KR101625871B1 - Cargo for liquefied gas and manufacturing method thereof - Google Patents

Cargo for liquefied gas and manufacturing method thereof Download PDF

Info

Publication number
KR101625871B1
KR101625871B1 KR1020140097128A KR20140097128A KR101625871B1 KR 101625871 B1 KR101625871 B1 KR 101625871B1 KR 1020140097128 A KR1020140097128 A KR 1020140097128A KR 20140097128 A KR20140097128 A KR 20140097128A KR 101625871 B1 KR101625871 B1 KR 101625871B1
Authority
KR
South Korea
Prior art keywords
insulating panel
panel
heat insulating
auxiliary barrier
adjacent
Prior art date
Application number
KR1020140097128A
Other languages
Korean (ko)
Other versions
KR20160015438A (en
Inventor
양진혁
김민규
박동희
윤인근
이승연
이재훈
임승범
전상언
정왕조
Original Assignee
삼성중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성중공업 주식회사 filed Critical 삼성중공업 주식회사
Priority to KR1020140097128A priority Critical patent/KR101625871B1/en
Priority to CN201580041510.6A priority patent/CN106573664B/en
Priority to JP2017504351A priority patent/JP6469839B2/en
Priority to PCT/KR2015/007858 priority patent/WO2016018038A1/en
Publication of KR20160015438A publication Critical patent/KR20160015438A/en
Application granted granted Critical
Publication of KR101625871B1 publication Critical patent/KR101625871B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • B65D90/02Wall construction
    • B65D90/06Coverings, e.g. for insulating purposes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C1/00Pressure vessels, e.g. gas cylinder, gas tank, replaceable cartridge
    • F17C1/12Pressure vessels, e.g. gas cylinder, gas tank, replaceable cartridge with provision for thermal insulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

단열패널 구조를 포함하는 액화가스 화물창과 그 제조방법이 개시된다. 본 발명의 실시예에 따른 액화가스 화물창은 액화가스의 수용공간을 둘러싸는 주방벽과 상기 주방벽을 둘러싸며 액화가스를 외부로부터 단열하는 단열패널 어셈블리를 포함하고, 평면부와 코너부로 형성되며, 평면부에 설치되는 단열패널 어셈블리는 다수가 인접하여 설치되는 하부 단열패널과 하부 단열패널 상에 적층되어 하부 단열패널을 밀봉하는 보조방벽과 보조방벽 상에 적층되고 다수가 인접하여 설치되며 하부 단열패널의 너비 방향 면적보다 크게 마련되는 상부 단열패널을 포함하고, 평면부에 설치되어 인접하는 상부 단열패널 사이의 경계는 인접하는 하부 단열패널 사이의 경계에 대응된다.A liquefied gas holding window including an insulating panel structure and a manufacturing method thereof are disclosed. The liquefied gas holding window according to an embodiment of the present invention includes a main wall surrounding a space for accommodating a liquefied gas and an insulating panel assembly surrounding the main wall and insulating the liquefied gas from the outside, The heat insulating panel assemblies provided on the flat portion include a lower heat insulating panel, a plurality of which are disposed adjacent to each other, an auxiliary barrier which is laminated on the lower heat insulating panel to seal the lower insulating panel, And the boundary between the adjacent upper insulating panels provided on the plane portion corresponds to the boundary between the adjacent lower insulating panels.

Description

액화가스 화물창과 그 제조방법{CARGO FOR LIQUEFIED GAS AND MANUFACTURING METHOD THEREOF}TECHNICAL FIELD [0001] The present invention relates to a liquefied gas-

본 발명은 액화가스 화물창과 그 제조방법에 관한 것으로, 더욱 상세하게는 단열패널 구조를 포함하는 액화가스 화물창과 그 제조방법에 관한 것이다.The present invention relates to a liquefied gas holding window and a manufacturing method thereof, and more particularly, to a liquefied gas holding window including a heat insulating panel structure and a manufacturing method thereof.

액화가스(Liquefied Gas)는 기체를 냉각 또는 압축하여 액체로 만든 것으로, LNG(Liquefied Natural Gas)나 LPG(Liquefied Petroleum Gas) 등의 액화가스의 소비량이 전 세계적으로 급증하고 있는 추세이다.Liquefied gas is a liquid made by cooling or compressing gas, and consumption of liquefied gas such as Liquefied Natural Gas (LPG) or LPG (Liquefied Petroleum Gas) is rapidly increasing worldwide.

액화가스의 일 예인 액화천연가스(LNG)는 메탄(methane)을 주성분으로 하는 천연가스를 -162°C로 냉각해 그 부피를 6백분의 1로 줄인 무색 투명한 초저온 액체를 말하며, 초저온 상태의 액화천연가스를 에너지로 이용하기 위해서 생산기지로부터 수요지의 인수지까지 대량으로 수송할 수 있는 효율적인 운송 방안이 검토되어 왔다. 이러한 노력의 일환으로 대량의 액화천연가스를 해상으로 수송할 수 있는 액화천연가스 수송선박이 개발되었다.Liquefied natural gas (LNG), which is an example of liquefied gas, refers to a colorless transparent cryogenic liquid having a volume of methane-based natural gas cooled to -162 ° C and reducing its volume by one-sixth, In order to utilize natural gas as energy, efficient transportation methods have been examined that can be mass-shipped from the production base to the destination of the demand site. As part of this effort, a liquefied natural gas transport vessel capable of transporting large volumes of liquefied natural gas to sea was developed.

액화천연가스 수송선박에는 초저온상태로 액화시킨 액화천연가스를 보관 및 저장할 수 있는 화물창(Cargo)이 구비되어야 하는데, 이러한 화물창에 요구되는 조건이 매우 까다로워 많은 어려움이 있었다.The liquefied natural gas transportation vessel must have a cargo which can store and store the liquefied natural gas liquefied at a cryogenic temperature.

즉, 액화천연가스는 대기압 보다 높은 증기압을 가지며, 대략 -162°C 정도의 비등 온도를 갖기 때문에, 이러한 액화천연가스를 안전하게 보관하고 저장하기 위해서는 이를 저장하는 화물창은 초저온에 견딜 수 있는 재료, 예를 들면 알루미늄강, 스테인리스강, 35% 니켈강 등으로 제작되어야 하며, 기타 열응력 및 열수축에 강하고, 열침입을 막을 수 있는 독특한 단열패널 구조로 설계되어야 한다. 이러한 액화천연가스 수송선박의 화물창은 그 구조에 따라 독립형(self-supporting) 방식과 멤브레인(membrane) 방식으로 구분할 수 있다.That is, since the liquefied natural gas has a higher vapor pressure than the atmospheric pressure and has a boiling temperature of about -162 ° C, in order to safely store and store such liquefied natural gas, For example, it should be made of aluminum steel, stainless steel, 35% nickel steel, etc. It should be designed with a unique insulation panel structure which is resistant to thermal stress and heat shrinkage and prevents heat penetration. Such a cargo hold of a liquefied natural gas transportation vessel can be divided into a self-supporting type and a membrane type depending on its structure.

멤브레인 방식의 일 예로, 한국 공개특허공보 10-2012-0013233호 (2012.02.14.)는 액화천연가스 저장 탱크 및 그의 제조방법에 대하여 개시하고 있다.Korean Patent Laid-Open Publication No. 10-2012-0013233 (Feb. 14, 2012) discloses a liquefied natural gas storage tank and a manufacturing method thereof.

한국 공개특허공보 10-2012-0013233호(2012.02.14.)Korean Published Patent Application No. 10-2012-0013233 (2012.02.14.)

본 발명의 실시예는 제작이 용이하고 비용을 절감할 수 있는 액화가스 화물창과 그 제조방법을 제공하고자 한다.An embodiment of the present invention is to provide a liquefied gas holding window and a method of manufacturing the same, which are easy to manufacture and can reduce cost.

본 발명의 일 측면에 따르면, 액화가스의 수용공간을 둘러싸는 주방벽과 상기 주방벽을 둘러싸며 액화가스를 외부로부터 단열하는 단열패널 어셈블리를 포함하고, 평면부와 코너부로 형성되는 액화가스 화물창에 있어서, 상기 평면부에 설치되는 단열패널 어셈블리는, 다수가 인접하여 설치되는 하부 단열패널; 상기 하부 단열패널 상에 적층되어 상기 하부 단열패널을 밀봉하는 보조방벽; 및 상기 보조방벽 상에 적층되고 다수가 인접하여 설치되며 상기 하부 단열패널의 너비 방향 면적보다 크게 마련되는 상부 단열패널;을 포함하고, 상기 평면부에 설치되어 인접하는 상부 단열패널 사이의 경계는 상기 인접하는 하부 단열패널 사이의 경계에 대응하는 액화가스 화물창이 제공될 수 있다.According to an aspect of the present invention, there is provided a liquefied gas storage chamber including a main wall enclosing a space for accommodating a liquefied gas, and an insulating panel assembly surrounding the main wall and insulating the liquefied gas from the outside, Wherein the heat insulating panel assembly installed on the flat portion includes a plurality of adjacent lower heat insulating panels; An auxiliary barrier laminated on the lower insulation panel to seal the lower insulation panel; And an upper insulation panel laminated on the auxiliary barrier and provided in a plurality of adjacent spaces and being arranged to be larger than a width direction area of the lower insulation panel, A liquefied gas holding window corresponding to a boundary between adjacent lower insulating panels can be provided.

상기 상부 단열패널의 가로 너비는 상기 하부 단열패널의 가로 너비의 정수배로 마련되는 액화가스 화물창이 제공될 수 있다.And a lateral width of the upper insulating panel may be an integral multiple of a width of the lower insulating panel.

상기 하부 단열패널은 가로 너비와 세로 너비가 동일하도록 마련되는 액화가스 화물창이 제공될 수 있다.The lower insulation panel may be provided with a liquefied gas holding window having the same width and the same width.

상기 하나의 상부 단열패널은 상기 인접하는 두 개의 하부 단열패널과 결합하는 액화가스 화물창이 제공될 수 있다.The one upper insulating panel may be provided with a liquefied gas cargo hold to be joined with the adjacent two lower insulating panels.

상기 하부 단열패널의 중앙부에 설치되고 상기 보조방벽을 관통하여 상기 상부 단열패널과 겹합되는 패널 고정유닛을 더 포함하는 액화가스 화물창이 제공될 수 있다.And a panel fixing unit installed at a central portion of the lower heat insulating panel and passing through the auxiliary barrier to be overlapped with the upper heat insulating panel.

상기 코너부에 설치되는 단열패널 어셈블리는, 하부 단열패널과 상부 단열패널을 포함하고, 상기 평면부에 설치되는 하부 단열패널과 상기 코너부에 설치되는 하부 단열패널 사이에는 설치 오차만큼 벌어진 공간을 충진하는 삽입 단열패널이 삽입되며, 상기 코너부에 설치되는 상부 단열패널 또는 인접하는 상기 평면부에 설치되는 상부 단열패널 중 어느 하나는 상기 삽입 단열패널의 너비만큼 더 길게 마련되는 액화가스 화물창이 제공될 수 있다.The heat insulating panel assembly installed in the corner portion includes a lower heat insulating panel and an upper heat insulating panel. The space between the lower heat insulating panel installed on the flat surface portion and the lower heat insulating panel installed on the corner portion is filled with a space A liquefied gas holding window is provided in which one of the upper and lower heat insulating panels installed in the corner portion or the adjacent upper surface insulating portion is longer than the width of the inserting and insulating panel is provided .

상기 보조방벽은 하부로 볼록하게 주름지는 제1주름부와 제2주름부와 교차부를 포함하고, 상기 제1주름부와 제2주름부는 상기 인접하는 하부 단열패널의 경계 사이에 수용되는 액화가스 화물창이 제공될 수 있다.Wherein the auxiliary barrier comprises a first wrinkle portion and a second wrinkle portion intersecting convexly downwardly and the first wrinkle portion and the second wrinkle portion are sandwiched between the boundaries of the adjacent lower heat- Can be provided.

상기 하부 단열패널의 모서리는 상기 주름부를 수용하는 챔퍼가 형성되는 액화가스 화물창이 제공될 수 있다.And a corner of the lower insulating panel may be provided with a liquefied gas holding window in which a chamfer for receiving the wrinkle is formed.

상기 하부 단열패널의 상부에는 보조방벽 연결부재가 마련되고, 상기 보조방벽은 다수의 보조방벽시트가 연속적으로 연결되어 형성되며, 상기 보조방벽시트는 상기 보조방벽 연결부재에 고정되고, 인접하는 상기 보조방벽시트는 상기 보조방벽 연결부재에 고정된 상기 보조방벽시트 상에 겹쳐져 고정되는 액화가스 화물창이 제공될 수 있다.Wherein an auxiliary barrier connecting member is provided on an upper portion of the lower insulating panel, and the auxiliary barrier is formed by connecting a plurality of auxiliary barrier sheets in series, the auxiliary barrier sheet being fixed to the auxiliary barrier connecting member, The barrier sheet may be provided with a liquefied gas holding window to be overlapped and fixed on the auxiliary barrier sheet fixed to the auxiliary barrier connecting member.

본 발명의 다른 측면에 따르면, 평면부와 코너부를 포함하는 외벽의 평면부에 단열패널을 설치하여 액화가스 화물창을 제조하는 방법에 있어서, 상기 평면부에 하부 단열패널을 제1방향과 제2방향으로 인접하도록 격자형으로 배치하여 설치하고, 상기 하부 단열패널 상에 보조방벽을 설치하고, 상기 보조방벽 상에 상부 단열패널을 적층하되, 상기 상부 단열패널은 제1방향과 제2방향으로 인접하도록 격자형으로 배치되고, 상기 인접하는 상부 단열패널 사이의 경계는 상기 인접하는 하부 단열패널 사이의 경계에 대응하도록 배치되는 액화가스 화물창의 제조방법이 제공될 수 있다.According to another aspect of the present invention, there is provided a method of manufacturing a liquefied gas holding window by providing a heat insulating panel on a plane portion of an outer wall including a flat portion and a corner portion, And an upper insulating panel is laminated on the auxiliary wall, wherein the upper insulating panel is disposed adjacent to the first direction in a second direction And a boundary between the adjacent upper insulating panels is arranged to correspond to a boundary between the adjacent lower insulating panels.

상기 보조방벽은 상기 보조방벽의 주름부가 상기 인접하는 하부 단열패널 사이의 경계에 수용되도록 설치되는 액화가스 화물창의 제조방법이 제공될 수 있다.And the auxiliary barrier is installed such that the corrugation of the auxiliary barrier is received at the boundary between the adjacent lower thermal insulation panels.

상기 보조방벽은 복수의 보조방벽시트를 연속적으로 연결하여 설치하되, 어느 하나의 보조방벽시트는 서로 꼭지점이 인접하는 네 개의 하부 단열패널 상에 걸치도록 설치되는 액화가스 화물창의 제조방법이 제공될 수 있다.The auxiliary barrier may be provided by continuously connecting a plurality of auxiliary barrier sheets, wherein one of the auxiliary barrier sheets is installed on four lower heat-insulating panels adjacent to each other at apexes thereof have.

상기 상부 단열패널은 상기 인접하는 2개의 하부 단열패널 상에 설치되되, 상기 상부 단열패널의 모서리는 상기 2개의 하부 단열패널의 외곽부 모서리에 대응하도록 설치되는 액화가스 화물창의 제조방법이 제공될 수 있다.The upper insulation panel is installed on the adjacent two lower insulation panels and the edge of the upper insulation panel is installed to correspond to the edge of the outer edge of the two lower insulation panels. have.

상기 보조방벽을 설치하기 전에, 상기 하부 단열패널 상에 보조방벽 연결부재를 설치하고, 상기 보조방벽은 복수의 보조방벽시트를 연속적으로 연결하여 설치하되, 상기 보조방벽시트의 모서리는 상기 보조방벽 연결부재 상에 고정되고, 인접하는 상기 보조방벽시트의 모서리는 상기 보조방벽 연결부재에 고정된 상기 보조방벽시트 상에 겹쳐져 고정되는 액화가스 화물창의 제조방법이 제공될 수 있다.Wherein an auxiliary barrier connecting member is provided on the lower insulating panel before the auxiliary barrier is installed, and the auxiliary barrier is formed by continuously connecting a plurality of auxiliary barrier sheets, wherein an edge of the auxiliary barrier sheet is connected to the auxiliary barrier connection And the edges of the adjoining auxiliary barrier sheet are fixed on the auxiliary barrier sheet fixed to the auxiliary barrier connecting member so as to overlap with each other.

상기 보조방벽시트와 상기 보조방벽 연결부재는 금속으로 마련되어, 상기 보조방벽시트 사이의 고정 및 상기 보조방벽시트와 상기 보조방벽 연결부재 사이의 고정은 용접 방법이 이용되는 액화가스 화물창의 제조방법이 제공될 수 있다.Wherein the auxiliary barrier sheet and the auxiliary barrier connection member are made of metal so that the fixing between the auxiliary barrier sheets and the securing between the auxiliary barrier sheet and the auxiliary barrier connection member are performed by a welding method, .

상기 보조방벽을 설치하기 전에, 상기 하부 단열패널 상에 패널 고정유닛을 설치하고, 상기 보조방벽의 설치는 상기 보조방벽의 관통홀에 상기 패널 고정유닛의 돌출부재가 수용되도록 하고, 상기 관통홀과 상기 패널 고정유닛을 밀봉하는 액화가스 화물창의 제조방법이 제공될 수 있다.Wherein the panel fixing unit is installed on the lower heat insulating panel before the auxiliary barrier is installed and the protrusion member of the panel fixing unit is received in the through hole of the auxiliary barrier, A method of manufacturing a liquefied gas holding window for sealing the panel fixing unit can be provided.

상기 코너부에 하부 단열패널과 상부 단열패널을 설치하고, 상기 평면부에 설치된 하부 단열패널과 상기 코너부에 설치된 하부 단열패널 사이의 설치 오차만큼 벌어진 공간에 삽입 단열패널을 삽입하고, 미리 설치된 상기 상부 단열패널 보다 상기 삽입 단열패널의 너비만큼 더 길게 마련되는 상기 상부 단열패널을 상기 코너부에 설치되는 상부 단열패널에 인접하도록 설치하는 액화가스 화물창의 제조방법이 제공될 수 있다.A lower heat insulating panel and an upper heat insulating panel are installed in the corner portion and the insertion heat insulating panel is inserted into a space wider by an installation error between a lower heat insulating panel provided on the flat surface portion and a lower heat insulating panel provided on the corner portion, And the upper heat insulating panel, which is longer than the upper heat insulating panel and is longer than the width of the insertion heat insulating panel, is disposed adjacent to the upper heat insulating panel installed in the corner portion.

상기 평면부에 설치되는 상기 하부 단열패널의 설치는 일정한 크기의 하부 단열패널들을 인접하여 배치하고, 상기 평면부에 설치되는 상기 상부 단열패널의 설치는 일정한 크기의 상부 단열패널들을 인접하여 배치하며, 상기 코너부에 설치된 하부 단열패널과 상기 평면부에 설치된 하부 단열패널 사이의 설치 오차만큼 벌어진 공간에 삽입 단열패널을 삽입하고, 상기 일정한 크기의 상부 단열패널 보다 상기 삽입단열패널의 너비만큼의 더 넓은 상부 단열패널을 상부 코너부에 설치되는 상부 단열패널에 인접하도록 설치하는 액화가스 화물창의 제조방법이 제공될 수 있다.The upper and lower heat insulation panels are disposed adjacent to each other. The upper insulation panels are disposed adjacent to each other. The upper insulation panels are disposed adjacent to each other. The insertion heat insulating panel is inserted into a space which is wider than an installation error between a lower heat insulating panel provided on the corner portion and a lower heat insulating panel provided on the flat surface portion and is wider than the upper heat insulating panel A method of manufacturing a liquefied gas holding window in which the upper heat insulating panel is installed adjacent to the upper heat insulating panel provided in the upper corner portion can be provided.

본 발명의 실시예에 따른 액화가스 화물창과 그 제조방법은 단일 형상의 하부 단열패널과 상부 단열패널을 연속적으로 연결할 수 있어 제작이 용이하고 시간과 비용을 절감할 수 있다.The liquefied gas holding window and the method of manufacturing the same according to the embodiment of the present invention can easily connect the lower and upper insulation panels of a single shape to each other, thereby facilitating manufacture and saving time and cost.

또한, 작업자가 수작업으로 설치할 수 있을 정도의 크기와 무게를 가지는 단열패널을 사용하여 제작이 용이하고 시간과 비용을 절감할 수 있다.In addition, it is easy to manufacture, and time and cost can be saved by using a heat insulating panel having a size and weight enough for a worker to install by hand.

또한, 단일 형상의 상부 단열패널을 이용하여 설치함으로써 종래에 인접하는 상부 단열패널 사이에 삽입되는 연결패널을 고정하기 위해 사용되었던 접착 고정방식을 제거할 수 있어 제작이 용이하고 시간과 비용을 절감할 수 있다.In addition, by using the upper insulating panel of a single shape, it is possible to eliminate the adhesive fixing method used for fixing the connecting panel inserted between the adjacent upper insulating panels, thereby making it easy to manufacture and saving time and cost .

도 1은 본 발명의 실시예에 따른 액화가스 화물창의 구조를 나타내기 위해 부분 조립한 모습의 사시도이다.
도 2는 본 발명의 실시예에 따른 액화가스 화물창의 구조를 나타내는 단면도이다.
도 3은 보조방벽의 결합모습을 나타내는 분해사시도이다.
도 4는 도 3의 확대도이다.
도 5는 상부 단열패널의 결합모습을 나타내는 단면도이다.
도 6은 주방벽의 결합모습을 나타내는 사시도이다.
도 7은 상부 단열패널과 하부 단열패널의 배치모습을 나타내기 위한 제1방향 단면도이다.
도 8은 상부 단열패널과 하부 단열패널의 배치모습을 나타내기 위한 제2방향 단면도이다.
1 is a perspective view of a partially assembled liquefied gas holding window according to an embodiment of the present invention.
2 is a cross-sectional view showing the structure of a liquefied gas holding window according to an embodiment of the present invention.
3 is an exploded perspective view showing an assembled state of the auxiliary barrier.
4 is an enlarged view of Fig.
5 is a cross-sectional view showing an assembled state of the upper insulating panel.
Fig. 6 is a perspective view showing a state of engagement of the kitchen wall. Fig.
7 is a first sectional view showing an arrangement of an upper insulating panel and a lower insulating panel.
8 is a sectional view in the second direction for showing an arrangement of an upper insulating panel and a lower insulating panel.

이하에서는 본 발명의 실시예들을 첨부 도면을 참조하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

이하에 소개되는 실시예들은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 본 발명의 사상이 충분히 전달될 수 있도록 하기 위해 예로서 제공되는 것이다. 본 발명은 이하 설명되는 실시예들에 한정되지 않고 다른 형태로 구체화될 수도 있다. 본 발명을 명확하게 설명하기 위하여 설명과 관계없는 부분은 도면에서 생략하였으며 도면들에 있어서, 구성요소의 폭, 길이, 두께 등은 편의를 위하여 과장되어 표현될 수 있다. 명세서 전체에 걸쳐서 동일한 참조번호들은 동일한 구성요소들을 나타낸다.The embodiments described below are provided by way of example so that those skilled in the art will be able to fully understand the spirit of the present invention. The present invention is not limited to the embodiments described below and may be embodied in other forms. In order to clearly explain the present invention, parts not related to the description are omitted from the drawings, and the width, length, thickness, etc. of the components may be exaggerated for convenience. Like reference numerals designate like elements throughout the specification.

본 발명의 실시예에 따른 액화가스 화물창은 초저온의 액화가스(Liquefied gas)를 저장 및/또는 운반하는 데 사용할 수 있다. 액화가스는 기체를 냉각 또는 압축하여 액체로 만든 것으로, 액화천연가스(LNG: Liquefied Natural Gas)와, 액화석유가스(LPG: Liquefied Petroleum Gas)와, 디메틸에테르(DME: Dimethyl Ether) 등을 포함한다.The liquefied gas holding window according to an embodiment of the present invention can be used to store and / or transport cryogenic liquefied gas. The liquefied gas is made of liquid by cooling or compressing the gas, and includes liquefied natural gas (LNG), liquefied petroleum gas (LPG), dimethyl ether (DME) and the like .

액화가스 화물창은 LNG 운반선, LNG RV(Regasification Vessel) 운반선, LPG 운반선, 또는 에틸렌(Ethylene) 운반선 등 액화가스 화물을 운송하는 운반선과, FSRU(Floating Storage Regasification Unit), FPSO(Floating Production Storage Offloading), 또는 BMPP(Barge Mounted Power Plant) 등 액화가스 화물을 저장 또는 생산하거나 혹은 기화설비를 갖춘 해상 부유설비에 적용된다. 또한, 액화가스 화물창은 해상에 설치되는 설비뿐만 아니라 육지에 설치되어 액화가스를 저장 또는 생산하기 위한 설비에 사용되는 것을 포함한다.Liquefied gas cargo holds are used to transport liquid gas such as LNG carrier, LNG RV (Regasification Vessel) carrier, LPG carrier or ethylene carrier, FSRU (Floating Storage Regulation Unit), FPSO (Floating Production Storage Offloading) Or Barge Mounted Power Plant (BMPP), or to marine floating plants with vaporization facilities. In addition, the liquefied gas cargo holds include not only the facilities installed on the sea, but also those used for facilities to store or produce liquefied gas installed on land.

이하에서는 액화가스 화물창 중 멤브레인 타입의 화물창을 일 예로 하여 설명하도록 한다. 도 1은 본 발명의 실시예에 따른 액화가스 화물창의 구조를 나타내기 위해 부분 조립한 모습의 사시도이고, 도 2는 본 발명의 실시예에 따른 액화가스 화물창의 구조를 나타내는 단면도이다.Hereinafter, a membrane-type cargo hold of a liquefied gas holding cargo will be described as an example. FIG. 1 is a partially assembled perspective view illustrating a structure of a liquefied gas holding window according to an embodiment of the present invention, and FIG. 2 is a cross-sectional view illustrating a structure of a liquefied gas holding window according to an embodiment of the present invention.

도면을 참고하면, 액화가스 화물창은 액화가스를 수용할 수 있는 공간을 둘러싸며 액화가스와 직접 접촉하는 주방벽(50)과, 주방벽(50)을 둘러싸며 액화가스를 외부로부터 단열하는 단열패널 어셈블리와, 단열패널 어셈블리를 둘러싸며 견고하게 지지하는 외벽(10)을 포함한다.Referring to the drawings, the liquefied gas holding window surrounds a space capable of accommodating the liquefied gas, and includes a main wall 50 in direct contact with the liquefied gas, a heat insulating panel 50 surrounding the main wall 50, Assembly, and an outer wall 10 that surrounds and firmly supports the insulating panel assembly.

주방벽(50)은 저장유체가 수용되는 저장공간을 밀봉하기 위한 것으로, 기밀성(또는 수밀성)이 요구된다. 액화가스는 비등점 이하의 초저온으로 유지될 수 있기 때문에 액체 상태로 저장되는 것이 보통이다. 그러나 온도 또는 압력의 변화에 따라 일부 액화가스의 기화가 발생할 수 있으며, 이 경우 화물창 내부의 압력은 크게 증가한다. 이러한 압력의 증가 등으로 주방벽(50)이 침투되는 경우에는 액체 또는 기체 상태의 액화가스가 단열패널 어셈블리에 유입될 수 있다. 유입된 액화가스는 온도가 상승함에 따라 부피가 급격하게 팽창하고, 단열패널 어셈블리를 손상시키게 된다. 화물창의 손상은 수선에 막대한 시간과 비용을 지출케 하므로 방벽의 기밀성은 매우 중요하게 취급된다.The kitchen wall 50 is for sealing the storage space in which the storage fluid is received, and requires airtightness (or watertightness). Liquefied gas is usually stored in a liquid state because it can be kept at a cryogenic temperature below the boiling point. However, depending on the change of temperature or pressure, vaporization of some liquefied gas may occur. In this case, the pressure inside the cargo hold increases greatly. When the kitchen wall 50 penetrates due to such an increase in pressure or the like, the liquid or gaseous liquefied gas can be introduced into the insulating panel assembly. As the temperature of the introduced liquefied gas increases, the volume rapidly expands and damages the heat insulating panel assembly. The damage to the cargo holds a significant amount of time and money in repairs, so the airtightness of the barrier is considered very important.

주방벽(50)은 초저온 상태에서도 물리적 및 화학적 상태를 유지할 수 있도록, 인바 합금(INVAR), 스테인리스강(SUS), 또는 알루미늄 합금 등의 금속재료를 이용할 수 있다. 주방벽(50)은 다수의 주방벽(50) 시트(sheet)가 연결되어 형성될 수 있으며, 기밀성을 유지하기 위하여 서로 간에 용접으로 결합될 수 있다.Metal material such as an invar alloy (INVAR), stainless steel (SUS), or an aluminum alloy can be used to maintain the physical and chemical conditions of the kitchen wall 50 even at a low temperature. The kitchen wall 50 may be formed by connecting a plurality of kitchen wall 50 sheets and may be welded to each other to maintain airtightness.

주방벽(50)을 용접하는 방법으로는 관련 기술분야에서 사용되는 다양한 용접방법이 사용될 수 있으며, 겹치기용접 또는 맞대기용접을 포함한다. 또한, 용접 품질을 향상시키면서도 작업편차를 줄여 균일한 품질을 얻기 위하여 레이저용접 또는 플라즈마 용접 등의 방법을 사용하는 자동용접장치를 이용할 수도 있다. 이상의 겹치기용접, 맞대기용접, 레이저용접, 또는 플라즈마 용접 등은 관련 기술분야에서 널리 알려진 기술이므로 자세한 설명을 생략하도록 한다.As a method of welding the kitchen wall 50, various welding methods used in the related art can be used and include lap welding or butt welding. An automatic welding apparatus using laser welding or plasma welding may also be used to improve uniformity of work quality while improving welding quality. Above-mentioned lap welding, butt welding, laser welding, plasma welding, etc. are well known in the related art, so a detailed description will be omitted.

주방벽(50)은 초저온의 저장유체와 직접 접촉하기 때문에 급격한 수축 및 팽창에 노출되어 있다. 주방벽(50)은 열수축과 열팽창이 반복되면서 피로가 누적되어 파괴되거나 열수축 발생 시 용접 부위가 파손되어 기밀성이 훼손될 수 있다. 이러한 문제 때문에, 주방벽(50)은 낮은 면강성(In-plane stiffness)을 갖기 위해 주름부(51)(corrugation)를 포함한다. 주름부(51)는 열응력에 대응하여 형상이 탄력적으로 변형됨으로써 용접 부위에서의 열응력을 줄여준다.Because the kitchen wall 50 is in direct contact with the cryogenic storage fluid, it is exposed to rapid contraction and expansion. The kitchen wall 50 may be damaged due to accumulation of fatigue due to repeated heat shrinkage and thermal expansion, or breakage of the welded portion when heat shrinkage occurs. Because of this problem, the kitchen wall 50 includes a corrugation 51 to have an in-plane stiffness. The corrugated portion 51 is elastically deformed in shape corresponding to the thermal stress, thereby reducing the thermal stress at the welded portion.

주방벽(50)은 서로 다른 방향으로 배치되는 제1주름부(51-1) 및 제2주름부(51-2)와, 두 주름부(51)가 교차되는 교차부(52)를 포함한다. 주방벽(50)의 면내 방향으로 작용하는 열응력은 두 방향의 주름부(51)에 의해 해소될 수 있다. 즉, 제1주름부(51-1)의 길이 방향으로 작용하는 열응력은 제2주름부(51-2)의 신축성에 의해 해소되고, 제2주름부(51-2)의 길이 방향으로 작용하는 열응력은 제1주름부(51-1)의 신축성에 의해 해소될 수 있다.The kitchen wall 50 includes first and second wrinkles 51-1 and 51-2 arranged in different directions and an intersection 52 at which the two wrinkles 51 intersect . The thermal stress acting in the in-plane direction of the kitchen wall 50 can be solved by the two-directional wrinkles 51. That is, the thermal stress acting in the longitudinal direction of the first wrinkled portion 51-1 is canceled by the elasticity of the second wrinkled portion 51-2, and the thermal stress acting in the longitudinal direction of the second wrinkled portion 51-2 Can be solved by the stretchability of the first wrinkled portion 51-1.

도면에는 수직하게 배치되는 두 방향의 주름부(51)를 도시하였지만, 필요에 따라 세 방향 이상의 주름부를 포함할 수 있다. 일 예로, 세 방향의 주름부는 서로 60도의 각도를 두고 배치될 수 있다.Although the two-directional wrinkles 51 are vertically arranged in the figure, they may include three or more wrinkles as required. For example, the three corrugations may be arranged at an angle of 60 degrees with respect to each other.

단열패널 어셈블리는 평면부에 설치되는 단열패널 어셈블리와 코너부에 설치되는 단열패널 어셈블리를 포함한다. 코너부는 서로 다른 각으로 배치되는 평면부를 연결하며, 서로 다른 두 방향의 단열패널이 연결되는 모서리부와, 서로 다른 세 방향의 단열패널이 연결되는 꼭지점부를 포함한다. 이하에서는 평면부에 설치되는 단열패널 어셈블리를 기본으로 하여 설명도록 한다.The heat insulating panel assembly includes an insulating panel assembly installed on a plane portion and an insulating panel assembly installed on a corner portion. The corner portion connects the flat portions disposed at different angles and includes a corner portion to which two different heat insulating panels are connected and a vertex portion to which three different heat insulating panels are connected. Hereinafter, the heat insulating panel assembly provided on the flat surface will be described as a basis.

단열패널(20, 30)은 일반적으로 폴리우레탄폼(PUF, Polyurethane Form) 또는 강화 폴리우레탄폼(R-PUF, Reinforced PUF) 등과 같이 단열성능이 우수하면서도 경량인 재료를 이용할 수 있으며, 저장유체를 외부와 단열시켜 초저온 상태로 유지할 수 있다. 단열패널 어셈블리는 단열성능의 향상 및 수선의 용이성 등의 목적으로 상부 단열패널(30)과 하부 단열패널(20)을 포함하는 2중 단열구조로 이루어지는 것이 일반적이다.The heat insulating panels 20 and 30 can be generally made of a material having excellent heat insulation performance and light weight such as polyurethane foam (PUF) or reinforced polyurethane foam (R-PUF, Reinforced PUF) It can be kept at an ultra-low temperature state by being insulated from the outside. The heat insulating panel assembly generally has a double insulation structure including the upper heat insulating panel 30 and the lower heat insulating panel 20 for the purpose of improving the heat insulating performance and facilitating the repair.

외벽(10)으로는 이너 헐(inner hull)이 사용될 수 있으며 저장유체의 하중을 지지한다. 외벽(10)에는 하부 단열패널(20)이 고정될 수 있다.An inner hull can be used for the outer wall 10 and supports the load of the storage fluid. The lower insulation panel 20 may be fixed to the outer wall 10.

하부 단열패널(20)은 외벽(10)에 견고하게 고정될 수 있도록 저면에 하부 제1보강패널(21)이 결합될 수 있으며, 스터드 볼트(12) 등을 포함하는 다양한 고정부재에 의해 외벽(10)과 결합할 수 있다. 하부 제1보강패널(21)은 플라이우드(plywood) 등을 사용할 수 있으며, 에폭시 글루(epoxy glue) 등과 같은 접착제를 사용하여 하부 단열패널(20)의 저면에 부착될 수 있다.The lower first reinforcing panel 21 can be coupled to the bottom surface so as to be firmly fixed to the outer wall 10. The lower first reinforcing panel 21 can be coupled to the outer wall 10 by various fixing members including the stud bolts 12, 10). ≪ / RTI > The lower first reinforcing panel 21 may be made of plywood or the like and may be attached to the bottom surface of the lower insulating panel 20 using an adhesive such as an epoxy glue or the like.

단열패널 어셈블리는 상부 단열패널(30)과 하부 단열패널(20) 사이에 개재되는 보조방벽(40)을 포함할 수 있다. 보조방벽(40)은 주방벽(50)이 침투되었을 경우 하부 단열패널(20)을 보호하여 수선에 요구되는 시간과 비용을 크게 절감할 수 있다.The insulating panel assembly may include an auxiliary barrier 40 interposed between the upper insulating panel 30 and the lower insulating panel 20. The auxiliary barrier 40 protects the lower insulation panel 20 when the kitchen wall 50 is infiltrated, thereby greatly reducing the time and cost required for the repair.

보조방벽(40)은 주방벽(50)과 동일하게 인바 합금(INVAR), 스테인리스강(SUS), 또는 알루미늄 합금 등의 금속재료를 이용하거나, 리지드 트리플렉스(rigid triplex)와 서플 트리플렉스(supple triplex)를 이용할 수 있다.The auxiliary barrier 40 may be formed of a metal material such as an INVAR, stainless steel or aluminum alloy as in the case of the kitchen wall 50 or a rigid triplex and a support triple triplex) can be used.

보조방벽(40)을 하부 단열패널(20)에 결합하는 방법의 차이에 따라 접착식 제작방법과 용접식 제작방법이 사용된다. 도면에 도시되지는 않았지만, 접착식 제작방법은 하부 단열패널(20) 상에 에폭시 글루 등의 접착제를 사용하여 리지드 트리플렉스를 부착하고, 인접하는 리지드 트리플렉스 사이를 서플 트리플렉스로 연결하여 마감함으로써 밀봉상태를 완성할 수 있다. 이 때 셔플 트리플렉스 역시 접착제에 의해 리지드 트리플렉스 상에 부착될 수 있다.The adhesive type manufacturing method and the welding type manufacturing method are used in accordance with the difference in the method of joining the auxiliary barrier 40 to the lower heat insulating panel 20. [ Although not shown in the drawing, in the adhesive type manufacturing method, a rigid triplex is attached by using an adhesive such as epoxy glue on the lower insulating panel 20, and the adjacent rigid triplex is connected with a support triplex, State can be completed. At this time, the shuffle triplex may also be attached to the rigid triplex by an adhesive.

본 발명의 실시예에 따른 액화가스 화물창은 인접하는 보조방벽(40)이 용접에 의해 결합되는 용접식 제작방법이 사용된다. 용접식 제작방법은 보조방벽(40)이 하부 단열패널(20)과 접착되어 결합하는 대신 기계적으로 결합되고, 상부 단열패널(30) 역시 보조방벽(40)과 접착되어 결합하는 대신 하부 단열패널(20)과 기계적으로 결합된다.A liquefied gas holding window according to an embodiment of the present invention is a welded manufacturing method in which adjacent auxiliary walls 40 are welded together. The welding method is such that the auxiliary barrier 40 is mechanically coupled instead of bonding to the lower insulating panel 20 and the upper insulating panel 30 is also bonded to the lower insulating panel 20 20).

이하 본 발명의 실시예에 따른 액화가스 화물창 및 그 제작방법에 대하여 설명하도록 한다. 아래의 설명에서는 도 1 내지 도 6을 참고하도록 한다.Hereinafter, a liquefied gas holding window and a method of manufacturing the same according to an embodiment of the present invention will be described. In the following description, reference is made to Figs. 1 to 6.

우선 도 2를 참고하여 하부 단열패널(20)에 대하여 설명하도록 한다.First, the lower insulating panel 20 will be described with reference to FIG.

하부 단열패널(20)은 저면에 접착되는 하부 제1보강패널(21)을 매개로 하여 외벽(10)에 결합될 수 있다. 외벽(10)에는 하부 단열패널(20)을 결합하기 위한 스터드 볼트(12)가 용접될 수 있다. 또한, 하부 단열패널(20)과 하부 제1보강패널(21)에는 스터드 볼트(12)가 관통될 수 있도록 관통홀(20a, 21a)이 형성된다. 이 때 하부 제1보강패널(21)에 형성되는 관통홀(21a)의 직경은 하부 단열패널(20)에 형성되는 관통홀(20a)의 직경보다 작게 마련될 수 있다.The lower heat insulating panel 20 may be coupled to the outer wall 10 through a lower first reinforcing panel 21 adhered to the bottom surface. The outer wall 10 may be welded with a stud bolt 12 for joining the lower insulating panel 20. Through holes 20a and 21a are formed in the lower heat insulating panel 20 and the lower first reinforcing panel 21 so that the stud bolts 12 can pass therethrough. The diameter of the through hole 21a formed in the lower first reinforcing panel 21 may be smaller than the diameter of the through hole 20a formed in the lower heat insulating panel 20. [

스터드 볼트(12)는 하부 단열패널(20)의 코너부에 형성되는 관통홀(20a)에 삽입되어 너트와 결합하고, 너트는 스터드 볼트(12)와 결합함으로써 하부 제1보강패널(21)을 구속한다. 결과적으로 하부 제1보강패널(21)이 부착된 하부 단열패널(20)이 외벽(10)에 결합된다. 이 때, 단열성능을 유지하기 위하여 관통홀(20a)에는 폼 플러그(20b)가 삽입될 수 있다.The stud bolt 12 is inserted into the through hole 20a formed in the corner of the lower heat insulating panel 20 and is engaged with the nut and the nut is engaged with the stud bolt 12 to thereby connect the lower first reinforcing panel 21 Restraint. As a result, the lower heat insulating panel 20 to which the lower first reinforcing panel 21 is attached is joined to the outer wall 10. At this time, the foam plug 20b may be inserted into the through hole 20a to maintain the heat insulating performance.

또한, 하부 제1보강패널(21)과 외벽(10) 사이에는 접착력을 가지는 매스틱(mastic, 11) 및/또는 단차를 조절하기 위한 레벨패드(13) 등이 개재될 수 있다. 특히 매스틱(11)은 접착력과 탄성을 동시에 가지기 때문에, 외벽(10)과 하부 단열패널(20)을 결합함과 동시에 상호간에 전달되는 충격을 완화할 수 있다.A mastic 11 having an adhesive force and / or a level pad 13 for adjusting a level difference may be interposed between the lower first reinforcing panel 21 and the outer wall 10. In particular, since the mastic 11 has both adhesive force and elasticity, it is possible to combine the outer wall 10 and the lower heat insulating panel 20 and alleviate the impact transmitted to each other.

복수의 하부 단열패널(20)들은 서로 인접하여 배치될 수 있고, 일 예로 격자형으로 배치될 수 있다. 격자형으로 배치된다는 것은 하부 단열패널(20)들이 제1방향으로 인접하여 배치되는 것뿐만 아니라 제2방향으로도 인접하여 배치되는 것을 의미한다.The plurality of lower insulating panels 20 may be disposed adjacent to each other, and may be arranged in a lattice pattern, for example. The arrangement in the form of a lattice means that the lower insulating panels 20 are disposed not only adjacent to each other in the first direction but also adjacent to each other in the second direction.

인접하는 하부 단열패널(20) 사이에는 하부 조인트(23)가 삽입될 수 있다. 하부 조인트(23)는 하부 단열패널(20) 사이의 간극을 충진할 수 있는 단열재일 수 있으며, 글라스 울(glass wool) 등이 사용될 수 있다. 하부 조인트(23)는 하부 단열패널(20)이 설치된 후에 삽입되거나, 하부 단열패널(20)의 측부에 부착된 상태로 설치될 수 있다.And the lower joint 23 can be inserted between the adjacent lower heat insulating panels 20. The lower joint 23 may be a heat insulating material capable of filling a gap between the lower heat insulating panels 20, and a glass wool or the like may be used. The lower joint 23 may be inserted after the lower insulating panel 20 is installed or attached to the side of the lower insulating panel 20.

다음으로 도 3과 도 4를 참고하여 하부 단열패널(20) 상에 설치되는 보조방벽(40)에 대하여 설명하도록 한다. 도 3은 보조방벽의 결합모습을 나타내는 분해사시도이고, 도 4는 도 3의 확대도이다.Next, the auxiliary barrier 40 provided on the lower insulating panel 20 will be described with reference to FIGS. 3 and 4. FIG. Fig. 3 is an exploded perspective view showing a state of engagement of the auxiliary barrier, and Fig. 4 is an enlarged view of Fig.

하부 단열패널(20)의 상부에는 보조방벽(40) 설치를 위해 하부 제2보강패널(22)이 적층될 수 있다. 하부 제2보강패널(22)은 플라이우드(plywood) 등을 사용할 수 있으며, 에폭시 글루(epoxy glue) 등과 같은 접착제를 사용하여 하부 단열패널(20)에 부착될 수 있다.A lower second reinforcing panel 22 may be laminated on the upper part of the lower insulating panel 20 for installing the auxiliary barrier 40. The lower second reinforcing panel 22 may be made of plywood or the like and may be attached to the lower insulating panel 20 using an adhesive such as an epoxy glue or the like.

하부 단열패널(20)의 상부에는 보조방벽 연결부재(24)가 마련될 수 있다. 특히, 하부 제2보강패널(22)이 마련되는 경우 보조방벽 연결부재(24)는 하부 제2보강패널(22)의 상면에 결합할 수 있다. 보조방벽 연결부재(24)는 SUS 등의 금속재질로 마련되어 보조방벽(40)과 용접 결합될 수 있으며, 리벳(24a) 등에 의하여 하부 제2보강패널(22)과 기계적으로 결합할 수 있다. 보조방벽 연결부재(24)는 하부 제2보강패널(22)에 형성되는 홈(22a)에 수용되어 하부 제2보강패널(22)의 상면으로 돌출되지 않을 수 있다.An auxiliary barrier connecting member 24 may be provided on the upper part of the lower insulating panel 20. Particularly, when the lower second reinforcing panel 22 is provided, the auxiliary barrier connecting member 24 can be coupled to the upper surface of the lower second reinforcing panel 22. [ The auxiliary barrier connecting member 24 may be made of a metal such as SUS and welded to the auxiliary barrier 40 and may be mechanically coupled to the lower second reinforcing panel 22 by a rivet 24a or the like. The auxiliary barrier connecting member 24 may be received in the groove 22a formed in the lower second reinforcing panel 22 and may not protrude from the upper surface of the lower second reinforcing panel 22. [

또한, 보조방벽 연결부재(24)는 스트립(strip) 형상으로 마련될 수 있으며, 서로 다른 방향으로 배열되어 교차부를 형성할 수 있다. 일 예로, 서로 직교하는 두 방향의 스트립 형상으로 마련될 수 있다. 보조방벽 연결부재(24)는 마주보는 하부 단열패널(20)의 모서리에 평행하게 마련될 수 있다. 또한, 보조방벽 연결부재(24)는 하나의 스트립으로 마련되거나 여러 개의 스트립이 연속적으로 연결되도록 마련될 수 있다.In addition, the auxiliary barrier connecting members 24 may be provided in a strip shape and may be arranged in different directions to form intersections. For example, two strips orthogonal to each other. The auxiliary barrier connecting member 24 may be provided parallel to the edge of the opposing lower insulating panel 20. In addition, the auxiliary barrier connecting member 24 may be provided in one strip or may be provided such that a plurality of strips are continuously connected.

하부 단열패널(20)의 상부에는 상부 단열패널(30)을 고정하는 패널 고정유닛(25)이 마련될 수 있다. 특히, 하부 제2보강패널(22)이 마련되는 경우 패널 고정유닛(25)은 하부 제2보강패널(22)의 상면에 결합할 수 있다. 패널 고정유닛(25)은 리벳(25c) 등에 의하여 하부 제2보강패널(22)과 기계적으로 결합되는 결합부(25a)와, 결합부(25a)에 연결되어 돌출되며 상부 단열패널(30)과 결합하는 돌출부재(25b)를 포함할 수 있다. 패널 고정유닛(25)은 하부 제2보강패널(22)에 형성되는 홈(22b)에 수용되어 하부 제2보강패널(22)의 상면으로 돌출되지 않을 수 있다.A panel fixing unit 25 for fixing the upper insulating panel 30 may be provided on the lower insulating panel 20. In particular, when the lower second reinforcing panel 22 is provided, the panel fixing unit 25 can be coupled to the upper surface of the lower second reinforcing panel 22. [ The panel fixing unit 25 includes an engaging portion 25a mechanically coupled to the lower second reinforcing panel 22 by means of a rivet 25c or the like, And may include projecting members 25b that engage with each other. The panel fixing unit 25 may be received in the groove 22b formed in the lower second reinforcing panel 22 and may not protrude from the upper surface of the lower second reinforcing panel 22. [

하부 단열패널(20)은 위에서 바라볼 때 정사각형 형상일 수 있으며, 작업자가 수작업으로 작업할 수 있을 정도의 무게와 크기인 것이 바람직하다. 하부 단열패널(20)이 크고 무거울 경우 기계적인 장비를 이용하여 작업하여야 하는데, 이는 제작공정에서 소요되는 비용과 시간을 증가시키게 된다. 또한, 하부 단열패널(20)의 경우 저면에 매스틱(11)이 부착된 상태로 작업되는 것이 보통이기 때문에 기계적인 장비를 사용하는 경우 효율이 저하될 우려가 있다.The lower insulating panel 20 may have a square shape when viewed from above, and it is preferable that the lower insulating panel 20 is of a weight and size sufficient for the operator to work manually. If the lower insulating panel 20 is large and heavy, it must be operated using mechanical equipment, which increases the cost and time required in the manufacturing process. In the case of the lower heat insulating panel 20, since the mastic 11 is normally attached to the bottom surface of the lower insulating panel 20, the efficiency may be lowered when using mechanical equipment.

일 예로, 본 발명의 실시예에 따른 하부 단열패널(20)은 약 1000mm*1000mm 크기의 강화 폴리우레탄폼(R-PUF)을 사용하면서도 무게는 20kg 안팎일 수 있다. 따라서 2명의 작업자가 진공 그립퍼(vacuum gripper) 등을 이용하여 수작업으로 작업 가능하다.For example, the bottom insulating panel 20 according to the embodiment of the present invention may use a reinforced polyurethane foam (R-PUF) having a size of about 1000 mm * 1000 mm, but the weight may be around 20 kg. Therefore, two workers can work manually by using a vacuum gripper or the like.

보조방벽 연결부재(24)는 인접하는 보조방벽 연결부재(24)와 연결(직접 연결되지 않고 가상의 연장선에 의해 연결되는 것을 포함)되어 하나의 닫힌 도형을 형성한다. 도면에는 8개의 하부 단열패널(20)이 인접하여 배치되고, 하부 단열패널(20)에 마련되는 보조방벽 연결부재(24)에 의해 직사각형 형상의 닫힌 도형이 형성되는 것이 도시된다.The auxiliary barrier connecting member 24 is connected (including by being connected by a virtual extension line without being directly connected) with the adjacent auxiliary barrier connecting member 24 to form one closed figure. It is shown in the figure that eight lower insulating panels 20 are disposed adjacent to each other and a rectangular closed shape is formed by an auxiliary barrier connecting member 24 provided on the lower insulating panel 20. [

보조방벽(40)을 구성하는 하나의 보조방벽(40) 시트(sheet)는 보조방벽 연결부재(24)에 의해 형성되는 닫힌 도형의 형상에 대응하는 형상일 수 있다. 보조방벽(40) 시트의 모서리는 각각 보조방벽 연결부재(24)에 겹쳐지도록 배치되어 고정될 수 있다. 일 예로, 보조방벽(40) 시트는 보조방벽 연결부재(24)에 가용접(tack welding) 방식으로 고정될 수 있다.One auxiliary barrier 40 sheet constituting the auxiliary barrier 40 may have a shape corresponding to the shape of the closed figure formed by the auxiliary barrier connecting member 24. [ The corners of the sheets of the secondary barrier 40 may be arranged and fixed so as to overlap the secondary barrier connecting members 24, respectively. In one example, the sheet of secondary barrier 40 may be secured to the secondary barrier connecting member 24 in a tack welding manner.

이 때, 보조방벽(40) 시트에는 패널 고정유닛(25)의 돌출부재(25b)가 관통될 수 있는 관통홀(40a)이 형성된다. 보조방벽(40)의 설치가 완료된 후 보조방벽(40)의 기밀성을 확보하기 위해 위의 관통홀(40a)과 패널 고정유닛(25)을 용접으로 마감한다.At this time, a through hole (40a) through which the projecting member (25b) of the panel fixing unit (25) can penetrate is formed in the seat of the auxiliary barrier (40). After the completion of the installation of the auxiliary barrier 40, the through hole 40a and the panel fixing unit 25 are welded to each other to secure the airtightness of the auxiliary barrier 40. [

하나의 보조방벽(40) 시트가 고정된 후 인접하는 일 측면에 다른 보조방벽(40) 시트가 고정될 수 있다. 이 때 미리 설치된 보조방벽(40) 시트와 인접하는 보조방벽(40) 시트의 모서리 중 하나 이상의 모서리는 미리 설치된 보조방벽(40) 시트와 겹쳐지도록 배치되고 다른 모서리는 보조방벽 연결부재(24) 상에 배치되어 고정될 수 있다. 일 예로, 보조방벽(40) 시트와 보조방벽(40) 시트의 고정 및 보조방벽(40) 시트와 보조방벽 연결부재(24)의 고정은 가용접(tack welding) 방식을 사용할 수 있다.After one auxiliary barrier 40 sheet is fixed, another auxiliary barrier 40 sheet may be fixed to the adjacent one side. At this time, at least one corner of the edge of the auxiliary barrier 40 sheet adjacent to the auxiliary barrier 40 sheet is arranged to overlap with the sheet of the auxiliary barrier 40 previously provided, and the other edge is disposed on the auxiliary barrier connection member 24 As shown in FIG. For example, the fixing of the auxiliary barrier 40 sheet and the auxiliary barrier 40 sheet and the securing of the auxiliary barrier 40 sheet and the auxiliary barrier connection member 24 can be performed using a tack welding method.

위의 설치 과정을 연속적으로 수행하여 하부 단열패널(20) 상에 보조방벽(40) 시트를 모두 고정한다. 그러나 아직은 인접하는 보조방벽(40) 시트 사이에 가용접만 된 상태이기 때문에 기밀성을 유지하기 위하여 본 용접을 하여야 한다.The above installation process is continuously performed to fix all the sheets of the auxiliary barrier 40 on the lower insulating panel 20. [ However, since it is still in a state of being in a state of being in contact with the gap between the adjoining auxiliary barrier 40 sheets, it is necessary to perform the main welding in order to maintain airtightness.

인접하는 보조방벽(40) 시트의 양 모서리는 겹치기 용접 또는 맞대기 용접에 의해 본 용접됨으로써 기밀성을 확보할 수 있다. 이 때 사용될 수 있는 용접방법은 관련 기술분야에서 사용되는 다양한 용접방법이 사용될 수 있다. 또한, 용접 품질을 향상시키면서도 작업편차를 줄여 균일한 품질을 얻기 위하여 레이저용접 또는 플라즈마 용접 등의 방법을 사용하는 자동용접장치를 이용할 수도 있다. 이상의 겹치기용접, 맞대기용접, 레이저용접, 또는 플라즈마 용접 등은 관련 기술분야에서 널리 알려진 기술이므로 자세한 설명을 생략하도록 한다.Both edges of the sheets of the auxiliary barrier wall 40 adjacent to each other are welded by lap welding or butt welding, thereby ensuring airtightness. As the welding method which can be used at this time, various welding methods used in the related art can be used. An automatic welding apparatus using laser welding or plasma welding may also be used to improve uniformity of work quality while improving welding quality. Above-mentioned lap welding, butt welding, laser welding, plasma welding, etc. are well known in the related art, so a detailed description will be omitted.

한편, 보조방벽 연결부재(24)는 인접하는 보조방벽(40) 시트끼리 용접할 때 용접선(또는 용접심)의 하부에 위치함으로써 용접열에 의해 보조방벽(40) 시트가 변형되는 것을 방지할 수 있다. 특히 플라즈마 용접이 사용되는 경우 고열에 의해 발생할 수 있는 보조방벽(40) 시트의 변형을 방지할 수 있다. 이 때 보조방벽(40) 시트끼리 겹치기 용접 또는 맞대기 용접하는 과정에서 용접열이 보조방벽 연결부재(24)에까지 전달되어 하부의 보조방벽 연결부재(24)와 그 상부에 위치하는 보조방벽(40) 시트가 서로 용접될 수도 있다.On the other hand, the auxiliary barrier connecting member 24 can be prevented from being deformed by the welding heat due to the welding heat (or welding seam) when the adjacent auxiliary barrier walls 40 are welded to each other . It is possible to prevent deformation of the auxiliary barrier 40 sheet, which may be caused by high temperature, particularly when plasma welding is used. At this time, in the process of overlap welding or butt welding of the sheets of the auxiliary barrier 40, the welding heat is transmitted to the auxiliary barrier connecting member 24, and the auxiliary barrier connecting member 24 and the auxiliary barrier 40, The sheets may be welded together.

보조방벽(40)은 저장유체와의 사이에 상부 단열패널(30)이 위치하기 때문에 주방벽(50)처럼 열변형이 크게 발생하지는 않더라도 어느 정도의 열변형은 피할 수 없다. 실제로 보조방벽과 하부 단열패널을 접착하여 결합하는 접착식 제작방법의 경우 보조방벽의 수축 및 팽창에 의해 하부 단열패널과의 접착면에 스트레스가 작용하여 접착 품질이 불량해지는 문제가 보고되곤 한다.Since the upper barrier panel 40 is located between the upper insulating panel 30 and the storage fluid, a certain amount of thermal deformation can not be avoided even if the thermal barrier is not greatly generated as the main wall 50. In the case of the adhesive type manufacturing method in which the auxiliary barrier and the lower insulating panel are bonded by bonding, stress is applied to the bonding surface with the lower insulating panel due to shrinkage and expansion of the auxiliary barrier.

보조방벽(40)은 낮은 면강성(In-plane stiffness)을 갖기 위해 주름부(41)(corrugation)를 포함할 수 있다. 주름부(41)는 열응력에 대응하여 형상이 탄력적으로 변형됨으로써 용접 부위에서의 열응력을 줄여준다.The secondary barrier 40 may include a corrugation 41 to have an in-plane stiffness. The corrugated portion 41 is elastically deformed in shape corresponding to the thermal stress, thereby reducing the thermal stress at the welded portion.

보조방벽(40)은 서로 다른 방향으로 배치되는 제1주름부(41-1) 및 제2주름부(41-2)와, 두 주름부(41)가 교차되는 교차부(42)를 포함한다. 보조방벽(40)의 면내 방향으로 작용하는 열응력은 두 방향의 주름부(41)에 의해 해소될 수 있다. 즉, 제1주름부(41-1)의 길이 방향으로 작용하는 열응력은 제2주름부(41-2)의 신축성에 의해 해소되고, 제2주름부(41-2)의 길이 방향으로 작용하는 열응력은 제1주름부(411-)의 신축성에 의해 해소될 수 있다.The auxiliary barrier 40 includes first and second wrinkled portions 41-1 and 41-2 arranged in different directions and an intersection portion 42 where the two wrinkled portions 41 intersect with each other . The thermal stress acting in the in-plane direction of the auxiliary barrier 40 can be relieved by the two-directional folds 41. [ That is, the thermal stress acting in the longitudinal direction of the first wrinkled portion 41-1 is canceled by the elasticity of the second wrinkled portion 41-2, and the thermal stress acting in the longitudinal direction of the second wrinkled portion 41-2 Can be solved by the stretchability of the first wrinkled portion 411-.

도면에는 수직하게 배치되는 두 방향의 주름부(41)를 도시하였지만, 필요에 따라 세 방향 이상의 주름부를 포함할 수 있다. 일 예로, 세 방향의 주름부는 서로 60도의 각도를 두고 배치될 수 있다.Although the two-sided wrinkle portions 41 are shown vertically, they may include three or more wrinkles as required. For example, the three corrugations may be arranged at an angle of 60 degrees with respect to each other.

보조방벽(40)에 마련되는 주름부(41)는 하부 단열패널(20)을 향해 아래로 볼록할 수 있으며, 인접하는 두 하부 단열패널(20)의 경계에 위치할 수 있다. 이 때 하부 단열패널(20) 상부의 모서리에는 주름부(41)를 수용할 수 있도록 챔퍼(chamfer)가 형성되어 주름부(41)와의 간섭을 피할 수 있다.The corrugated portion 41 provided on the auxiliary barrier 40 can be convex downward toward the lower insulating panel 20 and can be located at the boundary between two adjacent lower insulating panels 20. [ At this time, a chamfer is formed in the corner of the upper portion of the lower insulating panel 20 so as to accommodate the corrugation portion 41, so that interference with the corrugated portion 41 can be avoided.

보조방벽(40) 시트는 다수의 하부 단열패널(20)에 걸쳐질 수 있도록 마련될 수 있다. 하부 단열패널(20)에 걸쳐진다는 의미는 완전히 뒤덮는 경우와 일부만 덮는 경우를 포함한다. 일 예로, 도 1에는 하나의 보조방벽(40) 시트가 8개의 하부 단열패널(20) 상에 걸치도록 마련되는 것이 도시된다.The auxiliary barrier 40 sheet may be provided so as to extend across the plurality of lower insulating panels 20. [ The meaning of being laid over the lower insulating panel 20 includes the case of completely covering and the case of covering only partly. For example, in FIG. 1, it is shown that one auxiliary barrier 40 sheet is provided over eight lower insulating panels 20.

한편, 보조방벽(40) 시트의 모서리는 하부 단열패널(20)의 중심선으로부터 벗어나도록 안착된다. 보조방벽(40) 시트의 모서리는 보조방벽 연결부재(24) 및/또는 인접하는 보조방벽(40) 시트의 모서리와 용접되어야 하기 때문에 하부 단열패널(20)의 중앙부에 위치하는 패널 고정유닛(25)과 겹쳐지지 않도록 하기 위함이다. 보조방벽(40) 시트와 패널 고정유닛(25)의 간섭은 보조방벽(40) 시트에 돌출부재(25b)가 관통되는 관통홀(40a)을 형성함으로써 방지할 수 있음은 앞에서 설명하였다.On the other hand, the edges of the sheets of the auxiliary barrier 40 are seated so as to deviate from the center line of the lower insulating panel 20. The edge of the auxiliary barrier 40 sheet is required to be fixed to the panel fixing unit 25 located at the center of the lower insulating panel 20 because it must be welded to the edge of the auxiliary barrier connecting member 24 and / In order to prevent overlapping. It has been described above that the interference between the auxiliary barrier 40 sheet and the panel fixing unit 25 can be prevented by forming the through hole 40a through which the projecting member 25b penetrates the auxiliary barrier 40 sheet.

보조방벽(40) 시트의 한 변의 길이(L)는 보조방벽(40) 시트가 덮는 하부 단열패널(20)의 개수(n)에서 하나를 뺀 개수(n-1)에 하부 단열패널(20)의 한 변의 길이(D)를 곱한 만큼보다 약간 클 수 있다. 보조방벽(40) 시트의 정확한 변의 길이(L)는 인접하는 하부 단열패널(20) 사이에 이격된 거리와, 보조방벽(40) 시트가 겹치기 용접 될 때 겹쳐지는 간격에 의해 결정될 수 있다. 도면에서 하부 단열패널(20)의 한 변의 길이를 a라고 할 때, 보조방벽(40)의 긴 변의 길이는 3a 보다 약간 크고, 작은 변의 길이는 a 보다 약간 클 것이다.The length L of one side of the auxiliary barrier 40 sheet is smaller than the number n of the lower insulating panel 20 by subtracting one from the number n of the bottom insulating panels 20 covered by the auxiliary barrier 40 sheet. The length D of the one side of the light-emitting diode chip. The length L of the precise sides of the secondary barrier 40 sheet can be determined by the distance spaced between adjacent lower insulating panels 20 and the spacing that overlaps when the secondary barrier 40 sheets are welded together. In the drawing, when the length of one side of the lower insulating panel 20 is a, the length of the longer side of the auxiliary barrier 40 is slightly larger than 3a and the length of the smaller side is slightly larger than a.

보조방벽(40) 시트에는 하부 단열패널(20) 사이의 경계에 수용되는 주름부(41)가 마련된다. 주름부(41)는 프레스 공법 등에 의해 형성될 수 있다. 도면에는 보조방벽(40)의 긴 변에는 3개의 주름부가 형성되고, 작은 변에는 1개의 주름부가 형성되는 것이 도시된다.The auxiliary barrier 40 sheet is provided with a corrugated portion 41 accommodated in a boundary between the lower insulating panels 20. The corrugated portion 41 may be formed by a press method or the like. In the figure, three corrugations are formed on the long side of the auxiliary barrier 40, and one corrugation is formed on the small side.

위의 설명들을 종합하면, 보조방벽(40) 시트에는 보조방벽(40) 시트가 덮는 하부 단열패널(20) 사이의 경계에 대응하는 주름부(41)가 형성되고, 교차부(42)는 시트의 한 변의 중심을 기준으로 한 방향으로 치우쳐져 위치한다. 이에 따라 돌출부재(25b)가 관통되는 관통홀(40a) 역시 시트의 한 변의 중심을 기준으로 반대 방향으로 치우쳐서 위치한다.A folding portion 41 corresponding to the boundary between the lower insulating panels 20 on which the sheet of the auxiliary barrier 40 covers is formed and the crossing portion 42 is formed on the sheet As shown in FIG. The through hole 40a through which the protruding member 25b penetrates is also biased in the opposite direction with respect to the center of one side of the sheet.

이상에서 살펴본 특징 중, 패널 고정유닛(25)이 하부 단열패널(20)의 중심에 위치한다는 점, 보조방벽 연결부재(24)가 하부 단열패널(20)의 모서리에 평행하게 위치하되 패널 고정유닛(25)으로부터 이격되도록 중심에서 벗어나 위치한다는 점, 보조방벽(40)이 복수의 하부 단열패널(20)이 연결되어 형성되는 보조방벽 연결부재(24)의 닫힌 도형에 대응하는 형상으로 마련된다는 점, 보조방벽(40)에는 인접하는 하부 단열패널(20)의 경계에 수용되는 주름부(41)가 마련되되 4개의 하부 단열패널(20)이 만나는 부분에는 제1주름부(41-1)와 제2주름부(41-2)가 교차하는 교차부(42)가 마련된다는 점, 및 보조방벽(40)에는 패널 고정유닛(25)의 돌출부재(25b)가 관통될 수 있는 관통홀(40a)이 마련된다는 점은 제작을 용이하게 하고 제작 시간을 단축시킬 수 있는 특징이다.The panel fixing unit 25 is positioned at the center of the lower heat insulating panel 20 and the auxiliary wall connecting member 24 is positioned parallel to the edge of the lower heat insulating panel 20, And that the auxiliary barrier 40 is provided in a shape corresponding to the closed figure of the auxiliary barrier connecting member 24 formed by connecting the plurality of the bottom insulating panels 20 And the auxiliary barrier 40 is provided with a corrugated portion 41 accommodated in the boundary of the adjacent lower insulating panel 20 and the first corrugated portion 41-1 and the second corrugated portion 41 are formed at the portion where the four lower heat insulating panels 20 meet. And the second barrier rib 40 is provided with a through hole 40a through which the protruding member 25b of the panel fixing unit 25 can penetrate, ) Is a feature that facilitates fabrication and shortens fabrication time.

위와 같은 특징들로 인해 하부 제1보강패널(21) 및 하부 제2보강패널(22)이 적층되고 보조방벽 연결부재(24) 및 패널 고정유닛(25)이 설치된 복수의 하부 단열패널(20)을 외벽(10)에 설치하고, 복수의 보조방벽(40) 시트를 보조방벽 연결부재(24)에 고정하고, 보조방벽(40) 시트끼리 용접하는 방법에 의해 설치할 수 있어 제작공정이 매우 쉽고 단순해 진다. 이 때, 보조방벽(40) 시트는 서로 동일한 형상으로 마련되는 시트들을 사용할 수 있다는 점에서도 제작의 편의성이 증대될 수 있다.The lower first reinforcing panel 21 and the lower second reinforcing panel 22 are stacked and the plurality of lower heat insulating panels 20 having the auxiliary wall connecting member 24 and the panel fixing unit 25 are installed, It is possible to arrange the auxiliary barrier ribs 40 on the outer wall 10 by fixing the plurality of auxiliary barrier ribs 40 to the auxiliary barrier rib connecting member 24 and welding the sheets of the auxiliary barrier 40 to each other, It becomes. At this time, the auxiliary barriers 40 can be manufactured in the same manner as the sheets provided in the same shape.

보조방벽(40) 시트와 보조방벽(40) 시트의 본 용접은 자동용접장치를 이용할 수 있다. 특히 보조방벽(40)의 주름부의 용접 역시 자동용접장치를 이용할 수 있다. 이 때, 얇은 두께의 보조방벽(40) 시트와 보조방벽(40) 시트를 용접하기 위해 작업자가 수작업으로 용접을 진행하거나 자동용접장치를 이용하기 위해서는 두 보조방벽(40) 시트를 밀착시키는 핏업(Fit-Up) 작업이 필요하다. 특히 자동용접장치를 이용하는 경우 핏업 작업이 중요하다.The main welding of the auxiliary barrier 40 sheet and the auxiliary barrier 40 sheet can use an automatic welding device. In particular, welding of the corrugations of the auxiliary barrier 40 can also be performed using an automatic welding apparatus. At this time, in order to manually weld the worker to weld the sheets of the auxiliary barrier 40 and the auxiliary barrier 40 of thin thickness, or to use the automatic welding apparatus, Fit-Up. In particular, the use of automatic welding equipment is important to the work of the foot.

핏업 작업은 하부 단열패널(20) 상에 고정 설치되는 핏업지그(Fit-Up Zig, 미도시)에 의해 수행될 수 있다. 핏업지그는 패널 고정유닛(25)에 돌출되는 돌출부재(25b)에 결합하거나 흡착식에 의해 보조방벽(40) 시트 상에 고정될 수 있다.Up work may be performed by a fit-up zig (not shown) fixedly installed on the lower insulating panel 20. [ Up jig can be fixed to the auxiliary barrier 40 sheet by being engaged with the protruding member 25b protruding to the panel fixing unit 25 or by a suction type.

작업자는 핏업지그를 이용하여 위에 덮이는 보조방벽(40) 시트를 누르거나 아래에 깔린 보조방벽(40) 시트를 들어올리는 동작에 의해 두 보조방벽(40) 시트를 밀착 시킬 수 있다. 이 때, 아래에 깔린 보조방벽(40) 시트를 들어올리기 위해서는 흡착 방식과 접착 방식 등이 이용될 수 있다.The worker can close the sheets of the auxiliary barrier 40 by pressing the sheet of the auxiliary barrier 40 covering the upper part with the use of the pick-up jig or by raising the sheet of the auxiliary barrier 40 which is placed below. At this time, in order to raise the sheet of the auxiliary barrier wall 40 placed below, an adsorption method and a bonding method can be used.

보통 보조방벽(40) 시트를 핏업한 후에 가용접을 수행하여 두 보조방벽(40) 시트를 서로 고정한다. 서로 고정된 보조방벽(40) 시트는 자동용접장치에 의하여 용접되기 용이하다. 특히 곡선부를 포함하는 주름부의 경우 자동용접장치에 의한 용접품질을 향상시키기 위해서는 정교한 핏업 작업이 요구된다.Usually, after the sheet of the auxiliary barrier 40 is wiped, the abutting is performed to fix the sheets of the auxiliary barrier 40 to each other. The sheets of auxiliary barrier 40 secured to each other are easily weldable by automatic welding equipment. In particular, in the case of a wrinkle portion including a curved portion, a sophisticated work of finishing is required in order to improve the welding quality by the automatic welding device.

자동용접장치는 하부 단열패널(20)에 고정되도록 설치되는 레일을 따라 이동하면서 용접을 수행한다. 따라서 자동용접장치를 이용하기 위해서는 용접선 주위에 레일을 고정 설치하는 작업이 필요하다.The automatic welding apparatus performs welding while moving along a rail which is fixed to the lower insulating panel 20. [ Therefore, in order to use the automatic welding device, it is necessary to fix the rail around the welding line.

본 발명의 실시예에 따른 액화가스 화물창을 제조하는 방법에서는 하부 단열패널(20)과 상부 단열패널(30)을 고정하기 위한 패널 고정유닛(25)을 이용하여 레일을 고정 설치할 수 있다. 앞서 패널 고정유닛(25)에 상부 단열패널(30)을 고정하기 위하여 돌출되는 돌출부재(25b)가 설치될 수 있음을 설명한 바 있다. 자동용접장치의 레일은 패널 고정유닛(25)의 돌출부재(25b)에 결합되어 고정될 수 있으며, 패널 고정유닛(25)에 별도로 마련되는 다른 형상의 결합부재(미도시)에 결합될 수도 있다.In the method of manufacturing the liquefied gas holding window according to the embodiment of the present invention, the rails can be fixedly installed using the panel fixing unit 25 for fixing the lower insulating panel 20 and the upper insulating panel 30. It has been described that the protruding member 25b protruding for fixing the upper insulating panel 30 to the panel fixing unit 25 may be provided. The rails of the automatic welding apparatus may be fixedly coupled to the protruding members 25b of the panel fixing unit 25 and may be coupled to other shapes of coupling members (not shown) provided separately to the panel fixing unit 25 .

도면을 참고하면, 하부 단열패널(20)의 중앙부에 패널 고정유닛(25)이 마련되고, 패널 고정유닛(25)의 측부에 보조방벽 연결부재(24)가 마련될 수 있다. 한편, 도면과 달리 보조방벽 연결부재(24)와 패널 고정유닛(25)이 이격되지 않고 접촉하여도 무방하다.A panel fixing unit 25 may be provided at the center of the lower insulating panel 20 and an auxiliary barrier connecting member 24 may be provided at the side of the panel fixing unit 25. On the other hand, unlike the drawing, the auxiliary barrier connecting member 24 and the panel fixing unit 25 may be in contact without being separated from each other.

다음으로 자동용접장치를 이용하여 보조방벽(40) 시트를 용접하는 방법에 대하여 설명하도록 한다.Next, a method of welding the sheet of the auxiliary barrier 40 using the automatic welding apparatus will be described.

앞에서 보조방벽(40) 시트가 보조방벽 연결부재(24)에 가용접되고, 인접하는 보조방벽(40) 시트끼리 가용접되어 고정되는 것에 대하여 설명한 바 있다. 이제 두 보조방벽(40) 시트가 겹쳐지거나 맞닿는 선(용접선)을 따라 본 용접을 수행하면 보조방벽의 설치가 완료된다. 자동용접장치가 용접선을 따라 이동할 수 있도록 용접선 근처에 레일을 설치할 수 있다. 이 때 레일과 용접선이 평행하게 마련되는 경우 용접품질을 향상시키고 작업시간을 단축시킬 수 있다.It has been described that the sheet of the auxiliary barrier 40 is previously contacted to the auxiliary barrier connecting member 24 and the adjoining auxiliary barrier 40 sheets are contacted and fixed to each other. Now, by performing the main weld along a line (weld line) where the sheets of the two auxiliary walls 40 overlap or abut, the installation of the auxiliary barrier is completed. A rail can be installed near the weld line so that the automatic welding device can move along the weld line. In this case, when the rail and the weld line are provided in parallel, the welding quality can be improved and the working time can be shortened.

레일은 한 방향으로 배열되는 복수의 패널 고정유닛(25)에 고정되어 용접선에 평행하게 설치될 수 있다. 이 때, 패널 고정유닛(25)과 보조방벽 연결부재(24)가 인접하여 설치됨으로써 레일에 설치되는 자동용접장치가 용접선을 따라 용접 수행하는 작업을 용이하게 할 수 있다. 자동용접이 완료된 후 레일은 패널 고정유닛(25)으로부터 해체된다.The rails can be fixed to a plurality of panel fixing units 25 arranged in one direction and installed parallel to the weld line. At this time, since the panel fixing unit 25 and the auxiliary barrier connecting member 24 are disposed adjacent to each other, the automatic welding apparatus installed on the rails can facilitate welding work along the weld line. After the automatic welding is completed, the rails are disassembled from the panel fixing unit 25.

보조방벽(40) 시트에 패널 고정유닛(25)의 돌출부재(25b)가 관통되도록 관통홀(40a)이 형성되는 것은 앞서 살펴보았다. 보조방벽(40)의 기밀성을 확보하기 위해서는 보조방벽(40) 시트에 형성된 홀의 가장자리와 패널 고정유닛(25)을 용접하여야 하며, 관통홀(40a)의 형상을 따라 원호 용접이 실시될 수 있다.The through hole 40a is formed so that the projecting member 25b of the panel fixing unit 25 penetrates through the sheet of the auxiliary barrier 40, as described above. In order to ensure the airtightness of the auxiliary barrier 40, the edge of the hole formed in the sheet of the auxiliary barrier 40 is welded to the panel fixing unit 25, and arc welding may be performed along the shape of the through hole 40a.

보조방벽(40)의 용접이 완료되면 기밀성이 확보되는지 여부를 검사하는 과정을 거치게 된다. 검사과정으로는 보조방벽(40)과 하부 단열패널(20) 사이에 검사 가스를 주입하고 검사가스가 외부로 누출되는지 여부를 확인하는 방법이 사용될 수 있다. 검사 결과 외부에서 검사 가스가 검출된다면 그 부분의 용접 상태가 불량인 것으로 판단하여 재용접을 실시한다. 한편, 검사 결과 기밀성이 확보되는 것으로 판단된다면 상부 단열패널(30)을 설치하는 다음 과정으로 진행된다.When welding of the auxiliary barrier 40 is completed, it is checked whether the airtightness is secured. As the inspection process, a method of injecting a test gas between the auxiliary barrier 40 and the lower insulating panel 20 and checking whether the test gas leaks to the outside can be used. If the inspection gas is detected from the outside as an inspection result, it is judged that the welding condition of the part is defective and re-welding is performed. On the other hand, if it is determined that the airtightness is ensured, the process for installing the upper insulating panel 30 proceeds to the next step.

다음으로 도 5를 참고하여 상부 단열패널(30)에 대하여 설명하도록 한다. 도 5는 상부 단열패널의 결합모습을 나타내는 단면도이다.Next, the upper insulating panel 30 will be described with reference to FIG. 5 is a cross-sectional view showing an assembled state of the upper insulating panel.

복수의 상부 단열패널(30)들은 서로 인접하여 배치될 수 있고, 일 예로 격자형으로 배치될 수 있다. 격자형으로 배치된다는 것은 상부 단열패널(30)들이 제1방향으로 인접하여 배치되는 것뿐만 아니라 제2방향으로도 인접하여 배치되는 것을 의미한다.The plurality of upper insulating panels 30 may be disposed adjacent to each other, and may be arranged in a lattice pattern, for example. It is meant that the upper insulating panels 30 are disposed adjacent to each other in the second direction as well as disposed adjacent to each other in the first direction.

인접하는 상부 단열패널(12) 사이에는 상부 조인트(33)가 삽입될 수 있다. 상부 조인트(33)는 상부 단열패널(30) 사이의 간극을 충진할 수 있는 단열재일 수 있으며, 글라스 울(glass wool) 등이 사용될 수 있다. 상부 조인트(33)는 상부 단열패널(30)이 설치된 후에 삽입되거나, 상부 단열패널(30)의 측부에 부착된 상태로 설치될 수 있다.An upper joint 33 may be inserted between the adjacent upper heat insulating panels 12. The upper joint 33 may be a thermal insulation material capable of filling a gap between the upper insulating panels 30, and a glass wool or the like may be used. The upper joint 33 may be installed after the upper insulating panel 30 is installed or attached to the side of the upper insulating panel 30.

하부 단열패널(20) 사이의 간격을 무시한다면(일반적으로 매우 좁음) 상부 단열패널(30)은 하부 단열패널(20)의 약 정수 배 크기 형상으로 마련될 수 있다. 이 경우, 상부 단열패널(30)의 모서리는 하부 단열패널(20) 사이의 경계와 일치하게 된다. 따라서 상부 단열패널(30)을 하부 단열패널(20)의 설치 과정과 비슷하게 설치할 수 있어 제작의 편의성이 증대된다.If the distance between the lower insulating panels 20 is neglected (generally very narrow), the upper insulating panel 30 may be provided in a size of approximately a multiple of the size of the lower insulating panel 20. In this case, the edge of the upper insulating panel 30 is aligned with the boundary between the lower insulating panels 20. Accordingly, the upper insulating panel 30 can be installed in a manner similar to the installation process of the lower insulating panel 20, thereby enhancing the convenience of manufacture.

만일, 상부 단열패널(30)의 모서리가 하부 단열패널(20)의 경계와 일치하지 않고 하부 단열패널(20)과 엇갈리게 배치하는 경우, 상부 단열패널(30)을 하부 단열패널(20)과 고정한 후, 상부 단열패널(30) 사이의 간극에 연결패널(미도시)을 삽입해야 하며, 이 때 연결패널은 접착에 의해 고정된다는 점에서 제작에 불편함이 발생하게 되기 때문이다.If the corner of the upper heat insulating panel 30 does not coincide with the boundary of the lower heat insulating panel 20 but is staggered with the lower heat insulating panel 20, the upper heat insulating panel 30 is fixed to the lower heat insulating panel 20 A connecting panel (not shown) must be inserted into the gap between the upper insulating panels 30, and at this time, the connecting panel is fixed by bonding, which is inconvenient to manufacture.

상부 단열패널(30)은 하부 단열패널(20)에 견고하게 고정될 수 있도록 저면에 상부 제1보강패널(31)이 결합될 수 있다. 상부 제1보강패널(31)은 플라이우드(plywood) 등을 사용할 수 있으며, 에폭시 글루(epoxy glue) 등과 같은 접착제를 사용하여 상부 단열패널(30)의 저면에 부착될 수 있다.The upper first reinforcing panel 31 may be coupled to the bottom surface so that the upper insulating panel 30 can be firmly fixed to the lower heat insulating panel 20. [ The upper first reinforcing panel 31 may be made of plywood or the like and attached to the bottom surface of the upper insulating panel 30 using an adhesive such as epoxy glue.

상부 단열패널(30)과 상부 제1보강패널(31)에는 돌출부재(25b)가 관통될 수 있도록 관통홀(30a, 31a)이 형성된다. 이 때 상부 제1보강패널(31)에 형성되는 관통홀(31a)의 직경은 상부 단열패널(30)에 형성되는 관통홀(30a)의 직경보다 작게 마련될 수 있다.The upper insulating panel 30 and the upper first reinforcing panel 31 are formed with through holes 30a and 31a so that the projecting members 25b can pass through. The diameter of the through hole 31a formed in the upper first reinforcing panel 31 may be smaller than the diameter of the through hole 30a formed in the upper insulating panel 30.

또한, 상부 제1보강패널(31)에 형성되는 관통홀(31a)의 직경은 돌출부재(25b)의 직경에 대응하는 크기일 수 있다. 상부 제1보강패널(31)이 돌출부재(25b)와 상대적으로 이동하는 것을 방지하기 위함이다.The diameter of the through hole 31a formed in the upper first reinforcing panel 31 may be the same as the diameter of the protruding member 25b. The upper first reinforcing panel 31 is prevented from moving relative to the projecting member 25b.

돌출부재(25b)는 상부 단열패널(30)에 중앙부에 한 쌍으로 형성되는 관통홀(30a)에 삽입되어 너트와 결합하고, 너트는 돌출부재(25b)와 결합함으로써 상부 제1보강패널(31)을 구속한다. 결과적으로 상부 제1보강패널(31)이 부착된 상부 단열패널(30)이 하부 단열패널(20)에 결합된다. 이 때, 단열성능을 유지하기 위하여 관통홀(30a)에는 폼 플러그(30b)가 삽입될 수 있다.The protruding member 25b is inserted into the through hole 30a formed at the center of the upper heat insulating panel 30 and joined with the nut and the nut is engaged with the protruding member 25b to form the upper first reinforcing panel 31 ). As a result, the upper heat insulating panel 30 to which the upper first reinforcing panel 31 is attached is joined to the lower heat insulating panel 20. At this time, the foam plug 30b may be inserted into the through hole 30a to maintain the heat insulating performance.

상부 단열패널(30)은 두 개의 하부 단열패널(20)이 인접하여 배치되는 면적과 대응하는 크기 및 형상으로 마련될 수 있다. 일 예로, 도면과 같이 위에서 바라볼 때 정사각형(1 X 1)인 하부 단열패널(20)이 마련되는 경우 상부 단열패널(30)은 위에서 바라볼 때 한 변의 길이가 다른 한 변의 길이의 두 배인 직사각형(1 X 2)으로 마련될 수 있다. 구체적인 단열패널(20, 30)의 형상과 길이의 비는 경우에 따라 달라질 수 있음은 물론이다.The upper insulating panel 30 may be provided in a size and shape corresponding to the area where the two lower insulating panels 20 are disposed adjacent to each other. For example, when the lower insulation panel 20 having a square (1 X 1) as viewed from above is provided as shown in the drawing, the upper insulation panel 30 has a rectangular shape having two sides of one side, (1 x 2). It is a matter of course that the ratio of the shape and length of the specific heat insulating panels 20 and 30 may be varied depending on the case.

상부 단열패널(30)은 하나의 하부 단열패널(20)과 하부 단열패널(20)의 중앙에 위치하는 하나의 패널 고정유닛(25)에 의하여 결합될 수 있다. 이 경우 하나의 상부 단열패널(30)에는 두 개의 패널 고정유닛(25)이 결합될 수 있다. 상부 단열패널(30)에 고정점이 두 개가 마련됨으로써 상부 단열패널의 회전이 방지된다.The upper insulating panel 30 may be joined by one lower fixing panel 20 and one panel fixing unit 25 located at the center of the lower insulating panel 20. In this case, two panel fixing units 25 may be coupled to one upper insulating panel 30. By providing two fixing points on the upper heat insulating panel 30, rotation of the upper heat insulating panel is prevented.

만일, 도면에 도시된 바와 달리 상부 단열패널(30)의 형상 및 크기가 하부 단열패널(20)의 그것과 동일하게 마련되는 등으로 대응한다면, 중앙부에 위치하는 패널 고정유닛(25) 한 개에 의하여 상부 단열패널(30)과 하부 단열패널(20)이 서로 고정되게 된다. 다만, 이 경우 상부 단열패널(30)은 하부 단열패널(20) 상에서 회전하는 것이 허용된다.If the shape and size of the upper insulating panel 30 are the same as those of the lower insulating panel 20 or the like, unlike the drawings, The upper and lower thermal insulation panels 30 and 20 are fixed to each other. However, in this case, the upper insulating panel 30 is allowed to rotate on the lower insulating panel 20.

상부 단열패널(30)의 회전이 허용되면 제작 공정상에서 불편이 야기될 수 있다. 특히 측면이나 천정에 상부 단열패널(30)을 설치하는 경우 의도치 않게 상부 단열패널(30)이 회전하게 되어 이들을 정렬하는 데 노력과 시간이 소요될 수 있다. 또한, 상부 단열패널(30)의 회전이 허용됨으로써 인접하는 상부 단열패널(30) 사이에 응력이 발생할 수 있으며, 이로 인해 화물창의 내구성이 저하될 수 있다. 또한, 상부 단열패널(30)에 고정되는 주방벽(20)에 응력이 집중되어 용접부위 등에 파손을 야기할 수 있다.If rotation of the upper insulating panel 30 is allowed, inconvenience may be caused in the manufacturing process. In particular, when the upper insulating panel 30 is installed on the side surface or the ceiling, the upper insulating panel 30 may rotate unintentionally, which may take time and effort to align them. Also, since the upper insulating panel 30 is allowed to rotate, stress may be generated between the adjacent upper heat insulating panels 30, thereby reducing the durability of the cargo window. Further, stress is concentrated on the main wall 20 fixed to the upper heat insulating panel 30, which may cause damage to the welded portion or the like.

이상에서는 상부 단열패널(30)의 회전을 방지하기 위하여 하나의 상부 단열패널(30)에 두 개 이상의 하부 단열패널(20)이 결합하는 것을 예로 들어 설명하였지만, 이와 달리 하나의 상부 단열패널(30)과 하나의 하부 단열패널(20)이 결합하되, 패널 고정유닛(25)이 복수로 마련되는 경우를 포함할 수 있다.In the above description, two or more lower heat insulating panels 20 are coupled to one upper heat insulating panel 30 to prevent rotation of the upper heat insulating panel 30. Alternatively, one upper insulating panel 30 And one lower insulating panel 20 are combined and a plurality of panel fixing units 25 are provided.

상부 단열패널(30)의 상부에는 주방벽(50) 설치를 위해 상부 제2보강패널(32)이 적층될 수 있다. 상부 제2보강패널(32)은 플라이우드(plywood) 등을 사용할 수 있으며, 에폭시 글루(epoxy glue) 등과 같은 접착제를 사용하여 상부 단열패널(30)에 부착될 수 있다.An upper second reinforcing panel 32 may be laminated on the top of the upper insulating panel 30 for installing the kitchen wall 50. The upper second reinforcing panel 32 may be made of plywood or the like and may be attached to the upper insulating panel 30 using an adhesive such as an epoxy glue or the like.

상부 단열패널(12)의 상부에는 주방벽 연결부재(34)가 마련될 수 있다. 특히, 상부 제2보강패널(32)이 마련되는 경우 주방벽 연결부재(34)는 상부 제2보강패널(32)의 상면에 결합할 수 있다. 주방벽 연결부재(34)는 SUS 등의 금속재질로 마련되어 주방벽(50)과 용접 결합될 수 있으며, 리벳(34a) 등에 의하여 상부 제2보강패널(32)과 기계적으로 결합할 수 있다. 주방벽 연결부재(34)는 상부 제2보강패널(32)에 형성되는 홈(32a)에 수용되어 상부 제2보강패널(32)의 상면으로 돌출되지 않을 수 있다.The upper wall of the upper insulating panel 12 may be provided with a kitchen wall connecting member 34. In particular, when the upper second reinforcing panel 32 is provided, the main body wall connecting member 34 can be coupled to the upper surface of the upper second reinforcing panel 32. The kitchen wall connecting member 34 is made of a metal such as SUS and can be welded to the kitchen wall 50 and mechanically coupled to the upper second reinforcing panel 32 by a rivet 34a or the like. The main body wall connecting member 34 may be received in the groove 32a formed in the upper second reinforcing panel 32 and may not protrude from the upper surface of the upper second reinforcing panel 32. [

또한, 주방벽 연결부재(34)는 스트립(strip) 형상으로 마련될 수 있으며, 서로 다른 방향으로 배열되어 교차부를 형성할 수 있다. 일 예로, 서로 직교하는 두 방향의 스트립 형상으로 마련될 수 있다. 주방벽 연결부재(34)는 마주보는 상부 단열패널(30)의 모서리에 평행하게 마련될 수 있다. 또한, 주방벽 연결부재(34)는 하나의 스트립으로 마련되거나 여러 개의 스트립이 연속적으로 연결되도록 마련될 수 있다.In addition, the kitchen wall connecting members 34 may be provided in a strip shape and may be arranged in different directions to form intersections. For example, two strips orthogonal to each other. The kitchen wall connecting member 34 may be provided parallel to the edge of the facing upper insulating panel 30. In addition, the kitchen wall connecting member 34 may be provided in one strip or may be provided so that a plurality of strips are continuously connected.

상부 단열패널(30)의 상부에는 주방벽(50)을 설치하기 위한 방벽 설치부재(35)가 마련될 수 있다. 특히, 주방벽 연결부재(34)가 마련되는 경우 방벽 설치부재(35)는 주방벽 연결부재(34)의 상부에 마련될 수 있다.A barrier wall member 35 for installing the kitchen wall 50 may be provided on the upper portion of the upper insulating panel 30. In particular, when the kitchen wall connecting member 34 is provided, the wall mounting member 35 may be provided on the upper portion of the kitchen wall connecting member 34.

앞에서 자동용접장치를 이용하여 보조방벽(40) 시트를 용접하기 위해서는 레일이 설치되어야 하고, 패널 고정유닛(25)에 레일이 설치됨을 설명하였다. 이와 유사하게 자동용접장치를 이용하여 주방벽(50) 시트를 용접하기 위해서는 레일을 설치할 수 있는 방벽 설치부재(35)가 필요하다.It has been described above that a rail is to be installed for welding the seat of the secondary barrier 40 by using the automatic welding apparatus and a rail is provided for the panel fixing unit 25. [ Similarly, in order to weld a sheet of the kitchen wall 50 using an automatic welding apparatus, a barrier mounting member 35 capable of mounting a rail is required.

방벽 설치부재(35)는 서로 직교하는 두 방향의 주방벽 연결부재(34)가 만나는 교차부에 마련되는 스터드 볼트일 수 있다. 방벽 설치부재(35)는 주방벽 연결부재(34) 상에 용접 결합될 수 있다. 방벽 설치부재(35)가 마련되는 두 방향의 주방벽 연결부재(34)가 만나는 교차부는 주위에 4장의 주방벽(50) 시트가 만나는 4 시트 교차부일 수 있다. 주방벽(50) 시트의 코너부에 모따기되는 경우 방벽 설치부재(35)의 주위에 4장의 주방벽(50) 시트가 용접 설치되면서도 방벽 설치부재(35)와 간섭되지 않을 수 있다. 이 때, 주방벽(50) 시트의 코너부는 주방벽 연결부재(34)에 용접 결합됨으로써 기밀성을 유지하여야 한다.The barrier mounting member 35 may be a stud bolt provided at an intersection where the two-directional main body wall connecting members 34 are perpendicular to each other. The barrier mounting member 35 may be welded on the wall wall connecting member 34. [ The intersection where the two-way wall wall connecting member 34 provided with the barrier mounting member 35 meets may be a four-sheet intersection where four sheets of the kitchen wall 50 meet. The four sheets of the kitchen wall 50 may be welded around the barrier mounting member 35 when it is chamfered at the corner of the sheet of the kitchen wall 50 and may not interfere with the barrier mounting member 35. At this time, the corner portion of the seat of the kitchen wall 50 should be welded to the kitchen wall connecting member 34 to maintain airtightness.

방벽 설치부재(35)는 주방벽(50)을 설치하기 위한 것으로, 주방벽(50)의 설치가 완료되면 제거될 수 있다. 작업자가 이동하는 때에 장애물로 취급될 수 있기 때문이다.The barrier mounting member 35 is for mounting the kitchen wall 50 and can be removed when the installation of the kitchen wall 50 is completed. This is because the operator can be treated as an obstacle when moving.

다음으로 도 6을 참고하여 주방벽(50)이 설치되는 과정을 설명하도록 한다. 도 6은 주방벽의 결합모습을 나타내는 사시도이다.Next, the process of installing the kitchen wall 50 will be described with reference to FIG. Fig. 6 is a perspective view showing a state of engagement of the kitchen wall. Fig.

주방벽 연결부재(34)는 인접하는 주방벽 연결부재(34)와 연결(직접 연결되지 않고 가상의 연장선에 의해 연결되는 것을 포함)되어 하나의 닫힌 도형을 형성한다. 도 1에는 4개의 상부 단열패널(30)이 인접하여 배치되고, 상부 단열패널(30)에 마련되는 주방벽 연결부재(34)에 의해 직사각형 형상의 닫힌 도형이 형성되는 것이 도시된다.The main body wall connecting member 34 is connected to the adjacent main body wall connecting member 34 (including those connected by a virtual extension line without being directly connected thereto) to form one closed figure. In Fig. 1, four upper insulating panels 30 are arranged adjacent to each other, and a rectangular shaped closed figure is formed by a main body wall connecting member 34 provided on the upper insulating panel 30. In Fig.

주방벽(50)을 구성하는 하나의 주방벽(50) 시트(sheet)는 주방벽 연결부재(34)에 의해 형성되는 닫힌 도형의 형상에 대응하는 형상일 수 있으며, 주방벽(50) 시트의 4 모서리는 각각 주방벽 연결부재(34)에 겹쳐지도록 배치되어 고정될 수 있다. 일 예로, 주방벽(50) 시트는 주방벽 연결부재(34)에 가용접(tack welding) 방식으로 고정될 수 있다.One sheet of the kitchen wall 50 constituting the kitchen wall 50 may be in a shape corresponding to the shape of the closed figure formed by the kitchen wall connecting member 34, The four corners may be disposed and fixed so as to overlap with the respective wall wall connecting members 34, respectively. In one example, the seat of the kitchen wall 50 may be fixed to the kitchen wall connecting member 34 in a tack welding manner.

하나의 주방벽(50) 시트가 고정된 후 인접하는 일 측면에 다른 주방벽(50) 시트가 고정될 수 있다. 이 때 미리 설치된 주방벽(50) 시트와 인접하는 주방벽(50) 시트의 4 모서리 중 하나의 모서리는 미리 설치된 주방벽(50) 시트와 겹쳐지도록 배치되고 다른 3 모서리는 주방벽 연결부재(34) 상에 배치되어 고정될 수 있다. 일 예로, 주방벽(50) 시트와 주방벽(50) 시트의 고정 및 주방벽(50) 시트와 주방벽 연결부재(34)의 고정은 가용접(tack welding) 방식을 사용할 수 있다.After one sheet of the kitchen wall 50 is fixed, another sheet of the kitchen wall 50 can be fixed to the adjacent one side. At this time, one corner of the four corners of the kitchen wall 50 sheet adjoining to the pre-installed kitchen wall 50 sheet is arranged to overlap with the pre-installed kitchen wall 50 sheet and the other three corners are connected to the kitchen wall connecting member 34 ) And can be fixed. The fixing of the seat of the kitchen wall 50 and the fixing of the seat of the kitchen wall 50 and the fixing of the seat wall and the kitchen wall connecting member 34 of the kitchen wall 50 may use a tack welding method.

위의 설치 과정을 연속적으로 수행하여 상부 단열패널(30) 상에 주방벽(50) 시트를 모두 고정한다. 그러나 아직은 인접하는 주방벽(50) 시트 사이에 가용접만 된 상태이기 때문에 기밀성을 유지하기 위하여 본 용접을 하여야 한다.The above installation process is continuously performed to fix all the sheets of the kitchen wall 50 on the upper heat insulating panel 30. [ However, since it is still in a state of being in contact with the gap between adjacent sheets of the kitchen wall 50, it is necessary to perform this welding in order to maintain airtightness.

인접하는 주방벽(50) 시트의 양 모서리는 겹치기 용접 또는 맞대기 용접에 의해 본 용접됨으로써 기밀성을 확보할 수 있다. 이 때 사용될 수 있는 용접방법으로 보조방벽의 용접에 사용되는 방법이 사용될 수 있으며, 자동용접장치를 사용할 수 있음은 물론이다.Both edges of the adjacent sheet of the kitchen wall 50 are welded by lap welding or butt welding, thereby ensuring airtightness. As a welding method that can be used at this time, a method used for welding the auxiliary barrier can be used, and of course, an automatic welding device can be used.

한편, 주방벽 연결부재(34)는 인접하는 주방벽(50) 시트끼리 용접할 때 용접선(또는 용접심)의 하부에 위치함으로써 용접열에 의해 주방벽(50) 시트가 변형되는 것을 방지할 수 있다. 특히 플라즈마 용접이 사용되는 경우 고열에 의해 발생할 수 있는 주방벽(50) 시트의 변형을 방지할 수 있다. 이 때 주방벽(50) 시트끼리 겹치기 용접 또는 맞대기 용접하는 과정에서 용접열이 주방벽 연결부재(34)에까지 전달되어 하부의 주방벽 연결부재(34)와 그 상부에 위치하는 주방벽(50) 시트가 서로 용접될 수도 있다.On the other hand, the kitchen wall connecting member 34 is located below the welding line (or welding seam) when the adjacent sheets of the kitchen wall 50 are welded together, thereby preventing the sheet of the kitchen wall 50 from being deformed by the welding heat . It is possible to prevent deformation of the sheet of the kitchen wall 50, which may be caused by high temperature, particularly when plasma welding is used. At this time, in the process of overlap welding or butt welding of the sheets of the kitchen wall 50, the welding heat is transmitted to the kitchen wall connecting member 34 to connect the lower kitchen wall connecting member 34 and the kitchen wall 50 located thereon, The sheets may be welded together.

주방벽(50) 시트와 주방벽(50) 시트의 본 용접은 자동용접장치를 이용할 수 있다. 특히 주방벽(50)의 주름부의 용접 역시 자동용접장치를 이용할 수 있다. 이 때, 얇은 두께의 주방벽(50) 시트와 주방벽(50) 시트를 용접하기 위해 작업자가 수작업으로 용접을 진행하거나 자동용접장치를 이용하기 위해서는 두 주방벽(50) 시트를 밀착시키는 핏업(Fit-Up) 작업이 필요하다. 특히 자동용접장치를 이용하는 경우 핏업 작업이 중요하다.The main welding of the kitchen wall 50 sheet and the kitchen wall 50 sheet can utilize automatic welding equipment. In particular, welding of the corrugated portion of the kitchen wall 50 can also use an automatic welding apparatus. At this time, in order to manually weld the worker to weld the sheet of the kitchen wall 50 and the sheet of the kitchen wall 50 with a thin thickness or to use the automatic welding apparatus, Fit-Up. In particular, the use of automatic welding equipment is important to the work of the foot.

핏업 작업은 보조방벽(40)을 설치하는 과정과 동일한 방법이 사용될 수 있으므로, 자세한 설명을 생략하도록 한다. 핏업지그(미도시)는 주방벽 연결부재(34)에 설치되는 방벽 설치부재(35)에 결합하거나 흡착식에 의해 주방벽(50) 시트 상에 고정될 수 있다.Since the same method as the process of installing the auxiliary barrier 40 can be used for the work of the fatigue, a detailed description will be omitted. The pick-up jig (not shown) may be fixed to the sheet of the kitchen wall 50 by being engaged with or adsorbing to the barrier-attaching member 35 provided on the kitchen wall connecting member 34.

자동용접장치는 상부 단열패널(30)에 고정되도록 설치되는 레일을 따라 이동하면서 용접을 수행한다. 따라서 자동용접장치를 이용하기 위해서는 용접선 주위에 레일을 고정 설치하는 작업이 필요하다.The automatic welding apparatus performs welding while moving along the rails that are installed to be fixed to the upper insulating panel (30). Therefore, in order to use the automatic welding device, it is necessary to fix the rail around the welding line.

본 발명의 실시예에 따른 액화가스 화물창을 제조하는 방법에서는 주방벽 연결부재(34)에 설치되는 방벽 설치부재(35)(일 예로, 스터드 볼트)를 이용하여 레일을 고정 설치할 수 있다.In the method of manufacturing the liquefied gas holding window according to the embodiment of the present invention, the rails can be fixed by using a barrier attachment member 35 (for example, a stud bolt) provided on the kitchen wall connecting member 34.

다음으로 자동용접장치를 이용하여 주방벽(50) 시트를 용접하는 방법에 대하여 설명하도록 한다.Next, a method of welding the sheet of the kitchen wall 50 using the automatic welding apparatus will be described.

앞에서 주방벽(50) 시트가 주방벽 연결부재(34)에 가용접되고, 인접하는 주방벽(50) 시트끼리 가용접되어 고정되는 것에 대하여 설명한 바 있다. 이제 두 주방벽(50) 시트가 겹쳐지거나 맞닿는 선(용접선)을 따라 본 용접을 수행하면 주방벽의 설치가 완료된다. 자동용접장치가 용접선을 따라 이동할 수 있도록 용접선 근처에 레일을 설치할 수 있다. 이 때 레일과 용접선이 평행하게 마련되는 경우 용접품질을 향상시키고 작업시간을 단축시킬 수 있다.It has been described that the seat of the kitchen wall 50 is previously touched to the kitchen wall connecting member 34 and the adjacent sheets of the kitchen wall 50 are contacted and fixed to each other. Now, when the main welding is performed along the line (weld line) where the two kitchen wall 50 sheets overlap or abut, the installation of the kitchen wall is completed. A rail can be installed near the weld line so that the automatic welding device can move along the weld line. In this case, when the rail and the weld line are provided in parallel, the welding quality can be improved and the working time can be shortened.

레일은 한 방향으로 배열되는 복수의 방벽 설치부재(35)에 고정되어 용접선에 평행하게 설치됨으로써 레일에 설치되는 자동용접장치가 용접선을 따라 용접 수행하는 작업을 용이하게 할 수 있다. 자동용접이 완료된 후 레일은 방벽 설치부재(35)로부터 해체된다.The rails are fixed to a plurality of barrier mounting members 35 arranged in one direction so as to be parallel to the welding line, so that the automatic welding apparatus installed on the rails can facilitate welding along the welding line. After the automatic welding is completed, the rails are disassembled from the barrier mounting member 35.

주방벽(50)의 용접이 완료되면 기밀성이 확보되는지 여부를 검사하는 과정을 거치게 된다. 검사과정으로는 주방벽(50)과 상부 단열패널(30) 사이에 검사 가스를 주입하고 검사가스가 외부로 누출되는지 여부를 확인하는 방법이 사용될 수 있다. 검사 결과 외부에서 검사 가스가 검출된다면 그 부분의 용접 상태가 불량인 것으로 판단하여 재용접을 실시한다.When the welding of the kitchen wall 50 is completed, it is checked whether the airtightness is secured. As the inspection process, a method of injecting a test gas between the kitchen wall 50 and the upper heat insulating panel 30 and checking whether the test gas leaks to the outside can be used. If the inspection gas is detected from the outside as an inspection result, it is judged that the welding condition of the part is defective and re-welding is performed.

다음으로 도 7과 도 8을 참고하여 본 발명의 실시예에 따른 화물창의 제조방법에 대하여 설명하도록 한다. 도 7은 상부 단열패널(30)과 하부 단열패널(30)의 배치모습을 나타내기 위한 제1방향 단면도이고, 도 8은 상부 단열패널(30)과 하부 단열패널(20)의 배치모습을 나타내기 위한 제2방향 단면도이다.Next, a method of manufacturing a cargo hold according to an embodiment of the present invention will be described with reference to FIGS. 7 and 8. FIG. 7 is a sectional view in the first direction for showing the arrangement of the upper heat insulating panel 30 and the lower heat insulating panel 30 and FIG. 8 is a view showing the arrangement of the upper heat insulating panel 30 and the lower heat insulating panel 20 In a second direction.

단열패널 어셈블리가 설치되는 외벽(10)은 평면부(P)와 코너부(C)를 포함한다. 이하에서는 평면부(P)에 설치되는 단열패널 어셈블리에 대하여 설명하도록 한다.The outer wall 10 on which the insulating panel assembly is installed includes a flat portion P and a corner C. Hereinafter, the heat insulating panel assembly provided in the flat portion P will be described.

하부 단열패널(20)은 외벽(10)에 미리 설치된 스터드 볼트(12)에 고정될 수 있다. 하부 단열패널(20)은 저부에 하부 제1보강패널(21)이 접착에 의해 결합되고 상부에 하부 제2보강패널(22)이 접착에 의해 결합된 상태로 설치될 수 있다. 하부 단열패널(20)은 대체적으로 사각기둥 형상을 할 수 있으며, 4 모서리에 스터드 볼트(12)의 결합을 위한 관통홀(20a)이 형성될 수 있다.The lower heat insulating panel 20 can be fixed to the stud bolt 12 previously provided on the outer wall 10. The lower insulating panel 20 may be installed such that the lower first reinforcing panel 21 is bonded to the bottom of the lower insulating panel 20 and the lower second reinforcing panel 22 is bonded to the upper portion thereof by adhesive bonding. The lower heat insulating panel 20 may have a substantially rectangular column shape and a through hole 20a for joining the stud bolts 12 may be formed at four corners.

하부 단열패널(20)은 제1방향과 제2방향으로 인접하여 연속적으로 설치될 수 있다. 또한, 하부 단열패널(20)은 서로 엇갈리지 않도록 격자형으로 배치될 수 있다. 따라서 인접하는 하부 단열패널(20)의 경계는 연속적으로 이어질 수 있다.The lower heat insulating panel 20 may be continuously installed adjacent to the first direction and the second direction. Further, the lower insulating panels 20 can be arranged in a lattice form so as not to be staggered with each other. Therefore, the boundaries of the adjacent lower insulating panels 20 can be continuously connected.

하부 단열패널(20)은 너비 방향 단면 형상이 정사각형 일 수 있다. 즉, 가로 너비와 세로 너비가 같을 수 있다. 따라서 작업자는 하부 단열패널(20)의 방향에 상관 없이 하부 단열패널(20)을 설치할 수 있다. 또한, 하부 단열패널(20)은 미리 제작된 단일 형상 및 크기로 제공될 수 있다. 규격화된 하부 단열패널(20)을 사용함으로써 제작의 편의성이 증대될 수 있다.The lower insulating panel 20 may have a square cross-sectional shape in the width direction. That is, the width and the width may be the same. Therefore, the operator can install the lower heat insulating panel 20 regardless of the direction of the lower heat insulating panel 20. In addition, the lower insulating panel 20 can be provided in a single preformed shape and size. By using the standardized bottom insulating panel 20, convenience of fabrication can be increased.

하부 제1보강패널(21)의 저부에는 매스틱(11)이 부착된 상태일 수 있으며, 하부 제2보강패널(22)의 상부에는 보조방벽 연결부재(24)와 패널 고정유닛(25)이 설치된 상태일 수 있다. 따라서 미리 제작된 하부 단열패널(20)을 외벽(10)에 배치하고 스터드 볼트(12)와 결합하는 과정 만으로 하부 단열패널(20)의 설치 과정이 완료되어 제작공정이 단순해 질 수 있다.The mastic 11 may be attached to the bottom of the lower first reinforcing panel 21 and the auxiliary barrier connecting member 24 and the panel fixing unit 25 may be attached to the upper portion of the lower second reinforcing panel 22. [ It may be installed. Therefore, the installation process of the lower heat insulating panel 20 is completed by simply disposing the pre-manufactured lower insulating panel 20 on the outer wall 10 and joining with the stud bolt 12, thereby simplifying the manufacturing process.

코너부(C)에 설치되는 하부 단열패널(20)은 코너부(C)의 형상에 대응하도록 제작된다. 코너부(C)에 설치되는 하부 단열패널(20)과 이와 인접하도록 배치되는 평면부(P)에 설치되는 하부 단열패널(20) 사이에는 설치 오차에 따른 유격 공간(G)이 발생할 수 있다. 이 유격 공간(G)에는 삽입 단열패널(26)이 삽입될 수 있다. 삽입 단열패널(26)은 별도의 보강패널이 필요치 않을 수 있으며, 압입에 의해 끼워 넣어 고정되거나 접착에 의해 고정될 수 있다.The lower heat insulating panel 20 provided at the corner C is formed to correspond to the shape of the corner C. [ A clearance space G may be formed between the lower heat insulating panel 20 installed at the corner C and the lower heat insulating panel 20 installed at the flat portion P disposed adjacent thereto. The insertion gap panel 26 can be inserted into the clearance space G. The insulative and insulating panel 26 may not require a separate reinforcing panel and may be clamped or fixed by gluing by press-fitting.

하부 단열패널(20)의 설치가 완료된 후 하부 단열패널(20) 상에 보조방벽(40)이 설치될 수 있다. 보조방벽(40)은 다수의 보조방벽(40) 시트가 연속적으로 연결되어 형성될 수 있다.The auxiliary barrier 40 may be installed on the lower insulating panel 20 after the installation of the lower insulating panel 20 is completed. The auxiliary barrier 40 may be formed by continuously connecting a plurality of auxiliary barrier 40 sheets.

하나의 보조방벽(40) 시트는 복수의 하부 단열패널(20)을 커버할 수 있다. 바람직하게는 하나의 교차점에 꼭지점이 인접하는 4개의 하부 단열패널(20)들을 커버하도록 설치될 수 있다. 또한, 보조방벽(40) 시트의 한 변의 길이는 하부 단열패널(20)의 가로 또는 세로 길이 보다 길게 마련될 수 있다.One auxiliary barrier 40 sheet may cover the plurality of lower insulating panels 20. [ And may be installed to cover four lower insulating panels 20, which are preferably adjacent to one vertex at one intersection. Further, the length of one side of the auxiliary barrier 40 sheet may be longer than the width or length of the lower insulating panel 20.

일 예로, 도 3과 같이 하나의 보조방벽(40) 시트는 제1방향으로는 2개의 하부 단열패널(20)에, 제2방향으로는 4개의 하부 단열패널(20)에 걸치도록 설치될 수 있다. 이 때, 보조방벽(40) 시트의 제1방향 변의 길이는 하부 단열패널(20)의 너비 방향 변의 길이보다 약간 길 수 있으며, 제2방향 변의 길이는 하부 단열패널(20)의 너비 방향 변의 길이에 3배를 한 것 보다 약간 길 수 있다. 보조방벽(40) 시트의 변의 길이가 약간 더 길게 마련되는 것은 인접하는 보조방벽(40) 시트를 결합에 겹치기용접이 사용될 수 있다는 점과 인접하는 하부 단열패널(20)을 설치할 때 설치 편의성을 위해 약간의 간극을 두고 설치할 수 있다는 점 때문이다.For example, as shown in FIG. 3, one auxiliary barrier 40 sheet can be installed over two lower insulating panels 20 in a first direction and four lower insulating panels 20 in a second direction have. At this time, the length of the side of the auxiliary barrier 40 in the first direction may be slightly longer than the length of the width direction side of the lower heat insulating panel 20, and the length of the second direction side may be the length of the width direction side Which may be slightly longer than three times. The length of the sides of the auxiliary barrier 40 sheet is slightly longer than that of the adjacent auxiliary barrier 40 in that overlap welding can be used to bond the adjacent auxiliary barrier 40 sheets and for ease of installation when installing the adjacent bottom insulating panel 20 It can be installed with a slight gap.

보조방벽(40) 시트는 단일 형상 및 크기로 제작될 수 있으며, 제1방향과 제2방향으로 연속적으로 연결되도록 설치될 수 있다. 다만 코너부(C)에 설치되는 보조방벽(40)과 연결을 위해서는 별도로 크기로 제작되는 보조방벽(40) 시트를 이용할 수 있다.The auxiliary barrier 40 sheet may be manufactured in a single shape and size, and may be installed so as to be continuously connected to the first direction and the second direction. However, the auxiliary barrier 40 sheet may be separately formed for connection with the auxiliary barrier 40 provided at the corner portion C.

하부 단열패널(20)의 중앙부에는 패널 고정유닛(25)이 마련될 수 있다. 제작 공정을 단순하게 하기 위해 하나의 하부 단열패널(20)에 하나의 패널 고정유닛(25)만이 마련될 수 있으며, 패널 고정유닛(25)은 상부 단열패널(30)과 결합하였을 때 외력에 의한 응력의 불균형을 방지하기 위해 하부 단열패널(20)의 중앙부에 위치할 수 있다.A panel fixing unit 25 may be provided at a central portion of the lower heat insulating panel 20. Only one panel fixing unit 25 may be provided on one lower insulation panel 20 in order to simplify the manufacturing process and the panel fixing unit 25 may be fixed to the upper insulation panel 30 by an external force And may be located at the center of the lower insulating panel 20 to prevent stress unbalance.

한편, 보조방벽(40) 시트에는 패널 고정유닛(25)의 돌출부재(25b)가 관통되는 관통홀(40a)이 형성되며, 보조방벽(40) 시트를 설치한 후에는 보조방벽(40)의 기밀성 유지를 위해 관통홀(40a)을 따라 패널 고정유닛(25)과 용접 마감될 수 있다.A through hole 40a through which the projecting member 25b of the panel fixing unit 25 passes is formed in the seat of the auxiliary barrier 40. After the seat of the auxiliary barrier 40 is installed, And can be welded to the panel fixing unit 25 along the through hole 40a to maintain airtightness.

보조방벽 연결부재(24)는 보조방벽(40) 시트의 모서리에 대응하도록 제1방향과 제2방향을 따라 배치될 수 있다. 보조방벽 연결부재(24)는 패널 고정유닛(25)과의 간섭을 피하기 위해 하부 단열패널(20)의 중심선(가로 방향 중심선과 세로 방향 중심선을 포함)에서 어느 한 방향으로 치우쳐 배치될 수 있다.The auxiliary barrier connection member 24 may be disposed along the first direction and the second direction so as to correspond to the corners of the auxiliary barrier 40 sheet. The auxiliary barrier connecting member 24 may be disposed to be biased in either direction from the center line (including the center line and the center line in the longitudinal direction) of the lower insulating panel 20 in order to avoid interference with the panel fixing unit 25. [

상부 단열패널(30)은 패널 고정유닛(25)에 고정 결합될 수 있다. 상부 단열패널(30)은 저부에 상부 제1보강패널(31)이 접착에 의해 결합되고 상부에 상부 제2보강패널(32)이 접착에 의해 결합된 상태로 설치될 수 있다. 상부 단열패널(30)은 대체적으로 사각기둥 형상을 할 수 있으며, 중심선에 패널 고정유닛(25)과의 결합을 위한 관통홀(30a)이 형성될 수 있다.The upper insulating panel 30 may be fixedly coupled to the panel fixing unit 25. [ The upper insulating panel 30 may be installed such that the upper first reinforcing panel 31 is bonded to the bottom of the upper insulating panel 30 and the upper second reinforcing panel 32 is bonded to the upper portion of the upper first reinforcing panel 32 by adhesive bonding. The upper insulating panel 30 may have a substantially square pillar shape and a through hole 30a for coupling with the panel fixing unit 25 may be formed on the center line.

상부 단열패널(30)은 제1방향과 제2방향으로 인접하여 연속적으로 설치될 수 있다. 또한, 상부 단열패널(30)은 서로 엇갈리지 않도록 격자형으로 배치될 수 있다. 따라서 인접하는 상부 단열패널(30)의 경계는 연속적으로 이어질 수 있다.The upper insulating panel 30 may be continuously installed adjacent to the first direction and the second direction. Further, the upper insulating panels 30 may be arranged in a lattice form so as not to be staggered with respect to each other. Therefore, the boundaries of the adjacent upper insulating panels 30 can be continuously connected.

상부 단열패널(30)의 너비는 하부 단열패널(20)의 너비의 정수배로 마련될 수 있다. 즉, 상부 단열패널(30)의 가로 너비와 세로 너비는 하부 단열패널(20)의 가로 너비 또는 세로 너비의 정수배에서 선택할 수 있다.The width of the upper insulating panel 30 may be set to an integral multiple of the width of the lower insulating panel 20. [ That is, the width and the width of the upper insulating panel 30 can be selected from an integer multiple of the width or the width of the lower insulating panel 20.

일 예로, 도 1에는 상부 단열패널(30)의 너비 방향 단면 형상이 두 개의 하부 단열패널(20)을 연속적으로 배치하였을 때의 너비 방향 단면 형상과 동일하게 직사각형으로 마련되는 것을 도시하였다. 즉, 하부 단열패널(20)의 가로 너비와 세로 너비의 비가 1:1의 비율로 마련되고, 상부 단열패널(30)의 가로 너비와 세로 너비의 비가 1:2의 비율로 마련될 수 있다. 다만, 상부 단열패널(30)의 너비 방향 길이는 인접하는 하부 단열패널(20) 사이의 간극 길이를 고려하여 더 길게 제공될 수 있다.For example, in FIG. 1, the width direction cross-sectional shape of the upper heat insulating panel 30 is shown to be rectangular in the same width direction sectional shape when the two lower heat insulating panels 20 are continuously arranged. That is, the ratio of the horizontal width to the vertical width of the lower insulating panel 20 is 1: 1, and the ratio of the width of the upper insulating panel 30 to the width of the upper insulating panel 30 is 1: 2. However, the length in the width direction of the upper insulating panel 30 can be provided longer considering the gap length between the adjacent lower insulating panels 20.

또한, 상부 단열패널(30)은 미리 제작된 단일 형상 및 크기로 제공될 수 있다. 규격화된 상부 단열패널(30)을 사용함으로써 제작의 편의성이 증대될 수 있다.In addition, the upper insulating panel 30 may be provided in a preformed single shape and size. By using the standardized upper insulating panel 30, convenience of fabrication can be increased.

인접하는 상부 단열패널(30) 사이의 경계는 인접하는 하부 단열패널(20) 사이의 경계에 대응하도록 마련될 수 있다. 일 예로, 도 1에는 상부 단열패널(30)의 모서리가 인접하는 2개의 하부 단열패널(20)의 외곽부 모서리에 대응하는 것을 도시하였다. 여기서 외곽부 모서리는 2개의 하부 단열패널(20) 사이의 경계를 제외한 모서리를 의미한다.The boundary between the adjacent upper insulating panels 30 may be provided so as to correspond to the boundary between the adjacent lower insulating panels 20. For example, FIG. 1 shows that the edges of the upper insulating panel 30 correspond to the outer edges of two adjacent lower insulating panels 20. FIG. Here, the edge of the outer edge means an edge excluding the boundary between the two lower heat insulating panels 20.

앞에서 하나의 하부 단열패널(20)에 하나의 패널 고정유닛(25)이 설치될 수 있음을 설명하였다. 따라서 2개의 하부 단열패널(20)과 결합하는 상부 단열패널(30)은 2개의 패널 고정 유닛과 결합한다. 또한, 패널 고정유닛(25)이 하부 단열패널(20)의 중앙부에 마련될 수 있으므로, 상부 단열패널(30)의 관통홀(30a)은 중앙선 상에 마련될 수 있다.It has been described that one panel fixing unit 25 can be installed on one lower insulating panel 20 in the foregoing. Thus, the upper insulating panel 30, which mates with the two lower insulating panels 20, engages the two panel fixing units. Since the panel fixing unit 25 can be provided at the center of the lower heat insulating panel 20, the through hole 30a of the upper heat insulating panel 30 can be provided on the center line.

상부 제2보강패널(32)의 상부에는 주방벽 연결부재(34)와 방벽 설치부재(35)가 설치된 상태일 수 있다. 따라서 미리 제작된 상부 단열패널(30)을 하부 단열패널(20) 상에 배치하고 패널 고정유닛(25)과 결합하는 과정 만으로 상부 단열패널(30)의 설치 과정이 완료되어 제작공정이 단순해 질 수 있다.The upper portion of the upper second reinforcing panel 32 may be provided with a main wall connecting member 34 and a wall-mounting member 35. Therefore, the installation process of the upper insulating panel 30 is completed by simply arranging the preliminarily manufactured upper insulating panel 30 on the lower insulating panel 20 and joining with the panel fixing unit 25, thereby simplifying the manufacturing process .

코너부(C)에 설치되는 상부 단열패널(30)은 코너부(C)의 형상에 대응하도록 제작된다. 만일 코너부(C)에 설치되는 상부 단열패널(30)과 인접하도록 배치되는 평면부(P)에 설치되는 상부 단열패널(30)에 규격화된 상부 단열패널(30)을 사용하는 경우 두 상부 단열패널(30) 사이에 설치 오차에 따른 유격 공간(G)이 발생할 수 있다. 앞에서 코너부(C)에 설치되는 하부 단열패널(20)과 이와 인접하도록 배치되는 평면부(P)에 설치되는 하부 단열패널(20) 사이(G)에 삽입 단열패널(26)이 삽입될 수 있음을 설명하였다. 이 때 삽입 단열패널(26)의 제작을 위해 유격 공간(G)의 너비가 미리 계산된다.The upper heat insulating panel 30 provided on the corner C is formed to correspond to the shape of the corner C. [ If a normalized upper insulating panel 30 is used in the upper insulating panel 30 provided on the plane portion P disposed adjacent to the upper insulating panel 30 provided at the corner C, A space G may be generated between the panels 30 due to an installation error. The insertion insulator panel 26 can be inserted into the gap G between the lower heat insulating panel 20 provided at the corner C and the lower heat insulating panel 20 provided at the plane portion P disposed adjacent thereto . At this time, the width of the clearance space G is preliminarily calculated for manufacturing the inserting and insulating panel 26.

코너부(C)에 설치되는 상부 단열패널(30)과 인접하도록 배치되는 평면부(P)에 설치되는 상부 단열패널(30)은 규격화된 상부 단열패널(30)의 너비 방향 길이보다 삽입 단열패널(26)의 너비 방향 길이(G)만큼 더 길게 제작되는 상부 단열패널(30)을 이용할 수 있다. 하부 단열패널(20)에서와 같이 별도의 삽입 단열패널(26)을 사용하지 않음으로써 슬로싱 하중이 직접적으로 작용하는 상부 단열패널(30)의 강성과 내구성을 유지할 수 있다.The upper insulating panel 30 provided on the flat portion P arranged adjacent to the upper insulating panel 30 provided at the corner C is larger than the width direction length of the normalized upper insulating panel 30, The length of the upper insulating panel 30 may be longer than the length W of the upper insulating panel 30. [ It is possible to maintain the rigidity and durability of the upper insulating panel 30 directly acting on the sloshing load by not using the separate insertion and adiabatic panel 26 as in the lower insulating panel 20. [

상부 단열패널(30)의 설치가 완료된 후 상부 단열패널(30) 상에 주방벽(50)이 설치될 수 있다. 주방벽(50)은 다수의 주방벽(50) 시트가 연속적으로 연결되어 형성될 수 있다.After the installation of the upper insulation panel 30 is completed, the kitchen wall 50 may be installed on the upper insulation panel 30. The kitchen wall 50 may be formed by connecting a plurality of sheets of the kitchen wall 50 continuously.

하나의 주방벽(50) 시트는 복수의 상부 단열패널(30)을 커버할 수 있다. 바람직하게는 하나의 교차점에 꼭지점이 인접하는 4개의 상부 단열패널(30)들을 커버하도록 설치될 수 있다. 또한, 주방벽(50) 시트의 한 변의 길이는 상부 단열패널(30)의 가로 또는 세로 길이 보다 길게 마련될 수 있다.A single sheet of the kitchen wall 50 may cover a plurality of upper insulating panels 30. And may be installed to cover four upper insulating panels 30, which are preferably adjacent to each other at vertexes at one intersection. The length of one side of the sheet of the kitchen wall 50 may be longer than the width or length of the upper insulating panel 30.

일 예로, 도 1과 같이 하나의 주방벽(50) 시트는 제1방향 및 제2방향으로 각각 2개의 상부 단열패널(30)에 걸치도록 설치될 수 있다. 이 때, 주방벽(50) 시트의 제1방향 변의 길이는 상부 단열패널(30)의 제1방향 너비 방향 변의 길이보다 약간 길 수 있으며, 제2방향 변의 길이는 상부 단열패널(30)의 너비 방향 변의 길이보다 약간 길 수 있다. 주방벽(50) 시트의 변의 길이가 약간 더 길게 마련되는 것은 인접하는 주방벽(50) 시트를 결합에 겹치기용접이 사용될 수 있다는 점과 인접하는 상부 단열패널(30)을 설치할 때 설치 편의성을 위해 약간의 유격 공간을 두고 설치할 수 있다는 점 때문이다.For example, as shown in FIG. 1, one sheet of the kitchen wall 50 may be installed to extend over two upper insulating panels 30 in the first direction and the second direction, respectively. At this time, the length of the first direction side of the sheet of the kitchen wall 50 may be slightly longer than the length of the first direction width direction side of the upper heat insulating panel 30, and the length of the second direction side may be the width of the upper heat insulating panel 30 But may be slightly longer than the length of the sides. The provision of slightly longer sides of the sides of the kitchen wall 50 is advantageous in that overlapping welding of the sheets of adjacent kitchen wall 50 to the joint can be used and for ease of installation when installing the adjacent upper insulating panel 30 It can be installed with a little clearance space.

주방벽(50) 시트는 단일 형상 및 크기로 제작될 수 있으며, 제1방향과 제2방향으로 연속적으로 연결되도록 설치될 수 있다. 다만 코너부(C)에 설치되는 주방벽(50)과 연결을 위해서는 별도로 크기로 제작되는 주방벽(50) 시트를 이용할 수 있다.The sheets of the kitchen wall 50 may be made in a single shape and size, and may be installed so as to be continuously connected to the first direction and the second direction. However, it is possible to use a separate sheet of the kitchen wall 50 for connection with the kitchen wall 50 installed at the corner portion C.

주방벽 연결부재(34)는 주방벽(50) 시트의 모서리에 대응하도록 제1방향과 제2방향을 따라 배치될 수 있다. 주방벽 연결부재(34)는 관통홀(30a)과의 간섭을 피하기 위해 상부 단열패널(30)의 제2방향 중심선(도면에서 제1방향 모시리의 중점을 연결하여 제2방향으로 연장되는 가상의 선)에서 어느 한 방향으로 치우쳐 배치될 수 있다. 다만, 제1방향 중심선 상에는 관통홀(30a)이 마련되지 않기 때문에 제1방향으로 배치되는 주방벽 연결부재(34)가 제1방향 중심선과 일치되도록 마련되는 것은 문제가 없다.The kitchen wall connecting member 34 may be disposed along the first direction and the second direction to correspond to the corners of the seat of the kitchen wall 50. The kitchen wall connecting member 34 is connected to the second direction center line of the upper insulating panel 30 in order to avoid interference with the through hole 30a Line) in one direction. However, since the through hole 30a is not formed on the first direction center line, the main body wall connecting member 34 arranged in the first direction is provided so as to coincide with the first direction center line.

본 발명은 첨부된 도면에 도시된 일 실시예를 참고로 설명되었으나, 이는 예시적인 것에 불과하며, 당해 기술 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 수 있을 것이다. 따라서 본 발명의 진정한 범위는 첨부된 청구 범위에 의해서만 정해져야 할 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is clearly understood that the same is by way of illustration and example only and is not to be taken by way of limitation, You will understand. Accordingly, the true scope of the invention should be determined only by the appended claims.

10: 외벽, 11: 매스틱,
12: 스터드 볼트, 13: 레벨패드
20: 하부 단열패널, 20a: 관통홀,
20b: 폼 플러그, 21: 하부 제1보강패널,
21a: 관통홀, 22: 하부 제2보강패널,
22a, 22b: 홈, 23: 하부 조인트,
24: 보조방벽 연결부재, 24a: 리벳,
25: 패널 고정유닛, 25a: 결합부,
25b: 돌출부재, 25c: 리벳,
26:삽입 단열패널, 30: 상부 단열패널,
30a: 관통홀, 30b: 폼 플러그,
31: 상부 제1보강패널, 31a: 관통홀,
32: 상부 제2보강패널, 32a: 홈,
33: 상부 조인트, 34: 주방벽 연결부재,
34a: 리벳, 35: 방벽 설치부재,
40: 보조방벽, 40a: 관통홀,
41: 주름부, 42: 교차부,
50: 주방벽, 51: 주름부,
52: 교차부.
10: outer wall, 11: mastic,
12: Stud bolt, 13: Level pad
20: lower insulation panel, 20a: through hole,
20b: foam plug, 21: lower first reinforcing panel,
21a: Through hole, 22: Lower second reinforcing panel,
22a, 22b: groove, 23: lower joint,
24: auxiliary barrier connecting member, 24a: rivet,
25: a panel fixing unit, 25a: a coupling portion,
25b: projecting member, 25c: rivet,
26: inserting insulating panel, 30: upper insulating panel,
30a: Through hole, 30b: Foam plug,
31: upper first reinforcing panel, 31a: through hole,
32: upper second reinforcing panel, 32a: groove,
33: upper joint, 34: kitchen wall connecting member,
34a: Rivet, 35: Barrier mounting member,
40: auxiliary barrier, 40a: through hole,
41: wrinkle portion, 42: intersection portion,
50: a kitchen wall, 51: a wrinkled portion,
52: intersection.

Claims (16)

액화가스의 수용공간을 둘러싸는 주방벽과 상기 주방벽을 둘러싸며 액화가스를 외부로부터 단열하는 단열패널 어셈블리를 포함하고, 평면부와 코너부로 형성되는 액화가스 화물창에 있어서,
상기 평면부에 설치되는 단열패널 어셈블리는,
다수가 인접하여 설치되는 하부 단열패널;
상기 하부 단열패널 상에 적층되어 상기 하부 단열패널을 밀봉하는 보조방벽; 및
상기 보조방벽 상에 적층되고 다수가 인접하여 설치되며 상기 하부 단열패널의 너비 방향 면적보다 크게 마련되는 상부 단열패널;을 포함하고,
상기 평면부에 설치되어 인접하는 상부 단열패널 사이의 경계는 상기 인접하는 하부 단열패널 사이의 경계에 대응하며,
상기 보조방벽은 하부로 볼록하게 주름지는 제1주름부와, 제2주름부와, 상기 제1주름부와 제2주름부가 교차하는 교차부를 포함하고,
상기 제1주름부와 제2주름부는 상기 인접하는 하부 단열패널의 경계 사이에 수용되는 액화가스 화물창.
A liquefied gas holding window formed by a flat surface portion and a corner portion, the liquefied gas holding window including a main wall surrounding the liquefied gas receiving space and an insulating panel assembly surrounding the liquefied gas from the outside,
Wherein the heat insulating panel assembly installed on the flat surface portion comprises:
A plurality of lower insulation panels installed adjacent to each other;
An auxiliary barrier laminated on the lower insulation panel to seal the lower insulation panel; And
And an upper insulating panel laminated on the auxiliary wall, a plurality of which are adjacent to each other, and a larger area than a width direction area of the lower insulating panel,
Wherein a boundary between adjacent upper heat insulating panels provided on the flat portion corresponds to a boundary between the adjacent lower insulating panels,
Wherein the auxiliary barrier comprises a first wrinkled portion that is convexly wrinkled downwardly, a second wrinkled portion, and an intersection portion where the first wrinkled portion and the second wrinkled portion intersect,
Wherein the first corrugation and the second corrugation are received between the boundaries of the adjacent lower insulation panels.
제1항에 있어서,
상기 상부 단열패널의 가로 너비는 상기 하부 단열패널의 가로 너비의 정수배로 마련되는 액화가스 화물창.
The method according to claim 1,
Wherein the width of the upper insulating panel is set to an integral multiple of the width of the lower insulating panel.
제1항에 있어서,
상기 하부 단열패널은 가로 너비와 세로 너비가 동일하도록 마련되는 액화가스 화물창.
The method according to claim 1,
Wherein the lower insulation panel is provided so as to have the same lateral width and lateral width.
제1항에 있어서,
상기 하나의 상부 단열패널은 상기 인접하는 두 개의 하부 단열패널과 결합하는 액화가스 화물창.
The method according to claim 1,
Wherein the one upper insulation panel is joined to the adjacent two lower insulation panels.
제1항에 있어서,
상기 하부 단열패널의 중앙부에 설치되고 상기 보조방벽을 관통하여 상기 상부 단열패널과 겹합되는 패널 고정유닛을 더 포함하는 액화가스 화물창.
The method according to claim 1,
And a panel fixing unit installed at a central portion of the lower heat insulating panel and passing through the auxiliary wall to be overlapped with the upper heat insulating panel.
액화가스의 수용공간을 둘러싸는 주방벽과 상기 주방벽을 둘러싸며 액화가스를 외부로부터 단열하는 단열패널 어셈블리를 포함하고, 평면부와 코너부로 형성되는 액화가스 화물창에 있어서,
상기 평면부에 설치되는 단열패널 어셈블리는,
다수가 인접하여 설치되는 하부 단열패널;
상기 하부 단열패널 상에 적층되어 상기 하부 단열패널을 밀봉하는 보조방벽; 및
상기 보조방벽 상에 적층되고 다수가 인접하여 설치되며 상기 하부 단열패널의 너비 방향 면적보다 크게 마련되는 상부 단열패널;을 포함하고,
상기 평면부에 설치되어 인접하는 상부 단열패널 사이의 경계는 상기 인접하는 하부 단열패널 사이의 경계에 대응하며,
상기 코너부에 설치되는 단열패널 어셈블리는, 하부 단열패널과 상부 단열패널을 포함하고,
상기 평면부에 설치되는 하부 단열패널과 상기 코너부에 설치되는 하부 단열패널 사이에는 설치 오차만큼 벌어진 공간을 충진하는 삽입 단열패널이 삽입되며,
상기 코너부에 설치되는 상부 단열패널 또는 인접하는 상기 평면부에 설치되는 상부 단열패널 중 어느 하나는 상기 삽입 단열패널의 너비만큼 더 길게 마련되는 액화가스 화물창.
A liquefied gas holding window formed by a flat surface portion and a corner portion, the liquefied gas holding window including a main wall surrounding the liquefied gas receiving space and an insulating panel assembly surrounding the liquefied gas from the outside,
Wherein the heat insulating panel assembly installed on the flat surface portion comprises:
A plurality of lower insulation panels installed adjacent to each other;
An auxiliary barrier laminated on the lower insulation panel to seal the lower insulation panel; And
And an upper insulating panel laminated on the auxiliary wall, a plurality of which are adjacent to each other, and a larger area than a width direction area of the lower insulating panel,
Wherein a boundary between adjacent upper heat insulating panels provided on the flat portion corresponds to a boundary between the adjacent lower insulating panels,
The heat insulating panel assembly installed in the corner portion includes a lower heat insulating panel and an upper heat insulating panel,
An insertion heat insulating panel is inserted between the lower heat insulating panel provided on the flat surface portion and the lower heat insulating panel provided on the corner portion,
Wherein one of the upper heat insulating panel provided on the corner portion and the upper heat insulating panel provided on the adjacent flat surface portion is longer than the width of the inserted heat insulating panel.
삭제delete 제1항에 있어서,
상기 하부 단열패널의 모서리는 상기 주름부를 수용하는 챔퍼가 형성되는 액화가스 화물창.
The method according to claim 1,
Wherein the corners of the lower insulating panel have chambers for receiving the corrugations.
평면부와 코너부를 포함하는 외벽의 평면부에 단열패널을 설치하여 액화가스 화물창을 제조하는 방법에 있어서,
상기 평면부에 하부 단열패널을 제1방향과 제2방향으로 인접하도록 격자형으로 배치하여 설치하고,
상기 하부 단열패널 상에 보조방벽 연결부재를 설치하고,
상기 하부 단열패널 상에 복수의 보조방벽시트를 연속적으로 연결하여 보조방벽을 설치하되,
상기 보조방벽시트의 모서리는 상기 보조방벽 연결부재 상에 고정되고, 인접하는 상기 보조방벽시트의 모서리는 상기 보조방벽 연결부재에 고정된 상기 보조방벽시트 상에 겹쳐져 고정되며,
상기 보조방벽 상에 상부 단열패널을 적층하되, 상기 상부 단열패널은 제1방향과 제2방향으로 인접하도록 격자형으로 배치되고, 상기 인접하는 상부 단열패널 사이의 경계는 상기 인접하는 하부 단열패널 사이의 경계에 대응하도록 배치되는 액화가스 화물창의 제조방법.
A method of manufacturing a liquefied gas holding window by providing a heat insulating panel on a plane portion of an outer wall including a flat portion and a corner portion,
And the lower heat-insulating panels are arranged in a lattice-like manner so as to be adjacent to each other in the first direction and the second direction,
An auxiliary barrier connecting member is provided on the lower heat insulating panel,
A plurality of auxiliary barrier sheets are continuously connected to the lower heat insulating panel to form an auxiliary barrier,
The edge of the auxiliary barrier sheet is fixed on the auxiliary barrier connecting member and the edge of the adjacent auxiliary barrier sheet is overlapped and fixed on the auxiliary barrier sheet fixed to the auxiliary barrier connecting member,
Wherein the upper insulating panels are stacked on the auxiliary barrier such that the upper insulating panels are arranged in a lattice form so as to be adjacent to the first direction in a second direction, and a boundary between the adjacent upper insulating panels is formed between the adjacent lower insulating panels Of the liquefied gas-holding region.
제9항 에 있어서,
상기 보조방벽은 복수의 보조방벽시트를 연속적으로 연결하여 설치하되, 어느 하나의 보조방벽시트는 서로 꼭지점이 인접하는 네 개의 하부 단열패널 상에 걸치도록 설치되는 액화가스 화물창의 제조방법.
10. The method of claim 9,
Wherein the auxiliary barrier is provided by continuously connecting a plurality of auxiliary barrier sheets, wherein one of the auxiliary barrier sheets is installed on four lower insulating panels adjacent to each other at the vertexes thereof.
제9항 또는 제10항에 있어서,
상기 상부 단열패널은 상기 인접하는 2개의 하부 단열패널 상에 설치되되, 상기 상부 단열패널의 모서리는 상기 2개의 하부 단열패널의 외곽부 모서리에 대응하도록 설치되는 액화가스 화물창의 제조방법.
11. The method according to claim 9 or 10,
Wherein the upper insulation panel is installed on the two adjacent lower insulation panels, and the corner of the upper insulation panel is installed to correspond to the edge of the outer edge of the two lower insulation panels.
삭제delete 제9항에 있어서,
상기 보조방벽시트와 상기 보조방벽 연결부재는 금속으로 마련되어, 상기 보조방벽시트 사이의 고정 및 상기 보조방벽시트와 상기 보조방벽 연결부재 사이의 고정은 용접 방법이 이용되는 액화가스 화물창의 제조방법.
10. The method of claim 9,
Wherein the auxiliary barrier sheet and the auxiliary barrier connection member are made of metal so that fixing between the auxiliary barrier sheets and fixing between the auxiliary barrier sheet and the auxiliary barrier connection member are performed by a welding method.
제9항 또는 제10항에 있어서,
상기 보조방벽을 설치하기 전에, 상기 하부 단열패널 상에 패널 고정유닛을 설치하고,
상기 보조방벽의 설치는 상기 보조방벽의 관통홀에 상기 패널 고정유닛의 돌출부재가 수용되도록 하고, 상기 관통홀과 상기 패널 고정유닛을 밀봉하는 액화가스 화물창의 제조방법.
11. The method according to claim 9 or 10,
A panel fixing unit is provided on the lower heat insulating panel before the auxiliary barrier is installed,
Wherein the auxiliary barrier is installed so that the projecting member of the panel fixing unit is received in the through hole of the auxiliary barrier and the through hole and the panel fixing unit are sealed.
제9항 또는 제10항에 있어서,
상기 코너부에 하부 단열패널과 상부 단열패널을 설치하고,
상기 평면부에 설치된 하부 단열패널과 상기 코너부에 설치된 하부 단열패널 사이의 설치 오차만큼 벌어진 공간에 삽입 단열패널을 삽입하고,
미리 설치된 상기 상부 단열패널 보다 상기 삽입 단열패널의 너비만큼 더 길게 마련되는 상기 상부 단열패널을 상기 코너부에 설치되는 상부 단열패널에 인접하도록 설치하는 액화가스 화물창의 제조방법.
11. The method according to claim 9 or 10,
A lower heat insulating panel and an upper heat insulating panel are installed at the corner portion,
Inserting the inserting / insulating panel into a space which is wider than an installation error between a lower heat insulating panel provided on the flat portion and a lower heat insulating panel provided on the corner portion,
Wherein the upper insulating panel, which is longer than the pre-installed upper insulating panel by a width of the inserted heat-insulating panel, is disposed adjacent to an upper insulating panel provided on the corner.
제9항 또는 제10항에 있어서,
상기 평면부에 설치되는 상기 하부 단열패널의 설치는 일정한 크기의 하부 단열패널들을 인접하여 배치하고,
상기 평면부에 설치되는 상기 상부 단열패널의 설치는 일정한 크기의 상부 단열패널들을 인접하여 배치하며,
상기 코너부에 설치된 하부 단열패널과 상기 평면부에 설치된 하부 단열패널 사이의 설치 오차만큼 벌어진 공간에 삽입 단열패널을 삽입하고,
상기 일정한 크기의 상부 단열패널 보다 상기 삽입단열패널의 너비만큼의 더 넓은 상부 단열패널을 상부 코너부에 설치되는 상부 단열패널에 인접하도록 설치하는 액화가스 화물창의 제조방법.
11. The method according to claim 9 or 10,
The lower insulation panel provided on the flat portion is disposed adjacent to the lower insulation panels of a predetermined size,
The installation of the upper insulation panel installed on the flat surface portion is performed by disposing upper insulation panels of a certain size adjacent to each other,
Inserting the inserted heat insulating panel into a space defined by an installation error between a lower heat insulating panel provided on the corner portion and a lower heat insulating panel provided on the flat surface portion,
And a wider upper insulation panel as wide as the width of the insulated insulation panel than the upper insulation panel of a certain size is installed adjacent to the upper insulation panel installed in the upper corner.
KR1020140097128A 2014-07-30 2014-07-30 Cargo for liquefied gas and manufacturing method thereof KR101625871B1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
KR1020140097128A KR101625871B1 (en) 2014-07-30 2014-07-30 Cargo for liquefied gas and manufacturing method thereof
CN201580041510.6A CN106573664B (en) 2014-07-30 2015-07-28 Anti- wall flaps and liquefied gas cargo hold and its manufacturing method for liquefied gas cargo hold
JP2017504351A JP6469839B2 (en) 2014-07-30 2015-07-28 Barrier sheet used in liquefied gas cargo hold, liquefied gas cargo hold using the same, and manufacturing method thereof
PCT/KR2015/007858 WO2016018038A1 (en) 2014-07-30 2015-07-28 Barrier sheet used for liquefied gas cargo hold, liquefied gas cargo hold using same, and manufacturing method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140097128A KR101625871B1 (en) 2014-07-30 2014-07-30 Cargo for liquefied gas and manufacturing method thereof

Publications (2)

Publication Number Publication Date
KR20160015438A KR20160015438A (en) 2016-02-15
KR101625871B1 true KR101625871B1 (en) 2016-06-01

Family

ID=55356397

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140097128A KR101625871B1 (en) 2014-07-30 2014-07-30 Cargo for liquefied gas and manufacturing method thereof

Country Status (1)

Country Link
KR (1) KR101625871B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200066685A (en) * 2017-11-28 2020-06-10 재팬 마린 유나이티드 코포레이션 Heat dissipation structure and heat dissipation tank

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3070745B1 (en) * 2017-09-04 2019-09-06 Gaztransport Et Technigaz SEALED AND THERMALLY INSULATING TANK WITH ANTI-CONVICTIVE FILLING ELEMENT
FR3099538B1 (en) * 2019-07-31 2022-06-10 Gaztransport Et Technigaz Watertight and thermally insulated tank for floating structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200345090Y1 (en) 2003-12-29 2004-03-18 삼성중공업 주식회사 Insulation structure for cargo containment system of liquefied gas
KR100761219B1 (en) * 2005-01-26 2007-09-27 현대중공업 주식회사 Heat insulating structure of insulated cargo tanks of LNG carrier

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101337642B1 (en) 2011-12-16 2013-12-05 삼성중공업 주식회사 Liquefied Natural Gas storage tank and method to manufacture the same
KR20130107561A (en) * 2012-03-22 2013-10-02 대우조선해양 주식회사 Insulation system for lng cargocontainment
KR101497321B1 (en) * 2013-07-26 2015-03-02 삼성중공업 주식회사 Cargo barrier structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200345090Y1 (en) 2003-12-29 2004-03-18 삼성중공업 주식회사 Insulation structure for cargo containment system of liquefied gas
KR100761219B1 (en) * 2005-01-26 2007-09-27 현대중공업 주식회사 Heat insulating structure of insulated cargo tanks of LNG carrier

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200066685A (en) * 2017-11-28 2020-06-10 재팬 마린 유나이티드 코포레이션 Heat dissipation structure and heat dissipation tank
KR102357668B1 (en) * 2017-11-28 2022-02-08 재팬 마린 유나이티드 코포레이션 Heat dissipation structure and heat dissipation tank

Also Published As

Publication number Publication date
KR20160015438A (en) 2016-02-15

Similar Documents

Publication Publication Date Title
KR101652220B1 (en) Cargo for liquefied gas
KR101784833B1 (en) Cargo for liquefied gas and fixing unit for paner used therein
JP6469839B2 (en) Barrier sheet used in liquefied gas cargo hold, liquefied gas cargo hold using the same, and manufacturing method thereof
KR101652219B1 (en) Cargo for liquefied gas and manufacturing method thereof
KR101635026B1 (en) Cargo for liquefied gas
KR101722370B1 (en) Cargo barrier structure
KR101625871B1 (en) Cargo for liquefied gas and manufacturing method thereof
KR101792482B1 (en) Cargo for liquefied gas and fixing unit for paner used therein
KR101784838B1 (en) Cargo for liquefied gas and fixing unit used therein
KR101824428B1 (en) Cargo for liquefied gas
KR101625867B1 (en) Cargo for liquefied gas and manufacturing method thereof
KR20160027381A (en) Cargo for liquefied gas
KR101644366B1 (en) Secondary barriear sheet used for cargo and cargo for liguefied gas using the same
KR101422517B1 (en) Cargo for liquefied gas carrier ship and manufacturing method thereof
KR101864152B1 (en) Cargo for liquefied gas
KR101712007B1 (en) Cargo for liquefied gas
KR101784835B1 (en) Cargo for liquefied gas and fixing unit for paner used therein
KR101672209B1 (en) Cargo for liquefied natural gas
KR101701722B1 (en) Cargo barrier structure
KR101644369B1 (en) Barriear sheet used for cargo and cargo for liguefied gas
KR101644354B1 (en) Cargo barrier structure
KR20160015437A (en) Cargo for liquefied gas
KR101732568B1 (en) Insulation panel assembly for liquefied gas cargo tank and method for manufacturing the same
KR20160017218A (en) Manufacturing method of cargo for liquefied gas
KR20160017220A (en) Cargo for liquefied gas and manufactuaring method thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20190502

Year of fee payment: 4