KR102206277B1 - Stepping stone processing method and the stepping stone using natural stone - Google Patents

Stepping stone processing method and the stepping stone using natural stone Download PDF

Info

Publication number
KR102206277B1
KR102206277B1 KR1020190072967A KR20190072967A KR102206277B1 KR 102206277 B1 KR102206277 B1 KR 102206277B1 KR 1020190072967 A KR1020190072967 A KR 1020190072967A KR 20190072967 A KR20190072967 A KR 20190072967A KR 102206277 B1 KR102206277 B1 KR 102206277B1
Authority
KR
South Korea
Prior art keywords
stone
stepping
natural
raw
loaded
Prior art date
Application number
KR1020190072967A
Other languages
Korean (ko)
Other versions
KR20200144834A (en
Inventor
이오석
Original Assignee
(주)좋은세상
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)좋은세상 filed Critical (주)좋은세상
Priority to KR1020190072967A priority Critical patent/KR102206277B1/en
Publication of KR20200144834A publication Critical patent/KR20200144834A/en
Application granted granted Critical
Publication of KR102206277B1 publication Critical patent/KR102206277B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/22Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by cutting, e.g. incising
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/30Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor to form contours, i.e. curved surfaces, irrespective of the method of working used
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)
  • Road Paving Structures (AREA)

Abstract

이 건 발명은 자연석을 이용한 징검다리석 가공방법 및 징검다리석에 관한 것이다.
이를 위하여, 이 건 발명은 자연 원석을 절단하고, 도드락 다듬하여 구비되어지는 자연석을 이용한 징검다리석 가공방법에 있어서, 상기 징검다리석은 광산에서 캐내어진 자연 원석을 크기별로 선별 및 운반하여 원석 적재장에 적재되도록 하는 원석 적재단계와; 상기 원석 적재장에 적재된 자연 원석을 운반하여 절단기의 대차에 상차되도록 하는 원석 상차단계와; 상기 절단기가 구동되는 가운데 대차를 이동시켜 대차에 상차된 자연 원석이 절단되어 징검다리석의 형태를 갖도록 하는 원석 절단단계와; 상기 자연 원석이 절단된 징검다리석을 대차로부터 이동시켜 디딤부가 구비되도록 하는 디딤부 형성단계; 및 상기 디딤부가 형성된 가장자리를 그라운딩으로 연마시켜 테두리부가 구비되도록 하는 테두리부 연마단계로 이루어지고, 상기 징검다리석은 자연 원석의 상부가 수평으로 절단되어 디딤부가 구비되어지고, 상기 자연 원석의 하부에는 받침부가 구비되어지며, 상기 디딤부와 받침부 사이는 비정형 자연형태를 갖는 비정형 측면부가 구비되어지고, 상기 디딤부는 미끄럼을 방지하기 위한 미끄럼방지부가 구비됨을 특징으로 한다.
This invention relates to a stepping stone processing method and a stepping stone using natural stone.
To this end, the present invention is a method for processing a stepping stone using natural stone prepared by cutting a natural stone and trimming a dodrak, wherein the stepping stone is selected and transported by size of the natural stone excavated from the mine to load the raw stone. A step of loading the stone to be loaded in the sheet; A raw stone loading step of transporting the natural raw stones loaded in the raw stone loading area to be loaded on the cart of the cutter; A raw stone cutting step of moving the bogie while the cutting machine is driven so that the natural gemstone loaded on the bogie is cut to have the shape of a stepping stone; A step forming step of moving the stepping stone from which the natural gemstone has been cut from the cart so that the stepping part is provided; And an edge part polishing step of grinding the edge where the stepped part is formed by grounding so that the edge part is provided, and the stepping stone is provided with a stepping part by cutting the upper part of the natural gemstone horizontally. A part is provided, and an atypical side part having an atypical natural shape is provided between the stepped part and the support part, and the stepped part is characterized in that a non-slip part for preventing slipping is provided.

Description

자연석을 이용한 징검다리석 가공방법 및 징검다리석{STEPPING STONE PROCESSING METHOD AND THE STEPPING STONE USING NATURAL STONE} Stepping stone processing method and stepping stone using natural stone {STEPPING STONE PROCESSING METHOD AND THE STEPPING STONE USING NATURAL STONE}

이 건 발명은 자연석을 이용한 징검다리석 가공방법 및 징검다리석에 관한 것으로서, 특히 광산에서 캐내어진 자연 원석을 절단기를 이용하여 절단되어지도록 한 후 절단된 징검다리석의 상부면을 도두락 다듬으로 미끄럼을 방지할 수 있도록 하는 가운데 도두락 다듬된 모서리를 그라인딩하여 테두리부가 구비되어지도록 한 것이다.This invention relates to a method of processing a stepping stone using natural stone and a stepping stone. In particular, the natural stone excavated from a mine is cut using a cutter, and then the upper surface of the cut stepping stone is slided by smoothing. The edge part is provided by grinding the trimmed corners of the dodurak in the middle to prevent this.

일반적으로 대부분의 하천에는 다리가 설치되어 있어 편리하게 하천을 건널 수 있도록 되어 있으나, 수심이 얇은 하천의 경우 공사비의 절감차원에서 징검다리가 구비되어 있다.In general, most rivers are equipped with bridges so that you can cross the rivers conveniently, but in the case of rivers with a thin water depth, stepping stones are provided to reduce construction costs.

징검다리는 비교적 얕은 하천에 주위의 자연석을 이용하여 설치되는데, 자연석의 표면이 하천의 수면위로 노출되도록 함과 동시에 일정한 간격을 갖도록 하여 노출된 표면을 딛고 하천을 건너게 된다.The stepping stones are installed in a relatively shallow river using surrounding natural stones, and the surface of the natural stone is exposed to the surface of the river, and at the same time, it crosses the exposed surface with a certain distance.

자연석을 이용하여 징검다리를 설치하게 되면 자연친화적인 환경을 조성할 수 있어 매우 바람직하나, 자연석의 윗면 형태가 불균일함에 따라 표면을 딛고 이동하는 과정에서 미끄러지거나 균형을 잃어 하천에 빠지는 원인과 아울러 징검다리의 자연석 크기가 불균일하게 됨에 따라 시공하는 과정에서 많은 어려움과 시간이 소요되는 문제점이 있었다.Installing a stepping bridge using natural stone is highly desirable because it can create a nature-friendly environment, but due to the uneven shape of the top of the natural stone, it slips or loses balance in the process of moving against the surface. As the size of the natural stone of the bridge becomes uneven, there is a problem that a lot of difficulties and time are required in the construction process.

한편, 등록실용신안공보 제20-0163469호(1999.10.01)의 징검다리가 제안되었고, 제안된 징검다리는 높이보다 폭이 상대적으로 긴 직육면체 형상을 갖는 베이스가 얕은 하천 저면에 배치되는 가운데 상부면에 사람이 딛는 평평한 구조를 갖는 암석이 구비되도록 하여 시공에 소요되는 시간과 비용이 절감될 수 있도록 하였으나, 베이스의 상부로 구비되는 암석이 타설되는 콘크리트에 의하여 고착되는 형태를 가짐에 따라 시간이 경화하는 과정에서 콘크리트의 고착력의 약화로 인하여 암석이 분리되는 문제점이 있었다.On the other hand, the stepping bridge of Registration Utility Model Publication No. 20-0163469 (October 1, 1999) was proposed, and the proposed stepping bridge has a rectangular parallelepiped shape whose width is relatively longer than its height, and the upper surface is located at the bottom of a shallow river. The time and cost required for construction were reduced by providing a rock with a flat structure on which a person can step on, but the time hardened as the rock provided on the top of the base is fixed by the concrete being poured. During the process, there was a problem that the rocks were separated due to the weakening of the fixing power of the concrete.

이로 인해 상부가 미끄러우며, 암석이 분리된 홈에 발이 걸려 넘어지게 되는 문제점이 있었고, 이를 유지 보수하기 위한 시간과 비용이 지출되는 문제점이 있었다.Due to this, there is a problem that the upper part is slippery, and the foot trips over the groove where the rock is separated, and there is a problem that time and cost are spent for maintenance.

또한, 베이스를 포함하는 상부가 콘크리트로 이루어져 있음으로써, 주변과 조화를 이루지 못하게 되는 문제점이 여전이 있었다.In addition, since the upper part including the base is made of concrete, there is still a problem that it cannot be harmonized with the surroundings.

등록실용신안공보 제20-0163469호(1999.10.01)Registered Utility Model Publication No. 20-0163469 (1999.10.01)

이 건 발명은 징검다리석이 자연 원석으로 이루어지도록 하여 주변과 자연친화적으로 조화를 이룰 수 있도록 하고, 디딤부가 평평한 형태를 가지며 도드락 다듬에 의한 미끄럼방지부가 구비되어 발을 디디는 과정에서 미끄럼을 방지할 수 있도록 하고, 아울러 자연 원석에 의한 높은 표면 강도가 유지됨에 따라 수명이 연장될 수 있도록 한 것이다.In this invention, the stepping stones are made of natural gemstones so that they can be in harmony with the surroundings in a nature-friendly manner, and the stepping part has a flat shape, and the anti-slip part by trimming the dodrak is provided to prevent slipping during the stepping process. In addition, as the high surface strength of the natural stone is maintained, the lifespan can be extended.

이 건 발명은 자연 원석을 절단하고, 도드락 다듬하여 구비되어지는 자연석을 이용한 징검다리석 가공방법에 있어서,
상기 징검다리석은 광산에서 캐내어진 자연 원석을 크기별로 선별 및 운반하여 원석 적재장에 적재되도록 하는 원석 적재단계(S100)와; 상기 원석 적재장에 적재된 자연 원석을 운반하여 절단기의 대차에 상차되도록 하는 원석 상차단계(S200)와; 상기 절단기가 구동되는 가운데 대차를 이동시켜 대차에 상차된 자연 원석이 상부의 디딤부와 하부의 받침부가 마련되도록 수평으로 절단되어 비정형 측면부를 지니는 징검다리석의 형태를 갖도록 하는 원석 절단단계(S300)와; 절단된 징검다리석을 대차로부터 이동시킨 후, 샌딩기를 이용하여 예리하게 돌출된 비정형 측면부의 표면을 스무스하게 처리하고, 상부의 디딤부에 미끄럼을 방지하기 위한 미끄럼방지부를 도두락 다듬으로 형성하는 디딤부 형성단계(S400)와; 상기 디딤부가 형성된 가장자리를 그라운딩으로 연마시켜 외측 하향된 평면형 경사의 테두리부가 형성되도록 하여 징검다리석의 가장자리가 외부로 뚜렷하게 보여지도록 하는 테두리부 연마단계(S500); 및 상기 받침부에는 고정력이 확보되도록 요철부를 형성하는 요철부 가공단계(S510);로 이루어짐을 특징으로 한다.
In the present invention, in the stepping stone processing method using natural stone provided by cutting a natural gemstone and trimming it,
The stepping stone is a raw stone loading step (S100) of selecting and transporting the natural raw stone excavated from the mine by size to be loaded in the raw stone loading place; A raw stone loading step (S200) of transporting the natural raw stones loaded in the raw stone loading area to be loaded on the cart of the cutter; A stone cutting step (S300) of moving the bogie while the cutting machine is driven so that the natural stone loaded on the bogie is cut horizontally so as to provide a stepping portion at an upper portion and a support portion at a lower portion thereof to have a shape of a stepping stone having an atypical side portion (S300) and ; After moving the cut stepping stone from the bogie, a sanding machine is used to smooth the surface of the sharply protruding atypical side part, and a non-slip part to prevent slipping in the upper stepping part is formed by trimming A portion forming step (S400); An edge portion polishing step (S500) of grinding the edge on which the stepped portion is formed by grounding to form an edge portion of a planar inclined downwardly so that the edge of the stepping stone is clearly visible to the outside (S500); And an uneven portion processing step (S510) of forming an uneven portion so as to secure a fixing force on the support portion.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

이 건 발명은 광산에서 캐내어진 자연 원석을 절단기를 이용하여 절단되어지도록 한 후 절단된 징검다리석의 상부면이 도두락 다듬에 의한 미끄럼방지부가 구비되도록 함으로써, 이용자가 발로 딛고 건너가는 과정에서 일정 한도의 접지력이 유지되도록 하여 미끄러짐을 방지할 수 있는 효과를 얻을 수 있다.This invention allows the natural gemstone excavated from the mine to be cut using a cutter, and then the upper surface of the cut stepping stone is provided with a non-slip part by trimming the dodurak, so that a certain limit in the process of crossing the user's footsteps. It is possible to obtain the effect of preventing slipping by maintaining the grip of the body.

또한, 도두락 다듬에 의한 미끄럼방지부의 가장자리가 그라인딩으로 연마된 테두리부가 소정 넓이를 갖도록 구비됨으로써, 징검다리석의 가장자리가 외부로 뚜렷하게 보여지도록 하여 발을 헛디디는 것을 방지할 수 있는 효과를 얻을 수 있다.In addition, since the edge of the anti-slip portion by trimming the dodurak is provided so that the edge portion polished by grinding has a predetermined area, the edge of the stepping stone can be clearly seen to the outside, thereby preventing the foot from slipping. .

또한, 이를 통해 징검다리를 건너는 과정에서 발생되는 안전사고를 방지할 수 있는 효과를 얻을 수 있다.In addition, through this, it is possible to obtain an effect of preventing safety accidents occurring in the process of crossing the stepping bridge.

또한, 징검다리석의 예리한 비정형 측면부가 샌딩으로 스무스하게 구비됨에 따라 자연 친화감을 더 느낄 수 있도록 하는 효과를 얻을 수 있다.In addition, as the sharp atypical side portion of the stepping stone is smoothly provided by sanding, it is possible to obtain an effect of allowing more natural affinity to be felt.

그리고 징검다리석의 하부로 구비된 수평부에 요철부가 구비되도록 할 경우,징검다리석의 하부 매립이 용이한 가운데 고정력이 강화되도록 하여 시공 후 유동이 발생되는 것을 방지하여 징검다리가 틀어지는 것을 방지할 수 있는 효과를 얻을 수 있다.In addition, when the uneven part is provided in the horizontal part provided under the stepping stone, the fixing force is strengthened while the lower part of the stepping stone is easily buried, thereby preventing the occurrence of flow after construction, thereby preventing the stepping bridge from twisting. You can get the effect.

도1은 본 발명에 따른 자연석을 이용한 징검다리석 가공방법을 도시한 순서도.
도2는 본 발명에 따른 자연석을 이용한 징검다리석의 사시도.
도3은 본 발명에 따른 자연석을 이용한 징검다리석의 시공상태를 도시한 사시도.
도4는 본 발명에 따른 자연석을 이용한 징검다리석의 시공상태를 도시한 종단면도.
1 is a flow chart showing a stepping stone processing method using natural stone according to the present invention.
Figure 2 is a perspective view of a stepping stone using a natural stone according to the present invention.
Figure 3 is a perspective view showing the construction state of the stepping stone using a natural stone according to the present invention.
Figure 4 is a longitudinal sectional view showing the construction state of the stepping stone using natural stone according to the present invention.

이 건 발명의 실시예를 첨부 도면을 참조하여 설명하면 다음과 같다.Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.

도1은 본 발명에 따른 자연석을 이용한 징검다리석 가공방법을 도시한 순서도이고, 도2는 본 발명에 따른 자연석을 이용한 징검다리석의 사시도이고, 도3은 본 발명에 따른 자연석을 이용한 징검다리석의 시공상태를 도시한 사시도이고, 도4는 본 발명에 따른 자연석을 이용한 징검다리석의 시공상태를 도시한 종단면도이다.1 is a flow chart showing a method of processing a stepping stone using a natural stone according to the present invention, Figure 2 is a perspective view of a stepping stone using a natural stone according to the present invention, Figure 3 is a stepping stone using a natural stone according to the present invention It is a perspective view showing the construction state, and Figure 4 is a longitudinal sectional view showing the construction state of the stepping stone using natural stone according to the present invention.

이 건 발명에 따른 자연석을 이용한 징검다리석 가공방법을 설명하기에 앞서 이러한 가공방법에 의하여 가공된 징검다리석을 먼저 설명하기로 한다.Prior to describing the method of processing the stepping stone using natural stone according to the present invention, the stepping stone processed by this processing method will be described first.

징검다리석(A)은 자연 무늬가 그대로 노출되어 주변과 친환경적으로 조화를 이룰 수 있도록 하는 가운데 상부를 발로 디뎠을 경우, 미끄러짐을 방지하여 하천으로 넘어지는 것을 방지할 수 있도록 한 것으로 도2 내지 도4에 도시된 바와 같이, 디딤부(101), 받침부(102), 비정형 자연형태를 갖는 비정형 측면부(103)로 구비되어 있다.The stepping stone (A) is designed to prevent falling into the river by preventing slipping when the upper part is stepped on while the natural pattern is exposed as it is so that it can be harmonized with the surroundings in an eco-friendly manner. As shown in Figure 4, it is provided with a step portion 101, a support portion 102, and an atypical side portion 103 having an atypical natural shape.

상기 디딤부(101)는 자연 원석의 상부가 수평으로 절단된 형태를 갖도록 구비된 것으로 미끄럼을 방지하기 위한 미끄럼방지부(101-1)가 작업자의 수작업으로 인한 도두락 다듬으로 구비되어 있다.The step 101 is provided so that the upper portion of the natural stone is cut horizontally, and a non-slip part 101-1 for preventing slip is provided by trimming a runaway by manual labor of a worker.

이러한 상기 디딤부(101)는 미끄럼방지부(101-1)의 가장자리에 외측 하향으로 경사지는 형태를 갖는 테두리부(101-2)가 그라인딩으로 연마되도록 함으로써, 징검다리석(A)의 가장자리가 외부로 뚜렷하게 보여지도록 하여 징검다리석(A)을 디디고 건너가는 과정에서 발을 헛디디는 것을 방지할 수 있도록 하는 가운데 이를 통해 안전사고를 막을 수 있도록 한 것이다.The stepping portion 101 is such that the edge portion 101-2 having a shape inclined downwardly to the edge of the non-slip portion 101-1 is polished by grinding, so that the edge of the stepping stone (A) is By making it clearly visible to the outside, it is possible to prevent accidents while stepping on the stepping stone (A) to prevent missteps in the process of crossing.

상기 받침부(102)는 자연 원석의 하부에 구비된 것으로 수평으로 절단된 수평부(102-1)가 구비되어 시공 과정에서 하천 바닥에 안정된 형태로 지지될 수 있게 구비되어 있다.The support part 102 is provided under the natural stone and has a horizontal part 102-1 cut horizontally so that it can be supported in a stable form on the river floor during the construction process.

이러한 상기 징검다리석(A)의 하부 가장자리는 바닥기초(BS)와 가장자리 사이에 타설되어지는 콘크리트 몰타르(C)에 의하여 고정되도록 할 경우, 고정력의 증가를 가져와 물살에 의하여 유동이 발생되는 것을 방지할 수 있게 된다.When the lower edge of the stepping stone (A) is fixed by the concrete mortar (C) poured between the base of the floor (BS) and the edge, it increases the fixing force and prevents the flow caused by the current. You can do it.

상기 비형형 측면부(103)는 디딤부(101)와 받침부(102) 사이에 구비된 것으로 표면이 비정형 자연형태를 갖도록 구비되어 자연친화감을 더 느낄 수 있도록 구비되어 있다.The non-shaped side portion 103 is provided between the step portion 101 and the support portion 102 and is provided so that the surface has an atypical natural shape so that a feeling of nature-friendliness can be further felt.

이러한 비정형 측면부는 표면이 예리한 비정형 자연형태를 그대로 사용할 수 있고, 풍화작용에 의하여 표면이 스무스하게 된 것 처럼 샌딩을 통해 표면이 스므스하게 구비됨에 따라 시간의 흐름을 더 느낄 수 있도록 하기 위함이다.This atypical side part is intended to allow the use of an atypical natural shape with a sharp surface as it is, and to feel the passage of time more as the surface is smoothly provided through sanding as if the surface became smooth by weathering.

이러한 징검다리석의 가공방법은 도1에 도시된 바와 같이, 먼저, 원석 적재단계(S100)로 광산에서 캐내어진 자연 원석(RS)을 크기별로 선별한 후 운반하여 원석 적재장에 적재되도록 한 후 원석 적재장에 적재된 자연 원석(RS)을 운반하여 절단기(CT)의 대차(TK)에 상차되도록 한다(원석 상차단계(S200)).As shown in Fig. 1, the processing method of the stepping stone is first, by selecting the natural ore (RS) excavated from the mine by size in the ore loading step (S100), transporting it, and loading it in the ore The natural raw stone (RS) loaded in the loading area is transported to be loaded on the cart (TK) of the cutter (CT) (raw stone loading step (S200)).

다음, 원석 절단단계(S300)로 절단기(CT)가 구동되는 가운데 대차(TK)를 이동시켜 대차(TK)에 상차된 자연 원석(RS)이 절단되어 징검다리석의 형태를 갖도록 한다. 절단되어지는 자연 원석(RS)은 상면만이 절단되어지도록 하는 것이 바람직하고, 상기 자연 원석(RS)이 절단된 징검다리석(A)을 대차로부터 이동시켜 디딤부(10)가 구비되도록 한다(디딤부 형성단계(S400)). 이때, 디딤부 형성단계(S400)는 작업자의 수작업으로 인한 도두락 다듬으로 구비되도록 하는 것이 바람직하다.Next, in the rough stone cutting step (S300), while the cutter CT is driven, the bogie TK is moved so that the natural ore RS loaded on the bogie TK is cut to have the shape of a stepping stone. It is preferable that only the upper surface of the natural gemstone (RS) to be cut is cut, and the stepping part (10) is provided by moving the stepping stone (A) from which the natural gemstone (RS) is cut from the bogie ( Step forming step (S400)). At this time, it is preferable that the step of forming the step (S400) is provided by trimming the dodurak caused by the manual labor of the worker.

이는 자연 원석(RS)의 상면을 그대로 사용할 경우, 매우 미끄럽게 되며, 샌등으로 할 경우, 어느 정도의 거칠기를 갖지만 이 역시 미끄럽게 됨으로써, 징검다리석(A)을 밟고 하천을 건너 가는 과정에서 하천으로 넘어지거나 빠질 수 있게 되는 것을 더 방지할 수 있도록 하기 위함이다. 즉, 샌딩으로 할 경우, 전체적으로 규일한 거칠기를 갖지만, 도두락 다듬의 경우 전체적으로 불균일한 거칠기를 가지며 샌팅으로 처리한 거칠기보다 더 거친 거질기를 가질 수 있게 된다.When the upper surface of the natural stone (RS) is used as it is, it becomes very slippery, and when it is sanded, it has a certain degree of roughness, but it also becomes slippery, so in the process of stepping on the stepping stone (A) and crossing the river, It is to be able to prevent more from falling or falling. That is, in the case of sanding, the overall roughness is uniform. However, in the case of the sanding, the overall roughness is non-uniform and the roughness may be rougher than the roughness treated by sanding.

한편, 이 건 발명에서는 자연 원석(RS)이 절단된 징검다리석(A)을 대차(TK)로부터 이동시킨 후 바로 디딤부(101)가 구비되도록 하였으나, 이러한 디딤부(101)가 구비되기 이전에 즉, 자연 원석(RS)이 절단된 징검다리석(A)을 대차(TK)로부터 이동시켜 디딤부(101)가 구비되기 이전에 샌딩기로 이동시켜 예리하게 돌출된 비정형 측면부(103)의 표면이 스무스하게 구비되도록 하는 샌딩이 더 포함되도록 하는 것이 바람직하다.On the other hand, in this invention, the stepping part 101 is provided immediately after moving the stepping stone A from which the natural stone RS is cut from the bogie TK, but before such a step 101 was provided In other words, the surface of the atypical side part 103 sharply protruding by moving the stepping stone (A) from which the natural stone (RS) was cut from the bogie (TK) and moving it with a sanding machine before the stepping part 101 is provided. It is preferable to further include sanding to be provided smoothly.

다음, 테두리부 연마단계(S500)로 디딤부(101)가 형성된 가장자리를 그라운딩으로 연마시켜 테두리부(101-2)가 구비되도록 한다(테두리부 연마단계(S500)).Next, in the edge portion polishing step (S500), the edge portion on which the step portion 101 is formed is ground by grounding so that the edge portion 101-2 is provided (the edge portion polishing step (S500)).

한편, 이 건 발명에서는 징검다리석(A)의 하부가 단순히 수평형태로 절단되도록 하였으나, 이러한 형태 이외에 도4의 우측에 도시된 바와 같이, 요철부(102-2)가 구비되도록 할 수 있다. 이러한 경우, 요철부(102-2)에 의하여 매립이 용이하게 이루어지는 가운데 고정력이 강화되도록 하여 시공 후 물살에 의하여 징검다리석(A)의 위치가 틀어지는 것을 방지할 수 있도록 하기 위함이다On the other hand, in the present invention, the lower part of the stepping stone A is simply cut in a horizontal shape, but in addition to this shape, as shown on the right side of FIG. 4, the uneven portion 102-2 may be provided. In this case, it is to prevent the position of the stepping stone (A) from being distorted by the current after construction by strengthening the fixing force while the embedding is easily made by the uneven portion 102-2.

이 건 발명에 따른 상기 징검다리석(A)의 바닥 기초에 하부가 얹혀지는 형태로 시공되도록 하였으나, 이러한 형태 이외에 도4의 우측에 도시된 바와 같이, 징검다리석(A)의 하부 가장자리는 바닥기초(BS)와 가장자리 사이에 타설되어지는 콘크리트 몰타르(C)에 의하여 고정되도록 할 수 있다. In this case, the lower edge of the stepping stone (A) according to the invention is constructed in a form in which the lower part is placed on the floor foundation, but in addition to this form, as shown on the right side of Fig. 4, the lower edge of the stepping stone (A) is It can be fixed by the concrete mortar (C) poured between the foundation (BS) and the edge.

이러한 경우, 고정력의 증가를 가져와 물살에 의하여 유동이 발생되는 것을 방지할 수 있게 된다.In this case, it is possible to prevent the flow from being generated by the current by bringing about an increase in the fixing force.

S100:원석 적재단계 S200:원석 상차단계
S300:원석 절단단계 S400:디딤부 형성단계
S500:테두리부 연마단계 101:디딤부
101-1:미끄럼방지부 101-2:테두리부
102:받침부 102-1:수평부
103:비정형 측면부
S100: Gemstone loading step S200: Gemstone loading step
S300: Gemstone cutting step S400: Step forming step
S500: edge polishing step 101: stepping
101-1: non-slip part 101-2: border part
102: support portion 102-1: horizontal portion
103: atypical side portion

Claims (7)

자연 원석을 절단하고, 도드락 다듬하여 구비되어지는 자연석을 이용한 징검다리석 가공방법에 있어서,
상기 징검다리석은 광산에서 캐내어진 자연 원석을 크기별로 선별 및 운반하여 원석 적재장에 적재되도록 하는 원석 적재단계(S100)와;
상기 원석 적재장에 적재된 자연 원석을 운반하여 절단기의 대차에 상차되도록 하는 원석 상차단계(S200)와;
상기 절단기가 구동되는 가운데 대차를 이동시켜 대차에 상차된 자연 원석이 상부의 디딤부와 하부의 받침부가 마련되도록 수평으로 절단되어 비정형 측면부를 지니는 징검다리석의 형태를 갖도록 하는 원석 절단단계(S300)와;
절단된 징검다리석을 대차로부터 이동시킨 후, 샌딩기를 이용하여 예리하게 돌출된 비정형 측면부의 표면을 스무스하게 처리하고, 상부의 디딤부에 미끄럼을 방지하기 위한 미끄럼방지부를 도두락 다듬으로 형성하는 디딤부 형성단계(S400);
상기 디딤부가 형성된 가장자리를 그라운딩으로 연마시켜 외측 하향된 평면형 경사의 테두리부가 형성되도록 하여 징검다리석의 가장자리가 외부로 뚜렷하게 보여지도록 하는 테두리부 연마단계(S500); 및
상기 받침부에는 고정력이 확보되도록 요철부를 형성하는 요철부 가공단계(S510);
로 이루어짐을 특징으로 하는 자연석을 이용한 징검다리석 가공방법.
In the stepping stone processing method using natural stone provided by cutting a natural stone and trimming a dodrak,
The stepping stone is a raw stone loading step (S100) of selecting and transporting the natural raw stone excavated from the mine by size to be loaded in the raw stone loading place;
A raw stone loading step (S200) of transporting the natural raw stones loaded in the raw stone loading area to be loaded on the cart of the cutter;
A stone cutting step (S300) of moving the bogie while the cutting machine is driven so that the natural stone loaded on the bogie is cut horizontally so as to provide a stepping portion at an upper portion and a support portion at a lower portion thereof to have a shape of a stepping stone having an atypical side portion (S300) and ;
After moving the cut stepping stone from the bogie, a sanding machine is used to smooth the surface of the sharply protruding atypical side part, and a non-slip part to prevent slipping in the upper stepping part is formed by trimming Part forming step (S400);
An edge portion polishing step (S500) of grinding the edge on which the stepped portion is formed by grounding to form an edge portion of a planar inclined downwardly so that the edge of the stepping stone is clearly visible to the outside (S500); And
An uneven portion processing step (S510) of forming an uneven portion to secure a fixing force on the support portion (S510);
Stepping stone processing method using natural stone, characterized in that consisting of.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020190072967A 2019-06-19 2019-06-19 Stepping stone processing method and the stepping stone using natural stone KR102206277B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190072967A KR102206277B1 (en) 2019-06-19 2019-06-19 Stepping stone processing method and the stepping stone using natural stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190072967A KR102206277B1 (en) 2019-06-19 2019-06-19 Stepping stone processing method and the stepping stone using natural stone

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020210006150A Division KR102238121B1 (en) 2021-01-15 2021-01-15 Stepping stone using a natural stone

Publications (2)

Publication Number Publication Date
KR20200144834A KR20200144834A (en) 2020-12-30
KR102206277B1 true KR102206277B1 (en) 2021-01-22

Family

ID=74087993

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190072967A KR102206277B1 (en) 2019-06-19 2019-06-19 Stepping stone processing method and the stepping stone using natural stone

Country Status (1)

Country Link
KR (1) KR102206277B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200228600Y1 (en) * 2001-01-08 2001-06-15 한림에코텍주식회사 Stepping stone
KR100429041B1 (en) * 2001-11-15 2004-04-29 주식회사 우일 이알에스 construction method for forming rapids in river of city
KR101099632B1 (en) * 2011-05-23 2011-12-29 통명석재 주식회사 Line finish fieldstone manucacturing method and line finish fieldstone

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200163469Y1 (en) 1999-07-23 2000-02-15 주식회사한림에코텍 Stepping stone
KR20140028500A (en) * 2012-08-29 2014-03-10 주식회사 영월이엔에스 Stone floor and method for manufacturing the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200228600Y1 (en) * 2001-01-08 2001-06-15 한림에코텍주식회사 Stepping stone
KR100429041B1 (en) * 2001-11-15 2004-04-29 주식회사 우일 이알에스 construction method for forming rapids in river of city
KR101099632B1 (en) * 2011-05-23 2011-12-29 통명석재 주식회사 Line finish fieldstone manucacturing method and line finish fieldstone

Also Published As

Publication number Publication date
KR20200144834A (en) 2020-12-30

Similar Documents

Publication Publication Date Title
US11060305B2 (en) Patio blocks and block systems with side surface positioning and retaining structures
US5281047A (en) Masonry landscaping modules and methods of landscaping
US20160229008A1 (en) Entrance floor system
US20170120475A1 (en) Mould for a Skimmer Box Lid
KR102206277B1 (en) Stepping stone processing method and the stepping stone using natural stone
KR102238121B1 (en) Stepping stone using a natural stone
KR102203313B1 (en) Stairs Non-slip
JP2016209059A (en) Work tool on slab reinforcement
KR102206276B1 (en) Step stone processing method and the step stone using the natural stone
Brookes Stoneworking in the Geometric period at Corinth
KR102238120B1 (en) Step stone using a natural stone
CN207032715U (en) Steel construction cast-in-place concrete stair
JP2008038336A (en) Dirt floor concrete structure
US20180266060A1 (en) Hand Float for Spreading Concrete
JPH1046774A (en) Concrete block for stairs
RU219763U1 (en) Trolley for transportation of stone slabs
CN216276689U (en) Acrylic acid terrace structure with dustproof effect
KR20090005273U (en) Bulk stone having hexahedron form for paving
AU2005100162A4 (en) Tactile Ground Surface Indicator and Method of Manufacture
KR20210023589A (en) Finish stone processing method using the flagstone
JP2019196586A (en) Slip resistant steel sheet
JP3131945U (en) Earth retaining material
KR20020085965A (en) Finishing construction structure of stairs using vertical and horizontal block
KR200368195Y1 (en) non slip structure of stone stairs
JP3957114B2 (en) Minoh-mounted tombstone

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant