KR102093836B1 - Construction method of deck plate - Google Patents

Construction method of deck plate Download PDF

Info

Publication number
KR102093836B1
KR102093836B1 KR1020170145299A KR20170145299A KR102093836B1 KR 102093836 B1 KR102093836 B1 KR 102093836B1 KR 1020170145299 A KR1020170145299 A KR 1020170145299A KR 20170145299 A KR20170145299 A KR 20170145299A KR 102093836 B1 KR102093836 B1 KR 102093836B1
Authority
KR
South Korea
Prior art keywords
deck plate
gap
gap correction
cap
correction cap
Prior art date
Application number
KR1020170145299A
Other languages
Korean (ko)
Other versions
KR20190050107A (en
Inventor
임경상
Original Assignee
주식회사 상아뉴매틱
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 상아뉴매틱 filed Critical 주식회사 상아뉴매틱
Priority to KR1020170145299A priority Critical patent/KR102093836B1/en
Publication of KR20190050107A publication Critical patent/KR20190050107A/en
Application granted granted Critical
Publication of KR102093836B1 publication Critical patent/KR102093836B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • E04B5/40Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element with metal form-slabs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

본 발명은 간극 보정시공이 간편할 뿐만 아니라, 콘크리트를 타설한 이후에도 간극 보정 마무리 작업이 용이하여, 공사 기간을 단축할 수 있으며 이에 들어가는 인력과 비용을 절감하여 경제적인 효과를 가지는 데크플레이트 시공방법에 관한 것으로, 양 측에 보를 이격 설치하고, 상기 보의 사이에 데크플레이트를 설치하는 데크플레이트 설치단계; 상부와 하부가 서로 분리 가능하게 연결되는 간극 보정용 캡을 준비하여, 상기 보와 데크플레이트 틈새에 간극 보정용 캡을 설치하는 간극 보정용 캡 설치단계; 상기 보와 데크의 상면에 콘크리트 액을 타설하는 콘크리트 타설 단계; 및 상기 간극 보정용 캡의 하부를 당기어 상부로부터 분리시키는 간극 보정용 캡 분리단계를 포함한다.The present invention is not only convenient for the gap correction construction, but also facilitates the gap correction finishing operation even after pouring the concrete, thereby shortening the construction period and reducing the manpower and cost of entering the deck plate construction method with economical effect. Regarding, a deck plate installation step of spaced apart the beams on both sides, and to install a deck plate between the beams; A gap correction cap installation step of preparing a gap correction cap in which the upper and lower portions are detachably connected to each other and installing a gap correction cap in the gap between the beam and the deck plate; A concrete pouring step of pouring concrete liquid on the upper surface of the beam and deck; And a separation step of the gap correction cap to pull the lower portion of the gap correction cap and separate it from the upper portion.

Description

데크플레이트 시공방법 {Construction method of deck plate}Deck plate construction method {Construction method of deck plate}

본 발명은 데크플레이트 시공방법에 관한 것으로, 보다 상세하게는 보와 데크플레이트 사이의 간극을 보정하여 콘크리트 타설액이 누출되는 것을 방지하도록 구현한 데크플레이트 시공방법에 관한 것이다.The present invention relates to a method for constructing a deck plate, and more particularly, to a method for constructing a deck plate implemented to prevent a concrete pouring solution from leaking by correcting a gap between a beam and a deck plate.

일반적으로 데크플레이트(Deck-plate)란 건축물의 슬래브를 형성함에 있어 거푸집 대용으로서 콘크리트 타설 후에도 해체되지 않고 구조물을 형성할 수 있도록 아연도 강판과 같은 금속제 플레이트를 가공하여 제조된 슬래브용 자재를 말한다.
이와 같은 데크플레이트를 사용하여 슬래브 구조체를 축조하게 되면 바닥 콘크리트 공사용 형틀이 필요 없으므로 가설 공사에 소요되는 시간 및 비용을 절감할 수 있을 뿐 아니라, 단위 제품을 연속적으로 거치 고정하는 것만으로 시공이 이루어지므로 공사를 신속 용이하게 할 수 있으며, 공장 생산된 제품을 사용함으로써 일정 수준 이상의 품질을 확보할 수 있는 등의 장점을 가지고 있는 바, 최근 들어 이와 같이 데크플레이트를 사용 하여 슬래브 구조체를 시공하는 경우가 증가하고 있는 추세이다.
In general, deck-plate is a slab material manufactured by processing a metal plate such as a galvanized steel sheet so that it can be formed without dismantling even after pouring concrete as a formwork substitute in forming a slab of a building.
When a slab structure is constructed using such a deck plate, it is not necessary to reduce the time and cost required for the temporary construction because there is no need for a formwork for concrete construction on the floor. It has the advantage of being able to facilitate construction quickly and to secure a certain level of quality by using factory-produced products. Recently, the number of cases in which slab structures are constructed using deck plates has increased. It is a trend.

한편, 상기한 바와 같은 데크플레이트에 있어서 기존에는 주로 아연도 강판과 같은 판재를 연속적으로 절곡함으로써 사다리꼴의 골과 산이 반복되도록 한 형식의 데크플레이트가 주로 사용되고 있었으며, 이 경우 콘크리트 타설 후 골 부위가 마치 보강 리브와 같은 작용을 하여 바닥면의 강성을 증가시킬 수 있고, 골과 골 사이의 공간부를 전기 배선 및 설비 배관 등을 위한 공간으로 활용할 수 있다는 장점이 있어 종래로부터 이러한 형식의 데크플레이트가 널리 사용되고 있었다.On the other hand, in the deck plate as described above, in the past, a deck plate of a type in which trapezoidal bones and acids are repeated by repeatedly bending a plate material such as a galvanized steel sheet has been mainly used. It has the advantage of being able to increase the rigidity of the bottom surface by acting as a reinforcing rib, and the space between the valley and the valley can be used as a space for electrical wiring and facility piping. there was.

한국등록특허 제10-0814379호(2008.03.18 등록)는 트러스 거더 데크플레이트가 에이치형강에 안정적으로 안착되어 지지될 수 있도록 구성된 트러스 거더 일체형 슬래브 거푸집 구조에 관하여 개시되어 있는데, 슬래브 거푸집 패널이 트러스 거더의 하부에 다수개의 결합구에 의하여 이격되게 매달리어지도록 결합되어지되, 상기 트러스 거더의 하부철근 양측 단부 하단에는 지지구가 설치되어지고, 상기 지지구는 상기 일측의 하부철근과 타측의 하부철근에 연결되어지도록 설치되어 에이치형강의 플랜지의 상부에 얹혀지고, 상기 슬래브 거푸집 패널의 양단이 상기 에이치형강의 플랜지에 맞닿아지도록 설치되며, 상기 플랜지와 슬래브 거푸집 패널의 사이에는 콘크리트 몰탈이 흘러내리지 아니하도록 몰탈 흐름 방지재가 설치된 것을 특징으로 한다. Korean Patent Registration No. 10-0814379 (registration on March 18, 2008) discloses a truss girder integrated slab formwork structure configured to stably support a truss girder deck plate on H-shaped steel, wherein the slab formwork panel is a truss girder panel. It is coupled to be spaced apart by a plurality of coupling holes in the lower portion of the truss girder, the lower reinforcement at both ends of the lower end is installed, the support is connected to the lower rebar on one side and the lower rebar on the other side It is installed so as to be mounted on the top of the flange of the H-shaped steel, both ends of the slab formwork panel is installed to contact the flange of the H-shaped steel, mortar so that the concrete mortar does not flow between the flange and the slab formwork panel Characterized in that the flow prevention material is installed.

한국등록특허 제101125549호(2012.03.05 등록)는 트러스 데크플레이트를 이용한 슬래브 시공방법에 관하여 개시되어 있다. 개시된 기술에 따르면, 공장에서 복수의 고정수단 설치공을 정해진 간격을 두고 베이스 플레이트 상에 천공시켜 운송해온 트러스 데크플레이트들을 슬래브를 시공하고자 하는 건축물의 지주 상면에 순차적으로 연결/설치하는 공정과; 각각의 트러스 데크플레이트 저면에 소정 두께와 면적을 갖는 단열재를 위치시키고 복수의 고정수단을 이용하여 각각의 단열재를 트러스 데크플레이트에 일체로 부착 설치하는 공정과; 상기 트러스 데크플레이트들의 상면에 정해진 두께로 콘크리트를 타설하고 면 고르기를 한 다음 양생하여 단열재가 일체로 부착된 슬래브를 성형하는 공정;을 포함하고, 트러스 데크플레이트의 연결부 저면에 위치된 두 단열재의 접촉부 저면에, 소정 폭과 길이를 갖는 띠형 철판의 중심선을 따라 "U" 또는 "V"자 형상의 시멘트 페이스 유도홈이 일체로 절곡 형성되고, 상기 시멘트 페이스 유도홈의 양측에 형성된 날개에는 복수의 볼트 통과공을 천공한 구성을 갖는 시멘트 페이스트 유출 방지겸 유도판을 위치시킨 다음 고정수단을 이용하여 고정 설치하는 공정을 더 실시한다.Korean Registered Patent No. 101125549 (registered on March 5, 2012) discloses a method for constructing a slab using a truss deck plate. According to the disclosed technology, a process of sequentially connecting / installing truss deck plates which have been transported by drilling a plurality of fixing means installation holes on a base plate at predetermined intervals in a factory to the upper surface of a building to construct a slab; A step of locating an insulating material having a predetermined thickness and area on the bottom surface of each truss deck plate and integrally attaching and installing each insulating material to the truss deck plate using a plurality of fixing means; Containing concrete to a predetermined thickness on the upper surface of the truss deck plates, and then picking a surface and curing it to form a slab to which the insulation is integrally attached; includes, and the contact portion of the two insulation materials located on the bottom surface of the connecting portion of the truss deck plate A cement face guide groove having a “U” or “V” shape is integrally bent along a center line of a strip-shaped iron plate having a predetermined width and length on a bottom surface, and a plurality of bolts are provided on the wings formed on both sides of the cement face guide groove The process of installing and fixing a cement paste spill-preventing and guiding plate having a configuration with a through hole is further performed by using a fixing means.

상술한 바와 같은 종래의 데크플레이트를 시공하는 방법은, 콘크리트 타설시 보 역할을 하는 에이치(H)형강과 시공되는 데크플레이트 사이 틈새로 콘크리트 타설액이 흘러내리는 문제점을 방지하고자, 에이치형강과 데크플레이트 사이에 몰탈 흐름 방지재 또는 유도판과 같은 간극 보정기구를 설치하고 있다. 그러나 종래와 같은 간극 보정기구는, 고정을 위하여 테이핑 처리를 하거나 가장자리에 볼트공을 천공하여 볼트로 고정을 해야하는 불편함이 있다. 뿐만 아니라, 콘크리트 타설 후 간극 보정기구를 해체 및 제거하는 과정도 번거로워, 공사기간이 길어지며 소비되는 인력 및 비용이 늘어나는 문제점이 있다.The method of constructing the conventional deck plate as described above, to prevent the problem of the concrete pouring solution flowing into the gap between the H (H) section steel that acts as a beam when pouring concrete and the deck plate to be installed, H-shaped steel and deck plate A gap correction mechanism such as a mortar flow prevention material or an induction plate is provided between them. However, the gap correcting mechanism as in the related art has the inconvenience of fixing with a bolt by tapping or fixing a bolt hole at the edge for fixing. In addition, the process of dismantling and removing the gap correction mechanism after pouring concrete is cumbersome, and there is a problem in that the construction period is lengthened and the manpower and cost are increased.

본 발명은, 전술한 바와 같은 문제점을 해결하기 위한 것으로, 간극 보정 작업의 시공이 간편하고 잔여물 처리 및 후처리 작업이 용이한 데크플레이트 시공방법을 제공하는 것에 그 목적이 있다.The present invention is to solve the problems as described above, the object of the present invention is to provide a deck plate construction method that is easy to construct a gap correction operation and is easy to handle residues and post-treatment.

본 발명의 한 특징에 따르면, 양 측에 보를 이격 설치하고, 상기 보의 사이에 데크플레이트를 설치하는 데크플레이트 설치단계; 상부와 하부가 서로 분리 가능하게 연결되는 간극 보정용 캡을 준비하여, 상기 보와 데크플레이트 틈새에 간극 보정용 캡를 설치하는 간극 보정용 캡 설치단계; 상기 보와 데크플레이트의 상면에 콘크리트 액을 타설하는 콘크리트 타설 단계; 및 상기 간극 보정용 캡의 하부를 당기어 상부로부터 분리시키는 간극 보정용 캡 분리단계를 포함하는 데크플레이트 시공방법을 제공한다.According to one aspect of the present invention, the deck plate installation step of spaced apart the beams on both sides, and to install the deck plate between the beams; A gap-correcting cap installation step of preparing a gap-correcting cap having upper and lower portions detachably connected to each other and installing a gap-correcting cap in the gap between the beam and the deck plate; A concrete pouring step of pouring concrete liquid on the upper surface of the beam and deck plate; And it provides a deck plate construction method comprising the step of separating the gap correction cap to pull the lower portion of the gap correction cap to separate from the top.

일 실시예에서, 상기 간극 보정용 캡 설치단계는, 상기 간극 보정용 캡을 구부러뜨려 상기 보와 데크플레이트의 틈새로 끼워 넣을 수 있다.In one embodiment, in the step of installing the cap for correcting the gap, the cap for correcting the gap may be bent to fit the gap between the beam and the deck plate.

일 실시예에서, 상기 간극 보정용 캡 설치단계는, 상기 간극 보정용 캡을 상부는 상기 보와 데크플레이트 상면을 연결하여 상기 보와 데크 데크플레이트의 틈새를 덮고, 하부는 상기 보와 데크플레이트 사이에 끼워져 고정되도록 설치할 수 있다.In one embodiment, in the step of installing the cap for correcting the gap, an upper portion of the gap correcting cap is connected to the upper surface of the beam and the deck plate to cover a gap between the beam and the deck plate, and the lower portion is sandwiched between the beam and the deck plate. It can be installed to be fixed.

일 실시예에서, 상기 간극 보정용 캡 설치단계는, 상기 간극 보정용 캡의 하면 가장자리는 상기 보와 데크의 상면과 맞닿게 설치하고, 중앙 부분은 들뜨도록 설치할 수 있다.In one embodiment, in the step of installing the cap for calibrating the gap, an edge of the lower surface of the cap for calibrating the gap may be installed in contact with the upper surface of the beam and the deck, and the central portion may be installed to be lifted.

일 실시예에서, 상기 콘크리트 타설단계에서는, 상측으로 타설되는 콘크리트 액의 무게로 상기 간극 보정용 캡의 들뜬 중앙 부분이 상기 보와 데크플레이트의 상면에 밀착될 수 있다.In one embodiment, in the concrete pouring step, the excited central portion of the gap correction cap may be in close contact with the upper surface of the beam and deck plate with the weight of the concrete liquid poured upward.

본 발명에 따른 데크플레이트 시공방법에 의하면, 간극 보정용 캡을 구부려 끼워 넣는 방식으로 설치하여 간극 보정시공이 용이할 뿐만 아니라, 콘크리트 타설 후 간극 보정용 캡의 불필요한 부분은 뜯어내는 방식으로 제거하여 간극 보정 마무리 작업이 간편하게 실시될 수 있으므로, 전체 공사 기간을 단축할 수 있으며 이에 들어가는 인력과 비용을 절감하여 경제적인 효과를 가진다.According to the deck plate construction method according to the present invention, the gap correction cap is installed by bending and fitting the gap to facilitate the gap correction construction, and after pouring concrete, unnecessary portions of the gap correction cap are removed by tearing off to complete the gap correction. Since the work can be carried out easily, it is possible to shorten the entire construction period and has an economical effect by reducing labor and cost.

더불어, 굴곡진 공간이나 진입로가 좁은 틈새에도 간극 보정 시공이 가능하여, 기존의 시공이 어려웠던 구조물이나 부위에도 적용 가능하다는 장점이 있다.In addition, the gap correction construction is possible even in a narrow space in a curved space or a driveway, so it has an advantage that it can be applied to structures or parts that have been difficult to construct.

도 1은 본 발명의 일 실시예에 따른 데크플레이트 시공방법을 설명하기 위한 순서도이다.
도 2는 도 1에서 설명한 간극 보정용 캡을 도시한 사시도이다.
도 3은 도 1에서 설명한 간극 보정용 캡 설치단계에서, 보와 데크플레이트 틈새에 간극 보정용 캡이 설치된 상태를 도시한 도면이다.
도 4a는 도 3에서 보와 데크플레이트 사이에 설치된 간극 보정용 캡을 확대하여 도시한 도면이다.
도 4b는 도 4a에서 콘크리트 타설단계를 거쳐, 간극 보정용 캡이 압하된 상태를 도시한 도면이다.
1 is a flow chart for explaining a deck plate construction method according to an embodiment of the present invention.
FIG. 2 is a perspective view showing a gap correction cap described in FIG. 1.
3 is a view showing a state in which the cap for gap correction is installed in the gap between the beam and deck plate in the step of installing the cap for gap correction described in FIG. 1.
FIG. 4A is an enlarged view of a gap correction cap installed between the beam and the deck plate in FIG. 3.
FIG. 4B is a view showing a state in which the cap for correcting a gap is pressed down through a concrete pouring step in FIG. 4A.

아래에서는 첨부한 도면을 참고로 하여 본 발명의 실시 예에 대하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 그러나 본 발명에 관한 설명은 구조적 내지 기능적 설명을 위한 실시 예에 불과하므로, 본 발명의 권리범위는 본문에 설명된 실시 예에 의하여 제한되는 것으로 해석되어서는 아니 된다. 즉, 실시 예는 다양한 변경이 가능하고 여러 가지 형태를 가질 수 있으므로 본 발명의 권리범위는 기술적 사상을 실현할 수 있는 균등물들을 포함하는 것으로 이해되어야 한다. 또한, 본 발명에서 제시된 목적 또는 효과는 특정 실시예가 이를 전부 포함하여야 한다거나 그러한 효과만을 포함하여야 한다는 의미는 아니므로, 본 발명의 권리범위는 이에 의하여 제한되는 것으로 이해되어서는 아니 될 것이다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art to which the present invention pertains may easily practice. However, since the description of the present invention is only an example for structural or functional description, the scope of the present invention should not be interpreted as being limited by the embodiments described in the text. That is, since the embodiments can be variously modified and have various forms, it should be understood that the scope of the present invention includes equivalents capable of realizing technical ideas. In addition, the purpose or effect presented in the present invention does not mean that a specific embodiment should include all of them or only such an effect, and the scope of the present invention should not be understood as being limited thereby.

본 발명에서 서술되는 용어의 의미는 다음과 같이 이해되어야 할 것이다.The meaning of the terms described in the present invention should be understood as follows.

"제1", "제2" 등의 용어는 하나의 구성요소를 다른 구성요소로부터 구별하기 위한 것으로, 이들 용어들에 의해 권리범위가 한정되어서는 아니 된다. 예를 들어, 제1 구성요소는 제2 구성요소로 명명될 수 있고, 유사하게 제2 구성요소도 제1 구성요소로 명명될 수 있다. 어떤 구성요소가 다른 구성요소에 "연결되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결될 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다고 언급된 때에는 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. 한편, 구성요소들 간의 관계를 설명하는 다른 표현들, 즉 "~사이에"와 "바로 ~사이에" 또는 "~에 이웃하는"과 "~에 직접 이웃하는" 등도 마찬가지로 해석되어야 한다.Terms such as "first" and "second" are for distinguishing one component from other components, and the scope of rights should not be limited by these terms. For example, the first component may be referred to as the second component, and similarly, the second component may also be referred to as the first component. When a component is said to be "connected" to another component, it may be understood that other components may exist in the middle, although they may be directly connected to the other component. On the other hand, when a component is said to be "directly connected" to another component, it should be understood that no other component exists in the middle. On the other hand, other expressions describing the relationship between the components, that is, "between" and "immediately between" or "adjacent to" and "directly neighboring to" should be interpreted similarly.

단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한 복수의 표현을 포함하는 것으로 이해되어야 하고, "포함하다" 또는 "가지다" 등의 용어는 설시된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이며, 하나 또는 그 이상의 다른 특징이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.Singular expressions are to be understood as including plural expressions unless the context clearly indicates otherwise, and terms such as "comprises" or "have" include the features, numbers, steps, actions, components, parts or components described. It is to be understood that a combination is intended to be present, and should not be understood as pre-excluding the presence or addition possibility of one or more other features or numbers, steps, operations, components, parts or combinations thereof.

여기서 사용되는 모든 용어들은 다르게 정의되지 않는 한, 본 발명이 속하는 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가진다. 일반적으로 사용되는 사전에 정의되어 있는 용어들은 관련 기술의 문맥상 가지는 의미와 일치하는 것으로 해석되어야 하며, 본 발명에서 명백하게 정의하지 않는 한 이상적이거나 과도하게 형식적인 의미를 지니는 것으로 해석될 수 없다.All terms used herein have the same meaning as commonly understood by a person skilled in the art to which the present invention pertains, unless otherwise defined. The terms defined in the commonly used dictionary should be interpreted to be consistent with the meanings in the context of the related art, and cannot be interpreted as having ideal or excessively formal meanings unless explicitly defined in the present invention.

이제 본 발명의 실시 예에 따른 데크플레이트 시공방법에 대하여 도면을 참고로 하여 상세하게 설명한다.Now, a deck plate construction method according to an embodiment of the present invention will be described in detail with reference to the drawings.

도 1은 본 발명의 실시 예에 따른 데크플레이트 시공방법을 설명하기 위한 순서도이다.1 is a flow chart for explaining a deck plate construction method according to an embodiment of the present invention.

도 1을 참조하면, 본 발명에 따른 데크플레이트 시공방법은, 보(B)와 데크플레이트(D) 사이의 간극을 보정하여 상기 보(B)와 데크플레이트(D) 사이의 틈새로 콘크리트 타설액이 누출되는 것을 방지하기 위한 것으로, 이를 위해 데크플레이트 시공방법은 데크플레이트 설치단계(S100), 간극 보정용 캡 설치단계(S200), 콘크리트 타설단계(S300) 및 간극 보정용 캡 분리단계(S400)를 포함한다.Referring to Figure 1, deck plate construction method according to the present invention, by correcting the gap between the beam (B) and the deck plate (D), the concrete pouring solution into the gap between the beam (B) and the deck plate (D) To prevent this leakage, the deck plate construction method includes a deck plate installation step (S100), a gap compensation cap installation step (S200), a concrete pouring step (S300), and a gap compensation cap separation step (S400). do.

먼저, 양 측에 보(B)를 이격 설치하고, 상기 보(B) 사이에 데크플레이트(D)를 설치하는 데크플레이트 설치단계(S100)를 수행한다. First, the beam (B) is spaced apart on both sides, and a deck plate installation step (S100) of installing the deck plate (D) between the beams (B) is performed.

상술한 데크플레이트 설치단계(S100)에서, 상기 보(B)와 데크플레이트(D)는 상면이 서로 수평이 되도록 연결되며 양측에 배치된 보(B)와 데크플레이트(D)의 사이 두 지점에 틈새가 발생하게 된다.In the above-described deck plate installation step (S100), the beam (B) and the deck plate (D) are connected so that the upper surfaces are horizontal to each other, at two points between the beam (B) and the deck plate (D) disposed on both sides. A gap is created.

일 실시예에서, 상기 데크플레이트 설치단계(S100)에 있어서, 상기 보(B)는 H형강으로 예시되고, 상기 데크플레이트(D)는 널 형태의 패널 상부에 결합구가 피스 또는 볼트와 같은 체결구에 의해 일정 간격으로 고정 결합되고, 결합구의 상부에 트러스거더(Truss-girder)가 결합된 구조물로 예시될 수 있다.In one embodiment, in the step of installing the deck plate (S100), the beam (B) is exemplified as H-shaped steel, the deck plate (D) has a fastener such as a piece or bolt on the top of the panel of the null type It is fixedly fixed at regular intervals by a sphere, and may be exemplified as a structure in which a truss-girder is coupled to the upper portion of the fitting.

다음으로, 간극 보정용 캡(10)을 준비하고, 상기 보(B)와 데크플레이트(P) 의 틈새에 간극 보정용 캡(10)을 설치하는 간극 보정용 캡 설치단계(S200)를 수행한다. Next, the cap 10 for gap correction is prepared, and the gap correction cap installation step (S200) of installing the gap correction cap 10 in the gap between the beam B and the deck plate P is performed.

상기 간극 보정용 캡 설치단계(S200)에서, 상기 간극 보정용 캡(10)은 상부와 하부가 분리 가능하게 연결되도록 준비한다.In the gap correction cap installation step (S200), the gap correction cap 10 is prepared so that the upper and lower portions are detachably connected.

일 실시예에서, 상기 간극 보정용 캡 설치단계(S200)에 있어서, 상기 간극 보정용 캡(10)을 구부러뜨려 상기 보(B)와 데크플레이트(D)의 틈새로 끼워넣을 수 있다.In one embodiment, in the gap correction cap installation step (S200), the gap correction cap 10 may be bent to fit into the gap between the beam B and the deck plate D.

일 실시예에서, 상기 간극 보정용 캡 설치단계(S200)는 일(一)자형 틈새에 상기 간극 보정용 캡(10)을 직선형으로 삽입하는 단계와, 휘어진 틈새에 상기 간극 보정용 캡(10)을 굴곡형으로 삽입하는 단계를 포함할 수 있다.In one embodiment, the gap correction cap installation step (S200) is a step of inserting the gap correction cap 10 into a straight one-way gap and the gap correction cap 10 is bent into a curved gap. It may include the step of inserting.

일 실시예에서, 상기 간극 보정용 캡 설치단계(S200)에 있어서, 상기 간극 보정용 캡(10)은 상부가 상기 보(B)와 데크플레이트(D)의 상면을 연결하여 상기 보(B)와 데크플레이트(D)의 틈새를 덮고, 하부가 상기 보(B)와 데크플레이트(D)의 사이에 끼워져 고정되도록 설치될 수 있다.In one embodiment, in the gap correction cap installation step (S200), the gap correction cap 10 is connected to the upper surface of the beam (B) and the deck plate (D), the upper beam (B) and deck Covering the gap of the plate (D), the lower portion may be installed to be fixed between the beam (B) and the deck plate (D).

일 실시예에서, 상기 간극 보정용 캡 설치단계(S200)에 있어서, 상기 간극 보정용 캡(10)은 하면 가장자리가 상기 보와 데크의 상면과 맞닿게 설치되고, 중앙 부분은 들뜨도록 설치될 수 있다.In one embodiment, in the gap correction cap installation step (S200), the gap correction cap 10 is installed so that the lower edge is in contact with the upper surface of the beam and deck, and the central portion can be installed to be lifted.

이하에서는 도 2 내지 도 4a를 참조하여, 상기 간극 보정용 캡 설치단계(S200)에서 준비되는 간극 보정용 캡(10)의 구조에 관하여 상세하게 설명하도록 한다. 도 2는 도 1에서 설명한 간극 보정용 캡을 도시한 사시도이고, 도 3은 도 1에서 설명한 간극 보정용 캡 설치단계에서, 보와 데크플레이트 틈새에 간극 보정용 캡이 설치된 상태를 도시한 도면이며, 도 4a는 도 3에서 보와 데크플레이트 사이에 설치된 간극 보정용 캡을 확대하여 도시한 도면이다.Hereinafter, with reference to FIGS. 2 to 4A, the structure of the gap correction cap 10 prepared in the gap correction cap installation step (S200) will be described in detail. FIG. 2 is a perspective view showing a gap correction cap described in FIG. 1, and FIG. 3 is a view showing a gap correction cap installed in the gap between the beam and deck plate in the step of installing the gap correction cap described in FIG. 1, and FIG. 4A 3 is an enlarged view of a gap correction cap installed between a beam and a deck plate in FIG. 3.

도 2 내지 도 4a를 참조하면, 상기 간극 보정용 캡(10)은 보(B)와 데크플레이트(D) 사이의 틈새를 밀폐하여, 콘크리트를 타설하는 동안 상기 틈새 사이로 콘크리트 타설액이 흐르는 것을 방지하기 위한 것으로, 이를 위해 상기 간극 보정용 캡(10)은 밀폐부재(100) 및 고정부재(200)를 포함할 수 있다. 2 to 4A, the gap-correcting cap 10 seals the gap between the beam B and the deck plate D to prevent concrete pouring from flowing between the gaps while pouring concrete For this purpose, for this purpose, the gap correction cap 10 may include a sealing member 100 and a fixing member 200.

상기 밀폐부재(100)는 서로 이격된 보(B)와 데크플레이트(D)의 사이에 배치된다. 상기 밀폐부재(100)는 상기 보(B)와 데크플레이트(D)의 상면을 연결하도록 배치되어, 상기 보(B)와 데크플레이트(D) 사이의 틈새를 덮는 역할을 수행한다.The sealing member 100 is disposed between the beam (B) and the deck plate (D) spaced from each other. The sealing member 100 is disposed to connect the upper surface of the beam (B) and the deck plate (D), and serves to cover the gap between the beam (B) and the deck plate (D).

상기 밀폐부재(100) 탄성 소재로 이루어지며, 보다 바람직하게는 PVC 소재로 이루어질 수 있다. 이때 상기 밀폐부재(100)는 탄성을 가지며 구부러지는 것이 가능하여, 구부러진 틈새에도 설치가 용이하다. 또한 상기 밀폐부재(100)는, 하면에, 상기 고정부재(200)가 연장되는 부위가 들뜨도록 굴곡지되 외압에 의하여 펼쳐질 수 있는 탄력면(101)을 형성할 수 있다. 이때 상기 탄력면(101)은 상기 고정부재(200)가 연장되는 부위를 기준으로 하향으로 경사가 형성되어, 가장자리는 상기 보(B) 및 데크플레이트(D)의 면접하고, 상기 고정부재(200)가 연장되는 주위에는 상기 보(B) 및 데크플레이트(D)로부터 들뜨도록 형성된다. 또한 상기 탄력면(101)은 상기 밀폐부재(100)의 상측으로 콘크리트 타설액이 부어지는 경우, 상기 콘크리트 타설액의 무게에 의하여 들뜬 부위가 상기 하강하며 평평하게 펼쳐지도록 탄력을 가진다. The sealing member 100 is made of an elastic material, and more preferably may be made of a PVC material. At this time, the sealing member 100 has elasticity and can be bent, so it is easy to install even in a bent gap. In addition, the sealing member 100 may be formed on the lower surface, the elastic surface 101 that can be unfolded by an external pressure to be bent so that the fixing member 200 is extended. At this time, the elastic surface 101 is formed inclined downward based on the portion where the fixing member 200 extends, the edge of the beam (B) and the deck plate (D) to the interview, the fixing member 200 ) Is formed to be lifted from the beam (B) and deck plate (D) around the extension. In addition, when the concrete pouring solution is poured to the upper side of the sealing member 100, the elastic surface 101 has elasticity so that the excited portion is lowered and flattened by the weight of the concrete pouring solution.

상기 고정부재(200)는 상기 밀폐부재(100)의 하면으로부터 절취하여 분리 가능하도록 연장 형성된다. 즉, 상기 고정부재(200)는 폭이 좁게 형성되어 상기 보(B)와 데크플레이트(D)사이에 끼워짐으로써 상기 밀폐부재(100)의 움직임을 고정시킨다. 이때 상기 고정부재(200)는 탄성 소재로 이루어지며, 보다 바람직하게는 PVC 소재로 이루어질 수 있다. 이때 상기 고정부재(200)는 탄성을 가지며 구부러지는 것이 가능하여, 구부러진 틈새에도 설치가 용이하다. The fixing member 200 is formed so as to be detachable by cutting from the lower surface of the sealing member 100. That is, the fixing member 200 is formed with a narrow width to be fixed between the beam (B) and the deck plate (D) to fix the movement of the sealing member (100). At this time, the fixing member 200 is made of an elastic material, more preferably it may be made of a PVC material. At this time, the fixing member 200 has elasticity and can be bent, so it is easy to install even in a bent gap.

일 실시예에서 상기 고정부재(200)는 네크부(210), 연장부(220) 및 분리부(230)를 포함할 수 있다. In one embodiment, the fixing member 200 may include a neck portion 210, an extension portion 220, and a separation portion 230.

상기 네크부(210)는 상부에 배치되어 두께가 좁아지도록 절취홈(211)이 형성될 수 있다. 이때 상기 네크부(210)의 절취홈(211)이 형성된 부위는 끊어짐이 약하여, 사용자가 상기 고정부재(200)의 하단을 잡고 당기었을 때, 절취되기 용이하다. 또한 상기 절취홈(211)은 요입된 모서리가 각지게 형성되며, 그 각도가 90°를 이루는 것이 바람직하다. 이처럼 절취홈(211)의 요입된 모서리를 각지게 형성함으로써, 해당 부위가 더욱 취약하여 외력에 의해 보다 쉽게 절취될 수 있다. The neck portion 210 is disposed on the upper portion may be formed with a cutting groove 211 so as to have a narrow thickness. At this time, the portion where the cutout groove 211 of the neck portion 210 is formed is weakly cut off, so it is easy to be cut when the user grasps and pulls the lower end of the fixing member 200. In addition, the cut groove 211 is formed with a concave edge is angled, it is preferable that the angle forms a 90 °. By forming the concave edges of the cutting groove 211 in an angled manner, the corresponding portion is more vulnerable and can be more easily cut by external force.

상기 연장부(220)는 상기 네크부(210)의 상측에 배치되어 상기 밀폐부재의 하면으로부터 연장될 수 있다. 이때 상기 연장부(220)는 상기 네크부에서 끊어짐이 발생하여도, 상기 밀폐부재(100)와 연결되어 남아있을 수 있다. 또한 상기 분리부(230)는 상기 네크부(210)의 하측에 배치되고 상기 보(B)와 데크플레이트(D)의 하면으로부터 돌출되도록 형성될 수 있다. 이때 상기 분리부(230)는 상기 네크부(210)가 절취됨에 따라, 선택적으로 상기 연장부(220)로부터 뜯어져 분리될 수 있다. The extension part 220 may be disposed above the neck part 210 and extend from the lower surface of the sealing member. In this case, even if a break occurs in the neck portion, the extension portion 220 may remain connected to the sealing member 100. In addition, the separation unit 230 may be disposed under the neck portion 210 and may be formed to protrude from the lower surfaces of the beam B and the deck plate D. In this case, as the neck portion 210 is cut, the separation portion 230 may be selectively separated from the extension portion 220.

상기와 같은 연장부(220)는 상기 보(B)와 데크플레이트(D)의 틈새에 삽입 고정되도록 하향으로 일정 길이를 가지므로, 상기 연장부(220)는, 상기 보(B)와 데크플레이트(D) 틈새의 길이방향을 전후 방향으로 간주하였을 때, 상기 밀폐부재(100)가 좌우로 움직이는 것을 방지하여 줄 수 있다.Since the extension portion 220 has a predetermined length downward to be inserted and fixed in the gap between the beam B and the deck plate D, the extension portion 220 includes the beam B and the deck plate. (D) When the longitudinal direction of the gap is regarded as the front-rear direction, the sealing member 100 may be prevented from moving left and right.

일 실시예에서, 상기 고정부재(200)는 하단의 전방 또는 후방에, 수평 방향으로 돌출되는 돌기를 포함하여, 사용자가 상기 돌기를 잡아 당기어 상기 네크부(210)를 절취하도록 할 수 있다. 상기와 같은 고정부재(200)는 콘크리트 타설 후에, 하단을 잡아 당기어 상기 분리부(230)를 분리 제거할 수 있어, 상기 고정부재(200)에 불필요하게 남아있는 부위를 손쉽게 제거할 수 있다,In one embodiment, the fixing member 200 may include a protrusion protruding in the horizontal direction at the front or rear of the bottom, so that a user pulls the protrusion to cut the neck portion 210. The fixing member 200 as described above, after pouring the concrete, by pulling the lower end can be separated to remove the separation portion 230, it is possible to easily remove the unnecessary portion of the fixing member 200,

상기와 같이 간극 보정용 캡 설치단계(S200)를 수행함으로써, 굴곡진 공간이나 진입로가 좁은 틈새에도 간극 보정 시공이 가능하여, 기존의 시공이 어려웠던 구조물이나 부위에도 간극 보정을 수행할 수 있다.By performing the cap installation step (S200) for calibrating the gap as described above, it is possible to calibrate the gap even in a narrow gap between a curved space and a driveway, and thus it is possible to perform a gap correction even in a structure or a part where the existing construction was difficult.

다음으로, 상기 보(B)과 데크플레이트(D)의 상면에 콘크리트 액을 타설하는 콘크리트 타설단계(S300)를 수행한다.Next, a concrete pouring step (S300) of pouring concrete liquid on the upper surfaces of the beam (B) and the deck plate (D) is performed.

도 4b는 도 4a에서 콘크리트 타설단계를 거쳐, 간극 보정용 캡이 압하된 상태를 도시한 도면이다. FIG. 4B is a view showing a state in which the cap for correcting a gap is pressed down through a concrete pouring step in FIG. 4A.

일 실시예에서, 상기 콘크리트 타설단계(S300)에 있어서, 상기 간극 고정용 캡(10)은 콘크리트 타설액(C)의 무게로 인하여 상기 보(B)와 데크플레이트(D)로부터 들떠있던 탄력면(101)이 압하되면서, 상기 탄력면(101)이 상기 보(B)와 데크플레이트(D)의 상면에 밀착될 수 있다.In one embodiment, in the concrete pouring step (S300), the gap fixing cap 10 is the elastic surface floating from the beam (B) and the deck plate (D) due to the weight of the concrete pouring solution (C) As the 101 is pressed, the elastic surface 101 may be in close contact with the upper surface of the beam B and the deck plate D.

마지막으로, 상기 간극 보정용 캡(10)의 하부를 당기어 상부로부터 분리시키는 간극 보정용 캡 분리단계(S400)를 수행한다.Finally, the gap correction cap separation step (S400) of pulling the lower portion of the gap correction cap 10 and separating it from the top is performed.

일 실시예에서, 상기 간극 보정용 캡 분리단계(S400)에 있어서, 상기 간극 보정용 캡(10)의 고정부재(100)의 하단에 당기는 힘을 주어, 상기 네크부(210)가 절취되면서, 상기 분리부(230)를 상기 밀폐부재(100) 및 연장부(220)로부터 분리시킬 수 있다.In one embodiment, in the separation step of the cap for the gap correction (S400), by applying a pulling force to the lower end of the fixing member 100 of the gap correction cap 10, the neck portion 210 is cut, the separation The portion 230 may be separated from the sealing member 100 and the extension portion 220.

일 실시예에서, 상기 간극 보정용 캡 분리단계(S400)에 있어서, 상기와 같이 분리된 간극 보정용 캡(10)의 하부, 즉 분리부(230)를 수거하는 작업을 포함할 수 있다.In one embodiment, in the separation step of the cap for the gap correction (S400), the operation of collecting the lower portion of the cap 10 for the gap correction as described above, that is, the separation portion 230 may be included.

상기와 같이, 본 발명에 따른 데크플레이트 시공방법은, 간극 보정용 캡(10)을 구부려 끼워 넣는 방식으로 설치하여 간극 보정시공이 용이할 뿐만 아니라, 콘크리트 타설 후 간극 보정용 캡(10)의 불필요한 부분은 뜯어내는 방식으로 제거하여 간극 보정 마무리 작업이 간편하게 실시될 수 있으므로, 전체 공사 기간을 단축할 수 있으며 이에 들어가는 인력과 비용을 절감하여 경제적인 효과를 가진다.As described above, the deck plate construction method according to the present invention is not only easy to install the gap correction by installing the gap correction cap 10 in a bent manner, but also unnecessary parts of the gap correction cap 10 after pouring concrete Since the clearance gap finishing work can be carried out easily by removing it by tearing off, the overall construction period can be shortened, and the manpower and cost required for this are economical.

이상, 본 발명의 실시 예는 상술한 장치 및/또는 운용방법을 통해서만 구현이 되는 것은 아니며, 본 발명의 실시 예의 구성에 대응하는 기능을 실현하기 위한 프로그램, 그 프로그램이 기록된 기록 매체 등을 통해 구현될 수도 있으며, 이러한 구현은 앞서 설명한 실시 예의 기재로부터 본 발명이 속하는 기술분야의 전문가라면 쉽게 구현할 수 있는 것이다. 이상에서 본 발명의 실시 예에 대하여 상세하게 설명하였지만 본 발명의 권리범위는 이에 한정되는 것은 아니고 다음의 청구범위에서 정의하고 있는 본 발명의 기본 개념을 이용한 당업자의 여러 변형 및 개량 형태 또한 본 발명의 권리범위에 속하는 것이다.As described above, the embodiment of the present invention is not implemented only through the above-described apparatus and / or operating method, and a program for realizing a function corresponding to the configuration of the embodiment of the present invention, a recording medium in which the program is recorded, etc. It may be implemented, such an implementation can be easily implemented by those skilled in the art to which the present invention belongs from the description of the above-described embodiment. Although the embodiments of the present invention have been described in detail above, the scope of the present invention is not limited thereto, and various modifications and improvements of those skilled in the art using the basic concept of the present invention defined in the following claims are also provided. It belongs to the scope of rights.

B: 보
D: 데크플레이트
C: 시멘트 타설액
10: 간극 보정용 캡
100: 밀폐부재
101: 탄력면
200: 고정부재
210: 네크부
211: 절취홈
220: 연장부
230: 분리부
S100: 데크플레이트 설치단계
S200: 간극 보정용 캡 설치단계
S300: 콘크리트 타설단계
S400: 간극 보정용 캡 분리단계
B: Bo
D: Deck plate
C: Cement pouring
10: gap correction cap
100: sealing member
101: elastic cotton
200: fixing member
210: neck
211: cutting groove
220: extension
230: separation
S100: Deck plate installation step
S200: Gap correction cap installation step
S300: Concrete placing step
S400: Separation step of gap cap

Claims (5)

양 측에 보를 이격 설치하고, 상기 보의 사이에 데크플레이트를 설치하는 데크플레이트 설치단계;
상부와 하부가 서로 분리 가능하게 연결되는 간극 보정용 캡을 준비하여, 상기 보와 데크플레이트 틈새에 간극 보정용 캡을 설치하는 간극 보정용 캡 설치단계;
상기 보와 데크의 상면에 콘크리트 액을 타설하는 콘크리트 타설 단계; 및
상기 간극 보정용 캡의 하부를 당기어 상부로부터 분리시키는 간극 보정용 캡 분리단계; 를 포함하되,
상기 간극 보정용 캡 설치단계는,
상기 간극 보정용 캡을 구부러뜨려 상기 보와 데크플레이트의 틈새로 끼워넣고,
간극 보정용 캡의 상부는 상기 보와 데크플레이트 상면을 연결하여 상기 보와 데크플레이트의 틈새를 덮으며, 하부는 상기 보와 데크플레이트 사이에 끼워져 고정되도록 설치하며,
간극 보정용 캡의 하면 가장자리는 상기 보와 데크의 상면과 맞닿게 설치하고, 중앙 부분은 들뜨도록 설치되게 하고,
상기 간극 보정용 캡은,
탄성을 가진 PVC 소재로 형성되되, 상기 이격된 보와 데크플레이트 사이의 틈새를 덮는 밀폐부재;
상기 밀폐부재의 하부에 일체로 형성되어 보와 데크플레이트 사이에 삽입되어 밀폐부재의 움직임이 고정되게 하면서 밀폐부재에서 절취 가능케 되는 고정부재; 를 포함하되,
상기 고정부재는,
상부에 배치되어 두께가 좁아지도록 절취홈(211)이 형성된 네크부;
상기 네크부의 상측에 배치되어 상기 밀폐부재의 하면으로 연장된 연장부;
상기 네크부의 하측에 배치되어 상기 보와 데크플레이트의 하면으로부터 돌출되도록 형성되어 상기 네크부가 절취됨에 따라 선택적으로 상기 연장부로부터 뜯어져 분리되는 분리부; 를 포함하는 것을 특징으로 하는 데크플레이트 시공방법.
A deck plate installation step of installing beams on both sides and installing a deck plate between the beams;
A gap correction cap installation step of preparing a gap correction cap having an upper portion and a lower portion detachably connected to each other, and installing a gap correction cap in the gap between the beam and the deck plate;
A concrete pouring step of pouring concrete liquid on the upper surface of the beam and deck; And
Separating the cap for gap correction to pull the lower portion of the gap correction cap to separate from the top; Including,
The gap correction cap installation step,
Bend the gap correction cap and insert it into the gap between the beam and deck plate,
The upper part of the gap correction cap connects the upper surface of the beam and the deck plate to cover the gap between the beam and the deck plate, and the lower part is installed to be fixed between the beam and the deck plate,
The edge of the lower surface of the gap correction cap is installed to abut the upper surface of the beam and deck, and the central portion is installed to be lifted,
The gap correction cap,
It is formed of a PVC material having elasticity, a sealing member covering a gap between the spaced beam and the deck plate;
A fixing member formed integrally with the lower portion of the sealing member to be inserted between the beam and the deck plate to allow the movement of the sealing member to be fixed and to be cut off from the sealing member; Including,
The fixing member,
A neck portion disposed at the top and having a cut groove 211 formed to have a narrow thickness;
An extension portion disposed above the neck portion and extending to a lower surface of the sealing member;
A separating portion disposed under the neck portion to protrude from the lower surface of the beam and deck plate and selectively torn apart from the extension portion as the neck portion is cut; Deck plate construction method comprising a.
삭제delete 삭제delete 삭제delete 제1항에 있어서, 상기 콘크리트 타설단계에서는,
상측으로 타설되는 콘크리트 액의 무게로 상기 간극 보정용 캡의 들뜬 중앙 부분이 상기 보와 데크플레이트의 상면에 밀착되는 것을 특징으로 하는 데크플레이트 시공방법.
According to claim 1, In the concrete pouring step,
Deck plate construction method characterized in that the excited central portion of the gap correction cap is in close contact with the upper surface of the beam and the deck plate with the weight of the concrete liquid poured to the upper side.
KR1020170145299A 2017-11-02 2017-11-02 Construction method of deck plate KR102093836B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170145299A KR102093836B1 (en) 2017-11-02 2017-11-02 Construction method of deck plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170145299A KR102093836B1 (en) 2017-11-02 2017-11-02 Construction method of deck plate

Publications (2)

Publication Number Publication Date
KR20190050107A KR20190050107A (en) 2019-05-10
KR102093836B1 true KR102093836B1 (en) 2020-03-26

Family

ID=66580743

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170145299A KR102093836B1 (en) 2017-11-02 2017-11-02 Construction method of deck plate

Country Status (1)

Country Link
KR (1) KR102093836B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101068636B1 (en) * 2009-05-08 2011-09-28 정진규 Self-removing staple pin for deck plate, and deck plate slab construction method using the same
KR101639009B1 (en) * 2015-09-18 2016-07-12 구연진 In ceiling mold using truss girder type deck panels, flowing down pour concrete fluid-resistant filler and ceiling mold structure using there of

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101068636B1 (en) * 2009-05-08 2011-09-28 정진규 Self-removing staple pin for deck plate, and deck plate slab construction method using the same
KR101639009B1 (en) * 2015-09-18 2016-07-12 구연진 In ceiling mold using truss girder type deck panels, flowing down pour concrete fluid-resistant filler and ceiling mold structure using there of

Also Published As

Publication number Publication date
KR20190050107A (en) 2019-05-10

Similar Documents

Publication Publication Date Title
KR101452940B1 (en) Functional Deck Plate
WO2017188721A1 (en) Mold-prefabricated beam structure
JP2006316580A (en) Corrugated steel plate web pc composite beam and construction method of bridge using corrugated steel plate web pc composite beam
KR102034138B1 (en) beam form and construction method thereof
KR101639009B1 (en) In ceiling mold using truss girder type deck panels, flowing down pour concrete fluid-resistant filler and ceiling mold structure using there of
KR102093836B1 (en) Construction method of deck plate
KR102195990B1 (en) Non removing form with double structure and non removing form assembly with insulation inside the same
CN113047160A (en) Bridge expansion joint notch structure and construction and maintenance method thereof
KR100573515B1 (en) Reinforce structure for window frame of building
JP7231434B2 (en) Installation method of reinforcing bar assembly for tunnel secondary lining
KR200490910Y1 (en) Cap for gap correction
KR101483909B1 (en) Spacer for truss girder integrated deck without permanent form and the deck
KR20200008356A (en) Truss deck for long-span slab
CN113266158B (en) Method for installing air pipe in vertical concrete civil engineering
KR200357642Y1 (en) Reinforcement structure of inconner panel
KR100903352B1 (en) New RC Floor - to - Steel Column Connection Details Consisting of Steel Shear-Bearing Band and Steel Plates with Shear Studs for Preventing Slip of Slab
KR102036772B1 (en) Insulation Deck Plate
KR0145358B1 (en) Method of building slabs
JP6871808B2 (en) Reinforcing material, reinforcing structure
CN214939231U (en) Bridge expansion joint notch structure
KR100447860B1 (en) Concrete structure strengthen method and stregthen structure thereof
CN210177943U (en) Formwork mechanism of assembled boundary beam
CN217500563U (en) Reinforced concrete parapet and steel construction main part connection structure
KR100974672B1 (en) Precast concrete beam reinforced dapped end
KR20110047452A (en) Arch-Shaped Deck Plate For Construction

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right