KR101866024B1 - Heating and hot water device of the central type - Google Patents

Heating and hot water device of the central type Download PDF

Info

Publication number
KR101866024B1
KR101866024B1 KR1020160070370A KR20160070370A KR101866024B1 KR 101866024 B1 KR101866024 B1 KR 101866024B1 KR 1020160070370 A KR1020160070370 A KR 1020160070370A KR 20160070370 A KR20160070370 A KR 20160070370A KR 101866024 B1 KR101866024 B1 KR 101866024B1
Authority
KR
South Korea
Prior art keywords
hot water
heating
water
main
pipe
Prior art date
Application number
KR1020160070370A
Other languages
Korean (ko)
Other versions
KR20170138233A (en
Inventor
장용성
김영섭
안명호
Original Assignee
지에스건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 지에스건설 주식회사 filed Critical 지에스건설 주식회사
Priority to KR1020160070370A priority Critical patent/KR101866024B1/en
Publication of KR20170138233A publication Critical patent/KR20170138233A/en
Application granted granted Critical
Publication of KR101866024B1 publication Critical patent/KR101866024B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/08Hot-water central heating systems in combination with systems for domestic hot-water supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D17/00Domestic hot-water supply systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating
    • F24D19/1015Arrangement or mounting of control or safety devices for water heating systems for central heating using a valve or valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1066Arrangement or mounting of control or safety devices for water heating systems for the combination of central heating and domestic hot water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/02Fluid distribution means
    • F24D2220/0271Valves
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier

Abstract

중앙집중식 난방 및 급탕 장치가 개시된다.
본 발명에 의한 중앙집중식 난방 및 급탕 장치는, 열 생산설비에서 열매체를 전달받아 가열수를 생산하는 메인 열교환기; 상기 메인 열교환기에 연결되며, 가열수를 공급하는 메인 공급관; 상기 메인 열교환기에 연결되고, 가열수를 회수하는 메인 회수관; 상기 메인 공급관에 연결되며, 하나 이상의 난방구역에 난방을 위해 가열수를 공급하는 하나 이상의 난방용 가열수 공급관; 상기 메인 회수관에 연결되고, 상기 난방구역에서 전달되는 가열수를 상기 메인 회수관에 전달하는 하나 이상의 난방용 가열수 회수관; 상기 메인 공급관과 연결되는 급탕용 가열수 공급관, 상기 메인 회수관과 연결되는 급탕용 가열수 회수관에 각각 연결되고, 상기 급탕용 가열수 공급관에서 전달되는 가열수와 급수관을 통해 전달되는 시수를 열교환하여 각 세대 또는 층의 수전 분배기에 공급하기 위한 급탕수를 생산하는 급탕 열교환기; 상기 급탕 열교환기에 연결되고, 상기 수전 분배기에 급탕수를 공급하는 하나 이상의 급탕관; 상기 급탕 열교환기에 연결되며, 상기 급수관에서 전달되는 시수를 상기 급탕 열교환기에 전달하는 하나 이상의 시수 공급 배관; 상기 하나 이상의 난방용 가열수 공급관 또는 하나 이상의 난방용 가열수 회수관에 설치되어 난방수의 유량을 조절하는 하나 이상의 난방수 유량조절밸브; 상기 급탕용 가열수 공급관에 설치되며, 상기 메인 공급관에서 상기 급탕 열교환기로 공급되는 가열수의 유량을 조절하는 제3 밸브; 상기 하나 이상의 급탕관에 설치되고, 상기 수전 분배기로 공급되는 급탕수의 유량을 조절하는 하나 이상의 급탕수 유량조절밸브; 및 상기 난방수 유량조절밸브, 제3 밸브 및 급탕수 유량조절밸브를 제어하는 중앙제어기를 포함하여 이루어진다.
A centralized heating and hot water supply system is disclosed.
The centralized heating and hot water supply apparatus according to the present invention includes: a main heat exchanger for receiving heating medium from a heat production facility to produce heating water; A main supply pipe connected to the main heat exchanger and supplying heating water; A main return pipe connected to the main heat exchanger and recovering the heated water; At least one heating water supply pipe connected to the main supply pipe for supplying heating water to at least one heating zone for heating; At least one heating water recovery pipe connected to the main recovery pipe and delivering the heating water delivered from the heating zone to the main recovery pipe; A heating water supply pipe connected to the main supply pipe and a hot water return pipe connected to the main return pipe, the heating water transferred from the hot water supply pipe for hot water and the water transferred through the water supply pipe are subjected to heat exchange A hot water heat exchanger for producing hot water for supplying to the power distributor of each household or the floor; One or more hot water pipes connected to the hot water heat exchanger and supplying hot water to the power distributor; One or more water supply pipes connected to the hot water heat exchanger and delivering the water delivered from the water supply pipe to the hot water heat exchanger; At least one heating water flow rate regulating valve installed in the at least one heating water supply pipe for heating or at least one heating water return pipe for heating to regulate the flow rate of the heating water; A third valve installed in the hot water supply water supply pipe for regulating a flow rate of the heating water supplied from the main supply pipe to the hot water heat exchanger; One or more hot water flow regulating valves provided in the at least one hot water supply line for regulating the flow rate of the hot water supplied to the hot water distributor; And a central controller for controlling the heating water flow rate control valve, the third valve, and the hot water flow rate control valve.

Figure R1020160070370
Figure R1020160070370

Description

중앙집중식 난방 및 급탕 장치{HEATING AND HOT WATER DEVICE OF THE CENTRAL TYPE}{HEATING AND HOT WATER DEVICE OF THE CENTRAL TYPE}

본 발명은 중앙집중식 난방 및 급탕 장치에 관한 것으로서, 보다 상세하게는 상업건물 또는 공동주택을 이루는 복수의 공간에 효율적이고, 안정적인 난방 운전 및 급탕 공급이 가능한 중앙집중식 난방 및 급탕 장치에 관한 것이다.
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a centralized heating and hot water supply apparatus, and more particularly, to a centralized heating and hot water supply apparatus capable of efficient and stable heating operation and hot water supply in a plurality of spaces constituting a commercial building or a multi-

공동주택이나 중대형 규모의 빌딩 또는 고층빌딩은 각 층이나 세대에 난방과 급탕(온수)을 공급하기 위해 보일러 등과 같은 난방설비가 설치된다. 이러한 난방설비는 열매체(일례로, 온수, 중온수 또는 증기)의 생산방식에 따라 개별식 또는 중앙집중식으로 구분된다.In apartment buildings or medium to large-sized buildings or high-rise buildings, heating facilities such as boilers are installed to supply heating and hot water (hot water) to each floor or household. Such a heating system is divided into a separate type or a centralized type depending on the production method of the heating medium (for example, hot water, hot water or steam).

개별식의 경우, 공동주택의 각 세대나 층별로 열원을 생산하고, 개별적으로 난방운전을 시행하는 방식으로, 사용연료가 유류, 전기 또는 도시가스 등으로 다양하다.In the case of the individual type, the heat source is produced for each household or floor of the apartment house, and the heating operation is carried out separately. The fuel used varies from oil, electricity or city gas.

중앙집중식은 별도의 열원시설에서 생산된 열을 공동주택이나 건물에 이송하여 난방 및 급탕을 공급하는 방식이다. 그에 따라 중앙집중식은 별도의 열원시설에서 공동주택 등으로 열이 이송되는 동안의 열손실을 보전하기 위해 공동주택의 단지 내에 설치된 기계실에서 열원시설로부터 이송된 열을 교환하여 각 세대 또는 층으로 난방이나 급탕에 필요한 중저온수를 생산하여 공급한다.The centralized method is a method of transferring heat generated from a separate heat source facility to a house or building to supply heating and hot water. Accordingly, the centralized system exchanges the heat transferred from the heat source facility in the machine room installed in the complex of the apartment house to conserve the heat loss during the heat transfer from the separate heat source facility to the apartment house, Produces and supplies low and medium hot water needed for hot water supply.

이러한 중앙집중식은 다수의 수요처에 비교적 효율이 높은 열원설비를 사용함으로써 경제적이고, 전문적인 기술을 갖춘 관리자가 관리하기 때문에 개별식에 비해 설비의 효율이 감소되더라도 적극적으로 대응할 수 있는 장점이 있다. 또한, 동시 사용률이 적용되어 전체 설비용량을 축소할 수 있으며, 화력 등을 한 곳에 모아 화재와 같은 응급상황에 대한 대응이 용이한 장점이 있다.This centralized system has the advantage of being able to respond positively even if the facility efficiency is lowered compared with the individual type because it is managed by the manager having economical and specialized technology by using the heat source facility which is relatively efficient to a large number of customers. In addition, the simultaneous utilization rate can be applied to reduce the total facility capacity, and there is an advantage that the firepower can be collected in one place and the emergency situation such as fire can be easily responded to.

본 발명은 중앙집중식에 관한 것으로, 종래에 사용된 중앙집중식은 순환펌프를 포함하는 4-파이프 방식을 이용한다.The present invention relates to a centralized system, and a conventionally used centralized four-pipe system including a circulation pump is used.

종래의 중앙집중식은 난방용 열교환기와 급탕용 열교환기가 각각 구비되며, 순환펌프와 난방용 열교환기 및 급탕용 열교환기를 통해 공동주택이나 건물까지 난방수를 공급 및 회수하도록 배관이 연결된다. 이때, 난방용 열교환기는 각 세대에 연결된 난방 공급관 및 난방 회수관과 연결되고, 급탕용 열교환기는 각 세대에 연결된 급탕 공급관과 급탕 회수관과 연결된다.Conventionally, centralized heating and heat exchangers are provided respectively for heating and hot water, and piping is connected to supply and recover the heating water to the building or building through the circulation pump, the heating heat exchanger and the hot water heat exchanger. At this time, the heating heat exchanger is connected to the heating supply pipe and the heating return pipe connected to each household, and the hot water heat exchanger is connected to the hot water supply pipe and the hot water supply return pipe connected to each household.

즉, 종래의 중앙집중식은 난방과 급탕의 공급을 별개로 공급하기 위해 4-파이프가 설치됨에 따라 설비비용, 배관 설치를 위한 건축비, 설비 관리 및 유지 보수비용이 증대되며, 다수의 배관 설치에 따른 배관에서의 열손실이 발생하는 문제가 있다.That is, in the conventional centralized type, since the four-pipe is installed to separately supply the heating and the hot water supply, the equipment cost, the construction cost for the piping installation, the facility management and maintenance cost are increased, There is a problem that heat loss occurs in the piping.

또한, 난방 배관과 별도로 급탕 배관이 설치됨에 따라 배관 구조가 복잡하게 설치될 수밖에 없으며, 노후화로 인해 교체가 필요한 경우 복잡한 구조로 인해 교체가 쉽지 않은 문제가 있다.In addition, since the hot water piping is installed separately from the heating pipe, the piping structure is inevitably complicated to install, and when it is required to be replaced due to aging, it is difficult to replace the pipe due to its complicated structure.

또한 난방을 마치고 난방 회수관으로 회수되는 열을 재사용하지 못함으로써, 에너지를 낭비하는 문제가 있었으며, 각 세대나 층에서 급탕을 할 때, 최초에 배출되는 물의 온도가 낮아 가온의 급탕수가 배출될 때까지 다량의 물을 버리게 되어 물의 낭비를 초래하는 문제가 있다.
In addition, there was a problem of wasting energy by not reusing the heat recovered from the heating return pipe after the heating, and when the hot water was discharged from each generation or the floor, the temperature of the first discharged water was low, So that there is a problem that water is wasted.

대한민국 등록특허 제10-1479557호(2014.12.30)Korean Patent No. 10-1479557 (December 30, 2014)

본 발명은 상술한 종래기술의 문제점을 해결하기 위하여 안출된 것으로서, 상업건물 또는 공동주택을 이루는 복수의 공간에 종래에 비하여 간단한 구조로, 효율적이고 안정적인 난방 운전 및 급탕 공급이 가능한 중앙집중식 난방 및 급탕 장치를 제공하는 것에 그 목적이 있다. SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems of the prior art, and it is an object of the present invention to provide a central heating and hot water supply system capable of efficient and stable heating operation and hot water supply in a plurality of spaces, And an object of the present invention is to provide a device.

본 발명의 또 다른 목적은 난방을 마치고 회수되는 난방수의 열을 재활용하여 에너지를 절감할 수 있으며, 급탕수의 온도를 일정온도 이상으로 유지시킴으로써 물의 낭비를 막을 수 있는 중앙집중식 난방 및 급탕 장치를 제공하는 것에 있다.
Another object of the present invention is to provide a centralized heating and hot water supply device capable of saving energy by recycling the heat of the heated water recovered after heating and by preventing the water from being wasted by maintaining the temperature of the hot water more than a predetermined temperature .

상술한 목적을 달성하기 위하여 본 발명은, 중앙집중식 난방 및 급탕 장치를 제공하는데, 본 발명의 일례에 의한 중앙집중식 난방 및 급탕 장치는, In order to accomplish the above object, the present invention provides a centralized heating and hot water supply apparatus. In the centralized heating and hot water supply apparatus according to an embodiment of the present invention,

열 생산설비에서 열매체를 전달받아 가열수를 생산하는 메인 열교환기; 상기 메인 열교환기에 연결되며, 가열수를 공급하는 메인 공급관; 상기 메인 열교환기에 연결되고, 가열수를 회수하는 메인 회수관; 상기 메인 공급관에 연결되며, 하나 이상의 난방구역에 난방을 위해 가열수를 공급하는 하나 이상의 난방용 가열수 공급관; 상기 메인 회수관에 연결되고, 상기 난방구역에서 전달되는 가열수를 상기 메인 회수관에 전달하는 하나 이상의 난방용 가열수 회수관; 상기 메인 공급관과 연결되는 급탕용 가열수 공급관, 상기 메인 회수관과 연결되는 급탕용 가열수 회수관에 각각 연결되고, 상기 급탕용 가열수 공급관에서 전달되는 가열수와 급수관을 통해 전달되는 시수를 열교환하여 각 세대 또는 층의 수전 분배기에 공급하기 위한 급탕수를 생산하는 급탕 열교환기; 상기 급탕 열교환기에 연결되고, 상기 수전 분배기에 급탕수를 공급하는 하나 이상의 급탕관; 상기 급탕 열교환기에 연결되며, 상기 급수관에서 전달되는 시수를 상기 급탕 열교환기에 전달하는 하나 이상의 시수 공급 배관; 상기 하나 이상의 난방용 가열수 공급관 또는 하나 이상의 난방용 가열수 회수관에 설치되어 난방수의 유량을 조절하는 하나 이상의 난방수 유량조절밸브; 상기 급탕용 가열수 공급관에 설치되며, 상기 메인 공급관에서 상기 급탕 열교환기로 공급되는 가열수의 유량을 조절하는 제3 밸브; 상기 하나 이상의 급탕관에 설치되고, 상기 수전 분배기로 공급되는 급탕수의 유량을 조절하는 하나 이상의 급탕수 유량조절밸브; 및 상기 난방수 유량조절밸브, 제3 밸브 및 급탕수 유량조절밸브를 제어하는 중앙제어기를 포함하여 이루어진다.A main heat exchanger for producing heating water by receiving a heating medium from a heat production facility; A main supply pipe connected to the main heat exchanger and supplying heating water; A main return pipe connected to the main heat exchanger and recovering the heated water; At least one heating water supply pipe connected to the main supply pipe for supplying heating water to at least one heating zone for heating; At least one heating water recovery pipe connected to the main recovery pipe and delivering the heating water delivered from the heating zone to the main recovery pipe; A heating water supply pipe connected to the main supply pipe and a hot water return pipe connected to the main return pipe, the heating water transferred from the hot water supply pipe for hot water and the water transferred through the water supply pipe are subjected to heat exchange A hot water heat exchanger for producing hot water for supplying to the power distributor of each household or the floor; One or more hot water pipes connected to the hot water heat exchanger and supplying hot water to the power distributor; One or more water supply pipes connected to the hot water heat exchanger and delivering the water delivered from the water supply pipe to the hot water heat exchanger; At least one heating water flow rate regulating valve installed in the at least one heating water supply pipe for heating or at least one heating water return pipe for heating to regulate the flow rate of the heating water; A third valve installed in the hot water supply water supply pipe for regulating a flow rate of the heating water supplied from the main supply pipe to the hot water heat exchanger; One or more hot water flow regulating valves provided in the at least one hot water supply line for regulating the flow rate of the hot water supplied to the hot water distributor; And a central controller for controlling the heating water flow rate control valve, the third valve, and the hot water flow rate control valve.

그리고, 상기 메인 회수관과 급탕 열교환기 사이에 위치한 제1 급탕용 가열수 공급관에 설치된 제4 밸브; 및 상기 제1 급탕용 가열수 공급관과 급탕용 가열수 회수관 사이에 위치한 메인 회수관에 설치된 제5 밸브를 더 포함할 수 있으며, 상기 제3 밸브는 상기 메인 공급관과 메인 회수관 사이에 위치한 제1 급탕용 가열수 공급관에 설치되고, 상기 제1 급탕용 가열수 공급관은 상기 메인 회수관과 연결되고, 상기 메인 회수관을 통해 회수되는 가열수를 상기 급탕 열교환기로 공급하며, 상기 중앙제어기는 상기 제4 밸브 및 제5 밸브를 제어하고, 상기 메인 회수관의 가열수가 상기 급탕 열교환기로 공급되는 동안 상기 제3 밸브 및 제5 밸브는 차단되고, 상기 제4 밸브는 개방되도록 제어될 수 있다.A fourth valve provided in a first hot water supply water supply pipe located between the main return pipe and the hot water heat exchanger; And a fifth valve installed in the main return pipe located between the first hot water heating water supply pipe and the hot water heating water recovery pipe, and the third valve is disposed between the main supply pipe and the main return pipe Wherein the first hot water heating water supply pipe is connected to the main return pipe and supplies the hot water recovered through the main return pipe to the hot water heat exchanger, The fourth valve and the fifth valve are controlled and the third valve and the fifth valve are shut off while the heating water of the main recovery pipe is supplied to the hot water heat exchanger, and the fourth valve is controlled to be opened.

또한 상기 수전 분배기에 연결되고, 상기 하나 이상의 시수 공급 배관에 상기 수전 분배기에서 전달되는 급탕수를 전달하는 급탕 순환관; 및 상기 급수관에서 상기 하나 이상의 시수 공급 배관으로 전달되는 시수의 유량을 조절하는 제8 밸브를 더 포함할 수 있으며, 상기 급탕 순환관을 통해 급탕수를 유동시키는 경우, 상기 중앙제어기는 상기 제8 밸브가 차단되도록 제어할 수 있다.A hot water circulation pipe connected to the hot water distributor and transferring hot water supplied from the hot water distributor to the at least one hot water supply pipe; And an eighth valve for controlling the flow rate of the water delivered from the water supply pipe to the at least one water supply pipe. When the hot water flows through the hot water circulation pipe, the central controller controls the eighth valve Can be controlled to be blocked.

또한 상기 중앙제어기는 상기 메인 회수관에서 상기 급탕용 가열수 공급관으로 가열수가 공급되도록 상기 하나 이상의 난방수 유량조절밸브를 차단하고, 상기 제3 밸브 및 하나 이상의 급탕수 유량조절밸브가 개방되도록 제어할 수 있다.
Also, the central controller may block the at least one heating water flow control valve so that the heating water is supplied from the main return pipe to the heating water supply pipe for hot water supply, and controls the third valve and the at least one hot water flow control valve to be opened .

상술한 본 발명에 의할 경우, 상업건물 또는 공동주택을 이루는 복수의 공간에 종래에 비하여 간단한 구조로, 효율적이고 안정적인 난방 운전 및 급탕 공급이 가능한 중앙집중식 난방 및 급탕 장치를 제공할 수 있다.According to the present invention, it is possible to provide a centralized heating and hot water supply system which can efficiently and stably supply heating operation and hot water supply to a plurality of spaces constituting a commercial building or a multi-unit house with a simple structure compared with the conventional structure.

또한 본 발명은 난방을 마치고 회수되는 난방수의 열을 재활용하여 에너지를 절감할 수 있으며, 급탕수의 온도를 일정온도 이상으로 유지시킴으로써 물의 낭비를 막을 수 있는 효과가 있다.
Further, the present invention can reduce the energy by recycling the heat of the heated water recovered after the heating, and it is possible to prevent the waste of water by keeping the temperature of the hot water higher than a certain temperature.

도 1은 본 발명의 일 실시예에 따른 중앙집중식 난방 및 급탕 장치를 간략히 도시한 계통도이다.
도 2는 본 발명의 일 실시예에 따른 중앙집중식 난방 및 급탕 장치에서 난방이 이루어질 때의 계통을 간략히 도시한 계통도이다.
도 3은 본 발명의 일 실시예에 따른 중앙집중식 난방 및 급탕 장치에서 급탕이 이루어질 때의 계통을 간략히 도시한 계통도이다.
도 4는 본 발명의 일 실시예에 따른 중앙집중식 난방 및 급탕 장치에서 난방과 함께 급탕을 위한 예열이 이루어질 때의 계통을 간략히 도시한 계통도이다.
1 is a schematic diagram illustrating a centralized heating and hot water supply apparatus according to an embodiment of the present invention.
2 is a schematic diagram illustrating a system when heating is performed in a centralized heating and hot water supply apparatus according to an embodiment of the present invention.
FIG. 3 is a schematic diagram illustrating a system for hot water supply in a centralized heating and hot water supply apparatus according to an embodiment of the present invention.
FIG. 4 is a schematic diagram showing a system for preheating for heating and hot water in a centralized heating and hot water supply apparatus according to an embodiment of the present invention.

이하 본 발명의 바람직한 실시예에 대하여 첨부된 도면을 참조하여 보다 구체적으로 설명한다.Hereinafter, preferred embodiments of the present invention will be described more specifically with reference to the accompanying drawings.

도 1은 본 발명의 일 실시예에 따른 중앙집중식 난방 및 급탕 장치를 간략히 도시한 계통도이다.1 is a schematic diagram illustrating a centralized heating and hot water supply apparatus according to an embodiment of the present invention.

도 1을 참조하면, 본 발명의 일 실시예에 따른 중앙집중식 난방 및 급탕 장치(100)는, 메인 열교환기(110), 급탕 열교환기(120), 복수의 배관시설 및 중앙제어기(140)를 포함한다.1, a centralized heating and hot water apparatus 100 according to an embodiment of the present invention includes a main heat exchanger 110, a hot water heat exchanger 120, a plurality of piping facilities, and a central controller 140 .

메인 열교환기(110)는 열병합발전소나 중앙보일러 등과 같은 열 생산설비(A)에서 열매체를 전달받아 열교환으로 가열수를 생산한다. 이를 위해 메인 열교환기(110)에는 가열수를 공급하기 위한 메인 공급관(111)과 가열수를 회수하기 위한 메인 회수관(112)이 연결된다.The main heat exchanger 110 receives heating medium from a heat production facility A such as a cogeneration power plant or a central boiler, and produces heat water by heat exchange. To this end, a main supply pipe 111 for supplying heating water and a main return pipe 112 for recovering heating water are connected to the main heat exchanger 110.

본 실시예에 따른 중앙집중식 난방 및 급탕 장치(100)는, 하나의 열 생산설비(A)에서 다수의 공동주택 단지로 분배되며, 본 실시예에서의 메인 열교환기(110)는 다수의 공동주택 단지 각각에 설치된다. 즉, 메인 열교환기(110)는 하나의 공동주택 단지에 설치되며, 메인 열교환기(110)에 연결된 메인 공급관(111) 및 메인 회수관은 공동주택 단지의 각 건물로 분배되고, 다시 건물의 각 층으로 분배될 수 있다.The centralized heating and hot water supply apparatus 100 according to the present embodiment is distributed to a plurality of apartment houses in one heat production facility A. The main heat exchanger 110 in this embodiment is divided into a plurality of apartment houses It is only installed in each. That is, the main heat exchanger 110 is installed in one apartment complex, the main supply pipe 111 connected to the main heat exchanger 110 and the main return pipe are distributed to each building of the apartment complex, Layer. ≪ / RTI >

도 1에 도시된 계통도는 공동주택 단지에 설치된 메인 열교환기(110)에서 난방 및 급탕 공급이 필요한 복수의 구역을 갖는 건물의 한 층으로 메인 공급관(111)과 메인 회수관(112)이 연결된 것을 예시적으로 도시한 도면이다.1 schematically shows a structure of a building having a plurality of zones for heating and hot water supply in a main heat exchanger 110 installed in a multi-family housing complex, in which a main supply pipe 111 and a main return pipe 112 are connected Fig.

그에 따라 메인 공급관(111)은 제1 및 제2 난방용 가열수 공급관(113a, 113b)으로 연결되며, 제1 및 제2 난방용 가열수 공급관(113a, 113b)을 통해 해당 층의 각 세대로 가열수가 공급되어 난방이 이루어질 수 있다. 이때, 제1 난방공급관은 제1 난방구역(H1)으로 난방을 공급하고, 제2 난방용 가열수 공급관(113b)은 제2 난방구역(H2)으로 난방을 공급한다. 여기서, 제1 및 제2 난방구역(H1, H2)은 공동주택 등의 건물 중 한 층에 위치하는 두 개의 세대 각각을 의미하며, 필요에 따라 난방구역의 수는 변동될 수 있다. 그리고 난방구역의 수가 변동됨에 따라 난방용 가열수 공급관 및 난방용 가열수 회수관의 수도 그에 따라 변동될 수 있다. 또한 본 발명은 한 층뿐 아니라 복수의 층에도 적용될 수 있다.The main supply pipe 111 is connected to the first and second heating water supply pipes 113a and 113b for heating and the heating water supply pipes 113a and 113b for heating are connected to the heating water supply pipes 113a and 113b, And heating can be performed. At this time, the first heating supply pipe supplies the heating to the first heating zone H1, and the second heating heating water supply pipe 113b supplies the heating to the second heating zone H2. Here, the first and second heating zones H1 and H2 mean two generations located in one floor of a building such as a multi-family house, and the number of the heating zones may be varied if necessary. As the number of heating zones varies, the number of heating water supply pipes for heating and the number of heating water recovery pipes for heating may be varied accordingly. The present invention can be applied not only to one layer but also to a plurality of layers.

본 실시예에서는 예시적으로 제1 난방구역(H1)에 난방 및 급탕이 공급되는 것을 위주로 하여 설명하지만, 제2 난방구역(H2)도 제1 난방구역(H1)과 동일한 방식으로 난방 및 급탕이 공급될 수 있다.Although the heating and hot water supply is exemplarily provided in the first heating zone H1, the second heating zone H2 is also heated and heated in the same manner as the first heating zone H1. Can be supplied.

즉, 메인 공급관(111)은 제1 난방용 가열수 공급관(113a)을 통해 메인 열교환기(110)에서 가열된 가열수를 제1 난방구역(H1)으로 공급한다. 그에 따라 가열수는 난방수의 역할을 한다. 그리고 제1 난방구역(H1)은 제1 난방용 가열수 회수관(114a)으로 연결되며, 제1 난방용 가열수 회수관(114a)은 메인 회수관(112)과 연결된다. 이때, 제1 및 제2 난방용 가열수 회수관(114a, 114b)에는 제1 및 제2 밸브(131, 132)가 각각 설치되어, 난방수의 유량을 조절할 수 있다. 즉, 상기 제1 및 제2 밸브(131, 132)는 난방수의 유량을 역할을 하는 난방수 유량조절밸브이다. 여기서, 제1 및 제2 밸브(131, 132)는 제1 및 제2 난방용 가열수 회수관(114a, 114b)이 아닌 제1 및 제2 난방용 가열수 공급관(113a, 113b)에 설치될 수도 있다. That is, the main supply pipe 111 supplies the heated water heated by the main heat exchanger 110 to the first heating zone H1 through the first heating water supply pipe 113a. Accordingly, the heated water serves as the heating water. The first heating zone H1 is connected to the first heating water recovery pipe 114a and the first heating water recovery pipe 114a is connected to the main recovery pipe 112. [ At this time, the first and second heating water recovery tubes 114a and 114b are provided with first and second valves 131 and 132, respectively, so that the flow rate of the heating water can be adjusted. That is, the first and second valves 131 and 132 are heating water flow rate control valves serving as the flow rate of the heating water. The first and second valves 131 and 132 may be installed in the first and second heating water supply pipes 113a and 113b instead of the first and second heating water recovery tubes 114a and 114b .

본 실시예에서는 종래와 달리 복수의 세대에 하나의 급탕 열교환기가 배치되어 급탕을 공급하게 된다. 따라서 종래에 비해 설비의 간소화 및 배관의 간소화를 도모할 수 있다.In the present embodiment, unlike the prior art, one hot water heat exchanger is disposed in a plurality of generations to supply hot water. Therefore, compared to the conventional case, the facility can be simplified and the piping can be simplified.

메인 회수관(112)에는 가열수를 순환시키기 위한 순환펌프(117)가 배치될 수 있다. 순환펌프(117)는 제1 및 제2 난방구역(H1, H2), 급탕 열교환기(120)를 거쳐 회수되는 가열수의 순환을 위해 구비되며, 중앙제어기(140)에 의해 제어될 수 있다.The main return pipe 112 may be provided with a circulation pump 117 for circulating the heating water. The circulation pump 117 is provided for circulating the heating water recovered through the first and second heating zones H1 and H2 and the hot water heat exchanger 120 and can be controlled by the central controller 140. [

상기 급탕 열교환기(120)는 급탕 공급을 위한 열교환 설비이며, 일 측에 급탕용 가열수 공급관(115)과 급탕용 가열수 회수관(116)이 연결된다. 그리고 타 측에 급탕수 공급 배관(121) 및 시수 공급 배관(122)이 각각 연결될 수 있다. 이때, 급탕용 가열수 공급관(115)은 메인 공급관(111) 및 메인 회수관(112)과 연결되며, 급탕용 가열수 회수관(116)은 메인 회수관(112)과 연결된다. 그에 따라 급탕용 가열수 공급관(115)으로 공급되는 가열수는 메인 공급관(111)에서 공급되거나 메인 회수관(112)에서 공급될 수 있다. 이를 위해 급탕용 가열수 공급관(115)에는 제3 및 제4 밸브(133, 134)가 설치되어, 급탕 열교환기(120)로 공급되는 가열수의 공급경로, 공급여부 및 유량을 조절할 수 있다. 또한, 메인 회수관(112)에서 급탕용 가열수 공급관(115)으로 가열수가 공급되도록 하기 위해 메인 회수관(112)에 제5 밸브(135)가 설치될 수 있다. 또한 상기 제3 밸브(133)는 유량조절 기능을 가지는 밸브 외에 단순한 체크밸브가 사용되어도 무방하다. The hot water heat exchanger 120 is a heat exchange facility for supplying hot water, and a hot water supply water supply pipe 115 and a hot water supply water recovery pipe 116 are connected to one side. And the water supply water supply pipe 121 and the water supply pipe 122 may be connected to the other side, respectively. At this time, the hot water supply water supply pipe 115 is connected to the main supply pipe 111 and the main return pipe 112, and the hot water supply water return pipe 116 is connected to the main return pipe 112. The heated water supplied to the hot water supply water supply pipe 115 can be supplied from the main supply pipe 111 or supplied from the main return pipe 112. [ To this end, the hot water supply hot water supply pipe 115 is provided with third and fourth valves 133 and 134 so as to control the supply path, supply amount and flow rate of the hot water supplied to the hot water heat exchanger 120. The fifth valve 135 may be installed in the main return pipe 112 to supply the heating water to the hot water supply pipe 115 from the main return pipe 112. Also, the third valve 133 may be a simple check valve in addition to the valve having the flow control function.

급탕 열교환기(120)는 급수설비(127)와 연결된 급수관(128)을 통해 공급된 시수를 열교환을 통해 급탕수를 생성하고, 생성된 급탕수를 제1 및 제2 난방구역(H1, H2)의 수전 분배기(129)로 공급할 수 있다.The hot water heat exchanger 120 generates hot water through heat exchange with the water supplied through the water supply pipe 128 connected to the water supply unit 127 and supplies the generated hot water to the first and second heating zones H1 and H2, To the faucet distributor (129) of Fig.

그리고 급탕 열교환기(120)에는 시수 공급 배관(122)이 연결되고 상기 시수 공급 배관(122)에는 급수관(128)이 연결되어 급수관(128)을 통해 공급된 시수가 시수 공급 배관(122)을 통해 급탕 열교환기(120)로 공급될 수 있다. 급탕 열교환기(120)에서 열교환되어 생성된 급탕수는 급탕수 공급 배관(121)을 통해 제1 및 제2 급탕관(123a, 123b)으로 공급된다. 이렇게 공급된 급탕수는 제1 및 제2 급탕관(123a, 123b)을 거쳐 수전 분배기(129)로 공급될 수 있다.A water supply pipe 122 is connected to the hot water heat exchanger 120 and a water supply pipe 128 is connected to the water supply pipe 122 so that the water supplied through the water supply pipe 128 flows through the water supply pipe 122 To the hot water heat exchanger (120). The hot water generated by heat exchange in the hot water heat exchanger 120 is supplied to the first and second hot water supply pipes 123a and 123b through the hot water supply pipe 121. [ The supplied hot water can be supplied to the power receiving and distributing device 129 via the first and second hot water supplying pipes 123a and 123b.

급탕수는 급탕의 사용에 따라 수전 분배기(129)를 통해 소비되지만, 급탕의 사용이 중지되는 경우 배관 내에 남아있는 급탕수는 수전 분배기에 연결된 급탕 순환관(125)을 통해 순환될 수 있다. 급탕 순환관(125)은 시수 공급 배관(122)에 연결된다.The hot water is consumed through the faucet distributor 129 depending on the use of the hot water, but when the use of the hot water is stopped, the hot water remaining in the pipe can be circulated through the hot water circulation pipe 125 connected to the faucet distributor. The hot water circulation pipe (125) is connected to the water supply pipe (122).

그리고 제1 및 제2 급탕관(123a, 123b)에는 각각 제6 및 제7 밸브(136, 137)가 각각 설치될 수 있다. 상기 제6 및 제7 밸브(136, 137)에 의해 각 세대에 급탕수의 공급여부 및 유량이 조절될 수 있으며, 제6 및 제7 밸브(136, 137)는 중앙제어기(140)를 통해 제어될 수 있다. 즉, 상기 제6 및 제7 밸브(136, 137)는 급탕수의 유량을 조절하는 급탕수 유량조절밸브이다. 또한, 급수관(128) 또는 시수 공급 배관(122)에는 급탕 열교환기(120)로 공급되는 시수의 공급 여부 및 유량을 조절하기 위한 제8 밸브(138)가 설치될 수 있고, 제8 밸브(138)도 중앙제어기(140)를 통해 제어될 수 있다. 또한, 급탕 순환관(125)에는 역류 방지를 위한 체크밸브(CV)가 설치될 수 있다.And sixth and seventh valves 136 and 137 respectively may be installed in the first and second hot water supply pipes 123a and 123b, respectively. The sixth and seventh valves 136 and 137 are controlled by the central controller 140 to control whether the hot water is supplied to the respective generations or not and the flow rate thereof is controlled by the sixth and seventh valves 136 and 137, . That is, the sixth and seventh valves 136 and 137 are hot water flow regulating valves for regulating the flow rate of hot water. The water supply pipe 128 or the water supply pipe 122 may be provided with an eighth valve 138 for controlling whether the water supplied to the water heat exchanger 120 is supplied or not and the eighth valve 138 May also be controlled via the central controller 140. Also, a check valve CV for preventing backflow may be installed in the hot water circulation pipe 125.

도 2는 본 발명의 일 실시예에 따른 중앙집중식 난방 및 급탕 장치에서 난방만이 이루어질 때의 계통을 간략히 도시한 계통도이다.FIG. 2 is a schematic diagram showing a system for heating only in a centralized heating and hot water supply apparatus according to an embodiment of the present invention.

도 2에 도시된 도면을 이용하여 각 세대에 난방만이 이루어지는 것에 대해 설명한다.The heating only in each household will be described using the drawings shown in Fig.

메인 열교환기(110)에서 열교환된 가열수는 세대의 층으로 공급되며, 해당 층에서 제1 난방용 가열수 공급관(113a) 및 제2 난방용 가열수 공급관(113b)으로 분배되어 제1 및 제2 난방구역(H1, H2)으로 각각 공급된다. 그리고 제1 및 제2 난방구역(H1, H2)에서 회수되는 난방수는 각각 제1 및 제2 난방용 가열수 회수관(114a, 114b)을 거쳐 메인 회수관(112)으로 통합되어 메인 열교환기(110)로 회수된다. 이때, 순환펌프(117)에 의해 난방수가 지속적으로 유동될 수 있다.Heat water that has been heat-exchanged in the main heat exchanger 110 is supplied to the generation layers and is distributed to the first heating water supply pipe 113a and the second heating water supply pipe 113b in the corresponding layers, Respectively, into the zones H1 and H2. The heating water recovered in the first and second heating zones H1 and H2 is integrated into the main recovery pipe 112 through the first and second heating water recovery tubes 114a and 114b to be supplied to the main heat exchanger 110). At this time, the circulating pump 117 can continuously flow the heating water.

그리고 난방이 이루어지는 동안 제1 및 제2 밸브(131, 132)와 제5 밸브(135)는 개방된 상태를 유지하고, 필요에 따라 중앙제어기(140)에 의해 난방수의 유량이 제어될 수 있다. 또한, 제1, 제2 및 제5 밸브(131, 132, 135) 이외에 나머지 밸브(133, 134, 136, 137, 138)는 모두 폐쇄된 상태가 유지된다. 이렇게 각 밸브(131 ~ 138)의 제어를 통해 메인 열교환기(110)에서 생산되어 제1 및 제2 난방구역(H1, H2)으로 공급되는 가열수는 메인 공급관(111), 제1 및 제2 난방용 가열수 공급관(113a, 113b), 제1 및 제2 난방용 가열수 회수관(114a, 114b) 및 메인 회수관(112)을 거쳐 이동될 수 있다. 만일 제2 난방구역(H2)은 난방을 하지 않고, 제1 난방구역(H1) 만을 난방하는 경우에는 제2 밸브(132)를 폐쇄시키는 것에 의하여 이루어질 수 있다.While the heating is being performed, the first and second valves 131 and 132 and the fifth valve 135 are kept open, and the flow rate of the heating water can be controlled by the central controller 140 as needed . In addition to the first, second and fifth valves 131, 132 and 135, the remaining valves 133, 134, 136, 137 and 138 are kept closed. The heating water produced in the main heat exchanger 110 and supplied to the first and second heating zones H1 and H2 through the control of the valves 131 to 138 is supplied to the main supply pipe 111, The heating water supply pipes 113a and 113b for heating, the heating water recovery pipes 114a and 114b for the first and second heating, and the main return pipe 112. [ If the second heating zone H2 does not heat and only the first heating zone H1 is heated, the second valve 132 may be closed.

도 3은 본 발명의 일 실시예에 따른 중앙집중식 난방 및 급탕 장치에서 급탕이 이루어질 때의 계통을 간략히 도시한 계통도이다.FIG. 3 is a schematic diagram illustrating a system for hot water supply in a centralized heating and hot water supply apparatus according to an embodiment of the present invention.

도 3을 참조하여, 본 실시예에서 급탕이 이루어지는 것에 대해 설명한다.With reference to Fig. 3, a description will be given of the hot water supply in this embodiment.

메인 열교환기(110)에서 열교환된 가열수는 세대의 층으로 공급되며, 해당 층의 급탕용 가열수 공급관(115)을 통해 급탕 열교환기(120)로 공급된다. 그리고 가열수는 급탕 열교환기(120)에서 급탕용 가열수 회수관(116)을 거쳐 메인 회수관(112)으로 회수된다. 급탕 열교환기(120)로 공급된 시수는 가열수와의 열교환으로 급탕수로 변환되고, 급탕수는 급탕수 공급 배관(121)을 통해 제1 및 제2 급탕관(123a, 123b)으로 분배되어 제1 및 제2 난방구역(H1, H2)에 설치된 수전 분배기(129)로 공급된다.The heated water heat-exchanged in the main heat exchanger 110 is supplied to the generation layer and supplied to the hot water heat exchanger 120 through the hot water supply water supply pipe 115 for the hot water. The heated water is recovered to the main recovery pipe 112 through the hot water heat recovery pipe 116 in the hot water heat exchanger 120. The water supplied to the hot water heat exchanger 120 is converted into hot water by heat exchange with the heated water and the hot water is distributed to the first and second hot water supply pipes 123a and 123b through the hot water supply pipe 121 And is supplied to the faucet distributor 129 installed in the first and second heating zones H1 and H2.

상기와 같이, 급탕수가 수전 분배기(129)로 공급되는 과정, 즉 급탕수가 생산 및 공급되는 것은 수전 분배기(129)에서 급탕수의 소비가 이루어지는 순간을 감지함에 따라 이루어질 수 있다. 수전 분배기(129)에서 급탕수의 소비가 이루어지는지는 중앙제어기(140)를 통해 확인할 수 있는데, 이를 위해 제1 급탕관(123a)에는 유량센서가 설치될 수 있다. 유량센서는 수전 분배기(129)를 통해 급탕수의 소비가 일어나면, "+"값에 대한 신호를 중앙제어기(140)로 전송하고, 중앙제어기(140)는 급탕수가 생산되도록 각 밸브들을 제어한다. 또한 상기 유량센서에 의한 방식 이외에 수전의 동작을 기계적 또는 전기적으로 감지하는 방식 등 다양한 방식에 의하여 이루어질 수 있다.As described above, the process of supplying hot water to the water dispenser 129, that is, the production and supply of hot water, can be performed by sensing the moment when hot water is consumed in the water dispenser 129. Whether hot water is consumed in the faucet distributor 129 can be confirmed through the central controller 140. To this end, a flow rate sensor may be installed in the first hot water supply pipe 123a. The flow sensor sends a signal for the "+" value to the central controller 140 when hot water is consumed through the faucet distributor 129 and the central controller 140 controls each valve to produce hot water. In addition to the system using the flow sensor, the system may be implemented by various methods such as a mechanical or electrical sensing of the operation of the water supply.

상기와 같이, 급탕수의 생산이 필요하면, 중앙제어기(140)는 제1 및 제2 밸브(131, 132)를 폐쇄하여 제1 및 제2 난방구역(H1, H2)으로 공급되는 난방수를 차단하고, 제5 밸브(135)를 차단한다. 그리고 급탕용 가열수 공급관(115)에 설치된 제3 및 제4 밸브(133, 134)를 개방한다. 그에 따라 메인 공급관(111)으로 공급된 가열수가 급탕용 가열수 공급관(115)으로만 이동될 수 있다.The central controller 140 closes the first and second valves 131 and 132 to supply the heating water supplied to the first and second heating zones H1 and H2 And the fifth valve 135 is shut off. And the third and fourth valves 133 and 134 provided in the hot water supply water supply pipe 115 are opened. The heating water supplied to the main supply pipe 111 can be moved only to the heating water supply pipe 115 for hot water supply.

또한, 제6 내지 제8 밸브(136, 137, 138)를 개방한다. 그에 따라 급탕 열교환기(120)에서 생산된 급탕수는 제6 및 제7 밸브(136, 137)의 개방으로 제1 및 제2 급탕관(123a, 123b)을 통해 제1 및 제2 난방구역(H1, H2)의 수전 분배기(129) 측으로 공급될 수 있다. 또한, 제8 밸브(138)의 개방에 따라 급수설비(127)에서 공급된 시수가 급수관(128) 및 시수 공급 배관(122)을 거쳐 급탕 열교환기(120)에서 열교환되어 급탕수로 변환될 수 있다. 만일 제1 난방구역(H1)에서만 급탕 수요가 발생한 경우, 제7 밸브(137)를 폐쇄시켜 제1 난방구역(H1)의 수전분배기(129) 측으로만 급탕수를 유동시킨다. Further, the sixth to eighth valves 136, 137, and 138 are opened. The hot water produced by the hot water heat exchanger 120 is discharged through the first and second hot water supply pipes 123a and 123b to the first and second heating zones H1, and H2 to the power distributor 129 side. As the eighth valve 138 is opened, the water supplied from the water supply equipment 127 is heat-exchanged in the hot water heat exchanger 120 via the water supply pipe 128 and the water supply pipe 122, have. If the hot water supply demand occurs only in the first heating zone H1, the seventh valve 137 is closed to flow the hot water only toward the power distributor 129 of the first heating zone H1.

도 4는 본 발명의 일 실시예에 따른 중앙집중식 난방 및 급탕 장치에서 난방과 함께 급탕을 위한 예열이 이루어질 때의 계통을 간략히 도시한 계통도이다.FIG. 4 is a schematic diagram showing a system for preheating for heating and hot water in a centralized heating and hot water supply apparatus according to an embodiment of the present invention.

본 실시예에서는 난방이 공급되고, 급탕이 공급되지 않을 때 급탕수에 대한 예열을 수행할 수 있다. In this embodiment, preheating of the hot water can be performed when heating is supplied and no hot water is supplied.

종래에는 급탕수 사용 초기에 저온의 급탕수가 공급되어, 불필요한 물이 버려지는 문제가 있었다. 본 실시예에서는 처음부터 일정 온도 이상의 급탕수가 공급될 수 있도록 난방을 마치고 회수되는 난방수의 열을 이용하여 급탕수를 예열하게 된다. 즉, 수전 분배기(129)에서 소비되기 시작할 때의 급탕수 온도가 일정 이상으로 유지될 수 있게 급탕수는 수전 분배기(129), 급탕 순환관(125)과 시수 공급 배관(122)을 거쳐 급탕 열교환기로 순환될 수 있다. 그에 따라 급탕 열교환기(120)에서 다시 일정 이상의 열교환이 이루어진 상태에서 다시 급탕수 공급 배관(121)을 통해 제1 및 제2 급탕관(123a, 123b)을 거쳐 수전 분배기(129)로 공급될 수 있다.Conventionally, there has been a problem that low-temperature hot water is supplied at the initial stage of using hot water, and unnecessary water is discarded. In this embodiment, the hot water is preheated by using the heat of the heated water after completion of heating so that the hot water over a certain temperature can be supplied from the beginning. That is, the hot water temperature is maintained at a predetermined level or higher so that the hot water temperature at the time of starting to be consumed in the power distributor 129 can be maintained at a predetermined level or more. Thus, the hot water flows through the hot water distributor 129, the hot water circulation pipe 125, Can be circulated. The water can be supplied to the faucet distributor 129 through the first and second hot water supply pipes 123a and 123b through the hot water supply pipe 121 in a state where heat exchange is performed at a certain level or more in the hot water heat exchanger 120 have.

상기와 같이, 급탕수가 급탕 순환관(125)을 거쳐 순환되는 동안, 제1 및 제2 난방구역(H1, H2)을 거친 난방수는 메인 회수관(112)을 통해 이동되는데, 이때, 메인 회수관(112)의 난방수를 급탕 순환관(125)을 거쳐 순환하는 급탕수를 예열하는 열원으로 이용할 수 있다. 이를 위해 도 4에 도시된 바와 같이, 메인 회수관(112)의 제5 밸브(135)를 차단하고, 급탕용 가열수 공급관(115)의 제4 밸브(134)를 개방한다. 그에 따라 메인 회수관(112)을 통해 이동하는 난방수는 급탕 열교환기(120)로 이동될 수 있다.The hot water flowing through the first and second heating zones H1 and H2 is moved through the main return pipe 112 while the hot water is circulated through the hot water circulation pipe 125. At this time, The hot water of the pipe 112 can be used as a heat source for preheating the hot water circulating through the hot water circulation pipe 125. [ To do this, the fifth valve 135 of the main return pipe 112 is shut off and the fourth valve 134 of the hot water supply water supply pipe 115 is opened as shown in FIG. Accordingly, the hot water flowing through the main return pipe 112 can be transferred to the hot water heat exchanger 120.

이렇게 난방을 위해 이용된 난방수에 남아 있는 열을 급탕수의 예열을 위해 이용함으로써, 난방수의 열을 재활용할 수 있어 에너지를 절약할 수 있다.By using the heat remaining in the heating water used for the heating for the preheating of the hot water, the heat of the heating water can be recycled and the energy can be saved.

여기서, 폐쇄되는 밸브는 제3 밸브(133), 제5 밸브(135) 및 제8 밸브(138)이다. 제8 밸브(138)는 급탕수가 순환됨에 따라 급탕수에 시수를 공급할 필요가 없기 때문에 폐쇄된다.Here, the valves to be closed are the third valve 133, the fifth valve 135 and the eighth valve 138. The eighth valve (138) is closed because it is not necessary to supply the water to the hot water as the hot water is circulated.

또한 도시하지는 않았지만 급탕수의 순환라인에는 급탕수를 순환시키기 위한 순환펌프가 설치된다.Although not shown, a circulation pump for circulating hot water is installed in the circulation line of the hot water.

상기와 같이 급탕수를 일정 온도 이상으로 유지시키는 것은 급탕수의 순환라인에 온도 센서를 설치하고, 측정된 온도 값이 설정된 온도 값 이하일 경우 순환시키는 방식, 또는 주기적으로 정해진 일정 시간동안 급탕수를 순환시키는 방식 등 다양한 방식에 의하여 이루어질 수 있다. As described above, the hot water is kept at a predetermined temperature or more by providing a temperature sensor in the circulation line of the hot water and circulating the measured temperature value when the measured temperature value is lower than the set temperature value or circulating the hot water water for a predetermined period of time And the like.

상기와 같이 본 발명에 의할 경우, 종래에 비하여 간단한 구조로, 효율적이고 안정적인 난방 운전 및 급탕 공급이 가능하게 된다. 또한 난방을 마치고 회수되는 난방수의 열을 재활용하여 에너지를 절감할 수 있으며, 급탕수의 온도를 일정온도 이상으로 유지시킴으로써 자원의 낭비를 막을 수 있게 된다.As described above, according to the present invention, efficient and stable heating operation and hot water supply can be achieved with a simple structure compared with the conventional structure. In addition, energy can be saved by recycling the heat of the heating water recovered after the heating is completed, and waste of resources can be prevented by keeping the temperature of the hot water more than a certain temperature.

위에서 설명한 바와 같이 본 발명에 대한 구체적인 설명은 첨부된 도면을 참조한 실시예에 의해서 이루어졌지만, 상술한 실시예는 본 발명의 바람직한 예를 들어 설명하였을 뿐이므로, 본 발명이 상기 실시예에만 국한되는 것으로 이해돼서는 안 되며, 본 발명의 권리범위는 후술하는 청구범위 및 그 등가개념으로 이해되어야 할 것이다.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments. It should be understood that the scope of the present invention is to be understood as the scope of the following claims and their equivalents.

100: 난방 및 급탕 장치
110: 메인 열교환기
111: 메인 공급관 112: 메인 회수관
113: 난방용 가열수 공급관
113a: 제1 난방용 가열수 공급관 113b: 제2 난방용 가열수 공급관
114: 난방용 가열수 회수관
114a: 제1 난방용 가열수 회수관 114b: 제2 난방용 가열수 회수관
115: 급탕용 가열수 공급관 116: 급탕용 가열수 회수관
117: 순환펌프 120: 급탕 열교환기
121: 급탕수 공급 배관 122: 시수 공급 배관
123a: 제1 급탕관 123b: 제2 급탕관
125: 급탕 순환관 127: 급수설비
128: 급수관 129: 수전 분배기
131~138: 제1 내지 제8 밸브
140: 중앙제어기 A: 열 생산설비
H1: 제1 난방구역 H2: 제2 난방구역
CV: 체크밸브
100: Heating and water supply system
110: main heat exchanger
111: main supply pipe 112: main return pipe
113: Heating water supply pipe for heating
113a: First heating water supply pipe for heating 113b: Second heating water supply pipe
114: Heating water recovery pipe for heating
114a: First heating water recovery pipe 114b: Second heating water recovery pipe
115: Heating water supply pipe for hot water supply 116: Heating water return pipe for hot water supply
117: circulation pump 120: hot water heat exchanger
121: Hot water supply piping 122: City water supply piping
123a: first hot water tank 123b: second hot water tank
125: Hot water circulation pipe 127: Water supply facility
128: water pipe 129: faucet distributor
131 to 138: First to eighth valves
140: Central controller A: Heat production facility
H1: First heating zone H2: Second heating zone
CV: Check Valve

Claims (6)

열 생산설비에서 열매체를 전달받아 가열수를 생산하는 메인 열교환기;
상기 메인 열교환기에 연결되며, 가열수를 공급하는 메인 공급관;
상기 메인 열교환기에 연결되고, 가열수를 회수하는 메인 회수관;
상기 메인 공급관에 연결되며, 하나 이상의 난방구역에 난방을 위해 가열수를 공급하는 하나 이상의 난방용 가열수 공급관;
상기 메인 회수관에 연결되고, 상기 난방구역에서 전달되는 가열수를 상기 메인 회수관에 전달하는 하나 이상의 난방용 가열수 회수관;
상기 메인 공급관 및 메인 회수관과 연결되는 급탕용 가열수 공급관, 상기 메인 회수관과 연결되는 급탕용 가열수 회수관에 각각 연결되고, 상기 급탕용 가열수 공급관에서 전달되는 가열수와 급수관을 통해 전달되는 시수를 열교환하여 각 세대 또는 층의 수전 분배기에 공급하기 위한 급탕수를 생산하는 급탕 열교환기;
상기 급탕 열교환기에 연결되고, 상기 수전 분배기에 급탕수를 공급하는 하나 이상의 급탕관;
상기 급탕 열교환기에 연결되며, 상기 급수관에서 전달되는 시수를 상기 급탕 열교환기에 전달하는 시수 공급 배관;
상기 하나 이상의 난방용 가열수 공급관 또는 하나 이상의 난방용 가열수 회수관에 설치되어 난방수의 유량을 조절하는 하나 이상의 난방수 유량조절밸브;
상기 메인 공급관과 메인 회수관 사이에 위치한 급탕용 가열수 공급관에 설치되며, 상기 메인 공급관에서 상기 급탕 열교환기로 공급되는 가열수의 유량을 조절하는 제3 밸브;
상기 메인 회수관과 급탕 열교환기 사이에 위치한 급탕용 가열수 공급관에 설치되는 제4 밸브;
상기 급탕용 가열수 공급관과 급탕용 가열수 회수관 사이에 위치한 메인 회수관에 설치되는 제5 밸브;
상기 하나 이상의 급탕관에 설치되고, 상기 수전 분배기로 공급되는 급탕수의 유량을 조절하는 하나 이상의 급탕수 유량조절밸브;
상기 급수관에서 상기 시수 공급 배관으로 전달되는 시수의 유량을 조절하는 제8 밸브;
상기 수전 분배기에 연결되고, 상기 시수 공급 배관에 상기 수전 분배기에서 전달되는 급탕수를 전달하는 급탕 순환관;
상기 수전 분배기에서 전달되는 급탕수를 순환시키기 위하여 급탕 순환관에 배치되는 순환펌프; 및
상기 난방수 유량조절밸브, 제3 밸브, 제4 밸브, 제5 밸브, 급탕수 유량조절밸브, 제8 밸브 및 순환펌프를 제어하는 중앙제어기를 포함하며,
상기 중앙제어기는 상기 난방수 유량조절밸브, 제4 밸브, 급탕수 유량조절밸브가 개방되도록 제어하고, 상기 제3 밸브, 제5 밸브, 제8 밸브가 폐쇄되도록 제어하며, 상기 순환펌프가 동작되도록 제어하여, 난방을 수행함과 동시에 급탕 순환관내에 체류하는 급탕수를 예열하는 것을 특징으로 하는 중앙집중식 난방 및 급탕 장치.
A main heat exchanger for producing heating water by receiving a heating medium from a heat production facility;
A main supply pipe connected to the main heat exchanger and supplying heating water;
A main return pipe connected to the main heat exchanger and recovering the heated water;
At least one heating water supply pipe connected to the main supply pipe for supplying heating water to at least one heating zone for heating;
At least one heating water recovery pipe connected to the main recovery pipe and delivering the heating water delivered from the heating zone to the main recovery pipe;
A heating water supply pipe for hot water supply connected to the main supply pipe and the main return pipe and a heating water recovery pipe for hot water supply connected to the main return pipe, A hot water heat exchanger for producing hot water for supplying heat to the water dispenser of each household or floor;
One or more hot water pipes connected to the hot water heat exchanger and supplying hot water to the power distributor;
A water supply pipe connected to the hot water heat exchanger and transmitting the water supplied from the water pipe to the hot water heat exchanger;
At least one heating water flow rate regulating valve installed in the at least one heating water supply pipe for heating or at least one heating water return pipe for heating to regulate the flow rate of the heating water;
A third valve installed in the hot water supply pipe for hot water located between the main supply pipe and the main return pipe and controlling the flow rate of the heating water supplied from the main supply pipe to the hot water heat exchanger;
A fourth valve installed in a hot water supply pipe for hot water located between the main return pipe and the hot water heat exchanger;
A fifth valve installed in the main return pipe located between the hot water supply water supply pipe and the hot water supply water recovery pipe;
One or more hot water flow regulating valves provided in the at least one hot water supply line for regulating the flow rate of the hot water supplied to the hot water distributor;
An eighth valve for regulating the flow rate of the water delivered from the water supply pipe to the water supply pipe;
A hot water circulation pipe connected to the hot water distributor and delivering hot water supplied from the hot water distributor to the hot water distributing pipe;
A circulation pump disposed in the hot water circulation pipe for circulating the hot water supplied from the power distributor; And
And a central controller for controlling the heating water flow rate control valve, the third valve, the fourth valve, the fifth valve, the hot water flow control valve, the eighth valve and the circulation pump,
The central controller controls the heating water flow rate control valve, the fourth valve, and the hot water flow rate control valve to be opened, controls the third valve, the fifth valve and the eighth valve to be closed, And preheats the hot water flowing in the hot water circulation pipe at the same time as performing the heating.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020160070370A 2016-06-07 2016-06-07 Heating and hot water device of the central type KR101866024B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160070370A KR101866024B1 (en) 2016-06-07 2016-06-07 Heating and hot water device of the central type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160070370A KR101866024B1 (en) 2016-06-07 2016-06-07 Heating and hot water device of the central type

Publications (2)

Publication Number Publication Date
KR20170138233A KR20170138233A (en) 2017-12-15
KR101866024B1 true KR101866024B1 (en) 2018-06-08

Family

ID=60954523

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160070370A KR101866024B1 (en) 2016-06-07 2016-06-07 Heating and hot water device of the central type

Country Status (1)

Country Link
KR (1) KR101866024B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101081599B1 (en) 2009-04-28 2011-11-08 한국지역난방공사 Public housing and building integrated piping system
KR101222119B1 (en) * 2012-05-29 2013-01-14 윤석구 Heating and hot water supply systems
KR101425870B1 (en) * 2013-04-01 2014-08-04 한국지역난방공사 Apartment house integration system for heating and hot water supply including household hot water supply heat exchange facility
KR101479557B1 (en) 2014-10-24 2015-01-07 석암산업주식회사 Heating Water Supply system for Centralized heating type
KR101497457B1 (en) * 2013-12-23 2015-03-04 주식회사 경동나비엔 Boiler module of individual household for regional and central heating not to equip burning part

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130089487A (en) * 2012-02-02 2013-08-12 한국에너지기술연구원 The integrated district heating pipe system with individual hot water supplying unit in household of apartments

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101081599B1 (en) 2009-04-28 2011-11-08 한국지역난방공사 Public housing and building integrated piping system
KR101222119B1 (en) * 2012-05-29 2013-01-14 윤석구 Heating and hot water supply systems
KR101425870B1 (en) * 2013-04-01 2014-08-04 한국지역난방공사 Apartment house integration system for heating and hot water supply including household hot water supply heat exchange facility
KR101497457B1 (en) * 2013-12-23 2015-03-04 주식회사 경동나비엔 Boiler module of individual household for regional and central heating not to equip burning part
KR101479557B1 (en) 2014-10-24 2015-01-07 석암산업주식회사 Heating Water Supply system for Centralized heating type

Also Published As

Publication number Publication date
KR20170138233A (en) 2017-12-15

Similar Documents

Publication Publication Date Title
KR101425870B1 (en) Apartment house integration system for heating and hot water supply including household hot water supply heat exchange facility
US9175864B2 (en) Energy-saving central heating and hot water supply system
KR101222119B1 (en) Heating and hot water supply systems
KR101700534B1 (en) Heating and hot water device of the central type
KR100626993B1 (en) Energy saving type combined local heating system and central heating system in cogeneration system from natural gas
JP7019614B2 (en) Combined heating and cooling system
KR101281014B1 (en) The integrated district heating pipe system with individual heating unit in household of apartments
KR102013197B1 (en) Apartment house old pipe demolition and household heating system with new pipe
CN104534638A (en) Heat recovery system and method for data center
KR101866025B1 (en) Heating and hot water device of the central type
KR101479557B1 (en) Heating Water Supply system for Centralized heating type
KR101866024B1 (en) Heating and hot water device of the central type
KR20170052731A (en) Heating and hot water device of the central type
CN210179734U (en) Heat exchange unit with heat pump temperature regulation and control function
KR20100031177A (en) Hot water distributor for heating system
KR102499867B1 (en) Heating Unit for Hot Water Supply Combined with Hot Water Distributor
KR20130089487A (en) The integrated district heating pipe system with individual hot water supplying unit in household of apartments
KR100769118B1 (en) District heating system for using micro turbine
KR102584026B1 (en) Parallel-Type Heating Unit for Domestic Hot Water Supply Combined with Hot Water Header
KR102450821B1 (en) Integrated Piping System Using Hot Water Supply
KR102084242B1 (en) Removing old pipes and supplying hot water and heating water using new pipes
KR200370859Y1 (en) Water Supply System for Heating and Domestic Hot Water
CN114810242B (en) Comprehensive utilization method and system for energy of back pressure turbine steam source
CN213421158U (en) Heat exchange system of water heating type air heater
KR20230165021A (en) District heating system combined with distributed heat sink

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right