KR101578534B1 - Finishing and insulation construction method and construction of structures for Building exterior - Google Patents
Finishing and insulation construction method and construction of structures for Building exterior Download PDFInfo
- Publication number
- KR101578534B1 KR101578534B1 KR1020140174761A KR20140174761A KR101578534B1 KR 101578534 B1 KR101578534 B1 KR 101578534B1 KR 1020140174761 A KR1020140174761 A KR 1020140174761A KR 20140174761 A KR20140174761 A KR 20140174761A KR 101578534 B1 KR101578534 B1 KR 101578534B1
- Authority
- KR
- South Korea
- Prior art keywords
- heat insulating
- fixed
- tape
- finishing
- finishing material
- Prior art date
Links
- 238000009413 insulation Methods 0.000 title claims abstract description 22
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 239000000463 material Substances 0.000 claims abstract description 64
- 239000004575 stone Substances 0.000 claims abstract description 31
- 238000000034 method Methods 0.000 claims abstract description 15
- 239000000853 adhesive Substances 0.000 claims description 22
- 230000001070 adhesive effect Effects 0.000 claims description 21
- 239000011810 insulating material Substances 0.000 claims description 20
- 239000002184 metal Substances 0.000 claims description 13
- 229910052751 metal Inorganic materials 0.000 claims description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 239000007787 solid Substances 0.000 abstract description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 239000007769 metal material Substances 0.000 description 3
- 229920006328 Styrofoam Polymers 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 239000008261 styrofoam Substances 0.000 description 2
- 239000002390 adhesive tape Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009422 external insulation Methods 0.000 description 1
- 239000010438 granite Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000012774 insulation material Substances 0.000 description 1
- 238000009421 internal insulation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000004579 marble Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/78—Heat insulating elements
- E04B1/80—Heat insulating elements slab-shaped
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/21—Fastening means specially adapted for covering or lining elements
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B80/00—Architectural or constructional elements improving the thermal performance of buildings
- Y02B80/10—Insulation, e.g. vacuum or aerogel insulation
Abstract
Description
본 발명의 건축물의 기초 콘크리트 외벽면을 완성한 후, 단열과 마감석재를 동시에 시공하는 방법과 그 시공구조에 관한 것으로, 좀 더 구체적으로는 시공시간과 인력 등을 줄이면서도 단열효율의 향상과 견고한 시공상태를 얻을 수 있도록 개선한 것이다.The present invention relates to a method for simultaneously constructing an insulating wall and a finished stone after completing an outer wall surface of a foundation concrete of the present invention, and more particularly, to a method for improving insulation efficiency and a construction To improve the status.
주지된 바와 같이 건축물의 외벽을 마감할 때는 단열과 더불어 마감재를 시공하여 외관을 완성한다.As is well known, when the exterior wall of a building is closed, the exterior is completed by installing a finishing material together with insulation.
통상 건축물의 단열에는 내부단열과 외부단열이 있으나, 이미 사용되는 건축물의 단열을 보강하는 공사기 아니면, 단열성능의 효율이 높고, 열교가 없으면서 콘크리트 열화를 예방할 수 있는 등 많은 장점이 있으므로 외부단열이 많이 사용된다.In general, there are internal and external insulation in the insulation of buildings, but there are many advantages such as high efficiency of insulation performance, prevention of deterioration of concrete without heat bridges, It is widely used.
한편, 건축물의 외벽에는 상기 외부 단열과 동시에 마감재를 시공하여야 하는데, 여러 종류의 마감재가 시공되고 있지만 외관의 우수성이나 마감의 견고성 등을 감안할 때 석재를 이용하여 마감하는 것이 대표적이라 할 수 있다.On the other hand, the exterior wall of the building must be provided with a finish material at the same time as the external heat insulation. However, various types of finish materials are installed. However, considering the excellence of exterior appearance and robustness of finish, it is typical to finish using stone.
이와 같이 건축물의, 외부단열과 석재를 이용하여 마감을 하는 경우의 종래 시공과정을 살펴보면, 콘크리트로 벽체를 시공한 다음, 스티로폼 등의 단열재를 벽면에 부착하여 단열공사를 하며, 단열공사 후에는 외장 석재를 시공하기 위한 고정철물을 벽면에 고정하여야 하므로 단열재에 구멍을 뚫어 노출되는 벽면에 고정철물을 고정하는 방식을 취한다.In the conventional construction process of the building using the exterior insulation and the stone as described above, it is necessary to construct the wall by using the concrete, and then adhere the insulation material such as styrofoam to the wall to perform the insulation work. It is necessary to fix the fixed hardware for installing the stone on the wall, so it is necessary to fix the fixed hardware on the exposed wall by making a hole in the insulation.
이러한 시공방법에 의하면, 단열재 시공 후 다시 석재를 시공하여야 하므로 이중작업이 되는 불편함이 있고, 석재 고정용 철물을 고정하기 위해 단열재에 구멍을 형성하여야 하므로 구멍을 뚫는 작업에 대한 시간적 인력적 낭비는 물론이고, 특히 구멍부분에 의해 단열효과가 크게 저하되는 문제가 있었다.According to such a construction method, there is a disadvantage that it is necessary to construct the stone again after the insulation is applied, and there is a need to form a hole in the heat insulating material in order to fix the stone fixing fixture. Hence, Of course, there is a problem that the heat insulating effect is significantly deteriorated by the hole portion in particular.
또한, 종래 석재를 고정하는 작업시 석재의 두께가 넓지 않으므로 석재와 고정철물이 닿는 면에 접착제를 도포하여도 고정력이 부족하였으므로 이러한 접착력을 보강하기 위하여 석재의 후면과 고정철물 사이에 추가로 접착제를 도포하였는데, 이와 같은 후면 도포작업은 과도하게 많은 접착제가 사용되면서 작업이 어렵고 시간도 많이 걸리는 문제가 있었다.In addition, since the thickness of the stone is not wide when fixing the stone in the past, it is difficult to apply the adhesive even to the side contacting the stone and the fixed metal. Therefore, in order to reinforce the adhesive force, However, such a backside coating process has been problematic in that an excessive amount of adhesive is used, which makes the work difficult and time consuming.
또한, 고정철물의 아래와 위에 석재가 시공되고 나면, 측방향의 고정철물 간 사이 공간은 비어 있게 되므로 이러한 틈새에 백업재를 채워 마감을 하여야 했던 것이고, 결국 백업재 시공에 따르는 시간과 자재비용이 별도도 소요되는 단점이 있었다.In addition, once the stone has been installed on the lower and upper side of the fixed hardware, the space between the fixed hardware in the lateral direction becomes empty, so it is necessary to fill the gap by filling the backup material. .
상기 문제점을 감안하여 안출한 본 발명은 외벽면의 단열작업과 마감재 시공작업이 최대한 짧은 시간에도 견고하게 가능하도록 하고, 단열재에 구멍이 형성되어 단열효율이 저하되는 것을 방지하며, 접착제의 도포부위와 도포량을 최소화하여 작업을 간단히 하며, 별도의 백업재 시공을 생략할 수 있도록 함을 특징으로 하는 것이다.The present invention has been made in view of the above problems, and it is an object of the present invention to provide a method of manufacturing a heat insulating material, which can firmly perform heat insulation work and finish material construction work for a shortest possible time, It is possible to simplify the operation by minimizing the application amount and to eliminate the need for separate backup re-construction.
상기 목적을 달성하기 위한 본 발명은, 건축물 외장용으로 사용되는 석재에 석재의 크기와 동일한 크기로 절단한 단열재를 부착하여 일체화된 단열마감재를 구성하고, 접착된 상태의 단열마감재 테두리 4개 면을 감싸도록 쿠션을 가진 테이프를 테이핑하며, 벽면에 고정된 고정철물의 받침부 상면에 접착제를 도포한 후 그 위에 단열마감재를 얹어 시공하며, 시공된 단열마감재의 상면 전체와 그 위의 고정철물 위에 다시 접착제를 도포한 후 단열마감재를 얹어 시공하는 과정을 반복하며, 시공된 단열마감재 사이에는 생기는 가로세로 격자형 홈에 마감재로 마감하여 시공 완료함을 특징으로 한다.In order to accomplish the above object, the present invention is characterized in that a heat insulating material cut to the same size as the size of a stone is attached to a stone used for building exteriors to form an integrated heat insulating finishing material, and four sides of the heat insulating finishing material The adhesive tape is applied to the upper surface of the receiving portion of the fixed metal piece fixed to the wall surface. The adhesive is applied on the upper surface of the receiving portion of the fixed metal piece, and then the adhesive is applied on the entire upper surface of the adhered thermal insulating material, And then applying the heat insulating finishing material and repeating the process of applying the heat insulating finishing material, and finishing the finishing material in the horizontal and vertical grid grooves formed between the heat insulating finishing materials.
또한, 이러한 시공에 따라 상부 단열마감재와 하부 단열마감재의 각 테이프 두께에 고정철물의 두께가 묻혀 고정철물이 설치된 부분은 상하의 테이프가 압착되면서 고정철물을 감싸고 고정철물이 설치되지 않은 부분은 테이프끼리 맞닿아 접착된 상태가 되도록 한 것을 특징으로 한다.According to such construction, the thickness of the fixed hardware is applied to the thickness of each tape of the upper and lower thermal insulation finishing materials, and the upper and lower tapes are squeezed to wrap the fixed hardware. In the portion where the fixed hardware is not installed, So as to be in a bonded state.
이와 같은 본 발명에 의하면, 단열재와 석재가 일체로 된 단열마감재를 먼저 구비하고, 이를 한번에 시공하게 되므로 종래 단열재를 시공한 후 단열재에 구멍을 뚫고 석재를 시공하는 공정에 비하여 작업시간이 크게 단축될 수 있음은 물론이고 단열재가 제거된 공간이 없으므로 단열효율을 크게 향상시킬 수 있게 된다.According to the present invention, since the heat insulating finishing material integrally formed of the heat insulating material and the stone is firstly installed and then the heat insulating finishing material is applied to the heat insulating finishing material at once, the working time is greatly shortened compared with the conventional process of inserting the heat insulating material, As a matter of course, since there is no space where the heat insulating material is removed, the heat insulating efficiency can be greatly improved.
또한, 단열마감재의 두께가 종래 석재에 비하여 두 배 정도 넓어지므로 고정철물에 안정적으로 안착되어 시공이 될 수 있는 것이고, 이에 따라 종래 석재의 후면과 고정철물 사이에 접착제를 도포하는 작업이 필요 없으면서도 견고한 고정이 가능하므로 매우 편리하게 시공이 가능하고 견고한 시공도 가능하게 되는 것이다.In addition, since the thickness of the heat insulating finishing material is twice as large as that of the conventional stone, it can be stably placed on the fixed iron and can be applied. Accordingly, it is not necessary to apply the adhesive agent between the back face of the conventional stone and the fixed iron It is possible to perform a very convenient installation and a robust construction.
또 쿳션을 갖는 테이프가 단열마감재의 외면을 감싸고 있는 형태이므로 쿳션에 의한 테이프의 수축으로 고정철물을 수용하면서 안정적으로 시공이 되고 고정철물이 설치되지 않은 부분은 테이프가 서로 간에 밀착되는 것으로, 종래와 같이 별도의 백업재를 시공할 필요도 없어지는 등 건축물의 외벽 단열과 마감에 관한 공정을 획기적으로 개선할 수 있는 유용한 발명이라 할 수 있다.In addition, since the tape having the cushion surrounds the outer surface of the heat insulating finishing material, the tape can be stably installed while receiving the fixed hardware due to the shrinkage of the tape due to the cushion, It is a useful invention that can dramatically improve the process of insulation and finishing of the outer wall of a building, such as eliminating the need to install a separate backup material.
도 1은 본 발명의 소재준비 공정에 관한 예시도
도 2는 본 발명의 소재접합 공정에 관한 예시도
도 3은 본 발명의 테이핑 공정에 관한 예시도
도 4는 본 발명의 고정철물 부착공정에 관한 예시도
도 5는 본 발명의 단열마감재 시공공정에 관한 예시도
도 6은 도 5에 의해 시공된 상태의 정면도
도 7은 본 발명의 시공완료된 상태의 사시도
도 8은 본 발명에 의한 시공완료 상태의 고정철물 부분 단면도
도 9는 본 발명에 의한 시공완료 상태의 고정철물 없는 부분 단면도Fig. 1 is an exemplary view of a material preparation process of the present invention
Fig. 2 is an exemplary view of the material bonding process of the present invention
3 is an exemplary view of the taping process of the present invention
FIG. 4 is an exemplary view showing a process for attaching a fixed metal material according to the present invention
Fig. 5 is an exemplary view showing a process of constructing an adiabatic finish material according to the present invention
Fig. 6 is a front view of the state in which it is constructed by Fig.
Fig. 7 is a perspective view of the completed state of the present invention
8 is a cross-sectional view of a portion of a fixed metal part in a completed state according to the present invention
FIG. 9 is a partial cross-sectional view
이하 본 발명을 구현하기 위한 시공방법의 예와 구성 실시 예를 첨부된 도면에 의거 상세히 설명하면 다음과 같다.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, exemplary embodiments of a construction method for implementing the present invention will be described in detail with reference to the accompanying drawings.
먼저, 본 발명의 시공방법에 대하여 살펴본다.First, the construction method of the present invention will be described.
소재준비Material preparation
도 1과 같이 가로세로 일정한 규격을 갖는 화강석 대리석 등 건축물 외장용으로 사용되는 석재(2)를 준비한다. 스티로폼 등과 같이 단열기능이 우수하고 최대한 단단한 형체를 유지하는 재질의 단열재(3)를 구비한 후 석재(2)의 크기와 동일한 크기로 절단한다.As shown in Fig. 1, a
소재접합Material joint
도 2와 같이 상기 석재(2)와 단열재(3)를 접착제(10)를 이용하여 접착하여 일체화된 단열마감재(1)를 구비한다.As shown in Fig. 2, the
테이핑Taping
도 3과 같이 접착된 상태의 단열마감재(1) 테두리 4개 면을 감싸도록 테이핑을 하는데, 테이프(20)는 스폰지 등과 같이 쿳션 기능과 단열기능을 갖는 쿳션재의 일측면 또는 양측면에 접착면이 형성되어 있는 것으로, 양면에 접착면이 형성되는 경우에는 이형지를 필요로 하게 된다. 테이프(20)의 두께는 고정철물(4) 두께의 절반 이상이 되도록 한다.As shown in FIG. 3, taping is performed so as to wrap the four sides of the
이러한 테이프(20)를 단열마감재(1)에 부착할 때 단열재(3) 쪽 끝단과 석재(2) 쪽 끝단을 조금 남기고 부착한다. 단열재 쪽 끝단을 남기는 것은 단열재와 하부의 단열재 사이에 직접 접착제가 직접 접착되도록 하여 접착력을 강화하려는 것이고, 석재 쪽 끝단을 남기는 것은 마감재(40)를 처리하기 위한 공간을 만드는 것이다.When the
고정철물 부착Fixed steel attachment
도 4와 같이 건축물의 콘크리트 벽면(50)에 단열마감재(1)의 크기를 감안하여 상하 좌우 일정한 간격으로 앵커볼트(5)를 고정하고 고정철물(4)을 설치한다.As shown in FIG. 4, the
단열마감재 설치Install insulation finish
상기 고정된 고정철물(4)에 단열마감재(1)를 설치하는데, 도 5와 같이 고정철물(4)의 받침부(4') 상면에 접착제(10')를 도포한 후 그 위에 단열마감재(1)를 얹어 시공하며, 시공된 단열마감재(1)의 상면 전체에 다시 접착제(10')를 도포한 다음 상면에 밀착되게 상부의 고정철물(4)을 고정시키고 고정철물(4)의 위에 다시 접착제(10')를 도포한 후 단열마감재(1)를 얹어 시공하는 과정을 반복하게 된다.5, the adhesive 10 'is applied to the upper surface of the receiving portion 4' of the
연결부 마감Finish of connection
도 7 내지 도 9와 같이 시공된 단열마감재 사이에는 가로세로 격자형으로 홈이 생기게 되는데, 이는 테이프(20)가 석재(2)의 끝단까지 부착되지 않은 상태이므로 공간이 남아 있기 때문이다. 이러한 공간을 마감재(40)로 마감하면 시공이 완료된다.
7 to 9, grooves are formed in the transverse and vertical lattice shape because the space is left because the
이와 같은 방법으로 시공된 본 발명의 시공구조에 대하여 살펴본다.The construction of the present invention constructed in this manner will be described below.
본 발명에 의한 시공 구조는 콘크리트 벽면(50)에 상하 일정한 간격으로 앵커볼트(5)에 고정철물(4)이 고정되어 있고, 고정철물(4)의 사이에 단열마감재(1)가 연결된 구조로써, 단열마감재(1)는 동일한 크기의 석재(2)와 단열재(3)가 접착제(10)에 의해 접착되어 일체화된 상태이다.The construction according to the present invention has a structure in which a
그리고 단열마감재(1)의 테두리에는 테이프(20)가 감싸져 있는데, 도 6에서 상세히 볼 수 있듯이 테이프(20)는 두께가 고정철물(4)의 절반 이상이 되고 쿳션재로 구성되므로, 상부 단열마감재(1)와 하부 단열마감재(1)의 각 테이프 두께에 고정철물(4)의 두께가 묻혀 고정철물(4)이 설치된 부분은 상하의 테이프(20)가 압착되면서 고정철물(4)을 감싸고 고정철물(4)이 설치되지 않은 부분은 테이프(20)끼리 맞닿아 접착된 상태가 된다.
The
이와 같은 본 발명에 의하면, 단열재(3)와 석재(2)가 일체로 된 단열마감(1)재를 먼저 구비하고, 이를 한번에 시공하게 되므로 작업시간이 크게 단축되고, 단열재를 제거함에 의한 공간이 생기는 일도 없게 된다.According to the present invention, since the heat insulating finishing material (1) in which the heat insulating material (3) and the stone material (2) are integrated is provided first, There will be no occurrence.
단열마감재(1)의 두께가 종래 석재에 비하여 두 배 정도 넓어지므로 고정철물에 안정적으로 안착되어 시공이 될 수 있는 것이고, 고정철물과 단열마감재의 상면에만 접착제를 도포하는 작업만으로 견고한 시공이 가능하게 된다.Since the thickness of the heat insulating
단열마감재의 외면을 감싸고 있는 테이프의 쿳션에 의해 고정철물을 수용하게 되고 고정철물이 설치되지 않은 부분은 테이프가 서로 간에 밀착되므로 별도의 백업재를 시공할 필요도 없이 견고한 단열이 가능하게 된다.The cushion of the tape surrounding the outer surface of the adiabatic finishing material accommodates the fixed hardware. In the portion where the fixed hardware is not installed, the tape is closely adhered to each other, so that it is possible to perform solid insulation without having to install a separate backup material.
1: 단열마감재
2: 석재
3: 단열재
4: 고정철물
10, 10': 접착제
20: 테이프
40: 마감재
50: 콘크리트 벽면1: Insulation finish
2: Stone
3: Insulation
4: Fixed hardware
10, 10 ': Adhesive
20: tape
40: Finishing material
50: Concrete wall
Claims (3)
석재(2)와 단열재(3)를 접착제(10)를 이용하여 접착하여 일체화된 단열마감재(1)를 구비하는 공정과,
접착된 상태의 단열마감재(1) 테두리 4개 면을 감싸도록 테이핑을 하되, 테이프(20)는 스폰지 등과 같이 쿳션 기능과 단열기능을 갖는 쿳션재의 일측면 또는 양측면에 접착면이 형성되어 있는 것이며, 테이프(20)의 두께는 고정철물(4) 두께의 절반 이상이 되도록 하여 상부 단열마감재(1)와 하부 단열마감재(1)의 각 테이프 두께에 고정철물(4)의 두께가 묻혀 고정철물(4)이 설치된 부분은 상하의 테이프(20)가 압착되면서 고정철물(4)을 감싸고 고정철물(4)이 설치되지 않은 부분은 테이프(20)끼리 맞닿아 접착된 상태가 되도록 하는 공정과,
고정철물(4)에 단열마감재(1)를 설치하는데, 고정철물(4)의 받침부(4') 상면에 접착제(10')를 도포한 후 그 위에 단열마감재(1)를 얹어 시공하며, 시공된 단열마감재(1)의 상면 전체에 다시 접착제(10')를 도포한 다음 상면에 밀착되게 상부의 고정철물(4)을 고정시키고 고정철물(4)의 위에 다시 접착제(10')를 도포한 후 단열마감재(1)를 얹어 시공하는 과정을 반복하는 공정과,
시공된 단열마감재 사이에는 생기는 가로세로 격자형 홈에 마감재(40)로 마감하여 시공 완료함을 특징으로 하는 건축물의 외벽을 단열과 동시에 마감하는 시공방법.A step of preparing a stone 2 to be used for building exteriors and cutting the same to the size of the back stone 2 having the heat insulating material 3,
A step of providing the thermal insulating material (1) integrally formed by bonding the stone (2) and the heat insulating material (3) using an adhesive (10)
The tape 20 is provided with an adhesive surface on one side or both sides of a cushion material having a cushioning function and a heat insulating function such as a sponge and the like. The thickness of the fixed hardware 4 is set to be equal to the thickness of each tape of the upper and lower thermal insulation finishing materials 1 and 1 so that the thickness of the tape 20 is at least half the thickness of the fixed hardware 4, ) Of the upper and lower tapes (20, 20) are pressed together so as to surround the fixed hardware (4) and portions where the fixed hardware (4) is not provided are brought into contact with each other so that the tapes (20)
The heat insulating finishing material 1 is installed on the fixed hardware 4. The adhesive 10 'is applied to the upper face of the receiving portion 4' of the fixed metal fitting 4 and the thermal insulating finishing material 1 is placed thereon, An adhesive 10 'is applied on the entire upper surface of the adiabatic finishing material 1 which is applied and then the upper fixed metal piece 4 is fixed so as to be in close contact with the upper surface and the adhesive 10' A step of repeating a process of placing the adiabatic finishing material 1 thereon,
The method according to any one of claims 1 to 3, wherein the building is finished by finishing the finishing material (40) in the horizontal and vertical grid grooves formed between the installed thermal insulation finishing materials.
테이프(20)를 단열마감재(1)에 부착할 때 단열재(3) 쪽 끝단과 석재(2) 쪽 끝단을 조금 남기고 부착하는 것을 특징으로 하는 건축물의 외벽을 단열과 동시에 마감하는 시공방법.The method according to claim 1,
Wherein the outer wall of the building is closed at the same time when the tape is adhered to the heat insulating finishing material, while the end of the heat insulating material and the end of the stone material are slightly attached.
단열마감재(1)는 동일한 크기의 석재(2)와 단열재(3)가 접착제(10)에 의해 접착되어 일체화된 상태이고,
단열마감재(1)의 테두리에는 테이프(20)를 감싸되, 테이프(20)는 두께가 고정철물(4)의 절반 이상이 되고 쿳션재로 구성되어 상부 단열마감재(1)와 하부 단열마감재(1)의 각 테이프 두께에 고정철물(4)의 두께가 묻혀 고정철물(4)이 설치된 부분은 상하의 테이프(20)가 압착되면서 고정철물(4)을 감싸고 고정철물(4)이 설치되지 않은 부분은 테이프(20)끼리 맞닿아 접착된 상태가 되도록 한 것을 특징으로 하는 건축물의 외벽을 단열과 동시에 마감하는 시공구조.A construction structure in which fixed hardware 4 is fixed to an anchor bolt 5 at regular intervals in a vertical direction on a concrete wall surface 1 and an adiabatic finishing material 1 is connected between fixed hardware 4,
The heat insulating finishing material 1 is in a state in which the stone 2 and the heat insulating material 3 of the same size are adhered to each other by the adhesive 10,
The tape 20 is wrapped around the rim of the heat insulating finishing material 1. The tape 20 is more than half of the thickness of the fixed steel material 4 and is made of a cushion material so that the upper heat insulating finishing material 1 and the lower heat insulating finishing material 1 The upper and lower tape 20 are pressed and wrapped around the fixed metal piece 4 and the portion where the fixed metal piece 4 is not attached And the tapes (20) are brought into contact with each other so as to be adhered to each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020140174761A KR101578534B1 (en) | 2014-12-08 | 2014-12-08 | Finishing and insulation construction method and construction of structures for Building exterior |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020140174761A KR101578534B1 (en) | 2014-12-08 | 2014-12-08 | Finishing and insulation construction method and construction of structures for Building exterior |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101578534B1 true KR101578534B1 (en) | 2015-12-17 |
Family
ID=55081124
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020140174761A KR101578534B1 (en) | 2014-12-08 | 2014-12-08 | Finishing and insulation construction method and construction of structures for Building exterior |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101578534B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20170003454U (en) | 2016-03-29 | 2017-10-12 | 박혜경 | A one-piece structure for construction finishing materials using a bracket |
KR200487569Y1 (en) | 2018-03-08 | 2018-10-11 | 주식회사 우진스톤산업 | A one-piece type finishing materials using angle stiffener and it's construction |
CN114753580A (en) * | 2021-11-01 | 2022-07-15 | 德州欧文斯新型建材有限责任公司 | On-site-free stone-like gluing method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3035424B2 (en) | 1993-06-04 | 2000-04-24 | 株式会社松岡カッター製作所 | Rotary knife device |
-
2014
- 2014-12-08 KR KR1020140174761A patent/KR101578534B1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3035424B2 (en) | 1993-06-04 | 2000-04-24 | 株式会社松岡カッター製作所 | Rotary knife device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20170003454U (en) | 2016-03-29 | 2017-10-12 | 박혜경 | A one-piece structure for construction finishing materials using a bracket |
KR200487569Y1 (en) | 2018-03-08 | 2018-10-11 | 주식회사 우진스톤산업 | A one-piece type finishing materials using angle stiffener and it's construction |
CN114753580A (en) * | 2021-11-01 | 2022-07-15 | 德州欧文斯新型建材有限责任公司 | On-site-free stone-like gluing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101147446B1 (en) | Angle assembly for insulator construction and construction method using the same | |
US7823354B2 (en) | Structure reinforcement system | |
KR101239383B1 (en) | External heat insulating panel assembly and construction method for external heat insulation of building | |
JP6204009B2 (en) | Panel unit joint structure and panel unit | |
KR101578534B1 (en) | Finishing and insulation construction method and construction of structures for Building exterior | |
KR102045614B1 (en) | Slide fixing clip for earthquake-proof and construction method of exterior using the same | |
KR20140049413A (en) | A facing apparatus of outer wall | |
KR20140046769A (en) | Fastener assembly and heat insulator construction method thereof | |
KR101398336B1 (en) | Dryvit remodeling method | |
KR101425624B1 (en) | Outer material assembly of building and method for finishing outer wall of building using the same | |
CN104499614A (en) | Wall heat-preservation integration point hanging system and mounting method thereof | |
KR101429057B1 (en) | External insulation wall system for buildings and construction method using the same | |
KR101480990B1 (en) | Stone-plate combined PC pannel and Manufacturing method thereof | |
CN205840201U (en) | A kind of stone decoration external corner structure of wall cylindrical surface | |
CN210032208U (en) | Wallboard in precast concrete strip shape | |
KR101623301B1 (en) | Finishing and insulation finishing materials construction method for Building exterior | |
KR20120055764A (en) | Inside wall finish structure of concrete feed tank | |
KR20090072057A (en) | Screw piece for insulating material construction and construct method using thereof | |
US20220220733A1 (en) | A modular structural system and construction method thereof | |
JP2010064373A (en) | Manufacturing method of heat insulating precast concrete panel | |
KR101316927B1 (en) | Tile assembly of peeing protection | |
KR101074647B1 (en) | Fiber pipe and method of construction using the same | |
KR101156568B1 (en) | Method of Constructing Wall | |
CN109138309B (en) | Ceramic tile, heat-insulating integrated plate using ceramic tile and mounting method of ceramic tile | |
CN205088903U (en) | Wallboard connecting piece of getting ready |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GRNT | Written decision to grant |