KR101844761B1 - Civil engineering stone and aggregate transportation cost calculation system - Google Patents

Civil engineering stone and aggregate transportation cost calculation system Download PDF

Info

Publication number
KR101844761B1
KR101844761B1 KR1020170114291A KR20170114291A KR101844761B1 KR 101844761 B1 KR101844761 B1 KR 101844761B1 KR 1020170114291 A KR1020170114291 A KR 1020170114291A KR 20170114291 A KR20170114291 A KR 20170114291A KR 101844761 B1 KR101844761 B1 KR 101844761B1
Authority
KR
South Korea
Prior art keywords
information
civil engineering
cost
engineering material
transportation
Prior art date
Application number
KR1020170114291A
Other languages
Korean (ko)
Inventor
강두원
Original Assignee
주식회사 두원석재
강두원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 두원석재, 강두원 filed Critical 주식회사 두원석재
Priority to KR1020170114291A priority Critical patent/KR101844761B1/en
Application granted granted Critical
Publication of KR101844761B1 publication Critical patent/KR101844761B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0613Third-party assisted
    • G06Q30/0619Neutral agent
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • G06Q30/0284Time or distance, e.g. usage of parking meters or taximeters
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/04Billing or invoicing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0623Item investigation
    • G06Q30/0625Directed, with specific intent or strategy
    • G06Q30/0629Directed, with specific intent or strategy for generating comparisons
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/08Auctions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a cost calculation system for transportation of stone and aggregate for engineering works. The cost calculation system includes: a client terminal transmitting information regarding a construction work, including a type of the construction work, location information of a target land, and numerical data regarding the land, and information regarding materials for an engineering work, including types of engineering stones and aggregates to be used in the engineering work and material items made of a variety of construction tools to be used in the engineering work; at least one sales terminal transmitting cost information of the materials for an engineering work, and allowing the engineering materials, selected by the client terminal, to be transported only when transmitted costs of materials for an engineering work are selected; and a calculation server receiving the information regarding the construction work, the information regarding the materials for an engineering work, and the cost information of the materials for an engineering work, selecting a sales terminal having transmitted the lowest cost information from among the sales terminals having transmitted the cost information, calculating the amount of materials for an engineering work to be used, based on the information regarding the received construction work, calculating transportation costs based on the calculated amount of materials for an engineering work to be used and the lowest cost information, and guiding the transportation cost to be paid by transmitting the transportation costs to the client terminal.

Description

토목용 석/골재 운반비용 산출 시스템{Civil engineering stone and aggregate transportation cost calculation system}Technical Field [0001] The present invention relates to a civil engineering stone aggregate transportation cost calculation system,

본 발명은 토목용 석/골재 운반비용 산출 시스템에 관한 것으로, 더욱 상세하게는 토목 작업에 능숙하지 않은 개인이 자신의 토목 작업에 필요한 석/골재의 수요량을 쉽게 자동 산출하도록 구성됨으로써, 토목 작업에 석/골재가 부족하거나 과하게 남게 되는 문제가 발생하는 것을 방지함과 동시에 구매하고자 하는 석/골재의 수요량과 그 운반 거리에 따라 운반비를 자동 산출하도록 구성됨으로써, 운반비가 과하게 발생하는 것을 미리 인지하고 구매 의사를 정할 수 있도록 하는 토목용 석/골재 운반비용 산출 시스템에 관한 것이다.More particularly, the present invention relates to a system for calculating the cost of a stone / aggregate transportation cost for a civil engineering work, and more particularly, It is possible to prevent the occurrence of a problem that the stone / aggregate is insufficiently or excessively left, and at the same time, the transportation cost is automatically calculated according to the demand amount of the stone / aggregate to be purchased and the transportation distance, And a system for calculating the cost of transporting aggregate / aggregate to allow a doctor to be determined.

견치석이라든가 골재 바닥 깔기 등의 토목 시공에는 석재나 골재 등의 토목 자재들이 이용된다.Civil engineering materials such as stone and aggregate are used for civil engineering work such as concrete construction and aggregate floor laying.

이러한 토목 자재들은 토목 업자가 자재 판매 업자로부터 구매하여 시공을 하기도 하며, 때때로 개인적으로도 작은 공간에 이러한 토목 작업을 하기도 한다.These civil engineering materials are purchased by a civil engineer from a material supplier, and sometimes they are used to work in a small space.

개인적으로 앞뜰이나 뒤뜰 등에 작업을 하는 경우에는 직접 자재 판매 업자로부터 구매해야 한다. 토목 업자들은 자주 거래하는 자재 판매 업자가 있고 전문적으로 토목 작업을 하기 때문에 별 문제가 없으나, 개인적으로 토목 작업을 하거나 토목 자재를 구매하는 경우에는 상당한 시행 착오를 겪어야만 한다.If you personally work in the front yard or back yard, you must purchase from a direct material vendor. Civil engineers have frequent traders of materials, and they do not have any problems because they work professionally in civil works, but when they do civil works or purchase civil engineering materials, they have to go through a lot of trial and error.

일단은 견치석이나 조경석을 쌓을 때 얼마나 많은 견치석이나 조경석을 구매해야 하는지에 대해서 가늠하기 힘들다. 또한, 이러한 견치석이나 조경석, 바닥 골재 등은 그 무게나 부피가 상당히 무겁고 크기 때문에 주로 대형 트럭을 이용하여 운반해야 하는데, 이러한 대형 트럭의 이용으로 인해 자재비보다 오히려 운반비가 더 커지는 상황이 생기기도 한다. 특히, 운반 거리가 길어질수록 운반비도 같이 증가하기 때문에 적은 양의 석/골재 운반에도 상당한 운반비가 발생할 수 있다. 기존에는 과도한 운반비를 석/골재의 판매 비용에 포함시켜 비싼 단가로 구매할 수밖에 없는 문제점이 있다.At first, it is difficult to gauge how much more willingness to buy or how much to buy when building a godstone or godstone. Also, since such heavy-duty trucks, pavement stones, and floor aggregates are heavy and bulky, they have to be transported mainly using heavy trucks. The use of such heavy trucks may result in a transportation cost rather than a material cost. Particularly, as the transportation distance increases, the transportation cost also increases. Therefore, a considerable transportation cost may occur even in a small amount of stone / aggregate transportation. There is a problem in that it is inevitable to purchase an excessively expensive transportation cost as an expensive unit price by including it in the selling cost of the stone / aggregate.

작은 크기의 전기 배선 기구라든가 간단한 조명 설치 기구 등은 건축 자재나 인테리어(interior) 상품은 웹 쇼핑몰(web shoppingmall)을 통해서도 쉽게 구매할 수 있고 간단하게 택배를 통해서도 운반할 수 있지만, 무겁고 부피가 큰 토목 자재는 웹 쇼핑몰과 같은 판매 경로가 거의 없다.Building materials and interior goods can be easily purchased through a web shopping mall or simply delivered by courier. However, heavy and bulky civil engineering materials There are few sales channels like web shopping malls.

등록특허공보 10-0341934는 건축 자재를 판매하는 시스템에 대해 개시하고 있다. 그러나, 이와 같은 기존의 문헌들은 건축 자재의 판매와 관리 등에 대한 판매자의 판매/유통 관리에 대한 것이며, 소비자의 입장에서 쉽게 구매할 수 있는 수단에 대해서는 개시되어 있지 않다. 특히, 토목 자재는 더욱 그러하다.Patent Registration No. 10-0341934 discloses a system for selling building materials. However, such existing literature is concerned with sales / distribution management of sellers regarding sales and management of building materials, and there is no disclosure of a means that can be easily purchased from a consumer's standpoint. Especially, the civil engineering material is more like that.

이러한 토목 자재를 얼마나 구매해야 하는지 쉽게 가늠할 수 있게 하는 수단도 없으며, 남는 토목 자재는 처리하는 데에도 상당한 애로 사항이 있다.There is no means to easily gauge how much to purchase these civil engineering materials, and there are considerable difficulties in handling the remaining civil engineering materials.

그리고 앞서 언급한 바와 같이 운반 거리가 멀어 오히려 운반비가 더 많이 들게 되는 상황에 대해서도 쉽게 가늠하도록 구성되어 있지 않다.And, as mentioned above, it is not structured to easily measure the situation in which the transportation distance is long and the transportation cost is more increased.

대한민국 등록특허공보 제10-0341934호Korean Patent Publication No. 10-0341934

이와 같은 문제점을 해결하기 위하여 본 발명은 전술한 배경기술에 의해서 안출된 것으로, 토목 작업에 능숙하지 않은 개인이 자신의 토목 작업에 필요한 석/골재의 수요량을 쉽게 자동 산출하도록 구성됨으로써, 토목 작업에 석/골재가 부족하거나 과하게 남게 되는 문제가 발생하는 것을 방지할 수 있는 토목용 석/골재 운반비용 산출 시스템을 제공하는데 그 목적이 있다.In order to solve such problems, the present invention has been devised by the background art described above, and it is possible to easily calculate the demanded amount of the stone / aggregate required for an individual who is not skilled in civil works, And it is an object of the present invention to provide a system for calculating the cost of transportation of aggregate / aggregate for civil engineering that can prevent the problem of insufficient or excessive amount of stone / aggregate remaining.

또한, 본 발명은 구매하고자 하는 석/골재의 수요량과 그 운반 거리에 따라 운반비를 자동 산출하도록 구성됨으로써, 운반비가 과하게 발생하는 것을 미리 인지하고 구매 의사를 정할 수 있도록 하는 토목용 석/골재 운반비용 산출 시스템을 제공하는데 그 목적이 있다.In addition, the present invention is configured to automatically calculate the transportation cost according to the demand amount of the stone / aggregate to be purchased and the transportation distance thereof, so that it is possible to recognize the transportation cost excessively and to determine the purchasing intention. It is an object of the present invention to provide a calculation system.

또한, 본 발명은 개인 구매자는 중간 단계의 유통없이 웹 쇼핑몰에서 토목 자재를 구매하여 보다 저렴한 단가에 토목 자재를 구매할 수 있는 토목용 석/골재 운반비용 산출 시스템을 제공하는데 그 목적이 있다.It is another object of the present invention to provide a civil engineering stone / aggregate transportation cost calculation system in which individual buyers can purchase civil engineering materials at a web shopping mall without intermediate distribution and purchase civil engineering materials at lower cost.

이와 같은 과제를 달성하기 위한 본 발명의 일 실시예에 따르면, 공사 작업의 종류와 대상 토지의 위치정보 및 상기 토지에 대한 수치를 포함하는 공사정보와 토목 공사에 이용될 토목용 석/골재의 종류 및 토목 공사시 사용되는 각종 공사용 도구들로 이루어진 자재 아이템을 포함하는 토목용 자재 정보를 전송하는 고객단말; 상기 토목용 자재에 대한 비용정보를 전송하고, 전송한 토목용 자재들의 비용에 대한 선정시에만 상기 고객단말에 의해 선택된 토목용 자재를 운반하는 적어도 하나 이상의 판매단말; 및 상기 공사정보, 토목용 자재 정보 및 토목용 자재에 대한 비용정보가 전송되고, 전송된 상기 비용정보 중 최저가의 비용정보를 전송한 판매단말을 선정하며, 전송된 상기 공사정보에 따라 상기 토목용 자재의 수요량을 산출하고, 산출된 수요량과 상기 최저가의 비용정보를 바탕으로 운반비를 산출하여 상기 고객단말로 전송하여 결제가 이루어지도록 안내하는 산출서버;를 포함하는 것을 특징으로 한다.According to an aspect of the present invention, there is provided a method of constructing a building, comprising: constructing information including a type of a construction work, a location information of a target land, and a numerical value of the land, A customer terminal for transmitting civil engineering material information including a material item made up of various construction tools used in civil engineering work; At least one sales terminal for transmitting cost information for the civil engineering material and transporting the civil engineering material selected by the customer terminal only at the time of selecting the cost of the transferred civil engineering materials; And cost information for the construction material, the civil engineering material information, and the civil engineering material is transmitted and the sales terminal which transmitted the lowest cost information among the cost information transmitted is selected, And a calculation server for calculating a transportation cost based on the calculated demand amount and the lowest cost information, and transmitting the calculated transportation cost to the customer terminal to guide the settlement to be performed.

본 발명의 일 실시예에 따르면, 상기 산출서버는, 상기 토지 위치정보와 가장 인접한 위치에 있는 판매단말들 중에서 품목별 최저 토목 자재비용을 전송한 판매단말을 선정하는 입찰모듈; 지질 정보가 저장되며, 저장된 지질 정보와 상기 토지의 위치정보를 비교하여 현재 토지의 지질상태에 대한 정보를 생성하는 지질 정보 수집부; 상기 고객단말이 전송한 토목용 자재가 상기 토지의 지질상태에 적합한 토목용 자재 정보를 생성하여 상기 고객단말로 전송하는 자재 정보 안내모듈; 상기 토목용 자재 정보와, 상기 공사정보를 비교 분석하여 상기 토목용 자재 대한 수요량을 산출하는 수요량 산출모듈; 상기 토목용 자재의 운반비를 산출하는 운반비 산출모듈; 상기 고객단말 및 판매단말로부터 각각 전송되는 공사정보, 토목용 자재 정보, 토목 자재 비용정보를 송수신하고 운반비의 산출이 이루어지도록 산출서버를 이루는 각 구성요소들을 제어하는 산출 제어부;를 포함하는 것을 특징으로 한다.According to an embodiment of the present invention, the calculation server may include: a bid module for selecting a sales terminal to which the lowest civil engineering material cost for each item is transmitted from the sales terminals located closest to the land position information; A geological information collecting unit storing geologic information and comparing the stored geologic information with the geographical information of the land to generate information on the geological condition of the present land; A material information guide module that generates civil engineering material information suitable for the geological condition of the land and transmits the civil engineering material information to the customer terminal; A demand calculation module for comparing the civil engineering material information with the construction information to calculate a demanded amount of the civil engineering material; A transportation cost calculating module for calculating a transportation cost of the civil engineering material; And a calculation control unit for transmitting and receiving construction information, civil engineering material information, and civil engineering material cost information transmitted from the customer terminal and the sales terminal, respectively, and controlling each component constituting the calculation server so as to calculate the transportation cost, do.

본 발명의 일 실시예에 따르면, 상기 입찰모듈은, 상기 선정된 판매단말에 대한 정보 뿐만 아니라, 차순위에 있는 판매단말에 대한 정보도 함께 전송하되, 상위 1% 이내의 차순위 판매단말에 대한 정보만을 상기 산출 제어부를 통해 상기 고객단말로 전송하는 것을 특징으로 한다.According to an embodiment of the present invention, the bidding module transmits not only the information on the selected sales terminal but also the information on the sales terminal in the next order, but only the information on the next sales terminal within the upper 1% To the customer terminal through the calculation control unit.

본 발명의 일 실시예에 따르면, 상기 산출서버에는, 산출된 운반비에 대한 결제방식을 안내하며, 상기 고객단말의 비용 환불 요청에 따라 기결제된 비용에 대한 환불이 이루어지도록 하는 비용 결제모듈; 및 운반이 이루어진 상기 공사정보 및 토목용 자재의 종류와, 운반을 수행한 판매단말의 정보 및 운반비 정보가 저장되고, 상기 고객단말로부터 전송되는 유지 보수 요청을 상기 산출 제어부로 전송하는 고객 관리모듈;을 더 포함하는 것을 특징으로 한다.According to an embodiment of the present invention, the calculation server is provided with a cost payment module for guiding the payment method for the calculated transportation expenses and for making a refund for the overpaid cost according to the request for the cost refund of the customer terminal; A customer management module for storing the construction information and the type of civil engineering material carried, the information of the sales terminal performing the transportation, and the transportation cost information, and transmitting a maintenance request transmitted from the customer terminal to the calculation control unit; Further comprising:

이와 같은 본 발명의 실시예에 의하면, 토목 작업에 능숙하지 않은 개인이 자신의 토목 작업에 필요한 석/골재의 수요량을 쉽게 자동 산출하도록 구성됨으로써, 토목 작업에 석/골재가 부족하거나 과하게 남게 되는 문제가 발생하는 것이 방지하는 효과가 있다.According to the embodiment of the present invention, an individual who is not skilled in civil engineering work can easily calculate the demanded amount of the stone / aggregate required for his / her civil works, so that the stone / aggregate is left in the civil works There is an effect to prevent the occurrence of the problem.

또한, 본 발명의 실시예에 의하면, 구매하고자 하는 석/골재의 수요량과 그 운반 거리에 따라 운반비를 자동 산출하도록 구성됨으로써, 운반비가 과하게 발생하는 것을 미리 인지하고 구매 의사를 정할 수 있도록 하는 효과가 있다.In addition, according to the embodiment of the present invention, since the transportation cost is automatically calculated according to the demand amount of the stone / aggregate to be purchased and the transportation distance, the effect of allowing the transportation cost to be recognized in advance, have.

또한, 본 발명의 실시예에 의하면, 개인 구매자는 중간 단계의 유통없이 웹 쇼핑몰에서 토목 자재를 구매하여 보다 저렴한 단가에 토목 자재를 구매할 수 있는 효과가 있다.In addition, according to the embodiment of the present invention, the individual purchaser can purchase the civil engineering material at the web shopping mall without intermediate distribution and purchase the civil engineering material at a lower cost.

도 1은 본 발명의 일 실시예에 따른 토목용 석/골재 운반비용 산출 시스템을 나타낸 구성 블록도,
도 2는 본 발명의 일 실시예에 따른 토목용 석/골재 운반비용 산출 시스템의 서버를 나타낸 구성 블록도,
도 3 내지 도 9는 본 발명의 일 실시예에 따른 토목용 석/골재 운반비용 산출 시스템의 사용자 인터페이스 화면을 나타낸 도면이다.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a block diagram showing a system for calculating the cost of transporting cement / aggregate materials according to an embodiment of the present invention;
FIG. 2 is a block diagram showing a server of a civil engineering stone / aggregate transportation cost calculation system according to an embodiment of the present invention;
3 to 9 are views showing a user interface screen of the system for calculating the cost of transporting cement / aggregate materials according to an embodiment of the present invention.

이하, 본 발명의 바람직한 실시예를 첨부된 도면들을 참조하여 상세히 설명한다. 우선 각 도면의 구성요소들에 참조 부호를 부가함에 있어서, 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한, 본 발명을 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the drawings, the same reference numerals are used to designate the same or similar components throughout the drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

또한, 본 발명의 구성 요소를 설명하는 데 있어서, 제 1, 제 2, A, B, (a), (b) 등의 용어를 사용할 수 있다. 이러한 용어는 그 구성 요소를 다른 구성 요소와 구별하기 위한 것일 뿐, 그 용어에 의해 해당 구성 요소의 본질이나 차례 또는 순서 등이 한정되지 않는다. 어떤 구성 요소가 다른 구성요소에 "연결", "결합" 또는 "접속" 된다고 기재된 경우, 그 구성 요소는 그 다른 구성요소에 직접적으로 연결되거나 또는 접속될 수 있지만, 각 구성 요소 사이에 또 다른 구성 요소가 "연결", "결합" 또는 "접속"될 수도 있다고 이해되어야 할 것이다.In describing the components of the present invention, terms such as first, second, A, B, (a), and (b) may be used. These terms are intended to distinguish the constituent elements from other constituent elements, and the terms do not limit the nature, order or order of the constituent elements. When a component is described as being "connected", "coupled", or "connected" to another component, the component may be directly connected to or connected to the other component, It should be understood that an element may be "connected," "coupled," or "connected."

도 1은 본 발명의 일 실시예에 따른 토목용 석/골재 운반비용 산출 시스템을 나타낸 구성 블록도, 도 2는 본 발명의 일 실시예에 따른 토목용 석/골재 운반비용 산출 시스템의 서버를 나타낸 구성 블록도, 도 3 내지 도 9는 본 발명의 일 실시예에 따른 토목용 석/골재 운반비용 산출 시스템의 사용자 인터페이스 화면을 나타낸 도면이다.FIG. 1 is a block diagram showing a system for calculating the cost of transporting aggregate / aggregate transportation costs according to an embodiment of the present invention, and FIG. 2 is a view showing a server of the system for calculating costs for transporting aggregate / aggregate transportation costs according to an embodiment of the present invention. 3 to 9 are views showing a user interface screen of the system for calculating the cost of transporting cement / aggregate materials according to an embodiment of the present invention.

토목용 석/골재 운반비용 산출 시스템(100)은 토목 공사 작업의 종류와 대상 토지에 대한 수치를 전송하는 고객단말(100), 상기 고객단말(100)이 선택한 석/골재 및 자재 아이템의 비용정보를 전송하고, 선택된 석/골재 및 자재 아이템의 운반이 이루어지도록 하는 판매단말(200) 및 상기 고객단말(100) 및 판매단말(200)과 각각 연동하여 토목 공사에 필요한 석/골재 및 자재 아이템의 운반비를 산출하는 산출서버(300)를 포함하여 구성된다.  The civil engineering stone / aggregate transportation cost calculation system 100 includes a customer terminal 100 for transmitting a type of civil engineering work and a numerical value of a target land, a cost / cost information of a stone / aggregate and a material item selected by the customer terminal 100 A sales terminal 200 for transporting selected stone / aggregate and material items, and a sales terminal 200 for interlocking with the customer terminal 100 and the sales terminal 200, And a calculation server 300 for calculating a transportation cost.

고객단말(100)은 온라인 상에서 산출서버(300)의 산출 제어부(380)로 토목 공사 작업의 종류와 대상 토지의 위치정보 및 상기 토지에 대한 수치를 포함하는 공사정보와 함께 토목용 자재의 운반 비용에 대한 산출이 이루어지도록 하고, 산출서버(300)로부터 산출된 운반 비용에 대한 정보를 제공받아 표시한다.The customer terminal 100 transmits the construction information including the type of the civil engineering work and the location information of the target land and the numerical value of the land to the calculation control unit 380 of the calculation server 300 on- And information on the transportation cost calculated by the calculation server 300 is received and displayed.

여기서, 토목용 자재는 토목 공사에 이용될 토목용 석/골재의 종류 및 토목 공사시 사용되는 각종 공사용 도구들로 이루어진 자재 아이템을 포함하는 것이다.Here, the civil engineering material includes a kind of civil engineering stone / aggregate to be used in civil engineering and a material item made up of various construction tools used in civil engineering work.

또한, 토목 공사 작업에는 석/골재가 사용되는 토목 공사 작업으로서, 본 발명에서는 조경석 쌓기, 전석 쌓기, 견치석 쌓기, 바닥 깔기, 골재 깔기 등을 예시로 설명하였으나, 이에 한정하는 것은 아니다.In the present invention, the construction of a glazed glazed concrete, an all-stone glazing, a glazier glazing, a floor laying, and an aggregate laying are explained by way of example, but the present invention is not limited thereto.

또한, 대상 토지에 대한 수치는 해당 석/골재가 사용되는 영역을 한정하는 가로 길이, 세로 길이, 높이, 바닥에 골재를 깔 때 그 골재의 두께 등이 될 수 있다.Further, the numerical values for the target land may be a width, a vertical length, a height, and a thickness of the aggregate when the aggregate is laid on the floor, which defines an area where the stone / aggregate is used.

예를 들어, 도 3의 조경석 쌓기의 경우에는 조경석을 쌓는 경사 토지의 길이와 높이가 될 수 있다. 또한, 도 4의 전석 쌓기의 경우에는 전석을 쌓을 영역의 길이와 높이가 될 수 있다. 견치석 쌓기의 경우 도 5와 같이 길이와 높이가 되고 도 6의 바닥 깔기의 경우에는 가로 길이와 세로 길이, 도 7 및 도 8의 골재 깔기는 각각 가로 길이와 세로 길이 그리고 골재 두께가 되거나 또는 평수와 골재 두께가 될 수 있다.For example, in the case of the landscape glazing in FIG. 3, it may be the length and height of the sloping land to be piled. 4, the length and height of the area where all the stones are stacked can be obtained. 6 and the aggregate slabs of Figs. 7 and 8 are respectively the width, length, and aggregate thickness, respectively, of the floor slab of Fig. 6, It can be an aggregate thickness.

여기서, 토목용 자재에 포함된 석/골재의 종류나 자재 아이템은 산출서버(300)로 공사정보 전송시, 상기 산출서버(300)에서 고객단말(100)로 전송되는 것이다. Here, the type of stone / aggregate and the item of material contained in the civil engineering material are transmitted from the calculation server 300 to the customer terminal 100 when construction information is transmitted to the calculation server 300.

이때, 고객단말(100)은 산출서버(300)로부터 전송된 토목용 자재 정보를 확인한 후, 필요한 석/골재 및 자재 아이템을 선택하여 산출서버(300)로 다시 전송할 수 있으며, 산출서버(300)에서는 선택된 석/골재 및 자재 아이템에 대한 비용을 포함한 운반비를 산출하여 고객단말(100)로 전송하여 운반비에 대한 결제가 이루어지도록 할 수 있다.At this time, after confirming the civil engineering material information transmitted from the calculation server 300, the customer terminal 100 can select the required stone / aggregate and the material item and transmit it to the calculation server 300 again. The transportation cost including the cost for the selected stone / aggregate and the material item may be calculated and transmitted to the customer terminal 100 so that payment for the transportation fee may be made.

이때, 산출서버(300)에서 전송되는 토목용 자재는 고객단말(100)이 전송한 공사정보에 포함된 토지의 위치정보에 해당하는 지질 상태에 따라 가장 안정적으로 공사가 이루어질 수 있는 토목용 자재의 품목 정보를 나타낸다.At this time, the civil engineering material transmitted from the calculation server 300 is transmitted to the customer terminal 100 from the civil engineering material which can be constructed most stably according to the geological condition corresponding to the location information of the land included in the construction information transmitted by the customer terminal 100 Represents item information.

판매단말(200)은 토목 공사에 사용되는 토목용 자재에 대한 비용정보를 산출서버(300)의 제어부(380)로 전송하여 운반비 산출이 이루어지도록 하고, 고객단말(100)에 의해 선택된 토목용 자재를 고객단말(100)이 전송한 토목 공사를 시공할 토지까지 운반이 이루어지도록 하는 구성요소이다.The sales terminal 200 transmits the cost information of the civil engineering material used for civil engineering to the control unit 380 of the calculation server 300 so as to calculate the transportation cost, To the land to be constructed by the customer terminal (100).

이러한 판매단말(200)은 다수개로 구성되어 전국 각지에 위치할 수 있으며, 산출서버(300)로 전송한 토목용 자재들의 비용의 입찰이 성공되었을 때에만 상기 토지까지 운반이 이루어지도록 구성된다. The sales terminal 200 may include a plurality of sales terminals 200 and may be located in various locations throughout the country. The sales terminal 200 is configured to transport the land to the land only when the bidding of the costs of the civil engineering materials transmitted to the calculation server 300 is successful.

즉, 전국 각지에 위치하는 다수개의 판매단말(200)들이 각각 전송하는 토목용 자재들에 대한 비용정보들을 산출서버(300)에서 최저가로 전송한 판매단말(200)을 선택하고, 선택된 판매단말(200)은 고객단말(100)이 전송한 토지의 위치정보를 산출서버(300)로부터 전송받아 판매된 토목용 자재들의 운반이 이루어지도록 하는 것이다.That is, the sales terminal 200 that has transmitted the cost information for the civil engineering materials transmitted from the plurality of sales terminals 200 located in various parts of the country at the lowest price from the calculation server 300 is selected, 200 receives the location information of the land transferred by the customer terminal 100 from the calculation server 300 and carries the sold civil engineering materials.

산출서버(300)는 고객단말(100)에 의해 공사정보가 전송되면, 상기 공사정보에 포함된 토목 공사 작업의 종류와 대상 토지에 대한 수치에 따라 해당 토목용 자재의 수요량을 산출하고, 산출된 수요량에 대응하여 운반비를 산출하고, 산출된 운반비의 결제 및 토목용 자재의 운반 요청신호를 각각 고객단말(100) 및 판매단말(200)로 전송하는 구성요소로서, 입찰모듈(310), 지질 정보 수집부(320), 자재 정보 안내모듈(330), 수요량 산출모듈(340), 운반비 산출모듈(350), 비용 결제모듈(360), 고객 관리모듈(370) 및 산출 제어부(380)를 포함하여 구성된다. When the construction information is transmitted by the customer terminal 100, the calculation server 300 calculates the demand amount of the civil engineering material according to the type of civil works work and the value of the target land included in the construction information, A billing module 310 for calculating a billing amount corresponding to the demanded amount, a billing module 310 for collecting billing information, a billing module 310 for billing billing information, A customer information management module 330, a demand amount calculation module 340, a transportation cost calculation module 350, a cost payment module 360, a customer management module 370, and a calculation control unit 380 .

입찰모듈(310)은 산출 제어부(380)의 제어에 따라 적어도 하나 이상의 판매단말(200)로부터 토목 공사에 사용되는 토목용 자재들과 같은 토목 자재 비용에 대한 정보가 전송되면, 적어도 하나 이상의 토목용 자재비용을 지역별, 품목별로 분류하고, 각 지역별 최저 토목 자재비용과 품목별 최저 토목 자재비용에 대한 리스트를 생성한다. The bidding module 310 may receive at least one information about the civil engineering material costs such as civil engineering materials used for civil engineering work from at least one sales terminal 200 under the control of the calculation control unit 380, It classifies material costs by region and item, and generates a list of the lowest civil engineering material cost per item and the lowest civil engineering material cost per item.

여기서, 입찰모듈(310)은 리스트 생성시 최저가를 기준으로 가장 낮은 토목 자재비용을 전송한 판매단말(200)을 우선순위로 정렬하여 생성할 수 있다.Here, the bidding module 310 may generate and sort the sales terminals 200, which have transmitted the lowest engineering material cost, based on the lowest price in the list creation, in order of priority.

또한, 입찰모듈(310)은 지역별로 분류된 판매단말(200)에 대한 리스트를 바탕으로 고객단말(100)로부터 전송된 토지의 위치정보와 가장 인접한 위치에 있는 판매단말(200)들을 검색한 후, 상기 토지 위치정보와 가까운 위치에 있는 판매단말(200)을 우선순위로 정렬하고, 이후 정렬된 판매단말(200)들 중에서 품목별 최저 토목 자재비용을 전송한 판매단말(200)을 선정하여 상기 선정된 판매단말(200)이 전송한 품목별 최저 토목 자재비용을 산출 제어부(380)로 전송하여 운반비 산출이 이루어지도록 한다. The bidding module 310 searches the sales terminals 200 located nearest to the location information of the land transferred from the customer terminal 100 based on the list of the sales terminals 200 classified by region , Sorting the sales terminals 200 located close to the land position information in priority order, selecting the sales terminal 200 that has transmitted the lowest civil engineering material cost per item from among the ordered sales terminals 200, To the calculation control unit 380, the lowest civil engineering material cost of each item transmitted by the sales terminal 200, so that the transportation cost calculation is performed.

이러한 입찰모듈(310)은 토목 공사를 진행할 토지와 가장 인접한 위치에 있으며, 토목용 자재에 대한 가장 최저가의 토목 자재비용을 전송한 상기 선정된 판매단말(200)에 대한 정보를 산출 제어부(380)를 통해 고객단말(100)로 전송할 수 있다. The bidding module 310 is located nearest to the site where the civil works are to be performed. The bidding module 310 transmits information on the selected sales terminal 200, which transmitted the lowest cost civil engineering material to the civil engineering material, To the customer terminal 100 via the Internet.

이때, 상기 선정된 판매단말(200)에 대한 정보 뿐만 아니라, 차순위에 있는 판매단말(200)에 대한 정보도 함께 전송하되, 상위 1% 이내의 차순위 판매단말(200)에 대한 정보만을 산출 제어부(380)를 통해 고객단말(100)로 전송할 수 있을 것이다. At this time, not only the information on the selected sales terminal 200 but also the information on the sales terminal 200 in the next order is transmitted together with only the information on the next highest order sales terminal 200 within the upper 1% 380 to the customer terminal 100 via the Internet.

이에, 고객단말(100)은 산출서버(300)를 통해 산출된 가장 저렴한 운반비에 해당하는 판매단말(200)에 대한 정보와, 차순위에 해당하는 상위 1% 이내의 판매단말(200)들 중 원하는 판매단말(200)을 선택할 수 있을 것이다. Accordingly, the customer terminal 100 transmits information on the sales terminal 200 corresponding to the lowest transportation cost calculated through the calculation server 300 and information on the sales terminal 200 within the top 1% The sales terminal 200 may be selected.

지질 정보 수집부(320)는 국내 모든 지역에 대한 지질 정보를 수집하여 저장하는 것으로, 한국 지질협회 DB를 검색하여 저장될 수 있으며, 주기적으로 수집된 정보의 업데이트가 이루어질 수 있다. The geological information collecting unit 320 collects and stores geological information for all regions of the country. The geological information collecting unit 320 can retrieve and store the geological information DB of the Korea Geological Society DB, and periodically collect the collected information.

이러한 지질 정보 수집부(320)는 산출 제어부(380)를 통해 고객단말(100)로부터 전송된 토목 공사가 이루어질 토지에 대한 위치정보가 전송되면, 저장된 지질 정보와 토지의 위치정보를 비교하여 현재 토지의 지질상태를 파악하여 산출 제어부(380)의 제어에 따라 자재 정보 안내모듈(330)로 전송한다. When the location information of the land to be civilized is transmitted from the customer terminal 100 through the calculation control unit 380, the geological information collecting unit 320 compares the stored geological information with the location information of the land, And transmits it to the material information guidance module 330 under the control of the calculation control unit 380. [

이때, 본 발명의 지질 정보 수집부(320)는 고객단말(100)의 요청에 따라 토지의 위치정보에 대한 지질상태를 분석하여 산출 제어부(380)를 통해 고객단말(100)로 전송할 수도 있다. At this time, the geographical information collecting unit 320 of the present invention may analyze the geological condition of the land position information at the request of the customer terminal 100 and transmit the analyzed geological condition to the customer terminal 100 through the calculation control unit 380.

여기서, 고객단말(100)의 요청시 전송되는 토지의 위치정보는 토목 공사가 이루어질 토지의 위치정보일 수 있으며, 공사정보에 포함되지 않은 새로운 토지에 대한 위치정보일 수도 있다.Here, the location information of the land transferred when the customer terminal 100 is requested may be the location information of the land to be civil engineering, or may be the location information of the new land not included in the construction information.

자재 정보 안내모듈(330)은 지질 정보 수집부(320)로부터 제공되는 토지의 위치정보에 대한 지질정보를 바탕으로 토목 공사시 가장 적합한 토목용 자재 정보를 도출해내고, 도출된 토목용 자재 정보를 산출 제어부(380)를 통해 수요량 산출모듈(340)로 전송한다. The material information guide module 330 derives the most suitable civil engineering material information at the time of civil engineering work based on the geological information of the land position information provided from the geological information collector 320 and calculates the derived civil engineering material information And transmits it to the demand amount calculating module 340 through the control unit 380.

또한, 자재 정보 안내모듈(330)은 고객단말(100)이 선택한 토목용 자재가 고객단말(100)이 전송한 토지의 지질상태에 적합한 토목용 자재인지 여부를 판단하고, 적합한 토목용 자재가 아닌 경우, 적합한 토목용 자재 정보를 산출 제어부(380)를 통해 고객단말(100)로 전송할 수 있다.The material information guide module 330 determines whether the civil engineering material selected by the customer terminal 100 is a civil engineering material suitable for the geological condition of the land transferred by the customer terminal 100, The appropriate civil engineering material information can be transmitted to the customer terminal 100 through the calculation control unit 380. [

이때, 고객단말(100)은 자재 정보 안내모듈(330)에서 제공하는 토지의 지질상태에 적합한 자재 아이템을 재선택하여 산출 제어부(380)로 전송할 수 있을 것이다. At this time, the customer terminal 100 may reselect a material item suitable for the geological condition of the land provided by the material information guide module 330 and transmit the selected material item to the calculation control unit 380.

수요량 산출모듈(340)은 자재 정보 안내모듈(330)에서 전송된 토목용 자재 정보와 산출 제어부(380)에서 전송되는 토목 공사 작업의 종류 및 대상 토지에 대한 수치정보를 비교 분석하여 대상 토지에 대한 수치에 따라 필요한 석재 또는 골재의 수요량과, 자재 아이템에 대한 수요량을 산출한다. The demand calculation module 340 compares the civil engineering material information transmitted from the material information guide module 330 with the numerical information about the type of civil works work and the target land transferred from the calculation control section 380, According to the numerical value, the demand amount of stone or aggregate and the demand amount of the material item are calculated.

예를 들어, 도 3의 조경석 쌓기의 경우 구매단말(100)에 의해 선택된 조경석이 해당 길이와 높이에 대해 18 헤베만큼 필요함을 나타내고 있다. 이에, 정확한 수요량이 산출되어 토목 작업후 석/골재가 남아 돌거나 또는 토목 작업중 모자라게 되어 재구매하고 재운반하는 문제가 방지된다.For example, in the case of the glazed glazing of FIG. 3, it is shown that the selected glacier by the purchasing terminal 100 is required to be 18 heights for the length and height. Therefore, the exact demand amount is calculated, and the problem of repatriation after the civil works is lost due to the remaining stone / aggregate or the lack of work during civil works is prevented.

마찬가지로 도8의 예를 들면, 30평의 주차장에 석재를 깔아두는데, 구매단말(100)이 10 cm의 두께로 깔기를 원하면 972.0 헤베의 석재가 요구됨을 알 수 있다.Similarly, for example, in FIG. 8, stone is laid in a 30-pyeong parking lot. If the purchasing terminal 100 wants to lay the car in a thickness of 10 cm, it is understood that a stone of 972.0 hebei is required.

이와 같이, 토목 작업에 필요한 석/골재의 수요량이 정확하게 계산되어 누구든지 초보자도 쉽게 그 수요량을 정확하게 인지하여 쉽게 구매할 수 있게 된다. 주차장 석재 깔기와 같은 간단한 작업은 토목 업자 없이도 합리적으로 구매하여 작업을 할 수 있을 것이다.In this way, the amount of stone / aggregate required for civil works can be accurately calculated, so that anyone can easily purchase the required amount of the stone because it is easily recognized by the beginner. A simple work such as parking lot stone laying will be able to purchase and work reasonably without a civil engineer.

운반비 산출모듈(350)은 수요량 산출모듈(340)에서 산출된 수요량에 대응하여 운반비를 자동 산출하도록 구성될 수 있다.The transportation cost calculation module 350 may be configured to automatically calculate the transportation cost in accordance with the demanded amount calculated by the demand amount calculation module 340. [

운반비 산출은 선정된 판매단말(200)의 위치정보를 기준으로 고객단말(100)이 전송한 토지의 위치정보까지의 운반 거리에 대한 비용과, 수요량 산출모듈(340)을 통해 산출된 토목용 자재의 수량/무게를 수용할 수 있는 필요한 이동수단의 임대 비용에 따라 산출이 이루어지도록 구성된다. The calculation of the transportation cost is based on the location information of the selected sales terminal 200 and the cost of the transportation distance to the location information of the land transferred by the customer terminal 100 and the cost for the transportation of the civil engineering material Of the required moving means capable of accommodating the quantity / weight of the vehicle.

예를 들어, 토목용 자재의 운반량이 조금만 더 늘어나도 이동수단(예: 트럭)이 추가로 더 필요할 수도 있다. 이러한 경우에는 그만큼 운반비가 더 많이 늘어나게 된다.For example, even if the carrying capacity of civil engineering materials is increased a little more, there may be an additional need for transportation (eg trucks). In such a case, the transportation cost is increased more.

도 3의 조경 쌓기의 경우 18 헤베의 조경석에 대해서는 25톤 트럭 0.9대 분량의 운반량 또는 15톤 덤프 트럭 1.5대의 운반량이 된다. 이 운반량은 25톤 1대로도 운반 가능하므로 그 운반비가 많이 절약될 수 있는 운반량이 된다.For landscaping in Fig. 3, for a 18-hebe seaport, the carload of a 25-ton truck or a 15-ton dump truck will be 0.9 units. This can be transported in a quantity of 25 tons, so the shipping cost can be saved.

그리고 도 6의 경우 330 헤베의 바닥 공사에 25톤 덤프 트럭 19.4대 또는 15톤 덤프 트럭 30대가 요구됨을 알 수 있다.In the case of FIG. 6, it can be seen that a floor construction of 330 Hebei requires 19.5 dump trucks of 25 tons or 30 dump trucks of 15 tons.

한편, 본 발명의 운반비 산출모듈(350)은 도 9에 도시된 바와 같이, 운반 거리를 지도 API(application program interface)를 이용하여 판매단말(200)과 토목 공사가 이루어질 토지의 위치까지의 최단 거리를 산출하도록 구성될 수 있다.9, the transportation cost calculation module 350 of the present invention calculates the transportation cost using the application program interface (API) as shown in FIG. 9, using the shortest distance to the location of the sales terminal 200 and the land to be civilized . ≪ / RTI >

비용 결제모듈(360)은 산출된 운반비에 대한 결제방식을 안내하며, 고객단말(100)의 비용 환불 요청에 따라 기결제된 비용에 대한 환불이 이루어지도록 구성된다. The expense settlement module 360 guides the settlement method for the calculated transportation expenses and is configured to make a refund for the overpaid expenses according to the cost refund request of the customer terminal 100. [

이러한 비용 결제모듈(360)은 토목용 자재의 운반비의 산출이 완료되면, 운반이 이루어지기 전에 산출된 운반비의 전액을 선결제하거나, 또는 토목용 자재가 토목 공사가 이루어질 토지까지 모두 운반이 완료된 이후에 결제를 수행하는 후결제를 하도록 하거나, 또는 산출된 운반비의 일부 선결제 및 일부 후결제가 이루어지도록 안내할 수 있다. When the calculation of the transportation cost of the civil engineering material is completed, the cost payment module 360 prepares the entire transportation cost calculated before the transportation, or after the transportation of the civil engineering material to the land where the civil engineering work is completed is completed It is possible to make a settlement after performing the settlement, or guide some settlement of the calculated transport expenses and settlement after the settlement.

또한, 비용 결제모듈(360)은 고객단말(100)로부터 이미 결제가 이루어진 비용에 대한 환불 요청시, 이에 대한 환불 진행이 이루어지도록 구성된다. In addition, the charge settlement module 360 is configured so that, when a refund request is made for the cost of the settlement already made from the customer terminal 100, the refund progress is made.

고객 관리모듈(370)은 고객단말(100)이 전송한 공사정보와, 이에 대한 토목용 자재의 종류가 저장되며, 운반을 수행한 판매단말(200)의 정보 및 운반비 정보가 저장된다.The customer management module 370 stores the construction information transmitted by the customer terminal 100 and the types of the civil engineering materials. The information of the sales terminal 200 and the transportation cost information of the transportation terminal 200 are stored.

또한, 고객 관리모듈(370)은 저장된 고객단말(100)을 대상으로 토목 공사가 완료된 이후, 유지 보수 여부에 대한 안내가 이루어지도록 구성되며, 고객단말(100)로부터 유지 보수 요청이 있는 경우, 유지 보수가 이루어질 부분에 대한 공사정보를 요청할 수 있다. In addition, the customer management module 370 is configured to provide guidance on whether or not the maintenance is performed after completion of civil engineering work on the stored customer terminal 100. When there is a maintenance request from the customer terminal 100, You can request construction information for the part where maintenance will be done.

이때, 고객 관리모듈(370)은 산출 제어부(380)를 통해 유지보수에 사용될 토목용 자재의 최근 가격 정보를 요청한 후, 운반비 산출모듈(350)을 통해 운반비 재산출이 이루어지도록 할 수 있다. At this time, the customer management module 370 may request the latest price information of the civil engineering material to be used for maintenance through the calculation control unit 380, and then, the transportation cost re-calculation may be performed through the transportation cost calculation module 350.

여기서, 유지보수에 사용될 토목용 자재의 최근 가격 정보를 제공하는 판매단말(200)은 상기 고객단말(100)로 토목 공사를 위한 토목용 자재의 운반을 수행한 판매단말(200)이다.The sales terminal 200 providing latest price information of the civil engineering material to be used for maintenance is a sales terminal 200 carrying the civil engineering material for civil engineering work to the customer terminal 100.

또한, 운반비 재산출시, 유지 보수에 사용되는 토목용 자재의 수요량을 산출하도록 할 수 있다.In addition, it can calculate the demand amount of civil engineering materials used for the delivery of property, maintenance, and maintenance.

산출 제어부(380)는 고객단말(100) 및 판매단말(200)로부터 각각 전송되는 공사정보, 토목용 자재 정보, 토목 자재 비용정보 등을 송수신 하고 운반비의 산출이 이루어지도록 산출서버(300)를 이루는 각 구성요소들을 제어한다.The calculation control unit 380 transmits and receives construction information, civil engineering material information, civil engineering material cost information, and the like transmitted from the customer terminal 100 and the sales terminal 200, respectively, And controls each component.

이와 같은 산출 제어부(380)는 입찰모듈(310)에 의해 선정된 판매단말(200)이 전송한 토목 자재비용 상에 자재 정보 안내모듈(330)에 의해 도출된 토목용 자재에 대한 비용정보가 없는 경우, 산출 제어부(380)는 상기 선정된 판매단말(200)의 차순위에 있는 판매단말(200)로부터 전송된 토목 자재비용을 확인하여 상기 토목용 자재에 대한 비용정보를 모두 가지는 판매단말(200)에 대한 정보를 고객단말(100)로 전송함과 동시에 상기 차순위의 판매단말(200)과 고객단말(100) 간의 가격 협의가 이루어지도록 할 수 있다. The calculation control unit 380 may calculate cost information for the civil engineering material derived by the material information guide module 330 on the civil engineering material cost transmitted by the sales terminal 200 selected by the bidding module 310 The calculation control unit 380 checks the cost of the civil engineering material transmitted from the sales terminal 200 at the order of the selected sales terminal 200 and transmits the cost information to the sales terminal 200 having all the cost information for the civil engineering material, The price negotiation between the sales terminal 200 and the customer terminal 100 can be performed at the same time as the information about the customer terminal 100 is transmitted to the customer terminal 100.

즉, 고객단말(100)은 도출된 토목용 자재들 중에서 상기 선정된 판매단말(200)에서 판매하는 최저가의 토목용 자재를 구매하고, 이와 동시에 차순위의 판매단말(200)을 통해 상기 선정된 판매단말(200)에서 판매하지 않는 토목용 자재를 차순위의 판매단말(200)이 전송한 비용정보 보다 저렴한 가격으로 구매를 할 수 있게 되는 것이다. That is, the customer terminal 100 purchases the lowest priced civil engineering material sold by the selected sales terminal 200 among the derived civil engineering materials, and at the same time, It is possible to purchase the civil engineering materials not sold by the terminal 200 at a lower price than the cost information transmitted by the sales terminal 200 of the next order.

이때, 고객단말(100)과 차순위의 판매단말(200) 간의 협의된 가격정보는 산출 제어부(380)로 전송되어 최종 운반비 산출시 협의된 가격 정보가 포함된 상태에서 산출이 이루어지도록 할 수 있다. At this time, the negotiated price information between the customer terminal 100 and the sales terminal 200 of the next order is transmitted to the calculation control unit 380 so that the calculated price information can be calculated in the state that the negotiated price information is included in the calculation of the final transportation cost.

아울러, 고객단말(100)과 차순위의 판매단말(200) 간의 가격 협의시, 산출 제어부(380)는 협의 가능한 가격정보를 판매단말(200)로 전송함으로써, 일정 조건 내에서만 협의가 가능하도록 할 수 있다. In addition, when the price negotiation between the customer terminal 100 and the sales terminal 200 of the next order is made, the calculation control unit 380 can transmit negotiable price information to the sales terminal 200 so that negotiation can be made only within a certain condition have.

이는, 가격 협의시 발생할 수 있는 부정행위를 방지할 수 있으며, 고객단말(100)이 필요한 토목용 자재를 저렴하게 구매할 수 있도록 안내할 수 있게 될 것이다.This can prevent cheating that may occur when negotiating the price, and can guide the customer terminal 100 to purchase the civil engineering materials that are needed at a low cost.

이때, 산출 제어부(380)에서는 협의 가능한 가격정보로, 상기 선정된 판매단말(200)이 전송한 비용정보 보다 큰 가격과 상기 차순위 판매단말(200)이 전송한 비용정보 보다 적은 가격 범위를 제공하고, 상기 가격 범위 내에서만 협의가 가능하도록 할 수 있다. At this time, the calculation control unit 380 provides a price range that is larger than the cost information transmitted by the selected sales terminal 200 and less than the cost information transmitted from the next order sales terminal 200, with negotiable price information , So that negotiation can be made only within the above price range.

이상에서 기재된 "포함하다", "구성하다" 또는 "가지다" 등의 용어는, 특별히 반대되는 기재가 없는 한, 해당 구성 요소가 내재될 수 있음을 의미하는 것이므로, 다른 구성 요소를 제외하는 것이 아니라 다른 구성 요소를 더 포함할 수 있는 것으로 해석되어야 하며, 기술적이거나 과학적인 용어를 포함한 모든 용어들은, 다르게 정의되지 않는 한, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가진다. It is to be understood that the terms "comprises", "comprising", or "having" as used in the foregoing description mean that the constituent element can be implanted unless specifically stated to the contrary, And all terms including technical or scientific terms are to be construed as further including other elements unless the context clearly dictates otherwise as generally understood by one of ordinary skill in the art to which this invention belongs. Have the same meaning.

또한, 이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or essential characteristics thereof. . Therefore, the embodiments disclosed in the present invention are intended to illustrate rather than limit the scope of the present invention, and the scope of the technical idea of the present invention is not limited by these embodiments. The scope of protection of the present invention should be construed according to the following claims, and all technical ideas within the scope of equivalents should be construed as falling within the scope of the present invention.

100: 고객단말 200: 판매단말
300: 산출서버 310: 입찰모듈
320: 지질 정보 수집부 330: 자재 정보 안내모듈
340: 수요량 산출모듈 350: 운반비 산출모듈
360: 비용 결제모듈 370: 고객 관리모듈
380: 산출 제어부
100: customer terminal 200: sales terminal
300: Calculation server 310: Bidding module
320: geological information collection unit 330: material information guide module
340: demand quantity calculation module 350: transportation cost calculation module
360: Cost payment module 370: Customer management module
380:

Claims (4)

공사 작업의 종류와 대상 토지의 위치정보 및 상기 토지에 대한 수치를 포함하는 공사정보와 토목 공사에 이용될 토목용 석/골재의 종류 및 토목 공사시 사용되는 각종 공사용 도구들로 이루어진 자재 아이템을 포함하는 토목용 자재 정보를 전송하는 고객단말;
상기 토목용 자재에 대한 비용정보를 전송하고, 전송한 토목용 자재들의 비용에 대한 선정시에만 상기 고객단말에 의해 선택된 토목용 자재를 운반하는 적어도 하나 이상의 판매단말; 및
상기 공사정보, 토목용 자재 정보 및 토목용 자재에 대한 비용정보가 전송되고, 전송된 상기 비용정보 중 최저가의 비용정보를 전송한 판매단말을 선정하며, 전송된 상기 공사정보에 따라 상기 토목용 자재의 수요량을 산출하고, 산출된 수요량과 상기 최저가의 비용정보를 바탕으로 운반비를 산출하여 상기 고객단말로 전송하여 결제가 이루어지도록 안내하는 산출서버;를 포함하고,
상기 산출서버는,
적어도 하나 이상의 판매단말로부터 토목용 자재 비용에 대한 정보가 전송되면, 적어도 하나 이상의 토목용 자재 비용을 지역별, 품목별로 분류하고, 각 지역별 최저 토목 자재비용과 품목별 최저 토목 자재비용에 대한 리스트를 생성하고, 지역별로 분류된 판매단말에 대한 리스트를 바탕으로 상기 고객단말로부터 전송된 토지의 위치정보와 가장 인접한 위치에 있는 판매단말들을 검색한 후, 상기 토지 위치정보와 가까운 위치에 있는 판매단말을 우선순위로 정렬하고, 정렬된 판매단말들 중에서 품목별 최저 토목 자재비용을 전송한 판매단말을 선정하는 입찰모듈;
한국 지질협회 DB에 저장된 국내 모든 지역에 대한 지질 정보를 수집 및 저장되며, 저장된 지질 정보와 상기 고객단말로부터 전송된 상기 토지의 위치정보를 비교 및 분석하여 현재 토지의 지질상태에 대한 정보를 생성하는 지질 정보 수집부;
상기 지질 정보 수집부에서 생성한 상기 토지의 지질상태와 적합한 토목용 자재 정보를 생성하거나, 상기 고객단말이 전송한 토목용 자재가 상기 토지의 지질성태에 적합한지 여부를 판단하여 적합하지 않은 경우, 적합한 토목용 자재 정보를 전송하는 자재 정보 안내모듈;
상기 자재 정보 안내모듈에서 전송된 토목용 자재 정보와 산출 제어부에서 전송되는 토목 공사 작업의 종류 및 대상 토지에 대한 수치정보를 비교 분석하여 대상 토지에 대한 수치에 따라 필요한 석재 또는 골재의 수요량과, 자재 아이템에 대한 수요량을 산출하는 수요량 산출모듈;
상기 고객단말로부터 선정된 판매단말의 위치정보를 기준으로 상기 고객단말이 전송한 토지의 위치정보까지의 운반 거리에 대한 비용과, 상기 수요량 산출모듈을 통해 산출된 토목용 자재의 수량/무게를 수용할 수 있는 필요한 이동수단의 임대 비용에 따라 토목용 자재의 운반비를 산출하는 운반비 산출모듈;
상기 고객단말 및 판매단말로부터 각각 전송되는 공사정보, 토목용 자재 정보, 토목 자재 비용정보를 송수신하고 운반비의 산출이 이루어지도록 산출서버를 이루는 각 구성요소들을 제어하며, 상기 자재 정보 안내모듈에서 전송된 상기 적합한 토목용 자재 정보를 상기 고객단말로 전송하는 산출 제어부;
산출된 운반비에 대한 선결제, 후결제, 또는 일부 선결제 및 일부 후결제로 이루어진 결제방식을 안내하며, 상기 고객단말의 비용 환불 요청에 따라 기결제된 비용에 대한 환불이 이루어지도록 하는 비용 결제모듈; 및
운반이 이루어진 상기 공사정보 및 토목용 자재의 종류와, 운반을 수행한 판매단말의 정보 및 운반비 정보가 저장되고, 상기 고객단말로부터 전송되는 유지 보수 요청을 상기 산출 제어부로 전송하여 운반비의 재산출이 이루어지도록 하는 고객 관리모듈;
을 더 포함하는 것을 특징으로 하는 토목용 석/골재 운반비용 산출 시스템.
The construction information including the type of the construction work, the location information of the target land, and the numerical value of the land, the kind of the civil engineering stone / aggregate to be used in the civil engineering work, and the material item including various construction tools used in the civil engineering work A customer terminal for transmitting civil engineering material information;
At least one sales terminal for transmitting cost information for the civil engineering material and transporting the civil engineering material selected by the customer terminal only at the time of selecting the cost of the transferred civil engineering materials; And
The construction information, the civil engineering material information, and the cost information for the civil engineering material are transmitted, the sales terminal that has transmitted the lowest cost information among the transferred cost information is selected, and the civil engineering material And a calculation server for calculating a transportation cost based on the calculated demand amount and the lowest cost information and transmitting the calculated transportation cost to the customer terminal to guide the settlement,
Wherein the calculation server comprises:
When information on the civil engineering material cost is transmitted from at least one sales terminal, at least one civil engineering material cost is classified by region and item, a list of the lowest civil engineering material cost and the lowest civil engineering material cost per item is generated Searches for sales terminals located nearest to the location information of the land transmitted from the customer terminal based on the list of the sales terminals classified by region, A bidding module for selecting a sales terminal that has transmitted the lowest civil engineering material cost for each item among the ordered sales terminals;
Collects and stores geological information for all regions of the country stored in the Korean Geological Society DB and compares and analyzes the stored geological information and the location information of the land transferred from the customer terminal to generate information about the geological condition of the present land Geological Information Collection Department;
If the civil engineering material transmitted by the customer terminal is suitable for the geological condition of the land and is not suitable for the geological condition of the land generated by the geological information collector, A material information guide module for transmitting appropriate civil engineering material information;
A comparison between the civil engineering material information transmitted from the material information guide module and the numerical information about the kind of the civil works work and the target land transferred from the calculation control section and the demand amount of the stone or aggregate required according to the value of the target land, A demand quantity calculating module for calculating a demand quantity of the item;
A cost for the transportation distance to the location information of the land transferred by the customer terminal based on the location information of the sales terminal selected from the customer terminal and the quantity and weight of the civil engineering material calculated through the demand quantity calculation module A transportation cost calculating module for calculating a transportation cost of the civil engineering material according to the rental cost of the necessary transportation means that can be performed;
And transmits the construction information, the civil engineering material information, and the civil engineering material cost information transmitted from the customer terminal and the sales terminal, respectively, and controls each component constituting the calculation server so as to calculate the transportation cost, A calculation control unit for transmitting the appropriate civil engineering material information to the customer terminal;
A cost settlement module for guiding a settlement method consisting of a prepayment method, a postpayment method, a partial prepayment method, and a partial settlement method for the calculated transportation expenses, and to make a refund for overpaid expenses according to a request for a cost refund of the customer terminal; And
The type of the civil engineering material, the information of the sales terminal carrying the transportation, and the transportation cost information, and transmits the maintenance request transmitted from the customer terminal to the calculation control unit, A customer management module for performing the customer management module;
Further comprising the step of: calculating the cost of the stone / aggregate transportation cost for civil engineering.
삭제delete 제1항에 있어서,
상기 입찰모듈은,
상기 선정된 판매단말에 대한 정보 뿐만 아니라, 차순위에 있는 판매단말에 대한 정보도 함께 전송하되, 상위 1% 이내의 차순위 판매단말에 대한 정보만을 상기 산출 제어부를 통해 상기 고객단말로 전송하여 상기 고객단말 상기 산출서버를 통해 산출된 가장 저렴한 운반비에 해당하는 판매단말에 대한 정보와, 차순위에 해당하는 상위 1% 이내의 판매단말들 중 원하는 판매단말을 선택하도록 하는 것을 특징으로 하는 토목용 석/골재 운반비용 산출 시스템.
The method according to claim 1,
The bidding module,
Not only the information on the selected sales terminal but also the information on the sales terminal in the next order is transmitted together with information on the next highest order sales terminal within the upper 1% to the customer terminal through the calculation control unit, The information about the sales terminal corresponding to the lowest transportation cost calculated through the calculation server and the desired sales terminal among the sales terminals within the top 1% corresponding to the order of the order is selected. Cost calculation system.
삭제delete
KR1020170114291A 2017-09-07 2017-09-07 Civil engineering stone and aggregate transportation cost calculation system KR101844761B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170114291A KR101844761B1 (en) 2017-09-07 2017-09-07 Civil engineering stone and aggregate transportation cost calculation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170114291A KR101844761B1 (en) 2017-09-07 2017-09-07 Civil engineering stone and aggregate transportation cost calculation system

Publications (1)

Publication Number Publication Date
KR101844761B1 true KR101844761B1 (en) 2018-05-18

Family

ID=62453772

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170114291A KR101844761B1 (en) 2017-09-07 2017-09-07 Civil engineering stone and aggregate transportation cost calculation system

Country Status (1)

Country Link
KR (1) KR101844761B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116128675A (en) * 2023-03-21 2023-05-16 湖北庭凯建筑工程有限公司 Intelligent analysis management and control system for building construction based on Internet of things technology

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006209233A (en) * 2005-01-25 2006-08-10 Takami Fukaya Drawing support program of civil engineering structure

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006209233A (en) * 2005-01-25 2006-08-10 Takami Fukaya Drawing support program of civil engineering structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116128675A (en) * 2023-03-21 2023-05-16 湖北庭凯建筑工程有限公司 Intelligent analysis management and control system for building construction based on Internet of things technology
CN116128675B (en) * 2023-03-21 2024-05-10 湖北碳排放权交易中心有限公司 Intelligent analysis management and control system for building construction based on Internet of things technology

Similar Documents

Publication Publication Date Title
US20130035978A1 (en) Management of materials on a construction site
CN101751615A (en) Method and system for managing raw materials on construction site
KR100923255B1 (en) Surplus soil transportation management system and management method of surplus soil transportation using the same
Kiousis et al. Assessing traffic and environmental impacts of smart lockers logistics measure in a medium-sized municipality of Athens
Clark et al. The impacts of autonomous vehicles and e-commerce on local government budgeting and finance
KR102285639B1 (en) Total heavy equipment brokerage service method
KR101844761B1 (en) Civil engineering stone and aggregate transportation cost calculation system
US20060131382A1 (en) Apparatus, system, and method for selecting, pricing, and displaying a non-standardized product
Embacher Use of material delivery management system (MDMS) for asphalt paving applications
KR102258222B1 (en) Method for product transaction based on blockchain and apparatus for performing the method
CN111476426A (en) Big data-based cost data collection method and system
JP2019032631A (en) Collection conveyance processing method of wastes
JP2002203133A (en) Product transaction system and method, and computer readable recording medium recording program for carrying out the method
JP2021096841A (en) Matching system
JP2017097598A (en) System for collecting byproduct from construction site
Alumbugu et al. Analysis of outbound logistics channels for construction material
US20210241194A1 (en) Systems and methods for connecting management systems through scale ticket data
Subbiah et al. Buildmart Mobile Application for Construction Commodity
US11748675B1 (en) Construction site automatic telematic data to project specification requirements reconciliation system
US20240232969A1 (en) Networked supply chain marketplace for the construction industry
Mehany et al. Risk-Managed Lifecycle Costing for Asphalt Road Construction and Maintenance Projects Under Performance-Based Contracts
JP2002041869A (en) Transportation business transaction surrogate server, system and method for transportation business transaction using the same server and recording medium having program for computer to execute the same method recorded thereon
Neri Accurate Stockpile Material Inventory for Maintenance Activities
JP2024059235A (en) Server, orderer terminal, program and order intermediation method
KR102251472B1 (en) Method for future trading based on blockchain and apparatus for performing the method

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant