KR102061877B1 - Safety parapet constructing method for construction work - Google Patents

Safety parapet constructing method for construction work Download PDF

Info

Publication number
KR102061877B1
KR102061877B1 KR1020190077697A KR20190077697A KR102061877B1 KR 102061877 B1 KR102061877 B1 KR 102061877B1 KR 1020190077697 A KR1020190077697 A KR 1020190077697A KR 20190077697 A KR20190077697 A KR 20190077697A KR 102061877 B1 KR102061877 B1 KR 102061877B1
Authority
KR
South Korea
Prior art keywords
central body
body portion
scaffold
fixing
delete delete
Prior art date
Application number
KR1020190077697A
Other languages
Korean (ko)
Inventor
최인희
Original Assignee
최인희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최인희 filed Critical 최인희
Priority to KR1020190077697A priority Critical patent/KR102061877B1/en
Application granted granted Critical
Publication of KR102061877B1 publication Critical patent/KR102061877B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The present invention provides a method for manufacturing a safety handrail structure for construction. According to the present invention, the method for manufacturing a safety handrail structure for construction includes: a step of installing a column (12′) inserted into an accommodation body (110); a step of installing a handrail frame (100) blocking the upper part on one side of a footboard (11) installed in a scaffold (10) installed in the column (12′); a step of installing a fixing unit (200) fixing the handrail frame (100) to the scaffold (10) by being connected to a lower end of the handrail frame (100); and a step of installing a shielding unit (300) closing an opening unit (15) formed between the footboard (11) of the scaffold (10) and a furring strip (13) of the scaffold (10) by being connected to the lower end of the handrail frame (100). Therefore, the method for manufacturing a safety handrail structure for construction enables workers in a construction field to safely work by stably installing a safety handrail.

Description

건축 공사를 위한 안전 난간 구조물 시공 방법{Safety parapet constructing method for construction work}Safety parapet constructing method for construction work

본 발명은 건축 공사를 위한 안전 난간 구조물 시공 방법에 관한 것으로서, 보다 상세하게는 안전 난간의 안정적인 설치를 통해 공사 현장의 작업자들이 보다 안전하게 작업할 수 있는 건축 공사를 위한 안전 난간 구조물 시공 방법에 관한 것이다.The present invention relates to a method for constructing a safety railing structure for a building construction, and more particularly, to a method for constructing a safety railing structure for a construction project in which workers at a construction site can work more safely through a stable installation of a safety railing. .

일반적인 난간 구조는 가로기둥, 세로기둥, 난간대, 발판 등의 조합을 통해 추락을 방지하고자 하는 기술들이 대부분이다. 이러한 일반적인 난간구조들은 안전상의 목적을 달성하기 위하여 점차 상부에 구비되는 부재이 추가되어, 정작 난간구조의 하중 증가와 난간구조물의 설치를 어렵게 만드는 문제점이 있다. 또한, 이러한 난간의 설치와 보관 등에 있어 분실, 파손 등의 요인이 부가될 수 있는 문제점이 있다. 또한, 유지 보수 관리에 있어서도 비용이 증가되게 되는 문제점이 있다.The general railing structure is most of the techniques to prevent the fall through a combination of columns, columns, railings, scaffolding. In order to achieve safety goals, such general handrail structures are gradually added with members provided on the upper part, which makes it difficult to increase the load of the handrail structure and install the handrail structure. In addition, there is a problem that a factor such as loss, damage can be added in the installation and storage of such handrails. In addition, there is a problem that the cost is increased also in the maintenance management.

따라서, 설치 관리가 효율적이며 안정적인 기능도 확보할 수 있는 난간 구조물을 제공하는 것이 용이하지 못한 단점이 있다.Therefore, there is a disadvantage that it is not easy to provide a handrail structure that can efficiently install and secure stable functions.

한국등록특허 제10-0834771호Korean Patent Registration No. 10-0834771

본 발명은 안전 난간의 안정적인 설치를 통해 공사 현장의 작업자들이 보다 안전하게 작업할 수 있는 건축 공사를 위한 안전 난간 구조물 시공 방법을 제공하는 것을 목적으로 한다.It is an object of the present invention to provide a method for constructing a safety railing structure for a building construction in which workers at a construction site can work more safely through a stable installation of a safety railing.

본 발명은, 건축 공사를 위한 안전 난간 시공 방법으로서, 수용체(110)에 삽입되는 기둥(12')을 구비하는 단계; 상기 기둥(12')에 구비되는 비계(10)에 설치되는 발판(11)의 일측 상부를 막는 난간프레임(100)을 구비하는 단계; 상기 난간프레임(100)의 하단부에 결합되어 난간프레임(100)을 비계(10)에 고정하는 고정유닛(200)을 구비하는 단계; 및 상기 난간프레임(100)의 하단부에 결합되어 비계(10)의 발판(11)과 비계(10)의 띠장(13) 사이에 형성된 개구부(15)를 폐쇄하는 차폐유닛(300) 구비하는 단계를 포함하며, 상기 수용체(110)는, 종방향으로 절개된 형태의 제1 수용부(111)와, 상기 제1 수용부(111)와 형합 대응되며 바(bar) 형상체(113)를 매개로 상기 제1 수용부(111)를 전진 또는 후진시키기 위한 제2 수용부(112)가 구비되며, 상기 제1 수용부(111)와 상기 제2 수용부(112)는 상호 대응되는 반구형 중공홈이 형성되며, 상기 기둥(12')의 내측으로 가압하며, 상기 수용체(110)는 높이방향 상에서 상방과 하방 간에 고정력을 발생시키는 고정모듈(120)이 구비되며, 상기 고정모듈(120)은, 상기 수용체(110)의 높이방향 상에서 상방에 구비되는 상단 고정체(121)와, 상기 기둥(12')의 높이방향 상에서 하단에 구비되는 하단 고정체(123)와, 상기 기둥(12')의 높이방향 상에서 상기 상단 고정체(121)와 상기 하단 고정체(123) 사이에 구비되는 중단 고정체(122)가 구비되며, 상기 상단 고정체(121), 상기 중단 고정체(122) 및 상기 하단 고정체(123)는 상호간에 체결수단(124)으로 연동되어 결속되는 건축 공사를 위한 안전 난간 구조물 시공 방법을 제공한다.The present invention is a safety railing construction method for building, comprising the steps of having a pillar (12 ') inserted into the receptor (110); Providing a handrail frame (100) blocking an upper portion of one side of the scaffold (11) installed on the scaffold (10) provided in the pillar (12 '); Coupled to the lower end of the handrail frame 100 having a fixing unit 200 for fixing the handrail frame 100 to the scaffold (10); And a shielding unit 300 coupled to the lower end of the handrail frame 100 to close the opening 15 formed between the scaffold 11 of the scaffold 10 and the strip 13 of the scaffold 10. The container 110 includes a first accommodating part 111 in a longitudinally cut shape, and corresponds to the first accommodating part 111 through a bar shape 113. A second accommodating part 112 for advancing or reversing the first accommodating part 111 is provided, and the first accommodating part 111 and the second accommodating part 112 have a hemispherical hollow groove corresponding to each other. It is formed, and pressurizes to the inside of the pillar (12 '), the receptor 110 is provided with a fixing module 120 for generating a fixing force between the upper and lower in the height direction, the fixing module 120, the An upper fixing body 121 provided upward in the height direction of the receptor 110, and a lower end provided at the lower end in the height direction of the pillar 12 '. A stag 123 and a stop fixture 122 provided between the upper fixture 121 and the lower fixture 123 in the height direction of the pillar 12 ′ are provided, and the upper fixture ( 121, the suspension fixture 122 and the lower fixture 123 provides a method for constructing a safety railing structure for a building construction that is linked to each other by a fastening means 124 to each other.

본 발명에 따르면 안전 난간의 안정적인 설치를 통해 공사 현장의 작업자들이 보다 안전하게 작업할 수 있는 건축 공사를 위한 안전 난간 구조물 시공 방법을 제공할 수 있는 효과가 있다.According to the present invention there is an effect that can be provided through the stable installation of the safety railing to provide a method for constructing a safety railing structure for the construction work that workers at the construction site can work more safely.

도 1는 본 발명의 실시예에 의한 건축공사용 안전 난간 구조물의 사시도이다.
도 2은 본 발명의 실시예에 의한 건축공사용 안전 난간 구조물의 정면도이다.
도 3 및 도 4는 본 발명의 실시예에 의한 건축공사용 안전 난간 구조물의 측면도이다.
도 5 및 도 6은 본 발명의 실시예에 의한 건축공사용 안전 난간 구조물의 사용상태를 도시한 사시도이다.
도 7은 본 발명의 다른 실시예에 따른 건축공사용 안전 난간 구조물를 도시한 사시도이다.
도 8 내지 도 14는 도 7에 다른 구성들을 도시한 개략도이다.
도 15는 본 발명의 일 실시예에 따른 건축공사를 위한 안전 난간 구조물 시공 방법을 순차적으로 도시한 흐름도이다.
1 is a perspective view of a safety railing structure for construction work according to an embodiment of the present invention.
Figure 2 is a front view of a building construction safety railing construction according to an embodiment of the present invention.
Figure 3 and Figure 4 is a side view of the building construction safety guardrail according to an embodiment of the present invention.
5 and 6 are perspective views showing a state of use of the building construction safety handrail according to an embodiment of the present invention.
7 is a perspective view showing a safety railing structure for building construction according to another embodiment of the present invention.
8 to 14 are schematic diagrams showing other configurations in FIG. 7.
15 is a flowchart sequentially illustrating a method for constructing a safety railing structure for building construction according to an embodiment of the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 6에서와 같이, 본 발명의 실시예에 의한 건축공사용 안전 난간 구조물은 크게 난간프레임(100), 고정유닛(200), 차폐유닛(300) 및 서브고정유닛(400)으로 이루어진다. 난간프레임(100)은 도 5 및 도 6에 도시된 바와 같이, 고정유닛(200)에 의해 비계(飛階, 10)에 고정되어, 비계(10)에 설치된 발판(11)의 일측 상부를 막게 된다. 난간프레임(100)은 도 1 및 '도 2'에 도시된 바와 같이, 상호 좌우로 이격 배치되는 두 수직프레임(110), 두수직프레임(110)의 상단부를 연결하는 상부프레임(120), 두 수직프레임(110)의 하단부를 연결하는 하부프레임(130), 두 수직프레임(110)의 중앙을 연결하는 중간프레임(140), 그리고 중간프레임(140)과 하부프레임(130)을 연결하는 하나 이상의 보조프레임(150)을 포함하여 이루어진다.1 to 6, the building construction safety railing structure according to an embodiment of the present invention comprises a handrail frame 100, a fixing unit 200, a shielding unit 300 and a sub-fixing unit 400. As shown in FIGS. 5 and 6, the handrail frame 100 is fixed to the scaffold 10 by the fixing unit 200 to block an upper portion of one side of the scaffold 11 installed in the scaffold 10. do. Handrail frame 100 is shown in Figures 1 and 2, the two vertical frames 110 are spaced apart from each other left and right, the upper frame 120 connecting the upper end of the two vertical frame 110, two A lower frame 130 connecting the lower end of the vertical frame 110, an intermediate frame 140 connecting the center of the two vertical frames 110, and one or more connecting the intermediate frame 140 and the lower frame 130. It includes an auxiliary frame 150.

이와 같이 난간프레임(100)은 다수의 프레임이 결합되어 이루어짐에 따라, 비계(10)에 설치된 발판(11)의 일측상부 공간을 촘촘하게 구획하게 됨으로써 작업자의 추락을 효과적으로 방지할 수 있다. 고정유닛(200)은 난간프레임(100)의 하단부에 결합되어 난간프레임(100)을 비계(10)에 고정하는 것으로서, 도 1 및 도 5에 도시된 바와 같이, 일단부가 난간프레임(100)에 고정되고, 타단부가 비계(10)의 기둥(12)을 감싸게 되는 측방고정부재(210); 그리고 일단부가 난간프레임(100)에 고정되고, 타단부가 비계(10)의 장선(14)에 얹히게 되는 하방고정부재(220);를 포함하여 이루어진다.As the handrail frame 100 is formed by combining a plurality of frames as described above, the space on one side of the scaffold 11 installed in the scaffold 10 is tightly partitioned to effectively prevent the fall of the worker. The fixing unit 200 is coupled to the lower end of the handrail frame 100 to fix the handrail frame 100 to the scaffold 10, as shown in FIGS. 1 and 5, one end of the handrail frame 100. A side fixing member 210 which is fixed and has the other end surrounding the pillar 12 of the scaffold 10; And a lower fixing member 220 having one end fixed to the handrail frame 100 and the other end mounted on the joist 14 of the scaffold 10.

측방고정부재(210)의 일단부는 용접이나 볼트체결 방식 등에 의해 난간프레임(100)에 고정된다. 그리고 측방고정부재(210)의 타단부는 일측이 개방되어 비계(10)의 기둥(12)을 감싸게 되는 고정부(211)와, 개방된 고정부(211)의 일측을 개폐하게 되는 잠금핀(212)으로 이루어진다. 이에 따라 작업자는 도 5에 도시된 바와 같이, 고정부(211)가 비계(10)의 기둥(12)을 감싼 상태에서 잠금핀(212)을 이용하여 고정부(211)를 폐쇄함으로써 난간프레임(100)이 측방으로 유동하는 것을 방지할 수 있다. 하방고정부재(220)의 일단부는 측방고정부재(210)와 마찬가지로 용접이나 볼트체결 방식 등에 의해 난간프레임(100)에 고정된다. 그리고 하방고정부재(220)의 타단부는 하방 개방된 후크(hook) 형태로 이루어져 도 5에 도시된 바와 같이 비계(10)의 장선(14)에 얹히게 되고, 이에 따라 난간프레임(100)이 자중에 의해 낙하하는 것을 방지하게 된다.One end of the side fixing member 210 is fixed to the handrail frame 100 by welding or bolting. And the other end of the side fixing member 210, one side is open to the fixing portion 211 to surround the pillar 12 of the scaffold 10, and the locking pin to open and close one side of the open fixing portion 211 ( 212). Accordingly, as shown in FIG. 5, the worker closes the fixing part 211 by using the locking pin 212 while the fixing part 211 wraps the pillar 12 of the scaffold 10. 100) can be prevented from flowing laterally. One end of the lower fixing member 220 is fixed to the handrail frame 100 by welding or bolting like the side fixing member 210. And the other end of the lower fixing member 220 is formed in the form of a hook (open) downwards as shown in Figure 5 is placed on the joist 14 of the scaffold 10, accordingly the handrail frame 100 Falling by self weight is prevented.

도시된 바와 같이, 측방고정부재(210) 및 하방고정부재(220)는 난간프레임(100)의 양단부에 각각 설치된다. 즉, 측방고정부재(210) 및 하방고정부재(220)는 난간프레임(100)의 두 수직프레임(110)에 각각 구비되고, 이에따라 각 수직프레임(110)에 인접 배치되는 비계(10)의 기둥(12) 및 장선(14)에 각각 연결되어 난간프레임(100)을 고정하게 된다.As shown, the side fixing member 210 and the lower fixing member 220 are installed at both ends of the handrail frame 100, respectively. That is, the side fixing member 210 and the lower fixing member 220 are provided in the two vertical frames 110 of the handrail frame 100, respectively, and thus the pillars of the scaffold 10 disposed adjacent to each vertical frame 110 accordingly. It is connected to the 12 and the joist 14, respectively, to fix the handrail frame 100.

한편, 비계(10)에 둘 이상의 난간프레임(100)이 연속되도록 설치될 경우 상호 인접한 측방고정부재(210)끼리의 간섭이 방지될 수 있도록, 난간프레임(100)의 양단부에 설치된 각 측방고정부재(210)는 상호 상하방향으로 이격되도록 배치되는 것이 바람직할 것이다. 차폐유닛(300)은 난간프레임(100)의 하단부에 결합되는 것으로서, 난간프레임(100)에 기립 설치되고, 비계(10) 발판(11)의 길이방향을 따라 연장 형성된 고정패널(310); 고정패널(310)에 상하 회전 가능하게 결합된 회전패널(320); 그리고 회전패널(320)을 고정패널(310)에 고정하는 잠금수단(330);을 포함하여 이루어진다. 고정패널(310)은 난간프레임(100)이 비계(10)에 설치된 상태에서, 하단부가 비계(10) 발판(11)의 상면과 상응하는 높이에 위치하도록 설치되며, 이에 따라 고정패널(310)은 발판(11)의 일측 상부에 나지막한 벽(壁)을 형성하게 된다.On the other hand, when two or more handrail frames 100 are installed on the scaffold 10 to be continuous, each side fixing member installed at both ends of the handrail frame 100 so that interference between the adjacent side fixing members 210 can be prevented. 210 may be disposed to be spaced apart from each other in the vertical direction. Shielding unit 300 is to be coupled to the lower end of the handrail frame 100, a standing panel installed on the handrail frame 100, the scaffold 10, the fixed panel 310 extending along the longitudinal direction of the scaffold (11); A rotating panel 320 rotatably coupled to the fixed panel 310; And locking means 330 for fixing the rotating panel 320 to the fixing panel 310. Fixed panel 310 is installed so that the railing frame 100 is installed on the scaffold 10, the lower end is located at a height corresponding to the upper surface of the scaffold 10, the scaffold 11, accordingly fixed panel 310 Silver forms a low wall (壁) on the upper side of one side of the scaffold (11).

회전패널(320)은 고정패널(310)의 하단부에 상하 회전 가능하게 결합되어, 상방 회전시 도 3 및 도 5에 도시된 바와 같이 고정패널(310)에 포개어지고, 하방 회전시 도 4 및 도 6에 도시된 바와 같이 비계(10)의 발판(11)과 비계(10)의 띠장(13) 사이에 형성된 개구부(15, 도 5 참조)를 폐쇄하게 된다. 그리고 회전패널(320)을 고정패널(310)에 회전 가능하게 결합하기 위하여, 도 3 및 도 4에 도시된 바와 같이 회전패널(320)의 하단부에는 길이방향을 따라 연장된 회전축(321)이 형성되고, 고정패널(310)의 하단부에는 회전패널(320)의 회전축(321)이 회전 가능하게 삽입될 수 있도록 길이방향을 따라 삽입부(311)가 형성된다. Rotating panel 320 is coupled to the lower end of the fixed panel 310 so as to be rotated up and down, is superimposed on the fixed panel 310 as shown in Figures 3 and 5 when rotated upwards, Figure 4 and Figure As shown in FIG. 6, the opening 15 (see FIG. 5) formed between the scaffold 11 of the scaffold 10 and the strip 13 of the scaffold 10 is closed. And in order to rotatably couple the rotating panel 320 to the fixed panel 310, as shown in Figure 3 and 4, the lower end of the rotating panel 320 is formed with a rotating shaft 321 extending along the longitudinal direction At the lower end of the fixed panel 310, an insertion part 311 is formed along the length direction so that the rotation shaft 321 of the rotation panel 320 may be rotatably inserted.

여기서 회전축(321) 및 삽입부(311)는 각각 회전패널(320) 및 고정패널(310)에 일체로 형성되는데, 이에 따라 회전패널(320) 및 고정패널(310)을 압출 성형으로 용이하게 제작할 수 있되, 별도의 경첩을 설치하지 않더라도 회전패널(320)을 고정패널(310)에 회전 가능하게 결합할 수 있다. 또한, 회전축(321) 또는 삽입부(311), 또는 이들 모두에는 회전패널(320)의 하방 회전 각도를 제한하게 되는 스토퍼(312)(322)가 형성될 수 있다.Here, the rotating shaft 321 and the inserting portion 311 are formed integrally with the rotating panel 320 and the fixed panel 310, respectively, so that the rotating panel 320 and the fixed panel 310 can be easily manufactured by extrusion molding. Can be, but can be rotatably coupled to the rotating panel 320 to the fixed panel 310 even without installing a separate hinge. In addition, the rotation shaft 321 or the insertion portion 311, or both of them may be formed with stoppers 312, 322 to limit the downward rotation angle of the rotation panel 320.

도시된 바에 의하면, 스토퍼(312)(322)는 삽입부(311)의 상부 및 하부에서 회전축(321)을 향하도록 2개소에 돌출 형성되고, 회전축(321)의 외주면을 따라 배열되도록 3개소에 돌출 형성되어, 회전패널(320)이 하방 회전시에 고정패널(310)과 대략 직각을 이루며 고정될 수 있도록 구성된다. 잠금수단(330)은 '도 2' 내지 도 4에 도시된 바와 같이, 상호 포개진 고정패널(310) 및 회전패널(320)의 상단부에 끼워지는 'ㄷ'형의 홀딩부(331), 홀딩부(331)에서 하방 이격 배치되어 고정패널(310)의 후면에 회전 가능하게 결합되는 결합부(332), 그리고 홀딩부(331)와 결합부(332)를 연결하는 중계부(333)를 갖는 클립(clip) 형태로 이루어져, 회전패널(320)을 고정패널(310)에 포개진 상태로 고정하게 된다.As shown, the stoppers 312 and 322 are protruded in two places so as to face the rotation axis 321 at the top and bottom of the insertion portion 311, and in three places to be arranged along the outer circumferential surface of the rotation axis 321. Is formed to protrude, the rotation panel 320 is configured to be fixed at a right angle with the fixed panel 310 at the time of downward rotation. As shown in FIGS. 2 to 4, the locking means 330 is a holding portion 331 of the 'c' type that is fitted to the upper ends of the mutually overlapping fixed panel 310 and the rotating panel 320. It is disposed in the lower portion 331 has a coupling portion 332 rotatably coupled to the rear of the fixed panel 310, and a relay portion 333 connecting the holding portion 331 and the coupling portion 332 It is made of a clip (clip), it is fixed to the rotary panel 320 in a superimposed state on the fixed panel 310.

즉, 본 실시예의 잠금수단(330)에 의하면, 홀딩부(331)가 고정패널(310) 및 회전패널(320)의 상단부에 끼워지도록 잠금수단(330)을 회전시킴으로써 회전패널(320)을 고정패널(310)에 포개진 상태로 고정할 수 있으며, 홀딩부(331)가 고정패널(310) 및 회전패널(320)의 상단부에 이탈되도록 잠금수단(330)을 회전시킴으로써 고정패널(310)에 고정되어 있던 회전패널(320)을 회전 가능한 상태로 해제할 수 있다. 한편, 잠금수단(330)은 클립 형태로 한정되지 아니하고, 자석, 벨크로(velcro) 등 회전패널(320)을 고정패널(310)에 포개진 상태로 용이하게 고정 및 해제할 수 있는 다양한 수단이 적용될 수 있을 것이다.That is, according to the locking means 330 of the present embodiment, the rotating panel 320 is fixed by rotating the locking means 330 so that the holding part 331 is fitted to the upper end of the fixing panel 310 and the rotating panel 320. The panel 310 may be fixed in a superimposed state, and the locking unit 330 is rotated so that the holding unit 331 is separated from the upper end of the fixing panel 310 and the rotating panel 320 to the fixing panel 310. The fixed rotating panel 320 can be released in a rotatable state. On the other hand, the locking means 330 is not limited to the shape of the clip, a variety of means that can be easily fixed and released in a state in which the rotating panel 320, such as magnets, velcro (velcro) is superimposed on the fixed panel 310 is applied Could be.

서브고정유닛(400)은 난간프레임(100)의 상단부에 결합되는 것으로서, 도 1 및 도 5에 도시된 바와 같이, 난간프레임(100)에 상하 회전 가능하게 결합되어, 상방 회전시 난간프레임(100) 측으로 접히고, 하방 회전시 비계(10)의 기둥(12) 측으로 펼쳐지게 되는 서브고정부재(410); 그리고 서브고정부재(410)를 난간프레임(420)에 회전 가능하게 고정하는 힌지축(420)을 포함하여 이루어진다. 서브고정부재(410)는 힌지축(420)에 의해 난간프레임(100)의 각 수직프레임(110)에 설치되어 각 수직프레임(110)과 인접한 비계(10)의 기둥(12)을 향해 회전 동작하게 되는데, 이에 따라 각 서브고정부재(410)는 도 5에 도시된 바와 같이 비계(10)의 기둥(12) 측으로 펼쳐진 상태에서 기둥(12)과 수직프레임(110) 사이에 끼이게 됨으로써 난간프레임(100)이 비계(10) 띠장(13)의 길이방향을 따라 유동하는 것을 방지하게 된다.As the sub-fixing unit 400 is coupled to the upper end of the handrail frame 100, as shown in Figures 1 and 5, coupled to the handrail frame 100 so as to be rotated up and down, the handrail frame 100 during upward rotation A sub-fixing member 410 which is folded toward the side and is extended to the pillar 12 side of the scaffold 10 when rotated downward; And it comprises a hinge shaft 420 for rotatably fixing the sub-fixing member 410 to the handrail frame 420. The sub-fixing member 410 is installed on each vertical frame 110 of the handrail frame 100 by the hinge shaft 420 to rotate toward the pillar 12 of the scaffold 10 adjacent to each vertical frame 110. As a result, each sub-fixing member 410 is sandwiched between the pillar 12 and the vertical frame 110 in a state unfolded toward the pillar 12 of the scaffold 10 as shown in FIG. The 100 is prevented from flowing along the longitudinal direction of the scaffold 10.

그리고 도 1에 도시된 바와 같이, 서브고정부재(410)는 난간프레임(100)에 상하 회전 가능하게 결합되는 두수직플레이트(411), 두 수직플레이트(411)의 하단부를 연결하고 두 수직플레이트(411)의 하방 회전시 난간프레임(100)과 비계(10)의 기둥(12) 사이에 개재되는 하부플레이트(412), 그리고 힌지축(420)이 삽입되도록 두 수직플레이트(411)의 길이방향을 따라 형성된 가이드공(413)을 포함하여 이루어진다. 두 수직플레이트(411)는 상방 회전된 서브고정부재(410)가 수직프레임(110)의 외주면에 밀착될 수 있도록 수직프레임(110)의 양측을 감싸도록 배치된다. 그리고 두 수직플레이트(411)의 단부는 비계(10) 기둥(12)의 외주면과 접하여 더욱 견고하게 지지될 수 있도록 바깥쪽을 향하여 휘어지도록 형성된다.As shown in FIG. 1, the sub-fixing member 410 connects two vertical plates 411 and two vertical plates 411 which are vertically rotatable and coupled to the handrail frame 100, and two vertical plates ( The lower plate 412 interposed between the railing frame 100 and the pillar 12 of the scaffold 10 and the hinge shaft 420 are inserted in the longitudinal direction of the two vertical plates 411 when the 411 rotates downward. It comprises a guide hole 413 formed along. The two vertical plates 411 are disposed to surround both sides of the vertical frame 110 so that the upper rotating sub-fixing member 410 may be in close contact with the outer circumferential surface of the vertical frame 110. In addition, the ends of the two vertical plates 411 are formed to be bent outwardly so as to be more firmly supported by contacting the outer circumferential surface of the pillar 12 of the scaffold 10.

하부플레이트(412)는 서브고정부재(410)의 하방 회전시 수직프레임(110)에 걸리어 서브고정부재(410)가 수평을 유지할 수 있도록 서브고정부재(410)의 하방 회전 각도를 제한하게 된다. 가이드공(413)은 두 수직플레이트(411)의 길이방향을 따라 길죽하게 형성되어 힌지축(420)을 이탈하지 않는 범위 내에서 유동 가능한 구조를 갖는다. 이에 따라 서브고정부재(410)는 도 1에 도시된 바와 같이 상방 회전된 상태에서 가이드공(413)에 의해 하강하여 힌지축(420)에 걸쳐지게 됨으로써 비(非)사용 시 접힘 상태를 유지할 수 있다.The lower plate 412 is caught by the vertical frame 110 during the downward rotation of the sub-fixing member 410 to limit the downward rotation angle of the sub-fixing member 410 so that the sub-fixing member 410 is horizontal. . Guide hole 413 is formed along the longitudinal direction of the two vertical plate 411 has a structure that can flow within the range that does not leave the hinge axis 420. Accordingly, the sub-fixing member 410 is lowered by the guide hole 413 in an upwardly rotated state as shown in FIG. 1 so as to span the hinge shaft 420, thereby maintaining a folded state during non-use. have.

도 7은 본 발명의 다른 실시예에 따른 건축공사용 안전 난간 구조물를 도시한 사시도이다. 도 8 내지 도 14는 도 7에 다른 구성들을 도시한 개략도이다. 이하에서는 기술적 특징이 있는 부분을 중심으로 설명한다.7 is a perspective view showing a safety railing structure for building construction according to another embodiment of the present invention. 8 to 14 are schematic diagrams showing other configurations in FIG. 7. Hereinafter will be described focusing on the parts having technical features.

도 7 내지 도 14를 참조하면, 건축 공사를 위한 안전 난간 구조물로서, 수용체(110)에 삽입되는 기둥(12');상기 기둥(12')에 구비되는 비계(10') 상기 비계(10')에 설치되는 발판(11')의 일측 상부를 막는 난간프레임(100'); 상기 난간프레임(100')의 하단부에 결합되어 난간프레임(100')을 비계(10')에 고정하는 고정유닛(200'); 및 상기 난간프레임(100')의 하단부에 결합되어 비계(10')의 발판(11')과 비계(10')의 띠장(13') 사이에 형성된 개구부(15')를 폐쇄하는 차폐유닛(300');을 포함한다.7 to 14, as a safety railing structure for a building construction, a pillar 12 ′ inserted into a receiver 110; a scaffold 10 ′ provided at the pillar 12 ′, the scaffold 10 ′ Handrail frame (100 ') blocking the upper portion of one side of the footrest (11') installed in the); A fixing unit 200 'coupled to the lower end of the handrail frame 100' to fix the handrail frame 100 'to the scaffold 10'; And a shielding unit coupled to the lower end of the handrail frame 100 'to close the opening 15' formed between the scaffold 11 'of the scaffold 10' and the band 13 'of the scaffold 10'. 300 ').

상기 수용체(110)는, 종방향으로 절개된 형태의 제1 수용부(111)와, 상기 제1 수용부(111)와 형합 대응되며 바(bar) 형상체(113)를 매개로 상기 제1 수용부(111)를 전진 또는 후진시키기 위한 제2 수용부(112)가 구비된다. 상기 제1 수용부(111)와 상기 제2 수용부(112)는 상호 대응되는 반구형 중공홈이 형성되며, 상기 기둥(12')의 내측으로 가압하며, 상기 수용체(110)는 높이방향 상에서 상방과 하방 간에 고정력을 발생시키는 고정모듈(120)이 구비된다.The receptor 110 is formed in a longitudinally cut first accommodating portion 111 and the first accommodating portion 111 in correspondence with the bar (bar) shaped body 113 through the first A second accommodating part 112 is provided to move the accommodating part 111 forward or backward. The first accommodating portion 111 and the second accommodating portion 112 are formed with a hemispherical hollow groove corresponding to each other, press the inner side of the pillar 12 ', the receptor 110 is upward in the height direction Fixing module 120 for generating a fixing force between and downward is provided.

상기 고정모듈(120)은 상기 수용체(110)의 높이방향 상에서 상방에 구비되는 상단 고정체(121)와, 상기 기둥(12')의 높이방향 상에서 하단에 구비되는 하단 고정체(123)와, 상기 기둥(12')의 높이방향 상에서 상기 상단 고정체(121)와 상기 하단 고정체(123) 사이에 구비되는 중단 고정체(122)가 구비된다. 상기 상단 고정체(121), 상기 중단 고정체(122) 및 상기 하단 고정체(123)는 상호간에 체결수단(124)으로 연동되어 결속된다.The fixing module 120 is the upper fixing body 121 provided in the upper direction in the height direction of the container 110, the lower fixing body provided in the lower end in the height direction of the column 12 'and; A suspension fixture 122 is provided between the upper fixture 121 and the lower fixture 123 in the height direction of the pillar 12 ′. The upper fixture 121, the suspension fixture 122, and the lower fixture 123 are coupled to each other by the fastening means 124.

상기 상단 고정체(121)는 상기 수용체(110)를 둘러싸 결속되도록 구비되는 제1 중앙본체부(1211)와, 상기 제1 중앙본체부(1211)의 일측에 구비되는 제1-1 유동몸체부(1212)와, 상기 제1 중앙본체부(1211)의 타측에 구비되는 제1-2 유동몸체부(1213)가 구비된다.The upper stationary body 121 includes a first central body part 1211 provided to surround the receptor 110 and a first-first flow body part provided on one side of the first central body part 1211. 1212 and a 1-2 flow body portion 1213 provided on the other side of the first central body portion 1211 are provided.

상기 중단 고정체(122)는 상기 수용체(110)에 둘러싸 결속되도록 구비되는 제2 중앙본체부(1221)와, 상기 제2 중앙본체부(1221)의 일측에 구비되는 제2-1 유동몸체부(1222)와, 상기 제2 중앙본체부(1221)의 타측에 구비되는 제2-2 유동몸체부(1223)가 구비된다. 상기 하단 고정체(123)는 상기 수용체(110)에 둘러싸 결속되도록 구비되는 제3 중앙본체부(1231)와, 상기 제3 중앙본체부(1231)의 일측에 구비되는 제3-1 유동몸체부(1232)와, 상기 제3 중앙본체부(1231)의 타측에 구비되는 제3-2 유동몸체부(1233)가 구비된다.The suspension fixture 122 has a second central body portion 1221 provided to be bound by the receptor 110 and a 2-1 fluid body portion provided at one side of the second central body portion 1221. 1222 and the second-2 fluid body portion 1223 provided on the other side of the second central body portion 1221 are provided. The lower fixing body 123 is provided with a third central body part 1231 provided to be bound by the receptor 110 and a 3-1 fluid body part provided at one side of the third central body part 1231. 1232 and the third-2 fluid body 1233 provided on the other side of the third central body part 1231 are provided.

상기 제1-1 유동몸체부(1212)와 상기 제2-2 유동몸체부(1223)는 제1 체결수단(1241)을 통해 연동되며, 상기 제2-1 유동몸체부(1222)와 상기 제3-2 유동몸체부(1233)는 제2 체결수단(1242)을 통해 연동된다. 상기 제1 중앙본체부(1211), 상기 제2 중앙본체부(1221) 및 상기 제3 중앙본체부(1231)는 연동바(125)에 의하여 상호 연동되며, 상기 제2 중앙본체부(1221)는 연동바(125)를 매개로 상기 제1 중앙본체부(1211)와 상기 제2 중앙본체부(1221)를 잡아당기거나 밀어내도록 동작시킨다.The first-first flow body part 1212 and the second-second flow body part 1223 are interlocked through the first fastening means 1241, and the second-first flow body part 1222 and the second body are arranged. 3-2 the floating body portion 1233 is interlocked through the second fastening means 1242. The first central body part 1211, the second central body part 1221, and the third central body part 1231 are interlocked with each other by an interlocking bar 125, and the second central body part 1221 is provided. The first central body part 1211 and the second central body part 1221 are operated to pull or push through the interlocking bar 125.

상기 제1-1 유동몸체부(1212)는 상기 제1-1 유동몸체부(1212)에서 상방과 하방 간에 승강 또는 하강 유동되는 제1 가이드부(1212a)가 구비되며, 상기 제1 가이드부(1212a)에는 상기 제1 체결수단(1241)의 일단이 결속된다.The first-first flow body portion 1212 is provided with a first guide portion 1212a which is moved up or down in the first-first flow body portion 1212 between the upper and lower, the first guide portion ( One end of the first fastening means 1241 is engaged with 1212a).

상기 제2-1 유동몸체부(1222)는, 상기 제2-1 유동몸체부(1222)에서 상방과 하방 간에 승강 또는 하강 유동되는 제2 가이드부(1212b)가 구비되며, 상기 제2 가이드부(1212b)에는 상기 제2 체결수단(1242)의 일단이 결속된다.The 2-1 flow body portion 1222 is provided with a second guide portion 1212b which is moved up or down in the 2-1 flow body portion 1222 between the upper and lower, the second guide portion One end of the second fastening means 1242 is coupled to 1212b.

상기 제1-1 유동몸체부(1212)는 상기 제1 중앙본체부(1211)에서 정회전 또는 역회전 방식으로 회전 가능하게 구비되어, 상기 제1 체결수단(1241)을 매개로 상기 제2-2 유동몸체부(1223)와의 결속력의 조절이 가능하다. 상기 제2-1 유동몸체부(1222)는 상기 제2 중앙본체부(1221)에서 정회전 또는 역회전 방식으로 회전 가능하게 구비되어, 상기 제2 체결수단(1242)을 매개로 상기 제3-2 유동몸체부(1233)와의 결속력의 조절이 가능하다.The first-first flow body part 1212 is rotatably provided in a forward rotation or a reverse rotation manner in the first central body part 1211, and the second fastening means 1241 through the second fastening means 1241. 2 The binding force with the floating body portion 1223 can be adjusted. The 2-1 flow body portion 1222 is provided to be rotatable in the forward or reverse rotation manner in the second central body portion 1221, the third through the second fastening means (1242) 2 It is possible to adjust the binding force with the floating body portion (1233).

상기 제1-1 유동몸체부(1212) 및 상기 제2-1 유동몸체부(1222)는 각각 Y축 방향으로 회전 가능하게 구비되며, 상기 제1-2 유동몸체부(1213), 상기 제2-2 유동몸체부(1223) 및 상기 제3-2 유동몸체부(1233)는 각각 X축 방향으로 회전 가능하게 구비된다. 상기 제1 중앙본체부(1211), 상기 제2 중앙본체부(1221), 상기 제3 중앙본체부(1231)에는 다수의 출몰돌기(T)가 각각 구비된다. 상기 제1 체결수단(1241), 상기 제2 체결수단(1242)은 각각 적어도 한 쌍의 출몰돌기(T)들 사이에 가이드 된다.The first-first flow body portion 1212 and the second-first flow body portion 1222 are rotatably provided in the Y-axis direction, respectively, the first-second flow body portion 1213 and the second. The -2 flow body part 1223 and the 3-2 flow body part 1233 are rotatably provided in the X-axis direction, respectively. The first central body portion 1211, the second central body portion 1221, and the third central body portion 1231 are provided with a plurality of projection protrusions T, respectively. The first fastening means 1241 and the second fastening means 1242 are guided between at least one pair of projection protrusions T, respectively.

상기 수용체(110)는 상기 제1 수용부(111)에 반구형 제1 돌출물(111a)이 다수 구비되며, 상기 제2 수용부(112)에 반구형 제2 돌출물(112a)이 다수 구비되며, 상기 기둥(12')은 상방 몸체부(121a)와, 상기 상방 몸체부(121a)와 내장봉(121e)으로 연동되어, 상기 내장봉(121e)을 매개로 상기 상방 몸체부(121a)가 상방과 하방으로 유동되도록 하는 하방 몸체부(121b)를 포함한다.The receptor 110 is provided with a plurality of hemispherical first protrusions 111a in the first accommodating portion 111, and a plurality of hemispherical second protrusions 112a in the second accommodating portion 112. 12 'is connected to the upper body portion 121a, the upper body portion 121a and the internal rod 121e, and the upper body portion 121a is upward and downward through the internal rod 121e. It includes a lower body portion 121b to flow to.

상기 상방 몸체부(121a)와 상기 하방 몸체부(121b) 사이에서 상기 내장봉(121e)의 외주면에 제1 구획체(121c)와, 제2 구획체(121d)가 구비되며, 상기 내장봉(121e)은 상기 제1 구획체(121c)와 상기 제2 구획체(121d)를 기준으로 상방에서 하방으로 제1 구획영역(SP1)과 제2 구획영역(SP2), 제3 구획영역(SP3)이 형성된다.Between the upper body portion 121a and the lower body portion 121b, a first compartment 121c and a second compartment 121d are provided on an outer circumferential surface of the built-in rod 121e, and the built-in rod ( 121e is a first partition area SP1, a second partition area SP2, and a third partition area SP3 from the top to the bottom of the first partition 121c and the second partition 121d. Is formed.

상기 제1 수용부(111)의 상기 제1 돌출물(111a)과 상기 제2 수용부(112)의 상기 제2 돌출물(112a)은 각각 상기 제1 구획영역(SP1) 내지 상기 제3 구획영역(SP3)에 삽입 장착된다. 상기 제1 돌출물(111a)과 상기 제2 돌출물(112a)이 상기 제1 구획영역(SP1) 내지 상기 제3 구획영역(SP3)에 각각 장착된 상태에서, 상기 상방 몸체부(121a)는 하방으로 유동되어 상기 제1 돌출물(111a)과, 상기 제2 돌출물(112a)을 각각 가압한다.The first protrusion 111a of the first accommodating part 111 and the second protrusion 112a of the second accommodating part 112 respectively correspond to the first partition area SP1 to the third partition area ( SP3) is inserted and mounted. The upper body part 121a is downward when the first protrusion 111a and the second protrusion 112a are mounted in the first partition area SP1 to the third partition area SP3, respectively. It flows and presses the 1st protrusion 111a and the 2nd protrusion 112a, respectively.

상기 제1 돌출물(111a)과 상기 제2 돌출물(112a)은 각기 내부에서 출몰가능하게 구비되며, 기 돌출되어 있거나 추후에 돌출되도록 구비된다. 상기 수용체(1110)의 하부에 구비되는 저면패널부(126)를 포함한다. 상기 저면패널부(126)는, 상기 수용체(110)들 중 제1 수용체(1101)가 거치되는 제1 저면패널부(1261)와, 상기 수용체(110)들 중 제2 수용체(1102)가 거치되는 상기 제1 저면패널부(1261)에 수용되어 전진되거나 후진되는 제2 저면패널부(1262)가 구비된다.The first protrusion 111a and the second protrusion 112a are provided to be retractable from the inside, and protrude from each other or protrude later. The bottom panel unit 126 is provided below the container 1110. The bottom panel portion 126 includes a first bottom panel portion 1261 to which the first receptor 1101 is mounted, and a second receptor 1102 among the receptors 110 to be mounted. The second bottom panel portion 1262 is provided in the first bottom panel portion 1261 which is forward or backward.

상기 제1 저면패널부(1261)는 내부에 상기 제2 저면패널부(1262) 적어도 일부가 수용되면, 수용된 상기 제2 저면패널부(1262)의 수용영역을 상부에서 하부로 가압하도록 상기 제1 저면패널부(1261)의 내부측으로 유동되는 제1 승하강 가압부(1261a)가 구비된다.When at least a portion of the second bottom panel part 1262 is accommodated therein, the first bottom panel part 1261 may press the receiving area of the second bottom panel part 1262 from the top to the bottom thereof. The first raising and lowering pressure portion 1261a flowing to the inner side of the bottom panel portion 1261 is provided.

상기 제2 저면패널부(1262)는 가압된 상기 제1 승하강 가압부(1261a)와의 높이를 보정하기 위하여 상기 제2 저면패널부(1262)에서 승강 또는 하강되는 제2 승하강 가압부(1262a)가 구비되며, 상기 제1 수용체(1101)는 상기 제1 승하강 가압부(1261a)에 구비되며, 상기 제2 수용체(1102)는 상기 제2 승하강 가압부(1262a)에 구비된다.The second bottom panel portion 1262 is a second rising / lowering portion 1262a that is lifted or lowered from the second bottom panel portion 1262 to correct the height of the pressurized first raising / lowering portion 1261a. ) Is provided, the first container 1101 is provided in the first elevating pressing unit (1261a), the second container 1102 is provided in the second elevating pressing unit (1262a).

상기 제1 승하강 가압부(1261a)에는 상기 제1 수용체(1101)를 사이에 두고 가압하는 한 쌍의 제1 보강체(127)가 구비되며, 상기 제2 승하강 가압부(1262a)에는 상기 제2 수용체(1102)를 사이에 두고 가압하는 한 쌍의 제2 보강체(128)가 구비된다.The first elevating pressure portion 1261a is provided with a pair of first reinforcement bodies 127 for pressing the first receptor 1101 therebetween, and the second elevating pressure portion 1262a includes A pair of second reinforcements 128 are provided to press the second receptor 1102 therebetween.

상기 제1 보강체(127)는 상기 제1 수용체(1101)의 외측에 접촉된 채 일방으로 회전력을 발생시켜 상기 제1 수용체(1101)에 고정힘을 발생시키며, 상기 제2 보강체(128)는 상기 제2 수용체(1102)의 외측에 접촉된 채 일방으로 회전력을 발생시켜 상기 제2 수용체(1102)에 고정힘을 발생시키되, 상기 제1 수용체(1101)는 상기 제1 보강체(127)와 접촉되는 제1 영역(L1)이 횡단면 기준 다각 형상으로 이루어진다. 상기 제2 수용체(1102)는 상기 제1 보강체(127)와 접촉되는 제2 영역(L2)이 횡단면 기준 다각 형상으로 이루어진다.The first reinforcement 127 generates rotational force in one direction while being in contact with the outside of the first receptacle 1101 to generate a fixed force on the first receptacle 1101, and the second reinforcement 128 While generating a rotational force in one direction while being in contact with the outside of the second receptor 1102 generates a fixed force to the second receptor 1102, the first receptor 1101 is the first reinforcement 127 The first region L1 is in contact with the cross-sectional polygonal shape. The second receptor 1102 has a second region L2 in contact with the first reinforcement 127 having a cross-sectional reference polygonal shape.

상기 제1 보강체(1271)는, 상기 제1 승하강 가압부(1261a)에서 슬라이딩 방식으로 유동되는 제1 베이스부(1271)와, 상기 제1 베이스부(1271)에서 일정 범위로 왕복 유동되며 상기 제1 수용체(1101)의 외측에 접촉되어 회전힘을 가하는 제1 접촉부(1272)가 구비된다. 상기 제1 접촉부(1272)는 상기 제1 영역(L1)과 면접촉되는 다각형상으로 이루어진다.The first reinforcement 1271 may be reciprocated in a predetermined range from the first base part 1271 and the first base part 1271 that slides in the first lifting and lowering part 1261a in a sliding manner. A first contact part 1272 is provided on the outer side of the first receptor 1101 to apply a rotational force. The first contact part 1272 has a polygonal shape in surface contact with the first area L1.

상기 제2 보강체(1281)는 상기 제2 승하강 가압부(1262a)에서 슬라이딩 방식으로 유동되는 제2 베이스부(1281)와, 상기 제2 베이스부(1281)에서 일정 범위로 왕복 유동되며 상기 제2 수용체(1102)의 외측에 접촉되어 회전힘을 가하는 제2 접촉부(1282)가 구비된다. 상기 제2 접촉부(1282)는 상기 제2 영역(L2)과 면접촉되는 다각형상으로 이루어진다.The second reinforcement 1281 is reciprocated in a predetermined range from the second base portion 1281 and the second base portion 1281 flowing in a sliding manner in the second elevating pressure portion 1262a. A second contact portion 1282 is provided on the outside of the second receptor 1102 to apply a rotational force. The second contact portion 1282 has a polygonal shape in surface contact with the second region L2.

전술한 내용을 기반으로 하는 건축 공사를 위한 안전 난간 시공 방법은, 수용체(110)에 삽입되는 기둥(12')을 시공하는 단계; 상기 기둥(12')에 구비되는 비계(10)에 설치되는 발판(11‘)의 일측 상부를 막는 난간프레임(100’)을 시공하는 단계; 및 상기 난간프레임(100‘)의 하단부에 결합되어 난간프레임(100’)을 비계(10‘)에 고정하는 고정유닛(200’)을 시공하는 단계를 포함한다.Safety railing construction method for building construction based on the above-described content, the step of constructing the pillar 12 'inserted into the receptor 110; Constructing a railing frame (100 ') blocking an upper portion of one side of the scaffold (11') provided in the scaffold (10) provided in the pillar (12 '); And constructing a fixing unit 200 'coupled to the lower end of the handrail frame 100' to fix the handrail frame 100 'to the scaffold 10'.

한편, 상기 체결수단(124)은 엘라스토머, 고무, 금속, 천 등의 재질을 포함하여 구비될 수 있다. 그 두께도 필요한 강도에 따라 달리할 수 있다.On the other hand, the fastening means 124 may be provided including a material such as elastomer, rubber, metal, cloth. The thickness can also vary depending on the strength required.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

본 발명은 도면에 도시된 실시예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 다른 실시예가 가능하다는 점을 이해할 것이다. 따라서, 본 발명의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의하여 정해져야 할 것이다.Although the present invention has been described with reference to the embodiments shown in the drawings, this is merely exemplary, and it will be understood by those skilled in the art that various modifications and equivalent other embodiments are possible. Therefore, the true technical protection scope of the present invention will be defined by the technical spirit of the appended claims.

110 : 수용체
111 : 제1 수용부
120 : 고정모듈
121 : 상단 고정체
122 : 중단 고정체
123 : 하단 고정체
110: receptor
111: first receiving portion
120: fixed module
121: top fixture
122: suspended fixture
123: lower fixture

Claims (13)

건축 공사를 위한 안전 난간 시공 방법으로서,
수용체(110)에 삽입되는 기둥(12')을 시공하는 단계;
상기 기둥(12')에 구비되는 비계(10)에 설치되는 발판(11‘)의 일측 상부를 막는 난간프레임(100’)을 시공하는 단계; 및
상기 난간프레임(100‘)의 하단부에 결합되어 난간프레임(100’)을 비계(10‘)에 고정하는 고정유닛(200’)을 시공하는 단계를 포함하며,
상기 수용체(110)는,
종방향으로 절개된 형태의 제1 수용부(111)와, 상기 제1 수용부(111)와 형합 대응되며 바(bar) 형상체(113)를 매개로 상기 제1 수용부(111)를 전진 또는 후진시키기 위한 제2 수용부(112)가 구비되며,
상기 제1 수용부(111)와 상기 제2 수용부(112)는 상호 대응되는 반구형 중공홈이 형성되며, 상기 기둥(12')의 내측으로 가압하며,
상기 수용체(110)는 높이방향 상에서 상방과 하방 간에 고정력을 발생시키는 고정모듈(120)이 구비되며,
상기 고정모듈(120)은,
상기 수용체(110)의 높이방향 상에서 상방에 구비되는 상단 고정체(121)와, 상기 기둥(12')의 높이방향 상에서 하단에 구비되는 하단 고정체(123)와, 상기 기둥(12')의 높이방향 상에서 상기 상단 고정체(121)와 상기 하단 고정체(123) 사이에 구비되는 중단 고정체(122)가 구비되며,
상기 상단 고정체(121), 상기 중단 고정체(122) 및 상기 하단 고정체(123)는 상호간에 체결수단(124)으로 연동되어 결속되며,
상기 상단 고정체(121)는,
상기 수용체(110)를 둘러싸 결속되도록 구비되는 제1 중앙본체부(1211)와,
상기 제1 중앙본체부(1211)의 일측에 구비되는 제1-1 유동몸체부(1212)와,
상기 제1 중앙본체부(1211)의 타측에 구비되는 제1-2 유동몸체부(1213)가 구비되며,
상기 중단 고정체(122)는,
상기 수용체(110)에 둘러싸 결속되도록 구비되는 제2 중앙본체부(1221)와,
상기 제2 중앙본체부(1221)의 일측에 구비되는 제2-1 유동몸체부(1222)와
상기 제2 중앙본체부(1221)의 타측에 구비되는 제2-2 유동몸체부(1223)가 구비되며,
상기 하단 고정체(123)는,
상기 수용체(110)에 둘러싸 결속되도록 구비되는 제3 중앙본체부(1231)와,
상기 제3 중앙본체부(1231)의 일측에 구비되는 제3-1 유동몸체부(1232)와,
상기 제3 중앙본체부(1231)의 타측에 구비되는 제3-2 유동몸체부(1233)가 구비되며,
상기 제1-1 유동몸체부(1212)와 상기 제2-2 유동몸체부(1223)는 제1 체결수단(1241)을 통해 연동되며,
상기 제2-1 유동몸체부(1222)와 상기 제3-2 유동몸체부(1233)는 제2 체결수단(1242)을 통해 연동되는 건축 공사를 위한 안전 난간 구조물 시공 방법.
As a safety railing construction method for building construction,
Constructing a pillar 12 ′ inserted into the receptor 110;
Constructing a railing frame (100 ') blocking an upper portion of one side of the scaffold (11') provided on the scaffold (10) provided in the pillar (12 '); And
It is coupled to the lower end of the handrail frame 100 'includes constructing a fixing unit 200' fixing the handrail frame 100 'to the scaffold 10',
The receptor 110,
Advance the first accommodating part 111 through the first accommodating part 111 and the first accommodating part 111, which are cut in the longitudinal direction, through the bar shape 113. Or a second receiving part 112 for reversing,
The first accommodating part 111 and the second accommodating part 112 are formed with a hemispherical hollow groove corresponding to each other, and presses into the pillar 12 ',
The receptor 110 is provided with a fixing module 120 for generating a fixing force between the upper and lower in the height direction,
The fixed module 120,
Of the upper fixture 121 provided upward in the height direction of the receptor 110, the lower fixture 123 provided at the lower end in the height direction of the pillar 12 ', and the pillar 12'. Suspended fixing body 122 is provided between the upper fixing body 121 and the lower fixing body 123 in the height direction,
The upper fixture 121, the suspension fixture 122 and the lower fixture 123 are interlocked with each other by the fastening means 124, and bound to each other,
The upper fixture 121,
A first central body part 1211 provided to surround the receptor 110 and bound;
A first-first flow body part 1212 provided on one side of the first central body part 1211,
A 1-2 flow body part 1213 is provided on the other side of the first central body portion 1211,
The suspension fixture 122,
A second central body portion 1221 provided to be bound by the container 110 and bound;
2-1 the floating body portion 1222 provided on one side of the second central body portion 1221 and
The second-2 fluid body part 1223 provided on the other side of the second central body portion 1221 is provided,
The lower fixture 123,
A third central body part 1231 provided to be bound and bound by the container 110;
A 3-1 floating body part 1232 provided at one side of the third central body part 1231,
3-2 the flow body portion (1233) is provided on the other side of the third central body portion (1231),
The first-first flow body 1212 and the second-second flow body 1223 are interlocked through first fastening means 1241,
The 2-1 floating body portion 1222 and the 3-2 floating body portion (1233) is a safety railing structure construction method for the building work interlocked through the second fastening means (1242).
청구항 1에 있어서,
상기 제1 중앙본체부(1211), 상기 제2 중앙본체부(1221) 및 상기 제3 중앙본체부(1231)는 연동바(125)에 의하여 상호 연동되며,
상기 제2 중앙본체부(1221)는 연동바(125)를 매개로 상기 제1 중앙본체부(1211)와 상기 제2 중앙본체부(1221)를 잡아당기거나 밀어내도록 동작시키는 건축 공사를 위한 안전 난간 구조물 시공 방법.
The method according to claim 1,
The first central body part 1211, the second central body part 1221, and the third central body part 1231 are interlocked with each other by an interlocking bar 125.
The second central body portion 1221 is a safety for the construction work to operate to pull or push the first central body portion 1211 and the second central body portion 1221 via the interlocking bar 125. How to construct handrail structure.
청구항 2에 있어서,
상기 제1-1 유동몸체부(1212)는,
상기 제1-1 유동몸체부(1212)에서 상방과 하방 간에 승강 또는 하강 유동되는 제1 가이드부(1212a)가 구비되며, 상기 제1 가이드부(1212a)에는 상기 제1 체결수단(1241)의 일단이 결속되며,
상기 제2-1 유동몸체부(1222)는,
상기 제2-1 유동몸체부(1222)에서 상방과 하방 간에 승강 또는 하강 유동되는 제2 가이드부(1212b)가 구비되며, 상기 제2 가이드부(1212b)에는 상기 제2 체결수단(1242)의 일단이 결속되는 건축 공사를 위한 안전 난간 구조물 시공 방법.
The method according to claim 2,
The first-first fluid body 1212,
The first guide part 1212a is provided to move up or down in the first-first flow body part 1212 between upward and downward directions, and the first guide part 1212a includes the first fastening means 1241. Once it's bound,
The 2-1 fluid body 1222 is,
The second guide part 1212b is provided to move up or down in the 2-1 flow body part 1222 between the upper part and the lower part, and the second guide part 1212b includes the second fastening means 1242 of the second fastening means 1242. Safety railing structure construction method for building construction where one end is bound.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020190077697A 2019-06-28 2019-06-28 Safety parapet constructing method for construction work KR102061877B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190077697A KR102061877B1 (en) 2019-06-28 2019-06-28 Safety parapet constructing method for construction work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190077697A KR102061877B1 (en) 2019-06-28 2019-06-28 Safety parapet constructing method for construction work

Publications (1)

Publication Number Publication Date
KR102061877B1 true KR102061877B1 (en) 2020-01-02

Family

ID=69155299

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190077697A KR102061877B1 (en) 2019-06-28 2019-06-28 Safety parapet constructing method for construction work

Country Status (1)

Country Link
KR (1) KR102061877B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112482800A (en) * 2020-11-18 2021-03-12 熊金玉 Protection frame that construction used

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005023745A (en) * 2003-07-03 2005-01-27 Faibekkusu Kk Reinforcing structure of reinforced concrete column, and reinforcing material for use in the same
KR200477531Y1 (en) * 2014-01-29 2015-06-22 대주코레스(주) Safety parapet for construction work

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005023745A (en) * 2003-07-03 2005-01-27 Faibekkusu Kk Reinforcing structure of reinforced concrete column, and reinforcing material for use in the same
KR200477531Y1 (en) * 2014-01-29 2015-06-22 대주코레스(주) Safety parapet for construction work

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112482800A (en) * 2020-11-18 2021-03-12 熊金玉 Protection frame that construction used

Similar Documents

Publication Publication Date Title
KR102061871B1 (en) Safety parapet for construction work
KR20190114731A (en) Apparaurs for constructing slab of building and method for the same
KR102061877B1 (en) Safety parapet constructing method for construction work
JP7119165B2 (en) roof structure
JP4519015B2 (en) Perforated plate fence and its construction method
JP4814620B2 (en) Climbing method of external curing unit
KR101365059B1 (en) Temporary type guardrail post
KR102061876B1 (en) Safety parapet manufacturing method for construction work
KR101292617B1 (en) Coupling Apparatus For Safety Balustrade
KR101457633B1 (en) Guardrail having tilt ability cope with slope way and height adjusting
ITMI20071884A1 (en) MODULAR ELEMENT FOR THE CONSTRUCTION OF FIXED STAIRS
JP2021008743A (en) Easy installation type sunshade
KR20120121983A (en) Handrail that angle control is essy
KR101188618B1 (en) A pent roof
KR20080051395A (en) Space filler for aluminum form
KR20150032982A (en) A handrail panel for stairway
KR200485031Y1 (en) apparatus
KR101344064B1 (en) Assembled stairs construction
JP4316079B2 (en) Movable ladder
KR100680277B1 (en) Ladder's bracket for H-beam
KR102219660B1 (en) Elevating workbench for cable installation of cable-stayed bridge main tower and cable construction method for cable-stayed bridge main towerusing the same
KR200491131Y1 (en) Awning structure for a vehicle
CN218779917U (en) Building engineering building climbing frame
KR102610484B1 (en) Handrail coupling apparatus
JP6934803B2 (en) fence

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant