KR102081224B1 - Upper heater block position confirmation device for bookbinding and boring machine - Google Patents

Upper heater block position confirmation device for bookbinding and boring machine Download PDF

Info

Publication number
KR102081224B1
KR102081224B1 KR1020180144696A KR20180144696A KR102081224B1 KR 102081224 B1 KR102081224 B1 KR 102081224B1 KR 1020180144696 A KR1020180144696 A KR 1020180144696A KR 20180144696 A KR20180144696 A KR 20180144696A KR 102081224 B1 KR102081224 B1 KR 102081224B1
Authority
KR
South Korea
Prior art keywords
heater block
upper heater
hole
press arm
frame
Prior art date
Application number
KR1020180144696A
Other languages
Korean (ko)
Inventor
노희옥
Original Assignee
노희옥
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 노희옥 filed Critical 노희옥
Priority to KR1020180144696A priority Critical patent/KR102081224B1/en
Application granted granted Critical
Publication of KR102081224B1 publication Critical patent/KR102081224B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B42BOOKBINDING; ALBUMS; FILES; SPECIAL PRINTED MATTER
    • B42CBOOKBINDING
    • B42C13/00Bookbinding presses; Joint-creasing equipment for bookbinding; Drying or setting devices for books
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/01Means for holding or positioning work
    • B26D7/015Means for holding or positioning work for sheet material or piles of sheets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/27Means for performing other operations combined with cutting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26FPERFORATING; PUNCHING; CUTTING-OUT; STAMPING-OUT; SEVERING BY MEANS OTHER THAN CUTTING
    • B26F1/00Perforating; Punching; Cutting-out; Stamping-out; Apparatus therefor
    • B26F1/16Perforating by tool or tools of the drill type

Abstract

The present invention relates to a device for checking the position of an upper heater block for a book binding and punching apparatus and, more specifically, to a device for checking the position of an upper heater block for a book binding and punching apparatus configured to check whether an upper heater block is in a position where a plurality of printouts are to be bound, perform a bookbinding operation if the upper heater block is in a normal position, and stop the bookbinding operation if the upper heater block is in an abnormal position. According to the present invention, the book binding and punching apparatus having the device for checking the position of an upper heater block comprises: a frame; a lifting member installed on the frame; a punching member having a drill and a press arm; a lower heater block having a guide pin; the upper heater block having a through hole; a heater block moving member moving the lower and upper heater blocks; and a control unit.

Description

제본천공기용 상부 히터블록 위치 확인장치{Upper heater block position confirmation device for bookbinding and boring machine}Upper heater block position confirmation device for bookbinding and boring machine}

본 발명은 제본천공기용 상부 히터블록 위치 확인장치에 관한 것으로써, 특히 제본천공기의 제본 시 상부 히터블록이 다수의 인쇄물을 제본할 위치에 있는 지를 확인하여, 정상 위치이면 제본 작업을 진행하고 비정상 위치이면 제본 작업을 중단하게 해주는 제본천공기용 상부 히터블록 위치 확인장치에 관한 것이다.The present invention relates to an upper heater block positioning device for a bookbinding puncher, and in particular, to check whether the upper heater block is in a position to bind a plurality of printed matters when binding the booklet punching machine, if the normal position, the bookbinding operation is performed and the abnormal position The present invention relates to an upper heater block positioning device for a bookbinding punch that stops a bookbinding operation.

일반적으로, 가장 많이 사용되는 제본천공기는 적층된 다수의 인쇄물 또는 서류 등과 같은 지편에 구멍을 천공하고, 이 구멍에 일정 길이로 절단 공급되는 몰딩튜브를 삽입하면서 그 양단을 성형하여 하나로 묶어 제본하는 장치이다.In general, the most commonly used booklet puncher is a device for punching holes in a stack of a plurality of printed matters or papers, and forming both ends of the bookbinding by inserting a molding tube that is cut and supplied to a predetermined length into the holes. to be.

이와 관련하여, 특허문헌1은 적층된 다수의 지편에 구멍을 천공하고, 이에 일정길이로 절단된 몰딩튜브를 삽입하여 그 상하단을 상하 성형금형부 성형부로 가압성형하여 다수의 지편을 하나로 묶도록 성형하는 것에 있어서, 상기 상하 성형금형은 그 성형부에 라운드 곡면형상의 성형요홈을 원주상으로 대향 형성하고, 그 외측으로 각각 상하 방향으로 벌어지는 경사면을 대향 형성하여서 외표면으로 테프론 코팅처리하여 이루어지는 것을 특징으로 하는 제본기의 몰딩튜브 성형금형장치를 제공하였다.In this regard, Patent Literature 1 drills a hole in a plurality of stacked pieces, inserts a molding tube cut to a certain length, and presses the upper and lower ends to the upper and lower molding dies to form a plurality of pieces together. The upper and lower forming molds are formed by forming a round curved forming groove in a circumferentially facing portion thereof, and forming an inclined surface facing up and down in an outer surface thereof to form a teflon coating on the outer surface thereof. A molding tube molding machine for a bookbinding machine was provided.

하지만, 특허문헌1의 경우, 이동부재에 의해 이동하는 상 성형금형이 비정상 위치에 있게 되면, 하 성형금형의 가이드핀이 상 성형금형의 안내공에 삽입되지 않고 상 성형금형에 걸리게 될 우려가 있었다.However, in the case of Patent Document 1, when the upper molding die moved by the moving member is in an abnormal position, the guide pin of the lower molding die may be caught in the upper molding mold without being inserted into the guide hole of the upper molding mold. .

즉, 다수의 지편에 대한 제본이 제대로 되지 않으면서, 동시에 상하 성형금형에 손상이 발생될 우려가 있었다.That is, there was a possibility that damage to the upper and lower molding dies occurred at the same time without binding the large number of pieces.

그래서, 현재에는 상 성형금형이 제본할 위치에 정상적으로 위치되었는지 확인할 수 있는 장치를 필요로 하고 있는 실정이다. Therefore, at present, there is a need for an apparatus capable of confirming whether an image forming mold is normally positioned at a binding position.

특허문헌1 : 등록실용신안 제20-0195984호(2000.07.04. 등록.)Patent Document 1: Registration Utility Model No. 20-0195984 (Registration of April 4, 2000)

이에 본 발명은, 제본천공기의 제본 시 상부 히터블록이 다수의 인쇄물을 제본할 위치에 있는 지를 확인하여, 정상 위치이면 제본 작업을 진행하고 비정상 위치이면 제본 작업을 중단하게 해주는 제본천공기용 상부 히터블록 위치 확인장치를 제공하는데 목적이 있다.Accordingly, the present invention, when the binding of the booklet puncher checks whether the upper heater block is in the position to bind a plurality of prints, if the normal position proceeds the bookbinding operation and the upper heater block for booklet puncher to stop the bookbinding operation The purpose is to provide a positioning device.

상기한 목적을 달성하기 위하여 본 발명은, 지면에 설치되며 다수의 인쇄물이 적층되는 테이블이 구비된 프레임과, 프레임에 설치되는 승강부재와, 승강부재에 승강할 수 있게 설치되며 적층된 다수의 인쇄물에 구멍을 형성하는 드릴 및 다수의 인쇄물을 가압하여 테이블에 고정해주는 프레스암이 구비된 천공부재와, 다수의 인쇄물을 제본하는 몰딩튜브가 끼워지는 가이드핀이 구비된 하부 히터블록과, 프레스암의 내부에 이동할 수 있게 설치되며 가이드핀이 관통하는 관통구멍이 구비된 상부 히터블록과, 프레임에 설치되며 몰딩튜브를 다수의 인쇄물의 구멍에 삽입하여 가열 성형하도록 하부,상부 히터블록을 이동시켜주는 히터블록 이동부재와, 승강부재 및 천공부재 및 하부 히터블록 및 상부 히터블록 및 히터블록 이동부재를 제어하는 제어부를 포함한 제본천공기에 있어서, 상부 히터블록은, 프레스암의 레일에 안내되며, 관통구멍이 형성된 절연 재질의 제1가이드 부재와;, 제1가이드 부재에 설치되며, 절연된 열선에 의해 가열되고, 프레스암의 내면에 밀착되지 않도록 형성되며, 제어부의 제어에 의해 전류를 공급받고, 관통구멍이 형성된 히터부와;, 히터부와 히터블록 이동부재의 사이에 설치되는 절연 재질의 제2가이드 부재;를 포함하되, 프레스암에는 상부 히터블록의 전방으로 히터부와 접촉되는 접점부재가 설치되고;, 프레스암 및 접점부재는 접지된 프레임과 연결되며;, 다수의 인쇄물 제본 시, 히터블록 이동부재에 의해 상부 히터블록의 히터부가 접점부재에 접촉되어 전류가 접지된 프레임으로 흐르면, 제어부는 정상신호로 인식하여 히터블록 이동부재를 통해 하부 히터블록의 가이드핀이 상부 히터블록의 관통구멍을 관통하도록 제어하고;, 상부 히터블록의 히터부가 접점부재와 접촉되지 않아 전류가 접지된 프레임으로 흐르지 않으면, 제어부는 비정상신호로 인식하여 히터블록 이동부재를 통해 하부 히터블록의 가이드핀이 상부 히터블록의 관통구멍을 관통하지 않도록 제어하는 것을 특징으로 하는 제본천공기용 상부 히터블록 위치 확인장치를 제공한다.In order to achieve the above object, the present invention, the frame is provided on the ground and is provided with a table on which a plurality of printed matter is stacked, the elevating member is installed on the frame, the plurality of printed matter is installed to be able to lift the elevating member A lower heater block provided with a drilling member having a drill forming a hole in the hole and a press arm for pressing a plurality of printed matters to be fixed to a table, a guide pin into which a molding tube for binding a plurality of printed matters is inserted, An upper heater block installed to move inside and having a through hole through which guide pins penetrate, and a heater installed in a frame and moving the lower and upper heater blocks to insert a molding tube into a hole of a plurality of prints to be heated and molded. Control unit for controlling the block moving member, the elevating member and the punching member and the lower heater block and the upper heater block and the heater block moving member In the bookbinding puncher included, the upper heater block is guided to the rail of the press arm, the first guide member of an insulating material having a through hole formed therein; and installed in the first guide member and heated by an insulated hot wire, It is formed so as not to be in close contact with the inner surface of the arm, receiving a current supplied by the control of the control unit, the through hole is formed; and a second guide member of insulating material provided between the heater and the heater block moving member; It includes, but the press arm is provided with a contact member in contact with the heater in front of the upper heater block, the press arm and the contact member is connected to the grounded frame; when binding a plurality of prints, by the heater block moving member When the heater part of the upper heater block is in contact with the contact member and the current flows to the grounded frame, the controller recognizes the signal as normal and the lower heater block is moved through the heater block moving member. The id pin is controlled to penetrate the through hole of the upper heater block, and if the heater part of the upper heater block does not come into contact with the contact member and the current does not flow to the grounded frame, the controller recognizes an abnormal signal and passes through the heater block moving member. Provided is an upper heater block positioning device for a book drilling machine, characterized in that the guide pin of the lower heater block does not pass through the through hole of the upper heater block.

본 발명은 다수의 인쇄물 제본 시, 상부 히터블록의 히터부가 접점부재에 접촉되면 전류가 접지된 프레임으로 흐르는 효과가 있다.According to the present invention, when a plurality of printed matters are bound, when the heater part of the upper heater block contacts the contact member, the current flows to the grounded frame.

즉, 상부 히터블록의 위치가 다수의 인쇄물을 제본할 정상 위치로 제어부가 판단하여, 제본 작업을 그대로 진행하는 효과가 있다.That is, the control unit determines that the position of the upper heater block is a normal position for binding a plurality of printed matters, and the binding operation is performed as it is.

또한, 상부 히터블록의 히터부가 접점부재에 접촉하지 않으면 전류가 접지된 프레임으로 흐르는 않는 효과가 있다.In addition, if the heater portion of the upper heater block does not contact the contact member, there is an effect that the current does not flow to the grounded frame.

즉, 상부 히터블록의 위치가 다수의 인쇄물을 제본할 비정상 위치로 제어부가 판단하여, 제본 작업을 중단하는 효과가 있다.That is, the control unit determines that the position of the upper heater block is an abnormal position for binding a plurality of printed matters, thereby stopping the bookbinding operation.

다시 말해, 상부 히터블록의 관통구멍과 다수의 인쇄물의 구멍이 일치되지 않아서 상부 히터블록의 관통구멍 주변을 하부 히터블록의 가이드핀이 타격하는 것을 막아주어, 상부 히터블록의 관통구멍 주변 손상을 줄여주는 효과가 있다.In other words, the through-holes of the upper heater block do not coincide with the holes of a plurality of printed matters, thereby preventing the guide pins of the lower heater block from hitting around the through-holes of the upper heater block, thereby reducing damage around the through-holes of the upper heater block. Giving effect.

또한, 가이드핀의 타격을 막아주어 가이드핀이 휘는 것을 막아주는 효과가 있다.In addition, there is an effect that prevents the guide pin bent by preventing the hit of the guide pin.

본 발명은 고정판의 체결구멍과 체결볼트의 체결에 따라, 체결볼트가 고정판에서 상부 히터블록을 향해 돌출되는 정도를 조절할 수 있는 효과가 있다.The present invention according to the fastening of the fastening hole and the fastening bolt of the fixing plate, there is an effect that can adjust the extent to which the fastening bolt protrudes toward the upper heater block from the fixing plate.

즉, 상부 히터블록의 히터부와 체결볼트 접촉 시, 상부 히터블록의 관통구멍의 위치가 다수의 인쇄물의 구멍의 위치에 맞도록 미리 조절할 수 있는 효과가 있다.That is, when contacting the fastening bolt and the heater portion of the upper heater block, there is an effect that can be adjusted in advance so that the position of the through hole of the upper heater block to match the position of the holes of the plurality of printed matter.

본 발명은 고정판이 아닌 크기가 작은 체결볼트가 상부 히터블록의 히터부와 접촉되기 때문에, 상부 히터블록의 열이 체결볼트를 통해 고정판 및 프레스암에 덜 전달되는 효과가 있다.In the present invention, since the fastening bolts smaller than the fixed plate are in contact with the heater part of the upper heater block, heat of the upper heater block is less transmitted to the fixed plate and the press arm through the fastening bolts.

즉, 사용자의 손이 고정판 및 프레스암 접촉 시, 화상이 발생하는 것을 막아주는 효과가 있다.That is, when the user's hand is in contact with the fixed plate and the press arm, there is an effect of preventing the image from occurring.

또한, 전진하는 상부 히터블록과 고정된 체결볼트가 작은 면적으로 접촉되기 때문에, 고정판 및 프레스암에 전달되는 충격을 줄여주는 효과가 있다.In addition, since the fastening bolt fixed to the upper heater block is in contact with the small area, there is an effect of reducing the shock transmitted to the fixed plate and the press arm.

즉, 상부 히터블록의 접촉에 따른 고정판 및 프레스암의 손상을 막아주는 효과가 있다.That is, there is an effect of preventing damage to the fixing plate and the press arm due to the contact of the upper heater block.

본 발명은 고정부와 승강부가 일체로 형성되어 제2가이드 부재로 이루어지기 때문에, 제2가이드 부재를 제본천공기에 간편하게 설치할 수 있는 효과가 있다.According to the present invention, since the fixing part and the elevating part are integrally formed with the second guide member, the second guide member can be easily installed in the booklet puncher.

본 발명은 제2가이드 부재가 에폭시 또는 PC 절연 재질로 이루어지기 때문에, 금속보다 무게가 가벼워 이동시키기가 간편하며 금속보다 녹이 발생하지 않는 효과가 있다.According to the present invention, since the second guide member is made of epoxy or PC insulating material, the weight is lighter than that of metal, so that the second guide member is easy to move and rust does not occur than the metal.

또한, 금속보다 제조가 간편하고 조립성이 좋은 효과가 있다.In addition, it is easier to manufacture than metal and has an effect of good assembly.

도 1 및 도 2는 본 발명의 실시예를 따른 상부 히터블록 위치 확인장치가 제본천공기에 설치된 상태를 보여주는 설치 상태도,
도 3 및 도 4는 본 발명의 실시예를 따른 상부 히터블록 위치 확인장치의 상세도,
도 5 내지 도 12는 본 발명의 실시예를 따른 상부 히터블록 위치 확인장치의 사용상태도 및, 제본천공기의 상세도 및 사용상태도이다.
1 and 2 is an installation state diagram showing a state in which the upper heater block positioning device according to an embodiment of the present invention is installed in the booklet puncher,
3 and 4 is a detailed view of the upper heater block positioning device according to an embodiment of the present invention,
5 to 12 is a state of use of the upper heater block positioning device according to an embodiment of the present invention, and a detailed view and a state of use of the booklet puncher.

이에 상기한 바와 같은 본 발명의 실시예를 첨부도면에 의거하여 상세히 설명하면 다음과 같다.Accordingly, the embodiments of the present invention as described above will be described in detail with reference to the accompanying drawings.

도 1 내지 도 12에 도시된 바와 같이, 본 발명의 실시예를 따른 상부 히터블록 위치 확인장치(200)가 설치된 제본천공기(1000)는 지면에 설치되며 다수의 인쇄물(1)이 적층되는 테이블(101)이 구비된 프레임(100)과, 상기 프레임(100)에 설치되는 승강부재(110)와, 상기 승강부재(110)에 승강할 수 있게 설치되며 적층된 다수의 인쇄물(1)에 구멍(1a)을 형성하는 드릴(121) 및 다수의 상기 인쇄물(1)을 가압하여 테이블(101)에 고정해주는 프레스암(122)이 구비된 천공부재(120)가 포함된다.As shown in Figure 1 to 12, the booklet punching machine 1000, the upper heater block positioning device 200 is installed according to an embodiment of the present invention is installed on the ground and a table on which a plurality of printed matter (1) is stacked ( 101 is provided with a frame (100), the elevating member 110 is installed on the frame 100, the elevating member 110 is provided to be elevated to the elevating member (110) and a hole in a plurality of stacked (1) Drilling member 120 is formed with a drill 121 forming a 1a and a press arm 122 for pressing a plurality of the printed matter (1) to be fixed to the table 101.

여기서, 상기 천공부재(120)는 드릴(121) 및 랙기어가 구비된 천공모터(123)와, 상기 드릴(121)이 관통하는 관통구멍 및 레일(122a)이 형성된 프레스암(122)이 포함되며, 테이블(101)에는 상기 드릴(121)이 관통하는 관통구멍이 형성되며 각종 공구나 부품을 보관하는 보관장치가 설치된다.Here, the drilling member 120 includes a drilling motor 123 having a drill 121 and a rack gear, and a press arm 122 having a through hole and a rail 122a through which the drill 121 penetrates. The table 101 is provided with a through hole through which the drill 121 penetrates, and a storage device for storing various tools or parts is installed.

또한, 상기 프레임(100)은 지면에 설치되는 하부몸체와, 상기 하부몸체의 상부에 설치되는 베이스판과, 상기 베이스판의 상부에 설치되는 상부몸체로 이루어지며, 테이블(101)은 상기 베이스판 및 하부몸체에 설치된다.In addition, the frame 100 is composed of a lower body installed on the ground, a base plate installed on the upper portion of the lower body, and an upper body installed on the upper portion of the base plate, the table 101 is the base plate And it is installed on the lower body.

또한, 상기 승강부재(110)는 천공모터(123)와 프레스암(122)이 승강되게 설치되는 가이드구멍이 구비된 샤프트와, 상기 천공모터(123)가 승강하도록 랙기어에 치합되는 피니언기어가 구비된 승강모터와, 상기 천공모터(123) 및 프레스암(122) 및 프레임(100)의 베이스판 사이에 각각 설치되는 압축스프링이 포함된다.In addition, the elevating member 110 is a shaft having a guide hole for installing the lifting motor 123 and the press arm 122, and the pinion gear meshed with the rack gear so that the drilling motor 123 is elevated. Lifting motor provided, and the compression spring is provided between the punching motor 123 and the press arm 122 and the base plate of the frame 100, respectively.

그리고, 상기 제본천공기(1000)는 천공부재(120)에 설치되어 상기 천공부재(120)의 천공 시 생성되는 폐기칩을 드릴(121)의 내부로 흡입하여 외부로 배출하는 배출부재(180)와, 상기 프레임(100)의 하부몸체에 설치되어 배출부재(180)에서 배출되는 폐기칩이 수거되는 수거함(181)이 포함된다.And, the booklet puncher 1000 is installed in the punching member 120 and the discharge member 180 to suck the waste chips generated during the drilling of the punching member 120 to the inside of the drill 121 and to discharge to the outside; The collection box 181 is installed on the lower body of the frame 100 to collect waste chips discharged from the discharge member 180.

그리고, 상기 제본천공기(1000)는 프레임(100)의 하부몸체에 설치되어 적층된 다수의 인쇄물(1)을 제본할 만큼 몰딩튜브(2)를 절단하는 몰딩튜브 절단부재(190)가 포함된다.The bookbinding machine 1000 includes a molding tube cutting member 190 installed at the lower body of the frame 100 to cut the molding tube 2 to bind the plurality of printed matters 1 stacked thereon.

여기서, 상기 몰딩튜브 절단부재(190)는 몰딩튜브(2)가 순차적으로 삽입되는 제1,2삽입관과, 상기 제1삽입관에 삽입된 몰딩튜브(2)를 제2삽입관으로 안내하는 안내롤러가 구비된 이송모터가 포함된다.Here, the molding tube cutting member 190 guides the first and second insertion tubes into which the molding tube 2 is sequentially inserted, and the molding tube 2 inserted into the first insertion tube to the second insertion tube. Includes a transfer motor with a guide roller.

또한, 상기 몰딩튜브 절단부재(190)는 천공모터(123)와 같이 승강하도록 샤프트의 가이드구멍을 통해 상기 천공모터(123)와 연결된 이동봉과, 승강하는 상기 이동봉에 당김 및 당김 해제되어 회전하는 회전부와, 상기 회전부의 한쪽에 연결되어 회전하는 상기 회전부에 의해 전,후진하여 제2삽입관에 삽입된 몰딩튜브를 절단하는 칼날(190a)과, 상기 회전부의 반대편 한쪽에 연결되어 상기 회전부가 이동봉에 당김 해제될 때 상기 회전부를 당겨서 회전시켜주는 당김스프링이 포함된다.In addition, the molding tube cutting member 190 is a moving rod connected to the perforating motor 123 through the guide hole of the shaft to move up and down like the perforating motor 123, and the rotating portion is pulled and pulled off the moving rod to be elevated And a blade 190a for cutting the molding tube inserted into the second insertion tube by moving forward and backward by the rotating part connected to one of the rotating parts, and connected to the opposite side of the rotating part so that the rotating part is connected to the moving rod. A pull spring is included to pull and rotate the rotating part when the pull is released.

또한, 상기 천공모터(123)와 연결된 이동봉은 상기 천공모터(123)가 하강하면 샤프트의 가이드구멍을 통해 같이 하강하게 되고, 하강하는 상기 이동봉에 당김 해제되는 회전부는 당김스프링의 당김에 의해 회전되어 칼날(190a)을 전진시키게 되며, 회전하는 상기 회전부에 의해 전진하는 칼날(190a)은 제2삽입관을 열어서 몰딩튜브(2)를 하강시키게 된다.In addition, the moving rod connected to the punching motor 123 is lowered through the guide hole of the shaft when the punching motor 123 is lowered, the rotating portion is released by the pulling of the lowering the moving rod is rotated by the pulling of the pulling spring The blade 190a is advanced, and the blade 190a, which is advanced by the rotating part that rotates, lowers the molding tube 2 by opening the second insertion tube.

또한, 상기 천공모터(123)에 의해 고속 회전하는 드릴(121)의 천공 작업 완료 후 상기 천공모터(123)가 상승하면 상기 천공모터(123)와 연결된 이동봉도 같이 상승하게 되고, 회전부는 상승하는 상기 이동봉에 다시 당김되어 칼날(190a)을 후진시키게 되며, 후진하는 상기 칼날(190a)은 몰딩튜브(2)를 절단하면서 제2삽입관을 닫는다.In addition, when the drilling motor 123 is raised after completion of the drilling operation of the high-speed rotation of the drill 121 by the drilling motor 123, the moving rod connected to the drilling motor 123 is also raised, and the rotating part is raised. The moving rod is pulled back to reverse the blade 190a, and the retracting blade 190a closes the second insertion tube while cutting the molding tube 2.

또한, 상기 몰딩튜브 절단부재(190)는 프레스암(122)과 같이 승강하도록 와이어로 연결된 이동봉과, 상기 이동봉에 연결되어 칼날(190a)에 절단되도록 제2삽입관에서 하강하는 몰딩튜브(2)를 지지하며 빠짐구멍이 형성된 지지판과, 상기 프레임(100)의 하부몸체에 설치되면서 지지판에 연결되어 이동봉을 원상태로 복귀시켜주는 복귀스프링이 포함된다.In addition, the molding tube cutting member 190 is a moving rod connected to the wire to move up and down like the press arm 122, and the molding tube (2) is lowered from the second insertion pipe connected to the moving rod to be cut on the blade (190a) It is supported by the support plate and the missing hole is formed, and the return spring is connected to the support plate while being installed on the lower body of the frame 100 to return the movable rod to its original state.

그리고, 상기 제본천공기(1000)는 다수의 인쇄물(1)을 제본하는 몰딩튜브(2)가 끼워지는 가이드핀(131)이 구비된 하부 히터블록(130)과, 상기 프레스암(122)의 내부에 이동할 수 있게 설치되며 가이드핀(131)이 관통하는 관통구멍(140a)이 구비된 상부 히터블록(140)과, 상기 프레임(100)에 설치되며 몰딩튜브(2)를 다수의 인쇄물(1)의 구멍에 삽입하여 가열 성형하도록 하부,상부 히터블록(130)(140)을 이동시켜주는 히터블록 이동부재(150)가 포함된다.The booklet puncher 1000 includes a lower heater block 130 having a guide pin 131 into which a molding tube 2 for binding a plurality of printed matters 1 is fitted, and an inside of the press arm 122. The upper heater block 140 is installed so as to be movable in the guide pin 131 through hole 140a through which the guide pin 131 penetrates, and is installed in the frame 100 and the molding tube 2 is provided with a plurality of printed matters 1. The heater block moving member 150 for moving the lower and upper heater blocks 130 and 140 so as to be heat-molded by being inserted into the hole is included.

여기서, 상기 히터블록 이동부재(150)는 제1기어가 구비된 감속모터와, 상기 제1기어에 치합되어서 회전하는 제2기어가 구비된 캠축과, 상기 캠축에 설치되며 끼움홈이 외면에 형성된 중심캠(151)과, 상기 캠축에 설치되며 승강 안내로가 형성된 드럼캠(152)이 포함된다.Here, the heater block moving member 150 is a reduction shaft motor having a first gear, a cam shaft provided with a second gear that is rotated by being engaged with the first gear, and the fitting groove is formed on the outer surface of the cam shaft A center cam 151 and a drum cam 152 installed on the cam shaft and having a lifting guide path are included.

또한, 상기 드럼캠(152)의 상부면에는 경사돌기가 형성되며, 제1,2기어는 평기어로 이루어진다.In addition, an inclined protrusion is formed on an upper surface of the drum cam 152, and the first and second gears are formed of spur gears.

또한, 상기 히터블록 이동부재(150)는 중심캠(151)의 외면을 따라 안내되고 끼움홈에 끼워지는 작동자와, 상기 작동자에 연동되어 회전하는 제1링크와, 상기 제1링크에 연동되어 회전하는 제2링크와, 상기 제2링크와 연결대로 회전바의 한쪽이 연결되어 상기 제2링크에 연동되어 회전하는 작동샤프트가 포함된다.In addition, the heater block moving member 150 is guided along the outer surface of the center cam 151 and fitted into the fitting groove, the first link to rotate in conjunction with the operator, and the first link And a second link to rotate, and an operation shaft connected to the second link so that one side of the rotation bar is connected to the second link and rotates.

또한, 상기 회전바는 작동샤프트와 같이 방향으로 회전되게 상기 작동샤프트에 설치된다.In addition, the rotation bar is installed on the operation shaft to rotate in the same direction as the operation shaft.

또한, 상기 히터블록 이동부재(150)는 프레임(100)의 하부몸체에 설치되어 작동샤프트의 회전바 반대편 한쪽에 연결되는 복귀스프링이 포함된다.In addition, the heater block moving member 150 is installed on the lower body of the frame 100 includes a return spring connected to the opposite side of the rotation bar of the operation shaft.

또한, 상기 히터블록 이동부재(150)는 작동샤프트의 회전바 반대편 한쪽과 와이어로 연결되어 상기 작동샤프트의 회전에 따라 샤프트를 중심으로 회전하는 가이드풀리와, 상기 샤프트에 한쪽이 승강되고 반대편 한쪽에 승강 안내로에 승강 안내되는 작동롤러가 구비된 회전바가 포함된다.In addition, the heater block moving member 150 is connected to the opposite side of the rotary bar of the operation shaft by a wire and a guide pulley which rotates about the shaft according to the rotation of the operation shaft, and one side is elevated on the shaft and the other side Includes a rotary bar provided with an operation roller that is guided up and down the lifting guide.

또한, 상기 회전바의 한쪽은 승강 안내로에 작동롤러가 삽입되도록 가이드풀리와 같이 회전되게 연결봉으로 연결되며, 상기 회전바의 반대편 한쪽에는 작동롤러 승강 시 드럼캠(152) 주변에 설치된 가이드 플레이트를 따라 승강 안내되는 가이드롤러가 구비된다.In addition, one side of the rotary bar is connected to the connecting rod to be rotated like a guide pulley so that the operation roller is inserted into the elevating guide path, the opposite side of the rotary bar is guide plate installed around the drum cam 152 when the operation roller is elevated A guide roller which is guided up and down is provided.

또한, 상기 하부 히터블록(130)은 절연된 열선에 의해 가열되며 회전바의 반대편 한쪽에 설치되는 히터부가 포함되고, 가이드핀(131)은 상기 히터부의 상부에 설치되어 칼날(190a)에 절단된 몰딩튜브(2)가 끼워진다.In addition, the lower heater block 130 is heated by an insulated heating wire and includes a heater unit installed on the opposite side of the rotating bar, the guide pin 131 is installed on the heater portion is cut on the blade 190a The molding tube 2 is fitted.

또한, 상기 가이드핀(131)은 지지판의 빠짐구멍을 관통하며, 몰딩튜브(2)로 제본 작업 시 상기 빠짐구멍에서 빠져나오게 된다.In addition, the guide pin 131 penetrates through the missing hole of the support plate, and escapes from the missing hole when the binding tube 2 is bound to the work.

또한, 상기 가이드핀(131)은 테이블(101)의 관통구멍 및, 드릴(121)에 의해 형성되는 적층된 다수의 인쇄물(1)의 구멍(1a)을 관통한다.In addition, the guide pin 131 penetrates the through hole of the table 101 and the hole 1a of the plurality of stacked printed matters 1 formed by the drill 121.

또한, 상기 히터블록 이동부재(150)는 작동샤프트에 같은 방향으로 회전되게 설치되는 제1회전바와, 상기 제1회전바에 연결되어 상기 제1회전바의 회전에 따라 프레임(100)의 베이스판의 가이드구멍에서 전,후진하는 가림판(153)과, 상기 작동샤프트에 같은 방향으로 회전되게 설치되는 제2회전바와, 상기 제2회전바에 한쪽이 반대 방향으로 회전되게 설치되는 회전부재와, 상기 회전부재의 반대편 한쪽에 설치되어 상기 회전부재의 회전에 따라 가림판(153)과 반대 방향으로 전,후진하는 'ㄴ' 형태의 이동판(154)이 포함된다.In addition, the heater block moving member 150 is connected to the first rotation bar and the first rotation bar installed to rotate in the same direction on the operation shaft of the base plate of the frame 100 in accordance with the rotation of the first rotation bar The screening plate 153 moving forward and backward from the guide hole, a second rotating bar installed on the operation shaft to rotate in the same direction, a rotating member installed on one side of the second rotating bar to rotate in the opposite direction, and the rotation. It is installed on the opposite side of the member includes a moving plate 154 of the 'b' type to move forward, backward in the opposite direction as the screen plate 153 according to the rotation of the rotating member.

또한, 상기 제1,2회전바는 회전바보다 위에 위치되도록 작동샤프트에 설치되며, 베이스판의 가이드구멍은 가림판(153) 후진 후 가이드핀(131)에 관통된다.In addition, the first and second rotation bars are installed on the operation shaft to be positioned above the rotation bar, and the guide hole of the base plate penetrates through the guide pin 131 after reversing the screen plate 153.

또한, 상기 이동판(154)에는 상부 히터블록(140)이 고정 설치되어 같이 전,후진하게 된다.In addition, the moving plate 154, the upper heater block 140 is fixedly installed to be forward, backward.

또한, 상기 상부 히터블록(140)은 프레스암(122)의 레일(122a)에 안내되며, 관통구멍(140a)이 형성된 절연 재질의 판과 유사한 형태의 제1가이드 부재(141)와;, 상기 제1가이드 부재(141)에 설치되며, 절연된 열선(142a)에 의해 가열되고, 프레스암(122)의 내면에 밀착되지 않도록 형성되며, 제어부(160)의 제어에 의해 전류를 공급받고, 관통구멍(140a)이 형성된 히터부(142)와;, 상기 히터부(142)와 히터블록 이동부재(150)의 사이에 설치되는 절연 재질의 제2가이드 부재(143);가 포함된다.In addition, the upper heater block 140 is guided to the rail 122a of the press arm 122, the first guide member 141 of a similar shape to the plate of the insulating material formed with the through hole 140a; Is installed on the first guide member 141, is heated by an insulated heating wire 142a, is formed not to be in close contact with the inner surface of the press arm 122, is supplied with a current under the control of the controller 160, and penetrated And a heater unit 142 having a hole 140a formed therein, and a second guide member 143 made of an insulating material disposed between the heater unit 142 and the heater block moving member 150.

또한, 상기 히터부(142)는 제어부(160)에 포함되어 제어되는 전원부로부터 전류를 공급받으며, 풀업 저항을 통해 5V 상태가 되도록 와이어 등과 같은 절연된 전류공급선(161)을 통해 상기 전원부와 연결된다.In addition, the heater unit 142 receives current from the power supply unit included in the control unit 160 and is connected to the power supply unit via an insulated current supply line 161 such as a wire such that the heater unit 142 becomes a 5V state through a pull-up resistor. .

또한, 상기 제2가이드 부재(143)는 히터블록 이동부재(150)의 이동판(154)에 고정 설치되는 고정부(143a)와, 상기 고정부(143a)에서 돌출 형성되어 히터부(142)가 승강되게 설치되는 승강부(143b)로 이루어진다.In addition, the second guide member 143 is fixed to the moving plate 154 of the heater block moving member 150 is fixed to the fixed portion (143a), and is formed protruding from the fixed portion (143a) heater 142 It consists of a lifting unit (143b) is installed to be elevated.

또한, 상기 제2가이드 부재(143)는 에폭시 또는 PC(polycarbonate) 절연 재질로 이루어진다.In addition, the second guide member 143 is made of epoxy or polycarbonate (PC) insulating material.

그리고, 상기 제본천공기(1000)는 천공 및 제본 작업이 완료될 때까지 프레스암(122)을 고정해주는 프레스암 고정부재(191)가 포함된다.The bookbinding machine 1000 includes a press arm fixing member 191 for fixing the press arm 122 until the punching and bookbinding work is completed.

여기서, 상기 프레스암 고정부재(191)는 프레임(100)의 베이스판의 브라켓에 회전되게 설치되며, 프레스암(122)에 설치된 스톱봉이 끼워져 걸리는 걸림구멍이 형성된 고정바(191a)가 포함된다.Here, the press arm fixing member 191 is installed to be rotated on the bracket of the base plate of the frame 100, and includes a fixing bar (191a) formed with a catching hole for engaging the stop rod is installed in the press arm 122.

또한, 상기 프레스암 고정부재(191)는 프레임(100)의 베이스판과 고정바(191a)를 관통하며 상기 고정바(191a)에 걸리는 걸림머리 구비된 작동봉과, 상기 작동봉에 설치되어 프레임(100)의 베이스판과 고정바(191a) 사이에 위치되는 압축스프링과, 상기 작동봉과 프레임(100)의 베이스판의 브라켓 사이로 상기 프레임(100)의 베이스판에 설치되는 지지대가 포함된다.In addition, the press arm fixing member 191 penetrates the base plate and the fixing bar 191a of the frame 100 and has a working rod provided with a catching head caught on the fixing bar 191a, and is installed on the operating rod and the frame ( The compression spring is located between the base plate and the fixing bar 191a of the 100, and the support is installed on the base plate of the frame 100 between the operating rod and the bracket of the base plate of the frame 100.

또한, 상기 압축스프링은 고정바(191a)를 프레임(100)의 베이스판의 브라켓에서 경사지게 회전된 상태가 되도록 밀게 되며, 지지대는 상기 고정바(191a)가 프레임(100)의 베이스판의 브라켓에서 수평되게 회전된 상태가 될 때 상기 고정바(191a)를 지지하게 된다.In addition, the compression spring is pushed so that the fixed bar 191a is rotated to be inclined from the bracket of the base plate of the frame 100, the support is the fixing bar 191a from the bracket of the base plate of the frame 100 The fixing bar 191a is supported when the horizontally rotated state.

또한, 상기 프레스암 고정부재(191)는 프레임(100)의 하부몸체에 회전되게 설치되어 한쪽이 작동봉에 연결된 회전바와, 상기 회전바의 반대편 한쪽에 설치되어 드럼캠(152)의 상부면에 수평 안내되다가 경사돌기에 상승 안내되는 작동롤러가 포함된다.In addition, the press arm fixing member 191 is rotatably installed on the lower body of the frame 100, one side of the rotary bar is connected to the operating rod, the opposite side of the rotary bar is installed on the upper surface of the drum cam 152 It includes an operation roller which is guided horizontally and ascends to the inclined protrusion.

또한, 상기 작동봉은 작동롤러에 의해 회전바가 회전하면서 프레임(100)의 베이스판과 고정바(191a)에서 승강하게 된다.In addition, the operating rod is moved up and down in the base plate and the fixing bar 191a of the frame 100 by rotating the rotation bar by the operation roller.

그리고, 상기 제본천공기(1000)는 승강부재(110) 및 천공부재(120) 및 하부 히터블록(130) 및 상부 히터블록(140) 및 히터블록 이동부재(150) 및 배출부재(180) 및 몰딩튜브 절단부재(190)를 제어하는 제어부(160)가 포함된다.In addition, the booklet puncher 1000 includes a lifting member 110, a drilling member 120, a lower heater block 130, an upper heater block 140, a heater block moving member 150, a discharge member 180, and a molding. The control unit 160 for controlling the tube cutting member 190 is included.

여기서, 상기 제어부(160)는 버튼 누름식 또는 화면 터치식 등으로 이루어진다.Here, the control unit 160 is a button push type or screen touch type.

그리고, 상기 천공부재(120)의 프레스암(122)에는 상부 히터블록(140)의 전방으로 히터부(142)와 접촉되는 접점부재(170)가 설치된다.In addition, the press arm 122 of the punching member 120 is provided with a contact member 170 contacting the heater 142 in front of the upper heater block 140.

여기서, 상기 프레스암(122) 및 접점부재(170)는 그라운드와 연결되어 접지된 프레임(100)과 연결된다.Here, the press arm 122 and the contact member 170 is connected to the ground is connected to the grounded frame 100.

또한, 상기 접점부재(170)는 프레스암(122)에 설치되는 체결구멍(171a)이 구비된 고정판(171)과, 상기 체결구멍(171a)에 체결되어 히터부(142)와 접촉되는 체결볼트(172)가 포함된다.In addition, the contact member 170 is a fixing plate 171 having a fastening hole 171a installed in the press arm 122 and a fastening bolt fastened to the fastening hole 171a to be in contact with the heater 142. 172 is included.

또한, 상기 체결볼트(172)는 나사 또는 무두볼트 등으로 이루어진다.In addition, the fastening bolt 172 is made of screws or tanned bolts.

그리고, 상기 제본천공기(1000)에 설치되는 본 발명의 실시예를 따른 상부 히터블록 위치 확인장치(200)에는 상부 히터블록(140)과 접점부재(170)가 포함된다.In addition, the upper heater block positioning device 200 according to the embodiment of the present invention installed in the booklet puncher 1000 includes an upper heater block 140 and a contact member 170.

그래서, 다수의 상기 인쇄물(1) 제본 시, 히터블록 이동부재(150)에 의해 상부 히터블록(140)의 히터부(142)가 접점부재(170)에 접촉되어 전류가 접지된 프레임(100)으로 흐르면, 상기 제어부(160)는 정상신호로 인식하여 히터블록 이동부재(150)를 통해 하부 히터블록(130)의 가이드핀(131)이 상부 히터블록(140)의 관통구멍(140a)을 관통하도록 제어하게 된다.Thus, when the plurality of printed matters 1 are bound, the heater unit 142 of the upper heater block 140 contacts the contact member 170 by the heater block moving member 150 so that the current is grounded. If the flow through the control unit 160 is recognized as a normal signal through the heater block moving member 150, the guide pin 131 of the lower heater block 130 penetrates the through hole 140a of the upper heater block 140. To control.

또한, 상기 상부 히터블록(140)의 히터부(142)가 접점부재(170)와 접촉되지 않아 전류가 접지된 프레임(100)으로 흐르지 않으면, 상기 제어부(160)는 비정상신호로 인식하여 히터블록 이동부재(150)를 통해 하부 히터블록(130)의 가이드핀(131)이 상부 히터블록(140)의 관통구멍(140a)을 관통하지 않도록 제어하게 된다.In addition, when the heater 142 of the upper heater block 140 does not come into contact with the contact member 170 and the current does not flow to the grounded frame 100, the controller 160 recognizes the abnormal signal as a heater block. The guide pin 131 of the lower heater block 130 through the moving member 150 is controlled so as not to penetrate the through hole 140a of the upper heater block 140.

상기와 같이 구성된 본 발명의 작동을 설명하면 다음과 같다.Referring to the operation of the present invention configured as described above are as follows.

도 1 내지 도 12에 도시된 바와 같이, 본 발명의 실시예를 따른 상기 상부 히터블록 위치 확인장치(200)가 설치된 제본천공기(1000)는 프레임(100)의 테이블(101) 위로 다수의 인쇄물(1)을 적층시킨 후, 제어부(160)로 승강부재(110)를 구동시켜 천공부재(120)를 하강시킨다.As shown in Figure 1 to 12, the booklet puncher 1000 is installed the upper heater block positioning device 200 according to an embodiment of the present invention is a plurality of prints on the table 101 of the frame 100 ( After stacking 1), the lifting member 110 is driven by the controller 160 to lower the punching member 120.

여기서, 상기 상부 히터블록(140)의 제1가이드 부재(141)는 하강하는 프레스암(122)의 레일(122a)에 걸리면서, 제2가이드 부재(143)의 승강부(143b)를 따라 하강하게 된다.Here, the first guide member 141 of the upper heater block 140 is lowered along the elevating portion 143b of the second guide member 143 while being caught by the rail 122a of the lowering press arm 122. do.

또한, 상기 프레스암(122)은 다수의 인쇄물(1)을 가압하여 테이블(101)에 고정하게 된다.In addition, the press arm 122 presses a plurality of printed matters 1 to be fixed to the table 101.

그러면, 상기 천공부재(120)의 드릴(121)은 프레스암(122)의 관통구멍을 관통하여 적층된 다수의 인쇄물(1)에 구멍(1a)을 형성하게 된다.Then, the drill 121 of the punching member 120 forms a hole 1a in the plurality of printed matters 1 stacked through the through holes of the press arm 122.

여기서, 상기 천공부재(120)의 천공에 의해 생성된 폐기칩은 제어부(160)에 제어된 배출부재(180)를 통해, 드릴(121)의 내부로 흡입되면서 수거함(181)을 향해 배출된다.Here, the waste chips generated by the puncturing of the punching member 120 are discharged toward the collecting box 181 while being sucked into the drill 121 through the discharge member 180 controlled by the controller 160.

그리고, 상기 천공부재(120)의 천공 작업이 완료되면, 상기 천공부재(120)는 제어부(160)의 제어로 승강부재(110)에 의해 상승하게 되지만, 상기 천공부재(120)의 프레스암(122)은 프레스암 고정부재(191)에 의해 적층된 다수의 인쇄물(1)에 대한 가압 상태를 유지하게 된다.Then, when the drilling operation of the punching member 120 is completed, the punching member 120 is raised by the lifting member 110 under the control of the controller 160, but the press arm of the punching member 120 122 maintains a pressurized state on the plurality of printed matters 1 stacked by the press arm fixing member 191.

그리고, 상기 제어부(160)의 제어로 몰딩튜브 절단부재(190)를 구동시켜, 몰딩튜브(2)가 적층된 다수의 인쇄물(1)을 제본할 만큼의 길이를 가지도록 절단해준다.In addition, the molding tube cutting member 190 is driven by the control of the controller 160 to cut the molding tube 2 to have a length sufficient to bind the plurality of printed matters 1 stacked thereon.

그러면, 상기 몰딩튜브(2)는 하부 히터블록(130)의 가이드핀(131)에 끼워지게 된다.Then, the molding tube 2 is fitted to the guide pin 131 of the lower heater block 130.

여기서, 상기 몰딩튜브 절단부재(190)는 몰딩튜브 절단 작업이 완료되면 원상 복귀된다.Here, the molding tube cutting member 190 is returned to its original state when the molding tube cutting operation is completed.

그리고, 상기 제어부(160)의 제어로 히터블록 이동부재(150)를 구동시켜, 몰딩튜브(2)를 다수의 인쇄물(1)의 구멍(1a)에 삽입하여 가열 성형하도록 하부,상부 히터블록(130)(140)을 이동시키게 된다.In addition, the heater block moving member 150 is driven by the control of the controller 160 to insert the molding tube 2 into the holes 1a of the plurality of printed matters 1 to heat-form the lower and upper heater blocks ( 130) 140 will be moved.

그래서, 상기 몰딩튜브(2)가 끼워진 하부 히터블록(130)의 가이드핀(131)은 히터블록 이동부재(150)에 의해 이동되어 적층된 다수의 인쇄물(1)의 구멍(1a) 아래에 위치된다.Thus, the guide pin 131 of the lower heater block 130 into which the molding tube 2 is inserted is located below the hole 1a of the plurality of printed matters 1 which are moved and stacked by the heater block moving member 150. do.

그리고, 상기 제2가이드 부재(143)의 고정부(143a)는 히터블록 이동부재(150)에 의해 전진하게 되면서, 제1가이드 부재(141)가 프레스암(122)의 레일(122a)을 따라 전진하게 된다.In addition, while the fixing part 143a of the second guide member 143 is advanced by the heater block moving member 150, the first guide member 141 is along the rail 122a of the press arm 122. Go forward.

즉, 상기 상부 히터블록(140)은 전진하게 된다.That is, the upper heater block 140 is advanced.

여기서, 상기 가림판(153)은 히터블록 이동부재(150)에 의해 후진하게 되면서 프레임(100)의 베이스판의 가이드구멍을 개방하게 된다.Here, the blocking plate 153 is opened by the heater block moving member 150 while opening the guide hole of the base plate of the frame 100.

그리고, 전진하는 상기 상부 히터블록(140)의 히터부(142)는 제어부(160)의 제어에 의해 전류공급선(161)을 통해 전류를 공급받으면서 열선(142a)에 의해 가열되지만, 제1,2가이드 부재(141)(143)가 절연 재질로 이루어지기 때문에 상기 전류 및 열이, 프레스암(122) 및 히터블록 이동부재(150)로 흐르지 않는다.The heater unit 142 of the upper upper heater block 140 is heated by the heating wire 142a while receiving current through the current supply line 161 under the control of the controller 160, but the first and second heaters 142 are heated. Since the guide members 141 and 143 are made of an insulating material, the current and heat do not flow to the press arm 122 and the heater block moving member 150.

그래서, 전진하는 상기 상부 히터블록(140)의 히터부(142)는 접점부재(170)의 체결볼트(172)에 접촉되면서, 제어부(160)의 제어에 의해 전류공급선(161)을 통해 공급받은 전류가 순차적으로 고정판(171) 및 프레스암(122) 및 접지된 프레임(100)으로 흐르게 된다.Thus, the heater unit 142 of the upper heater block 140 is in contact with the fastening bolt 172 of the contact member 170, received through the current supply line 161 under the control of the controller 160. Current flows sequentially into the fixed plate 171 and the press arm 122 and the grounded frame 100.

그러면, 상기 상부 히터블록(140)의 히터부(142)는 5V 상태에서 그라운드와 동일한 0v 상태가 되고, 제어부(160)는 이를 정상신호로 인식하여 히터블록 이동부재(150)를 통해 하부 히터블록(130)의 가이드핀(131)이 상부 히터블록(140)의 관통구멍(140a)을 관통하도록 제어하게 된다.Then, the heater unit 142 of the upper heater block 140 becomes the same 0v state as the ground in the 5V state, the control unit 160 recognizes this as a normal signal and the lower heater block through the heater block moving member 150. The guide pin 131 of 130 is controlled to penetrate the through hole 140a of the upper heater block 140.

즉, 상기 제어부(160)는 접지된 프레임(100)으로 흐르는 전류에 의해 상부 히터블록(140)의 관통구멍(140a)과, 적층된 다수의 인쇄물(1)의 구멍(1a)이 수직 방향으로 동일선상에 있다고 판단하게 된다.That is, the control unit 160 is the through-hole 140a of the upper heater block 140 and the holes 1a of the plurality of printed matters 1 in the vertical direction by the current flowing through the grounded frame 100. It is judged to be in the same line.

그래서, 상기 하부 히터블록(130)의 가이드핀(131)은 순차적으로 프레임(100)의 베이스판의 가이드구멍 및 테이블(101)의 관통구멍 및 적층된 다수의 인쇄물(1)의 구멍(1a) 및 상부 히터블록(140)의 관통구멍(140a)을 관통하게 된다.Thus, the guide pin 131 of the lower heater block 130 is sequentially a guide hole of the base plate of the frame 100 and the through hole of the table 101 and the holes 1a of the plurality of printed matter 1 stacked. And it passes through the through hole 140a of the upper heater block 140.

그리고, 상기 몰딩튜브(2)는 적층된 다수의 인쇄물(1)의 구멍(1a)에 삽입되면서, 하부,상부 히터블록(130)(140)에 가열 성형되어 적층된 다수의 상기 인쇄물(1)을 묶게 된다.In addition, the molding tube 2 is inserted into the holes 1a of the plurality of stacked printed matters 1, and the plurality of printed matters 1 stacked by heating and molding the lower and upper heater blocks 130 and 140. Will be tied.

여기서, 상기 히터블록 이동부재(150)는 몰딩튜브 제본 작업이 완료되면 하부,상부 히터블록(130)(140)을 원상 복귀시키게 된다.Here, the heater block moving member 150 returns the lower and upper heater blocks 130 and 140 to their original state when the molding tube binding operation is completed.

또한, 상기 히터블록 이동부재(150)가 원상 복귀 되면서 연동된 프레스암 고정부재(191)도 원상 복귀 되고, 동시에 천공부재(120)의 프레스암(122)은 적층된 다수의 인쇄물(1)에 대한 가압 상태를 해제하게 된다.In addition, as the heater block moving member 150 returns to its original position, the interlocking press arm fixing member 191 is also restored to its original position, and at the same time, the press arm 122 of the punching member 120 is stacked on a plurality of printed matters 1. To release the pressurized state.

그래서, 상기와 같은 제본천공기(1000)의 천공 및 제본 작업을 반복하여, 다수의 인쇄물(1)을 800매 이하로 이루어진 책 형태로 만들게 된다.Thus, by repeating the punching and binding operations of the booklet puncher 1000 as described above, a plurality of printed matters (1) in the form of a book made up of 800 sheets or less.

한편, 상기 상부 히터블록(140)의 히터부(142)가 접점부재(170)의 체결볼트(172)에 접촉하지 않으면, 전류가 접지된 프레임(100)으로 흐르지 않게 된다. On the other hand, if the heater 142 of the upper heater block 140 does not contact the fastening bolt 172 of the contact member 170, the current does not flow to the grounded frame 100.

또한, 상기 제1,2가이드 부재(141)(143)가 절연 재질로 이루어지기 때문에, 전류 및 열이 프레스암(122) 및 히터블록 이동부재(150)로 흐르지 않는다.In addition, since the first and second guide members 141 and 143 are made of an insulating material, current and heat do not flow to the press arm 122 and the heater block moving member 150.

그러면, 상기 상부 히터블록(140)의 히터부(142)는 5V 상태를 유지하게 되고, 제어부(160)는 이를 비정상신호로 인식하여 히터블록 이동부재(150)를 통해 하부 히터블록(130)의 가이드핀(131)이 상부 히터블록(140)의 관통구멍(140a)을 관통하지 않도록 제어하게 된다.Then, the heater unit 142 of the upper heater block 140 maintains a 5V state, the control unit 160 recognizes this as an abnormal signal of the lower heater block 130 through the heater block moving member 150. The guide pin 131 is controlled so as not to penetrate the through hole 140a of the upper heater block 140.

즉, 상기 제어부(160)는 접지된 프레임(100)으로 흐르지 않는 전류에 의해 상부 히터블록(140)의 관통구멍(140a)과, 적층된 다수의 인쇄물(1)의 구멍(1a)이 수직 방향으로 동일선상에 있지 않다고 판단하게 되고, 표시 및 소리로 알리게 된다.That is, the controller 160 has a through hole 140a of the upper heater block 140 and a hole 1a of the plurality of printed matters 1 stacked in a vertical direction by a current that does not flow to the grounded frame 100. It is determined that it is not on the same line, and the display and sound are notified.

이상에서는 본 발명을 특정의 바람직한 실시예를 들어 도시하고 설명하였으나, 본 발명은 상기한 실시예에 한정되지 아니하며 본 발명의 정신을 벗어나지 않는 범위 내에서 당해 발명이 속하는 기술분야에서 통상의 지식을 가진자에 의해 다양한 변경과 수정이 가능할 것이다.Although the present invention has been shown and described with reference to certain preferred embodiments, the present invention is not limited to the above-described embodiments and has ordinary skill in the art to which the present invention pertains without departing from the spirit of the present invention. Various changes and modifications may be made by the user.

1 : 인쇄물 1a : 구멍
2 : 몰딩튜브 100 : 프레임
101 : 테이블 110 : 승강부재
120 : 천공부재 121 : 드릴
122 : 프레스암 122a : 레일
130 : 하부 히터블록 131 : 가이드핀
140 : 상부 히터블록 140a : 관통구멍
141 : 제1가이드 부재 142 : 히터부
142a : 열선 143 : 제2가이드 부재
143a :고정부 143b : 승강부
150 : 히터블록 이동부재 160 : 제어부
170 : 접점부재 171 : 고정판
171a : 체결구멍 172 : 체결볼트
180 : 배출부재 181 : 수거함
190 : 몰딩튜브 절단부재 191 : 프레스암 고정부재
200 : 상부 히터블록 위치 확인장치 1000 : 제본천공기
1: printed matter 1a: hole
2: molding tube 100: frame
101: table 110: elevating member
120: punched member 121: drill
122: press arm 122a: rail
130: lower heater block 131: guide pin
140: upper heater block 140a: through hole
141: first guide member 142: heater
142a: heating wire 143: second guide member
143a: fixed part 143b: lift
150: heater block moving member 160: control unit
170: contact member 171: fixed plate
171a: fastening hole 172: fastening bolt
180: discharge member 181: collection box
190: molding tube cutting member 191: press arm fixing member
200: upper heater block positioning device 1000: booklet punching machine

Claims (4)

지면에 설치되며 다수의 인쇄물(1)이 적층되는 테이블(101)이 구비된 프레임(100)과, 상기 프레임(100)에 설치되는 승강부재(110)와, 상기 승강부재(110)에 승강할 수 있게 설치되며 적층된 다수의 인쇄물(1)에 구멍(1a)을 형성하는 드릴(121) 및 다수의 상기 인쇄물(1)을 가압하여 테이블(101)에 고정해주는 프레스암(122)이 구비된 천공부재(120)와, 다수의 상기 인쇄물(1)을 제본하는 몰딩튜브(2)가 끼워지는 가이드핀(131)이 구비된 하부 히터블록(130)과, 상기 프레스암(122)의 내부에 이동할 수 있게 설치되며 가이드핀(131)이 관통하는 관통구멍(140a)이 구비된 상부 히터블록(140)과, 상기 프레임(100)에 설치되며 몰딩튜브(2)를 다수의 인쇄물(1)의 구멍(1a)에 삽입하여 가열 성형하도록 하부,상부 히터블록(130)(140)을 이동시켜주는 히터블록 이동부재(150)와, 상기 승강부재(110) 및 천공부재(120) 및 하부 히터블록(130) 및 상부 히터블록(140) 및 히터블록 이동부재(150)를 제어하는 제어부(160)를 포함한 제본천공기에 있어서,
상기 상부 히터블록(140)은, 프레스암(122)의 레일(122a)에 안내되며, 관통구멍(140a)이 형성된 절연 재질의 제1가이드 부재(141)와;, 상기 제1가이드 부재(141)에 설치되며, 절연된 열선(142a)에 의해 가열되고, 프레스암(122)의 내면에 밀착되지 않도록 형성되며, 제어부(160)의 제어에 의해 전류를 공급받고, 관통구멍(140a)이 형성된 히터부(142)와;, 상기 히터부(142)와 히터블록 이동부재(150)의 사이에 설치되는 절연 재질의 제2가이드 부재(143);를 포함하되,
상기 프레스암(122)에는 상부 히터블록(140)의 전방으로 히터부(142)와 접촉되는 접점부재(170)가 설치되고;,
상기 프레스암(122) 및 접점부재(170)는 접지된 프레임(100)과 연결되며;,
다수의 상기 인쇄물(1) 제본 시, 히터블록 이동부재(150)에 의해 상부 히터블록(140)의 히터부(142)가 접점부재(170)에 접촉되어 전류가 접지된 프레임(100)으로 흐르면, 상기 제어부(160)는 정상신호로 인식하여 히터블록 이동부재(150)를 통해 하부 히터블록(130)의 가이드핀(131)이 상부 히터블록(140)의 관통구멍(140a)을 관통하도록 제어하고;,
상기 상부 히터블록(140)의 히터부(142)가 접점부재(170)와 접촉되지 않아 전류가 접지된 프레임(100)으로 흐르지 않으면, 상기 제어부(160)는 비정상신호로 인식하여 히터블록 이동부재(150)를 통해 하부 히터블록(130)의 가이드핀(131)이 상부 히터블록(140)의 관통구멍(140a)을 관통하지 않도록 제어하는 것을 특징으로 하는 제본천공기용 상부 히터블록 위치 확인장치.
The frame 100 is installed on the ground and has a table 101 on which a plurality of printed matters 1 are stacked, the elevating member 110 installed on the frame 100, and the elevating member 110. A drill 121 for forming a hole 1a in a plurality of stacked printed matters 1 and a press arm 122 for pressing and fixing the plurality of printed matters 1 to the table 101 are provided. The lower heater block 130 is provided with a punching member 120, a guide pin 131 to which the molding tube 2 for binding the plurality of printed matters 1 is fitted, and inside the press arm 122. The upper heater block 140 is installed to be movable and provided with a through hole 140a through which the guide pin 131 penetrates, and is installed in the frame 100 and the molding tube 2 is formed of a plurality of printed matters 1. Heater block moving member 150 and the elevating member 110 for moving the lower and upper heater blocks 130 and 140 so as to be inserted into the hole (1a) and heat-molded. And a control unit 160 for controlling the punching member 120, the lower heater block 130, the upper heater block 140, and the heater block moving member 150.
The upper heater block 140 is guided to the rail 122a of the press arm 122 and includes a first guide member 141 of an insulating material having a through hole 140a formed therein; and the first guide member 141. It is installed in the), is heated by the insulated heating wire 142a, is formed not to be in close contact with the inner surface of the press arm 122, is supplied with a current by the control of the controller 160, the through hole 140a is formed And a heater part 142; and a second guide member 143 made of an insulating material installed between the heater part 142 and the heater block moving member 150.
The press arm 122 is provided with a contact member 170 in contact with the heater unit 142 in front of the upper heater block 140;
The press arm 122 and the contact member 170 are connected to the grounded frame 100;
When binding the plurality of printed matters 1, when the heater 142 of the upper heater block 140 contacts the contact member 170 by the heater block moving member 150, the current flows to the grounded frame 100. The controller 160 recognizes the normal signal and controls the guide pin 131 of the lower heater block 130 to pass through the through hole 140a of the upper heater block 140 through the heater block moving member 150. and;,
If the heater 142 of the upper heater block 140 does not come into contact with the contact member 170 and the current does not flow to the grounded frame 100, the controller 160 recognizes an abnormal signal to detect the heater block moving member. The upper heater block positioner for bookbinding perforator, characterized in that the control means so that the guide pin 131 of the lower heater block 130 does not penetrate the through hole 140a of the upper heater block 140 through 150.
제1항에 있어서,
상기 접점부재(170)는 프레스암(122)에 설치되는 체결구멍(171a)이 구비된 고정판(171)과, 상기 체결구멍(171a)에 체결되어 히터부(142)와 접촉되는 체결볼트(172)를 포함하는 것을 특징으로 하는 제본천공기용 상부 히터블록 위치 확인장치.
The method of claim 1,
The contact member 170 includes a fixing plate 171 having a fastening hole 171a installed in the press arm 122, and a fastening bolt 172 fastened to the fastening hole 171a to be in contact with the heater 142. Upper heater block positioning device for a bookbinding drill, characterized in that it comprises a).
제1항에 있어서,
상기 제2가이드 부재(143)는 히터블록 이동부재(150)에 고정 설치되는 고정부(143a)와, 상기 고정부(143a)에서 돌출 형성되어 히터부(142)가 승강되게 설치되는 승강부(143b)로 이루어지는 것을 특징으로 하는 제본천공기용 상부 히터블록 위치 확인장치.
The method of claim 1,
The second guide member 143 is a fixed part 143a fixedly installed on the heater block moving member 150 and a lifting part protruding from the fixed part 143a so that the heater part 142 is elevated. 143b) the upper heater block positioning device for a bookbinding drill, characterized in that consisting of.
제3항에 있어서,
상기 제2가이드 부재(143)는 에폭시 또는 PC(polycarbonate) 절연 재질로 이루어지는 것을 특징으로 하는 제본천공기용 상부 히터블록 위치 확인장치.
The method of claim 3,
The second guide member 143 is an upper heater block positioning device for a bookbinding punch, characterized in that made of epoxy or polycarbonate (PC) insulating material.
KR1020180144696A 2018-11-21 2018-11-21 Upper heater block position confirmation device for bookbinding and boring machine KR102081224B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180144696A KR102081224B1 (en) 2018-11-21 2018-11-21 Upper heater block position confirmation device for bookbinding and boring machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180144696A KR102081224B1 (en) 2018-11-21 2018-11-21 Upper heater block position confirmation device for bookbinding and boring machine

Publications (1)

Publication Number Publication Date
KR102081224B1 true KR102081224B1 (en) 2020-02-25

Family

ID=69647659

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180144696A KR102081224B1 (en) 2018-11-21 2018-11-21 Upper heater block position confirmation device for bookbinding and boring machine

Country Status (1)

Country Link
KR (1) KR102081224B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113618822A (en) * 2021-07-10 2021-11-09 新乡职业技术学院 Automatic perforating device of photovoltaic cell board

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10181237A (en) * 1996-12-27 1998-07-07 Canon Inc Bookbinding device
KR200195984Y1 (en) 2000-04-03 2000-09-15 노희옥 Tube molding device for filing machine
KR20010081959A (en) * 2000-11-21 2001-08-29 노희옥 Perforation device for filing machine
KR101226636B1 (en) * 2010-12-30 2013-01-25 정원엽 Apparatus for forming a hollow
KR101823642B1 (en) * 2016-04-15 2018-01-31 노희옥 Binding boring machine with a rotary drill pad protection

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10181237A (en) * 1996-12-27 1998-07-07 Canon Inc Bookbinding device
KR200195984Y1 (en) 2000-04-03 2000-09-15 노희옥 Tube molding device for filing machine
KR20010081959A (en) * 2000-11-21 2001-08-29 노희옥 Perforation device for filing machine
KR101226636B1 (en) * 2010-12-30 2013-01-25 정원엽 Apparatus for forming a hollow
KR101823642B1 (en) * 2016-04-15 2018-01-31 노희옥 Binding boring machine with a rotary drill pad protection

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113618822A (en) * 2021-07-10 2021-11-09 新乡职业技术学院 Automatic perforating device of photovoltaic cell board
CN113618822B (en) * 2021-07-10 2022-09-16 新乡职业技术学院 Automatic perforating device of photovoltaic cell board

Similar Documents

Publication Publication Date Title
KR101953360B1 (en) Removable table device for binding-boring machine
JP5792965B2 (en) Automatic bookbinding machine punching device structure
KR100415590B1 (en) Perforation device for filing machine
KR102100166B1 (en) Bookbinding and boring machine
CN110341342B (en) Cylinder type punching and binding device for accountants
KR102081224B1 (en) Upper heater block position confirmation device for bookbinding and boring machine
KR20200059677A (en) Waste chip transfer and charge alarm device for bookbinding and boring machine
KR101185572B1 (en) Punching device for punching papers using supersonic waves and method of punching using the same
KR102100170B1 (en) Bookbinding and boring machine
CN207510051U (en) A kind of binder with electric paper-holding device
KR102194224B1 (en) Press arm fastening device for bookbinding and boring machine
CN208469365U (en) Accounting bill binding apparatus
CN206733863U (en) A kind of automatic diplopore receipt binding machine
CN107264108B (en) Automatic binding machine with memory function and binding method thereof
CN205255782U (en) Novel bookbinding machine
JP4676846B2 (en) Residual resin pipe discharge device in automatic bookbinding machine using resin pipe
KR200191047Y1 (en) Perforation device for filing machine
KR100644328B1 (en) Pressing arm control device for punching work of a filing machine
KR200193629Y1 (en) Tube supply device for filing machine
CN110065326B (en) Device for flattening and punching accounting document
KR102619387B1 (en) Molding tube supply device for the bookbinding and boring machine
CN215790360U (en) Plastic pipe perforating machine
CN209851113U (en) Automatic push away material type timber puncher
CN114101402A (en) Sheet metal part perforating machine of bending
KR102539673B1 (en) Residual molding tube discharge device for the bookbinding and boring machine

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant