KR101848936B1 - electric supply equipment replacement apparatus using a crane - Google Patents

electric supply equipment replacement apparatus using a crane Download PDF

Info

Publication number
KR101848936B1
KR101848936B1 KR1020120150545A KR20120150545A KR101848936B1 KR 101848936 B1 KR101848936 B1 KR 101848936B1 KR 1020120150545 A KR1020120150545 A KR 1020120150545A KR 20120150545 A KR20120150545 A KR 20120150545A KR 101848936 B1 KR101848936 B1 KR 101848936B1
Authority
KR
South Korea
Prior art keywords
mounting
vertical
crane
joint part
joint
Prior art date
Application number
KR1020120150545A
Other languages
Korean (ko)
Other versions
KR20140081139A (en
Inventor
양희성
Original Assignee
양희성
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 양희성 filed Critical 양희성
Priority to KR1020120150545A priority Critical patent/KR101848936B1/en
Publication of KR20140081139A publication Critical patent/KR20140081139A/en
Application granted granted Critical
Publication of KR101848936B1 publication Critical patent/KR101848936B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P3/00Vehicles adapted to transport, to carry or to comprise special loads or objects
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P3/00Vehicles adapted to transport, to carry or to comprise special loads or objects
    • B60P3/14Vehicles adapted to transport, to carry or to comprise special loads or objects the object being a workshop for servicing, for maintenance, or for carrying workmen during work
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Forklifts And Lifting Vehicles (AREA)

Abstract

본 발명은 활선 상태에서 배전설비인 애자, 완금 및 전주 등을 안전하고 신속하게 교체할 수 있고 크레인의 사용으로 작업 인원 및 장비 사용을 최소화할 수 있는 크레인을 이용한 배전설비 교체 기구에 관한 것이다.
이를 위하여, 본 발명은 전주의 완금과 나란하게 가완목을 설치할 수 있도록 수직 장착대가 구비된 배전설비 교체 기구에 있어서, 크레인의 붐 선단에 장착되는 장착 브래킷, 장착 브래킷에 설치되어 상하로 회동각이 조절되는 제1관절부, 제1관절부에 설치되어 좌우로 회동각이 조절되는 제2관절부 및, 수직 장착대에 설치되어 제2관절부와 착탈 가능하게 장착되는 체결 소켓으로 이루어짐을 특징으로 한다.
The present invention relates to a power distribution system replacement apparatus using a crane capable of safely and promptly replacing a power distribution apparatus, a power supply apparatus, and a pole, in a live state, and minimizing the number of workers and equipment by using a crane.
In order to achieve the above object, the present invention provides a power distribution system replacing mechanism including a vertical mounting bracket so that a lumber can be installed in parallel to a pole of a pole, comprising: a mounting bracket mounted on a front end of a boom of a crane; A second joint part provided at the first joint part, the second joint part being adjustable in the turning angle to the left and right, and a fastening socket installed on the vertical mounting part and detachably mounted to the second joint part.

Description

크레인을 이용한 배전설비 교체 기구{electric supply equipment replacement apparatus using a crane}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a crane,

본 발명은 크레인을 이용한 배전설비 교체 기구에 관한 것으로, 더욱 상세하게는 활선 상태에서 배전설비인 애자, 완금 및 전주 등을 안전하고 신속하게 교체할 수 있고 크레인의 사용으로 작업 인원 및 장비 사용을 최소화할 수 있는 크레인을 이용한 배전설비 교체 기구에 관한 것이다.More particularly, the present invention relates to a power tool replacing mechanism using a crane, and more particularly, it is possible to safely and quickly replace a power tool, The present invention relates to a power distribution system using a crane.

일반적으로 배전선로는 발전소 또는 변전소로부터 다른 발전소 또는 변전소를 거치는 일 없이 직접 수용가에 이르는 선로를 말한다.Generally, a distribution line means a line from a power station or a substation to a customer directly without going through another power station or substation.

본 발명에서는 배전선로, 특히 전주에 의해 지지되는 배전선로에 설치된 애자, 완금 및 전주 등의 배전설비를 교체 대상으로 한다.In the present invention, a distribution facility such as an insulator, an insulator, and a pole installed on a distribution line, in particular, a distribution line supported by a pole is to be replaced.

본 발명의 배경이 되는 기술로는 본 발명의 출원인이 출원하여 특허받은 등록특허 제10-0865480호(등록일 2008. 10. 21) "활선 작업차를 이용한 직접 활선 작업장치"가 있다. As a background of the present invention, there is a direct live-action device using a live-action vehicle, which is registered and patented by the applicant of the present invention and registered in Korean Patent No. 10-0865480 (registered on October 21, 2008).

동 등록특허의 등록특허공보에는 활선 작업차를 이용하여 전력선 이설·완금 교체·가공지선 및 그 지지대 교체·전주 교체·애자 교체·단상선로 3상화 등의 작업을 수행하기 위한 활선 작업차를 이용한 직접 활선 작업장치가 개시된다. The registered patent publication of the registered patent includes the use of a live work car to perform operations such as power line disconnection, replacement of electric wire, replacement of ground wire and its support, replacement of electric pole, replacement of insulator, A live wire working apparatus is disclosed.

종래 활선 작업차를 이용한 직접 활선 작업장치는 활선 작업차의 붐으로부터 연장 형성된 지지부재와, 지지부재의 선단이 그 내측에 삽입 장착되고 수직방향으로 슬라이드 관로가 형성된 티형 연결부재와, 티형 연결부재의 슬라이드 관로 상에 상·하 방향으로 높낮이 조절이 가능하도록 설치된 승강부재 및, 공지의 가완목을 장착하여 전주에 기 설치된 완금과 평형하게 위치시킬 수 있도록 승강부재의 상단에 회전각 조절수단이 구비된다.A conventional live wire working apparatus using a live wire work car is composed of a support member formed from a boom of a live work vehicle, a T-type connection member having a front end of the support member inserted into the inside thereof and having a slide pipe in a vertical direction, The elevating member is provided on the slide tube so as to be adjustable in height in the upward and downward directions and the rotation angle adjusting means is provided on the upper end of the elevating member so that the elevating member can be positioned in equilibrium with the pre- .

상기의 기술적 구성에 따르면, 활선 작업차를 이용하여 직접 활선 작업장치를 작업위치에 인접시키고 활선 작업차의 바켓에 작업자가 탑승한 상태에서 작업을 수행함으로써 작업공간의 확보가 용이하는 등 작업환경을 개선할 수 있다.According to the above technical arrangement, it is possible to make the work environment easy by securing the work space by carrying out the work while the worker is aboarded on the bucket of the live work vehicle by directly adjoining the live wire work device to the work position using the live work vehicle Can be improved.

또한, 전력선을 옮겨두기 위한 가완목의 승·하강 및 좌·우 회동이 용이하여 기존 완금과 인접되게 위치시킬 수 있으므로 전력선의 이설작업이 쉬울 뿐 아니라 기존 전력선을 가완목으로 옮겨 설치한 후 그대로 들어올려 이격시킴으로써 작업시간을 단축할 수 있다.In addition, since it is easy to move up and down and move left and right in order to move the power line, it is possible to position the power line adjacent to the existing power line, so that it is easy to transfer the power line. It is possible to shorten the work time by raising and separating.

그리고 간소화된 품목만으로 전력선 이설·완금 교체·가공지선 및 그 지지대 교체·전주 교체·애자 교체·단상선로 3상화 등의 작업을 수행할 수 있으므로 작업의 효율성이 높고 필수장비의 구매에 따른 경제적 부담을 경감할 수 있다.And it is possible to perform the tasks such as power line disconnection, replacement of wire line, replacement of ground wire and its support, replacement of electric poles, replacement of insulator, and upgrading of single-phase line with only simplified items, so that the efficiency of work is high and the economic burden It can alleviate.

한편, 종래 활선 작업차를 이용한 직접 활선 작업장치는 가완목과 승강부재가 T자 형태를 이루고, 승강부재의 하단에 취부된 티형 연결부재에 활선 작업차의 붐으로부터 연장 형성된 지지부재가 삽입 장착됨에 따라 전주의 완금으로부터 가완목으로 전선을 이설시켜 지지할 수 있게 된다.Meanwhile, in the conventional live wire working apparatus using a live wire work vehicle, a support member formed from a boom of a live work vehicle is inserted into a T-shaped connecting member attached to a lower end of an elevating member, It is possible to support the electric wire from the electric wire of the Jeonju by a lavatory.

이를 위하여, T자 형태를 이루는 가완목과 승강부재를 전주 및 완금과 수평상태를 이루도록 선로 방향으로 활선 작업차를 진입시켜야 하는데, 도로의 폭이 협소하거나 장애물이 위치할 경우 활선 작업차의 방향 전환이 어려워 직접 활선 작업을 수행하는데 어려움이 있게 된다.In order to achieve this, it is necessary to enter the active work vehicle in the direction of the line so that the T-shaped flexible neck and the elevating member are level with the pole and the beam. If the width of the road is narrow or the obstacle is located, It is difficult to directly carry out the live wire work.

본 발명의 출원인은 종래 활선 작업차를 이용한 직접 활선 작업을 크레인을 이용하여 수행하되 도로의 폭이 좁거나 장애물이 위치하여 차량의 진입이 용이하지 않더라도 크레인의 진입 방향에 관계없이 직접 활선 작업을 수행할 수 있고, 안전성과 작업성을 더욱 높인 크레인을 이용한 배전설비 교체기구를 제안한다. The applicant of the present invention has heretofore conducted a direct live-line operation using a live operation truck using a crane, but performs a live operation directly irrespective of the direction of the crane, even if the width of the road is narrow or the obstacle is located, And proposes a power distribution equipment replacement mechanism using a crane that can enhance safety and workability.

본 발명은 차량의 진입방향에 관계없이 활선 상태에서 배전설비인 애자, 완금 및 전주 등을 안전하고 신속하게 교체할 수 있고 크레인의 사용으로 작업 인원 및 장비 사용을 최소화할 수 있는 크레인을 이용한 배전설비 교체 기구를 제공한다.INDUSTRIAL APPLICABILITY According to the present invention, it is possible to safely and promptly replace a power distribution apparatus, insulator, wire and pole, etc., in a live wire state regardless of the direction in which a vehicle enters, and to provide a power distribution apparatus using a crane Provide a replacement mechanism.

본 발명은 상기의 과제를 해결하기 위하여, 붐 선단에 체결공이 천공된 선단 플레이트가 구비된 크레인과, 전주의 완금과 나란하게 가완목을 설치하기 위한 수직 장착대가 구비된 크레인을 이용한 배전설비 교체 기구에 있어서, 선단 플레이트의 체결공에 대응하여 볼트공이 천공되어 볼트를 매개로 붐의 선단 플레이트에 장착되는 베이스 판과, 베이스 판으로부터 전방으로 나란하게 돌출된 한 쌍의 블레이드판으로 이루어진 장착 브래킷; 장착 브래킷의 블레이드판 사이에 설치되어 상하로 회동각이 조절되는 제1관절부; 제1관절부에 설치되어 좌우로 회동각이 조절되는 제2관절부 및; 수직 장착대에 삽입되어 핀에 의해 결합되는 삽입관과, 삽입관 일측으로 연장 형성되고 제2관절부의 선단이 삽입되어 핀에 의해 착탈 가능하게 결합되는 체결관으로 이루어진 체결 소켓;이 구비되어 제1관절부와 제2관절부의 조작만으로 가완목을 전주의 완금과 나란하게 설치할 수 있는 것을 특징으로 한다. In order to solve the above-mentioned problems, the present invention provides a power distribution system using a crane equipped with a crane having a front end plate with a fastening hole drilled at the tip of a boom, and a vertical mounting bracket A mounting bracket including a base plate which is formed by drilling a bolt hole corresponding to the fastening hole of the end plate and is mounted to the end plate of the boom via a bolt and a pair of blade plates protruding forward from the base plate in a front direction; A first joint part installed between the blade plates of the mounting bracket and having a turning angle adjusted up and down; A second joint provided at the first joint and having a pivotal angle adjusted to the left and right; And a fastening socket which is inserted into the vertical mount and is coupled by the pin, and a fastening socket extending from the insertion tube, the fastening socket comprising a fastening tube inserted into the distal end of the second joint and detachable by the pin, It is characterized in that it is possible to arrange the biceps with the manipulation of the joints and the second joints side by side with the bite of the previous biceps.

상기의 제1관절부는 블레이드 판 사이에 상하로 회동 가능하게 축 결합된 몸체부와, 몸체부로부터 연장 형성되고 원호 상으로 복수개의 각도 조절공이 천공된 한 쌍의 각도 조절판으로 이루어지고, 상기의 제2관절부는 각도 조절판 사이에 좌우로 회동 가능하게 축 결합되고 각도 조절공 중 어느 하나와 핀 결합에 의해 회동 각을 고정하는 핀 홀이 천공된 몸통부와, 몸통부 선단으로부터 연장 형성되어 체결 소켓에 삽입 장착되는 삽입부로 이루어지고, 상기의 제1관절부의 상하 회동각을 조절할 수 있도록 몸체부 후방 상단에 축을 매개로 회동각 조절 수나사가 아이들 상태로 체결되고 블레이드 판 후방 하단에 축을 매개로 회동각 조절 수나사와 나사결합된 암나사가 체결된 것을 특징으로 한다. Wherein the first joint part comprises a body part axially coupled between the blade plates so as to be rotatable up and down and a pair of angle adjusting plates extending from the body part and having a plurality of angle adjusting holes drilled in an arc shape, The two joints include a body portion pierced between the angle regulating plates so as to be rotatable in the right and left direction and having a pin hole formed therein to fix the rotation angle by pin engagement with any one of the angle regulating holes, And an insertion portion to which the first joint part is inserted and inserted. In order to adjust the vertical rotation angle of the first joint part, the rotation angle adjusting screw is fastened in an idle state via an axis at the rear upper part of the body part, And a female screw threadably engaged with the male screw is fastened.

상기의 제1관절부는 블레이드 판 사이에 상하로 회동 가능하게 축 결합된 몸체부와, 몸체부로부터 연장 형성되고 원호 상으로 복수개의 각도 조절공이 천공된 한 쌍의 각도 조절판으로 이루어지고, 상기의 제2관절부는 각도 조절판 사이에 좌우로 회동 가능하게 축 결합되고 각도 조절공 중 어느 하나와 핀 결합에 의해 회동 각을 고정하는 핀 홀이 천공된 몸통부와, 몸통부 선단으로부터 연장 형성되어 체결 소켓에 삽입 장착되는 삽입부로 이루어지고, 상기의 제1관절부의 상하 회동각을 조절할 수 있도록 몸체부 후방에 반원형의 웜 휠이 형성되고, 웜 휠과 맞물린 상태로 베이스 판에 회동 가능하게 축설된 회동각 조절 나사형 웜이 구비된 것을 특징으로 한다. Wherein the first joint part comprises a body part axially coupled between the blade plates so as to be rotatable up and down and a pair of angle adjusting plates extending from the body part and having a plurality of angle adjusting holes drilled in an arc shape, The two joints include a body portion pierced between the angle regulating plates so as to be rotatable in the right and left direction and having a pin hole formed therein to fix the rotation angle by pin engagement with any one of the angle regulating holes, A semicircular worm wheel is formed at the rear of the body so as to adjust a vertical rotation angle of the first joint, and a rotation angle adjustment And a screw-type worm is provided.

삭제delete

상기의 수직 장착대는 그 상단에 가완목을 수평상태로 삽입하여 핀을 매개로 고정하기 위한 T형 연결관을 구비하되, T형 연결관은 가완목을 용이하게 삽입 위치시킬 수 있도록 그 상면에 개폐 가능한 덮개가 구비된 것을 특징으로 한다. The vertical mounting table has a T-shaped connecting pipe for horizontally inserting the door fastener on its upper end to fix the door with the pins. The T-shaped connecting pipe is provided with an opening / And a possible cover is provided.

상기의 전주에 수직 장착대를 일정 거리 이격시켜 취부할 수 있도록 전주 장착부재가 더 구비되되, 전주 장착부재는 전방이 돌출되고 후방이 전주의 일측면에 밀착되는 장착몸체와, 장착몸체의 일측에 결속된 체인을 상기 전주 외측으로 둘러 타측에서 체인을 조이기 위한 조임부재 및, 장착몸체 전방에 수직 장착대의 삽탈이 용이하도록 개폐 가능한 덮개부가 마련된 장착 프레임이 구비된 것을 특징으로 한다. The electric pole mounting member is further provided with an electric pole mounting member for mounting the vertical mounting pole with a predetermined distance therebetween. The electric pole mounting member has a mounting body protruding frontward and a rear face being closely attached to one side face of the pole, A fastening member for tightening the chain on the other side of the bundled chain outside the electric pole and a mounting frame provided with a lid capable of opening and closing to facilitate insertion and removal of the vertical mounting board in front of the mounting body.

상기의 장착몸체의 하부와 수직 장착대 하단에는 공지의 장선기를 걸어 수직 장착대를 상방향으로 들어올리기 위한 장착 고리가 각 형성된 것을 특징으로 한다. The lower part of the mounting body and the lower part of the vertical mounting base are formed with mounting rings for lifting the vertical mounting base upward by hanging a known longitudinal wire.

상기의 가완목은 엘피애자를 매개로 완금에 지지된 전력선을 이선시켜 둘 수 있도록 그 내측에 전력선을 수용하기 위한 개폐 가능한 롤러부와 롤러부를 가완목으로부터 일정 간격 이격시키기 위한 절연봉 및 절연봉을 가완목에 장착하기 위한 장착부로 이루어진 이선용 롤러 기구가 더 구비된 것을 특징으로 한다. In order to allow the power line supported by the braid to be separated through the elbow insulator, an openable and closable roller portion for accommodating the power line is provided inside the braid, and an insulation bar and an exfoliation bar for separating the roller portion from the brace at a predetermined interval And a mounting roller for mounting on the fastener.

상기의 가완목은 현수애자를 매개로 완금에 지지된 전력선을 이선시켜 둘 수 있도록 공지의 장선기를 걸어 전력선을 당기기 위한 고리와 현수애자의 볼쇄클을 체결시켜 두기 위한 고리가 일체로 형성된 이선용 고리부재가 더 구비된 것을 특징으로 한다.In the above-described method, a known wire harness is installed so that a power line supported by the wire can be transferred through a suspending insulator, and a ring for pulling a power line and a ball chain of a suspending insulator are fastened together. Is further provided.

상기의 가완목과 수직 장착대 사이에 대각 방향으로 설치되어 몸통 회전에 따라 오른나사와 왼나사 결합된 양단 체결구가 신축되는 지지봉이 더 구비된 것을 특징으로 한다.And a support bar which is installed in a diagonal direction between the relaxed neck and the vertical mounting bracket and in which both ends of the right and left fasteners are expanded and contracted according to the rotation of the body.

본 발명에 따르면 전주 부근의 도로사정이나 장애물 등에 의해 차량 진입방향이 달라지더라도 작업공간의 충분한 확보로 배전설비인 애자, 완금 및 전주 등을 안전하고 신속하게 교체할 수 있음은 물론이고 크레인의 사용으로 작업 인원 및 장비 사용의 최소화로 경제적 이익을 창출할 수 있다는 효과가 있다. According to the present invention, it is possible to safely and quickly replace the power distributing equipment such as insulators, wickets, and electric poles, even when the direction of vehicle entry is changed due to road conditions or obstacles near the electric pole, It is possible to create economic benefits by minimizing the use of personnel and equipment.

도 1은 본 발명에 따른 크레인을 이용한 배전설비 교체 기구 사시도,
도 2는 본 발명에 따른 크레인을 이용한 배전설비 교체 기구의 회동 구조를 보인 사시도,
도 3은 본 발명에 따른 크레인을 이용한 배전설비 교체 기구의 회동 구조의 다른 실시 예를 보인 사시도,
도 4는 본 발명에 따른 크레인을 이용한 배전설비 교체 기구의 가완목과 수직 장착대의 상세 구조도,
도 5는 본 발명에 따른 크레인을 이용한 배전설비 교체 기구의 전주 장착부재의 상세 구조도,
도 6은 본 발명에 따른 크레인을 이용한 배전설비 교체 기구의 작업 예를 보인 예시도,
도 7은 본 발명에 따른 크레인을 이용한 배전설비 교체 기구의 전주 교체작업을 보인 예시도이다.
1 is a perspective view of a distribution facility replacement mechanism using a crane according to the present invention,
2 is a perspective view showing a rotating structure of a power distribution unit replacement mechanism using a crane according to the present invention,
FIG. 3 is a perspective view showing another embodiment of a rotating structure of a power distribution system replacing mechanism using a crane according to the present invention, FIG.
FIG. 4 is a detailed structural diagram of a relaxed neck and a vertical mounting table of a power distribution system replacing mechanism using a crane according to the present invention,
5 is a detailed structural view of a pole mounting member of a power distribution unit replacement mechanism using a crane according to the present invention.
FIG. 6 is a view showing an example of an operation example of a power distribution system replacing mechanism using a crane according to the present invention, FIG.
7 is a view illustrating an electric pole replacing operation of a power distribution system replacing mechanism using a crane according to the present invention.

이하에서는 첨부도면을 참조하여 본 발명에 따른 크레인을 이용한 배전설비 교체 기구의 바람직한 실시 예에 대하여 상세히 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of a power distribution system replacing mechanism using a crane according to the present invention will be described in detail with reference to the accompanying drawings.

도 1 및 2에 도시한 바와 같이, 본 발명은 전주(1)의 완금(10)과 나란하게 가완목(20)을 설치할 수 있도록 수직 장착대(30)가 구비된 배전설비 교체 기구에 양호하게 적용된다.1 and 2, the present invention is advantageously applied to a power distribution system replacement mechanism provided with a vertical mounting stand 30 so as to be able to install a gimbal 20 in parallel with the wax 10 of the electric pole 1 .

상세하게는, 크레인의 붐(40) 선단에 장착되는 장착 브래킷(50), 장착 브래킷(50)에 설치되어 상하로 회동각이 조절되는 제1관절부(60), 제1관절부(60)에 설치되어 좌우로 회동각이 조절되는 제2관절부(70) 및, 수직 장착대(30)에 설치되어 제2관절부(70)와 착탈 가능하게 장착되는 체결 소켓(80)으로 이루어진다.A mounting bracket 50 mounted on the front end of the boom 40 of the crane, a first joint part 60 provided on the mounting bracket 50 and adjusted in vertical turning angle, And a coupling socket 80 installed on the vertical mounting table 30 and detachably attached to the second joint 70. The second joint 70 is provided on the vertical mounting base 30,

상기의 기술적 구성에 따르면, 가완목(20)은 완금(10)과 나란하게 위치되고 수직 장착대(30)에 의해 지지된 상태에서 수직 장착대의 체결 소켓(80)이 크레인의 제2관절부(70)에 장착됨으로써 크레인의 붐(40)에 의해 지지된다. According to the above technical arrangement, the warp knitting machine 20 is positioned in parallel with the batting 10 and is supported by the vertical mounting bracket 30 so that the fastening socket 80 of the vertical mounting bracket is supported by the second joint 70 So as to be supported by the boom 40 of the crane.

또한, 수직 장착대(30)에 의해 지지된 가완목(20)은 크레인 제1관절부(60)의 상하 회동과 제2관절부(70)의 좌우 회동 및 크레인 붐(40)의 신축으로 기울기, 방향, 높이 조절을 통하여 전주(1)에 장착된 완금(10)과 나란한 상태를 유지할 수 있다. The warp knob 20 supported by the vertical mounting table 30 is supported by the vertical movement of the crane first joint portion 60 and the left and right rotation of the second joint portion 70 and by the elongation and contraction of the crane boom 40, So that it is possible to maintain a state of being in parallel with the wax 10 mounted on the electric pole 1 through the height adjustment.

다음, 상기의 장착 브래킷(50)은 붐의 선단 플레이트(41)에 볼트를 매개로 장착되는 베이스 판(51)과, 베이스 판(51)으로부터 전방으로 나란하게 돌출된 한 쌍의 블레이드 판(52)으로 이루어진다. The mounting bracket 50 includes a base plate 51 mounted to the boom end plate 41 via a bolt and a pair of blade plates 52 projecting from the base plate 51 ).

상기의 제1관절부(60)는 블레이드 판(52) 사이에 상하로 회동 가능하게 축(53) 결합된 몸체부(61)와, 몸체부(61)로부터 연장 형성되고 원호 상으로 복수개의 각도 조절공(63)이 천공된 한 쌍의 각도 조절판(62)으로 이루어진다. The first joint part 60 includes a body part 61 coupled between the blade plate 52 so as to be rotatable up and down and a shaft 53. The first joint part 60 includes a body part 61 extending from the body part 61, And a pair of angle regulating plates 62 in which holes 63 are perforated.

상기의 제2관절부(70)는 각도 조절판(62) 사이에 좌우로 회동 가능하게 축 결합되고 각도 조절공(63) 중 어느 하나와 핀 결합에 의해 회동 각을 고정하는 핀 홀이 천공된 몸통부(71)와, 몸통부(71) 선단으로부터 연장 형성되어 체결 소켓(80)에 삽입 장착되는 삽입부(72)로 이루어진다. The second joint part 70 is rotatably coupled to the angle adjusting plate 62 so as to be rotatable in the left and right direction and is engaged with any one of the angle adjusting holes 63, And an inserting portion 72 extending from the front end of the body portion 71 and inserted into the fastening socket 80.

그리고 상기의 제1관절부(60)의 상하 회동각을 조절할 수 있도록 몸체부(61) 후방 상단에 축(64)을 매개로 회동각 조절 수나사(65)가 아이들 상태로 체결되고 블레이드 판(52) 후방 하단에 축(54)을 매개로 회동각 조절 수나사(65)와 나사결합된 암나사(55)가 체결된다. The rotation angle adjusting male screw 65 is fastened in an idle state via an axis 64 to the rear upper end of the body portion 61 so as to adjust the vertical rotation angle of the first joint 60, And a female screw 55 screwed with the rotation angle adjusting screw 65 is fastened to the rear lower end via an axis 54. [

상기의 기술적 구성에 따르면, 장착 브래킷의 베이스 판(51)은 붐 선단 플레이트(41)에 천공된 체결공에 대응하여 볼트공이 천공된다. 따라서 장착 브래킷(50)은 체결구인 볼트와 너트에 의해 붐 선단 플레이트(41)에 탈부착 가능하게 설치된다. According to the above technical arrangement, the base plate (51) of the mounting bracket is perforated with a bolt hole corresponding to the fastening hole drilled in the boom end plate (41). Therefore, the mounting bracket 50 is detachably attached to the boom end plate 41 by bolts and nuts, which are fasteners.

제1관절부(60)는 장착 브래킷의 블레이드(52) 판 사이에 위치한 몸체부(61)가 블레이드 판(52)과 몸체부(61)를 관통하여 축설된 축(53)에 의해 회동 가능하게 결속되고, 축(53)을 중심으로 상하로 회동한다.The first joint part 60 is configured such that the body part 61 located between the plates of the mounting bracket 52 is rotatably coupled by the shaft 53 which passes through the blade plate 52 and the body part 61, And rotates up and down about the shaft 53 as shown in Fig.

또한, 제1관절부(60)는 몸체부(61) 후방 상단에 축설된 축(64)에 회동각 조절 수나사(65)가 제자리에서 헛돌게 아이들 상태로 체결되고, 블레이드 판(52) 후방 하단에 축설된 축(54)에 회동각 조절 수나사(65)와 나사결합된 암나사(55)가 체결되어 회동각 조절 수나사(65)를 일방향으로 돌릴 경우 회동각 조절 수나사(65)가 암나사(55)의 나사선을 따라 전진 운동하여 가까워짐에 따라 몸체부(61)가 축(53)을 중심으로 상방향으로 회전한다. The first joint 60 has a rotation angle adjusting screw 65 fixed in a idle idle state to a shaft 64 axially installed on the rear upper end of the body 61, When the rotation angle adjusting screw 65 is turned in one direction by fastening the female screw 55 screwed with the rotation angle adjusting screw 65 to the axially established shaft 54 so that the rotation angle adjusting screw 65 is engaged with the female screw 55 The body portion 61 rotates upward about the shaft 53 as it moves forward along the thread.

회동각 조절 수나사(65)를 반대로 돌릴 경우에는 회동각 조절 수나사(65)가 암나사(55)의 나사선을 따라 후퇴 운동하여 멀어짐에 따라 몸체부(61)가 축(53)을 중심으로 하방향으로 회전한다. 이로써 회동각 조절 수나사(65)를 통해 제1관절부(60)의 상하 회동각을 조절할 수 있게 된다.When the rotation angle adjusting screw 65 is turned reversely, the rotation angle adjusting screw 65 is retracted along the thread of the female screw 55 and the body portion 61 moves downward about the shaft 53 Rotate. Thus, the vertical rotation angle of the first joint 60 can be adjusted through the rotation angle adjusting screw 65. [

제2관절부(70)는 상하로 나란하게 설치된 제1관절부의 각도 조절판(62) 사이에 위치한 몸통부(71)가 각도 조절판(62)과 몸통부(71)를 관통하여 축설된 축(66)에 의해 회동 가능하게 결속됨에 따라 축(66)을 중심으로 좌우로 회동한다. The second joint 70 has a body 71 located between the angular adjustment plates 62 of the first joint disposed vertically and in parallel with the shaft 66 extending through the angle adjusting plate 62 and the body 71, So that it rotates about the shaft 66 in the left and right direction.

이때, 축(66)을 중심으로 제2관절부(70)를 회동시켜 몸통부(71)에 천공된 핀 홀을 제1관절부의 각도 조절판(62)에 천공된 어느 하나의 각도 조절공(63)과 일치시킨 후 핀을 꼽게 되면 제2관절부(70)의 회동각이 고정된다. At this time, the second joint part 70 is rotated about the axis 66 so that the pin hole drilled in the body part 71 is inserted into any one angle adjusting hole 63 formed in the angle adjusting plate 62 of the first joint part, The rotation angle of the second joint part 70 is fixed.

따라서 제2관절부의 몸통부(71)에 천공된 핀 홀과 제1관절부의 각도 조절판(62)에 원호 상으로 천공된 어느 하나의 각도 조절공(63)과의 핀 결합에 따라 제2관절부(70)의 좌우 회동각이 고정된다. Accordingly, the pin hole formed in the body part 71 of the second joint part and the angular adjustment hole 63 formed in the arc-shaped hole in the angle adjustment plate 62 of the first joint part are pin- 70 are fixed.

다음은 도 3을 참조하여 전술한 장착 브래킷(50)과 제1관절부(60), 제2관절부(70)의 다른 실시 예에 대하여 설명한다. Next, another embodiment of the mounting bracket 50, the first joint part 60, and the second joint part 70 described above with reference to Fig. 3 will be described.

장착 브래킷(50)은 붐의 선단 플레이트(41)에 볼트를 매개로 장착되는 베이스 판(51)과, 베이스 판(51)으로부터 전방으로 나란하게 돌출된 한 쌍의 블레이드 판(52)으로 이루어진다.The mounting bracket 50 is composed of a base plate 51 mounted on the end plate 41 of the boom through bolts and a pair of blade plates 52 protruding forward from the base plate 51 in a frontal direction.

제1관절부(60)는 블레이드 판(52) 사이에 상하로 회동 가능하게 축(53) 결합된 몸체부(61)와, 몸체부(61)로부터 연장 형성되고 원호 상으로 복수개의 각도 조절공(63)이 천공된 한 쌍의 각도 조절판(62)으로 이루어진다. The first joint part 60 includes a body part 61 coupled between the blade plate 52 so as to be rotatable up and down and a shaft 53 and a plurality of angle adjusting balls extending from the body part 61, 63 are pierced by a pair of angle regulating plates 62.

제2관절부(70)는 각도 조절판(62) 사이에 좌우로 회동 가능하게 축(66) 결합되고 각도 조절공(63) 중 어느 하나와 핀 결합에 의해 회동 각을 고정하는 핀 홀이 천공된 몸통부(71)와, 몸통부(71) 선단으로부터 연장 형성되어 체결 소켓(80)에 삽입 장착되는 삽입부(72)로 이루어진다. The second joint part 70 is coupled to the shaft 66 so as to be rotatable between right and left angles between the angle regulating plates 62 and is engaged with any one of the angle adjusting holes 63, And an inserting portion 72 extending from the front end of the body portion 71 and inserted into the fastening socket 80. [

그리고 제1관절부(60)의 상하 회동각을 조절할 수 있도록 몸체부(61) 후방에 반원형의 웜 휠(67)이 형성되고, 웜 휠(67)과 맞물린 상태로 베이스 판(51)에 회동 가능하게 축설된 회동각 조절 나사형 웜(56)이 구비된다. A semicircular worm wheel 67 is formed at the rear of the body portion 61 so as to adjust the vertical rotation angle of the first joint 60 and is rotatable with respect to the base plate 51 in a state of being meshed with the worm wheel 67 A rotation angle adjusting screw-type worm 56 is provided.

상기의 기술적 구성에서, 제1관절부(60)와 제2관절부(70) 간의 회동 구조는 전술한 바와 같으므로 장착 브래킷(50)에 상하로 회동 가능하게 구성된 제1관절부(60)의 회동 구조를 중심으로 설명한다. The rotating structure of the first joint part 60 configured to be vertically rotatable on the mounting bracket 50 is not limited to that of the first joint part 60 and the second joint part 70, Explained mainly.

제1관절부(60)의 상하 회동 구조는 웜기어 구조로, 제1관절부(60)는 장착 브래킷의 블레이드 판(52) 사이에 위치한 몸체부(61)가 블레이드 판(52)과 몸체부(61)를 관통하여 축설된 축(53)에 의해 회동 가능하게 결속되고, 축(53)을 중심으로 상하로 회동한다.The first joint part 60 has a body part 61 located between the blade plates 52 of the mounting bracket and the blade plate 52 and the body part 61. The first joint part 60 has a worm gear structure, And is pivoted up and down about the shaft 53. As shown in Fig.

제1관절부의 몸체부(61)는 후방에 반원형의 웜 휠(67)이 형성되고, 장착 브래킷의 베이스 판(51)은 웜 휠(67)과 맞물린 상태로 회동 가능하게 축설된 회동각 조절 나사형 웜(56)이 구비된다. 베이스 판(51)은 회동각 조절 나사형 웜(56)의 양단을 지지하여 회동 가능하게 축설할 수 있도록 플랜지(57)가 형성될 수 있다. A worm wheel 67 having a semicircular shape is formed at the rear of the body part 61 of the first joint part and a base plate 51 of the mounting bracket is rotatably supported by the worm wheel 67, A worm 56 is provided. The flange 57 may be formed on the base plate 51 so as to support both ends of the rotation angle adjusting worm 56 and rotatably support the both ends of the worm 56.

상기의 기술적 구성에 따르면, 회동각 조절 나사형 웜(56)을 일방향으로 돌일 경우 웜 휠(67)이 나사선을 따라 시계방향으로 회전하여 몸체부(61)가 축(53)을 중심으로 상방향으로 회전한다. When the worm wheel 56 is rotated in one direction, the worm wheel 67 rotates in the clockwise direction along the threaded line so that the body 61 rotates upward about the shaft 53 .

회동각 조절 나사형 웜(56)을 반대로 돌일 경우에는 웜 휠(67)이 나사선을 따라 반시계방향으로 회전하여 몸체부(61)가 축(53)을 중심으로 하방향으로 회전한다. 이로써 회동각 조절 나사형 웜(56)을 통해 제1관절부(60)의 상하 회동각을 조절할 수 있게 된다.When the worm wheel 56 is rotated in the opposite direction, the worm wheel 67 rotates in the counterclockwise direction along the thread line, and the body 61 rotates downward about the shaft 53. Thus, the vertical rotation angle of the first joint part 60 can be adjusted through the rotation angle adjusting worm 56.

다음, 상기의 체결 소켓(80)은 도 4에 도시한 바와 같이 가완목(20)을 지지하는 수직 장착대(30)를 크레인 붐(40)과 연결하기 위한 구성으로, 삽입된 수직 장착대(30)와 핀에 의해 결합되는 삽입관(81)과, 삽입관(81) 일측으로부터 연장 형성되어 제2관절부(70) 측 삽입시 핀(83)에 의해 결합되는 체결관(82)으로 이루어진다.4, the above-described fastening socket 80 is configured to connect the vertical mounting table 30, which supports the door handle 20, with the crane boom 40, And a fastening tube 82 extending from one side of the insertion tube 81 and coupled by a pin 83 when inserted into the second joint part 70. [

제2관절부(70)는 제1관절부(60)에 좌우로 회동 가능하게 축 결합된 몸통부(71)와, 몸통부(71)로부터 연장 형성되어 상기 체결 소켓의 체결관(82)에 삽입 장착되는 선단인 삽입부(72)로 이루어진다.The second joint 70 includes a body 71 that is pivotally coupled to the first joint 60 so as to be rotatable in the left and right direction and a second joint 70 that is extended from the body 71 and inserted into the fastening pipe 82 of the fastening socket And an inserting portion 72 which is a leading end.

제2관절부의 삽입부(72)는 체결 소켓의 체결관(82) 내로 삽입이 용이하도록 선두가 테이퍼지고, 과도한 삽입을 방지할 수 있도록 몸통부(71)와 단차가 형성된다. The insertion portion 72 of the second joint part is tapered to facilitate insertion into the fastening pipe 82 of the fastening socket and a step is formed with the body 71 so as to prevent excessive insertion.

상기의 기술적 구성에 따르면, 가완목(20)을 지지하는 수직 장착대(30)는 체결 소켓의 체결관(82)에 제2관절부의 삽입부(72)가 삽입되고 핀(83)에 의해 결속됨으로써 제2관절부(70)에 착탈 가능하게 장착된다.According to the above technical arrangement, the vertical mounting table 30 supporting the warp knitting machine 20 is constructed such that the insertion part 72 of the second joint part is inserted into the fastening pipe 82 of the fastening socket, And is detachably mounted on the second joint 70.

다음, 상기의 수직 장착대(30)는 그 상단에 가완목(20)을 수평상태로 삽입하여 핀(91)을 매개로 고정하기 위한 T형 연결관(90)을 구비하되, T형 연결관(90)은 가완목(20)을 용이하게 삽입 위치시킬 수 있도록 그 상면에 개폐 가능한 덮개(92)가 구비된다.Next, the vertical mounting table 30 is provided with a T-shaped connecting pipe 90 for horizontally inserting the door handle 20 on the top of the vertical mounting table 30 to fix the pin with the pin 91, (90) is provided with a lid (92) which can be opened and closed on its upper surface so that the lid (20) can be easily inserted and positioned.

상세하게는, T형 연결관(90)은 가완목(20)을 삽입 위치하기 위한 수평 삽입부(93)와 수직 장착대(30)의 상단을 삽입 위치하기 위한 수직 삽입부(94)가 형성되어 핀(95)을 매개로 가완목(20)과 수직 장착대(30)를 일체로 결속한다.In detail, the T-type connecting pipe 90 is formed with a horizontal insertion portion 93 for inserting the grip 20 and a vertical insertion portion 94 for inserting the upper end of the vertical mounting 30 So that the fastener 20 and the vertical mounting table 30 are integrally joined via the pin 95.

T형 연결관(90)의 수평 삽입부(93) 상판은 개폐 가능한 덮개(92)로, 덮개(92)는 일측이 힌지 결합되고 타측에 잠금장치(96)가 마련된다. 잠금장치(96)는 스프링에 의해 탄지된 장금 핀에 의해 잠금 처리되거나 해제된다.The upper plate of the horizontal insertion portion 93 of the T-type connection pipe 90 is an openable and closable lid 92. The lid 92 is hinged on one side and a locking device 96 on the other side. The lock device 96 is locked or released by a lock pin pinned by a spring.

다음, 수직 장착대(30)를 전주(1)로부터 일정 거리 이격시켜 전주(1)에 취부할 수 있도록 전주 장착부재(100)가 구비된다.Next, the electric pole mounting member 100 is provided so that the vertical mounting base 30 can be mounted on the electric pole 1 with a certain distance from the electric pole 1.

전주 장착부재(100)는 전방이 돌출되고 후방이 전주의 일측면에 밀착되는 장착몸체(101)와, 장착몸체(101)의 일측에 결속된 체인(102)을 전주(1) 외측으로 둘러 타측에서 체인(102)을 조이기 위한 조임부재(103) 및, 장착몸체(101) 전방에 수직 장착대(30)의 삽탈이 용이하도록 개폐 가능한 덮개부(111)가 마련된 장착 프레임(110)이 구비된다.The electric pole mounting member 100 includes a mounting body 101 whose front is protruded and whose rear side is in close contact with one side of the electric pole and a chain 102 which is bound to one side of the mounting body 101, A fastening member 103 for tightening the chain 102 and a mounting frame 110 provided in front of the mounting body 101 and provided with a lid portion 111 which can be opened and closed to facilitate insertion and removal of the vertical mounting base 30 .

상기의 기술적 구성에서, 장착몸체(110)는 후방으로 갈수록 확장되는 원추형으로 전주(1)와 밀착되도록 후방에 안착홈(104)이 형성된다.In the above technical construction, the mounting body 110 is formed with a seating groove 104 at the rear so as to come in close contact with the electric pole 1 in a conical shape extending toward the rear.

조임부재(103)는 공지의 기술적 구성으로, 장착몸체(101)의 일측에 결속되고 전주(1) 외측으로 두른 체인(102)을 장착몸체(101)의 타측에서 조일 수 있도록 구성하여 체인(102)의 긴장력으로 장착몸체(101)를 전주(1)에 견고히 장착한다.The tightening member 103 is configured to be able to be tightened at the other side of the mounting body 101 by a chain 102 bounded to one side of the mounting body 101 and worn outside the electric pole 1, The mounting body 101 is fixed firmly to the electric pole 1. [

장착몸체(101)의 전방에 형성된 장착 프레임(110)은 수직 장착대(30)의 삽탈이 용이하도록 측면에 개폐 가능한 덮개부(111)가 마련된다. 덮개부(111)는 일측이 힌지 결합되고 타측에 잠금장치(112)가 마련된다. 잠금장치(112)는 스프링에 의해 탄지된 장금 핀에 의해 잠금 처리되거나 해제된다.The mounting frame 110 formed on the front side of the mounting body 101 is provided with a lid part 111 which can be opened and closed at the side surface so that the vertical mounting table 30 can be easily inserted and removed. The lid part 111 is hinged on one side and the locking device 112 on the other side. The locking device 112 is locked or released by a lock pin pinned by a spring.

또한, 장착 프레임(110)은 수직 장착대(30)가 삽입 위치된 상태에서 고정할 수 있도록 전면에 스프링에 의해 탄지된 고정핀(113)이 마련된다. 즉, 고정핀(113)을 외측으로 당겨 수직 장착대(30)와의 핀 결합을 해제할 수 있고, 반대로 고정핀(113)을 놓으면 스프링에 의해 고정핀(113)이 장착 프레임(110) 내측으로 진입하여 수직 장착대(30)와 핀 결합된다.In addition, the mounting frame 110 is provided with a fixing pin 113 that is fixed to the front surface by a spring so that the mounting frame 110 can be fixed while the vertical mounting table 30 is inserted. In other words, the fixing pin 113 can be pulled outward to release the pin connection with the vertical mounting base 30. Conversely, when the fixing pin 113 is released, the fixing pin 113 is pushed toward the inside of the mounting frame 110 by the spring And is pin-coupled with the vertical mount 30.

상기의 기술적 구성에 따르면, 전주 장착부재(100)에 의해 수직 장착대(30)가 전주(1)에 취부된 상태에서 수직 장착대(30)의 체결 소켓(80)에 크레인 붐 선단의 제2관절부(70) 측을 결속시키고, 전주(1)로부터 전주 장착부재(100)를 철거하면 크레인의 붐(40)을 이용하여 수직 장착대(30)를 지지할 수 있게 된다.According to the above technical arrangement, in the state where the vertical mounting table 30 is attached to the electric pole 1 by the electric pole mounting member 100, the second socket 2 of the crane boom is connected to the fastening socket 80 of the vertical mounting table 30, When the pole attaching member 100 is removed from the pole 1, the boom 40 of the crane can be used to support the vertical mounting bracket 30.

다음, 전주 장착부재(100)에 의해 수직 장착대(30)가 전주(1)에 취부된 상태에서, 공지의 장선기(미도시)를 이용하여 수직 장착대(30)를 들어올릴 수 있도록 전주 장착부재의 장착몸체(101) 하부와 수직 장착대(30) 하단에 장선기를 걸기 위한 장착 고리(105,31)가 형성된다.Next, in a state in which the vertical mounting table 30 is mounted on the electric pole 1 by the electric pole mounting member 100, the vertical mounting table 30 is lifted up by using a well-known longitudinal fitting machine (not shown) Mounting hooks 105 and 31 are formed at the lower portion of the mounting body 101 of the mounting member and at the lower end of the vertical mounting base 30, respectively.

즉, 장착몸체의 장착 고리(105)에 장선기의 갈고리를 걸고 수직 장착대의 장착 고리(31)에 장선기의 인장부를 걸어 랫치구조의 핸들을 상하로 반복 조작함에 따라 인장부의 길이가 줄어들고, 그만큼 수직 장착대(30)가 상승하게 된다. 이때, 장착 프레임의 고정핀(113)은 외측으로 당겨져 수직 장착대(30)와의 핀 결합이 해제된다.That is, the length of the pulling portion is reduced by repeating the operation of the handle of the latching structure by hanging the hook of the hooking device on the mounting ring 105 of the mounting body and hanging the tensioning portion of the hooking device on the mounting hook 31 of the vertical mounting bracket. The vertical mounting table 30 is raised. At this time, the fixing pin 113 of the mounting frame is pulled outward and the pin connection with the vertical mounting table 30 is released.

다음, 가완목(20)은 엘피애자(또는 핀애자)를 매개로 완금에 지지된 전력선을 이선시켜 둘 수 있도록 그 내측에 전력선을 수용하기 위한 개폐 가능한 롤러부(121)와, 롤러부(121)를 가완목(20)으로부터 일정 간격 이격시키기 위한 절연봉(122) 및 절연봉(122)을 가완목(20)에 장착하기 위한 장착부(123)로 이루어진 이선용 롤러 기구(120)가 구비된다. Next, the fastener 20 is provided with a roller portion 121 that can be opened and closed to accommodate a power line inside the elongate insulator (or a pin insulator) so that the power line supported by the fastener can be reversed, And an attaching portion 123 for attaching the bent bar 122 to the fastener 20 are provided on the upper surface of the fastener 20.

상기의 기술적 구성에서, 이선용 롤러 기구(120)는 엘피애자(3)로부터 이선된 전력선(2)을 가완목(20) 상측으로 이격시켜 지지하기 위한 구성이다.In the above technical construction, the aligning roller mechanism 120 is a structure for supporting the power line 2 separated from the elbow insulator 3 by spacing the power line 2 upward.

롤러부(121)는 전력선(2)을 그 내측에 수용하여 지지할 수 있도록 개폐 가능하고 전력선(2)의 피복이 손상되는 것을 방지할 수 있도록 내측면에 롤러가 취부된다.The roller portion 121 is openable and closable so as to receive and support the power line 2 therein, and a roller is mounted on the inner side thereof to prevent the coating of the power line 2 from being damaged.

절연봉(122)은 이선된 전력선(2)을 가완목(20) 상측으로 이격시키고, 상측에 롤러부(121)가 장착되고 하측에 장착부(123)가 장착된다.The insulating strip 122 separates the power line 2 from the upper side of the strip 20 and the roller 121 is mounted on the upper side and the mounting portion 123 is mounted on the lower side.

장착부(123)는 가완목(20)에 탈부착할 수 있도록 하측이 개방되고, 가완목(20)을 내측에 수용한 상태에서 핀(124) 결합에 의해 장착된다. The mounting portion 123 is opened downward so as to be detachably attached to the door handle 20 and is mounted by the engagement of the pins 124 in a state where the door handle 20 is housed inside.

다음, 도 6을 참조하면 가완목(20)은 현수애자(4)를 매개로 완금(10)에 지지된 전력선(2')을 이선시켜 둘 수 있도록 공지의 장선기(미도시)를 걸어 전력선(2')을 당기기 위한 고리와 현수애자의 볼쇄클(5)을 체결시켜 두기 위한 고리가 일체로 형성된 이선용 고리부재(130,131)가 구비된다.6, the warp knitting machine 20 is provided with a known joiner (not shown) so as to allow the power line 2 'supported by the warp knot 10 to be separated via the suspending insulator 4, (130, 131) in which a ring for pulling the ball chain (2 ') and a ball chain (5) of the suspending insulator are integrally formed.

이선용 고리부재(130,131)는 관통볼트부(130)와 너트부(131)로 구성되고 이들 각각에 장선기를 걸어 전력선(2')을 당기기 위한 고리와 완금(10)으로부터 이설된 현수애자의 볼쇄클(5)을 체결시켜 두기 위한 고리가 일체로 형성되며, 가완목(20)에 천공된 체결공에 관통볼트부(130)를 넣고 너트부(131)로 죄어 설치한다.The connecting wire members 130 and 131 are composed of a through bolt portion 130 and a nut portion 131. A wire for pulling the power wire 2 'and a ball chain The through bolt portion 130 is inserted into the fastening hole formed in the fastener 20 and the nut portion 131 is fastened with the nut.

다음, 가완목(20)과 수직 장착대(30) 사이에 대각 방향으로 설치되어 몸통(141) 회전에 따라 오른나사와 왼나사 결합된 양단 체결구(142,143)가 신축되는 지지봉(140)이 구비된다(도 4 참조).Next, a support rod 140 is provided, which is installed in a diagonal direction between the grab handle 20 and the vertical mounting table 30 and is extended and contracted by both ends of the right and left screw fasteners 142 and 143 in accordance with the rotation of the body 141 (See Fig. 4).

지지봉(140)은 가완목(20)을 지지하기 위한 구성으로, 몸통(141) 양측에 오른나사와 왼나사로 이루어진 체결구(142,143)가 나사결합되어 몸통(141) 회전에 따라 체결구(142,143)가 풀리거나 조여져 신축되게 된다. 체결구(142,143)의 단부에는 핀 결합이 가능하도록 고리가 형성된다.The support bar 140 is configured to support the fastener 20 and fasteners 142 and 143 made of right and left screws are screwed on both sides of the body 141 to fasten the fasteners 142 and 143 according to the rotation of the body 141. [ And is expanded and contracted. At the ends of the fastening holes 142 and 143, a ring is formed so as to be able to be coupled with the pins.

가완목(20)과 수직 장착대(30)는 지지봉(140)을 설치할 수 있도록 핀을 매개로 고정되는 밴드(150)가 설치되며, 밴드(150)는 체결구(143)의 고리와 핀 결합되는 플랜지가 연장 형성된다. The band 150 and the vertical mounting bracket 30 are fixed to each other by a pin so that the support bar 140 can be installed. The flange is extended.

물론, 이선용 롤러 기구의 장착부(123)에 체결구(142)의 고리와 핀 결합하기 위한 플랜지를 더 형성할 수 있고, 이 경우 가완목(20)에 설치되는 밴드를 생략할 수 있다.
Of course, the mounting portion 123 of the aligning roller mechanism may be further provided with a flange for pin connection with the ring of the fastening tool 142, and this case can omit a band provided on the fastener 20.

다음은 전술한 구성요소 및 도면을 참조하여 애자교체, 완금교체에 대하여 설명한다.Hereinafter, the insulator replacement and inserting replacement will be described with reference to the above-described components and drawings.

먼저, 전주 장착부재(100)를 전주(1)에 장착한다.First, the electric pole mounting member 100 is mounted on the electric pole 1.

상세하게는, 장착몸체(101)의 후방을 전주(1)에 밀착시키고 장착몸체(101)의 일측에 결속된 체인(102)을 전주(1) 외측으로 두른 다음 타측에서 조임부재(103)로 체인(102)을 조여 전주(1)에 전주 장착부재(100)를 장착한다.Specifically, the rear of the mounting body 101 is brought into tight contact with the electric pole 1, the chain 102 bound to one side of the mounting body 101 is worn outside the electric pole 1, and then the other end is fastened to the fastening member 103 The electric pole mounting member 100 is mounted on the electric pole 1 by tightening the chain 102.

다음, 수직 장착대(30)를 전주 장착부재(100)에 장착한다.Next, the vertical mounting table 30 is mounted on the pole mounting member 100. [

상세하게는, 장착 프레임의 덮개부(111)를 개방하고 스프링에 의해 탄지된 고정핀(113)을 외측으로 당긴 다음 상단에 T형 연결관(90)이 구비된 수직 장착대(30)를 장착 프레임(110) 내측에 삽입 위치시킨다.Specifically, the lid portion 111 of the mounting frame is opened, the fixing pin 113 that is resiliently biased by the spring is pulled out, and then the vertical mounting table 30 having the T-type connecting pipe 90 is mounted And inserted into the frame 110.

수직 장착대(30)는 장착 높이를 조정할 수 있도록 복수개의 체결공이 천공되고, 이중 어느 하나가 스프링에 의해 탄지된 고정핀(113)과 핀 결합함으로써 장착 높이가 고정된다.A plurality of fastening holes are drilled in the vertical mounting table 30 to adjust the mounting height, and one of them is fixed to the fixing pin 113, which is fixed by a spring, so that the mounting height is fixed.

수직 장착대(30)의 장착 높이가 고정된 상태에서 덮개부(111)를 닫고 잠금장치(112)로 잠금처리함으로써 수직 장착대(30)는 전주 장착부재(100)에 의해 전주(1)에 견고히 취부된다. The vertical mounting table 30 is fixed to the electric pole 1 by the electric pole mounting member 100 by closing the lid portion 111 with the mounting height of the vertical mounting bracket 30 being fixed and locking with the locking device 112 It is firmly attached.

다음, 가완목(20)을 수직 장착대(30)에 장착한다.Next, the fastener 20 is mounted on the vertical mounting table 30.

상세하게는, 수직 장착대의 T형 연결관(90)은 가완목(20)을 용이하게 삽입 위치시킬 수 있도록 그 상면에 개폐 가능한 덮개(92)가 설치되므로 덮개(92)를 열어 가완목(20)을 삽입 위치시킨다.In detail, the T-type connection pipe 90 of the vertical mounting table is provided with a lid 92 which can be opened and closed on the upper surface thereof so that the lid 20 can be easily inserted and positioned. ).

가완목(20)은 편출 길이를 조절할 수 있도록 복수개의 체결공이 천공되고, 이중 어느 하나가 T형 연결관(90)에 천공된 장착공과 핀(91) 결합에 의해 편출 길이가 고정된다. A plurality of fastening holes are drilled in the fastener 20 so that the length of the fastener 20 can be adjusted, and the length of the fastener 20 is fixed by the engagement of the pin 91 and the mounting hole, one of which is drilled in the T-

가완목(20)의 편출 길이가 고정된 상태에서 덮개(92)를 닫고 잠금장치(96)로 잠금처리함으로써 가완목(20)은 수직 장착대(30)에 견고히 장착된다. The lid member 20 is firmly mounted on the vertical mounting table 30 by closing the lid 92 and locking the locking member 96 in a state where the length of the stripe 20 is fixed.

다음, 이선용 롤러 기구(120)를 가완목(20)에 장착한다.Next, the aligning roller mechanism 120 is attached to the fastener 20.

상세하게는, 완금(10)의 엘피애자(3)와 대응되게 이선용 롤러 기구의 장착부(123)를 가완목(20)에 거치시킨 후 핀(124)을 매개로 장착한다. More specifically, the mounting portion 123 of the aligning roller mechanism is mounted on the fastener 20 in correspondence with the elbows 3 of the fastener 10, and then mounted via the pin 124.

롤러부(121)는 엘피애자(3)로부터 전력선(2)을 이선시켜 둘 수 있도록 개방시켜 놓는다. The roller portion 121 is opened to allow the power line 2 to be disconnected from the elbow insulator 3.

다음, 가완목(20)과 수직 장착대(30) 사이에 지지봉(140)을 대각 방향으로 설치한다. Next, a support rod 140 is installed in a diagonal direction between the vertical member 20 and the vertical mounting base 30.

상세하게는, 이선용 롤러 기구의 장착부(123)에 지지봉의 일측 체결구(142) 고리를 위치시켜 핀으로 체결하고 지지봉의 타측 체결구(143) 고리를 밴드(150)에 위치시켜 핀으로 체결한 다음 지지봉의 몸통(141)을 일방향으로 회전시켜 양단에 나사결합된 체결구(142,143)를 신장시켜 수직 장착대(30)로부터 가완목(20)이 견고히 지지되도록 한다. Specifically, a ring of one side fastening hole 142 of the support rod is positioned on the mounting portion 123 of the aligning roller mechanism and is fastened with a pin, and the ring of the other side fastening hole 143 of the support rod is positioned on the band 150, The body 141 of the next support rod is rotated in one direction so that the fasteners 142 and 143 screwed on both ends are extended to firmly support the door 20 from the vertical mounting table 30. [

다음, 장선기를 이용하여 수직 장착대(30)를 상승시킨다.Next, the vertical mounting table 30 is lifted up by using a joiner.

상세하게는, T형 연결관(90)에 의해 가완목(20)과 수직 장착대(30)가 일체로 결속되고, 전주 장착부재(100)에 의해 수직 장착대(30)가 전주(1)에 취부된다. More specifically, the vertical joint 30 and the vertical mount 30 are integrally joined together by the T-shaped connecting pipe 90 and the vertical mounting table 30 is connected to the electric pole 1 by the pole mounting member 100. [ Respectively.

전주 장착부재(100)와 수직 장착대(30) 사이에 장선기를 설치할 수 있도록 전주 장착부재의 장착몸체(101)와 수직 장착대(30) 하단에 장착 고리(105,31)가 형성됨에 따라 장선기의 갈고리를 장착몸체의 장착 고리(105)에 걸고 장선기의 인장부를 수직 장착대 장착 고리(31)에 걸어 장선기를 설치한 다음 장착 프레임의 고정핀(113)을 외측으로 당겨 수직 장착대(30)와의 핀 결합을 해제시킨 상태에서 랫치구조의 핸들을 상하로 반복 조작함으로써 수직 장착대(30)를 상승시키게 된다.Since the mounting body 101 of the electrophotographic mounting member and the mounting rings 105 and 31 are formed at the lower end of the vertical mounting base 30 so as to be able to install a tensioner between the electric pole mounting member 100 and the vertical mounting base 30, The hooks of the frame are hooked to the attaching hooks 105 of the attaching body and the pulling portions of the attaching hooks are hooked to the vertical attaching hook attaching hook 31 to attach the attaching hooks. 30, the vertical mounting table 30 is raised by repeatedly operating the handle of the latch structure up and down.

수직 장착대(30)의 상승으로 가완목(20)에 설치되고 개방상태인 이선용 롤러 기구의 롤러부(121) 내로 전력선(2)이 위치되고, 롤러부(121)를 닫은 상태에서 엘피애자(3)에 전력선(2)을 결속하기 위한 와이어를 풀어 둔다. The power line 2 is positioned in the roller portion 121 of the switching roller mechanism that is installed in the fastener 20 and is lifted up by the vertical mounting table 30 and the roller portion 121 is closed, 3) to untie the wire for connecting the power line (2).

이어서, 장선기의 사용하여 수직 장착대(30)를 더 들어올림으로써 엘피애자(3)로부터 전력선(2)을 이설할 수 있게 되고, 엘피애자(3) 및 완금(10)을 철거하기 위한 작업공간의 확보로 엘피애자(3)와 완금(10)을 교체할 수 있게 된다.Subsequently, the vertical line 30 is lifted further by using the joining machine so that the power line 2 can be installed from the elbow 3 and the work for removing the elbows 3 and the wax 10 It is possible to replace the elbows 3 and the wax 10 by securing the space.

한편, 현수애자(4)에 의해 전력선(2')이 지지된 경우 가완목(20)에 이선용 고리부재(130,131)를 설치한다. On the other hand, in the case where the power line 2 'is supported by the suspending insulator 4, the ligating loop members 130 and 131 are provided on the lumber 20.

상세하게는, 이선용 고리부재(130,131)는 관통볼트부(130)와 너트부(131)로 이루어지고 이들에는 장선기를 걸어 전력선(2')을 당기기 위한 고리와, 완금(10)으로부터 이설된 현수애자의 볼쇄클(5)을 체결시켜 두기 위한 고리가 일체로 형성된다. 물론 가완목(20)은 이선용 고리부재(130,131)를 설치할 수 있도록 체결공이 천공된다. The connecting wire members 130 and 131 are formed of a through bolt portion 130 and a nut portion 131. The connecting wire member 130 and 131 have a ring for pulling the power wire 2 ' A ring for fastening the ball chain 5 of the insulator is integrally formed. Of course, the fastener 20 is drilled with a fastening hole so that the hooking loop members 130 and 131 can be installed.

체결공이 천공된 가완목(20)에 관통볼트부(130)를 삽입하고 반대편에서 너트부(131)로 죄어 이선용 고리부재(130,131)를 설치한다. The through bolt portion 130 is inserted into the fastener 20 having the fastener holes formed therein and the nut portion 131 is fastened on the opposite side to provide the twisting ring members 130 and 131.

장선기의 갈고리를 이선용 고리부재(130,131)의 일측 고리에 걸고 인장부를 전력선(2')에 결속시켜 랫치구조의 핸들을 상하로 반복 조작하면 전력선(2')이 당겨지게 되고, 완금(10)에 체결된 볼쇄클(5)이 느슨해져 이를 풀고 이선용 고리부재(130,131)의 타측 고리에 볼쇄클(5)을 체결함으로써 전력선(2')을 가완목(20)으로 이설할 수 있게 된다. 물론, 반대방향의 전력선도 동일한 방법으로 이설한다. The power line 2 'is pulled up by hooking the hook of the joining member to one side of the ring members 130 and 131 and binding the tension portion to the power line 2' and repeatedly operating the handle of the latch structure up and down. The ball chain 5 fastened to the ball chain 5 is loosened and released and the ball chain 5 is fastened to the other ring of the wire loop members 130 and 131 so that the power line 2 ' Of course, power lines in the opposite direction are also installed in the same way.

이후, 장선기를 사용하여 수직 장착대(30)를 더 들어올림으로써 현수애자(4) 및 완금(10)을 철거하기 위한 작업공간의 확보로 현수애자(4)와 완금(10)을 교체할 수 있게 된다.
Thereafter, the vertical mounting base 30 is further lifted using the long-chain line to secure the working space for removing the suspending insulator 4 and the wax 10, so that the suspension insulator 4 and the wax 10 can be replaced .

다음은 전술한 구성요소 및 도면을 참조하여 전주교체에 대하여 설명한다.Hereinafter, the pole replacement will be described with reference to the above-described components and drawings.

앞서 설명한 바와 같이, T형 연결관(90)에 의해 가완목(20)과 수직 장착대(30)가 일체로 결속되고, 전주 장착부재(100)에 의해 수직 장착대(30)가 전주(1)에 취부된다. As described above, the vertical member 30 and the vertical member 30 are integrally joined together by the T-type connecting pipe 90 and the vertical mounting base 30 is connected to the electric pole 1 .

수직 장착대(30)는 크레인의 붐(40) 선단 제2관절부(60)와 착탈 가능하게 장착되는 체결 소켓(80)이 설치된다.The vertical mounting bracket 30 is provided with a fastening socket 80 detachably mounted on the second joint portion 60 at the front end of the boom 40 of the crane.

크레인은 붐(40) 선단에 장착되는 장착 브래킷(50)과, 장착 브래킷(50)에 설치되어 상하로 회동각이 조절되는 제1관절부(60) 및 제1관절부(60)에 설치되어 좌우로 회동각이 조절되는 제2관절부(70)로 이루어진다.The crane includes a mounting bracket 50 mounted on the front end of the boom 40 and a first joint part 60 and a first joint part 60 which are installed on the mounting bracket 50 and whose upward and downward turning angles are adjusted, And a second joint part 70 whose rotation angle is adjusted.

제1관절부의 회동각 조절 수나사(65)를 이용하여 제1관절부(60)의 상하 회전각을 조절하고, 제2관절부의 몸통부(71)에 천공된 핀 홀과 제1관절부의 각도 조절판(62)에 원호 상으로 천공된 어느 하나의 각도 조절공(63)과의 핀 결합에 의해 제2관절부(70)의 좌우 회동각을 조절한다. The rotational angle of the first joint part 60 is adjusted by using the rotational angle adjusting screw 65 of the first joint part and the rotational angle of the pin hole formed in the trunk part 71 of the second joint part and the angle adjusting plate 62 of the second joint portion 70 by pin engagement with one of the angle adjusting holes 63 drilled in an arc shape.

상하, 좌우 회동각 조절로 제2관절부의 삽입부(72)가 체결 소켓의 체결관(82)과 일직선 상에 놓이면 크레인의 붐(40)을 신장시켜 제2관절부의 삽입부(72)가 체결 소켓의 삽입관(82)으로 삽입되도록 하고 핀(83)으로 결속한다.When the insertion part 72 of the second joint part is placed in line with the fastening pipe 82 of the fastening socket by adjusting the vertical, left and right pivotal angles, the boom 40 of the crane is extended and the insertion part 72 of the second joint part is fastened Inserted into the insertion tube 82 of the socket, and bound by the pin 83.

이어서, 완금(10)에 가설된 전력선(2)을 가완목(20)으로 이설(전력서의 이설과정은 전술한 바와 같다)하고, 장착 프레임의 덮개부(111)를 개방한 상태에서 전주(1)를 두르고 있는 체인(102)을 풀어 전주(1)로부터 전주 장착부재(100)를 철거한다. Subsequently, the power line 2 installed on the base 10 is transferred to the bobbin 20 (the process of disposing the power cord is the same as described above), and the cover 111 of the mounting frame is opened, 1 is loosened and the electric pole mounting member 100 is removed from the electric pole 1. [

이로써, 가완목(20)이 설치된 수직 장착대(30)가 크레인의 붐(40)에 의해 지지됨으로써 전주(1)를 교체할 수 있게 된다. As a result, the vertical mounting table 30 provided with the fastener 20 is supported by the boom 40 of the crane, so that the pole 1 can be replaced.

한편, 애자교체와 완금교체를 설명함에 있어 전주 장착부재(100)와 장선기(미도시)의 사용 예를 설명하였으나 가완목(20)이 설치된 수직 장착대(30)를 크레인 붐(40) 선단에 장착하고, 완금(10)과 인접되게 붐(40)을 신장시킨 다음 제1관절부(60)와 제2관절부(70)의 회동각을 조절하여 완금(10)과 나란하게 가완목(20)을 위치시킴으로써 전술한 배전설비의 교체작업을 수행할 수 있다. Although the use of the electric pole mounting member 100 and the joist unit (not shown) has been described in the description of the insulator replacement and the replacement of the insulator, the vertical mounting base 30, And the boom 40 is stretched adjacent to the wax 10 and then the angle of rotation between the first joint 60 and the second joint 70 is adjusted so that the biceps 40 are positioned in parallel with the wax 10, It is possible to perform the replacement operation of the above-described power distribution facility.

그리고 본 발명에서는 애자, 완금, 전주의 교체작업에 대하여 설명하였으나 이들 작업 외에도 배전설비 교체작업에 다양하게 응용할 수 있음은 당업자에 있어 자명하다 할 것이다. Although the present invention has been described with respect to the replacement work of the insulator, the bare metal, and the electric pole, it is obvious to those skilled in the art that the present invention can be applied variously to the replacement work of power distribution facilities.

1 : 전주 2, 2' : 전력선
3 : 엘피애자 4 : 현수애자
5 : 볼쇄클 10: 완금
20: 가완목 30: 수직 장착대
31: 장착 고리 40: 크레인 붐
41: 선단 플레이트 50: 장착 브래킷
51: 베이스 판 52: 블레이드 판
55: 암나사 56: 나사형 웜
60: 제1관절부 61: 몸체부
62: 각도 조절판 63: 각도 조절공
65: 회동각 조절 수나사 67: 웜 휠
70: 제2관절부 71: 몸통부
72: 삽입부 80: 체결 소켓
81: 삽입관 82: 체결관
90: T형 연결관 92: 덮개
93: 수평 삽입부 94: 수직 삽입부
100: 전주 장착부재 101: 장착몸체
102: 체인 103: 조임부재
105: 장착 고리 110: 장착 프레임
111: 덮개부 113: 고정핀
120: 이선용 롤러 기구 121: 롤러부
122: 절연봉 123: 장착부
130, 131: 이선용 고리부재(관통볼트부, 너트부)
140: 지지봉 141: 몸통
142, 143: 체결구 150: 밴드
1: Electric pole 2, 2 ': Power line
3: Elphinator 4: Suspension insulator
5: ball chain 10:
20: Grip 30: Vertical mounting base
31: mounting collar 40: crane boom
41: end plate 50: mounting bracket
51: base plate 52: blade plate
55: female thread 56: threaded worm
60: first joint 61:
62: Angle adjusting plate 63: Angle adjusting ball
65: Rotating angle adjusting screw 67: Worm wheel
70: second joint part 71: body part
72: insertion portion 80: fastening socket
81: insertion tube 82: fastening tube
90: T-shaped connector 92: cover
93: horizontal insertion portion 94: vertical insertion portion
100: electric pole mounting member 101: mounting body
102: chain 103: fastening member
105: mounting collar 110: mounting frame
111: lid portion 113: fixing pin
120: aligning roller mechanism 121: roller portion
122: an annual salary 123: a mounting portion
130, 131: Reclosable ring member (through bolt and nut)
140: support rod 141: body
142, 143: fastener 150: band

Claims (10)

붐 선단에 체결공이 천공된 선단 플레이트가 구비된 크레인과, 전주의 완금과 나란하게 가완목을 설치하기 위한 수직 장착대가 구비된 크레인을 이용한 배전설비 교체 기구에 있어서,
상기 선단 플레이트의 체결공에 대응하여 볼트공이 천공되어 볼트를 매개로 상기 붐의 선단 플레이트에 장착되는 베이스 판과, 상기 베이스 판으로부터 전방으로 나란하게 돌출된 한 쌍의 블레이드판으로 이루어진 장착 브래킷; 상기 장착 브래킷의 블레이드판 사이에 설치되어 상하로 회동각이 조절되는 제1관절부; 상기 제1관절부에 설치되어 좌우로 회동각이 조절되는 제2관절부 및; 상기 수직 장착대에 삽입되어 핀에 의해 결합되는 삽입관과, 상기 삽입관 일측으로 연장 형성되고 상기 제2관절부의 선단이 삽입되어 핀에 의해 착탈 가능하게 결합되는 체결관으로 이루어진 체결 소켓;이 구비되어 상기 제1관절부와 상기 제2관절부의 조작만으로 상기 가완목을 상기 전주의 완금과 나란하게 설치할 수 있는 것을 특징으로 하는 크레인을 이용한 배전설비 교체 기구.
1. A power distribution equipment replacing mechanism using a crane equipped with a crane equipped with a front end plate with a fastening hole at the front end of a boom and a vertical mounting stand for installing a lumbar support in parallel with an electric pole of a pole,
A mounting bracket including a base plate having a bolt hole corresponding to the fastening hole of the end plate and mounted to the end plate of the boom through a bolt, and a pair of blade plates projecting from the base plate in a frontward direction; A first joint part installed between the blade plates of the mounting bracket and having a turning angle adjusted up and down; A second joint provided at the first joint and having a turning angle adjusted to the left and right; And a fastening socket including a fastening tube inserted into the vertical mounting block and coupled by a pin, and a fastening tube extended from the insertion tube, the fastening tube being inserted into and detached from the distal end of the second joint, Wherein the first and second joint parts are provided to be parallel to the electric wire of the electric pole by the operation of the first joint part and the second joint part.
제 1항에 있어서,
상기 제1관절부는 상기 블레이드 판 사이에 상하로 회동 가능하게 축 결합된 몸체부와, 상기 몸체부로부터 연장 형성되고 원호 상으로 복수개의 각도 조절공이 천공된 한 쌍의 각도 조절판으로 이루어지고,
상기 제2관절부는 상기 각도 조절판 사이에 좌우로 회동 가능하게 축 결합되고 상기 각도 조절공 중 어느 하나와 핀 결합에 의해 회동 각을 고정하는 핀 홀이 천공된 몸통부와, 상기 몸통부 선단으로부터 연장 형성되어 상기 체결 소켓에 삽입 장착되는 삽입부로 이루어지고,
상기 제1관절부의 상하 회동각을 조절할 수 있도록 상기 몸체부 후방 상단에 축을 매개로 회동각 조절 수나사가 아이들 상태로 체결되고 상기 블레이드 판 후방 하단에 축을 매개로 상기 회동각 조절 수나사와 나사결합된 암나사가 체결된 것을 특징으로 하는 크레인을 이용한 배전설비 교체 기구.
The method according to claim 1,
Wherein the first joint part comprises a body part axially coupled between the blade plates so as to be rotatable up and down and a pair of angle adjusting plates extending from the body part and having a plurality of angle adjusting holes drilled in an arc shape,
Wherein the second joint part comprises a body part which is pivotally coupled to the angle regulating plate in the right and left direction and is pierced with a pin hole for fixing the rotation angle by pin engagement with any one of the angle adjusting holes, And an insertion portion formed and inserted into the fastening socket,
An adjustable angle adjusting screw is fastened in an idle state via an axis at an upper end of the rear portion of the body so as to adjust the angle of vertical rotation of the first joint part and a female screw threaded with the rotation angle adjusting screw, Wherein the crane is connected to the crane.
제 1항에 있어서,
상기 제1관절부는 상기 블레이드 판 사이에 상하로 회동 가능하게 축 결합된 몸체부와, 상기 몸체부로부터 연장 형성되고 원호 상으로 복수개의 각도 조절공이 천공된 한 쌍의 각도 조절판으로 이루어지고,
상기 제2관절부는 상기 각도 조절판 사이에 좌우로 회동 가능하게 축 결합되고 상기 각도 조절공 중 어느 하나와 핀 결합에 의해 회동 각을 고정하는 핀 홀이 천공된 몸통부와, 상기 몸통부 선단으로부터 연장 형성되어 상기 체결 소켓에 삽입 장착되는 삽입부로 이루어지고,
상기 제1관절부의 상하 회동각을 조절할 수 있도록 상기 몸체부 후방에 반원형의 웜 휠이 형성되고, 상기 웜 휠과 맞물린 상태로 상기 베이스 판에 회동 가능하게 축설된 회동각 조절 나사형 웜이 구비된 것을 특징으로 하는 크레인을 이용한 배전설비 교체 기구.
The method according to claim 1,
Wherein the first joint part comprises a body part axially coupled between the blade plates so as to be rotatable up and down and a pair of angle adjusting plates extending from the body part and having a plurality of angle adjusting holes drilled in an arc shape,
Wherein the second joint part comprises a body part which is pivotally coupled to the angle regulating plate in the right and left direction and is pierced with a pin hole for fixing the rotation angle by pin engagement with any one of the angle adjusting holes, And an insertion portion formed and inserted into the fastening socket,
A semicircular worm wheel is formed at the rear of the body part to adjust the vertical rotation angle of the first joint part, and a rotation angle adjusting screw-type worm rotatably installed on the base plate in an engaged state with the worm wheel (1). (2).
삭제delete 제 1항에 있어서,
상기 수직 장착대는 그 상단에 상기 가완목을 수평상태로 삽입하여 핀을 매개로 고정하기 위한 T형 연결관을 구비하되, 상기 T형 연결관은 상기 가완목을 용이하게 삽입 위치시킬 수 있도록 그 상면에 개폐 가능한 덮개가 구비된 것을 특징으로 하는 크레인을 이용한 배전설비 교체 기구.
The method according to claim 1,
The vertical mounting table includes a T-shaped connecting pipe for horizontally inserting the door handle into the upper portion of the vertical mounting bracket via a pin, and the T-shaped connecting pipe is provided with an upper surface And a lid for opening and closing the crane.
제 1항에 있어서,
상기 전주에 상기 수직 장착대를 일정 거리 이격시켜 취부할 수 있도록 전주 장착부재가 더 구비되되, 상기 전주 장착부재는 전방이 돌출되고 후방이 상기 전주의 일측면에 밀착되는 장착몸체와, 상기 장착몸체의 일측에 결속된 체인을 상기 전주 외측으로 둘러 타측에서 상기 체인을 조이기 위한 조임부재 및, 상기 장착몸체 전방에 상기 수직 장착대의 삽탈이 용이하도록 개폐 가능한 덮개부가 마련된 장착 프레임이 구비된 것을 특징으로 하는 크레인을 이용한 배전설비 교체 기구.
The method according to claim 1,
A mounting body for mounting the electric pole mounting member so that the vertical mounting pole can be mounted on the electric pole at a predetermined distance while the electric pole mounting member is protruded forward and the rear side is in close contact with a side face of the electric pole; And a mounting frame provided with a lid for opening and closing the vertical mount so as to facilitate insertion and removal of the vertical mount in front of the mounting body. Replacement mechanism of power distribution system using crane.
제 6항에 있어서,
상기 장착몸체의 하부와 상기 수직 장착대 하단에는 공지의 장선기를 걸어 상기 수직 장착대를 상방향으로 들어올리기 위한 장착 고리가 형성된 것을 특징으로 하는 크레인을 이용한 배전설비 교체 기구.
The method according to claim 6,
Wherein a mounting ring is formed at a lower portion of the mounting body and at a lower end of the vertical mounting bracket for mounting the vertical mounting bracket upwardly by a known bracket.
제 1항에 있어서,
상기 가완목은 엘피애자를 매개로 상기 완금에 지지된 전력선을 이선시켜 둘 수 있도록 그 내측에 전력선을 수용하기 위한 개폐 가능한 롤러부와 상기 롤러부를 상기 가완목으로부터 일정 간격 이격시키기 위한 절연봉 및 상기 절연봉을 상기 가완목에 장착하기 위한 장착부로 이루어진 이선용 롤러 기구가 더 구비된 것을 특징으로 하는 크레인을 이용한 배전설비 교체 기구.
The method according to claim 1,
Wherein the fastener includes a roller portion that is openable and closable for accommodating a power line inside thereof so as to allow a power line supported by the fastener to be separated through an elbow insulator, a cutting rod for spacing the roller portion from the fastener at a predetermined interval, Further comprising an aligning roller mechanism having a mounting portion for mounting an eccentric wand to the untwisted workpiece.
제 1항에 있어서,
상기 가완목은 현수애자를 매개로 상기 완금에 지지된 전력선을 이선시켜 둘 수 있도록 공지의 장선기를 걸어 상기 전력선을 당기기 위한 고리와 상기 현수애자의 볼쇄클을 체결시켜 두기 위한 고리가 일체로 형성된 이선용 고리부재가 더 구비된 것을 특징으로 하는 크레인을 이용한 배전설비 교체 기구.
The method according to claim 1,
In order to allow the power line supported by the wire to be transferred through the suspender insulator, a known wire harness is hung from the wire to pull the power wire, and a ring for fastening the ball chain of the suspending insulator is integrally formed. And a loop member is further provided on the crane.
제 1항에 있어서,
상기 가완목과 상기 수직 장착대 사이에 대각 방향으로 설치되어 몸통 회전에 따라 오른나사와 왼나사 결합된 양단 체결구가 신축되는 지지봉이 더 구비된 것을 특징으로 하는 크레인을 이용한 배전설비 교체 기구.
The method according to claim 1,
Further comprising a supporting rod installed in a diagonal direction between the relaxed neck and the vertical mounting bracket and extending and contracting with both ends of the right and left screws engaged with the rotation of the body.
KR1020120150545A 2012-12-21 2012-12-21 electric supply equipment replacement apparatus using a crane KR101848936B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120150545A KR101848936B1 (en) 2012-12-21 2012-12-21 electric supply equipment replacement apparatus using a crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120150545A KR101848936B1 (en) 2012-12-21 2012-12-21 electric supply equipment replacement apparatus using a crane

Publications (2)

Publication Number Publication Date
KR20140081139A KR20140081139A (en) 2014-07-01
KR101848936B1 true KR101848936B1 (en) 2018-05-28

Family

ID=51732518

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120150545A KR101848936B1 (en) 2012-12-21 2012-12-21 electric supply equipment replacement apparatus using a crane

Country Status (1)

Country Link
KR (1) KR101848936B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102525034B1 (en) * 2023-03-09 2023-04-24 (주)나이스에너지엔지니어링 Cable fixing bar provisionally installation equipment for work power distribution line

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160002178A (en) 2014-06-30 2016-01-07 현대자동차주식회사 Apparatus and method for self-localization of vehicle
KR101631916B1 (en) * 2015-09-14 2016-06-20 탑이앤지 주식회사 Method for changing power distribution line in hot line
KR101616484B1 (en) * 2015-09-21 2016-04-28 (주)우신전기기술사사무소 Method for changing power distribution line in hot line
KR101922443B1 (en) * 2016-11-24 2018-11-27 주식회사 성진 The Movable Temporary Arm Apparatus And Method Using In Uninterruptible Work In The Power Distribution Lines
CN109301755B (en) * 2018-11-16 2023-11-07 国网江苏省电力有限公司镇江供电分公司 Translation lifting and rotating assembly for insulator dismounting mechanism
CN109372315A (en) * 2018-11-30 2019-02-22 江苏神马电力股份有限公司 A kind of cross biling assembly and power transmission rod
KR102232560B1 (en) * 2020-10-20 2021-03-29 대원전기 주식회사 Roller movable insulated lift arm for indirect live wire and non-power-failure power distribution method
CN113734994B (en) * 2021-09-08 2023-10-13 中国石油化工股份有限公司 Crane-free replacing tool for field transformer
CN114566929B (en) * 2022-01-17 2024-02-06 国网山东省电力公司高青县供电公司 Circuit cross arm suspension frame
CN116937430B (en) * 2023-09-05 2024-04-16 国网山东省电力公司冠县供电公司 Wire lifting device for power transmission line erection

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200144203Y1 (en) * 1996-04-30 1999-06-15 한달숙 Angle adjustable crane insulation beam on a truck
JP2002199567A (en) * 2000-12-22 2002-07-12 Hokuriku Electric Power Co Inc:The Arm support prefabricated construction and various fixtures used in it
KR200364882Y1 (en) * 2004-07-07 2004-10-16 대원전기 주식회사 Power failure safe construction method for one-phase and three-phase distribution line and wire transter device thereof
KR100695784B1 (en) * 2005-09-13 2007-03-16 양희성 Auxiliary arm lifting apparatus for replacement work
KR100865480B1 (en) * 2007-07-21 2008-10-27 양희성 Direct apparatus for live wire using trane truck

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200144203Y1 (en) * 1996-04-30 1999-06-15 한달숙 Angle adjustable crane insulation beam on a truck
JP2002199567A (en) * 2000-12-22 2002-07-12 Hokuriku Electric Power Co Inc:The Arm support prefabricated construction and various fixtures used in it
KR200364882Y1 (en) * 2004-07-07 2004-10-16 대원전기 주식회사 Power failure safe construction method for one-phase and three-phase distribution line and wire transter device thereof
KR100695784B1 (en) * 2005-09-13 2007-03-16 양희성 Auxiliary arm lifting apparatus for replacement work
KR100865480B1 (en) * 2007-07-21 2008-10-27 양희성 Direct apparatus for live wire using trane truck

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102525034B1 (en) * 2023-03-09 2023-04-24 (주)나이스에너지엔지니어링 Cable fixing bar provisionally installation equipment for work power distribution line

Also Published As

Publication number Publication date
KR20140081139A (en) 2014-07-01

Similar Documents

Publication Publication Date Title
KR101848936B1 (en) electric supply equipment replacement apparatus using a crane
KR101473822B1 (en) Method for hot line work of power distribution equipment
KR101873421B1 (en) Spatial Extendible Mechanization Working Device Using Live line Working Vehicle
JP4307235B2 (en) Overhead wire lifting device
JP5823197B2 (en) Wire retention method
KR101087740B1 (en) One-touch clamp device for grounding connection
WO2019124299A1 (en) Insulator separation method, direction conversion tool used in said method, utility pole suspension device, insulator support tool, and tool for fixing to utility pole
KR100865480B1 (en) Direct apparatus for live wire using trane truck
KR101794296B1 (en) Connecting clamp for replacing power line of power distribution line
KR20090039398A (en) Apparatus for changing cross -arm and electric pole using trane truck
JP5822220B1 (en) Electrical device mounting device
CN104682263B (en) Hot-line work operation lever single-lever work head
JP5559592B2 (en) Gripping bracket, tension device replacement tool using gripping bracket, and tension device replacement method
JPH02262813A (en) Separated tension insulator bracket and mounting/ dismounting method thereof
JP2013055857A (en) Fall prevention net
KR20090024841A (en) Apparatus for changing cross -arm and electric pole using trane truck
JP2012161199A (en) High-voltage drop wire anchoring apparatus with falling preventing function
CN111541196A (en) Automatic installation tool for wire clamp
KR101438503B1 (en) Cable hanger
KR100919522B1 (en) Electric wire removing band
CN214755419U (en) Knife switch lead wire support convenient to installation
JPH0438230A (en) Replacing appliance for catenary wire insulator and method thereof
CN217522479U (en) Hydraulic engineering construction is with equipment of sunkening cord
JP2005295681A (en) Construction method for replacing dual conductor transmission line
JP3819738B2 (en) Method and apparatus for installing cans on overhead tracks

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant