KR102100543B1 - Furring strip joint unit for adjusting strut length - Google Patents

Furring strip joint unit for adjusting strut length Download PDF

Info

Publication number
KR102100543B1
KR102100543B1 KR1020170087312A KR20170087312A KR102100543B1 KR 102100543 B1 KR102100543 B1 KR 102100543B1 KR 1020170087312 A KR1020170087312 A KR 1020170087312A KR 20170087312 A KR20170087312 A KR 20170087312A KR 102100543 B1 KR102100543 B1 KR 102100543B1
Authority
KR
South Korea
Prior art keywords
steel pipe
length adjustment
length
band
strut
Prior art date
Application number
KR1020170087312A
Other languages
Korean (ko)
Other versions
KR20190006384A (en
Inventor
백진명
차민호
Original Assignee
백진명
주식회사 발해
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 백진명, 주식회사 발해 filed Critical 백진명
Priority to KR1020170087312A priority Critical patent/KR102100543B1/en
Publication of KR20190006384A publication Critical patent/KR20190006384A/en
Application granted granted Critical
Publication of KR102100543B1 publication Critical patent/KR102100543B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • E02D17/083Shoring struts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Clamps And Clips (AREA)

Abstract

본 발명은 부재를 절단할 필요가 없어져 자재의 손실염려가 없고, 별도의 이음작업이 불필요하며, 길이 조절에 크게 제한을 받지 않도록 한 스트럿 길이 조절용 띠장 결합유닛을 제공한다.
본 발명의 적절한 실시 형태에 따르면, 벽체측 띠장에 볼트 연결되는 띠장결합부재와; 상기 띠장결합부재의 일면에 접합되어 원형으로 배열된 다수개의 포지션 너트와; 일단이 상기 포지션 너트에 각기 체결되어 서로 나란하게 배치된 길이조절용 전산볼트와; 상기 길이조절용 전산볼트의 타단에 위치 이동가능하게 삽입되어 있는 다발강관 푸셔와; 상기 길이조절용 전산볼트에 나사 결합되어 다발강관 푸셔의 후퇴 이동을 억제하는 잠금너트를 포함하여, 상기 띠장결합부재와 상기 다발강관 푸셔와의 사이에 유압잭을 설치하여 다발강관 푸셔를 전진 가압할 수 있도록 구성된 것을 특징으로 한다.
The present invention provides a belt length coupling unit for strut length adjustment, which eliminates the need to cut the member, so that there is no fear of material loss, a separate joint operation is unnecessary, and that the length adjustment is not greatly limited.
According to a preferred embodiment of the present invention, the band-joining member which is bolted to the wall-side belt length; A plurality of position nuts which are joined to one surface of the band coupling member and arranged in a circle; Computation bolts for adjusting the length of each end is respectively fastened to the position nut and arranged parallel to each other; A bundle steel pipe pusher movably inserted into the other end of the length adjustment computer bolt; A screw nut is screwed to the length adjustment computer bolt and includes a lock nut that suppresses the retraction movement of the bundle steel pipe pusher, so that a hydraulic jack is installed between the strap coupling member and the bundle steel pipe pusher so that the bundle steel pipe pusher can be pushed forward. It is characterized by being configured.

Description

스트럿 길이 조절용 띠장 결합유닛{Furring strip joint unit for adjusting strut length}{Furring strip joint unit for adjusting strut length}

본 발명은 흙막이 벽체 시공시 설치되는 스트럿에 활용되는 스트럿 길이 조절용 띠장 결합유닛에 관한 것으로, 특히 부재를 절단할 필요가 없어져 자재의 손실염려가 없고, 별도의 이음작업이 불필요하며, 길이 조절에 크게 제한을 받지 않도록 한 스트럿 길이 조절용 띠장 결합유닛에 관한 것이다.The present invention relates to a strut length-adjusting band-joining unit used for a strut installed during construction of a retaining wall. In particular, there is no need to cut a member, so there is no fear of material loss, no additional jointing is required, and length adjustment is large. It relates to a strap length adjusting unit for adjusting the strut length so as not to be limited.

일반적으로 다발강관 스트럿(Strut)은 강관이 다발로 묶여져 있는 구조를 가지고 있다. 그런데 다발강관 스트럿(Strut)을 설치하기 위해서는 현장조건에 맞게 길이를 조절하여 사용하여야 한다. 이 경우 스트럿의 길이를 조절하기 위하여 부재를 절단하여 사용하거나 소부재를 제작하여 사용하고 경미한 차이는 잭의 스크로크(Stroke)로 조절하여 사용한다.Generally, a bundle steel pipe strut has a structure in which a steel pipe is bundled. However, in order to install a bundle steel tube strut, the length should be adjusted and used according to the site conditions. In this case, to adjust the length of the strut, the member is cut or used, or a small member is used, and the slight difference is used by adjusting the stroke of the jack.

그러나 부재를 절단하여 사용할 경우는 자재의 손실이 커 비경제적이고 많은 작업시간이 소용되는 단점이 있다. 소부재를 사용할 경우에는 부재의 제작과 이음작업에 따른 비용증가와 작업시간이 소요되는 단점이 있다. 또한 건설현장에서 일반적으로 쓰이고 있는 스크류 잭(Screw Jack)이나 프리로딩 잭(Preloading Jack)의 경우 스트로크가 120mm ~ 150mm 정도로 짧아 길이 조절에 한계가 있다.However, when the member is cut and used, there is a disadvantage in that material loss is large, which is uneconomical and wastes a lot of work time. In the case of using a small member, there is a disadvantage in that it increases the cost and the working time due to the manufacturing and jointing of the member. In addition, in the case of a screw jack or preloading jack, which is commonly used in construction sites, the stroke has a short stroke of about 120mm to 150mm, which limits the length adjustment.

따라서 이러한 문제를 해결하기 위하여 스트럿의 길이를 조절하므로써 불필요한 자재절단이나 소부재 제작의 필요성이 없고, 스트럿의 설치 시간을 단축하여 경제성과 작업성을 개선하기 위한 장치가 요구된다.Therefore, by adjusting the length of the strut in order to solve this problem, there is no need for unnecessary material cutting or small member manufacturing, and a device for improving economic efficiency and workability by reducing the installation time of the strut is required.

본 발명의 배경이 되는 기술로는 한국 등록특허 등록번호 제10-1708034호로서, '다발 강관식 버팀대 및 이를 이용한 흙막이 버팀공법'이 제안되어 있다. 여기서, 다발 강관식 버팀대는, 원형 강관으로 제작되어 일정한 길이를 갖고 굴착 깊이에 따른 사용 본수 만큼 구비되는 복수개 이상의 버팀재와; 상기 버팀재의 일측 단부에 각기 끼움 결합되어 띠장에 볼트 결합으로 결착되는 띠장 결합구와; 동일축상으로 이웃한 버팀재를 결합시켜 버팀대의 전체 길이를 증가시키는 버팀재 결합구;를 포함하여 구성된 것을 특징으로 하여, 굴착 심도에 따른 작용 토압에 대응하여 사용 본수에 맞는 다발식으로 버팀대를 구성하여 경제성과 효율적 버팀 시공이 가능한 이점을 갖는다.As a background technology of the present invention, as Korean Registered Patent Registration No. 10-1708034, a 'multi-steel pipe type brace and a method for supporting a soil clogging using the same' have been proposed. Here, the bundle steel pipe type brace is made of a circular steel pipe and has a certain length and has a plurality of or more braces provided for the number of uses according to the depth of excavation; A band-shaped coupling hole, which is fitted into one end of the support member, and is bolted to the belt-shaped coupling; Characterized in that it comprises a; brace members that increase the overall length of the brace by combining adjacent brace members on the same axis; and, in response to the working pressure according to the depth of excavation, the brace is configured in a bundle type suitable for the number of uses. It has the advantage of economical and efficient support construction.

그러나 상기 배경기술은 띠장에 띠장 결합구를 통해 버팀대를 정착시켜 나가는 과정에서 띠장과 띠장 결합구간에 부족한 간격이 발생되는 경우 통상의 스크류 잭을 사용할 수 밖에 없다. 이 경우 스크류 잭에서 발생되는 최대 스트로크를 가지고도 간격이 메워지지 않으면 소부재를 제작해 설치해야 하므로 이에 대한 방안이 요구된다.However, the above background technology is forced to use a conventional screw jack when insufficient spacing occurs between the band and the band joining section in the process of fixing the brace through the band joining hole. In this case, if the gap is not filled even with the maximum stroke generated by the screw jack, a method for this is required because a small member must be manufactured and installed.

한국 등록특허 등록번호 제10-1708034호Korean Registered Patent Registration No. 10-1708034

본 발명은 부재를 절단할 필요가 없어져 자재의 손실염려가 없고, 별도의 이음작업이 불필요하며, 길이 조절에 크게 제한을 받지 않도록 한 스트럿 길이 조절용 띠장 결합유닛을 제공함에 그 목적이 있다.The object of the present invention is to provide a strut-length-adjusting band-joining unit, which eliminates the need to cut the member, so that there is no fear of material loss, a separate jointing operation is unnecessary, and that the length adjustment is not greatly limited.

본 발명의 적절한 실시 형태에 따르면, 포지션 너트가 정착되는 전면판과, 다수의 볼트 체결공을 갖고 띠장에 지지되는 후면판 및 전,후면판을 연결시켜주는 부재보강판으로 구성되어 벽체측 띠장에 후면판을 통해 볼트 연결되는 띠장결합부재와;
상기 띠장결합부재의 일면에 접합되어 원형으로 배열된 다수개의 포지션 너트와;
일단이 상기 포지션 너트에 각기 체결되어 서로 나란하게 배치된 길이조절용 전산볼트와;
상기 길이조절용 전산볼트가 각기 삽입되는 볼트공을 갖는 가압판과, 상기 가압판의 전면에 원형 배열 접합되고 길이조절용 전산볼트와 어긋난 위치에 배치되어 다발 강관 스트럿측 각 강관의 단부가 삽입되는 다수개의 강관결합용 소켓과, 상기 가압판과 상기 강관결합용 소켓에 접합되어 상기 강관결합용 소켓의 접합을 보강하는 소켓 스티프너로 구성되어 상기 길이조절용 전산볼트의 타단에 위치 이동가능하게 삽입되어 있는 다발강관 푸셔와;
상기 길이조절용 전산볼트에 나사 결합되어 다발강관 푸셔의 후퇴 이동을 억제하는 잠금너트를 포함하여,
상기 띠장결합부재와 상기 다발강관 푸셔와의 사이에 유압잭을 설치하여 다발강관 푸셔를 전진 가압할 수 있도록 구성된 것을 특징으로 한다.
According to a preferred embodiment of the present invention, the front plate on which the position nut is settled, the back plate having a plurality of bolt fastening holes, and a member reinforcement plate connecting the front and rear plates to be supported on the belt, is provided on the wall-side belt. A band-joining member that is bolted through the back plate;
A plurality of position nuts which are joined to one surface of the band coupling member and arranged in a circle;
Computation bolts for adjusting the length of each end is respectively fastened to the position nut and arranged parallel to each other;
A plurality of steel pipe combinations in which a pressure plate having a bolt hole into which the length adjustment computer bolts are respectively inserted, and a circular array bonding to the front surface of the pressure plate and arranged at an offset position with the length adjustment computer bolt are inserted into the ends of each steel pipe on the bundle steel pipe strut side A bundle steel pipe pusher which is formed of a socket stiffener which is connected to the socket for the pressure plate and the socket for coupling the steel pipe and reinforces the connection of the socket for coupling the steel pipe, and is movably inserted into the other end of the length adjustment computer bolt;
A lock nut that is screwed to the length adjustment computer bolt to suppress the retraction movement of the bundle steel pipe pusher,
It is characterized in that it is configured to install the hydraulic jack between the band coupling member and the bundle steel pipe pusher to press forward the bundle steel pipe pusher.

삭제delete

삭제delete

본 발명에 따른 스트럿 길이 조절용 띠장 결합유닛은 스트럿 길이 조절용 띠장 결합유닛을 통하여 부족한 연결부분이 연결되어 종래와 같이 부재를 절단할 필요가 없어져 자재의 손실염려가 없다. 또한, 소부재의 제작과 이음작업이 불필요하여 이에 따른 비용감소와 작업시간이 단축되는 장점이 있다.The strut length-adjusting band-joining unit according to the present invention eliminates the need to cut the member as in the prior art because the insufficient connection portion is connected through the strut length-adjusting band-joining unit, so there is no fear of material loss. In addition, there is an advantage in that manufacturing and jointing of the small member are unnecessary, thereby reducing cost and reducing work time.

또한, 스트럿 길이 조절용 띠장 결합유닛은 유압잭의 스크로크를 충분히 수용할 수 있는 길이조절용 전산볼트를 가지고 있어 길이 조절에 크게 제한을 받지 않는 이점을 갖는다.In addition, the strut length-adjusting band-joining unit has the advantage of not being greatly limited in the length adjustment since it has a computerized bolt for length adjustment that can sufficiently accommodate the stroke of the hydraulic jack.

본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시 예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니 된다.
도 1은 본 발명에 따른 스트럿 길이 조절용 띠장 결합유닛의 사시도.
도 2는 도 1의 정면도.
도 3a는 도 2의 우측면도.
도 3b는 도 2의 좌측면도.
도 4는 본 발명에 따른 스트럿 길이 조절용 띠장 결합유닛의 설치상태도.
도 5a 내지 도 5c는 본 발명에 따른 스트럿 길이 조절용 띠장 결합유닛을 이용한 다발 강관 스트럿의 시공순서도.
The following drawings attached in the present specification are intended to illustrate preferred embodiments of the present invention, and serve to further understand the technical idea of the present invention together with the detailed description of the present invention, so the present invention is only described in the accompanying drawings. It is not limited and should not be interpreted.
1 is a perspective view of a strut length coupling unit for strut length adjustment according to the present invention.
Figure 2 is a front view of Figure 1;
Figure 3a is a right side view of Figure 2;
3B is a left side view of FIG. 2.
Figure 4 is an installation state of the belt length coupling unit for strut length adjustment according to the present invention.
5a to 5c is a flow chart of the construction of the bundle steel pipe struts using a strut length coupling unit for strut length adjustment according to the present invention.

아래에서 본 발명은 첨부된 도면에 제시된 실시 예를 참조하여 상세하게 설명이 되지만 제시된 실시 예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다.The present invention will be described in detail below with reference to the embodiments presented in the accompanying drawings, but the presented embodiments are illustrative for a clear understanding of the present invention and the invention is not limited thereto.

본 발명의 바람직한 실시 예에 따른 스트럿 길이 조절용 띠장 결합유닛(10)은 도 1 내지 도 4에 도시된 바와 같이 흑막이 벽체(1)측 띠장(5)에 볼트 연결되는 띠장결합부재(12)와, 띠장결합부재(12)의 일면에 접합되어 원형으로 배열된 다수개의 포지션 너트(14)와, 일단이 포지션 너트(14)에 각기 체결되어 서로 나란하게 배치된 길이조절용 전산볼트(16)와, 길이조절용 전산볼트(16)의 타단에 위치 이동가능하게 삽입되어 있는 다발강관 푸셔(18)와, 길이조절용 전산볼트(16)에 나사 결합되어 다발강관 푸셔(18)의 후퇴 이동을 억제하는 잠금너트(20)를 포함하여 구성된다.The strut length adjusting unit 10 for strut length adjustment according to the preferred embodiment of the present invention is a band length coupling member 12 which is bolted to the band length 5 on the black wall (1) side as shown in FIGS. , A plurality of position nuts (14) arranged in a circle by being bonded to one surface of the band coupling member (12), and one end is fastened to the position nut (14) respectively, and the length adjustment computer bolts (16) arranged in parallel with each other, A bundle steel pipe pusher 18 which is movably inserted at the other end of the length adjustment computer bolt 16 and a lock nut that is screwed to the length adjustment computer bolt 16 to suppress the retraction movement of the bundle steel pipe pusher 18 20.

띠장결합부재(12)는 전면판(121)과 다수의 볼트 체결공(122a)을 갖는 후면판(122) 및 전,후면판(121와 122)을 연결시켜주는 부재보강판(123)으로 구성되어 있다. 본 실시 예에서 전면판(121)은 다발강관(50)을 지지할 수 있는 충분한 면적을 갖는다. 띠장결합부재(12)는 후면판(122)을 통해 벽체(1)측 띠장(5)에 볼트 연결된다. 부재보강판(123)은 다발강관(50)에 압축력을 부여하더라도 띠장결합부재(12)가 변형되지 않는 충분한 강도를 갖도록 한다.The band-joining member 12 is composed of a front plate 121 and a back plate 122 having a plurality of bolt fastening holes 122a and a member reinforcement plate 123 connecting the front and rear plates 121 and 122. It is done. In this embodiment, the front plate 121 has a sufficient area to support the bundle steel pipe 50. The band-joining member 12 is bolted to the wall-side side belt 5 through the back plate 122. The member reinforcing plate 123 is such that even when a compressive force is applied to the bundle steel pipe 50, the band-joining member 12 has sufficient strength not to be deformed.

길이조절용 전산볼트(16)는 다발 강관 스트럿(50)의 단부쪽에 부족한 연결길이보다 충분히 더 길게 구성된다. 길이조절용 전산볼트(16)는 일단이 포지션 너트(14)에 체결되어 띠장결합부재(12)의 전면판(121)에 대하여 직각 방향으로 배치된다.The length adjustment computer bolt 16 is configured to be sufficiently longer than the insufficient connection length at the end of the bundle steel pipe strut 50. The length adjustment computer bolt 16 has one end fastened to the position nut 14 and is disposed at a right angle to the front plate 121 of the band coupling member 12.

다발강관 푸셔(18)는 길이조절용 전산볼트(16)가 각기 삽입되는 볼트공(18a)을 갖는 가압판(181)과, 가압판(181)의 전면에 다발 강관 스트럿(50)측 강관(50a)의개수만큼 원형 배열되어 접합된 강관결합용 소켓(182)과, 가압판(181)과 강관결합용 소켓(182)에 접합되어 강관결합용 소켓(182)의 접합을 보강하는 소켓 스티프너(183)를 포함하여 구성된다. 강관결합용 소켓(182)은 다발 강관 스트럿(50)측 강관(50a)의 단부가 삽입되도록 원통형으로 강관삽입홀(182a)을 갖는다.The bundle steel pipe pusher 18 includes a pressure plate 181 having bolt holes 18a into which the computer bolts for length adjustment are respectively inserted, and a bundle steel pipe strut 50 on the front side of the pressure plate 181, the steel pipe 50a Includes a socket 182 for the steel pipe coupling circularly arranged by the number, and a socket stiffener 183 that is joined to the pressure plate 181 and the steel pipe coupling socket 182 to reinforce the connection of the steel pipe coupling socket 182. It is configured by. The socket 182 for steel pipe coupling has a steel pipe insertion hole 182a in a cylindrical shape so that the end of the bundle steel pipe strut 50 side steel pipe 50a is inserted.

가압판(181)은 본 실시 예에서 띠장결합부재(12)측 전면판(121)과 동일한 면적을 갖는다. 강관결합용 소켓(182)은 원통형으로 구성된다. 강관결합용 소켓(182)측 강관삽입홀(182a)의 내경은 다발 강관 스트럿(50)의 개별 강관의 외경과 같거나 이보다 크게 구성된다. 따라서 다발 강관 스트럿(50)의 개별 강관은 강관결합용 소켓(182)의 강관삽입홀(182a)에 삽입되어 가압판(181)에 지지될 수 있다.The pressure plate 181 has the same area as the front plate 121 on the band-joining member 12 in this embodiment. The socket 182 for steel pipe coupling is formed in a cylindrical shape. The inner diameter of the steel pipe insertion hole 182a on the side of the socket 182 for steel pipe coupling is configured to be equal to or larger than the outer diameter of the individual steel pipes of the bundle steel pipe strut 50. Therefore, the individual steel pipes of the bundle steel pipe strut 50 may be inserted into the steel pipe insertion hole 182a of the socket 182 for steel pipe coupling and supported by the pressure plate 181.

여기서, 강관결합용 소켓(182)은 길이조절용 전산볼트(16)와 어긋난 위치에 배치된다. 다발강관 스트럿(50)은 도 4와 같이 간격유지재(51)를 통하여 강관(50a)이 다발로 묶여져 있으며, 길이가 긴 경우 중간에 중앙결합부재(52)를 통하여 연결되어 있다.Here, the socket 182 for steel pipe coupling is disposed at a position deviated from the computer bolt 16 for length adjustment. The bundle steel pipe strut 50 is bundled with a bundle of steel pipes 50a through a gap retaining member 51 as shown in FIG. 4, and is connected through a central coupling member 52 in the middle when the length is long.

미설명 부호 '2'는 '띠장 지지브라켓'이다.Unexplained symbol '2' is 'band support bracket'.

이와 같이 구성된 스트럿 길이 조절용 띠장 결합유닛(10)을 이용한 다발 강관 스트럿(50)의 설치를 흙막이 벽체 시공을 통하여 살펴본다.The installation of the bundle steel pipe strut 50 using the strut length adjusting unit 10 for strut length constructed as described above will be examined through the construction of a retaining wall.

먼저, 도 5a와 같이 흙막이 벽체(1)와 중간말뚝(2)이 지반에 시공된 상태에서, 단계별 굴착시마다 띠장(5,5a)이 설치된 후 다발 강관 스트럿(50)이 중간말뚝(2)에 거치된다.First, as shown in Figure 5a, in the state that the earthen wall (1) and the intermediate pile (2) are installed on the ground, after each step excavation, the strips (5,5a) are installed and the bundle steel pipe strut (50) is placed on the middle pile (2). Is mounted.

이때, 다발 강관 스트럿(50)의 일단은 일측 띠장(5)에 띠장결합부재(12)를 통해 지지되고, 다발 강관 스트럿(50)의 타단은 타측 띠장(5a)과 일정한 이격 거리를 갖게 된다.At this time, one end of the bundle steel pipe strut (50) is supported through a band-joining member (12) on one side length (5), and the other end of the bundle steel pipe strut (50) has a constant separation distance from the other side length (5a).

따라서 도 5a와 같이 스트럿 길이 조절용 띠장 결합유닛(10)을 타측 띠장(5a)과 다발 강관 스트럿(50)의 타단과의 사이에 배치한 후, 띠장결합부재(12)를 타측 띠장(5a)에 볼트로 고정한다.Therefore, after placing the strut length adjusting unit 10 for strut length adjustment between the other end of the band 5a and the other end of the bundle steel pipe strut 50, as shown in Figure 5a, the band length coupling member 12 to the other side length (5a) Secure with bolts.

그 다음, 띠장결합부재(12)와 스트럿 길이 조절용 띠장 결합유닛(10)측 다발강관 푸셔(18)와의 사이에 유압잭(22)을 설치한다.Next, a hydraulic jack 22 is installed between the strip coupling member 12 and the bundle steel pipe pusher 18 on the strut length adjusting unit 10 side.

그 다음, 유압잭(22)에 압유를 공급하여 다발강관 푸셔(18)를 밀어낸다. 이 과정에서 다발 강관 스트럿(50)의 각 강관(50a)은 강관결합용 소켓(182)에 결합된 후 지지되어 유압잭(22)의 가압을 받게 된다.Then, hydraulic oil is supplied to the hydraulic jack 22 to push out the bundle steel pipe pusher 18. In this process, each steel pipe 50a of the bundle steel pipe strut 50 is supported after being coupled to a socket 182 for coupling a steel pipe to receive pressure from the hydraulic jack 22.

그 다음, 잠금너트(20)를 회전 조작시켜 스트럿 길이 조절용 띠장 결합유닛(10)측 가압판(181)에 밀착시켜 놓는다. 따라서 다발 강관 스트럿(50)은 스트럿 길이 조절용 띠장 결합유닛(10)을 통해서 일측 띠장(5)과 타측 띠장(5a)의 사이에서 가압되어져 흙막이 벽체(1)를 지지한다.Then, the lock nut 20 is rotated to be in close contact with the pressure plate 181 on the side of the strut length adjusting unit 10 for adjusting the strut length. Therefore, the bundle steel pipe strut 50 is pressurized between the one side strip 5 and the other side strip 5a through the strut length adjusting band coupling unit 10 to support the mud wall 1.

그 다음, 유압잭(22)에 공급된 압유를 제거한 후 유압잭(22)을 스트럿 길이 조절용 띠장 결합유닛(10)에서 도 5b와 같이 제거한다.Then, after removing the hydraulic oil supplied to the hydraulic jack 22, the hydraulic jack 22 is removed from the strut length adjusting band coupling unit 10 as shown in FIG. 5B.

이같이 하여 다발 강관 스트럿(50)은 도 5c와 같이 각 굴착 단계마다 설치되어 흙막이 벽체(1)를 안정되게 지지한다.In this way, the bundle steel pipe strut 50 is installed at each excavation step as shown in FIG. 5C to stably support the retaining wall 1.

따라서 본 발명에 따르면, 스트럿 길이 조절용 띠장 결합유닛(10)을 통하여 부족한 연결부분이 연결되어 종래와 같이 부재를 절단할 필요가 없어져 자재의 손실염려가 없다. 또한, 종래의 소부재를 사용할 경우 부재의 제작과 이음작업이 불필요하여 이에 따른 비용감소와 작업시간이 단축되는 장점이 있다.Accordingly, according to the present invention, the insufficient connection portion is connected through the strut length adjusting band-joining unit 10, so that there is no need to cut the member as in the prior art, and there is no fear of material loss. In addition, when using a conventional small member, there is an advantage in that manufacturing and jointing of the member are unnecessary, thereby reducing cost and reducing work time.

또한, 스트럿 길이 조절용 띠장 결합유닛(10)은 유압잭(22)의 스크로크를 충분히 수용할 수 있는 길이조절용 전산볼트(16)를 가지고 있어 길이 조절에 크게 제한을 받지 않는 이점을 갖는다.In addition, the strut length-adjusting band-joining unit 10 has the advantage of not being greatly limited in the length adjustment because it has a length adjustment computer bolt 16 capable of sufficiently accommodating the stroke of the hydraulic jack 22.

지금까지 본 발명은 제시된 실시 예를 참조하여 상세하게 설명이 되었지만 이 분야에서 통상의 지식을 가진 자는 제시된 실시 예를 참조하여 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명은 이와 같은 변형 및 수정 발명에 의하여 제한되지 않으며 다만 아래에 첨부된 청구범위에 의하여 제한된다. The present invention has been described in detail with reference to the presented embodiments, but those skilled in the art can make various modifications and modified inventions without departing from the technical spirit of the present invention with reference to the presented embodiments. will be. The present invention is not limited by such modified and modified inventions, but is limited by the appended claims.

12: 띠장결합부재
14: 포지션 너트
16: 길이조절용 전산볼트
18: 다발강관 푸셔
181: 가압판
182: 강관결합용 소켓
183: 소켓 스티프너
20: 잠금너트
12: band-length coupling member
14: position nut
16: Computer bolt for length adjustment
18: bundle steel pipe pusher
181: pressure plate
182: socket for steel pipe coupling
183: socket stiffener
20: lock nut

Claims (3)

포지션 너트(14)가 정착되는 전면판(121)과, 다수의 볼트 체결공(122a)을 갖고 띠장(5)에 지지되는 후면판(122) 및 전,후면판(121와 122)을 연결시켜주는 부재보강판(123)으로 구성되어 벽체(1)측 띠장(5)에 후면판(122)을 통해 볼트 연결되는 띠장결합부재(12)와;
상기 띠장결합부재(12)의 일면에 접합되어 원형으로 배열된 다수개의 포지션 너트(14)와;
일단이 상기 포지션 너트(14)에 각기 체결되어 서로 나란하게 배치된 길이조절용 전산볼트(16)와;
상기 길이조절용 전산볼트(16)가 각기 삽입되는 볼트공(18a)을 갖는 가압판(181)과, 상기 가압판(181)의 전면에 원형 배열 접합되고 길이조절용 전산볼트(16)와 어긋난 위치에 배치되어 다발 강관 스트럿(50)측 각 강관(50a)의 단부가 삽입되는 다수개의 강관결합용 소켓(182)과, 상기 가압판(181)과 상기 강관결합용 소켓(182)에 접합되어 상기 강관결합용 소켓(182)의 접합을 보강하는 소켓 스티프너(183)로 구성되어 상기 길이조절용 전산볼트(16)의 타단에 위치 이동가능하게 삽입되어 있는 다발강관 푸셔(18)와;
상기 길이조절용 전산볼트(16)에 나사 결합되어 다발강관 푸셔(18)의 후퇴 이동을 억제하는 잠금너트(20)를 포함하여,
상기 띠장결합부재(12)와 상기 다발강관 푸셔(18)와의 사이에 유압잭(22)을 설치하여 다발강관 푸셔(18)를 전진 가압할 수 있도록 구성된 것을 특징으로 하는 스트럿 길이 조절용 띠장 결합유닛.
By connecting the front plate 121 on which the position nut 14 is settled, and the rear plate 122 and the front and rear plates 121 and 122 supported by the band 5 with a plurality of bolt fastening holes 122a, The main member is composed of a member reinforcement plate 123, and the band-joining member 12, which is bolted to the wall-side side 5 through the rear plate 122;
A plurality of position nuts 14 which are joined to one surface of the band-joining member 12 and arranged in a circle;
Computation bolt 16 for length adjustment is arranged in parallel with each other, one end is respectively fastened to the position nut 14;
The pressure plate 181 having a bolt hole 18a into which the length adjustment computer bolts 16 are respectively inserted, and circularly joined to the front surface of the pressure plate 181 and arranged in a position deviated from the length adjustment computer bolts 16 Multiple steel pipe strut (50) side a plurality of steel pipe coupling socket 182 is inserted into the end of each steel pipe (50a), the pressure plate 181 and the steel pipe coupling socket 182 is joined to the socket for the steel pipe coupling A bundle steel pipe pusher (18) composed of a socket stiffener (183) for reinforcing the joining of (182) and movably inserted into the other end of the length adjustment computer bolt (16);
Including the lock nut 20 that is screwed to the length adjustment computer bolt 16 to suppress the retraction movement of the bundle steel pipe pusher 18,
Strut length adjustment belt length coupling unit characterized in that it is configured to install and press the hydraulic jack 22 between the band coupling member (12) and the bundle steel pipe pusher (18) to push forward the bundle steel pipe pusher (18).
삭제delete 삭제delete
KR1020170087312A 2017-07-10 2017-07-10 Furring strip joint unit for adjusting strut length KR102100543B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170087312A KR102100543B1 (en) 2017-07-10 2017-07-10 Furring strip joint unit for adjusting strut length

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170087312A KR102100543B1 (en) 2017-07-10 2017-07-10 Furring strip joint unit for adjusting strut length

Publications (2)

Publication Number Publication Date
KR20190006384A KR20190006384A (en) 2019-01-18
KR102100543B1 true KR102100543B1 (en) 2020-04-13

Family

ID=65323546

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170087312A KR102100543B1 (en) 2017-07-10 2017-07-10 Furring strip joint unit for adjusting strut length

Country Status (1)

Country Link
KR (1) KR102100543B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424401A (en) * 2019-07-02 2019-11-08 浙江工业大学 A kind of extension type locking prestressing apparatus for shaped steel combination support

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100588943B1 (en) * 2003-10-24 2006-06-12 대림산업 주식회사 Strut Preloading Jack and Structure for Supporting Strut using thereof
KR101708034B1 (en) * 2016-06-09 2017-02-17 백진명 Bundle steel pipe type strut and retaining wall struting construction method using of the same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100588943B1 (en) * 2003-10-24 2006-06-12 대림산업 주식회사 Strut Preloading Jack and Structure for Supporting Strut using thereof
KR101708034B1 (en) * 2016-06-09 2017-02-17 백진명 Bundle steel pipe type strut and retaining wall struting construction method using of the same

Also Published As

Publication number Publication date
KR20190006384A (en) 2019-01-18

Similar Documents

Publication Publication Date Title
US4997314A (en) Pressure grouted pier and pier inserting tool
KR20110018581A (en) Structure for connecting and jointing square still supporting beam in temporary soil sheathing and reinforcing members for the same
CN108979678B (en) Multistage yielding and compressing type steel frame based on constant-resistance sliding hole shearing loss and connecting method
KR100698878B1 (en) Y Type Connecting Structure of Steel Pipe Struts
EP2278076A1 (en) Multi-purpose earth anchor bracket
US20110129300A1 (en) Steel liners for tunnels
KR101708034B1 (en) Bundle steel pipe type strut and retaining wall struting construction method using of the same
KR102100543B1 (en) Furring strip joint unit for adjusting strut length
KR101873343B1 (en) Multi-directional driving jack used for temporary installation for land-side protection wall
KR102478561B1 (en) Connector with insertion groove for wale and strut of earth retaining wall
CN210564572U (en) Assembled advance stress release pilot tunnel supporting construction of recycling
KR102275450B1 (en) Cover band of connection device for steel pipe strut and connection device for steel pipe strut having the same
KR101300078B1 (en) Variable supporting device for sheathing work pile
JP2017160769A (en) Extrusion jig of multistage drain pipe and extrusion method of multistage drain pipe
JP5785792B2 (en) Inner tube support device and method of mounting the support device
JP4847264B2 (en) Backing prevention device
KR102008991B1 (en) supporting system for strut using wale girders with plural row
CN215518799U (en) Slope unearthing mouth PC worker method stake reinforcing apparatus
JP5116111B2 (en) Backing prevention device
KR102146577B1 (en) Fixed structure of high strength support material with easy to install at the construction site and construction method thereof
KR102153437B1 (en) Buckling beam connection for retaining wall
CN113089690A (en) Assembled strutting arrangement and assembled supporting construction
CN101725142B (en) Method for applying prestressing force to deep foundation pit steel tube internal prop
JP3834721B2 (en) Ground reinforcement method
CN110984172B (en) Horizontal steel supporting mechanism for foundation pit supporting and use method thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant