KR101659572B1 - Double composite box girder with free concrete shrinkage and the construction method therefor - Google Patents

Double composite box girder with free concrete shrinkage and the construction method therefor Download PDF

Info

Publication number
KR101659572B1
KR101659572B1 KR1020160012181A KR20160012181A KR101659572B1 KR 101659572 B1 KR101659572 B1 KR 101659572B1 KR 1020160012181 A KR1020160012181 A KR 1020160012181A KR 20160012181 A KR20160012181 A KR 20160012181A KR 101659572 B1 KR101659572 B1 KR 101659572B1
Authority
KR
South Korea
Prior art keywords
concrete
steel box
free end
box girder
double
Prior art date
Application number
KR1020160012181A
Other languages
Korean (ko)
Inventor
지윤희
Original Assignee
지윤희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 지윤희 filed Critical 지윤희
Priority to KR1020160012181A priority Critical patent/KR101659572B1/en
Application granted granted Critical
Publication of KR101659572B1 publication Critical patent/KR101659572B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Abstract

When a bridge is constructed using double synthetic steel box girder, it is possible to reduce the weight by excluding a part of the lower concrete at the point of the shear retardation part, but it is possible to reduce the weight of the concrete due to the dew condensation The present invention relates to a double synthetic steel box girder having a center free end that can effectively prevent corrosion of a synthetic steel box girder while securing safety in terms of structure and a construction method thereof. The center free edge is formed on the basis of the lateral width of the lower flange in which the shear strap is most likely to be absorbed so that the gap between the upper ends of the lower concrete and the abdomen of the lower concrete is not caused by the drying shrinkage.

Description

BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a double composite steel box girder having a center free end and a construction method thereof,

The present invention relates to a double composite steel box girder having a center free end and a construction method thereof. More specifically, when a bridge is constructed using a double synthetic steel box girder, it is possible to reduce the self weight by excluding a part of the lower concrete at the point of the shear retardation site, but also the number of dew condensation due to rain etc. The present invention relates to a double synthetic steel box girder having a center free end which can effectively prevent corrosion of double synthetic steel box girder and can ensure safety in terms of structure and a construction method thereof.

The steel box girder 10 for a bridge is made of a box structure formed of an upper flange 13, an abdomen 12 and a lower flange 11 as shown in Fig. 1A, and is packed or slab concrete 50 as a bridge superstructure.

These steel box girders 10 are constructed so as to be connected to each other between a bridge or an alternate (focal point) when a bridge is constructed in a plurality of bridges, that is, in a continuous bridging manner.

Further, examples of the installation of the longitudinal and transverse ribs 30 and 40 can be confirmed. It can be seen that the steel box girder 10 is composed of the upper flange 13, the sheath 12 and the lower flange 11 in the form of a box. Longitudinal and transverse ribs 30, 40 are provided on the inner side surfaces of the abdomen portion 12 and the lower flange 11.

Since the lower flange is a compression flange, the steel box girder located at the bridge pier (fulcrum part) is composed of an additional lower concrete (not shown) on the upper flange so as to more effectively resist the bending moment, The lower concrete is additionally provided with a shear connection member (stud, not shown) on the upper surface of the lower flange 13 separately to improve the composite ability with the lower flange.

At this time, the steel box girder is painted with color to prevent surface corrosion.

However, there is no proper way to solve the problem because the abdomen and lower flange are corroded due to infiltration of infiltration water into the gap between the lower portion of the steel box girder abutting the lower concrete after the construction and maintenance.

That is, as shown in FIG. 1B, the lower concrete 60 located at the fulcrum portion is formed to have a constant thickness on the upper surface of the lower flange of the steel box girder and the inner side surface of the double bottom portion. Such a lower concrete shrinks due to drying shrinkage In particular, it can be seen that a gap is generated between the abdomen and the lower concrete. It can be seen that penetration water penetrates through the gap.

In addition, shear lag phenomenon occurs as the shear load ratio decreases remarkably along the region extending from the upper side of the lower concrete 60 to the lower and lower flanges, and when the gap is generated, There is a problem that the structural safety can not be ensured at both upper and lower portions of the concrete.

As shown in FIG. 1c, an induced waterproofing structure is introduced at a joint portion where a groundwater leakage problem occurs, such as an underground continuous wall.

That is, the hose 30 is inserted along the longitudinal direction of the joint 20 to the joint 20 formed by grooving along the length or width direction of the underground continuous wall 10; And a waterproof layer (40) formed by filling a mortar on the joint (20) in which the hose (30) is inserted. Wherein the hose (30) has an induction and waterproof structure of an underground continuous wall (10) in which a plurality of stainless steels are arranged in a net shape along the circumference of the hose (30).

However, the application of the induction and waterproof structure for installing such a hose to the conventional steel girder box is limited because it is interfered by the longitudinal and transverse ribs and the shear connection member, so that it can not be applied differently. There was a problem.

As a result, it is possible to prevent the corrosion of the steel material by the penetration water in the cross-sectional structure in which the lower concrete having the constant thickness is formed on the both abdomen and the lower flange like the double synthetic steel box girder. At present, no method has been disclosed for effectively controlling this.

Accordingly, it is an object of the present invention to provide a double synthetic steel box girder which can be manufactured more economically while effectively resisting compressive force acting on the fulcrum portion P, and which can prevent corrosion due to infiltration water at a portion where the lower concrete is formed It is possible to overcome the shear delay phenomenon and to reduce the weight by eliminating the lower concrete at the center part of the lower flange by the shear force delay and to be able to reinforce the central part of the lower flange, And a method of constructing the box girder.

Accordingly, the present invention provides a dual synthetic steel box girder,

First, the center part of the lower part concrete is separated by about 10% (10% of the transverse width of the lower flange) so that the center free part acts as the free end of drying shrinkage, And the gap between the lower part of the abdominal wall.

Since the generation of cracks can be prevented by controlling the occurrence of cracks, maintenance of the bridge can be improved, and generation of cracks can be controlled, thereby effectively restricting the very large shear force acting on the contact surface between the upper portions of the lower concrete and the upper plate The structural safety can be sufficiently improved.

Secondly, the central free end does not contribute to the section stiffness but excludes the portion which acts as unnecessary load, thereby reducing the weight of the double composite steel box girder, thereby improving the workability. Further, due to the lighter upper structure, The scale can be reduced, which makes it possible to construct more economical bridges.

Third, the double composite steel box girder is formed by the open cross-section, and the lower concrete is composited by the compressive shear connection material on the upper flange, which is a compression flange located at the fulcrum portion. By acting as a transverse rib, the lower flange, which is the compression flange, does not have to be provided with conventional longitudinal and transverse ribs.

Fourth, the bottom free flange is reinforced by providing a compression shear connection material such as a T-shaped steel material capable of having a large load load at the center free end to reinforce the lower flange. In the lower flange and the upper and lower abutment portions, And the inner steel box body is installed on the both side plates and the lower flange so that the infiltration water can be prevented and the structural safety can be sufficiently ensured.

According to the present invention, since the double synthetic steel box girder can control the clearance between the lower concrete and the concrete due to drying and shrinking of the concrete by the center free end, it is possible to more effectively prevent the corrosion of the steel due to penetration of permeate water. It becomes very advantageous.

In addition, in the compression flange (lower flange), the conventional longitudinal rib and the transverse rib are used in place of the conventional shear joint for compressing, so that the composite performance of the lower concrete and the slab concrete can be ensured, It is possible to simplify the manufacture of the box girder, thereby reducing the amount of steel material required and reducing the area of color coating, thereby remarkably reducing the manufacturing cost of the entire double composite steel box girder, It is possible to secure the resistance against the bending moment and thus it is possible to construct a double synthetic steel box girder which is structurally very efficient.

In addition, it is possible to more effectively reinforce the lower flange, which is the compression flange, through the compressive stress stiffener at the center free end, which is advantageous for reducing the weight and reinforcing the flexure.

FIG. 1A is a cross-sectional view of a conventional double composite steel box girder,
Fig. 1B is a diagram showing the drying shrinkage and shearing delay action of a conventional double synthetic steel box girder,
FIG. 1C is an inductive drainage structure in a joint connection portion of a conventional concrete member (underground continuous wall)
Figure 2 is a functional diagram of the central free end of the present invention,
FIGS. 3A, 3B and 3C are cross-sectional exemplary views of a double composite steel box girder in which a central lower portion concrete is excluded,
FIGS. 4, 5, and 6 are views showing the construction of a double composite steel box girder without a central lower portion concrete according to the present invention.

Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings, which will be readily apparent to those skilled in the art. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In order to clearly illustrate the present invention, parts not related to the description are omitted, and similar parts are denoted by like reference characters throughout the specification.

Throughout the specification, when an element is referred to as "comprising ", it means that it can include other elements as well, without excluding other elements unless specifically stated otherwise.

[Operation of the central free end 130 of the present invention]

Figure 2 illustrates the operation of the central free end 130 of the present invention.

It can be seen that the double synthetic steel box girder 100 without the central lower portion concrete is composed of the lower flange 110 and the double sheath 120 as the opening form steel box girder, Is formed integrally on the upper surface of the lower flange 110 and on the inner side surface of the bipod 120.

At this time, it can be seen that the portion (shear edge portion) which does not contribute to the section rigidity and acts as an unnecessary load is formed as a hollow space in the present invention.

Therefore, when the drying and shrinking of the lower concrete 150 occurs, the central free end 130 absorbs the shrinkage of the lower concrete because it is an empty space, so that a gap is not generated between the upper and lower portions of the lower concrete . This central free end is about 10% of the bottom flange width.

[Double composite steel box girder (100) with central free end of the present invention]

FIGS. 3A, 3B and 3C show exemplary views of a double composite steel box girder 100 having a center free end according to the present invention.

3A, the double composite steel box girder 100 excluding the center portion lower concrete includes a lower flange 110, a double portion 120, a center free end 130, a compression shear connection member 140, a lower concrete (150), a compressive stress stiffener (160), and a penetration prevention plate (170).

At this time, it can be seen that the double skin portion 120 is formed to be sloped upward to the right side on both side upper and upper surfaces of the lower flange 110, and the slab 200 is formed on the upper surface of the double skin portion 120.

It can be seen that the lower flange 110 forms a lower concrete 150 as a compression flange at the fulcrum P and has a central free end 130 formed therein, It can be seen that the structural integrity is secured between the lower flange 110 and the double leg portion 120 by the shear connection member 140.

Specifically, the lower flange 110 is formed of a steel plate in the form of a horizontal plate as shown in FIG.

The bipod 120 is formed of a steel plate in the form of a vertical plate extending upwardly and upwardly on both end surfaces of the lower flange 110.

The compression shear connection member 140 is installed to replace the longitudinal composite ribbons of the double composite steel box girder and to improve the composite performance of the double composite steel box girder and to replace longitudinal / transverse ribs. Respectively.

That is, since the lower flange 110 is disposed at the fulcrum P, which is the same as the pier when the double composite steel box girder is constructed, the lower flange 110 becomes a compression flange due to the bending moment.

In order to effectively resist the lower flange 110, the lower concrete 150 is formed to have a predetermined thickness on the upper surface of the lower flange 110 and the lower concrete 150 and the lower flange 110 are attached to each other So that the compression shear connection member 140 is formed.

At this time, the compressive shear connector 140 is also used as a reinforcing material for replacing the longitudinal ribs to resist buckling or twisting due to the bending moment in the lower flange 110 corresponding to the compression flange.

For this purpose, the compression shear connection members 140 are installed at positions where the longitudinal ribs are installed so as to be spaced apart from each other in the longitudinal direction by a point spacing, and the compression shear connection members 140 are also dispersed in the lateral direction.

Accordingly, the compressive shear connector 140 of the present invention is installed in order to secure the composite ability of the longitudinal ribs, the transverse ribs, and the lower concrete 150 of the conventional compression flange by their longitudinal and transverse arrangements. .

The lower concrete 150 is a portion formed to resist compressive stress due to the momentum when the double composite steel box girder is mounted at the point portion (alternation, bridge). The steel box girder in which the lower concrete 150 and the slab concrete are doubly formed at the fulcrums is called a double composite steel box girder.

The lower concrete 150 is formed in a predetermined thickness on the upper surface of the lower flange, Has a constant length in the longitudinal direction (longitudinal direction of the steel box girder) and is formed to have an extension length which is generally larger than the length of the longitudinal portion in the longitudinal direction.

Therefore, the lower concrete, the lower flange, and the sheep portion are merely synthesized integrally with each other by the compression shear connection member 140. Even if the quality control is possible, a gap may be formed. If the penetration water penetrates into such a gap, .

Accordingly, it can be seen that the central free end 130 is formed in the center portion of the lower concrete 150 so as to extend in the longitudinal direction as an empty space (corresponding to the extending length of the lower concrete longitudinal direction).

2, the lower concrete 150 is separated into left and right portions by the central free end 130 to absorb the shrinkage of the lower concrete 150 due to drying shrinkage.

It is noted that a compression stress stiffener 160 including a rod having a T-shaped section is further formed on the upper surface of the lower flange 110 of the central free end 130.

That is, the lower flange 110 is able to withstand the compressive stresses due to the momentum with the compressive shear connectors 140 and the compressive stress stiffener 160 including the rod of the T-shaped cross-section. Thus, in the present invention, a plurality of compressive stress stiffeners 160 are vertically spaced apart from each other in the longitudinal direction of the lower concrete to ensure sufficient structural safety.

In addition, it can be seen that the infiltration prevention plate 170 for preventing infiltration of infiltration water is further formed on both side upper surfaces of the lower concrete 150 contacting with the double skin portion 120.

Thus, the present invention prevents the gap between the lower and upper portions of the lower concrete 150 due to drying and shrinking of the lower concrete 150, and even if the infiltration water penetrates from the abdomen, it can be blocked by the infiltration preventing plate 170, The water is drained through the center free end 130, and the penetration water in the lower concrete is prevented from moving, so that the occurrence of condensation can be controlled as much as possible.

The penetration prevention plate 170 may be formed of a steel strip extending in a predetermined length from the both sides and formed continuously in correspondence with the extension length of the lower concrete and fixed by welding.

Next, the dual synthetic steel box girder 100 according to FIG. 3b differs in shape from the central free end 130 in comparison with FIG. 3A. In other words, the center free end 130 is formed upward from the upper surface of the lower flange, and is formed in the form of a broken groove. The upper and lower flanges 110 are formed on both upper and lower surfaces of the upper and lower flanges 110, And the slab 200 is formed on the upper surface of the double-sided portion 120.

3b, the double composite steel box girder 100 without the central lower portion concrete is formed of the lower flange 110, the double sheath 120, the center free end 130, the compression shear connection member 140, (150), a compressive stress stiffener (160), and a penetration prevention plate (170).

Specifically, the lower flange 110 is formed of a steel plate in the form of a horizontal plate.

The bipod 120 is also formed as a steel plate in the form of a vertical plate extending upwardly and upwardly on the both side end faces of the lower flange 110.

The compression shear connection member 140 is also installed to replace the longitudinally / transversely extending ribs and improve the composite performance with the lower concrete of the double synthetic steel box girder. The shear connection member 140 is located on the upper side of the lower flange or on the inner side of the lower concrete .

That is, since the lower flange 110 is disposed at the fulcrum P, which is the same as the pier when the double composite steel box girder is constructed, the lower flange 110 becomes a compression flange due to the bending moment.

In order to effectively resist the lower flange 110, the lower concrete 150 is formed to have a predetermined thickness on the upper surface of the lower flange 110 and the lower concrete 150 and the lower flange 110 are attached to each other So that the compression shear connection member 140 is formed.

At this time, the compressive shear connector 140 is also used as a reinforcing material for replacing the longitudinal ribs to resist buckling or twisting due to the bending moment in the lower flange 110 corresponding to the compression flange.

For this purpose, the compression shear connection members 140 are installed at positions where the longitudinal ribs are installed so as to be spaced apart from each other in the longitudinal direction by a point spacing, and the compression shear connection members 140 are also dispersed in the lateral direction.

Accordingly, the compressive shear connector 140 of the present invention is installed in order to secure the composite ability of the longitudinal ribs, the transverse ribs, and the lower concrete 150 of the conventional compression flange by their longitudinal and transverse arrangements. .

The lower concrete 150 is a portion formed to resist compressive stress due to the momentum when the double composite steel box girder is mounted at a fulcrum portion (alternation, bridge). The steel box girder in which the lower concrete 150 and the slab concrete are doubly formed at the fulcrums is called a double composite steel box girder.

The lower concrete 150 is formed in a predetermined thickness on the upper surface of the lower flange, Has a constant length in the longitudinal direction (longitudinal direction of the steel box girder) and is formed to have an extension length which is generally larger than the length of the longitudinal portion in the longitudinal direction.

Therefore, the lower concrete, the lower flange, and the sheep portion are merely synthesized integrally with each other by the compression shear connection member 140. Even if the quality control is possible, a gap may be formed. If the penetration water penetrates into such a gap, .

Accordingly, it can be seen that the central free end 130 of the lower concrete 150 is formed in the form of a recessed groove. As compared with FIG. 3A, the lower concrete 150 may be connected to each other without being separated from each other. The crushed grooves may be U-shaped to absorb shrinkage of the lower concrete 150 due to drying shrinkage same.

It can be seen that a compression stress stiffener 160 including a rod having a T-shaped cross section is further embedded in the lower lower flange 110 of the central free end 130.

That is, the lower flange 110 is also able to withstand the compressive stresses due to the momentum with the compressive shear connectors 140 and the compressive stress stiffener 160 including the rod of the T-shaped cross-section.

Thus, the compressive stress stiffener 160 is formed so as to be embedded in the lower flange 150 in the space formed by the crushed grooves on the upper surface of the lower portion of the lower concrete, so that the structural safety can be sufficiently ensured.

In addition, it can be seen that an infiltration prevention plate 170 for preventing infiltration of infiltration water is further formed on both side upper surfaces of the lower concrete 150 in contact with the inflatable portion 120.

Thus, the present invention prevents the gap between the lower and upper portions of the lower concrete 150 due to drying and shrinking of the lower concrete 150, and even if the infiltration water penetrates from the abdomen, it can be blocked by the infiltration preventing plate 170, The water is drained through the center free end 130 of the hollowed-out groove, and the penetration water in the lower concrete is not moved, so that the occurrence of condensation can be controlled as much as possible.

In this case, the central free end 130 is formed on the upper surface of the compression-use shear connection member 140 in the form of a recessed groove. So that the bottom surface of the central free end 130 is easily finished and is advantageous for the construction of the free end 130.

Next, the double composite steel box girder 100 according to FIG. 3C differs from the method of forming the center free end 130 and the lower concrete 150 in comparison with FIGS. 3A and 3B. That is, the center free end 130 may be formed of an inner steel box body 180 formed to fill the lower concrete 150, and the upper and lower flanges 110 may have upper and lower flanks 110, And the slab 200 is formed on the upper surface of the double-stitched portion 120. As shown in FIG.

Referring to FIG. 3C, the double synthetic steel box girder 100 without the central portion lower concrete is formed of the lower flange 110, the double sheath 120, the center free end 130, the compression shear connecting member 140, (150), and an inner steel box body (180).

Specifically, the lower flange 110 is formed of a steel plate in the form of a horizontal plate.

The bipod 120 is also formed as a steel plate in the form of a vertical plate extending upwardly and upwardly on the both side end faces of the lower flange 110.

The compression shear connection member 140 is also installed to replace the longitudinally / transversely extending ribs and improve the composite performance with the lower concrete of the double synthetic steel box girder. The shear connection member 140 is located on the upper side of the lower flange or on the inner side of the lower concrete .

That is, since the lower flange 110 is disposed at the fulcrum P, which is the same as the pier when the double synthetic steel box girder is constructed, the lower flange 110 is a compression flange due to the bending moment.

In order to effectively resist the lower flange 110, the lower concrete 150 is formed to have a predetermined thickness on the upper surface of the lower flange 110 and the lower concrete 150 and the lower flange 110 are attached to each other So that the compression shear connection member 140 is formed.

At this time, the compressive shear connector 140 is also used as a reinforcing material for replacing the longitudinal ribs to resist buckling or twisting due to the bending moment in the lower flange 110 corresponding to the compression flange.

For this purpose, the compression shear connection members 140 are installed at positions where the longitudinal ribs are installed so as to be spaced apart from each other in the longitudinal direction by a point spacing, and the compression shear connection members 140 are also dispersed in the lateral direction.

Accordingly, the compressive shear connector 140 of the present invention is installed in order to secure the composite ability of the longitudinal ribs, the transverse ribs, and the lower concrete 150 of the conventional compression flange by their longitudinal and transverse arrangements. .

The lower concrete 150 is a portion formed to resist compressive stress due to the momentum when the double composite steel box girder is mounted at a fulcrum portion (alternation, bridge). The steel box girder in which the lower concrete 150 and the slab concrete are doubly formed at the fulcrums is called a double composite steel box girder.

The lower concrete 150 is formed in a predetermined thickness on the upper surface of the lower flange, Has a constant length in the longitudinal direction (longitudinal direction of the steel box girder) and is formed to have an extension length which is generally larger than the length of the longitudinal portion in the longitudinal direction.

Therefore, the lower concrete, the lower flange, and the sheep portion are merely synthesized integrally with each other by the compression shear connection member 140. Even if the quality control is possible, a gap may be formed. If the penetration water penetrates into such a gap, .

In particular, the lower concrete 150 according to the present invention is manufactured by forming the inner steel box body 180 in the form of a lower concrete and forming it in the lower flange and the both abdomen portions by an injection hole formed in the inner steel box body 180 So that the lower concrete 150 is formed by injecting concrete.

Accordingly, it can be seen that the central free end 130 is formed as a hollow space at the center of the upper surface of the lower flange. Accordingly, it can be seen that the lower concrete 150 is separated from each other by the inner steel box body 180 and the shrinkage of the lower concrete 150 due to the drying shrinkage can be absorbed. That is, since the drying shrinkage of the lower concrete occurs in the direction of both the abdomen, the lower concrete contact surface can be slightly separated from the vertical plate 181.

3C, a compressive stress stiffener having a T-shaped cross section is not formed in the lower lower flange 110 of the central free end 130. This is because the vertical plate 182 of the inner steel box body 180 has a T- As a compressive stress stiffener 160 comprising a rod-shaped form.

That is, the lower flange 110 wrapped and constrained by the inner steel box body 180 can also withstand the compressive stress due to the momentum together with the compression shear coupling member 140. Thus, the present invention can form the inner steel box body 180 on both sides of the center free end 130 to ensure sufficient structural safety.

Accordingly, it can be seen that the inner steel box body 180 is formed in the form of a rectangular box body filled with the lower concrete 150 therein.

The inner steel box body 180 includes a vertical plate 182 and an upper horizontal plate 181. The upper and lower horizontal plates 182 are disposed on opposite sides of the lower concrete 150, And the upper surface serves as a role of preventing infiltration of infiltration water (serving as a penetration preventing plate).

Thus, the present invention prevents the gap between the lower concrete 150 and the abdomen due to drying shrinkage of the lower concrete 150, and even if penetration water penetrates from the abdomen, it can be blocked by the inner steel box body 180, The water is drained through the free end 130 in the form of an empty space and the infiltration water in the lower concrete is prevented from moving so that the occurrence of condensation can be controlled as much as possible.

This is a case in which the structural safety can be ensured more than in Figs. 3A and 3B while absorbing the drying shrinkage of the lower concrete, and the lower concrete is restrained by the inner steel box body 180 to further secure the structural safety It can be said that it is possible.

[Method of constructing a dual synthetic steel box girder with a free free end of the present invention]

FIGS. 4, 5 and 6 illustrate a method of constructing a dual synthetic steel box girder with a central free end according to the present invention, which comprises a double synthetic steel box girder with a central free end according to FIGS. 3a, 3b, It is about the construction method.

First, as shown in FIG. 4, a double synthetic steel box girder 100 having a center free end according to the present invention as shown in FIG. 3A is manufactured in a factory.

In the factory constructed double composite steel box girder 100, the lower concrete 150 is formed on the upper surface of the lower flange located at the fulcrum P,

A compression front shear connection 140 is formed in the lower flange 110 of the fulcrum portion P corresponding to both the lower and compression flanges and serves as a longitudinal and transverse rib for the lower flange, It is possible to effectively contribute to the integration by the synthesis of the concrete 150 and to absorb the drying shrinkage.

The lower flange 110 is able to withstand the compressive stresses due to the momentum with the compressive shear connectors 140 and the compressive stress stiffener 160 including the rod shape of the T-shaped cross section, It is possible to absorb infiltration water drainage and drying shrinkage by the free end 130 and to prevent infiltration of infiltration water through the infiltration prevention plate 170.

The lower concrete 110 having the lower flange 110, the double sheath 120, the center free end 130 in the form of an empty space, the shear connecting member 140 for compressing, the lower concrete 150 and the penetration preventing plate 170 150 and a compressive stress stiffener 160 including a T-shaped cross-section rod form is incorporated into the double composite steel box girder 100 such that the lower concrete 150 is positioned on the fulcrum P, The composite steel box girder 100 is mounted.

At this time, the steel box girder 100b in which the lower concrete 150 is not formed is also manufactured. It is mounted at a position other than the focal point. Next, it can be seen that the slab concrete (C) is installed to complete the high construction so that the slab (200) is formed on the upper part of the final double synthetic steel box girder.

Next, the description will be made with reference to a double synthetic steel box girder having a center free end according to FIG. 3b.

That is, as shown in FIG. 5, a double synthetic steel box girder 100 having a free free end of the present invention is manufactured at a factory.

In the factory constructed double composite steel box girder 100, the lower concrete 150 is formed on the upper surface of the lower flange located at the fulcrum P,

A compression front end coupling member 140 is formed in the lower flange 110 corresponding to the lower portion of the fulcrum portion and the compression flange at the fulcrum portion P so as to serve as longitudinal and transverse ribs in the lower flange, It is possible to effectively contribute to the unification by the synthesis of the compound (150) and to absorb the drying shrinkage.

The lower flange 110 is thus able to withstand the compressive stresses caused by the momentum along with the compressive shear connectors 140 and the compressive stress stiffener 160 including the T-shaped cross-section rod, It is possible to absorb infiltration water drainage and drying shrinkage by the free end 130 and to prevent infiltration of infiltration water through the infiltration prevention plate 170.

The lower concrete 110 having the lower flange 110, the double sheath 120, the center free end 130 in the form of a ripped groove, the shear connection member 140 for compression, the lower concrete 150, The double synthetic steel box girder 100 with the reinforced concrete 150 and the compressive stress stiffener 160 including the T-shaped section rods is brought into the site and the double concrete 150 is placed on the fulcrum P, The composite steel box girder 100 is mounted.

At this time, the steel box girder 100b in which the lower concrete 150 is not formed is also manufactured. It is mounted at a position other than the focal point. Next, it is understood that the slab concrete (C) is installed and the slab (200) is formed on the upper part of the final double synthetic steel box girder to complete the construction.

Next, the double synthetic steel box girder 100 having the center free end according to FIG. 3c will be described.

6, a double synthetic steel box girder 100 having a center free end of the present invention is manufactured at a factory.

In the factory constructed double composite steel box girder 100, the lower concrete 150 is formed on the upper surface of the lower flange located at the fulcrum P by the inner steel box body 180,

A compression front end coupling member 140 is formed in the lower flange 110 corresponding to the lower portion of the bending portion 120 and the compression flange at the fulcrum portion P so as to form longitudinal and transverse ribs And the lower concrete 150, thereby making it possible to absorb drying shrinkage.

The lower flange 110 is disposed inside the inner steel box body 180 with a compressive stress stiffener 160 including a constrained lower concrete 150, a compression shear connection member 140 and a rod having a T- So that it can absorb the permeate water drainage and drying shrinkage due to the hollow free end 130 in the form of an empty space and is capable of absorbing the drying shrinkage by the vertical plate of the inner steel box body 180 and the upper horizontal plate The penetration water penetration prevention effect can be obtained.

The lower flange 110, the double sheath 120, the center free end 130 in the form of an empty space, the shear connection member 140 for compression, the lower concrete 150, The double composite steel box girder 100 having the lower concrete 150 is brought into the site and the double composite steel box girder 100 is placed so that the lower concrete 150 is positioned at the fulcrum P. At this time, the steel box girder 100b in which the lower concrete 150 is not formed is also manufactured. It is mounted at a position other than the focal point. Next, the slab concrete (C) is installed to form the slab (200) on the upper part of the final double composite steel box girder.

It will be understood by those skilled in the art that the foregoing description of the present invention is for illustrative purposes only and that those of ordinary skill in the art can readily understand that various changes and modifications may be made without departing from the spirit or essential characteristics of the present invention. will be. It is therefore to be understood that the above-described embodiments are illustrative in all aspects and not restrictive. For example, each component described as a single entity may be distributed and implemented, and components described as being distributed may also be implemented in a combined form.

The scope of the present invention is defined by the appended claims rather than the detailed description and all changes or modifications derived from the meaning and scope of the claims and their equivalents are to be construed as being included within the scope of the present invention do.

100: Double composite steel box girder
110: Lower flange
120: Sheep abdomen
130: central free end
140: Shear connector for compression
150: Lower concrete
160: Compressive stress stiffener
170: penetration prevention plate
200: Slab

Claims (18)

A double composite steel box girder comprising a lower flange and an abdomen, wherein a lower concrete is formed integrally with a lower flange at a fulcrum portion,
The lower concrete 150 has a center free end formed on the basis of the lateral width of the lower flange where the shear pendant generates the greatest amount so as to absorb the shrinkage caused by the drying shrinkage of the concrete, The gap between the upper and lower abdomen is not caused by drying shrinkage,
The lower concrete 150 is separated from each other by a central free end 130 in the form of an empty space formed at a central portion of the lower flange and integrally formed with the lower flange and the lower shear joint member 140 Lt; / RTI &
A double synthetic steel box having a central free end for forming a penetration preventing plate 170 in the form of a horizontal plate for preventing infiltration of infiltration water is formed on both upper side surfaces of the lower concrete 150 contacting with the double- Girder.
delete The method according to claim 1,
The center free end (130) is provided with a central free end for forming a compressive stress stiffener (160) including a bar of T-shaped cross section on the upper surface of the lower flange.
delete The method according to claim 1,
The compression front shear connection member (140) is provided with a central free end spaced apart from each other at positions where longitudinal ribs and transverse ribs are installed to replace longitudinal ribs and transverse ribs.
A double composite steel box girder comprising a lower flange and an abdomen, wherein a lower concrete is formed integrally with a lower flange at a fulcrum portion,
The lower concrete 150 has a center free end formed on the basis of the lateral width of the lower flange where the shear pendant generates the greatest amount so as to absorb the shrinkage caused by the drying shrinkage of the concrete, The gap between the upper and lower abdomen is not caused by drying shrinkage,
The lower concrete 150 has a central free end 130 in the form of a recessed groove on the upper surface of the lower concrete corresponding to the upper portion of the upper flange upper surface, And is integrally formed,
A double synthetic steel box having a central free end for forming a penetration preventing plate 170 in the form of a horizontal plate for preventing infiltration of infiltration water is formed on both upper side surfaces of the lower concrete 150 contacting with the double- Girder.
The method according to claim 6,
And a central free end is formed at a lower portion of the central free end 130 to form a compressive stress stiffener 160 including a rod having a T-shaped cross section on the upper surface of the lower flange.
delete The method according to claim 6,
The compression front shear connection member 140 has a central free end formed as a spacing member spaced apart from each other at positions where longitudinal and transverse ribs are installed so as to replace the longitudinal ribs and the transverse ribs.
A double composite steel box girder comprising a lower flange and an abdomen, wherein a lower concrete is formed integrally with a lower flange at a fulcrum portion,
The lower concrete 150 has a center free end formed on the basis of the lateral width of the lower flange where the shear pendant generates the greatest amount so as to absorb the shrinkage caused by the drying shrinkage of the concrete, The gap between the upper and lower abdomen is not caused by drying shrinkage,
The lower concrete 150 is separated from each other by a central free end 130 in the form of an empty space formed at a central portion of a lower flange and is connected to an opposite vertical plate 182 formed on the upper surface of the upper flange, And a pair of upper horizontal plates 181 extending from the inner side of the vertical portion of the vertical plate 181 and connected to the upper end of the vertical plate 181. The lower flange and the shear connection member 140) having a central free end formed integrally therewith.
delete 11. The method of claim 10,
The compression front shear connection member (140) is provided with a central free end spaced apart from each other at positions where longitudinal ribs and transverse ribs are installed to replace longitudinal ribs and transverse ribs.
A method of constructing a dual synthetic steel box girder comprising a lower flange and a double sheath, wherein the lower concrete is formed integrally with the lower flange at the fulcrum portion,
(a) A steel box girder having a lower concrete located at a fulcrum of a factory is manufactured. The lower concrete (150) has a lateral direction of a lower flange in which a shear ply is most largely generated to absorb shrinkage due to concrete drying shrinkage So that a clearance between the upper ends of the upper and lower portions of the lower concrete is not generated by the drying shrinkage;
(b) loading the double composite steel box girder (100) with the lower concrete (150) into the site and placing the lower concrete (150) at the fulcrum portion; And
(c) placing slab concrete on the top of the double bottom portion of the dual synthetic steel box girder 100 to integrate the double composite steel box girder 100 with the slab,
The lower concrete 150 in the step (a) is formed separately from the central free end 130 in the form of an empty space formed at the center of the upper flange, ),
A double synthetic steel box having a central free end for forming a penetration preventing plate 170 in the form of a horizontal plate for preventing infiltration of infiltration water is formed on both upper side surfaces of the lower concrete 150 contacting with the double- Girder construction method.
delete A method of constructing a dual synthetic steel box girder comprising a lower flange and a double sheath, wherein the lower concrete is formed integrally with the lower flange at the fulcrum portion,
(a) A steel box girder having a lower concrete located at a fulcrum of a factory is manufactured. The lower concrete (150) has a lateral direction of a lower flange in which a shear ply is most largely generated to absorb shrinkage due to concrete drying shrinkage So that a clearance between the upper ends of the upper and lower portions of the lower concrete is not generated by the drying shrinkage;
(b) loading the double composite steel box girder (100) with the lower concrete (150) into the site and placing the lower concrete (150) at the fulcrum portion; And
(c) placing slab concrete on the top of the double bottom portion of the dual synthetic steel box girder 100 to integrate the double composite steel box girder 100 with the slab,
The lower concrete 150 in the step (a) has a central free end 130 in the form of a recessed groove in the upper surface of the lower concrete corresponding to the upper part of the upper surface of the lower flange, (140)
A double synthetic steel box having a central free end for forming a penetration preventing plate 170 in the form of a horizontal plate for preventing infiltration of infiltration water is formed on both upper side surfaces of the lower concrete 150 contacting with the double- Girder construction method.
A method of constructing a dual synthetic steel box girder comprising a lower flange and a double sheath, wherein the lower concrete is formed integrally with the lower flange at the fulcrum portion,
(a) A steel box girder having a lower concrete located at a fulcrum of a factory is manufactured. The lower concrete (150) has a lateral direction of a lower flange in which a shear ply is most largely generated to absorb shrinkage due to concrete drying shrinkage So that a clearance between the upper ends of the upper and lower portions of the lower concrete is not generated by the drying shrinkage;
(b) loading the double composite steel box girder (100) with the lower concrete (150) into the site and placing the lower concrete (150) at the fulcrum portion; And
(c) placing slab concrete on the top of the double bottom portion of the dual synthetic steel box girder 100 to integrate the double composite steel box girder 100 with the slab,
The lower concrete 150 in the step (a) is separated from each other by the central free end 130 in the form of an empty space formed at the center of the upper flange, And is formed inside the inner steel box body 180 including the vertical plate 182 and the upper upper horizontal plate 181 extending from the inner side of the upper portion of the vertical plate and connected to the upper end of the vertical plate, A method of constructing a dual synthetic steel box girder having a central free end formed with a central free end integrally formed by a compression shear connection member (140).
17. A method according to any one of claims 13, 15 or 16,
Wherein the dual synthetic steel box girder of step (a) is formed of an open form without an upper flange.
17. A method according to any one of claims 13, 15 or 16,
The method of claim 1, wherein the compressive shear connectors (140) have a central free end spaced apart from each other at locations where the longitudinal ribs and the transverse ribs are installed to replace longitudinal ribs and transverse ribs.

KR1020160012181A 2016-02-01 2016-02-01 Double composite box girder with free concrete shrinkage and the construction method therefor KR101659572B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160012181A KR101659572B1 (en) 2016-02-01 2016-02-01 Double composite box girder with free concrete shrinkage and the construction method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160012181A KR101659572B1 (en) 2016-02-01 2016-02-01 Double composite box girder with free concrete shrinkage and the construction method therefor

Publications (1)

Publication Number Publication Date
KR101659572B1 true KR101659572B1 (en) 2016-09-26

Family

ID=57068332

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160012181A KR101659572B1 (en) 2016-02-01 2016-02-01 Double composite box girder with free concrete shrinkage and the construction method therefor

Country Status (1)

Country Link
KR (1) KR101659572B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101993602B1 (en) * 2018-11-19 2019-06-27 에스오씨기술지주 주식회사 Steel girder formwork structure and reinforcement structure of steel girder parent part
KR102068307B1 (en) 2019-08-22 2020-01-20 주식회사 더빔에스아이 Double composite steel box girder using t-conner reinforcing member and construction method therewith
KR102173788B1 (en) 2020-05-08 2020-11-04 주식회사 더빔에스아이 Double composite box girder with gradual stiffness reduction, and construction method thereof
KR102249354B1 (en) * 2020-10-05 2021-05-07 주식회사 서린브릿지텍 Double composite box girder with separate pouring bottom concrete structure and the construction method therefor
CN114575234A (en) * 2022-04-12 2022-06-03 中建路桥集团有限公司 Cast-in-place box girder and bridge structure applying same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100938572B1 (en) * 2009-05-29 2010-01-26 산이건설 주식회사 Steel box girder with differential strength
KR100970247B1 (en) * 2008-04-21 2010-07-16 동국대학교 산학협력단 Compressed flange structure of composite-steel box girder
KR101084397B1 (en) * 2011-06-09 2011-11-18 주식회사 인터컨스텍 A composite steel box girder using precast concrete for continuous bridges and thereof manufacturing method
KR101476290B1 (en) * 2014-05-09 2014-12-24 우경기술주식회사 Steel composite PSC corrugated steel plate U girder

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100970247B1 (en) * 2008-04-21 2010-07-16 동국대학교 산학협력단 Compressed flange structure of composite-steel box girder
KR100938572B1 (en) * 2009-05-29 2010-01-26 산이건설 주식회사 Steel box girder with differential strength
KR101084397B1 (en) * 2011-06-09 2011-11-18 주식회사 인터컨스텍 A composite steel box girder using precast concrete for continuous bridges and thereof manufacturing method
KR101476290B1 (en) * 2014-05-09 2014-12-24 우경기술주식회사 Steel composite PSC corrugated steel plate U girder

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101993602B1 (en) * 2018-11-19 2019-06-27 에스오씨기술지주 주식회사 Steel girder formwork structure and reinforcement structure of steel girder parent part
KR102068307B1 (en) 2019-08-22 2020-01-20 주식회사 더빔에스아이 Double composite steel box girder using t-conner reinforcing member and construction method therewith
KR102173788B1 (en) 2020-05-08 2020-11-04 주식회사 더빔에스아이 Double composite box girder with gradual stiffness reduction, and construction method thereof
KR102249354B1 (en) * 2020-10-05 2021-05-07 주식회사 서린브릿지텍 Double composite box girder with separate pouring bottom concrete structure and the construction method therefor
CN114575234A (en) * 2022-04-12 2022-06-03 中建路桥集团有限公司 Cast-in-place box girder and bridge structure applying same

Similar Documents

Publication Publication Date Title
KR101659572B1 (en) Double composite box girder with free concrete shrinkage and the construction method therefor
US6807789B1 (en) Steel-concrete composite beam using asymmetric section steel beam
AU2007206065B2 (en) Hybrid composite beam system
KR100947306B1 (en) Composite bridge structure with concrete shear connector and construction method of the same
KR101499343B1 (en) Closed Built-up Beam, Hybrid Composite Beam and Strucutures using the same
KR101318773B1 (en) T-shaped composite girder segment integrated by i-shaped girder filled with concrete and slab and construction method of slab by prefabrication of the t-shaped composite girder segment
KR100761785B1 (en) Mold-concrete composite crossbeam
KR101661644B1 (en) Girder using precast slab connection block and precast slab construction method therewith
CN205712204U (en) A kind of multiple waterstop and waterproof construction thereof
KR101160763B1 (en) Composite beam using deck plate having plulality of cap plate
KR101458875B1 (en) Slim Floor System Using Built-up Type Steel Beam Made of Plate and Box-pipe
KR102249354B1 (en) Double composite box girder with separate pouring bottom concrete structure and the construction method therefor
KR101191545B1 (en) Deck plate having plulality of cap plate
KR101921024B1 (en) Perfobond Rib Supplemented with Steel Tube
CN105780924A (en) I-shaped steel and concrete combined structural member
KR20130090453A (en) Reinforcement member and girder using the same
CN105951997B (en) Greatly across the double slope concrete frames of prestressing force
KR101033107B1 (en) Composite bridge combined with combined slab and girder
KR101688440B1 (en) Reinforcement Member for Beam, Beam Equipped with the Reinforcement Member, Construction Structure Using the Beam
KR101376517B1 (en) Integrated Wall-Concrete Slab for Bridge and Structure of Concrete Slab for Bridge
KR100980797B1 (en) Structure reinfocing method using hybrid reinforced member
KR100554533B1 (en) Construction method for rhamen type hybrid bridge using the post rigid system
JP6579902B2 (en) Tunnel reinforcement structure
KR102643900B1 (en) Composite ramen bridge with slab structure using hollow pipes and fiber-reinforced square beams and its construction method
KR102068307B1 (en) Double composite steel box girder using t-conner reinforcing member and construction method therewith

Legal Events

Date Code Title Description
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20190722

Year of fee payment: 4