contents are created in a file format, and the management file includes a design drawing display unit for displaying design drawing information and design drawing information. The construction display part that displays the state of construction based on the design, the modified design drawing display part that displays the change information that changed the contents of the design drawing, and the modified construction that displays the state of construction based on the change information of the modified design drawing The building construction management system according to claim 1, further comprising a display unit. 前記サーバ部は、更に、施工準備及び/又は施工工事に関連する情報が登録された施工知識データベースと、建材に関する情報が登録された建材情報データベースと、建築物に関連する業者に関する情報が登録された業者一覧データベースとを備え、前記施主側端末装置、前記監理者側端末装置及び前記施工業者側端末装置から前記施工知識データベース、前記建材データベース及び前記業者一覧データベースにアクセス可能であることを特徴とする請求項1〜4のいずれかに記載の建築物の施工管理システム。   The server unit is further registered with a construction knowledge database in which information relating to construction preparation and / or construction work is registered, a building material information database in which information on building materials is registered, and information on contractors related to buildings. The contractor list database, and the construction knowledge database, the building material database, and the contractor list database are accessible from the owner side terminal device, the supervisor side terminal device, and the contractor side terminal device. The building construction management system according to any one of claims 1 to 4. 前記コンピュータ部は、更に、前記サーバ部に登録された情報を出力するためのデータ出力手段を備え、前記サーバ部は、建築物の完成図書に関する情報を登録する完成図書データベースを含み、建築物の完了検査が承認された時点で、前記承認記録データベースに登録された承認記録情報が、完成図書情報として前記完成図書データベースに登録され、前記完成図書データベースに登録された完成図書情報は、前記データ出力手段により出力されることを特徴とする請求項1〜5のいずれかに記載の建築物の施工管理システム。   The computer unit further includes data output means for outputting information registered in the server unit, and the server unit includes a completed book database for registering information on a completed book of a building, When the completion inspection is approved, the approval record information registered in the approval record database is registered in the completed book database as completed book information, and the completed book information registered in the completed book database is the data output The building construction management system according to any one of claims 1 to 5, wherein the construction management system is output by means. 前記コンピュータ部は、データの修正を完全に禁止するための修正完全禁止手段を備え、前記承認記録情報が完全図書情報として前記完成図書データベースに登録されると、前記修正完全禁止手段は、前記記録データベース、前記承認記録データベース及び前記完成図書データベースに登録された情報の修正を完全に禁止することを特徴とする請求項6に記載の建築物の施工管理システム。   The computer unit includes a correction complete prohibition unit for completely prohibiting correction of data, and when the approval record information is registered in the completed book database as complete book information, the correction complete prohibition unit 7. The construction management system for a building according to claim 6, wherein modification of information registered in the database, the approval record database, and the completed book database is completely prohibited. 前記サーバ部は、建材及び/又は材料の判定基準が登録された建材・材料基準データベースを備え、また前記コンピュータ部は、建材及び/又は材料の標準建材及び/又は標準材料を選定する標準品選定手段と、建材及び/又は材料を判定するための建材・材料判定手段を含んでおり、特記仕様の建材及び/又は材料を選定しないときには、前記標準品選定手段は、前記建材・材料基準データベースに登録された標準建材及び/又は標準材料を選定し、また特記仕様の建材及び/又は材料を選定したときには、前記建材・材料判定手段は、前記建材・材料データベースに登録された判定基準に基づいて選定した建材及び/又は材料が前記特記仕様を満足するかを判定することを特徴とする請求項1〜8のいずれかに記載の建築物の施工管理システム。   The server unit includes a building material / material reference database in which building material and / or material judgment criteria are registered, and the computer unit selects a standard building material and / or standard material for the building material and / or material. And a building material / material judging means for judging the building material and / or material. When the building material and / or material of special specification is not selected, the standard product selecting means is stored in the building material / material reference database. When a registered standard building material and / or standard material is selected, and a building material and / or material having a special specification is selected, the building material / material judging means is based on a judgment standard registered in the building material / material database. It is determined whether the selected building material and / or material satisfies the above-mentioned special specification, The construction management system for a building according to any one of claims 1 to 8, Temu. 建築物を施工する施工現場には、建築物を撮影するためのカメラ手段が設置され、前記サーバ部は、前記カメラ手段からの画像情報を登録する画像記録データベースを有し、前記カメラ手段からの画像情報又は前記画像記録データベースに登録された画像情報が、前記施主側端末装置、前記監理者側端末装置及び前記施工業者側端末装置に送信可能であることを特徴とする請求項1〜8のいずれかに記載の建築物の施工管理システム。   At the construction site where the building is constructed, camera means for photographing the building is installed, and the server unit has an image recording database for registering image information from the camera means, and from the camera means The image information or image information registered in the image recording database can be transmitted to the owner-side terminal device, the supervisor-side terminal device, and the contractor-side terminal device. A construction management system for a building according to any of the above. 前記建築施工行程の後に、建造した建築物を管理する建築物維持管理工程が行われ、この建築物維持管理工程に関連して、前記サーバ部は、管理のスケジュールに関する情報が登録される管理スケジュールデータベースと、定期報告書に関する情報が登録される定期報告記録データベースを含み、前記コンピュータ部は、維持管理対象項目に基づいて管理報告期日を演算する期日演算手段と、前記期日演算手段により演算された管理報告期日に基づいて報告準備期間を設定する準備期間設定手段とを含み、前記管理報告期日及び前記報告準備期間が前記管理スケジュールデータベースに登録され、前記報告準備期間中に作成された定期報告書が前記定期報告記録データベースに登録されることを特徴とする請求項1〜9のいずれかに記載の建築物の施工管理システム。   After the building construction process, a building maintenance management process for managing the built building is performed, and in relation to the building maintenance management process, the server unit is a management schedule in which information related to the management schedule is registered. Including a database and a periodic report recording database in which information related to the periodic report is registered, the computer unit being calculated by the due date calculating means for calculating the management report due date based on the maintenance management target item, and the due date calculating means And a preparation period setting means for setting a report preparation period on the basis of a management report date, the management report date and the report preparation period are registered in the management schedule database, and a periodic report created during the report preparation period Is registered in the periodic report record database. The building according to any one of claims 1 to 9, Construction management system of things.
JP2008122725A 2007-09-03 2008-05-08 Construction management system of building Withdrawn JP2009134685A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008122725A JP2009134685A (en) 2007-09-03 2008-05-08 Construction management system of building

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2007227595 2007-09-03
JP2007290187 2007-11-07
JP2008122725A JP2009134685A (en) 2007-09-03 2008-05-08 Construction management system of building

Publications (1)

Publication Number Publication Date
JP2009134685A true JP2009134685A (en) 2009-06-18

Family

ID=40866480

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008122725A Withdrawn JP2009134685A (en) 2007-09-03 2008-05-08 Construction management system of building

Country Status (1)

Country Link
JP (1) JP2009134685A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100992077B1 (en) * 2010-02-24 2010-11-04 (주)에스알파트너즈 A system and method for testing standard of industry foundation classes in architecture engineering construction
JP2011081649A (en) * 2009-10-08 2011-04-21 Sumikin System Buildings Corp Application document preparation system for standard system building linked with estimation system and structural design system
JP2013030061A (en) * 2011-07-29 2013-02-07 Nomura Research Institute Ltd Operation management support device
JP2014120054A (en) * 2012-12-18 2014-06-30 Hitachi Building Systems Co Ltd Achievement registration management system for building facility maintenance work
JP2015036887A (en) * 2013-08-13 2015-02-23 富士通株式会社 Purchase service providing apparatus, purchase service providing method, and purchase service providing program
JP2016110658A (en) * 2014-07-30 2016-06-20 明豊ファシリティワークス株式会社 Project progressing situation management system and computer program
JP2017045159A (en) * 2015-08-25 2017-03-02 株式会社Rings Information management system
JP2017157226A (en) * 2017-05-01 2017-09-07 富士通株式会社 Payment request service providing program, method, and apparatus
KR20180082168A (en) * 2017-01-10 2018-07-18 주식회사 한화건설 Method and system for inspection business use solution
WO2019003533A1 (en) * 2017-06-26 2019-01-03 日立オートモティブシステムズ株式会社 Parking assistance device
JP2019073862A (en) * 2017-10-12 2019-05-16 學 神出 Construction method of wooden house and certification method that wooden house built on the based on method
CN109816255A (en) * 2019-01-29 2019-05-28 珠海金慧科技有限公司 Self iteration intelligent algorithm of house ornamentation construction reference
CN109947805A (en) * 2019-03-22 2019-06-28 国网上海市电力公司 A kind of engineering project process management system and its management method
JP2020095445A (en) * 2018-12-12 2020-06-18 ジャパンパイル株式会社 Construction management server, management system for construction data, program for construction management server
CN111667224A (en) * 2019-03-05 2020-09-15 王民峰 APP for dynamically managing engineering construction based on project division at multiple terminals
CN112365151A (en) * 2020-11-09 2021-02-12 重庆智慧之源科技有限公司 Intelligent detection system for building concealed engineering
KR20210026633A (en) * 2019-08-30 2021-03-10 주식회사 이수시스템 Change management method and system for managing change elements utilizing drawing information
KR20210148833A (en) * 2020-06-01 2021-12-08 김예진 Personal direct construction service provision system
CN114240368A (en) * 2021-12-16 2022-03-25 江苏润通项目管理有限公司 Intelligent supervision method and system based on block chain technology
CN116290150A (en) * 2023-05-25 2023-06-23 广东省建设工程质量安全检测总站有限公司 On-line detection method and system for foundation of building engineering

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011081649A (en) * 2009-10-08 2011-04-21 Sumikin System Buildings Corp Application document preparation system for standard system building linked with estimation system and structural design system
KR100992077B1 (en) * 2010-02-24 2010-11-04 (주)에스알파트너즈 A system and method for testing standard of industry foundation classes in architecture engineering construction
JP2013030061A (en) * 2011-07-29 2013-02-07 Nomura Research Institute Ltd Operation management support device
JP2014120054A (en) * 2012-12-18 2014-06-30 Hitachi Building Systems Co Ltd Achievement registration management system for building facility maintenance work
JP2015036887A (en) * 2013-08-13 2015-02-23 富士通株式会社 Purchase service providing apparatus, purchase service providing method, and purchase service providing program
JP2016110658A (en) * 2014-07-30 2016-06-20 明豊ファシリティワークス株式会社 Project progressing situation management system and computer program
JP2017054530A (en) * 2014-07-30 2017-03-16 明豊ファシリティワークス株式会社 Project current status management system
JP2017045159A (en) * 2015-08-25 2017-03-02 株式会社Rings Information management system
KR101887056B1 (en) * 2017-01-10 2018-09-10 주식회사 한화건설 Method and system for inspection business use solution
KR20180082168A (en) * 2017-01-10 2018-07-18 주식회사 한화건설 Method and system for inspection business use solution
JP2017157226A (en) * 2017-05-01 2017-09-07 富士通株式会社 Payment request service providing program, method, and apparatus
US10974735B2 (en) 2017-06-26 2021-04-13 Hitachi Automotive Systems, Ltd. Parking assistance device
WO2019003533A1 (en) * 2017-06-26 2019-01-03 日立オートモティブシステムズ株式会社 Parking assistance device
JPWO2019003533A1 (en) * 2017-06-26 2019-12-12 日立オートモティブシステムズ株式会社 Parking assistance device
CN110753646A (en) * 2017-06-26 2020-02-04 日立汽车系统株式会社 Parking assist apparatus
US20200101984A1 (en) * 2017-06-26 2020-04-02 Hitachi Automotive Systems, Ltd. Parking assistance device
CN110753646B (en) * 2017-06-26 2022-11-25 日立安斯泰莫株式会社 Parking assist apparatus
JP2019073862A (en) * 2017-10-12 2019-05-16 學 神出 Construction method of wooden house and certification method that wooden house built on the based on method
JP2020095445A (en) * 2018-12-12 2020-06-18 ジャパンパイル株式会社 Construction management server, management system for construction data, program for construction management server
CN109816255A (en) * 2019-01-29 2019-05-28 珠海金慧科技有限公司 Self iteration intelligent algorithm of house ornamentation construction reference
CN111667224A (en) * 2019-03-05 2020-09-15 王民峰 APP for dynamically managing engineering construction based on project division at multiple terminals
CN109947805A (en) * 2019-03-22 2019-06-28 国网上海市电力公司 A kind of engineering project process management system and its management method
KR20210026633A (en) * 2019-08-30 2021-03-10 주식회사 이수시스템 Change management method and system for managing change elements utilizing drawing information
KR102340049B1 (en) * 2019-08-30 2021-12-17 주식회사 이수시스템 Change management method and system for managing change elements utilizing drawing information
KR20210148833A (en) * 2020-06-01 2021-12-08 김예진 Personal direct construction service provision system
KR102534928B1 (en) * 2020-06-01 2023-05-22 김예진 Personal direct construction service provision system
CN112365151A (en) * 2020-11-09 2021-02-12 重庆智慧之源科技有限公司 Intelligent detection system for building concealed engineering
CN114240368A (en) * 2021-12-16 2022-03-25 江苏润通项目管理有限公司 Intelligent supervision method and system based on block chain technology
CN116290150A (en) * 2023-05-25 2023-06-23 广东省建设工程质量安全检测总站有限公司 On-line detection method and system for foundation of building engineering
CN116290150B (en) * 2023-05-25 2023-07-21 广东省建设工程质量安全检测总站有限公司 On-line detection method and system for foundation of building engineering

Similar Documents

Publication Publication Date Title
JP2009134685A (en) Construction management system of building
Towey Construction quantity surveying: a practical guide for the contractor's QS
US9152934B2 (en) Arrangements for administrating and managing a construction project
US6826539B2 (en) Virtual structure data repository and directory
Lu et al. Demystifying construction project time–effort distribution curves: BIM and non-BIM comparison
US20010027407A1 (en) Control and inquiry system for construction work
US20140278705A1 (en) Hierarchical Workflow Management System
WO2006073406A1 (en) System and method for automated management of custom home design and build projects
KR20090072385A (en) Supporting system for integrated decision making of construction project and method of the same
US20100287092A1 (en) Method and system for real estate loan administration
Jin et al. Exploring the potential of technological innovations for temporary structures: A survey study
JP4602819B2 (en) Pile construction management method, pile construction management system, and management server for pile construction management system
CA2602180A1 (en) System and method for field management using radio frequency tags
JP4252196B2 (en) Construction inspection system, construction inspection information display device, and construction inspection method for buildings
JP2007279993A (en) Quality management method by construction inspection
JP3208133B2 (en) Building systems
Pheng Project Management for the Built Environment
US20130144677A1 (en) Workflow automation system and method for construction industry
US8346582B1 (en) System for facilitating a project between contractors and owners
Lee et al. Preparation of tender for building conservation work–current practices in Malaysia
Cheetham et al. The challenge of assuring quality on site: British construction site quality assurance case study
Pheng et al. Project Scope Management
JP2002288272A (en) Management system for putting civil engineering work into effect
Duta Government of India
Holm A Contractor's Guide to Planning, Scheduling, and Control

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110418

A072 Dismissal of procedure [no reply to invitation to correct request for examination]

Free format text: JAPANESE INTERMEDIATE CODE: A073

Effective date: 20120821

A300 Application deemed to be withdrawn because no request for examination was validly filed

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20120904