KR101719807B1 - Sleepers for railway - Google Patents
Sleepers for railway Download PDFInfo
- Publication number
- KR101719807B1 KR101719807B1 KR1020160057840A KR20160057840A KR101719807B1 KR 101719807 B1 KR101719807 B1 KR 101719807B1 KR 1020160057840 A KR1020160057840 A KR 1020160057840A KR 20160057840 A KR20160057840 A KR 20160057840A KR 101719807 B1 KR101719807 B1 KR 101719807B1
- Authority
- KR
- South Korea
- Prior art keywords
- sleeper
- rail pad
- rail
- main body
- fixing
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B3/00—Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
- E01B3/16—Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from steel
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C2/00—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
- C23C2/04—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the coating material
- C23C2/06—Zinc or cadmium or alloys based thereon
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C4/00—Coating by spraying the coating material in the molten state, e.g. by flame, plasma or electric discharge
- C23C4/04—Coating by spraying the coating material in the molten state, e.g. by flame, plasma or electric discharge characterised by the coating material
- C23C4/06—Metallic material
- C23C4/08—Metallic material containing only metal elements
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25D—PROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
- C25D3/00—Electroplating: Baths therefor
- C25D3/02—Electroplating: Baths therefor from solutions
- C25D3/04—Electroplating: Baths therefor from solutions of chromium
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25D—PROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
- C25D3/00—Electroplating: Baths therefor
- C25D3/02—Electroplating: Baths therefor from solutions
- C25D3/22—Electroplating: Baths therefor from solutions of zinc
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B3/00—Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
- E01B3/16—Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from steel
- E01B3/20—Sleeper construction for special purposes, e.g. with openings for ballast working
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2201/00—Fastening or restraining methods
- E01B2201/02—Fastening or restraining methods by wedging action
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Organic Chemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Mechanical Engineering (AREA)
- Electrochemistry (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Plasma & Fusion (AREA)
- Railway Tracks (AREA)
Abstract
Description
본 발명은 철도의 도상(道床) 위에서 레일을 직접 지지하고 궤간을 유지함과 동시에 하중을 넓은 범위로 분포시켜 도상에 전달하는 역할을 하는 철도용 침목(枕木, sleeper)에 관한 것이다.The present invention relates to a railway sleeper, which directly supports a rail on a road floor of a railway, maintains gauge, and distributes the load to a wide range and delivers it to the road.
일반적으로, 열차 등이 주행하게 되는 궤도(track)는 노반 위에 자갈 또는 쇄석으로 되는 도상을 마련하고, 상기 도상 위에 일정한 간격으로 침목을 배치하고 레일을 고정하게 된다.Generally, a track on which a train or the like travels is provided with a road bed made of gravel or crushed stone on a bedrock, and a railroad tie is fixed by arranging the sleepers at regular intervals on the road bed.
상기 침목은 목재나 콘크리트재로 제작되어 침목도상(道床)에 적당한 간격으로 나열되며, 그 위에 레일을 깔고 정착시킴으로써 레일과 레일 사이의 간격을 정확히 유지시키고, 레일에 가해지는 열차하중을 도상을 통해서 노반(路盤)에 전달하는 역할을 하는 것이다.The sleepers are made of wood or concrete and are arranged at suitable intervals on the road bed. The rails are laid on top of them to fix the gap between the rails and the rails, and the load applied to the rails To the roadbed.
이러한 침목은 철도가 건설되던 초창기부터 목재를 사용하였다. 목재의 종류에는 제한이 없으나, 참나무, 밤나무, 너도밤나무, 소나무, 느릅나무, 호두나무, 단풍나무 등이 주로 사용되어 왔다. 목재는 가공성이 좋아서 다량의 침목을 공급할 수 있지만, 산림을 훼손하게 되는 문제점과 함께 내구성이 약하고, 장기간 사용하면 비틀림이 발생하며, 부패되는 결점이 있어서 크레오소트유(油)를 주입하여 방부처리를 함으로써 수명을 연장시키게 된다.These sleepers used timber from the early days of railroad construction. There are no restrictions on the type of wood, but oak, chestnut, beech, pine, elm, walnut, and maple have been mainly used. The wood is good in workability, so it can supply a large amount of sleepers, but it has a problem of damaging the forests, weak durability, twisting when used for a long period of time, corruption defects and injecting creosote oil Thereby extending the service life.
