KR102294304B1 - Banister - Google Patents

Banister Download PDF

Info

Publication number
KR102294304B1
KR102294304B1 KR1020200017359A KR20200017359A KR102294304B1 KR 102294304 B1 KR102294304 B1 KR 102294304B1 KR 1020200017359 A KR1020200017359 A KR 1020200017359A KR 20200017359 A KR20200017359 A KR 20200017359A KR 102294304 B1 KR102294304 B1 KR 102294304B1
Authority
KR
South Korea
Prior art keywords
pipe
main body
fastening
fastening part
present
Prior art date
Application number
KR1020200017359A
Other languages
Korean (ko)
Other versions
KR20210010299A (en
Inventor
채다인
Original Assignee
채다인
주식회사 액세스나인
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020190086877A external-priority patent/KR102086713B1/en
Application filed by 채다인, 주식회사 액세스나인 filed Critical 채다인
Priority to KR1020200017359A priority Critical patent/KR102294304B1/en
Publication of KR20210010299A publication Critical patent/KR20210010299A/en
Application granted granted Critical
Publication of KR102294304B1 publication Critical patent/KR102294304B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G2005/148Railings latticed or netted

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

본 발명은 난간틀에 관한 것으로, 본 발명에 따른 난간틀은 서로 나란하게 배치된 제1 파이프(110)와 제2 파이프(120)를 포함하는 비계(100) 등에 결합되는 것으로, 제1 파이프(110)와 제2 파이프(120) 사이에 배치되어, 제1 파이프(110)와 제2 파이프(120) 사이의 공간을 커버하는 본체(200), 본체(200)의 일측에 구비되어, 제1 파이프(110)에 분리가능하게 체결되는 제1 체결부(300), 및 본체(200)의 타측에 구비되어, 제2 파이프(120)에 분리가능하게 체결되는 제2 체결부(400)를 포함한다.The present invention relates to a handrail frame, and the handrail frame according to the present invention is coupled to a scaffold 100 including a first pipe 110 and a second pipe 120 arranged in parallel with each other, and the first pipe ( The body 200 is disposed between the 110 and the second pipe 120 and covers the space between the first pipe 110 and the second pipe 120, and is provided on one side of the body 200, the first It includes a first fastening part 300 separably fastened to the pipe 110 , and a second fastening part 400 provided on the other side of the main body 200 to be detachably fastened to the second pipe 120 . do.

Description

난간틀{Banister}handrail {Banister}

본 발명은 난간틀에 관한 것이다.The present invention relates to a balustrade.

비계는 건설, 건축 등의 산업현장에서 쓰이는 가설 발판이나 시설물 유지 관리를 위해서 사람, 장비, 자재 등을 올려 작업할 수 있도록 임시로 설치한 가시설물을 의미한다. Scaffolding refers to temporary scaffolding used in industrial sites such as construction and construction, or temporary facilities that are temporarily installed so that people, equipment, materials, etc.

일반적으로, 건축물의 시공시 사용하는 비계는 수직파이프와 수평파이프를 조합하여 기본골격을 형성하고, 수평파이프에 발판이 설치된다. 이때, 비계에는 작업자나 자재 등의 추락을 방지하기 위해서 측면에 안전망 등이 설치될 수 있다. 하지만, 종래기술에 따른 안전망은 쉽게 찢어지거나 파손될 수 있고, 이와 같이 안전망이 찢어지거나 파손되는 경우 작업자나 자재 등의 추락을 방지할 수 없는 문제점이 존재한다.In general, scaffolding used in the construction of a building forms a basic skeleton by combining a vertical pipe and a horizontal pipe, and a scaffold is installed in the horizontal pipe. In this case, a safety net may be installed on the side of the scaffold to prevent a worker or material from falling. However, the safety net according to the prior art may be easily torn or damaged, and when the safety net is torn or damaged in this way, there is a problem in that it is not possible to prevent a fall of a worker or material.

한편, 선행기술문헌의 특허문헌에 개시된 바와 같이, 작업자의 발빠짐이나 자재의 추락 등을 방지하기 하기 위해서 발판의 측면에 직립되는 토보드(toe board)를 설치하는 기술도 개발되었다. 하지만, 토보드는 발판으로부터 낮은 높이로만 설치되므로, 작업자나 자재 등의 추락을 완벽히 방지하기 어렵다.On the other hand, as disclosed in the patent document of the prior art document, a technique for installing a toe board upright on the side of the footrest in order to prevent the worker from falling off or falling of the material has also been developed. However, since the toe board is installed only at a low height from the footrest, it is difficult to completely prevent a worker or material from falling.

KRUS 10-197970010-1979700 B1B1

본 발명은 상술한 종래기술의 문제점을 해결하기 위한 것으로, 본 발명의 일측면은 나란히 설치된 2개의 파이프 사이의 공간을 본체를 이용하여 커버함으로써, 작업자나 자재 등의 추락을 완벽히 방지할 수 있는 난간틀에 관한 것이다.The present invention is to solve the problems of the prior art described above, and one aspect of the present invention is to cover the space between two pipes installed side by side using the main body, thereby completely preventing the fall of workers or materials. It's about the frame.

본 발명의 실시예에 따른 나간틀은 서로 나란하게 배치된 제1 파이프와 제2 파이프에 결합되는 것으로, 상기 제1 파이프와 상기 제2 파이프 사이에 배치되어, 상기 제1 파이프와 상기 제2 파이프 사이의 공간을 커버하는 본체, 상기 본체의 일측에 구비되어, 상기 제1 파이프에 분리가능하게 체결되는 제1 체결부, 및 상기 본체의 타측에 구비되어, 상기 제2 파이프에 분리가능하게 체결되는 제2 체결부를 포함한다.The balustrade according to an embodiment of the present invention is coupled to a first pipe and a second pipe arranged in parallel with each other, and is disposed between the first pipe and the second pipe, and the first pipe and the second pipe a main body covering the space between the main body, a first fastening part provided on one side of the main body to be detachably fastened to the first pipe, and a first fastening part provided on the other side of the main body to be detachably fastened to the second pipe and a second fastening part.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 제1 체결부는 상기 제1 파이프를 둘러싸도록 연장되되, 상기 제2 파이프로부터 멀어지는 방향으로 개방된 제1 개방부가 형성되고, 상기 제2 체결부는 상기 제2 파이프를 둘러싸도록 연장되되, 상기 제1 파이프 및 상기 제2 파이프와 평행한 가상면에 수직 방향으로 개방된 제2 개방부가 형성된다.In addition, in the balustrade according to an embodiment of the present invention, the first fastening part is extended to surround the first pipe, a first opening part opened in a direction away from the second pipe is formed, and the second fastening part is formed. The portion extends to surround the second pipe, and a second opening portion opened in a vertical direction is formed on an imaginary surface parallel to the first pipe and the second pipe.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 제1 개방부를 통해서 상기 제1 체결부에 상기 제1 파이프가 삽입된 후, 상기 본체가 회전되어 상기 제2 개방부를 통해서 상기 제2 체결부에 상기 제2 파이프가 삽입된다.In addition, in the balustrade according to the embodiment of the present invention, after the first pipe is inserted into the first fastening part through the first opening part, the main body is rotated and the second fastening part is performed through the second opening part. The second pipe is inserted into the part.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 제1 체결부는 상기 제1 체결부에 상기 본체로부터 멀어지는 방향으로 탄성력을 제공하는 탄성부를 포함한다.In addition, in the gantry frame according to an embodiment of the present invention, the first fastening part includes an elastic part that provides an elastic force in a direction away from the main body to the first fastening part.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 제1 파이프와 접촉하는 상기 제1 체결부의 면 중 상기 본체와 가장 가까운 면을 제1 소정면이라고 정의하고, 상기 제2 파이프와 접촉하는 상기 제2 체결부의 면 중 상기 본체와 가장 가까운 면을 제2 소정면이라고 정의할 때, 상기 제1 소정면과 상기 제2 소정면 사이의 거리는 상기 제1 파이프와 상기 제2 파이프 사이의 거리보다 멀다.In addition, in the balustrade according to an embodiment of the present invention, a surface closest to the main body among the surfaces of the first fastening part in contact with the first pipe is defined as a first predetermined surface, and the surface in contact with the second pipe is defined as a first predetermined surface. When a surface of the second fastening part closest to the main body is defined as a second predetermined surface, the distance between the first predetermined surface and the second predetermined surface is greater than the distance between the first pipe and the second pipe.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 제1 체결부는, 일측에 상기 제1 개방부가 형성되어 상기 제1 파이프가 결합되는 U자형의 제1 결합부, 및 상기 제1 결합부와 상기 본체 사이에 배치되어 상기 제1 결합부와 상기 본체 사이에 탄성력을 제공하는 탄성부를 포함한다.In addition, in the balustrade according to an embodiment of the present invention, the first coupling part, the first opening part is formed on one side of the first U-shaped first coupling part to which the first pipe is coupled, and the first coupling part and an elastic part disposed between the main body and providing an elastic force between the first coupling part and the main body.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 탄성부는 판형으로 형성되되, 상기 본체로부터 상기 제1 결합부 방향으로 연장되면서 절곡된다.In addition, in the spiral frame according to an embodiment of the present invention, the elastic part is formed in a plate shape, and is bent while extending from the main body in the direction of the first coupling part.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 탄성부는 상기 제1 파이프 및 상기 제2 파이프와 평행한 가상면에 수직인 일방향을 향하도록 연장되다가, 절곡된 후, 상기 일방향과 반대인 타방향을 향하도록 연장된다.In addition, in the balustrade according to an embodiment of the present invention, the elastic part extends to face one direction perpendicular to a virtual plane parallel to the first pipe and the second pipe, is bent, and then is opposite to the one direction extended to face the other direction.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 본체의 일측과 상기 제1 체결부 중 어느 하나에는 제1 고정홀이 형성되고, 상기 본체의 일측과 상기 제1 체결부 중 다른 하나에는 상기 제1 고정홀에 삽입되는 제1 고정돌기가 형성되며, 상기 본체의 타측과 상기 제2 체결부 중 어느 하나에는 제2 고정홀이 형성되고, 상기 본체의 타측과 상기 제2 체결부 중 다른 하나에는 상기 제2 고정홀에 삽입되는 제2 고정돌기가 형성된다.In addition, in the balustrade according to an embodiment of the present invention, a first fixing hole is formed in one of the one side of the main body and the first fastening part, and the other one of the one side of the main body and the first fastening part is in the other of the first fastening part. A first fixing protrusion to be inserted into the first fixing hole is formed, and a second fixing hole is formed in any one of the other side of the main body and the second fastening part, and the other of the other side of the main body and the second fastening part is formed. One is formed with a second fixing protrusion inserted into the second fixing hole.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 본체의 일측에 상기 제1 고정홀이 형성되고, 상기 제1 체결부에 상기 제1 고정돌기가 형성될 때, 상기 제1 고정돌기는 N개(N은 자연수)가 형성되고, 상기 제1 고정홀은 상기 본체의 길이방향을 따라 N개를 초과하는 M개(M은 자연수)가 형성되며, 상기 본체의 타측에 상기 제2 고정홀이 형성되고, 상기 제2 체결부에 상기 제2 고정돌기가 형성될 때, 상기 제2 고절돌기는 L개(L은 자연수)가 형성되고, 상기 제2 고정홀은 상기 본체의 길이방향을 따라 L개를 초과하는 P개(P는 자연수)가 형성된다.In addition, in the handrail according to an embodiment of the present invention, when the first fixing hole is formed on one side of the main body and the first fixing projection is formed in the first fastening part, the first fixing projection is N pieces (N is a natural number) are formed, and M pieces (M is a natural number) exceeding N pieces are formed in the first fixing hole in the longitudinal direction of the body, and the second fixing hole is formed on the other side of the body. is formed, and when the second fixing protrusion is formed in the second fastening part, L (L is a natural number) number of the second high notch protrusion is formed, and the second fixing hole is formed along the longitudinal direction of the main body. P pieces (P is a natural number) exceeding L pieces are formed.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 본체의 일측에 상기 제1 고정홀이 형성되고, 상기 제1 체결부에 상기 제1 고정돌기가 형성되며, 상기 제1 체결부가 상기 본체의 외측에 결합될 때, 상기 제1 고정돌기의 말단에는 후크 형상의 제1 후크부가 형성되고, 상기 본체의 내측에는 상기 본체로부터 돌출되어 상기 제1 후크부가 걸리는 제1 돌출부가 형성되며, 상기 본체의 타측에 상기 제2 고정홀이 형성되고, 상기 제2 체결부에 상기 제2 고정돌기가 형성되며, 상기 제2 체결부가 상기 본체의 외측에 결합될 때, 상기 제2 고정돌기의 말단에는 후크 형상의 제2 후크부가 형성되고, 상기 본체의 내측에는 상기 본체로부터 돌출되어 상기 제2 후크부가 걸리는 제2 돌출부가 형성된다.In addition, in the handrail according to an embodiment of the present invention, the first fixing hole is formed on one side of the main body, the first fixing protrusion is formed in the first fastening part, and the first fastening part is the main body When coupled to the outside of the first hook-shaped first hook portion is formed at the distal end of the first fixing protrusion, the inner side of the main body is formed with a first protrusion protruding from the main body to catch the first hook portion, the main body The second fixing hole is formed on the other side of the, and the second fixing protrusion is formed in the second fastening part, and when the second fastening part is coupled to the outside of the main body, the end of the second fixing protrusion has a hook A second hook part having a shape is formed, and a second protrusion protruding from the main body and hooking the second hook part is formed inside the main body.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 제2 체결부에는 상기 본체의 타측과 마주보도록 돌출된 제3 돌출부가 형성된다.In addition, in the gantry frame according to an embodiment of the present invention, a third protrusion protruding to face the other side of the main body is formed in the second fastening portion.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 본체에는 소정의 패턴을 이루는 다수의 관통홀이 형성된다.In addition, in the balustrade according to the embodiment of the present invention, a plurality of through-holes forming a predetermined pattern are formed in the main body.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 다수의 상기 관통홀은 상기 본체 중 상기 제1 파이프로부터 소정거리 이상의 영역에만 형성된다.In addition, in the balustrade according to the embodiment of the present invention, the plurality of the through-holes are formed only in an area of the main body that is at least a predetermined distance from the first pipe.

또한, 본 발명의 실시예에 따른 나간틀에 있어서, 상기 본체 중 상기 제1 파이프로부터 소정거리 이내에는 판형부재가 구비된다.In addition, in the balustrade according to an embodiment of the present invention, a plate-shaped member is provided within a predetermined distance from the first pipe of the main body.

본 발명의 특징 및 이점들은 첨부도면에 의거한 다음의 상세한 설명으로 더욱 명백해질 것이다.The features and advantages of the present invention will become more apparent from the following detailed description taken in conjunction with the accompanying drawings.

이에 앞서 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이고 사전적인 의미로 해석되어서는 아니되며, 발명자가 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합되는 의미와 개념으로 해석되어야만 한다. Prior to this, the terms or words used in the present specification and claims should not be construed as conventional and dictionary meanings, and the inventor may properly define the concept of the term to describe his invention in the best way. It should be interpreted as meaning and concept consistent with the technical idea of the present invention based on the principle that there is.

본 발명에 따르면, 나란히 설치된 2개의 파이프 사이의 공간을 본체를 이용하여 커버함으로써, 작업자나 자재 등의 추락을 완벽히 방지할 수 있는 장점이 있다.According to the present invention, by covering the space between the two pipes installed side by side using the main body, there is an advantage that can completely prevent the fall of the worker or material.

또한, 본 발명에 따르면, 제1,2 체결부를 채용함으로써, 본체를 2개의 파이프에 쉽게 체결하고 분리할 수 있는 효과가 있다.In addition, according to the present invention, by employing the first and second fastening parts, there is an effect that the body can be easily fastened to and separated from the two pipes.

도 1은 본 발명의 실시예에 따른 난간틀이 설치된 비계의 사시도,
도 2는 본 발명의 실시예에 따른 난간틀의 정면도,
도 3은 본 발명의 실시예에 따른 난간틀의 사시도,
도 4 내지 도 5는 본 발명의 실시예에 따른 난간틀의 체결과정을 도시한 사시도, 및
도 6 내지 도 7은 본 발명의 실시예에 따른 난간틀의 체결과정을 도시한 측면도이다.
1 is a perspective view of a scaffold installed with a handrail according to an embodiment of the present invention;
2 is a front view of a handrail frame according to an embodiment of the present invention;
3 is a perspective view of a handrail frame according to an embodiment of the present invention;
4 to 5 are perspective views illustrating a fastening process of a handrail frame according to an embodiment of the present invention, and
6 to 7 are side views illustrating a fastening process of the handrail frame according to an embodiment of the present invention.

본 발명의 목적, 특정한 장점들 및 신규한 특징들은 첨부된 도면들과 연관되어지는 이하의 상세한 설명과 바람직한 실시예들로부터 더욱 명백해질 것이다. 본 명세서에서 각 도면의 구성요소들에 참조번호를 부가함에 있어서, 동일한 구성 요소들에 한해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 번호를 가지도록 하고 있음에 유의하여야 한다. 또한, "제1", "제2" 등의 용어는 하나의 구성요소를 다른 구성요소로부터 구별하기 위해 사용되는 것으로, 구성요소가 상기 용어들에 의해 제한되는 것은 아니다. 이하, 본 발명을 설명함에 있어서, 본 발명의 요지를 불필요하게 흐릴 수 있는 관련된 공지 기술에 대한 상세한 설명은 생략한다.The objects, specific advantages and novel features of the present invention will become more apparent from the following detailed description taken in conjunction with the accompanying drawings and preferred embodiments. In the present specification, in adding reference numbers to the components of each drawing, it should be noted that only the same components are given the same number as possible even though they are indicated on different drawings. Also, terms such as “first” and “second” are used to distinguish one component from another, and the component is not limited by the terms. Hereinafter, in describing the present invention, detailed descriptions of related known technologies that may unnecessarily obscure the gist of the present invention will be omitted.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시형태를 상세히 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 2는 본 발명의 실시예에 따른 난간틀의 사시도이다. 도 1 내지 도 2에 도시된 바와 같이, 본 실시예에 따른 난간틀은 서로 나란하게 배치된 제1 파이프(110)와 제2 파이프(120)를 포함하는 비계(100) 등에 결합되는 것으로, 제1 파이프(110)와 제2 파이프(120) 사이에 배치되어, 제1 파이프(110)와 제2 파이프(120) 사이의 공간을 커버하는 본체(200), 본체(200)의 일측에 구비되어, 제1 파이프(110)에 분리가능하게 체결되는 제1 체결부(300), 및 본체(200)의 타측에 구비되어, 제2 파이프(120)에 분리가능하게 체결되는 제2 체결부(400)를 포함한다.1 to 2 are perspective views of a handrail frame according to an embodiment of the present invention. 1 to 2, the handrail frame according to this embodiment is coupled to a scaffold 100 including a first pipe 110 and a second pipe 120 arranged in parallel with each other, and the second It is disposed between the first pipe 110 and the second pipe 120 and is provided on one side of the body 200 and the body 200 to cover the space between the first pipe 110 and the second pipe 120 . , a first fastening part 300 separably fastened to the first pipe 110 , and a second fastening part 400 provided on the other side of the main body 200 to be detachably fastened to the second pipe 120 . ) is included.

여기서, 본 실시예에 따른 난간틀은 공사현장에서 사용되는 비계(100, 도 1 참조)등에 설치될 수 있다. 비계(100)는 다수의 수직파이프(140)와 수평파이프(130)가 상호 결합되어 형성되는 것으로, 수평파이프(130)에는 작업자가 이동할 수 있도록 발판(150)이 결합될 수 있다. 이때, 본 실시예에 따른 난간틀은 발판(150)의 상측 공간 측면에 직립되도록 배치될 수 있다. 이러한 난간틀은 본체(200), 제1 체결부(300), 및 제2 체결부(400)를 포함하는데, 이하에서는 각 구성을 구체적으로 설명하도록 한다.Here, the handrail frame according to the present embodiment may be installed on a scaffold (100, see FIG. 1) used in a construction site. The scaffold 100 is formed by coupling a plurality of vertical pipes 140 and horizontal pipes 130 to each other, and a scaffold 150 may be coupled to the horizontal pipe 130 so that a worker can move. At this time, the handrail frame according to the present embodiment may be arranged to stand upright on the upper side of the space of the footrest 150 . The handrail frame includes a main body 200 , a first fastening part 300 , and a second fastening part 400 , and each configuration will be described in detail below.

상기 본체(200)는 비계(100) 등에 설치된 발판(150) 상의 측면을 커버하는 역할을 수행한다. 여기서, 본체(200)는 제1 파이프(110)와 제2 파이프(120) 사이에 배치되어, 제1 파이프(110)와 제2 파이프(120) 사이의 공간을 커버할 수 있다. 이때, 제1,2 파이프(110, 120)는 비계(100)를 구성하는 수평파이프(130)의 일부로 제1 파이프(110)는 발판(150)의 상측 공간 측면에 배치되고, 제2 파이프(120)는 제1 파이프(110)보다 상대적으로 상측에 배치될 수 있다. 또한, 제1 파이프(110)와 제2 파이프(120)는 나란하게 배치될 수 있다. 즉, 제1 파이프(110)와 제2 파이프(120)는 상하 방향으로 나란하게 배치되고, 이와 같이 상하 방향으로 배치된 제1 파이프(110)와 제2 파이프(120) 사이에 본체(200)가 배치되는 것이다. 도 2에 도시된 바와 같이, 본체(200)는 전체적으로 장방형으로 형성될 수 있고, 사각틀 형상으로 형성된 테두리부(210)와 테두리부(210)의 내부에 형성된 커버부(220)를 포함할 수 있다. 여기서, 테두리부(210)는 상대적으로 두꺼운(커버부(220)보다 두꺼운) 프레임으로 형성되어, 본체(200)가 충분한 강도를 구현할 수 있다. 또한, 커버부(220)는 상대적으로 얇은(테두리부(210)보다 얇은) 판형부재로 형성되어, 테두리부(210) 내부의 공간을 커버한다. 이때, 커버부(220)는 다수의 막대형부재(221)가 일정한 간격을 이루며 X자로 교차되면서 형성될 수 있다. 또한, 다수의 막대형부재(221) 사이 또는 막대형부재(221) 자체에는 소정의 패턴을 이루는 다수의 관통홀(223)이 형성되어, 강풍 등에 의해서 본체(200)가 제1,2 파이프(110, 120)로부터 분리되는 것을 방지할 수 있다.The main body 200 serves to cover the side surface of the scaffold 150 installed on the scaffold 100 and the like. Here, the body 200 may be disposed between the first pipe 110 and the second pipe 120 to cover the space between the first pipe 110 and the second pipe 120 . At this time, the first and second pipes 110 and 120 are a part of the horizontal pipe 130 constituting the scaffold 100 , and the first pipe 110 is disposed on the upper space side of the scaffold 150 , and the second pipe ( 120 may be disposed relatively above the first pipe 110 . In addition, the first pipe 110 and the second pipe 120 may be arranged side by side. That is, the first pipe 110 and the second pipe 120 are arranged side by side in the vertical direction, and the body 200 is disposed between the first pipe 110 and the second pipe 120 arranged in the vertical direction as described above. will be placed As shown in FIG. 2 , the main body 200 may be formed in a rectangular shape as a whole, and may include an edge portion 210 formed in a rectangular frame shape and a cover portion 220 formed inside the edge portion 210 . . Here, the edge portion 210 is formed of a relatively thick (thicker than the cover portion 220) frame, the body 200 can implement sufficient strength. In addition, the cover portion 220 is formed of a relatively thin (thinner than the edge portion 210) plate-shaped member, and covers the space inside the edge portion (210). In this case, the cover part 220 may be formed by crossing the plurality of rod-shaped members 221 at regular intervals in an X-shape. In addition, a plurality of through-holes 223 forming a predetermined pattern are formed between the plurality of rod-shaped members 221 or in the rod-shaped member 221 itself, so that the main body 200 is connected to the first and second pipes ( 110, 120) can be prevented from being separated.

추가적으로, 커버부(220)의 하단에는 제1,2 파이프(110, 120)와 평행한 방향으로 연장된 판형부재(225)가 형성되고, 관통홀(223)이 형성되지 않을 수 있다. 이와 같이, 커버부(220)의 하측에는 판형부재(225)가 형성됨으로써, 커버부(220)의 하측을 통해서 자재 등이 추락하는 것을 방지할 수 있다. 정리하면, 다수의 관통홀(223)은 본체(200) 중 제1 파이프(110)로부터 소정거리(L) 이상의 영역에만 형성되고, 본체(200) 중 제1 파이프(110)로부터 소정거리(L) 이내의 영역에는 판형부재(225)가 구비되고 관통홀(223)이 형성되지 않는다. 한편, 본체(200)의 일측(하측)에는 제1 체결부(300)가 구비되고, 본체(200)의 타측(상측)에는 제2 체결부(400)가 구비되는데, 이와 관련한 구체적인 내용은 후술하도록 한다.Additionally, a plate-shaped member 225 extending in a direction parallel to the first and second pipes 110 and 120 is formed at the lower end of the cover part 220 , and the through hole 223 may not be formed. In this way, the plate-shaped member 225 is formed on the lower side of the cover unit 220 , thereby preventing the material from falling through the lower side of the cover unit 220 . In summary, the plurality of through-holes 223 are formed only in an area of a predetermined distance L or more from the first pipe 110 of the body 200 , and a predetermined distance L from the first pipe 110 of the body 200 . ) in the region within the plate-shaped member 225 is provided and the through hole 223 is not formed. On the other hand, one side (lower side) of the main body 200 is provided with a first fastening part 300, and the other side (upper side) of the main body 200 is provided with a second fastening part 400, which will be described in detail later. let it do

한편, 본체(200)의 재질은 특별히 한정되는 것은 아니지만, 예를 들어 HDPE(High Density Polyethylene)로 형성될 수 있다.Meanwhile, the material of the body 200 is not particularly limited, but may be formed of, for example, high density polyethylene (HDPE).

상기 제1 체결부(300)는 본체(200)와 제1 파이프(110)를 결합시키는 것으로, 본체(200)의 일측(하측)에 구비되어 제1 파이프(110)에 분리가능하게 체결될 수 있다. 여기서, 제1 체결부(300)는 제1 파이프(110)를 둘러싸도록 연장되되, 제2 파이프(120)로부터 멀어지는 방향(하측 방향)으로 개방된 제1 개방부(310a)가 형성될 수 있다(도 3 참조). 즉, 제1 체결부(300)는 원호로 연장된 크램프 형태로 형성되되, 하측에 제1 개방부(310a)가 형성될 수 있는 것이다. 따라서, 제1 체결부(300)는 제1 개방부(310a)를 통해서 제1 파이프(110)가 체결될 수 있다. 더욱 구체적으로, 제1 체결부(300)는 일측(하측)에 제1 개방부(310a)가 형성되어 제1 파이프(110)가 결합되는 U자형의 제1 결합부(310), 및 제1 결합부(310)와 본체(200)의 테두리부(210) 사이에 배치되어 제1 결합부(310)와 본체(200) 사이에 탄성력을 제공하는 탄성부(320)를 포함할 수 있다. 이때, 탄성부(320)는 판형으로 형성되어, 본체(200)의 테두리부(210)로부터 제1 결합부(310) 방향으로 연장되면서 절곡될 수 있다. 구체적으로, 탄성부(320)는 제1 파이프(110) 및 제2 파이프(120)와 평행한 가상면에 수직인 일방향(B)을 향하도록 연장되다가, 절곡된 후, 일방향(B)과 반대인 타방향(C)을 향하도록 연장될 수 있다. 즉, 탄성부(320)는 절곡된 판형으로 형성되어, 본체(200)에 대해서 제1 체결부(300)에 탄성력을 제공할 수 있는 것이다. 다만, 탄성부(320)는 반드시 절곡된 판형으로 형성되어야 하는 것은 아니고, 탄성력을 제공할 수 있는 공지된 모든 수단으로 대체될 수 있음은 물론이다. 상술한 바와 같이, 탄성부(320)가 제1 체결부(300)에 탄성력을 제공함으로써, 본 실시예에 따른 난간틀은 제1,2 파이프(110, 120)에 강력하게 체결될 수 있는데, 이와 관련한 구체적인 설명은 후술하도록 한다.The first fastening part 300 is to couple the main body 200 and the first pipe 110 , and is provided on one side (lower side) of the main body 200 to be detachably fastened to the first pipe 110 . have. Here, the first coupling part 300 may extend to surround the first pipe 110 , and a first opening part 310a that is opened in a direction away from the second pipe 120 (downward direction) may be formed. (See Fig. 3). That is, the first fastening part 300 is formed in the form of a clamp extending in an arc, and the first opening part 310a may be formed on the lower side. Accordingly, the first pipe 110 may be fastened to the first fastening part 300 through the first opening 310a. More specifically, the first coupling part 300 has a first opening part 310a formed on one side (lower side) of the U-shaped first coupling part 310 to which the first pipe 110 is coupled, and the first It may include an elastic part 320 disposed between the coupling part 310 and the edge part 210 of the main body 200 to provide an elastic force between the first coupling part 310 and the main body 200 . In this case, the elastic part 320 may be formed in a plate shape, and may be bent while extending from the edge part 210 of the main body 200 in the direction of the first coupling part 310 . Specifically, the elastic portion 320 extends to face a direction (B) perpendicular to a virtual plane parallel to the first pipe 110 and the second pipe 120, is bent, and then is opposite to the one direction (B) It may be extended to face the other direction (C). That is, the elastic part 320 may be formed in a bent plate shape to provide an elastic force to the first fastening part 300 with respect to the main body 200 . However, the elastic part 320 does not necessarily have to be formed in a bent plate shape, and may be replaced by any known means capable of providing an elastic force. As described above, since the elastic part 320 provides an elastic force to the first fastening part 300, the handrail frame according to the present embodiment can be strongly fastened to the first and second pipes 110 and 120, A detailed description related thereto will be provided later.

한편, 제1 체결부(300)는 본체(200)에 분리가능하게 결합될 수 있다. 구체적으로, 제1 체결부(300)는 제1 지지부(330)를 더 포함할 수 있다. 탄성부(320)의 일단에 제1 결합부(310)가 배치될 때, 제1 지지부(330)는 탄성부(320)의 타단에는 배치되는 것으로, 본체(200)의 테두리부(210) 일측(하측)에 접촉한다. 도 2에 도시된 바와 같이, 본체(200)의 테두리부(210) 일측(하측)에는 제1 고정홀(340)이 형성되고, 제1 체결부(300)의 제1 지지부(330)에는 제1 고정홀(340)에 삽입되는 제1 고정돌기(350)가 형성될 수 있다. 도 2에 도시된 바와 같이, 제1 지지부(330)의 제1 고정돌기(350)가 본체(200)의 제1 고정홀(340)에 삽입되면서, 제1 체결부(300)는 본체(200)에 결합될 수 있다. 다만, 반드시 본체(200)의 테두리부(210) 일측(하측)에 제1 고정홀(340)이 형성되고, 제1 체결부(300)에 제1 고정돌기(350)가 형성되어야 하는 것은 아니고, 본체(200)의 테두리부(210) 일측(하측)에 제1 고정돌기(350)가 형성되고, 제1 체결부(300)에 제1 고정홀(340)이 형성될 수도 있다.Meanwhile, the first fastening part 300 may be detachably coupled to the main body 200 . Specifically, the first fastening part 300 may further include a first support part 330 . When the first coupling part 310 is disposed on one end of the elastic part 320 , the first support part 330 is disposed on the other end of the elastic part 320 , and the edge part 210 of the main body 200 is one side. (bottom) in contact. As shown in FIG. 2 , a first fixing hole 340 is formed on one side (lower side) of the edge portion 210 of the body 200 , and the first support portion 330 of the first fastening portion 300 has a second A first fixing protrusion 350 inserted into the first fixing hole 340 may be formed. As shown in FIG. 2 , while the first fixing protrusion 350 of the first support part 330 is inserted into the first fixing hole 340 of the main body 200 , the first fastening part 300 is connected to the main body 200 . ) can be combined. However, the first fixing hole 340 is formed on one side (lower side) of the edge portion 210 of the main body 200 , and the first fixing protrusion 350 is not necessarily formed on the first fastening portion 300 . , a first fixing protrusion 350 may be formed on one side (lower side) of the rim portion 210 of the body 200 , and a first fixing hole 340 may be formed in the first fastening portion 300 .

또한, 제1 고정돌기(350)는 N개(N은 자연수)가 형성되고, 제1 고정홀(340)은 본체(200)의 길이방향(제1 파이프(110)와 평행한 방향)을 따라 N개를 초과하는 M개(M은 자연수)가 형성될 수 있다. 예를 들어, 제1 고정돌기(350)는 2개가 형성되고, 제1 고정홀(340)은 본체(200)의 길이방향을 따라 4개가 형성될 수 있다. 이와 같이, 제1 고정돌기(350)의 개수보다 제1 고정홀(340)의 개수를 많이 형성함으로써, 제1 체결부(300)를 본체(200)의 길이방향을 따라 이동시키며 결합시킬 수 있다. 따라서, 제1 파이프(110)의 사이즈 등 비계(100)의 다양한 구조에 대응하여, 제1 체결부(300)를 다양한 위치로 이동시킬 수 있다. 한편, 제1 체결부(300)가 본체(200)의 테두리부(210) 외측에 결합될 때, 제1 고정돌기(350)의 말단에는 후크 형상의 제1 후크부(355)가 형성되고, 본체(200)의 테두리부(210) 내측에는 본체(200)의 테두리부(210)로부터 돌출된 제1 돌출부(360)가 형성될 수 있다. 따라서, 제1 고정돌기(350)의 제1 후크부(355)가 본체(200)의 제1 돌출부(360)에 걸릴 수 있고, 이때 제1 체결부(300)와 본체(200) 사이에는 강력한 체결력을 확보할 수 있다.In addition, N first fixing protrusions 350 are formed (N is a natural number), and the first fixing holes 340 are formed along the longitudinal direction of the body 200 (direction parallel to the first pipe 110 ). M pieces exceeding N pieces (M is a natural number) may be formed. For example, two first fixing protrusions 350 may be formed, and four first fixing holes 340 may be formed along the longitudinal direction of the body 200 . In this way, by forming the number of the first fixing holes 340 more than the number of the first fixing protrusions 350 , the first fastening part 300 can be moved along the longitudinal direction of the main body 200 to be coupled. . Accordingly, in response to various structures of the scaffold 100 , such as the size of the first pipe 110 , the first fastening part 300 may be moved to various positions. On the other hand, when the first fastening part 300 is coupled to the outside of the rim part 210 of the main body 200, a first hook part 355 of a hook shape is formed at the distal end of the first fixing protrusion 350, A first protrusion 360 protruding from the edge portion 210 of the body 200 may be formed inside the edge portion 210 of the body 200 . Accordingly, the first hook part 355 of the first fixing protrusion 350 may be caught by the first protrusion 360 of the main body 200 , and in this case, there is a strong gap between the first fastening part 300 and the main body 200 . Tightening force can be secured.

상기 제2 체결부(400)는 본체(200)와 제2 파이프(120)를 결합시키는 것으로, 본체(200)의 타측(상측)에 구비되어 제2 파이프(120)에 분리가능하게 체결될 수 있다. 여기서, 제2 체결부(400)는 제2 파이프(120)를 둘러싸도록 연장되되, 제1 파이프(110) 및 제2 파이프(120)와 평행한 가상면에 수직 방향(이하 소정방향(A))으로 개방된 제2 개방부(410a)가 형성될 수 있다(도 3 참조). 즉, 제2 체결부(400)는 원호로 연장된 크램프 형태로 형성되되, 상기 소정방향(A)으로 제2 개방부(410a)가 형성될 수 있는 것이다. 따라서, 제2 체결부(400)는 제2 개방부(410a)를 통해서 제2 파이프(120)가 체결될 수 있다. 더욱 구체적으로, 제2 체결부(400)는 상기 소정방향(A)으로 제2 개방부(410a)가 형성되어 제2 파이프(120)가 결합되는 U자형의 제2 결합부(410), 및 제2 결합부(410)와 본체(200)의 테두리부(210) 사이에 형성된 제2 지지부(430)를 포함할 수 있다. 이때, 제2 지지부(430)는 본체(200)의 테두리부(210) 타측(상측)에 접촉한다. 또한, 본체(200)의 테두리부(210) 타측(상측)에는 제2 고정홀(440)이 형성되고, 제2 체결부(400)의 제2 지지부(430)에는 제2 고정홀(440)에 삽입되는 제2 고정돌기(450)가 형성될 수 있다. 따라서, 제2 지지부(430)의 제2 고정돌기(450)가 본체(200)의 제2 고정홀(440)에 삽입되면서, 제2 체결부(400)는 본체(200)에 결합될 수 있다. 다만, 반드시 본체(200)의 테두리부(210) 타측(상측)에 제2 고정홀(440)이 형성되고, 제2 체결부(400)에 제2 고정돌기(450)가 형성되어야 하는 것은 아니고, 본체(200)의 테두리부(210) 타측(상측)에 제2 고정돌기(450)가 형성되고, 제2 체결부(400)에 제2 고정홀(440)이 형성될 수도 있다.The second fastening part 400 connects the main body 200 and the second pipe 120 , and is provided on the other side (upper side) of the main body 200 to be detachably fastened to the second pipe 120 . have. Here, the second fastening part 400 is extended to surround the second pipe 120 , in a direction perpendicular to a virtual plane parallel to the first pipe 110 and the second pipe 120 (hereinafter referred to as the predetermined direction A). ) may be formed with an open second opening 410a (see FIG. 3 ). That is, the second fastening part 400 is formed in the form of a clamp extending in an arc, and the second opening part 410a may be formed in the predetermined direction (A). Accordingly, the second pipe 120 may be coupled to the second coupling part 400 through the second opening part 410a. More specifically, the second fastening part 400 is a U-shaped second coupling part 410 in which the second opening part 410a is formed in the predetermined direction (A) and the second pipe 120 is coupled, and A second support part 430 formed between the second coupling part 410 and the edge part 210 of the main body 200 may be included. At this time, the second support portion 430 is in contact with the other side (upper side) of the edge portion 210 of the body 200 . In addition, a second fixing hole 440 is formed on the other side (upper side) of the edge portion 210 of the main body 200 , and a second fixing hole 440 is formed on the second support portion 430 of the second fastening portion 400 . A second fixing protrusion 450 to be inserted into may be formed. Accordingly, while the second fixing protrusion 450 of the second support 430 is inserted into the second fixing hole 440 of the main body 200 , the second fastening portion 400 may be coupled to the main body 200 . . However, the second fixing hole 440 is formed on the other side (upper side) of the edge portion 210 of the main body 200 , and the second fixing protrusion 450 is not necessarily formed on the second fastening portion 400 . , a second fixing protrusion 450 is formed on the other side (upper side) of the edge portion 210 of the main body 200 , and a second fixing hole 440 may be formed in the second fastening portion 400 .

또한, 제2 고정돌기(450)는 L개(L은 자연수)가 형성되고, 제2 고정홀(440)은 본체(200)의 길이방향(제2 파이프(120)와 평행한 방향)을 따라 L개를 초과하는 P개(P는 자연수)가 형성될 수 있다. 예를 들어, 제2 고정돌기(450)는 2개가 형성되고, 제2 고정홀(440)은 본체(200)의 길이방향을 따라 4개가 형성될 수 있다. 이와 같이, 제2 고정돌기(450)의 개수보다 제2 고정홀(440)의 개수를 많이 형성함으로써, 제2 체결부(400)를 본체(200)의 길이방향을 따라 이동시키며 결합시킬 수 있다. 따라서, 제2 파이프(120)의 사이즈 등 비계(100)의 다양한 구조에 대응하여, 제2 체결부(400)를 다양한 위치로 이동시킬 수 있다. 한편, 제2 체결부(400)가 본체(200)의 테두리부(210) 외측에 결합될 때, 제2 고정돌기(450)의 말단에는 후크 형상의 제2 후크부(455)가 형성되고, 본체(200)의 테두리부(210) 내측에는 본체(200)의 테두리부(210)로부터 돌출된 제2 돌출부(460)가 형성될 수 있다. 따라서, 제2 고정돌기(450)의 제2 후크부(455)가 본체(200)의 제2 돌출부(460)에 걸릴 수 있고, 이때 제2 체결부(400)와 본체(200) 사이에는 강력한 체결력을 확보할 수 있다.In addition, L (L is a natural number) of the second fixing protrusions 450 are formed, and the second fixing holes 440 are formed along the longitudinal direction of the main body 200 (a direction parallel to the second pipe 120). P pieces (P is a natural number) exceeding L pieces may be formed. For example, two second fixing protrusions 450 may be formed, and four second fixing holes 440 may be formed along the longitudinal direction of the body 200 . In this way, by forming a larger number of the second fixing holes 440 than the number of the second fixing protrusions 450 , the second fastening part 400 can be coupled while moving along the longitudinal direction of the main body 200 . . Accordingly, in response to various structures of the scaffold 100 , such as the size of the second pipe 120 , the second fastening part 400 may be moved to various positions. On the other hand, when the second fastening part 400 is coupled to the outside of the rim part 210 of the main body 200, a second hook part 455 in the shape of a hook is formed at the end of the second fixing protrusion 450, A second protrusion 460 protruding from the edge portion 210 of the body 200 may be formed inside the edge portion 210 of the body 200 . Accordingly, the second hook part 455 of the second fixing protrusion 450 may be caught by the second protrusion 460 of the main body 200 , and at this time, there is a strong gap between the second fastening part 400 and the main body 200 . Tightening force can be secured.

추가적으로, 제2 체결부(400)의 제2 지지부(430)에는 본체(200)의 테두리부(210) 타측(상측)과 마주보도록 본체(200)의 길이방향으로 돌출된 제3 돌출부(470)가 형성될 수 있다. 따라서, 제2 후크부(455)가 제2 돌출부(460)에 걸릴 때, 제3 돌출부(470)가 본체(200)의 테두리부(210) 외면과 접촉하므로, 제2 체결부(400)는 본체(200)의 테두리부(210) 외면에 안정적으로 고정될 수 있다.Additionally, the second support part 430 of the second fastening part 400 has a third protrusion 470 protruding in the longitudinal direction of the body 200 to face the other side (upper side) of the edge part 210 of the body 200 . can be formed. Accordingly, when the second hook portion 455 is caught by the second protrusion 460 , the third protrusion 470 comes into contact with the outer surface of the rim portion 210 of the body 200 , so the second fastening portion 400 is It may be stably fixed to the outer surface of the edge portion 210 of the main body 200 .

도 4 내지 도 5는 본 발명의 실시예에 따른 난간틀의 체결과정을 도시한 사시도로, 이를 참조하여 본 실시예에 따른 난간틀의 체결과정을 살펴보도록 한다.4 to 5 are perspective views illustrating the fastening process of the handrail frame according to an embodiment of the present invention. Referring to this, the fastening process of the handrail frame according to the present embodiment will be described.

우선, 도 4에 도시된 바와 같이, 우선 제1 개방부(310a)를 통해서 제1 체결부(300)에 제1 파이프(110)를 삽입시킨다.First, as shown in FIG. 4 , first, the first pipe 110 is inserted into the first fastening part 300 through the first opening part 310a.

다음, 도 5에 도시된 바와 같이, 제1 파이프(110)를 기준으로 본체(200)를 회전시켜, 제2 개방부(410a)를 통해서 제2 체결부(400)에 제2 파이프(120)를 삽입시킨다.Next, as shown in FIG. 5 , the body 200 is rotated with respect to the first pipe 110 , and the second pipe 120 is connected to the second fastening part 400 through the second opening part 410a. insert

즉, 제1 체결부(300)에 제1 파이프(110)를 삽입시킨 후, 본체(200)를 회전시켜, 제2 체결부(400)에 제2 파이프(120)를 삽입시킴으로써, 난간틀과 제1,2 파이프(110, 120) 사이의 체결이 완료될 수 있다. 결국, 작업자가 비계(100)의 발판(150) 위에서 본체(200)를 회전시키는 방식으로 제1,2 체결부(300, 400)과 제1,2 파이프(110, 120)를 체결할 수 있으므로, 체결과정이 간단하면서도 안전한 장점이 있다.That is, after inserting the first pipe 110 into the first fastening part 300 , by rotating the main body 200 and inserting the second pipe 120 into the second fastening part 400 , the handrail and The coupling between the first and second pipes 110 and 120 may be completed. As a result, the operator can fasten the first and second fastening parts 300 and 400 and the first and second pipes 110 and 120 in such a way that the operator rotates the main body 200 on the scaffold 150 of the scaffold 100 . , the fastening process is simple and safe.

도 6 내지 도 7은 본 발명의 실시예에 따른 난간틀의 체결과정을 도시한 측면도이다.6 to 7 are side views illustrating a fastening process of the handrail frame according to an embodiment of the present invention.

도 6에 도시된 바와 같이, 제1 파이프(110)와 접촉하는 제1 체결부(300, 제1 결합부(310))의 면 중 본체(200)와 가장 가까운 면을 제1 소정면(X)으로 정의하고, 제2 파이프(120)와 접촉하는 제2 체결부(400, 제2 결합부(410))의 면 중 본체(200)와 가장 가까운 면을 제2 소정면(Y)으로 정의할 수 있다. 이때, 제1 소정면(X)과 제2 소정면(Y) 사이의 거리(L1)는 제1 파이프(110)와 제2 파이프(120)의 사이의 거리(L2)보다 멀 수 있다. 즉, 제1 체결부(300)와 제2 체결부(400) 사이의 간격(L1)이 제1 파이프(110)와 제2 파이프(120) 사이의 간격(L2)보다 클 수 있는 것이다. 상술한 바와 같이, 제1 체결부(300)에는 제1 결합부(310)와 본체(200) 사이에 탄성력을 제공하는 탄성부(320)가 형성될 수 있다. 따라서, 제1 체결부(300)에 제1 파이프(110)를 삽입시키고, 도 7에 도시된 바와 같이, 본체(200)를 회전시킨 후, 탄성부(320)를 α만큼 수축시킴으로써, 제2 체결부(400)에 제2 파이프(120)를 삽입시킬 수 있다. 이와 같이, 탄성부(320)를 α만큼 수축시킨 상태에서 제2 체결부(400)에 제2 파이프(120)를 삽입시키면, 탄성부(320)는 제1 체결부(300)에 본체(200)로부터 멀어지는 방향으로 탄성력을 제공한다. 따라서, 탄성부(320)의 탄성력에 의해서 제1 체결부(300)와 제1 파이프(110)의 체결력 및 제2 체결부(400)와 제2 파이프(120) 사이의 체결력은 더욱 강화될 수 있다.As shown in FIG. 6 , the surface closest to the main body 200 among the surfaces of the first coupling part 300 and the first coupling part 310 in contact with the first pipe 110 is the first predetermined surface (X) and the surface closest to the main body 200 among the surfaces of the second coupling part 400 and the second coupling part 410 in contact with the second pipe 120 may be defined as the second predetermined surface Y. have. In this case, the distance L1 between the first predetermined surface X and the second predetermined surface Y may be greater than the distance L2 between the first pipe 110 and the second pipe 120 . That is, the gap L1 between the first fastening part 300 and the second fastening part 400 may be greater than the gap L2 between the first pipe 110 and the second pipe 120 . As described above, in the first coupling part 300 , an elastic part 320 providing an elastic force between the first coupling part 310 and the main body 200 may be formed. Accordingly, by inserting the first pipe 110 into the first fastening part 300 , as shown in FIG. 7 , rotating the main body 200 , and then contracting the elastic part 320 by α, the second The second pipe 120 may be inserted into the fastening part 400 . In this way, when the second pipe 120 is inserted into the second fastening part 400 in a state in which the elastic part 320 is contracted by α, the elastic part 320 is connected to the body 200 in the first fastening part 300 . ) provides an elastic force in the direction away from it. Therefore, the fastening force between the first fastening part 300 and the first pipe 110 and the fastening force between the second fastening part 400 and the second pipe 120 by the elastic force of the elastic part 320 can be further strengthened. have.

이상 본 발명을 구체적인 실시예를 통하여 상세히 설명하였으나, 이는 본 발명을 구체적으로 설명하기 위한 것으로, 본 발명은 이에 한정되지 않으며, 본 발명의 기술적 사상 내에서 당 분야의 통상의 지식을 가진 자에 의해 그 변형이나 개량이 가능함이 명백하다.Although the present invention has been described in detail through specific examples, this is intended to describe the present invention in detail, and the present invention is not limited thereto, and by those of ordinary skill in the art within the technical spirit of the present invention. It is clear that the modification or improvement is possible.

본 발명의 단순한 변형 내지 변경은 모두 본 발명의 영역에 속하는 것으로 본 발명의 구체적인 보호 범위는 첨부된 특허청구범위에 의하여 명확해질 것이다.All simple modifications and variations of the present invention fall within the scope of the present invention, and the specific scope of protection of the present invention will be made clear by the appended claims.

100: 비계 110: 제1 파이프
120: 제2 파이프 130: 수평파이프
140: 수직파이프 150: 발판
200: 본체 210: 테두리부
220: 커버부 221: 막대형부재
223: 관통홀 225: 판형부재
300: 제1 체결부 310: 제1 결합부
310a: 제1 개방부 320: 탄성부
330: 제1 지지부 340: 제1 고정홀
350: 제1 고정돌기 355: 제1 후크부
360: 제1 돌출부 400: 제2 체결부
410: 제2 결합부 410a: 제2 개방부
430: 제2 지지부 440: 제2 고정홀
450: 제2 고정돌기 455: 제2 후크부
460: 제2 돌출부 470: 제3 돌출부
L: 소정거리 A: 소정방향
B: 일방향 C: 타방향
X: 제1 소정면 Y: 제2 소정면
L1: 제1,2 소정면 사이의 거리 L2: 제1,2 파이프 사이의 거리
100: scaffold 110: first pipe
120: second pipe 130: horizontal pipe
140: vertical pipe 150: scaffold
200: body 210: edge portion
220: cover portion 221: rod-shaped member
223: through hole 225: plate-shaped member
300: first coupling part 310: first coupling part
310a: first opening 320: elastic part
330: first support 340: first fixing hole
350: first fixing protrusion 355: first hook portion
360: first protrusion 400: second fastening part
410: second coupling portion 410a: second opening
430: second support 440: second fixing hole
450: second fixing protrusion 455: second hook part
460: second protrusion 470: third protrusion
L: predetermined distance A: predetermined direction
B: one direction C: other direction
X: first predetermined surface Y: second predetermined surface
L1: Distance between first and second predetermined surfaces L2: Distance between first and second pipes

Claims (7)

서로 나란하게 배치된 제1 파이프와 제2 파이프에 결합되는 난간틀에 있어서,
상기 제1 파이프와 상기 제2 파이프 사이에 배치되어, 상기 제1 파이프와 상기 제2 파이프 사이의 공간을 커버하는 본체;
상기 본체의 일측에 구비되어, 상기 제1 파이프에 분리가능하게 체결되는 제1 체결부; 및
상기 본체의 타측에 구비되어, 상기 제2 파이프에 분리가능하게 체결되는 제2 체결부;
를 포함하고,
상기 제1 체결부는 상기 제1 파이프를 둘러싸도록 연장되되, 상기 제2 파이프로부터 멀어지는 방향으로 개방된 제1 개방부가 형성되고,
상기 제2 체결부는 상기 제2 파이프를 둘러싸도록 연장되되, 상기 제1 파이프 및 상기 제2 파이프와 평행한 가상면에 수직 방향으로 개방된 제2 개방부가 형성되며,
상기 제1 체결부는,
일측에 상기 제1 개방부가 형성되어 상기 제1 파이프가 결합되는 U자형의 제1 결합부; 및
상기 제1 결합부와 상기 본체 사이에 배치되어 상기 제1 결합부와 상기 본체 사이에 탄성력을 제공하는 탄성부;
를 포함하고,
상기 탄성부는 판형으로 형성되되, 상기 본체로부터 상기 제1 결합부 방향으로 연장되면서 절곡되는 난간틀.
In the handrail frame coupled to the first pipe and the second pipe arranged in parallel with each other,
a body disposed between the first pipe and the second pipe to cover a space between the first pipe and the second pipe;
a first fastening part provided on one side of the main body and detachably fastened to the first pipe; and
a second fastening part provided on the other side of the main body and detachably fastened to the second pipe;
including,
The first fastening portion is extended to surround the first pipe, a first opening is formed in a direction away from the second pipe,
The second fastening portion is extended to surround the second pipe, the first pipe and the second pipe and the second opening is formed with a second opening in a vertical direction in parallel to the virtual surface,
The first fastening part,
The first opening portion is formed on one side of the first U-shaped coupling portion to which the first pipe is coupled; and
an elastic part disposed between the first coupling part and the main body to provide an elastic force between the first coupling part and the main body;
including,
The elastic part is formed in a plate shape, and is bent while extending from the main body in the direction of the first coupling part.
청구항 1에 있어서,
상기 제1 개방부를 통해서 상기 제1 체결부에 상기 제1 파이프가 삽입된 후, 상기 본체가 회전되어 상기 제2 개방부를 통해서 상기 제2 체결부에 상기 제2 파이프가 삽입되는 난간틀.
The method according to claim 1,
After the first pipe is inserted into the first fastening part through the first opening part, the main body is rotated so that the second pipe is inserted into the second fastening part through the second opening part.
청구항 2에 있어서,
상기 제1 파이프와 접촉하는 상기 제1 체결부의 면 중 상기 본체와 가장 가까운 면을 제1 소정면이라고 정의하고,
상기 제2 파이프와 접촉하는 상기 제2 체결부의 면 중 상기 본체와 가장 가까운 면을 제2 소정면이라고 정의할 때,
상기 제1 소정면과 상기 제2 소정면 사이의 거리는 상기 제1 파이프와 상기 제2 파이프 사이의 거리보다 먼 난간틀.
3. The method according to claim 2,
Among the surfaces of the first coupling part in contact with the first pipe, a surface closest to the main body is defined as a first predetermined surface,
When defining a surface closest to the main body among the surfaces of the second coupling part in contact with the second pipe as a second predetermined surface,
a distance between the first predetermined surface and the second predetermined surface is greater than a distance between the first pipe and the second pipe.
청구항 1에 있어서,
상기 탄성부는 상기 제1 파이프 및 상기 제2 파이프와 평행한 가상면에 수직인 일방향을 향하도록 연장되다가, 절곡된 후, 상기 일방향과 반대인 타방향을 향하도록 연장되는 난간틀.
The method according to claim 1,
The elastic part extends to face one direction perpendicular to the virtual plane parallel to the first pipe and the second pipe, is bent, and then extends to face the other direction opposite to the first pipe and the second pipe.
청구항 1에 있어서,
상기 본체에는 소정의 패턴을 이루는 다수의 관통홀이 형성된 난간틀.
The method according to claim 1,
A handrail in which a plurality of through-holes forming a predetermined pattern are formed in the body.
청구항 5에 있어서,
다수의 상기 관통홀은 상기 본체 중 상기 제1 파이프로부터 소정거리 이상의 영역에만 형성되는 난간틀.
6. The method of claim 5,
A handrail frame in which a plurality of the through-holes are formed only in an area of the body that is at least a predetermined distance from the first pipe.
청구항 6에 있어서,
상기 본체 중 상기 제1 파이프로부터 소정거리 이내에는 판형부재가 구비되는 난간틀.
7. The method of claim 6,
A handrail frame provided with a plate-shaped member within a predetermined distance from the first pipe of the body.
KR1020200017359A 2019-07-18 2020-02-13 Banister KR102294304B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200017359A KR102294304B1 (en) 2019-07-18 2020-02-13 Banister

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020190086877A KR102086713B1 (en) 2019-07-18 2019-07-18 Banister
KR1020200017359A KR102294304B1 (en) 2019-07-18 2020-02-13 Banister

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020190086877A Division KR102086713B1 (en) 2019-07-18 2019-07-18 Banister

Publications (2)

Publication Number Publication Date
KR20210010299A KR20210010299A (en) 2021-01-27
KR102294304B1 true KR102294304B1 (en) 2021-08-27

Family

ID=74238235

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200017359A KR102294304B1 (en) 2019-07-18 2020-02-13 Banister

Country Status (1)

Country Link
KR (1) KR102294304B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3953975B2 (en) 2003-04-30 2007-08-08 信和株式会社 Skirting board for building scaffolding
JP5379668B2 (en) 2009-12-18 2013-12-25 辰雄 小野 Scaffolding equipment
KR101966048B1 (en) 2018-12-24 2019-04-04 권수오 Footplate for footwork for shipbuilding and offshore plant
KR101979700B1 (en) 2018-10-02 2019-05-17 (주)동은에프앤씨 Toe board system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3953975B2 (en) 2003-04-30 2007-08-08 信和株式会社 Skirting board for building scaffolding
JP5379668B2 (en) 2009-12-18 2013-12-25 辰雄 小野 Scaffolding equipment
KR101979700B1 (en) 2018-10-02 2019-05-17 (주)동은에프앤씨 Toe board system
KR101966048B1 (en) 2018-12-24 2019-04-04 권수오 Footplate for footwork for shipbuilding and offshore plant

Also Published As

Publication number Publication date
KR20210010299A (en) 2021-01-27

Similar Documents

Publication Publication Date Title
US5560588A (en) Support for temporary guard railing
JP4511347B2 (en) System for shielding and method of mounting the same
AU2017204442B2 (en) Washer assembly for use in affixing a guardrail support to a surface
KR102086713B1 (en) Banister
US20150211247A1 (en) Construction safety screen system
KR102294304B1 (en) Banister
CA2365885A1 (en) Scaffold safety net
KR101699425B1 (en) A safety footplate of constructing scarffold
WO2008013460A1 (en) A scaffolding platform
JP2016023425A (en) Main rope support
US20180274251A1 (en) Safety and debris drop netting system and related methodology
CA3061997A1 (en) Improved scaffold planks
KR200386867Y1 (en) Horizontal safety nets equipment
KR200469390Y1 (en) Scaffolding For Ship
EP1972739A2 (en) Extendable safety guardrail
KR102335856B1 (en) Safety railing for steel beam installation
JP2019031837A (en) Stair handrail for temporary scaffolding
KR20060095220A (en) The protective net installation apparatus and method thereof
EP2325416A1 (en) Perimeter protection system for construction sites
JP2006348580A (en) Scaffold for roofing work
KR20180107396A (en) soffit length for fixing beam
JP6286266B2 (en) Morning glory installation method and corner morning glory device for scaffold construction
JP3446958B1 (en) Safety chute for outer wall repair work and outer wall repair method
JP2006328651A (en) Safety handrail
JP2021032051A (en) Scattering prevention device and scattering prevention method

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right