KR101654655B1 - Retaining nature-rock wall and building method thereof - Google Patents

Retaining nature-rock wall and building method thereof Download PDF

Info

Publication number
KR101654655B1
KR101654655B1 KR1020140075569A KR20140075569A KR101654655B1 KR 101654655 B1 KR101654655 B1 KR 101654655B1 KR 1020140075569 A KR1020140075569 A KR 1020140075569A KR 20140075569 A KR20140075569 A KR 20140075569A KR 101654655 B1 KR101654655 B1 KR 101654655B1
Authority
KR
South Korea
Prior art keywords
stone
predetermined number
ornamental
stones
decorative
Prior art date
Application number
KR1020140075569A
Other languages
Korean (ko)
Other versions
KR20150145962A (en
Inventor
이대승
Original Assignee
양지개발 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 양지개발 주식회사 filed Critical 양지개발 주식회사
Priority to KR1020140075569A priority Critical patent/KR101654655B1/en
Publication of KR20150145962A publication Critical patent/KR20150145962A/en
Application granted granted Critical
Publication of KR101654655B1 publication Critical patent/KR101654655B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Revetment (AREA)
  • Retaining Walls (AREA)

Abstract

본 발명은 주변 환경과 조화를 이룰 수 있는 친환경 구조로서 자연석에 가까운 외관을 구비하여 친환경적인 석축 구조물을 축조할 수 있도록 하는 뒷돌 고정식 석축 구조물 및 그 시공 방법을 제공하는 것을 목적으로 한다.
상기 목적을 달성하기 위해, 본 발명에 따른 뒷돌 고정식 석축 구조물의 시공 방법은, 일정 개수의 제 1 장식석과 제 1 배수관으로 둘러싸인 일정 개수의 수직 정착물이 놓일 지반에 기초 콘크리트를 타설하되 일정 개수의 상기 제 1 장식석 및 일정 개수의 상기 수직 정착물의 하부가 상기 기초 콘크리트에 매입되도록 하는 제 1 단계(S100)와, 상기 기초 콘크리트의 상에 일정 개수의 배수로를 거치시키고, 상기 제 1 장식석의 후면에 설치된 제 1 세트 앵커와 상기 수직 정착물 사이를 제 1 철근으로 연결하며, 복수의 제 2 배수관의 하부가 상기 배수로에 안내되도록 상기 제 2 배수관을 세워서 거치시키고, 제 1 토사로 상기 제 1 장식석의 후방을 채워 다지는 제 2 단계(S200)와, 상기 제 1 토사 상면에 일정 개수의 제 2 장식석의 하부 및 일정 개수의 상기 제 1 장식석의 상부가 각각 겹치는 부위를 결합하고, 상기 제 2 장식석의 후면에 설치된 제 2 세트 앵커와 상기 수직 정착물 사이를 제 2 철근으로 연결하며, 제 2 토사로 상기 제 2 장식석의 후방의 일부를 채워 다지는 제 3 단계(S300)와, 상기 제 2 토사 상면에 일정 개수의 제 3 배수관이 상기 제 1 배수관과 십자(+)로 교차하여 연결되도록 뉘여서 거치시키고, 상기 제 2 토사의 상부를 제 3 토사로 채워 다지는 제 4 단계(S400)를 포함한다.
An object of the present invention is to provide a back-and-forth type stone-like structure and an installation method thereof, which are eco-friendly structures that can be harmonized with the surrounding environment and have an appearance close to a natural stone so as to construct an environmentally friendly stone-like structure.
In order to achieve the above object, a method of constructing a back-stone-fixed stone structure according to the present invention is characterized in that a foundation concrete is laid on a foundation where a certain number of vertical fixtures surrounded by a certain number of first ornamental stones and a first drain pipe are to be placed, A first step (S100) for allowing the first decorative stone and a predetermined number of the vertical fixing members to be embedded in the foundation concrete; and a second step for mounting a predetermined number of drainage paths on the foundation concrete, And the second drain pipe is mounted and fixed so that a lower portion of the plurality of second drain pipes is guided to the drain pipe, and the second drain pipe is mounted on the rear side of the first decorative piece with the first gravel, A second step S200 of filling the first gravel with a predetermined number of second ornamental stones, A second set of anchors provided on the rear surface of the second ornamental stones and the vertical fixtures are connected to each other by a second reinforcing bar, and a part of the rear surface of the second ornamental stones is filled with a second soil, (S300), a predetermined number of third drain pipes are crossed and crossed with the first drain pipe on the upper surface of the second gravel, and the upper part of the second gravel is connected to the third gravel (Step S400).

Description

뒷돌 고정식 석축 구조물 및 그 시공 방법{RETAINING NATURE-ROCK WALL AND BUILDING METHOD THEREOF}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reticulated stone-

본 발명은 뒷돌 고정식 석축 구조물 및 그 시공 방법에 관한 것으로, 더욱 상세하게는 자연석에 가까운 외관을 구비하여 친환경적이면서도 구조적으로 안정된 옹벽 구조물을 시공할 수 있도록 하는 뒷돌 고정식 석축 구조물 및 그 시공 방법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a back-stone-fixed stone structure and a construction method thereof, and more particularly, to a back-stone-type stone structure and a construction method thereof, .

토목공사시 발생하는 절개지, 경사지, 암반 등의 법면은 방치할 경우 침식, 낙석, 붕괴의 위험이 있다. 따라서, 이러한 곳에는 침식이나 붕괴 등을 방지함과 동시에 주변 경관과 어울리도록 하기 위해 옹벽 구조물을 구축한다.There is a risk of erosion, rockfall, and collapse when the cut surfaces, slopes, and rocks generated during civil works are left untreated. Therefore, it is necessary to construct a retaining wall structure to prevent erosion or collapse at these places and to match with the surrounding landscape.

또한, 옹벽은 주택 부지, 노변 등에 형성된 경사지, 절토지 및 암반 등의 법면의 붕괴를 방지하기 위하여 설치되는 콘크리트 구조물이다. 통상적으로, 이러한 옹벽은 콘크리트로 구성된 블럭의 축조나 콘크리트 타설에 의해 형성된다.In addition, the retaining wall is a concrete structure installed to prevent collapse of a slope, a slope, a rock, and the like formed on a residential site, a roadside, and the like. Normally, these retaining walls are formed by building blocks made of concrete or by pouring concrete.

통상의 옹벽 구조물로는 시공의 편리함과 경제성 등을 이유로 벽돌이나 콘크리트 구조물이 널리 이용되어 왔다. 하지만 콘크리트나 벽돌로 된 옹벽 구조물은 색상이나 형태가 획일적이기 때문에 친환경적이지 않고 주변 경관을 해칠 수 있었다.Conventional retaining wall structures have been widely used for brick or concrete structures due to the convenience of construction and economical efficiency. However, retaining walls made of concrete or brick are not environmentally friendly and can harm the surrounding landscape because of their uniform color and shape.

게다가, 이러한 콘크리트 구조물인 옹벽은 유연성이 적고, 배수 불량으로 침하 또는 전도될 위험이 높음은 물론, 공사기간이 길고 생태를 파괴하고 환경을 위해하고 나아가 해체시 폐기물 발생으로 인한 자연 훼손이 심각한 문제점을 있었다.In addition, the retaining wall, which is a concrete structure, has a low flexibility, and there is a high risk of settlement or conduction due to poor drainage, a long construction period, a serious problem of destroying ecology and environmental degradation, there was.

근래에는 이러한 문제를 해소하고자 콘크리트 옹벽 구조물 대신 발파석이나 자연석을 이용하여 석축 구조물을 시공함으로써 보다 자연친화적인 환경을 조성하는 추세이다. 그러나 발파석이나 자연석을 이용하는 옹벽 구조물은 채취나 운송 등의 어려움으로 인해 시공비 상승을 초래할 수 있었고, 소망하는 크기의 자연석이나 발파석을 구하기도 힘들었다. 또한, 발파석은 길이를 길게 할 경우 그 배면에 작용하는 토사의 압력에 의해 파손될 위험도 있어 그 길이를 길게 하는데 한계가 있었다.
특허 문헌 1 한국 등록특허공보 제10-0933660호
특허 문헌 2 일본 공개특허공보 특개평10-292378호
특허 문헌 3 일본 공개특허공보 특개평10-292378호
특허 문헌 4 한국 공개특허공보 제10-2005-0012870호
In recent years, in order to solve this problem, it is a tendency to create a more environmentally friendly environment by constructing a stone structure by using a blast stone or natural stone instead of a concrete retaining wall structure. However, due to the difficulty of harvesting and transporting the retaining wall structures using blasting stones or natural stones, it was possible to increase the construction cost, and it was difficult to obtain natural stone or blasting stone of the desired size. In addition, when the length of the blasting stone is increased, there is a risk of being damaged by the pressure of the gravel applied to the back surface of the blasting stone.
Patent Document 1 Korean Patent Publication No. 10-0933660
Patent Document 2: JP-A-10-292378
Patent Document 3: JP-A-10-292378
Patent Document 4: Korean Patent Laid-Open Publication No. 10-2005-0012870

이에 본 발명은 상기한 바와 같은 종래의 제반 문제점을 해소하기 위해 제안된 것으로서, 그 목적은 주변 환경과 조화를 이룰 수 있는 친환경 구조로서 자연석에 가까운 외관을 구비하여 친환경적인 석축 구조물을 축조할 수 있도록 하는 뒷돌 고정식 석축 구조물 및 그 시공 방법을 제공하는 것이다.Accordingly, the present invention has been made to solve the above-mentioned problems of the related art, and an object of the present invention is to provide an eco-friendly structure capable of harmonizing with the surrounding environment, And a method of constructing the same.

또한, 본 발명에 따른 다른 목적은 제작과 시공이 용이하면서도 구조적으로 안정된 석축 구조물을 시공할 수 있도록 하는 뒷돌 고정식 석축 구조물 및 그 시공 방법을 제공하는 것이다.It is another object of the present invention to provide a back-and-forth stone-like structure capable of constructing a stone structure that is easy to manufacture and construct while being structurally stable, and a construction method thereof.

상기 목적을 달성하기 위해, 본 발명에 따른 뒷돌 고정식 석축 구조물의 시공 방법은, 일정 개수의 제 1 장식석과 제 1 배수관으로 둘러싸인 일정 개수의 수직 정착물이 놓일 지반에 기초 콘크리트를 타설하되 일정 개수의 상기 제 1 장식석 및 일정 개수의 상기 수직 정착물의 하부가 상기 기초 콘크리트에 매입되도록 하는 제 1 단계(S100)와, 상기 기초 콘크리트의 상에 일정 개수의 배수로를 거치시키고, 상기 제 1 장식석의 후면에 설치된 제 1 세트 앵커와 상기 수직 정착물 사이를 제 1 철근으로 연결하며, 복수의 제 2 배수관의 하부가 상기 배수로에 안내되도록 상기 제 2 배수관을 세워서 거치시키고, 제 1 토사로 상기 제 1 장식석의 후방을 채워 다지는 제 2 단계(S200)와, 상기 제 1 토사 상면에 일정 개수의 제 2 장식석의 하부 및 일정 개수의 상기 제 1 장식석의 상부가 각각 겹치는 부위를 결합하고, 상기 제 2 장식석의 후면에 설치된 제 2 세트 앵커와 상기 수직 정착물 사이를 제 2 철근으로 연결하며, 제 2 토사로 상기 제 2 장식석의 후방의 일부를 채워 다지는 제 3 단계(S300)와, 상기 제 2 토사 상면에 일정 개수의 제 3 배수관이 상기 제 1 배수관과 십자(+)로 교차하여 연결되도록 뉘여서 거치시키고, 상기 제 2 토사의 상부를 제 3 토사로 채워 다지는 제 4 단계(S400)를 포함한다.In order to achieve the above object, a method of constructing a back-stone-fixed stone structure according to the present invention is characterized in that a foundation concrete is laid on a foundation where a certain number of vertical fixtures surrounded by a certain number of first ornamental stones and a first drain pipe are to be placed, A first step (S100) for allowing the first decorative stone and a predetermined number of the vertical fixing members to be embedded in the foundation concrete; and a second step for mounting a predetermined number of drainage paths on the foundation concrete, And the second drain pipe is mounted and fixed so that a lower portion of the plurality of second drain pipes is guided to the drain pipe, and the second drain pipe is mounted on the rear side of the first decorative piece with the first gravel, A second step S200 of filling the first gravel with a predetermined number of second ornamental stones, A second set of anchors provided on the rear surface of the second ornamental stones and the vertical fixtures are connected to each other by a second reinforcing bar, and a part of the rear surface of the second ornamental stones is filled with a second soil, (S300), a predetermined number of third drain pipes are crossed and crossed with the first drain pipe on the upper surface of the second gravel, and the upper part of the second gravel is connected to the third gravel (Step S400).

또한, 본 발명에 따른 뒷돌 고정식 석축 구조물의 시공 방법은, 상기 제 3 단계(S300)에서, 일정 개수의 상기 제 2 장식석의 하부 및 일정 개수의 상기 제 1 장식석의 상부가 각각 겹치는 부위에 제 1 관통홀을 각각 형성하되, 와이어로 상기 제 1 관통홀들을 각각 통과시켜서 겹치는 상기 부위를 묶음 연결한다.In the third step S300, the lower part of the second ornamental stones and the upper part of the first ornamental stones overlap each other. In the third step S300, Through holes are formed, and the first through holes are passed through the respective wires, and the overlapping portions are bundled and connected.

또한, 본 발명에 따른 뒷돌 고정식 석축 구조물의 시공 방법은, 상기 제 3 단계(S300)에서, 일정 개수의 상기 제 2 장식석의 하부 및 일정 개수의 상기 제 1 장식석의 상부가 각각 겹치는 부위에 앵커 매입홀을 각각 형성하되, 상기 앵커 매입홀에는 확장형 앵커 볼트를 사용하여 겹치는 상기 부위를 고정한다.In addition, the method of constructing the rear-bottom fixed-type stone structure according to the present invention is characterized in that, in the third step (S300), anchoring is performed on a portion where a predetermined number of the lower portions of the second ornamental stones and a predetermined number of the upper portions of the first ornamental stones overlap, Holes, and the overlapping anchor bolts are used to fix the overlapping portions in the anchor-embedding holes.

또한, 본 발명에 따른 뒷돌 고정식 석축 구조물의 시공 방법은, 상기 제 1 단계(S100)에서, 상기 수직 정착물은 소망하는 길이의 봉 형상의 기둥의 하부가 육면체 형상의 콘크리트에 매입되어 있다.In the first step S100, the vertical fixture is embedded in the hexahedral concrete with the lower portion of the rod-shaped column having a desired length.

또한, 본 발명에 따른 뒷돌 고정식 석축 구조물의 시공 방법은, 상기 기둥의 재질은 스틸 또는 스텐이다.Further, in the method of constructing the rear-view fixed-type stone structure according to the present invention, the material of the column is steel or stainless steel.

또한, 본 발명에 따른 뒷돌 고정식 석축 구조물의 시공 방법은, 상기 제 1 배수관과, 상기 제 2 배수관과 상기 제 3 배수관은 빨대 형상의 복수의 관들의 묶음인 관다발이다.In addition, the method for constructing the rear-view fixed-type stone structure according to the present invention is such that the first drain pipe, the second drain pipe and the third drain pipe are bundles of a plurality of straw-shaped pipes.

또한, 본 발명에 따른 뒷돌 고정식 석축 구조물의 시공 방법은, 상기 제 2 단계(S200)에서, 상기 배수로의 일측이 상기 제 1 장식석의 일 영역에 형성된 제 2 관통홀을 관통하도록 형성되어 있다.In the second step S200, one side of the drainage passage is formed so as to pass through a second through-hole formed in one area of the first ornamental stoneware.

또한, 본 발명에 따른 뒷돌 고정식 석축 구조물은, 일정 개수의 제 2 장식석의 하부 및 일정 개수의 제 1 장식석의 상부가 각각 겹치는 부위에 형성된 앵커 매입홀에 확장형 앵커 볼트에 의해 겹치는 상기 부위가 고정되고, 일정 개수의 상기 제 2 장식석의 하부 및 일정 개수의 상기 제 1 장식석의 상부가 각각 겹치는 부위에 형성된 제 1 관통홀에 와이어에 의해 겹치는 상기 부위가 묶음 연결됨으로써 일체화된 개별 장식석과, 상기 개별 장식석에 가해지는 토압에 저항하기 위해 상기 제 1 장식석의 후면에 설치된 제 1 세트 앵커와 제 1 철근으로 연결되고, 상기 제 2 장식석의 후면에 설치된 제 2 세트 앵커와 제 2 철근으로 연결되는 일정 개수의 수직 장착물과, 일정 개수의 상기 제 1 장식석의 하부와 일정 개수의 상기 수직 정착물의 하부가 놓일 지반에 타설되는 기초 콘크리트를 포함하되, 상기 개별 장식석의 후방에는 복수의 배수관 및 복수의 배수로가 매입되어 토사로 채워 다진다.Further, in the rear-wheel fixed type stone structure according to the present invention, the portions overlapping each other by the expanding anchor bolts are fixed to the anchor embedding holes formed in the portions where a certain number of the lower portions of the second ornamental stones and the upper portions of the predetermined number of the first decorative stones overlap with each other An individual decorative stones integrally formed by bundling the parts overlapping by a wire in a first through hole formed in a portion where a predetermined number of the lower portions of the second decorative stones and a predetermined number of upper portions of the first decorative stones overlap each other, A first set anchor provided on a rear surface of the first ornamental stone to resist a earth pressure applied to the first ornamental stone and connected to the first set anchor by a first reinforcing bar and a second set anchor provided on a rear surface of the second ornamental stone, And a lower portion of the first decorative stone and a lower portion of the vertical fixture are placed on the ground A plurality of drain pipes and a plurality of drainage paths are embedded in the rear of the individual ornamental stones and filled with the gravel.

이상에서 상술한 본 발명에 의하면, 주변 환경과 조화를 이룰 수 있는 친환경 구조로서 자연석에 가까운 외관을 구비하여 친환경적인 석축 구조물을 축조할 수 있는 효과가 있다.As described above, according to the present invention, it is possible to construct an eco-friendly stone structure having an appearance close to a natural stone as an eco-friendly structure that can be harmonized with the surrounding environment.

또한, 본 발명에 의하면 제작과 시공이 용이하면서도 구조적으로 안정된 석축 구조물을 시공할 수 있는 효과가 있다.In addition, according to the present invention, it is possible to construct a stone structure that is structurally stable while being easy to manufacture and construct.

도 1은 본 발명에 따른 뒷돌 고정식 석축 구조물 시공 방법의 전체 흐름을 나타내는 플로어 차트.
도 2는 본 발명에 따른 뒷돌 고정식 석축 구조물 시공 방법으로 시공된 뒷돌 고정식 석축 구조물의 완성도.
도 3은 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 1 단계를 나타내는 도면.
도 4는 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 2 단계를 나타내는 도면.
도 5는 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 3 단계를 나타내는 도면.
도 6은 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 4 단계를 나타내는 도면.
도 7은 본 발명에 따른 뒷돌 고정식 석축 구조물 시공 방법으로 시공된 뒷돌 고정식 석축 구조물의 평면도.
도 8은 본 발명에 따른 뒷돌 고정식 석축 구조물에서 개별 장식석을 나타내는 도면.
도 8a 내지 도 8d는 개별 장식석을 확장형 앵커 볼트로 고정하는 과정을 나타내는 도면.
도 9는 본 발명에 따른 뒷돌 고정식 석축 구조물에서 수직 정착물을 나타내는 도면.
도 10은 본 발명에 따른 뒷돌 고정식 석축 구조물에서 관다발을 나타내는 도면.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a floor chart showing the entire flow of a method of constructing a backstop type stone building structure according to the present invention. FIG.
FIG. 2 is a view showing the completion of a back-stone fixed-type stone structure constructed by a method of constructing a back-stone-fixed stone structure according to the present invention.
3 is a diagram showing a first step for constructing a rear-view fixed-type stone structure according to the present invention.
Figure 4 shows a second stage for the construction of a backstop fixed stone structure according to the present invention.
5 is a view showing a third step for constructing a rear-view fixed-type stone structure according to the present invention.
6 is a view showing a fourth step for constructing a back stone-fixed stone structure according to the present invention;
7 is a plan view of a rear-view fixed-type stone structure constructed by a method of constructing a back-stone-fixed stone structure according to the present invention.
8 is a view showing an individual ornamental stone in a back-and-forth fixed stone structure according to the present invention.
8A to 8D are views showing a process of fixing an individual decorative stone with an expandable anchor bolt.
9 is a view of a vertical fixture in a backstop rigid stone structure according to the present invention.
10 is a view of a vestibule in a trestle-fixed type stone structure according to the present invention;

본 발명은 다양한 변환을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 상세한 설명에 상세하게 설명하고자 한다. 그러나, 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변환, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 본 발명을 설명함에 있어서 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우 그 상세한 설명을 생략한다.BRIEF DESCRIPTION OF THE DRAWINGS The present invention is capable of various modifications and various embodiments, and specific embodiments are illustrated in the drawings and described in detail in the detailed description. It is to be understood, however, that the invention is not to be limited to the specific embodiments, but includes all modifications, equivalents, and alternatives falling within the spirit and scope of the invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

제1, 제2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안 된다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다.The terms first, second, etc. may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from another.

본 명세서에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 명세서에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. The singular expressions include plural expressions unless the context clearly dictates otherwise. In this specification, the terms "comprises" or "having" and the like refer to the presence of stated features, integers, steps, operations, elements, components, or combinations thereof, But do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, or combinations thereof.

또한, 명세서에 기재된 "…부", "…모듈" 등의 용어는 적어도 하나의 기능이나 동작을 처리하는 단위를 의미하며, 이는 하드웨어나 소프트웨어 또는 하드웨어 및 소프트웨어의 결합으로 구현될 수 있다.Also, the terms " part, "" module," and the like, which are described in the specification, mean a unit for processing at least one function or operation, and may be implemented by hardware or software or a combination of hardware and software.

또한, 본 발명을 설명함에 있어서 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명을 생략한다.In the following description, well-known functions or constructions are not described in detail since they would obscure the invention in unnecessary detail.

이하, 본 발명의 실시예에 대해 관련 도면들을 참조하여 상세히 설명하기로 한다.
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 뒷돌 고정식 석축 구조물 시공 방법의 전체 흐름을 나타내는 플로어 차트이다.BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a floor chart showing the entire flow of a method of constructing a backstop type stone building structure according to the present invention. Fig.

도 1을 참조하면, 본 발명에 따른 뒷돌 고정식 석축 구조물 시공 방법은, 일정 개수의 제 1 장식석(210)과 제 1 배수관(130)으로 둘러싸인 일정 개수의 수직 정착물(120)이 놓일 지반에 기초 콘크리트(100)를 타설하되 일정 개수의 제 1 장식석(210) 및 일정 개수의 수직 정착물(120)의 하부가 기초 콘크리트(100)에 매입되도록 하는 제 1 단계(S100)와, 기초 콘크리트(100)의 상에 일정 개수의 배수로(310)를 거치시키고, 제 1 장식석(210)의 후면에 설치된 제 1 세트 앵커(160)와 수직 정착물(120) 사이를 제 1 철근(161)으로 연결하며, 복수의 제 2 배수관(140)의 하부가 배수로(310)에 안내되도록 제 2 배수관(140)을 세워서 거치시키고, 제 1 토사(300)로 제 1 장식석(210)의 후방을 채워 다지는 제 2 단계(S200)와, 제 1 토사(300) 상면에 일정 개수의 제 2 장식석(220)의 하부 및 일정 개수의 제 1 장식석(210)의 상부가 각각 겹치는 부위를 결합하고, 제 2 장식석(220)의 후면에 설치된 제 2 세트 앵커(170)와 수직 정착물(120) 사이를 제 2 철근(171)으로 연결하며, 제 2 토사(400)로 제 2 장식석(220)의 후방의 일부를 채워 다지는 제 3 단계(S300)와, 제 2 토사(400) 상면에 일정 개수의 제 3 배수관(150)이 제 1 배수관(130)과 십자(+)로 교차하여 연결되도록 뉘여서 거치시키고, 제 2 토사(400)의 상부를 제 3 토사(500)로 채워 다지는 제 4 단계(S400)를 포함한다.Referring to FIG. 1, a method of constructing a rear-view fixed-type stone structure according to an embodiment of the present invention includes a step of arranging a predetermined number of vertical fixtures 120 surrounded by a first number of first decorative stones 210 and a first water pipe 130, A first step S100 of placing a concrete 100 and allowing a predetermined number of first decorative stones 210 and a predetermined number of vertical fixtures 120 to be embedded in the foundation concrete 100, And a first set of anchors 160 installed on the rear surface of the first decorative stone 210 and a vertical fixture 120 are connected to each other by a first reinforcing bar 161, A second drain pipe 140 is vertically installed so that the lower part of the plurality of second drain pipes 140 is guided to the drainage channel 310 and the rear side of the first or second decorative stone 210 is filled with the first gravel 300, (S200), a predetermined number of second decorative stones (220) on the upper surface of the first gravel (300), and a predetermined number of first And the second set anchor 170 and the vertical fixture 120 installed on the rear surface of the second decorative stone 220 are connected to each other by the second reinforcing bars 171, A third step S300 of filling the rear part of the second decorative stone 220 with the second soil 400 and a third number of third water pipes 150 on the upper surface of the second soil 400, (S400) in which the third gravel 500 is filled with the upper portion of the second gravel 400, and the third gravel 500 is filled with the second gravel 400 by being crossed with the water pipe 130 in a crossing manner.

이에 대해, 도 3 내지 도 6을 참조하여, 좀더 상세히 설명한다.
This will be described in more detail with reference to Figs. 3 to 6. Fig.

다음, 도 2는 본 발명에 따른 뒷돌 고정식 석축 구조물 시공 방법으로 시공된 뒷돌 고정식 석축 구조물의 완성도이다.Next, Fig. 2 is a diagram showing the completeness of the back-stone fixed-type stone structure constructed by the method of applying the back-stone-fixed stone structure according to the present invention.

도 2를 참조하면, 본 발명에 따른 뒷돌 고정식 석축 구조물은, 일정 개수의 제 2 장식석(220)의 하부 및 일정 개수의 제 1 장식석(210)의 상부가 각각 겹치는 부위에 형성된 앵커 매입홀(미도시)에 확장형 앵커 볼트(212)에 의해 서로 겹치는 부위가 고정되고, 일정 개수의 제 2 장식석(220)의 하부 및 일정 개수의 제 1 장식석(210)의 상부가 각각 겹치는 부위에 형성된 제 1 관통홀(미도시)에 와이어(211)에 의해 서로 겹치는 부위가 묶음 연결됨으로써 일체화된 개별 장식석(200)과, 개별 장식석(200)에 가해지는 토압에 저항하기 위해 제 1 장식석(210)의 후면에 설치된 제 1 세트 앵커(160)와 제 1 철근(161)으로 연결되고, 제 2 장식석(220)의 후면에 설치된 제 2 세트 앵커(170)와 제 2 철근(171)으로 연결되는 일정 개수의 수직 장착물(120)과, 일정 개수의 제 1 장식석(210)의 하부와 일정 개수의 수직 정착물(120)의 하부가 놓일 지반에 타설되는 기초 콘크리트(100)를 포함하되, 개별 장식석(200)의 후방에는 복수의 배수관(130, 140, 150) 및 복수의 배수로(310)가 매입되어 토사(300, 400, 500)로 채워 다지게 된다.
Referring to FIG. 2, the rear-view fixed-type stone structure according to the present invention includes an anchor embedding hole 220 formed at a lower portion of a predetermined number of second ornamental stones 220 and an upper portion of a predetermined number of first ornamental stones 210, (Not shown) are fixed to each other by an expanding anchor bolt 212, and a predetermined number of lower portions of the second ornamental stones 220 and upper portions of a predetermined number of the first ornamental stones 210 overlap each other The first ornamental stones 200 are integrally formed by connecting the overlapping portions of the first through-holes formed by the wires 211 to each other. The first ornamental stones 200 are integrally formed with the first ornamental stones 200 to resist the earth pressure applied to the individual ornamental stones 200. The first set anchor 160 installed on the rear surface of the stone 210 and the second set anchor 170 connected to the rear surface of the second ornamental stone 220 by the first reinforcing bars 161 and the second reinforcing rods 171 A predetermined number of vertical mounts 120 connected to the lower portion of the first decorative stone 210, A plurality of drain pipes 130, 140 and 150 and a plurality of drain pipes 310 are provided at the rear of the individual ornamental stones 200, Are buried and filled with the gravels 300, 400 and 500.

다음, 도 3은 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 1 단계를 나타내는 도면이다.Next, Fig. 3 is a view showing a first step for constructing a rear-view fixed-type stone structure according to the present invention.

도 3을 참조하면, 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 1 단계(S100)는 일정 개수의 제 1 장식석(210)과 제 1 배수관(130)으로 둘러싸인 일정 개수의 수직 정착물(120)이 놓일 지반에 기초 콘크리트(100)를 타설하게 된다.Referring to FIG. 3, the first step S100 of constructing the rear-view fixed-type stone structure according to the present invention includes a predetermined number of vertical fixtures 210 surrounded by the first decorative stone 210 and the first water pipe 130 The foundation concrete 100 will be laid on the ground to be placed.

기초 콘크리트(100)란, 시멘트를 물과 혼합하여 여러 크기의 골재(보통 자갈과 모래)를 결속시켜 만든 구조재인 콘크리트를 이용하여 구조물의 거푸집과 같은 빈 공간에 부어 타설함으로써 기초 콘크리트(100)를 설치하게 된다. 이러한 기초 콘크리트(100)는 가격이 매우 저렴하고 굳으면 강성을 띄게 되어 건물을 형성할 때 많이 이용되는 재료이다.The foundation concrete (100) refers to a foundation concrete (100) that is poured into an empty space such as a formwork of a structure by using concrete, which is a structural material made by combining cement with water and aggregating aggregates of various sizes (usually gravel and sand) . The base concrete (100) is a material that is used at a very low cost and rigid when it is hardened to form a building.

또한, 개별 장식석(200)은 자연석이나 발파석 등을 이용하는 것이 바람직하지만 필요에 의해 인공석 등을 사용할 수도 있다.It is preferable that the individual ornamental stone 200 is made of a natural stone or a blast stone, but artificial stone or the like may be used if necessary.

한편, 타설된 기초 콘크리트(100)가 굳기 전에 일정 개수의 제 1 장식석(210) 및 일정 개수의 수직 정착물(120)의 하부를 기초 콘크리트(100)에 매입시킨 후 기초 콘크리트(100)가 굳도록 한다. 이와 같이 기초 콘크리트(100)에 제 1 장식석(210) 및 수직 정착물(120)의 하부가 굳게 되면, 뒷돌 고정식 석축 구조물의 제 1 단계에 의한 지반 기초 공사가 완료된다.
The base concrete 100 is hardened after a certain number of the first decorative stones 210 and a certain number of the vertical fixtures 120 are buried in the base concrete 100 before the poured base concrete 100 hardens, . When the lower portion of the first decorative stone 210 and the vertical fixture 120 are hardened in the base concrete 100 as described above, the ground foundation work by the first step of the back stone fixed type stone structure is completed.

다음, 도 4는 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 2 단계를 나타내는 도면이다.Next, FIG. 4 is a view showing a second step for constructing the rear-bottom fixed-type stone structure according to the present invention.

도 4를 참조하면, 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 2 단계(S200)는 기초 콘크리트(100)의 상에 일정 개수의 배수로(310)를 거치시키고, 제 1 장식석(210)의 후면에 설치된 제 1 세트 앵커(160)와 수직 정착물 사이(120)를 제 1 철근(161)으로 연결한다.Referring to FIG. 4, a second step (S200) for constructing the back stone-fixed stone structure according to the present invention includes placing a predetermined number of drainage paths 310 on the foundation concrete 100, The first set anchor 160 and the vertical fixture 120 are connected to each other by a first reinforcing bar 161. [

이때, 복수의 제 2 배수관(140)의 하부가 배수로(310)에 안내되도록 제 2 배수관(140)을 세워서 거치시키고, 제 1 토사(300)로 제 1 장식석(210)의 후방을 채워 다지게 된다.At this time, the second drain pipe 140 is vertically installed so that the lower part of the plurality of second drain pipes 140 is guided to the drain pipe 310, and the first gravel 300 is filled with the rear part of the first decorative stone 210 do.

여기서, 제 1 세트 앵커(160) 대신 제 1 세트 앵커(160)에 준하는 연결구를 이용하여 연결할 수도 있다.
Here, instead of the first set anchor 160, connection may be made using a connector similar to the first set anchor 160.

다음, 도 5는 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 3 단계를 나타내는 도면이다.Next, FIG. 5 is a view showing a third step for constructing a rear-load fixed type stone structure according to the present invention.

도 5를 참조하면, 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 3 단계(S300)는 제 1 토사(300)의 상면에 일정 개수의 제 2 장식석(220)의 하부 및 일정 개수의 제 1 장식석(210)의 상부가 각각 겹치는 부위를 와이어나 철근 등을 이용하여 결합하고, 제 2 장식석(220)의 후면에 설치된 제 2 세트 앵커(170)와 수직 정착물(120) 사이를 제 2 철근(171)으로 연결하여 고정한 후, 제 2 토사(400)로 제 2 장식석(220)의 후방의 일부를 채워 다지게 된다.5, in a third step S300 of constructing the rear stone fixed type stone structure according to the present invention, a predetermined number of second ornamental stones 220 and a predetermined number of The second set anchor 170 and the vertical fixture 120 installed on the rear surface of the second ornamental stone 220 are connected to each other by a wire or a reinforcing bar, And then fixed to the second reinforcing bars 171. The second reinforcing rods 171 are fixed to the rear surface of the second decorative stone 220 by the second gravel 400. [

여기서, 수직 정착물(120)은 개별 장식석(200)의 적층수와 동일한 높이로 설치함이 바람직하고, 여기서, 제 1 장식석(210)의 하부는 기초 콘크리트(100)에 매입되고, 제 2 장식석(220)의 상부에 의해 지지되고, 제 1 철근(161) 및 제 2 철근(171)에 의해 수직 정착물(120)에 지지되므로, 토압에 대한 개별 장식석(200)의 저항력이 효율적으로 발휘될 수 있다.
Here, it is preferable that the vertical fixture 120 is installed at the same height as the number of stacked individual decorative stones 200. Here, the lower part of the first decorative stones 210 is embedded in the foundation concrete 100, Is supported by the upper portion of the decorative stone 220 and is supported by the vertical fixture 120 by the first reinforcing bar 161 and the second reinforcing bar 171 so that the resistance of the individual decorative stone 200 to the earth pressure can be efficiently Can be exercised.

다음, 도 6은 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 4 단계를 나타내는 도면이다.Next, FIG. 6 is a view showing a fourth step for constructing the rear-bottom fixed-type stone structure according to the present invention.

도 6을 참조하면, 본 발명에 따른 뒷돌 고정식 석축 구조물을 시공하기 위한 제 4 단계(S400)는 제 2 토사(400) 상면에 일정 개수의 제 3 배수관(150)이 제 1 배수관(120)과 십자(+) 형상으로 교차하여 연결되도록 뉘여서 거치시키고, 제 2 토사(400)의 상부를 제 3 토사(500)로 채워 다지게 된다.Referring to FIG. 6, in a fourth step S400 of constructing the back stone fixed type stone structure according to the present invention, a predetermined number of third drain pipes 150 are connected to the first drain pipe 120, And the upper portion of the second gravel 400 is filled with the third gravel 500.

물론, 제 3 배수관(150)과 제 1 배수관(120)은 일체로 형성할 수도 있다.Of course, the third drain pipe 150 and the first drain pipe 120 may be integrally formed.

이후, 도면에 도시하지는 않았지만 새로운 장식석을 거치하고 난 후 이 새로운 장식석과 제 2 장식석(220)의 일체화 과정, 뒷채움 및 다짐 과정, 배수관의 거치 과정, 새로운 장식석과 수직 정착물(120)의 연결 과정, 뒷채움(골재포설 포함) 및 다짐과정을 설계 높이까지 반복 시공하게 된다.
Although not shown in the drawing, after the new decorative stone is mounted, the process of integrating the new decorative stone and the second decorative stone 220, the backfilling and compaction process, the process of mounting the drainage pipe, the connection between the new decorative stone and the vertical fixture 120 Process, backfill (including aggregate laying) and compaction process to the design height.

다음, 도 7은 본 발명에 따른 뒷돌 고정식 석축 구조물 시공 방법으로 시공된 뒷돌 고정식 석축 구조물의 평면도이다.Next, Fig. 7 is a plan view of a rear-view fixed-type stone structure constructed by a method of constructing a back-stone-fixed stone structure according to the present invention.

도 7을 참조하면, 본 발명에 따른 뒷돌 고정식 석축 구조물은 일정 개수의 제 2 장식석(220)의 하부 및 일정 개수의 제 1 장식석(210)의 상부가 각각 겹치는 부위에 형성된 앵커 매입홀(미도시)에 확장형 앵커 볼트(212)에 의해 서로 겹치는 부위가 고정되고, 일정 개수의 제 2 장식석(220)의 하부 및 일정 개수의 제 1 장식석(210)의 상부가 각각 겹치는 부위에 형성된 제 1 관통홀(미도시)에 와이어(211)에 의해 서로 겹치는 부위가 묶음 연결됨으로써 일체화된 개별 장식석(200)과, 개별 장식석(200)에 가해지는 토압에 저항하기 위해 제 1 장식석(210)의 후면에 설치된 제 1 세트 앵커(160)와 제 1 철근(161)으로 연결되고, 제 2 장식석(220)의 후면에 설치된 제 2 세트 앵커(170)와 제 2 철근(171)으로 연결되는 일정 개수의 수직 장착물(120)과, 일정 개수의 제 1 장식석(210)의 하부와 일정 개수의 수직 정착물(120)의 하부가 놓일 지반에 타설되는 기초 콘크리트(100)를 포함하되, 개별 장식석(200)의 후방에는 복수의 배수관(130, 140, 150) 및 복수의 배수로(310)가 매입되어 토사(300, 400, 500)로 채워 다지게 된다.
Referring to FIG. 7, the rear-bottom fixed-type stone structure according to the present invention includes an anchor embedding hole (not shown) formed at a lower portion of a predetermined number of second ornamental stones 220 and an upper portion of a predetermined number of first ornamental stones 210 A predetermined number of overlapping portions are fixed to an anchor bolt 212 by an expanding anchor bolt 212 and a lower portion of a predetermined number of second ornamental stones 220 and an upper portion of a predetermined number of first ornamental stones 210 are overlapped with each other An individual ornamental stone 200 integrated with the first through-holes (not shown) so that the portions overlapping each other by the wires 211 are connected to each other, and the first ornamental stone 200, A second set anchor 170 and a second reinforcing bar 171 connected to the first set anchor 160 and a first reinforcing bar 161 connected to the rear surface of the second decorative stone 220, A predetermined number of vertical mounts 120 connected to the lower end of the first decorative stone 210, A plurality of drain pipes 130, 140 and 150 and a plurality of drain pipes 310 are provided at the rear of the individual ornamental stones 200, Are buried and filled with the gravels 300, 400 and 500.

다음, 도 8은 본 발명에 따른 뒷돌 고정식 석축 구조물에서 개별 장식석을 나타내는 도면이다.Next, FIG. 8 is a view showing an individual decorative stone in a rear-bottom fixed-type stone structure according to the present invention.

도 8을 참조하면, 일정 개수의 제 2 장식석(220)의 하부 및 일정 개수의 제 1 장식석(210)의 상부가 각각 겹치는 부위에 제 1 관통홀(미도시)을 각각 형성하고, 와이어(211)로 제 1 관통홀들을 각각 통과시켜서 서로 겹치는 부위를 묶음 연결하게 된다. 여기서, 와이어(211) 대신에 철사나, 철근 등을 이용할 수도 있다.Referring to FIG. 8, first through holes (not shown) are respectively formed in a lower portion of a predetermined number of second decorative stones 220 and a predetermined number of overlapping portions of the first decorative stones 210, Holes 211 through the first through holes to connect the overlapping portions together. Instead of the wire 211, a wire, a reinforcing bar, or the like may be used.

또한, 일정 개수의 제 2 장식석(220)의 하부 및 일정 개수의 제 1 장식석(210)의 상부가 각각 겹치는 부위에 앵커 매입홀(미도시)을 각각 형성하고, 앵커 매입홀에는 확장형 앵커 볼트(212)를 사용하여 서로 겹치는 부위를 고정하게 된다.In addition, an anchor embedding holes (not shown) may be formed at a position where a predetermined number of the second decorative stones 220 and a predetermined number of the first decorative stones 210 overlap each other, Bolts 212 are used to fix the overlapping portions.

또한, 본 발명에 이용되는 확장형 앵커 볼트(212)는 다음과 같이 설치된다.Further, the expandable anchor bolt 212 used in the present invention is installed as follows.

도 8a 내지 도 8d를 참조하면, 공지의 드릴 머신(15)을 이용하여 개별 장식석(200)에 앵커 매입홀(16)을 형성한다.8A to 8D, an anchor embedding hole 16 is formed in an individual decorative stone 200 by using a known drilling machine 15.

다음, 확장형 앵커 볼트(212)를 사용하여, 몸체(14-1)가 장식석(10,11)의 앵커 매입홀(16)에 고정된 상태로 나사부(14-2)가 장식석(10,11)의 상부에 일부 노출되도록 설치한다. 여기서, 확장형 앵커 볼트(212)에 대해 더욱 상세하게 설명하면, 본 발명에 적용되는 확장형 앵커 볼트(212)는 몸체(14-1), 나사부(14-2), 및 확장쐐기(14-3)로 구성되고, 몸체(14-1)의 중간 부위에는 스톱퍼(14-4)가 형성되어 있다. 확장쐐기(14-3)는 테이퍼부(14-5)에 의해 확장되는 구조이다.Next, using the expandable anchor bolts 212, the thread 14-2 is fixed to the decorative seats 10, 11 in a state where the body 14-1 is fixed to the anchor embedding holes 16 of the decorative seats 10, 11). The expandable anchor bolt 212 applied to the present invention has a body 14-1, a threaded portion 14-2, and an enlarged wedge 14-3, And a stopper 14-4 is formed at an intermediate portion of the body 14-1. The extended wedge 14-3 is extended by the tapered portion 14-5.

다음, 앵커 매입홀(16)에 고정된 복수의 앵커 볼트(14)의 각 나사부(14-2)에 너트(14-7)를 이용하여 고정한다. 더욱 상세하게는, 도 4d에 나타낸 바와 같이, 나사부(14-2)에 와셔(14-6)를 끼워 넣은 후에 너트(14-2)를 조이게 되면 앵커 볼트(14)의 몸체(14-1)가 약간 위로 상승함과 동시에 확장쐐기(14-3)가 확장되면서 장식석(210, 220) 내부에 완전히 밀착되고, 이에 따라 확장형 앵커 볼트(212)의 몸체(14-1)는 더 이상 위로 상승하지 않게 된다. 이러한 확장형 앵커 볼트(212)에 의해 더욱 안정적으로 연결되는 개별 장식석(200)을 고정할 수 있다.Next, it is fixed to each threaded portion 14-2 of the plurality of anchor bolts 14 fixed to the anchor embedding hole 16 by using the nut 14-7. More specifically, as shown in FIG. 4D, when the nut 14-2 is tightened after the washer 14-6 is inserted into the threaded portion 14-2, the body 14-1 of the anchor bolt 14, The expanding wedge 14-3 is expanded and tightly fitted into the ornamental stones 210 and 220 so that the body 14-1 of the expandable anchor bolt 212 is further raised . And the individual ornamental stones 200 more stably connected by the expanding anchor bolts 212 can be fixed.

또한, 개별 장식석(200) 간의 공간은 크기가 작은 채움석으로 채울 수도 있고, 토사가 유출되는 것을 방지하기 위해 부직포가 설치될 수도 있다.
In addition, the space between the individual ornamental stones 200 may be filled with fillets of small size, or a nonwoven fabric may be installed to prevent the foreign matter from flowing out.

다음, 도 9는 본 발명에 따른 뒷돌 고정식 석축 구조물에서 수직 정착물을 나타내는 도면이다.Next, FIG. 9 is a view showing a vertical fixture in a rear-bottom fixed-type stone structure according to the present invention.

도 9를 참조하면, 본 발명에 따른 뒷돌 고정식 석축 구조물의 수직 정착물(120)은 소망하는 길이의 봉 형상의 기둥(111)의 하부가 육면체 형상의 제 2 콘크리트(110)에 매입되어 있다. 여기서, 기둥(111)의 재질은 스틸 또는 스텐인 것이 바람직하지만, 이에 한정되는 것은 아니며, 저가이며 강질의 재질이면 어느 것을 사용해도 무방하다. Referring to FIG. 9, the vertical fixture 120 of the rear-view fixed-type stone structure according to the present invention is embedded in the hexahedron-shaped second concrete 110 with the lower portion of the rod 111 having a desired length. The material of the column 111 is preferably steel or stainless, but is not limited thereto, and any material may be used as long as it is a low-cost and strong material.

또한, 제 2 콘크리트(110)는 일정 높이의 하부가 기초 콘크리트(100)에 매입되도록 시공하게 된다. 이에 의해, 수직 정착물(120)은 지반인 기초 콘크리트(100)에 강하게 고정된다.
In addition, the second concrete 110 is constructed such that a lower portion of a predetermined height is embedded in the foundation concrete 100. Thus, the vertical fixture 120 is firmly fixed to the foundation concrete 100 as a foundation.

마지막으로, 도 10은 본 발명에 따른 뒷돌 고정식 석축 구조물에서 관다발을 나타내는 도면이다.Finally, FIG. 10 is a view showing the vents in a rear-bottom fixed-type stone structure according to the present invention.

도 10을 참조하면, 제 1 배수관(130)과, 제 2 배수관(140)과 제 3 배수관(150)은 빨대 형상의 복수의 관들의 묶음인 관다발로 이루어진다. 여기서, 복수의 관들의 재질은 휘어짐이 가능한 폴리염화비닐(PVC)나 폴리에틸렌(PE) 등을 이용하는 것이 바람직하다. 또한, 복수의 관들을 묶는 자재는 노끈이나 와이어 등과 같은 묶음 부재(131, 141, 151) 또는 조임 부재(미도시)를 이용하는 것이 바람직하다.Referring to FIG. 10, the first water pipe 130, the second water pipe 140, and the third water pipe 150 are formed of a bundle of bundles of straw-shaped pipes. Here, the material of the plurality of pipes is preferably made of polyvinyl chloride (PVC) or polyethylene (PE) which can be bent. Further, it is preferable to use a bundling member 131, 141, 151 such as a cord or a wire or a fastening member (not shown) as a material for binding the plurality of pipes.

이와 같은 배수관들은 관다발로 이루어져 있기 때문에, 지중으로 유입되는 빗물 등이 하나의 관 내부를 통해 배수될 수도 있고, 복수의 관들의 묶음으로 인해 형성되는 관들 사이의 미세 공간을 통해서도 빗물 등이 배수될 수 있다.
Since the drain pipes are formed of vents, the rainwater flowing into the ground can be drained through the inside of the single pipe, and the rainwater can be drained through the micro spaces between the pipes formed by the bundles of the plural pipes. have.

이와 같이 본 발명에 따른 뒷돌 고정식 석축 구조물 및 그 시공 방법에 따르면, 제 1 배수관(130)과, 제 2 배수관(140)과, 제 3 배수관(150)은 지중으로 유입되는 빗물 등을 배수하기 위해 이용된다.According to the second embodiment of the present invention, the first drain pipe 130, the second drain pipe 140, and the third drain pipe 150 are arranged to drain the rainwater, etc., .

한편, 상술한 배수로(310)의 일측은 제 1 장식석(210)의 일 영역에 형성된 제 2 관통홀(미도시)을 관통하도록 형성되어 있다. 즉, 제 2 관통홀을 통해 배수로(310)의 일측이 관통되어 있기 때문에, 제 1 배수관(130)과, 제 2 배수관(140)과, 제 3 배수관(150)을 통해 으르는 빗물 등은 배수로(310)로 안내되어 뒷돌 고정식 석축 구조물의 외부로 배수된다. 물론, 배수로(310)는 빗물이 뒷돌 고정식 석축 구조물의 외부로 잘 배수되도록 뒷돌 고정식 석축 구조물의 외부 방향이 낮고 뒷돌 고정식 석축 구조물의 내부 방향이 높도록 경사지게 거치되는 것은 당연하다. 또한, 배수로(310)는 상술한 제 2 관통홀을 관통하여 설치될 수도 있고, 개별 장식석(200) 간의 공간 사이로 설치될 수도 있다. 또한, 개별 장식석(200)의 공간 사이로 식물 등이 자생할 수 있도록, 개별 장식석(200)의 후방에 채워다지는 토사에 식물의 씨앗 등을 함께 매설할 수도 있다.Meanwhile, one side of the drainage path 310 is formed to pass through a second through-hole (not shown) formed in one area of the first ornamental stone 210. That is, since one side of the drainage path 310 is penetrated through the second through hole, rainwater or the like passing through the first drainage pipe 130, the second drainage pipe 140, and the third drainage pipe 150 is discharged (310) and drained to the outside of the back-stone-fixed stone structure. Of course, it is a matter of course that the drainage path 310 is inclined so that the outward direction of the back-stone fixed-type stone structure is low and the inner direction of the back-stone fixed type stone structure is high so that the rainwater can be drained well out of the back- The draining passage 310 may be installed through the second through hole or between the individual ornamental stones 200. In addition, seeds of plants and the like may be buried in the soil to be filled in the rear of the individual ornamental stone 200 so that the plants or the like may spontaneously grow between the spaces of the individual ornamental stones 200.

한편, 배수로(310)의 배수 출구에는 물만 통과시키고 토사나 골재는 통과할 수 없도록 소켓이나 망 등을 설치하는 것이 바람직하다.
On the other hand, it is preferable to install a socket or a net so that only the water passes through the drain outlet of the drain canal 310 and the soil or aggregate can not pass through.

이와 같이 본 발명에 따른 뒷돌 고정식 석축 구조물 및 그 시공 방법에 의해 주변 환경과 조화를 이룰 수 있는 친환경 구조로서 자연석에 가까운 외관을 구비하여 친환경적인 석축 구조물을 축조할 수 있는 효과가 있다.As described above, according to the present invention, it is possible to construct an eco-friendly stone structure having an appearance close to a natural stone as an eco-friendly structure that can be harmonized with the surrounding environment by the back stone fixed type stone structure and its construction method.

또한, 본 발명에 의하면 제작과 시공이 용이하면서도 구조적으로 안정된 석축 구조물을 시공할 수 있는 효과가 있다.
In addition, according to the present invention, it is possible to construct a stone structure that is structurally stable while being easy to manufacture and construct.

또한, 이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or essential characteristics thereof. . Therefore, the embodiments disclosed in the present invention are intended to illustrate rather than limit the scope of the present invention, and the scope of the technical idea of the present invention is not limited by these embodiments. The scope of protection of the present invention should be construed according to the following claims, and all technical ideas within the scope of equivalents should be construed as falling within the scope of the present invention.

100 : 기초 콘크리트
110 : 제 2 콘크리트
111 : 기둥
120 : 수직 정착물
130, 140, 150 : 제 1 배수관, 제 2 배수관, 제 3 배수관
131, 141, 151 : 제 1 묶음 부재, 제 2 묶음 부재, 제 3 묶음 부재
160, 170 : 제 1 세트 앵커, 제 2 세트 앵커
161, 171 :제 1 철근, 제 2 철근
200 : 개별 장식석
210 : 제 1 장식석
211 : 와이어
212 : 확장형 앵커 볼트
220 : 제 2 장식석
300, 400, 500 : 제 1 토사, 제 2 토사, 제 3 토사
310 : 배수로
100: foundation concrete
110: Second concrete
111: Column
120: vertical fixture
130, 140, 150: first drain pipe, second drain pipe, third drain pipe
131, 141, 151: first bundling member, second bundling member, third bundling member
160, 170: first set anchor, second set anchor
161, 171: a first reinforcing bar, a second reinforcing bar
200: Individual decorative stones
210: 1st decorative stone
211: wire
212: Extended anchor bolt
220: 2nd decoration stone
300, 400, 500: 1st Tosa, 2nd Tosa, 3rd Tosa
310: Drain

Claims (8)

일정 개수의 제 1 장식석과 제 1 배수관으로 둘러싸인 일정 개수의 수직 정착물이 놓일 지반에 기초 콘크리트를 타설하되 일정 개수의 상기 제 1 장식석 및 일정 개수의 상기 수직 정착물의 하부가 상기 기초 콘크리트에 매입되도록 하는 제 1 단계(S100)와,
상기 기초 콘크리트의 상에 일정 개수의 배수로를 거치시키고, 상기 제 1 장식석의 후면에 설치된 제 1 세트 앵커와 상기 수직 정착물 사이를 제 1 철근으로 연결하며, 복수의 제 2 배수관의 하부가 상기 배수로에 안내되도록 상기 제 2 배수관을 세워서 거치시키고, 제 1 토사로 상기 제 1 장식석의 후방을 채워 다지는 제 2 단계(S200)와,
상기 제 1 토사 상면에 일정 개수의 제 2 장식석의 하부 및 일정 개수의 상기 제 1 장식석의 상부가 각각 겹치는 부위를 결합하고, 상기 제 2 장식석의 후면에 설치된 제 2 세트 앵커와 상기 수직 정착물 사이를 제 2 철근으로 연결하며, 제 2 토사로 상기 제 2 장식석의 후방의 일부를 채워 다지는 제 3 단계(S300)와,
상기 제 2 토사 상면에 일정 개수의 제 3 배수관이 상기 제 1 배수관과 십자(+)로 교차하여 연결되도록 뉘여서 거치시키고, 상기 제 2 토사의 상부를 제 3 토사로 채워 다지는 제 4 단계(S400)를 포함하되,
일정 개수의 상기 제 2 장식석의 하부 및 일정 개수의 상기 제 1 장식석의 상부가 각각 겹치는 부위에 앵커 매입홀을 각각 형성하되, 상기 앵커 매입홀에는 확장형 앵커 볼트를 사용하여 겹치는 상기 부위를 고정하고,
상기 제 1 배수관과, 상기 제 2 배수관과 상기 제 3 배수관은 빨대 형상의 복수의 관들의 묶음인 관다발이며,
상기 복수의 관들의 재질은 폴리염화비닐(PVC) 또는 폴리에틸렌(PE)이고,
상기 복수의 관들을 묶는 자재는 노끈, 와이어, 또는 조임 부재 중 어느 하나를 이용하며,
상기 배수로의 배수 출구에는 소켓 또는 망을 설치하는 뒷돌 고정식 석축 구조물의 시공 방법.
So that a certain number of vertical fixtures enclosed by a predetermined number of first ornamental stones and first drain pipes are to be placed, and that a predetermined number of the first decorative stones and a predetermined number of the vertical fixtures are embedded in the foundation concrete A first step (SlOO)
A plurality of second drain pipes are connected to the drainage channel by connecting a first set anchor provided on the rear surface of the first ornamental stone and the vertical fixture by a first reinforcing bar, A second step S200 of raising and mounting the second drain pipe so as to be guided and filling the rear of the first decorative stone with the first gravel,
A second set of anchors provided on a rear surface of the second ornamental stones and a vertical fixing member disposed on the rear surface of the second ornamental stones, A third step (S300) of connecting a part of the rear side of the second ornamental stone with a second soil,
A fourth step S400 of filling the upper part of the second gravel with the third gravel is performed by placing and disposing a predetermined number of third water pipes on the second gravel upper surface in such a way that the third water pipes are crossed with the first water pipe, ),
An anchor embedding hole is formed at a position where a predetermined number of lower portions of the second ornamental stones and a predetermined number of upper portions of the first ornamental stones overlap with each other, and the overlapping anchor bolts are fixed to the anchor embedding holes,
Wherein the first drain pipe, the second drain pipe and the third drain pipe are bundles of a plurality of straw-shaped pipes,
The material of the plurality of pipes is polyvinyl chloride (PVC) or polyethylene (PE)
Wherein the material for binding the plurality of pipes uses one of a cord, a wire, and a tightening member,
And a socket or a net is installed at a drain outlet of the drainage duct.
제 1 항에 있어서,
상기 제 3 단계(S300)에서,
일정 개수의 상기 제 2 장식석의 하부 및 일정 개수의 상기 제 1 장식석의 상부가 각각 겹치는 부위에 제 1 관통홀을 각각 형성하되, 와이어로 상기 제 1 관통홀들을 각각 통과시켜서 겹치는 상기 부위를 묶음 연결하는 뒷돌 고정식 석축 구조물의 시공 방법.
The method according to claim 1,
In the third step S300,
A first through hole is formed in a portion where a predetermined number of lower portions of the second ornamental stones overlap each other and a predetermined number of upper portions of the first ornamental stones respectively overlap each other, A method of constructing a backstop fixed stone structure.
삭제delete 제 1 항에 있어서,
상기 제 1 단계(S100)에서,
상기 수직 정착물은 소망하는 길이의 봉 형상의 기둥의 하부가 육면체 형상의 제 2 콘크리트에 매입되어 있는 뒷돌 고정식 석축 구조물의 시공 방법.
The method according to claim 1,
In the first step S100,
Wherein the vertical fixture is embedded in a hexahedron-shaped second concrete with a lower portion of a rod-like column having a desired length.
제 4 항에 있어서,
상기 기둥의 재질은 스틸 또는 스텐인 뒷돌 고정식 석축 구조물의 시공 방법.
5. The method of claim 4,
Wherein the column is made of steel or stainless steel.
삭제delete 제 1 항에 있어서,
상기 제 2 단계(S200)에서,
상기 배수로의 일측이 상기 제 1 장식석의 일 영역에 형성된 제 2 관통홀을 관통하도록 형성되어 있는 뒷돌 고정식 석축 구조물의 시공 방법.
The method according to claim 1,
In the second step S200,
Wherein one side of the drainage passage is formed to pass through a second through-hole formed in one area of the first ornamental stonewall.
일정 개수의 제 2 장식석의 하부 및 일정 개수의 제 1 장식석의 상부가 각각 겹치는 부위에 형성된 앵커 매입홀에 확장형 앵커 볼트에 의해 서로 겹치는 상기 부위가 고정되고, 일정 개수의 상기 제 2 장식석의 하부 및 일정 개수의 상기 제 1 장식석의 상부가 각각 겹치는 부위에 형성된 제 1 관통홀에 와이어에 의해 서로 겹치는 상기 부위가 묶음 연결됨으로써 일체화된 개별 장식석과,
상기 개별 장식석에 가해지는 토압에 저항하기 위해 상기 제 1 장식석의 후면에 설치된 제 1 세트 앵커와 제 1 철근으로 연결되고, 상기 제 2 장식석의 후면에 설치된 제 2 세트 앵커와 제 2 철근으로 연결되는 일정 개수의 수직 장착물과,
일정 개수의 상기 제 1 장식석의 하부와 일정 개수의 상기 수직 정착물의 하부가 놓일 지반에 타설되는 기초 콘크리트를 포함하되,
상기 개별 장식석의 후방에는 복수의 배수관 및 복수의 배수로가 매입되어 토사로 채워 다지되,
일정 개수의 상기 제 2 장식석의 하부 및 일정 개수의 상기 제 1 장식석의 상부가 각각 겹치는 부위에 앵커 매입홀을 각각 형성하되, 상기 앵커 매입홀에는 확장형 앵커 볼트를 사용하여 겹치는 상기 부위를 고정하고,
상기 제 1 배수관과, 상기 제 2 배수관과 상기 제 3 배수관은 빨대 형상의 복수의 관들의 묶음인 관다발이며,
상기 복수의 관들의 재질은 폴리염화비닐(PVC) 또는 폴리에틸렌(PE)이고,
상기 복수의 관들을 묶는 자재는 노끈, 와이어, 또는 조임 부재 중 어느 하나를 이용하며,
상기 배수로의 배수 출구에는 소켓 또는 망을 설치하는 뒷돌 고정식 석축 구조물.
The anchoring holes formed in the lower portions of the predetermined number of the second decorative stones and the upper portions of the predetermined number of the first decorative stones are fixed to each other by the expanding anchor bolts and the lower portions of the predetermined number of the second decorative stones are fixed, An individual decorative stones integrally formed by bundling the portions of the first through-holes overlapping each other by a wire in a first through-hole formed in a portion where a predetermined number of upper portions of the first decorative stones overlap each other,
A second set of anchors installed on the rear surface of the second ornamental stone and connected to the second set of anchors by a second reinforcing bar to be connected to a first set anchor provided on the rear surface of the first ornamental stone to resist earth pressure applied to the individual ornamental stone; A predetermined number of vertical mounts,
And a base concrete poured into the ground to which a lower portion of the first decorative stone and a lower portion of the vertical fixture are to be laid,
A plurality of drain pipes and a plurality of drainage paths are embedded in the rear of the individual ornamental stones and filled with the gravel,
An anchor embedding hole is formed at a position where a predetermined number of lower portions of the second ornamental stones and a predetermined number of upper portions of the first ornamental stones overlap with each other, and the overlapping anchor bolts are fixed to the anchor embedding holes,
Wherein the first drain pipe, the second drain pipe and the third drain pipe are bundles of a plurality of straw-shaped pipes,
The material of the plurality of pipes is polyvinyl chloride (PVC) or polyethylene (PE)
Wherein the material for binding the plurality of pipes uses one of a cord, a wire, and a tightening member,
A backstop fixed type stone structure in which a socket or a net is installed at a drain outlet of the drainage channel.
KR1020140075569A 2014-06-20 2014-06-20 Retaining nature-rock wall and building method thereof KR101654655B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140075569A KR101654655B1 (en) 2014-06-20 2014-06-20 Retaining nature-rock wall and building method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140075569A KR101654655B1 (en) 2014-06-20 2014-06-20 Retaining nature-rock wall and building method thereof

Publications (2)

Publication Number Publication Date
KR20150145962A KR20150145962A (en) 2015-12-31
KR101654655B1 true KR101654655B1 (en) 2016-09-07

Family

ID=55128723

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140075569A KR101654655B1 (en) 2014-06-20 2014-06-20 Retaining nature-rock wall and building method thereof

Country Status (1)

Country Link
KR (1) KR101654655B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978836B (en) * 2018-06-30 2020-09-08 中国水利水电第九工程局有限公司 Method for building drainage ditch along road edge by using grouted rubble

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005194807A (en) * 2004-01-09 2005-07-21 Ashimori Ind Co Ltd Drain material and its manufacturing method
KR100933660B1 (en) * 2009-08-04 2009-12-23 동양이앤씨 주식회사 Structure for supporting stone wall for reinforcement and construction method thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10292378A (en) * 1997-04-11 1998-11-04 Takakon Kk Earth retaining wall
KR100495093B1 (en) * 2005-01-12 2005-06-14 (주) 부경종합기술단 A back filling structure of retaining wall

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005194807A (en) * 2004-01-09 2005-07-21 Ashimori Ind Co Ltd Drain material and its manufacturing method
KR100933660B1 (en) * 2009-08-04 2009-12-23 동양이앤씨 주식회사 Structure for supporting stone wall for reinforcement and construction method thereof

Also Published As

Publication number Publication date
KR20150145962A (en) 2015-12-31

Similar Documents

Publication Publication Date Title
KR100933660B1 (en) Structure for supporting stone wall for reinforcement and construction method thereof
US6874974B2 (en) Reinforced soil arch
JP2018021383A (en) Embankment slope protection method
JP2015183419A (en) Ground formation method and ground structure
KR20150141264A (en) Retaining nature-rock wall and building method thereof
CN109750682B (en) Construction method of rigid-flexible combined ecological slope protection of foam concrete roadbed side slope
KR101693345B1 (en) Retaining wall using natural stones and construction method for this same
KR101654655B1 (en) Retaining nature-rock wall and building method thereof
KR101383624B1 (en) Retaining Wall Having Natural Rock And Construction Method Thereof
CN107419738A (en) A kind of modularization method for greening side slope
JP7197879B2 (en) Falling rock protection fence
KR200413303Y1 (en) Stone stacked wall structure using steel beam
KR101696663B1 (en) Construction of retaining walls using safety Pipe and Geotextile mats
KR20090073330A (en) Revetment structure using natural stones
KR100758231B1 (en) Environmentally friendly sloped block structure for landscaping
KR101633729B1 (en) Structure of retaining wall
KR200479516Y1 (en) The spiral-shaped support structure
KR101501733B1 (en) The eco-friendly precast l type retaining wall fixed with an anchor
KR101224872B1 (en) Natural wall using fiber reinforcement
KR100451429B1 (en) Combination system of block type reinforced retaining wall used waste concrete and waste limestone and constructing method thereof
KR200471401Y1 (en) Apparatus to set up giogrid for raising the ground
KR101074267B1 (en) A revetment
KR200223114Y1 (en) A structure reinforcing for retaining wall for inclined plane which to cut off a rock wall
KR101035411B1 (en) Retaining wall structure and method thereof
KR100945384B1 (en) Support Structure for Artificial Rock Wall at Slopes

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
FPAY Annual fee payment

Payment date: 20190820

Year of fee payment: 4