또한 철도에 사용된 폐침목에는 국제암연구기구(IARC)가 인체 발암물질로 규정한 벤조피렌을 비롯하여 다양한 유독물질이 포함되어 있다. 또한 대부분 기름에 찌들어 있어 토양과 빗물에 노출될 경우 심각한 환경오염을 유발할 우려가 있어서 지정폐기물로 분류된다. 이러한 유해성 때문에 폐침목은 전량폐기 되곤 하였다. In addition, the sleeping ties used in the railroad include various toxic substances including benzopyran, which is defined by the International Agency for Research on Cancer (IARC) as a human carcinogen. In addition, it is classified as designated waste because it is mostly oiled and exposed to soil and rainwater, which may cause serious environmental pollution. Because of these hazards, the sleeping ties would be discarded altogether.
상기한 목재 침목의 문제점을 해결하기 위하여 콘크리트 침목이 사용되었다.A concrete sleeper was used to solve the problem of the above mentioned wooden sleepers.
콘크리트를 이용한 침목은 부패할 우려와 변형이 적어서 일정 기간 동안에는 레일이 틀어지는 현상이 거의 발생하지 않는다. 그러나 콘크리트 구조물에 의한 문제점도 발생하고 있다.The sleepers using concrete have little fear of decay and deformation, so that the rail does not twist for a certain period of time. However, there are also problems caused by concrete structures.
상기한 문제점을 살펴보면, 콘크리트 침목은 침목 상부에 설치되는 레일패드를 통하여 레일을 대형 볼트로 연결하며, 이 볼트 외벽을 플라스틱 매입전이 감싸고 있는 형태로 시공되는데, 상기 매입전 및 볼트가 삽입되는 삽입공이 침목의 상부면에 형성됨에 따라, 강우 또는 강설로 용해된 물이 상기 삽입공으로 쉽게 스며들어가게 된다.The concrete sleepers are constructed in such a way that a rail is connected to a large bolt through a rail pad installed on an upper part of a sleeper, and the outer wall of the bolt is wrapped with a plastic filler. As it is formed on the upper surface of the sleeper, water dissolved by rainfall or snowfall easily penetrates into the insertion hole.
수분의 유입이 지속적으로 이루어질 경우에는 콘크리트 구조물의 강도에 좋지 않은 영향을 주게 되고, 특히 동절기에는 유입된 물이 동결하면서 팽창하여 콘크리트 구조물에 균열을 발생시키게 됨으로써, 철도의 안전에 심각한 문제점을 발생시키게 된다.If the inflow of water is continued, the strength of the concrete structure will be adversely affected. In particular, in winter, the inflow water will expand while freezing, causing cracks in the concrete structure, do.
따라서 플라스틱 매입전과 볼트 아랫부분 사이의 빈 공간에 물이 스며들지 못하도록 방수 발포재, 또는 반고체 윤활유인 그리스를 넣어야 하는 등 유지 보수가 까다로운 문제점이 있다.Therefore, there is a problem that the waterproof foam material or the grease, which is a semi-solid lubricant, must be put in the empty space between the bottom of the bolt and the plastic before filling it.
또한 콘크리트 구조물은 압축강도가 높은 반면에 굽힘강도(flexural strength)와 충격강도(impact strength)는 상대적으로 약한 재질적 특성을 가지고 있어서, 철도차량의 교번하중(alternate load)이 굽힘 및 충격하중으로 작용하게 되므로, 사실상 침목의 재료로 적합하지 않은 것이다. 그리고, 장기간 사용하면, 풍화 침식에 의하여 내부의 철근 골조가 드러나게 될 정도로 일부가 부스러지거나 떨어져 나가, 내구성이 상당히 취약해지게 된다.In addition, the concrete structure has high compressive strength, but flexural strength and impact strength are relatively weak, so that the alternate load of the railway vehicle is affected by the bending and impact load So it is not really suitable as a material for sleepers. When used for a long period of time, a part of the steel is broken or separated so that the inner reinforcing frame is exposed by weathering erosion, and the durability is considerably weakened.
또한 교체되는 콘크리트 침목은 재활용이 불가능하여 모두 폐기처리를 해야 하는데, 폐기물 처리비용이 상당하게 소요되고, 폐기물의 매립지 선정은 지방자치단체 및 인근 주민들의 이해관계로 인하여 민원이 발생하기 때문에 쉬운 일이 아니다.In addition, the replacement of concrete sleepers can not be recycled. Therefore, it is necessary to dispose of all the sleepers, and the waste disposal cost is considerable. The selection of waste landfill is easy because the complaints are caused by the interests of local governments and local residents. no.
본 발명의 목적은 시공이 용이하고, 철도차량의 교번하중에 대하여 레일과 레일 사이의 간격을 정확히 유지시키며, 레일에 가해지는 열차하중을 도상을 통해서 안전하게 노반(路盤)에 전달할 수 있는 철도용 침목을 제공하는 것이다.An object of the present invention is to provide a railroad sleeping rail which can easily be installed, accurately maintains a gap between rails and rails with respect to an alternating load of a railroad car, and can safely transmit the load of a train applied to the railroad to the roadbed .
또한 본 발명은 변형과 부식됨이 없이 견고한 강성과 내구성을 유지할 수 있으며, 폐기시에는 전량 재활용이 가능하여 폐기물 처리에 따르는 비용이 없고, 제반 문제점을 해결할 수 있는 철도용 침목을 제공하는 것을 목적으로 한다.Another object of the present invention is to provide a railway sleeper capable of maintaining rigid rigidity and durability without being deformed and corroded, capable of recycling all the waste at the time of disposal, eliminating the cost of waste treatment and solving all the problems do.
본 발명이 의도하는 목적을 달성하기 위한 기술적인 특징은, 상부면에 레일패드가 설치되고, 상기 레일패드 상에 레일을 고정하는 숄더가 설치되어 철도 도상에 설치되는 레일을 지지하는 철도용 침목에 있어서, 상기 철도용 침목의 침목 본체가 금속재로 형성되며, 상기 침목 본체의 외부 표면에는 상기 침목 본체와 다른 종류의 금속재가 코팅되는 것을 특징으로 한다.Technical features of the present invention to achieve the object of the present invention are as follows: a rail pad is provided on an upper surface, and a shoulder for fixing the rail on the rail pad is provided to support a railroad rail The sleeper main body of the railway sleeper is formed of a metallic material, and the outer surface of the sleeper main body is coated with a metal material different from the sleeper main body.
바람직하게 상기 침목 본체와 다른 종류의 금속재 코팅은 아연으로 이루어지는 것을 특징으로 한다.Preferably, the sleeper body and the other kind of metallic material coating are made of zinc.
또한 본 발명은 상기 레일패드 및 고정부재가 상기 침목 본체에 상호 용접결합되는 것을 특징으로 한다.Further, the present invention is characterized in that the rail pad and the fixing member are welded together to the sleeper body.
또한 본 발명은 상기 침목 본체에 레일패드를 고정하기 위한 결합공이 형성되고, 상기 레일패드에는 저면 중앙으로부터 하향돌출되면서 수나사를 구비하는 고정봉이 형성되며, 상기 고정봉이 상기 결합공에 삽입된 다음 너트와 같은 체결구로 고정되는 것을 특징으로 한다.Further, according to the present invention, there is provided a fixing pad for fixing a rail pad to the sleeper main body, wherein the rail pad is formed with a fixing rod having a male screw protruding downward from the center of the bottom surface thereof, And is fastened with the same fastening member.
또한 본 발명은 침목 본체의 상부면에는 레일패드가 안착되는 상부안착홈이 형성되고, 하부면에는 고정부재가 안착되는 하부안착홈이 형성되는 것을 특징으로 한다.According to another aspect of the present invention, there is provided a railroad car comprising: an upper seating groove on which a rail pad is seated; and a lower seating groove on which a fixing member is seated.
또한 본 발명은 침목 본체의 측면과 바닥면에 배수공이 형성되는 것을 징으로 한다.Further, the present invention is characterized in that drainage holes are formed on the side surface and the bottom surface of the sleeper main body.
본 발명의 철도용 침목에 의하면, 침목이 아연도금 금속재로 형성되어 동절기에 균열 파손될 우려가 없고, 철도차량의 교번하중에 대하여 레일과 레일 사이의 간격을 정확히 유지시키고, 레일에 가해지는 열차하중을 도상을 통해서 안전하게 노반에 전달할 수 있게 된다.According to the railway sleeper of the present invention, there is no possibility that the sleeper is formed of a galvanized metal material and cracks are broken in the winter season, and the distance between the rail and the rail is accurately maintained with respect to the alternate load of the railway vehicle, So that it can be safely transmitted to the roadbed through the road.
또한, 폐기시에는 수거된 모든 침목을 금속주조(金屬鑄造)에 의하여 재활용할 수 있게 됨으로써 2차 환경오염이 방지되고, 폐기물처리에 따르는 비용이 절약되며, 또한 폐기물 매립지 선정 등과 같이 폐기물 처리에 따르는 제반 문제점이 발생되지 않는 효과가 있다.In addition, at the time of disposal, all the sleepers collected can be recycled by metal casting, thereby preventing secondary environmental pollution, saving costs associated with waste disposal, There is an effect that all the problems do not occur.
도 1은 본 발명의 분해 사시도.
도 2는 본 발명의 일부를 확대한 분해 사시도.
도 3은 본 발명의 단면도.
도 4는 본 발명의 일부를 확대한 단면도.
도 5는 본 발명의 다른 실시 예를 나타낸 분해 사시도. 1 is an exploded perspective view of the present invention.
FIG. 2 is an exploded perspective view of a part of the present invention. FIG.
3 is a sectional view of the present invention.
4 is an enlarged cross-sectional view of a part of the present invention;
5 is an exploded perspective view showing another embodiment of the present invention.
본 발명의 특징과 장점은 첨부된 도면에 의하여 설명되는 실시 예에 의하여 보다 명확하게 이해될 수 있을 것이다. The features and advantages of the present invention will become more apparent from the following detailed description of the present invention when taken in conjunction with the accompanying drawings.
다음에서 본 발명의 실시 예를 설명한다.Hereinafter, embodiments of the present invention will be described.
도 1은 본 발명의 분해 사시도이고, 도 2는 본 발명의 일부를 확대한 분해 사시도이며, 도 3은 본 발명의 단면도를 각각 나타내고 있다.FIG. 1 is an exploded perspective view of the present invention, FIG. 2 is an exploded perspective view of a part of the present invention, and FIG. 3 is a sectional view of the present invention.
이 도면에서 참조되는 바와 같이, 본 발명의 철도용 침목은, 침목 본체(10), 레일패드(20) 및 고정부재(30)로 이루어진다. As shown in this figure, the railway sleeper of the present invention is made up of a
상기 침목 본체(10)에는, 레일패드(20)를 고정하기 위한 고정수단으로서, 침목 본체(10)의 상부와 하부를 각각 수직으로 관통하는 결합공(100, 100a)이 형성된다.As the fixing means for fixing the
그리고 상부에 형성되는 결합공(100)의 양쪽에는 레일을 고정하는 숄더(50, 50a)를 설치하기 위한 삽입공(110, 110a)이 형성된다.On both sides of the
한편, 상기 침목 본체(10)의 측면에는 통기공(120)이 형성되고, 바닥면에는 배수공(130)이 형성된다. A
상기 통기공(120)은 침목 본체(10) 내부로 유입될 수 있는 빗물을 최소화하기 위하여 측면에 형성되며, 상기 삽입공(110, 110a)을 통하여 침목 본체(10)내부에 유입된 다음 남아있는 빗물 등이 증발하면서 배출될 수 있도록 한다.The
또한 상기 통기공(120)은 태양광 및 태양열에 의하여 금속재로 이루어진 침목 본체(10)의 온도가 상승할 때 내부의 더운 공기가 외부로 배출될 수 있게 함으로써, 온도 상승에 의하여 침목 본체(10)가 열변형이 되는 것을 방지하도록 한다.In addition, when the temperature of the sleeper
상기 배수공(130)은 침목 본체(10)의 바닥면에 형성되며, 상기 침목 본체(10) 내부로 유입된 빗물 등이 즉시 외부로 배출될 수 있게 한다.The
이러한 침목 본체(10)는, 금속재, 바람직하게는 강철을 이용하여 주조성형(cast molding), 인발(drawing), 압출(extrusion) 등에 의한 방법으로 제조될 수 있으며, 더욱 바람직하게는 강도향상을 위하여 강철판을 절곡성형을 하여 형성하는 것이 좋다. 그리고 그 표면은 방청 및 내부식성을 향상시키기 위하여 도금처리가 되도록 한다.This sleeper
또한 상기 침목 본체(10)는 속이 빈 마름모꼴의 형상으로 형성되어 강도가 향상되고 변형을 방지할 수 있게 된다. 예컨데, 환봉체의 경우에 속이 꽉찬 환봉체보다, 속이 빈 중공을 가지는 환봉체가 더 높은 굽힘강도를 발휘하듯이, 속이 빈 형태로 되는 침목 본체(10)를 통해 변형 방지와 더불어 재료를 절감하고, 무게를 경감하여 운반 이송 및 현장 설치작업이 용이하게 된다.Further, the sleeper
상기 도금은 바람직하게 철강의 방청력이 뛰어나고 제조원가가 저렴한 아연(Zn)으로 이루어지도록 한다.The plating is preferably made of zinc (Zn) which is excellent in the sound-releasing power of steel and low in manufacturing cost.
아연 도금은 전기도금, 용융도금, 용사법, 쉐라다이징, 메카니컬 플레이팅(Mechani㎈ Plating) 등과 같은 방법 중에서 선택되어질 수 있으며, 내식성을 향상시키기 위하여 도금후에 크로메이트(chromate)처리를 추가적으로 실시할 수도 있다.The zinc plating may be selected from the group consisting of electroplating, hot dip galvanizing, spraying, shrinking, mechanical plating and the like. In order to improve the corrosion resistance, a chromate treatment may be additionally performed after plating .
레일패드(20)는, 평판의 형상으로 이루어져서 상기 침목 본체(10)의 상부면에 안착되는 평판부(200)와, 상기 평판부(200)의 저면 중앙으로부터 하향돌출되며 상기 침목 본체(10)의 상부에 형성된 결합공(100)에 삽입되는 고정봉(210) 및 상기 고정봉(210)의 단부에 형성되어 상기 침목 본체(10) 하부에 형성된 결합공(100a)에 삽입되는 수나사(220)로 이루어진다.The
또한 레일을 고정하는 숄더(50, 50a)를 설치하기 위하여, 상기 레일패드(20)의 평판부(200)에는 상기 침목 본체(10)에 형성된 삽입공(110, 110a)과 일치하는 위치에 볼트공(230, 230a)이 천공되어 있다.In order to install the
고정부재(30)는 평판 형상으로 형성되며, 그 중앙에는 상기 레일패드(20)의 수나사(220)가 삽입되는 통공(300)이 형성되어있다.The
상기 침목 본체(10)의 한 면의 두께 및 레일패드(20)의 평판부와 고정부재(30)의 두께가 특별히 한정되는 것은 아니나, 레일과 철도차량의 하중에 따르는 안전도를 고려할 때, 도 3을 참조하면, 상기 레일패드(20)의 평판부(200)와 상기 고정부재(30)의 두께(d)는 상기 침목 본체(10)의 두께(D)에 대해 1/10 ~ 1/5이 되도록 함이 바람직하다. The thickness of one surface of the
상기 평판부(200)와 고정부재(30)의 두께(d)가 침목 본체(10)의 두께(D)에 대해 1/10 미만으로 형성되는 경우, 상기 평판부(200) 및 고정부재(30)가 상대적으로 얇아 상호 용접된 후 그 강성을 유지하기가 쉽지 않고 또한 굽힘강도가 취약해져 변형이 발생되어 안전에 문제가 발생될 수 있으며, 상기 평판부(200)와 고정부재(30)의 두께(d)가 침목 본체(10)의 두께(D)에 대해 1/5를 초과하여 형성되는 경우, 침목 본체에 대해 상대적으로 돌출부위가 많아지고 이로 인해 레일이 침목 본체와 이격거리가 길어져 안정성이 저하됨으로 바람직하지 못하다.When the thickness d of the
본 발명에서는 상기 구성을 만족시키는 범위 내에서, 예를 들면, 침목 본체(10)의 일면의 두께(D)를 6 ~ 8cm로 구현할 수 있으며, 이 경우 상기 평판부(200)와 고정부재(30)의 두께(d)는 0.8 ~ 1.2cm로 구현할 수 있다.For example, the thickness D of one surface of the
이 때, 상기 침목 본체(10)의 두께가 6cm 미만으로 형성되는 경우, 굽힘강도가 충분치 않아 상부의 레일 및 철도차량의 부하에 대응하기 용이하지 않으며, 8cm를 초과하여 형성되는 경우, 안전도는 향상되나 재료비가 상승되고 무게로 인해 운반이 어려운 문제가 있어 바람직하지 못하며, 지나친 두께로 인해 제작과정도 용이하지 않게 된다.If the thickness of the sleeper
또한, 레일패드(20)의 평판부(200) 및 고정부재(30)의 두께(d)가 0.8cm 미만으로 형성되는 경우, 상기 평판부(200) 및 고정부재(30)가 상대적으로 얇아 침목 본체(10)와 용접 결합된 후 그 강성을 유지하기가 쉽지 않고, 굽힘강도가 상대적으로 취약해 변형이 발생될 수 있어 바람직하지 못하고, 상기 레일패드(20)의 평판부(200) 및 고정부재(30)의 두께(d)가 1.2cm를 초과하여 형성되는 경우, 침목 본체에 대해 상대적으로 돌출부위가 많아지고 이로 인해 레일이 침목 본체와 이격거리가 길어져 안정성이 저하되며, 재료비용이 상승됨으로 바람직하지 못하다.When the thickness d of the
상기와 같이 구성되는 본 발명에 의하면, 도 4에서 보듯이, 침목 본체(10)의 결합공(100, 100a)을 관통하는 레일패드(20)의 수나사(220)가 고정부재(30)의 통공(300)을 관통한 다음 너트(40)와 체결되고, 이를 통해 상기 침목 본체(10)와 레일패드(20)가 결합고정될 수 있게 된다.4, the
너트(40)가 체결된 후에는, 상기 침목 본체(10)와 레일패드(20)가 접촉되는 접촉경계면과, 침목 본체(10)와 고정부재(30)가 접촉되는 접촉경계면이 용접에 의하여 결합될 수 있다. 이러한 용접에 의한 결합은 너트(40)가 체결되기 전 상기 접촉경계면에 대하여 먼저 용접이 수행된 다음 너트(40)를 체결하는 순서로도 이루어질 수 있다.After the
숄더(50, 50a)는 레일(도시되지 아니함)을 고정하기 위한 것으로, 수평상으로 클립 고정홈(500, 500a)이 형성되고, 바닥면에는 고정돌기(510, 510a)가 돌출형성되어 있다.The
상기 고정돌기(510, 510a)의 외주면에는 수나사가 형성될 수 있고, 수나사가 없이 봉체형으로 형성될 수도 있다.A male screw may be formed on the outer circumferential surface of the fixing
상기 숄더(50, 50a)의 고정돌기(510, 510a)가 침목 본체(10)에 고정된 레일패드(20)의 볼트공(230, 230a)에 체결되고, 또한 침목 본체(10)의 삽입공(110, 110a)에 삽입되어 결합되게 된다.The fixing
위의 설명에서는 레일패드(20)와 고정부재(30) 및 숄더(50, 50a)가 침목 본체(10)의 일측에 구성되는 것으로 설명하였으나, 동일한 구조가 침목 본체(10)의 반대편 단부에 대칭상으로 구성되는 것이다.Although the
도 5는 본 발명의 다른 실시 예를 나타낸 것으로서, 침목 본체(10)의 상부면에는 레일패드(20)가 안착되는 상부안착홈(140)이 형성되고, 침목의 길이방향으로 보강돌기(160)가 형성되며, 상기 침목 본체(10)의 바닥면에는 고정부재(30)가 안착되는 하부안착홈(150)이 형성됨을 알 수 있다.5 shows another embodiment of the present invention in which an
상기 실시예에 따르면, 상기 레일패드(20)가 침목 본체(10)의 상부안착홈(140)에 안착되었을 때 침목 본체(10)의 상부면과 동일한 수평면을 이루게 된다. 또한 상기 고정부재(30)는 침목본체(10)의 하부안착홈(150)에 안착되었을 때 침목 본체(10)의 하부면과 동일한 수평면을 이루게 된다.According to this embodiment, when the
상기 상부안착홈(140)과 하부안착홈(150)을 통해 레일패드(20)와 고정부재(30)가 더욱 견고하게 침목 본체(10)에 결합될 수 있게 되며, 보강돌기(160)는 침목 본체(10)의 굽힘강도와 충격강도를 더욱 높여주게된다.The
상기 상부안착홈(140)과 하부안착홈(150) 및 보강돌기(160)는 레일 본체(10)를 절곡성형하기 전에 프레스 가공에 의하여 형성시킬 수 있다.The
10 : 침목 본체 20 : 레일패드
30 : 고정부재 40 : 너트
50, 50a : 숄더 100, 100a : 결합공
110, 110a : 삽입공 120 : 통기공
130 : 배수공 140 : 상부안착홈
150 : 하부안착홈 160 : 보강돌기
200 : 평판부 210 : 고정봉
220 : 수나사 230, 230a : 볼트공
300 : 통공 500, 500a : 클립 고정홈
510, 510a : 고정돌기10: sleeper body 20: rail pad
30: fixing member 40: nut
50, 50a:
110, 110a: insertion hole 120:
130: drainage hole 140: upper seat groove
150: lower seating groove 160: reinforcing projection
200: flat plate part 210: fixing rod
220:
300: through
510, 510a: Fixing projection
Claims (3)
상기 숄더(50, 50a)의 고정돌기(510, 510a)가 침목 본체(10)에 고정된 레일패드(20)의 볼트공(230, 230a)과 침목 본체(10)의 삽입공(110, 110a)에 삽입되어 상기 침목 본체(10)에 결합되되,
상기 침목 본체(10)는,
측면과 바닥면에 각각 통기공(120)과 배수공(130)이 형성되며, 상부면과 바닥면에 상기 레일패드(20)를 고정하기 위한 결합공(100, 100a)이 형성되고,
상기 레일패드(20)는,
저면 중앙으로부터 하향 돌출되면서 끝단에 수나사(220)가 형성된 고정봉(210)이 구비되며, 상기 고정봉(210)이 상기 결합공(100)에 삽입된 후 상기 수나사(220)가 상기 결합공(100a)과 고정부재(30)의 통공(300)을 관통하여 너트(40)로 체결되어 상기 침목 본체(10)와 결합 고정되며,
상기 침목 본체(10)의 상부면에는 상기 레일패드(20)가 안착되는 상부안착홈(140)이 형성되고, 침목의 길이방향으로 보강돌기(160)가 형성되며, 상기 침목 본체(10)의 바닥면에는 상기 고정부재(30)가 안착되는 하부안착홈(150)이 형성되는 것을 특징으로 하는 철도용 침목.
A rail pad 20 is provided on the upper surface of the sleeper body 10 on which an outer surface is coated with another kind of metallic material and a shoulder 50 or 50a for fixing the rail on the rail pad 20 A railway sleeper for supporting a rail installed on a railway track,
The fixing protrusions 510 and 510a of the shoulders 50 and 50a are fixed to the bolt holes 230 and 230a of the rail pad 20 fixed to the sleeper main body 10 and the insertion holes 110 and 110a of the sleeper main body 10, And is coupled to the sleeper body 10,
The sleeper body (10)
A vent hole 120 and a drain hole 130 are formed on a side surface and a floor surface, respectively, and coupling holes 100 and 100a for fixing the rail pad 20 are formed on a top surface and a bottom surface,
The rail pad (20)
The fixing bar 210 is inserted into the coupling hole 100 and then the male screw 220 is inserted into the coupling hole 210. [ 100a and the through hole 300 of the fixing member 30 and is fastened to the sleeper body 10 by a nut 40,
The upper surface of the sleeper main body 10 is formed with an upper seating groove 140 on which the rail pad 20 is seated and a reinforcing protrusion 160 is formed in the longitudinal direction of the sleeper, And a bottom seating groove (150) on which the fixing member (30) is seated is formed on the bottom surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160057840A KR101719807B1 (en) | 2016-05-11 | 2016-05-11 | Sleepers for railway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160057840A KR101719807B1 (en) | 2016-05-11 | 2016-05-11 | Sleepers for railway |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101719807B1 true KR101719807B1 (en) | 2017-03-27 |
Family
ID=58496902
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020160057840A KR101719807B1 (en) | 2016-05-11 | 2016-05-11 | Sleepers for railway |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101719807B1 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06316901A (en) * | 1993-05-06 | 1994-11-15 | Kubota Corp | Sleeper |
KR970009822U (en) * | 1995-08-25 | 1997-03-29 | 정명희 | Rail support for railroad |
KR200404784Y1 (en) | 2005-09-30 | 2005-12-28 | 아이앤아이스틸 주식회사 | A railroad tie |
KR200420885Y1 (en) * | 2006-04-28 | 2006-07-05 | 영중산업 주식회사 | The Insulation Connecting Apparatus of the Installed at Steel Girder Beam Structure |
KR101150786B1 (en) | 2008-12-11 | 2012-06-08 | 한국철도기술연구원 | sleeper for railroad |
-
2016
- 2016-05-11 KR KR1020160057840A patent/KR101719807B1/en active IP Right Grant
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06316901A (en) * | 1993-05-06 | 1994-11-15 | Kubota Corp | Sleeper |
KR970009822U (en) * | 1995-08-25 | 1997-03-29 | 정명희 | Rail support for railroad |
KR200404784Y1 (en) | 2005-09-30 | 2005-12-28 | 아이앤아이스틸 주식회사 | A railroad tie |
KR200420885Y1 (en) * | 2006-04-28 | 2006-07-05 | 영중산업 주식회사 | The Insulation Connecting Apparatus of the Installed at Steel Girder Beam Structure |
KR101150786B1 (en) | 2008-12-11 | 2012-06-08 | 한국철도기술연구원 | sleeper for railroad |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2666414C (en) | Railroad tie and method for building or adapting a railroad | |
CN109853375B (en) | Bridge expansion joint reserved notch of assembled structure and construction method thereof | |
CN204356639U (en) | A kind of railroad bridge pavement structure | |
AU700313B2 (en) | Steel pipe connector of ladder-type sleeper for railway track | |
US9556565B2 (en) | Train rail track structure systems | |
CN103938504A (en) | Casting-free plastic-free large-adjustment-amount high-elasticity anti-theft rail fastener | |
KR101719807B1 (en) | Sleepers for railway | |
KR101132952B1 (en) | Composite rail for tramcar and rail track using the rail | |
CN204919227U (en) | Novel iron road bridge roof beam is with compound sleeper | |
CN207878190U (en) | The road bed board of rubber and metal composite and the component comprising the road bed board | |
CN215252300U (en) | Sectional combined type damping and noise reducing bridge expansion device | |
CN109235151A (en) | Elastic long sleeper buried-type ballastless track structure on a kind of Railway Steel Truss Girder Bridges | |
CN205775654U (en) | A kind of non-metal type backing plate for rail clip | |
CN110952414B (en) | Highway expansion joint sealing protection method | |
CN210561479U (en) | Plate type ballast bed structure for built-in pump room of subway | |
CN201485755U (en) | Concrete sleeper of pre-embedded combined casing | |
US9644323B2 (en) | Train rail track structure systems | |
CN107354877B (en) | Integral cup opening mounting structure for sound barrier | |
CN105113409A (en) | Slab ballast-less track deck for emergency repair of steel beam | |
CN104652182B (en) | A kind of sleeper and the method installing nut sleeve thereof | |
CN204530330U (en) | A kind of sleeper | |
KR200410832Y1 (en) | Block type railroad tie | |
CN201722847U (en) | H-shaped pre-stressed concrete column | |
DE19628529A1 (en) | Low vibration track for urban railway | |
CN204959604U (en) | A board -like ballastless track bridge floor for rushing to repair girder steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20200203 Year of fee payment: 4 |