KR102202470B1 - Masonry wall sleeve - Google Patents

Masonry wall sleeve Download PDF

Info

Publication number
KR102202470B1
KR102202470B1 KR1020200099002A KR20200099002A KR102202470B1 KR 102202470 B1 KR102202470 B1 KR 102202470B1 KR 1020200099002 A KR1020200099002 A KR 1020200099002A KR 20200099002 A KR20200099002 A KR 20200099002A KR 102202470 B1 KR102202470 B1 KR 102202470B1
Authority
KR
South Korea
Prior art keywords
sleeve
box
module
bracket
masonry
Prior art date
Application number
KR1020200099002A
Other languages
Korean (ko)
Inventor
김정우
최영남
Original Assignee
주식회사 정우에이앤씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 정우에이앤씨 filed Critical 주식회사 정우에이앤씨
Priority to KR1020200099002A priority Critical patent/KR102202470B1/en
Application granted granted Critical
Publication of KR102202470B1 publication Critical patent/KR102202470B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention provides a masonry sleeve, which includes: a first sleeve module (20) in which a first sleeve part (24) is provided on a first box part (22); a second sleeve module (30) in which a second sleeve part (34) is provided on a second box part (32); a connecting support plate (40) interposed between the first sleeve module (20) and the second sleeve module (30) and having a flow hole (42) communicating with both surfaces; and a connection means connecting the first sleeve module (20) and the second sleeve module (30). Therefore, the masonry sleeve can be conveniently and quickly constructed.

Description

조적 슬리브{Masonry wall sleeve}Masonry wall sleeve

본 발명은 조적 슬리브에 관한 것으로서, 보다 상세하게는 조적 벽체에 시공할 때에 번거로움을 없애고 조적 벽체의 강도가 취약해지는 등의 문제를 해결하고 조적 슬리브 설치 이후에 조적 벽체가 지저분해지는 문제 등을 해결한 새로운 구성의 조적 슬리브에 관한 것이다.The present invention relates to a masonry sleeve, and more particularly, solves the problem of eliminating the hassle when constructing the masonry wall and weakening the strength of the masonry wall, and solving the problem that the masonry wall becomes dirty after installing the masonry sleeve. It relates to a new construction of the masonry sleeve.

일반적으로, 빌딩이나 아파트, 빌라 등과 같은 다층식 건물을 시공하고자 할 경우에, 공조용 배관, 가스용 배관 등의 제반 작업을 행하게 되는데, 이러한 배관들은 건물을 시공하는 과정에서 벽체 내에 매설되는 슬리브 등을 이용하여 설치하는 것이 보통이다.In general, when constructing multi-storey buildings such as buildings, apartments, and villas, various works such as air conditioning pipes and gas pipes are performed.These pipes include sleeves buried in the wall during the construction of the building. It is usually installed using.

한편, 조적조 건물의 벽체는 모르타르와 접착재 등으로 각각의 블록을 일체화시켜 수직 하중 전달 및 외부 외장재와 내부 공간을 구성하고 있으며, 건물 내부의 공조를 위하여 공조용 배관 등을 건물 내부에 설치하게 된다. 즉, 조적조 건물의 실내 공조를 위해 공조 시스템이 설치되고, 공조 시스템에 연결된 배관은 조적조 건물의 벽체를 관통하도록 설치하여 공조용 배관이 건물의 벽체 내외부로 연통되도록 지지하여 설치하게 된다. 건물의 실내에 공조 시스템을 설치하고, 공조 시스템에 의해 따뜻한 공기를 실내에 공급하고 실내외 공기를 순환시키도록 공조 시스템에 배관을 연결하게 된다.On the other hand, the wall of the masonry building incorporates each block with mortar and adhesive material to transmit vertical loads and constitute an external exterior material and an internal space, and air conditioning pipes, etc., are installed inside the building for air conditioning inside the building. That is, an air conditioning system is installed for indoor air conditioning of a masonry building, and a pipe connected to the air conditioning system is installed so as to penetrate the wall of the masonry building to support and install the air conditioning pipes to communicate inside and outside the wall of the building. An air conditioning system is installed inside the building, and a pipe is connected to the air conditioning system to supply warm air to the interior and circulate the indoor and outdoor air by the air conditioning system.

이때, 상기 공조 시스템 등에 배관을 연결하기 위해서는 조적조 벽체에 양면으로 연통되도록 벽돌을 깨서 슬리브 설치홀을 형성하고, 조적조 벽체의 슬리브 설치홀에 슬리브를 결합한 상태에서 상기 슬리브에 건물 내외부용 배관(주로 플렉시블 배관)을 연결하고, 건물의 내부로 들어온 배관(즉, 조적조 벽체의 내부로 들어온 배관)을 건물 내부에 설치된 공조 시스템에 연결하고, 조적조 벽체의 외부에 있는 배관은 공조용 덕트와 같은 외부 배기부에 연통되도록 연결하는 경우가 많다.At this time, in order to connect the pipe to the air conditioning system, the brick is broken to communicate with both sides of the masonry wall to form a sleeve installation hole, and the sleeve is connected to the sleeve installation hole of the masonry tank, and the pipe for the interior and exterior of the building (mainly flexible Pipe), and the pipe that entered the building (that is, the pipe that entered the masonry wall) to the air conditioning system installed inside the building, and the pipe outside the masonry wall is an external exhaust part such as an air conditioning duct. In many cases, it is connected to communicate with each other.

그런데, 기존에는 벽돌을 깨서 슬리브 결합홀을 형성하는데, 이러한 경우에는 슬리브의 외주면과 벽돌을 깨서 형성한 슬리브 결합홀 사이를 밀봉재로 채워서 마감해야 하므로 시공이 번거롭고 조적 벽체의 강도가 취약해지는 문제도 있고 슬리브 설치 이후에 조적 벽체가 지저분해지는 문제가 있다.However, conventionally, a sleeve coupling hole is formed by breaking a brick. In this case, the construction is cumbersome and the strength of the masonry wall is weakened because the outer peripheral surface of the sleeve and the sleeve coupling hole formed by breaking the brick must be closed with a sealing material. There is a problem that the masonry wall becomes dirty after installing the sleeve.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

한국등록특허 제10-0731631호(2007년06월20일 등록)Korean Patent Registration No. 10-0731631 (registered on June 20, 2007) 한국등록특허 제10-1122052호(2012년02월23일 등록)Korean Patent Registration No. 10-1122052 (registered on February 23, 2012) 한국등록실용신안 제20-0489078호(2019년04월22일 등록)Korean Utility Model Registration No. 20-0489078 (registered on April 22, 2019) 한국등록실용신안 제20-0129758호(1998년08월24일 등록)Korean Utility Model Registration No. 20-0129758 (registered on August 24, 1998)

본 발명의 목적은 조적 벽체에 시공할 때에 번거로움을 없애고 조적 벽체의 강도가 취약해지는 등의 문제를 해결하고 조적 슬리브 설치 이후에 조적 벽체가 지저분해지는 문제 등을 해결한 새로운 구성의 조적 슬리브를 제공하고자 하는 것이다.An object of the present invention is to provide a new configuration of a masonry sleeve that eliminates the hassle of construction on a masonry wall, solves the problems of weakening the strength of the masonry wall, and solves the problem of the masonry wall becoming dirty after installation of the masonry sleeve. I want to.

상기와 같은 과제를 해결하기 위한 본 발명에 의하면, 제1박스부에 제1슬리브부가 구비된 제1슬리브 모듈; 제2박스부에 제2슬리브부가 구비된 제2슬리브 모듈; 상기 제1슬리브 모듈과 상기 제2슬리브 모듈 사이에 개재되며 양면으로 연통된 플로우홀을 구비한 연결 지지판; 상기 제1슬리브 모듈과 상기 제2슬리브 모듈을 연결하는 연결수단;을 포함하여 구성된 것을 특징으로 하는 조적 슬리브가 제공된다.According to the present invention for solving the above problems, a first sleeve module provided with a first sleeve portion in the first box portion; A second sleeve module having a second sleeve part in the second box part; A connection support plate interposed between the first sleeve module and the second sleeve module and having flow holes communicated on both sides; A masonry sleeve is provided, comprising: connecting means for connecting the first sleeve module and the second sleeve module.

상기 제1슬리브 모듈과 상기 제2슬리브 모듈 사이에 상기 연결 지지판이 개재된 상태에서 상기 연결수단으로 상기 제1슬리브 모듈과 상기 제2슬리브 모듈과 상기 연결 지지판이 결합된 상태로 유지되는 것을 특징으로 한다.In a state in which the connection support plate is interposed between the first sleeve module and the second sleeve module, the first sleeve module, the second sleeve module, and the connection support plate are maintained in a coupled state by the connection means. do.

상기 제1슬리브 모듈의 상기 제1박스부와 상기 제2슬리브 모듈의 상기 제2박스부는 안쪽면에 개방부가 형성된 박스 형상으로 구성되고, 상기 연결 지지판은 사각판 형상으로 구성되고, 상기 연결수단은 상기 제1박스부와 상기 연결 지지판과 상기 제2박스부의 코너부에 구비된 볼트 결합홀을 관통하는 볼트와, 상기 볼트에 체결된 너트로 구성된 것을 특징으로 한다.The first box portion of the first sleeve module and the second box portion of the second sleeve module are configured in a box shape with an opening formed on an inner surface, and the connection support plate is formed in a square plate shape, and the connection means It characterized in that the first box portion, the connection support plate, and a bolt passing through a bolt coupling hole provided at a corner portion of the second box portion, and a nut fastened to the bolt.

상기 연결 지지판은 양면으로 연통된 플로우홀을 구비하도록 구성되고, 상기 플로우홀의 둘레부에는 루프링부가 구비되고, 상기 루프링부의 양면 사이의 두께는 상기 연결 지지판의 양면 사이의 두께보다 더 두껍게 형성된 것을 특징으로 한다.The connection support plate is configured to have flow holes communicated on both sides, and a roof ring part is provided at the circumference of the flow hole, and the thickness between both sides of the roof ring part is formed to be thicker than the thickness between both sides of the connection support plate. It is characterized.

상기 루프링부에 상기 제1슬리브 모듈의 상기 제1슬리브부 내측단과 상기 제2슬리브 모듈의 상기 제2슬리브부 내측단이 가압 밀착되도록 구성된 것을 특징으로 한다.The roof ring part is characterized in that the inner end of the first sleeve part of the first sleeve module and the inner end of the second sleeve part of the second sleeve module are configured to be in close contact with each other by pressing.

상기 제1슬리브 모듈의 상기 제1슬리브부와 상기 제2슬리브 모듈의 상기 제2슬리브부와 상기 연결 지지판의 상기 플로우홀의 중심부는 동일 선상에 배치된 것을 특징으로 한다.The first sleeve portion of the first sleeve module, the second sleeve portion of the second sleeve module, and the center of the flow hole of the connection support plate are arranged on the same line.

상기 제1슬리브 모듈과 제2슬리브 모듈에서 제1슬리브부의 외주면과 제1박스부의 안쪽면 사이에 제1챔버가 형성되고, 상기 제2슬리브부의 외주면과 제2박스부의 안쪽면 사이에 제2챔버가 형성되고, 상기 제1챔버와 제2챔버에 충전제를 채워넣도록 구성된 것을 특징으로 한다.In the first sleeve module and the second sleeve module, a first chamber is formed between an outer peripheral surface of the first sleeve portion and an inner surface of the first box portion, and a second chamber is formed between the outer peripheral surface of the second sleeve portion and the inner surface of the second box portion. Is formed, and configured to fill the first chamber and the second chamber with a filler.

상기 제1슬리브부의 일부와 상기 제2슬리브부의 일부는 각각 상기 제1박스부와 상기 제2박스부의 내부로 일정 거리 들어가 있도록 구성된 것을 특징으로 한다.A portion of the first sleeve portion and a portion of the second sleeve portion are configured to enter the inside of the first box portion and the second box portion by a predetermined distance, respectively.

상기 제1박스부와 상기 제2박스부는 바깥벽의 둘레부에 측벽부가 형성되도록 구성되고, 상기 바깥벽의 양면으로 상기 제1슬리브부와 상기 제2슬리브부가 각각 돌출된 것을 특징으로 한다.The first box portion and the second box portion are configured such that side wall portions are formed on the circumference of the outer wall, and the first sleeve portion and the second sleeve portion each protrude from both surfaces of the outer wall.

상기 제1슬리브부의 길이는 상기 제2슬리브부의 길이보다 더 길게 형성된 것을 특징으로 한다.The length of the first sleeve portion is formed to be longer than the length of the second sleeve portion.

상기 제1슬리브 모듈과 상기 제2슬리브 모듈 중에서 적어도 하나의 모듈에는 고정 브라켓이 구비된다.At least one of the first sleeve module and the second sleeve module is provided with a fixing bracket.

상기 제1슬리브 모듈은 제1박스부에 제1슬리브부가 구비되도록 구성되고, 상기 제2슬리브 모듈은 제2박스부에 제2슬리브부가 구비되도록 구성되고, 상기 제1박스부와 상기 제2박스부 중에서 적어도 하나에 구비된 브라켓 결합 슬릿에 상기 고정 브라켓이 삽입되어 결합된 것을 특징으로 한다.The first sleeve module is configured to be provided with a first sleeve part in a first box part, and the second sleeve module is configured to be provided with a second sleeve part in a second box part, and the first box part and the second box It characterized in that the fixing bracket is inserted into and coupled to the bracket coupling slit provided in at least one of the parts.

상기 브라켓 결합 슬릿은 상기 제1슬리브 모듈의 상기 제1박스부와 상기 제2슬리브 모듈의 상기 제2박스부 중에서 적어도 하나의 전면에서 후면 쪽으로 연장되도록 구성되고, 상기 고정 브라켓은 단면 일자형의 판형상으로 구성되어, 상기 브라켓 결합 슬릿에 상기 고정 브라켓이 삽입되도록 구성된 것을 특징으로 한다.The bracket coupling slit is configured to extend from the front to the rear of at least one of the first box portion of the first sleeve module and the second box portion of the second sleeve module, and the fixing bracket has a straight cross-section plate shape. Consisting of, characterized in that configured to insert the fixing bracket into the bracket coupling slit.

상기 고정 브라켓의 양단부에는 고정편이 구비되고, 상기 고정편에는 볼트 결합홀이 구비되어, 상기 볼트 결합홀에 삽입된 볼트를 고정 대상물에 앵커링하여 상기 제1슬리브 모듈과 상기 제2슬리브 모듈과 연결 지지판을 상기 고정 대상물에 고정하도록 구성된 것을 특징으로 한다.A fixing piece is provided at both ends of the fixing bracket, and a bolt coupling hole is provided in the fixing piece, and the bolt inserted into the bolt coupling hole is anchored to a fixed object to connect the first sleeve module and the second sleeve module to the supporting plate. It characterized in that it is configured to fix the fixed object.

본 발명에 의하면, 제1박스부에 제1슬리브부가 구비된 제1슬리브 모듈; 제2박스부에 제2슬리브부가 구비된 제2슬리브 모듈; 상기 제1슬리브 모듈과 상기 제2슬리브 모듈 사이에 개재되며 양면으로 연통된 플로우홀을 구비한 연결 지지판; 상기 제1슬리브 모듈과 상기 제2슬리브 모듈을 연결하는 연결수단;을 포함하여 구성되고, 상기 제1박스부와 상기 제2박스부 중에서 적어도 하나에 구비된 브라켓 결합 슬릿에 고정 브라켓이 삽입되어 결합되며, 상기 브라켓 결합 슬릿의 전후단부 사이의 폭은 상기 고정 브라켓의 전후단부 사이의 폭보다 더 크게 형성되어, 상기 브라켓 결합 슬릿에서 상기 고정 브라켓이 이동 가능하도록 구성된 것을 특징으로 하는 조적 슬리브가 제공된다.According to the present invention, a first sleeve module provided with a first sleeve portion in the first box portion; A second sleeve module having a second sleeve part in the second box part; A connection support plate interposed between the first sleeve module and the second sleeve module and having flow holes communicated on both sides; A connecting means for connecting the first sleeve module and the second sleeve module; and a fixing bracket is inserted into the bracket coupling slit provided in at least one of the first box portion and the second box portion to be coupled A masonry sleeve is provided, wherein the width between the front and rear ends of the bracket coupling slit is formed larger than the width between the front and rear ends of the fixing bracket, and the fixing bracket is movable in the bracket coupling slit. .

본 발명에 의하면, 제1박스부에 제1슬리브부가 구비된 제1슬리브 모듈; 제2박스부에 제2슬리브부가 구비된 제2슬리브 모듈; 상기 제1슬리브 모듈과 상기 제2슬리브 모듈 사이에 개재되며 양면으로 연통된 플로우홀을 구비한 연결 지지판; 상기 제1슬리브 모듈과 상기 제2슬리브 모듈을 연결하는 연결수단;을 포함하여 구성되고, 상기 제1박스부와 상기 제2박스부 중에서 적어도 하나에 구비된 브라켓 결합 슬릿에 고정 브라켓이 삽입되어 결합되며, 상기 브라켓 결합 슬릿의 전후단부 사이의 폭은 상기 고정 브라켓의 전후단부 사이의 폭보다 더 크게 형성되어, 상기 브라켓 결합 슬릿에서 상기 고정 브라켓이 이동 가능하도록 구성되고, 상기 브라켓 결합 슬릿은 상기 제1박스부와 상기 제2박스부 중에서 적어도 하나의 전면에서 후면 쪽으로 연장되도록 구성되고, 상기 고정 브라켓은 단면 일자형의 판형상으로 구성되어, 상기 브라켓 결합 슬릿에 상기 고정 브라켓이 삽입되도록 구성되고, 상기 고정 브라켓은 양단부에 고정편이 구비되고, 상기 고정편에는 상하면으로 연통된 볼트 결합홀이 구비되고, 상기 제1박스부와 상기 제2박스부에 상기 브라켓 결합 슬릿이 형성되어, 상기 고정 브라켓이 상기 제1박스부에 형성된 브라켓 결합 슬릿에 삽입된 상태에서는 상기 고정 브라켓의 고정편과 상기 제1박스부의 측벽 사이에 일정 간격 이격된 스페이스가 확보되고, 상기 고정 브라켓이 상기 제2박스부에 형성된 브라켓 결합 슬릿에 삽입된 상태에서는 상기 고정 브라켓의 고정편과 상기 제2박스부의 측벽 사이에 일정 간격 이격된 스페이스가 확보되도록 구성된 것을 특징으로 하는 조적 슬리브가 제공된다.According to the present invention, a first sleeve module provided with a first sleeve portion in the first box portion; A second sleeve module having a second sleeve part in the second box part; A connection support plate interposed between the first sleeve module and the second sleeve module and having flow holes communicated on both sides; A connecting means for connecting the first sleeve module and the second sleeve module; and a fixing bracket is inserted into the bracket coupling slit provided in at least one of the first box portion and the second box portion to be coupled The width between the front and rear ends of the bracket coupling slit is formed larger than the width between the front and rear ends of the fixing bracket, so that the fixing bracket is movable in the bracket coupling slit, and the bracket coupling slit is At least one of the first box part and the second box part is configured to extend from the front side to the rear side, and the fixing bracket is configured in a plate shape having a straight cross-section, and the fixing bracket is inserted into the bracket coupling slit, and the The fixing bracket is provided with fixing pieces at both ends, the fixing piece has bolt coupling holes communicating with the upper and lower surfaces, and the bracket coupling slit is formed in the first box part and the second box part, so that the fixing bracket is In the state of being inserted into the bracket coupling slit formed in the first box part, a space separated by a predetermined distance is secured between the fixing piece of the fixing bracket and the side wall of the first box part, and the fixing bracket is formed in the second box part. In a state inserted into the coupling slit, a masonry sleeve is provided, characterized in that a space spaced apart by a predetermined distance is secured between the fixing piece of the fixing bracket and the side wall of the second box.

본 발명에 의한 조적 슬리브는 조적 구조물의 슬리브 결합홀에 간단하게 설치한 상태에서 고정 브라켓을 천정 슬라브 등의 고정 대상물에 고정하기만 하면 되므로, 시공이 편리하고 신속하며, 조적 벽체의 강도가 취약해지는 문제도 해결하며, 조적 슬리브 설치 이후에 조적 벽체가 지저분해지는 문제도 해결할 수 있다.The masonry sleeve according to the present invention is convenient and quick to install, and the strength of the masonry wall becomes weak because the fixing bracket needs only to be fixed to a fixed object such as a ceiling slab while simply installing it in the sleeve coupling hole of the masonry structure. It also solves the problem, and can solve the problem that the masonry wall becomes dirty after installing the masonry sleeve.

한편, 상기한 효과는 본 발명의 효과의 일부이며, 본 발명은 상기한 효과 이외에 다른 여러 가지 효과가 있음을 이해해야 할 것이다.On the other hand, it should be understood that the above effects are part of the effects of the present invention, and the present invention has various other effects in addition to the above effects.

도 1은 본 발명에 의한 조적 슬리브의 분해 사시도
도 2는 도 1에 도시된 제1슬리브 모듈의 사시도
도 3은 도 2의 안쪽면을 보여주는 사시도
도 4는 도 2의 안쪽면을 정면에서 보여주는 도면
도 5는 도 1에 도시된 제2슬리브 모듈의 사시도
도 6은 도 5의 안쪽면을 보여주는 사시도
도 7은 도 5의 안쪽면을 정면에서 보여주는 도면
도 8은 본 발명에 의한 조적 슬리브의 사시도
도 9는 도 8의 내부 구조를 보여주는 측단면도
도 10은 본 발명에 의한 조적 슬리브를 조적 벽체에 설치한 상태를 보여주는 정면도
도 11은 본 발명에 의한 조적 슬리브를 천정 슬라브에 고정하여 설치한 상태를 보여주는 일측면도
도 12는 도 8에 도시된 브라켓 결합슬릿 부분의 평단면도
도 13은 도 8에 도시된 조적 슬리브의 주요부인 제1슬리브 모듈의 제1브라켓 결합 슬릿의 길이를 확장시켜서 고정 브라켓의 위치를 변경한 상태를 보여주는 일측면도
도 14는 도 13에 도시된 브라케 결합슬릿 부분의 평단면도
도 15는 도 8에 도시된 조적 슬리브의 주요부인 제2슬리브 모듈의 제2브라켓 결합 슬릿의 길이를 확장시켜서 고정 브라켓의 위치를 변경한 상태를 보여주는 일측면도
도 16은 본 발명의 다른 실시예에 의한 조적 슬리브의 일측면도
도 17은 도 16에 도시된 주요부인 고정 브라켓의 위치를 변경한 상태를 보여주는 일측면도
도 18은 도 16의 평면도
도 19는 도 16에 도시된 고정 브라켓의 각도를 브라켓 결합슬릿을 기준으로 변경시킨 상태를 보여주는 평면도
1 is an exploded perspective view of a masonry sleeve according to the present invention
2 is a perspective view of the first sleeve module shown in FIG. 1
Figure 3 is a perspective view showing the inner surface of Figure 2
Figure 4 is a view showing the inner surface of Figure 2 from the front
5 is a perspective view of the second sleeve module shown in FIG. 1
6 is a perspective view showing the inner surface of FIG. 5
7 is a view showing the inner surface of FIG. 5 from the front
8 is a perspective view of a masonry sleeve according to the present invention
9 is a side cross-sectional view showing the internal structure of FIG. 8
10 is a front view showing a state in which a masonry sleeve according to the present invention is installed on a masonry wall
11 is a side view showing a state in which the masonry sleeve according to the present invention is fixed to the ceiling slab and installed
12 is a plan cross-sectional view of a bracket coupling slit portion shown in FIG. 8
13 is a side view showing a state in which the position of the fixing bracket is changed by extending the length of the first bracket coupling slit of the first sleeve module, which is a main part of the masonry sleeve shown in FIG. 8
14 is a plan cross-sectional view of a bracket coupling slit portion shown in FIG. 13
15 is a side view showing a state in which the position of the fixing bracket is changed by extending the length of the second bracket coupling slit of the second sleeve module, which is the main part of the masonry sleeve shown in FIG. 8
16 is a side view of a masonry sleeve according to another embodiment of the present invention
17 is a side view showing a state in which the position of the fixing bracket, which is the main part shown in FIG. 16, is changed
18 is a plan view of FIG. 16
19 is a plan view showing a state in which the angle of the fixing bracket shown in FIG. 16 is changed based on the bracket coupling slit

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예에 대하여 상세히 설명한다. 상기 본 발명의 목적과 특징 및 장점은 첨부도면 및 다음의 상세한 설명을 참조함으로써 더욱 쉽게 이해될 수 있을 것이다. 또한, 본 발명을 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. Objects, features, and advantages of the present invention will be more easily understood by referring to the accompanying drawings and the following detailed description. In addition, in describing the present invention, if it is determined that a detailed description of a related known configuration or function may obscure the subject matter of the present invention, a detailed description thereof will be omitted.

또한, 본 발명의 구성 요소를 설명하는 데 있어서, 제 1, 제 2, A, B, (a), (b) 등의 용어를 사용할 수 있다. 이러한 용어는 그 구성 요소를 다른 구성 요소와 구별하기 위한 것일 뿐, 그 용어에 의해 해당 구성 요소의 본질이나 차례 또는 순서 등이 한정되지 않는다. 예를 들어, 어떤 구성 요소가 다른 구성요소에 "연결", "결합" 또는 "접속"된다고 기재된 경우, 그 구성 요소는 그 다른 구성요소에 직접적으로 연결되거나 접속될 수 있지만, 각 구성 요소 사이에 또 다른 구성 요소가 "연결", "결합" 또는 "접속"될 수도 있다고 이해되어야 할 것이다.In addition, in describing the constituent elements of the present invention, terms such as first, second, A, B, (a), (b) may be used. These terms are only used to distinguish the component from other components, and the nature, order, or order of the component is not limited by the term. For example, if a component is described as being "connected", "coupled" or "connected" to another component, the component may be directly connected or connected to that other component, but between each component It should be understood that another component may be “connected”, “coupled” or “connected”.

도 1은 본 발명에 의한 조적 슬리브의 분해 사시도, 도 2는 도 1에 도시된 제1슬리브 모듈의 사시도, 도 3은 도 2의 안쪽면을 보여주는 사시도, 도 4는 도 2의 안쪽면을 정면에서 보여주는 도면, 도 5는 도 1에 도시된 제2슬리브 모듈의 사시도, 도 6은 도 5의 안쪽면을 보여주는 사시도, 도 7은 도 5의 안쪽면을 정면에서 보여주는 도면, 도 8은 본 발명에 의한 조적 슬리브의 사시도, 도 9는 도 8의 내부 구조를 보여주는 측단면도, 도 10은 본 발명에 의한 조적 슬리브를 조적 벽체에 설치한 상태를 보여주는 정면도, 도 11은 본 발명에 의한 조적 슬리브를 천정 슬라브에 고정하여 설치한 상태를 보여주는 일측면도, 도 12는 도 8에 도시된 브라켓 결합슬릿 부분의 평단면도, 도 13은 도 8에 도시된 조적 슬리브의 주요부인 제1슬리브 모듈의 제1브라켓 결합 슬릿의 길이를 확장시켜서 고정 브라켓의 위치를 변경한 상태를 보여주는 일측면도, 도 14는 도 13에 도시된 브라케 결합슬릿 부분의 평단면도, 도 15는 도 8에 도시된 조적 슬리브의 주요부인 제2슬리브 모듈의 제2브라켓 결합 슬릿의 길이를 확장시켜서 고정 브라켓의 위치를 변경한 상태를 보여주는 일측면도, 도 16은 본 발명의 다른 실시예에 의한 조적 슬리브의 일측면도, 도 17은 도 16에 도시된 주요부인 고정 브라켓의 위치를 변경한 상태를 보여주는 일측면도, 도 18은 도 16의 평면도, 도 19는 도 16에 도시된 고정 브라켓의 각도를 브라켓 결합슬릿을 기준으로 변경시킨 상태를 보여주는 평면도이다.1 is an exploded perspective view of a masonry sleeve according to the present invention, FIG. 2 is a perspective view of the first sleeve module shown in FIG. 1, FIG. 3 is a perspective view showing the inner surface of FIG. 2, and FIG. 4 is a front view of the inner surface of FIG. 5 is a perspective view of the second sleeve module shown in FIG. 1, FIG. 6 is a perspective view showing the inner surface of FIG. 5, FIG. 7 is a view showing the inner surface of FIG. 5 from the front, and FIG. 8 is the present invention A perspective view of a masonry sleeve by, Figure 9 is a side cross-sectional view showing the internal structure of Figure 8, Figure 10 is a front view showing a state in which the masonry sleeve according to the present invention is installed on a masonry wall, Figure 11 is a masonry sleeve according to the present invention A side view showing a state of being installed by fixing to the ceiling slab, FIG. 12 is a plan cross-sectional view of the bracket coupling slit portion shown in FIG. 8, and FIG. 13 is a first sleeve module, which is a main part of the masonry sleeve shown in FIG. One side view showing a state in which the position of the fixing bracket is changed by extending the length of the bracket coupling slit, FIG. 14 is a flat cross-sectional view of the bracket coupling slit shown in FIG. 13, and FIG. 15 is a main part of the masonry sleeve shown in FIG. One side view showing a state in which the position of the fixing bracket is changed by extending the length of the second bracket coupling slit of the second sleeve module, FIG. 16 is a side view of a masonry sleeve according to another embodiment of the present invention, and FIG. One side view showing a state in which the position of the fixing bracket, which is the main part shown in FIG. 16, is changed, FIG. 18 is a plan view of FIG. 16, and FIG. 19 shows a state in which the angle of the fixing bracket shown in FIG. 16 is changed based on the bracket coupling slit. It is a plan view showing.

도면을 참조하면, 본 발명의 조적 슬리브는 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이에 연결 지지판(40)이 개재되고, 상기 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 및 연결 지지판(40)은 연결수단에 의해 서로 결합된 상태로 유지된다. 연결 지지판(40)의 양면이 제1슬리브 모듈(20)의 내부에 구비된 제1보스(22BS)와 제2슬리브 모듈(30)의 내부에 구비된 제2보스(32BS)에 의해 지지되어 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이에 개재되도록 구성될 수 있다.Referring to the drawings, in the masonry sleeve of the present invention, a connection support plate 40 is interposed between the first sleeve module 20 and the second sleeve module 30, and the first sleeve module 20 and the second sleeve module (30) and the connection support plate 40 are maintained in a coupled state by a connection means. Both sides of the connection support plate 40 are supported by a first boss (22BS) provided inside the first sleeve module 20 and a second boss (32BS) provided inside the second sleeve module 30 It may be configured to be interposed between the first sleeve module 20 and the second sleeve module 30.

상기 제1슬리브 모듈(20)은 제1박스부(22)에 제1슬리브부(24)가 구비되도록 구성된다.The first sleeve module 20 is configured such that the first sleeve part 24 is provided in the first box part 22.

상기 제1박스부(22)는 좌우 양쪽의 제1사이드벽(22SW)에 제1상부 측벽(22UW)과 제1하부 측벽(22LW)이 연결된 박스 형상으로 구성된다. 제1박스부(22)가 사각 박스 형상으로 구성된다. 제1박스부(22)의 안쪽면은 개방되어 있다.The first box part 22 has a box shape in which a first upper side wall 22UW and a first lower side wall 22LW are connected to the first side walls 22SW on both left and right sides. The first box portion 22 is configured in a square box shape. The inner surface of the first box 22 is open.

상기 제1슬리브부(24)는 제1박스부(22)에 결합된다. 제1슬리브부(24)는 제1박스부(22)에 일체형으로 결합된다. 제1슬리브부(24)는 원형관 형상으로 구성된다. 이때, 제1슬리브부(24)는 제1박스부(22)의 바깥면에서 일정 길이 돌츨되어 있으며, 제1슬리브부(24)의 일부는 제1박스부(22)의 내부로 들어가 있다. 제1슬리브부(24)에서 제1박스부(22)의 바깥면 쪽으로 나와 있는 부분의 길이가 제1박스부(22)의 내부로 들어가 있는 부분의 길이보다 더 길다.The first sleeve part 24 is coupled to the first box part 22. The first sleeve portion 24 is integrally coupled to the first box portion 22. The first sleeve part 24 is configured in a circular tube shape. At this time, the first sleeve part 24 protrudes from the outer surface of the first box part 22 for a certain length, and a part of the first sleeve part 24 enters the inside of the first box part 22. The length of the portion protruding from the first sleeve portion 24 toward the outer surface of the first box portion 22 is longer than the length of the portion entering the first box portion 22.

상기 제1박스부(22)의 안쪽면에는 제1보스(22BS)가 구비된다. 제1보스(22BS)의 기단부가 제1박스부(22)의 안쪽면에 이어져 있고, 제1보스(22BS)는 제1슬리브부(24)의 바깥쪽에 배치된 상태에서 제1슬리브부(24)의 길이 방향과 나란한 방향으로 연장된다. 상기 제1보스(22BS)는 제1박스부(22)의 내부에 복수개로 구비된다. 상기 제1박스부(22)가 사각 박스 형상이어서 제1박스부(22)의 네 코너부와 인접한 내부에 각각 하나씩 제1보스(22BS)가 구비된다. 네 개의 제1보스(22BS)가 제1박스부(22)의 내부에 구비된 구조가 된다. 상기 제1박스부(22)의 바깥면에서 제1보스(22BS)의 선단부까지 볼트 결합홀이 연장된다. 구체적으로, 상기 제1박스부(22)의 바깥면에 헤드홈이 구비되고, 헤드홈에서부터 상기 제1보스(22BS)의 선단부까지 관통되도록 상기 볼트 결합홀이 구비된다. 상기 제1박스부(22)의 코너부와 인접한 바깥면에는 헤드홈이 구비되고, 상기 헤드홈에서부터 상기 제1보스(22BS)의 선단부까지 관통되도록 상기 볼트 결합홀이 구비된다. 본 발명에서는 제1박스부(22)의 네 코너부와 인접한 바깥면에 하나씩 헤드홈이 구비되고, 제1박스부(22)의 안쪽면에는 헤드홈과 만나는 위치게 각각 하나씩 제1보스(22BS)가 구비되어, 네 개의 헤드홈에서부터 네 개의 제1보스(22BS)의 선단부까지 볼트 결합홀이 이어진 구조가 된다. A first boss 22BS is provided on the inner surface of the first box 22. The base end of the first boss 22BS is connected to the inner surface of the first box part 22, and the first boss 22BS is disposed outside the first sleeve part 24, and the first sleeve part 24 It extends in a direction parallel to the length direction of ). The first boss 22BS is provided in plural within the first box 22. Since the first box portion 22 has a rectangular box shape, one first boss 22BS is provided inside each of the four corner portions of the first box portion 22 and adjacent to each other. Four first bosses 22BS are provided inside the first box 22. The bolt coupling hole extends from the outer surface of the first box part 22 to the tip end of the first boss 22BS. Specifically, a head groove is provided on the outer surface of the first box part 22, and the bolt coupling hole is provided so as to penetrate from the head groove to the tip end of the first boss 22BS. A head groove is provided on an outer surface of the first box portion 22 adjacent to the corner portion, and the bolt coupling hole is provided so as to penetrate from the head groove to the tip end of the first boss 22BS. In the present invention, one head groove is provided on the outer surface adjacent to the four corners of the first box part 22, and the first boss 22BS is provided on the inner surface of the first box part 22, one at a position meeting the head groove. ) Is provided, and the bolt coupling hole is connected from the four head grooves to the front ends of the four first bosses 22BS.

또한, 상기 제1박스부(22)의 내부에는 복수개의 보강리브(26,36)가 구비된다. 복수개의 상기 보강리브(26,36)는 제1박스부(22)의 안쪽면과 제1슬리브부(24)의 외주면에 이어져 있어서, 상기 제1박스부(22)와 제1슬리브부(24)의 연결 구조를 강하게 보강한다.In addition, a plurality of reinforcing ribs 26 and 36 are provided inside the first box 22. The plurality of reinforcing ribs 26 and 36 are connected to the inner surface of the first box part 22 and the outer circumferential surface of the first sleeve part 24, so that the first box part 22 and the first sleeve part 24 ) Strongly reinforce the connection structure.

상기 제1박스부(22)에는 브라켓 결합슬릿(54)이 구비된다. 제1박스부(22)에서 좌우 양쪽의 제1사이드벽(22SW)에 브라켓 결합슬릿(54)이 구비된다. 제1박스부(22)에 형성된 브라켓 결합슬릿(54)은 제1브라켓 결합슬릿(54FS)이라 할 수 있다. 상기 제1브라켓 결합슬릿(54FS)은 제1박스부(22)의 안쪽면에서 바깥면 쪽으로 일정 길이 연장되도록 구성된다. 제1브라켓 결합슬릿(54FS)은 단면 일자형의 슬릿 형상으로 구성된다. 제1브라켓 결합슬릿(54FS)은 좌우 양쪽 제1사이드벽(22SW)의 내외표면과 제1사이드벽(22SW)의 내측단 쪽으로 연통되도록 구성된다. 즉, 상기 제1브라켓 결합슬릿(54FS)은 단면 일자형 슬릿 형상으로 이루어진 것으로, 상기 제1브라켓 결합슬릿(54FS)이 제1박스부(22)의 내부에 구비되면서 동시에 제1박스부(22)의 양쪽 측면과 안쪽면(제2박스부(32)의 안쪽면과 마주하는 면)으로 연통된 구조가 된다. 즉, 상기 제1박스부(22)에 양면으로 연통된 제1브라켓 결합슬릿(54FS)이 구비된 구조가 된다. 이때, 복수개의 보강리브(26) 중에서 상기 제1브라켓 결합슬릿(54)과 옆에서 만나는 보강리브(26)에도 리브측 브라켓 결합슬릿이 구비된다. 리브측 결합슬릿은 보강리브의 내측단에서 외측단으로 길게 연통된 일자홀 형상으로 구성된다. 리브측 결합슬릿은 제1브라켓 결합슬릿(54FS)과 옆쪽으로 나란하게 만나는 일자홀 형상으로 구성된다. 상기 제1브라켓 결합슬릿(54FS)에 고정 브라켓이 삽입되어 들어올 때에 상기 고정 브라켓이 보강리브에 걸리지 않고 리브측 브라켓 결합슬릿에도 삽입되어 들어올 수 있게 된다.The first box part 22 is provided with a bracket coupling slit 54. Bracket coupling slits 54 are provided on the left and right first side walls 22SW in the first box 22. The bracket coupling slit 54 formed in the first box portion 22 may be referred to as a first bracket coupling slit 54FS. The first bracket coupling slit 54FS is configured to extend a predetermined length from the inner surface of the first box 22 toward the outer surface. The first bracket coupling slit 54FS has a straight slit shape in cross section. The first bracket coupling slit 54FS is configured to communicate with the inner and outer surfaces of the left and right first side walls 22SW and toward the inner end of the first side wall 22SW. That is, the first bracket coupling slit 54FS has a cross-sectional straight slit shape, and the first bracket coupling slit 54FS is provided inside the first box part 22 and at the same time, the first box part 22 It has a structure in communication with both sides and the inner surface (a surface facing the inner surface of the second box 32). That is, the first box portion 22 has a structure in which the first bracket coupling slit 54FS communicated with both sides is provided. At this time, a rib side bracket coupling slit is also provided in the reinforcing rib 26 meeting the first bracket coupling slit 54 from the side of the plurality of reinforcing ribs 26. The rib-side coupling slit is formed in the shape of a straight hole that is elongated from the inner end of the reinforcing rib to the outer end. The rib-side coupling slit is configured in a straight hole shape that meets the first bracket coupling slit 54FS side by side. When the fixing bracket is inserted into the first bracket engaging slit 54FS, the fixing bracket does not get caught in the reinforcing rib, and can be inserted into the rib side bracket engaging slit.

상기 제2슬리브 모듈(30)은 제2박스부(32)에 제2슬리브부(34)가 구비되도록 구성된다.The second sleeve module 30 is configured such that the second sleeve part 34 is provided in the second box part 32.

상기 제2박스부(32)는 좌우 양쪽의 제2사이드벽(32SW)에 제2상부 측벽(32UW)과 제2하부 측벽(32LW)을 구비한 박스 형상으로 구성된다. 제2박스부(32)가 사각 박스 형상으로 구성된다. 제2박스부(32)의 안쪽면은 개방되어 있다.The second box part 32 has a box shape having a second upper side wall 32UW and a second lower side wall 32LW on the left and right side of the second side walls 32SW. The second box part 32 is configured in a square box shape. The inner surface of the second box part 32 is open.

상기 제2박스부(32)의 안쪽면에는 제2보스(32BS)가 구비된다. 제2보스(32BS)의 기단부가 제2박스부(32)의 안쪽면에 이어져 있고, 제2보스(32BS)는 제2슬리브부(34)의 바깥쪽에 배치된 상태에서 제2슬리브부(34)의 길이 방향과 나란한 방향으로 연장된다. 상기 제2보스(32BS)는 제2박스부(32)의 내부에 복수개로 구비된다. 상기 제2박스부(32)가 사각 박스 형상이어서 제2박스부(32)의 네 코너부와 인접한 내부에 각각 하나씩 제2보스(32BS)가 구비된다. 네 개의 제2보스(32BS)가 제2박스부(32)의 내부에 구비된 구조가 된다. 상기 제2보스(32BS)의 선단부에서부터 기단부까지 일정 깊이의 볼트 결합홀이 구비된다. 볼트 결합홀은 제2보스(32BS)의 선단에서부터 기단부 쪽으로 일정 길이만큼 연장되는 한편 제2박스부(32)의 바깥쪽으로 연통되어 있지는 않은 구조이다. 제2박스부(32) 내부의 제2보스(32BS)는 제1박스부(22)에 구비된 제1보스(22BS)와 만나도록 정렬된다. 제1박스부(22)의 제1보스(22BS)에 형성된 볼트 결합홀과 제2박스부(32)의 제2보스(32BS)에 형성된 볼트 결합홀 및 연결 지지판(40)의 볼트 결합홀은 서로 만난 상태에서 상기 볼트 결합홀들에 삽입된 볼트(BT)가 상기 제2보스(32BS)의 볼트 결합홀에 조여짐으로써 상기 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이에 연결 지지판(40)이 개재된 상태에서 제1슬리브 모듈(20)과 연결 지지판(40)과 제2슬리브 모듈(30)이 서로 조립된 상태가 된다. 상기 볼트(BT)를 제1보스(26)의 제1보스(26)에 형성된 볼트 결합홀을 관통시켜서 제2보스(36)에 형성된 볼트 결합홀에 체결하면, 볼트(BT)의 헤드부는 제1박스부(22)의 헤드홈에 가압되어 상기 연결 지지판(140)이 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이에 개재된 상태에서 연결 지지판(140)과 제1슬리브 모듈(20)과 제2슬리브 모듈(30)이 기밀되도록 연결된다.A second boss 32BS is provided on the inner surface of the second box part 32. The base end of the second boss (32BS) is connected to the inner surface of the second box part (32), and the second boss (32BS) is disposed outside the second sleeve part (34), the second sleeve part (34). It extends in a direction parallel to the length direction of ). The second boss (32BS) is provided in a plurality of the inside of the second box (32). Since the second box part 32 has a square box shape, one second boss 32BS is provided inside each of the four corner parts of the second box part 32 and adjacent to each other. Four second bosses 32BS are provided inside the second box 32. A bolt coupling hole of a predetermined depth is provided from the front end to the base end of the second boss 32BS. The bolt coupling hole has a structure that extends from the front end of the second boss 32BS toward the base end by a predetermined length and does not communicate with the outside of the second box part 32. The second boss 32BS inside the second box part 32 is aligned to meet the first boss 22BS provided in the first box part 22. The bolt coupling hole formed in the first boss 22BS of the first box part 22, the bolt coupling hole formed in the second boss 32BS of the second box part 32, and the bolt coupling hole of the connection support plate 40 are Between the first sleeve module 20 and the second sleeve module 30 by tightening the bolts BT inserted into the bolt coupling holes in the state of meeting each other into the bolt coupling holes of the second boss 32BS. With the connection support plate 40 interposed therebetween, the first sleeve module 20, the connection support plate 40, and the second sleeve module 30 are assembled to each other. When the bolt BT is passed through the bolt coupling hole formed in the first boss 26 of the first boss 26 and fastened to the bolt coupling hole formed in the second boss 36, the head of the bolt BT The connection support plate 140 and the first sleeve module are pressed in the head groove of the first box part 22 so that the connection support plate 140 is interposed between the first sleeve module 20 and the second sleeve module 30. 20 and the second sleeve module 30 are connected to be airtight.

또한, 상기 제2박스부(32)의 내부에는 복수개의 보강리브(36)가 구비된다. 복수개의 상기 보강리브(36)는 제2박스부(32)의 안쪽면과 제2슬리브부(34)의 외주면에 이어져 있어서, 상기 제2박스부(32)와 제2슬리브부(34)의 연결 구조를 강하게 보강한다.In addition, a plurality of reinforcing ribs 36 are provided inside the second box part 32. The plurality of reinforcing ribs 36 are connected to the inner surface of the second box part 32 and the outer circumferential surface of the second sleeve part 34, so that the second box part 32 and the second sleeve part 34 Strongly reinforce the connection structure.

상기 제2박스부(32)에는 브라켓 결합슬릿(54)이 구비된다. 제2박스부(32)에서 좌우 양쪽 제2사이드벽(32SW)에 브라켓 결합슬릿(54)이 구비된다. 제2박스부(32)에 형성된 브라켓 결합슬릿(54)은 제2브라켓 결합슬릿(54SS)이라 할 수 있다. 상기 제2브라켓 결합슬릿(54SS)은 제2박스부(32)의 안쪽면에서 바깥면 쪽으로 일정 길이 연장된 형상으로 구성된다. 제2브라켓 결합슬릿(54SS)은 단면 일자형의 슬릿 형상으로 구성된다. 제2브라켓 결합슬릿(54SS)은 좌우 양쪽의 제2사이드벽(32SW)의 내외표면과 내측단으로 연통되도록 구성된다. 즉, 상기 제2브라켓 결합슬릿(54SS)은 단면 일자형 슬릿 형상으로 이루어지며, 제2브라켓 결합슬릿(54SS)이 제2박스부(32)의 내부에 구비되면서 동시에 제2박스부(32)의 양쪽 측면과 안쪽면(제1박스부(22)의 안쪽면과 마주하는 면)으로 연통된 구조가 된다. 즉, 상기 제2박스부(32)에 양면으로 연통된 제2브라켓 결합슬릿(54SS)이 구비된 구조가 된다. 이때, 복수개의 보강리브(36) 중에서 상기 제2브라켓 결합슬릿(54SS)과 옆에서 만나는 보강리브(36)에도 리브측 브라켓 결합슬릿이 구비된다. 리브측 결합슬릿은 보강리브(36)의 내측단에서 외측단으로 길게 연통된 일자홀 형상으로 구성된다. 리브측 결합슬릿은 제2브라켓 결합슬릿(54SS)과 옆쪽으로 나란하게 만나는 일자홀 형상으로 구성된다. 상기 제2브라켓 결합슬릿(54SS)에 고정 브라켓이 삽입되어 들어올 때에 상기 고정 브라켓이 보강리브(36)에 걸리지 않고 리브측 브라켓 결합슬릿에도 삽입되어 들어올 수 있게 된다.The second box part 32 is provided with a bracket coupling slit 54. In the second box part 32, bracket coupling slits 54 are provided on the left and right second side walls 32SW. The bracket coupling slit 54 formed in the second box part 32 may be referred to as a second bracket coupling slit 54SS. The second bracket coupling slit 54SS has a shape extending a predetermined length from the inner surface of the second box 32 toward the outer surface. The second bracket coupling slit 54SS is configured in a slit shape having a straight cross-section. The second bracket coupling slit 54SS is configured to communicate with the inner and outer surfaces and inner ends of the second side walls 32SW on both left and right sides. That is, the second bracket coupling slit 54SS has a cross-sectional straight slit shape, and the second bracket coupling slit 54SS is provided inside the second box part 32 and at the same time It has a structure in communication with both side surfaces and inner surfaces (surfaces facing the inner surface of the first box 22). That is, the second bracket coupling slit 54SS communicated on both sides of the second box part 32 is provided. At this time, a rib side bracket coupling slit is also provided in the reinforcing rib 36 meeting the second bracket coupling slit 54SS from the side of the plurality of reinforcing ribs 36. The rib-side coupling slit is configured in the shape of a straight hole that is elongated from the inner end of the reinforcing rib 36 to the outer end. The rib-side coupling slit is configured in a straight hole shape that meets the second bracket coupling slit 54SS side by side. When the fixing bracket is inserted into the second bracket engaging slit 54SS, the fixing bracket does not get caught in the reinforcing rib 36 and can be inserted into the rib-side bracket engaging slit.

상기 제2슬리브부(34)는 제2박스부(32)에 결합된다. 제2박스부(32)에 제2슬리브부(34)가 결합된다. 제2슬리브부(34)는 제2박스부(32)에 일체형으로 결합된다. 제2슬리브부(34)는 원형관 형상으로 구성된다. 이때, 제2슬리브부(34)는 제2박스부(32)의 바깥면에서 일정 길이 돌츨되어 있으며, 제2슬리브부(34)의 일부는 제2박스부(32)의 내부로 들어가 있다.The second sleeve part 34 is coupled to the second box part 32. The second sleeve portion 34 is coupled to the second box portion 32. The second sleeve portion 34 is integrally coupled to the second box portion 32. The second sleeve portion 34 is configured in a circular tube shape. At this time, the second sleeve portion 34 protrudes from the outer surface of the second box portion 32 for a predetermined length, and a part of the second sleeve portion 34 enters the inside of the second box portion 32.

상기 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이에 연결 지지판(40)이 배치된 상태에서 연결수단으로 제1슬리브 모듈(20)과 연결 지지판(40)과 제2슬리브 모듈(30)이 결합된 상태에서 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)이 서로 만나도록 구성된다. 즉, 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)이 서로 이어진 구조가 된다. 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)이 이어져서 고정 브라켓(50)을 삽입하기 위한 브라켓 결합슬릿(54)으로 형성된다.In a state in which the connection support plate 40 is disposed between the first sleeve module 20 and the second sleeve module 30, the first sleeve module 20, the connection support plate 40, and the second sleeve module ( 30) is configured so that the first bracket coupling slit 54FS and the second bracket coupling slit 54SS meet each other in a coupled state. That is, the first bracket coupling slit 54FS and the second bracket coupling slit 54SS are connected to each other. The first bracket coupling slit 54FS and the second bracket coupling slit 54SS are connected to each other to form a bracket coupling slit 54 for inserting the fixing bracket 50.

상기 제1슬리브 모듈(20)과 후술하는 연결 지지판(40)과 제2슬리브 모듈(30)이 연결수단에 의해 서로 연결된 본 발명의 조적 슬리브를 옆에서 볼 때에 일자형 슬릿 형태의 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)이 서로 이어지고 동시에 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)은 제1박스부(22)와 제2박스부(32)의 양쪽 옆으로 개방된 구조가 된다.The first bracket coupling slit in the form of a straight slit when viewed from the side of the masonry sleeve of the present invention in which the first sleeve module 20, the connection support plate 40 to be described later, and the second sleeve module 30 are connected to each other by a connecting means (54FS) and the second bracket coupling slit (54SS) are connected to each other, and at the same time, the first bracket coupling slit (54FS) and the second bracket coupling slit (54SS) are formed of the first box portion 22 and the second box portion 32. It becomes an open structure on both sides.

상기 연결 지지판(40)은 판형상으로 구성된다. 본 발명에서 제1슬리브 모듈(20)의 제1박스부(22)와 제2슬리브 모듈(30)의 제2박스부(32)가 사각 박스 형상이어서 연결 지지판(40)은 사각판 형상으로 구성된다. 상기 연결 지지판(40)에는 양면으로 연통된 플로우홀(42)이 구비된다. 상기 플로우홀(42)은 제1슬리브부(24)와 제2슬리브부(34)의 단면 형상과 동일한 형상의 홀로 구성된다. 제1슬리브부(24)와 제2슬리브부(34)의 단면 형상이 원형이므로, 상기 플로우홀(42)은 원형홀 형상으로 구성된다. The connection support plate 40 is configured in a plate shape. In the present invention, since the first box portion 22 of the first sleeve module 20 and the second box portion 32 of the second sleeve module 30 are in the shape of a square box, the connection support plate 40 is formed in the shape of a square plate. do. The connection support plate 40 is provided with flow holes 42 communicated on both sides. The flow hole 42 is formed of a hole having the same cross-sectional shape as the first sleeve portion 24 and the second sleeve portion 34. Since the cross-sectional shape of the first sleeve portion 24 and the second sleeve portion 34 is circular, the flow hole 42 has a circular hole shape.

상기 연결 지지판(40)에는 양면으로 연통된 볼트 결합홀이 구비된다. 연결 지지판(40)이 사각판 형상이어서 볼트 결합홀은 연결 지지판(40)의 네 코너부와 인접한 부분에 구비된다. 상기 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이에 연결 지지판(40) 개재된 상태에서 상기 연결 지지판(40)의 볼트 결합홀과 제1슬리브 모듈(20)의 제1박스부(22)의 제1보스(22BS)에 형성된 볼트 결합홀 및 제2슬리브 모듈(30)의 제2박스부(32)에 형성된 제2보스(32BS)가 동일 선상에서 만나도록 정렬된다.The connection support plate 40 is provided with bolt coupling holes communicated on both sides. Since the connection support plate 40 is in the shape of a square plate, the bolt coupling hole is provided in a portion adjacent to the four corners of the connection support plate 40. In the state where the connection support plate 40 is interposed between the first sleeve module 20 and the second sleeve module 30, the bolt coupling hole of the connection support plate 40 and the first box part of the first sleeve module 20 The bolt coupling hole formed in the first boss 22BS of 22 and the second boss 32BS formed in the second box 32 of the second sleeve module 30 are aligned to meet on the same line.

상기 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이에 연결 지지판(40)이 개재된다. 제1슬리브 모듈(20)의 제1박스부(22)와 제2슬리브 모듈(30)의 제2박스부(32)의 서로 마주하는 안쪽면 개방부 사이에 연결 지지판(40)이 개재되고, 상기 연결 지지판(40)의 플로우홀(42)의 중심부와 상기 제1슬리브부(24)와 제2슬리브부(34)의 중심부는 동일 선상에 배치된다. 상기 제1슬리브부(24)와 연결 지지판(40)의 플로우홀(42)과 제2슬리브부(34)를 통해서 공기가 흐를 수 있다.A connection support plate 40 is interposed between the first sleeve module 20 and the second sleeve module 30. A connection support plate 40 is interposed between the first box portion 22 of the first sleeve module 20 and the inner opening portions of the second box portion 32 of the second sleeve module 30 facing each other, The central portion of the flow hole 42 of the connection support plate 40 and the central portion of the first sleeve portion 24 and the second sleeve portion 34 are disposed on the same line. Air may flow through the first sleeve part 24 and the flow hole 42 and the second sleeve part 34 of the connection support plate 40.

상기 연결수단은 제1박스부(22)와 연결 지지판(40)의 코너부에 구비된 볼트 결합홀을 관통하는 볼트(BT)와, 상기 제2박스부(32)의 내부에 구비되어 볼트(BT)가 조여지는 제2보스(32BS)를 포함한다.The connecting means includes a bolt (BT) passing through a bolt coupling hole provided in the corner of the first box part 22 and the connection support plate 40, and the bolt ( BT) includes a second boss (32BS) to be tightened.

상기 제1박스부(22)의 내부에는 제1박스부(22)의 안쪽면에 구비되면서 제1슬리브부(24)의 둘레에 배치되도록 복수개의 제1보스(22BS)가 구비되고, 상기 제1보스(22BS)에 볼트 결합홀이 구비된다. 상기 제1박스부(22) 내부의 제1보스(22BS)에 형성된 볼트 결합홀은 제1슬리브 모듈(20)의 볼트 결합홀이다.A plurality of first bosses 22BS are provided inside the first box part 22 so as to be disposed on the inner surface of the first box part 22 and disposed around the first sleeve part 24. One boss (22BS) is provided with a bolt coupling hole. The bolt coupling hole formed in the first boss 22BS inside the first box part 22 is a bolt coupling hole of the first sleeve module 20.

상기 제1박스부(22)의 바깥면에는 헤드홈이 구비된다. 상기 제1슬리브 모듈(20)의 볼트 결합홀과 연결 지지판(40)의 볼트 결합홀들을 관통한 볼트(BT)를 제2슬리브 모듈(30)의 제2박스부(32) 내부에 구비된 제2보스(32BS)에 조여주면, 볼트(BT)의 헤드부는 제1박스부(22)의 헤드홈에 가압되고 볼트(BT)를 제2슬리브 모듈(30) 내부의 제2보스(32BS)에 결합된 상태가 되면서 상기 연결 지지판(40)이 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이에 개재된 상태에서 연결 지지판(40)과 제1슬리브 모듈(20)과 제2슬리브 모듈(30)이 기밀되도록 연결된다. 구체적으로, 상기 제1슬리브 모듈(20)의 제1박스부(22)의 바깥면에서 상기 제1보스(22BS)의 내측 단부로 연통된 볼트 결합홀과 연결 지지판(40)의 양면으로 연통된 볼트 결합홀에 볼트(BT)를 결합하고, 제2슬리브 모듈(30)의 제2박스부(32)의 내부에 구비된 제2보스(32BS)에 상기 볼트(BT)를 조여서 결합하면, 볼트(BT)의 헤드부는 제1박스부(22)의 헤드홈에 가압되고 볼트(BT) 자체는 제2슬리브 모듈(30)의 제2박스부(32) 내부에 구비된 제2보스(32BS)에 결합된 상태가 되면서 연결 지지판(40)이 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이에 개재된 상태에서 연결 지지판(40)의 양면이 제1슬리브 모듈(20)의 제1박스부(22)의 안쪽면과 제2슬리브 모듈(30)의 제2박스부(32)의 안쪽면에 가압 밀착되므로, 연결 지지판(40)이 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이에 개재된 상태에서 연결 지지판(40)과 제1슬리브 모듈(20)과 제2슬리브 모듈(30)이 기밀되도록 연결된 구조가 된다. 상기 연결 지지판(40)의 상단부는 제1슬리브 모듈(20)의 제1브라켓 결합슬릿과 제2슬리브 모듈(30)의 제2브라켓 결합슬릿을 벗어난 아래 위치에 배치된 상태에서 연결 지지판(40)의 양면이 제1슬리브 모듈(20)의 제1박스부(22)에 구비된 제1슬리브부(24)의 내측단과 제2슬리브 모듈(30)의 제2박스부(32)에 구비된 제2슬리브부(34)의 내측단에 가압 밀착되고 연결 지지판(40)의 나머지 양면은 상기 제1브라켓 결합슬릿(54FS)와 제2브라켓 결합슬릿(54SS)을 제외한 제1박스부(22)와 제2박스부(32)의 안쪽면을 막고 있게 되므로, 연결 지지판(40)과 제1슬리브 모듈(20)과 제2슬리브 모듈(30)이 기밀되도록 연결된 구조가 된다. 한편, 상기 연결 지자판(40)의 상단부가 제1슬리브 모듈(20)의 제1브라켓 결합슬릿과 제2슬리브 모듈(30)의 제2브라켓 결합슬릿을 벗어난 아래 위치에 배치된 상태에서 연결 지지판(40)의 양면이 제1슬리브 모듈(20)의 제1박스부(22) 둘레부의 제1사이드벽(22SW)의 내측단과 제1하부 측벽(22LW)의 내측단과 제2슬리브 모듈(30)의 제2박스부(32) 둘레부의 제2사이드벽(32SW)의 내측단과 제2하부 측벽(32LW)의 내측단에 가압 밀착됨으로써, 연결 지지판(40)이 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이에 개재된 상태에서 연결 지지판(40)과 제1슬리브 모듈(20)과 제2슬리브 모듈(30)이 기밀되도록 연결된 구조가 될 수도 있다. 제1슬리브 모듈(20)과 연결 지지판(40)과 제2슬리브 모듈(30)의 기밀되게 연결된다는 것은 제1슬리브부(24)와 제2슬리브부(34)의 내부로 공기가 흐르면서 외부로 세어나가지 않는다는 것을 의미한다.A head groove is provided on the outer surface of the first box part 22. The bolt (BT) passing through the bolt coupling hole of the first sleeve module 20 and the bolt coupling hole of the connection support plate 40 is provided in the second box part 32 of the second sleeve module 30. 2 When tightened to the boss (32BS), the head portion of the bolt (BT) is pressed into the head groove of the first box portion (22), and the bolt (BT) is pressed to the second boss (32BS) inside the second sleeve module (30). In a combined state, the connection support plate 40 is interposed between the first sleeve module 20 and the second sleeve module 30, and the connection support plate 40, the first sleeve module 20, and the second sleeve The module 30 is connected to be airtight. Specifically, the bolt coupling hole communicated from the outer surface of the first box portion 22 of the first sleeve module 20 to the inner end of the first boss 22BS and both sides of the connection support plate 40 When the bolt (BT) is coupled to the bolt coupling hole, and the bolt (BT) is fastened to the second boss (32BS) provided inside the second box part (32) of the second sleeve module (30), the bolt The head portion of (BT) is pressed into the head groove of the first box portion 22, and the bolt (BT) itself is a second boss (32BS) provided inside the second box portion 32 of the second sleeve module 30 The connection support plate 40 is interposed between the first sleeve module 20 and the second sleeve module 30 while the connection support plate 40 is connected to the first sleeve module 20. Since the inner surface of the first box part 22 and the inner surface of the second box part 32 of the second sleeve module 30 are pressed in close contact, the connection support plate 40 is connected to the first sleeve module 20 and the second sleeve. In a state interposed between the modules 30, the connection support plate 40, the first sleeve module 20, and the second sleeve module 30 are connected so as to be airtight. When the upper end of the connection support plate 40 is disposed at a position below the first bracket coupling slit of the first sleeve module 20 and the second bracket coupling slit of the second sleeve module 30, the connection support plate 40 Both sides of the first sleeve module 20 are provided at the inner end of the first sleeve part 24 provided in the first box part 22 and the second box part 32 of the second sleeve module 30. 2Pressing and close contact with the inner end of the sleeve part 34, and the remaining both sides of the connection support plate 40 are with the first box part 22 excluding the first bracket coupling slit 54FS and the second bracket coupling slit 54SS. Since the inner surface of the second box part 32 is blocked, the connection support plate 40, the first sleeve module 20, and the second sleeve module 30 are connected so as to be airtight. On the other hand, the connection support plate in a state in which the upper end of the connection base plate 40 is disposed below the first bracket coupling slit of the first sleeve module 20 and the second bracket coupling slit of the second sleeve module 30. Both sides of (40) are the inner end of the first side wall (22SW) of the first box part (22) of the first sleeve module (20) and the inner end of the first lower side wall (22LW) and the second sleeve module (30) The second box part 32 of the circumference of the second side wall 32SW and the second lower side wall 32LW of the inner end of the inner end and the inner end of the In a state interposed between the two sleeve modules 30, the connection support plate 40, the first sleeve module 20, and the second sleeve module 30 may be connected so as to be airtight. The airtight connection between the first sleeve module 20 and the connection support plate 40 and the second sleeve module 30 means that the air flows into the first sleeve part 24 and the second sleeve part 34 to the outside. It means it doesn't count.

상기 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 중에서 적어도 하나의 모듈에는 고정 브라켓(50)이 구비된다.At least one of the first sleeve module 20 and the second sleeve module 30 is provided with a fixing bracket 50.

상기 고정 브라켓(50)은 단면 일자형 판형상으로 구성된다. 상기 제1박스부(22)와 제2박스부(32) 중에서 적어도 하나에 구비된 브라켓 결합 슬릿에 고정 브라켓(50)이 삽입되어 결합된다. 상기 브라켓 결합 슬릿은 제1박스부(22)와 제2박스부(32) 중에서 적어도 하나의 안쪽벽에서 바깥벽 쪽으로 연장되도록 구성되고, 상기 고정 브라켓(50)은 단면 일자형의 판형상으로 구성되어, 상기 브라켓 결합 슬릿에 고정 브라켓(50)이 삽입되도록 구성된다. 본 발명에서는 제1슬리브 모듈(20)의 제1박스와 제2슬리브 모듈(30)의 제2박스부(32)에 각각 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)이 구비되어, 상기 고정 브라켓(50)이 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)에 삽입되어 결합된 구조가 된다. 상기 제1슬리브 모듈(20)과 연결 지지판(40)과 제2슬리브 모듈(30)을 상기 연결수단에 의해 조립하기 이전에 상기 고정 브라켓(50)을 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)에 삽입한 상태에서 상기 연결수단, 다시 말해, 볼트(BT)와 제1보스(26)와 제2보스(36)에 의해 제1슬리브 모듈(20)과 연결 지지판(40)과 제2슬리브 모듈(30)을 결합한다. 본 발명의 조적 슬리브는 제1슬리브 모듈(20)과 연결 지지판(40)과 제2슬리브 모듈(30) 및 고정 브라켓(50)이 조립된 구조가 된다.The fixing bracket 50 is configured in a straight plate shape in cross section. The fixing bracket 50 is inserted into and coupled to the bracket coupling slit provided in at least one of the first box portion 22 and the second box portion 32. The bracket coupling slit is configured to extend from the inner wall of at least one of the first box portion 22 and the second box portion 32 toward the outer wall, and the fixing bracket 50 is configured in a plate shape having a cross-sectional straight shape. , It is configured such that the fixing bracket 50 is inserted into the bracket coupling slit. In the present invention, a first bracket coupling slit 54FS and a second bracket coupling slit 54SS are respectively provided in the first box of the first sleeve module 20 and the second box portion 32 of the second sleeve module 30. Is provided, the fixing bracket 50 is inserted into the first bracket coupling slit 54FS and the second bracket coupling slit 54SS to form a combined structure. Before assembling the first sleeve module 20, the connection support plate 40, and the second sleeve module 30 by the connecting means, the fixing bracket 50 is attached to the first bracket coupling slit (54FS) and the second sleeve module. The first sleeve module 20 and the connection support plate 40 by the connecting means, that is, the bolt BT, the first boss 26 and the second boss 36 in the state inserted into the bracket coupling slit (54SS). ) And the second sleeve module 30 are combined. The masonry sleeve of the present invention has a structure in which the first sleeve module 20, the connection support plate 40, the second sleeve module 30, and the fixing bracket 50 are assembled.

상기 고정 브라켓(50)의 양단부에는 고정편(52)이 구비되고, 상기 고정편(52)에는 볼트 삽입홀이 구비되어, 상기 볼트 삽입홀에 삽입된 볼트(BT)를 고정 대상물에 앵커링하여 상기 제1슬리브 모듈(20)과 제2슬리브 모듈(30)과 연결 지지판(40)을 고정 대상물에 고정하도록 구성된다.Fixing pieces 52 are provided at both ends of the fixing bracket 50, and a bolt insertion hole is provided in the fixing piece 52, and the bolt BT inserted into the bolt insertion hole is anchored to the object to be fixed. It is configured to fix the first sleeve module 20, the second sleeve module 30, and the connection support plate 40 to a fixed object.

상기 고정편(52)은 고정 브라켓(50)의 양단부에 각각 구비된 한 쌍의 연결 고정편(52A)과, 상기 연결 고정편(52A)에 각각 구비된 장착 고정편(52B)을 포함한다. 장착 고정편(52B)에 양면으로 연통된 상기 볼트 삽입홀이 구비된다.The fixing piece 52 includes a pair of connection fixing pieces 52A each provided at both ends of the fixing bracket 50, and a mounting fixing piece 52B each provided on the connection fixing piece 52A. The bolt insertion hole communicated on both sides of the mounting fixing piece 52B is provided.

상기 고정 브라켓(50)의 양단부에 구비된 고정편(52) 중에서 장착 고정편(52B)에 형성된 볼트홀에 앵커링 볼트를 결합하고, 상기 앵커링 볼트를 고정 대상물이 앵커링하여 장착 고정편(52B)이 고정 대상물에 밀착 고정되도록 함으로써 본 발명의 조적 슬리브를 고정 대상물에 설치할 수 있다. 상기 고정 대상물의 천정 슬라브인 경우, 상기 고정 브라켓(50)의 장착 고정편(52B)에 삽입된 앵커링 볼트를 천정 슬라브의 아래에서 천정 슬라브 내부로 앵커링하여 장착 고정편(52B)이 천정 슬라브의 아래면에 밀착 고정되도록 함으로써 본 발명의 조적 슬리브를 천정 슬라브 아래에 설치할 수 있다. 이렇게 고정 대상물에 고정된 본 발명의 조적 슬리브에서 제1슬리브 모듈(20)의 제1슬리브부(24)와 제2슬리브 모듈(30)의 제2슬리브부(34)에 각각 건물의 배관을 연결하면 된다.Among the fixing pieces 52 provided at both ends of the fixing bracket 50, an anchoring bolt is coupled to a bolt hole formed in the mounting fixing piece 52B, and the anchoring bolt is anchored to the fixing object so that the mounting fixing piece 52B is By intimately fixing the object to be fixed, the masonry sleeve of the present invention can be installed on the object to be fixed. In the case of the ceiling slab of the fixed object, the anchoring bolt inserted into the mounting fixing piece 52B of the fixing bracket 50 is anchored from the bottom of the ceiling slab to the inside of the ceiling slab, so that the mounting fixing piece 52B is below the ceiling slab. By making it in close contact with the surface, the masonry sleeve of the present invention can be installed under the ceiling slab. In the masonry sleeve of the present invention fixed to the fixed object in this way, the pipes of the building are connected to the first sleeve part 24 of the first sleeve module 20 and the second sleeve part 34 of the second sleeve module 30, respectively. Just do it.

본 발명의 조적 슬리브는 벽돌을 깨서 슬리브 결합홀을 형성할 필요가 없이, 벽돌을 쌓을 때에 일부의 벽돌을 쌓지 않고 슬리브 결합홀을 형성하고, 이러한 일부의 벽돌을 쌓지 않고 형성된 슬리브 결합홀에 본 발명의 조적 슬리브를 삽입(주요부인 제1슬리브 모듈(20)과 제2슬리브 모듈(30)을 삽입)한 다음에, 상기와 같이 고정 브라켓(50)을 고정 대상물(주로, 천정 슬라브)에 볼트(BT)를 앵커링하기만 하면 되므로, 시공이 편리하고 신속하며, 조적 벽체의 강도가 취약해지는 문제도 해결하며, 조적 슬리브 설치 이후에 조적 벽체가 지저분해지는 문제도 해결한다.The masonry sleeve of the present invention does not need to form a sleeve coupling hole by breaking bricks, and forms a sleeve coupling hole without stacking some bricks when stacking bricks, and the present invention in the sleeve coupling hole formed without stacking some bricks. After inserting the masonry sleeve (inserting the first sleeve module 20 and the second sleeve module 30, which are the main parts), as described above, the fixing bracket 50 is bolted to the object (mainly, the ceiling slab). BT) is simply anchored, so construction is convenient and quick, and it solves the problem of weakening the strength of the masonry wall, and also solves the problem that the masonry wall becomes dirty after installing the masonry sleeve.

본 발명에서 주요부인 제1슬리브 모듈(20)의 제1박스부(22)와 제2슬리브 모듈(30)의 제2박스부(32)의 상하단 사이의 높이와 좌우 폭은 조적 구조물(주로, 조적 벽체)의 생략된 벽돌 갯수의 높이와 동일하게 형성되고 동시에 생략된 벽돌 갯수의 좌우 폭과 동일한 폭으로 설계되어 있어서 조적 구조물에서 벽돌을 쌓지 않고 몇 장 생략하면 조적 구조물에 형성된 슬리브 결합홀의 높이와 좌우 폭이 상기 제1박스부(22)와 제2박스부(32)의 높이와 좌우 폭과 동일하도록 되어 있으므로, 상기 제1박스부(22)와 제2박스부(32)를 그냥 조적 구조물의 슬리브 결합홀에 삽입한 상태에서 상기 고정 브라켓(50)을 천정 슬라브와 같은 고정 대상물에 앵커링하면 된다. In the present invention, the height and the left and right widths between the upper and lower ends of the first box part 22 of the first sleeve module 20 and the second box part 32 of the second sleeve module 30 are masonry structures (mainly, Masonry wall) is formed equal to the height of the number of omitted bricks and is designed to have the same width as the left and right widths of the number of omitted bricks.If you do not stack bricks in the masonry structure and omit a few pieces, the height of the sleeve coupling hole formed in the masonry Since the left and right widths are the same as the heights and the left and right widths of the first box part 22 and the second box part 32, the first box part 22 and the second box part 32 are simply masonry structures. The fixing bracket 50 can be anchored to a fixed object such as a ceiling slab while being inserted into the sleeve coupling hole of the.

따라서, 본 발명의 조적 슬리브는 조적 구조물의 슬리브 결합홀에 간단하에 설치한 상태에서 고정 브라켓(50)을 천정 슬라브 등의 고정 대상물에 고정하기만 하면 되므로, 시공이 편리하고 신속하며, 조적 벽체의 강도가 취약해지는 문제도 해결하며, 조적 슬리브 설치 이후에 조적 벽체가 지저분해지는 문제도 해결할 수 있는 것이다. 물론, 상기 제1박스부(22)와 제2박스부(32) 및 슬라브 결합홀 사이의 틈새는 밀봉재로 밀봉하여 마감하는 작업이 필요한 경우도 있기는 하지만, 기존에 비하여 밀봉재로 마감하는 작업이 많이 줄어들게 되어서 시공이 편리하고 신속하다.Therefore, the masonry sleeve of the present invention is simply installed in the sleeve coupling hole of the masonry structure and only needs to fix the fixing bracket 50 to a fixed object such as a ceiling slab, so the construction is convenient and fast, and It also solves the problem of weakening strength, and also solves the problem that the masonry wall becomes dirty after installing the masonry sleeve. Of course, there are cases where it is necessary to seal the gap between the first box part 22 and the second box part 32 and the slab coupling hole with a sealing material to close it. It is reduced a lot, so the construction is convenient and quick.

또한, 상기 제1슬리브부(24)의 길이는 제2슬리브부(34)의 길이보다 더 길게 형성되어 있어서, 조적 슬리브를 현장에서 시공할 때에 방향을 쉽게 정할 수 있으므로, 현장 설치 작업시 보다 편리하다.In addition, since the length of the first sleeve part 24 is longer than the length of the second sleeve part 34, the direction of the masonry sleeve can be easily determined when constructing the masonry sleeve at the site, so it is more convenient during field installation work. Do.

한편, 상기 연결 지지판(40)은 상기 플로우홀(42)의 주위에 루프링부(44)가 구비된다. 상기 플로우홀(42)이 원형홀 형상이어서 루프링부(44)는 원형링 형상으로 구성된다. 상기 루프링부(44)의 양면 사이의 두께는 연결 지지판(40)의 양면 사이의 두께보다 더 크게 구성된다.Meanwhile, the connection support plate 40 is provided with a roof ring part 44 around the flow hole 42. Since the flow hole 42 has a circular hole shape, the roof ring portion 44 has a circular ring shape. The thickness between both surfaces of the roof ring part 44 is larger than the thickness between both surfaces of the connection support plate 40.

상기 루프링부(44)에 제1슬리브 모듈(20)의 제1슬리브부(24)와 상기 제2슬리브 모듈(30)의 제2슬리브부(34)가 끼워진 상태에서 제1슬리브부(24)의 내측단과 제2슬리브부(34)의 내측단이 서로 가압 밀착되도록 구성된다. 상기 연결수단으로 제1슬리브 모듈(20)과 제2슬리브 모듈(30)과 연결 지지판(40)을 결합한 상태에서 상기 제1슬리브부(24) 내측단과 상기 제2슬리브 모듈(30)의 제2슬리브부(34) 내측단이 서로 가압 밀착되고, 상기 루프링부(44)가 제1슬리브부(24)와 제2슬리브부(34)의 외주면을 기밀되게 감싸고 있게 된다.The first sleeve portion 24 in the state where the first sleeve portion 24 of the first sleeve module 20 and the second sleeve portion 34 of the second sleeve module 30 are fitted to the roof ring portion 44 The inner end and the inner end of the second sleeve 34 are configured to be in close contact with each other. In a state in which the first sleeve module 20 and the second sleeve module 30 and the connection support plate 40 are combined as the connecting means, the inner end of the first sleeve part 24 and the second sleeve module 30 The inner ends of the sleeve part 34 are pressed into close contact with each other, and the roof ring part 44 airtightly surrounds the outer peripheral surfaces of the first sleeve part 24 and the second sleeve part 34.

따라서, 상기 제1슬리브부(24)와 제2슬리브부(34)와 연결 지지판(40)의 플로우홀(42) 사이의 연결 부분에 밀봉 구조가 견고하게 형성되므로, 상기 제1슬리브부(24)와 제2슬리브부(34)와 플로우홀(42)로 소통되는 공기가 외부로 세어나가는 경우를 확실하게 방지할 수 있다. Therefore, since the sealing structure is firmly formed at the connection portion between the first sleeve portion 24 and the second sleeve portion 34 and the flow hole 42 of the connection support plate 40, the first sleeve portion 24 ) And the second sleeve part 34 and the flow hole 42 can be reliably prevented from leaking out to the outside.

바람직하게, 상기 연결 지지판(40) 자체는 고무재질로 구성되어, 상기 연결 지지판(40)과 제1슬리브 모듈(20)과 제2슬리브 모듈(30) 사이의 연결부분의 밀봉성을 더 높이고, 상기 제1슬리브부(24)와 제2슬리브부(34)와 연결 지지판(40)의 플로우홀(42) 사이의 연결 부분에 밀봉 구조가 더 견고하게 형성되도록 한다.Preferably, the connection support plate 40 itself is made of a rubber material, further increasing the sealing property of the connection portion between the connection support plate 40 and the first sleeve module 20 and the second sleeve module 30, The sealing structure is formed more firmly at the connection portion between the first sleeve portion 24 and the second sleeve portion 34 and the flow hole 42 of the connection support plate 40.

한편, 상기 제1슬리브 모듈(20)은 제1박스부(22)의 제1브라켓 결합슬릿(54FS)에 이어지면서 제1사이드벽(22SW)의 두께보다 더 얇은 제1슬릿 확장 가이드편(52FEP)이 구비되고, 상기 제2슬리브 모듈(30)도 제2박스부(32)의 제2브라켓 결합슬릿(54SS)에 이어지면서 제2사이드벽(32SW)의 두께보다 더 얇은 제2슬릿 확장 가이드편(52SEP)이 더 구비된다. 제1슬리브 모듈(20)은 제1슬릿 확장 가이드편(52FEP)이 구비된 경우 플라스틱 재질로 구성되어, 상기 제1슬릿 확장 가이드편(52FEP)은 금속재의 고정 브라켓(50)이 밀어주는 힘이 작용하면 찢어지거나 파단될 수 있도록 구성되고, 제2슬리브 모듈(30)은 제2슬릿 확장 가이드편(52SEP)이 구비된 경우 플라스틱 재질로 구성되어, 상기 제2슬릿 확장 가이드편(52SEP)은 금속재의 고정 브라켓(50)이 밀어주는 힘이 작용하면 찢어지거나 파단될 수 있도록 구성된다.On the other hand, the first sleeve module 20 is connected to the first bracket coupling slit 54FS of the first box part 22 and is thinner than the thickness of the first side wall 22SW. ) Is provided, and the second sleeve module 30 is also connected to the second bracket coupling slit 54SS of the second box part 32, and a second slit extension guide that is thinner than the thickness of the second side wall 32SW. A piece 52SEP is further provided. The first sleeve module 20 is made of a plastic material when the first slit expansion guide piece 52FEP is provided, and the first slit expansion guide piece 52FEP has a force pushed by the fixing bracket 50 of a metal material. It is configured to be torn or broken when acting, and the second sleeve module 30 is made of a plastic material when the second slit expansion guide piece 52SEP is provided, and the second slit expansion guide piece 52SEP is a metal material. The fixing bracket 50 is configured to be torn or broken when the pushing force acts.

따라서, 제1슬리브 모듈(20)의 제1박스부(22)에 형성된 제1브라켓 결합슬릿(54FS)과 제2슬리브 모듈(30)의 제2박스부(32)에 형성된 제2브라켓 결합슬릿(54SS)에 고정 브라켓(50)이 삽입되어 결합된 상태에서 상기 고정 브라켓(50)을 일정한 힘으로 제1슬릿 확장 가이드편(52FEP) 쪽으로 밀어주면 제1슬릿 확장 가이드편(52FEP)이 찢어지거나 파단되면서 제1브라켓 결합슬릿(54FS)의 길이를 늘릴 수 있고, 이처럼 제1브라켓 결합슬릿(54FS)의 길이를 제1슬릿 확장 가이드편(52FEP)을 찢어주거나 파단시키는 방식으로 늘려주면, 상기 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)이 이어져서 형성된 브라켓 결합 슬릿의 전후단부 사이의 폭이 고정 브라켓(50)의 전후단부 사이의 폭보다 더 크게 형성되므로, 상기 브라켓 결합 슬릿을 따라서 고정 브라켓(50)을 필요한 위치에 이동시켜서 고정 대상물에 고정 브라켓(50)을 고정하면 되기 때문에, 조적 슬리브를 설치할 위치를 잡는데 있어서 보다 편리하고 신속한 효과가 있다. 상기 고정 브라켓(50)이 브라켓 결합슬릿(54)을 따라 이동시킬 수 있음으로 인하여 조적 슬리브를 현장에 설치하는데 보다 편리하면서도 조적 슬리브 설치 작업도 단축시켜서 현장 시공성을 더 높일 수 있다.Accordingly, the first bracket coupling slit 54FS formed in the first box portion 22 of the first sleeve module 20 and the second bracket coupling slit formed in the second box portion 32 of the second sleeve module 30 When the fixing bracket 50 is inserted and coupled to the (54SS) and the fixing bracket 50 is pushed toward the first slit extension guide piece 52FEP with a certain force, the first slit extension guide piece 52FEP may be torn or The length of the first bracket coupling slit 54FS can be increased while being broken, and if the length of the first bracket coupling slit 54FS is increased in such a way as to tear or break the first slit extension guide piece 52FEP, the Since the width between the front and rear ends of the bracket coupling slit formed by connecting the first bracket coupling slit (54FS) and the second bracket coupling slit (54SS) is larger than the width between the front and rear ends of the fixing bracket (50), the bracket coupling Since the fixing bracket 50 can be fixed to the object to be fixed by moving the fixing bracket 50 to the required position along the slit, there is a more convenient and quick effect in determining the location to install the masonry sleeve. Since the fixing bracket 50 can be moved along the bracket coupling slit 54, it is more convenient to install the masonry sleeve in the field, and the work of installing the masonry sleeve can be shortened, thereby further enhancing field workability.

또한, 상기 고정 브라켓(50) 양단부의 고정편(52)에서 연결 고정편(52A)은 제1박스부(22)의 측벽 외표면에서 일정 거리 이격되어 연결 고정편(52A)과 제1박스부(22)의 측벽 사이에 상기 스페이스가 확보되고, 연결 고정편(52A)이 제2박스부(32)의 측벽 외표면에서 일정 거리 이격되어 연결 고정편(52A)과 제2박스부(32)의 측벽 사이에 상기 스페이스가 확보되도록 구성되고, 동시에 상기 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)이 이어져서 형성된 브라켓 결합슬릿(54)의 전후단 사이의 폭은 상기 고정 브라켓(50)의 전후단 사이의 폭보다 더 크게 형성되어, 상기 고정 브라켓(50)을 브라켓 결합슬릿(54)을 기준으로 전후 방향으로 회동시켜서 고정 브라켓(50)의 각도를 조절할 수 있으므로, 조적 슬리브를 현장에 설치할 때에 더욱더 편리한 효과가 있다.In addition, in the fixing pieces 52 at both ends of the fixing bracket 50, the connection fixing pieces 52A are spaced a certain distance from the outer surface of the side wall of the first box part 22, so that the connection fixing pieces 52A and the first box part The space is secured between the side walls of (22), and the connection fixing piece (52A) is spaced a certain distance from the outer surface of the side wall of the second box part (32), so that the connection fixing piece (52A) and the second box part (32) The width between the front and rear ends of the bracket coupling slit 54 formed by connecting the first bracket coupling slit 54FS and the second bracket coupling slit 54SS at the same time is fixed. Since the bracket 50 is formed larger than the width between the front and rear ends of the bracket 50, the angle of the fixing bracket 50 can be adjusted by rotating the fixing bracket 50 in the front and rear direction based on the bracket coupling slit 54. There is a more convenient effect when installing the sleeve in the field.

한편, 제1슬리브 모듈(20)의 제1박스부(22)에 형성된 제1브라켓 결합슬릿(54FS)과 제2슬리브 모듈(30)의 제2박스부(32)에 형성된 제2브라켓 결합슬릿(54SS)에 고정 브라켓(50)이 삽입되어 결합된 상태에서 상기 고정 브라켓(50)을 일정한 힘으로 제2슬릿 확장 가이드편(52SEP) 쪽으로 밀어주면 제2슬릿 확장 가이드편(52SEP)이 찢어지거나 파단되면서 제2브라켓 결합슬릿(54SS)의 길이를 늘릴 수 있고, 이처럼 제2브라켓 결합슬릿(54SS)의 길이를 제2슬릿 확장 가이드편(52SEP)을 찢어주거나 파단시키는 방식으로 늘려주면, 상기 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)이 이어져서 형성된 브라켓 결합 슬릿의 전후단부 사이의 폭이 고정 브라켓(50)의 전후단부 사이의 폭보다 더 크게 형성되므로, 상기 브라켓 결합 슬릿을 따라서 고정 브라켓(50)을 필요한 위치에 이동시켜서 고정 대상물에 고정 브라켓(50)을 고정하면 되기 때문에, 조적 슬리브를 설치할 위치를 잡는데 있어서 보다 편리하고 신속한 효과가 있다. 상기 고정 브라켓(50)이 브라켓 결합슬릿(54)을 따라 이동시킬 수 있음으로 인하여 조적 슬리브를 현장에 설치하는데 보다 편리하면서도 조적 슬리브 설치 작업도 단축시켜서 현장 시공성을 더 높일 수 있다.Meanwhile, the first bracket coupling slit 54FS formed in the first box portion 22 of the first sleeve module 20 and the second bracket coupling slit formed in the second box portion 32 of the second sleeve module 30 When the fixing bracket 50 is inserted and coupled to the (54SS), pushing the fixing bracket 50 toward the second slit extension guide piece 52SEP with a certain force may cause the second slit extension guide piece 52SEP to be torn or While being broken, the length of the second bracket coupling slit 54SS can be increased, and if the length of the second bracket coupling slit 54SS is increased by tearing or breaking the second slit extension guide piece 52SEP, the Since the width between the front and rear ends of the bracket coupling slit formed by connecting the first bracket coupling slit (54FS) and the second bracket coupling slit (54SS) is larger than the width between the front and rear ends of the fixing bracket (50), the bracket coupling Since the fixing bracket 50 can be fixed to the object to be fixed by moving the fixing bracket 50 to the required position along the slit, there is a more convenient and quick effect in determining the location to install the masonry sleeve. Since the fixing bracket 50 can be moved along the bracket coupling slit 54, it is more convenient to install the masonry sleeve in the field, and the work of installing the masonry sleeve can be shortened, thereby further enhancing field workability.

또한, 상기 고정 브라켓(50) 양단부의 고정편(52)에서 연결 고정편(52A)은 제1박스부(22)의 측벽 외표면에서 일정 거리 이격되어 연결 고정편(52A)과 제1박스부(22)의 측벽 사이에 상기 스페이스가 확보되고, 연결 고정편(52A)이 제2박스부(32)의 측벽 외표면에서 일정 거리 이격되어 연결 고정편(52A)과 제2박스부(32)의 측벽 사이에 상기 스페이스가 확보되도록 구성되고, 동시에 상기 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)이 이어져서 형성된 브라켓 결합슬릿(54)의 전후단 사이의 폭은 상기 고정 브라켓(50)의 전후단 사이의 폭보다 더 크게 형성되어, 상기 고정 브라켓(50)을 브라켓 결합슬릿(54)을 기준으로 전후 방향으로 회동시켜서 고정 브라켓(50)의 각도를 조절할 수 있으므로, 조적 슬리브를 현장에 설치할 때에 더욱더 편리한 효과가 있다.In addition, in the fixing pieces 52 at both ends of the fixing bracket 50, the connection fixing pieces 52A are spaced a certain distance from the outer surface of the side wall of the first box part 22, so that the connection fixing pieces 52A and the first box part The space is secured between the side walls of (22), and the connection fixing piece (52A) is spaced a certain distance from the outer surface of the side wall of the second box part (32), so that the connection fixing piece (52A) and the second box part (32) The width between the front and rear ends of the bracket coupling slit 54 formed by connecting the first bracket coupling slit 54FS and the second bracket coupling slit 54SS at the same time is fixed. Since the bracket 50 is formed larger than the width between the front and rear ends of the bracket 50, the angle of the fixing bracket 50 can be adjusted by rotating the fixing bracket 50 in the front and rear direction based on the bracket coupling slit 54. There is a more convenient effect when installing the sleeve in the field.

즉, 본 발명에서는 고정 브라켓(50)을 제1슬리브 모듈(20)의 제1박스부(22)에 형성된 제1브라켓 결합슬릿(54FS)에 있는 제1슬릿 확장 가이드편(52FEP)을 고정 브라켓(50)으로 눌러서 찢어주거나 파단시켜서 브라켓 결합 슬릿의 길이를 늘려주거나 또는 고정 브라켓(50)을 제2슬리브 모듈(30)의 제2박스부(32)에 형성된 제2브라켓 결합슬릿(54SS)에 있는 제2슬릿 확장 가이드편(52SEP)을 고정 브라켓(50)으로 눌러서 찢어주거나 파단시켜서 브라켓 결합 슬릿의 길이를 늘려줌으로써, 상기와 같이 고정 브라켓(50)의 위치를 브라켓 결합 슬릿을 기준으로 전후 방향으로 이동시켜서 고정 브라켓(50)의 위치를 잡아줄 수 있는 한편, 고정 브라켓(50)을 브라켓 결합 슬릿을 기준으로 수평 방향으로 회동시켜서 고정 브라켓(50)의 위치를 잡아줄 수 있으므로, 본 발명의 조절 슬리브를 현장 설치할 때에 편리하고 신속한 효과를 기대할 수 있다.That is, in the present invention, the first slit extension guide piece 52FEP in the first bracket coupling slit 54FS formed on the first box part 22 of the first sleeve module 20 is fixed to the fixing bracket 50 The length of the bracket coupling slit is increased by pressing it with 50 and tearing or breaking it, or the fixing bracket 50 is attached to the second bracket coupling slit (54SS) formed in the second box part 32 of the second sleeve module 30. By pressing the second slit extension guide piece (52SEP) with the fixing bracket 50 to tear or break it to increase the length of the bracket coupling slit, the position of the fixing bracket 50 is moved forward and backward based on the bracket coupling slit. While it is possible to hold the position of the fixing bracket 50 by moving it, the fixing bracket 50 can be rotated in a horizontal direction with respect to the bracket coupling slit to hold the position of the fixing bracket 50, according to the present invention. Convenient and quick effects can be expected when the adjustment sleeve is installed on site.

한편, 본 발명에서는 브라켓 결합 슬릿의 전후단부 사이의 폭은 상기 고정 브라켓(50)의 전후단부 사이의 폭보다 더 크게 형성되어, 상기 브라켓 결합 슬릿에서 상기 고정 브라켓(50)이 이동 가능하도록 구성될 수 있다.On the other hand, in the present invention, the width between the front and rear ends of the bracket coupling slit is formed larger than the width between the front and rear ends of the fixing bracket 50, so that the fixing bracket 50 is movable in the bracket coupling slit. I can.

상기 제1브라켓 결합슬릿(54FS)의 전후단 사이의 폭이 고정 브라켓(50)의 전후단부 사이의 폭보다 크게 형성되고, 제2브라켓 결합슬릿(54SS)의 전후단 사이의 폭이 고정 브라켓(50)의 전후단부 사이의 폭보다 크게 형성되어, 상기 고정 브라켓(50)을 제1브라켓 결합슬릿(54FS)에 삽입하거나 제2브라켓 결합슬릿(54SS)에 삽입하거나 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)에 일부가 걸쳐지도록 고정 브라켓(50)을 삽입한 상태에서 연결수단으로 제1슬리브 모듈(20)과 연결 지지판(40)과 제2슬리브 모듈(30)을 결합한다.The width between the front and rear ends of the first bracket coupling slit 54FS is larger than the width between the front and rear ends of the fixing bracket 50, and the width between the front and rear ends of the second bracket coupling slit 54SS is fixed bracket ( 50) is formed larger than the width between the front and rear ends, and inserts the fixing bracket 50 into the first bracket coupling slit 54FS, or inserts the fixing bracket 50 into the second bracket coupling slit 54SS, or the first bracket coupling slit 54FS The first sleeve module 20 and the connection support plate 40 and the second sleeve module 30 are combined as a connecting means in a state in which the fixing bracket 50 is inserted so that a part of the and second bracket coupling slit 54SS is overlaid. do.

이때, 상기 제1브라켓 결합슬릿(54FS)의 전후단 사이의 폭이 고정 브라켓(50)의 전후단부 사이의 폭보다 크게 형성되고, 제2브라켓 결합슬릿(54SS)의 전후단 사이의 폭이 고정 브라켓(50)의 전후단부 사이의 폭보다 크게 형성되어, 상기 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)이 이어져서 형성된 브라켓 결합 슬릿의 전후단부 사이의 폭이 고정 브라켓(50)의 전후단부 사이의 폭보다 더 크게 형성되므로, 상기 브라켓 결합 슬릿을 따라서 고정 브라켓(50)을 필요한 위치에 이동시켜서 고정 대상물에 고정 브라켓(50)을 고정하면 되기 때문에, 조적 슬리브를 설치할 위치를 잡는데 있어서 보다 편리하고 신속한 효과가 있다. 상기 고정 브라켓(50)이 브라켓 결합슬릿(54)을 따라 이동시킬 수 있음으로 인하여 조적 슬리브를 현장에 설치하는데 보다 편리하면서도 조적 슬리브 설치 작업도 단축시켜서 현장 시공성을 더 높일 수 있는 것이다.At this time, the width between the front and rear ends of the first bracket coupling slit 54FS is formed larger than the width between the front and rear ends of the fixing bracket 50, and the width between the front and rear ends of the second bracket coupling slit 54SS is fixed. It is formed larger than the width between the front and rear ends of the bracket 50, and the width between the front and rear ends of the bracket coupling slit formed by connecting the first bracket coupling slit 54FS and the second bracket coupling slit 54SS is fixed bracket ( Since it is formed larger than the width between the front and rear ends of 50), the fixing bracket 50 can be fixed to the object to be fixed by moving the fixing bracket 50 along the bracket coupling slit to the required position. There is a more convenient and quick effect in catching. Since the fixing bracket 50 can be moved along the bracket coupling slit 54, it is more convenient to install the masonry sleeve in the field, and the installation work of the masonry sleeve is shortened, thereby further enhancing the field workability.

또한, 본 발명에서 고정 브라켓(50)은 양단부에 고정편(52)이 구비되고, 상기 고정편(52)에는 상하면으로 연통된 볼트홀이 구비(즉, 상기 고정편(52)의 장착 고정편(52B)에 볼트홀이 구비)되고, 상기 제1박스부(22)와 제2박스부(32)에 브라켓 결합 슬릿이 형성되어, 상기 고정 브라켓(50)이 제1박스부(22)에 형성된 브라켓 결합 슬릿에 삽입된 상태에서는 고정 브라켓(50)의 고정편(52)과 상기 제1박스부(22)의 측벽 사이에 일정 간격 이격된 스페이스가 확보되고, 상기 고정 브라켓(50)이 제2박스부(32)에 형성된 브라켓 결합 슬릿에 삽입된 상태에서는 상기 고정 브라켓(50)의 고정편(52)과 제2박스부(32)의 측벽 사이에 일정 간격 이격된 스페이스가 확보되도록 구성된다.In addition, in the present invention, the fixing bracket 50 is provided with fixing pieces 52 at both ends, and the fixing piece 52 has bolt holes communicating with the upper and lower surfaces (that is, the mounting fixing pieces of the fixing pieces 52 (52B) is provided with a bolt hole), a bracket coupling slit is formed in the first box part 22 and the second box part 32, so that the fixing bracket 50 is attached to the first box part 22 In the state inserted into the formed bracket coupling slit, a space spaced apart by a predetermined distance is secured between the fixing piece 52 of the fixing bracket 50 and the sidewall of the first box part 22, and the fixing bracket 50 is removed. 2 When inserted into the bracket coupling slit formed in the box part 32, it is configured to secure a space spaced apart by a predetermined distance between the fixing piece 52 of the fixing bracket 50 and the side wall of the second box part 32. .

구체적으로, 상기 고정 브라켓(50) 양단부의 고정편(52)에서 연결 고정편(52A)은 제1박스부(22)의 측벽 외표면에서 일정 거리 이격되어 연결 고정편(52A)과 제1박스부(22)의 측벽 사이에 상기 스페이스가 확보되고, 연결 고정편(52A)이 제2박스부(32)의 측벽 외표면에서 일정 거리 이격되어 연결 고정편(52A)과 제2박스부(32)의 측벽 사이에 상기 스페이스가 확보되도록 구성된다. 제1박스부(22)의 제1브라켓 결합슬릿(54FS)에 고정 브라켓(50)이 삽입된 상태에서는 상기 고정편(52)에서 연결 고정편(52A)과 제1박스부(22)의 측벽 사이에 일정 거리 이격된 스페이스가 확보되고, 제2박스부(32)의 제2브라켓 결합슬릿(54SS)에 고정 브라켓(50)이 삽입된 상태에서는 상기 고정편(52)에서 연결 고정편(52A)과 제2박스부(32)의 측벽 사이에 일정 거리 이격된 스페이스가 확보된다.Specifically, in the fixing pieces 52 at both ends of the fixing bracket 50, the connection fixing pieces 52A are spaced a certain distance from the outer surface of the side wall of the first box part 22, so that the connection fixing pieces 52A and the first box The space is secured between the side walls of the part 22, and the connection fixing piece 52A is spaced apart from the outer surface of the side wall of the second box part 32 by a certain distance, so that the connection fixing piece 52A and the second box part 32 ) Is configured to secure the space between the side walls. When the fixing bracket 50 is inserted into the first bracket coupling slit 54FS of the first box part 22, the connection fixing piece 52A from the fixing piece 52 and the side wall of the first box part 22 In a state where a space separated by a certain distance is secured, and the fixing bracket 50 is inserted into the second bracket coupling slit 54SS of the second box 32, the connection fixing piece 52A from the fixing piece 52 ) And a space separated by a predetermined distance between the sidewalls of the second box unit 32 is secured.

따라서, 상기 고정 브라켓(50)이 제1박스부(22)의 제1브라켓 결합슬릿(54FS)에 삽입된 상태에서는 상기 제1브라켓 결합슬릿(54FS)을 기준으로 제1박스부(22)의 좌우 측벽에서 상기 스페이스만큼 좌우로 이동시킬 수 있고, 상기 고정 브라켓(50)이 제2박스부(32)의 제2브라켓 결합슬릿(54SS)에 삽입된 상태에서는 상기 제2브라켓 결합슬릿(54SS)을 기준으로 제2박스부(32)의 좌우 측벽에서 상기 스페이스만큼 좌우로 이동시킬 수 있으며, 상기 고정 브라켓(50)이 제1박스부(22)의 제1브라켓 결합슬릿(54FS)과 제2박스부(32)의 제2브라켓 결합슬릿(54SS)에 일부가 걸쳐져서 삽입된 상태에서는 상기 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)을 기준으로 제1박스부(22)와 제2박스부(32)의 좌우 측벽에서 상기 스페이스만큼 좌우로 이동시킬 수 있으므로, 현장에서 필요한 만큼 고정 브라켓(50)을 제1박스부(22)와 제2박스부(32)에서 좌우 방향으로 이동시켜서 조적 슬리브를 설치할 수 있으므로, 조적 슬리브를 현장에 설치할 때에 더욱 편리하고 신속하다.Therefore, when the fixing bracket 50 is inserted into the first bracket coupling slit 54FS of the first box portion 22, the first box portion 22 is The second bracket coupling slit 54SS can be moved from the left and right sidewalls to the left and right by the space, and when the fixing bracket 50 is inserted into the second bracket coupling slit 54SS of the second box part 32, the second bracket coupling slit 54SS Based on the left and right sidewalls of the second box part 32, it can be moved to the left and right by the space, and the fixing bracket 50 includes the first bracket coupling slit 54FS of the first box part 22 and the second When the second bracket coupling slit 54SS of the box 32 is partially covered and inserted, the first box part 22 is based on the first bracket coupling slit 54FS and the second bracket coupling slit 54SS. ) And the left and right side walls of the second box part 32 as much as the space, so that the fixing bracket 50 is moved to the left and right in the first box part 22 and the second box part 32 as needed in the field. Since the masonry sleeve can be installed by moving in the direction, it is more convenient and quicker when installing the masonry sleeve in the field.

또한, 상기 고정 브라켓(50) 양단부의 고정편(52)에서 연결 고정편(52A)은 제1박스부(22)의 측벽 외표면에서 일정 거리 이격되어 연결 고정편(52A)과 제1박스부(22)의 측벽 사이에 상기 스페이스가 확보되고, 연결 고정편(52A)이 제2박스부(32)의 측벽 외표면에서 일정 거리 이격되어 연결 고정편(52A)과 제2박스부(32)의 측벽 사이에 상기 스페이스가 확보되도록 구성되고, 동시에 상기 제1브라켓 결합슬릿(54FS)과 제2브라켓 결합슬릿(54SS)이 이어져서 형성된 브라켓 결합슬릿(54)의 전후단 사이의 폭은 상기 고정 브라켓(50)의 전후단 사이의 폭보다 더 크게 형성되어, 상기 고정 브라켓(50)을 브라켓 결합슬릿(54)을 기준으로 전후 방향으로 회동시켜서 고정 브라켓(50)의 각도를 조절할 수 있으므로, 조적 슬리브를 현장에 설치할 때에 더욱더 편리한 효과가 있다.In addition, in the fixing pieces 52 at both ends of the fixing bracket 50, the connection fixing pieces 52A are spaced a predetermined distance from the outer surface of the side wall of the first box part 22, so that the connection fixing pieces 52A and the first box part The space is secured between the side walls of (22), and the connection fixing piece (52A) is spaced a certain distance from the outer surface of the side wall of the second box part (32), so that the connection fixing piece (52A) and the second box part (32) The width between the front and rear ends of the bracket coupling slit 54 formed by connecting the first bracket coupling slit 54FS and the second bracket coupling slit 54SS at the same time is fixed. Since the bracket 50 is formed larger than the width between the front and rear ends of the bracket 50, the angle of the fixing bracket 50 can be adjusted by rotating the fixing bracket 50 in the front and rear direction based on the bracket coupling slit 54. There is a more convenient effect when installing the sleeve in the field.

상기 제1슬리브 모듈(20)과 제2슬리브 모듈(30)에 형성된 상기 브라켓 결합슬릿(54)의 전후단 사이의 폭이 고정 브라켓(50)의 전후단 사이의 폭보다 더 크게 형성되고, 고정 브라켓(50) 양단부의 연결 고정편(52A)과 제1박스부(22)의 측벽 사이에 일정 거리 이격된 스페이스가 확보되고, 고정 브라켓(50) 양단부의 연결 고정편(52A)과 제2박스부(32)의 측벽 외표면에서 일정 거리 이격된 스페이스가 확보되도록 구성된 경우, 제1슬리브 모듈(20)과 제2슬리브 모듈(30)을 위에서 볼 때에 상기 고정 브라켓(50)을 브라켓 결합슬릿(54)을 기준으로 앞뒤로 이동시키고 동시에 전후 방향으로 돌려줌으로써 고정 브라켓(50)의 각도를 조절할 수 있으므로, 조적 슬리브를 현장에 설치할 때에 더욱더 편리한 효과가 있는 것이다.The width between the front and rear ends of the bracket coupling slit 54 formed on the first sleeve module 20 and the second sleeve module 30 is larger than the width between the front and rear ends of the fixing bracket 50, and is fixed. A space separated by a certain distance is secured between the connecting fixing pieces 52A at both ends of the bracket 50 and the side walls of the first box 22, and connecting fixing pieces 52A at both ends of the fixing bracket 50 and the second box When configured to secure a space separated by a predetermined distance from the outer surface of the side wall of the part 32, when the first sleeve module 20 and the second sleeve module 30 are viewed from above, the fixing bracket 50 is attached to the bracket coupling slit ( 54) by moving it back and forth and turning it back and forth at the same time, so that the angle of the fixing bracket 50 can be adjusted, it is more convenient when installing the masonry sleeve in the field.

또한, 본 발명에서는 상기 제1슬리브 모듈(20)과 제2슬리브 모듈(30)에서 제1슬리브부(24)의 외주면과 제1박스부(22)의 안쪽면 사이에 제1챔버가 형성되고, 상기 제2슬리브부(34)의 외주면과 제2박스부(32)의 안쪽면 사이에 제2챔버가 형성되고, 상기 제1챔버와 제2챔버에 충전제를 채워넣도록 구성된다. 상기 충전재는 단열 및 소음 겸용 충전제로 구성된다.In addition, in the present invention, in the first sleeve module 20 and the second sleeve module 30, a first chamber is formed between the outer peripheral surface of the first sleeve part 24 and the inner surface of the first box part 22 , A second chamber is formed between the outer circumferential surface of the second sleeve part 34 and the inner surface of the second box part 32, and is configured to fill the first and second chambers with a filler. The filler is composed of a filler for both heat insulation and noise.

따라서, 건물 공조용 팬이 돌아가면서 진동이나 소음이 발생하려고 하더라도, 상기 충전재를 제1챔버와 제2챔버에 채워놓은 상태이므로, 진동이나 소음이 감소되는 효과가 있고, 상기 충전재로 인하여 단열 효과가 더 높아지므로, 건물의 보온이나 냉방 상태를 보다 효율적으로 유지할 수 있게 된다.Therefore, even if the building air conditioning fan rotates and tries to generate vibration or noise, since the filler is filled in the first and second chambers, there is an effect of reducing vibration or noise, and the insulation effect is reduced due to the filler. Since it is higher, it is possible to more efficiently maintain the heat insulation or cooling of the building.

이상에서 기재된 "포함하다", "구성하다" 또는 "가지다" 등의 용어는, 특별히 반대되는 기재가 없는 한, 해당 구성 요소가 내재할 수 있음을 의미하는 것이므로, 다른 구성 요소를 제외하는 것이 아니라 다른 구성 요소를 더 포함할 수 있는 것으로 해석되어야 한다. 기술적이거나 과학적인 용어를 포함한 모든 용어들은, 다르게 정의되지 않는 한, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미가 있다. 사전에 정의된 용어와 같이 일반적으로 사용되는 용어들은 관련 기술의 문맥상의 의미와 일치하는 것으로 해석되어야 하며, 본 발명에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.Terms such as "include", "consist of" or "have" described above, unless otherwise stated, mean that the corresponding component may be present, and thus other components are not excluded. It should be interpreted as being able to further include other components. All terms, including technical or scientific terms, have the same meaning as commonly understood by a person of ordinary skill in the art, unless otherwise defined. Terms generally used, such as terms defined in the dictionary, should be interpreted as being consistent with the meaning of the context of the related technology, and are not interpreted as ideal or excessively formal meanings unless explicitly defined in the present invention.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The above description is merely illustrative of the technical idea of the present invention, and those of ordinary skill in the art to which the present invention pertains will be able to make various modifications and variations without departing from the essential characteristics of the present invention. Accordingly, the embodiments disclosed in the present invention are not intended to limit the technical idea of the present invention, but to explain the technical idea, and the scope of the technical idea of the present invention is not limited by these embodiments. The scope of protection of the present invention should be interpreted by the claims below, and all technical ideas within the scope equivalent thereto should be construed as being included in the scope of the present invention.

따라서, 이상에서 기술한 실시예들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제공되는 것이므로, 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 하며, 본 발명은 청구항의 범주에 의해 정의될 뿐이다.Therefore, the embodiments described above are provided to completely inform the scope of the invention to those of ordinary skill in the technical field to which the present invention belongs, and should be understood as illustrative and non-limiting in all respects, The invention is only defined by the scope of the claims.

20. 제1슬리브 모듈 22. 제1박스부
22SW. 제1사이드벽 22UW. 제1상부 측벽
22LW. 제1하부 측벽 22BS. 제1보스
26. 보강리브 30. 제2슬리브 모듈
32. 제2박스부 32SW. 제2사이드벽
32UW. 제2상부 측벽 32LW. 제2하부 측벽
32BS. 제2보스 36. 보강리브
40. 연결 지지판 42. 플로우홀
44. 루프링부 50. 고정 브라켓
52. 고정편 52A. 연결 고정편
52B. 장착 고정편 54. 브라켓 결합슬릿
54FS. 제1브라켓 결합슬릿 54SS. 제2브라켓 결합슬릿
20. 1st sleeve module 22. 1st box part
22SW. First side wall 22UW. First upper side wall
22LW. First lower side wall 22BS. First boss
26. Reinforcing rib 30. Second sleeve module
32. The second box part 32SW. 2nd side wall
32UW. Second upper side wall 32LW. Second lower side wall
32BS. 2nd boss 36. Reinforcing rib
40. Connection support plate 42. Flow hole
44. Roof ring part 50. Fixing bracket
52. Fixing piece 52A. Connection batten
52B. Mounting fixture 54. Bracket coupling slit
54FS. First bracket coupling slit 54SS. 2nd bracket coupling slit

Claims (12)

제1박스부(22)에 제1슬리브부(24)가 구비된 제1슬리브 모듈(20);
제2박스부(32)에 제2슬리브부(34)가 구비된 제2슬리브 모듈(30);
상기 제1슬리브 모듈(20)과 상기 제2슬리브 모듈(30) 사이에 개재되며 양면으로 연통된 플로우홀(42)을 구비한 연결 지지판(40);
상기 제1슬리브 모듈(20)과 상기 제2슬리브 모듈(30)을 연결하는 연결수단;을 포함하여 구성되고,
상기 제1슬리브 모듈(20) 또는 상기 제2슬리브 모듈(30)에는 고정 브라켓(50)이 구비되고,
상기 제1슬리브 모듈(20)은 제1박스부(22)에 제1슬리브부(24)가 구비되도록 구성되고, 상기 제2슬리브 모듈(30)은 제2박스부(32)에 제2슬리브부(34)가 구비되도록 구성되고, 상기 제1박스부(22)와 상기 제2박스부(32) 중에서 적어도 하나에는 브라켓 결합 슬릿에 상기 고정 브라켓(50)에 삽입되어 결합된 것을 특징으로 하는 조적 슬리브.
A first sleeve module 20 having a first sleeve part 24 in the first box part 22;
A second sleeve module 30 provided with a second sleeve part 34 in the second box part 32;
A connection support plate (40) interposed between the first sleeve module (20) and the second sleeve module (30) and having a flow hole (42) connected to both sides;
And a connecting means for connecting the first sleeve module 20 and the second sleeve module 30,
A fixing bracket 50 is provided on the first sleeve module 20 or the second sleeve module 30,
The first sleeve module 20 is configured such that a first sleeve part 24 is provided in the first box part 22, and the second sleeve module 30 is provided with a second sleeve part in the second box part 32. It is configured to be provided with a portion 34, characterized in that at least one of the first box portion 22 and the second box portion 32 is inserted into and coupled to the fixing bracket 50 in a bracket coupling slit. Masonry sleeve.
제1항에 있어서,
상기 제1슬리브 모듈(20)과 상기 제2슬리브 모듈(30) 사이에 상기 연결 지지판(40)이 개재된 상태에서 상기 연결수단으로 상기 제1슬리브 모듈(20)과 상기 연결 지지판(40)과 상기 제2슬리브 모듈(30)이 결합된 상태로 유지되는 것을 특징으로 하는 조적 슬리브.
The method of claim 1,
In a state in which the connection support plate 40 is interposed between the first sleeve module 20 and the second sleeve module 30, the first sleeve module 20 and the connection support plate 40 Masonry sleeve, characterized in that the second sleeve module (30) is maintained in a coupled state.
제1항에 있어서,
상기 제1슬리브 모듈(20)의 상기 제1박스부(22)와 상기 제2슬리브 모듈(30)의 상기 제2박스부(32)는 안쪽면에 개방부가 형성된 박스 형상으로 구성되고, 상기 연결 지지판(40)은 사각판 형상으로 구성되고, 상기 연결수단은 상기 제1박스부(22)와 상기 연결 지지판(40)에 구비된 볼트 결합홀을 관통하는 볼트(BT)와, 상기 제2박스부(32)의 내부에 구비되어 상기 볼트(BT)가 조여지는 제2보스(32BS);를 포함하여 구성된 것을 특징으로 하는 조적 슬리브.
The method of claim 1,
The first box portion 22 of the first sleeve module 20 and the second box portion 32 of the second sleeve module 30 are formed in a box shape with an opening on an inner surface thereof, and the connection The support plate 40 is configured in the shape of a square plate, and the connection means includes a bolt (BT) passing through the bolt coupling hole provided in the first box part 22 and the connection support plate 40, and the second box A masonry sleeve, comprising: a second boss (32BS) provided inside the part 32 to which the bolt (BT) is tightened.
제3항에 있어서,
상기 연결 지지판(40)은 양면으로 연통된 플로우홀(42)을 구비하도록 구성되고, 상기 플로우홀(42)의 둘레부에는 루프링부(44)가 구비되며, 상기 루프링부(44)의 양면 두께는 상기 연결 지지판(40)의 양면 사이의 두께보다 더 두껍게 형성된 것을 특징으로 하는 조적 슬리브.
The method of claim 3,
The connection support plate 40 is configured to have flow holes 42 communicated on both sides, and a roof ring part 44 is provided at the circumference of the flow hole 42, and the thickness of both sides of the roof ring part 44 The masonry sleeve, characterized in that formed thicker than the thickness between both sides of the connection support plate (40).
제1항에 있어서,
상기 제1슬리브 모듈(20)의 상기 제1슬리브부(24)와 상기 제2슬리브 모듈(30)의 상기 제2슬리브부(34)와 상기 연결 지지판(40)의 상기 플로우홀(42)의 중심부는 동일 선상에 배치된 것을 특징으로 하는 조적 슬리브.
The method of claim 1,
The first sleeve portion 24 of the first sleeve module 20 and the second sleeve portion 34 of the second sleeve module 30 and the flow hole 42 of the connection support plate 40 Masonry sleeve, characterized in that the center is disposed on the same line.
제1항에 있어서,
상기 제1슬리브부(24)의 일부와 상기 제2슬리브부(34)의 일부는 각각 상기 제1박스부(22)와 상기 제2박스부(32)의 내부로 일정 거리 들어가 있도록 구성된 것을 특징으로 하는 조적 슬리브.
The method of claim 1,
A part of the first sleeve part 24 and a part of the second sleeve part 34 are configured to enter the inside of the first box part 22 and the second box part 32 at a predetermined distance, respectively. Masonry sleeve
제6항에 있어서,
상기 제1박스부(22)와 상기 제2박스부(32)는 바깥벽의 둘레부에 측벽부가 형성되도록 구성되고, 상기 바깥벽의 양면으로 상기 제1슬리브부(24)와 상기 제2슬리브부(34)가 각각 돌출된 것을 특징으로 하는 조적 슬리브.
The method of claim 6,
The first box portion 22 and the second box portion 32 are configured to have sidewall portions formed at the periphery of the outer wall, and the first sleeve portion 24 and the second sleeve are formed on both sides of the outer wall. Masonry sleeve, characterized in that the portions 34 protrude, respectively.
제7항에 있어서,
상기 제1슬리브부(24)의 길이는 상기 제2슬리브부(34)의 길이보다 더 길게 형성된 것을 특징으로 하는 조적 슬리브.
The method of claim 7,
Masonry sleeve, characterized in that the length of the first sleeve portion (24) is formed longer than the length of the second sleeve portion (34).
삭제delete 삭제delete 제1항에 있어서,
상기 브라켓 결합 슬릿은 상기 제1슬리브 모듈(20)의 상기 제1박스부(22)와 상기 제2슬리브 모듈(30)의 상기 제2박스부(32) 중에서 적어도 하나의 전면에서 후면 쪽으로 연장되도록 구성되고, 상기 고정 브라켓(50)은 단면 일자형의 판형상으로 구성되어, 상기 브라켓 결합 슬릿에 상기 고정 브라켓(50)이 삽입되도록 구성된 것을 특징으로 하는 조적 슬리브.
The method of claim 1,
The bracket coupling slit extends from the front to the rear of at least one of the first box part 22 of the first sleeve module 20 and the second box part 32 of the second sleeve module 30 The masonry sleeve, characterized in that the fixing bracket (50) is configured in a plate shape having a straight cross section, and the fixing bracket (50) is inserted into the bracket coupling slit.
제1항에 있어서,
상기 고정 브라켓(50)의 양단부에는 고정편(52)이 구비되고, 상기 고정편(52)에는 볼트 삽입홀이 구비되어, 상기 볼트 삽입홀에 삽입된 볼트(BT)를 고정 대상물에 앵커링하여 상기 제1슬리브 모듈(20)과 상기 제2슬리브 모듈(30)을 상기 고정 대상물에 고정하도록 구성된 것을 특징으로 하는 조적 슬리브.
The method of claim 1,
Fixing pieces 52 are provided at both ends of the fixing bracket 50, and a bolt insertion hole is provided in the fixing piece 52, and the bolt BT inserted into the bolt insertion hole is anchored to the object to be fixed. A masonry sleeve, characterized in that configured to fix the first sleeve module (20) and the second sleeve module (30) to the fixed object.
KR1020200099002A 2020-08-07 2020-08-07 Masonry wall sleeve KR102202470B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200099002A KR102202470B1 (en) 2020-08-07 2020-08-07 Masonry wall sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200099002A KR102202470B1 (en) 2020-08-07 2020-08-07 Masonry wall sleeve

Publications (1)

Publication Number Publication Date
KR102202470B1 true KR102202470B1 (en) 2021-01-13

Family

ID=74142298

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200099002A KR102202470B1 (en) 2020-08-07 2020-08-07 Masonry wall sleeve

Country Status (1)

Country Link
KR (1) KR102202470B1 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0129758Y1 (en) 1995-09-16 1998-12-15 이상욱 Cable guide for wall pass-through
KR20020065119A (en) * 2001-02-05 2002-08-13 박기종 The conncting device synthetic resin
JP2005140226A (en) * 2003-11-06 2005-06-02 Hanabusa Kogyo Kk Piping construction method and pipe piece used therefor
KR100731631B1 (en) 2006-09-15 2007-07-03 장명석 Supporting appratus of lay a pipe of lay a duct for construct
KR20100000247U (en) * 2008-06-30 2010-01-07 (주)월드에어텍 duct supporter
KR101122052B1 (en) 2010-04-12 2012-03-15 아시아리드 주식회사 A fixing sleeve of building pipe
JP6209048B2 (en) * 2013-10-17 2017-10-04 未来工業株式会社 Wall penetration sleeve device, spacer, wall penetration sleeve installation method, and wall penetration sleeve installation structure
KR200489078Y1 (en) 2018-07-11 2019-04-26 서정본 Pipe connector

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0129758Y1 (en) 1995-09-16 1998-12-15 이상욱 Cable guide for wall pass-through
KR20020065119A (en) * 2001-02-05 2002-08-13 박기종 The conncting device synthetic resin
JP2005140226A (en) * 2003-11-06 2005-06-02 Hanabusa Kogyo Kk Piping construction method and pipe piece used therefor
KR100731631B1 (en) 2006-09-15 2007-07-03 장명석 Supporting appratus of lay a pipe of lay a duct for construct
KR20100000247U (en) * 2008-06-30 2010-01-07 (주)월드에어텍 duct supporter
KR101122052B1 (en) 2010-04-12 2012-03-15 아시아리드 주식회사 A fixing sleeve of building pipe
JP6209048B2 (en) * 2013-10-17 2017-10-04 未来工業株式会社 Wall penetration sleeve device, spacer, wall penetration sleeve installation method, and wall penetration sleeve installation structure
KR200489078Y1 (en) 2018-07-11 2019-04-26 서정본 Pipe connector

Similar Documents

Publication Publication Date Title
US8689503B2 (en) Embeddable device for passing conduits through a constructional component
KR101785279B1 (en) Installation structure for a out side thermal panel of filling thermal insulation
JP2014218814A (en) Heat insulation structure and heat insulation method for building
KR102202470B1 (en) Masonry wall sleeve
KR101849718B1 (en) Duct integrated sleeve and its construction method
KR101546921B1 (en) Outside wall insulation structure of building
KR102411535B1 (en) Masonry wall sleeve with increased ventilation efficiency
KR101415321B1 (en) Curtain wall unit for outer wall of a building
KR102185653B1 (en) Duct integrated fire prevention sleeve
KR102064454B1 (en) Dry bit construction structure of building wall and construction method using the same
KR20130068833A (en) A assembly apparatus roof pannel
KR101294247B1 (en) Heat exchanger with structure of expanded poly propylene
KR101743980B1 (en) Outside insulation panel unit and its construction method
KR101949393B1 (en) Integrated support beam structure Waterproof wall of the basement
KR100700442B1 (en) Outer insulation panel for building foundation
CN219952334U (en) Waterproof and structural insulation integrated external wall panel
KR102199419B1 (en) Inside wall panel and electric wire construction method using the same
KR102587845B1 (en) Integrated Supply and Exhaust Hood Cap
KR200220639Y1 (en) Lighte weighted partition which contains adapter
KR20230105918A (en) Vacuum insulation material assembly with tilting and thermal bridge protecting function
KR102257324B1 (en) Clip to fix the stucco of exterior wall
JP5616726B2 (en) Air conditioner mounting structure, building unit and unit building
KR102250069B1 (en) Dry wall structure for bathroom
KR200261831Y1 (en) wall outlet having efficiency of installation in concrete block using steel sheet
KR200195021Y1 (en) Exhausting duct sleeve and installationing structure of exhausting duct sleeve

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant