KR102195958B1 - Method for applying the maximum number of work limits per workers based on reliability in a multi-assignment crowdsourcing based projects for artificial intelligence training data generation - Google Patents

Method for applying the maximum number of work limits per workers based on reliability in a multi-assignment crowdsourcing based projects for artificial intelligence training data generation Download PDF

Info

Publication number
KR102195958B1
KR102195958B1 KR1020200089732A KR20200089732A KR102195958B1 KR 102195958 B1 KR102195958 B1 KR 102195958B1 KR 1020200089732 A KR1020200089732 A KR 1020200089732A KR 20200089732 A KR20200089732 A KR 20200089732A KR 102195958 B1 KR102195958 B1 KR 102195958B1
Authority
KR
South Korea
Prior art keywords
reliability
workers
work
project
worker
Prior art date
Application number
KR1020200089732A
Other languages
Korean (ko)
Inventor
박민우
김주영
Original Assignee
주식회사 크라우드웍스
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 크라우드웍스 filed Critical 주식회사 크라우드웍스
Priority to KR1020200089732A priority Critical patent/KR102195958B1/en
Application granted granted Critical
Publication of KR102195958B1 publication Critical patent/KR102195958B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063112Skill-based matching of a person or a group to a task
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063118Staff planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

Provided is a method for applying a limit on the maximum number of tasks for each worker based on reliability in a multi-assignment crowdsourcing-based project. The method comprises the steps of: previously setting a limit on the maximum number of tasks for each worker for a multi-assignment project; assigning multiple tasks of the project to multiple workers and requesting the tasks to be performed; receiving multiple task results from the multiple workers; calculating the reliability of each of the multiple workers based on the multiple task results; and updating the limit on the maximum number of tasks for each worker based on the reliability.

Description

인공지능 학습데이터 생성을 위한 다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법{METHOD FOR APPLYING THE MAXIMUM NUMBER OF WORK LIMITS PER WORKERS BASED ON RELIABILITY IN A MULTI-ASSIGNMENT CROWDSOURCING BASED PROJECTS FOR ARTIFICIAL INTELLIGENCE TRAINING DATA GENERATION}METHOD FOR APPLYING THE MAXIMUM NUMBER OF WORK LIMITS PER WORKERS BASED ON RELIABILITY IN A MULTI-ASSIGNMENT CROWDSOURCING BASED in a multi-allocated crowdsourcing-based project for generating artificial intelligence learning data PROJECTS FOR ARTIFICIAL INTELLIGENCE TRAINING DATA GENERATION}

본 발명은 다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법에 관한 것이다.The present invention relates to a method for applying the maximum number of work limits per worker based on reliability in a multi-allocation crowdsourcing-based project.

최근, 기업 활동의 일부 과정에 일반 대중을 참여시키는 크라우드소싱 기반으로 많은 양의 데이터를 수집 및 가공하는 기업들이 늘고 있다. 즉, 기업은 하나의 프로젝트를 오픈하여 일반 대중, 즉 작업자가 해당 프로젝트에 참여하게 함으로써, 작업자에 의해 완료된 작업 결과를 통해 필요한 정보를 수집하게 된다.Recently, more and more companies collect and process large amounts of data on a crowdsourcing basis that engages the general public in some process of corporate activities. In other words, by opening a project and allowing the general public, that is, workers to participate in the project, necessary information is collected through the work results completed by the workers.

이때, 크라우드소싱 기반 프로젝트 중 일부는 동일한 작업을 다수의 작업자에게 중복 배정하여 작업 수행을 요청하고, 동일한 작업에 대한 복수의 작업 결과를 수집하는 다중할당 방식을 통해 필요한 데이터를 수집하기도 한다.At this time, some of the crowdsourcing-based projects collect necessary data through a multi-allocation method in which the same task is duplicated and assigned to multiple workers to perform tasks, and multiple task results for the same task are collected.

이러한 다중할당 방식의 프로젝트는 유효한 데이터의 생산이 오직 작업자의 작업 결과에 의존하므로, 작업 능력이 뛰어나거나 신뢰할 수 있는 작업자에게 더욱 많은 작업을 할당하는 것이 바람직하다.In such a multi-allocation project, it is desirable to allocate more tasks to workers with excellent or reliable work ability, since the production of valid data depends only on the work results of the workers.

하지만, 현재 프로젝트에서는 작업자에 대한 구분 없이 작업자가 해당 프로젝트에서 최대로 수행할 수 있는 작업 건수가 제한되도록 설정되어 있다. 이 경우, 작업을 잘 수행하는 작업자들은 특별히 문제되지 않으나, 작업을 잘 수행하지 못하는 작업자들의 경우 최대 작업 제한 건수보다 감축시킬 필요가 있다.However, in the current project, the maximum number of tasks that a worker can perform in the project is set to be limited, regardless of the worker. In this case, workers who perform well are not particularly problematic, but workers who do not perform well need to be reduced from the maximum number of work limits.

검수자에 의해 검수가 이루어지는 방식의 프로젝트에서는 작업자의 작업 결과에 대한 반려 횟수를 기반으로 못하는 작업자들을 선별할 수 있으나, 다중할당 방식의 프로젝트에서는 검수자가 참여하지 않아 작업자들의 능력을 평가할 수 있는 방안이 부재한 실정이다. 따라서, 보다 작업을 잘 수행하면서 신뢰도가 높은 작업자를 선별하여 해당 작업자에게 더욱 많은 작업을 할당할 수 있도록 하는 방안이 필요하다.In a project where an inspection is performed by an inspector, workers who cannot be returned based on the number of rejection of the work result of the worker can be selected, but in a multi-allocation project, there is no way to evaluate the ability of the workers because the inspector does not participate. It is a situation. Therefore, there is a need for a method to select workers with high reliability while performing tasks better and to allocate more tasks to those workers.

공개특허공보 제10-2014-0095956호, 2014.08.04.Unexamined Patent Publication No. 10-2014-0095956, 2014.08.04.

본 발명이 해결하고자 하는 과제는 복수의 작업자의 작업 결과를 기반으로 작업자들의 신뢰도를 산출하고, 신뢰도를 기준으로 작업자들의 최대 작업 제한 건수를 조정할 수 있는 다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법을 제공하는 것이다.The problem to be solved by the present invention is to calculate the reliability of workers based on the work results of a plurality of workers, and to the reliability in a crowdsourcing-based project of a multi-allocation method that can adjust the maximum number of work limits of workers based on the reliability. It is to provide a method of applying the maximum number of work limits per worker based on the basis.

다만, 본 발명이 해결하고자 하는 과제는 상기된 바와 같은 과제로 한정되지 않으며, 또다른 과제들이 존재할 수 있다.However, the problem to be solved by the present invention is not limited to the problem as described above, and other problems may exist.

상술한 과제를 해결하기 위한 본 발명의 일면에 따른 다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법은 하나의 작업을 다수의 작업자에게 중복 배정하는 다중할당 방식의 크라우드소싱 기반 프로젝트(이하, "프로젝트")의 작업자 1인당 최대 작업 제한 건수를 사전 설정하는 단계; 상기 프로젝트의 복수의 작업을 복수의 작업자에게 배정하여 작업 수행을 요청하는 단계; 상기 복수의 작업자로부터 복수의 작업 결과를 입력받는 단계; 상기 복수의 작업 결과에 기초하여 복수의 작업자 각각의 신뢰도를 산출하는 단계; 및 상기 신뢰도에 기초하여 각 작업자별로 상기 최대 작업 제한 건수를 갱신하는 단계를 포함한다. 이때, 상기 복수의 작업 결과에 기초하여 복수의 작업자 각각의 신뢰도를 산출하는 단계는, 상기 다수의 작업자의 작업 결과 중 다수의견에 해당하는 작업 결과를 입력한 작업자의 건수를 산출하는 단계; 및 상기 작업자의 다중할당된 작업을 수행한 전체 건수 대비 상기 다수의견에 해당하는 작업 결과를 입력한 건수에 기초하여 상기 작업자의 신뢰도를 산출하는 단계를 포함하고, 상기 신뢰도에 기초하여 각 작업자별로 상기 최대 작업 제한 건수를 갱신하는 단계는, 복수의 구간으로 구분된 상기 복수의 작업자에 대한 신뢰도 중, 제1 구간 이하의 신뢰도를 갖는 작업자의 최대 작업 제한 건수를 상기 신뢰도에 대응되도록 감축시키고, 상기 제1 구간보다 높은 제2 구간을 초과하는 신뢰도를 갖는 작업자의 최대 작업 제한 건수를 가중치가 부여된 신뢰도에 대응되도록 증가시킨다.The method of applying the maximum number of tasks per worker based on reliability in a crowdsourcing-based project of a multi-allocation scheme according to an aspect of the present invention for solving the above-described problem is a multi-allocation scheme in which one task is redundantly assigned to a plurality of workers. Presetting a maximum number of work limits per worker of a crowdsourcing-based project (hereinafter, "project"); Allocating a plurality of tasks of the project to a plurality of workers and requesting the task to be performed; Receiving a plurality of job results from the plurality of workers; Calculating the reliability of each of the plurality of workers based on the plurality of work results; And updating the maximum number of work restrictions for each worker based on the reliability. In this case, calculating the reliability of each of the plurality of workers based on the plurality of work results may include: calculating the number of workers who input work results corresponding to a plurality of opinions among the work results of the plurality of workers; And calculating the reliability of the worker based on the number of inputting work results corresponding to the plurality of opinions relative to the total number of performing the multi-allocated work of the worker, and the reliability of each worker based on the reliability. In the step of updating the maximum number of work restrictions, among the reliability of the plurality of workers divided into a plurality of sections, the maximum number of work restrictions of workers having a reliability less than or equal to the first section is reduced to correspond to the reliability, and the second The maximum number of work restrictions of workers having a reliability exceeding the second section, which is higher than the first section, is increased to correspond to the weighted reliability.

본 발명의 일부 실시예에서, 상기 복수의 작업을 복수의 작업자에게 배정하여 작업 수행을 요청하는 단계는, 작업자가 현재까지 작업 수행한 전체 건수를 카운트하여 누적 작업 수행 건수를 산출하는 단계; 상기 누적 작업 수행 건수가 상기 최대 작업 제한 건수와 일치하는지 판단하는 단계; 및 상기 누적 작업 수행 건수가 상기 최대 작업 제한 건수와 일치하면, 상기 작업자에게 추가적인 작업 배정을 중지하는 단계를 포함할 수 있다.In some embodiments of the present invention, the step of requesting a task by assigning the plurality of tasks to a plurality of workers may include calculating the cumulative number of tasks performed by counting the total number of tasks performed by the worker to date; Determining whether the number of cumulative work executions matches the maximum work limit number; And stopping the assignment of additional tasks to the worker when the cumulative task execution number matches the maximum task limit number.

본 발명의 일부 실시예에서, 상기 복수의 작업 결과에 기초하여 복수의 작업자 각각의 신뢰도를 산출하는 단계는, 상기 작업자의 다중할당된 작업을 수행한 전체 건수에서, 상기 다수의 작업자의 작업 결과로부터 다수의견이 발생하지 않은 작업 결과는 배제시킬 수 있다.In some embodiments of the present invention, the step of calculating the reliability of each of the plurality of workers based on the plurality of work results may include, from the total number of the multiple-allocated tasks of the workers, from the work results of the plurality of workers. Results of work that do not have multiple opinions can be excluded.

본 발명의 일부 실시예는, 상기 프로젝트에 포함된 하나 이상의 기능요소의 유형을 판단하는 단계를 더 포함하되, 상기 복수의 작업 결과에 기초하여 복수의 작업자 각각의 신뢰도를 산출하는 단계는, 상기 다중할당 방식의 프로젝트와 관련하여, 상기 복수의 작업자 각각의 신뢰도를 기능요소의 유형별로 산출하고, 상기 기능요소는, 프로젝트를 수행하기 위한 작업툴(Tool)에 기반하여 결정되고, 상기 작업툴은 프로젝트에서 제공되며 작업자의 상기 프로젝트가 요구하는 작업을 수행하기 위하여 사용하는 툴일 수 있다.Some embodiments of the present invention further include the step of determining the type of one or more functional elements included in the project, wherein the step of calculating the reliability of each of the plurality of workers based on the results of the plurality of tasks comprises: Regarding the project of the allocation method, the reliability of each of the plurality of workers is calculated for each type of functional element, the functional element is determined based on a work tool for executing the project, and the work tool is a project It is provided in and may be a tool used to perform the work required by the worker's project.

본 발명의 일부 실시예에서, 상기 복수의 작업 결과에 기초하여 복수의 작업자 각각의 신뢰도를 산출하는 단계는, 상기 하나 이상의 기능요소를 포함하는 상기 작업자의 다중할당된 작업을 수행한 전체 건수에서, 상기 다수의 작업자의 작업 결과로부터 다수의견이 발생하지 않은 작업 결과는 배제시킬 수 있다.In some embodiments of the present invention, the step of calculating the reliability of each of the plurality of workers based on the results of the plurality of tasks may include, from the total number of cases of performing the multiple-allocated tasks of the workers including the one or more functional elements, It is possible to exclude a work result in which a plurality of opinions do not occur from the work results of the plurality of workers.

본 발명의 일부 실시예에서, 상기 복수의 작업 결과에 기초하여 복수의 작업자 각각의 신뢰도를 산출하는 단계는, 상기 다수의 작업자에게 다중할당되어 다수의견에 대한 평가가 완료된 작업이 N건(N은 1 이상의 자연수)만큼 누적될 때마다, 상기 N건의 작업에 대응하는 각 작업자에 대한 신뢰도를 산출할 수 있다.In some embodiments of the present invention, the step of calculating the reliability of each of a plurality of workers based on the results of the plurality of tasks includes N tasks that have been multi-allocated to the plurality of workers and evaluated for multiple opinions (N is Whenever a natural number of 1 or more) is accumulated, the reliability for each worker corresponding to the N tasks may be calculated.

본 발명의 일부 실시예에서, 상기 N건의 누적 건수는 상기 프로젝트의 진행률에 기초하여 점점 감소하도록 설정될 수 있다.In some embodiments of the present invention, the cumulative number of the N cases may be set to gradually decrease based on the progress of the project.

본 발명의 일부 실시예에서, 상기 신뢰도에 기초하여 각 작업자별로 상기 최대 작업 제한 건수를 갱신하는 단계는, 상기 복수의 구간 중 제1 구간 이하의 신뢰도를 갖는 작업자의 최대 작업 제한 건수를 상기 신뢰도에 대응되도록 감축시키되, 상기 작업자의 현재 작업 수행 건수가 상기 감축될 최대 작업 제한 건수보다 더 많을 경우, 상기 현재 작업 수행 건수만큼 상기 최대 작업 제한 건수를 감축시킬 수 있다.In some embodiments of the present invention, the updating of the maximum number of work restrictions for each worker based on the reliability may include, in the reliability, the maximum number of work restrictions of workers having a reliability less than or equal to the first section among the plurality of sections. If the number of current tasks performed by the worker is greater than the maximum number of tasks to be reduced, the maximum number of task restrictions may be reduced by the number of current tasks performed.

본 발명의 일부 실시예에서, 상기 신뢰도에 기초하여 각 작업자별로 상기 최대 작업 제한 건수를 갱신하는 단계는, 상기 복수의 구간으로 구분된 상기 복수의 작업자에 대한 신뢰도 중, 상기 제1 구간을 초과하며 상기 제2 구간 이하의 신뢰도를 갖는 작업자의 최대 작업 제한 건수를 이전 최대 작업 제한 건수로 유지시킬 수 있다.In some embodiments of the present invention, the updating of the maximum number of work restrictions for each worker based on the reliability may include, among the reliability of the plurality of workers divided into the plurality of sections, the first section is exceeded, and It is possible to maintain the maximum number of work restrictions of workers having a reliability less than or equal to the second section as the previous maximum number of work restrictions.

상술한 과제를 해결하기 위한 본 발명의 다른 면에 따른 컴퓨터 프로그램은, 하드웨어인 컴퓨터와 결합되어 상기 다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법을 실행하며, 컴퓨터 판독가능 기록매체에 저장된다.A computer program according to another aspect of the present invention for solving the above-described problem is combined with a computer as hardware to execute a method of applying the maximum number of work limits per worker based on reliability in the crowdsourcing-based project of the multi-allocation method, It is stored on a computer-readable recording medium.

본 발명의 기타 구체적인 사항들은 상세한 설명 및 도면들에 포함되어 있다.Other specific details of the present invention are included in the detailed description and drawings.

상술한 본 발명에 의하면, 다중할당 방식의 프로젝트에 대해서도 작업자들의 작업 능력을 평가할 수 있으며, 이러한 평가를 기반으로 작업자들의 최대 작업 제한 건수를 조정할 수 있다는 장점이 있다.According to the present invention described above, there is an advantage that it is possible to evaluate the work ability of workers even for a multi-allocation type project, and the maximum number of work limits of workers can be adjusted based on this evaluation.

즉, 최대 작업 제한 건수의 조정을 통해 작업 능력이 상대적으로 낮은 작업자들로 하여금 제한 건수 이상 작업을 수행하지 못하도록 하여 프로젝트의 품질 및 진행 속도를 증가시킬 수 있다.That is, by adjusting the maximum number of work limits, it is possible to increase the quality and speed of the project by preventing workers with relatively low work capabilities from performing more than the limit number of tasks.

이와 반대로, 작업을 잘 수행하는 신뢰도가 높은 작업자들에게는 신뢰도 및 가중치에 상응하는 만큼 최대 작업 제한 건수를 증가하여 갱신시켜줌으로써, 더욱 많은 작업을 배정받아 수행할 수 있도록 할 수 있다.Conversely, for workers with high reliability who perform tasks well, by increasing and updating the maximum number of task restrictions corresponding to the reliability and weight, more tasks can be assigned and performed.

즉, 작업을 잘 수행하는 작업자들이 추가 작업을 배정받아 진행할 경우 신뢰도가 낮은 작업자들에게 배정되는 건들이 상대적으로 줄어들게 되며, 프로젝트 후반으로 갈수록 프로젝트의 품질 및 진행 속도를 더욱 향상시킬 수 있다는 장점이 있다.In other words, if workers who perform well are assigned additional tasks, the number of tasks assigned to workers with low reliability is relatively reduced, and the quality and speed of the project can be further improved as it goes to the end of the project. .

또한, 프로젝트 후반으로 갈수록 신뢰도에 대한 평가 주기를 더욱 빈번하게 하도록 함으로써, 프로젝트의 초기뿐만 아니라 중후반인 경우에도 신규 작업자들의 유입을 차단하지 않으면서, 동시에 신뢰도가 높은 작업자들이 더욱 많은 작업을 수행하게끔 유도할 수 있다.In addition, by making the evaluation cycle for reliability more frequent as it goes to the second half of the project, it does not block the influx of new workers even in the early as well as mid-late of the project, and at the same time induces highly reliable workers to perform more tasks can do.

본 발명의 효과들은 이상에서 언급된 효과로 제한되지 않으며, 언급되지 않은 또 다른 효과들은 아래의 기재로부터 통상의 기술자에게 명확하게 이해될 수 있을 것이다.The effects of the present invention are not limited to the effects mentioned above, and other effects not mentioned will be clearly understood by those skilled in the art from the following description.

도 1은 본 발명의 일 실시예에 따른 크라우드소싱 서비스의 개념도이다.
도 2는 본 발명의 일 실시예에 따른 크라우드소싱 기반의 프로젝트의 진행 프로세스를 설명하기 위한 흐름도이다.
도 3은 작업자별 최대 작업 제한 건수 적용 방법의 순서도이다.
도 4는 다중할당 방식의 프로젝트의 작업을 설명하기 위한 예시도이다.
도 5는 복수의 작업자에게 작업을 배정하여 작업 수행을 요청하는 과정을 설명하기 위한 순서도이다.
도 6은 다중할당 방식의 프로젝트의 작업을 설명하기 위한 다른 예시도이다.
도 7은 본 발명의 일 실시예에 따른 작업자의 신뢰도를 산출하는 방법을 설명하기 위한 도면이다.
도 8은 태깅 기능요소가 포함된 다중할당 방식의 프로젝트의 작업을 수행한 작업자의 작업 결과에 대한 예시를 나타낸 도면이다.
도 9는 최대 작업 제한 건수를 갱신하는 내용을 설명하기 위한 일 예시를 도시한 도면이다.
도 10은 본 발명의 일 실시예에 따른 작업자별 최대 작업 제한 건수 적용 장치를 설명하기 위한 도면이다.
1 is a conceptual diagram of a crowdsourcing service according to an embodiment of the present invention.
2 is a flowchart illustrating a crowdsourcing-based project progress process according to an embodiment of the present invention.
3 is a flow chart of a method of applying the maximum number of work restrictions per worker.
4 is an exemplary view for explaining the work of a multi-allocation method project.
5 is a flowchart illustrating a process of requesting a task to be performed by assigning a task to a plurality of workers.
6 is another exemplary diagram for explaining the work of a multi-allocation method project.
7 is a diagram for explaining a method of calculating a worker's reliability according to an embodiment of the present invention.
8 is a diagram showing an example of a work result of a worker who has performed a task of a multi-allocation method project including a tagging function element.
9 is a diagram illustrating an example for explaining the content of updating the maximum number of work restrictions.
10 is a view for explaining an apparatus for applying the maximum number of work restrictions per worker according to an embodiment of the present invention.

본 발명의 이점 및 특징, 그리고 그것들을 달성하는 방법은 첨부되는 도면과 함께 상세하게 후술되어 있는 실시예들을 참조하면 명확해질 것이다. 그러나, 본 발명은 이하에서 개시되는 실시예들에 제한되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있으며, 단지 본 실시예들은 본 발명의 개시가 완전하도록 하고, 본 발명이 속하는 기술 분야의 통상의 기술자에게 본 발명의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 발명은 청구항의 범주에 의해 정의될 뿐이다. Advantages and features of the present invention, and a method of achieving them will become apparent with reference to the embodiments described below in detail together with the accompanying drawings. However, the present invention is not limited to the embodiments disclosed below, but may be implemented in a variety of different forms, only the present embodiments are intended to complete the disclosure of the present invention, It is provided to fully inform the technician of the scope of the present invention, and the present invention is only defined by the scope of the claims.

본 명세서에서 사용된 용어는 실시예들을 설명하기 위한 것이며 본 발명을 제한하고자 하는 것은 아니다. 본 명세서에서, 단수형은 문구에서 특별히 언급하지 않는 한 복수형도 포함한다. 명세서에서 사용되는 "포함한다(comprises)" 및/또는 "포함하는(comprising)"은 언급된 구성요소 외에 하나 이상의 다른 구성요소의 존재 또는 추가를 배제하지 않는다. 명세서 전체에 걸쳐 동일한 도면 부호는 동일한 구성 요소를 지칭하며, "및/또는"은 언급된 구성요소들의 각각 및 하나 이상의 모든 조합을 포함한다. 비록 "제1", "제2" 등이 다양한 구성요소들을 서술하기 위해서 사용되나, 이들 구성요소들은 이들 용어에 의해 제한되지 않음은 물론이다. 이들 용어들은 단지 하나의 구성요소를 다른 구성요소와 구별하기 위하여 사용하는 것이다. 따라서, 이하에서 언급되는 제1 구성요소는 본 발명의 기술적 사상 내에서 제2 구성요소일 수도 있음은 물론이다.The terms used in the present specification are for describing exemplary embodiments and are not intended to limit the present invention. In this specification, the singular form also includes the plural form unless specifically stated in the phrase. As used in the specification, “comprises” and/or “comprising” do not exclude the presence or addition of one or more other elements other than the mentioned elements. Throughout the specification, the same reference numerals refer to the same elements, and “and/or” includes each and all combinations of one or more of the mentioned elements. Although "first", "second", and the like are used to describe various elements, it goes without saying that these elements are not limited by these terms. These terms are only used to distinguish one component from another component. Therefore, it goes without saying that the first component mentioned below may be the second component within the technical idea of the present invention.

다른 정의가 없다면, 본 명세서에서 사용되는 모든 용어(기술 및 과학적 용어를 포함)는 본 발명이 속하는 기술분야의 통상의 기술자에게 공통적으로 이해될 수 있는 의미로 사용될 수 있을 것이다. 또한, 일반적으로 사용되는 사전에 정의되어 있는 용어들은 명백하게 특별히 정의되어 있지 않는 한 이상적으로 또는 과도하게 해석되지 않는다.Unless otherwise defined, all terms (including technical and scientific terms) used in the present specification may be used as meanings that can be commonly understood by those of ordinary skill in the art to which the present invention belongs. In addition, terms defined in a commonly used dictionary are not interpreted ideally or excessively unless explicitly defined specifically.

이하, 첨부된 도면을 참조하여 본 발명의 실시예를 상세하게 설명한다. Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 일 실시예에 따른 크라우드소싱 서비스의 개념도이다.1 is a conceptual diagram of a crowdsourcing service according to an embodiment of the present invention.

도 1을 참조하면, 크라우드소싱 서비스는 의뢰자(10), 서비스 제공 업체(20) 및 대중(30)으로 구성되어 수행된다.Referring to FIG. 1, a crowdsourcing service is performed by being composed of a client 10, a service provider 20, and a public 30.

의뢰자(10)는 크라우드소싱 기반의 프로젝트(이하, 프로젝트)를 의뢰하는 기업이나 개인을 의미한다.The sponsor 10 refers to a company or individual who requests a crowdsourcing-based project (hereinafter, referred to as a project).

의뢰자(10)는 인공지능 학습데이터의 생성을 위한 소스 데이터의 수집 또는 데이터 어노테이션 등을 목적으로 프로젝트를 의뢰한다. 프로젝트를 통해서 생성된 데이터는 지도 학습, 비지도 학습, 강화 학습 등의 임의의 기계 학습의 학습데이터로 활용될 수 있다. 소스 데이터의 수집은 녹음된 음성 수집, 사진 수집 등 가공되지 않은 데이터를 수집하는 것을 의미한다. 데이터 어노테이션은 텍스트, 사진, 비디오 등의 소스 데이터에 관련 주석 데이터를 입력하는 것을 의미한다. 예들 들어, 데이터 어노테이션은 주어진 지문에서 개체를 찾는 것, 유사한 문장을 찾는 것 등이 있을 수 있으나 이에 제한되지 않는다. 한편, 전술한 프로젝트의 종류는 일 실시예에 불과하며, 의뢰자의 설계에 따라 다양한 프로젝트가 본 발명에서 취급될 수 있다.The requester 10 requests a project for the purpose of collecting source data or annotating data for generating artificial intelligence learning data. The data generated through the project can be used as learning data for arbitrary machine learning such as supervised learning, unsupervised learning, and reinforcement learning. Collection of source data refers to collecting raw data such as recorded voice collection and photo collection. Data annotation refers to inputting relevant annotation data into source data such as text, photos, and videos. For example, the data annotation may include finding an entity in a given fingerprint or finding a similar sentence, but is not limited thereto. Meanwhile, the types of the above-described projects are only one embodiment, and various projects may be handled in the present invention according to the design of the client.

서비스 제공 업체(20)는 크라우드소싱 서비스를 제공하는 기업을 의미한다.The service provider 20 refers to a company that provides crowdsourcing services.

서비스 제공 업체(20)는 의뢰자(10)로부터 제품 또는 서비스에 대한 프로젝트를 의뢰받으면, 해당 프로젝트에 대한 작업을 일반 대중(30)에게 배정하여 대중(30)으로부터 작업 결과를 제공받는다. 이후, 작업 결과를 기반으로 추출된 최종 산출물을 의뢰자(10)에게 제공한다.When the service provider 20 receives a request for a project for a product or service from the client 10, the service provider 20 allocates a task for the project to the general public 30 and receives the work result from the public 30. Thereafter, the final product extracted based on the work result is provided to the client 10.

이때, 서비스 제공 업체(20)는 크라우드소싱 플랫폼(이하, 플랫폼)을 통해 의뢰자(10) 및 대중(30)에게 크라우드소싱 서비스를 제공한다. 즉, 서비스 제공 업체(20)는 의뢰자(10)로부터 프로젝트를 의뢰받으면, 플랫폼에 프로젝트를 오픈한다. 이후, 대중(30)으로부터 오픈된 프로젝트에 대한 작업 결과를 제공받으면, 해당 프로젝트를 플랫폼 상에서 종료하고, 최종 산출물을 추출하여 의뢰자(10)에게 제공할 수 있다.At this time, the service provider 20 provides a crowdsourcing service to the client 10 and the public 30 through a crowdsourcing platform (hereinafter, the platform). That is, when the service provider 20 receives a request for a project from the client 10, the service provider 20 opens the project on the platform. Thereafter, when the work result for the open project is received from the public 30, the project is terminated on the platform, and the final product may be extracted and provided to the client 10.

대중(30)은 플랫폼에 오픈된 프로젝트에 참여하는 일반 대중을 의미한다. 여기서, 대중(30)은 서비스 제공 업체(20)가 제공하는 애플리케이션 또는 웹사이트 등을 통해 플랫폼에 오픈된 프로젝트에 참여할 수 있다. The public 30 refers to the general public participating in the project open on the platform. Here, the public 30 may participate in a project opened on the platform through an application or website provided by the service provider 20.

대중(30)은 작업자(32) 및 검수자(34)로 구성된다.The public 30 is composed of a worker 32 and an inspector 34.

작업자(32)는 플랫폼에 오픈된 복수의 프로젝트 중 특정 프로젝트에 참여를 결정한다. 이후, 작업자(32)는 소스 데이터의 수집 또는 데이터 어노테이션 등의 작업을 수행하고, 이를 플랫폼에 전송한다.The worker 32 decides to participate in a specific project among a plurality of projects open on the platform. Thereafter, the operator 32 performs an operation such as collection of source data or data annotation, and transmits it to the platform.

검수자(34)는 플랫폼에 오픈된 복수의 프로젝트 중 특정 프로젝트에 참여를 결정한다. 이후, 검수자(34)는 작업자(32)가 수행한 작업 결과에 대한 검수를 수행한다. 검수자(34)는 검수 수행 결과로서, 검수 통과 처리 또는 반려 처리를 할 수 있고, 반려 처리시 반려 사유를 입력할 수 있다. 검수 통과의 경우 재작업과 이로 인한 재검수가 필요하지 않으므로, 검수 통과는 검수 완료와 동일한 의미를 가진다.The inspector 34 decides to participate in a specific project among a plurality of projects open on the platform. Thereafter, the inspector 34 inspects the result of the work performed by the operator 32. As a result of performing the inspection, the inspector 34 may perform inspection pass processing or rejection processing, and input a rejection reason during rejection processing. In the case of passing the inspection, it is not necessary to rework and re-examination due to this, so passing inspection has the same meaning as completion of inspection.

도 2는 본 발명의 일 실시예에 따른 크라우드소싱 기반의 프로젝트의 진행 프로세스를 설명하기 위한 흐름도이다. 2 is a flowchart illustrating a crowdsourcing-based project progress process according to an embodiment of the present invention.

먼저, 의뢰자(10)는 서비스 제공 업체(20)로 하나 이상의 프로젝트를 의뢰한다(S11).First, the requester 10 requests one or more projects to the service provider 20 (S11).

이후, 서비스 제공 업체(20)는 의뢰된 프로젝트를 플랫폼 상에 오픈한다(S12). 이때, 서비스 제공 업체(20)는 프로젝트 오픈 전에, 해당 프로젝트의 난이도 등을 고려하여 등급을 결정할 수 있다. 즉, 난이도에 따라 어떤 등급 이상의 대중(30)에게 해당 프로젝트를 노출시킬지를 결정할 수 있다. 이에 따라, 프로젝트의 작업 결과의 신뢰도를 높일 수 있게 된다. Thereafter, the service provider 20 opens the requested project on the platform (S12). At this time, the service provider 20 may determine the grade in consideration of the difficulty of the project before opening the project. That is, depending on the difficulty level, it is possible to determine which level or higher public 30 to expose the project. Accordingly, it is possible to increase the reliability of the work result of the project.

이후, 서비스 제공 업체(20)는 프로젝트의 등급에 따라 해당 등급 이상의 작업자(32)에게 작업을 할당하여 작업 요청한다(S13).Thereafter, the service provider 20 requests the work by assigning the work to the workers 32 of the corresponding level or higher according to the level of the project (S13).

이후, 작업자(32)는 할당된 작업을 수행하게 된다(S14). 이때, 작업자(32)는 어떤 이유에 의해 작업 자체가 불가능한 작업에 대해서는 작업을 수행하지 않고 작업 불가 사유를 입력할 수 있다. Thereafter, the worker 32 performs the assigned task (S14). In this case, the worker 32 may input the reason for the inability to work without performing the work for a work in which the work itself is impossible for some reason.

이후, 서비스 제공 업체(20)는 작업자(32)로부터 작업 결과를 제공받고(S15), 해당 작업 결과에 대한 검수 작업을 검수자(34)에게 할당하여 검수 요청한다(S16).Thereafter, the service provider 20 receives the work result from the worker 32 (S15), and assigns the work result to the inspector 34 to request the inspection (S16).

마찬가지로 본 발명의 일 실시예는 프로젝트의 난이도에 따라 설정된 등급 또는 검수자(34)의 자격 요건에 따라 수행 중인 전체 프로젝트 중 적합한 프로젝트만 검수자(34)에게 노출되게끔 할 수 있다.Similarly, according to an embodiment of the present invention, only a suitable project may be exposed to the inspector 34 out of the total projects being performed according to the level set according to the difficulty of the project or the qualification requirements of the inspector 34.

이후, 검수자(34)는 할당된 검수를 수행하게 된다(S17). 이때, 검수자(34)는 작업이 적합하게 수행된 것으로 판단하면 검수 완료를 결정하고, 검수 작업이 잘못된 것으로 판단하면 반려 처리한다. 반려 처리 시, 검수자(34)는 어떤 이유로 작업이 잘못된 것으로 판단했는지에 대한 반려 사유를 입력한다.Thereafter, the inspector 34 performs the assigned inspection (S17). At this time, the inspector 34 decides to complete the inspection when it is determined that the work has been properly performed, and if it is determined that the inspection work is wrong, it rejects the inspection. During rejection processing, the inspector 34 inputs the rejection reason for what reason the job was judged to be wrong.

이후, 서비스 제공 업체(20)는 검수자(34)로부터 검수 결과를 제공받는다(S18). Thereafter, the service provider 20 receives the inspection result from the inspector 34 (S18).

검수 결과가 검수 완료인 경우, 서비스 제공 업체(20)는 해당 작업 결과를 유효한 데이터로 사용하여, 이를 기반으로 하여 프로젝트 종료 시 최종 산출물을 추출하게 된다.When the inspection result is the inspection completion, the service provider 20 uses the work result as valid data, and based on this, extracts the final product at the end of the project.

검수 결과가 반려 처리인 경우, 서비스 제공 업체(20)는 내부적으로 검수를 다시 수행하거나, 작업자(32)에게 다시 작업을 배정하여 재작업을 수행하게 할 수도 있다. 재작업시 검수자의 재검수가 필요하다.When the inspection result is rejection processing, the service provider 20 may internally perform the inspection again, or assign the work to the worker 32 again to perform the rework. When reworking, re-examination by an inspector is required.

이후, 서비스 제공 업체(20)는 프로젝트 기간이 종료되거나 충분한 유효 데이터를 확보하게 되면 해당 프로젝트를 종료하고(S19), 확보된 유효 데이터를 기반으로 최종 결과물을 산출하여 의뢰자(10)에게 제공한다(S20).Thereafter, when the project period ends or sufficient valid data is secured, the service provider 20 terminates the project (S19), calculates a final result based on the secured valid data, and provides it to the client 10 ( S20).

이때, 프로젝트 종료 전, 서비스 제공 업체(20)는 작업자(32) 및 검수자(34)의 수행 결과를 평가하고, 평가에 따라 작업 비용 및 검수 비용을 산출하여 작업자(32) 및 검수자(34)에게 지급한다.At this time, before the end of the project, the service provider 20 evaluates the performance results of the worker 32 and the inspector 34, calculates the work cost and the inspection cost according to the evaluation, to the worker 32 and the inspector 34. give.

도 1 및 도 2에서는 단순히 의뢰자(10), 서비스 제공 업체(20), 작업자(32), 검수자(34)로 표현하였으나, 이들은 각 참여자에 의해서 운용되는 스마트폰, 태블릿, PDA, 랩톱, 데스크톱, 서버 등과 같은 컴퓨터 장치 또는 전기 통신 장치를 의미한다.In FIGS. 1 and 2, it is simply expressed as a requester 10, a service provider 20, an operator 32, and an inspector 34, but these are smartphones, tablets, PDAs, laptops, desktops, operated by each participant. It means a computer device such as a server or a telecommunication device.

이하에서는 도 3 내지 도 9를 참조하여 본 발명의 일 실시예에 따른 다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자(32)별 최대 작업 제한 건수 적용 방법(이하, 작업자별 최대 작업 제한 건수 적용 방법)을 설명하도록 한다.Hereinafter, a method of applying the maximum number of work limits per worker 32 based on reliability in a multi-allocation crowdsourcing-based project according to an embodiment of the present invention with reference to FIGS. 3 to 9 (hereinafter, the maximum work limit per worker How to apply the number of cases).

도 3은 작업자별 최대 작업 제한 건수 적용 방법의 순서도이다. 3 is a flow chart of a method of applying the maximum number of work restrictions per worker.

한편, 도 3에 도시된 단계들은 서비스 제공 업체(20)에 의해 운영되는 플랫폼 서버(이하, 서버)에 의해 수행되는 것으로 이해될 수 있지만, 이에 제한되는 것은 아니다.Meanwhile, the steps shown in FIG. 3 may be understood as being performed by a platform server (hereinafter, referred to as a server) operated by the service provider 20, but are not limited thereto.

먼저, 서버는 다중할당 방식의 크라우드소싱 기반 프로젝트(이하, 프로젝트)의 작업자(32) 1인당 최대 작업 제한 건수를 사전 설정한다(S110). First, the server presets the maximum number of work limits per worker 32 of a multi-allocation crowdsourcing-based project (hereinafter, referred to as a project) (S110).

도 4는 다중할당 방식의 프로젝트의 작업을 설명하기 위한 예시도이다.4 is an exemplary diagram for explaining the work of a multi-allocation method project.

본 발명의 일 실시예에 따른 프로젝트는 하나의 작업을 다수의 작업자에게 중복 배정하는 다중할당 방식으로 진행된다. 이때, 하나의 작업마다 작업을 수행하는 작업자(32)의 수는 프로젝트의 모든 작업에 동일하게 설정된다. 예를 들어, 특정 작업을 3명의 작업자에게 중복 배정한 경우, 다른 작업 역시 3명의 작업자에게 중복 배정된다.A project according to an embodiment of the present invention proceeds in a multi-allocation method in which one task is redundantly assigned to a plurality of workers. In this case, the number of workers 32 performing a task for each task is set equally for all tasks of the project. For example, if a specific task is duplicated to three workers, another task is also assigned to three workers.

또한, 다중할당 방식의 작업은 작업자(32)들의 다수의견이 유의미한 결과로 제출되는바, 이를 위해 동일한 작업을 배정받는 작업자(32)의 수는 홀수일 수 있으나 반드시 이에 제한되는 것은 아니다. 또한, 각각의 작업자(32)는 프로젝트의 임의의 작업을 랜덤하게 배정받을 수 있다.In addition, in the multi-allocation method, since multiple opinions of the workers 32 are submitted as meaningful results, the number of workers 32 who are assigned the same task for this purpose may be an odd number, but is not limited thereto. In addition, each worker 32 may be randomly assigned to an arbitrary task of the project.

일 예로, 본 발명에서의 다중할당 방식의 프로젝트는 주관적 평가가 요구되는 질문에 대한 답변을 선택하는 작업을 위한 프로젝트일 수 있다.As an example, the multi-allocation project in the present invention may be a project for selecting an answer to a question that requires subjective evaluation.

도 4를 참조하면, 문장단위 감정 라벨링에 관한 작업을 배정받은 작업자(32)는 제시된 문장의 텍스트를 읽고, 느껴지는 분위기를 평가하여 답안을 선택해야 한다. 이때, 해당 작업을 중복하여 배정받은 다수의 작업자(32)들은 각각의 주관적인 판단에 기초하여 해당 텍스트의 분위기가 부정적인지, 중립적인지 아니면 긍정적인지 여부를 선택하게 된다.Referring to FIG. 4, a worker 32 assigned a task for sentence-level emotion labeling should read the text of a presented sentence and select an answer by evaluating the atmosphere felt. At this time, the plurality of workers 32 who have been assigned the task in duplicate will select whether the atmosphere of the text is negative, neutral, or positive based on each subjective judgment.

도 4에서 제시된 작업과 같은 유형은 정해진 답안이 존재하지 않는다. 즉, 다중할당 작업은 해당 작업을 수행하는 작업자(32) 개인의 주관적인 판단에 기초하여 작업 결과로 특정 답안을 선택할 것을 요구하기 때문이다. 이때, 본 발명의 일 실시예는 작업을 다중할당 받은 다수의 작업자(32)에 의해 선택된 다수의견에 해당하는 답안이 발생한 경우에 한하여 해당 답안이 유효한 작업 결과로 분류되고 최종 산출물로 프로젝트의 의뢰자(10)에게 제공된다.There is no fixed answer for the type of work presented in FIG. 4. That is, this is because the multi-allocation task requires that a specific answer be selected as a task result based on the subjective judgment of the individual performing the task. At this time, in an embodiment of the present invention, only when an answer corresponding to a plurality of opinions selected by a plurality of workers 32 who have multiple assignments of work occurs, the answer is classified as a valid work result, and the project sponsor ( 10).

다시 말해, 주관적 평가가 요구되는 질문에 대한 답변을 선택하는 다중할당 방식의 프로젝트에서는 개별 작업자가 선택한 답안의 정답 여부가 아닌, 다수의 작업자에 의해 선택된 다수의견에 해당하는 답안의 발생 여부가 유효한 작업 결과로 취급된다. 이러한 특성으로 인해, 다중할당 방식의 프로젝트에서는 검수를 담당하는 검수자(34)가 프로젝트에서 제외될 수 있다.In other words, in a multi-allocation project in which an answer to a question that requires subjective evaluation is selected, it is not the correct answer to the answer selected by an individual worker, but the occurrence of an answer corresponding to the opinions selected by multiple workers is a valid task. Treated as a result. Due to this characteristic, in a multi-allocation project, the inspector 34 in charge of inspection may be excluded from the project.

한편, 본 발명의 일 실시예는 작업자 1인마다 최대 작업 제한 건수가 미리 설정되어 있다. 여기에서, 최대 작업 제한 건수는 하나의 프로젝트 내에서 각 작업자(32)가 최대로 수행할 수 있는 작업 건수를 의미한다. 예를 들어, 사전 설정된 최대 작업 제한 건수가 50건인 경우 각 작업자(32)는 50건을 초과하는 작업을 수행할 수 없는 것이 원칙이다.On the other hand, in an embodiment of the present invention, the maximum number of work limits is preset for each worker. Here, the maximum number of work limits means the number of work that each worker 32 can perform to the maximum within one project. For example, if the preset maximum number of work limits is 50, in principle, each worker 32 cannot perform more than 50 work.

다만, 모든 작업자(32)들이 모두 동일하게 그리고 동시에 50건의 작업을 배정받는 것은 아니다. 즉, 작업자(32)들은 첫번째 건의 작업이 완료되면 다음 작업을 요청하여 수행하고, 두번째 건의 작업이 완료되면 다음 작업을 요청하여 수행하는 방식으로, 각자의 상황에 맞게 작업을 수행하고 배정받는 것이므로, 동일 기간동안 어느 작업자는 50건에 도달할 수도 있는 반면 어느 작업자는 동일한 기간 동안 10건, 30건의 작업만을 배정받아 완료할 수도 있다.However, not all workers 32 are assigned 50 tasks equally and at the same time. In other words, when the first task is completed, the workers 32 request and perform the next task, and when the second task is completed, the next task is requested and performed. Therefore, the task is performed and assigned according to each situation. During the same period, one worker may reach 50, while another worker may be assigned only 10 or 30 tasks during the same period to complete.

한편, 하나의 프로젝트에는 복수의 작업이 포함될 수 있으며, 복수의 작업은 종류에 따라 복수의 태스크로 그룹화될 수 있고, 또는 각각의 작업이 서로 다른 종류의 작업일 수도 있으며, 동일한 작업일 수도 있지만, 이에 제한되는 것은 아니다.On the other hand, one project may contain a plurality of jobs, and the plurality of jobs may be grouped into a plurality of tasks according to the type, or each job may be a different type of job or the same job. It is not limited thereto.

또한, 복수의 작업자(32)는 소정의 단말 장치를 이용하여 작업을 수행한다. 작업자(32)의 단말 장치는 스마트폰, 태블릿, PDA, 랩톱, 데스크톱 등과 같은 컴퓨터 장치 또는 전기 통신 장치일 수 있으나, 이에 제한되는 것은 아니다.In addition, the plurality of workers 32 perform work using a predetermined terminal device. The terminal device of the worker 32 may be a computer device or a telecommunication device such as a smart phone, tablet, PDA, laptop, desktop, etc., but is not limited thereto.

다음으로, 서버는 프로젝트의 복수의 작업을 복수의 작업자(32)에게 배정하여 작업 수행을 요청하고(S120), 복수의 작업자(32)로부터 복수의 작업 결과를 입력받는다(S130).Next, the server assigns a plurality of tasks of the project to the plurality of workers 32 to request the task to be performed (S120), and receives a plurality of task results from the plurality of workers 32 (S130).

도 5는 복수의 작업자(32)에게 작업을 배정하여 작업 수행을 요청하는 과정을 설명하기 위한 순서도이다.5 is a flowchart illustrating a process of requesting a task to be performed by assigning a task to a plurality of workers 32.

본 발명의 일 실시예는, 프로젝트의 복수의 작업을 작업자(32)에게 배정하여 작업 수행을 요청함에 있어, 작업자(32)가 현재까지 작업 수행한 전체 건수를 카운트하여 누적 작업 수행 건수를 산출하고(S121), 누적 작업 수행 건수가 최대 작업 수행 건수와 일치하는지 여부를 판단하여(S122), 일치하는 경우 작업자(32)에게 추가적인 작업 배정을 중지한다(S123).According to an embodiment of the present invention, when requesting a task by assigning a plurality of tasks of a project to the worker 32, the total number of tasks performed by the worker 32 to date is counted to calculate the cumulative number of tasks performed. (S121), it is determined whether the number of cumulative work executions matches the maximum number of work executions (S122), and if they do match, the assignment of additional tasks to the worker 32 is stopped (S123).

즉, 최대 작업 제한 건수가 50건인 경우, 서버는 작업자(32)가 현재까지 작업 수행한 전체 건수를 카운트하여 누적 산출함에 따라, 누적 작업 수행 건수가 50건에 도달하면, 작업자(32)에게 추가적인 작업 배정을 중지한다.That is, when the maximum number of work limits is 50, the server counts and calculates the total number of tasks performed by the worker 32 so far. When the cumulative number of tasks reaches 50, the server adds additional Stop assigning tasks.

다시 말해, 작업자(32)는 하나의 프로젝트에 대하여 최대 50건의 작업만을 배정받을 수 있으며, 더 이상 추가적인 작업 배정은 불가하다.In other words, the worker 32 can only be assigned a maximum of 50 tasks for one project, and it is not possible to assign additional tasks any more.

다음으로, 서버는 복수의 작업 결과에 기초하여 복수의 작업자(32) 각각의 신뢰도를 산출한다(S140).Next, the server calculates the reliability of each of the plurality of workers 32 based on the results of the plurality of jobs (S140).

본 발명의 일 실시예에서 신뢰도는, 주관적 평가가 요구되는 질문에 대한 답변을 작업자(32)가 선택하는 작업을 수행하는 다중할당 방식의 프로젝트에 참여하여, 작업 결과로 얼마나 많은 유효 데이터를 생산하였는지를 평가하기 위한 지표이다. 즉, 신뢰도는 작업자(32)가 정답을 선택하였는지 또는 정답을 작성하였는지를 평가하는 정답률과는 다른 의미를 갖는다.In an embodiment of the present invention, reliability is how much effective data was produced as a result of the work by participating in a multi-allocation project in which the worker 32 selects an answer to a question that requires subjective evaluation. It is an indicator for evaluation. That is, the reliability has a different meaning from the rate of correct answers that evaluates whether the worker 32 has selected the correct answer or wrote the correct answer.

이와 같은 작업자(32)의 신뢰도는 다음과 같이 산출될 수 있다. The reliability of the operator 32 may be calculated as follows.

서버는 다중할당된 작업들을 대상으로, 다수의 작업자(32)의 작업 결과 중 다수의견에 해당하는 작업 결과를 입력한 해당 작업자(32)의 건수를 산출하고, 작업자(32)의 다중할당된 작업을 수행한 전체 건수 대비 다수의견에 해당하는 작업 결과를 입력한 건수에 기초하여 작업자(32)의 신뢰도를 산출한다.The server calculates the number of the workers 32 who have entered the work results corresponding to multiple opinions among the work results of the multiple workers 32, and multi-allocated jobs of the workers 32. The reliability of the worker 32 is calculated based on the number of inputs of work results corresponding to multiple opinions compared to the total number of performing operations.

도 6은 다중할당 방식의 프로젝트의 작업을 설명하기 위한 다른 예시도이다. 도 7은 본 발명의 일 실시예에 따른 작업자의 신뢰도를 산출하는 방법을 설명하기 위한 도면이다.6 is another exemplary diagram for explaining the work of a multi-allocation method project. 7 is a diagram for explaining a method of calculating a worker's reliability according to an embodiment of the present invention.

예를 들어, 작업자(32)들은 도 6과 같이 제시된 작업을 배정받음에 따라 자신의 주관적인 판단에 기초하여 주어진 대화에 대한 답변을 한다. 이때, 도 6과 같은 다중할당 방식의 작업을 배정받은 작업자(32)들은 각각의 주관적인 판단에 따라 B의 답변이 기분 나쁜 답변인지를 평가한 후 'O' 또는 'X'를 선택할 것이다.For example, workers 32 respond to a given conversation based on their own subjective judgment as they are assigned a task as shown in FIG. 6. In this case, the workers 32 who are assigned the multi-allocation method as shown in FIG. 6 will select'O' or'X' after evaluating whether B's answer is an unpleasant answer according to each subjective judgment.

도 7을 참조하면, 이와 같은 다중할당 방식의 작업을 수행하는 프로젝트에 5명의 작업자가 참가하였고, 이때의 다중할당 방식은 3명의 작업자가 같은 작업을 배정받아 수행하는 것이다.Referring to FIG. 7, five workers participated in a project performing such a multi-allocation method, and in this case, the multi-allocation method is that three workers are assigned the same task to perform.

첫 번째 작업인 '문제 1'을 수행한 작업자는 작업자 1, 작업자 2, 작업자 3이다. 이때, '문제 1'의 답안 중에서, O 답안을 선택한 작업자는 작업자 1과 작업자 3이며, X 답안을 선택한 작업자는 작업자 2 한명이다.Workers who performed the first task'Problem 1'were Worker 1, Worker 2, and Worker 3. At this time, among the answers to'Question 1', the worker who selected the answer O is worker 1 and the worker 3, and the worker who selected the answer X is one worker 2.

따라서, 다수의견에 해당하는 답안은 O 답안이며, O 답안을 입력한 작업자 1과 작업자 3에 대한 각각의 신뢰도 산출시 해당 작업 결과는 다수의견에 해당하는 작업 결과를 입력한 건수에 포함된다.Therefore, the answer corresponding to the majority opinion is the O answer, and when calculating the reliability of each worker 1 and worker 3 who entered the O answer, the work result is included in the number of inputted work results corresponding to the majority opinion.

5개의 작업 중 작업자 1이 수행한 전체 건수는 3건(문제 1 내지 문제 3)이다. 그리고 다수의견에 해당하는 작업 결과를 입력한 작업자 1의 건수는 2건(문제 1, 문제2)이다. 따라서, 작업자 1의 신뢰도는 약 66.67%로 산출된다.Of the five tasks, the total number of cases performed by worker 1 is 3 (Problem 1 to Problem 3). And the number of worker 1 who entered the work result corresponding to the majority opinion is 2 cases (problem 1, problem 2). Therefore, the reliability of worker 1 is calculated to be about 66.67%.

이와 같은 방식으로 다른 작업자들의 신뢰도를 산출하면, 작업자 2는 약 33.33%, 작업자 3과 작업자 5는 약 66.67%, 그리고 작업자 4는 100%로 산출된다.If the reliability of other workers is calculated in this way, it is calculated that worker 2 is about 33.33%, worker 3 and worker 5 are about 66.67%, and worker 4 is 100%.

한편, 본 발명의 일 실시예는 작업자(32)의 다중할당된 작업을 수행한 전체 건수에서, 다수의 작업자(32)의 작업 결과로부터 다수의견이 발생하지 않은 작업 결과는 배제시킬 수 있다.On the other hand, according to an embodiment of the present invention, in the total number of tasks performed by the workers 32 that are multi-allocated, work results in which multiple opinions do not occur may be excluded from the work results of the plurality of workers 32.

구체적으로, 다중할당된 작업을 배정받은 작업자(32)에 의해 선택된 답변 중 다수의견에 해당하는 답변이 발생하지 않은 경우에는 해당 작업에 대한 작업 결과는 유효 데이터로 분류되지 않는다. 따라서, 해당 작업은 작업자(32)의 다중할당된 작업을 수행한 전체 건수 산출시 합산되지 않는다. 그리고 다수의견에 해당하는 답변이 발생하지 않은 작업은 다른 복수의 작업자(32)를 대상으로 다시 배정된다. Specifically, if an answer corresponding to multiple opinions among answers selected by the operator 32 assigned to the multi-allocated task does not occur, the task result for the task is not classified as valid data. Therefore, the task is not summed up when calculating the total number of tasks performed by the worker 32 multi-allocated. In addition, tasks for which no answer corresponding to the majority opinion has occurred are reassigned to the other plurality of workers 32.

예를 들어, 도 4에서의 문장단위 감정 라벨링을 수행하는 다중할당 작업이 3명의 작업자에게 각각 배정되었고, 3명의 작업자가 각각 '부정적', '중립', '긍정적'의 답변을 선택하였다면, 다수의견에 해당하는 답변은 발생하지 않는다. 따라서, 해당 작업은 3명의 작업자 각각의 신뢰도를 산출하기 위한 전체 건수에 포함되지 않는다.For example, if a multi-allocation task for performing sentence-level emotion labeling in FIG. 4 was assigned to each of three workers, and three workers each selected'negative','neutral', and'positive' answers, multiple There is no response corresponding to the opinion. Therefore, the work is not included in the total number of cases for calculating the reliability of each of the three workers.

한편, 본 발명의 일 실시예에서 작업자(32)에 대한 신뢰도는 프로젝트에 포함되는 기능요소의 유형에 따라 산출될 수 있다. 이는 작업자(32)마다 선호하거나 익숙한 기능요소의 유형이 존재하고, 작업자(32)들이 이러한 기능요소의 유형을 포함하는 프로젝트에 참여하였을 때 작업자(32)들의 능력이 더욱 잘 발휘될 수 있으며 작업 결과의 품질 또한 우수하기 때문이다. Meanwhile, in an embodiment of the present invention, the reliability of the worker 32 may be calculated according to the type of functional element included in the project. This means that each worker 32 has a preferred or familiar type of functional element, and when the workers 32 participate in a project that includes the type of functional element, the ability of the workers 32 can be better exhibited, and the work result. This is because the quality of the product is also excellent.

도 8은 태깅 기능요소가 포함된 다중할당 방식의 프로젝트의 작업을 수행한 작업자(32)의 작업 결과에 대한 예시를 나타낸 도면이다.FIG. 8 is a diagram showing an example of a work result of a worker 32 who has performed a work of a multi-allocation method project including a tagging function element.

서버는 프로젝트에 포함된 하나 이상의 기능요소의 유형을 판단할 수 있으며, 다중할당 방식의 프로젝트와 관련하여 복수의 작업자(32) 각각에 대한 신뢰도를 기능요소의 유형별로 산출할 수 있다.The server may determine the types of one or more functional elements included in the project, and may calculate the reliability for each of the plurality of workers 32 for each type of functional element in relation to a multi-allocation project.

이때, 기능요소는, 프로젝트를 수행하기 위한 작업툴(Tool)에 기반하여 결정되고, 작업툴은 프로젝트에서 제공되며 작업자가 프로젝트가 요구하는 작업을 수행하기 위하여 사용하는 툴일 수 있다. In this case, the functional element is determined based on a work tool for executing the project, and the work tool is provided in the project and may be a tool used by a worker to perform a task required by the project.

예를 들어, 프로젝트를 수행하기 위해 바운딩 작업을 위한 바운딩 박스 툴(Bounding Box Tool), 전사 작업을 위한 인풋 박스 툴(Input Box Tool) 및 분류 작업을 위한 메이크 스텝 툴(Make Step Tool)이 필요한 경우, 해당 프로젝트는 바운딩 기능요소, 전사 기능요소 및 분류 기능요소를 포함하는 것으로 분류될 수 있다.For example, if you need a bounding box tool for bounding work, an input box tool for transfer work, and a make step tool for sorting work to perform a project , The project can be classified as including a bounding functional element, a transcription functional element, and a classification functional element.

도 8에 제시된 다중할당 작업은 작업자(32)의 주관적 판단에 기초하여 제시된 문장에서 명사구로 판단되는 텍스트를 선택하는 태깅(Tagging) 기능요소가 포함된 작업이다. 이러한 태깅 작업 역시 작업자(32)들의 주관적인 판단이 필요로 하는 경우가 있어, 다중할당 방식으로 다수의 작업자에게 중복 배정할 수 있다.The multi-allocation task shown in FIG. 8 is a task including a tagging function element for selecting text judged as a noun phrase from a sentence presented based on the subjective judgment of the worker 32. Since such tagging tasks also require subjective judgment of the workers 32, it is possible to redundantly allocate to a plurality of workers in a multi-allocation method.

태깅 기능요소가 포함된 작업을 수행하기 위해 작업자(32)들은 태깅 박스 툴(Tagging Box Tool)을 사용할 수 있다. 이때, 태깅 박스 툴에 기반하여 해당 프로젝트에 포함되는 기능요소는 태깅 기능요소로 결정된다.In order to perform a task including a tagging function element, the workers 32 may use a tagging box tool. At this time, the functional element included in the project based on the tagging box tool is determined as a tagging functional element.

이러한 기능요소를 고려하는 실시예에서도, 복수의 작업자(32) 각각의 신뢰도 산출시, 하나 이상의 기능요소를 포함하는 작업자(32)의 다중할당된 작업을 수행한 전체 건수에서, 다수의 작업자(32)의 작업 결과로부터 다수의견이 발생하지 않은 작업 결과는 배제시킬 수 있다.Even in an embodiment that considers these functional elements, when calculating the reliability of each of the plurality of workers 32, from the total number of performing multiple-allocated tasks of the workers 32 including one or more functional elements, a plurality of workers 32 ), work results that do not have multiple opinions can be excluded.

예를 들어, 도 8에 제시된 작업을 수행한 3명의 작업자 각각의 작업 결과는 모두 상이하다. 주어진 문장에서 작업자 1은 '밤', '채연'을 명사구로 태깅하였고, 작업자 2는 '밤', '채연', '자야기'를 명사구로 태깅하였으며, 작업자 3은 '밤'을 명사구로 태깅하였다. For example, the work results of each of the three workers who performed the work shown in FIG. 8 are all different. In the given sentence, worker 1 tagged'night' and'chaeyeon' as noun phrases, worker 2 tagged'night','chaeyeon', and'jayagi' as noun phrases, and worker 3 tagged'night' as a noun phrase I did.

이때, 다수의견에 해당하는 작업 결과의 발생 여부는 해당 작업에 대한 전체 작업 결과를 기준으로 작업자(32) 간 의견이 일치하는 작업 결과가 존재하는지 여부로 판단해야 한다. 이에 따르면, 3명의 작업자가 모두 '밤'을 명사구인 것으로 태깅하였으나, '채연', '자야기'의 텍스트에 대해서는 3명의 작업자의 의견이 일치하지 않으므로, 다수의견에 해당하는 작업 결과는 발생하지 않았다. 따라서, 해당 기능요소를 포함하는 작업 결과는 작업자(32)의 신뢰도를 산출하기 위한 전체 건수에서 배제시킨다.At this time, whether or not a work result corresponding to the majority opinion is generated should be determined based on the overall work result for the corresponding work as whether or not there is a work result in which the opinions of the workers 32 coincide. According to this, all three workers tagged'night' as a noun phrase, but the opinions of the three workers do not agree on the texts'Chaeyeon' and'Jayagi', so the work result corresponding to the majority opinion does not occur. Did. Therefore, the work results including the corresponding functional element are excluded from the total number of cases for calculating the reliability of the worker 32.

한편, 프로젝트의 기능요소의 유형이 복수인 경우에는, 복수의 기능요소의 유형별로 신뢰도를 산출할 수 있다. 예를 들어, 하나의 작업에 포함된 기능요소가 태깅과 바운딩 기능요소인 경우, 해당 작업 결과는 태깅 기능요소와 바운딩 기능요소 각각의 신뢰도 산출을 위한 작업 결과의 건수 산출시 모두 포함된다.On the other hand, when there are multiple types of functional elements of the project, reliability can be calculated for each type of the plurality of functional elements. For example, if the functional elements included in one job are tagging and bounding functional elements, the corresponding job results are included when calculating the number of job results for calculating the reliability of each of the tagging functional elements and the bounding functional elements.

다시 도 3을 참조하면, 전술한 바에 따라 작업자(32)의 신뢰도가 산출됨에 따라 서버는 신뢰도에 기초하여 각 작업자(32)별로 최대 작업 제한 건수를 갱신한다(S150).Referring back to FIG. 3, as the reliability of the worker 32 is calculated as described above, the server updates the maximum number of work restrictions for each worker 32 based on the reliability (S150).

도 9는 최대 작업 제한 건수를 갱신하는 내용을 설명하기 위한 일 예시를 도시한 도면이다.9 is a view showing an example for explaining the content of updating the maximum number of work restrictions.

서버는 복수의 작업자(32)에 대한 각 신뢰도를 복수의 구간으로 구분한다. 그리고 제1 구간 이하의 신뢰도를 갖는 작업자의 최대 작업 제한 건수를 신뢰도에 대응되도록 감축시킨다.The server divides each reliability of the plurality of workers 32 into a plurality of sections. In addition, the maximum number of work restrictions of workers having a reliability less than or equal to the first section is reduced to correspond to the reliability.

이와 달리, 서버는 제1 구간보다 높은 제2 구간을 초과하는 신뢰도를 갖는 작업자(32)의 최대 작업 제한 건수를 가중치가 부여된 신뢰도에 대응되도록 증가시킨다.In contrast, the server increases the maximum number of work restrictions of the worker 32 having a reliability exceeding the second interval higher than the first interval to correspond to the weighted reliability.

일 예로, 제1 구간과 제2 구간을 구분하는 기준값이 70%인 경우, 서버는 70% 이하의 신뢰도를 갖는 제1 구간과 70%를 초과하는 제2 구간으로 신뢰도를 구분할 수 있다.For example, when the reference value for separating the first section and the second section is 70%, the server may classify the reliability into a first section having a reliability of 70% or less and a second section exceeding 70%.

또한, 제1 구간과 제2 구간을 설정하는 기준값은 각각 상이할 수 있으며, 일 예로 제1 구간을 설정하는 기준값은 40%, 제2 구간을 설정하는 기준값은 70%일 수 있다. 이에 따라, 서버는 40% 이하의 신뢰도를 갖는 제1 구간과, 70%를 초과하는 제2 구간, 그리고 40%를 초과하며 70% 이하인 제3 구간으로 신뢰도를 구분할 수 있다. 이 경우, 서버는 중간 등급인 제3 구간의 신뢰도 갖는 작업자(32)의 최대 작업 제한 건수는 이전 최대 작업 제한 건수로 유지시킬 수 있다.Further, the reference values for setting the first section and the second section may be different from each other. For example, a reference value for setting the first section may be 40%, and a reference value for setting the second section may be 70%. Accordingly, the server may classify the reliability into a first interval having a reliability of 40% or less, a second interval exceeding 70%, and a third interval exceeding 40% and less than 70%. In this case, the server may maintain the maximum number of job restrictions of the worker 32 having the reliability of the third section, which is an intermediate grade, as the previous maximum number of job restrictions.

예를 들어, 복수의 작업자(32)에 대한 최대 작업 제한 건수는 50건으로 설정되어 있는 경우, 작업자 A는 최대 작업 제한 건수인 50건에 도달하면 더 이상 추가적인 작업 배정이 불가하다. For example, if the maximum number of work limits for the plurality of workers 32 is set to 50, the worker A can no longer allocate additional work when the maximum work limit of 50 is reached.

이때, 작업자 A에 대하여 산출된 신뢰도가 80%로, 제1 구간(0~70%)보다 높은 제2 구간(70%~)를 초과하고 있는 경우, 작업자 A의 신뢰도 80%에 미리 설정된 가중치 50%을 부가하여 총 130%에 해당하는 65건으로 최대 작업 제한 건수를 증가시킬 수 있다. At this time, when the calculated reliability for worker A is 80% and exceeds the second section (70%~), which is higher than the first section (0~70%), the weight set in advance to 80% of the reliability of worker A is 50 By adding %, you can increase the maximum number of work limits to 65, which is 130% of the total.

이와 같은 작업자(32)에 대한 신뢰도는, 다수의 작업자(32)에게 다중할당되어 다수의견에 대한 평가가 완료된 작업이 N건(N은 1 이상의 자연수)만큼 누적될 때마다, N건의 작업에 대응하는 각 작업자(32)에 대한 신뢰도를 산출할 수 있다. 이때, N건의 누적 건수는 프로젝트의 진행률에 기초하여 점점 감소하도록 설정되며, 이전 신뢰도 평가때 사용된 N건의 데이터는 다음 신뢰도 산출 대상인 N건에 포함되지 않는다.Reliability for such workers 32 is multi-allocated to a number of workers 32 and corresponds to N tasks whenever N tasks (N is a natural number of 1 or more) that have been evaluated for multiple opinions are accumulated. It is possible to calculate the reliability for each worker 32. At this time, the cumulative number of N cases is set to gradually decrease based on the progress of the project, and the N data used in the previous reliability evaluation are not included in the next reliability calculation target, N cases.

예를 들어, 도 9에서 최초 N건은 10건으로 설정되었으며, 작업자 A는 현재 15건의 작업을 수행하였다. 작업자 A의 15건의 작업 결과 중에서 다수의 작업자들이 모두 작업 결과를 제출하여 다수의견에 대한 평가가 완료된 작업이 총 10건으로 누적됨에 따라, 10건에 대한 신뢰도는 80%로 산출되어 최대 작업 제한 건수는 총 65건으로 증가하였다.For example, in FIG. 9, the first N cases were set to 10, and worker A currently performed 15 jobs. Of the 15 work results of worker A, a number of workers submitted work results, and as a total of 10 jobs that had been evaluated for multiple opinions were accumulated, the reliability of 10 cases was calculated as 80%, and the maximum number of jobs was restricted. It increased to a total of 65 cases.

이후, 프로젝트가 진행됨에 따라 작업자 A에 대한 N건은 10건에서 8건으로 감소되도록 설정되었다. 작업자 A는 현재까지 25건의 작업을 수행하였고, 이 중 다수의견에 대한 평가가 완료된 작업이 총 18건으로 누적되었으며, 서버는 이전 신뢰도 산출시 사용한 10건을 제외한 8건을 대상으로 작업자 A의 신뢰도를 다시 산출한다. 만약, 작업자 A의 현재 누적 건수인 8건에 대한 신뢰도는 급격히 낮아져 30%로 산출된 경우, 작업자 A의 최대 작업 제한 건수는 65건에 대한 30%인 약 20건으로 감소되도록 설정된다.After that, as the project progressed, N cases for worker A were set to decrease from 10 cases to 8 cases. Worker A has performed 25 tasks to date, and among them, a total of 18 tasks that have been evaluated for multiple opinions have been accumulated, and the server calculated the reliability of worker A for eight tasks excluding the ten tasks used in calculating the previous reliability. Recalculate. If the reliability of worker A's current cumulative number of 8 cases is rapidly lowered and is calculated as 30%, the maximum number of work restrictions of worker A is set to be reduced to about 20 cases, 30% of 65 cases.

이때, 서버는 복수의 구간 중 제1 구간 이하의 신뢰도를 갖는 작업자(32)의 최대 작업 제한 건수를 신뢰도에 대응되도록 감축시키되, 작업자(32)의 현재 작업 수행 건수가 감출될 최대 작업 제한 건수보다 더 많을 경우에는, 작업자(32)의 현재 작업 수행 건수만큼 최대 작업 제한 건수를 감축시킬 수 있다.At this time, the server reduces the maximum number of work restrictions of the worker 32 having a reliability less than or equal to the first section among the plurality of sections to correspond to the reliability, but the number of current tasks performed by the worker 32 is less than the maximum number of work restrictions to be hidden. If there are more, the maximum number of work restrictions may be reduced by the number of current work performed by the worker 32.

즉, 도 9의 예시에서 작업자 A의 신뢰도는 30%로 산출됨에 따라 최대 작업 제한 건수는 20건으로 감축되어야 하나, 작업자 A는 이미 25건의 작업을 수행한 상태이므로, 작업자 A에 대한 최대 작업 제한 건수는 25건으로 설정된다. That is, in the example of FIG. 9, as the reliability of worker A is calculated as 30%, the maximum number of work limits should be reduced to 20, but because worker A has already performed 25 tasks, the maximum number of work limits for worker A Is set to 25.

한편, 각 작업자(32)마다 작업 수행 시간, 능력이 각각 다르며, 타 작업자(32)에 의해 다수의견에 대한 평가 완료된 작업의 누적 건수도 각각 상이하게 산출되므로, 동일한 시점을 기준으로 각 작업자(32)마다 신뢰도 산출을 위한 N건은 서로 상이할 수 있다. 즉, 작업자 A는 현재 N건이 8건으로 적용되고 있는 반면, 작업자 A보다 더 많은 작업을 완료한 작업자 B는 현재 N건이 4건으로 적용되고 있을 수 있다.On the other hand, each worker 32 has different work execution times and capabilities, and the cumulative number of tasks that have been evaluated for multiple opinions by the other workers 32 are also calculated differently, so that each worker 32 ), N cases for calculating reliability may be different from each other. That is, N cases are currently being applied to 8 cases for worker A, while N cases are currently applied to 4 cases for worker B who has completed more work than worker A.

다만, N건의 누적 건수는 프로젝트의 진행률에 기초하여 설정되는 것이므로, 작업자 B는 N건이 8건, 6건, 4건 순으로 감소된 것인 반면, 작업자 A는 현재 프로젝트 진행률에 따라 N건이 8건에서 바로 4건으로 설정되게 된다.However, since the cumulative number of N cases is set based on the progress of the project, worker B has reduced N cases in the order of 8, 6, and 4, whereas worker A has N cases according to the current project progress rate. It will be set to 4 immediately.

이러한 최대 작업 제한 건수의 갱신 과정은 프로젝트의 모든 작업이 배정될 때까지 반복될 수 있다.This process of updating the maximum number of tasks can be repeated until all tasks in the project have been assigned.

한편, 상술한 설명에서, 단계 S11 내지 S150은 본 발명의 구현예에 따라서, 추가적인 단계들로 더 분할되거나, 더 적은 단계들로 조합될 수 있다. 또한, 일부 단계는 필요에 따라 생략될 수도 있고, 단계 간의 순서가 변경될 수도 있다. 아울러, 기타 생략된 내용이라 하더라도 후술하는 도 10의 내용은 도 1 내지 도 9의 작업자(32)별 최대 작업 제한 건수 적용 방법에도 적용될 수 있다.Meanwhile, in the above description, steps S11 to S150 may be further divided into additional steps or may be combined into fewer steps, according to an embodiment of the present invention. In addition, some steps may be omitted as necessary, and the order between steps may be changed. In addition, even if other contents are omitted, the contents of FIG. 10 to be described later may also be applied to the method of applying the maximum number of work restrictions per worker 32 of FIGS. 1 to 9.

이하에서는 본 발명의 일 실시예에 따른 다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자(32)별 최대 작업 제한 건수 적용 장치(200, 이하 작업자별 최대 작업 제한 건수 적용 장치)에 대하여 설명하도록 한다.Hereinafter, a device for applying the maximum number of work restrictions per worker 32 based on reliability in a multi-allocation type crowdsourcing-based project according to an embodiment of the present invention (200, hereinafter, a device for applying the maximum number of work limits per worker) Do it.

도 10은 본 발명의 일 실시예에 따른 작업자별 최대 작업 제한 건수 적용 장치(200)를 설명하기 위한 도면이다.10 is a view for explaining an apparatus 200 for applying the maximum number of work restrictions per worker according to an embodiment of the present invention.

도 10을 참조하면, 따른 작업자별 최대 작업 제한 건수 적용 장치(200)는 통신모듈(210), 메모리(220) 및 프로세서(230)를 포함한다.Referring to FIG. 10, the apparatus 200 for applying the maximum number of tasks for each worker according to the present invention includes a communication module 210, a memory 220, and a processor 230.

통신모듈(210)은 다중할당 방식의 작업을 복수의 작업자(32)에게 송신하여 작업 수행을 요청하고, 복수의 작업자(32)로부터 작업 결과를 수신한다. The communication module 210 transmits a multi-allocation method to a plurality of workers 32 to request a task to be performed, and receives a work result from the plurality of workers 32.

메모리(220)에는 작업자 각각의 신뢰도에 기초하여 프로젝트의 작업자(32) 1인당 최대 작업 제한 건수를 갱신하기 위한 프로그램이 저장된다.The memory 220 stores a program for updating the maximum number of work limits per worker 32 of the project based on the reliability of each worker.

프로세서(230)는 메모리(220)에 저장된 프로그램을 실행시킨다. 프로세서(230)는 메모리(220)에 저장된 프로그램을 실행시킴에 따라, 다수의 작업자(32)의 작업 결과 중 다수의견에 해당하는 작업 결과를 입력한 작업자의 건수를 산출하고, 작업자(32)의 다중할당된 작업을 수행한 전체 건수 대비 다수의견에 해당하는 작업 결과를 입력한 건수에 기초하여 작업자(32)의 신뢰도를 산출한다.The processor 230 executes a program stored in the memory 220. As the processor 230 executes the program stored in the memory 220, the number of workers who input the work results corresponding to the plurality of opinions among the work results of the plurality of workers 32 is calculated, and The reliability of the worker 32 is calculated based on the number of inputting work results corresponding to multiple opinions compared to the total number of multi-allocated tasks.

그리고, 프로세서(230)는 복수의 구간으로 구분된 복수의 작업자(32)에 대한 신뢰도 중, 제1 구간 이하의 신뢰도를 갖는 작업자의 최대 작업 제한 건수를 신뢰도에 대응되도록 감축시키고, 제1 구간보다 높은 제2 구간을 초과하는 신뢰도를 갖는 작업자(32)의 최대 작업 제한 건수를 가중치가 부여된 신뢰도에 대응되도록 증가시킨다.And, the processor 230 reduces the maximum number of work restrictions of workers having a reliability less than or equal to the first section among the reliability of the plurality of workers 32 divided into a plurality of sections to correspond to the reliability, and The maximum number of work restrictions of the worker 32 having a reliability exceeding the high second interval is increased to correspond to the weighted reliability.

도 10을 참조하여 설명한 작업자별 최대 작업 제한 건수 적용 장치(200)는 상술한 서버의 구성요소로 제공될 수 있다.The apparatus 200 for applying the maximum number of work limits for each worker described with reference to FIG. 10 may be provided as a component of the above-described server.

이상에서 전술한 본 발명의 일 실시예에 따른 다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법은, 하드웨어인 컴퓨터와 결합되어 실행되기 위해 프로그램(또는 어플리케이션)으로 구현되어 매체에 저장될 수 있다.The method for applying the maximum number of work limits per worker based on reliability in a multi-allocation crowdsourcing-based project according to an embodiment of the present invention described above is a program (or application) to be executed in combination with a computer that is hardware. It can be implemented and stored in a medium.

상기 전술한 프로그램은, 상기 컴퓨터가 프로그램을 읽어 들여 프로그램으로 구현된 상기 방법들을 실행시키기 위하여, 상기 컴퓨터의 프로세서(CPU)가 상기 컴퓨터의 장치 인터페이스를 통해 읽힐 수 있는 C, C++, JAVA, Ruby, 기계어 등의 컴퓨터 언어로 코드화된 코드(Code)를 포함할 수 있다. 이러한 코드는 상기 방법들을 실행하는 필요한 기능들을 정의한 함수 등과 관련된 기능적인 코드(Functional Code)를 포함할 수 있고, 상기 기능들을 상기 컴퓨터의 프로세서가 소정의 절차대로 실행시키는데 필요한 실행 절차 관련 제어 코드를 포함할 수 있다. 또한, 이러한 코드는 상기 기능들을 상기 컴퓨터의 프로세서가 실행시키는데 필요한 추가 정보나 미디어가 상기 컴퓨터의 내부 또는 외부 메모리의 어느 위치(주소 번지)에서 참조되어야 하는지에 대한 메모리 참조관련 코드를 더 포함할 수 있다. 또한, 상기 컴퓨터의 프로세서가 상기 기능들을 실행시키기 위하여 원격(Remote)에 있는 어떠한 다른 컴퓨터나 서버 등과 통신이 필요한 경우, 코드는 상기 컴퓨터의 통신 모듈을 이용하여 원격에 있는 어떠한 다른 컴퓨터나 서버 등과 어떻게 통신해야 하는지, 통신 시 어떠한 정보나 미디어를 송수신해야 하는지 등에 대한 통신 관련 코드를 더 포함할 수 있다.The above-described program includes C, C++, JAVA, Ruby, which can be read by a processor (CPU) of the computer through the device interface of the computer, in order for the computer to read the program and execute the methods implemented as a program. It may include a code (Code) coded in a computer language such as machine language. Such code may include a functional code related to a function defining necessary functions for executing the methods, and a control code related to an execution procedure necessary for the processor of the computer to execute the functions according to a predetermined procedure. can do. In addition, such code may further include additional information required for the processor of the computer to execute the functions or code related to a memory reference to which location (address address) of the internal or external memory of the computer should be referenced. have. In addition, when the processor of the computer needs to communicate with any other computer or server in the remote in order to execute the functions, the code uses the communication module of the computer to determine how It may further include a communication-related code for whether to communicate or what information or media to transmit and receive during communication.

상기 저장되는 매체는, 레지스터, 캐쉬, 메모리 등과 같이 짧은 순간 동안 데이터를 저장하는 매체가 아니라 반영구적으로 데이터를 저장하며, 기기에 의해 판독(reading)이 가능한 매체를 의미한다. 구체적으로는, 상기 저장되는 매체의 예로는 ROM, RAM, CD-ROM, 자기 테이프, 플로피디스크, 광 데이터 저장장치 등이 있지만, 이에 제한되지 않는다. 즉, 상기 프로그램은 상기 컴퓨터가 접속할 수 있는 다양한 서버 상의 다양한 기록매체 또는 사용자의 상기 컴퓨터상의 다양한 기록매체에 저장될 수 있다. 또한, 상기 매체는 네트워크로 연결된 컴퓨터 시스템에 분산되어, 분산방식으로 컴퓨터가 읽을 수 있는 코드가 저장될 수 있다.The stored medium is not a medium that stores data for a short moment, such as a register, cache, memory, etc., but a medium that stores data semi-permanently and can be read by a device. Specifically, examples of the storage medium include, but are not limited to, ROM, RAM, CD-ROM, magnetic tape, floppy disk, optical data storage device, and the like. That is, the program may be stored in various recording media on various servers to which the computer can access, or on various recording media on the user's computer. In addition, the medium may be distributed over a computer system connected through a network, and computer-readable codes may be stored in a distributed manner.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.The above description of the present invention is for illustrative purposes only, and those of ordinary skill in the art to which the present invention pertains will be able to understand that it can be easily modified into other specific forms without changing the technical spirit or essential features of the present invention. will be. Therefore, it should be understood that the embodiments described above are illustrative in all respects and not limiting. For example, each component described as a single type may be implemented in a distributed manner, and similarly, components described as being distributed may also be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is indicated by the claims to be described later rather than the detailed description, and all changes or modified forms derived from the meaning and scope of the claims and their equivalent concepts should be interpreted as being included in the scope of the present invention. do.

10 : 의뢰자
20 : 서비스 제공 업체
30 : 대중
32 : 작업자
34 : 검수자
200 : 작업자별 최대 작업 제한 건수 적용 장치
210 : 통신모듈
220 : 메모리
230 : 프로세서
10: Client
20: service provider
30: public
32: worker
34: inspector
200: Device for applying the maximum number of work limit per worker
210: communication module
220: memory
230: processor

Claims (10)

컴퓨터에 의해 수행되는 방법으로서,
하나의 작업을 다수의 작업자에게 중복 배정하는 다중할당 방식의 크라우드소싱 기반 프로젝트(이하, “프로젝트”)의 작업자 1인당 최대 작업 제한 건수를 사전 설정하는 단계;
상기 프로젝트의 복수의 작업을 복수의 작업자에게 배정하여 작업 수행을 요청하는 단계;
상기 복수의 작업자로부터 복수의 작업 결과를 입력받는 단계;
상기 복수의 작업 결과에 기초하여 복수의 작업자 각각의 신뢰도를 산출하는 단계; 및
상기 신뢰도에 기초하여 각 작업자별로 상기 최대 작업 제한 건수를 갱신하는 단계를 포함하되,
상기 복수의 작업 결과에 기초하여 복수의 작업자 각각의 신뢰도를 산출하는 단계는,
상기 다수의 작업자의 작업 결과 중 다수의견에 해당하는 작업 결과를 입력한 작업자의 건수를 산출하는 단계; 및
상기 작업자의 다중할당된 작업을 수행한 전체 건수 대비 상기 다수의견에 해당하는 작업 결과를 입력한 건수에 기초하여 상기 작업자의 신뢰도를 산출하는 단계를 포함하고,
상기 작업자의 다중할당된 작업을 수행한 전체 건수에서, 상기 다수의 작업자의 작업 결과로부터 다수의견이 발생하지 않은 작업 결과는 배제시키는 것이며,
상기 신뢰도에 기초하여 각 작업자별로 상기 최대 작업 제한 건수를 갱신하는 단계는,
복수의 구간으로 구분된 상기 복수의 작업자에 대한 신뢰도 중, 제1 구간 이하의 신뢰도를 갖는 작업자의 최대 작업 제한 건수를 상기 신뢰도에 대응되도록 감축시키고, 상기 제1 구간보다 높은 제2 구간을 초과하는 신뢰도를 갖는 작업자의 최대 작업 제한 건수를 가중치가 부여된 신뢰도에 대응되도록 증가시키는 것인,
다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법.
As a method performed by a computer,
Pre-setting the maximum number of tasks per worker for a crowdsourcing-based project (hereinafter, referred to as “project”) of a multi-allocation scheme in which one task is duplicated to a plurality of workers;
Allocating a plurality of tasks of the project to a plurality of workers and requesting the task to be performed;
Receiving a plurality of work results from the plurality of workers;
Calculating the reliability of each of the plurality of workers based on the plurality of work results; And
Including the step of updating the maximum number of work restrictions for each worker based on the reliability,
Calculating the reliability of each of the plurality of workers based on the plurality of work results,
Calculating the number of workers who input work results corresponding to multiple opinions among the work results of the plurality of workers; And
Comprising the step of calculating the reliability of the worker based on the number of inputting work results corresponding to the plurality of opinions relative to the total number of performing the multi-allocated work of the worker,
In the total number of cases in which the multi-allocated work of the worker is performed, work results in which multiple opinions do not occur from the work results of the plurality of workers are excluded,
The step of updating the maximum number of work restrictions for each worker based on the reliability,
Among the reliability of the plurality of workers divided into a plurality of sections, the maximum number of work restrictions of workers having a reliability less than or equal to the first section is reduced to correspond to the reliability, and exceeds the second section higher than the first section. To increase the maximum number of work restrictions of workers with reliability to correspond to the weighted reliability,
How to apply the maximum number of tasks per worker based on reliability in a multi-allocation crowdsourcing-based project.
제1항에 있어서,
상기 복수의 작업을 복수의 작업자에게 배정하여 작업 수행을 요청하는 단계는,
작업자가 현재까지 작업 수행한 전체 건수를 카운트하여 누적 작업 수행 건수를 산출하는 단계;
상기 누적 작업 수행 건수가 상기 최대 작업 제한 건수와 일치하는지 판단하는 단계; 및
상기 누적 작업 수행 건수가 상기 최대 작업 제한 건수와 일치하면, 상기 작업자에게 추가적인 작업 배정을 중지하는 단계를 포함하는,
다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법.
The method of claim 1,
Assigning the plurality of tasks to a plurality of workers and requesting the task to be performed,
Calculating a cumulative number of tasks performed by counting the total number of tasks performed by the operator to date;
Determining whether the number of cumulative work executions matches the maximum work limit number; And
If the cumulative number of job executions matches the maximum number of job restrictions, stopping the assignment of additional jobs to the worker,
How to apply the maximum number of tasks per worker based on reliability in a multi-allocation crowdsourcing-based project.
삭제delete 제1항에 있어서,
상기 프로젝트에 포함된 하나 이상의 기능요소의 유형을 판단하는 단계를 더 포함하되,
상기 복수의 작업 결과에 기초하여 복수의 작업자 각각의 신뢰도를 산출하는 단계는,
상기 다중할당 방식의 프로젝트와 관련하여, 상기 복수의 작업자 각각의 신뢰도를 기능요소의 유형별로 산출하고,
상기 기능요소는, 프로젝트를 수행하기 위한 작업툴(Tool)에 기반하여 결정되고, 상기 작업툴은 프로젝트에서 제공되며 작업자의 상기 프로젝트가 요구하는 작업을 수행하기 위하여 사용하는 툴인,
다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법.
The method of claim 1,
Further comprising determining the type of one or more functional elements included in the project,
Calculating the reliability of each of the plurality of workers based on the plurality of work results,
In relation to the project of the multi-allocation method, the reliability of each of the plurality of workers is calculated for each type of functional element,
The functional element is determined based on a work tool for performing a project, and the work tool is provided in a project and is a tool used by a worker to perform a task required by the project,
How to apply the maximum number of tasks per worker based on reliability in a multi-allocation crowdsourcing-based project.
제4항에 있어서,
상기 복수의 작업 결과에 기초하여 복수의 작업자 각각의 신뢰도를 산출하는 단계는,
상기 하나 이상의 기능요소를 포함하는 상기 작업자의 다중할당된 작업을 수행한 전체 건수에서, 상기 다수의 작업자의 작업 결과로부터 다수의견이 발생하지 않은 작업 결과는 배제시키는 것인,
다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법.
The method of claim 4,
Calculating the reliability of each of the plurality of workers based on the plurality of work results,
In the total number of cases of performing the multi-allocated tasks of the workers including the one or more functional elements, the work results in which multiple opinions do not occur from the work results of the plurality of workers are excluded,
How to apply the maximum number of tasks per worker based on reliability in a multi-allocation crowdsourcing-based project.
제1항에 있어서,
상기 복수의 작업 결과에 기초하여 복수의 작업자 각각의 신뢰도를 산출하는 단계는,
상기 다수의 작업자에게 다중할당되어 다수의견에 대한 평가가 완료된 작업이 N건(N은 1 이상의 자연수)만큼 누적될 때마다, 상기 N건의 작업에 대응하는 각 작업자에 대한 신뢰도를 산출하는 것인,
다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법.
The method of claim 1,
Calculating the reliability of each of the plurality of workers based on the plurality of work results,
Whenever N tasks (N is a natural number of 1 or more) that have been multi-allocated to the plurality of workers and evaluated for multiple opinions are accumulated, the reliability for each worker corresponding to the N tasks is calculated,
How to apply the maximum number of tasks per worker based on reliability in a multi-allocation crowdsourcing-based project.
제6항에 있어서,
상기 N건의 누적 건수는 상기 프로젝트의 진행률에 기초하여 점점 감소하도록 설정되는 것인,
다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법.
The method of claim 6,
The cumulative number of N cases is set to gradually decrease based on the progress of the project,
How to apply the maximum number of tasks per worker based on reliability in a multi-allocation crowdsourcing-based project.
제1항에 있어서,
상기 신뢰도에 기초하여 각 작업자별로 상기 최대 작업 제한 건수를 갱신하는 단계는,
상기 복수의 구간 중 제1 구간 이하의 신뢰도를 갖는 작업자의 최대 작업 제한 건수를 상기 신뢰도에 대응되도록 감축시키되,
상기 작업자의 현재 작업 수행 건수가 상기 감축될 최대 작업 제한 건수보다 더 많을 경우, 상기 현재 작업 수행 건수만큼 상기 최대 작업 제한 건수를 감축시키는 것인,
다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법.
The method of claim 1,
The step of updating the maximum number of work restrictions for each worker based on the reliability,
Reducing the maximum number of work restrictions of workers having a reliability equal to or less than the first section among the plurality of sections to correspond to the reliability,
When the number of current tasks performed by the worker is greater than the maximum number of tasks to be reduced, reducing the maximum number of tasks limited by the number of current tasks performed,
How to apply the maximum number of tasks per worker based on reliability in a multi-allocation crowdsourcing-based project.
제1항에 있어서,
상기 신뢰도에 기초하여 각 작업자별로 상기 최대 작업 제한 건수를 갱신하는 단계는,
상기 복수의 구간으로 구분된 상기 복수의 작업자에 대한 신뢰도 중, 상기 제1 구간을 초과하며 상기 제2 구간 이하의 신뢰도를 갖는 작업자의 최대 작업 제한 건수를 이전 최대 작업 제한 건수로 유지시키는,
다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법.
The method of claim 1,
The step of updating the maximum number of work restrictions for each worker based on the reliability,
Of the reliability of the plurality of workers divided into the plurality of sections, maintaining the maximum number of work restrictions of workers having a reliability of exceeding the first section and lower than the second section as the previous maximum number of work restrictions,
How to apply the maximum number of tasks per worker based on reliability in a multi-allocation crowdsourcing-based project.
컴퓨터와 결합되어, 제1항, 제2항 및 제4항 내지 제9항 중 어느 하나의 항의 다중할당 방식의 크라우드소싱 기반 프로젝트에서의 신뢰도에 기초한 작업자별 최대 작업 제한 건수 적용 방법을 실행시키기 위하여 컴퓨터 판독가능 기록매체에 저장된 컴퓨터 프로그램.In order to execute the method of applying the maximum number of work limits per worker based on the reliability in the crowdsourcing-based project of any one of paragraphs 1, 2 and 4 to 9 in combination with a computer, A computer program stored on a computer-readable recording medium.
KR1020200089732A 2020-07-20 2020-07-20 Method for applying the maximum number of work limits per workers based on reliability in a multi-assignment crowdsourcing based projects for artificial intelligence training data generation KR102195958B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200089732A KR102195958B1 (en) 2020-07-20 2020-07-20 Method for applying the maximum number of work limits per workers based on reliability in a multi-assignment crowdsourcing based projects for artificial intelligence training data generation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200089732A KR102195958B1 (en) 2020-07-20 2020-07-20 Method for applying the maximum number of work limits per workers based on reliability in a multi-assignment crowdsourcing based projects for artificial intelligence training data generation

Publications (1)

Publication Number Publication Date
KR102195958B1 true KR102195958B1 (en) 2020-12-29

Family

ID=74090295

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200089732A KR102195958B1 (en) 2020-07-20 2020-07-20 Method for applying the maximum number of work limits per workers based on reliability in a multi-assignment crowdsourcing based projects for artificial intelligence training data generation

Country Status (1)

Country Link
KR (1) KR102195958B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013190972A (en) * 2012-03-13 2013-09-26 Nomura Research Institute Ltd Project management support system and project management support program
KR20140095956A (en) 2013-01-25 2014-08-04 한국전자통신연구원 Method and system for generating image-knowledge contents based on crowdsourcing
KR101887415B1 (en) * 2017-11-21 2018-08-10 주식회사 크라우드웍스 Program and method for checking data labeling product

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013190972A (en) * 2012-03-13 2013-09-26 Nomura Research Institute Ltd Project management support system and project management support program
KR20140095956A (en) 2013-01-25 2014-08-04 한국전자통신연구원 Method and system for generating image-knowledge contents based on crowdsourcing
KR101887415B1 (en) * 2017-11-21 2018-08-10 주식회사 크라우드웍스 Program and method for checking data labeling product

Similar Documents

Publication Publication Date Title
KR102164844B1 (en) Method for evaluating workers using the unit of work difficulty of crowdsourcing based projects for artificial intelligence training data generation
KR102232866B1 (en) Method for distributing functional element unit work of crowdsourcing based project for artificial intelligence training data generation
KR102232859B1 (en) Method for automatically generating a worker pool based on the functional elements and difficulty of crowdsourcing based projects for artificial intelligence training data generation
KR102155790B1 (en) Method and apparatus for measuring competence of worker using average return rate
KR102244697B1 (en) Project curation method considering worker’s tendency of crowdsourcing based projects for artificial intelligence training data generation
KR102156582B1 (en) Method for selecting sincere worker and prioritizing inspection of crowdsourcing based projects for artificial intelligence training data generation
KR102195629B1 (en) Method for selecting workers based on capability of work in crowdsourcing based projects for artificial intelligence training data generation
KR102155889B1 (en) Method for improving quality through secondary work on work results of other workers in a crowdsourcing based projects for artificial intelligence training data generation
KR102195630B1 (en) Method for providing rewarded training for training participants in a crowdsourcing based projects for artificial intelligence training data generation
KR102155877B1 (en) Method for providing information of projects matching qualifications of crowdsourcing platform for artificial intelligence training data generation
KR102205811B1 (en) Method for setting minimum work time using work time of each functional elements of crowdsourcing based project for artificial intelligence training data generation
KR102232874B1 (en) Method for evaluating new inspector using verification work result of crowdsourcing based project for artificial intelligence training data generation
KR102155839B1 (en) Method and apparatus for monitoring worker based on the reason for not wokring
KR102155749B1 (en) Method for deciding proper unit price and proper amount of work using reference work time of crowdsourcing based project for artificial intelligence training data generation
KR102195958B1 (en) Method for applying the maximum number of work limits per workers based on reliability in a multi-assignment crowdsourcing based projects for artificial intelligence training data generation
KR102205808B1 (en) Method for determining the number of proper worker of worker pool using estimated work quantity of crowdsourcing based project for artificial intelligence training data generation
KR102244705B1 (en) Method for controlling worker inflow into project by reversal adjustment of work unit price between crowdsourcing based similar projects for training data generation
KR102155886B1 (en) Method for applying maximum number of work limits per worker based on inspection result of crowdsourcing based projects for artificial intelligence training data generation
KR102195632B1 (en) Method for calculating maximum wor result quantity by selecting available worker of crowdsourcing based project for artificial intelligence training data generation
KR102156585B1 (en) Method for controlling worker inflow into project by adjusting work unit price between crowdsourcing based projects for artificial intelligence training data generation
KR102164852B1 (en) Method for restricting participation of project considering urgent degree of crowdsourcing based project for artificial intelligence training data generation
KR102156587B1 (en) Method for increase and decrease operating of worker and inspector of crowdsourcing based project for artificial intelligence training data generation
KR102195956B1 (en) Method for updating maximum number of work limits according to work difficulty of crowdsourcing based project for artificial intelligence training data generation
KR102183812B1 (en) Method for paying inspection fee based on hourly wage for each inspector using the verification work results of crowdsourcing based projects for artificial intelligence training data generation
KR102183837B1 (en) Method for paying work fee based on hourly wage for each workers using verification work of crowdsourcing based projects for artificial intelligence training data generation

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant