KR101938702B1 - Pressure test member for checking inlet valve of pumping-up electric power station - Google Patents

Pressure test member for checking inlet valve of pumping-up electric power station Download PDF

Info

Publication number
KR101938702B1
KR101938702B1 KR1020160160404A KR20160160404A KR101938702B1 KR 101938702 B1 KR101938702 B1 KR 101938702B1 KR 1020160160404 A KR1020160160404 A KR 1020160160404A KR 20160160404 A KR20160160404 A KR 20160160404A KR 101938702 B1 KR101938702 B1 KR 101938702B1
Authority
KR
South Korea
Prior art keywords
inlet valve
dome
test member
check
pressure test
Prior art date
Application number
KR1020160160404A
Other languages
Korean (ko)
Other versions
KR20180060665A (en
Inventor
박규섭
Original Assignee
한전케이피에스 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한전케이피에스 주식회사 filed Critical 한전케이피에스 주식회사
Priority to KR1020160160404A priority Critical patent/KR101938702B1/en
Publication of KR20180060665A publication Critical patent/KR20180060665A/en
Application granted granted Critical
Publication of KR101938702B1 publication Critical patent/KR101938702B1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/26Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
    • G01M3/28Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M15/00Testing of engines
    • G01M15/14Testing gas-turbine engines or jet-propulsion engines

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

본 발명은, 양수발전소의 입구밸브 점검용 압력 테스트부재로, 상부저수지의 발전용수가 하부저수지로 흐르도록 설치되는 철관과, 상기 상부저수지와 하부저수지사이에 철관이 연결 설치되는 양수발전소의 전동발전기와, 가역식 펌프수차를 구비한 전동발전기 앞쪽 철관에 발전용수의 유입수량을 제어하도록 설치되는 입구밸브와, 전력을 공급하거나 양수전력을 사용할 수 있도록 송전선이 연결되면서 전동발전기에 전압을 조절할 수 있도록 연결 설치되는 변압기를 포함하여 구성되는 양수발전소에 있어서, 상기 입구밸브에 점검용수를 공급하여 형성되는 압력을 측정하여 입구밸브의 누수를 점검할 수 있도록 입구밸브에 설치되는 압력 테스트부재를 포함한 것을 특징으로 한다.The present invention relates to a pressure test member for inspecting an inlet valve of a pumped-storage power plant, comprising: an iron pipe which is installed such that power generation water of an upper reservoir flows to a lower reservoir; and a motor generator of a pumping power plant where an iron pipe is connected between the upper reservoir and the lower reservoir An inlet valve installed to control the flow rate of the power generation water to the iron pipe in front of the electric generator having the reversible pump water turbine, and an inlet valve installed to control the voltage of the electric generator, And a pressure test member installed on the inlet valve so as to check the leakage of the inlet valve by measuring the pressure formed by supplying the check valve to the inlet valve. .

Description

양수발전소의 입구밸브 점검용 압력 테스트부재{PRESSURE TEST MEMBER FOR CHECKING INLET VALVE OF PUMPING-UP ELECTRIC POWER STATION}[0001] PRESSURE TEST MEMBER FOR CHECKING INLET VALVE OF PUMPING-UP ELECTRIC POWER STATION [0002]

본 발명은 양수발전소의 입구밸브 점검용 압력 테스트부재에 관한 것으로, 더욱 상세하게는 양수발전소에서 유입수량을 조절할 수 있도록 설치되는 입구밸브에 설치하여 입구밸브의 누수 점검을 간편하게 할 수 있도록 한 양수발전소의 입구밸브 점검용 압력 테스트부재에 관한 것이다.The present invention relates to a pressure test member for inspecting an inlet valve of a pumping power plant, and more particularly, to a pressure test member for a pumping power plant which is installed in an inlet valve installed to adjust the flow rate of water in a pumping power plant, To a pressure test member for inspecting an inlet valve.

일반적으로 양수발전소(2)는 도 1에 도시한 바와 같이, 상부저수지(4)에 저장된 발전용수를 철관(6)을 통해 공급받은 발전전동기(8)가 구동함으로써 발전을 하게 된다. 발전전동기(8)의 발전으로 생산된 전력은 변압기(10)를 거친 후 송전선(12)을 통해 소비자에게 공급된다.Generally, as shown in FIG. 1, the pumped-storage power plant 2 generates power by driving the generator-motor 8 supplied with the power generation water stored in the upper reservoir 4 through the iron pipe 6. The electric power produced by the generation of the generator motor 8 is supplied to the consumer through the transmission line 12 after passing through the transformer 10.

상기한 발전전동기(8)는 철관(6)을 통해 공급되는 발전용수에 의하여 가역식 펌프수차(14)가 회전함으로써 발전하게 된다.The generator motor 8 generates electric power by rotating the reversible pump aberration 14 by the power generation water supplied through the iron pipe 6.

상기 발전전동기(8)에 공급되는 발전용수는 발전전동기(8)의 전방에 위치한 철관(6)에 설치되는 입구밸브(16)에 의하여 조절된다.The power generation water supplied to the generator electric motor 8 is regulated by the inlet valve 16 installed in the iron pipe 6 located in front of the generator electric motor 8.

즉, 상기 입구밸브(16)는 발전시 상부저수지(4)의 발전용수가 발전전동기(8)를 거쳐 하부저수지(18) 측으로 흐르도록 개방되고, 양수시 하부저수지(18)의 발전용수가 발전전동기(8)를 거쳐 상부저수지(4)로 양수되도록 개방된다.That is, the inlet valve 16 is opened so that the power generation water of the upper reservoir 4 flows to the lower reservoir 18 side via the generator motor 8, and when the power generation water of the lower reservoir 18 becomes positive Is opened to the upper reservoir (4) through the electric motor (8).

이러한, 상기 입구밸브(16)는 발전시와 양수시 정확히 작동하여야 하는데 누수가 발생해 밀폐압력이 떨어질 경우 발전시나 양수시 작동효율이 떨어지는 문제점이 있다. The inlet valve 16 must operate correctly when generating electricity and when it is pumped. However, when the sealing pressure is lowered due to the occurrence of leakage, there is a problem that the efficiency of operation is low when the power is generated or when the pump is pumped.

이에 따라, 현장에서는 입구밸브(16) 주변의 철관(6) 내부에서 발생하는 누수소음을 듣고 나서 입구밸브(16)를 점검하게 되는 등 항상 사후조치를 통해서만 입구밸브(16)를 점검하게 되는 문제점이 있다.Accordingly, in the field, the inlet valve 16 is checked after listening to the leakage noise generated inside the iron pipe 6 around the inlet valve 16, and the inlet valve 16 is always checked only after the post- .

또한, 종래 상기 입구밸브를 완전 분해하더라도 용수의 누수점검을 할 수 있는 장비가 없어 육안 점검이나 노후부품을 교환하는 수준에 머물고 있는 실정이다.In addition, even if the inlet valve is completely disassembled, there is no equipment for checking the water leakage, so that it is still in the level of visual inspection and replacement of old parts.

본 발명은 상기한 문제점을 해결하기 위해 발명된 것으로, 그 목적은 대형 설비인 입구밸브의 누수를 용이하게 점검할 수 있는 압력 테스트부재를 제공하는데 그 목적이 있다.It is an object of the present invention to provide a pressure test member capable of easily checking leakage of an inlet valve which is a large facility.

본 발명의 다른 목적은, 장비로 압력 테스트부재를 용이하게 들어올리거나 내릴 수 있도록 압력 테스트부재의 중심에 체결시킨 I-볼트를 제공하는데 그 목적이 있다.Another object of the present invention is to provide an I-bolt fastened to the center of a pressure test member so that the pressure test member can be easily lifted or lowered with the equipment.

본 발명의 또 다른 목적은, 대형설비인 입구밸브의 크기에 따라 압력 테스트부재를 제작하여 사용하면 다른 입구밸브의 누수점검도 용이하게 할 수 있도록 하는데 그 목적이 있다.Another object of the present invention is to make it easy to check the leakage of other inlet valves by using a pressure test member according to the size of the inlet valve which is a large facility.

상기한 기술적 과제를 달성하기 위한 본 발명은, 상부저수지의 발전용수가 하부저수지로 흐르도록 설치되는 철관과, 상기 상부저수지와 하부저수지사이에 철관이 연결 설치되는 양수발전소의 전동발전기와, 가역식 펌프수차를 구비한 전동발전기 앞쪽 철관에 발전용수의 유입수량을 제어하도록 설치되는 입구밸브와, 전력을 공급하거나 양수전력을 사용할 수 있도록 송전선이 연결되면서 전동발전기에 전압을 조절할 수 있도록 연결 설치되는 변압기를 포함하여 구성되는 양수발전소에 있어서,According to an aspect of the present invention, there is provided an electric power generator comprising: an iron pipe installed in a lower reservoir so that power generation water flows to a lower reservoir; a motor generator of a pumping power plant in which an iron pipe is connected between the upper reservoir and a lower reservoir; An inlet valve installed to control the flow rate of the power generation water to the iron pipe at the front of the electric generator having the pump water turbine and a transformer installed to be able to control the voltage to the electric generator while the power transmission line is connected Wherein the pumping station comprises:

상기 입구밸브에 점검용수를 공급하여 형성되는 압력을 측정하여 입구밸브의 누수를 점검할 수 있도록 입구밸브에 설치되는 압력 테스트부재를 포함한다.And a pressure test member installed on the inlet valve so as to check the leakage of the inlet valve by measuring the pressure formed by supplying the check valve to the inlet valve.

또한, 상기 압력 테스트부재는, 드레인홀, 에어밴트홀, 점검용수 공급홀, 게이지홀들을 형성하고 입구밸브의 일측 통로를 덮을 수 있도록 형성되는 돔형 커버와, 입구밸브의 누수를 점검할 수 있도록 상기 돔형 커버에 드레인홀, 에어밴트홀, 점검용수 공급홀, 게이지홀 등을 형성하고 여기에 드레인 밸브, 압력게이지, 점검용수 공급밸브를 각각 설치해 구성한 테스트부를 포함하여 구성되는 것을 특징으로 할 수 있다.The pressure test member may include a dome-shaped cover formed to form a drain hole, an air vent hole, a check water supply hole, gauge holes and cover one side passage of the inlet valve, And a test section in which a drain hole, an air vent hole, a check water supply hole, a gauge hole, and the like are formed in the dome-shaped cover, and a drain valve, a pressure gauge, and a check water supply valve are provided respectively.

또한, 상기 돔형 커버에는, 볼트들을 체결할 수 있도록 플렌지에 간격을 두고 다수 형성한 볼트홀과, 탈부착시 장비로 들어올리고 내릴 수 있도록 돔 부분 중심에 설치한 I-볼트가 형성되는 것을 특징으로 할 수 있다.The dome-shaped cover may be formed with a bolt hole formed at a plurality of intervals in the flange so as to fasten the bolts, and an I-bolt provided at the center of the dome portion so that the bolt can be lifted and lowered by the equipment at the time of attaching and detaching .

또한, 상기 테스트부는, 돔형 커버 내부의 점검용수를 배출할 수 있도록 설치되는 드레인 밸브와, 돔형 커버 내부에 점검용수를 공급할 수 있도록 설치되는 점검용수 공급밸브와, 돔형 커버 내부의 압력을 측정할 수 있도록 설치되는 압력게이지가 포함되는 것을 특징으로 할 수 있다.The test section may include a drain valve installed to discharge the check water in the dome-shaped cover, a check water supply valve installed to supply the check water into the dome-shaped cover, And a pressure gauge installed so as to be movable in the vertical direction.

또한, 상기 드레인 밸브는, 점검용수를 배출할 수 있도록 돔형 커버의 플랜지 측면을 관통시켜 형성한 드레인홀에 결합 설치되는 것을 특징으로 할 수 있다.The drain valve may be coupled to a drain hole formed through the side surface of the flange of the dome-shaped cover so as to discharge the check water.

또한, 상기 점검용수 공급밸브는, 입구밸브에 결합된 돔형커버 내부에 점검용수를 공급할 수 있도록 돔형 커버 상에 설치되는 것을 특징으로 할 수 있다.The check water supply valve may be provided on the dome-shaped cover so as to supply the check water into the dome-shaped cover coupled to the inlet valve.

또한, 상기 압력게이지는, 입구밸브에 결합된 돔형 커버 내부에 형성되는 압력을 측정할 수 있도록 돔형 커버 상에 설치되는 것을 특징으로 할 수 있다. The pressure gauge may be mounted on the dome-shaped cover so as to measure pressure formed inside the dome-shaped cover coupled to the inlet valve.

본 발명의 양수발전소의 입구밸브 점검용 압력 테스트부재에 의하면, 입구밸브가 대형이더라도 누수를 용이하게 체크할 수 있는 효과가 있다.According to the pressure test member for inspecting the inlet valve of the pumping power plant of the present invention, leakage can be easily checked even if the inlet valve is large.

또한, 중량물인 압력 테스트부재의 중심 볼트홀에 I-볼트를 체결시킴으로써 입구밸브에 대한 누수 점검시 탈부착 같은 운반 취급을 용이하게 할 수 있는 효과가 있다.In addition, by fastening the I-bolt to the center bolt hole of the pressure test member, which is a heavy material, there is an effect that transportation and handling such as detachment and attachment can be facilitated at the time of checking the leakage of the inlet valve.

또한, 압력 테스트부재를 입구밸브의 크기별로 제작하면 대형 설비인 입구밸브에 대한 누수 점검을 쉽게 할 수 있는 효과가 있다.Further, when the pressure test member is manufactured by the size of the inlet valve, it is easy to check the leakage of the inlet valve which is a large facility.

도 1은, 종래기술에 따른 양수발전소를 도시한 개념도.
도 2는, 본 발명에 따른 양수발전소의 입구밸브 점검용 압력 테스트부재를 도시한 도면.
도 3은, 도 2에 나타낸 입구밸브 점검용 압력 테스트부재를 도시한 평면도.
도 4는, 도 2에 나타낸 입구밸브 점검용 압력 테스트부재를 도시한 부분측단면도.
1 is a conceptual diagram showing a pumping power plant according to the prior art;
2 is a view showing a pressure test member for checking an inlet valve of a pumped storage power plant according to the present invention;
3 is a plan view showing a pressure test member for checking an inlet valve shown in Fig. 2; Fig.
Fig. 4 is a partial side sectional view showing the pressure test member for checking the inlet valve shown in Fig. 2; Fig.

본 발명을 충분히 이해하기 위해서 본 발명의 바람직한 실시예를 첨부되는 도면을 참조하여 설명한다. 본 발명의 실시예는 여러 가지 형태로 변형될 수 있으며, 본 발명의 범위가 아래에서 상세히 설명하는 실시예로 한정되는 것으로 해석되어서는 안 된다. 본 실시예는 당업계에서 평균적인 지식을 가진 자에게 본 발명을 보다 완전하게 설명하기 위하여 제공 되는 것이다. 따라서 도면에서의 요소의 형상 등은 보다 명확한 설명을 강조하기 위해서 과장되어 표현될 수 있다. 각 도면에서 동일한 부재는 동일한 참조부호로 도시한 경우가 있음을 유의하여야 한다. 또한, 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 공지 기능 및 구성에 대한 상세한 기술은 생략된다.For a better understanding of the present invention, a preferred embodiment of the present invention will be described with reference to the accompanying drawings. The embodiments of the present invention may be modified into various forms, and the scope of the present invention should not be construed as being limited to the embodiments described in detail below. The present embodiments are provided to enable those skilled in the art to more fully understand the present invention. Therefore, the shapes and the like of the elements in the drawings can be exaggeratedly expressed to emphasize a clearer description. It should be noted that in the drawings, the same members are denoted by the same reference numerals. Further, detailed descriptions of well-known functions and configurations that may be unnecessarily obscured by the gist of the present invention are omitted.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 설명함으로써, 본 발명의 양수발전소의 입구밸브 점검용 압력 테스트부재를 상세히 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a preferred embodiment of the present invention will be described with reference to the accompanying drawings, and a pressure test member for inspection of an inlet valve of a pumped storage power plant of the present invention will be described in detail.

본 발명에 따른 양수발전소의 입구밸브 점검용 압력 테스트부재(30)는, 도 2 내지 도 4에 도시한 바와 같이, 상부저수지(4)의 발전용수가 하부저수지(18)로 흐르도록 설치되는 철관(6)과, 상기 상부저수지(4)와 하부저수지(18)사이에 철관(6)이 연결 설치되는 양수발전소(2)의 전동발전기(8)와, 가역식 펌프수차(14)를 구비한 전동발전기(8) 앞쪽 철관(6)에 발전용수의 유입수량을 제어하도록 설치되는 입구밸브(16)와, 전력을 공급하거나 양수전력을 사용할 수 있도록 송전선(12)이 연결되면서 전동발전기(8)에 전압을 조절할 수 있도록 연결 설치되는 변압기(10)를 포함하여 구성되는 양수발전소(2)에 있어서, 상기 입구밸브(16)에 점검용수를 공급하여 형성되는 압력을 측정하여 입구밸브(16)의 누수를 점검할 수 있도록 입구밸브(16)에 설치된다.2 to 4, the pressure test member 30 for the inlet valve inspection of the amphibious power plant according to the present invention is constructed such that the power generation water of the upper reservoir 4 flows into the lower reservoir 18, (8) of a pumped-storage power plant (2) in which an iron pipe (6) is connected between the upper reservoir (4) and the lower reservoir (18) and a reversible pump aber An inlet valve 16 installed to control the flow rate of the power generation water to the front iron pipe 6 of the electric generator 8 and an electric motor 8 connected to the electric power transmission line 12 to supply electric power or to use the electric power, And a transformer 10 connected to control the voltage of the inlet valve 16 so as to control the pressure of the inlet valve 16 by measuring the pressure formed by supplying check water to the inlet valve 16, And is installed in the inlet valve 16 so that leakage can be checked.

또한, 상기 압력 테스트부재(30)는, 드레인홀(36), 에어밴트홀(38), 점검용수 공급홀(40), 게이지홀(42)들을 형성하고 입구밸브(16)의 일측 통로를 덮을 수 있도록 형성되는 돔형 커버(34)와, 입구밸브(16)의 누수를 점검할 수 있도록 상기 돔형 커버(34)에 드레인홀(36), 에어밴트홀(38), 점검용수 공급홀(40), 게이지홀(42) 등을 형성하고 여기에 드레인 밸브(44), 압력게이지(46), 점검용수 공급밸브(48)를 각각 설치해 구성한 테스트부(50)를 포함한다.The pressure test member 30 is formed by forming a drain hole 36, an air vent hole 38, a check water supply hole 40 and a gauge hole 42 and covering one side passage of the inlet valve 16 A drain hole 36, an air vent hole 38 and a check water supply hole 40 are formed in the dome-shaped cover 34 so as to check the leakage of the inlet valve 16, And a test section 50 in which a gauge hole 42 and the like are formed and a drain valve 44, a pressure gauge 46 and a check water supply valve 48 are provided.

또한, 압력 테스트부재(30)는 입구밸브(16)의 종류에 다양한 크기로 제작하여 설치할 수 있도록 함으로써, 입구밸브(15)에 대한 누수 체크 작업을 간편하게 할 수 있다.In addition, the pressure test member 30 can be manufactured and installed in various sizes in the kind of the inlet valve 16, so that the leakage check operation for the inlet valve 15 can be simplified.

또한, 상기 돔형 커버(34)에는, 볼트(32)들을 체결할 수 있도록 플렌지(52)에 간격을 두고 다수 형성한 볼트홀(54)과, 탈부착시 장비로 들어올리고 내릴 수 있도록 돔 부분 중심에 설치한 I-볼트(58)가 형성된다. 따라서 I-볼트(58)는, 중량물로 압력 테스트부재(30)의 탈부착과 운반을 용이하게 할 수 있도록 한다.The dome-shaped cover 34 is provided with a bolt hole 54 formed at the flange 52 so as to be able to fasten the bolts 32 at intervals and a bolt hole 54 formed at the center of the dome And an I-bolt 58 is formed. The I-bolt 58 thus facilitates the detachment and transport of the pressure test piece 30 with a heavy object.

또한, 상기 테스트부(50)는, 돔형 커버(34) 내부의 점검용수를 배출할 수 있도록 설치되는 드레인 밸브(44)와, 돔형 커버(34) 내부에 점검용수를 공급할 수 있도록 설치되는 점검용수 공급밸브(48)와, 돔형 커버(34) 내부의 압력을 측정할 수 있도록 설치되는 압력게이지(46)가 포함된다.The test unit 50 includes a drain valve 44 installed to discharge the check water in the dome-shaped cover 34 and a check valve 44 installed to supply the check water into the dome- A supply valve 48 and a pressure gauge 46 installed so as to measure the pressure inside the dome-shaped cover 34.

또한, 상기 드레인 밸브(44)는, 점검용수를 배출할 수 있도록 돔형 커버(34)의 플랜지(52) 측면을 관통시켜 형성한 드레인홀(36)에 결합 설치된다.The drain valve 44 is coupled to a drain hole 36 formed through the side surface of the flange 52 of the dome-shaped cover 34 so as to discharge the check water.

또한, 상기 점검용수 공급밸브(48)는, 입구밸브(16)에 결합된 돔형커버(34) 내부에 점검용수를 공급할 수 있도록 돔형 커버(34) 상에 설치된다.The check water supply valve 48 is installed on the dome-shaped cover 34 so as to supply the check water into the dome-shaped cover 34 coupled to the inlet valve 16.

또한, 상기 압력게이지(46)는, 입구밸브(16)에 결합된 돔형 커버(34) 내부에 형성되는 압력을 측정할 수 있도록 돔형 커버(34) 상에 설치된다. 즉, 압력측정이 용이하도록 돔형 커버(34)의 중간 위치 또는 상부 위치에 설치된다.The pressure gauge 46 is also installed on the dome-shaped cover 34 so as to measure the pressure formed inside the dome-shaped cover 34 coupled to the inlet valve 16. That is, it is installed at an intermediate position or an upper position of the dome-shaped cover 34 so as to facilitate the pressure measurement.

이하, 상기한 바와 같이 이루어지는 본 발명을 통해 양수발전소의 입구밸브 점검용 압력 테스트부재의 사용예를 설명한다.Hereinafter, the use of the pressure test member for checking the inlet valve of the amphibious power plant will be described with reference to the present invention as described above.

먼저, 입구밸브(16)를 철관(6)에서 분리한다. 분리된 입구밸브(16)의 일측 통로를 덮을 수 있도록 압력 테스트부재(30)를 입구밸브(16)에 볼트(32)들로 체결한다. 볼트(32)로 체결시 기밀이 유지되도록 결합시킨다.First, the inlet valve 16 is separated from the iron pipe 6. The pressure test member 30 is fastened to the inlet valve 16 with the bolts 32 so as to cover one side passage of the separated inlet valve 16. [ So that the airtightness is maintained when tightened with the bolt 32. [

압력 테스트부재(30)의 결합으로 형성된 내부에 점검용수 공급밸브(48)를 통해 점검용수를 공급한다. 점검용수가 공급되면, 돔형 커버(34)와 입구밸브(16)사이의 공간에 채워진 내부의 에어는 에어밴트홀(38)을 외부로 배출되고, 돔형 커버(34)내에는 고압이 형성된다.The check water is supplied through the check water supply valve 48 to the inside formed by the engagement of the pressure test member 30. When the check water is supplied, the air inside the space between the dome-shaped cover 34 and the inlet valve 16 is discharged to the outside through the air vent hole 38, and a high pressure is formed in the dome-shaped cover 34.

에어밴트홀(38)을 통해 공기가 배출됨에 따라 점검용수는 돔형 커버(34) 내에 고압의 압력을 형성하게 된다. 즉, 압력 테스트부재(30)의 내부 고압은 돔형 커버(34)에 설치된 압력게이지(46)가 측정하게 된다. 작업자는 압력게이지(46)를 보고 입구밸브(16)의 누수점검을 할 수 있게 된다.As the air is discharged through the air vent hole 38, the check water forms a high pressure in the dome-shaped cover 34. That is, the internal high pressure of the pressure test member 30 is measured by the pressure gauge 46 provided on the dome-shaped cover 34. The operator can see the pressure gauge 46 and check the leakage of the inlet valve 16.

또한, 압력 테스트부재(30) 내부에 형성된 압력이 압력게이지(46)로 측정했을 때 규정한 범위를 만족시키지 못하면 누수가 발생하고 있다고 작업자는 판단할 수 있게 된다. 입구밸브(16)에 압력 테스트부재(30)를 결합시켜 고압의 수압에 견디도록 하는 방법을 통해 입구밸브(16)의 누수 점검을 마치고 나면 드레인밸브(44)를 연다. 드레인밸브(4)는 돔형 커버(34) 내부에 충진된 점검용수를 배수하게 된다.Further, if the pressure formed inside the pressure test member 30 does not satisfy the range defined by the pressure gauge 46, the operator can judge that the leak is occurring. The drain valve 44 is opened after completing the leak check of the inlet valve 16 through the method of engaging the pressure test member 30 with the inlet valve 16 and withstanding the high pressure water pressure. The drain valve 4 drains the check water filled in the dome-shaped cover 34.

상기한 점검용수가 배수되면, 플렌지(52)에 체결된 볼트(32)들을 풀어 압력 테스트부재(30)를 입구밸브(16)에서 분리한다. 볼트(32)들이 풀린 중량물의 압력 테스트부재(30)는 돔형 커버(34)의 중심에 체결된 I-볼트(58)에 크레인이나 호이스트에 구비된 훅을 걸어 들어올린 후 입구밸브(16)에서 분리한 다음 보관하면 된다.When the check water is drained, the bolts 32 fastened to the flange 52 are released to separate the pressure test member 30 from the inlet valve 16. The pressure test member 30 of the heavy object from which the bolts 32 are loosened is hooked up to the I-bolt 58 fastened to the center of the dome-shaped cover 34 and equipped with a crane or a hoist, Separate and store.

상기한 바와 같이, 입구밸브(16)에 대한 누수압력 테스트는 압력 테스트부재(30)의 사용을 통해 누수점검을 간편하게 할 수 있는 장점이 있다.As described above, the water leakage pressure test for the inlet valve 16 is advantageous in that the leakage test can be easily performed through the use of the pressure test member 30. [

이상에서 설명된 본 발명의 양수발전소의 입구밸브 점검용 압력테스트부재의 실시예는 예시적인 것에 불과하며, 본 발명이 속한 기술분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 잘 알 수 있을 것이다. 그러므로 본 발명은 상기의 상세한 설명에서 언급되는 형태로만 한정되는 것은 아님을 잘 이해할 수 있을 것이다. 따라서 본 발명의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의해 정해져야 할 것이다. 또한, 본 발명은 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 그 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다. The embodiments of the pressure test member for the inlet valve inspection of the pumping power plant of the present invention described above are merely illustrative and those skilled in the art will appreciate that various modifications and equivalent implementations You can see that examples are possible. Therefore, it is to be understood that the present invention is not limited to the above-described embodiments. Accordingly, the true scope of the present invention should be determined by the technical idea of the appended claims. It is also to be understood that the invention includes all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.

2: 양수발전소 4: 상부저수지
6: 철관 8: 전동발전기
10: 변압기 14: 가역식 펌프수차
16: 입구밸브 18: 하부저수지
30: 압력 테스트부재 32: 볼트
34: 돔형 커버 36: 드레인홀
38: 에어밴트홀 40: 점검용수 공급홀
42: 게이지홀 44: 드레인밸브
46: 압력게이지 48: 점검용수 공급밸브
50: 테스트부 52: 플렌지
54: 볼트홀 58: I-볼트
2: Pumped storage power plant 4: Upper reservoir
6: iron pipe 8: electric generator
10: Transformer 14: Reversible pump aberration
16: inlet valve 18: lower reservoir
30: pressure test member 32: bolt
34: domed cover 36: drain hole
38: Air vent hole 40: Check water supply hole
42: Gauge hole 44: Drain valve
46: pressure gauge 48: check water supply valve
50: Test section 52: Flange
54: bolt hole 58: I-bolt

Claims (7)

삭제delete 상부저수지의 발전용수가 하부저수지로 흐르도록 설치되는 철관과, 상기 상부저수지와 하부저수지 사이에 철관이 연결 설치되는 양수발전소의 전동발전기와, 가역식 펌프수차를 구비한 전동발전기 앞쪽 철관에 발전용수의 유입수량을 제어하도록 설치되는 입구밸브와, 전력을 공급하거나 양수전력을 사용할 수 있도록 송전선이 연결되면서 전동발전기에 전압을 조절할 수 있도록 연결 설치되는 변압기와, 상기 입구밸브에 점검용수를 공급하여 형성되는 압력을 측정하여 입구밸브의 누수를 점검할 수 있도록 입구밸브에 설치되는 압력 테스트부재를 포함하여 이루어지는 양수발전소의 입구밸브 점검용 압력테스트부재에 있어서,
상기 압력 테스트부재는,
드레인홀, 에어밴트홀, 점검용수 공급홀, 게이지홀들을 형성하고 입구밸브의 일측 통로를 덮을 수 있도록 형성되는 돔형 커버와, 입구밸브의 누수를 점검할 수 있도록 상기 돔형 커버에 드레인홀, 에어밴트홀, 점검용수 공급홀, 게이지홀 등을 형성하고 여기에 드레인 밸브, 압력게이지, 점검용수 공급밸브를 각각 설치해 구성한 테스트부를 포함하여 구성되는 것을 특징으로 하는 양수발전소의 입구밸브 점검용 압력테스트부재.
A power generator of a pumping power plant in which an iron pipe is connected between the upper reservoir and the lower reservoir and a power generator in a front iron pipe of a reversible pump turbine having a reversible pump turbine, A transformer connected to the motor generator so as to control the voltage of the power generator while the power transmission line is connected to supply electric power or use positive power; And a pressure test member installed on the inlet valve so as to check the leakage of the inlet valve, the pressure test member for the inlet valve check of the amphibious power plant,
The pressure test member includes:
A drain hole, an air vent hole, a check water supply hole, a dome cover formed to form gauge holes and cover one side passage of the inlet valve, and a drain hole, an air vent And a test section in which a hole, a check water supply hole, a gauge hole, and the like are formed and a drain valve, a pressure gauge, and a check water supply valve are provided, respectively.
제 2 항에 있어서,
상기 돔형 커버에는,
볼트들을 체결할 수 있도록 플렌지에 간격을 두고 다수 형성한 볼트홀과, 탈부착시 장비로 들어올리고 내릴 수 있도록 돔 부분 중심에 설치한 I-볼트가 형성되는 것을 특징으로 하는 양수발전소의 입구밸브 점검용 압력테스트부재.
3. The method of claim 2,
In the domed cover,
A bolt hole formed in the flange so as to be able to fasten the bolts, and an I-bolt installed in the center of the dome portion so as to be lifted and lowered by the equipment when detachably attached. Pressure test member.
제 2 항에 있어서,
상기 테스트부는,
돔형 커버 내부의 점검용수를 배출할 수 있도록 설치되는 드레인 밸브와, 돔형 커버 내부에 점검용수를 공급할 수 있도록 설치되는 점검용수 공급밸브와, 돔형 커버 내부의 압력을 측정할 수 있도록 설치되는 압력게이지가 포함되는 것을 특징으로 하는 양수발전소의 입구밸브 점검용 압력테스트부재.
3. The method of claim 2,
Wherein the test unit comprises:
A drain valve installed to discharge the check water in the dome-shaped cover, a check water supply valve installed in the dome-shaped cover to supply the check water, and a pressure gauge installed to measure the pressure inside the dome- And a pressure test member for checking the inlet valve of the pumping power plant.
제 2 항에 있어서,
상기 드레인 밸브는,
점검용수를 배출할 수 있도록 돔형 커버의 플랜지 측면을 관통시켜 형성한 드레인홀에 결합 설치되는 것을 특징으로 하는 양수발전소의 입구밸브 점검용 압력테스트부재.
3. The method of claim 2,
The drain valve
And a drain hole formed through the flange side of the dome-shaped cover so as to discharge the check water.
제 2 항에 있어서.
상기 점검용수 공급밸브는,
입구밸브에 결합된 돔형커버 내부에 점검용수를 공급할 수 있도록 돔형 커버 상에 설치되는 것을 특징으로 하는 양수발전소의 입구밸브 점검용 압력테스트부재.
The method of claim 2,
Wherein the check water supply valve comprises:
Wherein the dome-shaped cover is provided on the dome-shaped cover so as to be able to supply check-in water to the inside of the dome-shaped cover coupled to the inlet valve.
제 2 항에 있어서,
상기 압력게이지는,
입구밸브에 결합된 돔형 커버 내부에 형성되는 압력을 측정할 수 있도록 돔형 커버 상에 설치되는 것을 특징으로 하는 양수발전소의 입구밸브 점검용 압력테스트부재.
3. The method of claim 2,
Wherein the pressure gauge comprises:
And a pressure test member for inspecting an inlet valve of the pumping power plant, wherein the pressure test member is installed on the dome-shaped cover so as to measure a pressure formed inside the dome-shaped cover coupled to the inlet valve.
KR1020160160404A 2016-11-29 2016-11-29 Pressure test member for checking inlet valve of pumping-up electric power station KR101938702B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160160404A KR101938702B1 (en) 2016-11-29 2016-11-29 Pressure test member for checking inlet valve of pumping-up electric power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160160404A KR101938702B1 (en) 2016-11-29 2016-11-29 Pressure test member for checking inlet valve of pumping-up electric power station

Publications (2)

Publication Number Publication Date
KR20180060665A KR20180060665A (en) 2018-06-07
KR101938702B1 true KR101938702B1 (en) 2019-01-15

Family

ID=62621854

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160160404A KR101938702B1 (en) 2016-11-29 2016-11-29 Pressure test member for checking inlet valve of pumping-up electric power station

Country Status (1)

Country Link
KR (1) KR101938702B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113916470A (en) * 2020-06-22 2022-01-11 周显双 Large-scale valve gas tightness detection device
CN112014083B (en) * 2020-08-12 2022-08-19 中国葛洲坝集团股份有限公司 Pressure test method for steel structure pressure regulating chamber

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101478008B1 (en) * 2013-09-13 2015-01-02 한국기계연구원 Lifetime Testing Method of Butterfly Valve
KR101510599B1 (en) * 2014-11-10 2015-04-08 주식회사 신한정공 Apparatus for testing francis turbine

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140057771A (en) * 2012-11-05 2014-05-14 현대중공업 주식회사 Water pressure test device
KR101448819B1 (en) * 2013-04-12 2014-10-13 한국기계연구원 Testing device for gate valve
KR101622044B1 (en) * 2014-10-29 2016-05-17 두산중공업 주식회사 Specimen test unit of the reactor vessel

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101478008B1 (en) * 2013-09-13 2015-01-02 한국기계연구원 Lifetime Testing Method of Butterfly Valve
KR101510599B1 (en) * 2014-11-10 2015-04-08 주식회사 신한정공 Apparatus for testing francis turbine

Also Published As

Publication number Publication date
KR20180060665A (en) 2018-06-07

Similar Documents

Publication Publication Date Title
KR101938702B1 (en) Pressure test member for checking inlet valve of pumping-up electric power station
KR100981985B1 (en) Underground water well cover with locking device for flowmeter attach and remove easy
CN204197233U (en) Environmental monitoring buoy
CN107063649A (en) The underwater wellhead annular space sealing ground test device of pressurization can be loaded simultaneously
KR101284359B1 (en) Butterfly Valve Life Test Equipment
CN201425537Y (en) Leak tightness test device for hatch covers
CN205801474U (en) A kind of lowering or hoisting gear of the sonar for boats and ships
KR20180001891U (en) Container structure for protective potential test box
CN101298870A (en) Method for mounting large-scale electric underwater pump
CN104755898A (en) Transportable hose-test containers, systems and methods
BR112020009220A2 (en) method for converting a naturally aspirated flotation cell into a forced gas flotation cell and apparatus
CN201653664U (en) Portable detection device for detecting tightness of submersible
CN201892606U (en) Leak hunting device for reaction kettle
KR20150017482A (en) Fluid supply apparatus for tank lorry
CN106149854A (en) Prefabricated pumping plant
JP4990992B2 (en) Leak detection device and leak detection method for turbine bypass valve
KR101220088B1 (en) Non-power hand pump is equipped closed underground water upper protective tube
CN201943055U (en) Water draining opening sealing and plugging device for drainage system of hydropower station
CN207600665U (en) Press off water experiment frame outside
CN201202659Y (en) Large-scale submersible electric pump
CN203350000U (en) Pressure test device of guide vane body
KR101194158B1 (en) Nonfreezing for waterworks
CN104359766A (en) Float type exhaust device
JP2008168939A (en) Ventilation pipe equipment for underground tank
JP2006070797A (en) Power generation facility

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant