KR102258666B1 - Pipe insulate structure - Google Patents

Pipe insulate structure Download PDF

Info

Publication number
KR102258666B1
KR102258666B1 KR1020200182225A KR20200182225A KR102258666B1 KR 102258666 B1 KR102258666 B1 KR 102258666B1 KR 1020200182225 A KR1020200182225 A KR 1020200182225A KR 20200182225 A KR20200182225 A KR 20200182225A KR 102258666 B1 KR102258666 B1 KR 102258666B1
Authority
KR
South Korea
Prior art keywords
jacket
side cap
pipe
cap
jackets
Prior art date
Application number
KR1020200182225A
Other languages
Korean (ko)
Inventor
김미경
Original Assignee
주식회사 정훈
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 정훈 filed Critical 주식회사 정훈
Priority to KR1020200182225A priority Critical patent/KR102258666B1/en
Application granted granted Critical
Publication of KR102258666B1 publication Critical patent/KR102258666B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L59/00Thermal insulation in general
    • F16L59/02Shape or form of insulating materials, with or without coverings integral with the insulating materials
    • F16L59/021Shape or form of insulating materials, with or without coverings integral with the insulating materials comprising a single piece or sleeve, e.g. split sleeve, two half sleeves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L59/00Thermal insulation in general
    • F16L59/14Arrangements for the insulation of pipes or pipe systems
    • F16L59/147Arrangements for the insulation of pipes or pipe systems the insulation being located inwardly of the outer surface of the pipe

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Insulation (AREA)

Abstract

The present invention relates to a pipe insulation structure that is easy to assemble and maintain. According to the present invention, the pipe insulation structure comprises: a first jacket (10) for enclosing an insulating material (I) surrounding a pipe (P) and having a first side cap (11) and a first other side cap (12) that are coupled or separated from each other; a second jacket (20) which surrounds the insulating material (I) in a state spaced apart from the first jacket (10) and has a second one side cap (21) and a second other side cap (22) that are coupled or separated from each other; and an intermediate jacket (30) connecting the first jacket (10) and the second jacket (20) in a state in which the insulating material (I) is wrapped.

Description

조립 및 유지 관리가 용이한 배관 단열구조{Pipe insulate structure}Pipe insulate structure for easy assembly and maintenance {Pipe insulate structure}

본 발명은 선박, 조선소, 플랜트등에 설치되는 파이프 배관을 단열하기 위한 단열구조에 관한 것으로서, 더욱 상세하게는 용이하게 조립할 수 있고 유지보수를 위하여 용이하게 분리할 수 있는, 조립 및 유지 관리가 용이한 배관 단열구조에 관한 것이다. The present invention relates to an insulating structure for insulating pipes installed in ships, shipyards, plants, etc., and in more detail, it can be easily assembled and easily separated for maintenance, easy assembly and maintenance. It relates to the pipe insulation structure.

일반적으로 선박, 조선소, 플랜트등에는 고온 또는 저온의 유체가 흐르는 각종 파이프 배관이 설치되며, 배관에는 유체의 열이 외부로 전도되는 것을 방지하기 위한 단열구조가 채용되고 있다. 이러한 배관은 두께가 10cm에서 수십 cm 가 되는 경우가 많다. In general, ships, shipyards, plants, etc. are installed with various pipe piping through which high or low temperature fluid flows, and an insulation structure is employed in the piping to prevent heat of the fluid from being conducted to the outside. These pipes are often 10 cm to tens of cm thick.

도 1은 종래의 배관 단열구조를 설명하기 위한 사시도이다. 1 is a perspective view for explaining a conventional pipe insulation structure.

도시된 바와 같이, 종래의 배관 단열구조는, 유체가 흐르는 두꺼운 배관(P)을 둘러싸는 유리섬유나 스펀지등과 같은 단열재(I)가 배관(P)을 둘러싼 상태를 유지할 수 있도록 하기 위한 것으로서, 스틸 판재를 원통 형태로 판금 성형한 것으로서 배관(P)을 둘러싸는 단열재(I)를 감싸는 자켓(1)과, 단열재(1)를 감싸는 자켓(1)이 풀어지지 않도록 자켓(1) 둘레를 감싸는 다수의 결속밴드(2)를 포함한다. 이때 결속밴드(2)는 자켓(1)의 직경이나 배관(P)의 길이에 따라 설치되는 개수가 정해지며, 이러한 결속밴드(2)의 양단에는 상호 체결하거나 분리할 수 있도록 착탈클립(2a)이 설치된다. As shown, the conventional pipe insulation structure is to maintain a state surrounding the pipe (P) with an insulating material (I) such as glass fiber or sponge surrounding the thick pipe (P) through which fluid flows, As a sheet metal molded steel plate in a cylindrical shape, the jacket (1) surrounding the insulation (I) surrounding the pipe (P) and the jacket (1) surrounding the insulation (1) are wrapped around the jacket (1) so that the jacket (1) is not released. Includes a plurality of binding bands (2). At this time, the number of binding bands (2) is determined according to the diameter of the jacket (1) or the length of the pipe (P), and a detachable clip (2a) at both ends of the binding band (2) so that they can be mutually fastened or separated. Is installed.

그런데 상기 단열구조에 있어서, 자켓(1)은 스틸 판재를 원통 형태로 판금 성형하여 구현된 것이기 때문에 그 자체의 탄성에 의하여 벌어지려는 성질이 강하고, 이에 따라 자켓(1)을 설치하기 위하여 작업자 1은 자켓(1)이 벌어지지 않도록 잡고, 작업자 2 는 결속밴드(2)로 자켓(1)을 결속하여야 하였다. 이러한 과정에서 많은 작업인원은 물론 작업시간이 소요되었다. However, in the heat insulating structure, since the jacket 1 is formed by sheet metal molding a steel plate in a cylindrical shape, it has a strong property to spread due to its own elasticity, and accordingly, the operator 1 The silver jacket (1) was held so that it did not open, and the worker 2 had to bind the jacket (1) with a binding band (2). In this process, not only a lot of workers, but also work time was taken.

또한 유지보수를 하는 상황이 될 경우 특정 위치의 자켓(1)을 분리하여야 하는데, 이 경우 먼저 해당 자켓(1)을 결속하는 다수의 밴드를 풀어야 하고, 유지보수가 완료되면 상기와 같은 방식으로 자켓(1)을 단열재(I) 주위를 감싸고 작업자 1 이 자켓(1)이 풀어지지 않도록 잡고 작업자 2가 다수의 밴드를 결속시키는 과정에서 많은 노력이 발생되었다. In addition, in the case of maintenance, the jacket (1) at a specific location must be removed. In this case, first, a plurality of bands that bind the jacket (1) must be released. When maintenance is completed, the jacket (1) must be removed in the same manner as above. A lot of effort was generated in the process of wrapping (1) around the insulation material (I) and holding the jacket (1) so that the worker 1 does not loosen and the worker 2 binds a number of bands.

본 발명은 상기와 같은 문제점을 해결하기 위하여 창출된 것으로서, 결속 밴드를 사용하지 않고 자켓을 설치할 수 있어, 최소의 작업 인원 및 시간에 설치가 가능한, 조립 및 유지 관리가 용이한 배관 단열구조를 제공하는 것을 목적으로 한다. The present invention was created to solve the above problems, and the jacket can be installed without the use of a binding band, thereby providing a pipe insulation structure that can be installed in a minimum number of working people and time, and is easy to assemble and maintain. It aims to do.

본 발명의 다른 목적은, 배관으로부터 쉽게 분리시킬 수 있어 용이한 유지보수를 가능하게 할 수 있는, 조립 및 유지 관리가 용이한 배관 단열구조를 제공하는 것이다. Another object of the present invention is to provide a pipe insulation structure that is easy to assemble and maintain, which can be easily separated from the pipe to enable easy maintenance.

상기와 같은 목적을 달성하기 위하여, 본 발명에 따른 조립 및 유지 관리가 용이한 배관 단열구조는, 유체가 이송되는 파이프 배관(P)을 단열하기 위한 것으로서, 배관(P)을 둘러싼 단열제(I)에 상기 단열제(I)의 일부가 노출되도록 일정한 간격으로 감싸게 설치되는 것으로서, 스틸 판재가 둥글게 말려져 구현되는 판재몸체(31)와, 상기 판재몸체(31)의 일단에 형성된 판재고리단(32)과, 상기 판재몸체(31)의 타단에 형성되어 상기 판재고리단(32)이 선택적으로 걸어지는 판재걸이단(33)을 포함하여 전체적으로 원통 형태를 이루는 다수의 매개자켓(30)(30')(30'); 상기 매개자켓(30)과 다른 매개자켓(30')의 양단 및 상기 단열재(I)를 감싸게 설치될 수 있도록 상호 결합되거나 분리되는 제1일측캡(11) 및 제1타측캡(12)을 가지며, 상기 매개자켓(30)과 다른 매개자켓(30') 사이에서 이동 가능한 제1자켓(10); 상기 다른 매개자켓(30')과 또 다른 매개자켓(30")의 양단 및 상기 단열재(I)를 감싸게 설치될 수 있도록 상호 결합되거나 분리되는 제2일측캡(21) 및 제2타측캡(22)을 가지며, 상기 다른 매개자켓(30')과 또 다른 매개자켓(30") 사이에서 이동 가능한 제2자켓(20); 및 상기 제1,2자켓(10)(20) 또는 매개자켓(30)의 표면에 길이 방향으로 형성되는 것으로서 열에 의하여 색깔이 변화되는 온도변색층(40);을 포함하고, 상기 제1자켓(10)은, 단면이 반원 형태를 이루는 상기 제1일측캡(11)과, 단면이 반원 형태를 이루는 상기 제1타측캡(12)과, 상기 제1일측캡(11)과 제1타측캡(12)의 일단에 형성되어 상호 힌지 결합 연결되는 제1힌지연결부(13)와, 상기 제1일측캡(11) 및 제1타측캡(12)의 타단에 형성되어 상호 체결 또는 분리되는 제1체결부(14)을 포함하고; 상기 제2자켓(20)은, 단면이 반원 형태를 이루는 상기 제2일측캡(21)과, 단면이 반원 형태를 이루는 상기 제2타측캡(22)과, 상기 제2일측캡(21)과 제2타측캡(22)의 일단에 형성되어 상호 힌지 결합 연결되는 제2힌지연결부(23)와, 상기 제2일측캡(21) 및 제2타측캡(22)의 타단에 형성되어 상호 체결 또는 분리되는 제2체결부(24)를 포함하고; 상기 제1,2힌지연결부(13)(23)는, 상기 제1,2일측캡(11)(21)의 일단에 형성된 제1,2구면단(13a)(23a)과, 상기 제1,2타측캡(12)(22)의 일단에 형성된 것으로서 상기 제1,2구면단(13a)(23a)을 부분적으로 감싸는 제1,2구면끼움단(13b)(23b)을 포함하고; 상기 제1,2체결부(14)(24)는, 상기 제1,2일측캡(11)(21)의 타단에 형성된 제1,2고리단(14a)(24a)과, 상기 제1,2타측캡(12)(22)의 타단에 형성된 것으로서 상기 제1,2고리단(14a)(24a)에 선택적으로 걸어지는 제1,2고리걸이단(14b)(24b)과, 상기 제1,2고리단(14a)(24a)의 선단에서 길게 돌출되게 형성되어 상기 제1,2고리단(14a)(24a)을 상기 제1,2고리걸이단(14b)(24b)으로부터 분리하기 위한 제1,2분리손잡이(14c)(24c)를 포함하고; 상기 제1,2일측캡(11)(21) 및 제1,2타측캡(12)(22)의 내주면 중앙에서 부분적으로 돌출되게 형성된 것으로서 상기 매개자켓(30)이 진입하는 최대 깊이를 규정하는 제1,2중간단턱(15)(25)을 포함하는 것;을 특징으로 한다. In order to achieve the above object, the pipe insulation structure that is easy to assemble and maintain according to the present invention is to insulate the pipe pipe (P) through which the fluid is transferred, and an insulation (I) surrounding the pipe (P) ) Is installed to be wrapped at regular intervals so that a part of the insulating material (I) is exposed, and a plate body 31 formed by rolling a steel plate and a plate ring end formed at one end of the plate body 31 ( 32), and a plurality of intermediate jackets 30 and 30 that are formed on the other end of the plate body 31 to form a cylindrical shape as a whole including a plate hanger end 33 on which the plate hook end 32 is selectively hung. ')(30'); It has a first one side cap 11 and a first other side cap 12 that are mutually coupled or separated so that both ends of the intermediate jacket 30 and the other intermediate jacket 30 ′ are installed to surround the insulation material I , A first jacket (10) movable between the intermediate jacket (30) and another intermediate jacket (30'); The second one side cap 21 and the second second side cap 22 that are mutually coupled or separated so that both ends of the other intermediate jacket 30 ′ and the other intermediate jacket 30 ″ and installed to surround the insulation material I ), the second jacket 20 movable between the other intermediate jacket 30 ′ and the other intermediate jacket 30 ″; And a temperature-chromic layer 40 formed in a longitudinal direction on the surface of the first and second jackets 10 and 20 or the intermediate jacket 30 and whose color is changed by heat. 10), the first one side cap 11 having a semicircular cross-section, the first other side cap 12 having a semicircular cross-section, and the first one side cap 11 and the first other side cap ( A first hinge connection 13 formed at one end of 12) and hingedly connected to each other, and a first fastener formed at the other ends of the first one side cap 11 and the first other side cap 12 to be mutually fastened or separated Includes part 14; The second jacket 20 includes the second one side cap 21 having a semicircular cross-section, the second other side cap 22 having a semicircular cross-section, and the second one side cap 21 A second hinge connecting portion 23 formed at one end of the second other side cap 22 and hingedly connected to each other, and the other end of the second one side cap 21 and the second second cap 22 to be mutually fastened or It includes a second fastening portion 24 to be separated; The first and second hinge connection portions 13 and 23 include first and second spherical ends 13a and 23a formed at one end of the first and second one side caps 11 and 21, and It includes first and second spherical fitting ends 13b and 23b which are formed at one end of the second cap 12 and 22 and partially surround the first and second spherical ends 13a and 23a; The first and second fastening portions 14 and 24 include first and second ring ends 14a and 24a formed on the other ends of the first and second one-side caps 11 and 21, and 2 The first and second hook ends (14b) (24b) formed on the other end of the other side cap (12) (22) and selectively hang on the first and second hook ends (14a) (24a), and the first ,It is formed to protrude long from the tip of the second ring end (14a) (24a) to separate the first and second ring ends (14a) (24a) from the first and second ring hook ends (14b) (24b). It includes first and second separating handles 14c and 24c; It is formed to partially protrude from the center of the inner circumferential surface of the first and second one side caps 11 and 21 and the first and second other side caps 12 and 22 and defines the maximum depth to which the intermediate jacket 30 enters. Including the first and second intermediate stepped (15) (25); characterized by.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

본 발명에 따르면, 기다란 배관(P)을 둘러싼 단열제(I)에 매개자켓(30)을 일정한 간격으로 배치하여 설치하고, 이후 매개자켓(30)의 양단이 내장되도록 제1,2자켓(10)(20)을 설치함으로서, 1 인의 작업자라도 시공 설치가 가능하고 작업시간을 단축시킬 수 있다. According to the present invention, the first and second jackets 10 are installed by arranging and installing the intermediate jackets 30 at regular intervals on the insulation (I) surrounding the long pipe P, and thereafter, both ends of the intermediate jacket 30 are embedded. ) By installing (20), even a single worker can perform construction and installation and shorten the working time.

또한, 배관(P)을 감싸는 단열재(I)를 일정한 간격으로 배치되어 감싸는 다수의 매개자켓(30)(30')(30")과, 매개자켓(30)(30')(30") 사이의 단열재(I)를 감싸면서 매개자켓의 양단을 수용하는 다수의 제1,2자켓(10)(20)을 포함함으로서, 배관(P)의 길이에 관계없이 설치 가능한 단열구조를 구현할 수 있다. In addition, between a plurality of intermediate jackets (30) (30') (30") and a plurality of intermediate jackets (30) (30') (30") that are arranged at regular intervals to surround the insulating material (I) surrounding the pipe (P), and By including a plurality of first and second jackets 10 and 20 for accommodating both ends of each jacket while surrounding the insulating material I of, it is possible to implement an insulating structure that can be installed regardless of the length of the pipe P.

또한 제1자켓(10)(20)고 매개자켓(30)이 교번으로 설치되고, 제1,2자켓(10)(20)과 매개자켓(30)이 상대 이동 가능하므로, 배관의 특정 위치에서 단열재(I)를 유지보수 하고자 할 경우 특정 위치의 제1자켓(10)과 제2자켓(20)을 좌우 방향으로 밀어 이동시켜 매개자켓(30)을 제1,2자켓(10)(20)으로부터 분리시키거나, 특정 위치의 제1자켓(10) 또는 제2자켓(20)을 분리시킨다. 분리한다. In addition, since the first jacket 10 and 20 and the intermediate jacket 30 are alternately installed, and the first and second jackets 10 and 20 and the intermediate jacket 30 can be moved relative to each other, In order to maintain the insulation (I), each jacket (30) is moved by pushing the first jacket (10) and the second jacket (20) in a specific position in the left and right directions to move the intermediate jacket (30) into the first and second jackets (10) (20). Or to separate the first jacket 10 or the second jacket 20 at a specific location. Separate.

그리고 제1,2자켓(10)(20)은 상호 결합되거나 분리되는 제1,2일측캡(11)(21) 및 제1,2타측캡(12)(22)으로 이루어지므로, 종래와 같은 결속밴드를 사용하지 않고도 단열재(I)를 감쌀 수 있고, 이에 따라 용이한 설치는 물론 유지보수시 용이한 분리가 가능하다라는 작용효과가 있다. And since the first and second jackets 10 and 20 are composed of first and second one side caps 11 and 21 and the first and second other side caps 12 and 22 that are coupled or separated from each other, It is possible to wrap the insulation material (I) without using a binding band, and accordingly, there is an effect that easy installation as well as easy separation during maintenance is possible.

도 1은 종래의 배관 단열구조를 설명하기 위한 사시도,
도 2는 본 발명에 따른 조립 및 유지 관리가 용이한 배관 단열구조의 정면도,
도 3은 도 2의 배관 단열구조의 단면을 설명하기 위한 사시도,
도 4는 도 3의 III-III' 선의 확대 단면도,
도 5는 도 4의 제1,2자켓 양측으로 매개자켓이 몰입되거나 돌출되는 것을 설명하기 위한 도면,
도 6은 도 5의 VI-VI'선을 따른 제1,2자켓의 단면도,
도 7은 도 6의 제1,2자켓이 벌어지는 동작을 설명하기 위한 도면,
도 8은 도 5의 매개자켓을 발췌하여 도시한 사시도,
도 9는 도 8의 매개자켓에 있어 판재고리단이 판재걸이단에 걸어진 상태를 설명하기 위한 단면도,
도 10은 도 3의 배관 단열구조에 온도변색층이 형성된 것을 설명하기 위한 도면,
도 11은 도 3의 배관 단열구조의 조립 과정을 설명하기 위한 도면,
1 is a perspective view for explaining a conventional pipe insulation structure,
2 is a front view of the pipe insulation structure for easy assembly and maintenance according to the present invention,
3 is a perspective view for explaining a cross-section of the pipe insulation structure of FIG. 2,
4 is an enlarged cross-sectional view taken along line III-III' of FIG. 3;
5 is a view for explaining that an intermediate jacket is immersed or protruded to both sides of the first and second jackets of FIG. 4;
6 is a cross-sectional view of the first and second jackets taken along line VI-VI' of FIG. 5;
FIG. 7 is a view for explaining an operation in which the first and second jackets of FIG. 6 are opened;
8 is a perspective view showing an excerpt of the intermediate jacket of FIG. 5;
9 is a cross-sectional view for explaining a state in which the plate hook end is hung on the plate hook end in the intermediate jacket of FIG. 8;
FIG. 10 is a view for explaining that a temperature discoloration layer is formed in the pipe insulation structure of FIG. 3;
11 is a view for explaining the assembly process of the pipe insulation structure of FIG. 3,

이하, 본 발명에 따른 조립 및 유지 관리가 용이한 배관 단열구조를 첨부된 도면들을 참조하여 상세히 설명한다. Hereinafter, a pipe insulation structure for easy assembly and maintenance according to the present invention will be described in detail with reference to the accompanying drawings.

이하에서, "상부" 나 "상"이라고 기재된 것은 접촉하여 바로 위에 있는 것뿐만 아니라 비접촉으로 위에 있는 것도 포함할 수 있다. 제1, 제2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 구성요소들은 용어들에 의해 한정 되어서는 안 된다. 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 또한 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다. 또한, 명세서에 기재된 "...부", "모듈" 등의 용어는 적어도 하나의 기능이나 동작을 처리하는 단위를 의미한다. 어떤 실시예가 달리 구현 가능한 경우에 특정한 공정 순서는 설명되는 순서와 다르게 수행될 수도 있다. 예를 들어, 연속하여 설명되는 두 공정이 실질적으로 동시에 수행될 수도 있고, 설명되는 순서와 반대의 순서로 진행될 수 있다.Hereinafter, what is described as "top" or "top" may include not only those directly above by contact, but also those that are above non-contact. Terms such as first and second may be used to describe various elements, but the elements should not be limited by terms. The terms are used only for the purpose of distinguishing one component from another component. Singular expressions include plural expressions unless the context clearly indicates otherwise. In addition, when a part "includes" a certain component, it means that other components may be further included rather than excluding other components unless specifically stated to the contrary. In addition, terms such as "... unit" and "module" described in the specification mean a unit that processes at least one function or operation. When a certain embodiment can be implemented differently, a specific process order may be performed differently from the described order. For example, two processes described in succession may be performed substantially simultaneously, or may be performed in an order opposite to the described order.

도 2는 본 발명에 따른 조립 및 유지 관리가 용이한 배관 단열구조의 정면도이고, 도 3은 도 2의 배관 단열구조의 단면을 설명하기 위한 사시도이고, 도 4는 도 3의 III-III' 선의 확대 단면도이고, 도 5는 도 4의 제1,2자켓 양측으로 매개자켓이 몰입되거나 돌출되는 것을 설명하기 위한 도면이다. 2 is a front view of a pipe insulation structure that is easy to assemble and maintain according to the present invention, FIG. 3 is a perspective view for explaining a cross section of the pipe insulation structure of FIG. 2, and FIG. 4 is a line III-III′ of FIG. It is an enlarged cross-sectional view, and FIG. 5 is a view for explaining that an intermediate jacket is immersed or protruded toward both sides of the first and second jackets of FIG. 4.

도시된 바와 같이, 본 발명에 따른 조립 및 유지 관리가 용이한 배관 단열구조는 유체가 이송되는 파이프 배관(P)을 단열하기 위한 것이다. 이러한 배관 단열구조는, 배관(P)의 외주면을 둘러싼 단열재(I)를 감싸는 것으로서, 상호 결합되거나 분리되는 제1일측캡(11) 및 제1타측캡(12)을 가지는 제1자켓(10)과; 제1자켓(10)과 이격된 상태에서 단열재(I)를 감싸는 것으로서, 상호 결합되거나 분리되는 제2일측캡(21) 및 제2타측캡(22)을 가지는 제2자켓(20)과; 단열재(I)를 감싼 상태에서 제1자켓(10)과 제2자켓(20)을 연결하는 매개자켓(30);을 포함한다. As shown, the pipe insulation structure for easy assembly and maintenance according to the present invention is to insulate the pipe pipe P through which the fluid is transferred. This pipe insulation structure, as surrounding the insulation material (I) surrounding the outer circumferential surface of the pipe (P), a first jacket 10 having a first one side cap 11 and a first other side cap 12 that are coupled or separated from each other and; A second jacket 20 having a second one side cap 21 and a second second side cap 22 that are coupled or separated from each other to surround the insulating material (I) in a state spaced apart from the first jacket 10; It includes; an intermediary jacket 30 for connecting the first jacket 10 and the second jacket 20 in a state surrounding the insulation material (I).

여기서 배관(P)에는 고온 또는 저온의 유체가 흐를 수 있으며, 두께가 10cm 에서 수십 cm 가 된다. Here, a fluid of high or low temperature may flow through the pipe P, and the thickness is from 10 cm to several tens of cm.

본 발명에서 용이한 설명을 위하여 1 개의 제1자켓(10)과 제2자켓(20)이 매개자켓(30)으로 연결되는 것으로 한정하여 설명하고 있으나, 배관(P)의 길이에 따라 제1,2자켓(10)(20) 및 매개자켓(30)은 반복적으로 설치된다. 또한 용이한 설명을 위하여 제1자켓(10)과 제2자켓(20)을 다른 도면부호로 설명하고 있으나, 제1,2자켓(10)(20)은 실질적으로 동일 구조 및 구성을 가진다.In the present invention, for ease of explanation, the first jacket 10 and the second jacket 20 are limited to be connected to each other by the intermediate jacket 30, but the first and second jackets according to the length of the pipe P The two jackets 10 and 20 and the intermediate jacket 30 are repeatedly installed. In addition, for easy description, the first jacket 10 and the second jacket 20 are described with different reference numerals, but the first and second jackets 10 and 20 have substantially the same structure and configuration.

도 6은 도 5의 VI-VI'선을 따른 제1,2자켓의 단면도이고, 도 7은 도 6의 제1,2자켓이 벌어지는 동작을 설명하기 위한 도면이다. 6 is a cross-sectional view of the first and second jackets taken along line VI-VI' of FIG. 5, and FIG. 7 is a view for explaining an operation of opening the first and second jackets of FIG. 6.

제1자켓(10)은, 단면이 반원 형태를 이루는 제1일측캡(11)과, 단면이 반원 형태를 이루는 제1타측캡(12)과, 제1일측캡(11)과 제1타측캡(12)의 일단에 형성되어 상호 힌지 결합 연결되는 제1힌지연결부(13)와, 제1일측캡(11) 및 제1타측캡(12)의 타단에 형성되어 상호 체결 또는 분리되는 제1체결부(14)를 포함한다. The first jacket 10 includes a first one side cap 11 having a semicircular cross section, a first other side cap 12 having a semicircular cross section, and a first one side cap 11 and a first other side cap A first hinge connection 13 formed at one end of (12) and hingedly connected to each other, and a first fastening formed at the other ends of the first one side cap 11 and the first other side cap 12 to be mutually fastened or separated Includes part 14.

제1힌지연결부(13)는, 제1일측캡(11)의 일단에 형성된 제1구면단(13a)과, 제1타측캡(12)의 일단에 형성된 것으로서 제1구면단(13a)을 부분적으로 감싸는 제1구면끼움단(13b)을 포함한다. 이러한 제1힌지연결부(13)에 의하여, 제1일측캡(11) 및 제1타측캡(12)은 제1구면끼움단(13b) 및 제1구면단(13a)을 중심으로 상호 벌어지거나 오므려진다. The first hinge connector 13 is formed at one end of the first one side cap 11 and a first spherical end 13a and one end of the first other side cap 12, and partially includes the first spherical end 13a. It includes a first spherical fitting end (13b) wrapped with. By this first hinge connection 13, the first one side cap 11 and the first other side cap 12 are mutually widened or closed around the first spherical fitting end 13b and the first spherical end 13a. It is lost.

제1체결부(14)는, 제1일측캡(11)의 타단에 형성된 제1고리단(14a)과, 제1타측캡(12)의 타단에 형성된 것으로서 제1고리단(14a)에 선택적으로 걸어지는 제1고리걸이단(14b)과, 제1고리단(14a)의 선단에 형성되어 제1고리단(14a)을 제1고리걸이단(14b)으로부터 분리하기 위한 제1분리손잡이(14c)를 포함한다.The first fastening portion 14 is formed at the other end of the first ring end 14a and the other end of the first cap 12, and is selectively applied to the first ring end 14a. A first detachable handle (14b) that is hung by the first hook end (14b) and a first detachable handle formed at the front end of the first hook end (14a) to separate the first hook end (14a) from the first hook hook end (14b) 14c).

이러한 제1체결부(14)에 의하여, 제1일측캡(11)과 제1타측캡(12)을 상호 오무리면 제1고리단(14a)이 제1고리걸이단(14b)에 끼어지면서 제1일측캡(11) 및 제1타측캡(12)이 단열재(I)를 감싸는 원통형의 제1자켓(10)이 된다. 그리고 제1분리손잡이(14c)를 젖힐 경우 제1고리단(14a)을 제1고리걸이단(|4b)으로부터 분리할 수 있고, 이 경우 제1일측캡(11)과 제1타측캡(12)은 상호 벌어질 수 있게 된다. By such a first fastening portion 14, when the first one side cap 11 and the first other side cap 12 are mutually closed, the first ring end 14a is inserted into the first hook end 14b One side cap 11 and the first other side cap 12 become a cylindrical first jacket 10 surrounding the heat insulator (I). And when the first separation handle (14c) is folded, the first ring end (14a) can be separated from the first hook end (|4b). In this case, the first one side cap 11 and the first other side cap 12 ) Can be mutually divided.

제1일측캡(11) 및 제1타측캡(12)의 내주면에는, 중앙을 구획하는 제1중간단턱(15)이 부분적으로 돌출되게 형성된다. 이러한 중간단턱(15)은 매개자켓(30)이 제1,2자켓(10)(20) 내측으로 진입할 때 최대 진입 깊이를 한정한다. On the inner circumferential surfaces of the first one side cap 11 and the first other side cap 12, a first intermediate step 15 partitioning the center is formed to partially protrude. This intermediate step 15 limits the maximum entry depth when the intermediate jacket 30 enters the first and second jackets 10 and 20 inside.

제2자켓(20)은, 도 5 및 도 6에 도시된 바와 같이, 단면이 반원 형태를 이루는 제2일측캡(21)과, 단면이 반원 형태를 이루는 제2타측캡(22)과, 제2일측캡(21)과 제2타측캡(22)의 일단에 형성되어 상호 힌지 결합 연결되는 제2힌지연결부(23)와, 제2일측캡(21) 및 제2타측캡(22)의 타단에 형성되어 상호 체결 또는 분리되는 제2체결부(24)를 포함한다. As shown in FIGS. 5 and 6, the second jacket 20 includes a second one side cap 21 having a semicircular cross-section, a second other side cap 22 having a semicircular cross-section, and 2A second hinge connection part 23 formed at one end of the one side cap 21 and the second other side cap 22 to be hingedly connected to each other, and the other end of the second one side cap 21 and the second second side cap 22 It is formed in and includes a second fastening portion 24 that is fastened or separated from each other.

제2힌지연결부(23)는, 제2일측캡(21)의 일단에 형성된 제2구면단(23a)과, 제2타측캡(22)의 일단에 형성된 것으로서 제2구면단(23a)을 부분적으로 감싸는 제2구면끼움단(23b)을 포함한다. 이러한 제2힌지연결부(23)에 의하여, 제2일측캡(21) 및 제2타측캡(22)은 제2구면끼움단(23b) 및 제2구면단(23a)에 의하여 상호 벌어지거나 오므려진다. The second hinge connecting portion 23 is formed at one end of the second one side cap 21 and a second spherical end 23a, and is formed at one end of the second other side cap 22, and partially includes the second spherical end 23a. It includes a second spherical fitting end (23b) wrapped with. By this second hinge connection 23, the second one side cap 21 and the second second side cap 22 are mutually widened or closed by the second spherical fitting end (23b) and the second spherical end (23a). Lose.

제2체결부(24)는, 제2일측캡(21)의 타단에 형성된 제2고리단(24a)과, 제2타측캡(22)의 타단에 형성된 것으로서 제2고리단(24a)에 선택적으로 걸어지는 제2고리걸이단(24b)과, 제2고리단(24a)의 선단에 형성되어 제2고리단(24a)을 제2고리걸이단(24b)으로부터 분리하기 위한 제2분리손잡이(24c)를 포함한다.The second fastening part 24 is formed at the other end of the second end of the second cap 21 and the second end 24a and the other end of the second cap 22 and is selectively formed at the end of the second end 24a. A second separation handle for separating the second hook end (24b) and the second hook end (24a) to separate the second hook end (24a) from the second hook end (24b). 24c).

이러한 제2체결부(24)에 의하여, 제2일측캡(21)과 제2타측캡(22)을 상호 오무리면 제2고리단(24a)이 제2고리걸이단(24b)에 끼어지면서 제2일측캡(21) 및 제2타측캡(22)이 단열재(I)를 감싸는 원통형의 제2자켓(20)이 된다. 그리고 제2분리손잡이(24c)를 젖힐 경우 제2고리단(24a)을 제2고리걸이단(24b)으로부터 분리할 수 있고, 이 경우 제2일측캡(21)과 제2타측캡(22)은 상호 벌어질 수 있게 된다. By such a second fastening part 24, when the second one side cap 21 and the second second side cap 22 are mutually closed, the second ring end 24a is inserted into the second hook end 24b 2 One side cap 21 and the second second side cap 22 become a cylindrical second jacket 20 surrounding the insulating material (I). And when the second separation handle (24c) is flipped, the second ring end (24a) can be separated from the second hook end (24b), in this case, the second one side cap 21 and the second second side cap 22 Will be mutually open.

제2일측캡(21) 및 제2타측캡(22)의 내주면에는, 중앙을 구획하는 제2중간단턱(25)이 부분적으로 돌출되게 형성된다. 이러한 제2중간단턱(25)은 매개자켓(30)이 제1,2자켓(10)(20) 내측으로 진입할 때 최대 진입 깊이를 한정한다. On the inner circumferential surfaces of the second one side cap 21 and the second second side cap 22, a second intermediate stepped portion 25 partitioning the center is formed to partially protrude. The second intermediate stepped step 25 defines a maximum depth of entry when the intermediate jacket 30 enters the first and second jackets 10 and 20 inside the first and second jackets 10 and 20.

상기 제1,2구면단(13a)(23a), 제1,2고리단(14a)(24a) 및 제1,2중간단턱(15)(25)은 제1,2일측캡(11)(21)을 몰딩 성형하는 과정에서 제1,2일측캡(11)(21)과 한 몸체가 된다. The first and second spherical ends (13a) (23a), the first and second ring ends (14a) (24a) and the first and second intermediate stepped jaws (15) (25) are the first and second one side caps (11) ( In the process of molding 21), the first and second caps 11 and 21 become one body.

상기 제1,2구면끼움단(13b)(23b), 제1,2고리걸이단(14b)(24b) 및 제1,2중간단턱(15)(25)은 제1,2타측캡(12)(22)을 몰딩 성형하는 과정에서 제1,2타측캡(12)(22)과 한 몸체가 된다. The first and second spherical fitting ends (13b) (23b), the first and second hooking ends (14b) (24b), and the first and second intermediate stepped jaws (15, 25) are the first and second other side caps (12). In the process of molding the) (22), it becomes one body with the first and second other side caps 12 and 22.

따라서 제1,2일측캡(11)(21)을 성형하기 위한 금형과 제1,2타측캡(12)(22)을 성형하기 위한 금형을 이용하여 제1,2자켓(10)(20)을 대량으로 생산할 수 있다. Therefore, using a mold for molding the first and second caps 11 and 21 and a mold for molding the first and second caps 12 and 22, the first and second jackets 10 and 20 Can be produced in large quantities.

상기 제1,2자켓(10)(20)은 실질적으로 동일한 구조이므로, 동작을 한번에 설명하면 다음과 같다.Since the first and second jackets 10 and 20 have substantially the same structure, the operation will be described as follows.

제1,2자켓(10)(20)은, 제1,2일측캡(11)(21)과 제1,2타측캡(12)(22)을 제1,2힌지연결부(13)(23)를 중심으로 벌린 상태에서 배관(P)을 둘러싼 단열재(I)를 감싸고, 이후 제1,2일측캡(11)(21)과 제1,2타측캡(12)(22)이 상호 포개어지는 방향으로 가압한다. 그러면 제1,2일측캡(11)(21) 타단의 제1,2고리단(14a)(24a)이 제1,2타측캡(12)(22) 타단의 제1,2고리걸이단(14b)(24b)에 걸어지면서 제1,2일측캡(11)(21) 및 제1,2타측캡(12)(22)은 도 6에 도시된 바와 같이 상기 단열재(I)를 감싸게 된다. The first and second jackets 10 and 20 include the first and second one side caps 11 and 21 and the first and second other side caps 12 and 22 and the first and second hinge connectors 13 and 23. ) In the state of being wide open, and wraps the insulation material (I) surrounding the pipe (P), and then the first and second caps 11 and 21 and the first and second caps 12 and 22 overlap each other. Pressurized in the direction. Then, the first and second end caps 11 and 21 at the other end of the first and second hook ends 14a and 24a at the other end of the first and second caps 12 and 22 14b) While walking on (24b), the first and second one side caps 11 and 21 and the first and second second side caps 12 and 22 surround the insulating material I as shown in FIG. 6.

그리고 배관 단열구조의 유지 보수를 위하여 제1,2자켓(10)(20)을 분리하고자 할 경우, 도 6에 도시된 바와 같이, 제1,2분리손잡이(14c)(24c)를 잡아당겨 제1,2고리단(14a)(24a)을 제1고리걸이단(14b)(24b)로부터 분리시킨다. And when removing the first and second jackets 10 and 20 for maintenance of the pipe insulation structure, as shown in FIG. 6, pulling the first and second separation handles 14c and 24c The 1,2 ring ends (14a) (24a) are separated from the first hook ends (14b) (24b).

도 8은 도 5의 매개자켓을 발췌하여 도시한 사시도이고, 도 9는 도 8의 매개자켓에 있어 판재고리단이 판재걸이단에 걸어진 상태를 설명하기 위한 단면도이다.FIG. 8 is a perspective view showing an excerpt of the intermediate jacket of FIG. 5, and FIG. 9 is a cross-sectional view for explaining a state in which the plate hook end is hung on the plate hook end of the intermediate jacket of FIG. 8.

매개자켓(30)은, 스틸 판재가 둥글게 말려져 구현되는 판재몸체(31)와, 판재몸체(31)의 일단에 형성된 판재고리단(32)과, 판재몸체(31)의 타단에 형성되어 판재고리단(32)이 선택적으로 걸어지는 판재걸이단(33)을 포함한다. 이러한 매개자켓(30)의 길이는 제1,2자켓(10)(20) 보다 작고, 예를 들면 1m 내외인 것이 바람직하다. The intermediate jacket 30 is formed on the other end of the plate body 31, the plate body 31 formed by rolling a steel plate, and a plate ring end 32 formed at one end of the plate body 31, and The ring end 32 includes a plate hanger end 33 to which it is selectively hung. The length of the intermediate jacket 30 is smaller than that of the first and second jackets 10 and 20, and is preferably about 1m, for example.

이러한 구조에 의하여, 판재몸체(31)를 배관(P)을 둘러싼 단열재(I)를 감싼후 판재고리단(32)을 판게걸이단(33)에 걸어서 매개자켓(30)은 단열재(I)를 감싸게 된다. With this structure, the plate body 31 is wrapped around the insulation material (I) surrounding the pipe (P), and then the plate ring end (32) is hooked to the plate hanger end (33), so that the intermediate jacket (30) is provided with the insulation (I) Wrapped around.

상기 매개자켓(30)은 도 5에 도시된 바와 같이, 제1,2자켓(10)(20) 내측으로 끼어져 결합되기 때문에 끼어지는 깊이를 가변할 수 있으며, 이에 따라 제1자켓(10)과 제2자켓(20) 사이의 길이를 가변할 수 있다. As shown in FIG. 5, the intermediate jacket 30 is inserted into the first and second jackets 10 and 20, and thus the depth of the intermediate jacket 30 can be varied. Accordingly, the first jacket 10 The length between the and the second jacket 20 can be varied.

도 10은 도 3의 배관 단열구조에 온도변색층이 형성된 것을 설명하기 위한 도면이다. FIG. 10 is a view for explaining that a temperature discoloration layer is formed in the pipe insulation structure of FIG. 3.

본 발명의 배관 단열구조는, 제1,2자켓(10)(20) 또는 매개자체(30)의 표면에 길이 방향으로 형성되는 것으로서 열에 의하여 색깔이 변화되는 온도변색층(40)을 더 포함한다. 이러한 온도도변색층(40)은 시온 잉크를 길이 방향으로 라인 패턴으로 형성된다. The pipe insulation structure of the present invention further includes a temperature discoloration layer 40 that is formed in the longitudinal direction on the surface of the first and second jackets 10 and 20 or the medium itself 30 and changes color by heat. . The temperature also changeable layer 40 is formed of Zion ink in a line pattern in the longitudinal direction.

온도변색층(40)은 배관(P) 및 단열재(I)에서 발생되는 다양한 변화에 대한 정보를 제공한다. 예를 들면, 다른 자켓에 형성된 온도변색층의 색상과 특정 자켓에 형성된 온도변색층의 색상이 현저히 다를 때, 특정 자켓에서 단열재(I)가 파손되거나, 또는 과도하게 많은 습기를 흡수하였다라는 것을 의미한다. 또는 온도변색층(40)의 온도가 평소와 현저히 다를 경우, 배관(P)을 흐르는 유체의 온도가 설정값에서 벗어남을 의미한다. The temperature discoloration layer 40 provides information on various changes occurring in the pipe P and the heat insulating material I. For example, when the color of the thermochromic layer formed on another jacket and the color of the thermochromic layer formed on a specific jacket are significantly different, it means that the insulation material (I) is damaged in a specific jacket or absorbed excessively much moisture. do. Alternatively, when the temperature of the temperature change layer 40 is significantly different from usual, it means that the temperature of the fluid flowing through the pipe P deviates from the set value.

도 11은 도 3의 배관 단열구조의 조립 과정을 설명하기 위한 도면이다. 11 is a view for explaining the assembly process of the pipe insulation structure of FIG. 3.

기다란 배관(P)을 둘러싼 단열재(I)에, 본 발명의 배관 단열구조를 설치하기 위하여, 일정한 간격으로 매개자켓(30)(30')(30")을 설치하고, 다수의 제1자켓(10)과 제2자켓(20)을 마주보는 매개자켓(30)(30')의 양단을 감싸도록 설치한다. 이러한 방식에 의하여 배관(P)의 길이가 길더라도 빠른 시간내에 제1,2자켓(10)(20) 및 매개자켓(30)(30')(30")을 반복 설치할 수 있다. In order to install the pipe insulation structure of the present invention on the insulation material (I) surrounding the elongated pipe (P), intermediate jackets 30, 30 ′, 30 ″ are installed at regular intervals, and a plurality of first jackets ( 10) and the second jacket 20 are installed to cover both ends of the intermediate jacket 30, 30' facing each other. In this way, even if the length of the pipe P is long, the first and second jackets ( 10) (20) and intermediate jacket (30) (30') (30") can be repeatedly installed.

이와 같이, 본 발명에 따르면, 기다란 배관(P)을 둘러싼 단열제(I)에 매개자켓(30)(30')(30")을 일정한 간격으로 배치하여 설치하고, 이후 매개자켓(30)(30')(30")의 양단이 내장되도록 제1,2자켓(10)(20)을 설치함으로서, 1 인의 작업자라도 시공 설치가 가능하고 작업시간을 단축시킬 수 있다. As described above, according to the present invention, intermediate jackets 30, 30 ′, 30 ″ are arranged and installed at regular intervals on the insulating material I surrounding the elongated pipe P, and thereafter, intermediate jackets 30 (30) ( By installing the first and second jackets 10 and 20 so that both ends of the 30') (30") are built-in, even a single worker can perform construction and installation and shorten the working time.

또한, 배관(P)을 감싸는 단열재(I)에 일정한 간격으로 배치되어 감싸는 다수의 매개자켓(30)(30')(30")과, 매개자켓(30)(30')(30") 사이의 단열재(I)를 감싸면서 매개자켓의 양단을 수용하는 다수의 제1,2자켓(10)(20)을 포함함으로서, 배관(P)의 길이가 매우 길거나 짧더라도 단열구조를 구현할 수 있다. In addition, a plurality of intermediate jackets 30, 30 ′, 30 ″ and 30 ′, 30 ″ and 30 ′, 30 ″ and 30 ″, 30 ″, and 30 ′, 30 ″ and 30 ″, 30 ″, 30 ″, and 30 ″, 30 ″, 30 ″, and By including a plurality of first and second jackets 10 and 20 for accommodating both ends of each jacket while enclosing the insulating material I of the pipe, even if the length of the pipe P is very long or short, an insulating structure can be implemented.

또한 제1,2자켓(10)(20)과 매개자켓(30)(30')(30")이 교번으로 설치되고, 제1,2자켓(10)(20)과 매개자켓(30)(30')(30")이 상대 이동 가능하므로, 배관의 특정 위치에서 단열재(I)를 유지보수 하고자 할 경우 특정 위치의 제1자켓(10)과 제2자켓(20)을 좌우 방향으로 밀어 이동시켜 특정 매개자켓을 제1,2자켓(10)(20)으로부터 분리시키거나, 특정 위치의 제1자켓(10) 또는 제2자켓(20)을 분리시킨다. In addition, the first and second jackets 10 and 20 and intermediate jackets 30 and 30 ′ and 30 ″ are alternately installed, and the first and second jackets 10 and 20 and intermediate jackets 30 and 30 Since 30') (30") can be moved relative to each other, if you want to maintain the insulation material (I) at a specific location of the pipe, push the first jacket 10 and the second jacket 20 at a specific location in the left and right directions to move it. Thus, a specific intermediate jacket is separated from the first and second jackets 10 and 20, or the first jacket 10 or the second jacket 20 at a specific position is separated.

또한 제1,2자켓(10)(20)은 상호 결합되거나 분리되는 제1,2일측캡(11)(21) 및 제1,2타측캡(12)(22)으로 이루어지므로, 종래와 같은 결속밴드를 사용하지 않고도 단열재(I)를 감쌀 수 있고, 이에 따라 용이한 설치는 물론 유지보수시 용이한 분리가 가능하다. In addition, since the first and second jackets 10 and 20 are composed of first and second one side caps 11 and 21 and the first and second other side caps 12 and 22 that are coupled or separated from each other, It is possible to wrap the insulation material (I) without using a binding band, and accordingly, easy installation as well as easy separation during maintenance is possible.

본 발명은 도면에 도시된 일 실시예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다. Although the present invention has been described with reference to an embodiment shown in the drawings, this is only exemplary, and those of ordinary skill in the art will understand that various modifications and other equivalent embodiments are possible therefrom.

P ... 배관 I ... 단열재
10 ... 제1자켓 11 ... 제1일측캡
12 ... 제1타측캡 13 ... 제1힌지연결부
13a ... 제1구면단 13b ... 제1구면끼움단
14 ... 제1체결부 14a ... 제1고리단
14b ... 제1고리걸이단 20 ... 제2자켓
21 ... 제2일측캡 22 ... 제2타측캡
23 ... 제2힌지연결부 23a ... 제2구면단
23b ... 제2구면끼움단 24 ... 제2체결부
24a ... 제2고리단 24b ... 제2고리걸이단
30 ... 매재자켓 31 ... 판재몸체
32 ... 판재고리단 33 ... 판재걸이단
40 ... 온도변색층
P ... Piping I ... Insulation
10 ... 1st jacket 11 ... 1st side cap
12 ... 1st other side cap 13 ... 1st hinge connection part
13a ... 1st spherical end 13b ... 1st spherical fitting end
14 ... 1st joint 14a ... 1st ring end
14b ... 1st hook end 20 ... 2nd jacket
21 ... 2nd side cap 22 ... 2nd other side cap
23 ... 2nd hinge connection 23a ... 2nd spherical end
23b ... 2nd spherical fitting end 24 ... 2nd joint
24a ... 2nd hook end 24b ... 2nd hook end
30 ... buried jacket 31 ... plate body
32 ... plate hook end 33 ... plate hook end
40 ... thermochromic layer

Claims (6)

유체가 이송되는 파이프 배관(P)을 단열하기 위한 것으로서,
배관(P)을 둘러싼 단열제(I)에 상기 단열제(I)의 일부가 노출되도록 일정한 간격으로 감싸게 설치되는 것으로서, 스틸 판재가 둥글게 말려져 구현되는 판재몸체(31)와, 상기 판재몸체(31)의 일단에 형성된 판재고리단(32)과, 상기 판재몸체(31)의 타단에 형성되어 상기 판재고리단(32)이 선택적으로 걸어지는 판재걸이단(33)을 포함하여 전체적으로 원통 형태를 이루는 다수의 매개자켓(30)(30')(30');
상기 매개자켓(30)과 다른 매개자켓(30')의 양단 및 상기 단열재(I)를 감싸게 설치될 수 있도록 상호 결합되거나 분리되는 제1일측캡(11) 및 제1타측캡(12)을 가지며, 상기 매개자켓(30)과 다른 매개자켓(30') 사이에서 이동 가능한 제1자켓(10);
상기 다른 매개자켓(30')과 또 다른 매개자켓(30")의 양단 및 상기 단열재(I)를 감싸게 설치될 수 있도록 상호 결합되거나 분리되는 제2일측캡(21) 및 제2타측캡(22)을 가지며, 상기 다른 매개자켓(30')과 또 다른 매개자켓(30") 사이에서 이동 가능한 제2자켓(20); 및
상기 제1,2자켓(10)(20) 또는 매개자켓(30)의 표면에 길이 방향으로 형성되는 것으로서 열에 의하여 색깔이 변화되는 온도변색층(40);을 포함하고,
상기 제1자켓(10)은, 단면이 반원 형태를 이루는 상기 제1일측캡(11)과, 단면이 반원 형태를 이루는 상기 제1타측캡(12)과, 상기 제1일측캡(11)과 제1타측캡(12)의 일단에 형성되어 상호 힌지 결합 연결되는 제1힌지연결부(13)와, 상기 제1일측캡(11) 및 제1타측캡(12)의 타단에 형성되어 상호 체결 또는 분리되는 제1체결부(14)을 포함하고;
상기 제2자켓(20)은, 단면이 반원 형태를 이루는 상기 제2일측캡(21)과, 단면이 반원 형태를 이루는 상기 제2타측캡(22)과, 상기 제2일측캡(21)과 제2타측캡(22)의 일단에 형성되어 상호 힌지 결합 연결되는 제2힌지연결부(23)와, 상기 제2일측캡(21) 및 제2타측캡(22)의 타단에 형성되어 상호 체결 또는 분리되는 제2체결부(24)를 포함하고;
상기 제1,2힌지연결부(13)(23)는, 상기 제1,2일측캡(11)(21)의 일단에 형성된 제1,2구면단(13a)(23a)과, 상기 제1,2타측캡(12)(22)의 일단에 형성된 것으로서 상기 제1,2구면단(13a)(23a)을 부분적으로 감싸는 제1,2구면끼움단(13b)(23b)을 포함하고;
상기 제1,2체결부(14)(24)는, 상기 제1,2일측캡(11)(21)의 타단에 형성된 제1,2고리단(14a)(24a)과, 상기 제1,2타측캡(12)(22)의 타단에 형성된 것으로서 상기 제1,2고리단(14a)(24a)에 선택적으로 걸어지는 제1,2고리걸이단(14b)(24b)과, 상기 제1,2고리단(14a)(24a)의 선단에서 길게 돌출되게 형성되어 상기 제1,2고리단(14a)(24a)을 상기 제1,2고리걸이단(14b)(24b)으로부터 분리하기 위한 제1,2분리손잡이(14c)(24c)를 포함하고;
상기 제1,2일측캡(11)(21) 및 제1,2타측캡(12)(22)의 내주면 중앙에서 부분적으로 돌출되게 형성된 것으로서 상기 매개자켓(30)이 진입하는 최대 깊이를 규정하는 제1,2중간단턱(15)(25)을 포함하는 것;을 특징으로 하는, 조립 및 유지 관리가 용이한 배관 단열구조.
It is to insulate the pipe pipe (P) through which the fluid is transferred,
It is installed to be wrapped at regular intervals so that a part of the insulation material (I) is exposed to the insulation material (I) surrounding the pipe (P), and a plate body 31 implemented by rolling a steel plate, and the plate body The overall cylindrical shape, including a plate hook end 32 formed at one end of 31), and a plate hook end 33 formed at the other end of the plate body 31 to selectively hang the plate hook end 32. A plurality of intermediary jackets 30, 30', 30'forming;
It has a first one side cap 11 and a first other side cap 12 that are mutually coupled or separated so that both ends of the intermediate jacket 30 and the other intermediate jacket 30 ′ are installed to surround the insulation material I , A first jacket (10) movable between the intermediate jacket (30) and another intermediate jacket (30');
The second one side cap 21 and the second second side cap 22 that are mutually coupled or separated so that both ends of the other intermediate jacket 30 ′ and the other intermediate jacket 30 ″ and installed to surround the insulation material I ), and the second jacket 20 movable between the other intermediate jacket 30 ′ and the other intermediate jacket 30 ″; And
Including; the first and second jackets 10, 20 or the intermediate jacket 30 formed in a longitudinal direction on the surface of the temperature color change layer 40 that changes color by heat; Including,
The first jacket 10 includes the first one side cap 11 having a semicircular cross-section, the first other side cap 12 having a semicircular cross-section, and the first one side cap 11 A first hinge connection part 13 formed at one end of the first other side cap 12 and hingedly connected to each other, and the other end of the first one side cap 11 and the first other side cap 12 to be mutually fastened or It includes a first fastening portion 14 to be separated;
The second jacket 20 includes the second one side cap 21 having a semicircular cross-section, the second other side cap 22 having a semicircular cross-section, and the second one side cap 21 A second hinge connecting portion 23 formed at one end of the second other side cap 22 and hingedly connected to each other, and the other end of the second one side cap 21 and the second second cap 22 to be mutually fastened or It includes a second fastening portion 24 to be separated;
The first and second hinge connection portions 13 and 23 include first and second spherical ends 13a and 23a formed at one end of the first and second one side caps 11 and 21, and It includes first and second spherical fitting ends 13b and 23b which are formed at one end of the second cap 12 and 22 and partially surround the first and second spherical ends 13a and 23a;
The first and second fastening portions 14 and 24 include first and second ring ends 14a and 24a formed on the other ends of the first and second one-side caps 11 and 21, and 2 The first and second hook ends (14b) (24b) formed on the other end of the other side cap (12) (22) and selectively hang on the first and second hook ends (14a) (24a), and the first ,It is formed to protrude long from the tip of the second ring end (14a) (24a) to separate the first and second ring ends (14a) (24a) from the first and second ring hook ends (14b) (24b). It includes first and second separating handles 14c and 24c;
It is formed to partially protrude from the center of the inner circumferential surface of the first and second one side caps 11 and 21 and the first and second other side caps 12 and 22 and defines the maximum depth to which the intermediate jacket 30 enters. Including the first and second intermediate stepped (15) (25); characterized in that, the pipe insulation structure that is easy to assemble and maintain.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020200182225A 2020-12-23 2020-12-23 Pipe insulate structure KR102258666B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200182225A KR102258666B1 (en) 2020-12-23 2020-12-23 Pipe insulate structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200182225A KR102258666B1 (en) 2020-12-23 2020-12-23 Pipe insulate structure

Publications (1)

Publication Number Publication Date
KR102258666B1 true KR102258666B1 (en) 2021-05-31

Family

ID=76150447

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200182225A KR102258666B1 (en) 2020-12-23 2020-12-23 Pipe insulate structure

Country Status (1)

Country Link
KR (1) KR102258666B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980057887U (en) * 1997-02-11 1998-10-15 이일용 Piping Insulation Cover
KR200299419Y1 (en) * 2002-09-28 2002-12-31 김동선 pipe laying lags protection cover
JP4318654B2 (en) * 2005-03-11 2009-08-26 明星工業株式会社 Insulation degradation diagnosis method, insulation degradation diagnostic equipment, and insulation
JP2010281345A (en) * 2009-06-02 2010-12-16 Chiyoda Kako Kensetsu Kk Heat insulating structure for pipe

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980057887U (en) * 1997-02-11 1998-10-15 이일용 Piping Insulation Cover
KR200299419Y1 (en) * 2002-09-28 2002-12-31 김동선 pipe laying lags protection cover
JP4318654B2 (en) * 2005-03-11 2009-08-26 明星工業株式会社 Insulation degradation diagnosis method, insulation degradation diagnostic equipment, and insulation
JP2010281345A (en) * 2009-06-02 2010-12-16 Chiyoda Kako Kensetsu Kk Heat insulating structure for pipe

Similar Documents

Publication Publication Date Title
US6111194A (en) Electrical and/or fluid power transmitting assembly in a manipulative robot
JPH0514497B2 (en)
CN107104409B (en) Cable sheath
JP2005509826A (en) Protective sleeve for fluid circulation tube
CN111173997A (en) Thermally expandable fire sleeve, coil of several thermally expandable fire sleeves and method for mounting a thermally expandable fire sleeve
KR102258666B1 (en) Pipe insulate structure
WO2015186982A1 (en) Pipe cover of ship pipe
KR970016259A (en) Insulation Jackets for Fluid Transport Conduits
DE602006016381D1 (en) Fastener for laying pipes, cables, ducts and other pipes
US10750578B2 (en) Assembled media line and contour shaped cap device
US2353494A (en) Insulating tape
KR101173681B1 (en) Removable insulation cover
JP2007320211A (en) Heat-insulating cover for injection-molding machine or the like
JPS6120836Y2 (en)
JPH11313427A (en) Cable joint box end plate
CA1223430A (en) Device and method for sealing
CN206647622U (en) A kind of pipeline support and matched fixing glue
KR100613165B1 (en) Cable Duct Coupling Device and Cable Duct having the Same Device
JP4532377B2 (en) Cable support
CN218548045U (en) Wear-resistant drag chain for cable
CN218471010U (en) Preformed end optical cable sheath
JP4123451B2 (en) Cable conduit and its construction method
JP2007306760A (en) Protective structure for wire harness branching part
KR200490437Y1 (en) thermosetting and insulating cover for piping pipe
KR20010040388A (en) Multiple pipe comprising an envelope

Legal Events

Date Code Title Description
AMND Amendment
E601 Decision to refuse application
X091 Application refused [patent]
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant