KR101556510B1 - Falling object prevention apparatus for bridge construction method therefor - Google Patents

Falling object prevention apparatus for bridge construction method therefor Download PDF

Info

Publication number
KR101556510B1
KR101556510B1 KR1020140088662A KR20140088662A KR101556510B1 KR 101556510 B1 KR101556510 B1 KR 101556510B1 KR 1020140088662 A KR1020140088662 A KR 1020140088662A KR 20140088662 A KR20140088662 A KR 20140088662A KR 101556510 B1 KR101556510 B1 KR 101556510B1
Authority
KR
South Korea
Prior art keywords
safety net
bridge
falling
fall
tension
Prior art date
Application number
KR1020140088662A
Other languages
Korean (ko)
Inventor
김성재
정택술
Original Assignee
브릿지테크놀러지(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 브릿지테크놀러지(주) filed Critical 브릿지테크놀러지(주)
Priority to KR1020140088662A priority Critical patent/KR101556510B1/en
Application granted granted Critical
Publication of KR101556510B1 publication Critical patent/KR101556510B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a method of installing a falling prevention apparatus for a bridge capable of being installed by being simply spread without ensuring a separate temporary facility and space, and released by being simply wound with subsequent work. The falling prevention apparatus comprises: both winding parts; and a safety net to connect both ends between both winding parts, and wound on one winding part. Moreover, the falling prevention apparatus is formed to install a safety net by winding the safety net wound in the one winding part, releasing the safety net by winding the safety net spread on an other winding part again.

Description

교량용 낙하 및 추락 방지장치 설치방법{FALLING OBJECT PREVENTION APPARATUS FOR BRIDGE CONSTRUCTION METHOD THEREFOR}TECHNICAL FIELD [0001] The present invention relates to a method of installing a fall prevention device for a bridge,

본 발명은 교량용 낙하 및 추락 방지장치 설치방법에 관한 것이다. 더욱 구체적으로 가시설 및 공간을 별도로 확보하지 않고서도 간단하게 펼쳐 설치할 수 있고, 후속작업과 함께 간단하게 감아 해체할 수 있는 교량용 낙하 및 추락 방지장치 및 그 설치방법에 대한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a method for installing a falling and falling device for a bridge. More specifically, the present invention relates to a falling and falling device for a bridge capable of being easily unfolded and installed without separately securing a temporary space and a space, and capable of simple winding and dismounting with a subsequent operation, and an installation method thereof.

도 1a는 종래 교량용 낙하물 방지공(방지장치)을 도시한 것이다.Fig. 1A shows a conventional bridge preventing ball (prevention device).

즉, 고리공(11)을 가지는 걸고리(12)를 긴 보울트 (13)로 끼워 거더(14)의 양쪽 측면하부에 형성한 삽탈공(15)으로 나사 조정한 다음 상기 걸고리(12)에 안전망(16)을 구비하는 강관(17)이 얹혀지는 각재(18)를 걸어서 낙하물 방지공을 설치하게 된다.That is to say, the hook 12 having the hook hole 11 is screwed into the long hole 13 and the screw hole 15 formed at the bottom of both sides of the girder 14, Preventing member is mounted on the steel pipe 17 provided with the anti-falling bars.

이에 낙하물 방지공을 설치함으로서 상면에 철근(19)이 돌출된 거더(14) 사이 하부로 낙하물이 안전망에 걸려 낙하사고가 발생하지 않도록 한 것이다.In this case, the fall-preventing holes are provided to prevent the falling objects from falling down to the lower portion of the girder 14 where the reinforcing bars 19 protrude from the upper surface.

나아가 낙하물 방지공을 설치한 후에는 거더 상면에 슬래브 거푸집(20)을 설치하고, 슬래브 거푸집 상면에 슬래브 콘크리트(C, 미도시)를 타설하여 슬래브를 시공하게 된다.Further, after the anti-falling ball is installed, the slab form 20 is provided on the upper surface of the girder, and the slab concrete (C, not shown) is placed on the upper face of the slab form to construct the slab.

이에 슬래브 시공 후, 낙하물 방지공을 해체할 때는 삽탈공(15)으로부터 나사 고정된 긴보울트(13)를 풀어주는 간단한 작업으로 가능하도록 하게 된다.After the slab is constructed, the fall prevention bolt can be disassembled by a simple operation of unscrewing the long bolt 13 screwed from the shovel hole 15.

하지만 종래 낙하물 방지공은 슬래브 시공 이후에 해체작업을 진행함에 따라 슬래브 하부공간을 확보하지 않을 경우 그 설치 및 해체가 매우 어렵기 때문에 이를 위한 가시설(브라켓, 동바리등)을 설치할 수밖에 없어 효율성 및 경제성이 떨어질 수 밖에 없었다.However, since the conventional anti-falling ball is dismantled after the slab construction, it is very difficult to install and disassemble the slab if the space below the slab is not secured. Therefore, it is inevitable to install a hypothetical (bracket, I had to fall.

도 1b는 특히 교량용 거더 하부에 열차가 통과하는 상태를 사진으로 도시한 것이다. 즉, 상기 교량용 거더(14) 하부에 열차가 통과하는 경우에는 거더 하부 사이에 종래 낙하물 방지공을 설치하기 위한 공간을 확보하기조차 어렵고 설사 설치가 가능한 경우라도 열차 통과를 통제할 수밖에 없다는 문제점이 발생하게 된다.FIG. 1B is a photograph showing a state in which a train passes under a girder for a bridge in particular. In other words, when a train passes under the bridge girder 14, it is difficult to secure a space for installing a conventional fall-prevention ball between the lower portion of the girder, and even if the bridge can be installed, .

또한 열차 이외에도 전차(지하철)가 통과하는 경우에는 교량용 거더 주위에 전기공급 시설 등이 설치되어 있어 안전상의 문제가 있기 때문에 종래 낙하물 방지공을 거더(14) 사이 하부에 설치하는 것은 달리 선택의 여지가 없었다.In addition, when a train (subway) passes besides a train, an electric supply facility is installed around the bridge girder, and there is a safety problem. Therefore, it is a matter of choice to place the anti- .

나아가 슬래브 거푸집(14)을 이용하여 슬래브를 시공하는 경우 역시 슬래브 거푸집(14)을 설치하기 위한 별도의 가시설이 필요하기 때문에 열차, 전차가 하부공간을 통과하는 경우에는 신속한 교량 시공이 어렵다는 문제점이 있게 된다.Further, in the case of constructing the slab using the slab form 14, a separate provisional statement for installing the slab form 14 is required. Therefore, when the train or the train passes through the lower space, it is difficult to construct the bridge quickly do.

이에 본 발명은 교량용 낙하 및 추락 방지장치를 거더 상면 사이에 간단하게 설치 및 해체할 수 있도록 하고, 곧 이어 슬래브 거푸집(교량용 데크)을 거더 상면 사이에 신속하게 설치할 수 있어 열차 등을 통제하지 않고 열차, 전차가 하부공간을 통과하는 교량을 보다 안전하고 신속하게 시공할 수 있는 낙하 및 추락 방지장치 및 그 설치방법 제공을 해결하고자 하는 기술적 과제로 한다.Accordingly, the present invention can easily install and dismount the falling and falling device for a bridge between upper surfaces of a girder, and quickly install a slab form (bridge deck) between the upper surfaces of the girder, The present invention is intended to solve the problem of providing a falling and falling prevention apparatus and a method of installing the bridge, in which a train and a train can pass through a lower space more safely and quickly.

상기 과제를 달성하기 위하여 본 발명은In order to achieve the above object,

첫째, 안전망을 권취부에 감아지도록 한 후, 안전망을 설치할 경우에는 권취부에 감아진 안전망을 풀어 펼쳐지도록 하고, 상기 권취부는 주변구조물에 미리 형성되어 있는 고정부에 임시로 고정되도록 설치하게 된다.First, when the safety net is wound around the winding part, the safety net wound around the winding part is unfolded, and the winding part is installed so as to be temporarily fixed to the fixing part previously formed in the peripheral structure.

둘째, 상기 펼쳐진 안전망이 일정한 장력을 가져 팽팽해지도록 하기 위하여 안전망에는 장력조절밴드를 부착시키고, 특히 횡방향밴드에는 밴드용버클(래치드 버클)를 연결하여 횡방향밴드를 잡아당겨 안전망이 팽팽하게 펼쳐지도록 하게 된다. 이때 밴드용버클에 장착한 고리형클램프(카리비너)를 이용하여 밴드용버클을 고정부에 고정시켜 상기 장력을 유지할 수 있도록 하게 된다.Second, a tension adjusting band is attached to the safety net so that the safety net having a certain tension is tensioned. In particular, a band buckle (latched buckle) is connected to the lateral band so that the lateral band is pulled to tighten the safety net . At this time, the belt buckle is fixed to the fixing part by using a ring type clamp (carabiner) mounted on the buckle for the band so that the tension can be maintained.

셋째, 교량용 낙하 및 추락 방지장치를 해체할 때는 밴드용버클을 고정부로부터 분리한 후, 펼쳐진 안전망을 권취부에 다시 감는 작업만으로 간단하게 해체시킬 수 있도록 하게 된다. 이에 예컨대 교량용 거더 상면 사이의 노출된 공간에 신속하게 교량용 데크를 안착시켜 낙하물이 발생하지 않도록 하는 등의 후속작업을 바로 신속하게 연속 실시할 수 있게 된다.Thirdly, when the falling and falling prevention device for a bridge is dismantled, the band buckle is separated from the fixing part, and then it can be disassembled simply by rewinding the deployed safety net to the winding part. Thus, for example, it is possible to promptly and continuously carry out subsequent work such as placing the bridge deck quickly in the exposed space between the upper surfaces of the bridge girder to prevent falling objects.

본 발명에 의한 낙하 및 추락 방지장치는 안전망을 권취함에 따른 설치 및 해체가 매우 간단하여 최소한의 작업자에 의한 조작이 가능하며 구조적으로 간단하여 재사용 및 내구성이 매우 크기 때문에 매우 신속한 이용이 가능하며 재사용이 용이하여 매우 경제적이게 된다. 이에 낙하물 또는 작업자 추락방지에 매유 효과적이게 된다.The falling and falling prevention apparatus according to the present invention is very easy to install and dismantle due to the winding of the safety net so that it can be operated by a minimum number of operators and is structurally simple, so that reuse and durability are very large, It becomes easy and very economical. This makes it effective to prevent fall or worker fall.

또한 본 발명의 낙하 및 추락 방지장치는 설치 후 해체가 용이하여 해체하면서 바로 후속작업을 바로 실시할 수 있어 보다 신속한 낙하 및 추락 방지장치 설치 이후 작업이 가능하여 작업의 효율성을 증진시킬 수 있게 된다.Further, the falling and falling prevention apparatus according to the present invention can be easily disassembled and disassembled, so that a subsequent work can be carried out immediately after disassembly, so that a work can be performed after installation of a fall and fall prevention apparatus.

도 1a는 종래 교량용 낙하 및 추락 방지장치의 설치사시도 및 부분 발췌도,
도 1b는 종래 열차 주변 교량의 시공사진,
도 2a는 본 발명의 낙하 및 추락 방지장치의 구성사시도,
도 2b 및 도 2c는 본 발명의 낙하 및 추락 방지장치의 설치 및 해체도,
도 3은 본 발명의 낙하 및 추락 방지장치의 설치사시도,
도 4a, 도 4b 및 도 4c는 본 발명의 낙하 및 추락 방지장치를 이용한 데크설치 방법의 순서도이다.
FIG. 1A is an installation perspective view and a partial extract of a conventional falling and falling device for a bridge,
FIG. 1B is a view showing a construction photograph of a bridge around a conventional train,
FIG. 2A is a structural perspective view of a fall and fall prevention apparatus of the present invention,
Fig. 2B and Fig. 2C are views showing installation and demounting of the falling and falling prevention apparatus of the present invention,
3 is an installation perspective view of the falling and falling prevention device of the present invention,
4A, 4B and 4C are flowcharts of a method of installing a deck using the falling and falling prevention apparatus of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings, which will be readily apparent to those skilled in the art. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In order to clearly illustrate the present invention, parts not related to the description are omitted, and similar parts are denoted by like reference characters throughout the specification.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.Throughout the specification, when an element is referred to as "comprising ", it means that it can include other elements as well, without excluding other elements unless specifically stated otherwise.

[ 본 발명의 낙하 및 추락 방지장치(100) ][Falling-down apparatus (100) of the present invention]

도 2a는 본 발명의 낙하 및 추락 방지장치의 구성사시도를 도시한 것이다.FIG. 2A is a perspective view showing the configuration of the falling and falling prevention apparatus of the present invention. FIG.

먼저 본 발명의 낙하 및 추락 방지장치(100)의 구성을 도 2a를 기준으로 살펴보면 다음과 같다.First, the structure of the falling / falling prevention apparatus 100 of the present invention will be described with reference to FIG. 2A.

즉, 상기 낙하 및 추락 방지장치(100)는 안전망(110), 권취부(120), 장력조절밴드(130), 밴드용버클(140)을 포함하여 구성된다.That is, the falling and falling prevention apparatus 100 includes a safety net 110, a winding unit 120, a tension adjusting band 130, and a band buckle 140.

먼저, 상기 안전망(110)은 낙하물이 낙하되었을 때 파손되지 않고 낙하물이 통과되지 않을 정도의 신축성, 방염성능 및 내구성을 가지면서 권취될 수 있는 그물망 또는 쉬트(sheet)를 이용하면 된다.First, the safety net 110 may be a net or a sheet that can be wound with a degree of stretchability, flame retardancy, and durability such that no drop is allowed to pass without being damaged when the drop falls.

예컨대 그물망 또는 쉬트는 P.V.C코팅망 또는 폴리에틸렌 섬유나 폴리프로필렌 섬유로 이루어진 소재 또는 폴리프로필렌 멀티필라멘트 섬유사 등을 직조하여 제조된 것을 이용하면 되며 달리 재질적 제한은 없다.For example, the mesh or sheet may be made of a fabric made of P.V.C coated mesh or polyethylene fiber or polypropylene fiber, or polypropylene multifilament fiber yarn, and the like.

이러한 안전망(110)은 예컨대 길이가 5m, 횡방향 폭이 2.2m 정도로 재단한 것을 이용하여 운반, 설치 및 해체에 있어 적합하게 크기를 정하면 되고 후술되는 권취부(120)에 권취될 수 있도록 제조된 것을 이용하게 된다.This safety net 110 is suitably sized for transportation, installation and disassembly by using, for example, a cut 5 m in length and 2.2 m in transverse width, and is manufactured so as to be wound on a winding unit 120 .

다음으로 상기 권취부(120)는 강관등과 같은 관부재(파이프, 비계 사용가능하며 감전사고를 방지하기 위하여 절연재질로 제작된 것을 이용할 수 있음)를 이용하되 안전망(110) 일단부가 연결되도록 하고, 타단부도 연결되도록 하여 2개(120a,120b)를 이용하게 된다.Next, the winding unit 120 is connected to one end of the safety net 110 by using a pipe member such as a steel pipe or the like (pipes and scaffolds can be used and made of an insulating material to prevent an electric shock accident) , And the other ends (120a, 120b) are used.

이에 양 권취부(120) 중 일권취부(120a)에 감겨지도록 한 상태에서, 권취부(120a,120b)사이를 벌려 벌려진 권취부(120a,120b) 사이에 감겨진 안전망(110)이 펼쳐질 수 있도록 하게 된다.The safety net 110 wound between the winding portions 120a and 120b which are opened between the winding portions 120a and 120b in a state in which the winding wire 120 is wound around the one winding portion 120a of the two winding portions 120 can be unfolded .

이러한 권취부(120)는 그 연장길이에 의하여 이격된 주변 구조물(예컨대 횡방향으로 이격된 거더) 사이에 횡방향으로 걸쳐지도록 설치된다. 이에 권취부의 양 단부가 주변 구조물(200) 상면에 걸쳐지도록 하는 걸림부 역할도 하게 된다.These winding units 120 are installed so as to horizontally span between adjacent structures spaced apart by their extension length (for example, transversely spaced girders). So that both end portions of the winding portion are engaged with the upper surface of the peripheral structure 200.

다음으로 상기 장력조절밴드(130)는 안전망(110) 일면에 부착된 스트립형태의 직물이다.Next, the tension adjusting band 130 is a strip-shaped fabric attached to one surface of the safety net 110. [

즉, 안전망(110) 자체는 펼쳐진 상태만으로는 일정한 장력을 유지하기 어렵기 때문에 장력조절밴드(130)로 안전망(110)의 형태유지 및 파손을 보완하면서 안전망을 잡아당겨 안전망의 팽팽한 정도를 조절(예컨대 작업자 추락에 저항할 수 있는 장력확보)할 수 있도록 한 것이다.That is, since the safety net 110 itself is difficult to maintain a constant tension only in the unfolded state, the tension control band 130 may be used to adjust the tightness of the safety net by pulling the safety net while compensating for the maintenance and breakage of the safety net 110 Thereby securing a tension that can resist a worker crash).

이러한 장력조절밴드(130)는 안전망의 장력도입 및 장력해제 방향으로 배치되도록 하게 된다. 예컨대 도 2a와 같이 안전망의 길이방향으로 부착되는 길이방향밴드(131); 및 상기 길이방향 밴드에 횡방향으로 부착되는 횡방향밴드(132);를 포함하며 상기 횡방향밴드(132)에 길이연장부(133)가 형성되어 있음을 알 수 있다.The tension adjusting band 130 is arranged in the direction of tension introduction and tension release of the safety net. A longitudinal band 131 attached in the longitudinal direction of the safety net as shown in FIG. 2A; And a transverse band 132 transversely attached to the longitudinal band, and that the transverse band 132 is formed with a length extension 133. [

이에 횡방향밴드(132)는 길이방향밴드(131)의 길이방향으로 다수개가 부착되어 있음을 알 수 있으며, 안전망(110)의 외측으로 더 연장되도록 형성된 길이연장부(133)에 밴드용버클(140)이 연결 설치되어 있음을 알 수 있다.It can be seen that a plurality of the transverse bands 132 are attached in the longitudinal direction of the longitudinal bands 131 and the transverse bands 132 are formed in the longitudinal extension portions 133, 140) are connected.

즉, 상기 밴드용버클(140)은 횡방향밴드(132)를 잡아당겨 장력을 도입 또는 도입된 장력을 풀어주는 역할을 하는 것으로서 예컨대 벨트조임기구에 사용되는 래치드버클을 이용하면 된다.That is, the band buckle 140 plays a role of pulling the lateral band 132 and releasing the tension or releasing the introduced tension, and for example, a ratchet buckle used in the belt tightening mechanism may be used.

즉, 길이연장부(133) 일단이 래치드버클에 연결되도록 하여 래치드버클의 손잡이를 회전시키면서 횡방향밴드(132)가 조여지도록 하거나 풀려질 수 있도록 함으로서 횡방향밴드(132)가 부착된 안전망(110)에 장력이 도입 또는 풀어지도록 하게 된다.That is, one end of the elongated portion 133 is connected to the latched buckle so that the lateral band 132 can be tightened or loosened while the handle of the ratchet buckle is rotated so that the lateral band 132 is attached to the safety net So that the tension is introduced or released to the main body 110.

이에 상기 밴드용버클(140)에는 고리형클램프(141, 일종의 카리비너)를 장착하여 고리형클램프(141)를 주변 구조물(200)의 고정부(210)에 걸려지도록 함으로서 횡방향밴드(132)의 장력을 유지하면서 밴드용버클(140)을 고정시키는 역할을 하게 된다.The annular clamp 141 is attached to the band buckle 140 so that the annular clamp 141 is caught by the securing portion 210 of the peripheral structure 200, And serves to fix the buckle 140 for the band while maintaining the tension of the buckle 140.

이에 먼저 밴드용버클(140)의 고리형클램프(141)를 상기 고정부(210)에 고정시킨 후, 밴드용버클(140)을 조작하여 횡방향밴드(132)의 장력을 조절할 수 있도록 하고, 나아가 고리형클램프(141)를 고정부(210)로부터 분리하여 간단하게 밴드용버클(140)의 고정 상태를 해체할 수 있게 된다.First, the annular clamp 141 of the band buckle 140 is fixed to the fixing portion 210 and then the tension of the lateral band 132 is adjusted by operating the band buckle 140, Further, the annular clamp 141 can be separated from the fixing portion 210 to easily disassemble the band buckle 140.

나아가 안전망(110)의 길이방향 외측단에는 관통홀(111)을 더 형성시켜, 상기 관통홀(111)과 주변 구조물에 설치된 고정부재(예컨대 교량용 거더의 상면에 형성된 전단철근등을 이용)에 와이어와 같은 연결부재(미도시)를 설치하여 안전망(110)이 보다 확실하게 주변 구조물에 장착되도록 할 수 있다.Further, a through hole 111 is further formed at the longitudinal outer end of the safety net 110, and a fixing member (for example, a front-end reinforcing bar formed on the upper surface of the bridge girder) is attached to the through- A connection member (not shown) such as a wire may be installed to securely mount the safety net 110 on the peripheral structure.

[ 본 발명의 낙하 및 추락 방지장치(100)의 설치 및 해체 ][Installation and disassembly of the falling and fall prevention apparatus 100 of the present invention]

도 2b 및 도 2c는 본 발명의 낙하 및 추락 방지장치(100)의 설치 및 해체도를 도시한 것이다.2B and 2C show the installation and disassembly of the fall-down and fall prevention apparatus 100 of the present invention.

먼저 본 발명의 낙하 및 추락 방지장치(100)의 설치방법을 도 2a를 기준으로 살펴보면 다음과 같다.First, a method of installing the fall-down and fall prevention apparatus 100 of the present invention will be described with reference to FIG. 2A.

즉, 낙하 및 추락 방지장치(100)를 구성하는 양 권취부(120)중 일권취부(120a)에는 안전망(110)의 일단이 연결된 상태에서 권취된 상태임을 알 수 있다.That is, it can be seen that one end of the safety net 110 is wound in the one-end mounting portion 120a of the two winding portions 120 constituting the fall-down and fall prevention apparatus 100. [

이로서 작업자는 권취된 안전망을 간단하게 운반할 수 있게 되며 무게도 작업자가 단독으로 운반할 정도가 되기 때문이다.This allows the operator to simply transport the wound safety net and the weight to the worker alone.

이에 본 발명의 낙하 및 추락 방지장치(100)를 서로 이격된 주변 구조물(200) 사이에 횡방향으로, 미리 권취된 상태로 안착시켜 놓고, 일 권취부(120a)의 단부를 주변 구조물(200)의 상면(A1)에 미리 형성되어 있는 주변 고정부(210)에 임시로 걸려지도록 하여 움직임을 방지하게 된다.Thus, the falling and falling prevention apparatus 100 of the present invention is placed in a state in which the falling and falling prevention apparatus 100 is wound in the transverse direction between the peripheral structures 200 spaced apart from each other, And is temporarily hooked on the peripheral fixing part 210 formed in advance on the upper surface A1 of the main body 210 to prevent the movement.

다음으로는 타 권취부(120b)를 상기 고정부(210)에 걸려진 일권취부(120a)로부터 멀어지도록 이격시켜 가면서 권취된 안전망(110)이 완전히 펼쳐지도록 하게 된다. 이에 안전망(110)이 완전히 펼쳐지도록 한 상태에서 타권취부(120b)를 역시 주변 고정부(210)에 임시로 걸려지도록 하여 간단하게 안전망(110)을 펼쳐진 상태로 설치할 수 있도록 하게 된다.Next, the safety wire 110 wound around the other winding portion 120b while being separated from the one-winding mounting portion 120a caught by the fixing portion 210 is completely opened. In this state, the safety net 110 is completely opened and temporarily secured to the surrounding fixing part 210 so that the safety net 110 can be easily installed in an unfolded state.

이와 같이 펼쳐진 안전망(110)에는 장력조절밴드(130)가 부착되어 있으므로 장력조절밴드(130)로부터 연장된 길이연장부(133)에 앞서 살펴본 밴드용버클(140)을 연결하고, 밴드용버클(140)에 설치된 고리형클램프(141)를 역시 주변의 고정부(210)에 연결시키게 된다.Since the safety net 110 is attached to the safety net 110 as described above, it is possible to connect the band buckle 140 as described above to the extension portion 133 extending from the tension adjusting band 130, And the annular clamp 141 installed in the fixing part 140 is also connected to the fixing part 210 around the fixing part.

이에 상기 장력조절밴드(130)를 조절하여 안전망(110)에 부착된 장력조절밴드(130)에 일정한 장력이 도입되도록 함으로서 안전망(110)이 팽팽하게 펼쳐지도록 하게 된다.The tension adjusting band 130 is adjusted so that a certain tensile force is introduced into the tension adjusting band 130 attached to the safety net 110 so that the safety net 110 is unfolded tightly.

이로서 간단하게 본 발명의 낙하 및 추락 방지장치(100)를 주변 구조물(200)에 설치할 수 있음을 알 수 있다.Thus, it can be seen that the falling / falling prevention apparatus 100 of the present invention can be installed in the peripheral structure 200 simply.

이러한 낙하 및 추락 방지장치(100) 설치는 모두 미리 설치된 주변 구조물(200)의 상면에서 이루어지게 되므로 설치에 있어 별도의 가시설이 필요 없고 최소한의 작업자에 의하여 이루어질 수 있게 됨을 알 수 있다.Since the falling and falling prevention apparatus 100 is installed on the upper surface of the pre-installed peripheral structure 200, it is understood that the installation of the falling and falling prevention apparatus 100 is unnecessary and can be performed by a minimum number of operators.

다음으로는 설치된 본 발명의 낙하 및 추락 방지장치(100)의 해체방법을 도 2c를 기준으로 살펴보면 다음과 같다.Next, the disassembling method of the falling and falling prevention apparatus 100 according to the present invention will be described with reference to FIG. 2C.

즉, 주변 구조물(200)의 고정부(210)에 연결된 밴드용버클(140)을 조절하여 장력조절밴드(130)의 도입된 장력을 풀어준 후, 밴드용버클(140)을 길이연장부(133)로부터 분리한 후, 고정부(210)에 걸려지도록 설치된 타권취부(120b)를 분리하여 안전망(110)을 다시 권취시키게 된다.That is, after adjusting the band buckle 140 connected to the fixing portion 210 of the peripheral structure 200 to release the introduced tension of the tension adjusting band 130, the band buckle 140 is extended to the length extending portion The safety net 110 is rewound by separating the second winding portion 120b installed to be hooked on the fixing portion 210. [

이에 최종 안전망(110)이 권취되면 일권취부(120a)를 고정부(210)로부터 분리하여 간단하게 본 발명의 낙하 및 추락 방지장치(100)를 해체하여 재사용이 가능하도록 하게 된다.When the final safety net 110 is wound, the one-piece mounting part 120a is separated from the fixing part 210 so that the falling and falling prevention device 100 of the present invention can be easily disassembled and reused.

물론, 고리형클램프(141)를 포함하는 밴드용버클(140)도 고정부(210)로부터 분리하여 재사용하면 되고, 안전망(110)의 관통홀(111)과 주변 고정부(210)에 연결시킨 연결부재(112)도 설치 후 해체하여 재사용 하면 된다.Of course, the band buckle 140 including the annular clamp 141 may be reused by separating it from the fixing portion 210 and connected to the through hole 111 of the safety net 110 and the peripheral fixing portion 210 The connection member 112 may also be disassembled and reused after installation.

이로서 본 발명에 의한 낙하 및 추락 방지장치(100)는 설치 및 해체가 매우 간단하여 최소한의 작업자에 의한 조작이 가능하며 구조적으로 간단하여 재사용이 용이하여 매우 신속한 이용이 가능하게 됨을 알 수 있으며 재사용이 용이하여 매우 경제적임을 알 수 있다.As a result, it can be seen that the dropping and falling prevention apparatus 100 according to the present invention is very simple to install and dismantle, so that it can be operated by a minimum number of operators, is structurally simple and easy to reuse, It is easy to understand that it is very economical.

[ 본 발명의 낙하 및 추락 방지장치(100)를 이용한 데크설치방법 ][Deck installation method using the fall-down and fall prevention apparatus 100 of the present invention]

도 3은 본 발명의 낙하 및 추락 방지장치(100)의 설치사시도, 도 4a, 도 4b 및 도 4c는 본 발명의 낙하 및 추락 방지장치를 이용한 데크설치 방법의 순서도를 도시한 것이다.FIG. 3 is a perspective view of the falling and falling prevention apparatus 100 of the present invention, and FIGS. 4A, 4B and 4C are flowcharts of a method of installing a deck using the fall and fall prevention apparatus of the present invention.

먼저 도 3에 의하면 본 발명의 낙하 및 추락 방지장치(100)가 주변 구조물(200)로서 교량용 거더(220)에 설치된 상태가 도시되어 있다.3, a state in which the falling / falling prevention apparatus 100 of the present invention is installed as a peripheral structure 200 on a bridge girder 220 is shown.

즉, 예컨대 교량용 거더(220)는 교대, 교각과 같은 교량하부구조에 미리 거치된 상태로 시공되는데 횡방향 상면 사이는 추후 슬래브가 시공되지만 슬래브 시공 이전에는 빈 공간으로서 낙하물이 낙하(작업자 추락 등도 포함)될 수 있는 공간이 된다.That is, for example, the bridge girder 220 is installed in a bridge substructure such as an alternating bridge or bridge bridge in a state where it is preliminarily mounted, and the slab is later installed between the upper surfaces in the transverse direction. However, ).

이에 상기 교량용 거더(220)의 상면에 횡방향으로 본 발명의 낙하 및 추락 방지장치(100)가 연속하여 설치된 상태를 확인할 수 있다.Thus, it can be seen that the fall and fall prevention apparatus 100 of the present invention is installed continuously on the upper surface of the bridge girder 220 in the lateral direction.

즉, 낙하 및 추락 방지장치(100)를 주변 고정부(210, 거더 상면의 돌출된 전단철근)에 고리형클램프(141)와 밴드용버클(140)을 이용하여 거더 상면 사이의 빈 공간이 덮여지도록 설치하고 있음을 알 수 있다.That is, the fall-off and fall prevention apparatus 100 is covered with the hollow space between the upper surface of the girder by using the annular clamp 141 and the band buckle 140 on the peripheral fixing portion 210 (the protruding shear reinforcement on the upper surface of the girder) It can be seen that it is installed so as to be installed.

이러한 낙하 및 추락 방지장치(100)의 연결부위(A2)는 서로 일부 겹쳐지도록 하여 연결부위를 통해 낙하물이 낙하되지 않도록 하게 된다.The connecting portions A2 of the falling and falling prevention apparatus 100 are partially overlapped with each other so that the falling objects do not fall through the connecting portions.

이러한 낙하 및 추락 방지장치(100)를 이용한 교량용 데크 설치방법을 도 4a, 도 4b 및 도 4c를 기준으로 살펴보면 다음과 같다.A method of installing a bridge deck using the fall-down and fall prevention apparatus 100 will be described with reference to FIGS. 4A, 4B and 4C.

주변 구조물(200)로서 교량용 거더(220)를 이용하게 되면 교량용 거더(220) 상면에는 통상 슬래브 거푸집을 별도로 설치하고, 슬래브 거푸집에 슬래브 콘크리트를 타설 및 양생시켜 슬래브를 시공하게 되는데 이럴 경우 슬래브 거푸집 설치가 매우 어려운 경우가 많게 된다.When the bridge girder 220 is used as the peripheral structure 200, the slab form is usually installed separately on the upper surface of the bridge girder 220, and the slab concrete is placed and cured in the slab form to construct the slab. It is often difficult to install the formwork.

이에 본 발명은 교량용 거더(220)의 슬래브 시공을 위한 슬래브 거푸집 역할을 하는 교량용 데크(230)를 이용하여 슬래브 거푸집 및 그 시공을 위한 가시설 설치가 필요 없도록 하게 된다.Thus, the present invention eliminates the need for a slab formwork and provisional installation for its construction by using a bridge deck 230 serving as a slab formwork for constructing a slab of a bridge girder 220.

먼저, 도 4a와 같이 교량하부구조(300)에 거치된 교량용 거더(220)는 횡방향으로 서로 이격되어 거치되어 있음을 알 수 있다.First, it can be seen that the bridge girders 220 mounted on the bridge substructure 300 as shown in FIG. 4A are spaced apart from each other in the transverse direction.

이러한 교량용 거더(220)의 상면에는 돌출된 전단철근과 같은 고정부(210)가 일정간격으로 다수 형성되어 있음을 알 수 있다.It can be seen that a plurality of fixing portions 210 such as protruded shear reinforcing bars are formed on the upper surface of the bridge girder 220 at regular intervals.

이에 도 4b와 같이 앞서 살펴본 낙하 및 추락 방지장치(100) 다수를 구비한 상태에서 1개씩 상기 교량용 거더(220)의 상면 사이에 횡방향으로 설치한 후, 교량용 거더의 길이방향으로 안전망(110)이 펼쳐지도록 설치하게 된다.As shown in FIG. 4B, the bridge girder 220 is horizontally installed between the upper surfaces of the bridge girder 220 in a state of having a plurality of falling and fall prevention apparatuses 100, 110) are unfolded.

역시 이러한 설치는 고리형클램프(141)와 밴드용버클(140)을 이용하여 거더 상면 사이의 공간이 장력이 도입된 안전망으로 덮여지도록 하고, 1개의 낙하 및 추락 방지장치(100)가 설치되면 바로 다른 낙하 및 추락 방지장치(100)를 연속하여 설치하게 된다.Also, in this installation, the space between the upper surfaces of the girders is covered with the safety net into which the tension is introduced by using the annular clamp 141 and the band buckle 140, and when one falling and falling prevention device 100 is installed The other falling and fall prevention apparatuses 100 are continuously installed.

이때 낙하 및 추락 방지장치(100)의 연결부위(A2)를 일부 겹쳐지도록 하여 연결부위에 있어 낙하물이 낙하되지 않도록 하게 된다.At this time, the connecting portion A2 of the falling and falling prevention device 100 is partially overlapped so that the falling object is prevented from dropping at the connecting portion.

이에 교량용 거더(220) 사이의 공간 전체를 본 발명의 낙하 및 추락 방지장치(100)가 설치되도록 하여 일단 낙하 및 추락 방지장치(100)의 설치작업을 완료하게 된다.Thus, the entire space between the bridge girders 220 is installed with the falling and falling prevention apparatus 100 of the present invention, thereby completing the installation work of the fall and fall prevention apparatus 100 once.

다음으로는 도 4c와 같이 설치 완료된 낙하 및 추락 방지장치(100)를 1개씩 해체하면서 바로 인양된 교량용 데크(230)를 빈 공간에 바로 설치하게 된다. 말하자면 낙하 및 추락 방지장치(100)가 해체된 빈 공간을 교량용 데크(230)로 대체하여 낙하물이 발생하지 않도록 한 것이다.Next, as shown in FIG. 4C, the installed bridge decks 100 are disassembled one by one, and immediately the lifted bridge deck 230 is immediately installed in the empty space. That is to say, the falling space where the falling and falling prevention apparatus 100 is disassembled is replaced by the bridge deck 230 so that no falling objects are generated.

이는 본 발명의 낙하 및 추락 방지장치(100)의 해체가 매우 신속하고 간단하게 이루어질 수 있기 때문이며 낙하 및 추락 방지장치(100)의 해체 이후 교량용 데크(230)를 바로 후속작업으로 설치할 수 있기 때문에 교량 시공에 있어 신속성과 공기절감이 가능하게 된다.This is because the dismounting of the falling and falling prevention apparatus 100 of the present invention can be very quick and simple and since the bridge deck 230 can be installed immediately after the dismantling of the falling and falling prevention apparatus 100 It is possible to speed up the construction of the bridge and reduce the air.

이에 미도시 하였지만 설치된 교량용 데크(230) 상면에 슬래브 콘크리트를 타설하여 슬래브 시공을 완성시켜 교량 시공을 완료하게 된다.Although not shown, the slab concrete is placed on the upper surface of the installed bridge deck 230 to complete the slab construction, thereby completing the bridge construction.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.It will be understood by those skilled in the art that the foregoing description of the present invention is for illustrative purposes only and that those of ordinary skill in the art can readily understand that various changes and modifications may be made without departing from the spirit or essential characteristics of the present invention. will be. It is therefore to be understood that the above-described embodiments are illustrative in all aspects and not restrictive. For example, each component described as a single entity may be distributed and implemented, and components described as being distributed may also be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is defined by the appended claims rather than the detailed description and all changes or modifications derived from the meaning and scope of the claims and their equivalents are to be construed as being included within the scope of the present invention do.

100: 낙하 및 추락 방지장치
110: 안전망
111: 관통홀 112: 연결부재
120: 권취부
120a: 일권취부 120b: 타권취부
130: 장력조절밴드
131: 길이방향밴드 132: 횡방향밴드
133: 길이연장부
140: 밴드용버클 141: 고리형클램프
200: 주변 구조물 210: 고정부
220: 교량용 거더 230: 교량용 데크
300: 교량하부구조
100: Drop and fall prevention device
110: Safety net
111: through hole 112: connecting member
120:
120a: One-piece mounting 120b: Two-piece mounting
130: tension adjusting band
131: longitudinal band 132: transverse band
133:
140: band buckle 141: annular clamp
200: peripheral structure 210:
220: girder for bridge 230: deck for bridge
300: Bridge infrastructure

Claims (10)

삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete a) 연장길이에 의하여 이격된 교량용 거더(220) 사이에 횡방향으로 걸쳐지도록 설치되어, 양 단부가 교량용 거더(220) 상면에 걸쳐지도록 하는 걸림부 역할을 하는 관부재인 양 권취부(120); 및 상기 양 권취부 사이에 양단이 연결되도록 하되 일권취부에 권취된 안전망(110);을 포함하는 낙하 및 추락 방지장치(100)의 상기 권치부(120)를 작업자가 교량용 거더(220)의 상면에 길이방향을 따라 형성된 전단철근인 고정부(210)에 임시로 고정시켜, 상기 낙하 및 추락 방지장치(100)를 교량용 거더(220) 상면 사이에 임시로 고정시키는 단계;
(b) 상기 권취된 안전망(110)을 펼쳐지도록 양 권취부(120)를 서로 벌려놓아 교량용 거더(220) 상면 사이의 빈 공간이 안전망(110)으로 덮여지도록 하는 단계; 및
(c) 상기 펼쳐진 안전망(110)에 장력을 도입시켜 교량용 거더(220)에 안전망이 설치되도록 하는 단계를 포함하며,
상기 (c) 단계에서 장력이 도입된 안전망(110)은 밴드용버클(140)에 연결된 길이조정부(133)의 길이를 조절하여 도입된 장력을 풀고, 밴드용버클(140)의 고리형클램프(141)를 교량용 거더(220)의 전단철근인 고정부(210)부터 분리하고, 상기 전단철근인 고정부(210)에 임시로 고정된 권취부(120)를 분리하여, 낙하 및 추락 방지장치(100)를 교량용 거더(220)로부터 해체하여 재사용 가능하도록 하되,
상기 낙하 및 추락 방지장치(100)를 1개씩 해체하면서 교량용 거더(220)의 상면의 빈공간은 교량용 데크(230) 설치작업이 연속되도록 하는 교량용 낙하 및 추락 방지장치 설치방법.
a) a two-piece winding part (220) which is installed so as to horizontally extend between the bridge girders (220) separated by the extension length and which is a tube member serving as a latching part for both ends to span over the upper surface of the bridge girder 120); And a safety net (110) wound around the one-way attaching portion so that both ends are connected between the two-turn take-up portions, wherein the work portion (120) of the fall- Temporarily fixing the fall-down and fall prevention apparatus 100 between the upper surface of the bridge girder 220 by temporarily fixing the bridge 210 to the fixing unit 210, which is a shear reinforcement formed along the longitudinal direction on the upper surface thereof;
(b) opening the two winding sections (120) to spread out the wound safety net (110) so that an empty space between the upper surfaces of the bridge girders (220) is covered with the safety net (110); And
(c) introducing a tension to the unfolded safety net 110 so that a safety net is installed in the bridge girder 220,
The safety net 110 in which the tension is introduced in the step (c) adjusts the length of the length adjusting part 133 connected to the band buckle 140 to loosen the introduced tension and to fix the annular clamp of the band buckle 140 141 is separated from the fixing portion 210 which is the front end reinforcement of the bridge girder 220 and the winding portion 120 temporarily fixed to the fixing portion 210 which is the front end reinforcement is separated, (100) from the bridge girder (220) so as to be reusable,
The method for installing a fall and fall prevention device for a bridge in which an operation for installing a bridge deck (230) is continued in a vacant space on an upper surface of a bridge girder (220) while disassembling the fall and fall prevention apparatuses (100) one by one.
제 7항에 있어서,
상기 (c)단계의 장력은 안전망 외측으로 연장 형성된 길이연장부(133)를 포함하는 장력조절밴드(130)에 밴드용버클(140)을 연결하고,상기 밴드용버클(140)에 장착된 고리형클램프(141)를 교량용 거더(220)의 고정부(210)에 고정시키고,상기 밴드용버클(140)에 연결된 길이조정부(133)의 길이를 조절하여 장력이 도입되도록 하는 교량용 낙하 및 추락 방지장치 설치방법.
8. The method of claim 7,
The tension of step (c) may be obtained by connecting a band buckle 140 to a tension adjusting band 130 including a length extension part 133 extended to the outside of the safety net, Type clamp 141 is fixed to the fixing portion 210 of the bridge girder 220 and the length of the length adjusting portion 133 connected to the band buckle 140 is adjusted to introduce tension, How to install the fall prevention device.
삭제delete 삭제delete
KR1020140088662A 2014-07-14 2014-07-14 Falling object prevention apparatus for bridge construction method therefor KR101556510B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140088662A KR101556510B1 (en) 2014-07-14 2014-07-14 Falling object prevention apparatus for bridge construction method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140088662A KR101556510B1 (en) 2014-07-14 2014-07-14 Falling object prevention apparatus for bridge construction method therefor

Publications (1)

Publication Number Publication Date
KR101556510B1 true KR101556510B1 (en) 2015-10-02

Family

ID=54341562

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140088662A KR101556510B1 (en) 2014-07-14 2014-07-14 Falling object prevention apparatus for bridge construction method therefor

Country Status (1)

Country Link
KR (1) KR101556510B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114575266A (en) * 2022-04-15 2022-06-03 中交二公局第三工程有限公司 Hang basket construction protector

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100653452B1 (en) * 2006-08-24 2006-12-04 허동석 The safety net
KR101377229B1 (en) * 2012-12-20 2014-03-20 (주)포스코 Safety net for protecting from falling onto coilcar pit

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100653452B1 (en) * 2006-08-24 2006-12-04 허동석 The safety net
KR101377229B1 (en) * 2012-12-20 2014-03-20 (주)포스코 Safety net for protecting from falling onto coilcar pit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114575266A (en) * 2022-04-15 2022-06-03 中交二公局第三工程有限公司 Hang basket construction protector
CN114575266B (en) * 2022-04-15 2024-01-30 中交二公局第三工程有限公司 Hanging basket construction protection device

Similar Documents

Publication Publication Date Title
KR100876074B1 (en) Main towers of cable stayed girder bridge and the construction method
US5522472A (en) Fall protection system for bridge construction
US20090188751A1 (en) Fall protection device
US10640993B2 (en) Method for adjustably suspending a structure
KR101275100B1 (en) Prefabricated Handrail
JP2010126959A (en) Retractable scaffold for steel tower for communication antenna
KR101556510B1 (en) Falling object prevention apparatus for bridge construction method therefor
KR102344183B1 (en) A preventing falling apparatus for power pole
US6502663B2 (en) Rebar anchorage system for horizontal lifeline
KR101257779B1 (en) Install device of safety-net for construction
JP5339826B2 (en) Scaffolding for transmission tower
US20170298641A1 (en) Netting Structure
JP2011109780A (en) Device and method for fixing overhead wire ladder
US7726634B2 (en) System and method for tensioning and locking a safety strand
KR101435528B1 (en) Fixing device for construction protective net
JP7448967B2 (en) Floor construction method
JP2004183305A (en) Safety device for roof working and roof break-up method
KR101408781B1 (en) Strut including Lug for mounting wedge and chainblock for drawing strand
JP4372674B2 (en) Dismantling method of ultra-high cylindrical structure
KR20230127480A (en) New concept fly net safety net structure and installation method thereof
KR100381652B1 (en) A guard net for construction
KR100425975B1 (en) An security a railing
KR100667164B1 (en) A Forming Method For PSC Beam in whieh Bars are Laid
KR20070035273A (en) Supporting Frame Of Safety Net For Construction Work
GB2550562A (en) Scaffold

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180919

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20191008

Year of fee payment: 5