KR101717489B1 KR1020160152741A KR20160152741A KR101717489B1 KR 101717489 B1 KR101717489 B1 KR 101717489B1 KR 1020160152741 A KR1020160152741 A KR 1020160152741A KR 20160152741 A KR20160152741 A KR 20160152741A KR 101717489 B1 KR101717489 B1 KR 101717489B1
Authority
KR
South Korea
Prior art keywords
file
hole
steel bar
circular plate
nut
Prior art date
Application number
KR1020160152741A
Other languages
Korean (ko)
Inventor
최영덕
박인수
Original Assignee
주식회사 포유엔지니어링
최영덕
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 포유엔지니어링, 최영덕 filed Critical 주식회사 포유엔지니어링
Priority to KR1020160152741A priority Critical patent/KR101717489B1/en
Application granted granted Critical
Publication of KR101717489B1 publication Critical patent/KR101717489B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/64Repairing piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2450/00Gaskets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Revetment (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a method for repairing a cracked PHC pile. The method for repairing a cracked PHC pile according to the present invention comprises: a separation step; a head portion organizing step; an extension installation step; a joint member preparation step; a joint member fixing step; and a reinforcing pile installing step, so a PHC pile inserted into the ground and a newly connected PHC pile are connected simply and firmly, thereby preventing bearing capacity from being deteriorated due to repair.

Description

중파 PHC 파일의 보수 시공 방법{Repair construction method of cracked PHC pile}Repair construction method of cracked PHC pile < RTI ID = 0.0 >

본 발명은 PHC 파일의 설치 과정에서 PHC 파일에 손상이 발생하였을 때 PHC 파일 전체를 뽑거나 제거한 후 재설치하지 않고 손상된 부분의 상측만 제거한 후 제거된 부분에 해당될 정도의 크기의 PHC 파일을 준비하여 지중에 이미 매립되어 있는 PHC 파일과 연결 설치하여 제거 후 다시 시공함에 따른 시공비의 증가 및 공기 증가를 방지할 수 있도록 한, 중파 PHC 파일의 보수 시공 방법에 관한 것이다.When a PHC file is damaged in the process of installing the PHC file, the PHC file is entirely removed or removed, and only the upper part of the damaged part is removed without reinstalling, and then a PHC file of a size large enough to correspond to the removed part is prepared The present invention relates to a method of repairing and installing a medium frequency PHC file, which can prevent an increase in construction cost and an increase in air due to the installation and removal of a PHC file already buried in the ground.

일반적으로, 빌딩, 교량 등 각종 건축토목구조물을 시공할 때 약한 지반을 보강하기 위하여 강관파일을 지층에 타설하여 매설하고 매설되는 강관파일의 선단은 폐쇄하고 두부(상단)에는 보강구조를 설치하여 기초 콘크리트 구조물을 구축하여 콘크리트 토목/건축구조물을 지탱하도록 하고 있다.Generally, when constructing various civil engineering structures such as buildings, bridges, etc., steel pipe files should be buried in the ground layer to reinforce the weak ground, and the ends of the steel pipe piles to be buried should be closed. And concrete structures are constructed to support concrete civil / structural structures.

현재에는 구조물이 점점 고층화, 대형화되고 지가상승, 환경문제 등의 발생으로 인하여 종래에는 볼 수 없었던 각종의 특수공사가 증가되고 있다.Nowadays, various kinds of special construction that have not been seen in the past are increasing due to the increase in the size of the structure, the increase in the size of the building, the increase in the land price, and the environmental problems.

또한, 종래의 건설구조물의 입지로써 등한시되었던 연약지반에서의 건설과 해안공사도 활발해지고 내진설계법의 도입과 함께 구조물의 안전성에 대한 인식도 달라짐에 따라 기초구조 보강을 위해 사용되는 파일은 좀 더 깊은 관입량과 큰지지력을 필요로 하게 되었다.In addition, construction and coastal construction in the soft ground, which had been neglected as a conventional construction site, became more active, and with the introduction of the seismic design method and the awareness of the safety of the structure, the file used for reinforcing the foundation structure has a deeper penetration depth And large bearing capacity.

이에 따라서 기존에 사용되던 콘크리트말뚝인 프리텐션 방식 콘크리트 말뚝 (이하, PC 파일이라 한다.)의 고강도화에 대한 대책으로 PHC 파일(PRETENSIONED SPUN HIGH STRENGTH CONCRETE PILES)이 실용화되고 있다.Accordingly, a PHC file (PRETENSIONED SPUN HIGH STRENGTH CONCRETE PILES) has been put into practical use as a countermeasure against the intensification of a pre-tensioned concrete pile (hereinafter referred to as PC file) which is a concrete pile used in the past.

PHC 파일은 한국산업표준 "KS F4306 프리텐션방식 원심력 고강도 콘크리트 말뚝" 에 규정되어 있으며, 콘크리트 강도가 78.5MPa (800kg/cm2)를 넘는 고강도 제품으로 현재는 대부분의 현장에서 PHC 파일을 사용하고 있다.The PHC file is stipulated in the KS F4306 Pretensioned Centrifugal High Strength Concrete Pile of KS F4306. It is a high strength product with a concrete strength exceeding 78.5MPa (800kg / cm2). Currently, PHC file is used in most sites.

PHC 파일은 기존의 PC 파일에 비하여 고강도 콘크리트를 사용하기 때문에 설계 지지력이 크게 향상되었으며, 타격에 대한 저항력이 높아 파손이 적고, 경제적인 시공설계가 가능하다는 장점이 있다.The PHC file has the advantage of using the high-strength concrete compared to the existing PC file, so that the design bearing capacity is greatly improved, the damage resistance is low due to the high impact resistance, and the economical construction design is possible.

한편, 항타 말뚝공법은 직타 방식과 선굴착 후 직타방식으로 나누어지는데 연약지반에 20 ~ 30m 깊이로 PHC 파일을 심을 때에는 주변지반이 다짐되어 지지력이 증가하기 때문에 직타 방식을 주로 사용한다.On the other hand, the pile driving method is divided into the straight type and the straight type after the excavation. When the PHC pile is planted at 20 ~ 30m depth on the soft ground, the supporting ground is increased because of the compaction of the surrounding ground.

그러나, 상기 PHC 파일을 항타기에 의해 연약지반에 직타하는 과정에서 지중에 위치한 암반 등의 장애물에 하단부가 부딪치면 PHC 파일이 수직으로 진행하는 게 아니라 한쪽으로 약간씩 휘어져 휨 현상이 발생한다.However, when the lower end of the PHC file is struck against an obstacle such as a rock placed in the ground in a process of directing the PHC file to the soft ground, the PHC file does not advance vertically but is warped slightly to one side.

상기와 같이 휨 현상이 발생하는 이유는 PHC 파일이 관 형상으로 이루어져 있어 암반에 부딪히거나 밀착되는 부분이 PHC 파일에서 중앙부분이 아니라 가장자리 부분이며, 접지압이 넓고 높기 때문에 직타 과정에서 쉽게 밀려나 휨 현상이 발생하는 문제점이 있다.The reason why the bending phenomenon occurs as described above is that the PHC pile is formed in a tubular shape so that the portion of the PHC pile which comes into contact with the rock is closely related to the edge portion of the PHC pile and has a wide and high ground pressure, There is a problem that this occurs.

즉, PHC 파일의 하단 가장자리가 비트역할을 함으로 인해 PHC 파일의 중공부 중앙은 구심점 역할을 하지 못해 자갈 및 점토층, 암반 등에 부딪쳤을 때 직타하는 과정에서 쉽게 한쪽을 비겨나가 PHC 파일의 휨현상이 발생한다.That is, since the bottom edge of the PHC file serves as a bit, the center of the hollow part of the PHC file does not act as a center point, and when the user touches the gravel, clay layer, or rock,

따라서 PHC 파일을 20 ~ 30m 깊이로 연결하여 진행하는 과정에서 지중에 위치하는 장애물에 의해 휨 현상 및 파손 현상이 쉽게 발생한다.Therefore, in the process of connecting the PHC file to the depth of 20 ~ 30m, the bending phenomenon and the breakage phenomenon easily occur due to the obstacle located in the ground.

이러한 문제점을 해소하기 위한 기술로 "피 에이치 씨 파일 휨 방지용 비트"(한국 공개특허공보 제10-2013-0015036호, 특허문헌 1)에는 항타기의 하부에 특수한 형상을 갖는 비트를 설치함으로써 PHC 파일의 진행 안정성을 향상시킬 수 있게 하여 항타 과정에서의 파일 방지하고자 하였다.In order to solve such a problem, "a bit for preventing bending of the pile" (Korean Patent Laid-Open Publication No. 10-2013-0015036, Patent Document 1) discloses that a bit having a special shape is provided under the pile, So as to improve the running stability and to prevent the file in the hitching process.

하지만, 특허문헌 1과 같은 기술 개발이 이루어짐에도 불구하고 여전히 많은 시공 현장에서 PHC 파일의 휨, 파손, 증파 등이 발생하고 있는 것이 여전한 실정이다.However, despite the development of the technology as in Patent Document 1, the PHC file is still bent, damaged, and propagated in many construction sites.

이러한 파손이 발생하게 되면 통상적으로는 인발 장치를 이용하여 삽입된 PHC 파일을 인발한 후 천공된 부분을 채운 다음 다져 지반 안정화를 도모하고, 그 이후에 다시 파일 시공을 하게 된다.When such breakage occurs, the pulled PHC file is usually pulled out using a pulling device, and then the perforated part is filled, and then the pile ground is stabilized, and then the pile construction is performed again.

하지만 이 경우 공사기간이 매우 증가하게 되는 문제점이 있으며, 인발된 파일은 폐기 처리되므로 폐기물 처리 비용이 증가하는 문제점도 있다.In this case, however, there is a problem that the construction period is greatly increased, and the withdrawn files are discarded, which increases the waste disposal cost.

KR 10-2013-0015036 (2013.02.13)KR 10-2013-0015036 (2013.02.13)

본 발명의 중파 PHC 파일의 보수 시공 방법은 상기와 같은 종래 기술에서 발생하는 문제점을 해소하기 위한 것으로, PHC 파일의 증파된 부분을 기준으로 윗 부분은 분리고, 아랫 부분은 두부를 정리한 다음 보수를 위한 보강 PHC 파일을 제작하여 상호 연결시킴으로써 이미 삽입된 PHC 파일을 인발함에 따른 공기 지연을 방지하고 자원 활용율을 높일 수 있게 하려는 것이다.The method for repairing and installing the medium frequency PHC file of the present invention is to solve the problem caused by the conventional technology as described above. The upper part is separated from the upper part of the PHC file, And to increase the utilization rate of the resources by preventing the air delay due to the extraction of the already inserted PHC file.

더불어, 이미 지중에 삽입된 PHC 파일과 새로이 연결되는 PHC 파일이 간단하면서도 견고하게 연결되도록 함으로써 보수에 따라 지지력이 저하되는 현상이 발생하지 않게 하려는 것이다.In addition, the PHC file inserted in the ground and the newly connected PHC file are simply and firmly connected to each other so that the bearing capacity is not lowered due to maintenance.

본 발명의 중파 PHC 파일 보수 시공 방법은 상기와 같은 과제를 해결하기 위하여, 내부에 길이 방향으로 중공부(2)가 형성되어 있고, 측벽면에 둘레를 따라 강봉(4)이 형성되어 있는 PHC 파일 중간이 손상된 중파파일(1)의 보수 시공 방법에 있어서, 중파파일(1)에서 중파된 부분을 기준으로 상측의 부분을 분리하는 분리단계; 상측 부분이 분리되고 남은 중파파일(1)의 두부를 정리하되 중파파일(1)의 강봉(4)이 두부 상측으로 돌출되도록 돌출부(4a)를 형성하는 두부정리단계; 상기 두부정리단계가 끝난 중파파일(1)의 두부 둘레에 거푸집을 설치한 후 거푸집에 무수축 고강도 몰탈을 주입한 후 양생하여 중파파일(1) 두부 상측으로 일체로 연장되는 연장부(5)를 형성하되, 상기 강봉(4)의 돌출부(4a)가 연장부(5) 상측으로 돌출되도록 하는 연장부설치단계; 상기 중파파일(1)과 동일한 외경을 가지며, 둘레를 따라 상기 강봉(4)의 돌출부(4a)와 일직선을 이루는 하부관통공(11a)이 형성되어 있는 하부원판(11)과, 상기 하부원판(11) 상부에 설치되고, 둘레에 다수의 상부관통공(12a)이 형성되어 있는 상부원판(12)과, 상기 상부원판(12)과 하부원판(11)을 연결하는 연결부재(13)로 구성된 이음부재(10)를 준비하는 이음부재준비단계; 상기 이음부재(10) 하부원판(11)의 하부관통공(11a)에 상기 강봉(4) 돌출부(4a)가 끼워지도록 하여 상기 이음부재(10)를 상기 연장부(5) 상측에 설치한 후 상기 강봉(4) 돌출부(4a)와 하부관통홀(11a) 둘레의 하부원판(11)을 용접 방식으로 고정시켜 상기 이음부재(10)를 상기 연장부(5)에 일체로 고정시키는 이음부재고정단계; 상기 중파파일과 동일하게 내부에 중공부(2)가 형성되어 있고 벽면에 강봉(4)이 설치되어 있으며, 하부에 강봉(4)과 연결된 너트(7)가 인서트되어 있는 별도의 보강파일(8)을 준비한 후, 보강파일(8)을 상기 이음부재(10) 상부에 설치하되 상기 너트(7)를 상기 상부관통공(12a)의 위치와 일직선이 되도록 배치한 후 볼트(9)로 상부관통홀(12a)을 관통한 채 너트(7)에 체결하여 보강파일(8)을 상부원판(12)에 고정시키는 보강파일설치단계;를 포함하여 구성된다.In order to solve the above problems, a method for repairing a medium-frequency PHC file according to the present invention is characterized in that a hollow portion (2) is formed in the longitudinal direction thereof and a steel rod (4) A method of repairing and installing a medium wave file (1) damaged in the middle, comprising the steps of: separating an upper side portion of the medium wave file (1) with reference to a medium wave portion; A head cleaning step of arranging a head of the medium wave file 1 separated from the upper part and forming a protrusion 4a so that the steel bar 4 of the medium wave file 1 protrudes upward from the head; After the mold is installed around the head of the middle wave file 1 after the head cleaning process, the unshrinkable high strength mortar is injected into the mold and cured to form an extension part 5 extending integrally to the upper side of the middle wave file 1 A protrusion (4a) of the steel bar (4) protruding upward from the extension (5); A lower circular plate 11 having the same outer diameter as the middle wave file 1 and having a lower through hole 11a formed in a line with the projecting portion 4a of the steel rod 4 around the lower circular plate 11, An upper circular plate 12 provided at an upper portion of the lower circular plate 11 and having a plurality of upper through holes 12a formed therearound and a connecting member 13 connecting the upper circular plate 12 and the lower circular plate 11 A joint member preparing step of preparing a joint member (10); The joint member 10 is installed on the upper portion of the extension 5 so that the projecting portion 4a of the steel rod 4 is inserted into the lower through hole 11a of the lower circular plate 11 of the joint member 10 A jointing member fixing the joining member 10 to the extending portion 5 by fixing the protruding portion 4a of the steel bar 4 and the lower circular plate 11 around the lower through- step; A hollow bar 2 is formed in the same way as the medium wave file and a steel bar 4 is provided on a wall surface and a separate reinforcing pile 8 inserted with a nut 7 connected to the steel bar 4 The nut 7 is arranged so as to be in line with the position of the upper through hole 12a and then the bolt 9 is passed through the upper portion of the joint member 10, And a reinforcing pile installation step of fastening the reinforcing pile 8 to the upper original plate 12 by fastening the reinforcing pile 7 to the nut 7 while passing through the hole 12a.

또는, 중파파일(1)에서 중파된 부분을 기준으로 상측의 부분을 분리하는 분리단계; 상측 부분이 분리되고 남은 중파파일(1)의 두부를 정리하되 중파파일(1)의 강봉(4)이 두부 상측으로 돌출되도록 돌출부(4a)를 형성하는 두부정리단계; 상기 두부정리단계가 끝난 중파파일(1)의 두부 둘레에 거푸집을 설치한 후 거푸집에 무수축 고강도 몰탈을 주입한 후 양생하여 중파파일(1) 두부 상측으로 일체로 연장되는 연장부(5)를 형성하되, 상기 강봉(4)의 돌출부(4a)가 연장부(5) 상측으로 돌출되도록 하는 연장부설치단계; 상기 연장부(5) 상부에 강봉(4) 돌출부(4a)가 상측으로 관통되도록 실링부재(20)를 설치하는 실링부재설치단계; 상하로 관통된 홀(31)이 중앙에 형성되어 있되, 홀(31) 상부는 상하로 일정한 내경을 가지면서 내주면에 나사산(31a)이 형성되어 있으며, 홀(31) 하부는 하단을 향해 점차 내경이 작아지는 형상의 체결공(31b)을 갖는 외측고정구(30)를 준비하여 상기 실링부재(20) 상부로 돌출된 강봉(4) 돌출부(4a)가 체결공(31b) 내부에 삽입되도록 설치하는 외측고정구설치단계와; 외주면은 상기 체결공에 끼워지는 쐐기 형태를 취하며, 내부에 상기 강봉(4) 돌출부(4a)가 관통하는 강봉관통홀(41)이 형성된 내측고정구(40)를 준비하여 상기 내측고정구(40)를 외측고정구(30)의 홀(31)을 통해 상부에서 하방으로 설치하여 강봉관통홀(41)에 강봉(4) 돌출부(4a)가 끼워지도록 설치하는 내측고정구설치단계와; 하부 외주면에 상기 외측고정구(30)의 홀(31) 나사산(31a)에 결합되는 나사산(51)이 형성된 봉 형상의 인장부재(50)를 준비하여 인장부재(50)를 외측고정구(30)에 나사결합하는 인장부재설치단계와; 상기 중파파일(1)과 동일하게 내부에 중공부(2)가 형성되어 있고 벽면에 강봉(4)이 설치되어 있는 별도의 보강파일(8)을 준비한 후, 보강파일(8)을 상기 인장부재(50)에 연결하는 보강파일설치단계;를 포함하여 구성된다.A separating step of separating a portion on the upper side based on the medium wave portion in the medium wave file 1; A head cleaning step of arranging a head of the medium wave file 1 separated from the upper part and forming a protrusion 4a so that the steel bar 4 of the medium wave file 1 protrudes upward from the head; After the mold is installed around the head of the middle wave file 1 after the head cleaning process, the unshrinkable high strength mortar is injected into the mold and cured to form an extension part 5 extending integrally to the upper side of the middle wave file 1 A protrusion (4a) of the steel bar (4) protruding upward from the extension (5); A sealing member mounting step of mounting a sealing member 20 on the upper part of the extension part 5 such that the projecting part 4a of the steel bar 4 penetrates upward; The upper portion of the hole 31 has a constant inner diameter and a thread 31a is formed on the inner circumferential surface of the upper portion of the hole 31. The lower portion of the hole 31 gradually becomes the inner diameter And the protruding portion 4a of the steel bar 4 protruded above the sealing member 20 is inserted into the fastening hole 31b by preparing the outer fastener 30 having the fastening hole 31b of the shape An outer fixture mounting step; The inner fixture 40 is provided with an inner fixture 40 having an outer circumferential surface in the form of a wedge fitted into the fastening hole and having a steel through hole 41 through which the protruding portion 4a of the steel rod 4 penetrates, An inner fixture installing step of installing the steel bar 4 through the hole 31 of the outer fixture 30 downward from the top and installing the steel bar 4 protrusion 4a in the steel bar through hole 41; A tensile member 50 of a bar shape having threaded portions 51 coupled to the thread 31a of the hole 31 of the outer fixture 30 is prepared on the lower outer circumferential surface and the tensile member 50 is attached to the outer fixture 30 A tension member mounting step of screwing; After preparing a reinforcing pile 8 in which a hollow portion 2 is formed and a steel rod 4 is provided on the wall surface in the same manner as the medium wave file 1, (50).

상기한 구성에 있어서, 상기 보강파일(8)은 하부에 강봉(4)과 연결된 너트부재(7a)가 인서트되어 있되, 너트부재(7) 내부에는 강봉(4) 저부에 삽입홈(7b)이 형성되어 있으며, 상기 인장부재(50)의 상부 외주면에 나사산이 형성되어 있고, 상기 보강파일설치단계에서 인장부재(50)의 상단을 상기 삽입홈(7b)에 삽입하고, 인장부재(50)의 외주면에 너트(80)를 체결하여 보강파일(8)을 인장부재(50)에 고정하는 것을 특징으로 한다.The reinforcing pile 8 is inserted in the lower part with a nut member 7a connected to the steel bar 4. The reinforcing pile 8 has an insertion groove 7b at the bottom of the steel rod 4 inside the nut member 7 The upper end of the tensile member 50 is inserted into the insertion groove 7b in the step of installing the reinforcing pile and the threaded portion of the tension member 50 And the nut (80) is fastened to the outer peripheral surface to fix the reinforcing pawls (8) to the tension member (50).

또는, 상기 보강파일(8)은 하부에 강봉(4)과 연결된 너트부재(7a)가 인서트되어 있되, 너트부재(7a) 내부에는 강봉(4) 저부에 삽입홈(7b)이 형성되어 있으며, 상기 보강파일설치단계에서 인장부재(50)의 상단을 상기 삽입홈(7a)에 삽입하고, 인장부재(50)의 외주면과 상기 너트부재(7a)를 용접 고정하여 보강파일(8)을 인장부재(50)에 고정하는 것을 특징으로 한다.Alternatively, the reinforcement pile 8 is inserted with a nut member 7a connected to the steel bar 4 at the bottom. An insertion groove 7b is formed at the bottom of the steel bar 4 in the nut member 7a, The upper end of the tension member 50 is inserted into the insertion groove 7a and the outer peripheral surface of the tension member 50 and the nut member 7a are welded and fixed in the step of installing the reinforcing pile, (50).

또는, 상기 중파파일(1)과 동일한 외경을 가지며, 둘레를 따라 상기 인장부재(50)와 일직선을 이루는 하부관통공(11a)이 형성되어 있는 하부원판(11)과, 상기 하부원판(11) 상부에 설치되고, 둘레에 다수의 상부관통공(12a)이 형성되어 있는 상부원판(12)과, 상기 상부원판(12)과 하부원판(11)을 연결하는 연결부재(13)로 구성된 이음부재(10)를 준비하는 이음부재준비단계; 상기 이음부재(10) 하부원판(11)의 하부관통공(11a)에 상기 인장부재(50)가 끼워지도록 하여 상기 끼워진 부분의 상, 하측에 너트(60)와 와셔(70)를 설치하여 인장부재(50)를 하부원판(11)에 고정시키는 이음부재고정단계;가 더 구비되며, 상기 보강파일설치단계는, 상기 중파파일(1)과 동일하게 내부에 중공부(2)가 형성되어 있고 벽면에 강봉(4)이 설치되어 있으며, 하부에 강봉(4)과 연결된 너트(7)가 인서트되어 있는 별도의 보강파일(8)을 준비한 후, 보강파일(8)을 상기 이음부재(10) 상부에 설치하되 상기 너트(7)를 상기 상부관통공(12a)의 위치와 일직선이 되도록 배치한 후 볼트(9)로 상부관통홀(12a)을 관통한 채 너트(7)에 체결하여 보강파일(8)을 상부원판(12)에 고정시키는 것을 특징으로 한다.A lower circular plate 11 having the same outer diameter as the middle wave file 1 and having a lower through hole 11a formed in a line with the tension member 50 around the lower circular plate 11, And a connecting member 13 for connecting the upper circular plate 12 and the lower circular plate 11. The upper circular plate 12 has a plurality of upper through holes 12a formed at its upper portion, (10); The nut 60 and the washer 70 are installed on the upper and lower sides of the fitting portion so that the tension member 50 is fitted into the lower through hole 11a of the lower circular plate 11 of the joint member 10, And fixing the member (50) to the lower disk (11), wherein the step of installing the reinforcing pile includes the steps of forming a hollow part (2) inside the same as the medium wave file A reinforcing pile 8 is attached to the joint member 10 after preparing a reinforcing pile 8 in which a steel bar 4 is provided on the wall surface and a nut 7 connected to the steel rod 4 is inserted in the lower portion. And the nut 7 is disposed so as to be in line with the position of the upper through hole 12a and then fastened to the nut 7 through the upper through hole 12a with the bolt 9, (8) is fixed to the upper circular plate (12).

본 발명에 의해, PHC 파일의 증파된 부분을 기준으로 윗 부분은 분리고, 아랫 부분은 두부를 정리한 다음 보수를 위한 보강 PHC 파일을 제작하여 상호 연결시킴으로써 이미 삽입된 PHC 파일을 인발함에 따른 공기 지연을 방지하고 자원 활용율을 높일 수 있게 된다.According to the present invention, the upper part of the PHC file is separated from the upper part of the PHC file, the lower part of the PHC file is rearranged, and the reinforced PHC file for the repair is manufactured and interconnected, It is possible to prevent delay and increase resource utilization rate.

더불어, 이미 지중에 삽입된 PHC 파일과 새로이 연결되는 PHC 파일이 간단하면서도 견고하게 연결되도록 함으로써 보수에 따라 지지력이 저하되는 현상이 발생하지 않게 된다.In addition, since the already inserted PHC file and the newly connected PHC file are simply and firmly connected, the bearing capacity is not lowered due to maintenance.

도 1은 중파된 PHC 파일 상태를 나타낸 단면도.
도 2는 파일 분리를 위해 지반을 굴착한 상태를 나타낸 단면도.
도 3은 중파된 파일 상부를 분리한 상태를 나타낸 단면도.
도 4는 중파파일의 두부를 정리한 상태를 나타낸 단면도.
도 5는 중파파일의 두부에 연장부를 형성한 예를 나타낸 단면도.
도 6은 중파파일의 두부에 이음부재를 설치한 상태를 나타낸 단면도.
도 7은 이음부재 위에 보강파일을 연결한 상태를 나타낸 단면도.
도 8은 연장부 위에 실링부재 및 외측고정구를 설치한 상태를 나타낸 단면도.
도 9는 도 8의 상태에서 내측고정구를 설치한 상태를 나타낸 단면도.
도 10은 도 9의 상태에서 인장부재를 연결한 상태를 나타낸 단면도.
도 11은 도 10의 상태에서 인장부재에 보강파일을 연결한 상태를 나타낸 단면도.
도 12는 도 10에서 인장부재에 이음부재를 설치한 후 보강파일을 연결한 상태를 나타낸 단면도.
1 is a cross-sectional view showing the state of a medium-wave PHC file.
2 is a cross-sectional view showing a state where a ground is excavated for file separation;
FIG. 3 is a cross-sectional view showing a state in which the upper portion of the middle-wave file is separated; FIG.
4 is a sectional view showing a state in which a head portion of a medium wave file is organized.
5 is a cross-sectional view showing an example in which an extended portion is formed on a head portion of a medium wave file;
6 is a cross-sectional view showing a state in which a coupling member is provided on a head portion of a medium-wave file;
7 is a cross-sectional view showing a state in which a reinforcing file is connected to a joint member.
8 is a cross-sectional view showing a state in which a sealing member and an outer fixing member are provided on an extension portion.
Fig. 9 is a sectional view showing a state in which the inner fastener is installed in the state of Fig. 8; Fig.
10 is a cross-sectional view showing a state in which a tension member is connected in the state of FIG. 9;
11 is a cross-sectional view showing a state in which a reinforcement file is connected to a tension member in the state of FIG. 10;
12 is a cross-sectional view showing a state in which a reinforcing pile is connected after a joint member is installed in a tension member in Fig.

본 발명은 내부에 길이 방향으로 중공부(2)가 형성되어 있고, 측벽면에 둘레를 따라 강봉(4)이 형성되어 있는 PHC 파일이 지중에 삽입되는 과정 또는 삽입된 후 중간에 휨 또는 크랙(3), 절단 등 손상되어 도 1과 같은 중파파일(1)이 된 경우 이를 보수하여 시공하는 방법에 관한 것이다.The present invention relates to a PHC pile having a hollow portion 2 formed therein in the longitudinal direction and having a steel bar 4 formed along the periphery of the sidewall surface, 3), cut and the like, and the medium wave file 1 as shown in Fig. 1 is damaged.

이하, 첨부된 도면을 통해 본 발명의 중파 PHC 파일의 보수 시공 방법에 대해 상세히 설명하기로 한다.Hereinafter, a method of repairing and installing a medium wave PHC file of the present invention will be described in detail with reference to the accompanying drawings.

1. 분리단계1. Separation step

도 3과 같이 중파파일(1)에서 중파된 부분을 기준으로 상측의 부분을 절단기 등을 이용하여 분리한다.As shown in Fig. 3, the upper side portion of the medium wave file 1 is separated by a cutter or the like with reference to the medium wave portion.

이때, 중파파일(1)의 삽입된 여건에 따라 도 2에 도시되어 있는 바와 같이 중파된 부분까지 주변을 굴착하여 절단 작업이 용이할 수 있게 함이 바람직하다.At this time, it is preferable to excavate the periphery to the mid-wave part as shown in FIG. 2 according to the inserted condition of the medium wave file 1, thereby facilitating the cutting operation.

2. 두부정리단계2. Tofu clearance stage

상측 부분이 분리되고 남은 중파파일(1)의 두부를 도 4와 같이 절단기, 그라인더 등을 이용하여 절단 등의 방법으로 정리하되 중파파일(1)의 강봉(4)이 두부 상측으로 돌출되도록 돌출부(4a)를 형성한다.The upper part of the middle wave file 1 is separated by the cutting method or the like using a cutter or a grinder as shown in Figure 4 so that the steel rods 4 of the middle wave file 1 are projected to the upper side of the head 4a.

이때, 콘크리트 부분은 도면과 같이 최대한 평평한 상태가 되도록 하고, 돌출된 돌출부(4a)의 길이가 전체적으로 동일해질 수 있도록 정리한다.At this time, the concrete part is made as flat as possible as shown in the figure, and the protruded protruding parts 4a are arranged so that the lengths of the protruded parts 4a can be made uniform as a whole.

3. 연장부설치단계3. Steps to install the extension

상기 두부정리단계가 끝난 중파파일(1)의 두부 둘레에 거푸집을 설치한 후 거푸집에 무수축 고강도 몰탈을 주입한 후 양생하여 도 5와 같이 중파파일(1) 두부 상측으로 일체로 연장되는 연장부(5)를 형성한다.After the mold is installed around the head of the middle wave file 1 after the head cleaning process, the non-shrinkage high strength mortar is injected into the mold and cured. Then, as shown in FIG. 5, (5).

이때, 상기 강봉(4)의 돌출부(4a)가 연장부(5) 상측으로 돌출되도록 한다.At this time, the protruding portion 4a of the steel bar 4 protrudes upward from the extended portion 5.

연장부(5)를 형성하는 것은 PHC 파일이 손상되는 과정에서 손상 부위 주변의 강봉(4)과 콘크리트 사이로 틈이 발생하는 등 중파파일(1)의 상단부가 파손된 상태인 경우가 많으므로 이 부분에 연장부(5)를 형성함으로써 강봉(4)과 콘크리트가 단부에서 일체화됨으로써 강도 저하를 방지할 수 있게 하려는 것이다.The formation of the extension part 5 is often due to the breakage of the upper end of the medium wave file 1, such as a gap between the steel rod 4 and the concrete around the damaged part in the process of damaging the PHC file, So that the strength of the steel rods 4 and concrete can be prevented from being lowered by integrating them at the ends.

4. 이음부재준비단계4. Preparations for joints

도 6에 도시되어 있는 바와 같은 이음부재(10)를 준비한다.The coupling member 10 as shown in Fig. 6 is prepared.

이음부재(10)는 크게 하부원판(11), 상부원판(12) 및 연결부재(13)로 이루어져 있으며 각각은 서로 용접 방식에 의해 견고하게 고정된 상태를 이룬다.The joint member 10 includes a lower circular plate 11, an upper circular plate 12, and a connecting member 13, which are firmly fixed to each other by a welding method.

구체적으로 하부원판(11)은 상기 중파파일(1)과 동일한 외경을 가지며, 둘레를 따라 상기 강봉(4)의 돌출부(4a)와 일직선을 이루는 하부관통공(11a)이 형성되어 있다.Specifically, the lower disk 11 has the same outer diameter as the middle-wave file 1, and a lower through-hole 11a is formed along the periphery of the lower disk 11 so as to be in line with the projecting portion 4a of the steel rod 4.

상부원판(12)은 상기 하부원판(11) 상부에 설치되고, 둘레에 다수의 상부관통공(12a)이 형성되어 있다.The upper circular plate 12 is installed on the lower circular plate 11 and has a plurality of upper through holes 12a formed therearound.

이때, 상부관통공(12a)은 하부관통공(11a)과 수직 방향으로 일직선을 이룰 수도 있으나, 이보다는 서로 평면상에서 엇갈려 배치되어 있는 것이 바람직하다.At this time, the upper through-hole 12a may be straight in a direction perpendicular to the lower through-hole 11a, but is preferably staggered on the plane.

연결부재(13)는 도면과 같이 상기 상부원판(12)과 하부원판(11)을 연결하는 부재로 원형의 관 형태를 취한다.The connecting member 13 is a member for connecting the upper circular plate 12 and the lower circular plate 11 as shown in the drawing, and has a circular tube shape.

이때, 연결부재(13)의 외주면에는 다수의 보강리브가 형성되어 하중 지지력을 높여줄 수 있도록 할 수 있다.At this time, a plurality of reinforcing ribs may be formed on the outer circumferential surface of the connecting member 13 to increase the load bearing capacity.

5. 이음부재고정단계5. Fixing step of joint members

도 6에 도시되어 있는 바와 같이 상기 이음부재(10) 하부원판(11)의 하부관통공(11a)에 상기 강봉(4) 돌출부(4a)가 끼워지도록 하여 상기 이음부재(10)를 상기 연장부(5) 상측에 설치한다.The protruding portion 4a of the steel bar 4 is inserted into the lower through hole 11a of the lower circular plate 11 of the joint member 10 so that the joint member 10 is inserted into the extension portion 11a, (5).

그런 다음 상기 강봉(4) 돌출부(4a)와 하부관통홀(11a) 둘레의 하부원판(11)을 용접 방식으로 고정시켜 상기 이음부재(10)를 상기 연장부(5)에 일체로 고정시킨다.Then, the protruding portion 4a of the steel bar 4 and the lower circular plate 11 around the lower through hole 11a are fixed by welding so that the joint member 10 is integrally fixed to the extending portion 5.

도 6의 도면기호 6은 용접에 따른 용접부(6)를 나타낸 것이다.6 shows a welding portion 6 according to welding.

6. 보강파일설치단계6. Steps to install a reinforcement file

도 7에 도시된 바와 같이 상기 중파파일(1)과 동일하게 내부에 중공부(2)가 형성되어 있고 벽면에 강봉(4)이 설치되어 있되, 하부에 강봉(4)과 연결된 너트(7)가 인서트되어 있는 별도의 보강파일(8)을 준비한다.7, a hollow portion 2 is formed in the same way as the middle wave file 1, and a steel rod 4 is provided on the wall surface, and a nut 7 connected to the steel rod 4 at the lower portion. A separate reinforcement file 8 is prepared.

너트(7)는 통상의 너트와 같이 일정한 내경을 갖도록 할 수 있으나, 도면과 같이 상부의 내경이 하부의 내경보다 작게 형성되고, 강봉(4)은 하단부가 상부보다 직경이 크게 형성되어 너트(7) 내부에 하단부가 끼워진 형태를 취하도록 함이 바람직하다.The inner diameter of the upper portion of the nut 7 is smaller than the inner diameter of the lower portion and the diameter of the lower portion of the steel rod 4 is larger than that of the upper portion of the nut 7, It is preferable that the lower end portion is fitted in the inside of the recess.

더불어 이 너트(7)는 내주면에 나사산이 형성되어 있다.In addition, the nut 7 has threads formed on its inner peripheral surface.

이러한 보강파일(8)을 준비한 후 보강파일(8)을 상기 이음부재(10) 상부에 설치하되 상기 너트(7)를 상기 상부관통공(12a)의 위치와 일직선이 되도록 배치한 후 도시된 볼트(9)로 상부관통홀(12a)을 관통한 채 너트(7)에 체결하여 보강파일(8)을 상부원판(12)에 고정킨다.After the reinforcement file 8 is prepared, the reinforcement file 8 is installed on the joint member 10 so that the nut 7 is aligned with the position of the upper through-hole 12a, The reinforcing pawls 8 are fastened to the upper original plate 12 by fastening them to the nuts 7 while passing through the upper through holes 12a with the fastening pawls 9.

이러한 보수 시공 방법에 따르면, 손상이 발생된 PHC 파일 전체를 지중에서 분리하지 않아도 되므로 공기를 획기적으로 단축시키고, 자원의 폐기를 최소화할 수 있는 장점을 갖게 된다.According to the repairing method, it is not necessary to separate the entire PHC file in which the damage occurs, so that the air can be remarkably shortened and the disposal of resources can be minimized.

더불어, 손상이 발생되어 상측이 분리된 중파파일(1)에 별도의 보강파일(8)이 원래의 파일에 최대한 근접되게 견고하게 연결된 상태가 되므로 설계 계획으로부터 벗어나는 구조적 불량을 최대한 방지할 수 있게 된다.In addition, since the additional reinforcing file 8 is firmly connected to the original file as close as possible to the middle-size file 1 where the upper side is separated due to the damage, structural defects deviating from the design plan can be prevented as much as possible .

그런데, 파일 손상은 항타가 최종적으로 이루어지지 않은 환경이 될 수도 있다.However, file corruption may be an environment in which hacking is not finally achieved.

즉, 전술한 실시예와 같이 보강파일(8)을 연결한 후 다시 항타가 이루어져야 하는 환경이 발생할 수 있다.That is, an environment in which the reinforcement file 8 is connected after the reinforcement file 8 is connected as in the above-described embodiment may occur.

이 경우 보강파일(8)에 가해진 항타력이 하부의 중파파일(1)에 전달됨에 있어서 중파파일(1)의 강봉(4) 특히 두부 측의 돌출부(4a)에 집중적으로 가해지고 이에 따라 보강을 위해 몰탈 시공된 연장부(5)가 파손되어 그 만큼의 파일 강도가 저하되는 문제점이 발생될 수 있다.In this case, when the impact force applied to the reinforcement file 8 is transmitted to the lower middle wave file 1, it is concentratedly applied to the steel rods 4 of the middle wave file 1, particularly to the projecting portion 4a of the head side, There is a possibility that the extensions 5 formed in the mortar may be damaged and the file strength may be reduced accordingly.

이러한 문제점을 해소하기 위한 방안으로 본 발명은 아래와 같은 실시예로 진행될 수도 있다.In order to solve such a problem, the present invention may be implemented in the following embodiments.

구체적으로, Specifically,

1. 분리단계1. Separation step

실시예 1과 같이 중파파일(1)에서 중파된 부분을 기준으로 상측의 부분을 분리한다.The upper side portion is separated based on the medium wave portion in the medium wave file 1 as in the first embodiment.

2. 두부정리단계2. Tofu clearance stage

실시예 1과 같이 상측 부분이 분리되고 남은 중파파일(1)의 두부를 정리하되 중파파일(1)의 강봉(4)이 두부 상측으로 돌출되도록 돌출부(4a)를 형성한다.The upper portion of the middle wave file 1 is separated and the remaining portion of the middle wave file 1 is folded as shown in Embodiment 1 so that the projecting portion 4a is formed so that the steel bar 4 of the middle wave file 1 protrudes upward from the head.

3. 연장부설치단계3. Steps to install the extension

실시예 1과 같이 상기 두부정리단계가 끝난 중파파일(1)의 두부 둘레에 거푸집을 설치한 후 거푸집에 무수축 고강도 몰탈을 주입한 후 양생하여 중파파일(1) 두부 상측으로 일체로 연장되는 연장부(5)를 형성하되, 상기 강봉(4)의 돌출부(4a)가 연장부(5) 상측으로 돌출되도록 한다.As shown in Example 1, a mold was installed around the head of the middle wave file (1) after completion of the head cleaning process, and a non-shrinkage high strength mortar was injected into the mold, The protruding portion 4a of the steel bar 4 protrudes upward from the extended portion 5. [

4. 실링부재설치단계4. Steps for installing the sealing member

실시예 1과 다르게 도 8에도시된 것처럼 상기 연장부(5) 상부에 강봉(4) 돌출부(4a)가 상측으로 관통되도록 실링부재(20)를 설치한다.8, the sealing member 20 is installed on the upper portion of the extended portion 5 such that the projecting portion 4a of the steel rod 4 penetrates upward.

실링부재(20)는 인장력 또는 인발력이 작용할 때 상측의 보강파일(8)과 하측의 중파파일(1) 사이에 발생하는 틈으로 지하수가 유입되는 것을 차단시켜 강봉의 부식을 미연에 방지하는 역할을 하도록 한다.The sealing member 20 serves to prevent the groundwater from flowing into the gaps occurring between the upper reinforcing pile 8 and the lower middle pavement 1 when tensile force or pulling force acts to prevent corrosion of the steel rods .

5. 외측고정구설치단계5. Step of Installing the External Fixture

도 8에 도시되어 있는 바와 같이 상하로 관통된 홀(31)이 중앙에 형성되어 있되, 홀(31) 상부는 상하로 일정한 내경을 가지면서 내주면에 나사산(31a)이 형성되어 있으며, 홀(31) 하부는 하단을 향해 점차 내경이 작아지는 형상의 체결공(31b)을 갖는 외측고정구(30)를 준비하여 상기 실링부재(20) 상부로 돌출된 강봉(4) 돌출부(4a)가 체결공(31b) 내부에 삽입되도록 설치한다.8, a hole 31 is formed at the center of the hole 31. The upper portion of the hole 31 has a predetermined inner diameter and a thread 31a formed on the inner circumferential surface thereof, The lower part of the lower part is provided with an outer fixture 30 having a fastening hole 31b whose inner diameter gradually decreases toward the lower end so that the projecting part 4a of the steel rod 4 protruded above the sealing member 20 is fastened to the fastening hole 31b.

6. 내측고정구설치단계6. Internal fastener mounting step

도 9에 도시되어 있는 바와 같이 외주면은 상기 체결공에 끼워지는 쐐기 형태를 취하며, 내부에 상기 강봉(4) 돌출부(4a)가 관통하는 강봉관통홀(41)이 형성된 내측고정구(40)를 준비하여 상기 내측고정구(40)를 외측고정구(30)의 홀(31)을 통해 상부에서 하방으로 설치하여 강봉관통홀(41)에 강봉(4) 돌출부(4a)가 끼워지도록 설치한다.9, the outer circumferential surface has a wedge shape to be fitted in the fastening hole, and an inner fastener 40 having a steel through-hole 41 through which the projecting portion 4a of the steel rod 4 passes is formed therein The inner fixture 40 is installed through the hole 31 of the outer fixture 30 so as to be downward from the upper portion and the steel rod 4 protruding portion 4a is fitted to the steel pipe through hole 41.

이때, 강봉(4) 돌출부(4a)는 상단이 내측고정구(40) 상단면보다 낮은 위치가 되도록 즉, 틈이 있는 상태가 바람직하다.At this time, it is preferable that the projecting portion 4a of the steel bar 4 has a gap such that the upper end thereof is located lower than the upper end surface of the inner fastener 40.

이는 인장부재(50)를 통해 전달되는 항타력이 직접적으로 강봉(4)에 전달되지 않고 간접적으로 전달될 수 있도록 하기 위함이다.This is for the purpose of enabling the anti-pulling force transmitted through the tension member (50) to be indirectly transmitted without being directly transmitted to the steel bar (4).

7. 인장부재설치단계7. Tension Member Installation Steps

도 10에 도시되어 있는 바와 같이 하부 외주면에 상기 외측고정구(30)의 홀(31) 나사산(31a)에 결합되는 나사산(51)이 형성된 봉 형상의 인장부재(50)를 준비하여 인장부재(50)를 외측고정구(30)에 나사결합한다.10, a rod-like tensile member 50 having a thread 51 coupled to the thread 31a of the hole 31 of the outer fixture 30 is prepared on the lower outer circumferential surface, and the tensile member 50 ) To the outer fixture (30).

8. 보강파일설치단계8. Steps to install a reinforcement file

도 11에 도시되어 있는 바와 같이 상기 중파파일(1)과 동일하게 내부에 중공부(2)가 형성되어 있고 벽면에 강봉(4)이 설치되어 있는 별도의 보강파일(8)을 준비한 후, 보강파일(8)을 상기 인장부재(50)에 연결한다.As shown in Fig. 11, a reinforcing pile 8 having a hollow portion 2 formed therein and having a steel bar 4 on the wall thereof is prepared and reinforced similarly to the medium wave file 1, To connect the pile (8) to the tension member (50).

이때, 보강파일설치단계는 다양한 방식이 적용될 수 있다.At this time, various methods can be applied to the reinforcement file installation step.

간단한 방식은 도 11에 도시되어 있는 바와 같이 상기 보강파일(8)은 하부에 강봉(4)과 연결된 너트부재(7a)가 인서트되어 있되, 너트부재(7) 내부에는 강봉(4) 저부에 삽입홈(7b)이 형성되어 있으며, 상기 인장부재(50)의 상부 외주면에 나사산이 형성되도록 하고, 상기 보강파일설치단계에서 인장부재(50)의 상단을 상기 삽입홈(7b)에 삽입하고, 인장부재(50)의 외주면에 너트(80)를 체결하여 보강파일(8)을 인장부재(50)에 고정시킬 수 있다.11, a nut member 7a connected to a steel bar 4 is inserted in a lower portion of the reinforcing pile 8, and the reinforcing pile 8 is inserted into a bottom portion of the steel bar 4 in the nut member 7, And the upper end of the tension member 50 is inserted into the insertion groove 7b in the step of installing the reinforcing pile, The nut 80 can be fastened to the outer peripheral surface of the member 50 to fix the reinforcing pawl 8 to the tension member 50. [

또는 도시되어 있지는 않지만 상기 보강파일(8)은 하부에 강봉(4)과 연결된 너트부재(7a)가 인서트되어 있되, 너트부재(7a) 내부에는 강봉(4) 저부에 삽입홈(7b)이 형성되어 있으며, 상기 보강파일설치단계에서 인장부재(50)의 상단을 상기 삽입홈(7a)에 삽입하고, 인장부재(50)의 외주면과 상기 너트부재(7a)를 용접 고정하여 보강파일(8)을 인장부재(50)에 고정시킬 수도 있다.A nut member 7a connected to the steel bar 4 is inserted in the lower portion of the reinforcing pile 8 and an insertion groove 7b is formed in the bottom of the steel bar 4 inside the nut member 7a The upper end of the tension member 50 is inserted into the insertion groove 7a and the outer peripheral surface of the tension member 50 and the nut member 7a are welded and fixed to each other, May be fixed to the tension member (50).

이러한 도 11의 실시예는 외측고정구(30), 내측고정구(40) 및 인장부재(50)가 설치됨으로 인해 중파파일(1)에서 보강파일(8)로 전달되는 항타력이 인장부재(50)를 통해 전달되면서 강봉(4)에 직접 전달되지 않고 내측고정구(40), 외측고정구(30)로 고르게 분산되면서 전달됨으로써 연장부(5)의 손상 발생 가능성을 낮춰주게 된다.11, an anti-buckling force transmitted from the middle-wave file 1 to the reinforcement pile 8 due to the provision of the outer fixture 30, the inner fixture 40 and the tension member 50 is transmitted to the tension member 50, The inner fixture 40 and the outer fixture 30 are uniformly dispersed and transmitted without being directly transmitted to the steel bar 4 while being transmitted through the steel bar 4, thereby reducing the possibility of damage to the extended portion 5. [

이때, 도 11의 실시예는 가급적 보강파일(8)과 중파파일(1)의 강봉(4)이 서로 일직선상이 되도록 함이 바람직하다.At this time, it is preferable that the reinforcing file 8 and the steel rods 4 of the middle-size wave file 1 are in a straight line, preferably in the embodiment of Fig.

즉, 상부에서 가해진 항타력이 수직방향상에서 각도 변화 없이 하방으로 보강파일(8)에 전달되도록 함으로써 하중 전달이 원할해질 수 있게 된다.That is, load transfer can be facilitated by transmitting the anti-striking force applied from the upper portion to the reinforcing pawl 8 downward without changing the angle in the vertical direction.

이때, 보강파일설치단계는 외측고정구(30), 내측고정구(40) 및 인장부재(50)가 활용됨은 물론 제1실시예에서 제시된 이음부재(10)가 함께 활용될 수 있다.At this time, in the reinforcing file installation step, the outer fixture 30, the inner fixture 40, and the tension member 50 are utilized, and the joint member 10 shown in the first embodiment can be used together.

구체적으로, 도 12에 도시되어 있는 바와 같이 Specifically, as shown in Fig. 12

상기 중파파일(1)과 동일한 외경을 가지며, 둘레를 따라 상기 인장부재(50)와 일직선을 이루는 하부관통공(11a)이 형성되어 있는 하부원판(11)과, 상기 하부원판(11) 상부에 설치되고, 둘레에 다수의 상부관통공(12a)이 형성되어 있는 상부원판(12)과, 상기 상부원판(12)과 하부원판(11)을 연결하는 연결부재(13)로 구성된 이음부재(10)를 준비하는 이음부재준비단계;A lower circular plate 11 having the same outer diameter as the middle wave file 1 and having a lower through hole 11a formed in a line with the tension member 50 around the lower circular plate 11, And a connecting member 13 for connecting the upper circular plate 12 and the lower circular plate 11. The upper circular plate 12 is provided with a plurality of upper through holes 12a, Preparing a joint member;

상기 이음부재(10) 하부원판(11)의 하부관통공(11a)에 상기 인장부재(50)가 끼워지도록 하여 상기 끼워진 부분의 상, 하측에 너트(60)와 와셔(70)를 설치하여 인장부재(50)를 하부원판(11)에 고정시키는 이음부재고정단계;가 더 구비되며,The nut 60 and the washer 70 are installed on the upper and lower sides of the fitting portion so that the tension member 50 is fitted into the lower through hole 11a of the lower circular plate 11 of the joint member 10, And a fixing step of fixing the member (50) to the lower original plate (11)

상기 보강파일설치단계는, The method of claim 1,

상기 중파파일(1)과 동일하게 내부에 중공부(2)가 형성되어 있고 벽면에 강봉(4)이 설치되어 있으며, 하부에 강봉(4)과 연결된 너트(7)가 인서트되어 있는 별도의 보강파일(8)을 준비한 후, 보강파일(8)을 상기 이음부재(10) 상부에 설치하되 상기 너트(7)를 상기 상부관통공(12a)의 위치와 일직선이 되도록 배치한 후 볼트(9)로 상부관통홀(12a)을 관통한 채 너트(7)에 체결하여 보강파일(8)을 상부원판(12)에 고정시키도록 구성될 수 있다.A hollow part 2 is formed in the interior of the middle wave file 1 and a steel rod 4 is provided on the wall surface and a nut 7 connected to the steel rod 4 is inserted in the lower part. The reinforcing file 8 is installed on the joint member 10 so that the nut 7 is arranged so as to be in line with the position of the upper through hole 12a, The reinforcing pawls 8 may be fastened to the nuts 7 through the upper through holes 12a to fix the reinforcing pawls 8 to the upper original plate 12. [

도 12의 방식은 도 11의 실시예와 도 7의 실시예의 장점을 모두 취합한 것이다.The system of FIG. 12 combines the advantages of the embodiment of FIG. 11 and the embodiment of FIG.

일예로 도 7의 실시예는 전술한 것처럼 항타시 하중 전달에 문제점이 발생할 수 있다.For example, the embodiment of FIG. 7 may cause a problem in load transfer at the time of hovering as described above.

반면 도 11의 실시예는 하중 전달이 원할하고 중파파일(1)의 두부 손상을 방지할 수 있으나, 보강파일(8)을 정확한 치수로 하지 않을 경우 문제가 발생할 수 있다.On the other hand, the embodiment of FIG. 11 can prevent damage to the head of the medium wave file 1, which is desirable in terms of load transfer, but may cause problems when the reinforcement file 8 is not set to an accurate dimension.

즉, 보수 현장에서 삽입된 중파파일(1)의 정확한 깊이, 보강파일(8)과의 연결에 필요한 공간의 측량, 설계가 정확하지 못할 경우 기 설치된 여타의 PHC 파일과 높이가 다르게 되는 문제점이 발생할 가능성이 있다.That is, the exact depth of the medium wave file (1) inserted at the repair site, the measurement of the space required for connection with the reinforcement file (8), and the problem that the height is different from other installed PHC files There is a possibility.

반면 전술한 도 12의 실시예는 인장부재(50)의 상측과, 이음부재(10)의 하측이 인장부재(50)의 관통 길이의 조절에 따라 높이 조절이 가능해지게 된다.On the other hand, in the embodiment of FIG. 12 described above, the height of the upper portion of the tension member 50 and the lower side of the joint member 10 can be adjusted in accordance with the adjustment of the penetration length of the tension member 50.

더 나아가 도 12에 도시되어 있는 바와 같이 인장부재(50)의 상단에 보조연결관(90)을 나사 결합하여 끼워 보조연결관(90)이 볼트(9)를 지지하도록 연결하면 하중의 전달이 보다 원할히 이루어지기 때문에 중파파일(1)과 보강파일(8)의 연결부로 항타력이 전달될 때 연결 부위에서의 파손, 손상을 최대한 방지할 수 있게 된다.12, when the auxiliary connection pipe 90 is screwed into the upper end of the tension member 50 and the auxiliary connection pipe 90 is connected to support the bolt 9, It is possible to prevent breakage or damage at the connection portion when the anti-tying force is transmitted to the connection portion between the medium wave file 1 and the reinforcement file 8. [

이 경우에도 두 파일의 강봉이 일직선상으로 배치될 수 있다.In this case also, the steel rods of the two files can be arranged in a straight line.

한편, 상기와 같이 구성된 본 발명의 보수 시공 방법에서 중파파일(1)과 보강파일(8)의 연결 부분의 둘레에 지하수 유입을 막기 위해 미도시된 강관형의 부재가 밴딩 고정될 수 있다 할 것이다.Meanwhile, in the repair and construction method of the present invention constructed as described above, a steel pipe-like member (not shown) may be banded and fixed around the connecting portion of the medium wave file 1 and the reinforcing pile 8 to prevent groundwater inflow .

1 : 중파파일 2 : 중공부
3 : 크랙 4 : 강봉
4a : 돌출부 5 : 연장부
6 : 용접부 7 : 너트
7a : 너트부재 7b : 삽입홈
8 : 보강파일 9 : 볼트
10 : 이음부재 11 : 하부원판
11a : 하부관통공 12 : 상부원판
12a : 상부관통공 13 : 연결부재
20 : 실링부재 30 : 외측고정구
31 : 홀 31a : 나사산
31b : 체결공 40 : 내측고정구
41 : 강봉관통홀 50 : 인장부재
51 : 나사산 60 : 너트
70 : 와셔 80 : 너트
90 : 보조연결관
1: medium wave file 2: hollow part
3: crack 4: steel bar
4a: protruding portion 5: extending portion
6: weld 7: nut
7a: nut member 7b: insertion groove
8: Reinforcement file 9: Bolt
10: joint member 11: lower disk
11a: Lower through hole 12: Upper disc
12a: upper through hole 13: connecting member
20: sealing member 30: outer fastener
31: hole 31a: thread
31b: fastening hole 40: inner fastener
41: steel bar penetration hole 50: tensile member
51: thread 60: nut
70: Washer 80: Nut
90: auxiliary connector

Claims (5)

내부에 길이 방향으로 중공부(2)가 형성되어 있고, 측벽면에 둘레를 따라 강봉(4)이 형성되어 있는 PHC 파일 중간이 손상된 중파파일(1)의 보수 시공 방법에 있어서,
중파파일(1)에서 중파된 부분을 기준으로 상측의 부분을 분리하는 분리단계;
상측 부분이 분리되고 남은 중파파일(1)의 두부를 정리하되 중파파일(1)의 강봉(4)이 두부 상측으로 돌출되도록 돌출부(4a)를 형성하는 두부정리단계;
상기 두부정리단계가 끝난 중파파일(1)의 두부 둘레에 거푸집을 설치한 후 거푸집에 무수축 고강도 몰탈을 주입한 후 양생하여 중파파일(1) 두부 상측으로 일체로 연장되는 연장부(5)를 형성하되, 상기 강봉(4)의 돌출부(4a)가 연장부(5) 상측으로 돌출되도록 하는 연장부설치단계;
상기 중파파일(1)과 동일한 외경을 가지며, 둘레를 따라 상기 강봉(4)의 돌출부(4a)와 일직선을 이루는 하부관통공(11a)이 형성되어 있는 하부원판(11)과, 상기 하부원판(11) 상부에 설치되고, 둘레에 다수의 상부관통공(12a)이 형성되어 있는 상부원판(12)과, 상기 상부원판(12)과 하부원판(11)을 연결하는 연결부재(13)로 구성된 이음부재(10)를 준비하는 이음부재준비단계;
상기 이음부재(10) 하부원판(11)의 하부관통공(11a)에 상기 강봉(4) 돌출부(4a)가 끼워지도록 하여 상기 이음부재(10)를 상기 연장부(5) 상측에 설치한 후 상기 강봉(4) 돌출부(4a)와 하부관통홀(11a) 둘레의 하부원판(11)을 용접 방식으로 고정시켜 상기 이음부재(10)를 상기 연장부(5)에 일체로 고정시키는 이음부재고정단계;
상기 중파파일과 동일하게 내부에 중공부(2)가 형성되어 있고 벽면에 강봉(4)이 설치되어 있으며, 하부에 강봉(4)과 연결된 너트(7)가 인서트되어 있는 별도의 보강파일(8)을 준비한 후, 보강파일(8)을 상기 이음부재(10) 상부에 설치하되 상기 너트(7)를 상기 상부관통공(12a)의 위치와 일직선이 되도록 배치한 후 볼트(9)로 상부관통홀(12a)을 관통한 채 너트(7)에 체결하여 보강파일(8)을 상부원판(12)에 고정시키는 보강파일설치단계;를 포함하여 구성된,
중파 PHC 파일의 보수 시공 방법.
1. A method of repairing and installing a medium wave file (1) in which a hollow portion (2) is formed in the longitudinal direction inside and a steel rod (4) is formed along the side wall surface,
A separating step of separating the upper part based on the medium wave part in the medium wave file (1);
A head cleaning step of arranging a head of the medium wave file 1 separated from the upper part and forming a protrusion 4a so that the steel bar 4 of the medium wave file 1 protrudes upward from the head;
After the mold is installed around the head of the middle wave file 1 after the head cleaning process, the unshrinkable high strength mortar is injected into the mold and cured to form an extension part 5 extending integrally to the upper side of the middle wave file 1 A protrusion (4a) of the steel bar (4) protruding upward from the extension (5);
A lower circular plate 11 having the same outer diameter as the middle wave file 1 and having a lower through hole 11a formed in a line with the projecting portion 4a of the steel rod 4 around the lower circular plate 11, An upper circular plate 12 provided at an upper portion of the lower circular plate 11 and having a plurality of upper through holes 12a formed therearound and a connecting member 13 connecting the upper circular plate 12 and the lower circular plate 11 A joint member preparing step of preparing a joint member (10);
The joint member 10 is installed on the upper portion of the extension 5 so that the projecting portion 4a of the steel rod 4 is inserted into the lower through hole 11a of the lower circular plate 11 of the joint member 10 A jointing member fixing the joining member 10 to the extending portion 5 by fixing the protruding portion 4a of the steel bar 4 and the lower circular plate 11 around the lower through- step;
A hollow bar 2 is formed in the same way as the medium wave file and a steel bar 4 is provided on a wall surface and a separate reinforcing pile 8 inserted with a nut 7 connected to the steel bar 4 The nut 7 is arranged so as to be in line with the position of the upper through hole 12a and then the bolt 9 is passed through the upper portion of the joint member 10, And a reinforcing-file mounting step of fastening the reinforcing pile (8) to the upper original plate (12) by fastening to the nut (7) while passing through the hole (12a)
Maintenance method of medium wave PHC file.
내부에 길이 방향으로 중공부(2)가 형성되어 있고, 측벽면에 둘레를 따라 강봉(4)이 형성되어 있는 PHC 파일 중간이 손상된 중파파일(1)의 보수 시공 방법에 있어서,
중파파일(1)에서 중파된 부분을 기준으로 상측의 부분을 분리하는 분리단계;
상측 부분이 분리되고 남은 중파파일(1)의 두부를 정리하되 중파파일(1)의 강봉(4)이 두부 상측으로 돌출되도록 돌출부(4a)를 형성하는 두부정리단계;
상기 두부정리단계가 끝난 중파파일(1)의 두부 둘레에 거푸집을 설치한 후 거푸집에 무수축 고강도 몰탈을 주입한 후 양생하여 중파파일(1) 두부 상측으로 일체로 연장되는 연장부(5)를 형성하되, 상기 강봉(4)의 돌출부(4a)가 연장부(5) 상측으로 돌출되도록 하는 연장부설치단계;
상기 연장부(5) 상부에 강봉(4) 돌출부(4a)가 상측으로 관통되도록 실링부재(20)를 설치하는 실링부재설치단계;
상하로 관통된 홀(31)이 중앙에 형성되어 있되, 홀(31) 상부는 상하로 일정한 내경을 가지면서 내주면에 나사산(31a)이 형성되어 있으며, 홀(31) 하부는 하단을 향해 점차 내경이 작아지는 형상의 체결공(31b)을 갖는 외측고정구(30)를 준비하여 상기 실링부재(20) 상부로 돌출된 강봉(4) 돌출부(4a)가 체결공(31b) 내부에 삽입되도록 설치하는 외측고정구설치단계와;
외주면은 상기 체결공에 끼워지는 쐐기 형태를 취하며, 내부에 상기 강봉(4) 돌출부(4a)가 관통하는 강봉관통홀(41)이 형성된 내측고정구(40)를 준비하여 상기 내측고정구(40)를 외측고정구(30)의 홀(31)을 통해 상부에서 하방으로 설치하여 강봉관통홀(41)에 강봉(4) 돌출부(4a)가 끼워지도록 설치하는 내측고정구설치단계와;
하부 외주면에 상기 외측고정구(30)의 홀(31) 나사산(31a)에 결합되는 나사산(51)이 형성된 봉 형상의 인장부재(50)를 준비하여 인장부재(50)를 외측고정구(30)에 나사결합하는 인장부재설치단계와;
상기 중파파일(1)과 동일하게 내부에 중공부(2)가 형성되어 있고 벽면에 강봉(4)이 설치되어 있는 별도의 보강파일(8)을 준비한 후, 보강파일(8)을 상기 인장부재(50)에 연결하는 보강파일설치단계;를 포함하여 구성된,
중파 PHC 파일의 보수 시공 방법.
1. A method of repairing and installing a medium wave file (1) in which a hollow portion (2) is formed in the longitudinal direction inside and a steel rod (4) is formed along the side wall surface,
A separating step of separating the upper part based on the medium wave part in the medium wave file (1);
A head cleaning step of arranging a head of the medium wave file 1 separated from the upper part and forming a protrusion 4a so that the steel bar 4 of the medium wave file 1 protrudes upward from the head;
After the mold is installed around the head of the middle wave file 1 after the head cleaning process, the unshrinkable high strength mortar is injected into the mold and cured to form an extension part 5 extending integrally to the upper side of the middle wave file 1 A protrusion (4a) of the steel bar (4) protruding upward from the extension (5);
A sealing member mounting step of mounting a sealing member 20 on the upper part of the extension part 5 such that the projecting part 4a of the steel bar 4 penetrates upward;
The upper portion of the hole 31 has a constant inner diameter and a thread 31a is formed on the inner circumferential surface of the hole 31. The lower portion of the hole 31 gradually extends toward the lower end, And the protruding portion 4a of the steel bar 4 protruded above the sealing member 20 is inserted into the fastening hole 31b by preparing the outer fastener 30 having the fastening hole 31b of the shape An outer fixture mounting step;
The inner fixture 40 is provided with an inner fixture 40 having an outer circumferential surface in the form of a wedge fitted into the fastening hole and having a steel through hole 41 through which the protruding portion 4a of the steel rod 4 penetrates, An inner fixture installing step of installing the steel bar 4 through the hole 31 of the outer fixture 30 downward from the top and installing the steel bar 4 protrusion 4a in the steel bar through hole 41;
A tensile member 50 of a bar shape having threaded portions 51 coupled to the thread 31a of the hole 31 of the outer fixture 30 is prepared on the lower outer circumferential surface and the tensile member 50 is attached to the outer fixture 30 A tension member mounting step of screwing;
After preparing a reinforcing pile 8 in which a hollow portion 2 is formed and a steel rod 4 is provided on the wall surface in the same manner as the medium wave file 1, And a reinforcing-file installing step of connecting the reinforcing-
Maintenance method of medium wave PHC file.
제 2항에 있어서,
상기 보강파일(8)은 하부에 강봉(4)과 연결된 너트부재(7a)가 인서트되어 있되,
너트부재(7) 내부에는 강봉(4) 저부에 삽입홈(7b)이 형성되어 있으며,
상기 인장부재(50)의 상부 외주면에 나사산이 형성되어 있고,
상기 보강파일설치단계에서 인장부재(50)의 상단을 상기 삽입홈(7b)에 삽입하고, 인장부재(50)의 외주면에 너트(80)를 체결하여 보강파일(8)을 인장부재(50)에 고정하는 것을 특징으로 하는,
중파 PHC 파일의 보수 시공 방법.
3. The method of claim 2,
The reinforcing pile (8) is inserted with a nut member (7a) connected to a steel bar (4)
An insertion groove 7b is formed in the bottom of the steel bar 4 inside the nut member 7,
A thread is formed on the outer peripheral surface of the upper portion of the tensile member 50,
The upper end of the tension member 50 is inserted into the insertion groove 7b and the nut 80 is fastened to the outer circumferential surface of the tension member 50 in the step of installing the reinforcing pile, Is fixed to the base
Maintenance method of medium wave PHC file.
제 2항에 있어서,
상기 보강파일(8)은 하부에 강봉(4)과 연결된 너트부재(7a)가 인서트되어 있되,
너트부재(7a) 내부에는 강봉(4) 저부에 삽입홈(7b)이 형성되어 있으며,
상기 보강파일설치단계에서 인장부재(50)의 상단을 상기 삽입홈(7b)에 삽입하고, 인장부재(50)의 외주면과 상기 너트부재(7a)를 용접 고정하여 보강파일(8)을 인장부재(50)에 고정하는 것을 특징으로 하는,
중파 PHC 파일의 보수 시공 방법.

3. The method of claim 2,
The reinforcing pile (8) is inserted with a nut member (7a) connected to a steel bar (4)
Inside the nut member 7a, an insertion groove 7b is formed at the bottom of the steel bar 4,
The upper end of the tension member 50 is inserted into the insertion groove 7b and the outer circumferential surface of the tension member 50 and the nut member 7a are welded and fixed, (50). ≪ RTI ID = 0.0 >
Maintenance method of medium wave PHC file.

제 2항에 있어서,
상기 중파파일(1)과 동일한 외경을 가지며, 둘레를 따라 상기 인장부재(50)와 일직선을 이루는 하부관통공(11a)이 형성되어 있는 하부원판(11)과, 상기 하부원판(11) 상부에 설치되고, 둘레에 다수의 상부관통공(12a)이 형성되어 있는 상부원판(12)과, 상기 상부원판(12)과 하부원판(11)을 연결하는 연결부재(13)로 구성된 이음부재(10)를 준비하는 이음부재준비단계;
상기 이음부재(10) 하부원판(11)의 하부관통공(11a)에 상기 인장부재(50)가 끼워지도록 하여 끼워진 부분의 상, 하측에 너트(60)와 와셔(70)를 설치하여 인장부재(50)를 하부원판(11)에 고정시키는 이음부재고정단계;가 더 구비되며,
상기 보강파일설치단계는,
상기 중파파일(1)과 동일하게 내부에 중공부(2)가 형성되어 있고 벽면에 강봉(4)이 설치되어 있으며, 하부에 강봉(4)과 연결된 너트(7)가 인서트되어 있는 별도의 보강파일(8)을 준비한 후, 보강파일(8)을 상기 이음부재(10) 상부에 설치하되 상기 너트(7)를 상기 상부관통공(12a)의 위치와 일직선이 되도록 배치한 후 볼트(9)로 상부관통홀(12a)을 관통한 채 너트(7)에 체결하여 보강파일(8)을 상부원판(12)에 고정시키는 것을 특징으로 하는,
중파 PHC 파일의 보수 시공 방법.
3. The method of claim 2,
A lower circular plate 11 having the same outer diameter as the middle wave file 1 and having a lower through hole 11a formed in a line with the tension member 50 around the lower circular plate 11, And a connecting member 13 for connecting the upper circular plate 12 and the lower circular plate 11. The upper circular plate 12 is provided with a plurality of upper through holes 12a, Preparing a joint member;
A nut 60 and a washer 70 are provided on upper and lower sides of a portion of the lower circular plate 11 of the joint member 10 fitted in the lower through hole 11a so as to fit the tension member 50, (50) is fixed to the lower original plate (11)
The method of claim 1,
A hollow part 2 is formed in the interior of the middle wave file 1 and a steel rod 4 is provided on the wall surface and a nut 7 connected to the steel rod 4 is inserted in the lower part. The reinforcing file 8 is installed on the joint member 10 so that the nut 7 is arranged so as to be in line with the position of the upper through hole 12a, Is fastened to the nut (7) while passing through the upper through hole (12a) to fix the reinforcement pile (8) to the upper original plate (12)
Maintenance method of medium wave PHC file.
KR1020160152741A 2016-11-16 2016-11-16 Repair construction method of cracked PHC pile KR101717489B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160152741A KR101717489B1 (en) 2016-11-16 2016-11-16 Repair construction method of cracked PHC pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160152741A KR101717489B1 (en) 2016-11-16 2016-11-16 Repair construction method of cracked PHC pile

Publications (1)

Publication Number Publication Date
KR101717489B1 true KR101717489B1 (en) 2017-03-20

Family

ID=58502863

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160152741A KR101717489B1 (en) 2016-11-16 2016-11-16 Repair construction method of cracked PHC pile

Country Status (1)

Country Link
KR (1) KR101717489B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100835778B1 (en) * 2007-03-16 2008-06-05 정인배 Attachable and detachable joint apparatus of concrete pile for foundation work
KR20110052428A (en) * 2009-11-10 2011-05-18 김영란 Attachable joint apparatus of pile
KR20120083606A (en) * 2011-01-18 2012-07-26 (주)비제이피코리아 A joint apparatus of concrete pile for foundation work
KR20130015036A (en) 2011-08-02 2013-02-13 한남기초(주) The bit for protecting bending of phc piles
KR20150105613A (en) * 2014-03-07 2015-09-17 (주)영구조엔지니어링 The smart front end cap for adjusting phc file length and the method using thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100835778B1 (en) * 2007-03-16 2008-06-05 정인배 Attachable and detachable joint apparatus of concrete pile for foundation work
KR20110052428A (en) * 2009-11-10 2011-05-18 김영란 Attachable joint apparatus of pile
KR20120083606A (en) * 2011-01-18 2012-07-26 (주)비제이피코리아 A joint apparatus of concrete pile for foundation work
KR20130015036A (en) 2011-08-02 2013-02-13 한남기초(주) The bit for protecting bending of phc piles
KR20150105613A (en) * 2014-03-07 2015-09-17 (주)영구조엔지니어링 The smart front end cap for adjusting phc file length and the method using thereof

Similar Documents

Publication Publication Date Title
KR101928054B1 (en) Construction method of retaining wall for underground structures with narrow edge space
KR101418978B1 (en) Structure of pile coupling
KR101103530B1 (en) Apparatus for restoration of disparity sinking construction or introducing pre-stress of pipe pile
KR101658020B1 (en) Joint Structure of Pile-to-Pile cap Connection for Concrete Structure
KR101739266B1 (en) PHC pile connecting apparatus and Repair construction method of cracked PHC pile using it
KR102012883B1 (en) Aseismatic Reinforcement Steel Frame with Friction Slip Brace and Aseismatic Reinforcement Method using thereof
KR101195235B1 (en) Underground structure construction method using composite pile
KR101489387B1 (en) End supporting multi micro pile and method for constructing the same
KR101426066B1 (en) End supporting multi micro pile and method for reinforcing structure base using this
KR101331219B1 (en) Method for constructing micro pile using reinforcing end bearing capacity
KR101717489B1 (en) Repair construction method of cracked PHC pile
KR101448145B1 (en) Column Integrated Footing
KR101855458B1 (en) Composite pile
KR100842372B1 (en) Pretension soil nail method of top-down
KR101623377B1 (en) Reinforcing structure for pipe head
KR101493495B1 (en) reinforcement structure for PHC pile and constructing method of PHC pile using thereof
KR101500087B1 (en) Foundation slab reinforcement method for integral behavior with existing building and structure of the same
KR101558927B1 (en) Concrete flat slab structure and construction method of the same
KR20190123854A (en) Micropile
KR100776620B1 (en) Bar Type Anchor
KR100922121B1 (en) Construction Structure of Footing using Hybrid Pile having Various Cross-section
KR20080086254A (en) A construction method for concrete retaining wall using anchor soldier pile-style extracting, non-extracting-type soil nailing
KR102051386B1 (en) construction method of flexural and seismic reinforcing high strength concrete pile with metal cap
JP6071125B2 (en) Underground support joint structure
KR101217488B1 (en) Extension structure of pile foundation

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right