KR102080799B1 - Integrated apparatus for training water system and gas system fire extinguishing equipment - Google Patents

Integrated apparatus for training water system and gas system fire extinguishing equipment Download PDF

Info

Publication number
KR102080799B1
KR102080799B1 KR1020180135273A KR20180135273A KR102080799B1 KR 102080799 B1 KR102080799 B1 KR 102080799B1 KR 1020180135273 A KR1020180135273 A KR 1020180135273A KR 20180135273 A KR20180135273 A KR 20180135273A KR 102080799 B1 KR102080799 B1 KR 102080799B1
Authority
KR
South Korea
Prior art keywords
gas
water
detector
fire extinguishing
control panel
Prior art date
Application number
KR1020180135273A
Other languages
Korean (ko)
Inventor
김철수
박재형
Original Assignee
주식회사 케이티이엔지
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 케이티이엔지 filed Critical 주식회사 케이티이엔지
Priority to KR1020180135273A priority Critical patent/KR102080799B1/en
Application granted granted Critical
Publication of KR102080799B1 publication Critical patent/KR102080799B1/en

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B19/00Teaching not covered by other main groups of this subclass
    • G09B19/24Use of tools
    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62CFIRE-FIGHTING
    • A62C99/00Subject matter not provided for in other groups of this subclass
    • A62C99/0081Training methods or equipment for fire-fighting

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Emergency Management (AREA)
  • Fire Alarms (AREA)

Abstract

According to an embodiment of the present invention, an integrated training device for a fire extinguishing facility of a water system and a gas system, comprises a notification unit, a test valve box, a preaction valve inspection unit, a gas system fire extinguishing facility inspecting unit, a control panel, and a wiring training unit. The control panel operates an alarm and a siren when the test valve box is operated to be opened, turns on main and auxiliary pump operating display lamps, operates the alarm and the siren in accordance with operations of all of a water system heat sensor and a water system smoke sensor or an operation of a supervisory panel, operates an electronic valve to be opened while turning on the main and auxiliary pump operating display lamps, operates the alarm and siren in accordance with operations of all of a gas system heat sensor and a gas system smoke sensor or an operation of a manual starting device, and operates a starting container box while turning on a chemical discharge display lamp. The wiring training unit can perform wiring for the notification unit, the test valve box, the preaction valve inspection unit, the gas system fire extinguishing facility inspecting unit, and the control panel in accordance with a wiring diagram for each training of the test valve box, the preaction valve inspection unit, the gas system fire extinguishing facility inspecting unit.

Description

수계 및 가스계 소화설비 통합 실습장비{Integrated apparatus for training water system and gas system fire extinguishing equipment}Integrated apparatus for training water system and gas system fire extinguishing equipment

본 발명은 수계 및 가스계 소화설비를 실습 가능하게 하는 장비에 관한 것이다.The present invention relates to equipment that makes it possible to practice water- and gas-based fire extinguishing equipment.

화재발생시 초기진화를 위해 소방관련법령에 준하여 일정규모 이상의 건물에 대해 소화설비, 자동화재 탐지설비, 경보설비, 비상조명설비, 비상방송설비 등을 시설해야 한다. 소화설비는 소화약제를 사용하여 자동 또는 수동의 방법으로 방호 대상물에 설치하여 화재 확산을 막거나 억제시키는 설비로서, 소화약제 종류에 따라 수계 소화설비와 가스계 소화설비로 나뉠 수 있다.Fire extinguishing equipment, automatic fire detection equipment, alarm equipment, emergency lighting equipment, emergency broadcasting equipment, etc. should be installed for buildings over a certain size in accordance with the firefighting laws for the initial fire extinguishing. Fire extinguishing equipment is installed in the protection target by automatic or manual method using extinguishing agent to prevent or suppress the spread of fire. It can be divided into water extinguishing and gas-based extinguishing equipment according to the type of extinguishing agent.

수계 소화설비는 물을 사용하여 냉각작용을 통한 가연물과 산소의 화학반응을 억제하여 소화하는 설비이다. 대표적인 수계 소화설비로는 스프링클러 등이 있다. 가스계 소화설비는 할로겐 화합물 소화약제, 이산화탄소, 청정 소화약제 등을 사용하여 가연물과 산소의 화학반응을 억제하고 냉각작용과 희석작용으로 소화하는 설비이다.Water-based fire extinguishing equipment uses water to suppress and extinguish chemical reactions of flammables and oxygen through cooling. Typical water-based fire extinguishing facilities include sprinklers. Gas-based fire extinguishing equipment uses halogen compound extinguishing agent, carbon dioxide, and clean extinguishing agent to suppress chemical reaction between flammables and oxygen, and to extinguish by cooling and dilution.

한편, 특정소방대상물의 자율적인 자체소방점검 강화로 소방안전관리자의 역할이 증가하고 있으며, 소방안전관리자의 실무역량강화 및 업무전문성 향상 도모를 위해 소화설비 작동방법과 점검 전반 등에 대한 실습 위주의 교육 강화가 필요하다. 그에 따라, 안전관리현장에서 실무역량을 확보한 소방안전관리자의 양성을 위한 실습장비가 요구되고 있는 실정이다.On the other hand, the role of fire safety managers is increasing due to the autonomous self-inspection of specific firefighting targets.In order to strengthen firefighting safety manager's working capacity and improve professionalism, training-oriented training on fire extinguishing system operation and general inspection is provided. Reinforcement is needed. Accordingly, the practice of training equipment for the training of fire safety managers who have secured practical capabilities is required.

등록특허번호 제 10-1112189호(2012. 02. 24. 공고)Patent Registration No. 10-1112189 (2012. 02. 24. notification)

본 발명의 과제는 수계 및 가스계 소화설비의 실습 효과를 높여 실습자의 실무역량을 강화할 수 있게 하는 수계 및 가스계 소화설비 통합 실습장비를 제공함에 있다.An object of the present invention is to provide a water- and gas-based fire-extinguishing integrated training equipment to enhance the practical effect of the water-based and gas-based fire-extinguishing equipment to enhance the practitioner's working capacity.

상기의 과제를 달성하기 위한 본 발명에 따른 수계 및 가스계 소화설비 통합 실습장비는 알림부와, 시험밸브함과, 프리액션밸브 점검부와, 가스계 소화설비 점검부와, 제어반, 및 배선 실습부를 포함한다. 여기서, 알림부는 경종과, 싸이렌과, 주펌프 가동 표시등과, 보조펌프 가동 표시등, 및 약제방출표시등을 구비하여, 실습 보드에 장착된다.Water and gas fire extinguishing equipment integrated training equipment according to the present invention for achieving the above object is a notification unit, test valve box, preaction valve check unit, gas-based fire extinguishing equipment check unit, control panel, and wiring practice Contains wealth. Here, the notification unit includes a bell, a siren, a main pump operation indicator, an auxiliary pump operation indicator, and a drug release indicator, and is mounted on the training board.

프리액션밸브 점검부는 준비작동식 스프링클러 설비를 점검하기 위한 수계용 열감지기 및 수계용 연기감지기와, 수계용 열감지기와 수계용 연기감지기를 작동시키기 위한 수계용 감지기 버튼들과, 수계용 열감지기와 수계용 연기감지기의 전체 작동에 따라 개방 작동하는 전자밸브, 및 전자밸브를 수동으로 개방 작동시키기 위한 슈퍼비조리 패널을 구비한다.The preaction valve inspection unit is a water system heat detector and a water system smoke detector for inspecting the ready-acting sprinkler system, a water system sensor button for operating the water system heat detector and a water system smoke detector, a water system heat detector, A solenoid valve which opens according to the overall operation of the water-based smoke detector, and a super non-cooking panel for manually opening and operating the solenoid valve.

가스계 소화설비 점검부는 가스계 소화설비를 점검하기 위한 가스계용 열감지기 및 가스계용 연기감지기와, 가스계용 열감지기와 가스계용 연기감지기를 작동시키기 위한 가스계용 감지기 버튼들과, 가스계용 열감지기와 가스계용 연기감지기의 전체 작동에 따라 설정 지연시간 경과 후 소화약제를 방출하고 방출 확인 신호를 출력하는 기동용기함, 및 기동용기함을 수동으로 기동시키기 위한 수동기동장치를 구비한다.The gas-based fire extinguishing system inspection unit includes a gas-based heat detector and a gas-based smoke detector for checking the gas-based fire extinguishing system, gas-based sensor buttons for operating the gas-based heat detector and a gas-based smoke detector, a gas-based heat detector and According to the overall operation of the gas-based smoke detector is provided with a starting container for discharging the extinguishing agent and output a release confirmation signal after a set delay time, and a manual starting device for manually starting the starting container.

제어반은 시험밸브함의 개방 작동시 경종 및 싸이렌을 작동시키고 주펌프 가동 표시등과 보조펌프 가동 표시등을 점등시키고, 수계용 열감지기와 수계용 연기감지기의 전체 작동 또는 슈퍼비조리 패널의 작동에 따라 경종 및 싸이렌을 작동시키고 주펌프 가동 표시등과 보조펌프 가동 표시등을 점등시킴과 아울러 전자밸브를 개방 작동시키며, 가스계용 열감지기와 가스계용 연기감지기의 전체 작동 또는 수동기동장치의 작동에 따라 경종 및 싸이렌을 작동시키고 약제방출표시등을 점등시킴과 아울러 기동용기함을 작동시킨다.The control panel operates the alarm bell and the siren when the test valve box is opened, turns on the main pump start indicator and the auxiliary pump start indicator, and turns the alarm clock and alarm according to the total operation of the water heat detector and the water smoke detector or the operation of the super non-cooking panel. It operates the siren, turns on the main pump start indicator and auxiliary pump start indicator, opens the solenoid valve, and operates the bell and the siren according to the total operation of the gas-based heat detector and the gas-based smoke detector or the manual starter. Turn on the drug release indicator and activate the starter container.

배선 실습부는 시험밸브함과 프리액션밸브 점검부와 가스계 소화설비 점검부의 각 실습을 위한 배선도에 따라 알림부와 시험밸브함과 프리액션밸브 점검부와 가스계 소화설비 점검부 및 제어반을 배선할 수 있게 한다.The wiring training unit can wire the notification unit, the test valve compartment, the preaction valve inspection unit, the gas fire extinguishing system inspection unit, and the control panel according to the wiring diagram for each exercise of the test valve compartment, the preaction valve inspection unit, and the gas fire extinguishing system inspection unit. To be able.

본 발명에 따르면, 습식 스프링클러 설비와 준비작동식 스프링클러 설비와 가스계 소화설비의 각 진행 과정에 대한 이해도를 높이도록 실습할 수 있으므로, 실습 효과를 높여 실습자의 실무역량을 강화하는데 기여할 수 있다.According to the present invention, it can be practiced to improve the understanding of each process of the wet sprinkler facility, pre-operated sprinkler facility and gas-based fire extinguishing facility, it can contribute to enhance the practical ability of the practitioner by increasing the practice effect.

도 1은 본 발명의 일 실시예에 따른 수계 및 가스계 소화설비 통합 실습장비에 대한 구성도이다.
도 2는 시험밸브함을 실습하기 위한 배선도이다.
도 3은 프리액션밸브 점검부를 실습하기 위한 배선도이다.
도 4는 가스계 소화설비 점검부를 실습하기 위한 배선도이다.
도 5는 도 1에 도시된 수계 및 가스계 소화설비 통합 실습장비의 일부에 대한 실제 도면이다.
도 6은 알림부를 일부 발췌하여 도시한 도면이다.
도 7은 시험밸브함을 발췌하여 도시한 도면이다.
도 8은 프리액션밸브 점검부를 일부 발췌하여 도시한 도면이다.
도 9는 가스계 소화설비 점검부를 일부 발췌하여 도시한 도면이다.
도 10은 제어반을 발췌하여 도시한 도면이다.
도 11은 제어반에서 복구 버튼이 배치된 영역을 발췌하여 도시한 도면이다.
도 12는 제어반에 구비된 슈퍼비조리 조작기를 도시한 도면이다.
도 13은 제어반에 구비된 수동기동 조작기를 도시한 도면이다.
1 is a block diagram of a water- and gas-based fire-extinguishing integrated training equipment according to an embodiment of the present invention.
2 is a wiring diagram for practicing the test valve box.
3 is a wiring diagram for practicing the preaction valve check unit.
4 is a wiring diagram for practicing the gas-based fire extinguishing system inspection unit.
FIG. 5 is an actual view of a part of the integrated water and gas fire extinguishing training equipment shown in FIG. 1.
6 is a view showing a part of the notification unit.
7 is a view showing an extract of the test valve box.
8 is a view showing a partial extract of the preaction valve check.
9 is a view showing a part of the gas-based fire extinguishing facility inspection unit.
10 is a view showing an extract of the control panel.
FIG. 11 is a diagram illustrating an area in which a recovery button is disposed in the control panel.
12 is a diagram illustrating a super non-cooking manipulator provided in the control panel.
13 is a view illustrating a manual start manipulator provided in the control panel.

본 발명에 대해 첨부된 도면을 참조하여 상세히 설명하면 다음과 같다. 여기서, 동일한 구성에 대해서는 동일부호를 사용하며, 반복되는 설명, 본 발명의 요지를 불필요하게 흐릴 수 있는 공지 기능 및 구성에 대한 상세한 설명은 생략한다. 본 발명의 실시형태는 당업계에서 평균적인 지식을 가진 자에게 본 발명을 보다 완전하게 설명하기 위해서 제공되는 것이다. 따라서, 도면에서의 요소들의 형상 및 크기 등은 보다 명확한 설명을 위해 과장될 수 있다.When described in detail with reference to the accompanying drawings for the present invention. Here, the same reference numerals are used for the same components, and repeated descriptions and detailed descriptions of well-known functions and configurations that may unnecessarily obscure the subject matter of the present invention will be omitted. Embodiments of the present invention are provided to more completely explain the present invention to those skilled in the art. Accordingly, the shape and size of elements in the drawings may be exaggerated for clarity.

도 1은 본 발명의 일 실시예에 따른 수계 및 가스계 소화설비 통합 실습장비에 대한 구성도이다. 도 2는 시험밸브함을 실습하기 위한 배선도이다. 도 3은 프리액션밸브 점검부를 실습하기 위한 배선도이다. 도 4는 가스계 소화설비 점검부를 실습하기 위한 배선도이다. 도 5는 도 1에 도시된 수계 및 가스계 소화설비 통합 실습장비의 일부에 대한 실제 도면이다. 도 6은 알림부를 일부 발췌하여 도시한 도면이다. 도 7은 시험밸브함을 발췌하여 도시한 도면이다. 도 8은 프리액션밸브 점검부를 일부 발췌하여 도시한 도면이다. 도 9는 가스계 소화설비 점검부를 일부 발췌하여 도시한 도면이다. 도 10은 제어반을 발췌하여 도시한 도면이다.1 is a block diagram of a water- and gas-based fire-extinguishing integrated training equipment according to an embodiment of the present invention. 2 is a wiring diagram for practicing the test valve box. 3 is a wiring diagram for practicing the preaction valve check unit. 4 is a wiring diagram for practicing the gas-based fire extinguishing system inspection unit. FIG. 5 is an actual view of a part of the integrated training system for water and gas fire extinguishing equipment shown in FIG. 1. 6 is a view showing a part of the notification unit. 7 is a view showing an extract of the test valve box. 8 is a view showing a partial extract of the preaction valve check. 9 is a view showing a part of the gas-based fire extinguishing facility inspection unit. 10 is a view showing an extract of the control panel.

도 1 내지 도 10을 참조하면, 본 발명의 일 실시예에 따른 수계 및 가스계 소화설비 통합 실습장비(100)는 알림부(110)와, 시험밸브함(120)과, 프리액션밸브 점검부(130)와, 가스계 소화설비 점검부(140)와, 제어반(150), 및 배선 실습부(160)를 포함한다.1 to 10, the water- and gas-based fire extinguishing facility integrated training equipment 100 according to an embodiment of the present invention is a notification unit 110, the test valve box 120, the preaction valve check unit 130, a gas fire extinguishing system check unit 140, a control panel 150, and a wiring training unit 160.

알림부(110)는 경종(111)과, 싸이렌(112)과, 주펌프 가동 표시등(113)과, 보조펌프 가동 표시등(114), 및 약제방출표시등(115)을 구비하여, 실습 보드(101)에 장착된다. 여기서, 실습 보드(101)는 수직으로 세워진 상태로 거치대(102)에 의해 지지될 수 있다. 실습 보드(101)는 화이트 보드 등으로 이루어질 수 있다.The alarm unit 110 is provided with the alarm bell 111, the siren 112, the main pump operation indicator 113, the auxiliary pump operation indicator 114, and the drug release indicator 115. It is mounted on the board 101. Here, the training board 101 may be supported by the holder 102 in a vertical state. The training board 101 may be made of a white board or the like.

경종(111)과, 싸이렌(112)과, 주펌프 가동 표시등(113)과, 보조펌프 가동 표시등(114), 및 약제방출표시등(115)은 실습 보드(101)의 앞면에 장착될 수 있다. 거치대(102)는 하단에 캐스터 바퀴(103)들이 장착되어 실습 보드(101)의 이동을 용이하게 할 수 있다.The alarm bell 111, the siren 112, the main pump operation indicator 113, the auxiliary pump operation indicator 114, and the drug release indicator 115 may be mounted on the front surface of the training board 101. Can be. The cradle 102 may be equipped with caster wheels 103 at the bottom thereof to facilitate movement of the training board 101.

실습자가 시험밸브함(120)과 프리액션밸브 점검부(130)와 가스계 소화설비 점검부(140)를 실습할 때, 경종(111)이 명동되고 싸이렌(112)이 경보음을 울려 화재의 발생 또는 화재의 발생이 예상되는 상황을 알려준다.When the practitioner exercises the test valve box 120, the preaction valve check unit 130, and the gas fire extinguishing system check unit 140, the alarm bell 111 is moved and the siren 112 sounds an alarm to trigger a fire. It informs you of the situation where an outbreak or fire is expected.

실습자가 시험밸브함(120)과 프리액션밸브 점검부(130)를 통해 습식 스프링클러 설비와 준비작동식 스프링클러 설비를 포함한 수계소화설비의 작동을 실습할 때, 주펌프 가동 표시등(113)은 점등되어 주펌프가 가상적으로 가동 중임을 표시하며, 보조펌프 가동 표시등(114)은 점등되어 보조펌프가 가상적으로 가동 중임을 표시한다.When the practitioner practices the operation of the water fire extinguishing system including the wet sprinkler system and the pre-operated sprinkler system through the test valve box 120 and the preaction valve checker 130, the main pump operation indicator 113 lights up. The main pump is virtually running, and the auxiliary pump operation indicator 114 is turned on to indicate that the auxiliary pump is virtually running.

여기서, 주펌프는 수계소화설비에 필요한 방수량과 방수압력으로 주수하기 위해 사용되는 가압송수장치이다. 보조펌프는 배관 내 압력손실에 따른 주펌프의 빈번한 기동을 방지하기 위하여 충압 역할을 하는 펌프이다.Here, the main pump is a pressurized water supply device used for pouring water with the amount of waterproof and the pressure required for water-based fire extinguishing equipment. Auxiliary pump is a pump that acts as a charge to prevent frequent starting of the main pump due to pressure loss in the pipe.

주펌프 가동 표시등(113)의 주변에는 주펌프를 나타내는 주펌프 모식도(113a)가 실습 보드(101)의 앞면에 부착될 수 있다. 보조펌프 가동 표시등(114)의 주변에는 보조펌프를 나타내는 보조펌프 모식도(114a)가 실습 보드(101)의 앞면에 부착될 수 있다.A main pump schematic diagram 113a representing the main pump may be attached to the front surface of the training board 101 around the main pump operation indicator 113. An auxiliary pump schematic diagram 114a representing the auxiliary pump may be attached to the front surface of the training board 101 around the auxiliary pump operation indicator light 114.

실습자가 가스계 소화설비 점검부(140)를 통해 가스계 소화설비의 작동을 실습할 때, 약제방출표시등(115)은 점등되어 기동용기함(143)의 개방에 따른 소화약제방출을 표시한다.When the practitioner practices the operation of the gas fire extinguishing facility through the gas fire extinguishing facility checker 140, the drug release indicator 115 lights to indicate the discharge of the fire extinguishing agent due to the opening of the start container 143. .

시험밸브함(120)은 습식 스프링클러 설비를 점검하기 위한 것이다. 시험밸브함(120)은 시험배관(121)과, 시험배관(121)을 개폐하는 시험밸브(122), 및 시험밸브(122)의 개폐 상태를 제어반(150)으로 송신하는 템퍼스위치(tamper switch, 123)를 포함하여, 실습 보드(101)에 장착될 수 있다.The test valve box 120 is for checking the wet sprinkler facility. The test valve box 120 includes a test pipe 121, a test valve 122 for opening and closing the test pipe 121, and a tamper switch for transmitting the open / closed state of the test valve 122 to the control panel 150. , 123 may be mounted on the training board 101.

실제 시험밸브함은 유수검지장치를 사용하는 스프링클러 설비에서 화재로 인하여 헤드가 개방되었을 때 설비의 각 부분이 정상적으로 작동하는지 시험하기 위해 헤드를 직접 개방시키지 않고도 작동상태를 확인할 수 있도록 구성되며, 시험밸브 개방시 유수검지장치를 통해 제어반으로 개방 신호를 제공한다.The actual test valve box is configured to check the operation status without opening the head directly to test whether each part of the equipment is normally operated when the head is opened due to a fire in the sprinkler system using the flow detection device. When open, the flow detection device provides an open signal to the control panel.

본 실시예의 시험밸브함(120)은 시험밸브(121) 개방시 템퍼스위치(123)를 통해 제어반(150)으로 개방 신호를 제공함으로써, 유수의 흐름 없이 제어반(150)으로 입력되는 압력스위치의 신호를 구현한다. 여기서, 압력스위치는 주펌프 및 보조펌프의 기동에 따라 작동하도록 습식 스프링클러 설비에 구비된 것이다.The test valve box 120 of the present embodiment provides an open signal to the control panel 150 through the temper switch 123 when the test valve 121 is opened, and thus a signal of the pressure switch input to the control panel 150 without flowing water. Implement Here, the pressure switch is provided in the wet sprinkler facility to operate according to the start of the main pump and the auxiliary pump.

프리액션밸브 점검부(130)는 준비작동식 스프링클러 설비를 점검하기 위한 수계용 열감지기(131) 및 수계용 연기감지기(132)와, 수계용 열감지기(131)와 수계용 연기감지기(132)를 작동시키기 위한 수계용 감지기 버튼들(131a, 132a)과, 수계용 열감지기(131)와 수계용 연기감지기(132)의 전체 작동에 따라 개방 작동하는 전자밸브(133), 및 전자밸브(133)를 수동으로 개방 작동시키기 위한 슈퍼비조리 패널(134)을 구비한다. 프리액션밸브 점검부(130)는 실습 보드(101)의 앞면에 장착될 수 있다.The preaction valve check unit 130 includes a water system heat detector 131 and a water system smoke detector 132, a water system heat detector 131, and a water system smoke detector 132 for checking a pre-operated sprinkler facility. The solenoid valve 133 and the solenoid valve 133 which open and operate according to the total operation of the water detector button 131a and 132a for operating the water system, the heat detector 131 for the water system, and the smoke detector 132 for the water system; ), A super non-cooking panel 134 is provided for manually opening and operating. The preaction valve check unit 130 may be mounted on the front surface of the training board 101.

수계용 열감지기(131)는 주위 온도가 일정상승률 이상일 경우 작동한다. 수계용 연기감지기(132)는 주위 연기 입자에 의해 작동한다. 실습자는 수계용 열감지기(131)에 열을 가하여 수계용 열감지기(131)의 작동을 시험하거나, 수계용 연기감지기(132)에 테스트용 연기스프레이를 살포하여 수계용 연기감지기(132)의 작동을 시험할 수 있다. 수계용 열감지기(131)와 수계용 연기감지기(132)는 오작동을 방지하도록 교차회로 방식으로 연결될 수 있다.The water-based thermal sensor 131 operates when the ambient temperature is above a certain rate of increase. The water-based smoke detector 132 is operated by ambient smoke particles. The practitioner applies heat to the water heat detector 131 to test the operation of the water heat detector 131, or sprays a test smoke spray to the water smoke detector 132 to operate the water smoke detector 132. Can be tested. The water system heat detector 131 and the water system smoke detector 132 may be connected in a cross circuit manner to prevent a malfunction.

수계용 감지기 버튼들(131a, 132a)은 수계용 열감지기(131)와 수계용 연기감지기(132)에 각각 인접해 배치될 수 있다. 수계용 감지기 버튼들(131a, 132a)은 수계용 열감지기(131)에 열을 가하지 않고 수계용 열감지기(131)의 작동을 시험할 수 있게 하고, 수계용 연기감지기(132)에 연기스프레이를 살포하지 않고 수계용 연기감지기(132)의 작동을 시험할 수 있게 한다.The water detector buttons 131a and 132a may be disposed adjacent to the water heat detector 131 and the water smoke detector 132, respectively. The water system detector buttons 131a and 132a allow to test the operation of the water system heat detector 131 without applying heat to the water system heat detector 131, and provide a smoke spray to the water system smoke detector 132. It is possible to test the operation of the water smoke detector 132 without spraying.

실제 준비작동식 스프링클러 설비는 화재 발생시 감지기 작동에 의해 전자밸브가 기동됨으로 인해 프리액션밸브가 개방되고, 그에 따라 1차측의 가압수가 2차측으로 유입되고, 이후 헤드가 열에 의해 개방되면 유입된 물이 방사되도록 구성된다. 본 실시예에서, 전자밸브(133)는 수계용 열감지기(131)와 수계용 연기감지기(132)의 전체 작동에 따라 제어반(150)에 의해 개방 작동하도록 제어됨으로써, 프리액션밸브의 개방 작동을 가상적으로 시험할 수 있게 한다.In the case of a pre-operated sprinkler system, the preaction valve is opened by actuating the solenoid valve by the detector operation in the event of a fire, so that the pressurized water from the primary side flows into the secondary side, and then the head is opened by heat, Configured to be radiated. In this embodiment, the solenoid valve 133 is controlled to be opened by the control panel 150 in accordance with the overall operation of the water system heat detector 131 and the water system smoke detector 132, thereby controlling the opening operation of the preaction valve. Allows you to test virtually.

실제 슈퍼비조리 패널은 수동으로 프리액션밸브를 작동시킬 수 있는 장치이다. 본 실시예에서, 슈퍼비조리 패널(134)은 제어반(150)을 통해 수동으로 전자밸브(133)를 개방 작동시키도록 구성됨으로써, 프리액션밸브의 개방 작동을 가상적으로 시험할 수 있게 한다.In fact, the super non-cooking panel is a device that can operate the preaction valve manually. In this embodiment, the super non-cooking panel 134 is configured to manually open the solenoid valve 133 through the control panel 150, thereby enabling a virtual test of the opening operation of the preaction valve.

슈퍼비조리 패널(134)은 전자밸브(133)를 수동 조작하기 위한 조작 버튼(134a)과, 조작 버튼(134a)을 앞쪽에서 개폐하는 덮개(134b)를 포함하여 구성될 수 있다. 슈퍼비조리 패널(134)은 조작 버튼(134a)의 개방 동작에 따라 점등하는 램프(134c)를 구비할 수 있다. 슈퍼비조리 패널(134)의 주변에는 프리액션밸브를 나타내는 프리액션 모식도(135)가 실습 보드(101)의 앞면에 부착될 수 있다.The super non-cooking panel 134 may include an operation button 134a for manually operating the solenoid valve 133 and a cover 134b for opening and closing the operation button 134a from the front side. The super non-cooking panel 134 may include a lamp 134c that lights up according to the opening operation of the operation button 134a. A preaction schematic 135 representing a preaction valve may be attached to the front surface of the training board 101 around the super non-cooking panel 134.

가스계 소화설비 점검부(140)는 가스계 소화설비를 점검하기 위한 가스계용 열감지기(141) 및 가스계용 연기감지기(142)와, 가스계용 열감지기(131)와 가스계용 연기감지기(142)를 작동시키기 위한 가스계용 감지기 버튼들(141a, 142a)과, 가스계용 열감지기(141)와 가스계용 연기감지기(142)의 전체 작동에 따라 설정 지연시간 경과 후 소화약제를 방출하고 방출 확인 신호를 출력하는 기동용기함(143), 및 기동용기함(143)을 수동으로 기동시키기 위한 수동기동장치(144)를 구비한다. 가스계 소화설비 점검부(140)는 실습 보드(101)의 앞면에 장착될 수 있다.The gas-based fire extinguishing system check unit 140 includes a gas-based heat detector 141 and a gas-based smoke detector 142, a gas-based heat detector 131, and a gas-based smoke detector 142 for checking a gas-based fire extinguishing facility. According to the overall operation of the gas-based detector buttons 141a and 142a, the gas-based heat detector 141 and the gas-based smoke detector 142, the extinguishing agent is discharged after a set delay time and the release confirmation signal is received. An output starter container 143 and a manual starter 144 for manually starting the starter container 143 are provided. Gas-based fire extinguishing facility check unit 140 may be mounted on the front surface of the training board (101).

가스계용 열감지기(141)는 주위 온도가 일정상승률 이상일 경우 작동한다. 가스계용 연기감지기(142)는 주위 연기 입자에 의해 작동한다. 실습자는 가스계용 열감지기(141)에 열을 가하여 가스계용 열감지기(141)의 작동을 시험하거나, 가스계용 연기감지기(142)에 테스트용 연기스프레이를 살포하여 가스계용 연기감지기(142)의 작동을 시험할 수 있다. 가스계용 열감지기(141)와 가스계용 연기감지기(142)는 오작동을 방지하도록 교차회로 방식으로 연결될 수 있다.The gas-based heat detector 141 operates when the ambient temperature is above a certain rate of increase. Gas-based smoke detector 142 is operated by the surrounding smoke particles. The practitioner applies heat to the gas-based heat detector 141 to test the operation of the gas-based heat detector 141, or sprays a test smoke spray to the gas-based smoke detector 142 to operate the gas-based smoke detector 142. Can be tested. The gas-based heat detector 141 and the gas-based smoke detector 142 may be connected in a cross circuit manner to prevent malfunction.

가스계용 감지기 버튼들(141a, 142a)은 가스계용 열감지기(141)와 가스계용 연기감지기(142)에 각각 인접해 배치될 수 있다. 가스계용 감지기 버튼들(141a, 142a)은 가스계용 열감지기(141)에 열을 가하지 않고 가스계용 열감지기(141)의 작동을 시험할 수 있게 하고, 가스계용 연기감지기(142)에 연기스프레이를 살포하지 않고 가스계용 연기감지기(142)의 작동을 시험할 수 있게 한다.Gas-based sensor buttons 141a and 142a may be disposed adjacent to the gas-based heat detector 141 and the gas-based smoke detector 142, respectively. Gas-based detector buttons 141a and 142a allow to test the operation of the gas-based heat detector 141 without applying heat to the gas-based heat detector 141 and to provide a smoke spray to the gas-based smoke detector 142. It is possible to test the operation of the gas-based smoke detector 142 without spraying.

기동용기함(143)은 가스계 소화설비의 소화약제 저장용기(143a)와, 솔레노이드 밸브(143b), 및 압력스위치(143c)로 구성될 수 있다. 기동용기함(143)은 실습자의 개방 작동시, 솔레노이드 밸브(143b)의 격발에 의해 소화약제 저장용기(143a)가 개방되어 소화약제 저장용기(143a)로부터 소화약제가 방출되고, 방출된 소화약제의 압력에 의해 압력스위치(143c)가 켜짐에 따라 제어반(150)으로 방출 확인 신호를 전달한다. 소화약제로는 이산화탄소 소화약제가 사용될 수 있다.The starting container box 143 may include a fire extinguishing agent storage container 143a of the gas-based fire extinguishing facility, a solenoid valve 143b, and a pressure switch 143c. When the operation container 143 is opened, the extinguishing agent storage container 143a is opened by the triggering of the solenoid valve 143b to release the extinguishing agent from the extinguishing agent storage container 143a. As the pressure switch 143c is turned on by the pressure of the control panel 150, the release confirmation signal is transmitted. As the extinguishing agent, carbon dioxide extinguishing agent may be used.

수동기동장치(144)는 기동용기함(143)을 수동 조작하기 위한 조작 버튼(144a)과, 조작 버튼(144a)을 앞쪽에서 개폐하는 덮개(144b)를 포함하여 구성될 수 있다.The manual starting device 144 may include an operation button 144a for manually operating the start container 143 and a cover 144b for opening and closing the operation button 144a from the front side.

제어반(150)은 시험밸브함(120)의 개방 작동시 경종(111) 및 싸이렌(112)을 작동시키고 주펌프 가동 표시등(113)과 보조펌프 가동 표시등(114)을 점등시킨다. 제어반(150)은 수계용 열감지기(131)와 수계용 연기감지기(132)의 전체 작동 또는 슈퍼비조리 패널(134)의 작동에 따라 경종(111) 및 싸이렌(112)을 작동시키고 주펌프 가동 표시등(133)과 보조펌프 가동 표시등(134)을 점등시킴과 아울러 전자밸브(133)를 개방 작동시킨다.The control panel 150 operates the alarm bell 111 and the siren 112 during the opening operation of the test valve box 120, and turns on the main pump operation indicator 113 and the auxiliary pump operation indicator 114. The control panel 150 operates the seedling 111 and the siren 112 and operates the main pump according to the entire operation of the water heat detector 131 and the water smoke detector 132 or the operation of the super non-cooking panel 134. The indicator 133 and the auxiliary pump operation indicator 134 are turned on, and the solenoid valve 133 is opened.

제어반(150)은 가스계용 열감지기(141)와 가스계용 연기감지기(142)의 전체 작동 또는 수동기동장치(144)의 작동에 따라 경종(111) 및 싸이렌(112)을 작동시키고 약제방출표시등(115)을 점등시킴과 아울러 기동용기함(143)을 작동시킨다. 제어반(150)은 실습 보드(101)의 앞면에 장착될 수 있다.The control panel 150 operates the seedling 111 and the siren 112 according to the overall operation of the gas-based heat detector 141 and the gas-based smoke detector 142 or the operation of the manual starting device 144. Turn on the 115 and operate the starter container 143. The control panel 150 may be mounted on the front surface of the training board 101.

배선 실습부(160)는 시험밸브함(120)과 프리액션밸브 점검부(130)와 가스계 소화설비 점검부(140)의 각 실습을 위한 배선도에 따라 알림부(110)와 시험밸브함(120)과 프리액션밸브 점검부(130)와 가스계 소화설비 점검부(140) 및 제어반(150)을 배선할 수 있게 한다.The wiring training unit 160 has a notification unit 110 and a test valve box according to the wiring diagram for each training of the test valve box 120, the preaction valve checker 130, and the gas fire extinguishing facility checker 140 ( 120 and the preaction valve check unit 130 and the gas-based fire extinguishing system check unit 140 and the control panel 150 can be wired.

즉, 실습자는 시험밸브함(120)을 실습하고자 할 경우, 도 2에 도시된 시험밸브함(120)의 실습을 위한 배선도를 확인하면서 알림부(110)와 시험밸브함(120) 및 제어반(150)을 배선하는 실습을 수행할 수 있다. 실습자는 프리액션밸브 점검부(130)을 실습하고자 할 경우, 도 3에 도시된 프리액션밸브 점검부(130)의 실습을 위한 배선도를 확인하면서 알림부(110)와 프리액션밸브 점검부(130) 및 제어반(150)을 배선하는 실습을 수행할 수 있다.That is, if the practitioner wants to practice the test valve box 120, the notification unit 110 and the test valve box 120 and the control panel (checking the wiring diagram for the practice of the test valve box 120 shown in FIG. Practice to wire 150 can be performed. When the practitioner wants to practice the preaction valve check unit 130, the practitioner checks the wiring diagram for the practice of the preaction valve check unit 130 shown in FIG. 3 while notifying the notification unit 110 and the preaction valve check unit 130. ) And the control panel 150 can be performed.

또한, 실습자는 가스계 소화설비 점검부(140)를 실습하고자 할 경우, 도 4에 도시된 가스계 소화설비 점검부(140)의 실습을 위한 배선도를 확인하면서 알림부(110)와 가스계 소화설비 점검부(140) 및 제어반(150)을 배선하는 실습을 수행할 수 있다. In addition, when the practitioner wants to practice the gas-based fire extinguishing system check unit 140, the practitioner checks the wiring diagram for the practice of the gas-based fire extinguishing system check unit 140 shown in FIG. Practice of wiring the facility inspection unit 140 and the control panel 150 may be performed.

배선 실습부(160)는 알림부(110)와 시험밸브함(120)과 프리액션밸브 점검부(130)와 가스계 소화설비 점검부(140) 및 제어반(150)에 구비된 단자들(A1~A10, B1, B2), 및 단자들(A1~A10, B1, B2, C1~C16, D1~D18, E1~E29)에 시험밸브함(120)과 프리액션밸브 점검부(130)와 가스계 소화설비 점검부(140)의 각 실습을 위한 배선도에 따라 선택적으로 연결되는 배선 케이블(미도시)들을 포함할 수 있다.The wire training unit 160 includes terminals A1 provided in the notification unit 110, the test valve box 120, the preaction valve checker 130, the gas fire extinguishing facility checker 140, and the control panel 150. A10, B1, B2, and terminals A1-A10, B1, B2, C1-C16, D1-D18, E1-E29 at the test valve box 120 and the preaction valve check unit 130 and gas. It may include a wiring cable (not shown) that is selectively connected according to the wiring diagram for each practice of the system fire extinguishing facility check unit 140.

알림부(110)의 단자들(A1~A10)은 경종(111)과, 싸이렌(112)과, 주펌프 가동 표시등(113)과, 보조펌프 가동 표시등(114), 및 약제방출표시등(115)의 각 주변에 회로적으로 구성되어 실습 보드(101)에 배치될 수 있다. 시험밸브함(120)의 단자들(B1, B2)은 템퍼스위치(123)의 주변에 회로적으로 구성되어 실습 보드(101)에 배치될 수 있다.Terminals A1 to A10 of the alarm unit 110 are the alarm bell 111, the siren 112, the main pump operation indicator 113, the auxiliary pump operation indicator 114, and the chemical emission indicator. The circuit may be configured around each of the 115 and disposed on the training board 101. The terminals B1 and B2 of the test valve box 120 may be configured in a circuit around the temper switch 123 and disposed on the training board 101.

프리액션밸브 점검부(130)의 단자들(C1~C16)은 수계용 열감지기(131)와 수계용 연기감지기(132)와 전자밸브(133) 및 슈퍼비조리 패널(134)의 각 주변에 회로적으로 구성되어 실습 보드(101)에 배치될 수 있다. 가스계 소화설비 점검부(140)의 단자들(D1~D18)은 가스계용 열감지기(141)와 가스계용 연기감지기(142)와 솔레노이드 밸브(143b)와 압력스위치(143c) 및 수동기동장치(144)의 각 주변에 회로적으로 구성되어 실습 보드(101)에 배치될 수 있다.The terminals C1 to C16 of the preaction valve check unit 130 are provided around each of the water heat detector 131, the water smoke detector 132, the solenoid valve 133, and the super non-cooking panel 134. The circuit may be configured and disposed on the training board 101. Terminals D1 to D18 of the gas-based fire extinguishing system check unit 140 include a gas-based heat detector 141, a gas-based smoke detector 142, a solenoid valve 143b, a pressure switch 143c, and a manual starting device ( Each circuit 144 may be configured to be disposed on the training board 101.

제어반(150)의 단자들(E1~E29)은 알림부(110)의 단자들(A1~A10)과 시험밸브함(120)의 단자들(B1, B2)과 프리액션밸브 점검부(130)의 단자들(C1~C16)과 가스계 소화설비 점검부(140)의 단자들(D1~D18)과 각 실습 배선도에 따라 선택적으로 연결되도록 제어반(150)의 주변에 회로적으로 구성되어 실습 보드(101)에 배치될 수 있다. 다른 예로, 단자들(A1~A10, B1, B2, C1~C16, D1~D18, E1~E29)은 별도의 단자대에 구성되는 것도 가능하다.The terminals E1 to E29 of the control panel 150 are the terminals A1 to A10 of the notification unit 110, the terminals B1 and B2 of the test valve box 120 and the preaction valve checker 130. The training board is configured in a circuit around the control panel 150 to be selectively connected to the terminals (C1 ~ C16) and the terminals (D1 ~ D18) of the gas-based fire extinguishing system check unit 140 according to each practice wiring diagram May be disposed at 101. As another example, the terminals A1 to A10, B1, B2, C1 to C16, D1 to D18, and E1 to E29 may be configured in separate terminal blocks.

한편, 제어반(150)은 시험밸브함(120)의 개방 작동에 따라 점등하는 알람밸브등(151a)을 포함할 수 있다. 제어반(150)은 시험밸브함(120)의 개방 작동과 전자밸브(133)의 개방 작동에 따라 점등되는 방출확인등(151b)과 주펌프 기동램프(151c)와 보조펌프 기동램프(151d)를 포함할 수 있다.On the other hand, the control panel 150 may include an alarm valve light (151a) that is turned on in accordance with the opening operation of the test valve box 120. The control panel 150 includes a discharge check lamp 151b, a main pump starting lamp 151c, and an auxiliary pump starting lamp 151d which are turned on in accordance with the opening operation of the test valve box 120 and the opening operation of the solenoid valve 133. It may include.

제어반(150)은 수계용 열감지기(131)와 수계용 연기감지기(132)와 가스계용 열감지기(141)와 가스계용 연기감지기(142)의 작동에 따라 점등되는 화재 구역의 지구 표시등(151e)과 화재 표시등(151f)을 포함할 수 있다. 제어반(150)은 가스계용 열감지기(141)와 가스계용 연기감지기(142)의 전체 작동 또는 수동기동장치(144)의 작동에 따라 점등되는 기동용기함 기동램프(151g)를 포함할 수 있다.The control panel 150 is an earth indicator 151e of the fire zone that is turned on by the operation of the water system heat detector 131, the water system smoke detector 132, the gas system heat detector 141, and the gas system smoke detector 142. ) And a fire indicator 151f. The control panel 150 may include a starting container box starting lamp 151g that is turned on according to the overall operation of the gas-based heat detector 141 and the gas-based smoke detector 142 or the operation of the manual starting device 144.

제어반(150)은 가스계용 열감지기(141)와 가스계용 연기감지기(142)의 전체 작동 또는 수동기동장치(144)의 작동에 따라 지연 타이머의 시간 변화를 표시하는 지연 시간 표시기(151h)를 포함할 수 있다. 여기서, 지연 타이머는 30초로 설정될 수 있다. 지연 시간 표시기(151h)는 시간이 30초부터 점차적으로 감소되는 형태로 시간 변화를 표시할 수 있다. 제어반(150)은 수동기동장치(144)의 작동에 따라 점등되는 수동조작 표시등(151i)을 포함할 수 있다.The control panel 150 includes a delay time indicator 151h which displays the time change of the delay timer according to the overall operation of the gas-based heat detector 141 and the gas-based smoke detector 142 or the operation of the manual starting device 144. can do. Here, the delay timer may be set to 30 seconds. The delay time indicator 151h may display the time change in a form in which the time gradually decreases from 30 seconds. The control panel 150 may include a manual operation indicator 151i that is turned on according to the operation of the manual starting device 144.

도 11에 도시된 바와 같이, 제어반(150)은 복구 버튼(152)을 포함할 수 있다. 프리액션밸브 점검부(130)와 가스계 소화설비 점검부(140)에 대한 실습 후, 실습자가 복구 버튼(152)을 누르면 경종(111) 및 싸이렌(112)을 종료시키고 지구 표시등(151e)과 화재 표시등(151f)을 소등시키는 등 모든 작동을 정지시켜 복구할 수 있게 한다.As shown in FIG. 11, the control panel 150 may include a recovery button 152. After the training on the preaction valve check unit 130 and the gas-based fire extinguishing system check unit 140, when the practitioner presses the recovery button 152, the alarm bell 111 and the siren 112 are terminated and the earth indicator light 151e And stops all operations such as turning off the fire indicator 151f and restoring it.

제어반(150)은 지구 표시등(151e)과 화재 표시등(151f)과 그 밖의 표시등의 점등을 확인하기 위한 동작시험 스위치(153a)와, 1회로마다 화재시의 작동 시험을 행할 수 있게 하는 회로선택 스위치(153b)와, 감시기 회로의 단락/단선 이상유무를 판정하기 위한 도통시험 스위치(153c)와, 예비전원의 전압 등이 정상인지 판정하기 위한 예비전원시험 스위치(153d) 등을 포함할 수 있다.The control panel 150 includes an operation test switch 153a for confirming the lighting of the earth indicator light 151e, the fire indicator 151f, and the other indicators, and a circuit for performing an operation test in case of fire for each circuit. And a selector switch 153b, a conduction test switch 153c for determining whether there is a short circuit or disconnection abnormality in the supervisor circuit, a preliminary power test switch 153d for determining whether the voltage of the spare power supply is normal or the like. have.

한편, 도 12에 도시된 바와 같이, 제어반(150)은 수동/연동 선택 스위치(154a)를 수동으로 선택한 상태에서 기동/정지 스위치(154b)를 기동으로 선택함에 따라 슈퍼비조리 패널(134)과 동일한 작동을 수행하게 하는 슈퍼비조리 조작기(154)를 포함할 수 있다. 따라서, 실습자는 슈퍼비조리 패널(134) 대신, 제어반(150)의 슈퍼비조리 조작기(154)를 이용하여 프리액션밸브 점검부(130)를 시험할 수 있다.On the other hand, as shown in FIG. 12, the control panel 150 and the super non-cooking panel 134 as the start / stop switch 154b is selected as the start in the state of manually selecting the manual / linked selection switch 154a It may include a super non-cooking manipulator 154 to perform the same operation. Therefore, the practitioner may test the preaction valve check unit 130 using the super non-cooking manipulator 154 of the control panel 150 instead of the super non-cooking panel 134.

도 13에 도시된 바와 같이, 제어반(150)은 수동/연동 선택 스위치(155a)를 수동으로 선택한 상태에서 기동/정지 스위치(155b)를 기동으로 선택함에 따라 수동기동장치(144)와 동일한 작동을 수행하게 하는 수동기동 조작기(155)를 포함할 수 있다. 제어반(150)은 지연 타이머의 작동을 일시적으로 멈추도록 설정하기 위한 일시정지 스위치를 포함할 수 있다. 따라서, 실습자는 수동기동장치(144) 대신, 제어반(150)의 수동기동 조작기(155)를 이용하여 가스계 소화설비 점검부(140)를 시험할 수 있다.As shown in FIG. 13, the control panel 150 performs the same operation as the manual start device 144 by selecting the start / stop switch 155b as start in the state in which the manual / interlock selection switch 155a is manually selected. It may include a manual start manipulator 155 to perform. The control panel 150 may include a pause switch for temporarily stopping the operation of the delay timer. Therefore, the practitioner can test the gas-based fire extinguishing system check unit 140 by using the manual start manipulator 155 of the control panel 150 instead of the manual start device 144.

전술한 수계 및 가스계 소화설비 통합 실습장비(100)의 작용 예를 설명하면 다음과 같다.Referring to the operation of the water- and gas-based fire-extinguishing integrated training equipment 100 described above are as follows.

습식 스프링클러 설비를 점검하는 과정을 실습하고자 할 경우, 실습자는 시험밸브함(120)의 실습을 위한 배선도를 확인하면서 알림부(110)와 시험밸브함(120) 및 제어반(150)을 배선한다. 그 다음, 실습자는 시험밸브함(120)의 시험밸브(122)를 개방 작동시킨다. 그러면, 경종(111)이 명동되고 싸이렌(112)이 경보음을 울린다. 또한, 주펌프 가동 표시등(113)과 보조펌프 가동 표시등(114)이 점등됨으로써, 주펌프와 보조펌프가 가상적으로 가동 중임을 알려준다.In order to practice the process of checking the wet sprinkler facility, the practitioner wires the notification unit 110, the test valve box 120, and the control panel 150 while checking the wiring diagram for the practice of the test valve box 120. The practitioner then opens the test valve 122 of the test valve compartment 120. Then, the alarm bell 111 is moved and the siren 112 sounds an alarm. In addition, the main pump operation indicator 113 and the auxiliary pump operation indicator 114 is turned on, thereby indicating that the main pump and the auxiliary pump are operating virtually.

제어반(150)에서는 알람밸브 표시등(151a)이 점등되어 시험밸브(122)의 개방 표시를 나타내고, 방출확인등(151b)이 점등되어 주펌프 및 보조펌프의 기동에 의한 압력스위치의 작동을 나타내며, 주펌프 기동램프(151c)와 보조펌프 기동램프(151d)가 점등되어 주펌프와 보조펌프의 가상적인 가동을 나타낸다. 실습자가 시험밸브(122)를 폐쇄 작동시키면, 모두 소등되고 경보가 종료된다. 따라서, 실습자는 시험밸브(122)의 개방에 따른 진행 과정에 대해 이해할 수 있게 된다.In the control panel 150, the alarm valve indicator 151a is lit to indicate the opening of the test valve 122, and the discharge confirmation lamp 151b is lit to indicate the operation of the pressure switch by starting the main pump and the auxiliary pump. The main pump starting lamp 151c and the auxiliary pump starting lamp 151d are turned on to indicate virtual operation of the main pump and the auxiliary pump. When the practitioner closes the test valve 122, all the lights are turned off and the alarm ends. Thus, the practitioner can understand the progress of the opening of the test valve 122.

한편, 준비작동식 스프링클러 설비의 프리액션밸브를 점검하는 과정을 실습하고자 할 경우, 실습자는 프리액션밸브 점검부(130)의 실습을 위한 배선도를 확인하면서 알림부(110)와 프리액션밸브 점검부(130) 및 제어반(150)을 배선한다. 그 다음, 실습자는 수계용 연기감지기(132)에 테스트용 연기스프레이를 살포하거나 수계용 연기감지기(132)에 할당된 수계용 감지기 버튼(132a)을 눌러서 수계용 연기감지기(132)를 작동시킨다.On the other hand, if you want to practice the process of checking the preaction valve of the pre-operated sprinkler facility, the practitioner checks the wiring diagram for the practice of the preaction valve check unit 130 while the notification unit 110 and the preaction valve check unit 130 and the control panel 150 are wired. Then, the practitioner sprays the test smoke spray on the water smoke detector 132 or presses the water detector button 132a assigned to the water smoke detector 132 to operate the water smoke detector 132.

그러면, 경종(111)이 명동되고, 제어반(150)에서는 수계용 연기감지기(152)가 작동한 화재 구역의 지구 표시등(151e)과 화재 표시등(151f)이 점등된다. 이때, 수계용 연기감지기(132)의 신호는 자기 유지되며, 제어반(150)의 복구 버튼(152)을 누르면 모두 소등되고, 경보가 종료된다.Then, the alarm 111 is moved and the control panel 150 lights the earth indicator light 151e and the fire indicator 151f of the fire zone where the water smoke detector 152 operated. At this time, the signal of the water-based smoke detector 132 is self-maintained, and when the recovery button 152 of the control panel 150 is pressed off, all of them go out, and the alarm is terminated.

이 상태에서, 실습자가 수계용 열감지기(131)에 열을 가하거나 수계용 열감지기(131)에 할당된 수계용 감지기 버튼(131a)을 눌러서 수계용 열감지기(131)를 작동시킴과 아울러, 수계용 연기감지기(132)에 테스트용 연기스프레이를 살포하거나 수계용 연기감지기(132)에 할당된 수계용 감지기 버튼(132a)을 눌러서 수계용 연기감지기(132)를 작동시키면, 전자밸브(133)가 개방 작동한다.In this state, the practitioner heats the water heat sensor 131 or presses the water sensor button 131a assigned to the water heat sensor 131 to operate the water heat sensor 131, Spray the test smoke spray on the water system smoke detector 132 or press the water system detector button 132a assigned to the water system smoke detector 132 to operate the water system smoke detector 132, the solenoid valve 133 It works open.

제어반(150)에서는 수계용 열감지기(131)와 수계용 연기감지기(132)가 작동한 화재 구역의 지구 표시등(151e)이 모두 점등되고, 화재 표시등(151f)이 점등된다. 또한, 제어반(150)에서는 방출확인등(151b)이 점등되어 주펌프 및 보조펌프의 기동에 의한 압력스위치의 작동을 나타내며, 주펌프 기동램프(151c)와 보조펌프 기동램프(151d)가 점등되어 주펌프와 보조펌프의 가상적인 가동을 나타낸다. 그리고, 싸이렌(112)이 경보음을 울린다. 제어반(150)의 복구 버튼(152)을 누르면 모두 소등되고 경보가 종료된다.In the control panel 150, both the earth indicator 151e of the fire zone where the water system heat detector 131 and the water system smoke detector 132 operate, and the fire indicator 151f light up. In addition, in the control panel 150, the discharge confirmation lamp 151b is turned on to indicate the operation of the pressure switch by starting the main pump and the auxiliary pump, and the main pump starting lamp 151c and the auxiliary pump starting lamp 151d are turned on. It shows the virtual operation of main pump and auxiliary pump. And the siren 112 sounds an alarm. When the recovery button 152 of the control panel 150 is pressed, all are turned off and the alarm is terminated.

이 상태에서, 실습자가 슈퍼비조리 패널(134)의 덮개(134b)를 열고 조작 버튼(134a)을 누르면, 전자밸브(133)가 개방 작동한다. 이후 과정은 수계용 열감지기(131)와 수계용 연기감지기(132)를 전체 작동시킴에 따라 발생되는 과정과 동일하게 이루어진다. 제어반(150)의 복구 버튼(152)을 누르면 모두 소등되고 경보가 종료된다.In this state, when the practitioner opens the cover 134b of the super non-cooking panel 134 and presses the operation button 134a, the solenoid valve 133 opens. Since the process is made the same as the process generated by operating the water-based heat detector 131 and the water-based smoke detector 132 as a whole. When the recovery button 152 of the control panel 150 is pressed, all are turned off and the alarm is terminated.

이 상태에서, 실습자가 슈퍼비조리 조작기(154)를 조작해서 수동/연동 선택 스위치(154a)를 수동으로 선택한 상태에서 기동/정지 스위치(154b)를 기동으로 선택하면, 전자밸브(133)가 개방 작동한다. 이후 과정은 수계용 열감지기(131)와 수계용 연기감지기(132)를 전체 작동시키거나 슈퍼비조리 패널(134)을 작동시킴에 따라 발생되는 과정과 동일하게 이루어진다. 제어반(150)의 복구 버튼(152)을 누르면 모두 소등되고 경보가 종료된다. 따라서, 실습자는 준비작동식 스프링클러 설비의 프리액션밸브의 개방에 따른 진행 과정에 대해 이해할 수 있게 된다.In this state, when the practitioner operates the super non-cooking manipulator 154 and manually selects the start / stop switch 154b with the manual / interlock selection switch 154a selected, the solenoid valve 133 opens. Works. Subsequently, the process is performed in the same manner as the process generated by operating the water heat detector 131 and the water smoke detector 132 for the whole or the super non-cooking panel 134. When the recovery button 152 of the control panel 150 is pressed, all are turned off and the alarm is terminated. Thus, the practitioner can understand the process of opening the preaction valve of the pre-operated sprinkler facility.

한편, 가스계 소화설비를 점검하는 과정을 실습하고자 할 경우, 실습자는 가스계 소화설비 점검부(140)의 실습을 위한 배선도를 확인하면서 알림부(110)와 가스계 소화설비 점검부(140) 및 제어반(150)을 배선한다. 그 다음, 실습자는 가스계용 연기감지기(142)에 테스트용 연기스프레이를 살포하거나 가스계용 연기감지기(142)에 할당된 가스계용 감지기 버튼(142a)을 눌러서 가스계용 연기감지기(142)를 작동시킨다.On the other hand, if you want to practice the process of checking the gas-based fire extinguishing system, the practitioner checks the wiring diagram for the practice of the gas-based fire extinguishing system check unit 140 while the notification unit 110 and the gas-based fire extinguishing system check unit 140 And the control panel 150 are wired. Next, the practitioner sprays the test smoke spray on the gas-based smoke detector 142 or presses the gas-based sensor button 142a assigned to the gas-based smoke detector 142 to operate the gas-based smoke detector 142.

그러면, 경종(111)이 명동되고, 제어반(150)에서는 가스계용 연기감지기(142)가 작동한 화재 구역의 지구 표시등(151e)과 화재 표시등(151f)이 점등된다. 그리고, 제어반(150)에서는 지연 타이머의 설정 시간이 지연 시간 표시기(151h)에 표시된다. 제어반(150)의 복구 버튼(152)을 누르면 모두 소등되고 경보가 종료되며, 지연 시간 표시기(151h)도 소등된다.Then, the alarm 111 is moved, and the control panel 150 lights the earth indicator 151e and the fire indicator 151f of the fire zone where the gas-based smoke detector 142 is operated. In the control panel 150, the setting time of the delay timer is displayed on the delay time indicator 151h. When the recovery button 152 of the control panel 150 is pressed, all of the lights are turned off and the alarm ends, and the delay time indicator 151h is also turned off.

이 상태에서, 실습자가 가스계용 열감지기(141)에 열을 가하거나 가스계용 열감지기(141)에 할당된 가스계용 감지기 버튼(141a)을 눌러서 가스계용 열감지기(141)를 작동시킴과 아울러, 가스계용 연기감지기(142)에 테스트용 연기스프레이를 살포하거나 가스계용 연기감지기(142)에 할당된 가스계용 감지기 버튼(142a)을 눌러서 가스계용 연기감지기(142)를 작동시킨다.In this state, the practitioner heats the gas-based heat sensor 141 or presses the gas-based sensor button 141a assigned to the gas-based heat sensor 141 to operate the gas-based heat sensor 141, The gaseous smoke detector 142 is operated by spraying a test smoke spray on the gaseous smoke detector 142 or by pressing the gaseous sensor button 142a assigned to the gaseous smoke detector 142.

그러면, 경종(111)이 명동된다. 제어반(150)에서는 가스계용 열감지기(141)와 가스계용 연기감지기(142)가 작동한 화재 구역의 지구 표시등(151e)이 모두 점등되고, 화재 표시등(151f)이 점등된다. 그리고, 제어반(150)에서는 지연 타이머가 작동하여 지연 시간 표시기(151h)에 시간 감소가 표시된다.Then, the seedling 111 is moved. In the control panel 150, both the earth indicator 151e of the fire zone where the gas-based heat detector 141 and the gas-based smoke detector 142 operated are lit, and the fire indicator 151f is lit. In the control panel 150, the delay timer is operated to display the time reduction on the delay time indicator 151h.

지연 타이머에 설정된 지연 시간이 경과하면, 기동용기함(143)이 개방 작동한다. 이때, 기동용기함(143)은 솔레노이드 밸브(143b)의 격발에 의해 소화약제 저장용기(143a)가 개방되어 소화약제 저장용기(143a)로부터 소화약제가 방출되고, 방출된 소화약제의 압력에 의해 압력스위치(143c)가 켜짐에 따라 제어반(150)으로 방출 확인 신호를 전달한다. 제어반(150)에서는 약제방출표시등(115)이 점등된다. 그리고, 싸이렌(112)이 경보음을 울린다. 제어반(150)의 복구 버튼(152)을 누르면 모두 소등되고 경보가 종료되며, 지연 시간 표시기(151h)도 소등된다.When the delay time set in the delay timer has elapsed, the start container 143 is opened. At this time, the starting container 143 is a fire extinguishing agent storage container 143a is opened by the trigger of the solenoid valve 143b, the extinguishing agent is released from the extinguishing agent storage container 143a, by the pressure of the released extinguishing agent As the pressure switch 143c is turned on, the control panel 150 transmits a release confirmation signal. In the control panel 150, the drug release indicator 115 is turned on. And the siren 112 sounds an alarm. When the recovery button 152 of the control panel 150 is pressed, all of the lights are turned off and the alarm ends, and the delay time indicator 151h is also turned off.

이 상태에서, 실습자가 수동기동장치(144)의 덮개(144b)를 열고 조작 버튼(144a)을 누르면, 제어반(150)에 수동조작 표시등(151i)이 점등한다. 이후 과정은 가스계용 열감지기(141)와 가스계용 연기감지기(142)를 전체 작동시킴에 따라 발생되는 과정과 동일하게 이루어진다. 제어반(150)의 복구 버튼(152)을 누르면 모두 소등되고 경보가 종료된다.In this state, when the practitioner opens the cover 144b of the manual starting device 144 and presses the operation button 144a, the manual operation indicator light 151i lights up on the control panel 150. Since the process is made the same as the process generated by operating the gas-based heat detector 141 and the gas-based smoke detector 142 as a whole. When the recovery button 152 of the control panel 150 is pressed, all are turned off and the alarm is terminated.

이 상태에서, 실습자가 수동기동 조작기(155)를 조작해서 수동/연동 선택 스위치(155a)를 수동으로 선택한 상태에서 기동/정지 스위치(155b)를 기동으로 선택하면, 제어반(150)에 수동조작 표시등(151i)이 점등한다. 이후 과정은 가스계용 열감지기(141)와 가스계용 연기감지기(142)를 전체 작동시키거나 수동기동장치(144)를 작동시킴에 따라 발생되는 과정과 동일하게 이루어진다. 제어반(150)의 복구 버튼(152)을 누르면 모두 소등되고 경보가 종료된다. 따라서, 실습자는 가스계 소화설비의 기동용기함(143)의 개방에 따른 진행 과정에 대해 이해할 수 있게 된다.In this state, if the practitioner operates the manual start manipulator 155 and selects the start / stop switch 155b as start while manually selecting the manual / interlock selection switch 155a, the control panel 150 displays the manual operation. The lamp 151i lights up. Since the process is made the same as the process generated by operating the gas-based heat detector 141 and the gas-based smoke detector 142 as a whole or the manual starting device 144. When the recovery button 152 of the control panel 150 is pressed, all are turned off and the alarm is terminated. Therefore, the practitioner can understand the progress of the opening of the starting container 143 of the gas-based fire extinguishing facility.

이와 같이, 수계 및 가스계 소화설비 통합 실습장비(100)에 의하면, 습식 스프링클러 설비와 준비작동식 스프링클러 설비와 가스계 소화설비의 각 진행 과정에 대한 이해도를 높이도록 실습할 수 있으므로, 실습 효과를 높여 실습자의 실무역량을 강화하는데 기여할 수 있다.As such, according to the integrated training system for water and gas fire extinguishing equipment, it is possible to practice to improve the understanding of each process of the wet sprinkler equipment, the pre-operated sprinkler equipment, and the gas fire extinguishing equipment. It can contribute to strengthening the practitioner's working capacity.

본 발명은 첨부된 도면에 도시된 일 실시예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 당해 기술분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 수 있을 것이다. 따라서, 본 발명의 진정한 보호 범위는 첨부된 청구 범위에 의해서만 정해져야 할 것이다. Although the present invention has been described with reference to one embodiment shown in the accompanying drawings, this is merely exemplary, and it will be understood by those skilled in the art that various modifications and equivalent other embodiments are possible therefrom. Could be. Accordingly, the true scope of protection of the invention should be defined only by the appended claims.

101..실습 보드 110..알림부
111..경종 112..싸이렌
113..주펌프 가동 표시등 114..보조펌프 가동 표시등
115..약제방출표시등 120..시험밸브함
130..프리액션밸브 점검부 131..수계용 열감지기
132..수계용 가스감지기 133..전자밸브
134..슈퍼비조리 패널 140..가스계 소화설비 점검부
141..가스계용 열감지기 142..가스계용 가스감지기
143..기동용기함 144..수동기동장치
150..제어반 160..배선 실습부
101 .. Training Board 110 .. Notification
111..Songjong 112..Siren
113. Main pump start indicator 114. Secondary pump start indicator
115. Chemical release indicator 120. Test valve box
130. Preaction valve check 131. Water detector for water system
132.Gas detectors for water systems 133. Solenoid valves
134. Super non-cooking panel 140. Gas fire extinguishing system inspection
141..Gas detector for gas meter 142..Gas detector for gas meter
143..starter 144..manual starter
150. Control panel 160. Wiring practice

Claims (6)

경종과, 싸이렌과, 주펌프 가동 표시등과, 보조펌프 가동 표시등, 및 약제방출표시등을 구비하여, 실습 보드에 장착되는 알림부;
습식 스프링클러 설비를 점검하기 위한 시험밸브함;
준비작동식 스프링클러 설비를 점검하기 위한 수계용 열감지기 및 수계용 연기감지기와, 상기 수계용 열감지기 및 수계용 연기감지기에 각각 인접하게 배치되어 상기 수계용 열감지기와 수계용 연기감지기를 작동시키기 위한 수계용 감지기 버튼들과, 상기 수계용 열감지기와 수계용 연기감지기의 전체 작동에 따라 개방 작동하는 전자밸브, 및 상기 전자밸브를 수동으로 개방 작동시키기 위한 슈퍼비조리 패널을 구비하여, 상기 실습 보드에 장착되는 프리액션밸브 점검부;
가스계 소화설비를 점검하기 위한 가스계용 열감지기 및 가스계용 연기감지기와, 상기 가스계용 열감지기와 가스계용 연기감지기에 각각 인접하게 배치되어 상기 가스계용 열감지기와 가스계용 연기감지기를 작동시키기 위한 가스계용 감지기 버튼들과, 상기 가스계용 열감지기와 가스계용 연기감지기의 전체 작동에 따라 설정 지연시간 경과 후 소화약제를 방출하고 방출 확인 신호를 출력하는 기동용기함, 및 상기 기동용기함을 수동으로 기동시키기 위한 수동기동장치를 구비하여, 상기 실습 보드에 장착되는 가스계 소화설비 점검부;
상기 시험밸브함의 개방 작동시 상기 경종 및 싸이렌을 작동시키고 상기 주펌프 가동 표시등과 보조펌프 가동 표시등을 점등시키며, 상기 수계용 열감지기와 수계용 연기감지기의 전체 작동 또는 상기 슈퍼비조리 패널의 작동에 따라 상기 경종 및 싸이렌을 작동시키고 상기 주펌프 가동 표시등과 보조펌프 가동 표시등을 점등시킴과 아울러 상기 전자밸브를 개방 작동시키며, 상기 가스계용 열감지기와 가스계용 연기감지기의 전체 작동 또는 상기 수동기동장치의 작동에 따라 상기 경종 및 싸이렌을 작동시키고 상기 약제방출표시등을 점등시킴과 아울러 상기 기동용기함을 작동시키도록 상기 실습 보드에 장착되는 제어반; 및
상기 시험밸브함과 프리액션밸브 점검부와 가스계 소화설비 점검부의 각 실습을 위한 배선도에 따라 상기 알림부와 시험밸브함과 프리액션밸브 점검부와 가스계 소화설비 점검부 및 제어반을 배선할 수 있게 하는 배선 실습부;를 포함하며,
상기 시험밸브함은,
시험배관과, 상기 시험배관을 개폐하는 시험밸브, 및 상기 시험밸브의 개폐 상태를 상기 제어반으로 송신하는 템퍼스위치를 포함하여, 상기 실습 보드에 장착되며;
상기 배선 실습부는,
상기 경종과 싸이렌과 주펌프 가동 표시등과 보조펌프 가동 표시등 및 약제방출표시등의 각 주변에 회로적으로 구성된 알림부의 단자들과,
상기 템퍼스위치의 주변에 회로적으로 구성된 시험밸브함의 단자들과,
상기 수계용 열감지기와 수계용 연기감지기와 전자밸브 및 슈퍼비조리 패널의 각 주변에 회로적으로 구성된 프리액션밸브 점검부의 단자들과,
상기 가스계용 열감지기와 가스계용 연기감지기와 솔레노이드 밸브와 압력스위치 및 수동기동장치의 각 주변에 회로적으로 구성된 가스계 소화설비 점검부의 단자들과,
상기 알림부의 단자들과 시험밸브함의 단자들과 프리액션밸브 점검부의 단자들과 가스계 소화설비 점검부의 단자들과 각 실습 배선도에 따라 선택적으로 연결되도록 제어반의 주변에 회로적으로 구성된 제어반의 단자들, 및
상기 단자들에 각 실습 배선도에 따라 선택적으로 연결되는 배선 케이블들을 포함하는 것을 특징으로 하는 수계 및 가스계 소화설비 통합 실습장비.
A notification unit mounted on the training board, including a bell, a siren, a main pump operation indicator, an auxiliary pump operation indicator, and a drug release indicator;
Test valve box to check wet sprinkler installations;
A water system heat detector and a water system smoke detector for inspecting a pre-operated sprinkler system, and the water system heat detector and the water system smoke detector are respectively disposed adjacent to each other to operate the water system heat detector and the water system smoke detector. The training board includes a sensor button for water system, a solenoid valve which opens according to the overall operation of the water sensor and the smoke detector for water, and a super non-cooking panel for manually opening and operating the solenoid valve. Preaction valve check unit mounted on the;
A gas-based heat detector and a gas-based smoke detector for inspecting a gas-based fire extinguishing system, and a gas for operating the gas-based heat detector and the gas-based smoke detector, respectively, adjacent to the gas-based heat detector and the gas-based smoke detector. Manual start of the detector button, a starter container for releasing the extinguishing agent and outputting a release confirmation signal after a set delay time according to the overall operation of the gas-based heat detector and the gas-based smoke detector, and the starter container manually A gas-based fire extinguishing system check unit mounted on the training board, having a manual starting device to make it;
When the test valve box is opened, the alarm bell and the siren are operated and the main pump operation indicator and the auxiliary pump operation indicator are turned on, and the entire operation of the water heater and the water smoke detector for the water system or the operation of the super non-cooking panel is performed. According to the operation of the alarm bell and the siren, the main pump operation indicator and the auxiliary pump operation indicator lights up, the solenoid valve is opened and operated, the overall operation of the gas-based heat detector and gas-based smoke detector or the manual start device A control panel mounted to the training board to operate the seedling and the siren according to the operation and to light the drug release indicator and to operate the starting container box; And
According to the wiring diagrams for the training of the test valve box, the preaction valve check unit and the gas fire extinguishing system check unit, the notification unit, the test valve box, the preaction valve check unit, the gas fire extinguishing system check unit and the control panel can be wired. It includes a wiring training unit to make,
The test valve box,
A test pipe, a test valve for opening and closing the test pipe, and a temper switch for transmitting an open / closed state of the test valve to the control panel, the test valve being mounted on the training board;
The wiring training unit,
Terminals of the alarm unit configured circuitry around each of the alarm bell, the siren, the main pump operation indicator light, the auxiliary pump operation indicator light, and the drug release indicator light;
Terminals of a test valve box circuitly configured around the temper switch,
Terminals of the preaction valve inspection unit circuitly configured around each of the water heat sensor, the water smoke detector, the solenoid valve, and the super non-cooking panel;
Terminals of the gas-based fire extinguishing system check unit which are configured around each of the gas-based heat detector, the gas-based smoke detector, the solenoid valve, the pressure switch, and the manual starting device;
Terminals of the control panel circuitally configured around the control panel to selectively connect the terminals of the notification unit, the terminals of the test valve box, the terminals of the pre-action valve inspection unit, the terminals of the gas-based fire extinguishing system inspection unit and according to each practice wiring diagram , And
Water- and gas-based fire-extinguishing integrated training equipment, characterized in that it comprises a wiring cable that is selectively connected to the terminals according to each practice wiring diagram.
삭제delete 삭제delete 제1항에 있어서,
상기 제어반은,
상기 시험밸브함의 개방 작동에 따라 점등하는 알람밸브등과,
상기 시험밸브함의 개방 작동과 상기 전자밸브의 개방 작동에 따라 점등되는 방출확인등과 주펌프 기동램프와 보조펌프 기동램프와,
상기 수계용 열감지기와 수계용 연기감지기와 가스계용 열감지기와 가스계용 연기감지기의 작동에 따라 점등되는 화재 구역의 지구 표시등과 화재 표시등과,
상기 가스계용 열감지기와 가스계용 연기감지기의 전체 작동 또는 상기 수동기동장치의 작동에 따라 점등되는 기동용기함 기동램프와,
상기 가스계용 열감지기와 가스계용 연기감지기의 전체 작동 또는 상기 수동기동장치의 작동에 따라 지연 타이머의 시간 변화를 표시하는 지연 시간 표시기와,
상기 수동기동장치의 작동에 따라 점등되는 수동조작 표시등을 포함하는 것을 특징으로 하는 수계 및 가스계 소화설비 통합 실습장비.
The method of claim 1,
The control panel,
An alarm valve that lights up according to the opening operation of the test valve box,
A discharge confirmation lamp, a main pump starting lamp and an auxiliary pump starting lamp, which are lit in accordance with the opening operation of the test valve box and the opening operation of the solenoid valve;
Earth indicators and fire indicators in the fire zone, which are lit according to the operation of the water heat sensor, the water smoke detector for the water system, the heat detector for the gas gauge, and the gas detector for the gas gauge;
A starting container box starting lamp which is turned on according to the overall operation of the gas-based heat detector and the gas-based smoke detector or the operation of the manual starting device;
A delay time indicator for displaying the time change of the delay timer according to the overall operation of the gas-based heat detector and the gas-based smoke detector or the operation of the manual starting device;
Water- and gas-based fire extinguishing system integrated training equipment, characterized in that it comprises a manual operation indicator lighted in accordance with the operation of the manual starting device.
제1항에 있어서,
상기 제어반은,
수동/연동 선택 스위치를 수동으로 선택한 상태에서 기동/정지 스위치를 기동으로 선택함에 따라 상기 슈퍼비조리 패널과 동일한 작동을 수행하게 하는 슈퍼비조리 조작기를 포함하는 것을 특징으로 하는 수계 및 가스계 소화설비 통합 실습장비.
The method of claim 1,
The control panel,
Water-based and gas-based fire extinguishing equipment comprising a super non-cooking manipulator for performing the same operation as the super non-cooking panel by selecting the start / stop switch to start in the state of manually selecting the manual / interlock selection switch. Integrated training equipment.
제1항에 있어서,
상기 제어반은
수동/연동 선택 스위치를 수동으로 선택한 상태에서 기동/정지 스위치를 기동으로 선택함에 따라 상기 수동기동장치와 동일한 작동을 수행하게 하는 수동기동 조작기, 및
지연 타이머의 작동을 일시적으로 멈추도록 설정하기 위한 일시정지 스위치를 포함하는 것을 특징으로 하는 수계 및 가스계 소화설비 통합 실습장비.
The method of claim 1,
The control panel is
A manual start manipulator for performing the same operation as the manual start device by selecting the start / stop switch as start with the manual / interlock selection switch manually selected, and
Water- and gas-based fire extinguishing system integrated training equipment comprising a pause switch to set the operation of the delay timer to temporarily stop.
KR1020180135273A 2018-11-06 2018-11-06 Integrated apparatus for training water system and gas system fire extinguishing equipment KR102080799B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180135273A KR102080799B1 (en) 2018-11-06 2018-11-06 Integrated apparatus for training water system and gas system fire extinguishing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180135273A KR102080799B1 (en) 2018-11-06 2018-11-06 Integrated apparatus for training water system and gas system fire extinguishing equipment

Publications (1)

Publication Number Publication Date
KR102080799B1 true KR102080799B1 (en) 2020-02-24

Family

ID=69637215

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180135273A KR102080799B1 (en) 2018-11-06 2018-11-06 Integrated apparatus for training water system and gas system fire extinguishing equipment

Country Status (1)

Country Link
KR (1) KR102080799B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111210687A (en) * 2020-02-27 2020-05-29 南京工程学院 Operation and maintenance training platform for electromechanical equipment system of urban rail transit
CN114061682A (en) * 2021-11-23 2022-02-18 刘礽瑞 Automatic gas meter case of putting out a fire
KR20220115387A (en) * 2021-02-10 2022-08-17 신성대학교 산학협력단 Simulation test apparatus for fire protection sprinkler equipment and method thereof
KR20230122460A (en) * 2022-02-14 2023-08-22 신성대학교 산학협력단 Sprinkler system by direct connection of piped water

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200293063Y1 (en) * 1999-04-08 2003-01-14 주식회사 케이티이엔지 Temperature, Pressure, Power controls and defrost automatic operating refrigeration system
KR20080001532U (en) * 2006-11-29 2008-06-03 이원일 Test velve for operating test of alarm valve
KR20090080282A (en) * 2008-01-21 2009-07-24 효림전자 주식회사 Fire phase noticable extinguishing control panel
KR101112189B1 (en) 2011-04-06 2012-02-24 (주)씨엔씨테크 Fire simulation apparatus and fire extinguisher education system using fire simulation apparatus
KR20180119184A (en) * 2017-04-24 2018-11-02 주식회사 지에프에스 System and method for integrated smoke control system by fire Alarm Control Panel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200293063Y1 (en) * 1999-04-08 2003-01-14 주식회사 케이티이엔지 Temperature, Pressure, Power controls and defrost automatic operating refrigeration system
KR20080001532U (en) * 2006-11-29 2008-06-03 이원일 Test velve for operating test of alarm valve
KR20090080282A (en) * 2008-01-21 2009-07-24 효림전자 주식회사 Fire phase noticable extinguishing control panel
KR101112189B1 (en) 2011-04-06 2012-02-24 (주)씨엔씨테크 Fire simulation apparatus and fire extinguisher education system using fire simulation apparatus
KR20180119184A (en) * 2017-04-24 2018-11-02 주식회사 지에프에스 System and method for integrated smoke control system by fire Alarm Control Panel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111210687A (en) * 2020-02-27 2020-05-29 南京工程学院 Operation and maintenance training platform for electromechanical equipment system of urban rail transit
KR20220115387A (en) * 2021-02-10 2022-08-17 신성대학교 산학협력단 Simulation test apparatus for fire protection sprinkler equipment and method thereof
KR102583896B1 (en) * 2021-02-10 2023-09-26 신성대학교 산학협력단 Simulation test apparatus for fire protection sprinkler equipment and method thereof
CN114061682A (en) * 2021-11-23 2022-02-18 刘礽瑞 Automatic gas meter case of putting out a fire
KR20230122460A (en) * 2022-02-14 2023-08-22 신성대학교 산학협력단 Sprinkler system by direct connection of piped water
KR102678379B1 (en) * 2022-02-14 2024-06-24 신성대학교 산학협력단 Sprinkler system by direct connection of piped water

Similar Documents

Publication Publication Date Title
KR102080799B1 (en) Integrated apparatus for training water system and gas system fire extinguishing equipment
KR101863100B1 (en) IOT-based traditional market fire prevention system
JP6278463B2 (en) Gas fire extinguishing equipment
CN102274598A (en) Automatic fire extinguisher device
JP2007068639A (en) Gas fire extinguishing facilities
KR20220116883A (en) Apparatus for automatically extinguishing fire in a distributing board or a panel board
JP5361838B2 (en) Control device for fire fighting system
JP3762857B2 (en) Fire fighting training equipment
JP2003310785A (en) Hydrant device-operating method-guiding system
KR20130059248A (en) Automatic fire extinguishing system
CN115691263B (en) Intelligent fire-fighting equipment with visual guidance of police and micro-experience of fire-fighting propaganda
KR102558126B1 (en) Smart fire extinguisher system to notify fire occurrence information
CN102058949B (en) The method of operating of fire extinguishing system and fire extinguishing system
JP3532799B2 (en) Extinguishing gas emission control system in gas fire extinguishing equipment
JP2005058460A (en) Device and method for inspecting fire fighting equipment
JP5785916B2 (en) Control device for fire fighting system
JP5368389B2 (en) Fire extinguishing system control panel
CN212032517U (en) Portable fire control linkage teaching demonstration platform
KR20120023903A (en) Fire-fighting system for training
CN210543043U (en) Fire extinguishing control system
KR200209603Y1 (en) Fire drill education equipment
JP5702979B2 (en) Control device for fire fighting system
KR101707631B1 (en) Mechanical fire extinguish equipment
JP2015223449A (en) Fire-extinguishing system control board
CN117919640A (en) Fixed automatic foam spray fire extinguishing system and method for electric vehicle shed

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant