KR102135717B1 - Holding apparatus for inspection of guided missile - Google Patents

Holding apparatus for inspection of guided missile Download PDF

Info

Publication number
KR102135717B1
KR102135717B1 KR1020180125375A KR20180125375A KR102135717B1 KR 102135717 B1 KR102135717 B1 KR 102135717B1 KR 1020180125375 A KR1020180125375 A KR 1020180125375A KR 20180125375 A KR20180125375 A KR 20180125375A KR 102135717 B1 KR102135717 B1 KR 102135717B1
Authority
KR
South Korea
Prior art keywords
guided
grenade
fixed
clamping member
launcher
Prior art date
Application number
KR1020180125375A
Other languages
Korean (ko)
Other versions
KR20200044512A (en
Inventor
김석용
이승희
오동진
Original Assignee
주식회사 한화
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한화 filed Critical 주식회사 한화
Priority to KR1020180125375A priority Critical patent/KR102135717B1/en
Publication of KR20200044512A publication Critical patent/KR20200044512A/en
Application granted granted Critical
Publication of KR102135717B1 publication Critical patent/KR102135717B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42BEXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
    • F42B35/00Testing or checking of ammunition
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42BEXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
    • F42B33/00Manufacture of ammunition; Dismantling of ammunition; Apparatus therefor
    • F42B33/001Devices or processes for assembling ammunition, cartridges or cartridge elements from parts

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Manipulator (AREA)

Abstract

본 발명은 유도탄 점검용 고정 장치에 관한 것으로 유도탄의 일측이 안착되어 고정되는 제1유도탄 고정부, 상기 제1유도탄 고정부와 이격되게 위치되며 상기 유도탄의 타측이 안착되어 고정되는 제2유도탄 고정부, 조립이 완료된 유도탄이 장입되는 발사관의 일측이 안착되어 고정되는 제1발사관 고정부, 상기 제1발사관 고정부와 이격되게 위치되며 상기 발사관의 타측이 안착되어 고정되는 제2발사관 고정부를 포함하여 유도탄의 조립 중 유도탄의 변형된 형상을 각각 고정할 수 있어 유도탄 조립 과정에서 유도탄 점검을 원활하게 진행할 수 있어 유도탄의 점검 작업 시 소요되는 시간을 단축하고, 소요되는 작업인원도 감소됨은 물론 점검 작업의 안전성과 편의성이 증대될 뿐만 아니라 유도탄의 각 조립 단계에서 점검 작업 시 구성품들의 기구적 위치를 동일한 위치로 위치시킬 수 있어 기구적 특성을 파악하는 점검에 유리한 환경을 제공하고, 점검 소프트 웨어의 제작 및 운용의 편의성을 증가시킬 수 있다. The present invention relates to a fixing device for inspecting a guided missile, a first guided grenade fixing part to which one side of the guided grenade is seated and fixed, and a second guided grenade fixed to be spaced apart from the first guided grenade fixing part and fixed to the other side of the guided grenade Including the first launcher fixed portion is fixed to one side of the launcher where the assembled missile is charged and fixed, the second launcher fixed portion is located spaced apart from the first launcher fixed portion and the other side of the launcher is seated and fixed During the assembly of guided missiles, each of the modified shapes of guided missiles can be fixed, so it is possible to smoothly inspect guided missiles during the guided missile assembly process, thereby reducing the time required to inspect guided missiles and reducing the number of personnel required. In addition to increasing safety and convenience, it is possible to position the mechanical positions of components in the same position during the inspection work at each assembly stage of guided missiles, providing an advantageous environment for checking the mechanical characteristics, making and manufacturing inspection software. It can increase the convenience of operation.

Figure R1020180125375
Figure R1020180125375

Description

유도탄 점검용 고정 장치{HOLDING APPARATUS FOR INSPECTION OF GUIDED MISSILE}Fixed device for checking missiles {HOLDING APPARATUS FOR INSPECTION OF GUIDED MISSILE}

본 발명은 유도탄 점검용 고정 장치에 관한 것으로 더 상세하게는 유도탄 조립 중 각 조립 과정에서 유도탄의 점검이 가능하도록 유도탄을 거치시켜 고정할 수 있는 유도탄 점검용 고정 장치에 관한 발명이다. The present invention relates to a fixing device for inspecting a guided missile, and more particularly, to a fixing device for inspecting a guided missile that can be fixed by mounting a guided missile to enable inspection of a guided missile during each assembly process during assembly of a guided missile.

일반적으로 유도탄은 단면적에 대한 길이의 비율인 세장비가 큰 형태로 제조되고, 이에 분할된 복수의 유도탄 몸체를 유도탄 조립대 상에서 일렬로 위치시킨 후 분할된 복수의 몸체를 직선 이동시켜 조립하고 있다.In general, the guided grenade is manufactured in a large form with three pieces of equipment, which is a ratio of the length to the cross-sectional area, and the divided plurality of guided munition bodies are placed in a line on the guided grenade assembly table and then assembled by moving the plurality of divided bodies in a straight line.

즉, 종래의 유도탄 조립대는 분할된 복수의 유도탄 몸체를 지지하며 조립대 상에 직선 왕복 이동 가능하고 상, 하 이동 가능한 복수의 유도탄 지지대를 구비하여 유도탄 지지대 상에 각각의 유도탄 몸체를 올려놓고 정렬한 후 분할된 유도탄 몸체를 직선 이동시켜 조립하고 있다. That is, the conventional guided grenade assembly supports a plurality of divided guided grenade bodies and has a plurality of guided grenade supports that can be reciprocated in a straight line and moveable up and down on the assembly base, and each guided grenade body is placed and aligned on the guided grenade support. Afterwards, the divided guide grenade body is moved and assembled.

본 발명과 관련된 선행특허로 한국 특허등록 제1708001호 '유도무기 조립장치'가 제안된 바 있다.As a prior patent related to the present invention, Korean Patent Registration No. 1708001'Guide Weapons Assembly Device' has been proposed.

한국 특허등록 제1708001호 '유도무기 조립장치'는 조립대에 정렬된 상기 동체를 관통하게 설치되고, 내부부품을 또 다른 동체의 내부로 밀어서 삽입시키는 슬라이더를 포함한 발명이다.Korean Patent Registration No. 1708001'Guide Weapons Assembly Device' is an invention including a slider which is installed to penetrate the fuselage arranged on the assembly table and inserts an internal part by pushing it into another fuselage.

유도탄은 조립 과정에서 각각 유도탄의 부품 및 유도탄의 정상 조립 여부, 유도탄의 작동 등을 조립 단계에 따라 점검하고 있다.In the assembly process, the parts of the missile, whether the missile is normally assembled, and the operation of the missile are checked according to the assembly stage.

그러나, 한국 특허등록 제1708001호 '유도무기 조립장치'는 조립을 위해 각 부품을 거치시키고 조립하고 있으나 유도탄의 각 조립 단계에서 유도탄 점검 절차 중 조립 정도에 따라 발생하는 다양한 형상의 유도탄을 고정할 수 없는 문제점이 있었다. However, the Korean Patent Registration No. 1708001'Guide Weapons Assembly Device' mounts and assembles each part for assembly, but it can fix guided missiles of various shapes that occur depending on the degree of assembly during the guided missile inspection procedure at each assembly stage of guided missiles. There was no problem.

그리고, 유도탄의 조립 시 각 기존의 고정된 형상의 치구로는 각각의 유도탄의 길이와 외경 등 물리적 요소가 변경되면서 대응할 수 없다는 문제가 발생하였다. In addition, when assembling the missile, each existing fixed-shaped jig caused a problem that physical elements such as the length and outer diameter of each missile could not be changed.

이를 위하여 각 조립 단계에서 유도탄의 점검을 위해 각 조립단계의 유도탄 형상에 따라 유도탄의 점검을 위한 별도의 고정장치가 제작하였지만 점검절차에 의해 바뀌는 유도탄의 형상에 따라 반복적으로 고정장치 전체를 변경하여 설치하여야 했다.To this end, a separate fixing device for inspection of guided missiles was prepared according to the shape of guided missiles in each assembly step for inspection of guided missiles in each assembly step, but the entire fixing device was repeatedly changed and installed according to the shape of guided missiles changed by the inspection procedure. Had to.

하지만, 유도탄의 규모에 의해 유도탄의 점검을 위한 고정장치의 규모가 커지면서 설치 및 해체 작업에 의한 안전 문제와 다수의 고정장치의 관리 문제가 발생하였다. However, due to the size of the missile, the size of the fixing device for the inspection of the missile increased, causing safety problems due to installation and dismantling work and management problems of a large number of fixing devices.

또한 유도탄의 조립 단계에서 각 형상에 따른 전용 유도탄 점검용 고정장치를 제작하면서 발생한 점검대 대비 구성품의 상대 위치가 계속 변경되어 이를 개선하기 위하여 점검 장비의 SW에 각각의 고정장치에 따른 구성품의 상대 위치를 변경하여 입력하는 작업이 추가되었으며, 이러한 수치를 별도로 관리하여야 하는 어려움이 있다. In addition, the relative position of the components compared to the inspection table that occurred while manufacturing the dedicated guide missile inspection fixtures according to each shape in the assembly stage of the missile is continuously changed to improve the relative position of the components according to each fixture in the SW of the inspection equipment. Added the task of changing and inputting, and it is difficult to manage these numbers separately.

이러한 전용 유도탄 점검용 고정장치의 설치와 해체 작업의 어려움과 복잡함은 점검하는 유도탄의 개수가 증가하면서 고정장치를 반복적으로 교체하게 됨으로 발생하는 시간과 인적 자원 소모 증가로 인해 유도탄 점검 절차의 지연이 발생하였다. The difficulty and complexity of installing and dismantling the fixed equipment for the inspection of the guided missiles caused delays in the guided missile inspection process due to the increased time and human resource consumption caused by the repeated replacement of the fixtures as the number of inspected missiles increased. Did.

이는 유도탄 점검의 효율성이 떨어지게 되어 유도탄 생산의 효율성이 저하되는 문제점이 발생하였다.This caused a problem that the efficiency of the missile inspection was reduced and the efficiency of the production of the missile was deteriorated.

0001)한국 특허등록 제1708001호 '유도무기 조립장치'(2017.02.13.등록)0001) Korea Patent Registration No. 1708001'Guide weapon assembly device' (2017.02.13. registration)

본 발명의 목적은 유도탄의 조립 중 유도탄의 변형된 형상을 각각 고정할 수 있어 유도탄 조립 과정에서 유도탄 점검을 원활하게 진행할 수 있는 유도탄 점검용 고정 장치를 제공하는 데 있다.An object of the present invention is to provide a fixing device for inspecting a guided missile that can smoothly conduct a guided missile inspection in the process of assembling guided missiles because each of the modified shapes of the guided missiles can be fixed during assembly of the guided missile.

본 발명의 다른 목적은 유도탄의 각 조립 단계에서 점검 작업 시 구성품들의 기구적 위치를 동일한 위치로 위치시킬 수 있어 기구적 특성을 파악하는 점검에 유리한 환경을 제공하고, 점검 소프트 웨어의 제작 및 운용의 편의성을 증가시키는 유도탄 점검용 고정 장치를 제공하는 데 있다.Another object of the present invention is to provide a favorable environment for inspection to grasp the mechanical characteristics by positioning the mechanical position of the components at the same time during the inspection operation at each assembly step of the guided munition, and the production and operation of inspection software It is to provide a fixing device for inspecting a guided missile that increases convenience.

상기한 본 발명의 목적을 달성하기 위하여 본 발명에 따른 유도탄 점검용 고정 장치의 일 실시예는 유도탄의 일측이 안착되어 고정되는 제1유도탄 고정부, 상기 제1유도탄 고정부와 이격되게 위치되며 상기 유도탄의 타측이 안착되어 고정되는 제2유도탄 고정부, 조립이 완료된 유도탄이 장입되는 발사관의 일측이 안착되어 고정되는 제1발사관 고정부, 상기 제1발사관 고정부와 이격되게 위치되며 상기 발사관의 타측이 안착되어 고정되는 제2발사관 고정부를 포함하는 것을 특징으로 한다.In order to achieve the above object of the present invention, an embodiment of the fixing device for inspecting guided missiles according to the present invention is positioned to be spaced apart from a first guided grenade fixing part fixed to one side of a guided grenade and fixed. A second guided grenade fixing part on which the other side of the guided grenade is seated and fixed, a first launcher fixed portion on which one side of the launcher where the assembled guided grenade is loaded and fixed, is spaced apart from the first launcher fixed portion and positioned on the other side of the launcher It characterized in that it comprises a second launcher fixed to be seated and fixed.

본 발명에서 상기 제1유도탄 고정부는 유도탄의 동체 중 일부를 감싸는 제1유도탄 삽입부가 위치된 제1유도탄 클램핑부재, ,유도탄의 동체 중 나머지 부분을 감싸는 제2유도탄 삽입부가 위치되고 상기 제1유도탄 클램핑부재에 분리 가능하게 결합되는 제2유도탄 클램핑부재를 포함하며, 상기 제2유도탄 고정부는 유도탄의 동체 중 일부를 감싸는 제3유도탄 삽입부가 위치된 제3유도탄 클램핑부재 및 유도탄의 동체 중 나머지 부분을 감싸는 제4유도탄 삽입부가 위치되고 상기 제3유도탄 클램핑부재에 분리 가능하게 결합되는 제4유도탄 클램핑부재를 포함할 수 있다. In the present invention, the first guide grenade fixing part is a first guide grenade clamping member in which a first guide grenade insert that surrounds a part of the body of the guided grenade is located, and a second guide grenade insert that wraps the rest of the body of the guide grenade is located and clamping the first guide grenade A second guided grenade clamping member is detachably coupled to the member, and the second guided grenade fixing part surrounds a third guided grenade clamping member and a guided grenade fuselage body in which a third guided grenade insert is wrapped around a portion of the body of the guided grenade A fourth guided grenade clamping member may be provided, wherein a fourth guided grenade insert is positioned and detachably coupled to the third guided grenade clamping member.

본 발명에서 상기 제1발사관 고정부는 발사관 중 일부를 감싸는 제1발사관 삽입부가 위치된 제1발사관 클램핑부재 및 발사관 중 나머지 부분을 감싸는 제2발사관 삽입부가 위치되고 상기 제1발사관 클램핑부재에 분리 가능하게 결합되는 제2발사관 클램핑부재를 포함하고, 상기 제2발사관 고정부는 발사관 중 일부를 감싸는 제3발사관 삽입부가 위치된 제3발사관 클램핑부재 및 발사관 중 나머지 부분을 감싸는 제4발사관 삽입부가 위치되고 상기 제3발사관 클램핑부재에 분리 가능하게 결합되는 제4발사관 클램핑부재를 포함할 수 있다.In the present invention, the first blasting tube fixing part is a first blasting tube clamping member in which a first blasting tube inserting part surrounding a part of the blasting tube and a second blasting tube inserting part surrounding the rest of the blasting tube are positioned and detachably detachable from the first blasting tube clamping member A second launcher clamping member is coupled, and the second launcher clamping part is positioned at a third launcher clamping member surrounding a portion of the launcher, and a fourth launcher insertion section surrounding the rest of the launcher, and the second It may include a fourth launching tube clamping member detachably coupled to the three launching tube clamping member.

본 발명에 따른 유도탄 점검용 고정 장치의 일 실시예는 상기 제1유도탄 고정부와 제1발사관 고정부가 장착되어 고정되는 제1베이스부 및 상기 제2유도탄 고정부와 제2발사관 고정부가 장착되어 고정되는 제2베이스부를 더 포함할 수 있다.An embodiment of the fixing device for inspecting guided missiles according to the present invention is fixed by being equipped with a first base part fixed with the first guided grenade fixed portion and a first launcher fixed portion and a second grenade fixed portion and a second launcher fixed portion mounted with a fixed It may further include a second base portion.

본 발명에서 상기 제1베이스부에는 상기 제1유도탄 고정부가 상, 하 이동 가능하게 위치되고, 상기 제2베이스부에는 제2유도탄 고정부가 상, 하 이동 가능하게 위치되어 상기 제1발사관 고정부와 상기 제2발사관 고정부로 발사관을 거치시켜 고정할 수 있다. In the present invention, in the first base portion, the first guided grenade fixing portion is positioned to be movable up and down, and in the second base portion, the second guided grenade fixing portion is positioned to be movable up and down, and the first launcher fixed portion is located. It can be fixed by mounting the launch tube to the second launch tube fixing portion.

본 발명에 따른 유도탄 점검용 고정 장치의 일 실시예는 상기 제1유도탄 고정부와 상기 제1발사관 고정부가 장착되어 고정되는 제1베이스부 및 상기 제2유도탄 고정부와 상기 제2발사관 고정부가 장착되어 고정되는 제2베이스부를 더 포함하고, 상기 제1베이스부에는 상기 제1유도탄 클램핑부재의 양측에 상기 제1유도탄 클램핑부재를 관통하여 위치되어 상기 제1유도탄 클램핑부재의 상, 하 이동을 안내하는 제1승하강 안내막대부재가 구비되고, 상기 제2베이스부에는 상기 제3유도탄 클램핑부재의 양측에 상기 제3유도탄 클램핑부재를 관통하여 위치되어 상기 제3유도탄 클램핑부재의 상, 하 이동을 안내하는 제2승하강 안내막대부재가 구비될 수 있다.An embodiment of the fixing device for inspecting guided missiles according to the present invention is equipped with a first base part fixed with the first guided grenade fixed part and the first launcher fixed part, and a second guided grenade fixed part and the second launcher fixed part mounted It further comprises a second base portion to be fixed, the first base portion is located on both sides of the first guided grenade clamping member through the first guided grenade clamping member to guide the movement of the first guided grenade clamping member up and down A first elevating guide bar member is provided, and the second base portion is positioned on both sides of the third guided grenade clamping member to penetrate the third guided grenade clamping member to move up and down of the third guided grenade clamping member. A second elevating guide bar member for guiding may be provided.

본 발명에서 상기 제1승하강 안내막대부재의 상단부에는 상기 제1유도탄 클램핑부재가 걸려 이동이 제한되는 제1클램핑 스토퍼부가 위치되고, 상기 제1승하강 안내막대부재의 하단부에는 상기 제1유도탄 클램핑부재가 안착되는 제1클램핑 받침부가 위치되며, 상기 제2승하강 안내막대부재의 상단부에는 상기 제3유도탄 클램핑부재가 걸려 이동이 제한되는 제2클램핑 스토퍼부가 위치되고, 상기 제2승하강 안내막대부재의 하단부에는 제3유도탄 클램핑부재가 안착되는 제2클램핑 받침부가 위치될 수 있다.In the present invention, a first clamping stopper portion to which movement of the first guided ammunition clamping member is restricted is located at an upper end of the first descending guide bar member, and the first guided ball clamping is provided at a lower end of the first descending guide bar member. A first clamping support portion to which a member is seated is located, and a second clamping stopper portion to which movement of the third guided bullet clamping member is restricted is located at an upper portion of the second elevating guide rod member, and the second elevating guide rod A second clamping support portion to which the third guided bullet clamping member is seated may be located at a lower portion of the member.

본 발명에 따른 유도탄 점검용 고정 장치의 일 실시예는 상기 제1유도탄 고정부와 상기 제1발사관 고정부가 장착되어 고정되는 제1베이스부 및 상기 제2유도탄 고정부와 상기 제2발사관 고정부가 장착되어 고정되는 제2베이스부를 더 포함하고, 상기 제1유도탄 클램핑부재는 상기 제1베이스부에 상, 하 이동 가능하게 위치되는 제1이동 몸체 및 상기 제1이동 몸체의 상부에 상, 하 이동 가능하게 위치되어 제1승하강부에 의해 상, 하 이동되며 유도탄의 동체 중 일부를 감싸는 제1유도탄 삽입부가 위치된 제2이동 몸체를 포함하며, 상기 제3유도탄 클램핑부재는 상기 제2베이스부에 상, 하 이동 가능하게 위치되는 제3이동 몸체 및 상기 제3이동 몸체의 상부에 상, 하 이동 가능하게 위치되고 제2승하강부에 의해 상, 하 이동되며 유도탄의 동체 중 일부를 감싸는 제3유도탄 삽입부가 위치된 제4이동 몸체를 포함할 수 있다. An embodiment of the fixing device for inspecting guided missiles according to the present invention is equipped with a first base part fixed with the first guided grenade fixed part and the first launcher fixed part, and a second guided grenade fixed part and the second launcher fixed part mounted It further comprises a second base portion to be fixed, the first guided grenade clamping member is a first movable body positioned to be movable up and down on the first base portion and movable up and down on the upper portion of the first movable body And a second moving body in which a first guided grenade insert is positioned to move up and down by a first elevating unit and surrounds a portion of the body of the guided grenade, wherein the third guided grenade clamping member is placed on the second base. Inserting a third guided grenade that is positioned to be movable downward and upward, and to be moved up and down on the upper portion of the third movable body and is moved up and down by a second elevating unit and surrounding a part of the fuselage's fuselage It may include a fourth movable body positioned additionally.

본 발명에서 상기 제1승하강부는 상기 제1이동 몸체에 세워져 회전 가능하게 위치되며 상기 제2이동 몸체에 나사결합되어 회전되어 회전되는 방향에 따라 상기 제2이동 몸체를 승하강시키는 제1클램핑 승하강 스크류를 포함하고, 상기 제2승하강부는 상기 제3이동 몸체에 세워져 회전 가능하게 위치되며 상기 제4이동 몸체에 나사결합되어 회전되어 회전되는 방향에 따라 상기 제4이동 몸체를 승하강시키는 제2클램핑 승하강 스크류를 포함할 수 있다. In the present invention, the first elevating unit is positioned on the first movable body to be rotatably positioned and screwed to the second movable body to rotate and rotate to rotate the first movable body according to the direction of rotation. It includes a descending screw, the second elevating portion is rotatably positioned on the third movable body and is screwed to the fourth movable body to rotate and rotate the fourth movable body according to the direction of rotation. It may include a two clamping lifting screw.

본 발명에서 상기 제1승하강부는 상기 제1이동 몸체에 회전가능하게 위치되고 외부로 돌출되게 위치되며 상기 제1클램핑 승하강 스크류를 작동시키는 회전력을 발생시키는 제1승하강 조작부재를 더 포함하며, 상기 제2승하강부는 상기 제3이동 몸체에 회전가능하게 위치되고 외부로 돌출되게 위치되며 상기 제2클램핑 승하강 스크류를 작동시키는 회전력을 발생시키는 제2승하강 조작부재를 더 포함할 수 있다. In the present invention, the first elevating unit further includes a first elevating operation member that is rotatably positioned on the first movable body and protrudes outward and generates rotational force to operate the first clamping elevating screw. , The second elevating portion may further include a second elevating operation member that is rotatably positioned on the third movable body and protrudes outward and generates a rotational force to operate the second clamping elevating screw. .

본 발명에서 상기 제1승하강부는 전기 전원을 공급받아 작동되어 상기 제1클램핑 승하강 스크류를 회전시키는 제1승하강 회전모터를 더 포함하고, 상기 제2승하강부는 전기 전원을 공급받아 작동되어 제2클램핑 승하강 스크류를 회전시키는 제2승하강 회전모터를 더 포함할 수 있다.In the present invention, the first elevating unit further includes a first elevating and rotating motor that operates by receiving electrical power to rotate the first clamping elevating screw, and the second elevating unit is operated by receiving electrical power. The second clamping lowering and rotating motor for rotating the lifting screw may further include.

본 발명에 따른 유도탄 점검용 고정 장치의 일 실시예는 상기 제1베이스부의 좌, 우 이동을 가능하게 하는 제1직선 이동부와 상기 제2베이스부의 좌, 우 이동을 가능하게 하는 제2직선 이동부를 더 포함할 수 있다. An embodiment of the fixing device for inspecting guided missiles according to the present invention includes a first linear moving part that enables left and right movement of the first base part and a second linear motion that enables left and right movement of the second base part. It may further include wealth.

본 발명에서 상기 제1직선 이동부는 상기 제1베이스부가 이동 가능하게 결합되고 유도탄 또는 발사체의 원주 방향으로 위치되어 상기 제1베이스부의 직선 이동을 안내하는 제1직선 이동 가이드 레일부재를 포함하며, 상기 제2직선 이동부는 상기 제2베이스부가 이동 가능하게 결합되고 유도탄 또는 발사체의 원주 방향으로 위치되어 제2베이스부의 직선 이동을 안내하는 제2직선 이동 가이드 레일부재를 포함할 수 있다. In the present invention, the first linear moving portion includes a first linear moving guide rail member that is movably coupled to the first base portion and is positioned in a circumferential direction of a guided missile or projectile to guide linear movement of the first base portion, wherein the The second linear moving portion may include a second linear moving guide rail member that is movably coupled to the second base portion and is positioned in a circumferential direction of a guided missile or projectile to guide linear movement of the second base portion.

본 발명에 따른 유도탄 점검용 고정 장치의 일 실시예는 상기 제1베이스부와 상기 제2베이스부의 전, 후 이동을 가능하게 하는 길이방향 직선 이동부를 더 포함할 수 있다. One embodiment of the fixing device for inspecting guided missiles according to the present invention may further include a longitudinal linear moving part that enables front and rear movement of the first base part and the second base part.

본 발명에 따른 유도탄 점검용 고정 장치의 일 실시예는 상기 제1베이스부와 상기 제2베이스부의 전, 후 이동을 가능하게 하는 길이방향 직선 이동부를 더 포함하며, 상기 길이방향 직선 이동부는 상기 제1직선 이동 가이드 레일부재와 상기 제2직선 이동 가이드 레일부재를 연결하는 레일 연결부재 및 상기 레일 연결부재가 이동 가능하게 결합되고 유도탄 또는 발사체의 길이 방향으로 위치되어 상기 레일 연결부재의 직선 이동을 안내하는 길이방향 이동 가이드 레일부재를 포함할 수 있다. One embodiment of the fixing device for inspecting guided missiles according to the present invention further includes a longitudinal linear moving part enabling front and rear movement of the first base part and the second base part, wherein the longitudinal straight moving part comprises the first A rail connecting member connecting the 1 linear moving guide rail member and the second linear moving guide rail member and the rail connecting member are movably coupled and positioned in the longitudinal direction of a guided missile or projectile to guide the linear movement of the rail connecting member It may include a longitudinal movement guide rail member.

본 발명에 따른 유도탄 점검용 고정 장치의 일 실시예는 일단부가 상기 제1발사관 고정부에 분리 가능하게 결합되고 타단부가 상기 제2발사관 고정부에 분리 가능하게 결합되며 유도탄의 내부로 삽입되어 장착되는 유도탄의 내부 부품을 안착시켜 거치할 수 있는 부품 받침부를 더 포함할 수 있다. One embodiment of the fixing device for inspecting guided missiles according to the present invention is one end detachably coupled to the first blasting tube fixing part, the other end detachably coupled to the second blasting tube fixing part, and inserted and mounted inside the guided bullet It may further include a component support that can be mounted to seat the internal parts of the guided missile.

본 발명에 따른 유도탄 점검용 고정 장치의 일 실시예는 일단부가 상기 제1발사관 고정부에 분리 가능하게 결합되고 타단부가 상기 제2발사관 고정부에 분리 가능하게 결합되며 유도탄의 내부로 삽입되어 장착되는 유도탄의 내부 부품을 안착시켜 거치할 수 있는 부품 받침부를 더 포함하며, 상기 부품 받침부는 상부가 개방된 형태의 부품 삽입공간이 구비된 부품 받침부재, 상기 부품 받침부재의 일단부 측에 위치되고 상기 제1발사관 클램핑부재와 분리 가능하게 결합되고 유도탄의 분리된 동체를 결합할 수 있는 제1동체 결합부재, 상기 부품 받침부재의 타단부 측에 위치되고 제3발사관 클램핑부재와 분리 가능하게 결합되고 유도탄의 분리된 동체를 결합할 수 있는 제2동체 결합부재를 포함할 수 있다. One embodiment of the fixing device for inspecting guided missiles according to the present invention is one end detachably coupled to the first blasting tube fixing part, the other end detachably coupled to the second blasting tube fixing part, and inserted and mounted inside the guided bullet It further includes a component support portion that can be mounted to seat the internal parts of the guided missile, the component support portion is located on the one side of the component support member, the component support member provided with a component insertion space of the open top type A first fuselage coupling member that is detachably coupled to the first blasting tube clamping member and capable of coupling a separated body of guided ammunition, is located on the other end side of the component supporting member, and is detachably coupled to a third blasting tube clamping member, A second fuselage coupling member capable of coupling the separated fuselage of the guided missile may be included.

본 발명에서 상기 제1동체 결합부재의 양측에는 상기 제1발사관 클램핑부재에 안착되어 볼트 체결되는 제1안착부가 위치되고, 상기 제2동체 결합부재의 양측에는 상기 제3발사관 클램핑부재에 안착되어 볼트 체결되는 제2안착부가 위치될 수 있다. In the present invention, both sides of the first fuselage coupling member are seated on the first blasting tube clamping member, and a first seating portion to be bolted is located, and on both sides of the second fuselage coupling member are seated on the third blasting tube clamping member. A second seating portion to be fastened may be located.

본 발명에서 상기 부품 받침부재는 반원형의 단면을 가지는 부품 삽입공간이 내부에 위치될 수 있다. In the present invention, the component supporting member may have a component insertion space having a semi-circular cross section therein.

본 발명에서 상기 제1동체 결합부재와 상기 제2동체 결합부재는 동체의 일부분을 감싸되 적어도 동체의 절반을 초과하여 감싸는 링형태로 형성되어 동체가 내부로 삽입되어 거치될 수 있다. In the present invention, the first fuselage coupling member and the second fuselage coupling member are formed in a ring shape surrounding a portion of the fuselage but at least more than half of the fuselage so that the fuselage can be inserted and mounted therein.

본 발명에서 상기 제1유도탄 고정부는 유도탄의 동체 중 일부를 감싸는 제1유도탄 삽입부가 위치된 제1유도탄 클램핑부재, 유도탄의 동체 중 나머지 부분을 감싸는 제2유도탄 삽입부가 위치되고 상기 제1유도탄 클램핑부재에 분리 가능하게 결합되는 제2유도탄 클램핑부재를 포함하며, 상기 제2유도탄 고정부는 유도탄의 동체 중 일부를 감싸는 제3유도탄 삽입부가 위치된 제3유도탄 클램핑부재 및 유도탄의 동체 중 나머지 부분을 감싸는 제4유도탄 삽입부가 위치되고 상기 제3유도탄 클램핑부재에 분리 가능하게 결합되는 제4유도탄 클램핑부재를 포함하며, 상기 제1동체 결합부재의 외측면에는 하부 측에 상기 제1유도탄 클램핑부의 제1유도탄 삽입부에 삽입되어 안착되는 제1보조 받침부가 돌출되게 위치되고, 상기 제2동체 결합부재의 외측면에는 하부 측에 상기 제2유도탄 클램핑부재의 제2유도탄 삽입부에 삽입되어 안착되는 제2보조 받침부가 돌출되게 위치될 수 있다. In the present invention, the first guided grenade fixing part is a first guided grenade clamping member in which a first guided grenade insert that surrounds a portion of the body of the guided grenade is located, a second guided grenade insert that wraps the rest of the body of the guided grenade, and the first guided grenade clamping member A second guided grenade clamping member detachably coupled to the second guided grenade clamping member, a third guided grenade clamping member surrounding a portion of the fuselage of the guided grenade and a third guided grenade clamping member and a guided grenade fuselage A fourth guided grenade clamping member is provided with a fourth guided grenade insert and detachably coupled to the third guided grenade clamping member. The second auxiliary support is inserted and seated in the second guide grenade inserting portion of the second guided grenade clamping member on the outer side of the second fuselage coupling member. The part can be positioned to protrude.

본 발명에서 상기 제1보조 받침부는 상기 제1유도탄 삽입부의 곡률과 대응되는 곡률을 가지는 곡면을 가져 제1유도탄 삽입부 내에 안착되며, 상기 제2보조 받침부는 상기 제2유도탄 삽입부의 곡률과 대응되는 곡률을 가지는 곡면을 가져 제2유도탄 삽입부 내에 안착될 수 있다. In the present invention, the first auxiliary support portion has a curved surface having a curvature corresponding to the curvature of the first guided bullet inserting portion, and is seated in the first guided bullet inserting portion, and the second auxiliary support portion corresponds to the curvature of the second guided bullet inserting portion. It may have a curved surface having a curvature to be seated in the second guided grenade insert.

본 발명은 유도탄의 조립 중 유도탄의 변형된 형상을 각각 고정할 수 있어 유도탄 조립 과정에서 유도탄 점검을 원활하게 진행할 수 있어 유도탄의 점검 작업 시 소요되는 시간을 단축하고, 소요되는 작업인원도 감소됨은 물론 점검 작업의 안전성과 편의성이 증대되는 효과가 있다. The present invention can be fixed to each of the deformed shape of the missile during the assembly of the missile, it is possible to smoothly inspect the missile during the assembly process of the missile, reducing the time required to inspect the missile and reducing the required workforce. This has the effect of increasing the safety and convenience of the inspection work.

본 발명은 유도탄의 각 조립 단계에서 점검 작업 시 구성품들의 기구적 위치를 동일한 위치로 위치시킬 수 있어 기구적 특성을 파악하는 점검에 유리한 환경을 제공하고, 점검 소프트 웨어의 제작 및 운용의 편의성을 증가시키는 효과가 있다. The present invention provides a favorable environment for inspection to grasp the mechanical characteristics by increasing the mechanical position of components during the inspection operation at each assembly step of the guided missile, and increases the convenience of manufacturing and operating inspection software It is effective.

도 1은 본 발명에 따른 유도탄 점검용 고정 장치의 일 실시예를 도시한 사시도.
도 2 및 도 3은 본 발명에 따른 유도탄 점검용 고정 장치에 대한 사용예를 도시한 사시도.
도 4는 본 발명에 따른 유도탄 점검용 고정 장치에서 부품 받침부의 일 실시예를 도시한 사시도.
도 5는 본 발명에 따른 유도탄 점검용 고정 장치에서 부품 받침부를 사용한 사용예를 도시한 사시도.
1 is a perspective view showing an embodiment of a fixing device for checking guided missiles according to the present invention.
2 and 3 is a perspective view showing an example of use for the fixing device for inspecting guided missiles according to the present invention.
Figure 4 is a perspective view showing an embodiment of a part receiving part in the fixing device for inspecting guided missiles according to the present invention.
Figure 5 is a perspective view showing an example of the use of the part support in the fixing device for inspecting guided missiles according to the present invention.

본 발명을 더욱 상세히 설명한다.The present invention will be described in more detail.

본 발명의 바람직한 실시 예를 첨부된 도면에 의하여 상세히 설명하면 다음과 같다. 본 발명의 상세한 설명에 앞서, 이하에서 설명되는 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니된다. 따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.If described in detail by the accompanying drawings, preferred embodiments of the present invention. Prior to the detailed description of the present invention, terms or words used in the present specification and claims described below should not be construed as being limited to conventional or dictionary meanings. Therefore, the configuration shown in the embodiments and the drawings described in this specification are only the most preferred embodiments of the present invention and do not represent all of the technical spirit of the present invention, and thus can replace them at the time of application. It should be understood that there may be equivalents and variations.

도 1은 본 발명에 따른 유도탄 점검용 고정 장치의 일 실시예를 도시한 사시도이고, 도 1을 참고하면 본 발명에 따른 유도탄 점검용 고정 장치는 유도탄의 일측이 안착되어 고정되는 제1유도탄 고정부(100)와 제1유도탄 고정부(100)와 이격되게 위치되며 조립이 완료된 유도탄의 타측이 안착되어 고정되는 제2유도탄 고정부(200)를 포함한다.1 is a perspective view showing an embodiment of a fixing device for inspecting a missile according to the present invention, and referring to FIG. 1, a fixing device for inspecting a guided missile according to the present invention is a first guided ball fixing part on which one side of a guided missile is seated and fixed It includes a second guided grenade fixed portion 200 which is spaced apart from the first guided grenade fixed portion 100 and the other side of the assembled guided missile seated and fixed.

제1유도탄 고정부(100)와 제2유도탄 고정부(200)는 유도탄의 동체를 잡아 고정시킬 수 있는 구조를 가지는 것을 일 예로 한다.For example, the first guided grenade fixing unit 100 and the second guided grenade fixing unit 200 have a structure capable of holding and fixing the body of the guided missile.

제1유도탄 고정부(100)는 유도탄의 동체 중 일부를 감싸는 제1유도탄 삽입부가 위치된 제1유도탄 클램핑부재(110), 유도탄의 동체 중 나머지 부분을 감싸는 제2유도탄 삽입부가 위치되고 제1유도탄 클램핑부재(110)에 분리 가능하게 결합되는 제2유도탄 클램핑부재(120)를 포함한다. The first guided grenade fixing part 100 is a first guided grenade clamping member 110 in which a first guided grenade insert that surrounds a part of the body of the guided grenade is located, a second guided grenade insert that wraps the rest of the body of the guided grenade, and a first guided grenade And a second guided bullet clamping member 120 that is detachably coupled to the clamping member 110.

제1유도탄 삽입부는 유도탄의 동체 중 절반을 감싸는 반원형으로 형성되고, 제2유도탄 삽입부는 유도탄 동체 중 나머지 절반을 감싸는 반원형으로 형성되는 것을 일 예로 한다.For example, the first guided grenade insert is formed in a semicircular shape surrounding half of the body of the guided missile, and the second guided grenade insert is formed in a semicircular shape surrounding the other half of the guided missile body.

또한, 제2유도탄 클램핑부재(120)는 반원형의 링체로 양 측에 제1유도탄 클램핑부재(110)에 안착되어 볼트 체결로 분리 가능하게 결합되는 제1플랜지부(121)가 각각 위치된다.In addition, the second guided grenade clamping member 120 is a semi-circular ring body, and the first flange portion 121 which is seated on the first guided grenade clamping member 110 on both sides and detachably coupled by bolt fastening is positioned, respectively.

제2유도탄 클램핑부재(120)는 제1플랜지부(121)를 관통하여 제1유도탄 클램핑부재(110)에 체결되는 제1클램핑 고정볼트(121a)에 의해 제1유도탄 클램핑부재(110)에 분리 가능하게 결합된다.The second guided grenade clamping member 120 is separated from the first guided grenade clamping member 110 by the first clamping fixing bolt 121a which penetrates the first flange portion 121 and is fastened to the first guided grenade clamping member 110. Possibly combined.

또한, 제2유도탄 고정부(200)는 유도탄의 동체 중 일부를 감싸는 제3유도탄 삽입부가 위치된 제3유도탄 클램핑부재(210), 유도탄의 동체 중 나머지 부분을 감싸는 제4유도탄 삽입부가 위치되고 제3유도탄 클램핑부재(210)에 분리 가능하게 결합되는 제4유도탄 클램핑부재(220)를 포함한다. In addition, the second guided grenade fixing part 200 is a third guided grenade clamping member 210 in which a third guided grenade insert that surrounds a portion of the body of the guided grenade is located, and a fourth guided grenade insert that wraps the rest of the body of the guided grenade is located and is And a fourth guided grenade clamping member 220 detachably coupled to the third guided grenade clamping member 210.

제3유도탄 삽입부는 유도탄의 동체 중 절반을 감싸는 반원형으로 형성되고, 제4유도탄 삽입부는 유도탄 동체 중 나머지 절반을 감싸는 반원형으로 형성되는 것을 일 예로 한다. For example, the third guided grenade insert is formed in a semicircular shape surrounding half of the body of the guided missile, and the fourth guided grenade insert is formed in a semicircular shape surrounding the other half of the guided missile body.

또한, 제4유도탄 클램핑부재(220)는 반원형의 링체로 양 측에 제3유도탄 클램핑부재(210)에 안착되어 볼트 체결로 분리 가능하게 결합되는 제2플랜지부(221)가 각각 위치된다.In addition, the fourth guided grenade clamping member 220 is a semi-circular ring body, the second guide portion 221 is seated on the third guided grenade clamping member 210 on both sides and detachably coupled by bolting.

제4유도탄 클램핑부재(220)는 제2플랜지부(221)를 관통하여 제3유도탄 클램핑부재(210)에 체결되는 제2클램핑 고정볼트(221a)에 의해 제3유도탄 클램핑부재(210)에 분리 가능하게 결합된다.The fourth guided grenade clamping member 220 penetrates the second flange portion 221 and is separated from the third guided grenade clamping member 210 by the second clamping fixing bolt 221a which is fastened to the third guided grenade clamping member 210. Possibly combined.

유도탄은 동체의 일측이 제1유도탄 클램핑부재(110)와 제2유도탄 클램핑부재(120) 사이에서 클램핑되어 위치가 고정되고, 동체의 타측이 일측이 제3유도탄 클램핑부재(210)와 제4유도탄 클램핑부재(220) 사이에서 클램핑되어 위치가 고정된다. The guided ammunition is clamped between the first guided bullet clamping member 110 and the second guided bullet clamping member 120 on one side of the fuselage, and the position of the fuselage is fixed, and the other side of the fuselage has a third guided bullet clamping member 210 and a fourth guided bullet. It is clamped between the clamping members 220 so that its position is fixed.

그리고, 제1유도탄 고정부(100)의 일측 또는 타측에는 조립이 완료된 유도탄이 장입되는 발사관의 일측이 안착되어 고정되는 제1발사관 고정부(300)가 위치된다.And, on one side or the other side of the first guided grenade fixing unit 100 is located a first launcher fixed portion 300 is fixed to one side of the launch tube is loaded with the assembled guided missile.

또한, 제2유도탄 고정부(200)의 일측 또는 타측에는 발사관의 타측이 안착되어 고정되는 제2발사관 고정부(400)가 위치된다.In addition, a second launcher fixed portion 400 is located on one side or the other side of the second guided grenade fixing portion 200, the other side of the launcher is seated and fixed.

제1발사관 고정부(300)는 제1유도탄 고정부(100)의 타측에 위치되고, 제2발사관 고정부(400)는 제2유도탄 고정부(200)의 일측에 위치되어 제1유도탄 고정부(100)와 제2유도탄 고정부(200)의 사이에 위치되는 것을 일 예로 한다.The first launcher fixation part 300 is located on the other side of the first grenade fixation part 100, and the second launcher fixation part 400 is located on one side of the second grenade fixation part 200 and the first grenade fixation part For example, it is located between the (100) and the second guided grenade 200.

제1발사관 고정부(300)와 제2발사관 고정부(400)는 발사관을 잡아 고정시킬 수 있는 구조를 가지는 것을 일 예로 한다.As an example, the first launch tube fixing part 300 and the second launch tube fixing part 400 have a structure capable of holding and fixing the launch tube.

제1발사관 고정부(300)는 발사관 중 일부를 감싸는 제1발사관 삽입부가 위치된 제1발사관 클램핑부재(310), 발사관 중 나머지 부분을 감싸는 제2발사관 삽입부가 위치되고 제1발사관 클램핑부재(310)에 분리 가능하게 결합되는 제2발사관 클램핑부재(320)를 포함한다. The first blast tube fixing part 300 includes a first blast tube clamping member 310 in which a first blast tube insertion part surrounding a part of the launcher tube is located, a second blast tube insertion part surrounding the rest of the launcher tube, and a first blast tube clamping member 310 It includes a second launch tube clamping member 320 that is detachably coupled to ).

제1발사관 삽입부는 발사관 중 절반을 감싸는 반원형으로 형성되고, 제2발사관 삽입부는 발사관 동체 중 나머지 절반을 감싸는 반원형으로 형성되는 것을 일 예로 한다. As an example, the first injection tube inserting portion is formed in a semicircular shape surrounding half of the launching tube, and the second injection tube inserting portion is formed in a semicircular shape surrounding the other half of the launching tube body.

또한, 제2발사관 클램핑부재(320)는 반원형의 링체로 양 측에 제1발사관 클램핑부재(310)에 안착되어 볼트 체결로 분리 가능하게 결합되는 제3플랜지부(321)가 각각 위치된다.In addition, the second launching tube clamping member 320 is a semi-circular ring body, and a third flange portion 321 is mounted on both sides of the first launching tube clamping member 310 and detachably coupled by bolting.

제2발사관 클램핑부재(320)는 제1플랜지부(121)를 관통하여 제1발사관 클램핑부재(310)에 체결되는 제3클램핑 고정볼트(321a)에 의해 제1발사관 클램핑부재(310)에 분리 가능하게 결합된다.The second launching tube clamping member 320 is separated from the first launching tube clamping member 310 by a third clamping fixing bolt 321a which penetrates through the first flange part 121 and is fastened to the first launching tube clamping member 310. Possibly combined.

또한, 제2발사관 고정부(400)는 발사관 중 일부를 감싸는 제3발사관 삽입부가 위치된 제3발사관 클램핑부재(410), 발사관 중 나머지 부분을 감싸는 제4발사관 삽입부가 위치되고 제3발사관 클램핑부재(410)에 분리 가능하게 결합되는 제4발사관 클램핑부재(420)를 포함한다. In addition, the second launching tube fixing part 400 is a third launching tube clamping member 410 in which a third launching tube inserting part surrounding a part of the launching tube is located, and a fourth launching tube inserting part surrounding the rest of the launching tube is located and a third launching tube clamping member And a fourth launch tube clamping member 420 detachably coupled to the 410.

제3발사관 삽입부는 발사관 중 절반을 감싸는 반원형으로 형성되고, 제4발사관 삽입부는 발사관 동체 중 나머지 절반을 감싸는 반원형으로 형성되는 것을 일 예로 한다. For example, the third injection tube inserting portion is formed in a semicircular shape surrounding half of the launch tube, and the fourth injection tube insertion portion is formed in a semicircular shape surrounding the other half of the fuselage tube.

또한, 제4발사관 클램핑부재(420)는 반원형의 링체로 양 측에 제3발사관 클램핑부재(410)에 안착되어 볼트 체결로 분리 가능하게 결합되는 제4플랜지부(421)가 각각 위치된다.In addition, the fourth launching tube clamping member 420 is a semi-circular ring body, the fourth flange portion 421 is seated on the third launching tube clamping member 410 on both sides and detachably coupled by bolt fastening, respectively.

제4발사관 클램핑부재(420)는 제2플랜지부(221)를 관통하여 제3발사관 클램핑부재(410)에 체결되는 제4클램핑 고정볼트(421a)에 의해 제3발사관 클램핑부재(410)에 분리 가능하게 결합된다.The fourth launching tube clamping member 420 is separated from the third launching tube clamping member 410 by a fourth clamping fixing bolt 421a that penetrates through the second flange portion 221 and is fastened to the third launching tube clamping member 410. Possibly combined.

발사관은 동체의 일측이 제1발사관 클램핑부재(310)와 제2발사관 클램핑부재(320) 사이에서 클램핑되어 위치가 고정되고, 동체의 타측이 일측이 제3발사관 클램핑부재(410)와 제4발사관 클램핑부재(420) 사이에서 클램핑되어 위치가 고정된다. The launch tube is clamped between the first launch tube clamping member 310 and the second launch tube clamping member 320, and the position is fixed, and the other side of the fuselage has a third launch tube clamping member 410 and a fourth launch tube. The position is fixed by clamping between the clamping members 420.

본 발명에 따른 유도탄 점검용 고정 장치는 제1유도탄 고정부(100)와 제1발사관 고정부(300)가 장착되어 고정되는 제1베이스부(500), 제2유도탄 고정부(200)와 제2발사관 고정부(400)가 장착되어 고정되는 제2베이스부(600)를 더 포함할 수 있다.The apparatus for checking guided missiles according to the present invention includes a first base unit 500 and a second guided grenade fixing unit 200 to which a first guided grenade fixing unit 100 and a first launcher fixing unit 300 are mounted and fixed. A second base part 600 to which the two launch tube fixing parts 400 are mounted and fixed may be further included.

제1유도탄 고정부(100)와 제1발사관 고정부(300)는 서로 중심이 일치되도록 위치될 수 있고, 제2유도탄 고정부(200)와 제2발사관 고정부(400)는 서로 중심이 일치되도록 위치될 수 있다.The first guided grenade fixing part 100 and the first blasting tube fixing part 300 may be positioned to coincide with each other, and the second grenade fixing part 200 and the second blasting tube fixing part 400 coincide with each other. It can be positioned as much as possible.

제1발사관 고정부(300)는 제1유도탄 고정부(100)의 타측면에 밀착되게 위치되고, 제2발사관 고정부(400)는 제2유도탄 고정부(200)의 일측면에 밀착되게 위치되는 것을 일 예로 한다.The first blast tube fixing part 300 is positioned in close contact with the other side of the first grenade fixing part 100, and the second blast tube fixing part 400 is positioned in close contact with one side of the second grenade fixing part 200 Take that as an example.

제1베이스부(500)에는 제1유도탄 고정부(100)가 상, 하 이동 가능하게 위치되고, 제2베이스부(600)에는 제2유도탄 고정부(200)가 상, 하 이동 가능하게 위치된다.In the first base portion 500, the first guided grenade fixing portion 100 is positioned to be movable up and down, and in the second base portion 600, the second guided grenade fixing portion 200 is positioned to be moved up and down. do.

제1베이스부(500)에는 제1유도탄 클램핑부재(110)가 상, 하 이동 가능하게 위치되고, 제2베이스부(600)에는 제3유도탄 클램핑부재(210)가 상, 하 이동 가능하게 위치되어 유도탄의 동체보다 직경이 큰 발사관을 제1발사관 고정부(300)와 제2발사관 고정부(400)로 고정할 때 제1유도탄 클램핑부재(110)와 제2유도탄 클램핑부재(120)를 하강시켜 발사관에 걸리지 않는 위치로 위치시킬 수 있다.In the first base portion 500, the first guided grenade clamping member 110 is positioned to be movable up and down, and in the second base portion 600, the third guided grenade clamping member 210 is positioned to be moved up and down. The first grenade clamping member 110 and the second grenade clamping member 120 are lowered when the launcher having a diameter larger than that of the body of the guided missile is fixed with the first blasting tube fixing part 300 and the second blasting tube fixing part 400 It can be placed in a position not caught by the launch tube.

제1베이스부(500)에는 제1유도탄 클램핑부재(110)의 양측에 위치되어 제1유도탄 클램핑부재(110)를 관통하여 위치되어 제1유도탄 클램핑부재(110)의 상, 하 이동을 안내하는 제1승하강 안내막대부재(510)가 구비될 수 있다. The first base portion 500 is located on both sides of the first guided grenade clamping member 110 and is positioned to penetrate the first guided grenade clamping member 110 to guide the up and down movement of the first guided grenade clamping member 110 A first elevating guide bar member 510 may be provided.

제1승하강 안내막대부재(510)의 상단부에는 제1유도탄 클램핑부재(110)가 걸려 이동이 제한되는 제1클램핑 스토퍼부(511)가 위치되고, 제1승하강 안내막대부재(510)의 하단부에는 제1유도탄 클램핑부재(110)가 안착되는 제1클램핑 받침부(512)가 위치된다. A first clamping stopper portion 511 to which movement of the first guided bullet clamping member 110 is applied is located at an upper end of the first lifting guide bar member 510, and the first lifting guide bar member 510 The first clamping support portion 512 on which the first guided bullet clamping member 110 is seated is positioned at the lower portion.

제1유도탄 클램핑부재(110)는 제1승하강 안내막대부재(510)에 의해 안내되어 수직으로 승하강되고, 제1클램핑 스토퍼부(511)에 걸리는 상사점에서 제1발사관 클램핑부재(310)보다 높게 위치되어 제1발사관 클램핑부재(310)에 걸리지 않고 유도탄의 동체가 안착될 수 있게 위치된다.The first guided bullet clamping member 110 is guided by the first lifting guide bar member 510 and vertically elevated and lowered, and the first launcher clamping member 310 at a top dead center applied to the first clamping stopper part 511 It is positioned higher so that the fuselage of the guided missile is seated without being caught by the first launch tube clamping member 310.

또한, 제1유도탄 클램핑부재(110)는 제1클램핑 받침부(512)에 안착되는 하사점에 위치되어 유도탄의 동체보다 직경이 큰 발사관을 제1발사관 고정부(300)와 제2발사관 고정부(400)로 고정할 때 발사관에 걸리지 않도록 위치된다. In addition, the first guided grenade clamping member 110 is located at the bottom dead center seated on the first clamping support portion 512, and the first launcher fixation part 300 and the second launcher fixation part have a launcher having a diameter larger than the body of the guided missile. When fixed with 400, it is positioned so as not to be caught by the launch tube.

제1유도탄 클램핑부재(110)에는 상사점에서 위치를 고정하는 제1클램핑 위치 고정구가 구비되고, 제1클램핑 위치 고정구는 제1유도탄 클램핑부재(110)를 관통하여 제1승하강 안내막대부재(510)를 가압하는 세트스크류 구조일 수 있고 이외에도 승하강되는 위치를 고정할 수 있는 공지의 다른 고정구의 구조를 이용하여 다양하게 변형되어 실시될 수 있음을 밝혀둔다. The first guided grenade clamping member 110 is provided with a first clamping position fixture that secures a position at a top dead center, and the first clamping position fixture passes through the first guided grenade clamping member 110 to provide a first elevating guide bar member ( 510) It may be a set screw structure that pressurizes, and in addition, it can be carried out in various modifications by using other well-known structures of fixtures that can fix a position to be elevated.

제2베이스부(600)에는 제3유도탄 클램핑부재(210)의 양측에 위치되어 제3유도탄 클램핑부재(210)를 관통하여 위치되어 제3유도탄 클램핑부재(210)의 상, 하 이동을 안내하는 제2승하강 안내막대부재(610)가 구비될 수 있다. The second base portion 600 is located on both sides of the third guided grenade clamping member 210 to penetrate the third guided grenade clamping member 210 to guide the up and down movement of the third guided grenade clamping member 210 A second elevating guide bar member 610 may be provided.

제2승하강 안내막대부재(610)의 상단부에는 제3유도탄 클램핑부재(210)가 걸려 이동이 제한되는 제2클램핑 스토퍼부(611)가 위치되고, 제2승하강 안내막대부재(610)의 하단부에는 제3유도탄 클램핑부재(210)가 안착되는 제2클램핑 받침부(612)가 위치된다. A second clamping stopper portion 611 to which movement of the third guided grenade clamping member 210 is applied is located at an upper end of the second elevating guide rod member 610, and of the second elevating guide rod member 610 The second clamping support portion 612 on which the third guided bullet clamping member 210 is seated is located at the lower portion.

제3유도탄 클램핑부재(210)는 제2승하강 안내막대부재(610)에 의해 안내되어 수직으로 승하강되고, 제2클램핑 스토퍼부(611)에 걸리는 상사점에서 제3발사관 클램핑부재(410)보다 높게 위치되어 제3발사관 클램핑부재(410)에 걸리지 않고 유도탄의 동체가 안착될 수 있게 위치된다.The third guided grenade clamping member 210 is guided by the second elevating guide rod member 610 to vertically elevate, and the third launcher clamping member 410 at a top dead center applied to the second clamping stopper part 611 It is positioned higher so that the fuselage of the guided missile is seated without being caught by the third launching tube clamping member 410.

또한, 제3유도탄 클램핑부재(210)는 제2클램핑 받침부(612)에 안착되는 하사점에 위치되어 유도탄의 동체보다 직경이 큰 발사관을 제1발사관 고정부(300)와 제2발사관 고정부(400)로 고정할 때 발사관에 걸리지 않도록 위치된다. In addition, the third guided grenade clamping member 210 is located at the bottom dead center seated on the second clamping support portion 612, and the first launcher fixation part 300 and the second launcher fixation part are mounted on a launcher having a diameter larger than the body of the guided missile. When fixed with 400, it is positioned so as not to be caught by the launch tube.

제3유도탄 클램핑부재(210)에는 상사점에서 위치를 고정하는 제1클램핑 위치 고정구가 구비되고, 제1클램핑 위치 고정구는 제3유도탄 클램핑부재(210)를 관통하여 제2승하강 안내막대부재(610)를 가압하는 세트스크류 구조일 수 있고 이외에도 승하강되는 위치를 고정할 수 있는 공지의 다른 고정구의 구조를 이용하여 다양하게 변형되어 실시될 수 있음을 밝혀둔다. The third guided grenade clamping member 210 is provided with a first clamping position fixture that secures a position at a top dead center, and the first clamping position fixture passes through the third guided grenade clamping member 210 and is a second elevating guide rod member ( 610) It may be a set screw structure that pressurizes, and in addition, it can be realized that it can be implemented in various modifications using structures of other known fasteners that can fix a position to be raised and lowered.

제1유도탄 클램핑부재(110)는 제1베이스부(500)에 상, 이동 가능하게 위치되는즉, 제1승하강 안내막대부재(510)에 상, 하 이동 가능하게 위치되는 제1이동 몸체(111), 제1이동 몸체(111)의 상부에 상, 하 이동 가능하게 위치되고 제1승하강부(700)에 의해 상, 하 이동되며 유도탄의 동체 중 일부를 감싸는 제1유도탄 삽입부가 위치된 제2이동 몸체(112)를 포함할 수 있다. The first guided grenade clamping member 110 is a first movable body (that is, movably positioned on the first base portion 500), that is, movably positioned up and down on the first elevating guide bar member 510 ( 111), the first movable body 111 is positioned to be movable up and down, and moved up and down by the first elevating unit 700, and the first guided grenade insert that surrounds a part of the fuselage's fuselage is located. 2 may include a moving body (112).

또한, 제3유도탄 클램핑부재(210)는 제2베이스부(600)에 상, 하 이동 가능하게 위치되는 즉, 제2승하강 안내막대부재(610)에 상, 하 이동 가능하게 위치되는 제3이동 몸체(211), 제3이동 몸체(211)의 상부에 상, 하 이동 가능하게 위치되고 제2승하강부(800)에 의해 상, 하 이동되며 유도탄의 동체 중 일부를 감싸는 제3유도탄 삽입부가 위치된 제4이동 몸체(212)를 포함할 수 있다. In addition, the third guide grenade clamping member 210 is positioned to be movable up and down on the second base portion 600, that is, the third to be moved up and down on the second elevating guide bar member 610. A moving body 211, a third guided grenade inserting part positioned above and below the third moving body 211 and being moved up and down by the second elevating portion 800 and surrounding a part of the body of the guided missile It may include a fourth moving body 212 located.

제1이동 몸체(111)에는 제2이동 몸체(112)를 승하강시키는 제1승하강부(700)가 위치되고, 제3이동 몸체(211)에는 제4이동 몸체(212)를 승하강시키는 제2승하강부(800)가 위치될 수 있다.The first moving body 111 is provided with a first moving part 700 for moving the second moving body 112 up and down, and a third moving body 211 is provided with a fourth moving body 212 for moving up and down. Two elevating and descending portions 800 may be located.

제1승하강부(700)는 제1이동 몸체(111)에 세워져 회전 가능하게 위치되며 제2이동 몸체(112)에 나사결합되어 회전되어 회전되는 방향에 따라 제2이동 몸체(112)를 승하강시키는 제1클램핑 승하강 스크류(710)를 포함할 수 있다.The first elevating and descending portion 700 is placed on the first movable body 111 and rotatably positioned, screwed to the second movable body 112 and rotated to move up and down the second movable body 112 according to the rotational direction. The first clamping elevating screw 710 may be included.

그리고, 제1승하강부(700)는 제1이동 몸체(111)에 회전가능하게 위치되고 외부로 돌출되게 위치되며 제1클램핑 승하강 스크류(710)를 작동시키는 회전력을 발생시키는 제1승하강 조작부재(720)를 더 포함할 수 있다.Then, the first elevating unit 700 is rotatably positioned on the first movable body 111 and is protruded outward, and the first elevating operation to generate a rotational force to operate the first clamping elevating screw 710. The member 720 may be further included.

제1승하강부(700)는 도시되지 않았지만 전기 전원을 공급받아 작동되어 제1클램핑 승하강 스크류(710)를 회전시키는 제1승하강 회전모터를 더 포함할 수도 있음을 밝혀둔다. Although the first elevating unit 700 is not shown, it is revealed that it may further include a first elevating rotary motor that is operated by receiving electric power to rotate the first clamping elevating screw 710.

제2승하강부(800)는 제3이동 몸체(211)에 세워져 회전 가능하게 위치되며 제4이동 몸체(212)에 나사결합되어 회전되어 회전되는 방향에 따라 제4이동 몸체(212)를 승하강시키는 제2클램핑 승하강 스크류(미도시)를 포함할 수 있다.The second lifting and descending part 800 is placed on the third moving body 211 and rotatably positioned, screwed to the fourth moving body 212 and rotated to move up and down the fourth moving body 212 according to the rotational direction. The second clamping may include an elevating screw (not shown).

또한, 제2승하강부(800)는 제3이동 몸체(211)에 회전가능하게 위치되고 외부로 돌출되게 위치되며 제2클램핑 승하강 스크류(미도시)를 작동시키는 회전력을 발생시키는 제2승하강 조작부재(820)를 더 포함할 수 있다.In addition, the second elevating unit 800 is rotatably positioned on the third movable body 211 and is protruded to the outside, and the second elevating unit generates rotational force to operate the second clamping elevating screw (not shown). The operation member 820 may be further included.

제2클램핑 승하강 스크류(미도시)와 제2승하강 조작부재(820)는 도 1에 정확하게 도시되어 있지 않으나, 도 1에서 도시되어 확인될 수 있는 제1클램핑 승하강 스크류(710)와 제1승하강 조작부재(720)의 구성과 동일하게 실시될 수 있음을 확인한다. The second clamping elevating screw (not shown) and the second elevating operation member 820 are not exactly shown in FIG. 1, but the first clamping elevating screw 710 and the first clamping elevating screw 710 can be confirmed. 1, it is confirmed that it can be carried out in the same manner as the configuration of the elevating operation member 720.

제2승하강부(800)는 도시되지 않았지만 전기 전원을 공급받아 작동되어 제2클램핑 승하강 스크류(미도시)를 회전시키는 제2승하강 회전모터(미도시)를 더 포함할 수도 있음을 밝혀둔다. Although the second elevating unit 800 is not shown, it is revealed that it may further include a second elevating rotating motor (not shown) that operates by receiving electric power to rotate the second clamping elevating screw (not shown). .

작업자는 제1승하강 조작부재(720)와 제2승하강 조작부재(820)를 각각 양방향으로 선택적으로 회전시켜 제2이동 몸체(112)와 제4이동 몸체(212)를 각각 승강시키거나 하강시켜 제2이동 몸체(112)와 제4이동 몸체(212)의 높이를 미세하게 조절하여 제2이동 몸체(112)와 제4이동 몸체(212)에 유도탄을 거치시켜 고정시킬 수 있다. The operator selectively rotates the first elevating operation member 720 and the second elevating operation member 820 in both directions to elevate or lower the second movable body 112 and the fourth movable body 212, respectively. The second moving body 112 and the fourth moving body 212 can be finely adjusted to fix the height of the second moving body 112 and the fourth moving body 212 by placing guided missiles.

제1승하강부(700)와 제2승하강부(800)는 실질적으로 유도탄의 동체가 올려지는 제1유도탄 삽입부가 구비되는 제2이동 몸체(112)와 유도탄의 동체가 올려지는 제3유도탄 삽입부가 구비되는 제4이동 몸체(212)의 높이를 미세하게 조절하여 유도탄의 점검 시 유도탄의 동체 위치를 검사에 편리하고, 유도탄의 동체를 거치시키기 용이하게 위치시킬 수 있도록 한다. The first elevating part 700 and the second elevating part 800 have a second moving body 112 provided with a first guided grenade insert which substantially raises the body of a guided missile and a third guided grenade insert with a fuselage of guided grenade. By finely adjusting the height of the fourth moving body 212 provided, it is convenient to inspect the location of the body of the guided missile when inspecting the guided missile, and to easily position the fuselage of the guided missile.

도시되지 않았지만, 제1승하강부(700)와 제2승하강부(800)는 유압실린더일 수도 있고, 이외에도 모터에 의해 회전되는 레크기어 및 레크기어에 맞물려 직선 이동하는 레크기어를 이용한 레크 피니언 기어구조의 승하강 기기일 수도 있고, 이외에도 공지의 직선 이동 구조를 이용하여 다양하게 변형되어 실시될 수 있음을 밝혀둔다. Although not shown, the first elevating part 700 and the second elevating part 800 may be hydraulic cylinders, or in addition, a recioning gear structure using a reciprocating gear that is linearly moved by a reciprocating gear and a reciprocating gear rotated by a motor. It can be a lifting device of, or, in addition, it is revealed that it can be carried out in various modifications using a known linear movement structure.

그리고, 본 발명에 따른 유도탄 점검용 고정 장치는 제1베이스부(500)의 좌, 우 이동을 가능하게 하는 제1직선 이동부(900)와 제2베이스부(600)의 좌, 우 이동을 가능하게 하는 제2직선 이동부(1000)를 더 포함할 수 있다. In addition, the fixing device for inspecting guided missiles according to the present invention moves the left and right of the first linear moving part 900 and the second base part 600 to enable the left and right movement of the first base part 500. It may further include a second linear moving unit 1000 to enable.

제1직선 이동부(900)와 제2직선 이동부(1000)는 제1베이스부(500)와 제2베이스부(600)를 유도탄의 폭방향 즉, 원주 방향으로 좌, 우 이동될 수 있도록 한다.The first linear moving part 900 and the second linear moving part 1000 may move the first base part 500 and the second base part 600 left and right in the width direction of the guided bullet, that is, in the circumferential direction. do.

제1직선 이동부(900)는 제1베이스부(500)가 이동 가능하게 결합되고 유도탄 또는 발사체의 원주 방향으로 위치되어 제1베이스부(500)의 직선 이동을 안내하는 제1직선 이동 가이드 레일부재(910)를 포함할 수 있다.The first linear moving part 900 is a first linear moving guide rail in which the first base portion 500 is movably coupled and positioned in the circumferential direction of a guided missile or projectile to guide linear movement of the first base portion 500. It may include a member 910.

제1베이스부(500)는 제1직선 이동 가이드 레일부재(910)를 따라 이동 가능하게 위치되고 세트 스크류 등의 위치 고정구로 위치가 고정되는 것을 일 예로 한다.As an example, the first base portion 500 is movably positioned along the first linear movement guide rail member 910 and fixed in position with a positioning fixture such as a set screw.

제1베이스부(500)는 제1직선 이동 가이드 레일부재(910)를 따라 이동되고, 제1베이스부(500)를 관통하여 제1직선 이동 가이드 레일부재(910)를 가압하는 세트 스크류로 위치가 고정되고, 세트 스크류가 풀려 다시 제1직선 이동 가이드 레일부재(910)를 따라 이동될 수 있는 것을 일 예로 한다. The first base portion 500 is moved along the first linear movement guide rail member 910 and is positioned with a set screw that presses the first linear movement guide rail member 910 through the first base portion 500 It is assumed that is fixed, and the set screw is released and can be moved along the first linear movement guide rail member 910 again.

또한, 제2직선 이동부(1000)는 제2베이스부(600)가 이동 가능하게 결합되고 유도탄 또는 발사체의 원주 방향으로 위치되어 제2베이스부(600)의 직선 이동을 안내하는 제2직선 이동 가이드 레일부재(1010)를 포함할 수 있다.In addition, the second linear movement unit 1000 is a second linear movement in which the second base unit 600 is movably coupled and positioned in the circumferential direction of the guided missile or projectile to guide the linear movement of the second base unit 600. A guide rail member 1010 may be included.

제2베이스부(600)는 제2직선 이동 가이드 레일부재(1010)를 따라 이동 가능하게 위치되고 세트 스크류 등의 위치 고정구로 위치가 고정되는 것을 일 예로 한다.As an example, the second base portion 600 is movably positioned along the second linear movement guide rail member 1010 and fixed in position with a position fixture such as a set screw.

제2베이스부(600)는 제2직선 이동 가이드 레일부재(1010)를 따라 이동되고, 제2베이스부(600)를 관통하여 제2직선 이동 가이드 레일부재(1010)를 가압하는 세트 스크류로 위치가 고정되고, 세트 스크류가 풀려 다시 제2직선 이동 가이드 레일부재(1010)를 따라 이동될 수 있는 것을 일 예로 한다. The second base portion 600 is moved along the second linear movement guide rail member 1010, and is positioned with a set screw that presses the second linear movement guide rail member 1010 through the second base portion 600 It is assumed that is fixed, and the set screw is released and can be moved along the second linear movement guide rail member 1010 again.

제1직선 이동부(900)와 제2직선 이동부(1000)는 볼스크류 구조의 리니어 엑추에이터를 포함하여 리니어 엑추에이터에 포함된 모터의 작동에 의해 각각 전동을 제1베이스부(500)와 제2베이스부(600)를 직선 이동시킬 수 있음을 밝혀둔다.The first linear moving unit 900 and the second linear moving unit 1000 include the linear actuator of the ball screw structure, and each of the first base unit 500 and the second electric power is transmitted by the operation of the motor included in the linear actuator. It is revealed that the base portion 600 can be moved in a straight line.

또한, 제1직선 이동부(900)와 제2직선 이동부(1000)는 이외에도 유압 실린더, 회전모터에 의해 회전되는 피니언 기어와 피니언 기어에 맞물려 직선 이동되는 레크와 피니언 구조 등과 같이 공지의 직선 이동 구조를 이용하여 다양하게 변형되어 실시될 수 있음을 밝혀둔다. Further, in addition to the first linear moving part 900 and the second linear moving part 1000, well-known linear motion such as a pinion gear rotated by a hydraulic cylinder and a rotating motor and a pin and pinion structure that is linearly moved by the pinion gear are moved. It turns out that it can be implemented by various modifications using a structure.

본 발명에 따른 유도탄 점검용 고정 장치는 제1베이스부(500)와 제2베이스부(600)의 전, 후 이동을 가능하게 하는 길이방향 직선 이동부(1100)를 더 포함할 수 있다.The fixing device for inspecting guided missiles according to the present invention may further include a longitudinal linear moving part 1100 that enables front and rear movement of the first base part 500 and the second base part 600.

길이방향 직선 이동부(1100)는 제1직선 이동 가이드 레일부재(910)와 제2직선 이동 가이드 레일부재(1010)를 연결하는 레일 연결부재(1110), 레일 연결부재(1110)가 이동 가능하게 결합되고 유도탄 또는 발사체의 길이 방향으로 위치되어 레일 연결부재(1110)의 직선 이동을 안내하는 길이방향 이동 가이드 레일부재(1120)를 포함할 수 있다. In the longitudinal linear moving part 1100, the rail connecting member 1110 and the rail connecting member 1110 connecting the first linear moving guide rail member 910 and the second linear moving guide rail member 1010 are movable. It may be coupled and is located in the longitudinal direction of the missile or projectile may include a longitudinal movement guide rail member 1120 to guide the linear movement of the rail connecting member 1110.

레일 연결부재(1110)는 길이방향 이동 가이드 레일부재(1120)를 따라 이동 가능하게 위치되고 세트 스크류 등의 위치 고정구로 위치가 고정되는 것을 일 예로 한다.As an example, the rail connecting member 1110 is movably positioned along the longitudinal movement guide rail member 1120 and the position is fixed by a position fixture such as a set screw.

레일 연결부재(1110)는 길이방향 이동 가이드 레일부재(1120)를 따라 이동되고, 레일 연결부재(1110)를 관통하여 길이방향 이동 가이드 레일부재(1120)를 가압하는 세트 스크류로 위치가 고정되고, 세트 스크류가 풀려 다시 길이방향 이동 가이드 레일부재(1120)를 따라 이동될 수 있는 것을 일 예로 한다. The rail connecting member 1110 is moved along the longitudinal moving guide rail member 1120, and the position is fixed by a set screw that presses the longitudinal moving guide rail member 1120 through the rail connecting member 1110, As an example, the set screw may be loosened and moved again along the longitudinal movement guide rail member 1120.

길이방향 직선 이동부(1100)는 볼스크류 구조의 리니어 엑추에이터를 포함하여 리니어 엑추에이터에 포함된 모터의 작동에 의해 각각 전동을 제1베이스부(500)와 제2베이스부(600)를 직선 이동시킬 수 있음을 밝혀둔다.The lengthwise linear moving part 1100 includes linear motion actuators having a ball screw structure to linearly move the first base part 500 and the second base part 600 respectively by the operation of the motor included in the linear actuator. Reveals that it can.

또한, 길이방향 직선 이동부(1100)는 이외에도 유압 실린더, 회전모터에 의해 회전되는 피니언 기어와 피니언 기어에 맞물려 직선 이동되는 레크와 피니언 구조 등과 같이 공지의 직선 이동 구조를 이용하여 다양하게 변형되어 실시될 수 있음을 밝혀둔다. In addition, the longitudinal linear moving part 1100 is variously modified by using a well-known linear moving structure such as a hydraulic cylinder, a pinion gear rotated by a rotating motor and a pin and a pinion gear which are linearly moved by a pinion gear. It can be revealed.

제1직선 이동부(900), 제2직선 이동부(1000), 길이방향 직선 이동부(1100)는 제1베이스부(500)와 제2베이스부(600)를 가로 방향과 전, 후 방향으로 직선 이동시켜 제1유도탄 고정부(100)와 제2유도탄 고정부(200)를 통해 거치되어 고정되는 유도탄, 제1발사관 고정부(300)와 제2발사관 고정부(400)를 통해 거치되어 고정되는 발사관을 점검 작업이 용이한 위치로 이동시켜 점검 작업 시 편의성을 향상시킬 수 있다. The first linear moving part 900, the second linear moving part 1000, and the longitudinal straight moving part 1100 are the first base part 500 and the second base part 600 in the horizontal direction and the front and rear direction. The guided grenade, which is mounted and fixed through the first guided grenade fixing unit 100 and the second guided grenade fixing unit 200 by being moved in a straight line, is mounted through the first launcher fixing unit 300 and the second grenade fixing unit 400 The fixed launcher can be moved to a location where inspection work is easy to improve convenience during inspection work.

한편, 도 2 및 도 3은 본 발명에 따른 유도탄 점검용 고정 장치에 대한 사용예를 도시한 사시도이고, 도 2는 본 발명에 따른 유도탄 점검용 고정 장치의 제1유도탄 고정부(100)와 제2유도탄 고정부(200)를 통해 유도탄(10)을 거치시켜 고정함으로써 유도탄(10)을 점검하는 예를 도시한 것이고, 도 3은 본 발명에 따른 유도탄 점검용 고정 장치의 제1발사관 고정부(300)와 제2발사관 고정부(400)를 통해 유도탄(10)이 내부로 장입된 발사관(20)을 거치시켜 고정함으로써 발사관(20)을 점검하는 예를 도시한 것이다.On the other hand, Figures 2 and 3 is a perspective view showing an example of the use of the guide device for inspecting guided missiles according to the present invention, Figure 2 is a first guided grenade fixing part 100 and the first guided missile fixing device for checking guided missiles according to the invention 2 shows an example of checking the guided missile 10 by mounting and fixing the guided missile 10 through the guided missile fixing part 200, and FIG. 3 shows the first launcher fixation part of the fixed device for checking guided missiles according to the present invention ( 300) and the second launching tube fixing part 400 shows an example of checking the launching tube 20 by mounting and fixing the launching tube 20 into which the guided missile 10 is loaded.

도 2를 참고하면 제1유도탄 고정부(100)과 제2유도탄 고정부(200) 즉, 제1유도탄 클램핑부재(110)와 제2유도탄 클램핑부재(120)로 조립이 완료된 유도탄(10)의 일측을 클램핑하여 고정하고, 제3유도탄 클램핑부재(210)와 제4유도탄 클램핑부재(220)로 조립이 완료된 유도탄(10)의 타측을 클램핑하여 고정한 예를 나타내고 있다.Referring to Figure 2, the first guided grenade fixing part 100 and the second guided grenade fixing part 200, that is, the first guided grenade clamping member 110 and the second guided grenade clamping member 120 of the guided missile assembly 10 is completed It shows an example in which one side is clamped and fixed, and the other side of the guided missile 10, which has been assembled with the third guided bullet clamping member 210 and the fourth guided bullet clamping member 220, is clamped and fixed.

이 때 제2발사관 클램핑부재(320)와 제4발사관 클램핑부재(420)는 각각 제1발사관 클램핑부재(310)와 제3발사관 클램핑부재(410)에서 분리되어 제거되어 유도탄(10)을 제1유도탄 클램핑부재(110)와 제3유도탄 클램핑부재(210) 상에 안착시켜 거치시킬 수 있게 된다.At this time, the second launching tube clamping member 320 and the fourth launching tube clamping member 420 are separated from the first launching tube clamping member 310 and the third launching tube clamping member 410, respectively, to remove the guided missile 10. The guided missile clamping member 110 and the third guided missile clamping member 210 may be seated and mounted.

즉, 조립이 완료된 완성탄인 유도탄(10)을 점검하는 경우 일단 제2발사관 클램핑부재(320), 제4발사관 클램핑부재(420), 제2유도탄 클램핑부재(120), 제4유도탄 클램핑부재(220)를 제1발사관 클램핑부재(310), 제3발사관 클램핑부재(410), 제1유도탄 클램핑부재(110), 제3유도탄 클램핑부재(210)에서 각각 분리하여 제1유도탄 삽입부와 제3유도탄 삽입부의 상부 측을 각각 개방한다.That is, when checking the guided missile 10, which is the completed bullet, the second launcher clamping member 320, the fourth launcher clamping member 420, the second grenade clamping member 120, and the fourth guided grenade clamping member ( 220) is separated from the first launcher clamping member 310, the third launcher clamping member 410, the first grenade clamping member 110, and the third grenade clamping member 210, respectively, and the first grenade insert part and the third The upper side of the guided ammunition insertion section is opened.

그리고, 제1유도탄 클램핑부재(110)와 제3유도탄 클램핑부재(210) 상에 완성탄인 유도탄(10)을 안착시킨 후 즉, 제1유도탄 삽입부와 제3유도탄 삽입부 내에 유도탄을 삽입하여 안착시킨 후 제2유도탄 클램핑부재(120), 제4유도탄 클램핑부재(220)를 제1유도탄 클램핑부재(110)와 제3유도탄 클램핑부재(210)에 결합시켜 유도탄(10)을 클램핑하여 위치를 고정한다.Then, after the first guided grenade clamping member 110 and the third guided grenade clamping member 210 are seated on the guided bullet 10, that is, by inserting the guided grenade into the first guided grenade inserting portion and the third guided grenade inserting portion, After being seated, the second guided grenade clamping member 120 and the fourth guided grenade clamping member 220 are coupled to the first guided grenade clamping member 110 and the third guided grenade clamping member 210 to clamp the guided munitions 10 to position them. To fix.

또한, 도 3을 참고하면 제1발사관 고정부(300)와 제2발사관 고정부(400) 즉, 제1발사관 클램핑부재(310)와 제2발사관 클램핑부재(320)로 조립이 완료된 유도탄이 내부로 장입된 발사관(20) 일측을 클램핑하여 고정하고, 제3발사관 클램핑부재(410)와 제4발사관 클램핑부재(420)로 조립이 완료된 유도탄이 내부로 장입된 발사관(20)의 타측을 클램핑하여 고정한 예를 나타내고 있다.In addition, referring to Figure 3, the first blast pipe fixing part 300 and the second blast pipe fixing part 400, that is, the first blast pipe clamping member 310 and the second blast pipe clamping member 320, the assembled guided ammunition inside By clamping one side of the launch tube 20 loaded with, and fixing the other side of the launch tube 20 in which the guided missiles assembled with the third launch tube clamping member 410 and the fourth launch tube clamping member 420 are charged into the inside, It shows a fixed example.

이 때 제2유도탄 클램핑부재(120)와 제4유도탄 클램핑부재(220)는 각각 제1유도탄 클램핑부재(110)와 제3유도탄 클램핑부재(210)에서 분리되어 제거되고, 제1유도탄 클램핑부재(110)와 제3유도탄 클램핑부재(210)는 하강되어 발사관(20)에 걸리지 않도록 위치된다. At this time, the second grenade clamping member 120 and the fourth grenade clamping member 220 are removed from the first grenade clamping member 110 and the third grenade clamping member 210, respectively, and the first grenade clamping member ( 110) and the third guided grenade clamping member 210 are lowered and positioned so as not to be caught by the launch tube 20.

즉, 조립이 완료된 완성탄인 유도탄이 장입된 발사관(20)을 점검하는 경우 일단 제2발사관 클램핑부재(320), 제4발사관 클램핑부재(420), 제2유도탄 클램핑부재(120), 제4유도탄 클램핑부재(220)를 제1발사관 클램핑부재(310), 제3발사관 클램핑부재(410), 제1유도탄 클램핑부재(110), 제3유도탄 클램핑부재(210)에서 각각 분리하고, 제1유도탄 클램핑부재(110)와 제3유도탄 클램핑부재(210)를 하강시켜 제1발사관 삽입부와 제2발사관 삽입부에 겹쳐지지 않도록 위치시킴으로써 제1발사관 삽입부와 제3발사관 삽입부의 상부 측을 각각 개방한다.That is, when checking the launch tube 20 loaded with the guided missile, which is the completed bullet, the second launcher clamping member 320, the fourth launcher clamping member 420, and the second guided grenade clamping member 120, fourth The guided missile clamping member 220 is separated from the first launcher clamping member 310, the third launcher clamping member 410, the first grenade clamping member 110, and the third grenade clamping member 210, respectively. By lowering the clamping member 110 and the third guide grenade clamping member 210 so as not to overlap the first blast tube insertion portion and the second blast tube insertion portion, the upper ends of the first blast pipe insertion portion and the third blast pipe insertion portion are respectively opened. do.

그리고, 제1발사관 클램핑부재(310)와 제3발사관 클램핑부재(410) 상에 완성탄인 유도탄이 장입된 발사관(20)을 안착시킨 후 즉, 제1발사관 삽입부와 제3발사관 삽입부 내에 발사관(20)을 삽입하여 안착시킨 후 제2발사관 클램핑부재(320), 제4발사관 클램핑부재(420)를 제1발사관 클램핑부재(310)와 제3발사관 클램핑부재(410)에 결합시켜 발사관(20)을 클램핑하여 위치를 고정한다.In addition, after the first launcher clamping member 310 and the third launcher clamping member 410 are seated on the launcher 20, which is loaded with guided bullets, that is, in the first launcher insertion section and the third launcher insertion section After the launch tube 20 is inserted and seated, the second launch tube clamping member 320 and the fourth launch tube clamping member 420 are coupled to the first launch tube clamping member 310 and the third launch tube clamping member 410 to launch the tube ( Fix the position by clamping 20).

도 4는 본 발명에 따른 유도탄 점검용 고정 장치에서 부품 받침부(1200)의 일 실시예를 도시한 사시도이고, 도 5는 본 발명에 따른 유도탄 점검용 고정 장치에서 부품 받침부(1200)를 사용한 사용예를 도시한 사시도이다. 4 is a perspective view showing an embodiment of a part supporting part 1200 in a guide device for inspecting a guided missile according to the present invention, and FIG. 5 is a part supporting part 1200 in a guide device for checking a guided missile according to the present invention. It is a perspective view showing an example of use.

도 4 및 도 5를 참고하면 본 발명에 따른 유도탄 점검용 고정 장치는 일단부가 제1발사관 고정부(300)에 분리 가능하게 결합되고 타단부가 제2발사관 고정부(400)에 분리 가능하게 결합되며 유도탄의 내부로 삽입되어 장착되는 유도탄의 내부 부품(10c)을 안착시켜 거치할 수 있는 부품 받침부(1200)를 더 포함할 수 있다.Referring to Figures 4 and 5, the fixed device for checking guided missiles according to the present invention is detachably coupled to one end of the first blast tube fixing part 300 and the other end is detachably coupled to the second blast tube fixing part 400. In addition, it may further include a component support portion 1200 that can be mounted and mounted on the inner part 10c of the guided missile which is inserted into the interior of the guided missile.

부품 받침부(1200)는 상부가 개방된 형태의 부품 삽입공간이 구비된 부품 받침부재(1210), 부품 받침부재(1210)의 일단부 측에 위치되고 제1발사관 클램핑부재(310)와 분리 가능하게 결합되고 유도탄의 분리된 동체(10a)를 결합할 수 있는 제1동체 결합부재(1220), 부품 받침부재(1210)의 타단부 측에 위치되고 제3발사관 클램핑부재(410)와 분리 가능하게 결합되고 유도탄의 분리된 동체(10b)를 결합할 수 있는 제2동체 결합부재(1230)를 포함한다.The part supporting part 1200 is located at one end side of the part supporting member 1210, the part receiving member 1210 having an insert opening space of the upper part and is detachable from the first launch tube clamping member 310. The first fuselage coupling member 1220 capable of combining the separated fuselage 10a of the guided missile and located on the other end side of the component support member 1210 and detachable from the third launch tube clamping member 410 And a second fuselage coupling member 1230 that can be coupled and combine the separated fuselage 10b of guided missiles.

제1동체 결합부재(1220)와 제2동체 결합부재(1230)는 제1발사관 클램핑부재(310)와 제3발사관 클램핑부재(410)에 각각 볼트 체결로 분리 가능하게 결합된다.The first fuselage coupling member 1220 and the second fuselage coupling member 1230 are detachably coupled to the first launch tube clamping member 310 and the third launch tube clamping member 410 by bolting, respectively.

제1동체 결합부재(1220)의 양측에는 제1발사관 클램핑부재(310)에 안착되어 제3클램핑 고정볼트(321a)로 볼트 체결되는 제1안착부(1221)가 위치되고, 제2동체 결합부재(1230)의 양측에는 제3발사관 클램핑부재(410)에 안착되어 제4클램핑 고정볼트(421a)로 볼트 체결되는 제2안착부(1231)가 위치된다.The first seating portion 1221, which is seated on the first launch tube clamping member 310 and bolted to the third clamping fixing bolt 321a, is located on both sides of the first fuselage coupling member 1220, and the second fuselage coupling member On both sides of 1230, a second seating portion 1231 that is seated on the third launching tube clamping member 410 and bolted to the fourth clamping fixing bolt 421a is located.

부품 받침부재(1210)는 반원형의 단면을 가지는 부품 삽입공간이 내부에 위치되고, 제1동체 결합부재(1220)와 제2동체 결합부재(1230)는 동체(10a, 10b)의 일부분을 감싸되 적어도 동체의 절반을 초과하여 감싸는 링형태로 형성되어 동체(10a, 10b)가 내부로 삽입되어 거치되는 것을 일 예로 한다. The component supporting member 1210 has a semi-circular cross-section of a component insertion space, and the first fuselage coupling member 1220 and the second fuselage coupling member 1230 surround a portion of the fuselage 10a, 10b. As an example, it is formed in a ring shape enclosing at least half of the fuselage and the fuselage 10a, 10b is inserted and mounted inside.

제1동체 결합부재(1220)와 제2동체 결합부재(1230)는 각각 양단부가 이격된 링형태로 형성되어 내부로 유도탄의 동체(10a, 10b)가 각각 끼워져 결합되는 것을 일 예로 한다. For example, the first fuselage coupling member 1220 and the second fuselage coupling member 1230 are formed in a ring shape with both ends spaced apart, and the fuselage bodies 10a, 10b of guided missiles are respectively fitted into each other.

또한, 제1동체 결합부재(1220)의 외측면에는 하부 측에 제1유도탄 클램핑부재(110)의 제1유도탄 삽입부에 삽입되어 안착되는 제1보조 받침부(1220a)가 돌출되게 위치된다.In addition, a first auxiliary support portion 1220a, which is inserted into and seated in the first guided bullet inserting portion of the first guided bullet clamping member 110, is positioned on the outer side of the first fuselage coupling member 1220 to protrude.

제1보조 받침부(1220a)는 제1유도탄 삽입부의 곡률과 대응되는 곡률을 가지는 곡면을 가져 제1유도탄 삽입부 내에 안착되어 안정적으로 지지될 수 있다. The first auxiliary support portion 1220a has a curved surface having a curvature corresponding to the curvature of the first guided bullet inserting portion, and can be stably supported by being seated in the first guided bullet inserting portion.

제2동체 결합부재(1230)의 외측면에는 하부 측에 제3유도탄 클램핑부재(210)의 제3유도탄 삽입부에 삽입되어 안착되는 제2보조 받침부(1230a)가 돌출되게 위치된다.The second auxiliary supporting portion 1230a, which is inserted into and seated in the third guided bullet inserting portion of the third guided bullet clamping member 210, is located on the outer side of the second fuselage coupling member 1230.

제2보조 받침부(1230a)는 제3유도탄 삽입부의 곡률과 대응되는 곡률을 가지는 곡면을 가져 제3유도탄 삽입부 내에 안착되어 안정적으로 지지될 수 있다. The second auxiliary support portion 1230a has a curved surface having a curvature corresponding to the curvature of the third guided bullet inserting portion, and can be stably supported in the third guided bullet inserting portion.

도 5를 참고하면 유도탄의 조립이 완료되기 전 내부 부품(10c)과 유도탄의 동체를 함께 점검하는 경우 제2발사관 클램핑부재(320), 제4발사관 클램핑부재(420), 제2유도탄 클램핑부재(120), 제4유도탄 클램핑부재(220)를 제1발사관 클램핑부재(310), 제3발사관 클램핑부재(410), 제1유도탄 클램핑부재(110), 제3유도탄 클램핑부재(210)에서 각각 분리하고 제1발사관 클램핑부재(310)와 제2발사관 클램핑부재(320) 상에 제1동체 결합부재(1220)의 제1안착부(1221)와 제2동체 결합부재(1230)의 제2안착부(1231)를 각각 안착시키고 볼트 체결로 부품 받침부(1200)를 장착한다. Referring to FIG. 5, when the inner part 10c and the body of the guided missile are checked together before the assembly of the guided missile is completed, the second launcher clamping member 320, the fourth launcher clamping member 420, and the second guided grenade clamping member ( 120), the fourth grenade clamping member 220 is separated from the first launcher clamping member 310, the third launcher clamping member 410, the first grenade clamping member 110, the third grenade clamping member 210, respectively And the first seating portion 1221 of the first fuselage coupling member 1220 and the second seating portion of the second fuselage coupling member 1230 on the first blast pipe clamping member 310 and the second blast pipe clamping member 320 Each of the (1231) is seated, and the part receiving part 1200 is mounted by bolting.

그리고, 제1동체 결합부재(1220)에 분할된 유도탄의 동체 중 하나(10a)를 결합시켜 거치하고, 제2동체 결합부재(1230)에 분할된 유도탄의 동체 중 다른 하나(10b)를 결합시켜 거치한 후 부품 받침부재(1210)의 부품 삽입공간에 유도탄 내에 장착되는 내부 부품(10c)을 안착시켜 거치할 수 있다. Then, the first fuselage member 1220 is coupled to and mounted on one of the fuselage bodies 10a of the guided grenade, and the second fuselage member 1230 is coupled to the other one of the fuselage bodies of the guided grenade by combining After mounting, the internal component 10c mounted in the guided bullet may be seated in the component insertion space of the component supporting member 1210 and mounted.

본 발명은 조립이 완료된 완성탄 형태의 유도탄, 완성탄 형태의 유도탄이 내부로 장입된 상태의 발사관, 조립이 완료되지 않은 상태로 분할된 각각의 동체와 동체 내로 삽입되는 유도탄의 내부 부품(10c)을 거치치시켜 위치를 고정한 후 점검 작업을 각각 수행할 수 있다. The present invention is a completed grenade-type guided grenade, a completed grenade-type guided launcher inside, and each fused body divided into an uncompleted state and an internal part of the guided grenade inserted into the fuselage (10c) After fixing the position by mounting, each of the inspection operations can be performed.

즉, 본 발명은 유도탄의 조립 중 유도탄의 변형된 형상을 각각 고정할 수 있어 유도탄 조립 과정에서 유도탄 점검을 원활하게 진행할 수 있어 유도탄의 점검 작업 시 소요되는 시간을 단축하고, 소요되는 작업인원도 감소됨은 물론 점검 작업의 안전성과 편의성이 증대된다. That is, the present invention can fix each of the deformed shapes of the missile during the assembly of the missile, thereby smoothly inspecting the missile in the process of assembling the missile, thereby reducing the time required to inspect the missile and reducing the number of personnel required Of course, the safety and convenience of inspection work are increased.

본 발명은 유도탄의 각 조립 단계에서 점검 작업 시 구성품들의 기구적 위치를 동일한 위치로 위치시킬 수 있어 기구적 특성을 파악하는 점검에 유리한 환경을 제공하고, 점검 소프트 웨어의 제작 및 운용의 편의성을 증가시킬 수 있다. The present invention provides a favorable environment for inspection to grasp the mechanical characteristics by increasing the mechanical position of components during the inspection operation at each assembly step of the guided missile, and increases the convenience of manufacturing and operating inspection software I can do it.

본 발명은 상기한 실시 예에 한정되는 것이 아니라, 본 발명의 요지에 벗어나지 않는 범위에서 다양하게 변경하여 실시할 수 있으며 이는 본 발명의 구성에 포함됨을 밝혀둔다.The present invention is not limited to the above-described embodiments, but can be implemented by variously changing within a range not departing from the gist of the present invention.

10 : 유도탄 10a, 10b : 동체
10c : 내부 부품 20 : 발사관
100 : 제1유도탄 고정부 110 : 제1유도탄 클램핑부재
120 : 제2유도탄 클램핑부재 121 : 제1플랜지부
121a : 제1클램핑 고정볼트 200 : 제2유도탄 고정부
210 : 제3유도탄 클램핑부재 220 : 제4유도탄 클램핑부재
221 : 제2플랜지부 221a : 제2클램핑 고정볼트
300 : 제1발사관 고정부 310 : 제1발사관 클램핑부재
320 : 제2발사관 클램핑부재 321 : 제3플랜지부
321a : 제3클램핑 고정볼트 400 : 제2발사관 고정부
410 : 제3발사관 클램핑부재 420 : 제4발사관 클램핑부재
421 : 제4플랜지부 421a : 제4클램핑 고정볼트
500 : 제1베이스부 510 : 제1승하강 안내막대부재
511 : 제1클램핑 스토퍼부 512 : 제1클램핑 받침부
600 : 제2베이스부 610 : 제2승하강 안내막대부재
611 : 제2클램핑 스토퍼부 612 : 제2클램핑 받침부
700 : 제1승하강부 710 : 제1클램핑 승하강 스크류
720 : 제1승하강 조작부재 800 : 제2승하강부
820 : 제2승하강 조작부재 900 : 제1직선 이동부
910 : 제1직선 이동 가이드 레일부재 1000 : 제2직선 이동부
1010 : 제2직선 이동 가이드 레일부재 1100 : 길이방향 직선 이동부
1110 : 레일 연결부재
1120 : 길이방향 이동 가이드 레일부재
1200 : 부품 받침부 1210 : 부품 받침부재
1220 : 제1동체 결합부재 1220a : 제1보조 받침부
1221 : 제1안착부 1230 : 제2동체 결합부재
1230a : 제2보조 받침부 1231 : 제2안착부
10: guided bullets 10a, 10b: fuselage
10c: inner part 20: launch tube
100: first guided grenade fixing part 110: first guided grenade clamping member
120: second guided grenade clamping member 121: first flange portion
121a: first clamping fixing bolt 200: second guided grenade fixing part
210: third guided grenade clamping member 220: fourth guided grenade clamping member
221: second flange portion 221a: second clamping fixing bolt
300: first blasting tube fixing part 310: first blasting tube clamping member
320: second clamping member clamping member 321: third flange portion
321a: 3rd clamping fixing bolt 400: 2nd launching tube fixing part
410: clamping member of the third launching tube 420: clamping member of the fourth launching tube
421: 4th flange portion 421a: 4th clamping fixing bolt
500: first base portion 510: first elevating guide bar member
511: first clamping stopper portion 512: first clamping support portion
600: second base portion 610: second elevating guide bar member
611: second clamping stopper portion 612: second clamping support portion
700: first lifting part 710: first clamping lifting screw
720: first elevating operation member 800: second elevating part
820: second elevating operation member 900: first linear moving part
910: first linear movement guide rail member 1000: second linear movement unit
1010: 2nd linear movement guide rail member 1100: longitudinal linear movement part
1110: rail connecting member
1120: longitudinal movement guide rail member
1200: parts supporting part 1210: parts supporting member
1220: first fuselage coupling member 1220a: first auxiliary support
1221: first seating portion 1230: second fuselage coupling member
1230a: Second auxiliary support 1231: Second seat

Claims (22)

유도탄의 일측이 안착되어 고정되는 제1유도탄 고정부;
상기 제1유도탄 고정부와 이격되게 위치되며 상기 유도탄의 타측이 안착되어 고정되는 제2유도탄 고정부;
조립이 완료된 유도탄이 장입되는 발사관의 일측이 안착되어 고정되는 제1발사관 고정부; 및
상기 제1발사관 고정부와 이격되게 위치되며 상기 발사관의 타측이 안착되어 고정되는 제2발사관 고정부를 포함하며,
상기 제1발사관 고정부는,
발사관 중 일부를 감싸는 제1발사관 삽입부가 위치된 제1발사관 클램핑부재; 및
발사관 중 나머지 부분을 감싸는 제2발사관 삽입부가 위치되고 상기 제1발사관 클램핑부재에 분리 가능하게 결합되는 제2발사관 클램핑부재를 포함하고,
상기 제2발사관 고정부는,
발사관 중 일부를 감싸는 제3발사관 삽입부가 위치된 제3발사관 클램핑부재; 및
발사관 중 나머지 부분을 감싸는 제4발사관 삽입부가 위치되고 상기 제3발사관 클램핑부재에 분리 가능하게 결합되는 제4발사관 클램핑부재를 포함하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
A first guided grenade fixing part on which one side of the guided grenade is seated and fixed;
A second guided grenade fixed portion which is spaced apart from the first guided grenade fixed portion and is fixed by being seated on the other side of the guided grenade;
A first launcher fixed portion on which one side of the launcher where the assembled guided missile is loaded is fixed; And
It is located spaced apart from the first launcher fixed portion and includes a second launcher fixed portion is fixed to the other side of the launch tube,
The first launch tube fixing unit,
A first blast tube clamping member in which a first blast tube insertion portion surrounding a portion of the launcher tube is located; And
And a second launcher clamping member which is located in the second launcher tube surrounding the rest of the launcher and is detachably coupled to the first launcher clamping member,
The second launch tube fixing unit,
A third launching tube clamping member in which a third launching tube inserting part surrounding a part of the launching tube is located; And
And a fourth launcher clamping member which is located at a fourth launcher insertion portion surrounding the rest of the launcher and is detachably coupled to the third launcher clamping member.
청구항 1에 있어서,
상기 제1유도탄 고정부는,
유도탄의 동체 중 일부를 감싸는 제1유도탄 삽입부가 위치된 제1유도탄 클램핑부재;
유도탄의 동체 중 나머지 부분을 감싸는 제2유도탄 삽입부가 위치되고 상기 제1유도탄 클램핑부재에 분리 가능하게 결합되는 제2유도탄 클램핑부재를 포함하며,
상기 제2유도탄 고정부는,
유도탄의 동체 중 일부를 감싸는 제3유도탄 삽입부가 위치된 제3유도탄 클램핑부재; 및
유도탄의 동체 중 나머지 부분을 감싸는 제4유도탄 삽입부가 위치되고 상기 제3유도탄 클램핑부재에 분리 가능하게 결합되는 제4유도탄 클램핑부재를 포함하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 1,
The first guided grenade fixing part,
A first guided bullet clamping member in which a first guided bullet inserting portion surrounding a part of the body of the guided bullet is located;
A second guided grenade clamping member which is located on the second guided grenade clamping member and is detachably coupled to the first guided grenade clamping member;
The second guided grenade fixing part,
A third guided bullet clamping member in which a third guided bullet inserting portion surrounding a part of the body of the guided bullet is located; And
And a fourth guided grenade clamping member which is located on the third guided grenade clamping member and is detachably coupled to the third guided grenade clamping member.
삭제delete 청구항 1에 있어서,
상기 제1유도탄 고정부와 상기 제1발사관 고정부가 장착되어 고정되는 제1베이스부; 및
상기 제2유도탄 고정부와 상기 제2발사관 고정부가 장착되어 고정되는 제2베이스부를 더 포함하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 1,
A first base portion to which the first guided grenade fixing portion and the first launcher fixing portion are mounted and fixed; And
The second guided grenade fixing part and the second base tube fixing unit for checking guided missiles further comprising a second base portion is fixed.
유도탄의 일측이 안착되어 고정되는 제1유도탄 고정부;
상기 제1유도탄 고정부와 이격되게 위치되며 상기 유도탄의 타측이 안착되어 고정되는 제2유도탄 고정부;
조립이 완료된 유도탄이 장입되는 발사관의 일측이 안착되어 고정되는 제1발사관 고정부;
상기 제1발사관 고정부와 이격되게 위치되며 상기 발사관의 타측이 안착되어 고정되는 제2발사관 고정부;
상기 제1유도탄 고정부와 상기 제1발사관 고정부가 장착되어 고정되는 제1베이스부; 및
상기 제2유도탄 고정부와 상기 제2발사관 고정부가 장착되어 고정되는 제2베이스부를 포함하며,
상기 제1베이스부에는 상기 제1유도탄 고정부가 상, 하 이동 가능하게 위치되고, 상기 제2베이스부에는 제2유도탄 고정부가 상, 하 이동 가능하게 위치되어 상기 제1발사관 고정부와 상기 제2발사관 고정부로 발사관을 거치시켜 고정할 수 있도록 하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
A first guided grenade fixing part on which one side of the guided grenade is seated and fixed;
A second guided grenade fixed portion which is spaced apart from the first guided grenade fixed portion and is fixed by being seated on the other side of the guided grenade;
A first launcher fixed portion on which one side of the launcher where the assembled guided missile is loaded is fixed;
A second blast tube fixing part positioned to be spaced apart from the first blast tube fixing part and fixed to the other side of the launcher tube;
A first base portion to which the first guided grenade fixing portion and the first launcher fixing portion are mounted and fixed; And
The second guided grenade fixing portion and the second base portion fixing unit is mounted and includes a second base portion,
In the first base portion, the first guided grenade fixing portion is positioned to be movable up and down, and in the second base portion, a second guided grenade fixing portion is positioned to be movable up and down, so that the first launch tube fixing portion and the second Fixation device for the guided missile inspection, characterized in that to be fixed by mounting the launcher with a launcher fixed.
유도탄의 일측이 안착되어 고정되는 제1유도탄 고정부;
상기 제1유도탄 고정부와 이격되게 위치되며 상기 유도탄의 타측이 안착되어 고정되는 제2유도탄 고정부;
조립이 완료된 유도탄이 장입되는 발사관의 일측이 안착되어 고정되는 제1발사관 고정부; 및
상기 제1발사관 고정부와 이격되게 위치되며 상기 발사관의 타측이 안착되어 고정되는 제2발사관 고정부를 포함하며,
상기 제1유도탄 고정부는,
유도탄의 동체 중 일부를 감싸는 제1유도탄 삽입부가 위치된 제1유도탄 클램핑부재;
유도탄의 동체 중 나머지 부분을 감싸는 제2유도탄 삽입부가 위치되고 상기 제1유도탄 클램핑부재에 분리 가능하게 결합되는 제2유도탄 클램핑부재를 포함하며,
상기 제2유도탄 고정부는,
유도탄의 동체 중 일부를 감싸는 제3유도탄 삽입부가 위치된 제3유도탄 클램핑부재; 및
유도탄의 동체 중 나머지 부분을 감싸는 제4유도탄 삽입부가 위치되고 상기 제3유도탄 클램핑부재에 분리 가능하게 결합되는 제4유도탄 클램핑부재를 포함하고,
상기 제1유도탄 고정부와 상기 제1발사관 고정부가 장착되어 고정되는 제1베이스부;
상기 제2유도탄 고정부와 상기 제2발사관 고정부가 장착되어 고정되는 제2베이스부를 더 포함하고,
상기 제1베이스부에는 상기 제1유도탄 클램핑부재의 양측에 상기 제1유도탄 클램핑부재를 관통하여 위치되어 상기 제1유도탄 클램핑부재의 상, 하 이동을 안내하는 제1승하강 안내막대부재가 구비되고,
상기 제2베이스부에는 상기 제3유도탄 클램핑부재의 양측에 상기 제3유도탄 클램핑부재를 관통하여 위치되어 상기 제3유도탄 클램핑부재의 상, 하 이동을 안내하는 제2승하강 안내막대부재가 구비되는 것을 특징으로 하는 유도탄 점검용 고정 장치.
A first guided grenade fixing part on which one side of the guided grenade is seated and fixed;
A second guided grenade fixed portion which is spaced apart from the first guided grenade fixed portion and is fixed by being seated on the other side of the guided grenade;
A first launcher fixed portion on which one side of the launcher where the assembled guided missile is loaded is fixed; And
It is located spaced apart from the first launcher fixed portion and includes a second launcher fixed portion is fixed to the other side of the launch tube,
The first guided grenade fixing part,
A first guided bullet clamping member in which a first guided bullet inserting portion surrounding a part of the body of the guided bullet is located;
A second guided grenade clamping member which is located on the second guided grenade clamping member and is detachably coupled to the first guided grenade clamping member;
The second guided grenade fixing part,
A third guided bullet clamping member in which a third guided bullet inserting portion surrounding a part of the body of the guided bullet is located; And
A fourth guided grenade clamping member is disposed to surround the rest of the body of the guided grenade and is detachably coupled to the third guided grenade clamping member,
A first base portion to which the first guided grenade fixing portion and the first launcher fixing portion are mounted and fixed;
The second guided grenade fixing portion and the second base portion is fixed to the second launcher is mounted further comprises,
The first base portion is provided with first guiding and descending guide bar members positioned on both sides of the first guided bullet clamping member to penetrate the first guided bullet clamping member to guide up and down movement of the first guided bullet clamping member. ,
The second base portion is provided with a second lifting guide member on both sides of the third guided grenade clamping member to penetrate the third guided grenade clamping member to guide up and down movement of the third guided grenade clamping member. Fixed device for inspecting missiles, characterized in that.
청구항 6에 있어서,
상기 제1승하강 안내막대부재의 상단부에는 상기 제1유도탄 클램핑부재가 걸려 이동이 제한되는 제1클램핑 스토퍼부가 위치되고, 상기 제1승하강 안내막대부재의 하단부에는 상기 제1유도탄 클램핑부재가 안착되는 제1클램핑 받침부가 위치되며,
상기 제2승하강 안내막대부재의 상단부에는 상기 제3유도탄 클램핑부재가 걸려 이동이 제한되는 제2클램핑 스토퍼부가 위치되고, 상기 제2승하강 안내막대부재의 하단부에는 상기 제3유도탄 클램핑부재가 안착되는 제2클램핑 받침부가 위치되는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 6,
A first clamping stopper portion to which movement of the first guided bullet clamping member is restricted is located at an upper portion of the first guide plate member, and the first guided bullet clamping member is seated at a lower end of the first guide plate member. The first clamping support portion is located,
A second clamping stopper portion to which movement of the third guided bullet clamping member is restricted is located at an upper end portion of the second guide plate member, and the third guided bullet clamping member is seated at a lower end of the second guide plate member. Fixed clamping device for inspecting missiles, characterized in that the second clamping support is located.
유도탄의 일측이 안착되어 고정되는 제1유도탄 고정부;
상기 제1유도탄 고정부와 이격되게 위치되며 상기 유도탄의 타측이 안착되어 고정되는 제2유도탄 고정부;
조립이 완료된 유도탄이 장입되는 발사관의 일측이 안착되어 고정되는 제1발사관 고정부;
상기 제1발사관 고정부와 이격되게 위치되며 상기 발사관의 타측이 안착되어 고정되는 제2발사관 고정부;
상기 제1유도탄 고정부와 상기 제1발사관 고정부가 장착되어 고정되는 제1베이스부; 및
상기 제2유도탄 고정부와 상기 제2발사관 고정부가 장착되어 고정되는 제2베이스부를 포함하며,
상기 제1유도탄 고정부는,
유도탄의 동체 중 일부를 감싸는 제1유도탄 삽입부가 위치된 제1유도탄 클램핑부재;
유도탄의 동체 중 나머지 부분을 감싸는 제2유도탄 삽입부가 위치되고 상기 제1유도탄 클램핑부재에 분리 가능하게 결합되는 제2유도탄 클램핑부재를 포함하며,
상기 제2유도탄 고정부는,
유도탄의 동체 중 일부를 감싸는 제3유도탄 삽입부가 위치된 제3유도탄 클램핑부재; 및
유도탄의 동체 중 나머지 부분을 감싸는 제4유도탄 삽입부가 위치되고 상기 제3유도탄 클램핑부재에 분리 가능하게 결합되는 제4유도탄 클램핑부재를 포함하고,
상기 제1유도탄 클램핑부재는,
상기 제1베이스부에 상, 하 이동 가능하게 위치되는 제1이동 몸체; 및
상기 제1이동 몸체의 상부에 상, 하 이동 가능하게 위치되어 제1승하강부에 의해 상, 하 이동되며 유도탄의 동체 중 일부를 감싸는 제1유도탄 삽입부가 위치된 제2이동 몸체를 포함하며,
상기 제3유도탄 클램핑부재는,
상기 제2베이스부에 상, 하 이동 가능하게 위치되는 제3이동 몸체; 및
상기 제3이동 몸체의 상부에 상, 하 이동 가능하게 위치되고 제2승하강부에 의해 상, 하 이동되며 유도탄의 동체 중 일부를 감싸는 제3유도탄 삽입부가 위치된 제4이동 몸체를 포함하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
A first guided grenade fixing part on which one side of the guided grenade is seated and fixed;
A second guided grenade fixed portion which is spaced apart from the first guided grenade fixed portion and is fixed by being seated on the other side of the guided grenade;
A first launcher fixed portion on which one side of the launcher where the assembled guided missile is loaded is fixed;
A second blast tube fixing part positioned to be spaced apart from the first blast tube fixing part and fixed to the other side of the launcher tube;
A first base portion to which the first guided grenade fixing portion and the first launcher fixing portion are mounted and fixed; And
The second guided grenade fixing portion and the second base portion fixing unit is mounted and includes a second base portion,
The first guided grenade fixing part,
A first guided bullet clamping member in which a first guided bullet inserting portion surrounding a part of the body of the guided bullet is located;
A second guided grenade clamping member which is located on the second guided grenade clamping member and is detachably coupled to the first guided grenade clamping member;
The second guided grenade fixing part,
A third guided bullet clamping member in which a third guided bullet inserting portion surrounding a part of the body of the guided bullet is located; And
A fourth guided grenade clamping member is disposed to surround the rest of the body of the guided grenade and is detachably coupled to the third guided grenade clamping member,
The first grenade clamping member,
A first moving body positioned to be movable up and down on the first base; And
It includes a second moving body located on the upper portion of the first moving body to be moved up and down and moved up and down by a first elevating portion and positioned with a first guided bullet insert that surrounds a part of the body of the guided missile,
The third guided bullet clamping member,
A third moving body positioned to be movable up and down on the second base; And
It is characterized in that it comprises a fourth movable body located on the upper part of the third movable body, movable up and down, and moved up and down by a second elevating part, and positioned with a third guided grenade insert that surrounds a part of the body of the guided missile. Fixing device for checking guided missiles.
청구항 8에 있어서,
상기 제1승하강부는 상기 제1이동 몸체에 세워져 회전 가능하게 위치되며 상기 제2이동 몸체에 나사결합되어 회전되어 회전되는 방향에 따라 상기 제2이동 몸체를 승하강시키는 제1클램핑 승하강 스크류를 포함하고,
상기 제2승하강부는 상기 제3이동 몸체에 세워져 회전 가능하게 위치되며 상기 제4이동 몸체에 나사결합되어 회전되어 회전되는 방향에 따라 상기 제4이동 몸체를 승하강시키는 제2클램핑 승하강 스크류를 포함하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 8,
The first elevating unit is mounted on the first movable body to be rotatably positioned and screwed to the second movable body to rotate and rotate the first clamping elevating screw to elevate the second movable body according to the rotating direction. Including,
The second elevating portion is rotatably positioned on the third movable body and is screwed to the fourth movable body to rotate and rotate the second clamping elevating screw to elevate the fourth movable body according to the rotational direction. Fixed apparatus for checking missiles, characterized in that it comprises.
청구항 9에 있어서,
상기 제1승하강부는,
상기 제1이동 몸체에 회전가능하게 위치되고 외부로 돌출되게 위치되며 상기 제1클램핑 승하강 스크류를 작동시키는 회전력을 발생시키는 제1승하강 조작부재를 더 포함하며,
상기 제2승하강부는,
상기 제3이동 몸체에 회전가능하게 위치되고 외부로 돌출되게 위치되며 상기 제2클램핑 승하강 스크류를 작동시키는 회전력을 발생시키는 제2승하강 조작부재를 더 포함하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 9,
The first elevating unit,
Further comprising a first elevating operation member which is rotatably located on the first movable body and protrudes outward and generates a rotational force to operate the first clamping elevating screw,
The second elevating portion,
Fixed device for checking guided missiles, characterized in that it further comprises a second lifting and lowering operation member which is rotatably positioned on the third moving body and protrudes outward and generates a rotational force to operate the second clamping lifting screw. .
청구항 9에 있어서,
상기 제1승하강부는,
전기 전원을 공급받아 작동되어 상기 제1클램핑 승하강 스크류를 회전시키는 제1승하강 회전모터를 더 포함하고,
상기 제2승하강부는,
전기 전원을 공급받아 작동되어 제2클램핑 승하강 스크류를 회전시키는 제2승하강 회전모터를 더 포함하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 9,
The first elevating unit,
Further comprising a first elevating rotary motor that is operated by receiving electrical power to rotate the first clamping elevating screw,
The second elevating portion,
A guide device for inspecting guided missiles, characterized in that it further comprises a second lifting and lowering rotating motor operated by receiving electrical power to rotate the second clamping lifting and lowering screw.
삭제delete 유도탄의 일측이 안착되어 고정되는 제1유도탄 고정부;
상기 제1유도탄 고정부와 이격되게 위치되며 상기 유도탄의 타측이 안착되어 고정되는 제2유도탄 고정부;
조립이 완료된 유도탄이 장입되는 발사관의 일측이 안착되어 고정되는 제1발사관 고정부;
상기 제1발사관 고정부와 이격되게 위치되며 상기 발사관의 타측이 안착되어 고정되는 제2발사관 고정부;
상기 제1유도탄 고정부와 상기 제1발사관 고정부가 장착되어 고정되는 제1베이스부;
상기 제2유도탄 고정부와 상기 제2발사관 고정부가 장착되어 고정되는 제2베이스부;
상기 제1베이스부의 좌, 우 이동을 가능하게 하는 제1직선 이동부; 및
상기 제2베이스부의 좌, 우 이동을 가능하게 하는 제2직선 이동부를 포함하며,
상기 제1직선 이동부는 상기 제1베이스부가 이동 가능하게 결합되고 유도탄 또는 발사체의 원주 방향으로 위치되어 상기 제1베이스부의 직선 이동을 안내하는 제1직선 이동 가이드 레일부재를 포함하며,
상기 제2직선 이동부는 상기 제2베이스부가 이동 가능하게 결합되고 유도탄 또는 발사체의 원주 방향으로 위치되어 제2베이스부의 직선 이동을 안내하는 제2직선 이동 가이드 레일부재를 포함하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
A first guided grenade fixing part on which one side of the guided grenade is seated and fixed;
A second guided grenade fixed portion which is spaced apart from the first guided grenade fixed portion and is fixed by being seated on the other side of the guided grenade;
A first launcher fixed portion on which one side of the launcher where the assembled guided missile is loaded is fixed;
A second blast tube fixing part positioned to be spaced apart from the first blast tube fixing part and fixed to the other side of the launcher tube;
A first base portion to which the first guided grenade fixing portion and the first launcher fixing portion are mounted and fixed;
A second base portion to which the second guide grenade fixing portion and the second launcher fixing portion are mounted and fixed;
A first linear moving portion enabling left and right movement of the first base portion; And
And a second linear moving part enabling left and right movement of the second base part,
The first linear moving portion includes a first linear moving guide rail member movably coupled to the first base portion and positioned in a circumferential direction of a guided missile or projectile to guide linear movement of the first base portion,
The second linear moving part is a check guide missile characterized in that the second base portion is movably coupled and includes a second linear movement guide rail member that is positioned in the circumferential direction of the projectile or projectile to guide the linear movement of the second base portion. Dragon fixture.
삭제delete 청구항 13에 있어서,
상기 제1베이스부와 상기 제2베이스부의 전, 후 이동을 가능하게 하는 길이방향 직선 이동부를 더 포함하며,
상기 길이방향 직선 이동부는,
상기 제1직선 이동 가이드 레일부재와 상기 제2직선 이동 가이드 레일부재를 연결하는 레일 연결부재; 및
상기 레일 연결부재가 이동 가능하게 결합되고 유도탄 또는 발사체의 길이 방향으로 위치되어 상기 레일 연결부재의 직선 이동을 안내하는 길이방향 이동 가이드 레일부재를 포함하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 13,
The first base portion and the second base portion further includes a longitudinal linear moving portion that enables movement before and after,
The longitudinal linear moving part,
A rail connecting member connecting the first linear moving guide rail member and the second linear moving guide rail member; And
The rail connecting member is movably coupled and is located in the longitudinal direction of the guided projectile or projectile, the guide device for checking guided missiles comprising a longitudinally moving guide rail member for guiding the linear movement of the rail connecting member.
유도탄의 일측이 안착되어 고정되는 제1유도탄 고정부;
상기 제1유도탄 고정부와 이격되게 위치되며 상기 유도탄의 타측이 안착되어 고정되는 제2유도탄 고정부;
조립이 완료된 유도탄이 장입되는 발사관의 일측이 안착되어 고정되는 제1발사관 고정부;
상기 제1발사관 고정부와 이격되게 위치되며 상기 발사관의 타측이 안착되어 고정되는 제2발사관 고정부; 및
일단부가 상기 제1발사관 고정부에 분리 가능하게 결합되고 타단부가 상기 제2발사관 고정부에 분리 가능하게 결합되며 유도탄의 내부로 삽입되어 장착되는 유도탄의 내부 부품을 안착시켜 거치할 수 있는 부품 받침부를 포함하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
A first guided grenade fixing part on which one side of the guided grenade is seated and fixed;
A second guided grenade fixed portion which is spaced apart from the first guided grenade fixed portion and is fixed by being seated on the other side of the guided grenade;
A first launcher fixed portion on which one side of the launcher where the assembled guided missile is loaded is fixed;
A second blast tube fixing part positioned to be spaced apart from the first blast tube fixing part and fixed to the other side of the launcher tube; And
One end part is detachably coupled to the first launch tube fixing part, the other end is detachably coupled to the second launch tube fixing part, and a part support capable of seating and mounting the internal parts of the guided missile inserted into and mounted inside the guide missile. Fixed apparatus for checking guided missiles, characterized in that it comprises a wealth.
청구항 1에 있어서,
일단부가 상기 제1발사관 고정부에 분리 가능하게 결합되고 타단부가 상기 제2발사관 고정부에 분리 가능하게 결합되며 유도탄의 내부로 삽입되어 장착되는 유도탄의 내부 부품을 안착시켜 거치할 수 있는 부품 받침부를 더 포함하며,
상기 부품 받침부는,
상부가 개방된 형태의 부품 삽입공간이 구비된 부품 받침부재;
상기 부품 받침부재의 일단부 측에 위치되고 상기 제1발사관 클램핑부재와 분리 가능하게 결합되고 유도탄의 분리된 동체를 결합할 수 있는 제1동체 결합부재;
상기 부품 받침부재의 타단부 측에 위치되고 제3발사관 클램핑부재와 분리 가능하게 결합되고 유도탄의 분리된 동체를 결합할 수 있는 제2동체 결합부재를 포함하는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 1,
One end part is detachably coupled to the first launch tube fixing part, the other end is detachably coupled to the second launch tube fixing part, and a part support capable of seating and mounting the internal parts of the guided missile inserted into and mounted inside the guide missile. More wealth,
The parts supporting portion,
A component support member provided with a component insertion space of an open type;
A first fuselage coupling member positioned at one end side of the component supporting member and detachably coupled with the first launch tube clamping member and capable of coupling a separated fuselage of guided missiles;
And a second fuselage coupling member positioned on the other end side of the component supporting member and detachably coupled with a third launch tube clamping member and capable of coupling a separated fuselage of guided missiles.
청구항 17에 있어서,
상기 제1동체 결합부재의 양측에는 상기 제1발사관 클램핑부재에 안착되어 볼트 체결되는 제1안착부가 위치되고, 상기 제2동체 결합부재의 양측에는 상기 제3발사관 클램핑부재에 안착되어 볼트 체결되는 제2안착부가 위치되는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 17,
A first seating portion is mounted on both sides of the first fuselage coupling member and is bolted to the first blasting tube clamping member, and is mounted on both sides of the second fuselage coupling member to be bolted by being seated on the third blasting clamping member. 2 The fixing device for the guided missile inspection, characterized in that the seating portion is located.
청구항 17에 있어서,
상기 부품 받침부재는 반원형의 단면을 가지는 부품 삽입공간이 내부에 위치되는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 17,
The component supporting member is a fixing device for a guided missile inspection, characterized in that a component insertion space having a semi-circular cross-section is located therein.
청구항 17에 있어서,
상기 제1동체 결합부재와 상기 제2동체 결합부재는 동체의 일부분을 감싸되 적어도 동체의 절반을 초과하여 감싸는 링형태로 형성되어 동체가 내부로 삽입되어 거치되는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 17,
The first fuselage coupling member and the second fuselage coupling member are formed in a ring shape enclosing a portion of the fuselage but at least more than half of the fuselage, so that the fuselage is inserted into the inside and mounted to check guided missiles. .
청구항 17에 있어서,
상기 제1유도탄 고정부는,
유도탄의 동체 중 일부를 감싸는 제1유도탄 삽입부가 위치된 제1유도탄 클램핑부재;
유도탄의 동체 중 나머지 부분을 감싸는 제2유도탄 삽입부가 위치되고 상기 제1유도탄 클램핑부재에 분리 가능하게 결합되는 제2유도탄 클램핑부재를 포함하며,
상기 제2유도탄 고정부는,
유도탄의 동체 중 일부를 감싸는 제3유도탄 삽입부가 위치된 제3유도탄 클램핑부재; 및
유도탄의 동체 중 나머지 부분을 감싸는 제4유도탄 삽입부가 위치되고 상기 제3유도탄 클램핑부재에 분리 가능하게 결합되는 제4유도탄 클램핑부재를 포함하며,
상기 제1동체 결합부재의 외측면에는 하부 측에 상기 제1유도탄 클램핑부의 제1유도탄 삽입부에 삽입되어 안착되는 제1보조 받침부가 돌출되게 위치되고,
상기 제2동체 결합부재의 외측면에는 하부 측에 상기 제2유도탄 클램핑부재의 제2유도탄 삽입부에 삽입되어 안착되는 제2보조 받침부가 돌출되게 위치되는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 17,
The first guided grenade fixing part,
A first guided bullet clamping member in which a first guided bullet inserting portion surrounding a part of the body of the guided bullet is located;
A second guided grenade clamping member which is located on the second guided grenade clamping member and is detachably coupled to the first guided grenade clamping member;
The second guided grenade fixing part,
A third guided bullet clamping member in which a third guided bullet inserting portion surrounding a part of the body of the guided bullet is located; And
A fourth guided grenade clamping member is disposed to surround the rest of the body of the guided missile and is detachably coupled to the third guided grenade clamping member.
On the outer surface of the first fuselage coupling member, a first auxiliary support portion inserted into and seated in the first guided bullet inserting portion of the first guided bullet clamping portion is protruded on the lower side,
A fixing device for checking guided missiles, characterized in that a second auxiliary support portion inserted into and seated in a second guided grenade inserting portion of the second guided grenade clamping member is disposed on an outer side of the second fuselage coupling member.
청구항 21에 있어서,
상기 제1보조 받침부는 상기 제1유도탄 삽입부의 곡률과 대응되는 곡률을 가지는 곡면을 가져 제1유도탄 삽입부 내에 안착되며,
상기 제2보조 받침부는 상기 제2유도탄 삽입부의 곡률과 대응되는 곡률을 가지는 곡면을 가져 제2유도탄 삽입부 내에 안착되는 것을 특징으로 하는 유도탄 점검용 고정 장치.
The method according to claim 21,
The first auxiliary support portion has a curvature having a curvature corresponding to the curvature of the first guided bullet inserting portion, and is seated in the first guided bullet inserting portion,
The second auxiliary support portion has a curved surface having a curvature corresponding to the curvature of the second guided grenade insert, characterized in that it is seated in the second guided grenade insert, guide device for checking guided missiles.
KR1020180125375A 2018-10-19 2018-10-19 Holding apparatus for inspection of guided missile KR102135717B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180125375A KR102135717B1 (en) 2018-10-19 2018-10-19 Holding apparatus for inspection of guided missile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180125375A KR102135717B1 (en) 2018-10-19 2018-10-19 Holding apparatus for inspection of guided missile

Publications (2)

Publication Number Publication Date
KR20200044512A KR20200044512A (en) 2020-04-29
KR102135717B1 true KR102135717B1 (en) 2020-07-20

Family

ID=70466650

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180125375A KR102135717B1 (en) 2018-10-19 2018-10-19 Holding apparatus for inspection of guided missile

Country Status (1)

Country Link
KR (1) KR102135717B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100418666B1 (en) * 2001-03-22 2004-02-11 기아자동차주식회사 Apparatus for loading anti-tank missile
KR100713217B1 (en) * 2006-09-14 2007-05-02 국방과학연구소 Station for guided missile
KR101691391B1 (en) * 2015-03-05 2016-12-30 국방과학연구소 Missile fixing apparatus

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4685412A (en) * 1986-02-14 1987-08-11 Fmc Corporation Submarine weapon dolly with self stowing bands
KR101708001B1 (en) 2015-05-18 2017-02-17 국방과학연구소 Assembling apparatus for missile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100418666B1 (en) * 2001-03-22 2004-02-11 기아자동차주식회사 Apparatus for loading anti-tank missile
KR100713217B1 (en) * 2006-09-14 2007-05-02 국방과학연구소 Station for guided missile
KR101691391B1 (en) * 2015-03-05 2016-12-30 국방과학연구소 Missile fixing apparatus

Also Published As

Publication number Publication date
KR20200044512A (en) 2020-04-29

Similar Documents

Publication Publication Date Title
KR100713217B1 (en) Station for guided missile
KR101708001B1 (en) Assembling apparatus for missile
KR101224754B1 (en) A shell automatic loading apparatus of a mortar
KR102135717B1 (en) Holding apparatus for inspection of guided missile
CN105773040A (en) Internal folding/unfolding clamp for annular member
CN108627047A (en) Universal gun shoots support device for big gun
CN112077508B (en) Positioning assembly of thin-wall cylinder
US10458735B2 (en) Combined loading device and combined loading method for shell and charge
CN112611255B (en) Artillery locking machine shell-pulling test device and test method
CN107290210B (en) Special equivalent clamp for impact fatigue test of heavy part of automatic machine
CN102564222B (en) Artillery ammunitions loading system
CN105783585B (en) Gun launching recoil force effect simulation device
KR940002806B1 (en) Apparatus and method for preassembling a top nozzle subassembly for a nuclear fuel assembly
KR102467804B1 (en) Incremental forming apparatus for manufacturing projectile and manufacturing method of projectile using the same
EP2180284A2 (en) Weapon system, in particular for military vehicle
CN215598218U (en) Large-elevation launching protection device for 40mm rocket tube
JP7174165B2 (en) Barrel mount and machine gun
KR102231201B1 (en) Apparatus for loading ammunition in cannon
CN208366153U (en) Universal gun shoots support device for big gun
KR102278377B1 (en) Warhead extraction apparatus
CN112730111A (en) Vertical high-speed projectile launcher based on hydraulic thrust
RU212593U1 (en) Training projectile extractor from the barrel of a 2S19M2 self-propelled howitzer
KR102010504B1 (en) Loading device of pod for launch vehicle
RU2318705C1 (en) Method of and device for mating launcher with missiles of different classes of multistage missile family
KR101930503B1 (en) Laminating apparatus for submunition assembly and laminating method for submunition assembly using the same

Legal Events

Date Code Title Description
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant