KR102263779B1 - Construction method of beam frame of building - Google Patents

Construction method of beam frame of building Download PDF

Info

Publication number
KR102263779B1
KR102263779B1 KR1020190117117A KR20190117117A KR102263779B1 KR 102263779 B1 KR102263779 B1 KR 102263779B1 KR 1020190117117 A KR1020190117117 A KR 1020190117117A KR 20190117117 A KR20190117117 A KR 20190117117A KR 102263779 B1 KR102263779 B1 KR 102263779B1
Authority
KR
South Korea
Prior art keywords
frame
reinforcing bar
building
time
setting
Prior art date
Application number
KR1020190117117A
Other languages
Korean (ko)
Other versions
KR20210035008A (en
Inventor
황성섭
Original Assignee
황성섭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 황성섭 filed Critical 황성섭
Priority to KR1020190117117A priority Critical patent/KR102263779B1/en
Publication of KR20210035008A publication Critical patent/KR20210035008A/en
Application granted granted Critical
Publication of KR102263779B1 publication Critical patent/KR102263779B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0604Prismatic or cylindrical reinforcement cages composed of longitudinal bars and open or closed stirrup rods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

본 발명은 건축물의 보 뼈대 시공방법에 관한 것으로, 그 구성은 양측으로 수평 이격되어 길게 형성되는 받침대의 상부에 보의 뼈대가 되는 철근을 배치하기 위한 1회성 배치틀을 안치하는 안치단계(S10);와, 상기 1회성 배치틀에 보의 뼈대가 되는 하부철근과 상부철근과 강화판을 배치 조립하는 조립단계(S20);와, 상기 1회성 배치틀에 조립된 보의 뼈대를 이송수단을 통해 시공되는 건축물로 승강 이송시켜 간편히 보의 뼈대로 구축하는 이송단계(S30);와, 보 뼈대의 구축이 완료되면 상기 1회성 배치틀로부터 이송수단의 이송와이어를 회수하는 회수단계(S40);로 이루어지는 것을 특징으로 하는 것으로서,
1회성 배치틀에 보의 뼈대가 되는 하부철근과 상부철근 및 강화판을 배치하여 결속 조립한 후, 그 조립된 뼈대를 이송수단을 통해 1회성 배치틀과 함께 시공되는 건축물로 이송 설치하여 보의 뼈대로 사용함으로, 작업자는 1회성 배치틀과 함께 조립된 보의 뼈대를 시공중인 건축물로 이송 배치하는 한 번의 공정으로 간편히 보의 뼈대를 구축할 수 있어 보 뼈대의 신속한 구축을 통해 건축물의 공기를 대폭 절감할 수 있을 뿐만 아니라, 1회성 배치틀을 통해 보의 뼈대를 외부에서 배치 조립할 수 있어 작업공간이 협소한 건축물에서 보의 뼈대인 철근을 배치 조립할 필요가 없어 작업자에게 보 뼈대의 구축 편의성을 제공할 수 있는 효과가 있다.
또한, 보의 뼈대인 철근이 배치 고정되는 1회성 배치틀은 철근과 함께 보의 뼈대로 사용되므로 보의 강도를 대폭 향상시켜 건축물의 구조적인 안전성을 강화할 수 있는 효과가 있다.
The present invention relates to a method for constructing a beam frame of a building, the configuration of which is a placing step of placing a one-time arrangement frame for arranging reinforcing bars that become the frame of a beam on the upper part of a pedestal that is horizontally spaced apart on both sides and formed long (S10) And, an assembly step (S20) of disposing and assembling the lower reinforcing bars, upper reinforcing bars, and reinforcing plates that become the skeleton of the beam in the one-time arrangement frame (S20); and constructing the frame of the beam assembled in the one-time arrangement frame through a transport means A transfer step (S30) of easily constructing a beam frame by elevating and transporting it to a building to be constructed; and a recovery step (S40) of recovering the transfer wire of the transfer means from the one-time placement frame when the construction of the beam frame is completed; As characterized in that,
The lower reinforcing bar, upper reinforcing bar and reinforcing plate, which are the frame of the beam, are placed on the one-time arrangement frame and assembled, and then the assembled frame is transferred to the building to be constructed together with the one-time arrangement frame through a transport means. By using it as a structure, the worker can easily build the beam frame in one process of transferring the beam frame assembled together with the one-time placement frame to the building under construction, and greatly increasing the air of the building through the rapid construction of the beam frame. In addition to saving, it is possible to arrange and assemble the frame of the beam from the outside through a one-time arrangement frame, so there is no need to arrange and assemble the rebar, which is the frame of the beam, in a building with a narrow work space. There is an effect that can be done.
In addition, the one-time arrangement frame in which the reinforcing bar, which is the frame of the beam, is placed and fixed, is used as the frame of the beam together with the reinforcing bar, so it has the effect of significantly improving the strength of the beam and strengthening the structural safety of the building.

Description

건축물의 보 뼈대 시공방법{Construction method of beam frame of building}Construction method of beam frame of building

본 발명은 건축물의 보 뼈대 시공방법에 관한 것으로, 더욱 상세하게는 1회성 배치틀에 보의 뼈대가 되는 하부철근과 상부철근 및 강화판을 배치하여 결속 조립한 후, 그 조립된 뼈대를 이송수단을 통해 1회성 배치틀과 함께 시공되는 건축물로 이송 설치하여 보의 뼈대로 사용함으로, 작업자는 1회성 배치틀과 함께 조립된 보의 뼈대를 시공중인 건축물로 이송 배치하는 한 번의 공정으로 간편히 보의 뼈대를 구축할 수 있어 보 뼈대의 신속한 구축을 통해 건축물의 공기를 대폭 절감할 수 있을 뿐만 아니라, 1회성 배치틀을 통해 보의 뼈대를 외부에서 배치 조립할 수 있어 작업공간이 협소한 건축물에서 보의 뼈대인 철근을 배치 조립할 필요가 없어 작업자에게 보 뼈대의 구축 편의성을 제공할 수 있는 건축물의 보 뼈대 시공방법에 관한 것이다.The present invention relates to a method for constructing a beam frame of a building, and more particularly, after binding and assembling the lower reinforcing bar, the upper reinforcing bar and the reinforcing plate, which are the frame of the beam in a one-time arrangement frame, the assembled frame is transferred to a transport means By transferring and installing the beam to the building under construction together with the one-time placement frame, the worker transfers and arranges the beam frame assembled together with the one-time placement frame to the building under construction in a single process. Not only can the construction period be greatly reduced through the rapid construction of the beam frame, but also the beam frame can be arranged and assembled from the outside through a one-time arrangement frame, so that the beam frame can be used in a building with a narrow work space. It relates to a method of constructing a beam frame of a building that can provide workers with convenience in constructing the beam frame without the need to arrange and assemble the steel reinforcing bar.

일반적으로 보는 건축물의 기본 뼈대 중의 하나로서 수직재의 기둥에 연결되어 하중을 지탱하고 있는 중요한 구조물이다.In general, it is one of the basic frameworks of a building, and is an important structure that is connected to the vertical column and supports the load.

따라서 건축물의 보는 구조적인 강도를 강화하기 위해 보 내부에 뼈대 기능을 하는 철근을 배치하여 건축하게 되는데, 이러한 철근은 수 미터의 길이를 가지며 고중량이기 때문에 작업자가 철근을 직접 운반하는 것은 매우 비능률적이다.Therefore, in order to strengthen the structural strength of the building beam, reinforcing bars serving as a skeletal function are placed inside the beam and built. Since these rebars have a length of several meters and are heavy, it is very inefficient for workers to directly transport rebars.

그러므로 크레인을 통해서 철근을 시공되는 건축물로 이송시켜 현장에서 철근을 배치 조립하게 되는데, 이때 보의 강도가 전체적으로 골고루 확보되도록 보의 뼈대인 철근을 상·하부에 일정한 간격으로 조립 배치하여 구축하는데, 이러한 보 뼈대를 구축하기 위해 크레인으로 하나씩 철근을 이송시켜 배치 조립하게 되면 너무 많은 설치 시간이 요구되므로 작업이 비능률적인 문제점이 있다.Therefore, reinforcing bars are transferred to the building to be constructed through a crane and rebars are arranged and assembled on site. At this time, rebars, which are the skeleton of the beam, are assembled and arranged at regular intervals in the upper and lower parts to ensure the overall strength of the beam. In order to construct the beam frame, if the reinforcing bars are transported one by one with a crane and assembled, too much installation time is required, so the operation is inefficient.

더욱이, 시공되는 건축물 상에는 작업자가 활동할 수 있는 충분한 공간의 확보가 곤란함으로 열악한 작업공간에서 보의 철근을 배치 조립하기가 너무 불편하고 어려워 보의 뼈대인 철근을 배치 고정하는 작업이 매우 늦을 수밖에 없고, 이로 인해 건축의 공기가 대폭 지연되는 문제점이 있었다.Moreover, since it is difficult to secure sufficient space for workers to work on the building being constructed, it is too inconvenient and difficult to arrange and assemble the reinforcing bars of the beam in a poor working space. As a result, there was a problem in that the construction period was significantly delayed.

따라서, 상기와 같은 문제점을 해결할 수 있도록 건축물의 보 빼대를 간편히 설치하여 보의 편리한 구축을 수행할 수 있는 건축물의 보 뼈대 시공방법의 개발이 필요한 실정이다.Therefore, in order to solve the above problems, there is a need to develop a method for constructing a beam frame of a building that can easily construct a beam by simply installing the beam.

본 발명은 상기한 바와 같은 제반 문제점을 해결하기 위하여 제안된 것으로, 그 목적은 1회성 배치틀에 보의 뼈대가 되는 하부철근과 상부철근 및 강화판을 배치하여 결속 조립한 후, 그 조립된 뼈대를 이송수단을 통해 1회성 배치틀과 함께 시공되는 건축물로 이송 설치하여 보의 뼈대로 사용함으로, 작업자는 1회성 배치틀과 함께 조립된 보의 뼈대를 시공중인 건축물로 이송 배치하는 한 번의 공정으로 간편히 보의 뼈대를 구축할 수 있어 보 뼈대의 신속한 구축을 통해 건축물의 공기를 대폭 절감할 수 있을 뿐만 아니라, 1회성 배치틀을 통해 보의 뼈대를 외부에서 배치 조립할 수 있어 작업공간이 협소한 건축물에서 보의 뼈대인 철근을 배치 조립할 필요가 없어 작업자에게 보 뼈대의 구축 편의성을 제공할 수 있는 건축물의 보 뼈대 시공방법을 제공함에 있다.The present invention has been proposed to solve the various problems as described above, and its purpose is to arrange the lower reinforcing bars, upper reinforcing bars and reinforcing plates that are the frame of a beam in a one-time arrangement frame, and after binding and assembling the assembled frame By transporting and installing the beam frame together with the one-time placement frame through transport means, the worker can easily transfer the beam frame assembled together with the one-time placement frame to the building under construction in a single process. Since it is possible to construct a beam frame, it is possible to significantly reduce the construction period through rapid construction of the beam frame, and it is possible to arrange and assemble the beam frame from the outside through a one-time arrangement frame, so it can be used in a building with a narrow work space. An object of the present invention is to provide a method of constructing a beam frame of a building that can provide workers with convenience in constructing the beam frame because it is not necessary to arrange and assemble the rebar, which is the frame of the beam.

또한, 보의 뼈대인 철근이 배치 고정되는 1회성 배치틀은 철근과 함께 보의 뼈대로 사용되므로 보의 강도를 대폭 향상시켜 건축물의 구조적인 안전성을 강화할 수 있는 건축물의 보 뼈대 시공방법을 제공함에 있다.In addition, since the one-time arrangement frame in which the reinforcing bars, which are the frame of the beam, are placed and fixed, is used as the frame of the beam together with the reinforcing bars, so that the strength of the beam is greatly improved and the structural safety of the building can be strengthened. have.

상기와 같은 목적을 달성하기 위한 본 발명에 따른 건축물의 보 뼈대 시공방법은 양측으로 수평 이격되어 길게 형성되는 받침대의 상부에 보의 뼈대가 되는 철근을 배치하기 위한 1회성 배치틀을 안치하는 안치단계(S10);와, 상기 1회성 배치틀에 보의 뼈대가 되는 하부철근과 상부철근과 강화판을 배치 조립하는 조립단계(S20);와, 상기 1회성 배치틀에 조립된 보의 뼈대를 이송수단을 통해 시공되는 건축물로 승강 이송시켜 간편히 보의 뼈대로 구축하는 이송단계(S30);와, 보 뼈대의 구축이 완료되면 상기 1회성 배치틀로부터 이송수단의 이송와이어를 회수하는 회수단계(S40);를 포함하여 이루어지며,
상기 1회성 배치틀은 상기 받침대의 상부에 둘 이상이 일정한 간격으로 배치되는 것으로, 상기 받침대의 상부에 적층되어 보의 뼈대가 되는 하부철근을 지지하는 지지판과, 상기 지지판의 상부 양측에서 상부로 수직 돌출되는 서로 마주보게 위치되는 설정판을 포함하여 구성되어 전체적으로 "ㅛ" 형상을 갖는 배치틀과, 상기 설정판 상에 수직으로 일정한 간격으로 관통 형성되는 것으로, 내입 배치되는 임시 설정봉을 통해 보 뼈대의 상부철근의 높이 설정을 유도하는 설정공과, 상기 설정공에 내입 배치되어 보 뼈대의 상부철근을 임시로 지지하여 상부철근의 높이를 설정하는 임시 설정봉을 포함하여 구성되며,
상기 조립단계(S20)는 보 뼈대의 상부철근의 높이를 고려하여 상기 배치틀의 설정공으로 상기 임시 설정봉을 관통 배치시킨 후, 상기 임시 설정봉의 상부에 상부철근을 적층 배치하는 제1공정(S21)과, 상기 받침대의 상부로 하부철근을 지지하는 동시에 상기 임시 설정봉에 위치된 상부철근과 연결되는 "└┘" 형상의 배치철근을 다수 배치하는 제2공정(S22)과, 상기 임시 설정봉을 회수하여 상기 배치틀의 내부를 개방한 상태에서 다수의 하부철근을 상기 배치철근의 상부에 적층 배치하는 제3공정(S23)과, 보의 뼈대가 되는 강화판을 상기 배치틀의 지지판과 배치철근에 적층 배치한 후, 상기 강화판의 상부에 상부철근을 지지할 수 있는 지지봉을 용접 고정한 후에 상기 지지봉의 상부에 다수의 상부철근을 적층 배치한 후, 상기 상부철근의 상부로 상부철근을 결속 고정하는 결속철근을 적층하는 제4공정(S24)을 포함하여 구성되는 것을 특징으로 한다.
The method for constructing a beam frame of a building according to the present invention for achieving the above object is a placing step of placing a one-time arrangement frame for arranging reinforcing bars that become the frame of the beam on the upper part of the pedestal which is horizontally spaced apart on both sides and formed to be long. (S10); and an assembly step (S20) of disposing and assembling the lower reinforcing bars, the upper reinforcing bars and the reinforcing plate, which are the frame of the beam in the one-time arrangement frame; and a means for transporting the frame of the beam assembled in the one-time arrangement frame A transfer step (S30) of easily constructing a beam frame by elevating and transporting it to a building to be constructed through a; and a recovery step (S40) of recovering the transfer wire of the transfer means from the one-time placement frame when the construction of the beam frame is completed It is made including;
The one-time placement frame is two or more arranged at regular intervals on the upper portion of the support, a support plate that is laminated on the upper portion of the support to support a lower reinforcing bar that becomes the skeleton of a beam, and vertical from both upper sides of the support plate to the top A placement frame having a “ㅛ” shape as a whole and configured to include a setting plate positioned to face each other protruding, and a beam skeleton through a temporary setting rod that is vertically disposed on the setting plate at regular intervals. It consists of a setting hole for inducing setting the height of the upper reinforcing bar of the , and a temporary setting bar disposed inside the setting hole to temporarily support the upper reinforcing bar of the beam frame to set the height of the upper reinforcing bar,
The assembling step (S20) is a first step (S21) of placing the temporary setting bar through the setting hole of the arrangement frame in consideration of the height of the upper reinforcing bar of the beam frame, and then stacking the upper reinforcing bars on the upper part of the temporary setting bar (S21) ) and a second process (S22) of disposing a plurality of arrangement reinforcing bars in the shape of "└┘" connected to the upper reinforcing bars located on the temporary setting rods while supporting the lower reinforcing bars to the upper part of the pedestal (S22), and the temporary setting rods A third process (S23) of stacking and arranging a plurality of lower reinforcing bars on top of the arrangement reinforcing bars in a state in which the inside of the arrangement frame is opened by collecting After stacking and placing a plurality of upper reinforcing bars on the upper part of the support bar after welding and fixing a support bar capable of supporting the upper reinforcing bar on the upper part of the reinforcing plate, binding and fixing the upper reinforcing bar to the upper part of the upper reinforcing bar It is characterized in that it is configured to include a fourth step (S24) of laminating the binding reinforcing bars.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

이상에서와 같이 본 발명에 따른 건축물의 보 뼈대 시공방법에 의하면, 1회성 배치틀에 보의 뼈대가 되는 하부철근과 상부철근 및 강화판을 배치하여 결속 조립한 후, 그 조립된 뼈대를 이송수단을 통해 1회성 배치틀과 함께 시공되는 건축물로 이송 설치하여 보의 뼈대로 사용함으로, 작업자는 1회성 배치틀과 함께 조립된 보의 뼈대를 시공중인 건축물로 이송 배치하는 한 번의 공정으로 간편히 보의 뼈대를 구축할 수 있어 보 뼈대의 신속한 구축을 통해 건축물의 공기를 대폭 절감할 수 있을 뿐만 아니라, 1회성 배치틀을 통해 보의 뼈대를 외부에서 배치 조립할 수 있어 작업공간이 협소한 건축물에서 보의 뼈대인 철근을 배치 조립할 필요가 없어 작업자에게 보 뼈대의 구축 편의성을 제공할 수 있는 효과가 있다.As described above, according to the method for constructing a beam frame of a building according to the present invention, the lower reinforcing bar, the upper reinforcing bar and the reinforcing plate are arranged and assembled in a one-time arrangement frame, and then the assembled frame is transferred to the transport means. By transferring and installing the beam to the building under construction together with the one-time placement frame, the worker transfers and arranges the beam frame assembled together with the one-time placement frame to the building under construction in a single process. Not only can the construction period be greatly reduced through the rapid construction of the beam frame, but also the beam frame can be arranged and assembled from the outside through a one-time arrangement frame, so that the beam frame can be used in a building with a narrow work space. There is no need to arrange and assemble the reinforcement bars, which has the effect of providing convenience to the worker for constructing the beam frame.

또한, 보의 뼈대인 철근이 배치 고정되는 1회성 배치틀은 철근과 함께 보의 뼈대로 사용되므로 보의 강도를 대폭 향상시켜 건축물의 구조적인 안전성을 강화할 수 있는 효과가 있다.In addition, the one-time arrangement frame in which the reinforcing bar, which is the frame of the beam, is placed and fixed, is used as the frame of the beam together with the reinforcing bar, so it has the effect of significantly improving the strength of the beam and strengthening the structural safety of the building.

도 1은 본 발명의 실시예에 따른 건축물의 보 뼈대 시공방법의 블럭도
도 2는 도 1에 도시된 건축물의 보 뼈대 시공방법에 사용되는 1회성 배치틀의 사시도
도 3은 도 1에 도시된 건축물의 보 뼈대 시공방법에 사용되는 1회성 배치틀의 정면도
도 4는 도 1에 도시된 건축물의 보 뼈대 시공방법을 설명하기 위한 도면
1 is a block diagram of a beam frame construction method of a building according to an embodiment of the present invention;
Figure 2 is a perspective view of a one-time placement frame used in the construction method of the beam frame of the building shown in Figure 1;
Figure 3 is a front view of a one-time arrangement frame used in the construction method of the beam frame of the building shown in Figure 1;
Figure 4 is a view for explaining the construction method of the beam frame of the building shown in Figure 1;

본 발명의 바람직한 실시예에 따른 건축물의 보 뼈대 시공방법을 첨부된 도면에 의거하여 상세히 설명한다. 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 공지 기능 및 구성에 대한 상세한 기술은 생략한다.A method of constructing a beam frame of a building according to a preferred embodiment of the present invention will be described in detail based on the accompanying drawings. Detailed descriptions of well-known functions and configurations that are determined to unnecessarily obscure the gist of the present invention will be omitted.

도 1 내지 도 4는 본 발명의 실시예에 따른 건축물의 보 뼈대 시공방법을 도시한 것으로, 도 1은 본 발명의 실시예에 따른 건축물의 보 뼈대 시공방법의 블럭도를, 도 2는 도 1에 도시된 건축물의 보 뼈대 시공방법에 사용되는 1회성 배치틀의 사시도를, 도 3은 도 1에 도시된 건축물의 보 뼈대 시공방법에 사용되는 1회성 배치틀의 정면도를, 도 4는 도 1에 도시된 건축물의 보 뼈대 시공방법을 설명하기 위한 도면을 각각 나타낸 것이다.1 to 4 show a method for constructing a beam frame of a building according to an embodiment of the present invention, FIG. 1 is a block diagram of a method for constructing a beam frame of a building according to an embodiment of the present invention, and FIG. A perspective view of a one-time placement frame used in the construction method of a beam frame of a building shown in FIG. 3 is a front view of a one-time placement frame used in the method of constructing a beam frame of a building shown in FIG. 1, FIG. 4 is FIG. The drawings for explaining the construction method of the beam frame of the building shown in Fig.

상기 도면에 도시한 바와 같이, 본 발명의 실시예에 따른 건축물의 보 뼈대 시공방법(100)은 안치단계(S10)와, 조립단계(S20)와, 이송단계(S30)와, 회수단계(S40)를 포함하고 있다.As shown in the figure, the beam frame construction method 100 of a building according to an embodiment of the present invention includes a placing step (S10), an assembling step (S20), a transferring step (S30), and a recovery step (S40). ) is included.

도 1에 도시된 바와 같이, 상기 안치단계(S10)는 양측으로 수평 이격되어 길게 형성되는 받침대(10)의 상부에 보의 뼈대가 되는 철근(1)을 배치하기 위한 1회성 배치틀(20)을 안치하는 공정이다.As shown in FIG. 1, the placing step (S10) is a one-time arrangement frame 20 for arranging the reinforcing bars 1, which become the skeleton of the beam, on the upper portion of the pedestal 10 that is horizontally spaced apart from each other on both sides. is the process of placing

여기서, 도 4a에 도시된 바와 같이 상기 안치단계(S10)에서 보의 뼈대를 조립하고자 하는 장소의 바닥(지면)에 배치되는 상기 받침대(10)는 상기 1회성 배치틀(20)을 지지하여 상기 1회성 배치틀(20)에서 보의 뼈대를 구성하는 철근(1)이 용이하게 조립되도록 유도한다.Here, as shown in FIG. 4A, the pedestal 10 disposed on the floor (ground) of the place where the frame of the beam is to be assembled in the placing step S10 supports the one-time placement frame 20 to support the In the one-time arrangement frame 20, the reinforcing bars 1 constituting the skeleton of the beam are induced to be easily assembled.

도 1에 도시된 바와 같이, 상기 조립단계(S20)는 상기 1회성 배치틀(20)에 보의 뼈대가 되는 하부철근(1a)과 상부철근(1b)과 강화판(3)을 배치 조립하는 공정으로, 제1공정(S21)과, 제2공정(S22)과, 제3공정(S23)과, 제4공정(S24)으로 이루어진다.1, the assembling step (S20) is a process of disposing and assembling a lower reinforcing bar 1a, an upper reinforcing bar 1b, and a reinforcing plate 3, which are the frame of a beam in the one-time arrangement frame 20 , a first process ( S21 ), a second process ( S22 ), a third process ( S23 ), and a fourth process ( S24 ) are performed.

여기서, 상기 조립단계(S20)의 공정을 설명하기 앞서서 상기 1회성 배치틀(20)의 구성을 살펴보면, 도 2와 도 3에 도시된 바와 같이 상기 1회성 배치틀(20)은 상기 받침대(10)의 상부에 둘 이상이 일정한 간격으로 배치되는 것으로, 상기 받침대(10)의 상부에 적층되어 보의 뼈대가 되는 하부철근(1a)을 지지하는 지지판(21a)과, 상기 지지판(21a)의 상부 양측에서 상부로 수직 돌출되는 서로 마주보게 위치되는 설정판(21b)을 포함하여 구성되어 전체적으로 "ㅛ" 형상을 갖는 배치틀(21)과, 상기 설정판(21b) 상에 수직으로 일정한 간격으로 관통 형성되는 것으로, 내입 배치되는 임시 설정봉(23)을 통해 보 뼈대의 상부철근(1b)의 높이 설정을 유도하는 설정공(22)과, 상기 설정공(22)에 내입 배치되어 보 뼈대의 상부철근(1b)을 임시로 지지하여 상부철근(1b)의 높이를 설정하는 임시 설정봉(23)을 포함하여 구성된다.Here, before describing the process of the assembly step (S20), looking at the configuration of the one-time placement frame 20, as shown in FIGS. 2 and 3, the one-time placement frame 20 is the pedestal 10 ) to be arranged at regular intervals on the upper portion of the support plate 21a, which is laminated on the upper portion of the support 10 to support the lower reinforcing bar 1a that becomes the skeleton of the beam, and the upper portion of the support plate 21a A placement frame 21 having a “ㅛ” shape as a whole and configured to include a setting plate 21b positioned to face each other vertically protruding upward from both sides, and passing through the setting plate 21b at regular intervals vertically on the setting plate 21b To be formed, the setting hole 22 for inducing the setting of the height of the upper reinforcing bar 1b of the beam skeleton through the temporary setting rod 23 arranged internally, and the setting hole 22 arranged internally to the upper part of the beam skeleton It is configured to include a temporary setting bar 23 for temporarily supporting the reinforcing bar 1b to set the height of the upper reinforcing bar 1b.

즉, 도 4b에 도시된 바와 같이 상기 제1공정(S21)은 보 뼈대의 상부철근(1b)의 높이를 고려하여 상기 배치틀(21)의 설정공(22)으로 상기 임시 설정봉(23)을 관통 배치시킨 후, 상기 임시 설정봉(23)의 상부에 상부철근(1b)을 적층 배치하는 공정이다.That is, as shown in Figure 4b, the first step (S21) is the temporary setting rod 23 with the setting hole 22 of the placement frame 21 in consideration of the height of the upper reinforcing bar 1b of the beam frame. After placing the through, it is a process of stacking the upper reinforcement (1b) on top of the temporary setting rod (23).

이때 상기 배치틀(21)의 설정판(21b) 바깥쪽에 상부철근(1b)을 배치한다.At this time, the upper reinforcing bar 1b is disposed on the outside of the setting plate 21b of the arrangement frame 21 .

여기서, 상기 임시 설정봉(23)에 배치되는 상부철근(1b)은 상부철근(1b)의 높이를 설정하기 위한 기준으로 일부만을 배치하는 과정이며, 상기 배치틀(21) 설정판(21b)의 안쪽으로 상부철근(1b)을 배치하지 않는 이유는 상기 제3공정(S23)에서 상기 배치틀(21) 내부에 하부철근(1a) 등을 배치하는 공정을 원활하게 진행하기 위함이다.Here, the upper reinforcing bar 1b disposed on the temporary setting bar 23 is a process of arranging only a part of the upper reinforcing bar 1b as a reference for setting the height of the upper reinforcing bar 1b, and the arrangement frame 21 of the setting plate 21b The reason for not disposing the upper reinforcing bars 1b inward is to smoothly proceed with the process of disposing the lower reinforcing bars 1a and the like in the arrangement frame 21 in the third process S23.

도 4c에 도시된 바와 같이, 상기 제2공정(S22)은 상기 받침대(10)의 상부로 하부철근(1a)을 지지하는 동시에 상기 임시 설정봉(23)에 위치된 상부철근(1b)과 연결되는 "└┘" 형상의 배치철근(2)을 다수 배치하는 공정이다.As shown in Fig. 4c, the second process (S22) is connected to the upper reinforcing bar 1b positioned on the temporary setting bar 23 while supporting the lower reinforcing bar 1a to the upper part of the pedestal 10. It is a process of arranging a large number of placed reinforcing bars (2) in the shape of "└┘".

여기서, 상기 배치철근(2)의 상부는 상부철근(1b)과 철사(6)나 용접 등의 결속방식으로 연결되어 서로 결속 고정된다.Here, the upper portion of the arrangement reinforcing bar 2 is connected to the upper reinforcing bar 1b and the wire 6 or by a binding method such as welding and is fixed to each other.

도 4d에 도시된 바와 같이, 상기 제3공정(S23)은 상기 임시 설정봉(23)을 회수하여 상기 배치틀(21)의 내부를 개방한 상태에서 다수의 하부철근(1a)을 상기 배치철근(2)의 상부에 적층 배치하는 공정이다.As shown in FIG. 4D , in the third process (S23), a plurality of lower reinforcing bars 1a are placed in a state in which the temporary setting rod 23 is recovered and the inside of the arrangement frame 21 is opened. (2) It is a process of laminating|stacking on the upper part.

이때, 상기 배치틀(21)의 지지판(21a) 역시 배치되는 하부철근(1a)을 지지하여 하부철근(1a)의 안정적인 배치를 유도하며, 상기 하부철근(1a)은 상기 배치철근(2) 및 지지판(21a)과 철사(6)나 용접 등의 결속방식으로 연결되어 서로 결속 고정된다.At this time, the support plate 21a of the arrangement frame 21 also supports the lower reinforcing bar 1a which is also disposed to induce a stable arrangement of the lower reinforcing bar 1a, and the lower reinforcing bar 1a is the arrangement reinforcing bar 2 and The support plate 21a and the wire 6 are connected to each other by a binding method such as welding or bonding and fixed to each other.

도 4e에 도시된 바와 같이, 상기 제4공정(S24)은 보의 뼈대가 되는 강화판(3)을 상기 배치틀(21)의 지지판(21a)과 배치철근(2)에 적층 배치한 후, 상기 강화판(3)의 상부에 상부철근(1b)을 지지할 수 있는 지지봉(4)을 용접 고정한 후에 상기 지지봉(4)의 상부에 다수의 상부철근(1b)을 적층 배치한 후, 상기 상부철근(1b)의 상부로 상부철근(1b)을 결속 고정하는 결속철근(5)을 적층하여 상기 1회성 배치틀(20)에 보의 뼈대 조립을 완료하는 공정이다.As shown in Fig. 4e, in the fourth step (S24), the reinforcing plate 3, which is the frame of the beam, is stacked on the support plate 21a of the placement frame 21 and the placement reinforcing bar 2, and then the After welding and fixing the support bar 4 capable of supporting the upper reinforcing bar 1b on the upper part of the reinforcing plate 3, a plurality of upper reinforcing bars 1b are stacked on top of the support bar 4, and then the upper reinforcing bar ( 1b) is a process of stacking the binding reinforcing bars 5 for binding and fixing the upper reinforcing bars 1b to the upper part of 1b) to complete the assembling of the beam frame in the one-time arrangement frame 20.

여기서, 상기 강화판(3)의 높이는 상부철근(1b)이 배치되는 높이를 고려하여 형성되어 상기 지지봉(4)을 통해 상부철근(1b)의 높이가 적합하게 설정 고정되며, 상기 강화판(3)은 상기 배치틀(21)의 지지판(21a)과 용접 결합되며, 상기 결속철근(5)은 상부철근(1b)과 철사(6)나 용접 방식으로 연결되어 서로 결속 고정된다.Here, the height of the reinforcing plate 3 is formed in consideration of the height at which the upper reinforcing bar 1b is disposed so that the height of the upper reinforcing bar 1b is appropriately set and fixed through the support bar 4, and the reinforcing plate 3 is It is welded to the support plate 21a of the arrangement frame 21, and the binding reinforcing bar 5 is connected to the upper reinforcing bar 1b and the wire 6 or by welding, and is fixed to each other.

즉, 상기와 같은 조립단계(S20)의 공정을 통해 외부에서 상기 1회성 배치틀(20)에 보의 뼈대를 간편히 조립할 수 있다.That is, through the process of the assembling step (S20) as described above, the frame of the beam can be easily assembled in the one-time arrangement frame 20 from the outside.

한편, 보의 뼈대를 구성하는 철근(1:상부철근과 하부철근)과 배치철근(2)과 결속철근(5)과 강화판(3) 및 지지봉(4)은 통상적으로 보의 뼈대를 구축하기 위해 사용되는 구성물로, 이에 대한 상세한 설명은 생략하도록 한다.On the other hand, the reinforcing bars (1: upper and lower reinforcing bars) constituting the frame of the beam, the arrangement reinforcing bar 2, the binding reinforcing bar 5, the reinforcing plate 3, and the support bar 4 are usually used to construct the frame of the beam. As a component used, a detailed description thereof will be omitted.

도 1에 도시된 바와 같이, 상기 이송단계(S30)는 상기 1회성 배치틀(20)에 조립된 보의 뼈대를 이송수단(30)을 통해 시공되는 건축물로 승강 이송시켜 간편히 보의 뼈대로 구축하는 공정이다.As shown in Fig. 1, the transfer step (S30) is to transport the frame of the beam assembled in the one-time arrangement frame 20 to the building to be constructed through the conveying means 30 to easily construct the frame of the beam. is a process that

여기서, 도 2와 도 3에 도시된 바와 같이 상기 이송수단(30)은 상기 배치틀(21)의 설정판(21b) 상부 상에 관통 형성되는 이송구멍(31)과, 상기 이송구멍(31)과 연결되어 상기 1회성 배치틀(20)과 함께 조립된 보의 뼈대의 이송을 유도하는 이송와이어(32)를 포함하여 구성된다.Here, as shown in FIGS. 2 and 3 , the transfer means 30 includes a transfer hole 31 that is formed through the upper portion of the setting plate 21b of the placement frame 21 , and the transfer hole 31 . It is connected to and configured to include a transfer wire 32 for inducing transfer of the skeleton of the beam assembled together with the one-time placement frame 20 .

즉, 상기 이송단계(S30)에서는 상기 조립단계(S20)를 통해 상기 1회성 배치틀(20)에 보 뼈대의 조립이 완료되면, 도 4f에 도시된 바와 같이 상기 배치틀(21)에 형성되는 상기 이송구멍(31)에 상기 이송와이어(32)를 결속하고, 그 이송와이어(32)를 크레인(미도시)과 연결하여 상기 1회성 배치틀(20)과 함께 조립된 보의 뼈대를 시공중인 건축물로 이송하여 보의 뼈대로 사용한다.That is, in the transfer step (S30), when the assembly of the beam frame to the one-time placement frame 20 is completed through the assembling step (S20), as shown in FIG. Binding the transfer wire 32 to the transfer hole 31, and connecting the transfer wire 32 with a crane (not shown) to construct a beam frame assembled together with the one-time placement frame 20 It is transported to the building and used as the frame of the beam.

도 1에 도시된 바와 같이, 상기 회수단계(S40)는 보 뼈대의 구축이 완료되면 상기 1회성 배치틀(20)로부터 이송수단(30)의 이송와이어(32)를 회수하는 공정이다.1, the recovery step (S40) is a process of recovering the transfer wire 32 of the transfer means 30 from the one-time placement frame 20 when the construction of the beam frame is completed.

즉, 도 4g에 도시된 바와 같이 상기 이송단계(S30)에서 1회성 배치틀(20)에 조립된 보 뼈대가 시공중인 건축물로 이송 완료되면, 상기 1회성 배치틀(20)로부터 상기 이송수단(30)의 이송와이어(31)를 회수하여 다른 1회성 배치틀(20)에 조립되는 보 뼈대의 이송을 위한 용도로 재사용한다.That is, as shown in Fig. 4g, when the beam frame assembled in the one-time placement frame 20 in the transfer step (S30) is transferred to the building under construction, the transfer means ( The transfer wire 31 of 30) is recovered and reused for the purpose of transferring the beam frame assembled to the other one-time placement frame 20 .

상기와 같은 공정으로 이루어지는 본 발명의 건축물의 보 뼈대 시공방법(100)은 1회성 배치틀(20)에 보의 뼈대가 되는 하부철근(1a)과 상부철근(1b) 및 강화판(3)을 배치하여 결속 조립한 후, 그 조립된 뼈대를 상기 이송수단(30)을 통해 상기 1회성 배치틀(20)과 함께 시공되는 건축물로 이송 설치하여 보의 뼈대로 사용함으로, 작업자는 상기 1회성 배치틀(20)과 함께 조립된 보의 뼈대를 시공중인 건축물로 이송 배치하는 한 번의 공정으로 간편히 보의 뼈대를 구축할 수 있어 보 뼈대의 신속한 구축을 통해 건축물의 공기를 대폭 절감할 수 있을 뿐만 아니라, 상기 1회성 배치틀(20)을 통해 보의 뼈대를 외부에서 배치 조립할 수 있어 작업공간이 협소한 건축물에서 보의 뼈대인 철근을 배치 조립할 필요가 없어 작업자에게 보 뼈대의 구축 편의성을 제공할 수 있는 효과가 있다.The beam frame construction method 100 of the present invention comprising the above process arranges the lower reinforcing bar 1a, the upper reinforcing bar 1b, and the reinforcing plate 3 as the beam frame in the one-time arrangement frame 20 . After binding and assembling, the assembled skeleton is transferred to a building to be constructed together with the one-time placement frame 20 through the transfer means 30 and used as a beam frame, so that the operator can use the one-time placement frame (20) It is possible to easily construct a beam frame in a single process of transferring and disposing the frame of the beam assembled together with the building under construction, so that not only can the construction of the building be significantly reduced through the rapid construction of the beam frame, Through the one-time arrangement frame 20, the frame of the beam can be arranged and assembled from the outside, so there is no need to arrange and assemble the reinforcing bar, which is the frame of the beam, in a building with a narrow work space, which can provide workers with the convenience of constructing the beam frame. It works.

또한, 보의 뼈대인 철근(1)이 배치 고정되는 상기 1회성 배치틀(20)은 철근(1)과 함께 보의 뼈대로 사용되므로 보의 강도를 대폭 향상시켜 건축물의 구조적인 안전성을 강화할 수 있는 효과가 있다.In addition, since the one-time placement frame 20, in which the reinforcing bar 1, which is the frame of the beam, is placed and fixed, is used as the frame of the beam together with the reinforcing bar 1, so that the strength of the beam can be greatly improved to strengthen the structural safety of the building. there is an effect

상기와 같은 구성을 가진 본 발명의 실시예에 따른 건축물의 보 뼈대 시공방법(100)은 다음과 같은 공정으로 시공중인 건축물에 간편히 보의 뼈대를 구축한다.The beam frame construction method 100 according to an embodiment of the present invention having the above configuration easily constructs a beam frame in a building under construction by the following process.

먼저, 도 4a에 도시된 바와 같이 지면에 배치된 받침대(10)의 상부에 1회성 배치틀(20)을 배치한다. (S10)First, as shown in Figure 4a, a one-time placement frame 20 is disposed on the upper portion of the pedestal 10 disposed on the ground. (S10)

그런 후, 도 4b 내지 도 4e에 도시된 바와 같이 상기 1회성 배치틀에 보의 뼈대가 되는 하부철근과 상부철근 및 강화판을 배치 조립한다. (S20)Then, as shown in Figs. 4b to 4e, the lower reinforcing bar, the upper reinforcing bar and the reinforcing plate are arranged and assembled in the one-time arrangement frame. (S20)

그런 후, 도 4f에 도시된 바와 같이 이송수단(30)을 통해 상기 1회성 배치틀(20)에 조립된 보 뼈대를 시공중인 건축물로 이송시켜 간편히 보 뼈대로 구축 사용한다. (S30)Thereafter, as shown in FIG. 4f, the beam frame assembled in the one-time placement frame 20 is transferred to the building under construction through the transfer means 30, and is easily constructed and used as a beam frame. (S30)

상기와 같이 보 뼈대의 구축이 완료되면, 도 4g에 도시된 바와 같이 상기 1회성 배치틀(20)로부터 이송수단(30)의 이송와이어(32)를 회수하여 다른 1회성 배치틀(20)에 조립되는 보 뼈대의 이송을 위한 용도로 재사용한다. (S40)When the construction of the beam frame is completed as described above, as shown in FIG. 4g , the transfer wire 32 of the transfer means 30 is recovered from the one-time placement frame 20 and placed in another one-time placement frame 20 . It is reused for the purpose of transporting the assembled beam frame. (S40)

상기와 같은 공정을 통해 우수한 강도를 갖는 건축물의 보 뼈대를 매우 간편하고 신속하게 구축할 수 있다.Through the process as described above, it is possible to construct a beam frame of a building having excellent strength very simply and quickly.

본 발명은 첨부된 도면에 도시된 실시예를 참고로 설명되었으나 이는 예시적인 것으로 상술한 실시예에 한정되지 않으며, 당해 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 실시예가 가능하다는 점을 이해할 수 있을 것이다. 또한, 본 발명의 사상을 해치지 않는 범위 내에서 당업자에 의한 변형이 가능함은 물론이다. 따라서, 본 발명에서 권리를 청구하는 범위는 상세한 설명의 범위 내로 정해지는 것이 아니라 후술되는 청구범위와 이의 기술적 사상에 의해 한정될 것이다.Although the present invention has been described with reference to the embodiments shown in the accompanying drawings, which are illustrative and not limited to the above-described embodiments, those of ordinary skill in the art will realize that various modifications and equivalent embodiments are possible therefrom. point can be understood. In addition, it is a matter of course that modifications by those skilled in the art are possible within the scope that does not impair the spirit of the present invention. Accordingly, the scope of claiming the right in the present invention will not be defined within the scope of the detailed description, but will be limited by the claims and its technical spirit to be described later.

1. 철근 1a. 하부철근
1b. 상부철근 2. 배치철근
3. 강화판 4. 지지봉
5. 결속철근 6. 철사
10. 받침대 20. 1회성 배치틀
21. 배치틀 21a. 지지판
21b. 설정판 22. 설정공
23. 임시 설정봉 30. 이송수단
31. 이송구멍 32. 이송와이어
S10. 안치단계 S20. 조립단계
S21. 제1공정 S22. 제2공정
S23. 제3공정 S24. 제4공정
S30. 이송단계 S40. 회수단계
100. 건축물의 보 뼈대 시공방법
1. Rebar 1a. lower bar
1b. Upper reinforcing bar 2. Arrangement rebar
3. Reinforcement plate 4. Support bar
5. Bundling reinforcing bar 6. Wire
10. Pedestal 20. One-time placement frame
21. Placement frame 21a. support plate
21b. Setting Board 22. Setting Ball
23. Temporary setting rod 30. Transport means
31. Transfer hole 32. Transfer wire
S10. Placement step S20. assembly stage
S21. 1st process S22. 2nd process
S23. Third process S24. 4th process
S30. Transfer step S40. recovery stage
100. Construction method of beam frame of building

Claims (3)

건축물의 보 뼈대 시공방법에 있어서,
양측으로 수평 이격되어 길게 형성되는 받침대(10)의 상부에 보의 뼈대가 되는 철근(1)을 배치하기 위한 1회성 배치틀(20)을 안치하는 안치단계(S10);
상기 1회성 배치틀(20)에 보의 뼈대가 되는 하부철근(1a)과 상부철근(1b)과 강화판(3)을 배치 조립하는 조립단계(S20);
상기 1회성 배치틀(20)에 조립된 보의 뼈대를 이송수단(30)을 통해 시공되는 건축물로 승강 이송시켜 간편히 보의 뼈대로 구축하는 이송단계(S30); 및
보 뼈대의 구축이 완료되면 상기 1회성 배치틀(20)로부터 이송수단(30)의 이송와이어(32)를 회수하는 회수단계(S40);를 포함하여 이루어지며,
상기 1회성 배치틀(20)은 상기 받침대(10)의 상부에 둘 이상이 일정한 간격으로 배치되는 것으로, 상기 받침대(10)의 상부에 적층되어 보의 뼈대가 되는 하부철근(1a)을 지지하는 지지판(21a)과, 상기 지지판(21a)의 상부 양측에서 상부로 수직 돌출되는 서로 마주보게 위치되는 설정판(21b)을 포함하여 구성되어 전체적으로 "ㅛ" 형상을 갖는 배치틀(21)과, 상기 설정판(21b) 상에 수직으로 일정한 간격으로 관통 형성되는 것으로, 내입 배치되는 임시 설정봉(23)을 통해 보 뼈대의 상부철근(1b)의 높이 설정을 유도하는 설정공(22)과, 상기 설정공(22)에 내입 배치되어 보 뼈대의 상부철근(1b)을 임시로 지지하여 상부철근(1b)의 높이를 설정하는 임시 설정봉(23)을 포함하여 구성되며,
상기 조립단계(S20)는 보 뼈대의 상부철근(1b)의 높이를 고려하여 상기 배치틀(21)의 설정공(22)으로 상기 임시 설정봉(23)을 관통 배치시킨 후, 상기 임시 설정봉(23)의 상부에 상부철근(1b)을 적층 배치하는 제1공정(S21)과, 상기 받침대(10)의 상부로 하부철근(1a)을 지지하는 동시에 상기 임시 설정봉(23)에 위치된 상부철근(1b)과 연결되는 "└┘" 형상의 배치철근(2)을 다수 배치하는 제2공정(S22)과, 상기 임시 설정봉(23)을 회수하여 상기 배치틀(21)의 내부를 개방한 상태에서 다수의 하부철근(1a)을 상기 배치철근(2)의 상부에 적층 배치하는 제3공정(S23)과, 보의 뼈대가 되는 강화판(3)을 상기 배치틀(21)의 지지판(21a)과 배치철근(2)에 적층 배치한 후, 상기 강화판(3)의 상부에 상부철근(1b)을 지지할 수 있는 지지봉(4)을 용접 고정한 후에 상기 지지봉(4)의 상부에 다수의 상부철근(1b)을 적층 배치한 후, 상기 상부철근(1b)의 상부로 상부철근(1b)을 결속 고정하는 결속철근(5)을 적층하는 제4공정(S24)을 포함하여 구성되는 것을 특징으로 하는 건축물의 보 뼈대 시공방법.
In the beam frame construction method of a building,
Placing step (S10) of placing a one-time placement frame 20 for arranging the reinforcing bar (1) serving as the skeleton of the beam on the upper part of the pedestal 10 that is horizontally spaced apart from each other on both sides;
an assembly step (S20) of disposing and assembling a lower reinforcing bar (1a), an upper reinforcing bar (1b), and a reinforcing plate (3), which are the skeleton of the beam, in the one-time arrangement frame (20);
A transfer step (S30) of easily constructing the frame of the beam by elevating and transferring the frame of the beam assembled in the one-time arrangement frame 20 to the building to be constructed through the conveying means 30; and
When the construction of the beam frame is completed, a recovery step (S40) of recovering the transfer wire 32 of the transfer means 30 from the one-time placement frame 20 is made including;
The one-time arrangement frame 20 is to be arranged at regular intervals on the upper portion of the pedestal 10, and is laminated on the upper portion of the pedestal 10 to support the lower reinforcing bar 1a, which is the skeleton of the beam. A support plate 21a, and a setting plate 21b positioned to face each other vertically protruding upward from both sides of the upper side of the support plate 21a, and a placement frame 21 having a "ㅛ" shape as a whole, and the A setting hole 22, which is vertically formed through the setting plate 21b at regular intervals, and induces the setting of the height of the upper reinforcing bar 1b of the beam frame through a temporary setting rod 23 disposed inside, and the It is disposed inside the setting hole 22 to temporarily support the upper reinforcing bar 1b of the beam frame and includes a temporary setting bar 23 for setting the height of the upper reinforcing bar 1b,
In the assembling step (S20), the temporary setting rod 23 is inserted through the setting hole 22 of the placement frame 21 in consideration of the height of the upper reinforcing bar 1b of the beam frame, and then the temporary setting rod A first step (S21) of stacking and arranging the upper reinforcing bar (1b) on the upper part of (23), and at the same time supporting the lower reinforcing bar (1a) to the upper part of the pedestal (10) and positioned on the temporary setting bar (23) A second process (S22) of arranging a plurality of placement reinforcing bars 2 in the shape of "└┘" connected to the upper reinforcing bar 1b, and recovering the temporary setting rod 23 to remove the inside of the placement frame 21 A third process (S23) of stacking and arranging a plurality of lower reinforcing bars 1a on top of the arrangement reinforcing bars 2 in an open state, and a reinforcing plate 3 serving as a frame of the beam is installed as a support plate of the arrangement frame 21 After stacking on the reinforcement plate (2) and (21a), after fixing the support rod (4) capable of supporting the upper reinforcement (1b) on the upper part of the reinforcement plate (3) by welding and fixing a plurality of the support rods (4) on the upper part After stacking the upper reinforcing bars (1b) of the fourth step (S24) of stacking the binding reinforcing bars (5) for binding and fixing the upper reinforcing bars (1b) to the upper part of the upper reinforcing bars (1b) A method for constructing a beam frame of a building characterized
삭제delete 삭제delete
KR1020190117117A 2019-09-23 2019-09-23 Construction method of beam frame of building KR102263779B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190117117A KR102263779B1 (en) 2019-09-23 2019-09-23 Construction method of beam frame of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190117117A KR102263779B1 (en) 2019-09-23 2019-09-23 Construction method of beam frame of building

Publications (2)

Publication Number Publication Date
KR20210035008A KR20210035008A (en) 2021-03-31
KR102263779B1 true KR102263779B1 (en) 2021-06-09

Family

ID=75237838

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190117117A KR102263779B1 (en) 2019-09-23 2019-09-23 Construction method of beam frame of building

Country Status (1)

Country Link
KR (1) KR102263779B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100736382B1 (en) * 2006-01-16 2007-07-06 김두희 Reinforcement bars and beam construction method using them
KR100863974B1 (en) * 2008-06-11 2008-10-17 (주)화인테크 Pre-fabrication method of rebar for reinforced concrete column
JP2017014706A (en) * 2015-06-27 2017-01-19 株式会社安藤・間 Steel frame concrete structure
KR101730989B1 (en) * 2016-07-26 2017-05-12 주식회사베스트엔지니어링 Variable worktable for arrangement of rebar
JP2018100589A (en) * 2018-02-07 2018-06-28 東急建設株式会社 Basic assembly steel bar construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100736382B1 (en) * 2006-01-16 2007-07-06 김두희 Reinforcement bars and beam construction method using them
KR100863974B1 (en) * 2008-06-11 2008-10-17 (주)화인테크 Pre-fabrication method of rebar for reinforced concrete column
JP2017014706A (en) * 2015-06-27 2017-01-19 株式会社安藤・間 Steel frame concrete structure
KR101730989B1 (en) * 2016-07-26 2017-05-12 주식회사베스트엔지니어링 Variable worktable for arrangement of rebar
JP2018100589A (en) * 2018-02-07 2018-06-28 東急建設株式会社 Basic assembly steel bar construction method

Also Published As

Publication number Publication date
KR20210035008A (en) 2021-03-31

Similar Documents

Publication Publication Date Title
US10584478B2 (en) Building frame structure having edge beam and construction method thereof
KR102263778B1 (en) Frame assembly device for building beam
KR102263779B1 (en) Construction method of beam frame of building
JP6849491B2 (en) Exposed column base structure of steel columns and its construction method
KR101360287B1 (en) Assembled gang form
KR102329323B1 (en) Construction method of building column
JP5174786B2 (en) Rafter unit for roof construction, roof construction block and roof construction method of building
JP5322216B2 (en) Steel frame reinforced concrete frame construction method
KR102263777B1 (en) Steel reinforcement assembly device for building columns
KR101666981B1 (en) Connecting structure of prefabricated steel frame
JP3138112U (en) Roof unit structure and connecting hardware used therefor
KR101866559B1 (en) Construction technique of concrete structures through the Precast Concrete
JP2768237B2 (en) Assembly translation method and beam joining method of large hanging boiler, and beam joining structure
JP6035836B2 (en) Construction method for reinforced concrete structures
KR102196893B1 (en) Drop panel having One Body Structure and method of constructing a structure using the drop panel
JPH07112807A (en) Rack construction method and jig for automatic store
JP2009002035A (en) Foldable working platform and method of assembling the same
JP2018040165A (en) Method to arrange bars at beam-column connection part
JP2018044286A (en) Steel plate concrete structure, and construction method for the same
JP2002138578A (en) Method for bar arrangement of main reinforcement and hoop on steel frame bar
JPS6019848Y2 (en) steel column
JP6015089B2 (en) Beam
JP2017071902A (en) Fixing structure for building unit, and unit building
JP2912817B2 (en) Pallets for transporting building materials
JPH0454786B2 (en)

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant