KR101881580B1 - Bridge comprising monolithic structure of girder and pier and construction method for the same - Google Patents

Bridge comprising monolithic structure of girder and pier and construction method for the same Download PDF

Info

Publication number
KR101881580B1
KR101881580B1 KR1020170119401A KR20170119401A KR101881580B1 KR 101881580 B1 KR101881580 B1 KR 101881580B1 KR 1020170119401 A KR1020170119401 A KR 1020170119401A KR 20170119401 A KR20170119401 A KR 20170119401A KR 101881580 B1 KR101881580 B1 KR 101881580B1
Authority
KR
South Korea
Prior art keywords
bridge
psc
girder
continuous
reinforcing bars
Prior art date
Application number
KR1020170119401A
Other languages
Korean (ko)
Inventor
노경범
노우현
노실근
노옥근
박치웅
Original Assignee
우경기술주식회사
노경범
노우현
노옥근
노실근
박치웅
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 우경기술주식회사, 노경범, 노우현, 노옥근, 노실근, 박치웅 filed Critical 우경기술주식회사
Priority to KR1020170119401A priority Critical patent/KR101881580B1/en
Application granted granted Critical
Publication of KR101881580B1 publication Critical patent/KR101881580B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a construction method for a bridge including: a girder-pier-integrated strong coupling structure including producing a pier, an abutment, and a plurality of PSC girders; placing the PSC girders at the abutment and the pier; temporarily fastening steel materials on the top of the end portion on the adjacent side of each of two of the PSC girders that are adjacent to each other, placing a second reinforcing bar at a beam part at which a beam is to be formed, and arranging a third reinforcing bar at a continuous part between two adjacent PSC girders; forming a bottom plate slab by placing and curing concrete on the top of the PSC girder; and completely fastening the steel materials on the top of the end portion on the adjacent side of each of two of the PSC girders that are adjacent and temporarily fastened to each other and forming a continuous portion and the beam and the pier portion bottom plate slab by placing and curing concrete at the beam part and between two adjacent PSC girders so that a first reinforcing bar, the second reinforcing bar, and the third reinforcing bar are integrated.

Description

거더와 교각의 일체화 강결구조를 포함하는 교량 및 그 시공방법{Bridge comprising monolithic structure of girder and pier and construction method for the same}BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a bridge including an integrated steel structure of a girder and a bridge,

본 발명은 거더와 교각의 일체화 강결구조를 포함하는 교량 및 그 시공방법에 관한 것이다.The present invention relates to a bridge including an integrated steel structure of a girder and a bridge, and a construction method thereof.

현재 국내에 건설하는 대부분의 교량은 교량받침을 적용하고 있다. 교량받침을 적용하지 않는 교량은 라멘교나 FCM 교량 정도로 미미하다. 최근에 교량받침과 신축이음장치를 설치하지 않으려는 의도로 일체형 교대를 적용한 일체식 교대 교량을 다수 건설하고 있으나, 교각은 대부분 교량받침을 적용한다. 대한민국등록실용신안 제20-0300023호 "교각에 강결시킨 라멘형 다경간 연속 PSC I형 거더교량구조"는 교량받침(5)을 개시한다. 현재 교량 건설에 PSC 거더를 적용하는 교량은 대부분 중간 교각인 중간지점부에서는 탄성받침을 적용하여 건설되고 있는 실정이다. 연속 교량의 경우 연속지점부인 중간 교각에서는 2개의 교량받침을 적용하는데 교량의 온도하중에 의한 팽창과 수축으로 인한 탄성받침의 변형이 발생하고, 변형된 탄성받침이 회복되지 않아 교대에서 교량과 교대의 단차가 발생하여 주행 안전성에 문제가 되는 경우가 종종 발생하고 있는 상황이다. Most of the bridges currently constructed in Korea are using bridge supports. Bridges without bridge supports are insignificant for ramen bridge or FCM bridges. In recent years, a number of one - way alternating bridges have been constructed with the intention of not installing the bridge supports and expansion joints. However, most bridge bridges are applied with bridge supports. Korean Registered Utility Model No. 20-0300023 "Raman type multi span continuous PSC type I girder bridge structure which is pierced on a pier" starts a bridge support (5). Currently, the bridges applying PSC girder to the bridge construction are constructed by applying the elastic bearing at the intermediate point, which is the middle pier. In the case of continuous bridges, two bridge supports are applied at the middle bridge pier which is the continuous point bridge. The elastic support is deformed due to the expansion and contraction due to the temperature load of the bridge, and the deformed elastic support is not recovered. There is a case in which a step is generated to cause a problem in running safety.

또한 교량상부의 누수로 인하여 탄성받침의 강재가 부식하는 경우가 발생하여 탄성받침을 교체해야 하는 경우, 및 시간이 지남에 따라 탄성받침의 경화로 인하여 받침 역할을 할 수 없어 탄성받침을 교체해야 되는 경우 등이 발생하여 교량 건설 후에 교량 유지관리 비용이 과다하게 발생하고 있다. 또한 탄성받침의 변형문제가 지속적으로 발생하므로 PSC 거더 교량 건설 시 교각코핑에 유지관리용 점검 시설을 설치하도록 되어 있어 초기 교량 건설비용이 증대된다. 이와 같이 거더 적용교량의 탄성받침에 의한 문제점이 발생하고 있는 실정이어서 교량받침을 적용하지 않는 거더와 교각코핑을 일체화하는 방안을 검토하여 교량 건설 후에 발생하는 유지관리비용 절감과 교량받침 점검 시설을 설치하지 않음으로 교량 건설 공사비를 절감할 수 있는 기술의 개발이 요구되고 있다.In addition, when the elastic bearing is eroded due to the leakage of the upper part of the bridge due to the leakage of the elastic bearing, and the elastic bearing is hardened due to the hardening of the elastic bearing over time, the elastic bearing must be replaced In this case, bridge maintenance cost is excessive after construction of bridge. In addition, since the problem of deformation of the elastic bearing continuously occurs, it is necessary to install a maintenance inspection facility in the bridge copping when constructing the PSC girder bridge, thereby increasing the cost of the initial bridge construction. As a result, there is a problem caused by the elastic support of the girder-applied bridges. Therefore, considering the integration of the girder and the bridge copping that do not apply the bridge support, the maintenance cost reduction and the bridge support inspection facility It is required to develop a technology capable of reducing the construction cost of the bridge.

KRKR 20-030002320-0300023 Y1Y1

교각인 중간지점부에서 교량받침 없이 PSC 거더와 교각을 일체화한 구조를 포함하는 교량을 제공하고자 한다. And a bridge including a structure in which a PSC girder and a bridge pier are integrated without a bridge support at an intermediate point portion of a pier.

또한, 상기 PSC 거더와 교각을 일체화한 구조를 포함하는 교량의 시공방법을 제공하고자 한다.The present invention also provides a method of constructing a bridge including a structure in which the PSC girder and a pier are integrated.

본 발명의 일례는 PSC 거더교에서 연속부를 거더와 교각을 일체화하는 구조에서 교각코핑부의 교축방향 중간부에서 교축 직각방향으로 전 길이에 걸쳐서 연속부 강결접합철근이 PSC 거더의 중립축 상부 높이로 다수개가 일정간격으로 수직으로 매립 설치되어 PSC 거더 연속부와 교축방향 교각코핑폭과 동일한 가로보에 합성접합되며 PSC 거더의 연속부 상부에는 연속부 연결접합강재가 위치하여 PSC 거더의 연속부 상면이 연결접합강재에 의해 연속화되는 구조이며, 상기 PSC 거더의 연속부 연결접합강재와 연속부와 가로보 부분에 일체로 구성된 연속부 철근 및 가로보 철근과 교각코핑부 상면의 연속부 강결접합철근과 연속부 및 가로보 및 바닥판 슬래브에 타설되는 콘크리트에 의해 강결접합 구조로 일체화되는 것에 특징이 있는 거더와 교각의 일체화 강결구조일 수 있다.An example of the present invention relates to a structure in which a continuous portion is integrated with a girder and a pier in a PSC girder bridge. In a structure in which a girder and a pier are integrated, a plurality of continuous reinforced steel bars are arranged at a height above the neutral axis of the PSC girder The upper part of the continuous part of the PSC girder is connected to the joining steel of the continuous joining part of the continuous joint of PSC girder. Continuous continuous steel reinforcing bars of the PSC girder, continuous steel reinforcing bars and cross reinforcing bars integrally formed with the continuous steel reinforcing bars and the beam reinforcing steel bars, Integrating the girder and pier which is characterized by being integrated into the rigid-bonded structure by the concrete placed on the slab It can be tightened.

본 발명의 일례는 PSC 거더교에서 연속부를 거더와 교각을 일체화하는 구조에서 교각코핑부의 교축방향 중간부에서 교축 직각방향으로 전 길이에 걸쳐서 연속부 강결접합 철근이 PSC 거더의 중립축 상부 높이로 다수개가 일정간격으로 수직으로 매립 설치되어 PSC 거더 연속부와 교축방향 교각코핑폭과 동일한 가로보에 합성접합되며 PSC 거더의 연속부 상면에는 교각부 바닥판 슬래브 갈고리 철근이 연속부 강결접합강재과 겹이음으로 일정길이가 바닥판 슬래브에 매립되는 구조이며, 상기 PSC 거더의 연속부와 가로보 부분에 일체로 구성된 연속부 철근 및 가로보 철근과 교각코핑부 상면의 연속부 강결접합철근과 교각부 바닥판 슬래브 갈고리 철근과 연속부 및 가로보 및 바닥판 슬래브에 타설되는 콘크리트에 의해 강결접합 구조로 일체화되는 것에 특징이 있는 거더와 교각의 일체화 강결구조일 수 있다.An example of the present invention relates to a structure in which a continuous portion is integrated with a girder and a pier in a PSC girder bridge. In a structure in which a girder and a pier are integrated, a plurality of continuous reinforced steel bars are arranged at a height above the neutral axis of the PSC girder The PSC girder is connected to the intersection of the PSC girder continuous section and the cross beam with the same crossing width. The upper part of the continuous part of the PSC girder has a certain length Wherein the continuous reinforcing bars and the cross bar reinforcing bars integrally formed with the continuous portion and the transverse portion of the PSC girder and the continuous reinforcing steel reinforcing bars and the bridging portion bottom plate slab reinforcing bars on the upper surface of the pier capping portion, And a concrete structure that is integrated into the steel-welded structure by the concrete placed in the beam and the bottom plate slab Integrated steel girders and piers envoys of that gong can be stretched.

PSC 거더의 연속부는 PS강선 또는 PS 강봉에 의해 연속화 긴장이 추가되는 것일 수 있다.The continuous part of the PSC girder may be one in which the continuous tension is added by the PS steel bar or the PS steel bar.

PSC 거더의 연속부의 연결접합강재는 강판 또는 강봉 또는 철근을 사용하는 것일 수 있다.The connecting joint steel of the continuous part of the PSC girder may be a steel plate or a steel rod or a steel bar.

PSC 거더는 강재거더 또는 강합성 거더인 것일 수 있다.The PSC girder may be a steel girder or a steel composite girder.

본 발명의 일례는 PSC 거더교에서 거더와 교각을 강결접합 구조로 일체화하는 구조 및 시공방법에 있어서 제1단계로 교대 및 교각과 PSC 거더를 제작장에서 제작하는 단계로 중간지점부인 교각부 코핑상부에 교축직각방향으로 전 길이에 걸쳐 철근을 연속부 강결접합 용도로 PSC 거더의 중립축 상부 높이까지 일정간격으로 다수개 열을 수직으로 매립 설치하는 단계; 제2단계로 교각코핑 상부의 교축방향 양단부 부근에 임시 받침을 설치하고 PSC 거더를 교대, 교각에 거치하는 단계; 제3단계로 교각코핑 상부의 임시 받침에 거치된 PSC 거더의 연속화를 위해 PSC 거더의 연속부 부분의 양단부 상부에 있는 연속부 연결접합 강재를 가체결 하고 연속부부분과 가로보부분에 철근을 배근하는 단계; 제4단계로 바닥판 슬래브 콘크리트를 연속부 및 가로보와 교각부 바닥판 슬래브 부분을 제외하고 1차로 전 구간에 타설하여 양생하는 단계; 제5단계로 PSC 거더의 연속부 상부에 가체결된 연속부 연결접합 강재를 완전 체결하고 교각코핑 상부 양단부에 설치된 임시 받침 부분이 블록아웃 될 수 있게 임시 받침 측면부 전부를 격벽시공하고 PSC 거더의 연속부 및 가로보와 교각부 바닥판 슬래브 부분에 콘크리트를 2차로 일괄 타설하여 양생하는 단계; 제6단계로 교각코핑 상부 양단부에 설치된 임시 받침을 제거하고 그 제거된 블럭아웃 부분에 그라우팅으로 충진 시공하고 PSC 거더를 연속부 PS강선으로 긴장하는 단계; 및 제7단계로 교면방수, 포장, 방호벽 등 교량 부가시설물을 설치하는 단계인 것에 특징이 있는 거더와 교각의 일체화 시공방법일 수 있다.One example of the present invention is a construction and construction method for integrating a girder and a pier in a rigid joint structure in a PSC girder bridge. In a first step, alternate, pier and PSC girder are manufactured at a manufacturing site. Vertically embedding a plurality of columns at regular intervals up to the height of the neutral axis of the PSC girder for continuous joining of reinforcing bars along the entire length in a direction perpendicular to the throat; In a second step, a provisional support is installed in the vicinity of both ends of the upper portion of the pier capping and the PSC girder is alternately installed on the pier. In the third step, in order to serialize the PSC girder placed on the temporary support above the pier capping, the continuous joint joining steel at the upper part of both ends of the continuous part of the PSC girder is fastened and reinforcing steel is inserted in the continuous part and the beam part ; In the fourth step, the slab concrete of the bottom plate is laid in the whole area except the continuous portion, the side beam and the bottom plate slab portion of the pier portion, and cured; In the fifth step, the PSC girder is continuously fastened to the upper part of the continuous part of the continuous joint joining steel, and the temporary support part installed at both ends of the pier capping upper part is blocked out. A step of cementing the concrete and the side beams and the piers of the bottom plate slabs in a second order; In a sixth step, a provisional support installed at both ends of the upper part of the bridge pier is removed, grouting is applied to the removed block-out part, and the PSC girder is tensioned with the continuous PS wire. And step 7 is a step of installing bridges such as bridges, waterproofing, packaging, barrier walls, and the like.

본 발명의 일례는 PSC 거더교에서 거더와 교각을 강결접합 구조로 일체화하는 구조 및 시공방법에 있어서 제1단계로 교대 및 교각과 PSC 거더를 제작장에서 제작하는 단계로 중간지점부인 교각의 코핑상부에 교축직각방향으로 전 길이에 걸쳐 철근을 연결부 강결접합용도로 PSC 거더의 중립축 상부 높이까지 일정간격으로 다수개 열을 수직으로 매립 설치하는 단계; 제2단계로 교각코핑 상부의 교축방향 양단부 부근에 임시 받침을 설치하고 PSC 거더를 교대, 교각에 거치하는 단계; 제3단계로 교각코핑 상부의 임시 받침에 거치된 PSC 거더의 연속화를 위해 PSC 거더의 연속부 부분의 양단부 상부에 있는 연속부 연결접합 강재를 완전체결하고 연속부 부분과 가로보 부분에 철근을 배근하는 단계; 제4단계로 교각코핑 상부 양단부에 설치된 임시 받침 부분이 블록아웃될 수 있게 임시 받침 측면부 전부를 격벽 시공하고 PSC 거더의 연속부 및 가로보와 교각부 바닥판 슬래브 부분에 콘크리트를 1차로 일괄 타설 양생하는 단계; 제5단계로 교각코핑 상부 양단부에 설치된 임시 받침을 제거하고 그 제거된 블럭아웃 부분에 그라우팅으로 충진 시공하고 PSC 거더를 연속부 상부 가로보 양측면부에서 PS 강봉으로 긴장하는 단계; 제6단계로 교각부 바닥판 슬래브 부분을 포함하여 바닥판 슬래브 전 구간에 콘크리트를 2차로 일괄 타설 양생하는 단계; 및 제7단계로 교면방수, 포장, 방호벽 등 교량 부가시설물을 설치하는 단계인 것에 특징이 있는 거더와 교각의 일체화 시공방법일 수 있다.One example of the present invention relates to a structure and a construction method for integrating a girder and a bridge into a strong-joint structure in a PSC girder bridge. In the first step, alternation, pier and PSC girder are manufactured at a manufacturing site. Installing a plurality of rows vertically in the PSC girder at regular intervals up to the height of the neutral axis of the PSC girder in order to join the reinforcing bars to each other over the entire length in the direction perpendicular to the throat; In a second step, a provisional support is installed in the vicinity of both ends of the upper portion of the pier capping and the PSC girder is alternately installed on the pier. In the third step, to connect the continuous PSC girder to the temporary support at the upper part of the bridge coping, the continuous joint joint steel at both ends of the continuous part of the PSC girder is fully tightened and reinforcement is applied to the continuous part and the transverse part step; In the fourth step, the temporary support part installed at both ends of the bridge ceiling is blocked out, and all of the temporary support side parts are constructed as bulkheads, and the concrete is laid in the primary part of the continuous part of the PSC girder, step; A fifth step of removing the temporary support provided at both ends of the upper portion of the bridge coping, filling the removed block-out portion with grouting, and tightening the PSC girder at both sides of the upper portion of the continuous portion with the PS steel bar; In a sixth step, the concrete is installed in all places of the bottom plate slab, including the bottom plate slab portion of the pier portion; And step 7 is a step of installing bridges such as bridges, waterproofing, packaging, barrier walls, and the like.

본 발명의 일례는 PSC 거더교에서 거더와 교각을 강결접합 구조로 일체화하는 구조 및 시공방법에 있어서 제1단계로 교대 및 교각과 PSC 거더를 제작장에서 제작하는 단계로 중간지점부인 교각코핑 상부에 교축직각방향으로 전 길이에 걸쳐 철근을 연속부 강결접합 용도로 PSC 거더의 중립축 상부 높이까지 일정간격으로 다수개의 열을 수직으로 매립 설치하는 단계; 제2단계로 교각코핑 상부의 교축방향 양단부 부근에 임시 받침을 설치하고 PSC 거더를 교대, 교각에 거치하는 단계; 제3단계로 교각코핑 상부에 거치된 PSC 거더의 연속부 부분과 가로보 부분에 철근을 배근하고 교각의 교핑 상면에서 중립축 상부까지 수직으로 매립 설치된 연속부 강결접합 철근 상단부분에서 철근의 일정길이가 바닥판 슬래브에 매립될 수 있게 갈고리 철근을 겹이음 배근하는 단계; 제4단계로 바닥판 슬래브 콘크리트를 연속부 및 가로보와 교각부 바닥판 슬래브 부분을 제외하고 1차로 전 구간에 타설하여 양생하는 단계; 제5단계로 교각코핑 상부 양단부에 설치된 임시 받침 부분이 블록아웃될 수 있게 임시 받침 측면부 전부를 격벽시공하고 PSC 거더의 연속부 및 가로보와 교각부 바닥판 슬래브 부분에 콘크리트를 2차로 일괄 타설 양생하는 단계; 제6단계로 교각코핑 상부 앙단부에 설치된 임시 받침을 제거하고 그 제거된 블록아웃 부분에 그라우팅으로 충진 시공하고 PSC 거더를 연속부 PS강선으로 긴장하는 단계; 및 제7단계로 교면방수, 포장, 방호벽 등 교량 부가시설물을 설치하는 단계인 것에 특징이 있는 거더와 교각의 일체화 시공방법일 수 있다.An example of the present invention relates to a structure and a construction method for integrating a girder and a bridge into a strong-joint structure in a PSC girder bridge. In the first step, alternation, pier and PSC girder are manufactured at a manufacturing site. Vertically embedding a plurality of columns at regular intervals up to the height of the neutral axis of the PSC girder for continuous joining of reinforcing bars along the entire length in the perpendicular direction; In a second step, a provisional support is installed in the vicinity of both ends of the upper portion of the pier capping and the PSC girder is alternately installed on the pier. In the third step, reinforcing bars are inserted in the continuous portion and the transverse portion of the PSC girder installed at the upper part of the bridge pier, and the vertical length of the continuous reinforced concrete reinforced concrete is embedded vertically from the top of the bridge to the upper portion of the neutral shaft. Folding the hook reinforcement so that it can be embedded in the plate slab; In the fourth step, the slab concrete of the bottom plate is laid in the whole area except the continuous portion, the side beam and the bottom plate slab portion of the pier portion, and cured; In the fifth step, the entirety of the temporary support side portion is constructed as a bulkhead so that the temporary support portion installed at both ends of the pier capping upper portion can be blocked out, and the concrete is installed in the secondary portion of the PSC girder continuous portion, step; In a sixth step, the provisional support installed at the upper end of the bridge pier is removed, grouting is applied to the removed block-out part, and the PSC girder is tensioned with the continuous PS wire. And step 7 is a step of installing bridges such as bridges, waterproofing, packaging, barrier walls, and the like.

임시 받침은 유압잭 또는 선행 하중잭 또는 스크류잭 또는 샌드잭을 사용하는 것일 수 있다.The temporary support may be a hydraulic jack or a preceding load jack or a screw jack or a sand jack.

본 발명에 따른 거더와 교각의 일체화 강결구조를 포함하는 교량의 시공방법은 복수의 제1철근이 교각의 코핑의 상면에서 수평방향으로 복수의 행과 열을 따라 이격 배치되도록 상기 복수의 제1철근을 상기 교각에 매립 설치하는 단계를 포함하는 상기 교각, 교대 및 복수의 PSC 거더를 제작하는 단계; 상기 코핑의 상면에 임시 받침을 설치하고 상기 복수의 PSC 거더를 상기 교대와 상기 교각에 거치하는 단계; 상기 복수의 PSC 거더 중 인접한 2개의 PSC 거더 각각의 인접한 측의 단부의 상부에 있는 강재를 서로 가체결하고, 상기 코핑의 상부에 위치하고 가로보가 형성될 가로보 부분에 제2철근을 배근하고, 상기 인접한 2개의 PSC 거더 사이의 연속부 부분에 제3철근을 배근하는 단계; 상기 가로보 부분과 상기 연속부 부분을 제외하고 상부에 콘크리트를 타설하고 양생하여 바닥판 슬래브를 형성하는 단계; 및 가체결된 상기 인접한 2개의 PSC 거더 각각의 인접한 측의 단부의 상부에 있는 강재를 서로 완전 체결하고, 상기 제1철근, 상기 제2철근 및 상기 제3철근이 일체화되도록 상기 인접한 2개의 PSC 거더 사이와 상기 가로보 부분에 콘크리트를 타설하고 양생하여 연속부, 가로보 및 교각부 바닥판 슬래브를 형성하는 단계를 포함할 수 있다.A method of constructing a bridge including an integrated steel structure of a girder and a bridge pier according to the present invention is characterized in that a plurality of first reinforcing bars are horizontally spaced apart along a plurality of rows and columns in an upper surface of a coping of a pier, Alternately and a plurality of PSC girders including the step of embedding the bridge columns in the piers; Mounting a temporary base on the upper surface of the coping and mounting the plurality of PSC girders on the alternating and piercing angles; And a second reinforcing member is disposed on a portion of the upper portion of the upper portion of the adjacent end of each of the adjacent two PSC girders of the plurality of PSC girders, Disposing a third reinforcing bar in a continuous portion between the two PSC girders; Forming a bottom plate slab by pouring and curing concrete on the upper portion except for the crossbar portion and the continuous portion; And the adjacent two PSC girders are fastened to each other so that the first reinforcing bars, the second reinforcing bars and the third reinforcing bars are integrated with each other, And forming the continuous portion, the cross beam and the pier portion bottom plate slab by pouring and curing the concrete at the cross section portion.

본 발명에 따른 거더와 교각의 일체화 강결구조를 포함하는 교량의 시공방법은 복수의 제1철근이 교각의 코핑의 상면에서 수평방향으로 복수의 행과 열을 따라 이격 배치되도록 상기 복수의 제1철근을 상기 교각에 매립 설치하는 단계를 포함하는 상기 교각, 교대 및 복수의 PSC 거더를 제작하는 단계; 상기 코핑의 상면에 임시 받침을 설치하고 상기 복수의 PSC 거더를 상기 교대와 상기 교각에 거치하는 단계; 상기 복수의 PSC 거더 중 인접한 2개의 PSC 거더 각각의 인접한 측의 단부의 상부에 있는 강재를 서로 완전 체결하고, 상기 코핑의 상부에 위치하고 가로보가 형성될 가로보 부분에 제2철근을 배근하고, 상기 인접한 2개의 PSC 거더 사이의 연속부 부분에 제3철근을 배근하는 단계; 상기 제1철근, 상기 제2철근 및 상기 제3철근이 일체화되도록 상기 연속부 부분과 상기 가로보 부분에 콘크리트를 타설하고 양생하여 연속부, 가로보 및 교각부 바닥판 슬래브를 형성하는 단계; 상기 임시 받침을 제거하고 상기 임시 받침이 제거된 부분에 그라우팅으로 충진 시공하고, 상기 PSC 거더의 상기 연속부의 상부에 해당하는 부분을 상기 가로보의 양측면부에서 PS 강봉으로 긴장하는 단계; 및 상기 교각부 바닥판 슬래브를 포함하여 상기 PSC 거더의 상부에 콘크리트를 타설하고 양생하여 바닥판 슬래브를 형성하는 단계를 포함할 수 있다.A method of constructing a bridge including an integrated steel structure of a girder and a bridge pier according to the present invention is characterized in that a plurality of first reinforcing bars are horizontally spaced apart along a plurality of rows and columns in an upper surface of a coping of a pier, Alternately and a plurality of PSC girders including the step of embedding the bridge columns in the piers; Mounting a temporary base on the upper surface of the coping and mounting the plurality of PSC girders on the alternating and piercing angles; The steel material on the upper side of the adjacent end of each of the two adjacent PSC girders of the plurality of PSC girders is fully fastened to each other and a second reinforcing bar is placed on the crossing portion located on the upper side of the coping to form the beam, Disposing a third reinforcing bar in a continuous portion between the two PSC girders; Inserting and curing the concrete into the continuous portion and the crossbar portion so that the first reinforcing bar, the second reinforcing bar and the third reinforcing bar are integrated, thereby forming a continuous portion, a beam, and a bridge bottom slab; Removing the temporary base and filling the portion where the temporary base is removed with grouting, and tensing the portion of the PSC girder corresponding to the upper portion of the PSC girder with PS bar at both side portions of the beam; And forming the bottom plate slab by pouring and curing concrete on the PSC girder including the pier portion bottom slab.

본 발명에 따른 거더와 교각의 일체화 강결구조를 포함하는 교량의 시공방법은 복수의 제1철근이 교각의 코핑의 상면에서 수평방향으로 복수의 행과 열을 따라 이격 배치되도록 상기 복수의 제1철근을 상기 교각에 매립 설치하는 단계를 포함하는 상기 교각, 교대 및 복수의 PSC 거더를 제작하는 단계; 상기 코핑의 상면에 임시 받침을 설치하고 상기 복수의 PSC 거더를 상기 교대와 상기 교각에 거치하는 단계; 상기 코핑의 상부에 위치하고 가로보가 형성될 가로보 부분에 제2철근을 배근하고, 상기 인접한 2개의 PSC 거더 사이의 연속부 부분에 제3철근을 배근하고, 상기 교각의 코핑의 상면에서 상기 PSC 거더의 중립축의 상부까지 수직으로 매립 설치된 제1철근의 상단 부분에 적어도 일부가 추후에 형성될 바닥판 슬래브에 매립될 수 있게 갈고리 철근을 겹이음 배근하는 단계; 상기 가로보 부분과 상기 연속부 부분을 제외하고 상부에 콘크리트를 타설하고 양생하여 바닥판 슬래브를 형성하는 단계; 및 상기 제1철근, 상기 제2철근 및 상기 제3철근이 일체화되도록 상기 인접한 2개의 PSC 거더 사이와 상기 가로보 부분에 콘크리트를 타설하고 양생하여 연속부, 가로보 및 교각부 바닥판 슬래브를 형성하는 단계를 포함할 수 있다.A method of constructing a bridge including an integrated steel structure of a girder and a bridge pier according to the present invention is characterized in that a plurality of first reinforcing bars are horizontally spaced apart along a plurality of rows and columns in an upper surface of a coping of a pier, Alternately and a plurality of PSC girders including the step of embedding the bridge columns in the piers; Mounting a temporary base on the upper surface of the coping and mounting the plurality of PSC girders on the alternating and piercing angles; A second reinforcing bar is disposed at a portion of the upper portion of the coping where the beam is to be formed and a third reinforcing bar is placed in a continuous portion between the adjacent two PSC girders, Folding the hook reinforcement so that at least a part of the upper portion of the first reinforcing bar embedded vertically to the upper portion of the neutral axis can be embedded in the bottom plate slab to be formed later; Forming a bottom plate slab by pouring and curing concrete on the upper portion except for the crossbar portion and the continuous portion; And a step of curing and curing the concrete between the adjacent two PSC girders and the crossbar portion so that the first reinforcing bars, the second reinforcing bars and the third reinforcing bars are integrated, thereby forming a continuous portion, a cross beam and a bridge portion bottom slab . ≪ / RTI >

상기 교량의 시공방법은 상기 임시 받침을 제거하고 상기 임시 받침이 제거된 부분에 그라우팅으로 충진 시공하고 상기 연속부를 PS 강선 또는 PS 강봉으로 연속화 긴장하는 단계를 더 포함할 수 있다.The method of constructing the bridge may further include the step of removing the temporary support, filling the portion where the temporary support is removed by grouting, and continuing to tense the continuous portion to the PS steel wire or the PS steel wire.

상기 제1철근, 상기 제2철근 및 상기 제3철근이 일체화되도록 상기 인접한 2개의 PSC 거더 사이와 상기 가로보 부분에 콘크리트를 타설하고 양생하는 단계는 상기 임시 받침 부분이 제거될 수 있게 상기 임시 받침의 측면부를 격벽 시공하는 단계를 포함할 수 있다.The step of pouring and curing the concrete between the adjacent two PSC girders and the crossbar portion so that the first reinforcing bars, the second reinforcing bars and the third reinforcing bars are integrated, And a step of constructing a side wall part of the bulkhead.

상기 연속부는 PS 강선 또는 PS 강봉에 의해 연속화 긴장이 추가될 수 있다.The continuous portion may be subjected to continuous tension by a PS steel wire or a PS steel bar.

상기 강재는 강판, 강봉 및 철근 중 어느 하나 이상을 포함하고, 상기 PSC 거더는 강재거더 및 강합성 거더 중 어느 하나 이상을 포함할 수 있다.The steel material may include at least one of a steel plate, a steel bar, and a reinforcing bar, and the PSC girder may include at least one of a steel girder and a steel composite girder.

상기 임시 받침은 유압잭, 선행 하중잭, 스크류잭 및 샌드잭 중 어느 하나 이상을 포함할 수 있다.The temporary support may include at least one of a hydraulic jack, a preceding load jack, a screw jack, and a sand jack.

상기 복수의 제1철근은 상기 복수의 제1철근의 상단의 높이가 상기 PSC 거더의 중립축의 높이 보다 높도록 상기 교각에 매립 설치될 수 있다.The plurality of first reinforcing bars may be embedded in the bridge pier so that the height of the upper ends of the plurality of first reinforcing bars is higher than the height of the neutral axis of the PSC girder.

상기 교량의 시공방법은 상기 연속화 긴장하는 단계 이후, 상기 바닥판 슬래브의 상면에 교면방수 시공, 포장 시공 및 방호벽 설치를 수행하는 단계를 더 포함할 수 있다.The method of constructing the bridge may further include, after the continuous tensioning step, performing a bridging waterproofing construction, a paving construction, and a fire wall installation on an upper surface of the bottom plate slab.

본 발명에 따른 거더와 교각의 일체화 강결구조를 포함하는 교량은 교대; 코핑을 포함하는 교각; 일부가 상기 교각의 코핑의 상면으로부터 수직방향으로 돌출되고 상기 교각의 코핑의 상면에서 수평방향으로 복수의 행과 열을 따라 이격되도록 상기 교각에 설치되는 복수의 제1철근; 상기 교대와 상기 교각에 배치되는 복수의 PSC 거더; 상기 복수의 PSC 거더 중 인접한 2개의 PSC 거더 각각의 인접한 측의 단부의 상부에 배치되어 서로 결합되는 강재; 상기 PSC 거더의 가로보 부분에 배치되는 제2철근; 상기 인접한 2개의 PSC 거더 사이에 배치되는 제3철근; 상기 PSC 거더의 가로보 부분에서 상기 제2철근에 형성되는 가로보; 인접한 2개의 상기 가로보 사이에 형성되는 연속부; 및 상기 PSC 거더의 상부에 배치되는 바닥판 슬래브를 포함하고, 상기 가로보와 상기 연속부는 콘크리트의 일괄 타설과 양생에 의해 일체로 형성되어 상기 제1철근, 상기 제2철근 및 상기 제3철근을 일체화할 수 있다.Bridges comprising an integrated steel structure of girders and piers in accordance with the present invention may alternate; A bridge including a coping; A plurality of first reinforcing bars projecting vertically from the upper surface of the copings of the bridge piers and installed on the bridge piers so as to be spaced along a plurality of rows and columns in a horizontal direction on an upper surface of the copings of the bridge piers; A plurality of PSC girders disposed in the alternation and at the pier; A plurality of PSC girders; a plurality of PSC girders each having a plurality of adjacent PSC girders; A second reinforcing bar disposed at a transverse portion of the PSC girder; A third reinforcing bar disposed between the adjacent two PSC girders; A beam formed in the second reinforcing bar at a crossing portion of the PSC girder; A continuous portion formed between two adjacent said cross beams; And a bottom plate slab disposed on the upper portion of the PSC girder, wherein the crossbeam and the continuous portion are integrally formed by collective pouring and curing of concrete to integrate the first reinforcing bar, the second reinforcing bar and the third reinforcing bar can do.

상기 교량은 상기 연속부를 긴장하는 PS 강선 또는 PS 강봉을 더 포함할 수 있다.The bridge may further include a PS steel wire or a PS steel bar which tenses the continuous portion.

교각인 중간지점부에서 교량받침 없이 교각과 PSC 거더를 일체화하는 방법은 교각에서는 교량받침과 교량점검 장치를 없애고 바닥판 슬래브에서는 신축이음 장치를 생략할 수 있어 초기 건설비용을 절감하면서도 공용 중 수시로 교체 등 유지보수를 하여야 함에 따라 발생하는 유지관리비용도 절감할 수 있다.The method of integrating the piers and the PSC girder without the bridge support at the midpoint of the pier can eliminate the bridge support and the bridge inspection device at the piers and omit the expansion joints at the bottom slabs, The maintenance cost can be reduced.

이와 같은 방법은 중간지점부인 교각부에서 교량받침을 가지는 교량보다는 시공단계가 다소 늘어날 여지는 있으나 건설 후 50년 내지 100년을 공용 사용하여야 하는 유지관리 주체의 입장에서는 매우 유용한 기술이 될 수 있다.In this way, the construction phase may be somewhat increased rather than the bridges with bridges at the bridges of the bridge, but this can be a very useful technique for the maintenance personnel who need to use the bridges for 50 to 100 years.

교량에서 교량받침은 평균적으로 10년 내지 15년 주기로 교체하고 있고 신축이음장치는 5년의 주기로 교체하고 있어 그 유지관리비용 뿐만 아니라 교통차단 등에 따른 많은 사회적 비용도 감소시킬 수 있으며, 교량 바닥판 슬래브에 신축이음 장치가 없어 주행성이 향상되어 신축이음 장치부분에서 단차발생 등에 따른 소음발생이 없고 동부분에서 충격 등에 따른 교량 상하부 부분의 손상을 예방할 수 있으며, 교량받침이 없으므로 교량받침 높이만큼 형하공간을 추가 확보할 수 있고 이에 종단 경사를 더욱 완만하게 할 수 있으며, 신축이음장치 및 교량받침 교체에 따른 교통통제가 불필요하므로 교통통제에 따른 사회적 비용을 절감할 수 있는 등 많은 장점을 가지고 있다.The bridges on bridges are being replaced on a regular basis for a period of 10 to 15 years and the expansion joints are replaced for a period of 5 years so that not only the maintenance costs but also the social costs associated with traffic interruption can be reduced, It is possible to prevent damage to the upper and lower parts of the bridge due to the impact in the part without the occurrence of noise due to the occurrence of steps in the expansion joint part and to prevent the bridge part from being damaged. It is possible to make the terminal slope more gentle and it has many merits such as the reduction of the social cost due to the traffic control because the traffic control according to the replacement of the expansion joint device and the bridge support is unnecessary.

거더와 교각을 일체화 강결구조로 하므로 건설초기에는 신축이음장치와 교량받침을 생략하므로 건설비용을 절감하며 공용중에는 신축이음 및 교량받침 교체가 없으므로 유지관리비용을 절감할 수 있다. Since the girder and bridge pier are made into a unified steel structure, the construction cost is reduced since the expansion joint and bridge support are omitted at the beginning of the construction, and the maintenance cost can be reduced because there is no replacement of the expansion joint and the bridge support during public use.

교량 바닥판 슬래브에 신축이음장치가 없으므로 주행성이 좋으며 신축이음장치 부분의 단차 발생 등으로 인한 소음이 없고 동부분에 충격이 없으므로 교량 상하부 부분의 손상을 예방할 수 있다.Since the bridge deck slab does not have a telescopic joint, it has good running characteristics. There is no noise due to the step difference of the expansion joint part, and there is no impact on the bridge part, so damage to the upper and lower parts of the bridge can be prevented.

교량의 교량받침이 없으므로 교량받침 높이만큼 교량의 형하공간을 추가 확보할 수 있고 종단경사를 더욱 완만하게 할 수 있다. Since there is no bridge support of the bridge, it is possible to secure additional space of the bridge by the height of the bridge support and to make the slope of the terminal more gentle.

교량의 신축이음장치 및 교량받침 교체에 따른 교통통제가 필요없으므로 교통통제에 따른 사회적비용을 절감할 수 있다.It is possible to reduce the social cost due to the traffic control because it is not necessary to control the traffic according to the expansion joint of the bridge and the bridge support.

도 1은 본 발명의 제1실시예에 따른 교량의 단면도이다.
도 2는 본 발명의 제1실시예에 따른 교량의 시공방법 중 교대와 교각을 제작하는 단계를 설명하기 위한 도면이다.
도 3은 도 2의 교각의 단면도이다.
도 4는 도 2의 교각의 사시도이다.
도 5는 도 2의 교각의 평면도이다.
도 6은 본 발명의 제1실시예에 따른 교량의 시공방법 중 외측경간부 PSC 거더와 내측경간부 PSC 거더를 제작하는 단계를 설명하기 위한 도면이다.
도 7은 본 발명의 제1실시예에 따른 교량의 시공방법 중 PSC 거더를 교각에 거치하는 단계를 설명하기 위한 도면이다.
도 8은 본 발명의 제1실시예에 따른 교량의 시공방법 중 연속부 연결접합강재를 가체결하고 가로보 철근과 연속부 철근을 배근하는 단계를 설명하기 위한 도면이다.
도 9는 본 발명의 제1실시예에 따른 교량의 시공방법 중 콘크리트 1차 타설 양생을 통해 바닥판 슬래브를 형성하는 단계를 설명하기 위한 도면이다.
도 10은 본 발명의 제1실시예에 따른 교량의 시공방법 중 가체결된 연속부 연결접합강재를 완전 체결하고 임시 받침이 제거될 수 있게 임시 받침의 측면부를 격벽시공하고 콘크리트 2차 타설 양생을 통해 가로보, 연속부 및 교각부 바닥판 슬래브를 형성하는 단계를 설명하기 위한 도면이다.
도 11은 본 발명의 제1실시예에 따른 교량의 시공방법 중 임시 받침을 제거하고 임시 받침이 제거된 부분에 그라우팅으로 충진 시공하고 PSC 거더를 연속부 PS 강선으로 긴장하는 단계를 설명하기 위한 도면이다.
도 12는 본 발명의 제1실시예에 따른 교량의 시공방법 중 교면방수 시공, 포장 시공 및 방호벽 설치 단계를 설명하기 위한 도면이다.
도 13은 본 발명의 제2실시예에 따른 교량의 단면도이다.
도 14는 본 발명의 제2실시예에 따른 교량의 시공방법 중 콘크리트 1차 타설 양생을 통해 가로보, 연속부 및 교각부 바닥판 슬래브를 형성하는 단계를 설명하기 위한 도면이다.
도 15는 본 발명의 제2실시예에 따른 교량의 시공방법 중 임시 받침을 제거하고 그 제거된 부분에 그라우팅으로 충진 시공하고 PSC 거더를 연속부 상부 가로보 양측면부에서 PS 강봉으로 긴장하는 단계를 설명하기 위한 도면이다.
도 16은 본 발명의 제2실시예에 따른 교량의 시공방법 중 교각부 바닥판 슬래브 부분을 포함하여 바닥판 슬래브 전 구간에 콘크리트를 2차로 일괄 타설 양생하는 단계를 설명하기 위한 도면이다.
도 17은 본 발명의 제3실시예에 따른 교량의 단면도이다.
도 18은 본 발명의 제3실시예에 따른 교량의 시공방법 중 외측경간부 PSC 거더와 내측경간부 PSC 거더를 제작하는 단계를 설명하기 위한 도면이다.
도 19는 본 발명의 제3실시예에 따른 교량의 시공방법 중 PSC 거더를 교각에 거치하는 단계를 설명하기 위한 도면이다.
도 20은 본 발명의 제3실시예에 따른 교량의 시공방법 중 가로보 철근, 연속부 철근 및 갈고리 철근을 배근하는 단계를 설명하기 위한 도면이다.
도 21은 본 발명의 제3실시예에 따른 교량의 시공방법 중 콘크리트 1차 타설 양생을 통해 바닥판 슬래브를 형성하는 단계를 설명하기 위한 도면이다.
도 22는 본 발명의 제3실시예에 따른 교량의 시공방법 중 콘크리트 2차 타설 양생을 통해 가로보, 연속부 및 교각부 바닥판 슬래브를 형성하는 단계를 설명하기 위한 도면이다.
1 is a cross-sectional view of a bridge according to a first embodiment of the present invention.
FIG. 2 is a view for explaining a step of manufacturing an alternation and a pier in a method of constructing a bridge according to the first embodiment of the present invention.
3 is a cross-sectional view of the pier in Fig.
4 is a perspective view of the pier in Fig.
Fig. 5 is a plan view of the pier in Fig. 2. Fig.
FIG. 6 is a view for explaining a step of manufacturing a PSC girder of an outer lateral portion and an inner lateral PSC girder of a method of constructing a bridge according to a first embodiment of the present invention.
7 is a view for explaining a step of mounting a PSC girder to a bridge pier in a method of constructing a bridge according to the first embodiment of the present invention.
FIG. 8 is a view illustrating a step of fastening a continuous joint connecting steel material in a method of constructing a bridge according to a first embodiment of the present invention, and arranging a crossbar reinforcing bar and a continuous reinforcing bar.
9 is a view for explaining a step of forming a bottom plate slab through a concrete primary casting curing method among the method of constructing a bridge according to the first embodiment of the present invention.
10 is a perspective view illustrating a method of constructing a bridge according to a first embodiment of the present invention. FIG. 10 is a cross-sectional view illustrating a method of constructing a bridge according to a first embodiment of the present invention. A continuous section, and a bridge bottom plate slab through the through-hole, the bottom plate slab, and the bottom plate slab.
11 is a view for explaining a step of removing a temporary support from a method of constructing a bridge according to the first embodiment of the present invention, filling the part where the temporary support is removed by grouting, and tightening the PSC girder with the continuous PS wire to be.
FIG. 12 is a view for explaining a bridging waterproofing construction, a paving construction, and a fire wall installation step in a method of constructing a bridge according to the first embodiment of the present invention.
13 is a cross-sectional view of a bridge according to a second embodiment of the present invention.
FIG. 14 is a view for explaining a step of forming a beam, a continuous portion and a bridge portion bottom plate slab through a concrete primary casting curing method among the method of constructing a bridge according to the second embodiment of the present invention.
FIG. 15 illustrates a step of removing a temporary support from a method of constructing a bridge according to a second embodiment of the present invention, filling the removed portion with grouting, and tightening the PSC girder with the PS steel bar at both side portions of the upper portion of the continuous portion. Fig.
FIG. 16 is a view for explaining a step of secondarily laying and curing concrete in the entirety of the bottom plate slab including the bridge portion bottom plate slab portion of the bridge construction method according to the second embodiment of the present invention.
17 is a cross-sectional view of a bridge according to a third embodiment of the present invention.
18 is a view for explaining a step of manufacturing a PSC girder of an outer side portion and a PSC girder portion of an inner side portion of a bridge construction method according to a third embodiment of the present invention.
19 is a view for explaining a step of mounting a PSC girder to a bridge pier in a method of constructing a bridge according to a third embodiment of the present invention.
FIG. 20 is a view for explaining a step of arranging a crossbar reinforcing bar, a continuous reinforcing bar, and a hook reinforcing bar in a method of constructing a bridge according to a third embodiment of the present invention.
FIG. 21 is a view for explaining a step of forming a bottom plate slab through a concrete primary casting curing method among the construction methods of a bridge according to a third embodiment of the present invention.
FIG. 22 is a view for explaining a step of forming a beam, a continuous portion and a bridge portion bottom plate slab through concrete secondary curing in a method of constructing a bridge according to a third embodiment of the present invention.

이하에서는 설명의 편의를 위해 본 발명의 일부 실시 예를 예시적인 도면을 통해 설명한다. 다만, 본 발명의 기술 사상은 설명되는 일부 실시 예에 한정되지 않는다.Hereinafter, some embodiments of the present invention will be described with reference to the accompanying drawings. However, the technical spirit of the present invention is not limited to some embodiments described.

또한, 본 발명의 실시 예의 구성 요소를 설명하는 데 있어서, 제1, 제2, A, B, (a), (b) 등의 용어를 사용할 수 있다. 이러한 용어는 그 구성 요소를 다른 구성 요소와 구별하기 위한 것일 뿐, 그 용어에 의해 해당 구성 요소의 본질이나 차례 또는 순서 등이 한정되지 않는다. In describing the components of the embodiment of the present invention, terms such as first, second, A, B, (a), and (b) may be used. These terms are intended to distinguish the constituent elements from other constituent elements, and the terms do not limit the nature, order or order of the constituent elements.

어떤 구성 요소가 다른 구성요소에 '연결' 또는 '결합'된다고 기재된 경우, 그 구성 요소는 그 다른 구성요소에 직접적으로 연결 또는 결합될 수 있지만, 그 구성 요소와 그 다른 구성요소 사이에 또 다른 구성 요소가 '연결' 또는 '결합'될 수도 있다고 이해되어야 할 것이다.When a component is described as being "connected" or "coupled" to another component, the component may be directly coupled or coupled to the other component, but another component It is to be understood that the elements may be " connected " or " coupled ".

이하에서는 본 발명의 일례인 강결접합구조 및 방법에 대하여 설명한다.Hereinafter, the steel-welded structure and method, which is an example of the present invention, will be described.

강결접합구조는 교각코핑 부분과 PSC 거더(300)의 연속부 부분(320)과 가로보 부분(310)이 교각코핑 부분의 상부에 다수개의 열이 일정간격으로 PSC 거더(300)의 중립축 상부 높이까지 수직으로 설치된 강결접합철근(제1철근)(410)으로 상호 강결구조로 합성 접합한 것으로 교량 하부구조인 교각(100)과 상부구조인 PSC 거더(300) 및 가로보(610)를 강결 일체화하는 것이며 상부구조의 하중에 의한 모멘트가 하부로 전달되는 구조이고 다점고정교각 방식으로 지진 저항능력을 증대시키는 구조이다. 상기 구조는 교각(100)의 연성으로 상부거더의 변위를 흡수 하는 구조로 바닥판 슬래브(800)에는 신축이음장치를 생략하고 교각부에서는 교랑받침을 생략할 수 있어 건설시에는 건설비용을 절감하고 공용중에는 유지관리비용을 절감할 수 있는 유용한 구조이다. 또한 공용중 유지관리를 위한 교통차단등의 조치가 전혀 없어 교통통제에 따른 사회적 비용의 발생이 전혀 없는 장점이 있다.The steel-pipe joint structure is constructed such that the bridge portion 310 and the continuous portion 320 of the PSC girder 300 are spaced apart from each other by a plurality of rows at regular intervals to the height above the neutral axis of the PSC girder 300 (First reinforcing bars) 410 which are vertically installed and combined with each other in a mutually rigid structure to integrally join the pier 100 as a bridge substructure, the PSC girder 300 and the beam 610 as upper structures, It is a structure in which the moment due to the load of the upper structure is transmitted to the lower part and the structure of increasing the earthquake resistance ability by the multipoint fixed bridge method. The above structure can absorb the displacement of the upper girder due to the softness of the bridge pier 100. The expansion joint can be omitted in the bottom plate slab 800 and the bridge support can be omitted in the bridge portion, It is a useful structure that can reduce the maintenance cost during public use. In addition, there are no measures such as traffic interruption for public administration maintenance, and there is no social cost due to traffic control at all.

상기 강결접합구조는 그 구조 및 시공방법에 따라 3가지 방법으로 구성할 수 있다.The steel-welded structure can be constructed in three ways according to its structure and construction method.

제1방법은 교각부 바닥판 슬래브(810)가 형성될 부분 등을 제외한 나머지 바닥판 슬래브(800) 전구간에 콘크리트를 1차로 타설 양생한 후에 연속부 부분(320) 및 가로보 부분(310)과 교각부 바닥판 슬래브(810)가 형성될 부분에는 2차로 콘크리트를 타설 양생하는 방법이다. 이의 구체적인 시공방법은 PSC 거더(300)의 연속부 연결접합 강재(강재)(500)를 가체결한 후에 교각부 바닥판 슬래브(810)가 형성될 부분 등을 제외한 바닥판 슬래브(800)의 나머지 구간에 콘크리트를 1차로 타설 양생하여 연속부 연결접합 강재(500)가 PSC 거더(300)와 바닥판 슬래브(800)의 응력을 사전에 전부 받게 한 후 연속부 연결접합 강재(500)를 완전체결하고 연속부 부분(320) 및 가로보 부분(310)과 교각부 바닥판 슬래브(810)가 형성될 부분에는 2차로 콘크리트를 일괄 타설 양생하여 하부구조인 교각(100)과 상부구조인 PSC 거더(300) 및 가로보(610)를 나중에 강결구조로 합성 접합하는 것이다. 이는 시공과정은 다소 복잡하지만 연속부 연결접합 강재(500)가 PSC 거더(300)와 바닥판 슬래브(800)의 응력을 사전에 미리 모두 발생하게 한 후에 교각부 바닥판 슬래브(810) 등을 시공하는 것으로 연속부 연결접합 강재(500)의 소요량을 절감하고 공용중 연속부 바닥판의 균열을 제어할 수 있는 장점이 있는 구조 및 그 시공방법이다.The first method is a method in which concrete is first placed and cured between the entirety of the bottom plate slab 800 excluding the portion where the bridge bottom slab 810 is to be formed and the like, and then the continuous portion 320 and the beam portion 310, And a second concrete is placed and cured in the portion where the sub floor slab 810 is to be formed. The concrete construction method of the PSC girder 300 is performed such that the remaining section of the bottom plate slab 800 excluding the part where the bridge bottom plate slab 810 is to be formed after the continuous connecting joint steel material (steel material) The concrete is first placed and cured so as to completely receive the stress of the PSC girder 300 and the bottom plate slab 800 in advance and the continuous joint connecting steel material 500 is fully tightened The pier 100 having a lower structure and the PSC girder 300 having an upper structure are integrally formed by curing the secondary concrete in a place where the continuous portion 320 and the beam portion 310 and the pier portion bottom plate slab 810 are to be formed, And the rib 610 are joined together in a steel structure later. Although the construction process is somewhat complicated, after the continuous joint connecting steel material 500 causes the PSC girder 300 and the bottom plate slab 800 to generate stress in advance, the bridge bottom plate slab 810, Thereby reducing the amount of continuous jointed steel material 500 and controlling the cracks in the continuous bottom deck in common, and a construction method thereof.

즉 이는 PSC 거더교에서 연속부(620)를 PSC 거더(300)와 교각(100)을 일체화하는 구조에서 교각코핑부의 교축방향 중간부에서 교축 직각방향으로 전 길이에 걸쳐서 연속부 강결접합철근(410)이 PSC 거더(300)의 중립축 상부 높이로 다수개가 일정간격으로 수직으로 매립 설치되어 PSC 거더(300)의 연속부(620)와 교축방향 교각코핑폭과 동일한 가로보(610)에 합성접합되며 PSC 거더(300)의 연속부(620) 상부에는 연속부 연결접합강재(500)가 위치하여 PSC 거더(300)의 연속부(620)의 상면이 연결접합강재(500)에 의해 연속화되는 구조이며, 상기 PSC 거더(300)의 연속부 연결접합강재(500)와 연속부 부분(320)과 가로보 부분(310)에 일체로 구성된 연속부 철근(제3철근)(430) 및 가로보 철근(제2철근)(420)과 교각코핑부 상면의 연속부 강결접합철근(410)과 연속부(620), 가로보(610) 및 바닥판 슬래브(800)에 타설되는 콘크리트에 의해 강결접합 구조로 일체화되는 것에 특징이 있는 거더와 교각의 일체화 강결구조이다. That is, in the structure in which the PSC girder 300 and the pier 100 are integrated in the continuous portion 620 in the PSC girder bridge, the continuous reinforcing steel bar 410 extends over the entire length in the direction perpendicular to the throttle from the middle portion in the throttle- A plurality of PSC girders 300 are vertically buried at a height above the neutral axis and are integrally joined to the continuous beams 620 of the PSC girder 300, The continuous joint connecting steel material 500 is positioned above the continuous portion 620 of the PSC girder 300 so that the upper surface of the continuous portion 620 of the PSC girder 300 is continuous by the joint bonded steel material 500, A continuous reinforcing bar (third reinforcing bar) 430 integrally formed with the continuous joint connecting steel material 500 and the continuous portion 320 and the beam portion 310 of the PSC girder 300 and a cross bar reinforcing bar (second reinforcing bar) And the continuous portion joining reinforcement 410 and the continuous portion 620 on the upper surface of the pier capping portion 420, the beam 610, Labrador 800 integrated in the girder and which is characterized in that the piers are integrated into ganggyeol bonded structure by the concrete to be poured in a ganggyeol structure.

제2방법은 연속부 부분(320) 및 가로보 부분(310)에 1차로 콘크리트를 타설 양생하고 연속부 PS 강봉(340)의 긴장 후에 교각부 바닥판 슬래브(810)가 형성될 부분을 포함한 바닥판 슬래브(800) 전구간에 2차로 콘크리트를 일괄 타설 양생하는 방법으로 이의 구체적인 시공방법은 PSC 거더(300)의 연속부 연결접합 강재(500)의 완전체결 후 연속부 부분(320)과 가로보 부분(310)에 콘크리트를 1차로 타설 양생하여 하부구조인 교각부와 상부구조인 PSC 거더(300) 및 가로보(610)를 강결구조로 합성접합한 다음 PSC 거더(300)의 연속부 부분(320) 및 가로보 부분(310)을 PS 강봉(340)으로 긴장한 후에 연속부 부분(320)의 상부에 있는 교각부 바닥판 슬래브(810)를 포함한 바닥판 슬래브(800)의 전구간에 2차로 콘크리트를 일괄 타설 양생하는 방법이며 이는 연속부 부분(320)의 연결접합 강재(500)와 PS 강봉(340)이 PSC 거더(300) 및 바닥판 슬래브(800) 응력을 사후에 모두 부담하여야 하기 때문에 연속부 연결접합 강재(500)와 PS 강봉(340)의 소요량은 늘어나지만 바닥판 슬래브(800)의 시공을 전구간에 걸쳐 콘크리트를 일괄 타설 양생하는 것으로 시공의 편리성을 우선시 하는 구조 및 그 시공 방법이다. The second method is a method in which the concrete is first cast on the continuous portion 320 and the beam portion 310 and the bottom plate including the portion where the pier portion bottom plate slab 810 is to be formed after the continuous PS rigid bar 340 is strained, A concrete method of collecting and curing concrete in a second place between the whole of the slab 800 and its concrete construction method is a method of fully curing the continuous portion 320 of the PSC girder 300 and the intersection portion 310 The PSC girder 300 and the beam 610 are combined and joined together in a strong structure. Then, the continuous portion 320 of the PSC girder 300, After the portion 310 is tensed with the PS steel bar 340, the concrete is placed in a second place in the whole area of the bottom plate slab 800 including the pier portion bottom plate slab 810 at the upper portion of the continuous portion 320 , Which is the same as that of the continuous joint portion 320, The requirement of the continuous joint connecting steel material 500 and the PS steel bar 340 is increased since the PS material 500 and the PS steel bar 340 bear the stresses of the PSC girder 300 and the bottom plate slab 800 after all The construction of the bottom plate slab 800 is a construction in which the convenience of the construction is prioritized by placing the concrete in a whole place and curing the whole area, and the construction method thereof.

즉 이는 PSC 거더교에서 연속부를 거더와 교각을 일체화하는 구조에서 교각코핑부의 교축방향 중간부에서 교축 직각방향으로 전 길이에 걸쳐서 연속부 강결접합철근(410)이 PSC 거더(300)의 중립축 상부 높이로 다수개가 일정간격으로 수직으로 매립 설치되어 PSC 거더(300)의 연속부(620)와 교축방향 교각코핑폭과 동일한 가로보(610)에 합성접합되며 PSC 거더(300)의 연속부 부분(320)의 상부에는 연속부 연결접합강재(500)가 위치하여 PSC 거더(300)의 연속부(620) 상면이 연결접합강재(500)에 의해 연속화되는 구조이며, 상기 PSC 거더(300)의 연속부 연결접합강재(500)와 연속부 부분(320)과 가로보 부분(310)에 일체로 구성된 연속부 철근(430) 및 가로보 철근(420)과 교각코핑부 상면의 연속부 강결접합철근(410)과 연속부(620) 및 가로보(610) 및 바닥판 슬래브(800)에 타설되는 콘크리트에 의해 강결접합 구조로 일체화되는 것에 특징이 있는 거더와 교각의 일체화 강결구조이다.In other words, in the PSC girder bridge structure in which the continuous portion is integrated with the girder and the pier, the continuous reinforced steel reinforcement 410 extends over the entire length in the direction perpendicular to the sagittal axis of the pier- A plurality of PSC girders 300 are vertically buried at regular intervals and are joined together with the continuous portion 620 of the PSC girder 300 to a cross beam 610 having the same width as the crossing direction crossing width, And the upper portion of the continuous portion 620 of the PSC girder 300 is continuous by the connecting joint steel 500. The PSC girder 300 has a continuous connecting joint steel 500, The continuous steel reinforcing bars 430 and the reinforcing bars 420 and the continuous reinforcing steel reinforcing bars 410 on the upper surface of the pier capping portion 410 and the continuous steel reinforcing bars 410 integrally formed with the steel material 500, the continuous portion 320, The slab 620 and the beam 610 and the cone placed in the bottom plate slab 800 The integrated structure of the girder and ganggyeol pier that is characterized in that integrated into ganggyeol junction structure by discrete.

제3방법은 연속부 부분(320)과 교각부 바닥판 슬래브(810)가 형성될 부분에 교각부 바닥판 슬래브 갈고리 철근(440)을 배근하고 연속부인 교각부 바닥판 슬래브(810)가 형성될 부분 등을 제외한 나머지 바닥판 슬래브(800)의 전구간에 1차로 콘크리트를 타설 양생한 후에 연속부 부분(320) 및 가로보 부분(310)과 교각부 바닥판 슬래브(810)가 형성될 부분에 2차로 콘크리트를 타설 양생하는 방법으로 이의 구체적인 시공방법은 PSC 거더(300)의 연속부 부분(320)에서 교각부 바닥판 슬래브 갈고리 철근(440)을 수직으로 설치된 연속부 강결접합철근(410)에 겹이음으로 교축방향으로 일정길이까지 연장 배근하고 연속부 부분(320)인 교각부 바닥판 슬래브(810)가 형성될 부분 등을 제외한 바닥판 슬래브(800)의 나머지 구간에 콘크리트를 1차로 타설 양생하여 교각부 바닥판 슬래브 갈고리 철근(440)이 1차로 타설된 바닥판 슬래브(800)에 일정길이가 합성되도록 하며 연속부 부분(320) 및 가로보 부분(310)과 교각부 바닥판 슬래브(810)가 형성될 부분에는 콘크리트를 2차로 일괄 타설 양생하여 하부구조인 교각부와 상부구조인 PSC 거더(300) 및 가로보(610)를 나중에 강결구조로 합성 접합하는 것이며 PSC 거더(300)와 바닥판 슬래브(800)의 응력이 사전에 미리 모두 발생되게 한 후 연속부(620) 상부에 있는 교각부 바닥판 슬래브(810) 등을 시공하는 것으로 자재소요량을 절감하고 공용중 연속부 바닥판의 균열을 제어할 수 있는 장점이 있 는 구조 및 그 시공방법이다.In the third method, the bridge portion bottom plate slab claw reinforcement 440 is disposed at the portion where the continuous portion 320 and the bridge bottom plate slab 810 are to be formed, and the bridge portion bottom plate slab 810 as a continuous portion is formed The first and second concrete slabs 810 and 810 are to be formed in a portion where the continuous portion 320 and the beam portion 310 and the pier portion bottom plate slab 810 are to be formed, A concrete method of curing concrete is a method in which a pier portion bottom plate slab claw reinforcement 440 is vertically disposed on a continuous reinforced steel reinforcing bar 410 at a continuous portion 320 of the PSC girder 300 The concrete is first laid and cured in the remaining section of the bottom plate slab 800 excluding the part where the bridge bottom slab 810 as the continuous section 320 is to be formed, Sub floor plate A portion of the bottom plate slab 800 in which the bending bar reinforcement 440 is firstly inserted is formed to have a predetermined length and a portion where the continuous portion 320 and the beam portion 310 and the bridge bottom plate slab 810 are to be formed The PSC girder 300 and the beam 610 are joined to each other by a steel structure and the stress of the PSC girder 300 and the bottom plate slab 800 is increased The bottom plate slab 810 and the like at the upper portion of the continuous portion 620 can be used to reduce the amount of material required and to control cracks in the continuous bottom plate And the construction method thereof.

즉 이는 PSC 거더교에서 연속부를 거더와 교각을 일체화하는 구조에서 교각코핑부의 교축방향 중간부에서 교축 직각방향으로 전 길이에 걸쳐서 연속부 강결접합 철근(410)이 PSC 거더(300)의 중립축 상부 높이로 다수개가 일정간격으로 수직으로 매립 설치되어 PSC 거더(300)의 연속부(620)와 교축방향 교각코핑폭과 동일한 가로보(610)에 합성접합되며 PSC 거더(300)의 연속부(620)의 상면에는 교각부 바닥판 슬래브 갈고리 철근(440)이 연속부 강결접합강재(500)과 겹이음으로 일정길이가 바닥판 슬래브(800)에 매립되는 구조이며, 상기 PSC 거더(300)의 연속부 부분(320)과 가로보 부분(310)에 일체로 구성된 연속부 철근(430) 및 가로보 철근(420)과 교각코핑부 상면의 연속부 강결접합철근(410)과 교각부 바닥판 슬래브 갈고리 철근(440)과 연속부(620) 및 가로보(610) 및 바닥판 슬래브(800)에 타설되는 콘크리트에 의해 강결접합 구조로 일체화되는 것에 특징이 있는 거더와 교각의 일체화 강결구조이다. In other words, in the PSC girder bridge structure in which the continuous portion is integrated with the girder and the pier, the continuous reinforced steel reinforcement 410 extends over the entire length in the direction perpendicular to the sagittal axis of the pier- A plurality of PSC girders 300 are vertically buried at regular intervals and are integrally joined to the cross beams 610 having the same crossing axial crossing width as the continuous portion 620 of the PSC girder 300. The upper surface of the continuous portion 620 of the PSC girder 300 Is a structure in which a bridge portion bottom plate slab claw reinforcement 440 is overlapped with the continuous steel structure joining steel material 500 so that a certain length is embedded in the bottom plate slab 800. The continuous portion of the PSC girder 300 The continuous reinforcing bars 430 and the reinforcing bars 420 and the continuous reinforcing steel reinforcing bars 410 on the upper surface of the pier capping part and the piers of the bridge deck slab reinforcing bars 440, The continuous portion 620 and the beam 610 and the bottom plate Labrador 800 integrated in the girder and which is characterized in that the piers are integrated into ganggyeol bonded structure by the concrete to be poured in a ganggyeol structure.

본 발명에 따른 강결접합구조 및 제1시공방법은 다음의 단계를 포함할 수 있다.The steel-welded structure and first construction method according to the present invention may include the following steps.

제1단계는 교대(200) 및 교각(100)과 PSC 거더(300)를 제작장에서 제작하는 단계로 중간지점부인 교각(100)의 코핑(110)의 상부에 교축직각방향으로 전 길이에 걸쳐 철근(410)을 연속부 강결접합 용도로 PSC 거더(300)의 중립축 상부 높이까지 일정간격으로 다수개 열을 수직으로 매립 설치하는 단계일 수 있다.The first step is to manufacture the alternation 200 and the pier 100 and the PSC girder 300 at the manufacturing site. The PSC girder 300 is installed at the upper part of the coping 110 of the pier 100, A plurality of columns may be vertically buried at regular intervals up to the height of the neutral axis of the PSC girder 300 for continuous joining of reinforcing bars 410.

제2단계는 교각코핑(코핑)(110) 상부의 교축방향 양단부 부근에 임시 받침(710)을 설치하고 PSC 거더(300)를 교대(200), 교각(100)에 거치하는 단계일 수 있다.The second step may be to place the temporary support 710 near the opposite ends of the piercing coping 110 in the throttle direction and to mount the PSC girder 300 on the alternating 200 and pier 100.

제3단계는 교각코핑(110) 상부의 임시 받침(710)에 거치된 PSC 거더(300)의 연속화를 위해 PSC 거더(300)의 연속부 부분(320)의 양단부 상부에 있는 연속부 연결접합 강재(500)를 가체결 하고 연속부 부분(320)과 가로보 부분(310)에 철근을 배근하는 단계일 수 있다.The third step is to connect the continuous joint joining steel members 320 at the upper portions of both ends of the continuous portion 320 of the PSC girder 300 for the sequencing of the PSC girder 300 mounted on the temporary support 710 above the pier capping 110. [ The reinforcing bars may be fastened to the continuous portion 320 and the reinforcing bars 310 to the reinforcing bars 310.

제4단계는 바닥판 슬래브(800)를 형성할 콘크리트를 연속부 부분(320) 및 가로보 부분(310)과 교각부 바닥판 슬래브(810)가 형성될 부분을 제외하고 1차로 전 구간에 타설하여 양생하는 단계일 수 있다.In the fourth step, the concrete for forming the bottom plate slab 800 is first laid in all the sections except for the continuous portion 320 and the portion where the beam portion 310 and the bridge bottom plate slab 810 are to be formed It can be a curing step.

제5단계는 PSC 거더(300)의 연속부 부분(320) 상부에 가체결된 연속부 연결접합 강재(500)를 완전 체결하고 교각코핑(110) 상부 양단부에 설치된 임시 받침(710) 부분이 블록아웃될 수 있게 임시 받침(710)의 측면부 전부를 격벽시공하고 PSC 거더(300)의 연속부 부분(320) 및 가로보 부분(310)과 교각부 바닥판 슬래브(810)가 형성될 부분에 콘크리트를 2차로 일괄 타설하여 양생하는 단계일 수 있다.In the fifth step, the continuous joint connecting steel material 500 fastened to the upper portion of the continuous portion 320 of the PSC girder 300 is completely fastened, and the portion of the temporary support 710 installed at both ends of the upper portion of the pier- The PSC girder 300 is constructed such that the continuous portion 320 of the PSC girder 300 and the portion where the beam portion 310 and the pier portion bottom plate slab 810 are to be formed, It may be a step to cure by putting it in the second batch.

제6단계는 교각코핑(110) 상부 양단부에 설치된 임시 받침(710)을 제거하고 그 제거된 블럭아웃 부분에 그라우팅(730)으로 충진 시공하고 PSC 거더(300)를 연속부 PS 강선(PS 강선)(330)으로 긴장하는 단계일 수 있다.In the sixth step, the temporary support 710 installed at both ends of the upper portion of the pier capping 110 is removed, the grout 730 is filled in the removed block out portion, and the PSC girder 300 is connected to the continuous PS wire (PS wire) (330). ≪ / RTI >

제7단계는 교면방수, 포장, 방호벽 등 교량 부가시설물을 설치하는 단계로 시공할 수 있다. The seventh step is to install the bridging facilities such as bridge waterproofing, pavement, and barrier wall.

본 발명에 따른 강결접합구조 및 제2시공방법은 다음의 단계를 포함할 수 있다.The steel-welded structure and the second construction method according to the present invention may include the following steps.

제1단계는 교대(200) 및 교각(100)과 PSC 거더(300)를 제작장에서 제작하는 단계로 중간지점부인 교각(100)의 코핑(110)의 상부에 교축직각방향으로 전 길이에 걸쳐 철근(410)을 연속부 강결접합 용도로 PSC 거더(300)의 중립축 상부 높이까지 일정간격으로 다수개 열을 수직으로 매립 설치하는 단계일 수 있다.The first step is to manufacture the alternation 200 and the pier 100 and the PSC girder 300 at the manufacturing site. The PSC girder 300 is installed at the upper part of the coping 110 of the pier 100, A plurality of columns may be vertically buried at regular intervals up to the height of the neutral axis of the PSC girder 300 for continuous joining of reinforcing bars 410.

제2단계는 교각코핑(110) 상부의 교축방향 양단부 부근에 임시 받침(710)을 설치하고 PSC 거더(300)를 교대(200), 교각(100)에 거치하는 단계일 수 있다.The second step may be to place the temporary support 710 in the vicinity of both ends in the direction of the throttle above the bridge coping 110 and to mount the PSC girder 300 on the bridge 200 and the bridge 100.

제3단계는 교각코핑(110) 상부의 임시 받침(710)에 거치된 PSC 거더(300)의 연속화를 위해 PSC 거더(300)의 연속부 부분(320)의 양단부 상부에 있는 연속부 연결접합 강재(500)를 완전체결하고 연속부 부분(320)과 가로보 부분(310)에 철근을 배근하는 단계일 수 있다.The third step is to connect the continuous joint joining steel members 320 at the upper portions of both ends of the continuous portion 320 of the PSC girder 300 for the sequencing of the PSC girder 300 mounted on the temporary support 710 above the pier capping 110. [ Tightening the reinforcing bar 500 and fully reinforcing the continuous portion 320 and the crossbar portion 310.

제4단계는 교각코핑(110) 상부 양단부에 설치된 임시 받침(710) 부분이 블록아웃될 수 있게 임시 받침(710)의 측면부 전부를 격벽 시공하고 PSC 거더(300)의 연속부 부분(320) 및 가로보 부분(310)과 교각부 바닥판 슬래브(810)가 형성될 부분에 콘크리트를 1차로 일괄 타설 양생하는 단계일 수 있다.In the fourth step, the entire side portion of the temporary support 710 is partitioned so that the portion of the temporary support 710 installed at both ends of the upper portion of the pier capping 110 can be blocked out, the continuous portion 320 of the PSC girder 300, The first concrete pouring and curing may be performed at the portion where the beam portion 310 and the pier portion bottom plate slab 810 are to be formed.

제5단계는 교각코핑(110) 상부 양단부에 설치된 임시 받침(710)을 제거하고 그 제거된 블럭아웃 부분에 그라우팅(730)으로 충진 시공하고 PSC 거더(300)를 연속부(620)의 상부 가로보(610)의 양측면부에서 PS 강봉(340)으로 긴장하는 단계일 수 있다.The fifth step is to remove the temporary support 710 installed at both ends of the upper part of the pier capping 110 and to fill the removed block out portion with the grouting 730 and to fix the PSC girder 300 to the upper portion of the continuous portion 620 To the PS steel rods 340 at both side portions of the base 610.

제6단계는 교각부 바닥판 슬래브(810)가 형성될 부분을 포함하여 바닥판 슬래브(800) 전 구간에 콘크리트를 2차로 일괄 타설 양생하는 단계일 수 있다.The sixth step may include a step of curing the concrete in the whole area of the entire floor slab 800 including the part where the bridge bottom slab 810 is to be formed.

제7단계는 교면방수, 포장, 방호벽 등 교량 부가시설물을 설치하는 단계로 시공할 수 있다. The seventh step is to install the bridging facilities such as bridge waterproofing, pavement, and barrier wall.

본 발명에 따른 강결접합구조 및 제3시공방법은 다음의 단계를 포함할 수 있다.The steel-welded structure and the third construction method according to the present invention may include the following steps.

제1단계는 교대(200) 및 교각(100)과 PSC 거더(300)를 제작장에서 제작하는 단계로 중간지점부인 교각(100)의 코핑(110)의 상부에 교축직각방향으로 전 길이에 걸쳐 철근(410)을 연속부 강결접합 용도로 PSC 거더(300)의 중립축 상부 높이까지 일정간격으로 다수개 열을 수직으로 매립 설치하는 단계일 수 있다.The first step is to manufacture the alternation 200 and the pier 100 and the PSC girder 300 at the manufacturing site. The PSC girder 300 is installed at the upper part of the coping 110 of the pier 100, A plurality of columns may be vertically buried at regular intervals up to the height of the neutral axis of the PSC girder 300 for continuous joining of reinforcing bars 410.

제2단계는 교각코핑(110) 상부의 교축방향 양단부 부근에 임시 받침(710)을 설치하고 PSC 거더(300)를 교대(200), 교각(100)에 거치하는 단계일 수 있다.The second step may be to place the temporary support 710 in the vicinity of both ends in the direction of the throttle above the bridge coping 110 and to mount the PSC girder 300 on the bridge 200 and the bridge 100.

제3단계는 교각코핑(110) 상부에 거치된 PSC 거더(300)의 연속부 부분(320)과 가로보 부분(310)에 철근(410, 420)을 배근하고 교각(100)의 교핑(110)의 상면에서 중립축 상부까지 수직으로 매립 설치된 연속부 강결접합 철근(410) 상단부분에서 철근의 일정길이가 바닥판 슬래브에 매립될 수 있게 갈고리 철근(440)을 겹이음 배근하는 단계일 수 있다.The third step is to reinforce the reinforcing bars 410 and 420 on the continuous portion 320 and the beam portion 310 of the PSC girder 300 mounted on the pier capping 110, The reinforcing bar 440 may be folded so that a certain length of the reinforcing bars can be embedded in the bottom plate slab at the upper end of the continuous reinforcing steel bar 410 embedded vertically from the upper surface to the upper portion of the neutral shaft.

제4단계는 바닥판 슬래브(800)를 형성할 콘크리트를 연속부 부분(320) 및 가로보 부분(310)과 교각부 바닥판 슬래브(810)가 형성될 부분을 제외하고 1차로 전 구간에 타설하여 양생하는 단계일 수 있다.In the fourth step, the concrete for forming the bottom plate slab 800 is first laid in all the sections except for the continuous portion 320 and the portion where the beam portion 310 and the bridge bottom plate slab 810 are to be formed It can be a curing step.

제5단계는 교각코핑(110) 상부 양단부에 설치된 임시 받침(710) 부분이 블록아웃될 수 있게 임시 받침(710)의 측면부 전부를 격벽시공하고 PSC 거더(300)의 연속부 부분(320) 및 가로보 부분(310)과 교각부 바닥판 슬래브(810)가 형성될 부분에 콘크리트를 2차로 일괄 타설 양생하는 단계일 수 있다.In the fifth step, the entire side portion of the temporary support 710 is partitioned so that the portion of the temporary support 710 installed at both ends of the upper portion of the pier capping 110 can be blocked out, the continuous portion 320 of the PSC girder 300, And the second concrete placement and curing of concrete at the portion where the beam portion 310 and the bridge portion bottom plate slab 810 are to be formed.

제6단계는 교각코핑(110) 상부 앙단부에 설치된 임시 받침(710)을 제거하고 그 제거된 블록아웃 부분에 그라우팅(730)으로 충진 시공하고 PSC 거더(300)를 연속부 PS강선(330)으로 긴장하는 단계일 수 있다.The PSC girder 300 is connected to the continuous PS strand 330 by the grouting 730. The PSC girder 300 is connected to the PS strand 330 by the grouting 730, And the like.

제7단계는 교면방수, 포장, 방호벽 등 교량 부가시설물을 설치하는 단계로 시공할 수 있다. The seventh step is to install the bridging facilities such as bridge waterproofing, pavement, and barrier wall.

강결접합구조 및 시공방법의 각 시공단계에서 아래와 같은 사항으로 부분 부분 변경 적용하여 효율을 더욱 증대시키거나 시공범위를 더욱 확대할 수도 있다.At each construction stage of steel-joint structure and construction method, it is possible to further increase the efficiency or to enlarge the construction scope by applying partial modification to the following items.

PSC 거더(300)의 연속화를 위한 강재연결은 강판연결 이외에 강봉연결 또는 철근연결 구조로도 할 수 있으며 강판은 볼트 또는 용접으로 접합 연결하고 강봉 또는 철근은 커플링 또는 겹이음으로 접합 연결하는 구조로도 하므로 경제성과 시공여건에 따라 연속부 연결접합 강재를 신축적으로 다양하게 선택하여 적용할 수가 있다. PSC 거더(300)에서 PS 강선(330) 긴장은 거더 여건 등에 따라 선택적으로 PS 강선을 사용하거나 PS 강봉을 사용하거나 생략하는 구조로도 적용할 수도 있다. 하부구조인 교각부와 강결합성접합되는 가로보(610)의 폭은 교각코핑부의 교축방향 폭과 동일한 폭의 구조로 시공될 수 있다. PSC 거더(300)는 PSC 거더, 강재거더, 강합성거더인 구조로 응용적용이 가능하다. 임시 받침(710)은 유압잭, 선택하중잭, 스크류잭, 샌드잭을 선택적으로 사용할 수 있다.In addition to steel plate connection, the PSC girder 300 may be formed of a steel bar connection or a reinforcing bar connection structure. The steel plate may be connected by bolt or welding, and the steel bar or reinforcing bar may be connected by coupling or lap joint. Therefore, it is possible to flexibly and flexibly apply continuous joint jointed steel according to economical efficiency and construction conditions. The tension of the PS steel wire 330 in the PSC girder 300 may be selectively applied to the structure using the PS steel wire or the PS steel bar depending on the girder condition or the like. The width of the cross beam 610 which is rigidly joined to the bridge portion as a substructure can be constructed in a structure having the same width as the width of the bridge crossing portion in the throttle direction. PSC girder 300 is applicable to PSC girder, steel girder, and steel composite girder. The temporary support 710 can selectively use a hydraulic jack, a selective load jack, a screw jack, and a sand jack.

상기와 같은 교량 하부구조인 교각부와 교량 상부구조인 PSC 거더(300)를 강결구조로 접합하는 구조는, 첫째 PSC 거더(300)와 교각(100)을 일체화 강결구조로 하므로 건설초기에는 신축이음장치와 교량받침을 생략하므로 건설비용을 절감하며 공용중에는 신축이음 및 교량받침 교체가 없으므로 유지관리비용을 절감할 수 있다. The PSC girder 300 and the bridge 100 are integrally formed in a steel structure so that the bridge pier portion and the PSC girder 300, which are bridge substructures, It reduces the construction cost by omitting the device and the bridge support, and reduces the maintenance cost because there is no replacement of the expansion joint and the bridge support during public use.

둘째, 교량 바닥판 슬래브(800)에 신축이음장치가 없으므로 주행성이 좋으며 신축이음장치 부분의 단차 발생 등으로 인한 소음이 없고 동부분에 충격이 없으므로 교량 상하부 부분의 손상을 예방할 수 있다.Second, since the bridge deck slab (800) does not have a telescopic joint, it has good running characteristics. There is no noise due to the step difference of the expansion joint part, and there is no impact on the bridge part, so damage to the upper and lower parts of the bridge can be prevented.

셋째, 교량의 교량받침이 없으므로 교량받침 높이만큼 교량의 형하공간을 추가 확보할 수 있고 종단경사를 더욱 완만하게 할 수 있다. Third, since there is no bridge support in the bridge, it is possible to secure the additional space of the bridge as much as the support height of the bridge and to make the slope of the end more gentle.

넷째, 교량의 신축이음장치 및 교량받침 교체에 따른 교통통제가 필요없으므로 교통통제에 따른 사회적비용을 절감할 수 있다. Fourth, it is possible to reduce the social cost due to the traffic control because there is no need to control the traffic according to the bridge expansion / contraction device and bridge restoration.

또한, 교량 하부구조인 교각(100)은 상부구조인 PSC 거더(300)의 하중에 의한 모멘트를 다점고정 교각방식으로 저항하는 구조로 지진 저항능력을 증대시키는 구조이다.In addition, the bridge pier 100, which is a bridge substructure, has a structure that increases the earthquake resistance by a structure that resists the moment due to the load of the PSC girder 300, which is the upper structure, by a multi-point fixed bridge method.

이하에서는 본 발명의 제1실시예에 따른 교량의 구조에 대하여 설명한다.Hereinafter, the structure of the bridge according to the first embodiment of the present invention will be described.

도 1은 본 발명의 제1실시예에 따른 교량의 단면도이다.1 is a cross-sectional view of a bridge according to a first embodiment of the present invention.

교량은 교각(100)을 포함할 수 있다. 교각(100)은 PSC 거더(300)를 하부에서 지지할 수 있다. 교각(100)은 교대(200) 사이에 배치될 수 있다. 교각(100)은 복수로 구비되어 서로 이격되어 배치될 수 있다.The bridge may include a bridge 100. The bridge pier 100 can support the PSC girder 300 from below. Bridge columns 100 may be disposed between alternations 200. The bridge pillars 100 may be provided in plural and spaced apart from each other.

교각(100)은 코핑(110)을 포함할 수 있다. 코핑(110)은 "교각코핑"으로 호칭될 수 있다. 코핑(110)은 교각(100)의 상단에 배치될 수 있다. 코핑(110)의 직경은 교각(100)의 하부의 직경 보다 클 수 있다. The bridge 100 may include a coping 110. The coping 110 may be referred to as "bridge coping ". The copings 110 may be disposed at the top of the bridge 100. The diameter of the coping 110 may be greater than the diameter of the lower portion of the bridge 100.

교량은 교대(200)를 포함할 수 있다. 교대(200)는 교량의 양단에 배치될 수 있다. 즉, 교대(200)는 교량의 시작 부분과 끝 부분에 각각 배치될 수 있다.The bridge may include an alternating 200. Alternate 200 can be placed at both ends of the bridge. That is, alternation 200 can be placed at the beginning and end of the bridge, respectively.

교량은 PSC 거더(prestressed concrete 거더)(300)를 포함할 수 있다. PSC 거더(300)는 복수로 구비될 수 있다. 복수의 PSC 거더(300)는 교대(200)와 교각(100)에 배치될 수 있다. PSC 거더(300)는 강재거더 또는 강합성 거더일 있다. 즉, PSC 거더(300)는 강재거더 또는 강합성 거더로 대체될 수 있다.The bridge may include a PSC girder (prestressed concrete girder) 300. The PSC girder 300 may be provided in plural. A plurality of PSC girders 300 may be disposed in alternation 200 and bridge 100. The PSC girder 300 is a steel girder or a steel composite girder. That is, the PSC girder 300 can be replaced with a steel girder or a steel composite girder.

PSC 거더(300)는 외측경간부 PSC 거더(도 6의 (a) 참조)와 내측경간부 PSC 거더(도 6의 (b) 참조)를 포함할 수 있다. 외측경간부 PSC 거더는 일단은 교대(200)에 배치되고 타단은 교각(100)에 배치될 수 있다. 이 경우, 외측경간부 PSC 거더의 타단에만 강재(500)가 배치되고 일단에는 강재(500)가 배치되지 않을 수 있다. 내측경간부 PSC 거더는 양단이 모두 교각(100)에 배치될 수 있다. 이 경우, 내측경간부 PSC 거더의 양단에 강재(500)가 배치될 수 있다.The PSC girder 300 may include an outer transversal PSC girder (see FIG. 6 (a)) and an inner transversely spaced PSC girder (see FIG. 6 (b)). The outer transversal PSC girder may be disposed at one end in alternation 200 and at the other end in pier 100. In this case, the steel material 500 may be disposed only at the other end of the outer transversely PSC girder and the steel material 500 may not be disposed at one end. Both ends of the inner transversely section PSC girder may be disposed in the bridge 100. In this case, the steel material 500 may be disposed at both ends of the inner transversal PSC girder.

PSC 거더(300)는 가로보 부분(310)을 포함할 수 있다. 다만, 가로보 부분(310)은 PSC 거더(300)의 횡방향(연속보 부분(320)을 PSC 거더(300)의 종방향의 이격 공간으로 보는 경우)의 이격 공간을 포함할 수 있다. 즉, 가로보 부분(310)은 가로보(610)가 형성될 부분으로 PSC 거더(300)의 일부와 횡방향으로 이격 배치된 복수의 PSC 거더(300) 사이의 공간을 포함할 수 있다. 가로보 부분(310)에 콘크리트가 타설되어 가로보(610)가 형성될 수 있다. 가로보 부분(310)은 PSC 거더(300)의 말단부에 배치될 수 있다. 인접한 2개의 가로보 부분(310) 사이에는 연속부 부분(320)이 배치될 수 있다.The PSC girder 300 may include a beam portion 310. However, the beam portion 310 may include a spacing space in the lateral direction of the PSC girder 300 (when the continuous beam portion 320 is viewed as a longitudinally spaced space of the PSC girder 300). That is, the beam portion 310 may include a space between a portion of the PSC girder 300 and a plurality of PSC girders 300 spaced laterally from the portion where the beam 610 is to be formed. The beams 610 can be formed by placing concrete in the beam portion 310. The beam portion 310 may be disposed at the distal end of the PSC girder 300. A continuous portion 320 may be disposed between two adjacent crossbar portions 310.

PSC 거더(300)는 연속부 부분(320)을 포함할 수 있다. 다만, 연속부 부분(320)은 PSC 거더(300)의 종방향의 이격 공간을 포함할 수 있다. 즉, 연속부 부분(320)은 연속부(620)가 형성될 부분으로 PSC 거더(300)의 일부와 종방향으로 이격 배치된 복수의 PSC 거더(300) 사이의 공간을 포함할 수 있다. 연속부 부분(320)에 콘크리트가 타설되어 연속부(620)가 형성될 수 있다. 연속부 부분(320)은 인접한 2개의 PSC 거더(300)의 사이 공간일 수 있다.The PSC girder 300 may include a continuous portion 320. However, the continuous portion 320 may include a longitudinally spaced space of the PSC girder 300. That is, the continuous portion 320 may include a space between a portion of the PSC girder 300 and a plurality of PSC girders 300 arranged in the longitudinal direction, as a portion where the continuous portion 620 is to be formed. Concrete may be placed in the continuous portion 320 to form the continuous portion 620. The continuous portion 320 may be a space between two adjacent PSC girders 300.

PSC 거더(300)는 PS 강선(330)을 포함할 수 있다. PS 강선(330)은 "연속부 PS 강선"으로 호칭될 수 있다. PS 강선(330)은 연속부(620)를 긴장하기 위해 사용될 수 있다. PS 강선(330)은 가로보(610)를 긴장하기 위해 사용될 수 있다. PS 강선(330)은 PSC 거더(300)에 긴장하기 위해 사용될 수 있다.The PSC girder 300 may include a PS steel wire 330. PS wire 330 may be referred to as "continuous PS wire." The PS wire 330 may be used to tense the continuous portion 620. The PS wire 330 can be used to tilt the beam 610. The PS wire 330 may be used to tense the PSC girder 300.

교량은 제1철근(410)을 포함할 수 있다. 제1철근(410)은 "연속부 강결접합 철근"으로 호칭될 수 있다. 제1철근(410)은 일부가 교각(100)의 코핑(110)의 상면으로부터 수직방향으로 돌출되고 교각(100)의 코핑(110)의 상면에서 수평방향으로 복수의 행과 형을 따라 이격되도록 교각(100)에 설치될 수 있다.The bridge may include a first reinforcing bar 410. The first reinforcing bars 410 may be referred to as "continuous reinforcing steel bars ". The first reinforcing bars 410 may be formed such that a portion of the first reinforcing bars 410 protrude vertically from the upper surface of the copings 110 of the piers 100 and are spaced along the plurality of rows and dies in the horizontal direction on the upper surface of the copings 110 of the piers 100 And can be installed in the bridge 100.

교량은 제2철근(420)을 포함할 수 있다. 제2철근(420)은 "가로보 철근"으로 호칭될 수 있다. 제2철근(420)은 PSC 거더(300)의 가로보 부분(310)에 배치될 수 있다.The bridge may include a second reinforcing bar 420. The second reinforcing bars 420 may be referred to as "crossbar reinforcing bars ". The second reinforcing bars 420 may be disposed in the transverse portion 310 of the PSC girder 300.

교량은 제3철근(430)을 포함할 수 있다. 제3철근(430)은 "연속부 철근"으로 호칭될 수 있다. 제3철근(430)은 인접한 2개의 PSC 거더(300) 사이에 배치될 수 있다. 제3철근(430)은 PSC 거더(300)의 연속부 부분(320)에 배치될 수 있다.The bridge may include a third reinforcing bar (430). The third reinforcing bars 430 may be referred to as "continuous reinforcing bars ". The third reinforcing bars 430 may be disposed between two adjacent PSC girders 300. The third reinforcing bars 430 may be disposed in the continuous portion 320 of the PSC girder 300.

교량은 강재(500)를 포함할 수 있다. 강재(500)는 "연속부 연결접합 강재"로 호칭될 수 있다. 강재(500)는 복수의 PSC 거더(300) 중 인접한 2개의 PSC 거더(300) 각각의 인접한 측의 단부의 상부에 배치되어 서로 결합될 수 있다. 강재(500)는 강판, 강봉 및 철근 중 어느 하나 이상을 포함할 수 있다.The bridge may include a steel material 500. The steel material 500 may be referred to as "continuity bonded joint steel. &Quot; The steel material 500 may be disposed on the upper portion of the adjacent side of each of two adjacent PSC girders 300 of the plurality of PSC girders 300 and may be coupled to each other. The steel material 500 may include at least one of a steel sheet, a steel bar, and a reinforcing bar.

교량은 가로보(610)를 포함할 수 있다. 가로보(610)는 PSC 거더(300)의 가로보 부분(310)에서 제2철근(420)에 형성될 수 있다.The bridge may include a cross beam 610. The beam 610 may be formed on the second reinforcing bar 420 at the transverse portion 310 of the PSC girder 300.

교량은 연속부(620)를 포함할 수 있다. 연속부(620)는 인접한 2개의 가로보(610) 사이에 형성될 수 있다. 연속부(620)는 PS 강선 또는 PS 강봉에 의해 연속화 긴장이 추가될 수 있다.The bridge may include a continuous portion 620. The continuous portion 620 may be formed between two adjacent beams 610. Continuous strain can be added to the continuous portion 620 by the PS steel wire or the PS steel bar.

본 실시예에서 가로보(610)와 연속부(620)는 콘크리트의 일괄 타설과 양생에 의해 일체로 형성되어 제1철근(410), 제2철근(420) 및 제3철근(430)을 일체화할 수 있다.In the present embodiment, the beam 610 and the continuous portion 620 are integrally formed by collective pouring and curing of concrete to integrate the first reinforcing bars 410, the second reinforcing bars 420 and the third reinforcing bars 430 .

교량은 임시 받침(710)을 포함할 수 있다. 임시 받침(710)은 유압잭, 선행 하중잭, 스크류잭 및 샌드잭 중 어느 하나 이상을 포함할 수 있다.The bridge may include a temporary support 710. The temporary support 710 may include at least one of a hydraulic jack, a preceding load jack, a screw jack, and a sand jack.

교량은 그라우팅(730)을 포함할 수 있다. 그라우팅(730)은 임시 받침(710)이 제거된 부분에 시공될 수 있다.The bridge may include grouting (730). The grouting 730 can be applied to the portion where the temporary support 710 is removed.

교량은 바닥판 슬래브(800)를 포함할 수 있다. 바닥판 슬래브(800)는 PSC 거더(300)의 상부에 배치될 수 있다. 바닥판 슬래브(800)는 교각부 바닥판 슬래브(810)를 포함할 수 있다. 교각부 바닥판 슬래브(810)는 바닥판 슬래브(810) 중 교각(100)과 수직방향으로 오버랩되는 부분일 수 있다.The bridge may include a bottom plate slab 800. The bottom plate slab 800 may be disposed on top of the PSC girder 300. The bottom plate slab 800 may include a bridge bottom plate slab 810. The bridge deck slab 810 may be a portion of the bottom slab 810 that overlaps the bridge 100 in the vertical direction.

이하에서는 본 발명의 제2실시예에 따른 교량의 구조에 대하여 설명한다. 이하에서는 제2실시예에 따른 교량의 구조 중 제1실시예와 차이를 갖는 구성을 위주로 설명한다. 즉, 제2실시예에 따른 교량의 구조 중 제1실시예와 공통인 구성은 제1실시예에서의 설명이 유추 적용될 수 있다.Hereinafter, a structure of a bridge according to a second embodiment of the present invention will be described. Hereinafter, the structure of the bridge according to the second embodiment, which is different from that of the first embodiment, will be mainly described. That is, the structure common to the first embodiment among the structures of the bridge according to the second embodiment can be applied to the description in the first embodiment by analogy.

도 13은 본 발명의 제2실시예에 따른 교량의 단면도이다.13 is a cross-sectional view of a bridge according to a second embodiment of the present invention.

교량은 PS 강봉(340)을 포함할 수 있다. PS 강봉(340)은 PSC 거더(300)의 연속부(620)의 상부에 해당하는 부분을 가로보(610)의 양측면부에서 긴장하기 위해 사용될 수 있다.The bridge may include a PS steel bar 340. The PS steel bar 340 may be used to tense the portions corresponding to the upper portions of the continuous portion 620 of the PSC girder 300 at both side portions of the beam 610.

이하에서는 본 발명의 제3실시예에 따른 교량의 구조에 대하여 설명한다. 이하에서는 제3실시예에 따른 교량의 구조 중 제1실시예와 차이를 갖는 구성을 위주로 설명한다. 즉, 제3실시예에 따른 교량의 구조 중 제1실시예와 공통인 구성은 제1실시예에서의 설명이 유추 적용될 수 있다.Hereinafter, a structure of a bridge according to a third embodiment of the present invention will be described. The structure of the bridge according to the third embodiment is different from that of the first embodiment. In other words, a structure common to the first embodiment among the structures of the bridge according to the third embodiment can be applied to the description in the first embodiment by analogy.

도 17은 본 발명의 제3실시예에 따른 교량의 단면도이다.17 is a cross-sectional view of a bridge according to a third embodiment of the present invention.

교량은 갈고리 철근(440)을 포함할 수 있다. 갈고리 철근(440)은 교각(100)의 코핑(110)의 상면에서 PSC 거더(300)의 중립축의 상부까지 수직으로 매립 설치된 제1철근(410)의 상단 부분에 적어도 일부가 추후에 형성될 바닥판 슬래브(800)에 매립될 수 있게 겹입음 배근될 수 있다. 갈고리 철근(440)은 적어도 일부가 바닥판 슬래브(800)에 매립될 수 있다. 갈고리 철근(440)은 제1철근(410)에 결합될 수 있다. 갈고리 철근(440)은 적어도 일부의 형상이 갈고리 형상을 가질 수 있다.The bridges may include hook bars 440. The hook reinforcement 440 is formed on the upper portion of the first reinforcing bar 410 vertically buried from the upper surface of the coping 110 of the pier 100 to the upper portion of the neutral axis of the PSC girder 300, And can be folded so as to be embedded in the plate slab 800. At least a portion of the hook reinforcement 440 may be embedded in the bottom plate slab 800. The hook reinforcement 440 may be coupled to the first reinforcement 410. The hook reinforcement 440 may have a hook shape at least in part.

또한, 제3실시예에 따른 교량에서 강재(500)는 생략될 수 있다. 도 18의 (a)에는 외측경간부 PSC 거더가 도시되고 (b)에는 내측경간부 PSC 거더가 도시된다. 도 18을 참조하면, PSC 거더(300)에 제1실시예와 제2실시예의 일구성인 강재(500)가 생략되었음을 확인할 수 있다.Further, the steel material 500 in the bridge according to the third embodiment can be omitted. 18 (a) shows an outer transversal PSC girder and (b) shows an inner transversal PSC girder. Referring to FIG. 18, it can be confirmed that the steel material 500, which is a constitution of the first embodiment and the second embodiment, is omitted from the PSC girder 300.

이하에서는 본 발명의 제1실시예에 따른 교량의 시공방법에 대하여 설명한다.Hereinafter, a method of constructing a bridge according to a first embodiment of the present invention will be described.

도 2는 본 발명의 제1실시예에 따른 교량의 시공방법 중 교대와 교각을 제작하는 단계를 설명하기 위한 도면이고, 도 3은 도 2의 교각의 단면도이고, 도 4는 도 2의 교각의 사시도이고, 도 5는 도 2의 교각의 평면도이고, 도 6은 본 발명의 제1실시예에 따른 교량의 시공방법 중 외측경간부 PSC 거더와 내측경간부 PSC 거더를 제작하는 단계를 설명하기 위한 도면이다.FIG. 2 is a view for explaining a step of manufacturing an alternation and a bridge in the method of constructing a bridge according to the first embodiment of the present invention, FIG. 3 is a sectional view of the bridge in FIG. 2, FIG. 6 is a perspective view of a bridge construction method according to the first embodiment of the present invention. FIG. 6 is a perspective view illustrating a construction of a PSC girder of an outer lateral section and a PSC inner section of a bridge according to a first embodiment of the present invention. FIG.

교량의 시공방법은 복수의 제1철근(410)이 교각(100)의 코핑(1100의 상면에서 수평방향으로 복수의 행과 열을 따라 이격 배치되도록 복수의 제1철근(410)을 교각(100)에 매립 설치하는 단계를 포함하는 교각(100), 교대(200) 및 복수의 PSC 거더(300)를 제작하는 단계를 포함할 수 있다. 이때, 복수의 제1철근(410)은 복수의 제1철근(410)의 상단의 높이가 PSC 거더(300)의 중립축의 높이 보다 높도록 교각(100)에 매립 설치될 수 있다.A plurality of first reinforcing bars 410 are connected to a bridge 100 so as to be spaced along a plurality of rows and columns in a horizontal direction on the upper surface of the coping 1100 of the bridge 100, And a plurality of PSC girders 300. The plurality of first reinforcing bars 410 may include a plurality of first reinforcing bars 410, The height of the upper end of the one reinforcing bar 410 may be higher than the height of the neutral axis of the PSC girder 300.

도 7은 본 발명의 제1실시예에 따른 교량의 시공방법 중 PSC 거더를 교각에 거치하는 단계를 설명하기 위한 도면이다.7 is a view for explaining a step of mounting a PSC girder to a bridge pier in a method of constructing a bridge according to the first embodiment of the present invention.

교량의 시공방법은 코핑(110)의 상면에 임시 받침(710)을 설치하고 복수의 PSC 거더(300)를 교대(200)와 교각(100)에 거치하는 단계를 포함할 수 있다.The method of constructing the bridge may include installing a temporary support 710 on the upper surface of the coping 110 and mounting a plurality of PSC girders 300 on the alternate 200 and bridge 100.

도 8은 본 발명의 제1실시예에 따른 교량의 시공방법 중 연속부 연결접합강재를 가체결하고 가로보 철근과 연속부 철근을 배근하는 단계를 설명하기 위한 도면이다.FIG. 8 is a view illustrating a step of fastening a continuous joint connecting steel material in a method of constructing a bridge according to a first embodiment of the present invention, and arranging a crossbar reinforcing bar and a continuous reinforcing bar.

교량의 시공방법은 복수의 PSC 거더(300) 중 인접한 2개의 PSC 거더(300) 각각의 인접한 측의 단부의 상부에 있는 강재(500)를 서로 가체결하고, 코핑(110)의 상부에 위치하고 가로보(610)가 형성될 가로보 부분(310)에 제2철근(420)을 배근하고, 인접한 2개의 PSC 거더(300) 사이의 연속부 부분(320)에 제3철근(430)을 배근하는 단계를 포함할 수 있다.The method of constructing the bridge is to fasten the steel material 500 at the upper part of the adjacent end of each of the two adjacent PSC girders 300 of the plurality of PSC girders 300 to each other, The step of placing the second reinforcing bars 420 on the transverse portion 310 where the first reinforcing bars 610 are to be formed and the third reinforcing bars 430 on the continuous portion 320 between the adjacent two PSC girders 300 .

도 9는 본 발명의 제1실시예에 따른 교량의 시공방법 중 콘크리트 1차 타설 양생을 통해 바닥판 슬래브를 형성하는 단계를 설명하기 위한 도면이다.9 is a view for explaining a step of forming a bottom plate slab through a concrete primary casting curing method among the method of constructing a bridge according to the first embodiment of the present invention.

교량의 시공방법은 가로보 부분(310)과 연속부 부분(320)을 제외하고 상부에 콘크리트를 타설하고 양생하여 바닥판 슬래브(800)를 형성하는 단계를 포함할 수 있다.The method of constructing the bridge may include forming the bottom plate slab 800 by pouring and curing the concrete on the upper portion except for the intersection portion 310 and the continuous portion 320.

도 10은 본 발명의 제1실시예에 따른 교량의 시공방법 중 가체결된 연속부 연결접합강재를 완전 체결하고 임시 받침이 제거될 수 있게 임시 받침의 측면부를 격벽시공하고 콘크리트 2차 타설 양생을 통해 가로보, 연속부 및 교각부 바닥판 슬래브를 형성하는 단계를 설명하기 위한 도면이다.10 is a perspective view illustrating a method of constructing a bridge in accordance with a first embodiment of the present invention. FIG. 10 is a perspective view of a concrete installation method according to a first embodiment of the present invention. A continuous section, and a bridge bottom plate slab through the through-hole, the bottom plate slab, and the bottom plate slab.

교량의 시공방법은 가체결된 인접한 2개의 PSC 거더(300) 각각의 인접한 측의 단부의 상부에 있는 강재(500)를 서로 완전 체결하고, 제1철근(410), 제2철근(420) 및 제3철근(430)이 일체화되도록 인접한 2개의 PSC 거더(300) 사이와 가로보 부분(310)에 콘크리트를 타설하고 양생하여 연속부(620), 가로보(610) 및 교각부 바닥판 슬래브(810)를 형성하는 단계를 포함할 수 있다.The method of constructing the bridge is to completely fasten the steel material 500 on the upper end of the adjacent side of each of the adjacent two PSC girders 300 fastened together and to fasten the first reinforcing bars 410, Concrete beams are cured and cured between the adjacent two PSC girders 300 and the beam portion 310 so that the third reinforcing bars 430 are integrated so that the continuous portion 620, the beam 610 and the pier portion bottom plate slab 810, To form the second electrode.

교량의 시공방법에서 제1철근(410), 제2철근(420) 및 제3철근(430)이 일체화되도록 인접한 2개의 PSC 거더(300) 사이와 가로보 부분(310)에 콘크리트를 타설하고 양생하는 단계는 임시 받침(710) 부분이 제거될 수 있게 임시 받침(710)의 측면부를 격벽 시공하는 단계를 포함할 수 있다. 이와 같은 구조를 통해 임시 받침(710)은 블록아웃될 수 있다.The concrete is laid between two adjacent PSC girders 300 and the beam portion 310 so that the first reinforcing bars 410, the second reinforcing bars 420 and the third reinforcing bars 430 are integrated in the bridging method, The step may include the step of constructing the bulkhead of the side portion of the temporary support 710 so that the portion of the temporary support 710 can be removed. With this structure, the temporary support 710 can be blocked out.

상기 임시 받침 부분이 제거될 수 있게 상기 임시 받침의 측면부를 격벽 시공하는 단계를 포함하는 교량의 시공방법.And constructing a side wall of the temporary support so as to remove the temporary support portion.

도 11은 본 발명의 제1실시예에 따른 교량의 시공방법 중 임시 받침을 제거하고 임시 받침이 제거된 부분에 그라우팅으로 충진 시공하고 PSC 거더를 연속부 PS 강선으로 긴장하는 단계를 설명하기 위한 도면이다.11 is a view for explaining a step of removing a temporary support from a method of constructing a bridge according to the first embodiment of the present invention, filling the part where the temporary support is removed by grouting, and tightening the PSC girder with the continuous PS wire to be.

교량의 시공방법은 임시 받침(710)을 제거하고 임시 받침(710)이 제거된 부분에 그라우팅(730)으로 충진 시공하고 PSC 거더(300)를 PS 강선(330)으로 긴장하는 단계를 포함할 수 있다.The method of constructing the bridge may include the step of removing the temporary support 710 and filling the portion where the temporary support 710 is removed with the grouting 730 and straining the PSC girder 300 with the PS steel wire 330 have.

도 12는 본 발명의 제1실시예에 따른 교량의 시공방법 중 교면방수 시공, 포장 시공 및 방호벽 설치 단계를 설명하기 위한 도면이다.FIG. 12 is a view for explaining a bridging waterproofing construction, a paving construction, and a fire wall installation step in a method of constructing a bridge according to the first embodiment of the present invention.

교량의 시공방법은 바닥판 슬래브(800)의 상면에 교면방수 시공, 포장 시공 및 방호벽 설치를 수행하는 단계를 포함할 수 있다. 이를 통해, 바닥판 슬래브(800)의 상면에는 교면방수층(910)이 형성될 수 있다. 교면방수층(910)의 상면에는 포장층(920)이 형성될 수 있다. 포장층(920)의 상면에는 방호벽(930)이 배치될 수 있다.The method of constructing a bridge may include performing a cross-over waterproof construction, a pavement construction, and a barrier installation on the top surface of the bottom plate slab 800. Accordingly, a cross-linked waterproof layer 910 may be formed on the top surface of the bottom plate slab 800. The packaging layer 920 may be formed on the upper surface of the cross-linked waterproof layer 910. A barrier wall 930 may be disposed on the upper surface of the packaging layer 920.

이하에서는 본 발명의 제2실시예에 따른 교량의 시공방법에 대하여 설명한다. 다만, 본 발명의 제2실시예는 앞선 제1실시예와의 차이점을 중심으로 설명한다. 즉, 본 발명의 제2실시예에 대하여 설명되지 않은 부분은 제1실시예에서의 설명이 유추 적용될 수 있다.Hereinafter, a method of constructing a bridge according to a second embodiment of the present invention will be described. However, the second embodiment of the present invention will be described focusing on differences from the first embodiment. That is, the description of the second embodiment of the present invention can be applied to the description of the first embodiment.

도 14는 본 발명의 제2실시예에 따른 교량의 시공방법 중 콘크리트 1차 타설 양생을 통해 가로보, 연속부 및 교각부 바닥판 슬래브를 형성하는 단계를 설명하기 위한 도면이다.FIG. 14 is a view for explaining a step of forming a beam, a continuous portion and a bridge portion bottom plate slab through a concrete primary casting curing method in a method of constructing a bridge according to a second embodiment of the present invention.

교량의 시공방법은 복수의 PSC 거더(300) 중 인접한 2개의 PSC 거더(300) 각각의 인접한 측의 단부의 상부에 있는 강재(500)를 서로 완전 체결하고, PSC 거더(300) 중 코핑(110)의 상부에 거치되고 가로보(610)가 형성될 가로보 부분(310)에 제2철근(420)을 배근하고, 인접한 2개의 PSC 거더(300) 사이에 제3철근(430)을 배근하는 단계를 포함할 수 있다. 제1실시예의 해당 단계에서 인접한 2개의 강재(500)를 가체결하는 것과는 차이점이다.The method of constructing the bridge is to completely fasten the steel material 500 at the upper part of the adjacent end of each of the adjacent two PSC girders 300 among the plurality of PSC girders 300 to each other, Placing the second reinforcing bars 420 on the beam portion 310 where the beams 610 are to be formed and disposing the third reinforcing bars 430 between the adjacent two PSC girders 300 . The difference is that the two adjacent steel materials 500 are joined together in the corresponding step of the first embodiment.

교량의 시공방법은 제1철근(410), 제2철근(420) 및 제3철근(430)이 일체화되도록 인접한 2개의 PSC 거더(300) 사이와 가로보 부분(310)에 콘크리트를 타설하고 양생하여 연속부(620), 가로보(610) 및 교각부 바닥판 슬래브(810)를 형성하는 단계를 포함할 수 있다. 제1실시예에서 가로보(610)와 연속부(620) 보다 바닥판 슬래브(810)를 먼저 형성하는 것과는 차이점이다.The method of constructing the bridge includes placing and curing the concrete between the adjacent two PSC girders 300 and the beam portion 310 so that the first reinforcing bars 410, the second reinforcing bars 420 and the third reinforcing bars 430 are integrated Forming a continuous portion 620, a beam 610 and a bridge bottom slab 810. This is different from the first embodiment in that the bottom plate slab 810 is formed earlier than the cross beam 610 and the continuous portion 620.

도 15는 본 발명의 제2실시예에 따른 교량의 시공방법 중 임시 받침을 제거하고 그 제거된 부분에 그라우팅으로 충진 시공하고 PSC 거더를 연속부 상부 가로보 양측면부에서 PS 강봉으로 긴장하는 단계를 설명하기 위한 도면이다.FIG. 15 illustrates a step of removing a temporary support from a method of constructing a bridge according to a second embodiment of the present invention, filling the removed portion with grouting, and tightening the PSC girder with the PS steel bar at both sides of the upper portion of the continuous portion. Fig.

교량의 시공방법은 임시 받침(710)을 제거하고 임시 받침(710)이 제거된 부분에 그라우팅(730)으로 충진 시공하고, PSC 거더(300)의 연속부(620)의 상부에 해당하는 부분을 가로보(610)의 양측면부에서 PS 강봉(340)으로 긴장하는 단계를 포함할 수 있다. The method of constructing the bridge is such that the temporary support 710 is removed and the portion where the temporary support 710 is removed is filled with the grouting 730 and the portion corresponding to the upper portion of the continuous portion 620 of the PSC girder 300 And tensioning the PS steel bar 340 at both side portions of the beam 610.

도 16은 본 발명의 제2실시예에 따른 교량의 시공방법 중 교각부 바닥판 슬래브 부분을 포함하여 바닥판 슬래브 전 구간에 콘크리트를 2차로 일괄 타설 양생하는 단계를 설명하기 위한 도면이다.FIG. 16 is a view for explaining a step of secondarily laying and curing concrete in the entirety of the bottom plate slab including the bridge portion bottom plate slab portion of the bridge construction method according to the second embodiment of the present invention.

교량의 시공방법은 교각부 바닥판 슬래브(810)를 포함하여 PSC 거더(300)의 상부에 콘크리트를 타설하고 양생하여 바닥판 슬래브(800)를 형성하는 단계를 포함할 수 있다.The method of constructing the bridge may include forming a bottom plate slab 800 by pouring and curing the concrete on top of the PSC girder 300, including the bridge bottom slab 810.

이하에서는 본 발명의 제3실시예에 따른 교량의 시공방법에 대하여 설명한다. 다만, 본 발명의 제3실시예는 앞선 제1실시예와의 차이점을 중심으로 설명한다. 즉, 본 발명의 제2실시예에 대하여 설명되지 않은 부분은 제1실시예에서의 설명이 유추 적용될 수 있다.Hereinafter, a method of constructing a bridge according to a third embodiment of the present invention will be described. However, the third embodiment of the present invention will be described focusing on differences from the first embodiment. That is, the description of the second embodiment of the present invention can be applied to the description of the first embodiment.

도 18은 본 발명의 제3실시예에 따른 교량의 시공방법 중 외측경간부 PSC 거더와 내측경간부 PSC 거더를 제작하는 단계를 설명하기 위한 도면이고, 도 19는 본 발명의 제3실시예에 따른 교량의 시공방법 중 PSC 거더를 교각에 거치하는 단계를 설명하기 위한 도면이고, 도 20은 본 발명의 제3실시예에 따른 교량의 시공방법 중 가로보 철근, 연속부 철근 및 갈고리 철근을 배근하는 단계를 설명하기 위한 도면이다.18 is a view for explaining a step of manufacturing a PSC girder of an outer side web portion and an inner side PSC girder of a bridge construction method according to a third embodiment of the present invention. FIG. 20 is a view for explaining a step of mounting a PSC girder on a bridge pier in a method of constructing a bridge according to a third embodiment of the present invention. Fig.

교량의 시공방법은 PSC 거더(300) 중 코핑(110)의 상부에 거치되고 가로보(610)가 형성될 가로보 부분(310)에 제2철근(420)을 배근하고, 인접한 2개의 PSC 거더(300) 사이에 제3철근(430)을 배근하고, 교각(100)의 코핑(110)의 상면에서 PSC 거더(300)의 중립축의 상부까지 수직으로 매립 설치된 제1철근(410)의 상단 부분에 적어도 일부가 추후에 형성될 바닥판 슬래브(800)에 매립될 수 있게 갈고리 철근(440)을 겹이음 배근하는 단계를 포함할 수 있다.The method of constructing the bridge is to install the second reinforcing bars 420 on the upper portion of the copings 110 of the PSC girder 300 and to the transverse portion 310 where the beams 610 are to be formed and to sandwich the adjacent two PSC girders 300 And the upper portion of the first reinforcing bar 410 embedded vertically from the upper surface of the coping 110 of the pier 100 to the upper portion of the neutral axis of the PSC girder 300, Folding the hook reinforcement 440 so that a part of the reinforcement can be embedded in the bottom plate slab 800 to be formed later.

도 21은 본 발명의 제3실시예에 따른 교량의 시공방법 중 콘크리트 1차 타설 양생을 통해 바닥판 슬래브를 형성하는 단계를 설명하기 위한 도면이다.FIG. 21 is a view for explaining a step of forming a bottom plate slab through a concrete primary casting curing method among the construction methods of a bridge according to a third embodiment of the present invention.

교량의 시공방법은 PSC 거더(300) 중 가로보 부분(310)을 포함하는 일부를 제외하고 상부에 콘크리트를 타설하고 양생하여 바닥판 슬래브(800)를 형성하는 단계를 포함할 수 있다.The method of constructing the bridge may include forming a bottom plate slab 800 by pouring and curing the concrete on top of the PSC girder 300 except for a portion including the crossbar portion 310.

도 22는 본 발명의 제3실시예에 따른 교량의 시공방법 중 콘크리트 2차 타설 양생을 통해 가로보, 연속부 및 교각부 바닥판 슬래브를 형성하는 단계를 설명하기 위한 도면이다.FIG. 22 is a view for explaining a step of forming a beam, a continuous portion and a bridge portion bottom plate slab through concrete secondary curing in a method of constructing a bridge according to a third embodiment of the present invention.

교량의 시공방법은 제1철근(410), 제2철근(420) 및 제3철근(430)이 일체화되도록 인접한 2개의 PSC 거더(300) 사이와 가로보 부분(310)에 콘크리트를 타설하고 양생하여 연속부(620), 가로보(610) 및 교각부 바닥판 슬래브(810)를 형성하는 단계를 포함할 수 있다.The method of constructing the bridge includes placing and curing the concrete between the adjacent two PSC girders 300 and the beam portion 310 so that the first reinforcing bars 410, the second reinforcing bars 420 and the third reinforcing bars 430 are integrated Forming a continuous portion 620, a beam 610 and a bridge bottom slab 810.

이상에서, 본 발명의 실시 예를 구성하는 모든 구성 요소들이 하나로 결합하거나 결합하여 동작하는 것으로 설명되었다고 해서, 본 발명이 반드시 이러한 실시 예에 한정되는 것은 아니다. 즉, 본 발명의 목적 범위 안에서라면, 그 모든 구성 요소들이 하나 이상으로 선택적으로 결합하여 동작할 수도 있다. 또한, 이상에서 기재된 '포함하다', '구성하다' 또는 '가지다' 등의 용어는, 특별히 반대되는 기재가 없는 한, 해당 구성 요소가 내재할 수 있음을 의미하는 것이므로, 다른 구성 요소를 제외하는 것이 아니라 다른 구성 요소를 더 포함할 수 있는 것으로 해석되어야 한다. 기술적이거나 과학적인 용어를 포함한 모든 용어들은, 다르게 정의되지 않는 한, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미가 있다. 사전에 정의된 용어와 같이 일반적으로 사용되는 용어들은 관련 기술의 문맥상의 의미와 일치하는 것으로 해석되어야 하며, 본 발명에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다. While the present invention has been described in connection with what is presently considered to be the most practical and preferred embodiment, it is to be understood that the invention is not limited to the disclosed embodiments. That is, within the scope of the present invention, all of the components may be selectively coupled to one or more of them. It is to be understood that the terms such as 'include', 'comprising', or 'having', as used herein, mean that a component can be implied unless specifically stated to the contrary. But should be construed as including other elements. All terms, including technical and scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, unless otherwise defined. Commonly used terms, such as predefined terms, should be interpreted to be consistent with the contextual meanings of the related art, and are not to be construed as ideal or overly formal, unless expressly defined to the contrary.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시 예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시 예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The foregoing description is merely illustrative of the technical idea of the present invention, and various changes and modifications may be made by those skilled in the art without departing from the essential characteristics of the present invention. Therefore, the embodiments disclosed in the present invention are intended to illustrate rather than limit the scope of the present invention, and the scope of the technical idea of the present invention is not limited by these embodiments. The scope of protection of the present invention should be construed according to the following claims, and all technical ideas within the scope of equivalents should be construed as falling within the scope of the present invention.

100: 교각 200: 교대
300: PSC 거더 410: 제1철근
500: 강재 610: 가로보
710: 임시 받침 800: 바닥판 슬래브
100: Pier 200: Shift
300: PSC girder 410: first reinforcing bar
500: Steel 610: Rear beam
710: temporary rest 800: bottom plate slab

Claims (11)

복수의 제1철근이 교각의 코핑의 상면에서 수평방향으로 복수의 행과 열을 따라 이격 배치되도록 상기 복수의 제1철근을 상기 교각에 매립 설치하는 단계를 포함하는 상기 교각, 교대 및 복수의 PSC 거더를 제작하는 단계;
상기 코핑의 상면에 임시 받침을 설치하고 상기 복수의 PSC 거더를 상기 교대와 상기 교각에 거치하는 단계;
상기 복수의 PSC 거더 중 인접한 2개의 PSC 거더 각각의 인접한 측의 단부의 상부에 있는 강재를 서로 가체결하고, 상기 코핑의 상부에 위치하고 가로보가 형성될 가로보 부분에 제2철근을 배근하고, 상기 인접한 2개의 PSC 거더 사이의 연속부 부분에 제3철근을 배근하는 단계;
상기 가로보 부분과 상기 연속부 부분을 제외하고 상부에 콘크리트를 타설하고 양생하여 바닥판 슬래브를 형성하는 단계; 및
가체결된 상기 인접한 2개의 PSC 거더 각각의 인접한 측의 단부의 상부에 있는 강재를 서로 완전 체결하고, 상기 제1철근, 상기 제2철근 및 상기 제3철근이 일체화되도록 상기 인접한 2개의 PSC 거더 사이와 상기 가로보 부분에 콘크리트를 타설하고 양생하여 연속부, 가로보 및 교각부 바닥판 슬래브를 형성하는 단계를 포함하고,
상기 임시 받침을 제거하고 상기 임시 받침이 제거된 부분에 그라우팅으로 충진 시공하고 상기 연속부를 PS 강선 또는 PS 강봉으로 연속화 긴장하는 단계를 더 포함하며,
상기 제1철근, 상기 제2철근 및 상기 제3철근이 일체화되도록 상기 인접한 2개의 PSC 거더 사이와 상기 가로보 부분에 콘크리트를 타설하고 양생하는 단계는
상기 임시 받침 부분이 제거될 수 있게 상기 임시 받침의 측면부를 격벽 시공하는 단계를 포함하는 거더와 교각의 일체화 강결구조를 포함하는 교량의 시공방법.
Alternate and multiple PSCs including a plurality of first reinforcing bars embedded in the bridge piers so that a plurality of first reinforcing bars are spaced along a plurality of rows and columns in a horizontal direction on an upper surface of the coping of the pier, Fabricating a girder;
Mounting a temporary base on the upper surface of the coping and mounting the plurality of PSC girders on the alternating and piercing angles;
And a second reinforcing member is disposed on a portion of the upper portion of the upper portion of the adjacent end of each of the adjacent two PSC girders of the plurality of PSC girders, Disposing a third reinforcing bar in a continuous portion between the two PSC girders;
Forming a bottom plate slab by pouring and curing concrete on the upper portion except for the crossbar portion and the continuous portion; And
Between the two adjacent PSC girders so that the first reinforcing bars, the second reinforcing bars and the third reinforcing bars are integrated with each other, And curing and curing the concrete at the crossbar portion to form a continuous portion, a cross beam, and a bridge bottom slab,
Further comprising the steps of removing the temporary support, filling the portion where the temporary support is removed with grouting, and continuously tensioning the continuous portion to the PS steel wire or the PS steel bar,
Placing and curing the concrete between the adjacent two PSC girders and the crossbar portion so that the first reinforcing bars, the second reinforcing bars and the third reinforcing bars are integrated,
And constructing a side wall of the temporary support so that the temporary support portion can be removed.
복수의 제1철근이 교각의 코핑의 상면에서 수평방향으로 복수의 행과 열을 따라 이격 배치되도록 상기 복수의 제1철근을 상기 교각에 매립 설치하는 단계를 포함하는 상기 교각, 교대 및 복수의 PSC 거더를 제작하는 단계;
상기 코핑의 상면에 임시 받침을 설치하고 상기 복수의 PSC 거더를 상기 교대와 상기 교각에 거치하는 단계;
상기 복수의 PSC 거더 중 인접한 2개의 PSC 거더 각각의 인접한 측의 단부의 상부에 있는 강재를 서로 완전 체결하고, 상기 코핑의 상부에 위치하고 가로보가 형성될 가로보 부분에 제2철근을 배근하고, 상기 인접한 2개의 PSC 거더 사이의 연속부 부분에 제3철근을 배근하는 단계;
상기 제1철근, 상기 제2철근 및 상기 제3철근이 일체화되도록 상기 연속부 부분과 상기 가로보 부분에 콘크리트를 타설하고 양생하여 연속부, 가로보 및 교각부 바닥판 슬래브를 형성하는 단계;
상기 임시 받침을 제거하고 상기 임시 받침이 제거된 부분에 그라우팅으로 충진 시공하고, 상기 PSC 거더의 상기 연속부의 상부에 해당하는 부분을 상기 가로보의 양측면부에서 PS 강봉으로 긴장하는 단계; 및
상기 교각부 바닥판 슬래브를 포함하여 상기 PSC 거더의 상부에 콘크리트를 타설하고 양생하여 바닥판 슬래브를 형성하는 단계를 포함하고,
상기 임시 받침을 제거하고 상기 임시 받침이 제거된 부분에 그라우팅으로 충진 시공하고 상기 연속부를 PS 강선 또는 PS 강봉으로 연속화 긴장하는 단계를 더 포함하며,
상기 제1철근, 상기 제2철근 및 상기 제3철근이 일체화되도록 상기 인접한 2개의 PSC 거더 사이와 상기 가로보 부분에 콘크리트를 타설하고 양생하는 단계는
상기 임시 받침 부분이 제거될 수 있게 상기 임시 받침의 측면부를 격벽 시공하는 단계를 포함하는 거더와 교각의 일체화 강결구조를 포함하는 교량의 시공방법.
Alternate and multiple PSCs including a plurality of first reinforcing bars embedded in the bridge piers so that a plurality of first reinforcing bars are spaced along a plurality of rows and columns in a horizontal direction on an upper surface of the coping of the pier, Fabricating a girder;
Mounting a temporary base on the upper surface of the coping and mounting the plurality of PSC girders on the alternating and piercing angles;
The steel material on the upper side of the adjacent end of each of the two adjacent PSC girders of the plurality of PSC girders is fully fastened to each other and a second reinforcing bar is placed on the crossing portion located at the upper portion of the coping and in which the crossbeam is to be formed, Disposing a third reinforcing bar in a continuous portion between the two PSC girders;
Inserting and curing the concrete into the continuous portion and the crossbar portion so that the first reinforcing bar, the second reinforcing bar and the third reinforcing bar are integrated, thereby forming a continuous portion, a beam, and a bridge bottom slab;
Removing the temporary base and filling the portion where the temporary base is removed with grouting, and tensing the portion of the PSC girder corresponding to the upper portion of the PSC girder with PS bar at both side portions of the beam; And
And forming a bottom plate slab by pouring and curing concrete on top of the PSC girder, including the bridge bottom slab,
Further comprising the steps of removing the temporary support, filling the portion where the temporary support is removed with grouting, and continuously tensioning the continuous portion to the PS steel wire or the PS steel bar,
Placing and curing the concrete between the adjacent two PSC girders and the crossbar portion so that the first reinforcing bars, the second reinforcing bars and the third reinforcing bars are integrated,
And constructing a side wall of the temporary support so that the temporary support portion can be removed.
복수의 제1철근이 교각의 코핑의 상면에서 수평방향으로 복수의 행과 열을 따라 이격 배치되도록 상기 복수의 제1철근을 상기 교각에 매립 설치하는 단계를 포함하는 상기 교각, 교대 및 복수의 PSC 거더를 제작하는 단계;
상기 코핑의 상면에 임시 받침을 설치하고 상기 복수의 PSC 거더를 상기 교대와 상기 교각에 거치하는 단계;
상기 코핑의 상부에 위치하고 가로보가 형성될 가로보 부분에 제2철근을 배근하고, 상기 인접한 2개의 PSC 거더 사이의 연속부 부분에 제3철근을 배근하고, 상기 교각의 코핑의 상면에서 상기 PSC 거더의 중립축의 상부까지 수직으로 매립 설치된 제1철근의 상단 부분에 적어도 일부가 추후에 형성될 바닥판 슬래브에 매립될 수 있게 갈고리 철근을 겹이음 배근하는 단계;
상기 가로보 부분과 상기 연속부 부분을 제외하고 상부에 콘크리트를 타설하고 양생하여 바닥판 슬래브를 형성하는 단계; 및
상기 제1철근, 상기 제2철근 및 상기 제3철근이 일체화되도록 상기 인접한 2개의 PSC 거더 사이와 상기 가로보 부분에 콘크리트를 타설하고 양생하여 연속부, 가로보 및 교각부 바닥판 슬래브를 형성하는 단계를 포함하고,
상기 임시 받침을 제거하고 상기 임시 받침이 제거된 부분에 그라우팅으로 충진 시공하고 상기 연속부를 PS 강선 또는 PS 강봉으로 연속화 긴장하는 단계를 더 포함하며,
상기 제1철근, 상기 제2철근 및 상기 제3철근이 일체화되도록 상기 인접한 2개의 PSC 거더 사이와 상기 가로보 부분에 콘크리트를 타설하고 양생하는 단계는
상기 임시 받침 부분이 제거될 수 있게 상기 임시 받침의 측면부를 격벽 시공하는 단계를 포함하는 거더와 교각의 일체화 강결구조를 포함하는 교량의 시공방법.
Alternate and multiple PSCs including a plurality of first reinforcing bars embedded in the bridge piers so that a plurality of first reinforcing bars are spaced along a plurality of rows and columns in a horizontal direction on an upper surface of the coping of the pier, Fabricating a girder;
Mounting a temporary base on the upper surface of the coping and mounting the plurality of PSC girders on the alternating and piercing angles;
A second reinforcing bar is disposed at a portion of the upper portion of the coping where the beam is to be formed and a third reinforcing bar is placed in a continuous portion between the adjacent two PSC girders, Folding the hook reinforcement so that at least a part of the upper portion of the first reinforcing bar embedded vertically to the upper portion of the neutral axis can be embedded in the bottom plate slab to be formed later;
Forming a bottom plate slab by pouring and curing concrete on the upper portion except for the crossbar portion and the continuous portion; And
Placing the concrete between the adjacent two PSC girders and the crossbar portion so that the first reinforcing bar, the second reinforcing bar and the third reinforcing bar are integrated, and curing the concrete to form a continuous portion, Including,
Further comprising the steps of removing the temporary support, filling the portion where the temporary support is removed with grouting, and continuously tensioning the continuous portion to the PS steel wire or the PS steel bar,
Placing and curing the concrete between the adjacent two PSC girders and the crossbar portion so that the first reinforcing bars, the second reinforcing bars and the third reinforcing bars are integrated,
And constructing a side wall of the temporary support so that the temporary support portion can be removed.
삭제delete 삭제delete 제1항, 제2항 중 어느 한 항에 있어서,
상기 강재는 강판, 강봉 및 철근 중 어느 하나 이상을 포함하고,
상기 PSC 거더는 강재거더 또는 강합성 거더인 거더와 교각의 일체화 강결구조를 포함하는 교량의 시공방법.
4. The method according to any one of claims 1 to 3,
Wherein the steel material comprises at least one of a steel sheet, a steel bar, and a reinforcing bar,
Wherein the PSC girder comprises an integrated steel structure of a girder and a pier which is a steel girder or a steel composite girder.
제1항, 제2항 및 제3항 중 어느 한 항에 있어서,
상기 임시 받침은 유압잭, 선행 하중잭, 스크류잭 및 샌드잭 중 어느 하나 이상을 포함하는 거더와 교각의 일체화 강결구조를 포함하는 교량의 시공방법.
The method according to any one of claims 1, 2, and 3,
Wherein the temporary support includes an integral steel structure of a girder and a bridge including at least one of a hydraulic jack, a preceding load jack, a screw jack, and a sand jack.
제1항, 제2항 및 제3항 중 어느 한 항에 있어서,
상기 복수의 제1철근은 상기 복수의 제1철근의 상단의 높이가 상기 PSC 거더의 중립축의 높이 보다 높도록 상기 교각에 매립 설치되는 거더와 교각의 일체화 강결구조를 포함하는 교량의 시공방법.
The method according to any one of claims 1, 2, and 3,
Wherein the plurality of first reinforcing bars include an integrated reinforcing structure of a girder and a bridge pier installed in the pier so that a height of an upper end of the plurality of first reinforcing bars is higher than a height of a neutral axis of the PSC girder.
제1항, 제2항 및 제3항 중 어느 한 항에 있어서,
상기 연속화 긴장하는 단계 이후,
상기 바닥판 슬래브의 상면에 교면방수 시공, 포장 시공 및 방호벽 설치를 수행하는 단계를 더 포함하는 거더와 교각의 일체화 강결구조를 포함하는 교량의 시공방법.
The method according to any one of claims 1, 2, and 3,
After the sequencing and tensioning step,
The method of claim 1, further comprising the step of: performing cross-securing waterproofing, paving, and installing a barrier wall on the top surface of the bottom slab.
삭제delete 삭제delete
KR1020170119401A 2017-09-18 2017-09-18 Bridge comprising monolithic structure of girder and pier and construction method for the same KR101881580B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170119401A KR101881580B1 (en) 2017-09-18 2017-09-18 Bridge comprising monolithic structure of girder and pier and construction method for the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170119401A KR101881580B1 (en) 2017-09-18 2017-09-18 Bridge comprising monolithic structure of girder and pier and construction method for the same

Publications (1)

Publication Number Publication Date
KR101881580B1 true KR101881580B1 (en) 2018-07-24

Family

ID=63059190

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170119401A KR101881580B1 (en) 2017-09-18 2017-09-18 Bridge comprising monolithic structure of girder and pier and construction method for the same

Country Status (1)

Country Link
KR (1) KR101881580B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016420A (en) * 2021-11-23 2022-02-08 兴泰建设集团有限公司 Assembly type construction method for single pier column steel bridge
CN114263121A (en) * 2022-01-13 2022-04-01 中工武大设计集团有限公司 Prestressed steel beam tensioning structure in concrete box girder structure system conversion and construction method
CN114293480A (en) * 2021-12-23 2022-04-08 浙江正方交通建设有限公司 Comprehensive reinforcing structure for active hollow slab bridge and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200300023Y1 (en) 2002-09-27 2003-01-06 전혜관 multi-span continuous prestressed concrete girder bridge structure rigidly joined to pier
KR200431821Y1 (en) * 2006-09-13 2006-11-27 장현옥 The Method of Construction for Continuous Bridge made by Prestressed Concrete I-Shape Girder
KR20120018565A (en) * 2010-08-23 2012-03-05 권오근 Continuous supporting structure of corrugated steel web psc beam using secondary tendon and method for constructing the same
KR101582599B1 (en) * 2013-03-11 2016-01-06 주식회사 동성엔지니어링 Bridge construction method for forming continuous point part of pier using copping for connecting girder
KR20160142985A (en) * 2015-06-04 2016-12-14 (주)태영이씨엠 Concrete Girder With Coupler And Method For Constructing Rhamen Bridge Using The Same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200300023Y1 (en) 2002-09-27 2003-01-06 전혜관 multi-span continuous prestressed concrete girder bridge structure rigidly joined to pier
KR200431821Y1 (en) * 2006-09-13 2006-11-27 장현옥 The Method of Construction for Continuous Bridge made by Prestressed Concrete I-Shape Girder
KR20120018565A (en) * 2010-08-23 2012-03-05 권오근 Continuous supporting structure of corrugated steel web psc beam using secondary tendon and method for constructing the same
KR101582599B1 (en) * 2013-03-11 2016-01-06 주식회사 동성엔지니어링 Bridge construction method for forming continuous point part of pier using copping for connecting girder
KR20160142985A (en) * 2015-06-04 2016-12-14 (주)태영이씨엠 Concrete Girder With Coupler And Method For Constructing Rhamen Bridge Using The Same

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016420A (en) * 2021-11-23 2022-02-08 兴泰建设集团有限公司 Assembly type construction method for single pier column steel bridge
CN114016420B (en) * 2021-11-23 2024-02-13 兴泰建设集团有限公司 Single pier column steel bridge assembly type construction method
CN114293480A (en) * 2021-12-23 2022-04-08 浙江正方交通建设有限公司 Comprehensive reinforcing structure for active hollow slab bridge and construction method
CN114293480B (en) * 2021-12-23 2024-05-24 浙江正方交通建设有限公司 Active hollow slab bridge comprehensive reinforcement structure and construction method
CN114263121A (en) * 2022-01-13 2022-04-01 中工武大设计集团有限公司 Prestressed steel beam tensioning structure in concrete box girder structure system conversion and construction method
CN114263121B (en) * 2022-01-13 2023-07-04 中工武大设计集团有限公司 Prestressed steel beam tensioning structure in concrete box girder structure system transformation and construction method

Similar Documents

Publication Publication Date Title
KR101881578B1 (en) Bridge comprising monolithic structure of girder and pier and construction method for the same
KR100958014B1 (en) Construction method of steel composite girder bridge
KR102009134B1 (en) Construction Method of Long Span Girder Bridge
KR100703134B1 (en) Prefabricated prestressed concrete beam bridge and its construction method
KR100991869B1 (en) Single and continuous prestressed concrete girder bridge and the construction method
KR101187168B1 (en) Small river pc bridge and construction method thereof
KR100986207B1 (en) Precast psc t-type girder bridge and its construction method
JP3588325B2 (en) Construction method of single span and multi span composite girder bridges
KR102061224B1 (en) Sectionally devided precast box culverts and the construction method thereof
JP2007077630A (en) Continuous girder using precast main-girder segment, and its erection method
KR101881580B1 (en) Bridge comprising monolithic structure of girder and pier and construction method for the same
KR101107826B1 (en) Slab-type box girder made by precast concrete and method constructing the bridge therewith
KR101318773B1 (en) T-shaped composite girder segment integrated by i-shaped girder filled with concrete and slab and construction method of slab by prefabrication of the t-shaped composite girder segment
JP3844743B2 (en) Box girder bridge structure and its construction method
KR101586320B1 (en) Psc girder rahmen bridge and construction method thereof
KR101312759B1 (en) Safety construction method against overturning of steel cross beam using psc curved girder
KR101020483B1 (en) Apparatus having a girder connection anchor plate and construction method for continuity of precast prestressed concrete girder bridges using the same apparatus
KR101735077B1 (en) Bridge deck using precast concrete panel
KR200406615Y1 (en) T shape precast concrete panel
JP4477467B2 (en) Bridge structure and its replacement method
KR20070001410A (en) Mounting structure of steel cross-beam in multi-girder concrete bridge and its construction method
JP4086863B2 (en) Continuous girder structure in double span girder bridge
KR100856848B1 (en) A structure of prestressed concrete pavement and its construction method
KR20030094195A (en) Improved prestressed steel reinforced concrete beam and bridge construction method using the same beam
KR100989153B1 (en) Psc girder connection structure with strength connector detail for substitution of rebar placement in deck and bridge construction method using the same

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant