KR101763068B1 KR1020160054053A KR20160054053A KR101763068B1 KR 101763068 B1 KR101763068 B1 KR 101763068B1 KR 1020160054053 A KR1020160054053 A KR 1020160054053A KR 20160054053 A KR20160054053 A KR 20160054053A KR 101763068 B1 KR101763068 B1 KR 101763068B1
Authority
KR
South Korea
Prior art keywords
design information
design
information
power plant
nuclear power
Prior art date
Application number
KR1020160054053A
Other languages
Korean (ko)
Inventor
임병기
문병석
이재경
Original Assignee
한국수력원자력 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국수력원자력 주식회사 filed Critical 한국수력원자력 주식회사
Priority to KR1020160054053A priority Critical patent/KR101763068B1/en
Application granted granted Critical
Publication of KR101763068B1 publication Critical patent/KR101763068B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • G06F17/50
    • G06F17/5004
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D1/00Details of nuclear power plant
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Plasma & Fusion (AREA)
  • Primary Health Care (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Architecture (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

원자력 발전소의 건설을 위한 종합 설계 정보, 공급자 기기설계 정보 및 현장 설계 정보를 포함하는 원자력 발전소 전체 설계 정보를 통합하여 관리하기 위한 장치가 제공된다. 전체 설계 정보 통합 관리 장치는, 종합 설계사 서버로부터 원자력 발전소의 건설을 위한 종합 설계 정보를 수신하는 종합 설계 정보 수집부로서, 상기 수신된 종합 설계 정보는 상기 종합 설계사 서버의 최신 종합 설계 정보와 동기화되는, 상기 종합 설계 정보 수집부와, 복수의 공급자들에 의한 원자력 발전소용 기기의 설계 정보들을 저장하고, 상기 수신한 종합 설계 정보에 따라 호환 가능한 기기의 설계 정보를 포함하는 공급자 기기설계 정보를 제공하는 공급자 설계 정보 관리부 및 시공사 서버로 상기 종합 설계 정보 및 공급자 기기설계 정보를 제공하고, 상기 시공사 서버로부터 상기 종합 설계 정보에 기초한 시공 도면을 포함하는 현장 설계 정보를 수신하는 현장 설계 정보 수집부를 포함할 수 있다. A device for integrating and managing the entire design information of the nuclear power plant including comprehensive design information, supplier device design information and site design information for the construction of the nuclear power plant is provided. The overall design information integrated management apparatus is a comprehensive design information collecting unit for receiving comprehensive design information for construction of a nuclear power plant from a general designer server, and the received overall design information is synchronized with the latest comprehensive design information of the general designer server , The integrated design information collecting unit, design information of the equipment for a nuclear plant by a plurality of suppliers, and providing supplier equipment design information including design information of compatible equipment according to the received overall design information And a site design information collecting unit for providing the overall design information and supplier equipment design information to the supplier design information management unit and the construction company server and receiving the site design information including the construction drawings based on the comprehensive design information from the construction company server have.

Figure R1020160054053
Figure R1020160054053

Description

원자력 발전소 전체 설계 정보 통합 관리 장치{AN APPARATUS FOR MANAGING INTEGRATED INFORMATION OF NUCLEAR POWER PLANT DESIGN}FIELD OF THE INVENTION [0001] The present invention relates to an integrated management system for nuclear power plants,

본 발명은 원자력 발전소의 설계에 관한 것으로서, 보다 구체적으로는 원자력 발전소의 건설을 위해 필요한 설계 정보를 통합 관리하기 위한 장치에 관한 것이다. The present invention relates to a design of a nuclear power plant, and more particularly, to an apparatus for integrally managing design information necessary for construction of a nuclear power plant.

통상적인 플랜트 건설은 설계 (E : Engineering), 구매 (P : Procurement), 시공 (C : Construction) 계약을 통해 건설사 또는 사업관리 (PMC) 사가 설계, 구매, 시공을 일괄하여 수행하고 있어 동일 조직 및 동일 시스템 사용으로 설계 데이터 공유와 활용이 원활하게 이루어지는 반면에 국내 원자력 발전소의 건설은 EPC를 분리하여 발주하고 있으며, 특히 원자력 발전소의 건설을 위한 설계 분야는 플랜트 종합 설계 (Architect Engineering, A/E), 공급자 기기설계, 시공사가 수행하는 현장 설계로 분리되어 수행된다. 즉, 설계, 구매 및 시공 계약이 분리되어 있어 설계 데이터 공유 및 활용에 한계가 있다. Typical plant construction involves design, purchase, and construction of construction companies or business management (PMC) companies through contracts for design (E: Engineering), procurement (P: procurement) and construction (C: EPC is separated from the construction of domestic nuclear power plant while design data sharing and utilization is smoothly performed by using the same system. Especially, the design field for the construction of nuclear power plant is Architect Engineering (A / E) , Supplier equipment design, and site design performed by the contractor. In other words, design, purchase, and construction contracts are separated, which limits design data sharing and utilization.

특히 원자력 발전소의 주요 설비인 구조물 (Structure), 계통 (System), 기기 (Component) 설계는 종합 설계와 보조기기 설계로 구분할 수 있으며 종합 설계사는 구조물 설계와 P&ID, C&ID 등의 계통 설계, 주기기인 원자로 냉각재 펌프 (Reactor Coolant Pump, RCP) 및 증기 발생기 등을 설계를 수행하며 펌프, 밸브 등의 보조기기 설계는 보조기기 제작업체에서 수행하고 있다. In particular, the design of structures, systems, and components, which are the main facilities of nuclear power plants, can be classified into general design and auxiliary design. General designers can design the structure, system design such as P & ID, C & (RCP), steam generator, etc. Design of ancillary equipment such as pumps, valves, etc. is carried out by an auxiliary equipment maker.

또한, 종합 설계사에서 제공된 종합 설계 정보를 기준으로 시공 현장에서 작성하는 시공용 도면을 설계하는 현장 설계는 시공사에서 별도의 설계 시스템을 구축하여 시공용 도면 생산 및 시공업무에 활용하고 있다.In addition, the site design for designing the construction drawings to be created on the construction site based on the comprehensive design information provided by the general designer is constructed by the construction company and used for the production and construction work of the construction drawings.

따라서, 설계 주체와 설계를 수행하는 설계 프로그램이 설계 단계에 따라 다양함에 따라 원자력 발전소를 구성하는 전체 설비에 대한 설계모델 통합을 구현하기에는 한계가 있고, 각각의 설계 주체별로 필요한 설계 정보가 중복 재생산되어 설계 업무 효율성을 저해하는 요소로 작용하였다. 즉 기존 원자력 발전소 건설에서의 3차원 CAD 설계모델은 설계사, 제작사, 시공사 간의 업무가 단절되어 각 참여 업체에서 생산되는 모델이 독립적으로 관리되어 있거나 문서 기반의 도면 중심으로 저장 및 관리되고 있다.Therefore, there are limitations in implementing the design model integration for the entire facilities constituting the nuclear power plant as the design subject and the design program for designing vary according to the design stage, and the design information required for each design subject is duplicated It was a factor that hindered the efficiency of design work. In other words, the three-dimensional CAD design model in the existing nuclear power plant construction is disconnected between the designer, the manufacturer, and the construction company, and the model produced by each participating company is independently managed or stored and managed as a document-based drawing center.

따라서, 원자력 발전소 건설에 참여하는 다양한 주체와 다양한 설계 시스템에서 생성되는 정보를 단일화된 시스템으로 통합하는데 어려움이 있으며, 원자력 발전소의 각 단계에 따라 생성되는 설계 정보가 통합되지 않고 퍼스트 (1st) 콘크리트 타설 이전의 설계 완성도가 높지 않음에 따라 시공시 설계 오류로 인한 시공 효율성이 떨어지는 문제점이 있다. Therefore, it is difficult to integrate information generated from various subjects participating in nuclear power plant construction and various design systems into a unified system, and it is difficult to integrate design information generated by each step of nuclear power plant, As the previous design completeness is not high, there is a problem that the efficiency of construction due to a design error is lowered.

한국 공개특허공보 제 2015-001923 호 ("원전 플랜트 업무프로세스 모델링 및 절차서 관리 방법", 한국수력원자력 주식회사)Korean Patent Laid-Open Publication No. 2015-001923 ("Method of managing plant process business process modeling and procedure book ", Korea Hydro & Nuclear Power Co., Ltd.)

전술한 문제점을 해결하기 위한 본 발명의 목적은 원자력 발전소의 건설을 위해 필요한 종합 설계, 공급자 기기설계 및 현장 설계를 포함하는 모든 설계 정보 (3D 모델 포함) 에 관한 정보를 통합하여 관리하고, 이를 원자력 발전소 건설 프로젝트에 적용할 수 있는 장치를 제공하는 것이다. The object of the present invention for solving the above-mentioned problems is to integrate and manage information on all the design information (including the 3D model) including the comprehensive design, supplier equipment design, and field design necessary for the construction of a nuclear power plant, And to provide a device that can be applied to a power plant construction project.

다만, 본 발명의 해결하고자 하는 과제는 이에 한정되는 것이 아니며, 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위에서 다양하게 확장될 수 있을 것이다. It should be understood, however, that the present invention is not limited to the above-described embodiments, but may be variously modified without departing from the spirit and scope of the invention.

전술한 목적을 달성하기 위한 본 발명의 일 실시예에 따른 원자력 발전소 전체 설계 정보 통합 관리 장치는 원자력 발전소의 건설을 위한 종합 설계 정보, 공급자 기기설계 정보 및 현장 설계 정보를 포함하는 원자력 발전소 전체 설계 정보를 통합하여 관리하기 위한 장치로서, 종합 설계사 서버로부터 원자력 발전소의 건설을 위한 종합 설계 정보를 수신하는 종합 설계 정보 수집부로서, 상기 수신된 종합 설계 정보는 상기 종합 설계사 서버의 최신 종합 설계 정보와 동기화되는, 상기 종합 설계 정보 수집부; 복수의 공급자들에 의한 원자력 발전소용 기기의 설계 정보들을 저장하고, 상기 수신한 종합 설계 정보에 따라 호환 가능한 기기의 설계 정보를 포함하는 공급자 기기설계 정보를 제공하는 공급자 설계 정보 관리부; 및 시공사 서버로 상기 종합 설계 정보 및 공급자 기기설계 정보를 제공하고, 상기 시공사 서버로부터 상기 종합 설계 정보에 기초한 시공 도면을 포함하는 현장 설계 정보를 수신하는 현장 설계 정보 수집부를 포함할 수 있다. In order to achieve the above-mentioned object, the integrated design information management system of a nuclear power plant according to an embodiment of the present invention includes a design information of a nuclear power plant including comprehensive design information, supplier design information, and site design information for construction of a nuclear power plant The integrated design information collecting unit receives comprehensive design information for construction of a nuclear power plant from a general designer server, and the received overall design information is synchronized with the latest comprehensive design information of the general designer server The integrated design information collecting unit; A supplier design information management unit that stores design information of a device for a nuclear power plant by a plurality of suppliers and provides supplier equipment design information including design information of a compatible device according to the received overall design information; And a site design information collecting unit for providing the overall design information and supplier equipment design information to a construction company server and receiving site design information including a construction drawing based on the comprehensive design information from the construction company server.

일 측면에 따르면, 상기 종합 설계 정보는 상기 원자력 발전소의 구조물 (Structure) 설계, 계통 (System) 설계 및 주기기 설계에 관한 정보를 포함할 수 있다. According to one aspect, the integrated design information may include information on structure design, system design, and main device design of the nuclear power plant.

일 측면에 따르면, 상기 주기기는 원자로 냉각재 펌프 (Reactor Coolant Pump, RCP) 및 증기 발생기 중 적어도 하나를 포함할 수 있다. According to one aspect, the cyclic unit may include at least one of a reactor coolant pump (RCP) and a steam generator.

일 측면에 따르면, 상기 공급자 기기설계 정보는 상기 원자력 발전소의 보조 기기 (Component) 설계에 관한 정보를 포함할 수 있다. According to an aspect, the supplier device design information may include information on an accessory component design of the nuclear power plant.

일 측면에 따르면, 상기 보조 기기는 펌프 및 밸브 중 적어도 하나를 포함할 수 있다. According to an aspect, the auxiliary device may include at least one of a pump and a valve.

일 측면에 따르면, 상기 종합 설계 정보 및 공급자 기기설계 정보를 운영 정보로서 발주사 서버에 제공하는 전체 설계 정보 제공부를 더 포함할 수 있다. According to an aspect of the present invention, the apparatus may further include an overall design information providing unit for providing the overall design information and the supplier equipment design information to the order book server as operation information.

일 측면에 따르면, 상기 종합 설계 정보, 공급자 기기설계 정보 및 현장 설계 정보를 통합하여 저장하는 전체 설계 정보 데이터베이스를 더 포함할 수 있다. According to an aspect of the present invention, the information processing apparatus may further include an overall design information database for integrating and storing the comprehensive design information, supplier equipment design information, and site design information.

일 측면에 따르면, 상기 전체 설계 정보 데이터베이스는 제 2 원자력 발전소의 건설을 위한 설계 정보로서 상기 종합 설계 정보, 공급자 기기설계 정보 및 현장 설계 정보를 제공할 수 있다. According to one aspect, the overall design information database may provide the integrated design information, supplier equipment design information, and site design information as design information for the construction of the second nuclear power plant.

일 측면에 따르면, 상기 전체 설계 정보 데이터베이스는 제 2 원자력 발전소의 건설을 위한 제 2 공급자 결정 정보를 수신하는 것에 응답하여, 상기 공급자 기기설계 정보를 상기 제 2 공급자 기기설계 정보로 대체할 수 있다. According to one aspect, the overall design information database may replace the supplier instrument design information with the second supplier instrument design information in response to receiving second supplier determination information for construction of a second nuclear power plant.

개시된 기술은 다음의 효과를 가질 수 있다. 다만, 특정 실시예가 다음의 효과를 전부 포함하여야 한다거나 다음의 효과만을 포함하여야 한다는 의미는 아니므로, 개시된 기술의 권리범위는 이에 의하여 제한되는 것으로 이해되어서는 아니 될 것이다.The disclosed technique may have the following effects. It is to be understood, however, that the scope of the disclosed technology is not to be construed as limited thereby, as it is not meant to imply that a particular embodiment should include all of the following effects or only the following effects.

전술한 본 발명의 일 실시예에 따른 원자력 발전소 전체 설계 정보 통합 관리 장치에 따르면, 원자력 발전소의 건설을 위해 필요한 종합 설계, 공급자 기기설계 및 현장 설계를 포함하는 모든 설계 정보 (모델 포함) 에 관한 정보를 통합하여 관리하고, 이를 원자력 발전소 건설 프로젝트에 적용할 수 있다. According to the integrated design information management system of the nuclear power plant according to the embodiment of the present invention, information on all the design information (including the model) including the comprehensive design, the supplier equipment design and the site design necessary for the construction of the nuclear power plant And it can be applied to the nuclear power plant construction project.

따라서, 원자력 발전소를 구성하고 있는 구조물, 계통, 기기의 모든 설계 정보와 관련된 정교한 3차원 그래픽 형상 표현 및 통합 구축이 가능하며 설계 분야별 참여 업체의 데이터의 중복을 방지하고 그 활용의 극대화가 가능하다.Therefore, it is possible to construct a sophisticated 3D graphic representation and integrated construction related to all the design information of the structure, system, and apparatus constituting the nuclear power plant. It is possible to prevent duplication of data of participating companies in the design field and maximize the utilization thereof.

또한, 설계 단계에 전면 적용하여 현장 설계분을 포함한 다양한 설계 분야 간의 공간 관리 및 배치 업무에 활용할 수 있고, 현장 설계인 상세 설계까지 3차원 CAD 데이터베이스로 완벽하게 구축할 수 있어 설계자와 제작사 간의 정보 통합을 통한 설계 품질 제고, 정확한 도면 출력 및 자재 물량 산출, 시공 전 설계완성도 제고를 달성함으로써 정확한 시공 계획 수립 및 현장 시공 간섭 검토가 가능하다.In addition, it can be used for space management and batch work among various design fields, including field design, and can be completely applied to the design stage, and the detailed design of the site design can be completely constructed as a three-dimensional CAD database. To achieve accurate design output, to calculate the quantity of material, and to improve the design completeness before construction.

또한, 보조기기 설계 정보를 통합한 종합 설계와 현장 설계 정보를 3D 모델로 통합하여 최종 준공 도면 (As-Built 도면) 의 구축이 가능하며 3D 모델, P&ID 등 2D 도면과 관련 설계 정보 등을 체계적으로 확보하여 운영 단계에 필요한 모든 설계 정보를 통합하여 이관할 수 있다. In addition, it is possible to construct the final completed drawing (As-Built drawing) by integrating the integrated design information of the auxiliary equipment design information and the site design information into the 3D model, and to construct systematically the 2D drawing such as 3D model, P & And all the design information necessary for the operational stage can be integrated and transferred.

3차원 CAD 및 관련 정보는 제작사와 공급사에 공유되어 통합 시공사와 공유하여 상세 시공용 3D CAD 작성, 기기설치 및 반입 계획 (4D CAD Simulation 포함), 임시 스캐폴딩 (scaffolding) 계획 등의 시공 계획 수립이 가능하다.3D CAD and related information are shared with manufacturers and suppliers, and they are shared with the integration contractor to establish construction plans such as 3D CAD creation for detailed construction, installation of equipment and import plan (including 4D CAD Simulation), and temporary scaffolding plan It is possible.

원자력 발전소의 설계 완성도, 즉, 전체 참조 모델이 구축되면 모듈 공법 적용시 다양한 모듈 제작 및 사전 시뮬레이션 등을 통해 설계 및 시공을 위한 간섭 점검 등의 모듈 시공성이 향상될 수 있다. When the design completeness of the nuclear power plant, that is, the complete reference model is constructed, the module construction such as interference checking for design and construction can be improved through various module manufacturing and pre-simulation when the module construction method is applied.

도 1 은 본 발명의 일 실시예에 따른 원자력 발전소의 건설을 위한 전체 설계 정보를 통합 관리 하기 위한 시스템의 개념도이다.
도 2 는 본 발명의 일 실시예에 따른 원자력 발전소 전체 설계 정보 통합 관리 장치의 구성을 나타내는 블록도이다.
도 3 은 도 2 의 전체 설계 정보 통합 관리 장치가 적용된 정보 저장 장치와 현장 설계용 장치의 개념도이다.
도 4 는 종래의 공급자 기기설계 정보의 처리 절차를 나타내는 흐름도이다.
도 5 는 본 발명의 일 실시예에 따른 공급자 기기설계 정보의 처리 절차를 나타내는 흐름도이다.
도 6 은 본 발명의 일 실시예에 따른 설계 정보 모델의 활용 방안을 나타내는 개념도이다.
1 is a conceptual diagram of a system for integrally managing overall design information for construction of a nuclear power plant according to an embodiment of the present invention.
FIG. 2 is a block diagram illustrating a configuration of an integrated design information management system for a nuclear power plant according to an embodiment of the present invention. Referring to FIG.
FIG. 3 is a conceptual diagram of an information storage device and a field design device to which the entire design information integrated management device of FIG. 2 is applied.
4 is a flowchart showing a procedure of processing the conventional supplier device design information.
5 is a flowchart illustrating a procedure of processing supplier device design information according to an embodiment of the present invention.
FIG. 6 is a conceptual diagram illustrating an application of a design information model according to an embodiment of the present invention.

본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 상세하게 설명하고자 한다.While the invention is susceptible to various modifications and alternative forms, specific embodiments thereof are shown by way of example in the drawings and will herein be described in detail.

그러나, 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.It should be understood, however, that the invention is not intended to be limited to the particular embodiments, but includes all modifications, equivalents, and alternatives falling within the spirit and scope of the invention.

제 1, 제 2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안 된다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다. 예를 들어, 본 발명의 권리 범위를 벗어나지 않으면서 제 1 구성요소는 제 2 구성요소로 명명될 수 있고, 유사하게 제 2 구성요소도 제 1 구성요소로 명명될 수 있다. 및/또는 이라는 용어는 복수의 관련된 기재된 항목들의 조합 또는 복수의 관련된 기재된 항목들 중의 어느 항목을 포함한다.The terms first, second, etc. may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from another. For example, without departing from the scope of the present invention, the first component may be referred to as a second component, and similarly, the second component may also be referred to as a first component. And / or < / RTI > includes any combination of a plurality of related listed items or any of a plurality of related listed items.

어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다거나 "직접 접속되어" 있다고 언급된 때에는, 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. It is to be understood that when an element is referred to as being "connected" or "connected" to another element, it may be directly connected or connected to the other element, . On the other hand, when an element is referred to as being "directly connected" or "directly connected" to another element, it should be understood that there are no other elements in between.

본 출원에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terminology used in this application is used only to describe a specific embodiment and is not intended to limit the invention. The singular expressions include plural expressions unless the context clearly dictates otherwise. In the present application, the terms "comprises" or "having" and the like are used to specify that there is a feature, a number, a step, an operation, an element, a component or a combination thereof described in the specification, But do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, or combinations thereof.

다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥상 가지는 의미와 일치하는 의미를 가진 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.Unless defined otherwise, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. Terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with the meaning in the context of the relevant art and are to be interpreted in an ideal or overly formal sense unless explicitly defined in the present application Do not.

이하, 첨부한 도면들을 참조하여, 본 발명의 바람직한 실시예를 보다 상세하게 설명하고자 한다. 본 발명을 설명함에 있어 전체적인 이해를 용이하게 하기 위하여 도면상의 동일한 구성요소에 대해서는 동일한 참조부호를 사용하고 동일한 구성요소에 대해서 중복된 설명은 생략한다. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In order to facilitate the understanding of the present invention, the same reference numerals are used for the same constituent elements in the drawings and redundant explanations for the same constituent elements are omitted.

원자력 발전소 전체 설계 정보 통합 관리 시스템Integrated Design Information Integrated Management System of Nuclear Power Plant

전술한 바와 같이, 종래의 원자력 발전소 건설을 위한 설계는 플랜트 종합 설계, 공급자 기기설계 및 현장 설계로 구분되어 이루어지고 있기 때문에 원자력 발전소의 건설에 필요한 모든 설계 정보가 통합되어 관리될 수 없었으며, 각각의 설계 주체에 의해서 필요한 설계 정보가 중복하여 생산됨으로써 설계 업무의 효율성을 저해하는 요소가 되었고 종합 설계 정보에 변동이 있는 경우에도 이러한 정보가 현장의 시공을 맡은 시공자에게 즉각적으로 업데이트될 수 없어 현장 설계에 반영되지 못하는 문제점이 있었다. As described above, since the design for the conventional nuclear power plant construction is divided into the plant comprehensive design, the supplier equipment design, and the field design, all the design information necessary for the construction of the nuclear power plant can not be integrated and managed. The design information is redundantly produced by the designing body of the engineer, thereby hindering the efficiency of the design work. Even if there is a change in the comprehensive design information, such information can not be immediately updated to the constructor It is not reflected to the user.

이에 본 발명은 원자력 발전소의 건설을 위해 생성되는 모든 설계 정보(모델 포함)를 통합하여 관리할 수 있는 원자력 발전소 전체 설계 정보 통합 관리 장치를 제공하고, 이를 원자력 발전소의 건설 프로젝트에 적용하기 위한 방법론을 제시하고자 한다. Accordingly, the present invention provides a comprehensive design information management apparatus for a nuclear power plant capable of integrating and managing all the design information (including models) generated for the construction of a nuclear power plant, and a methodology for applying the integrated design information management apparatus to a nuclear power plant construction project I want to present it.

원자력 발전소의 건설 단계에서 필요한 설계 단계의 기본 정보 (예를 들어, 배관 계통도 (P&ID), SOD 등) 를 구축하고, 계통 설계의 통합성 및 설계 형상 관리, 계통과 상세(Physical) 설계의 일치성(Consistency), 구축된 정보의 적합성 검토 등과 같이, 대상 원자력 발전소의 설계 품질 향상을 위해서는 원자력 발전소 전체 설계 모델을 통합하기 위하여 원자력 발전소의 건설을 위한 전체 설계 정보 모델 통합 장치는 반드시 필요하다. It is necessary to construct the basic information of the design stage (for example, P & ID, SOD, etc.) required in the construction stage of the nuclear power plant and to ensure the consistency of system design, It is necessary to integrate the entire design information model for the construction of the nuclear power plant to integrate the whole design model of the nuclear power plant in order to improve the design quality of the target nuclear power plant such as consistency and suitability review of the constructed information.

도 1 은 본 발명의 일 실시예에 따른 원자력 발전소의 건설을 위한 전체 설계 정보를 통합 관리하기 위한 시스템의 개념도이다. 도 1 에 도시된 바와 같이, 본 발명의 일 실시예에 따른 원자력 발전소의 건설을 위한 전체 설계 정보를 통합 관리 하기 위한 시스템은 종합 설계사 서버 (10), 원자력 발전소 전체 설계 정보 통합 관리 장치 (200), 시공사 서버 (40) 및 발주사 서버 (30) 를 포함할 수 있다. 여기서, 원자력 발전소 전체 설계 정보 통합 관리 장치에 따른 전체 설계 정보를 발주자 시스템으로서 구축하여 시공사에 제공할 수 있으며, 이에 따라 시공사 서버 (40) 및 발주사 서버 (30) 는 통합된 형태로 존재할 수 있다. 1 is a conceptual diagram of a system for integrally managing overall design information for construction of a nuclear power plant according to an embodiment of the present invention. As shown in FIG. 1, a system for integrally managing overall design information for construction of a nuclear power plant according to an embodiment of the present invention includes a general designer server 10, an integrated design information management apparatus 200 for a nuclear power plant, A construction company server 40, and an orderer server 30. Here, the overall design information according to the integrated design information management system of the nuclear power plant can be constructed as an owner system and provided to the construction company. Accordingly, the constructor server 40 and the orderer server 30 can exist in an integrated form .

앞서 언급한 바와 같이, 원자력 발전소의 건설을 위한 설계 분야는 원자력 발전소의 주요 설비인 구조물 (Structure), 계통 (System) 및 주기기 등에 대한 설계를 포함하는 플랜트 종합 설계 (A/E) 와 주로 보조 기기의 설계를 포함하는 공급자 기기설계 및 시공 현장에서 작성하는 시공 도면의 설계를 포함하는 현장 설계로 구분될 수 있다. 각각의 설계 주체와 관련하여, 종합 설계는 종합 설계사에 의해 수행되어 종합 설계사 서버 (10) 로부터 획득될 수 있고, 현장 설계는 상기 종합 설계사 서버 (10) 로부터 획득된 현장 설계 정보를 시공사 서버 (40) 에 제공하는 것에 응답하여 상기 현장 설계 정보에 상응하는 현장 시공 정보를 상기 시공사 서버 (40) 로부터 획득할 수 있다. As mentioned above, the design field for the construction of nuclear power plants is composed of plant comprehensive design (A / E), which mainly includes design of structure, system and main equipment of nuclear power plant, Site design including the design of the supplier's equipment including the design of the equipment and the design of the construction drawings created at the construction site. With respect to each design entity, the overall design can be performed by the general designer and obtained from the general designer server 10, and the site design can transmit the site design information obtained from the general designer server 10 to the construction company server 40 The site construction information corresponding to the site design information can be acquired from the construction company server 40 in response to the provision of the site design information.

일 측면에 따르면, 원자력 발전소 전체 설계 정보 통합 관리 시스템은 원자력 발전소 건설을 위한 종합 설계, 공급자 기기설계, 현장 설계를 통합하여 관리 및 활용하기 위하여 종합 설계와 연계되는 현장 설계 시스템을 발주자 시스템으로 구축하여 종합 설계에서 제공된 설계 모델을 근간으로 시공용 현장설계를 수행하도록 할 수 있다. 따라서, 원자력 발전소 전체 설계 정보 통합 관리 장치 (200) 는, 발주사 서버 (30) 와 시공사 서버 (40) 를 포함하여 구축된 발주자 시스템으로 통합된 전체 설계 정보를 제공할 수 있고, 발주자 시스템을 이용하여 시공사로 하여금 시공용 현장 설계를 수행하도록 구성될 수 있다. According to one aspect, the integrated design information management system of the nuclear power plant is constructed by the client system as the site design system linked with the comprehensive design to integrate and manage the comprehensive design, supplier equipment design, and site design for the nuclear power plant construction Based on the design model provided in the comprehensive design, it is possible to carry out site design for construction. Accordingly, the integrated design information integrated management device 200 of the nuclear power plant can provide overall design information integrated into the client system including the client server 30 and the client company server 40, and can use the client system So that the construction company can perform the site design for construction.

상기와 같은 원자력 발전소 전체 설계 정보 통합 관리 시스템은 구조물과 계통 위주의 설계 모델을 생산하는 종합 설계회사의 종합 설계 모델을 실시간으로 동기화하여, 시공사로 하여금 가장 최신의 확정된 종합 설계 모델을 바탕으로 시공용 현장 설계를 수행하도록 하여 종합 설계 정보와 시공사에서 사용하고 있는 현장의 설계 정보가 가장 최신의 통합 설계 정보 상태로 유지되도록 함으로써, 최신 정보를 사용하여 시공이 이루어지도록 할 수 있다. The integrated design information integrated management system of the nuclear power plant as described above synchronizes the comprehensive design model of the general designing company which produces the structural model and the system-oriented design model in real time, so that the construction company constructs the construction information based on the latest, And the design information of the site used in the construction company is kept in the state of the latest integrated design information, so that the construction can be performed using the latest information.

한편, 주로 보조기기의 설계와 관련된 공급자 기기설계 정보에 대해서, 종래에는 종합 설계사의 설계 모델과 보조기기 제작자 (공급자) 에 의한 보조기기 모델을 통합하기 위하여 먼저 모든 제작자 정보를 종합 설계사에 제출하고, 종합 설계사의 검토 및 승인 하에 제작자 정보를 구축하는 시스템으로 운영되고 있다. 이러한 문제점을 해결하기 위하여, 본 발명의 일 실시예에 따른 원자력 발전소 전체 설계 정보 통합 관리 시스템은 원자력 발전소 전체 설계 정보 통합 관리 시스템은, 원자력 발전소 전체 설계 정보 통합 관리 장치가 종합 설계사 서버 (10) 로부터 수신한 종합 설계 정보와 호환이 가능한 기기 설계 정보를 제공 받아 종합 설계 정보 및 현장 설계 정보와 통합하여 관리 및 활용할 수 있다. In the meantime, in order to integrate the design model of the general designer and the auxiliary device model by the auxiliary device manufacturer (supplier), it is necessary to first submit all the manufacturer information to the general designer, It is operated as a system to build information of producers under review and approval of comprehensive designers. In order to solve such a problem, the integrated design information integrated management system of a nuclear power plant according to an embodiment of the present invention includes an integrated design information integrated management system of a nuclear power plant, The device design information that is compatible with the received overall design information can be received and integrated with the overall design information and the site design information to be managed and utilized.

원자력 발전소 전체 설계 정보 통합 관리 시스템에 의해 통합하여 관리되고 있는 종합 설계 모델, 기기 모델, 현장 설계 모델이 통합된 원자력 발전소 전체 설계 모델이 후속 프로젝트에서 효과적으로 활용될 수 있다. 이를 위해, 예를 들어 기기 모델의 경우에는 후속 프로젝트의 사업 초기 제작자가 결정되기 전까지는 이전 프로젝트에서 사용된 기기 설계 모델을 활용하여 임시로 기존 모델링을 사용하고, 제작자가 결정되면 제작자가 납품할 기기의 3차원 CAD 모델을 제출하여 이전 모델과 교체한다. 따라서, 발전소 전체 모델을 통합하여 변경된 부분만 모델을 변경함에 따라 변경되지 않고 기존 모델을 활용할 수 있게 되어, 원자력 발전소의 건설 전에 발전소 설계 및 시공에 필요한 모든 설계 정보 확보가 가능하게 되어 재 설계 또는 재시공의 사례가 감소되고 정확한 물량 산정이 가능하게 된다.The overall design model of a nuclear power plant incorporating a comprehensive design model, device model, and site design model integrated and managed by the integrated design information management system of a nuclear power plant can be effectively utilized in subsequent projects. For this purpose, for example, in the case of a device model, the existing modeling is temporarily used by using the device design model used in the previous project until the initial project maker of the subsequent project is determined, and when the producer is determined, To replace the previous model. Therefore, it is possible to utilize the existing model without modification by changing the model only by changing the whole model of the power plant. Therefore, it is possible to acquire all the design information necessary for the design and construction of the power plant before the construction of the nuclear power plant, And the accurate amount of the waste can be calculated.

상기 시스템은 원자력 발전소 건설 사업의 기획에서 폐기에 이르기까지의 전 생애주기단계를 고려한 통합 제작자 기술정보 데이터베이스를 구축할 수 있으며, 구축된 데이터베이스에 대하여 설계, 제작 등의 사업 단계별 정보 구축 책임을 규정하고, 설계, 구매 및 건설 계약을 체결하는 데 있어서, 규정된 정보의 관리 책임대로 작업이 진행되도록 계약적으로 책임을 반영하는 것에 의해 발전소 전체 모델 구축을 가능하게 할 수 있다. The system can build a database of integrated manufacturer technical information considering the entire life cycle stages from the planning to the disposal of the nuclear power plant construction project. In designing, purchasing and constructing contracts, it is possible to construct a whole model of the power plant by contractually reflecting the responsibility for the work to be carried out according to the management responsibility of the prescribed information.

이하, 상기 시스템에 포함된 본 발명의 일 실시예에 따른 원자력 발전소 전체 설계 정보 통합 관리 장치를 보다 구체적으로 설명한다. Hereinafter, the integrated design information management system of a nuclear power plant according to an embodiment of the present invention will be described in more detail.

원자력 발전소 전체 설계 정보 통합 관리 장치Integrated Design Information Integrated Management System of Nuclear Power Plant

도 2 는 본 발명의 일 실시예에 따른 원자력 발전소 전체 설계 정보 통합 관리 장치의 구성을 나타내는 블록도이다. 이하, 도 2 를 참조하여 본 발명의 일 실시예에 따른 원자력 발전소 전체 설계 정보 통합 관리 장치를 설명한다. 도 2 에 도시된 바와 같이, 본 발명의 일 실시예에 따른 원자력 발전소의 건설을 위한 종합 설계 정보, 공급자 기기설계 정보 및 현장 설계 정보를 포함하는 원자력 발전소 전체 설계 정보를 통합하여 관리하기 위한 장치 (200) 는, 종합 설계 정보 수집부 (210), 공급자 설계 정보 관리부 (220), 현장 설계 정보 수집부 (230) 및 전체 설계 정보 데이터베이스 (240) 를 포함할 수 있다. FIG. 2 is a block diagram illustrating a configuration of an integrated design information management system for a nuclear power plant according to an embodiment of the present invention. Referring to FIG. Hereinafter, an integrated design information management system for a nuclear power plant according to an embodiment of the present invention will be described with reference to FIG. As shown in FIG. 2, a device for integrating and managing the entire design information of a nuclear power plant including comprehensive design information, supplier device design information, and site design information for construction of a nuclear power plant according to an embodiment of the present invention 200 may include a comprehensive design information collecting unit 210, a supplier design information managing unit 220, a site design information collecting unit 230 and an entire design information database 240.

먼저, 종합 설계 정보 수집부 (210) 는 종합 설계사 서버 (10) 로부터 원자력 발전소의 건설을 위한 종합 설계 정보를 수신할 수 있으며, 상기 수신된 종합 설계 정보는 종합 설계사 서버 (10) 의 최신 종합 설계 정보와 동기화될 수 있다. 즉, 종합 설계사에 의해 생성된 최초의 종합 설계에 대한 정보가 종합 설계사 서버 (10) 를 통해 종합 설계 정보 수집부 (210) 로 수신된 이후에, 상기 종합 설계사가 종합 설계에 대해 일부 수정을 가하는 경우에는, 수정된 최신 버전의 종합 설계에 대한 정보가 다시 종합 설계 정보 수집부 (210) 로 전송되는 방식으로, 종합 설계 정보 수집부 (210) 에 의해 수집되는 종합 설계 정보는 항상 종합 설계사의 최신 종합 설계 정보와 동기화될 수 있다. 전술한 바와 같이, 종합 설계 정보는 주로 원자력 발전소의 주요 설비인 구조물 (Structure) 의 설계, 계통 (System) 의 설계 및 주기기에 대한 설계를 포함할 수 있고, 주기기는 예를 들어 원자로 냉각재 펌프 (Reactor Coolant Pump, RCP) 및 증기 발생기 중 적어도 하나를 포함할 수 있다. First, the comprehensive design information collecting unit 210 can receive comprehensive design information for construction of a nuclear power plant from the general designer server 10, and the received overall design information is transmitted to the general designing company server 10 Information can be synchronized with the information. That is, after the information on the first comprehensive design created by the general designer is received by the general design information server 10 through the general design engineer server 10, the general designer may make some modifications to the overall design The integrated design information collected by the comprehensive design information collecting unit 210 is always updated with the latest design information of the general designer And can be synchronized with the comprehensive design information. As described above, the comprehensive design information may include the design of the main structure of the nuclear power plant, the design of the system, and the design of the periodic unit, and the periodic unit may include, for example, a reactor coolant pump A coolant pump (RCP), and a steam generator.

한편, 공급자 설계 정보 관리부 (220) 는 복수의 공급자들에 의한 원자력 발전소용 기기의 설계 정보들을 저장할 수 있으며, 상기 종합 설계사 서버 (10) 로부터 수신한 종합 설계 정보에 따라 호환 가능한 기기의 설계 정보를 포함하는 공급자 기기설계 정보를 제공할 수 있다. 전술한 바와 같이, 공급자 기기설계 정보는 주로 원자력 발전소에 적용되는 보조 기기의 설계에 대한 정보를 포함할 수 있다. 보조 기기는, 예를 들어 펌프 및 밸브 중 적어도 하나를 포함할 수 있다. Meanwhile, the supplier design information management unit 220 may store design information of the apparatuses for the nuclear power plant by a plurality of suppliers. In accordance with the general design information received from the general designer server 10, And can provide supplier device design information including. As described above, the supplier device design information may include information about the design of the auxiliary device, which is mainly applied to the nuclear power plant. Ancillary equipment may include, for example, at least one of a pump and a valve.

이러한 공급자 기기설계 정보와 관련하여, 종래에는 종합 설계사의 설계 모델과 보조기기 모델을 통합하기 위하여, 보조 기기와 관련된 모든 공급자들 (제작자들)에 관한 정보를 종합 설계사에 제출하도록 하여, 종합 설계사의 검토 및 승인 하에 공급자 기기설계 정보를 구축하는 형태로 운영되었다. 관련하여, 도 4 는 종래의 공급자 기기설계 정보의 처리 절차를 나타내는 흐름도이다. 도 4 를 참조하면, 종래에는 공급자는 예를 들어 보조 기기과 관련된 제작 정보를 종합 설계사에게 제출하고, 종합 설계사는 문서 형태의 정보를 발주자에게 전달하며, 상기 제작 정보를 포함하여 설계 도면을 작성한 뒤 이를 발주자 및 시공사에 전달한다. 시공하는 상기 설계 도면을 기반으로 시공 도면을 작성하여 발주자에게 제공할 수 있다. With regard to such supplier device design information, conventionally, in order to integrate the design model of the general designer and the auxiliary device model, it is necessary to submit information on all the suppliers (producers) related to the auxiliary device to the general designer, Reviewed and approved, and constructed the supplier's equipment design information. 4 is a flowchart showing the processing procedure of the conventional supplier equipment design information. Referring to FIG. 4, in the prior art, the supplier, for example, submits the production information related to the auxiliary device to the general designer, the general designer delivers the information of the document type to the customer, creates the design drawing including the production information, To the client and the construction company. The construction drawing can be created based on the design drawing to be provided to the client.

도 5 는 본 발명의 일 실시예에 따른 공급자 기기설계 정보의 처리 절차를 나타내는 흐름도이다. 도 5 에 도시된 바와 같이, 본 발명의 일 실시예에 따른 원자력 발전소 전체 설계 정보 통합 관리 장치에서는 공급자는 데이터베이스에 예를 들어 보조기기와 관련된, 공급자 기기설계 정보를 제공하고, 종합 설계사는 종합 설계 정보를 데이터베이스에 제공할 수 있다. 데이터베이스에서는 상기 종합 설계사에 의한 종합 설계 정보에 따라 호환이 가능한 제작사의 기기 설계 정보, 즉 호환 가능한 기기의 설계 정보를 포함하는 공급자 기기설계 정보를 제공할 수 있다. 데이터베이스에서는 종합 설계에 따른 설계 도면이 제공될 수 있고, 시공자는 이를 기반으로 시공 도면을 생성할 수 있다. 또한, 발주자에게는 운영 정보로서 상기 데이터베이스의 종합 설계 정보 및 공급자 기기설계 정보가 제공될 수 있다. 5 is a flowchart illustrating a procedure of processing supplier device design information according to an embodiment of the present invention. As shown in FIG. 5, in the integrated design information management system of a nuclear power plant according to an embodiment of the present invention, the supplier provides supplier device design information related to an auxiliary device, for example, in a database, Information can be provided to the database. In the database, supplier device design information including device design information of a compatible manufacturer, that is, design information of a compatible device, can be provided according to the comprehensive design information by the general designer. In the database, a design drawing according to a comprehensive design can be provided, and a construction worker can create a construction drawing based on the design drawing. Also, the owner can be provided with the overall design information and the supplier device design information of the database as the operation information.

한편, 현장 설계 정보 수집부 (230) 는 시공사 서버 (40) 로 상기 종합 설계 정보 및 공급자 기기설계 정보 중 적어도 하나를 제공할 수 있다. 시공사 서버 (40) 에서는 종합 설계 정보 수집부 (210) 를 통해 수집된 최신의 종합 설계 정보를 기반으로, 최신 버전의 종합 설계 정보에 대응하는 현장에서 활용하기 위한 시공 도면을 작성할 수 있다. 따라서, 현장 설계 정보 수집부 (230) 는 시공사 서버 (40) 로부터 상기 최신의 종합 설계 정보에 기초한 시공 도면을 포함하는 현장 설계 정보를 수신할 수 있다. Meanwhile, the site design information collecting unit 230 may provide at least one of the overall design information and the supplier equipment design information to the construction company server 40. Based on the latest comprehensive design information collected through the comprehensive design information collection unit 210, the construction company server 40 can create a construction drawing for utilization in the field corresponding to the latest version of the comprehensive design information. Accordingly, the site design information collecting unit 230 can receive the site design information including the construction drawings based on the latest comprehensive design information from the construction company server 40. [

도 3 은 도 2 의 전체 설계 정보 통합 관리 장치가 적용된 정보 저장 장치와 현장 설계용 장치의 개념도이다. 전술한 바와 같이, 본 발명의 일 측면에 따른 원자력 발전소 건설을 위한 전체 설계 정보 통합 장치는, 종합 설계, 공급자 기기설계, 현장 설계를 통합하기 위하여 종합 설계와 연계되는 현장 설계 시스템을 발주자시스템으로서 구축하고, 종합 설계에서 제공된 설계 모델을 근간으로 시공용 현장 설계를 수행하도록 할 수 있다. 따라서, 원자력 발전소 전체 설계 정보 통합 시스템은 종합 설계에서 생산되는 설계 정보와 항상 가장 최신의 설계 정보를 저장하는 정보 저장 장치 (310) 와 정보 저장 장치에서 저장된 정보를 바탕으로 시공을 수행하기 위한 현장 설계를 수행하는 현장 설계용 장치 (320) 로 구현될 수 있다. 예를 들어, 본 발명의 일 실시예에 따른 원자력 발전소 전체 설계 정보 통합 관리 장치 (200) 는 정보 저장 장치 (310) 로서 구현될 수 있고, 본 발명의 일 실시예에 따른 발주사 서버 (40) 와 시공사 서버 (30) 가 일체로서 구성된 발주자 시스템이 현장 설계용 장치 (320) 로서 구현될 수 있다. FIG. 3 is a conceptual diagram of an information storage device and a field design device to which the entire design information integrated management device of FIG. 2 is applied. As described above, the overall design information integration apparatus for constructing a nuclear power plant according to one aspect of the present invention includes a site design system associated with a comprehensive design as an owner system to integrate a comprehensive design, a supplier equipment design, and a site design And to perform the site design for the construction based on the design model provided in the comprehensive design. Therefore, the whole design information integration system of the nuclear power plant includes an information storage device 310 for storing the design information produced in the comprehensive design and the latest design information at all times, and a field design for performing the construction based on the information stored in the information storage device And an on-site design device 320 for performing on-site design. For example, the integrated design information integrated management system 200 of the nuclear power plant according to an embodiment of the present invention can be implemented as the information storage device 310, and the ordering server 40 according to an embodiment of the present invention, And the construction company server 30 as a unit can be implemented as the site designing apparatus 320.

도 3 에 도시된 바와 같이, 본 발명의 일 실시예에 따른 적용 대상인 원자력 발전소 전체 설계 정보 통합 시스템은 종합 설계에서 기계, 전기, 계측 등에 대한 설계 정보를 통합할 수 있는 데이터베이스를 구축하고, 이 구축된 3D CAD Model 데이터베이스를 사업 참여자가 관련된 업무를 상호 공유하면서 원자력 발전소의 건설 업무를 수행하도록 할 수 있다. 즉, 통합된 3D CAD Model DB는 기계, 전기, 계측 등 설계 분야별로 통합된 모델 및 관련된 정보를 저장할 수 있으며, 실시간 또는 정기적으로 발주자에 제공되어 시공용 현장 설계를 현장 설계용 장치 (320) 에서 수행하도록 할 수 있다. As shown in FIG. 3, the integrated design information integration system of the nuclear power plant according to the embodiment of the present invention is constructed by building a database capable of integrating design information on mechanical, electrical, and measurement in the overall design, The 3D CAD Model database can be shared among the business participants to carry out the construction work of the nuclear power plant. In other words, the integrated 3D CAD Model DB can store integrated models and related information for each design field such as mechanical, electrical, and measurement, and can be provided to the client in real time or periodically, .

다시 도 2 를 참조하면, 여기서, 원자력 발전소 전체 설계 정보 통합 관리 장치 (200) 는 전체 설계 정보 데이터베이스 (240) 및 전체 설계 정보 제공부 (250) 를 포함할 수 있고, 상기 전체 설계 정보 데이터베이스 (240) 가 상기 종합 설계 정보, 공급자 기기설계 정보 및 현장 설계 정보를 통합하여 저장할 수 있으며, 상기 전체 설계 정보 제공부 (250) 가 상기 종합 설계 정보 및 공급자 기기설계 정보를 운영 정보로서 발주사 서버 (30) 에 제공할 수 있다. 2, the nuclear power plant total design information integrated management apparatus 200 may include an overall design information database 240 and an overall design information providing unit 250, and the overall design information database 240 The overall design information providing unit 250 may store the overall design information and the supplier device design information as operation information to the order server 30 ).

전술한 본 발명의 일 실시예에 따른 원자력 발전소 전체 설계 정보 통합 관리 장치에 따르면, 원자력 발전소의 건설을 위해 필요한 종합 설계, 공급자 기기설계 및 현장 설계를 포함하는 모든 설계 정보 (모델 포함) 에 관한 정보를 통합하여 관리하고, 이를 원자력 발전소 건설 프로젝트에 적용할 수 있다. According to the integrated design information management system of the nuclear power plant according to the embodiment of the present invention, information on all the design information (including the model) including the comprehensive design, the supplier equipment design and the site design necessary for the construction of the nuclear power plant And it can be applied to the nuclear power plant construction project.

따라서, 원자력 발전소를 구성하고 있는 구조물, 계통, 기기의 모든 설계 정보와 관련된 정교한 3차원 그래픽 형상 표현이 가능하며 설계 분야별 참여 업체의 데이터의 중복을 방지하고 그 활용의 극대화가 가능하다.Therefore, it is possible to express sophisticated 3-dimensional graphical shapes related to all design information of structures, systems, and devices that constitute a nuclear power plant, and it is possible to prevent duplication of data of participating companies in design fields and to maximize their utilization.

또한, 설계 단계에 전면 적용하여 현장 설계분을 포함한 다양한 설계 분야 간의 공간 관리 및 배치 업무에 활용할 수 있고, 현장 설계인 상세 설계까지 3차원 CAD 데이터베이스로 완벽하게 구축할 수 있어 설계자와 제작사 간의 정보 통합을 통한 설계 품질 제고, 정확한 도면 출력 및 자재 물량 산출, 시공 전 설계완성도 제고를 달성함으로써 정확한 시공 계획 수립 및 현장 시공 간섭 검토가 가능하다.In addition, it can be used for space management and batch work among various design fields, including field design, and can be completely applied to the design stage, and the detailed design of the site design can be completely constructed as a three-dimensional CAD database. To achieve accurate design output, to calculate the quantity of material, and to improve the design completeness before construction.

또한, 보조기기 설계 정보를 통합한 종합 설계와 현장 설계 정보를 3D 모델로 통합하여 최종 준공 도면 (As-Built 도면) 의 구축이 가능하며 3D 모델, P&ID 등 2D 도면과 관련 설계 정보 등을 체계적으로 확보하여 운영 단계에 필요한 모든 설계 정보를 통합하여 이관할 수 있다. In addition, it is possible to construct the final completed drawing (As-Built drawing) by integrating the integrated design information of the auxiliary equipment design information and the site design information into the 3D model, and to construct systematically the 2D drawing such as 3D model, P & And all the design information necessary for the operational stage can be integrated and transferred.

또한, 원전건설(시공) 종료시 기존의 시공용 설계도면 및 현장설계 시 시공사의 구축된 설계정보는 원전 발주사 (NPCMS, LDM) 에 이관하게 되며 시공사에서 생성한 정보에 대한 시공사의 설계 도면 등 외부 누출 여부에 대한 보안관리 측면에 취약한 상황의 발생이 가능할 수도 있다. 이를 해결하기 위해 발주자의 원전 설계정보통합관리시스템을 구축하여 발주자의 시스템으로 시공용 도면 발행, 현장 설계를 수행한 후 단지 발주자 설계정보통합관리시스템에서만 현장 설계 정보가 존재하게 됨으로 별도의 시공사의 설계시스템에 설계정보 저장이 완벽하게 차단이 가능함으로써, 보다 더 확실한 보안관리가 가능하게 된다.In addition, at the end of construction (construction) of the nuclear power plant, the existing design information of the construction company and the design information of the construction company during the site design are transferred to the nuclear power plant ordering company (NPCMS, LDM), and the construction drawings of the construction company It may be possible to develop a vulnerable situation in terms of security management of leaks. In order to solve this problem, after constructing an integrated management system of nuclear plant design information of the client, issuing the drawing for construction and designing the site as the system of the client, the field design information exists only in the client design information integrated management system. The storage of design information in the system can be completely blocked, thereby enabling more reliable security management.

3차원 CAD 및 관련 정보는 제작사와 공급사에 공유되어 통합 시공사와 공유하여 상세 시공용 3D CAD 작성, 기기설치 및 반입 계획 (4D CAD Simulation 포함), 임시 스캐폴딩 (scaffolding) 계획 등의 시공 계획 수립이 가능하다.3D CAD and related information are shared with manufacturers and suppliers, and they are shared with the integration contractor to establish construction plans such as 3D CAD creation for detailed construction, installation of equipment and import plan (including 4D CAD Simulation), and temporary scaffolding plan It is possible.

원자력 발전소의 설계 완성도, 즉, 전체 참조 모델이 구축되면 모듈 공법 적용시 다양한 모듈 제작 및 사전 시뮬레이션 등을 통해 설계 및 시공을 위한 간섭 점검 등의 모듈 시공성이 향상될 수 있다. When the design completeness of the nuclear power plant, that is, the complete reference model is constructed, the module construction such as interference checking for design and construction can be improved through various module manufacturing and pre-simulation when the module construction method is applied.

도 6 은 본 발명의 일 실시예에 따른 설계 정보 모델의 활용 방안을 나타내는 개념도이다. 도 6 을 참조하면, 일 측면에 따른 원자력 발전소 전체 설계 정보 통합 관리 장치 (200) 에서 생성된 발전소 전체 설계 정보 모델을 효과적으로 활용하기 위한 방법론이 도시될 수 있다. 본 발명의 일 실시예에 따른 종합 설계 모델, 기기 모델, 현장 설계 모델이 통합된 전체 설계 모델은 도 2 에 도시된 전체 설계 정보 데이터베이스 (240) 에 저장되어 후속하는 원자력 발전소의 건설 프로젝트에서도 효과적으로 활용될 수 있다. 이를 위하여, 특히 기기 모델의 경우에는 후속 원자력 발전소 건설의 사업 진행 초기에 원자력 발전소의 기기들에 대한 제작자 (공급자) 가 결정되기 전까지는 이전의 원자력 발전소 건설 프로젝트에서 사용된 데이터를 활용하여 3D 기기를 모델링하고, 제작자가 결정되면 제작자가 납품할 기기의 3차원 CAD 모델을 제출하여 이전 모델과 교체하는 방식으로 수정될 수 있다.FIG. 6 is a conceptual diagram illustrating an application of a design information model according to an embodiment of the present invention. Referring to FIG. 6, there is shown a methodology for effectively utilizing the entire plant design information model generated by the integrated design information management apparatus 200 of a nuclear power plant according to an aspect. The overall design model incorporating the comprehensive design model, the device model, and the site design model according to an embodiment of the present invention is stored in the entire design information database 240 shown in FIG. 2, and can be effectively utilized in a subsequent nuclear power plant construction project . For this purpose, especially in the case of the device model, it is necessary to use the data used in the previous nuclear power plant construction project until the manufacturer (supplier) of the nuclear power plant's equipment is determined at the beginning of the construction of the subsequent nuclear power plant, And when the manufacturer is determined, the manufacturer can submit a three-dimensional CAD model of the device to be delivered and replace it with the previous model.

도 2 를 참조하여 본 발명의 일 실시예에 따른 원자력 발전소 전체 설계 정보 통합 관리 장치 (200) 와 관련하여 설명하면, 전체 설계 정보 데이터베이스 (240) 는 제 2 원자력 발전소의 건설에 대한 기기의 공급자가 결정되기 이전에는 제 2 원자력 발전소의 건설을 위한 설계 정보로서 상기 전체 설계 정보 데이터베이스에 저장되어 있던 종합 설계 정보, 공급자 기기설계 정보 및 현장 설계 정보를 제공할 수 있다. 또한, 제 2 원자력 발전소에 대한 기기의 공급자가 결정되어, 전체 설계 정보 데이터베이스 (240) 가 제 2 원자력 발전소의 건설을 위한 제 2 공급자 결정 정보를 수신하는 것에 응답하여, 상기 공급자 기기설계 정보를 상기 제 2 공급자 기기설계 정보로 대체하여 저장할 수 있다. Referring to FIG. 2, the overall design information database 240 of the integrated design information management system 200 of a nuclear power plant according to an exemplary embodiment of the present invention includes an overall design information database 240, It is possible to provide the comprehensive design information, the supplier equipment design information, and the site design information stored in the overall design information database as the design information for the construction of the second nuclear power plant. In addition, in response to the determination of the supplier of the equipment for the second nuclear power plant and the overall design information database 240 receiving the second supplier determination information for the construction of the second nuclear power plant, Can be replaced with the second supplier device design information and stored.

결국, 발전소 전체 모델이 통합됨에 따라 데이터 기반 통합 설계시스템은 후속하는 원자력 발전소 건설 프로젝트에서 선행 호기의 O&M 설계변경, 구매 패키지 변경에 따른 공급자 정보 변경 등의 변경된 내용만 설계를 수행할 수 있고, 원자력 발전소 건설의 설계 완성도 제고가 가능하며 변경되지 않은 보조 기기 설계분과, 현장 설계분은 별도로 수행하지 않고 통합 환경을 구축함으로써 설계 프로세스의 생산성 향상이 가능하다. As a result, the data-based integrated design system can design only the changed contents, such as the O & M design change of the preceding system and the change of the supplier information due to the change of the purchase package in the subsequent nuclear power plant construction project, It is possible to improve the design completeness of the power plant construction. It is possible to improve the productivity of the design process by constructing integrated environment without designing the unchanged auxiliary equipment design and site design separately.

이상, 도면 및 실시예를 참조하여 설명하였지만, 본 발명의 보호범위가 상기 도면 또는 실시예에 의해 한정되는 것을 의미하지는 않으며 해당 기술 분야의 숙련된 당업자는 하기의 특허 청구의 범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다. It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined by the appended claims. It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention.

10 : 종합 설계사 서버
30 : 발주사 서버
40 : 시공사 서버
200 : 원자력 발전소 전체 설계 정보 통합 관리 장치
210 : 종합 설계 정보 수집부
220 : 공급자 설계 정보 관리부
230 : 현장 설계 정보 수집부
240 : 전체 설계 정보 데이터베이스
250 : 전체 설계 정보 제공부
310 : 정보 저장 장치
320 : 현장 설계용 장치
10: Composite agent server
30: Ordering server
40: Contractor server
200: Integrated Design Information Integrated Management System for Nuclear Power Plant
210: Integrated design information collecting section
220: supplier design information management section
230: Field design information collecting section
240: Overall design information database
250: Total Design Information Offering
310: Information storage device
320: Equipment for site design

Claims (9)

원자력 발전소의 건설을 위한 종합 설계 정보, 공급자 기기설계 정보 및 현장 설계 정보를 포함하는 원자력 발전소 전체 설계 정보를 통합하여 관리하기 위한 장치에 있어서,
종합 설계사 서버로부터 원자력 발전소의 건설을 위한 종합 설계 정보를 수신하는 종합 설계 정보 수집부로서, 상기 수신된 종합 설계 정보는 상기 종합 설계사 서버의 최신 종합 설계 정보와 동기화되는, 상기 종합 설계 정보 수집부;
복수의 공급자들에 의한 원자력 발전소용 기기의 설계 정보들을 저장하고, 상기 수신한 종합 설계 정보에 따라 호환 가능한 기기의 설계 정보를 포함하는 공급자 기기설계 정보를 제공하는 공급자 설계 정보 관리부;
시공사 서버로 상기 종합 설계 정보 및 공급자 기기설계 정보를 제공하고, 상기 시공사 서버로부터 상기 종합 설계 정보에 기초한 시공 도면을 포함하는 현장 설계 정보를 수신하는 현장 설계 정보 수집부; 및
상기 종합 설계 정보, 공급자 기기설계 정보 및 현장 설계 정보를 통합하여 저장하는 전체 설계 정보 데이터베이스를 포함하고,
상기 전체 설계 정보 데이터베이스는 제 2 원자력 발전소의 건설을 위한 설계 정보로서 상기 종합 설계 정보, 공급자 기기설계 정보 및 현장 설계 정보를 제공하고, 제 2 원자력 발전소의 건설을 위한 제 2 공급자 결정 정보를 수신하는 것에 응답하여, 상기 공급자 기기설계 정보를 상기 제 2 공급자 기기설계 정보로 대체하는, 원자력 발전소 전체 설계 정보 통합 관리 장치.
1. An apparatus for integrating and managing overall design information of a nuclear power plant including comprehensive design information, supplier equipment design information, and site design information for the construction of a nuclear power plant,
A general design information collecting unit for receiving comprehensive design information for construction of a nuclear power plant from a general designer server, wherein the received overall design information is synchronized with the latest comprehensive design information of the general designer server;
A supplier design information management unit that stores design information of a device for a nuclear power plant by a plurality of suppliers and provides supplier equipment design information including design information of a compatible device according to the received overall design information;
A site design information collecting unit for providing the overall design information and supplier equipment design information to a construction company server and receiving site design information including a construction drawing based on the comprehensive design information from the construction company server; And
A total design information database for integrating and storing the comprehensive design information, supplier equipment design information, and site design information,
The overall design information database provides the integrated design information, supplier equipment design information, and site design information as design information for the construction of the second nuclear power plant, and receives the second supplier determination information for the construction of the second nuclear power plant And replaces the supplier device design information with the second supplier device design information in response to the second supplier device design information.
제 1 항에 있어서,
상기 종합 설계 정보는 상기 원자력 발전소의 구조물 (Structure) 설계, 계통 (System) 설계 및 주기기 설계에 관한 정보를 포함하는, 원자력 발전소 전체 설계 정보 통합 관리 장치.
The method according to claim 1,
The integrated design information includes information on the structure design, system design, and main device design of the nuclear power plant.
제 2 항에 있어서,
상기 주기기는 원자로 냉각재 펌프 (Reactor Coolant Pump, RCP) 및 증기 발생기 중 적어도 하나를 포함하는, 원자력 발전소 전체 설계 정보 통합 관리 장치.
3. The method of claim 2,
Wherein the periodic unit comprises at least one of a reactor coolant pump (RCP) and a steam generator.
제 1 항에 있어서,
상기 공급자 기기설계 정보는 상기 원자력 발전소의 보조 기기 (Component) 설계에 관한 정보를 포함하는, 원자력 발전소 전체 설계 정보 통합 관리 장치.
The method according to claim 1,
Wherein the supplier device design information includes information on the design of an auxiliary component of the nuclear power plant.
제 4 항에 있어서,
상기 보조 기기는 펌프 및 밸브 중 적어도 하나를 포함하는, 원자력 발전소 전체 설계 정보 통합 관리 장치.
5. The method of claim 4,
Wherein the auxiliary equipment comprises at least one of a pump and a valve.
제 1 항에 있어서,
상기 종합 설계 정보 및 공급자 기기설계 정보를 운영 정보로서 발주사 서버에 제공하는 전체 설계 정보 제공부를 더 포함하는, 원자력 발전소 전체 설계 정보 통합 관리 장치.
The method according to claim 1,
And an overall design information providing unit for providing the overall design information and the supplier device design information to the order placement server as operation information.
삭제delete 삭제delete 삭제delete
KR1020160054053A 2016-05-02 2016-05-02 An apparatus for managing integrated information of nuclear power plant design KR101763068B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160054053A KR101763068B1 (en) 2016-05-02 2016-05-02 An apparatus for managing integrated information of nuclear power plant design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160054053A KR101763068B1 (en) 2016-05-02 2016-05-02 An apparatus for managing integrated information of nuclear power plant design

Publications (1)

Publication Number Publication Date
KR101763068B1 true KR101763068B1 (en) 2017-07-28

Family

ID=59422209

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160054053A KR101763068B1 (en) 2016-05-02 2016-05-02 An apparatus for managing integrated information of nuclear power plant design

Country Status (1)

Country Link
KR (1) KR101763068B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102036461B1 (en) * 2018-12-06 2019-10-24 한국수력원자력 주식회사 Device and Method for establishing information of equipment reference at constructing stage of nuclear power plant
KR102020351B1 (en) * 2018-08-10 2019-11-04 한국수력원자력 주식회사 A display apparatus for presenting and utilizing nuclear power plant intelligent general arrangement drawings
KR20190136203A (en) 2018-05-30 2019-12-10 경희대학교 산학협력단 Method and Apparatus for Revision Management of Information from Design and Construction Stages in Cold Region Pipeline Project
KR20210136384A (en) * 2020-05-07 2021-11-17 한국수력원자력 주식회사 On-line system for providing method for verifying quality of air operating valve using in nuclear power plant

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001297116A (en) * 2000-04-12 2001-10-26 Chiyoda Corp Integrated design system of plant and integrated management system of plant construction project
JP2003044529A (en) * 2001-07-26 2003-02-14 Hitachi Ltd Support method and system for integration of database
JP2008084051A (en) * 2006-09-28 2008-04-10 Toshiba Corp Plant multidiscipline engineering support system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001297116A (en) * 2000-04-12 2001-10-26 Chiyoda Corp Integrated design system of plant and integrated management system of plant construction project
JP2003044529A (en) * 2001-07-26 2003-02-14 Hitachi Ltd Support method and system for integration of database
JP2008084051A (en) * 2006-09-28 2008-04-10 Toshiba Corp Plant multidiscipline engineering support system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190136203A (en) 2018-05-30 2019-12-10 경희대학교 산학협력단 Method and Apparatus for Revision Management of Information from Design and Construction Stages in Cold Region Pipeline Project
KR102020351B1 (en) * 2018-08-10 2019-11-04 한국수력원자력 주식회사 A display apparatus for presenting and utilizing nuclear power plant intelligent general arrangement drawings
CN112567476A (en) * 2018-08-10 2021-03-26 韩国水力原子力株式会社 Device for representing and utilizing the overall layout of a nuclear power plant
KR102036461B1 (en) * 2018-12-06 2019-10-24 한국수력원자력 주식회사 Device and Method for establishing information of equipment reference at constructing stage of nuclear power plant
KR20210136384A (en) * 2020-05-07 2021-11-17 한국수력원자력 주식회사 On-line system for providing method for verifying quality of air operating valve using in nuclear power plant
KR102404852B1 (en) 2020-05-07 2022-06-07 한국수력원자력 주식회사 On-line system for providing method for verifying quality of air operating valve using in nuclear power plant

Similar Documents

Publication Publication Date Title
KR101763068B1 (en) An apparatus for managing integrated information of nuclear power plant design
König et al. Intelligent BIM-based construction scheduling using discrete event simulation
KR101860276B1 (en) 3D piping design support program device applied to smart plant collaboration system
KR101827227B1 (en) Smart Plant Multidimensional Space 3D Piping Design Collaboration Service Method
CN109558412A (en) The data growing method and device of assembled architecture construct platform
Galiano-Garrigos et al. Building information modelling in operations of maintenance at the university of alicante
JP2008084051A (en) Plant multidiscipline engineering support system
KR20160080388A (en) Bim-based construction value engineering (ve) processing system
CN103530714A (en) Method and system for handling conditional dependencies between alternative product segments
CN110651286A (en) Method for managing life cycle of complex engineering facility and implementation system thereof
Schenk et al. Architecture for modeling and simulation of technical systems along their lifecycle
KR101547120B1 (en) Layered discrete event simulation method for prediction and management of production schedule
André et al. Exploring the design platform in industrialized housing for efficient design and production of customized houses
Ham et al. BIM based construction project case analysis for facility life cycle management from the perspective of the client
Gokce et al. IFC view for bill of quantities for software interoperability
KR102668849B1 (en) Automatic calculation system for quantity and construction cost of railway facility based on building information modelling (bim)
Kolychev et al. Application of Road Mapping for Hi-Tech Projects Commercialization in Corporated Innovative Enterpreneurship
Duo et al. A practicable safety modeling methodology for aircraft systems using Altarica
Quintero Botero Evaluation of interoperability in construction programs using the IFC 4
Chelyshkov et al. DATA-flow in the field of urban planning: basics, concept, methodology
Fremont et al. CIM extensions for ERDF information system projects
KR20240036766A (en) Automatic calculation system for quantity and construction cost of railway facility based on building information modelling (bim), and method for the same
KR20170135167A (en) Hand-over automation method for establishing a facilities master of plant
Просяник et al. Building information modeling (bim): definition, origins and elements, brief history and future prospects
Lim Basic Study on Data-Centric design information integration system framework development for adapting Nuclear Power Plant construction in Korea