KR102050051B1 - Target for measure the displacement in tunnel - Google Patents

Target for measure the displacement in tunnel Download PDF

Info

Publication number
KR102050051B1
KR102050051B1 KR1020180158556A KR20180158556A KR102050051B1 KR 102050051 B1 KR102050051 B1 KR 102050051B1 KR 1020180158556 A KR1020180158556 A KR 1020180158556A KR 20180158556 A KR20180158556 A KR 20180158556A KR 102050051 B1 KR102050051 B1 KR 102050051B1
Authority
KR
South Korea
Prior art keywords
weight
tunnel
measurement target
target
base
Prior art date
Application number
KR1020180158556A
Other languages
Korean (ko)
Inventor
김희선
Original Assignee
주식회사 코리아하이테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 코리아하이테크 filed Critical 주식회사 코리아하이테크
Priority to KR1020180158556A priority Critical patent/KR102050051B1/en
Application granted granted Critical
Publication of KR102050051B1 publication Critical patent/KR102050051B1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/02Means for marking measuring points
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B11/00Measuring arrangements characterised by the use of optical techniques
    • G01B11/16Measuring arrangements characterised by the use of optical techniques for measuring the deformation in a solid, e.g. optical strain gauge

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Disclosed is a target for measuring displacement in a tunnel, wherein when a tunnel is constructed, a measurement target attached for convergence measurement and crown settle measurement is configured to absorb a shock when the measurement target receives a blasting shock from the outside. Moreover, the measurement target is bent at a predetermined angle, and at the same time, is formed to be restored to an original state. Therefore, the measurement target is not easily damaged.

Description

터널용 변위측정 타겟{TARGET FOR MEASURE THE DISPLACEMENT IN TUNNEL}Displacement measurement target for tunnels {TARGET FOR MEASURE THE DISPLACEMENT IN TUNNEL}

본 발명은 터널용 변위측정 타겟에 관한 것으로, 보다 상세하게는 터널의 내공 변위 및 천단 침하를 측정하기 위해 터널의 내부에 부착되는 터널용 변위측정 타겟에 관한 것이다.The present invention relates to a displacement measurement target for a tunnel, and more particularly, to a displacement measurement target for a tunnel which is attached to the inside of the tunnel for measuring the hole displacement and the tip settlement of the tunnel.

일반적으로, 차량 및 기차 등의 운행을 원활하게 하고 사회 간접자본의 확충을 위해 터널의 시공이 활발히 이루어지고 있으며, 터널의 시공 공법도 새로운 기술이 개발되어 나날이 발전하고 있는 추세이다.In general, the construction of tunnels is actively performed to facilitate the operation of vehicles and trains, and to expand social indirect capital, and the construction of tunnels is also being developed day by day with new technologies.

상술한 터널 시공에는 새로운 첨단 공법이 적용되더라도 여러 가지 불확실한 요소들이 많이 존재하게 되는 데, 그 중에서도 지질학적인 불확실성이 가장 중요한 문제로 대두되고 있으며, 이미 시공된 터널의 경우에도 노후화로 인하여 터널 내공의 변위가 발생하게 되면 터널 구조물의 붕락에 의해 대형사고가 발생할 가능성이 있다.In the above-described tunnel construction, many uncertain factors exist even when the new advanced construction technique is applied. Among them, geological uncertainty is the most important problem, and in the case of tunnels already constructed, the displacement of tunnel construction due to aging If there is a large accident can occur due to the collapse of the tunnel structure.

이러한 문제들을 미연에 방지하기 위해, 최근에는 터널 내공의 변위량을 측정하는 방법이 개발되고 있는 데, 대표적인 방법으로서 터널 내공에 반사판을 갖춘 소형의 타겟 구조물을 터널 전체에 부착하고, 레이저 광선을 측정하고자 하는 터널 부위에 설치된 타겟 구조물에 발사함에 의해, 반사되어 돌아오는 광선의 속도에 의해 길이를 파악하고, 소정의 기준 좌표점과 해당 터널의 측정점과의 각도 변위량을 측정함으로써, 길이와 각도 변위량에 근거한 터널 내부의 내공 변위량을 파악할 수 있도록 하고 있다.In order to prevent these problems, a method of measuring the displacement of tunnel holes has recently been developed. As a representative method, a small target structure having a reflector at the tunnel hole is attached to the entire tunnel and the laser beam is measured. By firing on the target structure installed at the tunnel site, the length is determined by the speed of the reflected beam and the angle displacement between a predetermined reference coordinate point and the measurement point of the tunnel is measured. The internal displacement of the tunnel can be understood.

도 1은 종래의 터널에 부착된 측량 타겟을 나타낸 도면으로서, 도시된 바와 같이 터널의 내부 벽면에 다수개의 측량 타겟(2)이 일정 간격을 두고 고정적으로 부착되어 있는데, 이러한 측량 타겟(2)은 말굽(∪)형상의 타겟 지지대(4) 내측에 반사판(6)을 일정 각도를 갖도록 고정적으로 결합되어 있는 형상으로 이루어져 있다. 그리고, 작업자는 레이저 광선 발사 장치를 조작하여 측량하고자 하는 터널 부위에 부착되어 있는 측량 타겟(2)의 반사판(6)을 향하여 레이저 광선을 발사하여 반사되는 광선을 취함으로써, 해당 측량 타겟(2)이 설치된 터널 부위의 내공 변위량을 파악할 수 있게 되는 것이다.1 is a view illustrating a survey target attached to a conventional tunnel. As shown in FIG. 1, a plurality of survey targets 2 are fixedly fixed to the inner wall of the tunnel at regular intervals. It consists of a shape in which the reflector 6 is fixedly coupled to the horseshoe-shaped target support 4 inwardly at an angle. Then, the operator operates the laser beam firing apparatus and emits the laser beam toward the reflecting plate 6 of the surveying target 2 attached to the tunnel portion to be surveyed, thereby taking the reflected beam, thereby measuring the survey target 2. It is possible to grasp the displacement amount of the hole at the installed tunnel site.

하지만, 종래의 측량 타겟(2)의 경우에는 반사판(6)이 타겟 지지대(4)에 고정적으로 결합되어 있기 때문에, 터널 내부의 계속적인 발파를 위해 폭발물이나 대형 굴착기 등으로 작업을 지속하는 과정에서 굴착부로부터 예기치 않게 고속으로 날아오는 바위나 돌 등의 파편을 맞게 되면, 반사판이 변형되거나 파손될 뿐만 아니라, 타겟 지지대에 고정적으로 결합된 반사판(6)이 충격을 이기지 못하게 되어 타겟 지지대(4)에 연결 부분이 파손되어 분리되는 문제가 발생된다. 따라서, 반사판이 변형되거나 파손된 경우 변위량 측정 타겟으로서 사용이 불가능하게되고, 반사판이 측량 타겟에서 분리되어 떨어져 버린 경우에는 해당 측량 타겟을 터널 벽면에 다시 설치해야 하거나, 큰 충격량에 의해 측량 타겟이 파손되면 새로운 측량 타겟으로 교체해야 함에 따라, 터널 작업의 지연에 따른 작업성이 떨어짐은 물론 시공 비용도 상승할 수 밖에 없다는 문제점이 있다.However, in the case of the conventional survey target 2, since the reflecting plate 6 is fixedly coupled to the target support 4, in the process of continuing work with explosives, large excavators, etc. for continuous blasting inside the tunnel If a fragment of rock or stone that unexpectedly flows from an excavation part is hit by an unexpectedly high speed, the reflector may not only be deformed or damaged, but also the reflector 6 fixedly coupled to the target support may not be able to withstand the impact. The problem is that the connection part is broken and separated. Therefore, when the reflecting plate is deformed or broken, it becomes impossible to use it as a displacement measuring target, and when the reflecting plate is separated from the surveying target and dropped, the surveying target must be reinstalled on the tunnel wall, or the surveying target is damaged by a large impact amount. If it needs to be replaced with a new survey target, there is a problem in that workability due to delay of tunnel work is reduced and construction costs are inevitably increased.

본 발명은 상술한 문제점을 개선하기 위해 제안된 것으로, 그 목적은 터널시공시 내공변위 및 천단 침하의 측정을 위해 부착되는 측량 타겟이 외부로부터 발파 충격을 받으면 충격을 흡수하면서 소정의 각도로 휘어짐과 동시에 탄성복원력에 의해 원상태로 복원되도록 구성되어 측량 타겟이 쉽게 파손이 되지 않도록 한 터널용 변위측정 타겟을 제공하는 데 있다.The present invention has been proposed to improve the above-mentioned problems, and its object is to provide a measurement target attached for measurement of internal displacement and sedimentary settlement during tunnel construction, when it receives a blasting shock from the outside, it is bent at a predetermined angle while absorbing the impact. At the same time, to provide a displacement measuring target for the tunnel is configured to be restored to the original state by the elastic restoring force so that the survey target is not easily broken.

또한, 본 발명의 다른 목적은, 측량 타겟을 간단하게 끼워 설치할 수 있게 구성되어, 발파 충격에 의해 측량 타겟이 분리되어도 재설치가 용이할 뿐만 아니라, 시공이 용이하면서 신속한 재설치가 가능하게 구성된 터널용 변위측정 타겟을 제공하는 데 있다.In addition, another object of the present invention is configured to be easily fitted to the survey target, it is easy to reinstall even if the survey target is separated by the blasting impact, as well as easy to install, displacement for tunnels configured to enable quick reinstallation To provide a measurement target.

상술한 목적은, 터널의 내부 벽에 박힘되어 고정되는 박힘부재와, 상면 중앙에 상기 박힘부재의 하단이 끼워져 결합되는 결합공이 형성되고, 저면에 길이방향을 따라 끼움홈이 형성된 베이스와, 탄성재질의 판체로 구성되어 외부로부터 발파 충격을 받으면 충격을 흡수하면서 소정의 각도로 휘어짐과 동시에 탄성복원력에 의해 원상태로 복원되도록 구성되되, 상기 베이스의 끼움홈에 상단부가 선택적으로 끼움 결합되고, 타겟이 형성된 고휘도반사지가 부착되는 측량 타겟판을 포함하여 구성된 것을 특징으로 하는 터널용 변위측정 타겟에 의해 달성된다.The above-described object is formed with a nailing member fixed to the inner wall of the tunnel, the coupling hole is formed in the lower end of the nailing member is coupled to the center of the upper surface, the base is formed in the longitudinal groove in the bottom surface, the elastic material Composed of a plate body of the blasting shock from the outside is absorbed by the shock at a predetermined angle and at the same time configured to be restored to the original state by the elastic restoring force, the upper end is selectively fitted to the fitting groove of the base, the target is formed It is achieved by a displacement measurement target for a tunnel, characterized in that it comprises a measurement target plate to which a high brightness reflector is attached.

여기서, 상기 박힘부재의 하면 중앙에는 상기 결합공에 끼움 결합되는 결합핀이 돌출 형성되고, 상기 결합공의 내부에는 상기 결합핀이 부착 고정되도록 자석부재가 구비되며, 상기 박힘부재의 하면에는 결합핀의 외측으로 반사지가 부착되어, 상기 베이스를 박힘부재에 결합할 때, 결합핀의 위치를 정확하게 식별하여 결합공에 삽입 결합할 수 있게 구성되는 것이 바람직하다.Herein, a coupling pin is formed to protrude from the center of the lower surface of the nailing member, and a magnet member is provided inside the coupling hole to fix and fix the coupling pin. When the reflective paper is attached to the outside of the base, when the base is coupled to the embedding member, it is preferable that the position of the coupling pin is accurately configured to be inserted and coupled to the coupling hole.

그리고, 상기 베이스에는 그 상단부 측면에서 끼움홈으로 관통 형성된 체결공이 형성되고, 상기 체결공에는 육각렌치볼트가 체결되어, 상기 체결공으로 체결된 육각렌치볼트가 끼움홈에 삽입된 측량 타겟판의 측면을 가압하면서 분리가능하게 고정하도록 구성되며, 상기 타겟이 형성된 고휘도반사지는 측량 타겟판의 전면과 후면에 부착되어 측량 타겟판이 양방향으로 사용 가능하게 구성되는 것이 바람직하다.And, the base is formed with a fastening hole penetrating through the fitting groove on the side of the upper end, the fastening hole is a hexagon wrench bolt is fastened, the side of the measurement target plate inserted into the fitting groove of the hexagon wrench bolt fastened to the fastening hole It is configured to be detachably fixed while pressing, and the high luminance reflector on which the target is formed is preferably attached to the front and rear surfaces of the measurement target plate so that the measurement target plate can be used in both directions.

상기 측향 타켓판의 표면에는 초산이 함유된 목초농축액 4중량%와, 솔루빌라이저(Solubilizer) 8중량%와, 하이드로콜로이드 3.5중량%와, 산화나트륨 1.5중량%와, 폴리아닐린 2.5중량%와, 멜라민 시아누레이트 4.5중량%와, 펜타에리스리톨 4.5중량%와, 멜라민 포스페이트 4.5중량%와, 디메틸폴리실록산 2.5중량%와, 라이네케염 1.5중량%와, 알킬벤젠술폰산나트륨 1.5중량%와, 프로스타글란딘(prostaglandin) 4.5중량%와, DBNPA(2,2-Dibromo-3-nitrilopropionamide) 3.5중량%와, 일라이트분말 1.5중량% 및 나머지 폴리에틸렌수지로 이루어진 코팅액이 도포되어 코팅층이 형성되고, 상기 코팅층 위에는 0.1㎛ 입도를 갖는 하석 분말 4.5중량%와, 0.1㎛ 입도를 갖는 일라이트 분말 5.5중량%와, 셀룰로오스 디아세테이트 8.5중량%와, PTFE 5중량%와, 콜타르(Coal tar) 1.5중량%와, 세토스 2.5중량%와, 폴리에틸렌 글리콜 페닐에테르 3.5중량%와, 실리콘 1.5중량%와, 소르비탄 올리에이트 2.5중량%와, 물 15중량% 및 나머지 변성 우레탄수지로 이루어지는 마감코팅층이 형성되는 것이 바람직하다.4% by weight of acetic acid-containing grass concentrate, 8% by weight of solubilizer, 3.5% by weight of hydrocolloid, 1.5% by weight of sodium oxide, 2.5% by weight of polyaniline, melamine 4.5% by weight of cyanurate, 4.5% by weight of pentaerythritol, 4.5% by weight of melamine phosphate, 2.5% by weight of dimethylpolysiloxane, 1.5% by weight of Reineke salt, 1.5% by weight of sodium alkylbenzenesulfonate, prostaglandin 4.5 wt%, DBNPA (2,2-Dibromo-3-nitrilopropionamide) 3.5wt%, illite powder 1.5wt% and the remaining polyethylene resin coating solution was applied to form a coating layer, 0.1㎛ particle size on the coating layer 4.5% by weight of lower stone powder having, 5.5% by weight of illite powder having a particle size of 0.1 µm, 8.5% by weight of cellulose diacetate, 5% by weight of PTFE, 1.5% by weight of coal tar, 2.5% by weight of cetos With polyethylene It is preferable that a finish coating layer consisting of 3.5% by weight of glycol phenyl ether, 1.5% by weight of silicon, 2.5% by weight of sorbitan oleate, 15% by weight of water and the remaining modified urethane resin is formed.

본 발명에 따른 터널용 변위측정 타겟은 터널시공시 내공변위 및 천단 침하의 측정을 위해 부착되는 측량 타겟판이 탄성재질의 판체로 구성되어, 외부로부터 발파 충격을 받으면 충격을 흡수하면서 소정의 각도로 휘어짐과 동시에 탄성복원력에 의해 원상태로 복원되도록 구성되어 측량 타겟이 쉽게 파손이 되지 않는다는 효과가 있다.In the displacement measurement target for tunnel according to the present invention, the measurement target plate attached to the measurement of internal displacement and sedimentary settlement during tunnel construction is composed of a plate of elastic material, and is bent at a predetermined angle while absorbing impact when subjected to blasting shock from the outside. At the same time it is configured to be restored to its original state by the elastic restoring force has the effect that the survey target is not easily damaged.

또한, 측량 타겟판이 베이스에 분리 가능하게 결합되어, 발파 충격에 의해 측량 타겟판이 분리되어도 베이스에 끼워 조립하면 다시 설치되기 때문에, 시공이 용이하면서 재설치에 따른 비용이 소요되지 않는다는 효과가 있다.In addition, the measurement target plate is detachably coupled to the base, and even if the measurement target plate is separated by the blasting impact, it is installed again when the assembly is inserted into the base, so that the construction is easy and the cost of the reinstallation is not required.

도 1은 종래의 터널용 변위측정 타겟의 일례를 도시한 도면,
도 2는 본 발명에 따른 터널용 변위측정 타겟을 나타낸 분리사시도,
도 3은 본 발명에 따른 터널용 변위측정 타겟을 나타낸 결합사시도,
도 4는 본 발명에 따른 터널용 변위측정 타겟이 터널에 설치된 모습을 도시한 단면도,
도 5는 본 발명에 따른 터널용 변위측정 타겟의 작용을 설명하기 위한 도면,
도 6 및 도 7은 본 발명에 따른 터널용 변위측정 타겟의 바람직한 다른 실시예를 설명하기 위한 도면,
도 8은 본 발명에 따른 터널용 변위측정 타겟의 바람직한 또 다른 실시예를 설명하기 위한 도면.
1 is a view showing an example of a conventional displacement measurement target for tunnels,
2 is an exploded perspective view showing a displacement measurement target for a tunnel according to the present invention;
3 is a combined perspective view showing a displacement measurement target for a tunnel according to the present invention;
4 is a cross-sectional view showing a state in which a displacement measurement target for a tunnel is installed in a tunnel according to the present invention;
5 is a view for explaining the operation of the displacement measurement target for tunnel according to the present invention,
6 and 7 are views for explaining another preferred embodiment of the displacement measurement target for tunnels according to the present invention;
8 is a view for explaining another preferred embodiment of the displacement measurement target for a tunnel according to the present invention.

첨부된 도면들을 참조하여 본 발명에 대해 상세히 설명하면 다음과 같다. Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 2 내지 도 4를 참조하면, 본 발명에 따른 터널용 변위측정 타겟은 터널의 내공 변위 및 천단 침하를 측정하기 위해 터널의 내부에 부착되는 것으로, 박힘부재(100), 베이스(200), 측량 타겟판(300)를 포함하여 구성된다.2 to 4, the displacement measurement target for a tunnel according to the present invention is to be attached to the inside of the tunnel to measure the hole displacement and the tip settlement of the tunnel, the nailing member 100, the base 200, surveying It is configured to include a target plate 300.

상기 박힘부재(100)는 터널의 내부 벽에 박힘되어 고정되는 부재이다. 즉, 상기 박힘부재(100)는 터널의 내부 벽면 또는 천단부에 고정적으로 박힘되어, 후술하는 베이스(200)가 선택적으로 결합 및 분리될 수 있게 구성되면서 베이스(200)가 설치될 수 있게 하는 부재이다.The nailing member 100 is a member that is nailed and fixed to the inner wall of the tunnel. That is, the nailing member 100 is fixedly nailed to the inner wall surface or the top end of the tunnel, the member to allow the base 200 to be installed while being configured to be selectively coupled and separated the base 200 to be described later to be.

여기서, 박힘부재(100)는 터널의 내부 벽면에 견고하게 박힘되어 고정될 수 있다면, 공지의 다양한 부재가 적용될 수 있으며, 바람직하게는 도시된 바와 같이 쐐기형상의 핀부재 또는 미도시된 철근부재, 앙카볼트 등으로 구성될 수 있음은 물론이다.Here, if the pinch member 100 can be firmly embedded and fixed to the inner wall surface of the tunnel, a variety of known members can be applied, preferably as shown in the wedge-shaped pin member or not shown rebar member, Of course, it can be composed of an anchor bolt.

상기 베이스(200)는 상기 박힘부재(100)에 선택적으로 결합 또는 분리될 수 있게 설치되고, 후술하는 측량 타겟판(300)이 선택적으로 결합 또는 분리될 수 있게 설치되는 부재이다.The base 200 is a member installed to be selectively coupled to or separated from the nailing member 100, and a measurement target plate 300 to be described later is installed to be selectively coupled or separated.

구체적으로, 상기 베이스(200)는 상면 중앙에 상기 박힘부재(100)의 하단이 끼워져 결합되는 결합공(210)이 형성되고, 저면에 길이방향을 따라 끼움홈(220)이 형성된다. 좀 더 구체적으로, 상기 베이스(200)는 직사각형의 박스 형상으로 마련되고, 상기 결합공(210)은 베이스(200)의 상면 중앙에 형성되며, 끼움홈(200)은 베이스(200)의 하면에 중앙 길이방향을 따라 슬릿 형태로 형성되는 것이 바람직하다.Specifically, the base 200 is formed in the center of the upper surface of the coupling hole 210 is coupled to the lower end of the insertion member 100 is coupled, the fitting groove 220 is formed along the longitudinal direction on the bottom surface. More specifically, the base 200 is provided in a rectangular box shape, the coupling hole 210 is formed in the center of the upper surface of the base 200, the fitting groove 200 is on the lower surface of the base 200 It is preferably formed in a slit form along the central longitudinal direction.

상기 측량 타겟판(300)은 탄성재질의 판체로 구성되어 외부로부터 발파 충격을 받으면 충격을 흡수하면서 소정의 각도로 휘어짐과 동시에 탄성복원력에 의해 원상태로 복원되도록 구성된다. 여기서, 상기 측량 타겟판(300)은 소정의 탄성을 가지는 금속재질, 합성수지재질 등의 판체로 구성되는 것이 바람직하다.The measurement target plate 300 is composed of a plate of elastic material is configured to be restored to the original state by the elastic restoring force while bending at a predetermined angle while absorbing the impact when the blasting shock from the outside. Here, the measurement target plate 300 is preferably composed of a plate body, such as a metal material, a synthetic resin material having a predetermined elasticity.

즉, 도 5에 도시된 바와 같이, 상기 측량 타겟판(300)은 탄성재질의 판체로 구성되기 때문에, 터널 내부의 계속적인 발파를 위해 폭발물이나 대형 굴착기 등으로 작업을 지속하는 과정에서 굴착부로부터 예기치 않게 고속으로 날아오는 바위나 돌 등의 파편(P)을 맞게 되더라도, 측량 타겟판(300)이 충격을 흡수하면서 소정의 각도로 휘어짐과 동시에 탄성복원력에 의해 원상태로 복원되게 구성된다. 따라서, 측량 타겟판(300)이 쉽게 파손이 되지 않기 때문에 오랜기간 사용할 수 있을 뿐만 아니라, 측량 타겟판(300)이 휘거나 찌그러드는 등 변형이 발생되지 않기 때문에 측량 타겟판(300)을 통해 정확하게 터널의 내공변위 및 천단 침하의 측정할 수 있다는 장점이 있다. That is, as shown in Figure 5, since the measurement target plate 300 is composed of a plate of the elastic material, from the excavation portion in the process of continuing work with explosives, large excavators, etc. for continuous blasting inside the tunnel Even if unexpectedly hit the debris (P), such as a rock or stone flying at high speed, the measurement target plate 300 is configured to be bent at a predetermined angle while absorbing the shock and restored to its original state by the elastic restoring force. Therefore, since the survey target plate 300 is not easily damaged, it can be used for a long time, and since the deformation does not occur such as the survey target plate 300 is bent or crushed, it is precisely through the survey target plate 300. There is an advantage in that it is possible to measure the hole displacement and the celestial settlement of the tunnel.

그리고, 상기 측량 타겟판(300)은 상기 베이스의 끼움홈(220)에 상단부가 선택적으로 끼움 결합되고, 타겟(T)이 형성된 고휘도반사지(310)가 부착된다. 즉, 측량 타겟판(300)은 탄성재질의 판체로 구성되어, 베이스의 끼움홈(220)에 끼움 결합되면서 조립식으로 결합되게 구성된다. 따라서, 본 발명에 따른 측량 타겟판(300)은 발파 충격에 의해 측량 타겟판(300)이 베이스(200)에 분리되더라도, 분리된 측량 타겟판(300)을 다시 베이스의 끼움홈(220)에 끼워 재결합시키기만 하면 복구가 완료되기 때문에, 종래와 같이 반사판을 재설치할 필요가 없어 재설치에 따른 비용이 발생되지 않는다는 장점이 있다.In addition, the measurement target plate 300 is selectively fitted to the upper end portion of the fitting groove 220 of the base, and a high brightness reflector 310 having a target T is attached thereto. That is, the measurement target plate 300 is composed of a plate of an elastic material, it is configured to be assembled to be assembled while being fitted into the fitting groove 220 of the base. Therefore, the measurement target plate 300 according to the present invention, even if the measurement target plate 300 is separated from the base 200 by the blasting impact, the separated measurement target plate 300 to the fitting groove 220 of the base again Since the restoration is completed by simply refitting, it is not necessary to reinstall the reflector as in the prior art, and thus there is an advantage in that the cost of the reinstallation is not incurred.

한편, 본 발명에 따르면 도 6 및 도 7에 도시된 바와 같이, 상기 박힘부재(100)의 하면 중앙에는 상기 결합공(210)에 끼움 결합되는 결합핀(110)이 돌출 형성되고, 상기 결합공(210)의 내부에는 상기 결합핀(110)이 부착 고정되도록 자석부재(M)가 구비되는 것이 바람직하다. 즉, 상기와 같은 구성에 의해, 박힘부재(100)의 결합핀(110)이 베이스(200)의 결합공(210)에 끼워지면서 박힘부재(100)에 베이스(200)가 조립식으로 결합 및 분리될 수 있게 구성되며, 박힘부재(100)의 결합핀(110)이 결합공(210) 내의 자석부재(M)에 부착되면서, 박힘부재(100)에 베이스(200)가 더욱 견고한 결합이 이루어질 수 있게 된다.On the other hand, according to the present invention, as shown in Figure 6 and 7, the center of the lower surface of the nailing member 100, the coupling pin 110 is fitted into the coupling hole 210 is formed to protrude, the coupling hole The inside of the 210 is preferably provided with a magnet member (M) so that the coupling pin 110 is attached and fixed. That is, by the configuration as described above, while the coupling pin 110 of the nailing member 100 is fitted into the coupling hole 210 of the base 200, the base 200 is assembled and separated from the nailing member 100 in a prefabricated manner. Is configured to be, as the coupling pin 110 of the nailing member 100 is attached to the magnet member (M) in the coupling hole 210, the base 200 to the nailing member 100 can be made more robust coupling Will be.

또한, 상기 박힘부재(100)의 하면에는 결합핀(110)의 외측으로 반사지(120)가 부착되는 것이 바람직하다. 즉, 상기 베이스(200)를 박힘부재(100)에 결합할 때, 어두운 터널 내에서 박힘부재(100)의 하면에 부착된 반사지(120)가 빛을 반사하여 박힘부재(100)의 위치를 정확하게 식별할 수 있게 구성되기 때문에, 작업자는 박힘부재의 결합핀(110)의 위치를 정확하게 식별한 후, 결합핀(110)을 베이스의 결합공(210)에 삽입 결합하여, 용이하게 박힘부재(100)에 베이스(200)를 조립할 수 있게 된다.In addition, it is preferable that the reflective paper 120 is attached to the outer side of the coupling pin 110 on the lower surface of the nailing member 100. That is, when the base 200 is coupled to the nailing member 100, the reflector 120 attached to the bottom surface of the nailing member 100 reflects light in a dark tunnel to accurately position the nailing member 100. Since it is configured to be identified, the operator accurately identifies the position of the coupling pin 110 of the nailing member, and then inserts the coupling pin 110 into the coupling hole 210 of the base, and easily nailed the member 100 The base 200 can be assembled.

나아가, 본 발명에 따르면, 도 8에 도시된 바와 같이, 상기 베이스(200)에는 그 상단부 측면에서 끼움홈(220)으로 관통 형성된 체결공(230)이 형성되고, 상기 체결공(230)에는 육각렌치볼트(B)가 체결되어, 상기 체결공(230)으로 체결된 육각렌치볼트(B)가 끼움홈(220)에 삽입된 측량 타겟판(300)의 측면을 가압하면서 분리가능하게 고정하도록 구성된다. 따라서, 베이스의 끼움홈(220)에 끼움 결합된 측량 타겟판(300)이 육각렌치볼트(B)에 의해 가압되면서 지지되어, 측량 타겟판(300)이 베이스(200)에 더욱 견고하게 결합 고정된다.Furthermore, according to the present invention, as shown in Figure 8, the base 200 is formed with a fastening hole 230 formed through the fitting groove 220 at the upper end side, the fastening hole 230 is hexagonal Wrench bolt (B) is fastened, the hexagon wrench bolt (B) fastened by the fastening hole 230 is configured to detachably fix while pressing the side of the measurement target plate 300 inserted into the fitting groove 220 do. Therefore, the measurement target plate 300 fitted to the fitting groove 220 of the base is supported while being pressed by the hexagon wrench bolts B, and the measurement target plate 300 is more firmly fixed to the base 200. do.

한편, 본 발명은 측량 타겟판(300)의 표면에는 초산이 함유된 목초농축액 4중량%와, 솔루빌라이저(Solubilizer) 8중량%와, 하이드로콜로이드 3.5중량%와, 산화나트륨 1.5중량%와, 폴리아닐린 2.5중량%와, 멜라민 시아누레이트 4.5중량%와, 펜타에리스리톨 4.5중량%와, 멜라민 포스페이트 4.5중량%와, 디메틸폴리실록산 2.5중량%와, 라이네케염 1.5중량%와, 알킬벤젠술폰산나트륨 1.5중량%와, 프로스타글란딘(prostaglandin) 4.5중량%와, DBNPA(2,2-Dibromo-3-nitrilopropionamide) 3.5중량%와, 일라이트분말 1.5중량% 및 나머지 폴리에틸렌수지로 이루어진 코팅액을 도포할 수 있다.On the other hand, the present invention, the surface of the measurement target plate 300, 4% by weight of acetic acid-containing grass concentrate, solubilizer (Solubilizer) 8% by weight, hydrocolloid 3.5% by weight, sodium oxide 1.5% by weight, 2.5% by weight of polyaniline, 4.5% by weight of melamine cyanurate, 4.5% by weight of pentaerythritol, 4.5% by weight of melamine phosphate, 2.5% by weight of dimethylpolysiloxane, 1.5% by weight of Reineke salt, 1.5% of sodium alkylbenzenesulfonate %, 4.5% by weight of prostaglandin, 3.5% by weight of DBNPA (2,2-Dibromo-3-nitrilopropionamide), 1.5% by weight of an illite powder, and a coating liquid consisting of the remaining polyethylene resin may be applied.

이렇게 코팅액으로 코팅하여 코팅층을 형성하게 되면, 측량 타켓판(300) 표면에서의 항균성, 내수성, 난연성을 확보할 수 있어 장수명화를 유지하고, 화재시 유해가스 발생을 억제하는 효과를 얻을 수 있다. When the coating layer is formed by coating with the coating solution, antimicrobial, water resistance, and flame retardancy can be ensured on the surface of the target target measurement plate 300, thereby maintaining long life and suppressing harmful gas generation in a fire.

이때, 초산은 목초 농축액에 결합되어 표면에 붙은 유기물을 분해하여 코팅층이 잘 붙도록 하여 주며, 목초 농축액과 함께 냄새 제거에도 기여하게 된다.At this time, acetic acid is bonded to the grass concentrate to decompose the organic matter adhered to the surface so that the coating layer adheres well, and contributes to the removal of the odor with the grass concentrate.

그리고, 솔루빌라이저는 코팅액을 구성하는 조성물들의 유화성과 가용화성을 구현하여 층분리를 막고 유화안정화를 유도하게 된다.The solubilizer prevents layer separation and induces emulsion stabilization by emulsifying and solubilizing the compositions constituting the coating solution.

또한, 하이드로콜로이드(Hydrocolloid)는 겔을 형성하여 습윤상태를 유지함으로써 점착성을 장시간 동안 확정하여 바인딩성을 강화시키기 위해 첨가되는 것으로 특히 방수기능을 강화시켜 젖음성이 생기지 않도록 하기 위해 첨가된다.In addition, the hydrocolloid (Hydrocolloid) is added to strengthen the binding properties by forming a gel to maintain a wet state by fixing the adhesion for a long time, in particular to enhance the waterproof function so that the wettability does not occur.

아울러, 산화나트륨은 알칼리성 산화물로서 항장력을 증가시키기 위해 첨가되며, 폴리아닐린은 전도성 고분자로서 표면의 전기저항을 작게하여 정전기 발생을 억제하도록 하기 위해 첨가된다.In addition, sodium oxide is added as an alkaline oxide to increase the tensile strength, and polyaniline is added as a conductive polymer to reduce the electrical resistance of the surface to suppress the generation of static electricity.

뿐만 아니라, 멜라민 시아누레이트는 수지분산성이 좋고 대상수지의 물성을 저하시키지 않으면서 난연성은 향상시키고 성형성은 우수한 특성이 있고, 펜타에리스리톨은 합성고무와 플라스틱의 중간 특성을 가진 물질로서 연소시 화염방지와 한계산소지수의 상승을 유도하여 발화저항성을 크게 하기 위해 첨가되며, 멜라민 포스페이트는 질소가 함유되어 있어 난연상승 기능을 갖는 무독성으로서, 특히 할로겐이 함유되어 있지 않아 독성이 없어 유용하다.In addition, melamine cyanurate has good resin dispersibility and improves flame retardancy and moldability without deteriorating the physical properties of the target resin. Pentaerythritol is a material having intermediate properties between synthetic rubber and plastic. It is added in order to induce prevention and increase the limit oxygen index and increase the ignition resistance. Melamine phosphate is nitrogen-containing and non-toxic with a flame-retardant rising function, especially since it does not contain halogen and is not toxic.

그리고, 디메틸폴리실록산은 내화학성 및 발수성에 따른 오염방지기능을 강화하고, 소포성을 확보하기 위해 첨가되며, 라이네케염과 알킬벤젠술폰산나트륨은 내산성을 확보하기 위해 첨가된다.In addition, dimethyl polysiloxane is added to enhance the anti-fouling function according to the chemical resistance and water repellency, and to secure anti-foaming, and the Reineke salt and sodium alkylbenzene sulfonate are added to secure acid resistance.

또한, 프로스타글란딘은 20개의 탄소로 이루어진 지방산 유도체로서 세균활성을 억제하여 사멸시키고 분해 제거하는 효과를 강화시키기 위해 더 첨가되며, DBNPA(2,2-Dibromo-3-nitrilopropionamide)는 액상 항균제로서 특히 곰팡이 발생을 억제하고 발생된 곰팡이 제거에 탁월한 효과를 제공하고, 일라이트는 점토광물중 하나로 음이온을 띠기 때문에 양이온의 부유 미입자와 전기적인 중화로 응집침전을 유발하여 중금속, 유독가스, 유해물질을 흡착 분해함은 물론 바이러스와 박테리아 및 곰팡이 등의 정균 작용과 살균 작용이 뛰어나므로 항균, 항바이러스 및 살균, 유해물질 흡착 분해를 위해 더 첨가된다.In addition, prostaglandin is a fatty acid derivative consisting of 20 carbons, which is further added to inhibit the bactericidal activity, kill and decompose, and DBNPA (2,2-Dibromo-3-nitrilopropionamide) is a liquid antibacterial agent, especially mold. This product provides an excellent effect on the removal of fungi and the elimination of fungi.Since illite has an anion as one of the clay minerals, it adsorbs and decomposes heavy metals, toxic gases, and harmful substances by causing coagulation and precipitation by floating neutral particles and electric neutralization of cations. As well as excellent bactericidal and bactericidal activity of viruses, bacteria and fungi, it is added for antibacterial, antiviral and bactericidal, and adsorption decomposition of harmful substances.

이때, 이러한 코팅층이 형성된 측량 타겟판의 표면에 대해 ASTM D2863-17에 따라 난연성을 테스트한 결과, V-2 등급으로 판정되어 난연성이 확보된 것으로 확인되었다. 뿐만 아니라, 곰팡이 균에 대한 항균활성 시험에 대해서도 항균성이 있는 것으로 확인되었다.At this time, as a result of testing the flame retardancy according to ASTM D2863-17 on the surface of the measurement target plate on which such a coating layer was formed, it was determined that the flame retardance was determined to be V-2 grade. In addition, it was confirmed that there is antimicrobial activity against the antimicrobial activity test against fungi.

또한, JIS T8 103의 규격에 따라 대전방지특성을 확인한 결과, 0.51×108Ω으로 확인되어 1×105Ω ≤ R(저항) ≤ 1×109Ω 범위에 속한 것으로 양호한 대전방지특성이 있는 것으로 확인되었다.In addition, as a result of confirming the antistatic property according to the standard of JIS T8 103, it was confirmed as 0.51 × 108Ω, which is in the range of 1 × 10 5 Ω ≤ R (resistance) ≤ 1 × 10 9 Ω It became.

덧붙여, 본 발명에서는 상기 코팅액이 건조된 후 내구성, 내수성, 균열억제성 등을 확보하기 위해 마감코팅액을 도포한다.In addition, in the present invention, after the coating solution is dried, a finish coating solution is applied to ensure durability, water resistance, crack resistance, and the like.

상기 마감코팅액액은 0.1㎛ 입도를 갖는 하석 분말 4.5중량%와, 0.1㎛ 입도를 갖는 일라이트 분말 5.5중량%와, 셀룰로오스 디아세테이트 8.5중량%와, PTFE 5중량%와, 콜타르(Coal tar) 1.5중량%와, 세토스 2.5중량%와, 폴리에틸렌 글리콜 페닐에테르 3.5중량%와, 실리콘 1.5중량%와, 소르비탄 올리에이트 2.5중량%와, 물 15중량% 및 나머지 변성 우레탄수지로 이루어진다.The finish coating solution is 4.5% by weight of the stone powder having a particle size of 0.1 μm, 5.5% by weight of the illite powder having a particle size of 0.1 μm, 8.5% by weight of cellulose diacetate, 5% by weight of PTFE, and coal tar 1.5 It consists of weight%, 2.5% by weight of cetos, 3.5% by weight of polyethylene glycol phenyl ether, 1.5% by weight of silicon, 2.5% by weight of sorbitan oleate, 15% by weight of water and the remaining modified urethane resin.

여기에서, 하석((Na2OㆍAl2O3ㆍ2SiO2)(K2OㆍAl2O3ㆍ2SiO2)은 두 조성이 섞여 있는 것으로 내열성과 투광성 및 도막의 강도를 유지하기 위해 첨가되며, 일라이트분말은 원적외선 방사량이 탁월하여 탈취, 소취, 공기정화이 있고, 특히 바이러스, 박테리아, 곰팡이에 대한 항균작용이 우수한 것으로 알려져 있다. 때문에, 물, 대기, 토양 중에 존재하는 중금속과 각종 유도가스를 흡착, 탈취, 분해 제거하는 용도로 많이 활용되고 있다.Here, the lower stone ((Na 2 O · Al 2 O 3 2SiO 2 ) (K 2 O · Al 2 O 3 2SiO 2 ) is a mixture of the two compositions and is added to maintain heat resistance, light transmittance, and strength of the coating film. It is known that the illite powder is excellent in deodorizing, deodorizing, and air purification due to its excellent far-infrared radiation, and it is known to be excellent in antibacterial activity against viruses, bacteria, and fungi. Therefore, heavy metals and various induced gases in water, air, and soil are known. Is widely used for adsorption, deodorization and decomposition.

그리고, 셀룰로오스 디아세테이트는 셀룰로오스를 구성하는 파라노스(pyranose) 고리로 인해 높은 유리전이온도를 갖게 되므로 도포층의 인장강도, 굴곡강도, 충격강도를 향상시키기 위해 첨가되며, 폴리테트라플로오르에틸렌(PTFE)은 불소수지의 하나로서 절연안정성과 비점착성 및 낮은 마찰계수로 인해 발수특성과 방수특성이 우수한 물질이다.In addition, since cellulose diacetate has a high glass transition temperature due to a pyranose ring constituting cellulose, it is added to improve tensile strength, bending strength, and impact strength of the coating layer, and polytetrafluoroethylene (PTFE ) Is one of the fluorine resins, which has excellent water repellency and waterproof properties due to insulation stability, non-tackiness and low coefficient of friction.

또한, 콜타르는 균열억제 및 방수성능 강화를 위해 첨가되며, 세토스는 팜오일에서 추출된 추출물로서 유화안정화는 물론 점도를 조절하고 조성물의 침강을 방지하기 위해 첨가되고, 폴리에틸렌 글리콜 페닐에테르는 입자의 응집을 방지하고 균일한 분산성을 확보하여 방수 및 단열 특성을 나타내는 성분들이 고르게 분포되도록 유도하기 위해 첨가되며, 실리콘은 조성물 교반중 기포가 생성되는 것을 억제하여 도막 불량을 차단하기 위해 첨가된다.In addition, coal tar is added to prevent cracking and strengthening waterproofing properties, and cetos is an extract extracted from palm oil, and is added to control the viscosity and to prevent sedimentation of the composition, as well as to stabilize the emulsion, and polyethylene glycol phenyl ether It is added to prevent agglomeration and to ensure uniform dispersibility so that the components exhibiting waterproof and thermal insulation properties are evenly distributed, and silicon is added to prevent bubbles from forming during stirring of the composition to block coating defects.

뿐만 아니라, 소르비탄 올리에이트(Sorbitan Oleate)는 에멀젼 상태로의 가용화, 유화 및 분산안정성을 유지하기 위해 첨가된다.In addition, sorbitan oleate is added to maintain solubilization, emulsification and dispersion stability in the emulsion state.

이와 같이 구성하게 되면, 측량 타겟판(300)의 내구성, 내수성, 균열억제성 등을 확보하여 측정타켓의 장수명화를 달성할 수 있게 된다.When configured in this way, it is possible to secure the durability, water resistance, crack suppression, etc. of the measurement target plate 300 to achieve a longer life of the measurement target.

100: 박힘부재 200: 베이스
300: 측량 타겟판
100: nailing member 200: base
300: survey target plate

Claims (4)

터널의 내부 벽에 박힘되어 고정되는 박힘부재와,
상면 중앙에 상기 박힘부재의 하단이 끼워져 결합되는 결합공이 형성되고, 저면에 길이방향을 따라 끼움홈이 형성된 베이스와,
탄성재질의 판체로 구성되어 외부로부터 발파 충격을 받으면 충격을 흡수하면서 소정의 각도로 휘어짐과 동시에 탄성복원력에 의해 원상태로 복원되도록 구성되되, 상기 베이스의 끼움홈에 상단부가 선택적으로 끼움 결합되고, 타겟이 형성된 고휘도반사지가 부착되는 측량 타겟판을 포함하여 구성되되,
상기 측향 타켓판의 표면에는 초산이 함유된 목초농축액 4중량%와, 솔루빌라이저(Solubilizer) 8중량%와, 하이드로콜로이드 3.5중량%와, 산화나트륨 1.5중량%와, 폴리아닐린 2.5중량%와, 멜라민 시아누레이트 4.5중량%와, 펜타에리스리톨 4.5중량%와, 멜라민 포스페이트 4.5중량%와, 디메틸폴리실록산 2.5중량%와, 라이네케염 1.5중량%와, 알킬벤젠술폰산나트륨 1.5중량%와, 프로스타글란딘(prostaglandin) 4.5중량%와, DBNPA(2,2-Dibromo-3-nitrilopropionamide) 3.5중량%와, 일라이트분말 1.5중량% 및 나머지 폴리에틸렌수지로 이루어진 코팅액이 도포되어 코팅층이 형성되고,
상기 코팅층 위에는 0.1㎛ 입도를 갖는 하석 분말 4.5중량%와, 0.1㎛ 입도를 갖는 일라이트 분말 5.5중량%와, 셀룰로오스 디아세테이트 8.5중량%와, PTFE 5중량%와, 콜타르(Coal tar) 1.5중량%와, 세토스 2.5중량%와, 폴리에틸렌 글리콜 페닐에테르 3.5중량%와, 실리콘 1.5중량%와, 소르비탄 올리에이트 2.5중량%와, 물 15중량% 및 나머지 변성 우레탄수지로 이루어지는 마감코팅층이 형성된 것을 특징으로 하는 터널용 변위측정 타겟.
A nailing member fixed to the inner wall of the tunnel,
A base having a coupling hole formed at the center of the upper surface by engaging the lower end of the nailing member, and having a fitting groove formed along the longitudinal direction at the bottom thereof;
Composed of a plate of elastic material when the blasting shock from the outside absorbs the shock and is bent at a predetermined angle and restored to its original state by the elastic restoring force, the upper end is selectively fitted to the fitting groove of the base, the target It is configured to include a measurement target plate to which the formed high-brightness reflective paper is attached,
4% by weight of acetic acid-containing grass concentrate, 8% by weight of solubilizer, 3.5% by weight of hydrocolloid, 1.5% by weight of sodium oxide, 2.5% by weight of polyaniline, melamine 4.5% by weight of cyanurate, 4.5% by weight of pentaerythritol, 4.5% by weight of melamine phosphate, 2.5% by weight of dimethylpolysiloxane, 1.5% by weight of Reineke salt, 1.5% by weight of sodium alkylbenzenesulfonate, prostaglandin 4.5 wt%, DBNPA (2,2-Dibromo-3-nitrilopropionamide) 3.5wt%, illite powder 1.5wt% and the remaining coating liquid of the polyethylene resin is applied to form a coating layer,
On the coating layer, 4.5 wt% of the stone powder having a particle size of 0.1 μm, 5.5 wt% of the illite powder having a particle size of 0.1 μm, 8.5 wt% of cellulose diacetate, 5 wt% of PTFE, and 1.5 wt% of coal tar And, a finishing coating layer comprising 2.5% by weight of cetos, 3.5% by weight of polyethylene glycol phenyl ether, 1.5% by weight of silicon, 2.5% by weight of sorbitan oleate, 15% by weight of water and the remaining modified urethane resin. Displacement measurement target for tunnel.
제1항에 있어서,
상기 박힘부재의 하면 중앙에는 상기 결합공에 끼움 결합되는 결합핀이 돌출 형성되고, 상기 결합공의 내부에는 상기 결합핀이 부착 고정되도록 자석부재가 구비되며,
상기 박힘부재의 하면에는 결합핀의 외측으로 반사지가 부착되어, 상기 베이스를 박힘부재에 결합할 때, 결합핀의 위치를 정확하게 식별하여 결합공에 삽입 결합할 수 있게 구성된 것을 특징으로 하는 터널용 변위측정 타겟.
The method of claim 1,
The center of the lower surface of the nailing member is provided with a coupling pin protruding from the coupling hole, the magnet member is provided inside the coupling hole so that the coupling pin is attached and fixed,
The lower surface of the nailing member is attached to the reflector to the outside of the coupling pin, when the base is coupled to the nailing member, the displacement for the tunnel, characterized in that the position of the coupling pin can be accurately identified and inserted into the coupling hole Measure target.
제1항에 있어서,
상기 베이스에는 그 상단부 측면에서 끼움홈으로 관통 형성된 체결공이 형성되고, 상기 체결공에는 육각렌치볼트가 체결되어, 상기 체결공으로 체결된 육각렌치볼트가 끼움홈에 삽입된 측량 타겟판의 측면을 가압하면서 분리가능하게 고정하도록 구성되며,
상기 타겟이 형성된 고휘도반사지는 측량 타겟판의 전면과 후면에 부착되어 측량 타겟판이 양방향으로 사용가능하게 구성된 것을 특징으로 하는 터널용 변위측정 타겟.
The method of claim 1,
The base is formed with a fastening hole penetrating through the fitting groove at the side of the upper end portion, the hexagonal wrench bolt is fastened to the fastening hole, while pressing the side of the measurement target plate inserted into the fitting groove the hexagon wrench bolt fastened to the fastening hole Configured to detachably secure,
And a high luminance reflector having the target formed thereon, which is attached to the front and rear surfaces of the survey target plate so that the survey target plate can be used in both directions.
삭제delete
KR1020180158556A 2018-12-10 2018-12-10 Target for measure the displacement in tunnel KR102050051B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180158556A KR102050051B1 (en) 2018-12-10 2018-12-10 Target for measure the displacement in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180158556A KR102050051B1 (en) 2018-12-10 2018-12-10 Target for measure the displacement in tunnel

Publications (1)

Publication Number Publication Date
KR102050051B1 true KR102050051B1 (en) 2019-11-28

Family

ID=68730316

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180158556A KR102050051B1 (en) 2018-12-10 2018-12-10 Target for measure the displacement in tunnel

Country Status (1)

Country Link
KR (1) KR102050051B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100278367B1 (en) * 1998-12-30 2001-02-01 정순착 Rotary target attaching device for measuring internal displacement and shear displacement
KR100685008B1 (en) * 2004-11-08 2007-02-22 이근호 Pin apparatus for measuring displacement of tunnel's inner surface
KR200469711Y1 (en) * 2012-04-13 2013-11-04 주식회사 이제이텍 target for survey
KR200477287Y1 (en) * 2015-02-10 2015-05-28 주식회사 경진그린텍 a target with radiation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100278367B1 (en) * 1998-12-30 2001-02-01 정순착 Rotary target attaching device for measuring internal displacement and shear displacement
KR100685008B1 (en) * 2004-11-08 2007-02-22 이근호 Pin apparatus for measuring displacement of tunnel's inner surface
KR200469711Y1 (en) * 2012-04-13 2013-11-04 주식회사 이제이텍 target for survey
KR200477287Y1 (en) * 2015-02-10 2015-05-28 주식회사 경진그린텍 a target with radiation

Similar Documents

Publication Publication Date Title
US9982429B2 (en) Expansion joint seal system
ES2312836T3 (en) POLYMER COMPOSITIONS DELAYED FLAME.
US9933091B2 (en) Penetration structure for fireproof compartment containing epoxy-resin-containing thermally expandable resin composition sheet and method for constructing the penetration structure
US4659381A (en) Flame retarded asphalt blend composition
ES2643024T3 (en) Flame retardant resin frame
BR112013006675A2 (en) flexible and waterproof roof coverings
BRPI0519233A2 (en) curable precursor of an essentially halogen-free low-density flame retardant epoxy composition, essentially halogen-free low-density flame retardant epoxy composition, and use of a precursor
US20100197182A1 (en) Fire resistant building element and plaster therefor
KR101762309B1 (en) Non-combustible inorganic paint composition having a heat insulating function and method for manufacturing thereof
KR102050051B1 (en) Target for measure the displacement in tunnel
BE904900A (en) COATING COMPOSITION AND METHOD FOR PROTECTING A SURFACE AGAINST CORROSION.
CN104356455A (en) Formula of chloroprene rubber protection sleeve for automobile universal joint
KR20190033268A (en) Asphalt waterproofing material having improved freezing resistance
DE102016013784A1 (en) Effective expansion joint profile arrangement for structures with a reliable safety fire protection barrier and distance protection sound insulation device
KR102310510B1 (en) Asphalt primer having improved freezing resistance
KR20160047129A (en) flame retardancy waterproof flooring coating composition
KR101682673B1 (en) Waterproofing Agent With Enhanced Adhesion and Manufacturing Method Thereof
EP0147455B1 (en) Paint mass for bituminous roof sides
KR20190029827A (en) Flame retardant epoxy flooring and waterproof composition
JP6666654B2 (en) Fire resistant structure of beam
JP2001098661A (en) Fire resistive structure for h-shaped steel beam
KR101726430B1 (en) Weed proof mat fixing ring
KR102331427B1 (en) Lane separator with delineator
EP0730695A1 (en) Gap seal
KR102674329B1 (en) Glass fiber reinforced floorboards with electrostatic and anti-slip functions and their manufacturing methods

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant